[{"data":1,"prerenderedAt":2521},["ShallowReactive",2],{"blog-post-nl-elektrokeuring-afgekeurd":3,"blog-alternates-inspection-failed-what-now":581},{"id":4,"title":5,"articleId":6,"body":7,"category":558,"date":559,"description":560,"extension":561,"lastUpdated":562,"locale":563,"meta":564,"navigation":565,"path":566,"publishDate":559,"readTime":567,"refreshInterval":568,"seo":569,"slug":570,"stem":571,"tags":572,"__hash__":580},"blog\u002Fblog\u002Finspection-failed-what-now.nl.md","Elektrokeuring afgekeurd — wat nu? Stap-voor-stap gids na een negatieve keuring","inspection-failed-what-now",{"type":8,"value":9,"toc":535},"minimark",[10,14,22,25,30,37,42,116,123,127,131,138,142,149,153,160,164,317,321,325,328,341,345,352,356,359,379,386,400,404,411,415,426,430,437,440,454,458,465,491,494,497,502,523],[11,12,5],"h1",{"id":13},"elektrokeuring-afgekeurd-wat-nu-stap-voor-stap-gids-na-een-negatieve-keuring",[15,16,17,21],"p",{},[18,19,20],"strong",{},"Geen paniek."," Zo'n 40 % van alle elektrokeuringen in België valt negatief uit. Een afgekeurde keuring betekent niet dat uw volledige installatie gevaarlijk is — vaak gaat het om formele tekortkomingen of makkelijk op te lossen problemen.",[15,23,24],{},"In deze gids leest u wat er na een negatieve keuring moet gebeuren, welke inbreukcodes er bestaan en hoe u zich voorbereidt op de herkeuring.",[26,27,29],"h2",{"id":28},"wat-gebeurt-er-na-een-negatieve-keuring","Wat gebeurt er na een negatieve keuring?",[15,31,32,33,36],{},"Na de keuring ontvangt u een ",[18,34,35],{},"uitgebreid verslag"," van het keuringsorganisme (bijv. BTV, Vinçotte, AIB). Dit verslag somt alle vastgestelde inbreuken op, elk met een code:",[38,39,41],"h3",{"id":40},"inbreukcodes-begrijpen","Inbreukcodes begrijpen",[43,44,45,64],"table",{},[46,47,48],"thead",{},[49,50,51,55,58,61],"tr",{},[52,53,54],"th",{},"Code",[52,56,57],{},"Ernst",[52,59,60],{},"Betekenis",[52,62,63],{},"Termijn",[65,66,67,84,100],"tbody",{},[49,68,69,75,78,81],{},[70,71,72],"td",{},[18,73,74],{},"C1",[70,76,77],{},"Licht",[70,79,80],{},"Kleine tekortkoming, geen onmiddellijk gevaar",[70,82,83],{},"Oplossen bij eerstvolgende gelegenheid",[49,85,86,91,94,97],{},[70,87,88],{},[18,89,90],{},"C2",[70,92,93],{},"Gemiddeld",[70,95,96],{},"Tekortkoming die op middellange termijn opgelost moet worden",[70,98,99],{},"Moet bij herkeuring opgelost zijn",[49,101,102,107,110,113],{},[70,103,104],{},[18,105,106],{},"C3",[70,108,109],{},"Zwaar",[70,111,112],{},"Ernstig gevaar — onmiddellijk handelen vereist",[70,114,115],{},"Onmiddellijk oplossen",[15,117,118,119,122],{},"Bij C2- en C3-inbreuken is de keuring ",[18,120,121],{},"negatief"," en is een herkeuring vereist. Bij uitsluitend C1-inbreuken kan de keuring alsnog positief zijn.",[26,124,126],{"id":125},"termijnen-per-situatie","Termijnen per situatie",[38,128,130],{"id":129},"bij-verkoop-van-vastgoed","Bij verkoop van vastgoed",[15,132,133,134,137],{},"Wanneer u een woning koopt en de elektrokeuring negatief uitvalt, hebt u als koper een ",[18,135,136],{},"termijn van 18 maanden"," vanaf de aankoopdatum om alle inbreuken te verhelpen en een positieve herkeuring te verkrijgen.",[38,139,141],{"id":140},"bij-nieuwe-installatie","Bij nieuwe installatie",[15,143,144,145,148],{},"Bij een nieuwe elektroinstallatie (nieuwbouw, volledige renovatie) moet de installatie ",[18,146,147],{},"VOOR de ingebruikname"," conform zijn. De netbeheerder (Fluvius, ORES) schakelt de stroom pas in wanneer een positief keuringscertificaat voorligt.",[38,150,152],{"id":151},"bij-periodieke-keuring","Bij periodieke keuring",[15,154,155,156,159],{},"De periodieke keuring (elke 25 jaar voor woningen) geeft bij een negatief resultaat een termijn die in het verslag vermeld wordt — typisch ",[18,157,158],{},"1 jaar"," voor de herkeuring.",[26,161,163],{"id":162},"de-10-meest-voorkomende-redenen-voor-afkeuring","De 10 meest voorkomende redenen voor afkeuring",[43,165,166,182],{},[46,167,168],{},[49,169,170,173,176,179],{},[52,171,172],{},"Nr.",[52,174,175],{},"Tekortkoming",[52,177,178],{},"AREI-artikel",[52,180,181],{},"Frequentie",[65,183,184,198,211,225,238,251,264,277,290,304],{},[49,185,186,189,192,195],{},[70,187,188],{},"1",[70,190,191],{},"Ontbrekend of verkeerd differentieel (30 mA)",[70,193,194],{},"Art. 4.2.4.3",[70,196,197],{},"Zeer frequent",[49,199,200,203,206,209],{},[70,201,202],{},"2",[70,204,205],{},"Ontbrekende of verouderde elektroplannen (documentatieplicht: Art. 9.1.2 Nr. 1 eendraadschema, Art. 9.1.2 Nr. 2 situatieplan)",[70,207,208],{},"Art. 9.1.2 \u002F 3.1.2",[70,210,197],{},[49,212,213,216,219,222],{},[70,214,215],{},"3",[70,217,218],{},"Gebrekkige aarding (aardingsweerstand te hoog: Art. 4.2.4.3b legt 30 Ω als regulatoire drempel vast — bij overschrijding zijn bijkomende differentieelschakelaars met hoge gevoeligheid vereist; algemene formule: R_A × I∆n ≤ 50 V)",[70,220,221],{},"Art. 4.2.4.3b",[70,223,224],{},"Frequent",[49,226,227,230,233,236],{},[70,228,229],{},"4",[70,231,232],{},"Ontbrekende etikettering van stroomkringen",[70,234,235],{},"Art. 6.4.6",[70,237,224],{},[49,239,240,243,246,249],{},[70,241,242],{},"5",[70,244,245],{},"Kabels zonder beschermbuis\u002Fkabelgoot (XVB-kabels mogen opbouw zonder beschermbuis worden gelegd. VOB-aders moeten altijd in beschermbuizen worden gelegd)",[70,247,248],{},"Art. 5.2.1.5",[70,250,224],{},[49,252,253,256,259,262],{},[70,254,255],{},"6",[70,257,258],{},"Badkamerzones niet gerespecteerd",[70,260,261],{},"Art. 7.1",[70,263,93],{},[49,265,266,269,272,275],{},[70,267,268],{},"7",[70,270,271],{},"Ontbrekende hoofdschakelaar (of \u003C40A)",[70,273,274],{},"Art. 5.3.5.1b",[70,276,93],{},[49,278,279,282,285,288],{},[70,280,281],{},"8",[70,283,284],{},"Zekering te groot voor de kabeldoorsnede",[70,286,287],{},"Art. 4.4.3.2",[70,289,93],{},[49,291,292,295,298,301],{},[70,293,294],{},"9",[70,296,297],{},"Ontbrekende SPD bij nieuwe installatie",[70,299,300],{},"Art. 4.5.1",[70,302,303],{},"Bij nieuwbouw",[49,305,306,309,312,315],{},[70,307,308],{},"10",[70,310,311],{},"Ontbrekende rookmelders op het situatieplan (rookmelders zijn geen AREI-vereiste in strikte zin, maar een bouwrechtelijke\u002Fwoonrechtelijke verplichting — regionaal: Vlaanderen, Wallonië, Brussel. De afwezigheid kan als opmerking in het keuringsverslag worden vermeld)",[70,313,314],{},"Regionaal",[70,316,224],{},[26,318,320],{"id":319},"stap-voor-stap-na-de-negatieve-keuring","Stap voor stap: na de negatieve keuring",[38,322,324],{"id":323},"stap-1-verslag-zorgvuldig-lezen","Stap 1: Verslag zorgvuldig lezen",[15,326,327],{},"Ga elke inbreuk apart door. Noteer:",[329,330,331,335,338],"ul",{},[332,333,334],"li",{},"Welke code (C1\u002FC2\u002FC3)?",[332,336,337],{},"Waar is het probleem precies (kamer, stroomkring)?",[332,339,340],{},"Wat wordt er precies betwist?",[38,342,344],{"id":343},"stap-2-prioriteiten-stellen","Stap 2: Prioriteiten stellen",[15,346,347,348,351],{},"Begin met de ",[18,349,350],{},"C3-inbreuken"," (zwaar) — deze vormen een onmiddellijk gevaar. Daarna de C2-inbreuken. C1-inbreuken kunnen parallel of later opgelost worden.",[38,353,355],{"id":354},"stap-3-vakman-of-zelf","Stap 3: Vakman of zelf?",[15,357,358],{},"Veel tekortkomingen kunt u zelf oplossen:",[329,360,361,367,373],{},[332,362,363,366],{},[18,364,365],{},"Etikettering aanbrengen"," — zekeringen in de verdeelkast labelen",[332,368,369,372],{},[18,370,371],{},"Situatieplan bijwerken"," — met PlanElec maken",[332,374,375,378],{},[18,376,377],{},"Rookmelders installeren"," — eenvoudig aan het plafond monteren",[15,380,381,382,385],{},"Voor andere tekortkomingen hebt u een ",[18,383,384],{},"elektricien"," nodig:",[329,387,388,391,394,397],{},[332,389,390],{},"Differentieel bijplaatsen of vervangen",[332,392,393],{},"Aarding verbeteren",[332,395,396],{},"Kabels in beschermbuizen leggen",[332,398,399],{},"Hoofdschakelaar installeren",[38,401,403],{"id":402},"stap-4-plannen-bijwerken","Stap 4: Plannen bijwerken",[15,405,406,407,410],{},"Een van de meest voorkomende tekortkomingen is een ontbrekend of verouderd eendraadschema en situatieplan. Deze moeten ",[18,408,409],{},"de huidige toestand"," van de installatie weerspiegelen — niet de toestand van 20 jaar geleden.",[38,412,414],{"id":413},"stap-5-herkeuring-afspreken","Stap 5: Herkeuring afspreken",[15,416,417,418,421,422,425],{},"Aanbevolen wordt de herkeuring bij ",[18,419,420],{},"hetzelfde keuringsorganisme"," dat de oorspronkelijke keuring heeft uitgevoerd — de eigenaar kan echter ook een ander geaccrediteerd controleorganisme inschakelen. Bij de herkeuring worden ",[18,423,424],{},"enkel de betwiste punten"," opnieuw gecontroleerd — niet de volledige installatie.",[26,427,429],{"id":428},"kosten-van-de-herkeuring","Kosten van de herkeuring",[15,431,432,433,436],{},"De kosten voor een herkeuring liggen typisch tussen ",[18,434,435],{},"€80 en €120",", afhankelijk van het keuringsorganisme en het aantal te controleren punten. Dit is doorgaans goedkoper dan de eerste keuring.",[15,438,439],{},"Daarnaast zijn er kosten voor het verhelpen van de tekortkomingen:",[329,441,442,445,448,451],{},[332,443,444],{},"Differentieel bijplaatsen: €100-200 (materiaal + arbeid)",[332,446,447],{},"Aarding verbeteren: €200-500",[332,449,450],{},"Plannen laten maken: €150-400 (of gratis met PlanElec)",[332,452,453],{},"Hoofdschakelaar installeren: €80-150",[26,455,457],{"id":456},"hoe-planelec-helpt","Hoe PlanElec helpt",[15,459,460,461,464],{},"PlanElec kan veel van de meest voorkomende afkeuringsredenen ",[18,462,463],{},"VOOR de keuring"," detecteren:",[329,466,467,473,479,485],{},[332,468,469,472],{},[18,470,471],{},"Validatie"," controleert automatisch op ontbrekende differentielen, verkeerde beveiliging en meer",[332,474,475,478],{},[18,476,477],{},"Eendraadschema"," wordt AREI-conform gegenereerd — een van de meest voorkomende tekortkomingen vervalt",[332,480,481,484],{},[18,482,483],{},"Situatieplan"," met correcte AREI-symbolen",[332,486,487,490],{},[18,488,489],{},"Etikettering"," van alle stroomkringen wordt automatisch in het schema gedocumenteerd",[15,492,493],{},"Zo kunt u typische fouten vermijden voordat de keurder langskomt.",[495,496],"hr",{},[15,498,499],{},[18,500,501],{},"Gerelateerde artikelen:",[329,503,504,511,517],{},[332,505,506],{},[507,508,510],"a",{"href":509},"\u002Fblog\u002F10-meest-voorkomende-arei-overtredingen","De 10 meest voorkomende AREI-overtredingen",[332,512,513],{},[507,514,516],{"href":515},"\u002Fblog\u002F30ma-differentieel","30 mA differentieel: Wanneer is het verplicht?",[332,518,519],{},[507,520,522],{"href":521},"\u002Fblog\u002Fkabeldoorsnede-zekering","Kabeldoorsnede en zekering: De juiste combinatie",[15,524,525,528,529],{},[18,526,527],{},"Bereid u optimaal voor op de elektrokeuring — met PlanElec maakt u AREI-conforme plannen en detecteert u tekortkomingen vroegtijdig."," ",[507,530,534],{"href":531,"rel":532},"https:\u002F\u002Fplanelec.be",[533],"nofollow","Nu starten →",{"title":536,"searchDepth":537,"depth":537,"links":538},"",2,[539,543,548,549,556,557],{"id":28,"depth":537,"text":29,"children":540},[541],{"id":40,"depth":542,"text":41},3,{"id":125,"depth":537,"text":126,"children":544},[545,546,547],{"id":129,"depth":542,"text":130},{"id":140,"depth":542,"text":141},{"id":151,"depth":542,"text":152},{"id":162,"depth":537,"text":163},{"id":319,"depth":537,"text":320,"children":550},[551,552,553,554,555],{"id":323,"depth":542,"text":324},{"id":343,"depth":542,"text":344},{"id":354,"depth":542,"text":355},{"id":402,"depth":542,"text":403},{"id":413,"depth":542,"text":414},{"id":428,"depth":537,"text":429},{"id":456,"depth":537,"text":457},"guide","2026-06-16","Is uw elektrokeuring negatief? Geen paniek — zo'n 40 % valt door. Hier leest u wat de inbreukcodes betekenen, hoe u de problemen oplost en wat de herkeuring kost.","md","2026-06-05","nl",{},true,"\u002Fblog\u002Finspection-failed-what-now.nl","6 min",12,{"title":5,"description":560},"elektrokeuring-afgekeurd","blog\u002Finspection-failed-what-now.nl",[573,574,575,576,577,578,579],"keuring","elektrokeuring","afgekeurd","inbreuken","herkeuring","arei","belgie","AvfkBd5ZL8n277EoU-HGxP7IRkC1s9VPy2e_hLYSbDk",[582,1104,1623,2148],{"id":583,"title":584,"articleId":6,"body":585,"category":558,"date":559,"description":1090,"extension":561,"lastUpdated":562,"locale":1091,"meta":1092,"navigation":565,"path":1093,"publishDate":559,"readTime":567,"refreshInterval":568,"seo":1094,"slug":1095,"stem":1096,"tags":1097,"__hash__":1103},"blog\u002Fblog\u002Finspection-failed-what-now.de.md","Elektrokontrolle durchgefallen — was nun? Schritt-für-Schritt-Anleitung nach einer negativen Elektrokontrolle",{"type":8,"value":586,"toc":1070},[587,590,596,599,603,610,614,678,685,689,693,700,704,711,715,722,726,859,863,867,870,881,885,892,896,899,919,926,940,944,951,955,966,970,977,980,994,998,1005,1031,1034,1036,1041,1061],[11,588,584],{"id":589},"elektrokontrolle-durchgefallen-was-nun-schritt-für-schritt-anleitung-nach-einer-negativen-elektrokontrolle",[15,591,592,595],{},[18,593,594],{},"Keine Panik."," Rund 40 % aller Elektrokontrollen (Keuringen) in Belgien fallen negativ aus. Eine durchgefallene Kontrolle bedeutet nicht, dass Ihre gesamte Installation gefährlich ist — oft sind es formelle Mängel oder leicht behebbare Probleme.",[15,597,598],{},"In diesem Guide erfahren Sie, was nach einer negativen Kontrolle zu tun ist, welche Mängelcodes es gibt und wie Sie sich auf die Nachkontrolle vorbereiten.",[26,600,602],{"id":601},"was-passiert-nach-einer-negativen-kontrolle","Was passiert nach einer negativen Kontrolle?",[15,604,605,606,609],{},"Nach der Kontrolle erhalten Sie einen ",[18,607,608],{},"ausführlichen Bericht"," des Kontrollorganismus (z. B. BTV, Vinçotte, AIB). Dieser Bericht listet alle festgestellten Mängel auf, jeweils mit einem Code:",[38,611,613],{"id":612},"mängelcodes-verstehen","Mängelcodes verstehen",[43,615,616,631],{},[46,617,618],{},[49,619,620,622,625,628],{},[52,621,54],{},[52,623,624],{},"Schweregrad",[52,626,627],{},"Bedeutung",[52,629,630],{},"Frist",[65,632,633,648,663],{},[49,634,635,639,642,645],{},[70,636,637],{},[18,638,74],{},[70,640,641],{},"Leicht",[70,643,644],{},"Geringfügiger Mangel, keine unmittelbare Gefahr",[70,646,647],{},"Beheben bei nächster Gelegenheit",[49,649,650,654,657,660],{},[70,651,652],{},[18,653,90],{},[70,655,656],{},"Mittel",[70,658,659],{},"Mangel, der mittelfristig behoben werden muss",[70,661,662],{},"Muss bei Nachkontrolle behoben sein",[49,664,665,669,672,675],{},[70,666,667],{},[18,668,106],{},[70,670,671],{},"Schwer",[70,673,674],{},"Ernste Gefahr — sofortiges Handeln erforderlich",[70,676,677],{},"Sofort beheben",[15,679,680,681,684],{},"Bei C2- und C3-Mängeln ist die Kontrolle ",[18,682,683],{},"negativ"," und eine Nachkontrolle ist erforderlich. Bei ausschließlich C1-Mängeln kann die Kontrolle trotzdem positiv ausfallen.",[26,686,688],{"id":687},"fristen-je-nach-situation","Fristen je nach Situation",[38,690,692],{"id":691},"bei-immobilienverkauf","Bei Immobilienverkauf",[15,694,695,696,699],{},"Wenn Sie eine Immobilie kaufen und die Elektrokontrolle negativ ausfällt, haben Sie als Käufer eine ",[18,697,698],{},"Frist von 18 Monaten"," ab dem Kaufdatum, um alle Mängel zu beheben und eine positive Nachkontrolle zu erhalten.",[38,701,703],{"id":702},"bei-neuinstallation","Bei Neuinstallation",[15,705,706,707,710],{},"Bei einer neuen Elektroinstallation (Neubau, komplette Renovierung) muss die Installation ",[18,708,709],{},"VOR der Inbetriebnahme"," konform sein. Der Netzbetreiber (Fluvius, ORES) schaltet den Strom erst frei, wenn ein positives Kontrollzertifikat vorliegt.",[38,712,714],{"id":713},"bei-periodischer-kontrolle","Bei periodischer Kontrolle",[15,716,717,718,721],{},"Die periodische Kontrolle (alle 25 Jahre für Wohnungen) ergibt bei negativem Ergebnis eine Frist, die im Bericht angegeben wird — typischerweise ",[18,719,720],{},"1 Jahr"," für die Nachkontrolle.",[26,723,725],{"id":724},"die-10-häufigsten-durchfallgründe","Die 10 häufigsten Durchfallgründe",[43,727,728,743],{},[46,729,730],{},[49,731,732,734,737,740],{},[52,733,172],{},[52,735,736],{},"Mangel",[52,738,739],{},"AREI-Artikel",[52,741,742],{},"Häufigkeit",[65,744,745,757,768,780,791,802,813,824,835,847],{},[49,746,747,749,752,754],{},[70,748,188],{},[70,750,751],{},"Fehlender oder falscher FI-Schutzschalter (30 mA)",[70,753,194],{},[70,755,756],{},"Sehr häufig",[49,758,759,761,764,766],{},[70,760,202],{},[70,762,763],{},"Fehlende oder veraltete Elektropläne (Dokumentationspflicht: Art. 9.1.2 Nr. 1 Eindrahtschema, Art. 9.1.2 Nr. 2 Situationsplan)",[70,765,208],{},[70,767,756],{},[49,769,770,772,775,777],{},[70,771,215],{},[70,773,774],{},"Fehlerhafte Erdung (Erdungswiderstand zu hoch: Art. 4.2.4.3b legt 30 Ω als regulatorische Schwelle fest — bei Überschreitung sind zusätzliche Differenzstrom-Schutzeinrichtungen mit hoher Empfindlichkeit vorgeschrieben; allgemeine Formel: R_A × I∆n ≤ 50 V)",[70,776,221],{},[70,778,779],{},"Häufig",[49,781,782,784,787,789],{},[70,783,229],{},[70,785,786],{},"Fehlende Beschriftung der Stromkreise",[70,788,235],{},[70,790,779],{},[49,792,793,795,798,800],{},[70,794,242],{},[70,796,797],{},"Kabel ohne Schutzrohr\u002FKabelkanal (XVB-Kabel dürfen auf Putz ohne Schutzrohr verlegt werden. VOB-Einzeladern müssen immer in Schutzrohren verlegt werden)",[70,799,248],{},[70,801,779],{},[49,803,804,806,809,811],{},[70,805,255],{},[70,807,808],{},"Badezimmer-Zonen missachtet",[70,810,261],{},[70,812,656],{},[49,814,815,817,820,822],{},[70,816,268],{},[70,818,819],{},"Fehlender Hauptschalter (oder \u003C40A)",[70,821,274],{},[70,823,656],{},[49,825,826,828,831,833],{},[70,827,281],{},[70,829,830],{},"Sicherung zu groß für den Kabelquerschnitt",[70,832,287],{},[70,834,656],{},[49,836,837,839,842,844],{},[70,838,294],{},[70,840,841],{},"Fehlender SPD bei Neuinstallation",[70,843,300],{},[70,845,846],{},"Bei Neubauten",[49,848,849,851,854,857],{},[70,850,308],{},[70,852,853],{},"Fehlende Rauchmelder auf dem Situationsplan (Rauchmelder sind keine AREI-Anforderung im engeren Sinne, sondern eine baurechtliche\u002Fwohnrechtliche Vorschrift — regional: Flandern, Wallonien, Brüssel. Das Fehlen kann als Anmerkung im Prüfbericht vermerkt werden)",[70,855,856],{},"Regional",[70,858,779],{},[26,860,862],{"id":861},"schritt-für-schritt-nach-der-negativen-kontrolle","Schritt-für-Schritt: Nach der negativen Kontrolle",[38,864,866],{"id":865},"schritt-1-bericht-sorgfältig-lesen","Schritt 1: Bericht sorgfältig lesen",[15,868,869],{},"Gehen Sie jeden Mangel einzeln durch. Notieren Sie sich:",[329,871,872,875,878],{},[332,873,874],{},"Welcher Code (C1\u002FC2\u002FC3)?",[332,876,877],{},"Wo genau ist das Problem (Raum, Stromkreis)?",[332,879,880],{},"Was genau wird bemängelt?",[38,882,884],{"id":883},"schritt-2-prioritäten-setzen","Schritt 2: Prioritäten setzen",[15,886,887,888,891],{},"Beginnen Sie mit den ",[18,889,890],{},"C3-Mängeln"," (schwer) — diese stellen eine unmittelbare Gefahr dar. Dann die C2-Mängel. C1-Mängel können parallel oder später behoben werden.",[38,893,895],{"id":894},"schritt-3-fachmann-oder-selbst","Schritt 3: Fachmann oder Selbst?",[15,897,898],{},"Viele Mängel können Sie selbst beheben:",[329,900,901,907,913],{},[332,902,903,906],{},[18,904,905],{},"Beschriftung anbringen"," — Sicherungen im Verteiler beschriften",[332,908,909,912],{},[18,910,911],{},"Situationsplan aktualisieren"," — mit PlanElec erstellen",[332,914,915,918],{},[18,916,917],{},"Rauchmelder installieren"," — einfach an der Decke montieren",[15,920,921,922,925],{},"Für andere Mängel brauchen Sie einen ",[18,923,924],{},"Elektriker",":",[329,927,928,931,934,937],{},[332,929,930],{},"FI-Schalter nachrüsten oder tauschen",[332,932,933],{},"Erdung verbessern",[332,935,936],{},"Kabel in Schutzrohre verlegen",[332,938,939],{},"Hauptschalter installieren",[38,941,943],{"id":942},"schritt-4-pläne-aktualisieren","Schritt 4: Pläne aktualisieren",[15,945,946,947,950],{},"Einer der häufigsten Mängel ist ein fehlendes oder veraltetes Eindrahtschema und Situationsplan. Diese müssen ",[18,948,949],{},"den aktuellen Zustand"," der Installation widerspiegeln — nicht den Zustand von vor 20 Jahren.",[38,952,954],{"id":953},"schritt-5-nachkontrolle-vereinbaren","Schritt 5: Nachkontrolle vereinbaren",[15,956,957,958,961,962,965],{},"Empfohlen wird die Nachkontrolle beim ",[18,959,960],{},"selben Kontrollorganismus",", der die ursprüngliche Kontrolle durchgeführt hat — der Eigentümer kann aber auch einen anderen akkreditierten Kontrollorganismus beauftragen. Bei der Nachkontrolle werden ",[18,963,964],{},"nur die beanstandeten Punkte"," erneut geprüft — nicht die gesamte Installation.",[26,967,969],{"id":968},"kosten-der-nachkontrolle","Kosten der Nachkontrolle",[15,971,972,973,976],{},"Die Kosten für eine Nachkontrolle liegen typischerweise zwischen ",[18,974,975],{},"€80 und €120",", abhängig vom Kontrollorganismus und der Anzahl der zu prüfenden Punkte. Das ist in der Regel günstiger als die Erstkontrolle.",[15,978,979],{},"Zusätzlich fallen Kosten für die Mängelbehebung an:",[329,981,982,985,988,991],{},[332,983,984],{},"FI-Schalter nachrüsten: €100-200 (Material + Arbeit)",[332,986,987],{},"Erdung verbessern: €200-500",[332,989,990],{},"Pläne erstellen lassen: €150-400 (oder kostenlos mit PlanElec)",[332,992,993],{},"Hauptschalter installieren: €80-150",[26,995,997],{"id":996},"wie-planelec-hilft","Wie PlanElec hilft",[15,999,1000,1001,1004],{},"PlanElec kann viele der häufigsten Durchfallgründe ",[18,1002,1003],{},"VOR der Kontrolle"," erkennen:",[329,1006,1007,1013,1019,1025],{},[332,1008,1009,1012],{},[18,1010,1011],{},"Validierung"," prüft automatisch auf fehlende FI-Schalter, falsche Absicherung und mehr",[332,1014,1015,1018],{},[18,1016,1017],{},"Eindrahtschema"," wird AREI-konform generiert — einer der häufigsten Mängelgründe entfällt",[332,1020,1021,1024],{},[18,1022,1023],{},"Situationsplan"," mit korrekten AREI-Symbolen",[332,1026,1027,1030],{},[18,1028,1029],{},"Beschriftung"," aller Stromkreise wird automatisch im Schema dokumentiert",[15,1032,1033],{},"So können Sie typische Fehler vermeiden, bevor der Kontrolleur kommt.",[495,1035],{},[15,1037,1038],{},[18,1039,1040],{},"Verwandte Artikel:",[329,1042,1043,1049,1055],{},[332,1044,1045],{},[507,1046,1048],{"href":1047},"\u002Fde\u002Fblog\u002F10-haeufigste-arei-verstoesse","Die 10 häufigsten AREI-Verstöße",[332,1050,1051],{},[507,1052,1054],{"href":1053},"\u002Fde\u002Fblog\u002F30ma-fi-schutzschalter","30 mA FI-Schutzschalter: Wann ist er Pflicht?",[332,1056,1057],{},[507,1058,1060],{"href":1059},"\u002Fde\u002Fblog\u002Fkabelquerschnitt-sicherung","Kabelquerschnitt und Sicherung: Die richtige Kombination",[15,1062,1063,528,1066],{},[18,1064,1065],{},"Bereiten Sie sich optimal auf die Elektrokontrolle vor — mit PlanElec erstellen Sie AREI-konforme Pläne und erkennen Mängel frühzeitig.",[507,1067,1069],{"href":531,"rel":1068},[533],"Jetzt starten →",{"title":536,"searchDepth":537,"depth":537,"links":1071},[1072,1075,1080,1081,1088,1089],{"id":601,"depth":537,"text":602,"children":1073},[1074],{"id":612,"depth":542,"text":613},{"id":687,"depth":537,"text":688,"children":1076},[1077,1078,1079],{"id":691,"depth":542,"text":692},{"id":702,"depth":542,"text":703},{"id":713,"depth":542,"text":714},{"id":724,"depth":537,"text":725},{"id":861,"depth":537,"text":862,"children":1082},[1083,1084,1085,1086,1087],{"id":865,"depth":542,"text":866},{"id":883,"depth":542,"text":884},{"id":894,"depth":542,"text":895},{"id":942,"depth":542,"text":943},{"id":953,"depth":542,"text":954},{"id":968,"depth":537,"text":969},{"id":996,"depth":537,"text":997},"Ihre Elektrokontrolle (Keuring) ist negativ ausgefallen? Keine Panik — rund 40 % fallen durch. Hier erfahren Sie, was die Mängelcodes bedeuten, wie Sie die Probleme beheben und was die Nachkontrolle kostet.","de",{},"\u002Fblog\u002Finspection-failed-what-now.de",{"title":584,"description":1090},"stromabnahme-durchgefallen","blog\u002Finspection-failed-what-now.de",[573,1098,1099,1100,1101,578,1102],"elektrokontrolle","durchgefallen","mängel","nachkontrolle","belgien","eQYj0zplQWit_toCkyHomonhbq0_axSbESVo1rdvCos",{"id":1105,"title":1106,"articleId":6,"body":1107,"category":558,"date":559,"description":1609,"extension":561,"lastUpdated":562,"locale":1610,"meta":1611,"navigation":565,"path":1612,"publishDate":559,"readTime":567,"refreshInterval":568,"seo":1613,"slug":6,"stem":1614,"tags":1615,"__hash__":1622},"blog\u002Fblog\u002Finspection-failed-what-now.en.md","Electrical Inspection Failed — What Now? Step-by-Step Guide After a Negative Inspection",{"type":8,"value":1108,"toc":1589},[1109,1112,1118,1121,1125,1132,1136,1200,1207,1211,1215,1222,1226,1233,1237,1244,1248,1380,1384,1388,1391,1402,1406,1413,1417,1420,1440,1446,1460,1464,1471,1475,1486,1490,1497,1500,1514,1518,1524,1550,1553,1555,1560,1580],[11,1110,1106],{"id":1111},"electrical-inspection-failed-what-now-step-by-step-guide-after-a-negative-inspection",[15,1113,1114,1117],{},[18,1115,1116],{},"Don't panic."," Around 40% of all electrical inspections (keuringen) in Belgium come back negative. A failed inspection doesn't mean your entire installation is dangerous — it's often formal deficiencies or easily fixable problems.",[15,1119,1120],{},"In this guide, you'll learn what to do after a negative inspection, what the deficiency codes mean and how to prepare for the re-inspection.",[26,1122,1124],{"id":1123},"what-happens-after-a-negative-inspection","What Happens After a Negative Inspection?",[15,1126,1127,1128,1131],{},"After the inspection, you receive a ",[18,1129,1130],{},"detailed report"," from the inspection body (e.g. BTV, Vinçotte, AIB). This report lists all identified deficiencies, each with a code:",[38,1133,1135],{"id":1134},"understanding-deficiency-codes","Understanding Deficiency Codes",[43,1137,1138,1153],{},[46,1139,1140],{},[49,1141,1142,1144,1147,1150],{},[52,1143,54],{},[52,1145,1146],{},"Severity",[52,1148,1149],{},"Meaning",[52,1151,1152],{},"Deadline",[65,1154,1155,1170,1185],{},[49,1156,1157,1161,1164,1167],{},[70,1158,1159],{},[18,1160,74],{},[70,1162,1163],{},"Minor",[70,1165,1166],{},"Minor deficiency, no immediate danger",[70,1168,1169],{},"Fix at the next opportunity",[49,1171,1172,1176,1179,1182],{},[70,1173,1174],{},[18,1175,90],{},[70,1177,1178],{},"Medium",[70,1180,1181],{},"Deficiency that must be fixed in the medium term",[70,1183,1184],{},"Must be resolved by re-inspection",[49,1186,1187,1191,1194,1197],{},[70,1188,1189],{},[18,1190,106],{},[70,1192,1193],{},"Severe",[70,1195,1196],{},"Serious danger — immediate action required",[70,1198,1199],{},"Fix immediately",[15,1201,1202,1203,1206],{},"With C2 and C3 deficiencies, the inspection is ",[18,1204,1205],{},"negative"," and a re-inspection is required. With only C1 deficiencies, the inspection may still be positive.",[26,1208,1210],{"id":1209},"deadlines-by-situation","Deadlines by Situation",[38,1212,1214],{"id":1213},"property-sale","Property Sale",[15,1216,1217,1218,1221],{},"If you are buying a property and the electrical inspection is negative, you as the buyer have an ",[18,1219,1220],{},"18-month deadline"," from the purchase date to fix all deficiencies and obtain a positive re-inspection.",[38,1223,1225],{"id":1224},"new-installation","New Installation",[15,1227,1228,1229,1232],{},"For a new electrical installation (new build, complete renovation), the installation must be compliant ",[18,1230,1231],{},"BEFORE commissioning",". The grid operator (Fluvius, ORES) only activates the power supply when a positive inspection certificate is presented.",[38,1234,1236],{"id":1235},"periodic-inspection","Periodic Inspection",[15,1238,1239,1240,1243],{},"The periodic inspection (every 25 years for residential properties) gives a deadline stated in the report in case of a negative result — typically ",[18,1241,1242],{},"1 year"," for the re-inspection.",[26,1245,1247],{"id":1246},"top-10-reasons-for-failure","Top 10 Reasons for Failure",[43,1249,1250,1266],{},[46,1251,1252],{},[49,1253,1254,1257,1260,1263],{},[52,1255,1256],{},"No.",[52,1258,1259],{},"Deficiency",[52,1261,1262],{},"AREI Article",[52,1264,1265],{},"Frequency",[65,1267,1268,1280,1291,1302,1313,1324,1335,1346,1357,1369],{},[49,1269,1270,1272,1275,1277],{},[70,1271,188],{},[70,1273,1274],{},"Missing or incorrect RCD (30 mA)",[70,1276,194],{},[70,1278,1279],{},"Very frequent",[49,1281,1282,1284,1287,1289],{},[70,1283,202],{},[70,1285,1286],{},"Missing or outdated electrical plans (documentation requirement: Art. 9.1.2 Nr. 1 single-line diagram, Art. 9.1.2 Nr. 2 situation plan)",[70,1288,208],{},[70,1290,1279],{},[49,1292,1293,1295,1298,1300],{},[70,1294,215],{},[70,1296,1297],{},"Faulty earthing (earth resistance too high: Art. 4.2.4.3b sets 30 Ohm as the regulatory threshold — if exceeded, additional high-sensitivity residual-current devices are required; general formula: R_A x I_delta_n \u003C= 50 V)",[70,1299,221],{},[70,1301,224],{},[49,1303,1304,1306,1309,1311],{},[70,1305,229],{},[70,1307,1308],{},"Missing labelling of circuits",[70,1310,235],{},[70,1312,224],{},[49,1314,1315,1317,1320,1322],{},[70,1316,242],{},[70,1318,1319],{},"Cables without protective conduit (XVB cables may be surface-mounted without conduit. VOB single-core wires must always be routed in conduit)",[70,1321,248],{},[70,1323,224],{},[49,1325,1326,1328,1331,1333],{},[70,1327,255],{},[70,1329,1330],{},"Bathroom zones not respected",[70,1332,261],{},[70,1334,1178],{},[49,1336,1337,1339,1342,1344],{},[70,1338,268],{},[70,1340,1341],{},"Missing main switch (or \u003C40A)",[70,1343,274],{},[70,1345,1178],{},[49,1347,1348,1350,1353,1355],{},[70,1349,281],{},[70,1351,1352],{},"Breaker too large for cable cross-section",[70,1354,287],{},[70,1356,1178],{},[49,1358,1359,1361,1364,1366],{},[70,1360,294],{},[70,1362,1363],{},"Missing SPD for new installation",[70,1365,300],{},[70,1367,1368],{},"New builds",[49,1370,1371,1373,1376,1378],{},[70,1372,308],{},[70,1374,1375],{},"Missing smoke detectors on situation plan (smoke detectors are not an AREI requirement per se, but a building\u002Fhousing regulation — regional: Flanders, Wallonia, Brussels. Their absence may be noted as a remark in the inspection report)",[70,1377,856],{},[70,1379,224],{},[26,1381,1383],{"id":1382},"step-by-step-after-the-negative-inspection","Step by Step: After the Negative Inspection",[38,1385,1387],{"id":1386},"step-1-read-the-report-carefully","Step 1: Read the Report Carefully",[15,1389,1390],{},"Go through each deficiency individually. Note down:",[329,1392,1393,1396,1399],{},[332,1394,1395],{},"Which code (C1\u002FC2\u002FC3)?",[332,1397,1398],{},"Where exactly is the problem (room, circuit)?",[332,1400,1401],{},"What exactly is the complaint?",[38,1403,1405],{"id":1404},"step-2-set-priorities","Step 2: Set Priorities",[15,1407,1408,1409,1412],{},"Start with the ",[18,1410,1411],{},"C3 deficiencies"," (severe) — these represent immediate danger. Then the C2 deficiencies. C1 deficiencies can be addressed in parallel or later.",[38,1414,1416],{"id":1415},"step-3-professional-or-diy","Step 3: Professional or DIY?",[15,1418,1419],{},"Many deficiencies can be fixed yourself:",[329,1421,1422,1428,1434],{},[332,1423,1424,1427],{},[18,1425,1426],{},"Apply labelling"," — label the circuit breakers in the distribution board",[332,1429,1430,1433],{},[18,1431,1432],{},"Update the situation plan"," — create with PlanElec",[332,1435,1436,1439],{},[18,1437,1438],{},"Install smoke detectors"," — simple ceiling mounting",[15,1441,1442,1443,925],{},"For other deficiencies, you need an ",[18,1444,1445],{},"electrician",[329,1447,1448,1451,1454,1457],{},[332,1449,1450],{},"Retrofit or replace RCDs",[332,1452,1453],{},"Improve earthing",[332,1455,1456],{},"Route cables through protective conduit",[332,1458,1459],{},"Install the main switch",[38,1461,1463],{"id":1462},"step-4-update-plans","Step 4: Update Plans",[15,1465,1466,1467,1470],{},"One of the most common deficiencies is a missing or outdated single-line diagram and situation plan. These must reflect the ",[18,1468,1469],{},"current state"," of the installation — not the state from 20 years ago.",[38,1472,1474],{"id":1473},"step-5-schedule-the-re-inspection","Step 5: Schedule the Re-Inspection",[15,1476,1477,1478,1481,1482,1485],{},"It is recommended to schedule the re-inspection with the ",[18,1479,1480],{},"same inspection body"," that carried out the original inspection — however, the owner may also engage a different accredited inspection body. During the re-inspection, ",[18,1483,1484],{},"only the contested points"," are re-examined — not the entire installation.",[26,1487,1489],{"id":1488},"cost-of-re-inspection","Cost of Re-Inspection",[15,1491,1492,1493,1496],{},"The cost of a re-inspection typically ranges between ",[18,1494,1495],{},"EUR 80 and EUR 120",", depending on the inspection body and the number of points to be checked. This is generally cheaper than the initial inspection.",[15,1498,1499],{},"Additionally, there are costs for fixing the deficiencies:",[329,1501,1502,1505,1508,1511],{},[332,1503,1504],{},"Retrofitting an RCD: EUR 100-200 (material + labour)",[332,1506,1507],{},"Improving earthing: EUR 200-500",[332,1509,1510],{},"Having plans created: EUR 150-400 (or free with PlanElec)",[332,1512,1513],{},"Installing a main switch: EUR 80-150",[26,1515,1517],{"id":1516},"how-planelec-helps","How PlanElec Helps",[15,1519,1520,1521,925],{},"PlanElec can detect many of the most common reasons for failure ",[18,1522,1523],{},"BEFORE the inspection",[329,1525,1526,1532,1538,1544],{},[332,1527,1528,1531],{},[18,1529,1530],{},"Validation"," automatically checks for missing RCDs, incorrect protection sizing and more",[332,1533,1534,1537],{},[18,1535,1536],{},"Single-line diagram"," is generated AREI-compliant — one of the most common deficiency reasons is eliminated",[332,1539,1540,1543],{},[18,1541,1542],{},"Situation plan"," with correct AREI symbols",[332,1545,1546,1549],{},[18,1547,1548],{},"Labelling"," of all circuits is automatically documented in the diagram",[15,1551,1552],{},"This way, you can avoid typical mistakes before the inspector arrives.",[495,1554],{},[15,1556,1557],{},[18,1558,1559],{},"Related articles:",[329,1561,1562,1568,1574],{},[332,1563,1564],{},[507,1565,1567],{"href":1566},"\u002Fen\u002Fblog\u002Ftop-10-arei-violations","Top 10 AREI Violations",[332,1569,1570],{},[507,1571,1573],{"href":1572},"\u002Fen\u002Fblog\u002F30ma-rcd-per-socket","30 mA RCD: When Is It Mandatory?",[332,1575,1576],{},[507,1577,1579],{"href":1578},"\u002Fen\u002Fblog\u002Fcable-cross-section-breaker","Cable Cross-Section and Breaker: The Right Combination",[15,1581,1582,528,1585],{},[18,1583,1584],{},"Prepare optimally for the electrical inspection — with PlanElec, create AREI-compliant plans and detect deficiencies early.",[507,1586,1588],{"href":531,"rel":1587},[533],"Get started →",{"title":536,"searchDepth":537,"depth":537,"links":1590},[1591,1594,1599,1600,1607,1608],{"id":1123,"depth":537,"text":1124,"children":1592},[1593],{"id":1134,"depth":542,"text":1135},{"id":1209,"depth":537,"text":1210,"children":1595},[1596,1597,1598],{"id":1213,"depth":542,"text":1214},{"id":1224,"depth":542,"text":1225},{"id":1235,"depth":542,"text":1236},{"id":1246,"depth":537,"text":1247},{"id":1382,"depth":537,"text":1383,"children":1601},[1602,1603,1604,1605,1606],{"id":1386,"depth":542,"text":1387},{"id":1404,"depth":542,"text":1405},{"id":1415,"depth":542,"text":1416},{"id":1462,"depth":542,"text":1463},{"id":1473,"depth":542,"text":1474},{"id":1488,"depth":537,"text":1489},{"id":1516,"depth":537,"text":1517},"Your electrical inspection (keuring) came back negative? Don't panic — around 40% fail. Here's what the deficiency codes mean, how to fix the problems and what the re-inspection costs.","en",{},"\u002Fblog\u002Finspection-failed-what-now.en",{"title":1106,"description":1609},"blog\u002Finspection-failed-what-now.en",[1616,1617,1618,1619,1620,578,1621],"inspection","electrical-inspection","failed","deficiencies","re-inspection","belgium","rDxMTNvxUoBzkSOvecNfFu8pCzCCVzVyRxkQlV49aK0",{"id":1624,"title":1625,"articleId":6,"body":1626,"category":558,"date":559,"description":2132,"extension":561,"lastUpdated":562,"locale":2133,"meta":2134,"navigation":565,"path":2135,"publishDate":559,"readTime":567,"refreshInterval":568,"seo":2136,"slug":2137,"stem":2138,"tags":2139,"__hash__":2147},"blog\u002Fblog\u002Finspection-failed-what-now.fr.md","Contrôle électrique refusé — que faire ? Guide étape par étape après un contrôle négatif",{"type":8,"value":1627,"toc":2112},[1628,1631,1637,1640,1644,1651,1655,1719,1726,1730,1734,1741,1745,1752,1756,1763,1767,1901,1905,1909,1912,1923,1927,1934,1938,1941,1961,1968,1982,1986,1993,1997,2008,2012,2019,2022,2036,2040,2047,2073,2076,2078,2083,2103],[11,1629,1625],{"id":1630},"contrôle-électrique-refusé-que-faire-guide-étape-par-étape-après-un-contrôle-négatif",[15,1632,1633,1636],{},[18,1634,1635],{},"Pas de panique."," Environ 40 % de tous les contrôles électriques en Belgique sont négatifs. Un contrôle négatif ne signifie pas que toute votre installation est dangereuse — il s'agit souvent de défauts formels ou de problèmes facilement corrigeables.",[15,1638,1639],{},"Dans ce guide, vous découvrirez ce qu'il faut faire après un contrôle négatif, quels sont les codes d'infraction et comment vous préparer au recontrôle.",[26,1641,1643],{"id":1642},"que-se-passe-t-il-après-un-contrôle-négatif","Que se passe-t-il après un contrôle négatif ?",[15,1645,1646,1647,1650],{},"Après le contrôle, vous recevez un ",[18,1648,1649],{},"rapport détaillé"," de l'organisme de contrôle (par ex. BTV, Vinçotte, AIB). Ce rapport liste toutes les infractions constatées, chacune avec un code :",[38,1652,1654],{"id":1653},"comprendre-les-codes-dinfraction","Comprendre les codes d'infraction",[43,1656,1657,1672],{},[46,1658,1659],{},[49,1660,1661,1663,1666,1669],{},[52,1662,54],{},[52,1664,1665],{},"Gravité",[52,1667,1668],{},"Signification",[52,1670,1671],{},"Délai",[65,1673,1674,1689,1704],{},[49,1675,1676,1680,1683,1686],{},[70,1677,1678],{},[18,1679,74],{},[70,1681,1682],{},"Léger",[70,1684,1685],{},"Défaut mineur, pas de danger immédiat",[70,1687,1688],{},"Corriger à la prochaine occasion",[49,1690,1691,1695,1698,1701],{},[70,1692,1693],{},[18,1694,90],{},[70,1696,1697],{},"Moyen",[70,1699,1700],{},"Défaut à corriger à moyen terme",[70,1702,1703],{},"Doit être corrigé lors du recontrôle",[49,1705,1706,1710,1713,1716],{},[70,1707,1708],{},[18,1709,106],{},[70,1711,1712],{},"Grave",[70,1714,1715],{},"Danger sérieux — action immédiate requise",[70,1717,1718],{},"Corriger immédiatement",[15,1720,1721,1722,1725],{},"En présence d'infractions C2 et C3, le contrôle est ",[18,1723,1724],{},"négatif"," et un recontrôle est nécessaire. Avec uniquement des infractions C1, le contrôle peut tout de même être positif.",[26,1727,1729],{"id":1728},"délais-selon-la-situation","Délais selon la situation",[38,1731,1733],{"id":1732},"lors-dune-vente-immobilière","Lors d'une vente immobilière",[15,1735,1736,1737,1740],{},"Si vous achetez un bien immobilier et que le contrôle électrique est négatif, vous disposez en tant qu'acheteur d'un ",[18,1738,1739],{},"délai de 18 mois"," à compter de la date d'achat pour corriger toutes les infractions et obtenir un recontrôle positif.",[38,1742,1744],{"id":1743},"pour-une-nouvelle-installation","Pour une nouvelle installation",[15,1746,1747,1748,1751],{},"Pour une nouvelle installation électrique (construction neuve, rénovation complète), l'installation doit être conforme ",[18,1749,1750],{},"AVANT la mise en service",". Le gestionnaire de réseau (Fluvius, ORES) n'active le courant que lorsqu'un certificat de contrôle positif est présenté.",[38,1753,1755],{"id":1754},"lors-du-contrôle-périodique","Lors du contrôle périodique",[15,1757,1758,1759,1762],{},"Le contrôle périodique (tous les 25 ans pour les habitations) donne, en cas de résultat négatif, un délai indiqué dans le rapport — typiquement ",[18,1760,1761],{},"1 an"," pour le recontrôle.",[26,1764,1766],{"id":1765},"les-10-causes-de-refus-les-plus-fréquentes","Les 10 causes de refus les plus fréquentes",[43,1768,1769,1785],{},[46,1770,1771],{},[49,1772,1773,1776,1779,1782],{},[52,1774,1775],{},"N°",[52,1777,1778],{},"Défaut",[52,1780,1781],{},"Article RGIE",[52,1783,1784],{},"Fréquence",[65,1786,1787,1799,1810,1822,1833,1844,1855,1866,1877,1889],{},[49,1788,1789,1791,1794,1796],{},[70,1790,188],{},[70,1792,1793],{},"Différentiel 30 mA absent ou inadéquat",[70,1795,194],{},[70,1797,1798],{},"Très fréquent",[49,1800,1801,1803,1806,1808],{},[70,1802,202],{},[70,1804,1805],{},"Plans électriques absents ou obsolètes (obligation de documentation : Art. 9.1.2 Nr. 1 schéma unifilaire, Art. 9.1.2 Nr. 2 plan de situation)",[70,1807,208],{},[70,1809,1798],{},[49,1811,1812,1814,1817,1819],{},[70,1813,215],{},[70,1815,1816],{},"Mise à la terre défectueuse (résistance de terre trop élevée : Art. 4.2.4.3b fixe 30 Ω comme seuil réglementaire — en cas de dépassement, des dispositifs différentiels à haute sensibilité supplémentaires sont requis ; formule générale : R_A × I∆n ≤ 50 V)",[70,1818,221],{},[70,1820,1821],{},"Fréquent",[49,1823,1824,1826,1829,1831],{},[70,1825,229],{},[70,1827,1828],{},"Étiquetage manquant des circuits",[70,1830,235],{},[70,1832,1821],{},[49,1834,1835,1837,1840,1842],{},[70,1836,242],{},[70,1838,1839],{},"Câbles sans tube de protection\u002Fgoulotte (les câbles XVB peuvent être posés en apparent sans tube de protection. Les conducteurs VOB individuels doivent toujours être posés dans des tubes de protection)",[70,1841,248],{},[70,1843,1821],{},[49,1845,1846,1848,1851,1853],{},[70,1847,255],{},[70,1849,1850],{},"Zones salle de bains non respectées",[70,1852,261],{},[70,1854,1697],{},[49,1856,1857,1859,1862,1864],{},[70,1858,268],{},[70,1860,1861],{},"Interrupteur principal absent (ou \u003C40A)",[70,1863,274],{},[70,1865,1697],{},[49,1867,1868,1870,1873,1875],{},[70,1869,281],{},[70,1871,1872],{},"Disjoncteur surdimensionné pour la section de câble",[70,1874,287],{},[70,1876,1697],{},[49,1878,1879,1881,1884,1886],{},[70,1880,294],{},[70,1882,1883],{},"SPD absent pour nouvelle installation",[70,1885,300],{},[70,1887,1888],{},"Construction neuve",[49,1890,1891,1893,1896,1899],{},[70,1892,308],{},[70,1894,1895],{},"Détecteurs de fumée absents sur le plan de situation (les détecteurs de fumée ne sont pas une exigence RGIE à proprement parler, mais une prescription du droit de la construction\u002Fdu logement — régionale : Flandre, Wallonie, Bruxelles. L'absence peut être notée comme remarque dans le rapport de contrôle)",[70,1897,1898],{},"Régional",[70,1900,1821],{},[26,1902,1904],{"id":1903},"étape-par-étape-après-le-contrôle-négatif","Étape par étape : après le contrôle négatif",[38,1906,1908],{"id":1907},"étape-1-lire-attentivement-le-rapport","Étape 1 : Lire attentivement le rapport",[15,1910,1911],{},"Examinez chaque infraction individuellement. Notez :",[329,1913,1914,1917,1920],{},[332,1915,1916],{},"Quel code (C1\u002FC2\u002FC3) ?",[332,1918,1919],{},"Où se situe exactement le problème (pièce, circuit) ?",[332,1921,1922],{},"Que reproche-t-on exactement ?",[38,1924,1926],{"id":1925},"étape-2-établir-les-priorités","Étape 2 : Établir les priorités",[15,1928,1929,1930,1933],{},"Commencez par les ",[18,1931,1932],{},"infractions C3"," (graves) — elles représentent un danger immédiat. Ensuite les infractions C2. Les infractions C1 peuvent être résolues en parallèle ou ultérieurement.",[38,1935,1937],{"id":1936},"étape-3-professionnel-ou-soi-même","Étape 3 : Professionnel ou soi-même ?",[15,1939,1940],{},"Beaucoup de défauts peuvent être corrigés soi-même :",[329,1942,1943,1949,1955],{},[332,1944,1945,1948],{},[18,1946,1947],{},"Apposer l'étiquetage"," — étiqueter les disjoncteurs dans le tableau",[332,1950,1951,1954],{},[18,1952,1953],{},"Mettre à jour le plan de situation"," — créer avec PlanElec",[332,1956,1957,1960],{},[18,1958,1959],{},"Installer des détecteurs de fumée"," — simple montage au plafond",[15,1962,1963,1964,1967],{},"Pour d'autres défauts, un ",[18,1965,1966],{},"électricien"," est nécessaire :",[329,1969,1970,1973,1976,1979],{},[332,1971,1972],{},"Ajouter ou remplacer le différentiel",[332,1974,1975],{},"Améliorer la mise à la terre",[332,1977,1978],{},"Placer les câbles dans des tubes de protection",[332,1980,1981],{},"Installer l'interrupteur principal",[38,1983,1985],{"id":1984},"étape-4-mettre-à-jour-les-plans","Étape 4 : Mettre à jour les plans",[15,1987,1988,1989,1992],{},"L'un des défauts les plus fréquents est un schéma unifilaire et un plan de situation absents ou obsolètes. Ceux-ci doivent refléter ",[18,1990,1991],{},"l'état actuel"," de l'installation — pas l'état d'il y a 20 ans.",[38,1994,1996],{"id":1995},"étape-5-planifier-le-recontrôle","Étape 5 : Planifier le recontrôle",[15,1998,1999,2000,2003,2004,2007],{},"Il est recommandé de prendre rendez-vous auprès du ",[18,2001,2002],{},"même organisme de contrôle"," qui a effectué le contrôle initial — mais le propriétaire peut aussi choisir un autre organisme de contrôle accrédité. Lors du recontrôle, ",[18,2005,2006],{},"seuls les points contestés"," sont réexaminés — pas l'installation complète.",[26,2009,2011],{"id":2010},"coût-du-recontrôle","Coût du recontrôle",[15,2013,2014,2015,2018],{},"Le coût d'un recontrôle se situe typiquement entre ",[18,2016,2017],{},"80 € et 120 €",", selon l'organisme de contrôle et le nombre de points à vérifier. C'est généralement moins cher que le premier contrôle.",[15,2020,2021],{},"S'ajoutent les coûts de correction des défauts :",[329,2023,2024,2027,2030,2033],{},[332,2025,2026],{},"Ajouter un différentiel : 100-200 € (matériel + main-d'oeuvre)",[332,2028,2029],{},"Améliorer la mise à la terre : 200-500 €",[332,2031,2032],{},"Faire établir les plans : 150-400 € (ou gratuitement avec PlanElec)",[332,2034,2035],{},"Installer l'interrupteur principal : 80-150 €",[26,2037,2039],{"id":2038},"comment-planelec-vous-aide","Comment PlanElec vous aide",[15,2041,2042,2043,2046],{},"PlanElec peut détecter bon nombre des causes de refus les plus fréquentes ",[18,2044,2045],{},"AVANT le contrôle"," :",[329,2048,2049,2055,2061,2067],{},[332,2050,2051,2054],{},[18,2052,2053],{},"La validation"," vérifie automatiquement les différentiels manquants, la protection inadéquate et plus encore",[332,2056,2057,2060],{},[18,2058,2059],{},"Le schéma unifilaire"," est généré conformément au RGIE — l'une des causes de refus les plus courantes est éliminée",[332,2062,2063,2066],{},[18,2064,2065],{},"Le plan de situation"," avec les symboles RGIE corrects",[332,2068,2069,2072],{},[18,2070,2071],{},"L'étiquetage"," de tous les circuits est automatiquement documenté dans le schéma",[15,2074,2075],{},"Vous évitez ainsi les erreurs typiques avant la visite du contrôleur.",[495,2077],{},[15,2079,2080],{},[18,2081,2082],{},"Articles connexes :",[329,2084,2085,2091,2097],{},[332,2086,2087],{},[507,2088,2090],{"href":2089},"\u002Ffr\u002Fblog\u002F10-infractions-rgie-frequentes","Les 10 infractions RGIE les plus fréquentes",[332,2092,2093],{},[507,2094,2096],{"href":2095},"\u002Ffr\u002Fblog\u002Fdifferentiel-30ma","Différentiel 30 mA : quand est-il obligatoire ?",[332,2098,2099],{},[507,2100,2102],{"href":2101},"\u002Ffr\u002Fblog\u002Fsection-cable-disjoncteur","Section de câble et disjoncteur : la bonne combinaison",[15,2104,2105,528,2108],{},[18,2106,2107],{},"Préparez-vous de manière optimale au contrôle électrique — avec PlanElec, créez des plans conformes au RGIE et détectez les défauts à l'avance.",[507,2109,2111],{"href":531,"rel":2110},[533],"Commencer maintenant →",{"title":536,"searchDepth":537,"depth":537,"links":2113},[2114,2117,2122,2123,2130,2131],{"id":1642,"depth":537,"text":1643,"children":2115},[2116],{"id":1653,"depth":542,"text":1654},{"id":1728,"depth":537,"text":1729,"children":2118},[2119,2120,2121],{"id":1732,"depth":542,"text":1733},{"id":1743,"depth":542,"text":1744},{"id":1754,"depth":542,"text":1755},{"id":1765,"depth":537,"text":1766},{"id":1903,"depth":537,"text":1904,"children":2124},[2125,2126,2127,2128,2129],{"id":1907,"depth":542,"text":1908},{"id":1925,"depth":542,"text":1926},{"id":1936,"depth":542,"text":1937},{"id":1984,"depth":542,"text":1985},{"id":1995,"depth":542,"text":1996},{"id":2010,"depth":537,"text":2011},{"id":2038,"depth":537,"text":2039},"Votre contrôle électrique est négatif ? Pas de panique — environ 40 % des contrôles échouent. Découvrez ce que signifient les codes d'infraction, comment corriger les problèmes et combien coûte le recontrôle.","fr",{},"\u002Fblog\u002Finspection-failed-what-now.fr",{"title":1625,"description":2132},"controle-electrique-refuse","blog\u002Finspection-failed-what-now.fr",[2140,2141,2142,2143,2144,2145,2146],"controle","controle-electrique","refuse","infractions","recontrole","rgie","belgique","b8VmWNMhK-MDS6WNzMFN-eqYhapbKeCEd8ioAvFGYtk",{"id":4,"title":5,"articleId":6,"body":2149,"category":558,"date":559,"description":560,"extension":561,"lastUpdated":562,"locale":563,"meta":2518,"navigation":565,"path":566,"publishDate":559,"readTime":567,"refreshInterval":568,"seo":2519,"slug":570,"stem":571,"tags":2520,"__hash__":580},{"type":8,"value":2150,"toc":2498},[2151,2153,2157,2159,2161,2165,2167,2219,2223,2225,2227,2231,2233,2237,2239,2243,2245,2361,2363,2365,2367,2375,2377,2381,2383,2385,2399,2403,2413,2415,2419,2421,2427,2429,2433,2435,2445,2447,2451,2469,2471,2473,2477,2491],[11,2152,5],{"id":13},[15,2154,2155,21],{},[18,2156,20],{},[15,2158,24],{},[26,2160,29],{"id":28},[15,2162,32,2163,36],{},[18,2164,35],{},[38,2166,41],{"id":40},[43,2168,2169,2181],{},[46,2170,2171],{},[49,2172,2173,2175,2177,2179],{},[52,2174,54],{},[52,2176,57],{},[52,2178,60],{},[52,2180,63],{},[65,2182,2183,2195,2207],{},[49,2184,2185,2189,2191,2193],{},[70,2186,2187],{},[18,2188,74],{},[70,2190,77],{},[70,2192,80],{},[70,2194,83],{},[49,2196,2197,2201,2203,2205],{},[70,2198,2199],{},[18,2200,90],{},[70,2202,93],{},[70,2204,96],{},[70,2206,99],{},[49,2208,2209,2213,2215,2217],{},[70,2210,2211],{},[18,2212,106],{},[70,2214,109],{},[70,2216,112],{},[70,2218,115],{},[15,2220,118,2221,122],{},[18,2222,121],{},[26,2224,126],{"id":125},[38,2226,130],{"id":129},[15,2228,133,2229,137],{},[18,2230,136],{},[38,2232,141],{"id":140},[15,2234,144,2235,148],{},[18,2236,147],{},[38,2238,152],{"id":151},[15,2240,155,2241,159],{},[18,2242,158],{},[26,2244,163],{"id":162},[43,2246,2247,2259],{},[46,2248,2249],{},[49,2250,2251,2253,2255,2257],{},[52,2252,172],{},[52,2254,175],{},[52,2256,178],{},[52,2258,181],{},[65,2260,2261,2271,2281,2291,2301,2311,2321,2331,2341,2351],{},[49,2262,2263,2265,2267,2269],{},[70,2264,188],{},[70,2266,191],{},[70,2268,194],{},[70,2270,197],{},[49,2272,2273,2275,2277,2279],{},[70,2274,202],{},[70,2276,205],{},[70,2278,208],{},[70,2280,197],{},[49,2282,2283,2285,2287,2289],{},[70,2284,215],{},[70,2286,218],{},[70,2288,221],{},[70,2290,224],{},[49,2292,2293,2295,2297,2299],{},[70,2294,229],{},[70,2296,232],{},[70,2298,235],{},[70,2300,224],{},[49,2302,2303,2305,2307,2309],{},[70,2304,242],{},[70,2306,245],{},[70,2308,248],{},[70,2310,224],{},[49,2312,2313,2315,2317,2319],{},[70,2314,255],{},[70,2316,258],{},[70,2318,261],{},[70,2320,93],{},[49,2322,2323,2325,2327,2329],{},[70,2324,268],{},[70,2326,271],{},[70,2328,274],{},[70,2330,93],{},[49,2332,2333,2335,2337,2339],{},[70,2334,281],{},[70,2336,284],{},[70,2338,287],{},[70,2340,93],{},[49,2342,2343,2345,2347,2349],{},[70,2344,294],{},[70,2346,297],{},[70,2348,300],{},[70,2350,303],{},[49,2352,2353,2355,2357,2359],{},[70,2354,308],{},[70,2356,311],{},[70,2358,314],{},[70,2360,224],{},[26,2362,320],{"id":319},[38,2364,324],{"id":323},[15,2366,327],{},[329,2368,2369,2371,2373],{},[332,2370,334],{},[332,2372,337],{},[332,2374,340],{},[38,2376,344],{"id":343},[15,2378,347,2379,351],{},[18,2380,350],{},[38,2382,355],{"id":354},[15,2384,358],{},[329,2386,2387,2391,2395],{},[332,2388,2389,366],{},[18,2390,365],{},[332,2392,2393,372],{},[18,2394,371],{},[332,2396,2397,378],{},[18,2398,377],{},[15,2400,381,2401,385],{},[18,2402,384],{},[329,2404,2405,2407,2409,2411],{},[332,2406,390],{},[332,2408,393],{},[332,2410,396],{},[332,2412,399],{},[38,2414,403],{"id":402},[15,2416,406,2417,410],{},[18,2418,409],{},[38,2420,414],{"id":413},[15,2422,417,2423,421,2425,425],{},[18,2424,420],{},[18,2426,424],{},[26,2428,429],{"id":428},[15,2430,432,2431,436],{},[18,2432,435],{},[15,2434,439],{},[329,2436,2437,2439,2441,2443],{},[332,2438,444],{},[332,2440,447],{},[332,2442,450],{},[332,2444,453],{},[26,2446,457],{"id":456},[15,2448,460,2449,464],{},[18,2450,463],{},[329,2452,2453,2457,2461,2465],{},[332,2454,2455,472],{},[18,2456,471],{},[332,2458,2459,478],{},[18,2460,477],{},[332,2462,2463,484],{},[18,2464,483],{},[332,2466,2467,490],{},[18,2468,489],{},[15,2470,493],{},[495,2472],{},[15,2474,2475],{},[18,2476,501],{},[329,2478,2479,2483,2487],{},[332,2480,2481],{},[507,2482,510],{"href":509},[332,2484,2485],{},[507,2486,516],{"href":515},[332,2488,2489],{},[507,2490,522],{"href":521},[15,2492,2493,528,2495],{},[18,2494,527],{},[507,2496,534],{"href":531,"rel":2497},[533],{"title":536,"searchDepth":537,"depth":537,"links":2499},[2500,2503,2508,2509,2516,2517],{"id":28,"depth":537,"text":29,"children":2501},[2502],{"id":40,"depth":542,"text":41},{"id":125,"depth":537,"text":126,"children":2504},[2505,2506,2507],{"id":129,"depth":542,"text":130},{"id":140,"depth":542,"text":141},{"id":151,"depth":542,"text":152},{"id":162,"depth":537,"text":163},{"id":319,"depth":537,"text":320,"children":2510},[2511,2512,2513,2514,2515],{"id":323,"depth":542,"text":324},{"id":343,"depth":542,"text":344},{"id":354,"depth":542,"text":355},{"id":402,"depth":542,"text":403},{"id":413,"depth":542,"text":414},{"id":428,"depth":537,"text":429},{"id":456,"depth":537,"text":457},{},{"title":5,"description":560},[573,574,575,576,577,578,579],1781158576971]