[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"blog-post-nl-verzegeling-differentieel-vervalt-2026":3,"blog-alternates-blog-post-nl-verzegeling-differentieel-vervalt-2026-rcd-sealing-abolished-2026":526,"blog-next-steps-blog-post-nl-verzegeling-differentieel-vervalt-2026-rcd-sealing-abolished-2026":2315},{"id":4,"title":5,"articleId":6,"body":7,"category":499,"date":500,"description":501,"extension":502,"lastUpdated":503,"locale":504,"meta":505,"navigation":506,"path":507,"publishDate":500,"readTime":508,"refreshInterval":509,"seo":510,"seoTitle":511,"slug":512,"stem":513,"tags":514,"__hash__":525},"blog\u002Fblog\u002Frcd-sealing-abolished-2026.nl.md","Wat verandert er op 1 november 2026 aan de verzegeling van differentieelschakelaars?","rcd-sealing-abolished-2026",{"type":8,"value":9,"toc":484},"minimark",[10,15,40,43,47,50,138,145,149,156,159,213,217,220,247,250,254,261,276,287,291,294,316,319,323,326,341,345,348,363,371,375,378,381,385,446,449,453,478],[11,12,14],"h2",{"id":13},"wat-verandert-er-op-1-november-2026","Wat verandert er op 1 november 2026?",[16,17,18,19,23,24,27,28,35,36,39],"p",{},"Vanaf ",[20,21,22],"strong",{},"1 november 2026"," moet een erkend organisme de differentieelstroombeschermingsinrichting aan het begin van een huishoudelijke elektrische installatie ",[20,25,26],{},"niet langer verzegelen"," wanneer de installatie conform wordt bevonden. Het ",[29,30,34],"a",{"href":31,"rel":32},"https:\u002F\u002Fwww.ejustice.just.fgov.be\u002Fcgi\u002Farticle.pl?language=nl&sum_date=2026-09-15&lg_txt=n&numac_search=2026006432",[33],"nofollow","koninklijk besluit van 13 augustus 2026",", gepubliceerd in het Belgisch Staatsblad van 15 september 2026 (numac 2026006432), schrapt het voorschrift in de delen 4 en 6 van boek 1 van het AREI. Boek 1 krijgt daardoor ",[20,37,38],{},"versie 07",".",[16,41,42],{},"De verplichting zelf om aan het begin van de installatie ten minste één differentieel van ten hoogste 300 mA te plaatsen, blijft ongewijzigd. Wat verdwijnt, is uitsluitend de verzegeling van dat toestel door de keurder — en de bijbehorende vermelding daarvan in het keuringsverslag.",[11,44,46],{"id":45},"welke-bepalingen-worden-precies-geschrapt","Welke bepalingen worden precies geschrapt?",[16,48,49],{},"Het besluit telt vijf artikelen; drie ervan wijzigen boek 1.",[51,52,53,69],"table",{},[54,55,56],"thead",{},[57,58,59,63,66],"tr",{},[60,61,62],"th",{},"Artikel KB 13\u002F08\u002F2026",[60,64,65],{},"Bepaling in boek 1",[60,67,68],{},"Wat er gebeurt",[70,71,72,88,103,117,128],"tbody",{},[57,73,74,78,85],{},[75,76,77],"td",{},"Art. 1",[75,79,80,81,84],{},"Deel 4, onderafdeling ",[20,82,83],{},"4.2.4.3., b.",", derde alinea",[75,86,87],{},"Volledig opgeheven: zowel de ongenaakbaarheid van de ingangsklemmen als de verzegeling die dat blijvend moest maken.",[57,89,90,93,100],{},[75,91,92],{},"Art. 2",[75,94,95,96,99],{},"Deel 6, onderafdeling ",[20,97,98],{},"6.4.6.4., b.6."," (besluiten)",[75,101,102],{},"Vervangen: het verslag van de gelijkvormigheidscontrole bevestigt enkel nog het viseren van schema's en plannen.",[57,104,105,108,114],{},[75,106,107],{},"Art. 3",[75,109,95,110,113],{},[20,111,112],{},"6.5.7.2., b.6.",", tweede alinea",[75,115,116],{},"Vervangen: het verslag van het controlebezoek vermeldt enkel nog dat de schema's en plannen opnieuw geviseerd zijn.",[57,118,119,122,125],{},[75,120,121],{},"Art. 4",[75,123,124],{},"—",[75,126,127],{},"Inwerkingtreding op de eerste dag van de tweede maand na publicatie, dus 1 november 2026.",[57,129,130,133,135],{},[75,131,132],{},"Art. 5",[75,134,124],{},[75,136,137],{},"Uitvoering door de minister bevoegd voor Energie.",[16,139,140,141,144],{},"De geschrapte alinea in 4.2.4.3., b. luidde: „Gepaste maatregelen verzekeren de ongenaakbaarheid van de ingangsklemmen van de in de 1ste alinea bedoelde differentieelstroombeschermingsinrichting(en). Het blijvend karakter van deze ongenaakbaarheid wordt verwezenlijkt door verzegeling uitgevoerd door de persoon die volgens afdeling 6.4.1. belast is met de gelijkvormigheidscontrole vóór de ingebruikname.\" Die hele alinea verdwijnt — niet alleen het woord verzegeling. De algemene bescherming tegen elektrische schokken bij ",[20,142,143],{},"rechtstreekse aanraking"," (afdeling 4.2.2., onder meer door omhulsels en isolatie) blijft onverkort gelden; een verdeelbord moet zijn actieve delen dus nog altijd afschermen.",[11,146,148],{"id":147},"is-de-verzegeling-de-enige-wijziging-in-versie-07","Is de verzegeling de enige wijziging in versie 07?",[16,150,151,152,155],{},"Ja. In een woord-voor-woordvergelijking van de volledige Nederlandse en Franse tekst van versie 06 en versie 07 verschillen alleen de drie genoemde passages en de versieaanduiding op de titelpagina. ",[20,153,154],{},"Inhoudelijk verandert verder niets","; alle andere afwijkingen zijn paginering en regelafbreking.",[16,157,158],{},"Verwar dit niet met twee andere data:",[51,160,161,174],{},[54,162,163],{},[57,164,165,168,171],{},[60,166,167],{},"Datum",[60,169,170],{},"Besluit",[60,172,173],{},"Wat wijzigt",[70,175,176,187,202],{},[57,177,178,181,184],{},[75,179,180],{},"01\u002F04\u002F2026",[75,182,183],{},"KB van 6 oktober 2025",[75,185,186],{},"Boek 1 versie 06: geaarde gelijkstroomsystemen (TN, TT, IT) in het AREI opgenomen.",[57,188,189,192,195],{},[75,190,191],{},"01\u002F10\u002F2026",[75,193,194],{},"KB van 20 juli 2026",[75,196,197,198,201],{},"Uitsluitend ",[20,199,200],{},"boek 3"," (luchtlijnen hoogspanning) — niet huishoudelijk.",[57,203,204,207,210],{},[75,205,206],{},"01\u002F11\u002F2026",[75,208,209],{},"KB van 13 augustus 2026",[75,211,212],{},"Boek 1 versie 07: verzegeling van de differentieel opgeheven.",[11,214,216],{"id":215},"waarom-wordt-de-verzegeling-afgeschaft","Waarom wordt de verzegeling afgeschaft?",[16,218,219],{},"Het verslag aan de Koning motiveert de opheffing met vijf praktijksituaties die telkens discussie opleverden over nut en toepassing:",[221,222,223,227,234,237,244],"ul",{},[224,225,226],"li",{},"na het verwijderen van een zegel kan alleen een erkend organisme opnieuw verzegelen, en dan enkel via een nieuwe controle;",[224,228,229,230,233],{},"bij een ",[20,231,232],{},"niet-conform"," verklaarde installatie verplichtte boek 1 het organisme niet om te verzegelen;",[224,235,236],{},"de verzegeling gold alleen voor huishoudelijke installaties;",[224,238,239,240,243],{},"bij een belangrijke wijziging of uitbreiding kon de verzegeling ",[20,241,242],{},"gedeeltelijk"," zijn: enkel de differentieel waarop de werken betrekking hadden, moest verzegeld worden;",[224,245,246],{},"het afschrikkende karakter van een zegel als veiligheidsmaatregel is beperkt.",[16,248,249],{},"De beslissing kwam er in overleg met vertegenwoordigers van installateurs, erkende organismen en openbare netbeheerders. Het verslag stelt uitdrukkelijk dat de opheffing geen afbreuk doet aan de veiligheid van huishoudelijke installaties.",[11,251,253],{"id":252},"hoe-zag-zon-verzegeling-er-in-de-praktijk-uit","Hoe zag zo'n verzegeling er in de praktijk uit?",[16,255,256,257,260],{},"Het AREI schreef nooit een ",[20,258,259],{},"vorm"," voor. De tekst eiste enkel „verzegeling\" door de persoon belast met de gelijkvormigheidscontrole — niet een bepaald materiaal, kleur of merkteken. In de praktijk betekende dat meestal:",[221,262,263,270,273],{},[224,264,265,266,269],{},"een afdekplaatje of klemmenkap over de ",[20,267,268],{},"ingangsklemmen"," van de hoofddifferentieel, met twee oogjes of gaatjes;",[224,271,272],{},"een dun metaaldraadje door die oogjes, tot een gesloten lus;",[224,274,275],{},"een loodje of kunststof zegel op de lus, dichtgeknepen met een loodtang, vaak met het kenteken van het erkend organisme.",[16,277,278,279,282,283,286],{},"Het zegel zat dus op de ",[20,280,281],{},"ingang"," van de differentieel, niet op de uitgang: het bewees dat alles achter het toestel via die maximaal 300 mA-beveiliging gevoed werd, en het kon niet worden verbroken zonder zichtbaar spoor. Belangrijk: dit staat volledig los van de ",[20,284,285],{},"zegels van de netbeheerder"," op de aansluiting en de meter — ook op een digitale meter. Die blijven onaangeroerd en mogen nooit worden verwijderd.",[11,288,290],{"id":289},"mijn-hoofddifferentieel-is-niet-verzegeld-is-dat-een-inbreuk","Mijn hoofddifferentieel is niet verzegeld — is dat een inbreuk?",[16,292,293],{},"Niet noodzakelijk, en vanaf 1 november 2026 in elk geval niet meer. Een ontbrekend zegel op een oudere installatie heeft doorgaans een van deze verklaringen:",[221,295,296,303,306,313],{},[224,297,298,299,302],{},"de installatie werd bij de controle ",[20,300,301],{},"niet conform"," verklaard; dan verplichtte boek 1 het organisme niet om te verzegelen;",[224,304,305],{},"er werd na de controle aan het bord gewerkt en het zegel werd verbroken — wat op zich geen inbreuk op boek 1 is, wel een verlies aan bewijswaarde;",[224,307,308,309,312],{},"bij een uitbreiding werd slechts ",[20,310,311],{},"één"," van meerdere differentiëlen aan het begin verzegeld;",[224,314,315],{},"het geplaatste toestel of de kastopbouw liet geen verzegeling van de ingangsklemmen toe.",[16,317,318],{},"Een zegel op de meterkast of de aansluitkabel is iets anders: dat is het zegel van de distributienetbeheerder en heeft niets met het AREI-voorschrift te maken. Zekerheid over jouw installatie geeft het laatste keuringsverslag: daarin stond tot nu toe uitdrukkelijk of er verzegeld werd.",[11,320,322],{"id":321},"mag-een-bestaand-zegel-nu-zomaar-weg","Mag een bestaand zegel nu zomaar weg?",[16,324,325],{},"Vanaf 1 november 2026 vloeit uit boek 1 geen verplichting meer voort om een zegel op de differentieel aan te brengen of intact te houden. Verwijder het toch niet zelf:",[221,327,328,331,338],{},[224,329,330],{},"werken aan een verdeelbord blijven werken onder spanning in de nabijheid van de voedingskabel en horen bij een vakman;",[224,332,333,334,337],{},"zegels van de netbeheerder op meter, hoofdzekering of aansluiting vallen ",[20,335,336],{},"niet"," onder deze wijziging en blijven verboden terrein;",[224,339,340],{},"een intact zegel blijft een praktisch bewijs dat er sinds de laatste controle niets aan de voeding veranderd is.",[11,342,344],{"id":343},"wat-betekent-dit-voor-keuringsverslagen-en-dossiers","Wat betekent dit voor keuringsverslagen en dossiers?",[16,346,347],{},"Verslagen die na 1 november 2026 worden opgesteld, vermelden de verzegeling niet meer. Wat wel blijft:",[221,349,350,357,360],{},[224,351,352,353,356],{},"de bevestiging dat het erkend organisme de ",[20,354,355],{},"eendraadschema's en situatieplannen"," heeft geviseerd, bij de gelijkvormigheidscontrole én bij het controlebezoek;",[224,358,359],{},"de vermelding van de uiterste datum van het volgende controlebezoek (hoofdstuk 6.5.);",[224,361,362],{},"de beoordeling van de installatie volgens de voorschriften die op dat ogenblik gelden.",[16,364,365,366,370],{},"Oudere verslagen met een verzegelingsvermelding blijven gewoon geldig. Een installatie hoeft niet opnieuw gekeurd te worden omdat een voorschrift wegvalt: een controle beoordeelt de installatie naar het recht dat van toepassing is, en het ",[29,367,369],{"href":368},"\u002Fblog\u002Felektrische-keuring","controlebezoek van een bestaande installatie"," volgt zijn eigen periodiciteit.",[11,372,374],{"id":373},"wat-betekent-de-wijziging-voor-de-zelfcontrole-van-planelec","Wat betekent de wijziging voor de zelfcontrole van PlanElec?",[16,376,377],{},"Niets – en dat is logisch. De AREI\u002FRGIE-zelfcontrole in PlanElec werkt op het projectmodel: eendraadschema, situatieplan, kringen, beveiligingen en verdeelbord. Verzegelen is een handeling van de keurder op de geplaatste installatie, geen eigenschap van een plan; de verzegeling was daarom nooit een controleregel. De hoofddifferentieel van maximaal 300 mA aan het begin controleert de zelfcontrole wel verder, want die verplichting blijft (4.2.4.3 b).",[16,379,380],{},"Voor bestaande installaties leg je per kring vast uit welke periode hij stamt: vóór 1 oktober 1981, onder het oude AREI, onder het nieuwe AREI vanaf 1 juni 2020 of actuele werken. De zelfcontrole past daarop de toegelaten afwijkingen uit deel 8 toe en benoemt ze in de bevindingen. De regelwerktekst in PlanElec is boek 1 versie 06 (van toepassing sinds 1 april 2026). Metingen en de keuring ter plaatse doet het erkend organisme.",[11,382,384],{"id":383},"bronnen","Bronnen",[51,386,387,397],{},[54,388,389],{},[57,390,391,394],{},[60,392,393],{},"Bron",[60,395,396],{},"Inhoud",[70,398,399,410,422,434],{},[57,400,401,407],{},[75,402,403],{},[29,404,406],{"href":31,"rel":405},[33],"KB 13 augustus 2026, BS 15 september 2026",[75,408,409],{},"Besluittekst en verslag aan de Koning",[57,411,412,419],{},[75,413,414],{},[29,415,418],{"href":416,"rel":417},"https:\u002F\u002Fwww.ejustice.just.fgov.be\u002Feli\u002Farrete\u002F2026\u002F08\u002F13\u002F2026006432\u002Fjustel",[33],"Geconsolideerde versie in Justel",[75,420,421],{},"Officiële consolidatie",[57,423,424,431],{},[75,425,426],{},[29,427,430],{"href":428,"rel":429},"https:\u002F\u002Feconomie.fgov.be\u002Fsites\u002Fdefault\u002Ffiles\u002FFiles\u002FPublications\u002Ffiles\u002FAREI-Bijlage-Boek-1-installaties-op-laagspanning-en-op-zeer-lage-spanning-2026-v07.pdf",[33],"Boek 1 van het AREI, van toepassing vanaf 1 november 2026 (PDF)",[75,432,433],{},"Versie 07, volledige tekst",[57,435,436,443],{},[75,437,438],{},[29,439,442],{"href":440,"rel":441},"https:\u002F\u002Feconomie.fgov.be\u002Fnl\u002Fpublicaties\u002Falgemeen-reglement-op-de",[33],"FOD Economie — AREI-overzichtspagina",[75,444,445],{},"Alle boeken en wijzigingsbesluiten",[16,447,448],{},"Dit artikel vat de officiële teksten samen; bindend is de tekst in het Belgisch Staatsblad.",[11,450,452],{"id":451},"verwante-artikelen","Verwante artikelen",[221,454,455,461,466,472],{},[224,456,457],{},[29,458,460],{"href":459},"\u002Fblog\u002Farei-reglementen-2026","AREI-regelgeving 2026: de belangrijkste wijzigingen",[224,462,463],{},[29,464,465],{"href":368},"Elektrische keuring in België",[224,467,468],{},[29,469,471],{"href":470},"\u002Fblog\u002Finspectie-checklist","Inspectiechecklist: wat de keurder nakijkt",[224,473,474],{},[29,475,477],{"href":476},"\u002Fblog\u002Fdifferentieel-type-a-vs-type-b","Differentieel type A of type B",[16,479,480],{},[29,481,483],{"href":482},"\u002F","Bouw je elektrisch dossier op in PlanElec →",{"title":485,"searchDepth":486,"depth":486,"links":487},"",2,[488,489,490,491,492,493,494,495,496,497,498],{"id":13,"depth":486,"text":14},{"id":45,"depth":486,"text":46},{"id":147,"depth":486,"text":148},{"id":215,"depth":486,"text":216},{"id":252,"depth":486,"text":253},{"id":289,"depth":486,"text":290},{"id":321,"depth":486,"text":322},{"id":343,"depth":486,"text":344},{"id":373,"depth":486,"text":374},{"id":383,"depth":486,"text":384},{"id":451,"depth":486,"text":452},"news","2026-09-27","Vanaf 1 november 2026 vervalt de verplichte verzegeling van de differentieel aan het begin van een huishoudelijke installatie. Wat het KB van 13 augustus 2026 precies schrapt, wat onveranderd blijft en wat het betekent voor keuringsverslagen.","md","2026-10-05","nl",{},true,"\u002Fblog\u002Frcd-sealing-abolished-2026.nl","9 min",6,{"title":5,"description":501},"Verzegeling differentieel: wat verandert op 1\u002F11\u002F2026","verzegeling-differentieel-vervalt-2026","blog\u002Frcd-sealing-abolished-2026.nl",[515,516,517,518,519,520,521,522,523,524],"AREI","RGIE","verzegeling","differentieel","differentieelschakelaar","keuring","erkend organisme","boek 1 versie 07","KB 13 augustus 2026","België","5mH1pnjGwC-TMPpR_GYGGrbLXpt6TfGP5aPd_xb2jJ4",[527,1028,1516,1987],{"id":528,"title":529,"articleId":6,"body":530,"category":499,"date":500,"description":1009,"extension":502,"lastUpdated":503,"locale":1010,"meta":1011,"navigation":506,"path":1012,"publishDate":500,"readTime":508,"refreshInterval":509,"seo":1013,"seoTitle":1014,"slug":1015,"stem":1016,"tags":1017,"__hash__":1027},"blog\u002Fblog\u002Frcd-sealing-abolished-2026.de.md","Was ändert sich am 1. November 2026 bei der Verplombung von Differenzialschaltern?",{"type":8,"value":531,"toc":996},[532,536,555,558,562,565,638,645,649,656,659,712,718,722,725,750,753,757,764,779,790,794,797,818,821,825,828,843,847,850,865,873,877,880,883,887,958,961,965,990],[11,533,535],{"id":534},"was-ändert-sich-am-1-november-2026","Was ändert sich am 1. November 2026?",[16,537,538,539,542,543,546,547,551,552,39],{},"Ab dem ",[20,540,541],{},"1. November 2026"," muss eine zugelassene Stelle die Differenzstrom-Schutzeinrichtung am Anfang einer häuslichen elektrischen Anlage ",[20,544,545],{},"nicht mehr verplomben",", wenn die Anlage als konform beurteilt wird. Der ",[29,548,550],{"href":31,"rel":549},[33],"Königliche Erlass vom 13. August 2026",", veröffentlicht im Belgischen Staatsblatt vom 15. September 2026 (Numac 2026006432), streicht die Vorschrift in den Teilen 4 und 6 von Buch 1 des AREI. Buch 1 erhält damit die ",[20,553,554],{},"Version 07",[16,556,557],{},"Die Pflicht, am Anfang der Anlage mindestens eine Differenzstrom-Schutzeinrichtung mit höchstens 300 mA einzubauen, bleibt unverändert. Entfallen ist ausschließlich die Verplombung dieses Geräts durch den Prüfer — und der entsprechende Vermerk im Prüfbericht.",[11,559,561],{"id":560},"welche-bestimmungen-werden-genau-gestrichen","Welche Bestimmungen werden genau gestrichen?",[16,563,564],{},"Der Erlass hat fünf Artikel; drei davon ändern Buch 1.",[51,566,567,580],{},[54,568,569],{},[57,570,571,574,577],{},[60,572,573],{},"Artikel KE 13.08.2026",[60,575,576],{},"Bestimmung in Buch 1",[60,578,579],{},"Wirkung",[70,581,582,595,608,620,629],{},[57,583,584,586,592],{},[75,585,77],{},[75,587,588,589,591],{},"Teil 4, Unterabschnitt ",[20,590,83],{},", dritter Absatz",[75,593,594],{},"Vollständig aufgehoben: sowohl die Unberührbarkeit der Eingangspole als auch die Plombierung, die sie dauerhaft machen sollte.",[57,596,597,599,605],{},[75,598,92],{},[75,600,601,602,604],{},"Teil 6, Unterabschnitt ",[20,603,98],{}," (Schlüsse)",[75,606,607],{},"Ersetzt: Der Bericht der Konformitätsprüfung bescheinigt nur noch das Visieren der Schemata und Positionspläne.",[57,609,610,612,617],{},[75,611,107],{},[75,613,601,614,616],{},[20,615,112],{},", zweiter Absatz",[75,618,619],{},"Ersetzt: Der Bericht des Kontrollbesuchs nennt nur noch das erneute Visieren der Schemata und Positionspläne.",[57,621,622,624,626],{},[75,623,121],{},[75,625,124],{},[75,627,628],{},"Inkrafttreten am ersten Tag des zweiten Monats nach der Veröffentlichung, also am 1. November 2026.",[57,630,631,633,635],{},[75,632,132],{},[75,634,124],{},[75,636,637],{},"Ausführung durch den für Energie zuständigen Minister.",[16,639,640,641,644],{},"Der gestrichene Satz in 4.2.4.3., b. lautete sinngemäß: Geeignete Maßnahmen stellen die Unberührbarkeit der Eingangspole der im ersten Absatz genannten Differenzstrom-Schutzeinrichtung(en) sicher, und diese Unberührbarkeit wird durch eine Plombierung dauerhaft gemacht. Es verschwindet also der gesamte Absatz, nicht nur das Wort Plombierung. Der allgemeine Schutz gegen elektrische Schläge bei ",[20,642,643],{},"direktem Berühren"," (Abschnitt 4.2.2., unter anderem durch Umhüllungen und Isolierung) gilt unverändert weiter; ein Verteiler muss seine aktiven Teile also nach wie vor abschirmen.",[11,646,648],{"id":647},"ist-die-verplombung-die-einzige-änderung-in-version-07","Ist die Verplombung die einzige Änderung in Version 07?",[16,650,651,652,655],{},"Ja. Im Wortvergleich der vollständigen niederländischen und französischen Fassungen von Version 06 und Version 07 unterscheiden sich nur die drei genannten Stellen und die Versionsangabe auf dem Titelblatt. ",[20,653,654],{},"Inhaltlich ändert sich sonst nichts","; alle übrigen Abweichungen sind Seiten- und Zeilenumbrüche.",[16,657,658],{},"Nicht zu verwechseln mit zwei anderen Daten:",[51,660,661,673],{},[54,662,663],{},[57,664,665,667,670],{},[60,666,167],{},[60,668,669],{},"Erlass",[60,671,672],{},"Umfang",[70,674,675,686,701],{},[57,676,677,680,683],{},[75,678,679],{},"01.04.2026",[75,681,682],{},"KE vom 6. Oktober 2025",[75,684,685],{},"Buch 1 Version 06: geerdete Gleichstromsysteme (TN, TT, IT) im AREI aufgenommen.",[57,687,688,691,694],{},[75,689,690],{},"01.10.2026",[75,692,693],{},"KE vom 20. Juli 2026",[75,695,696,697,700],{},"Ausschließlich ",[20,698,699],{},"Buch 3"," (Hochspannungsfreileitungen) — nicht häuslich.",[57,702,703,706,709],{},[75,704,705],{},"01.11.2026",[75,707,708],{},"KE vom 13. August 2026",[75,710,711],{},"Buch 1 Version 07: Verplombung des Differenzstromschutzes aufgehoben.",[16,713,714,717],{},[20,715,716],{},"Hinweis zur deutschen Fassung:"," Die deutsche AREI-Seite des FÖD Wirtschaft (zuletzt aktualisiert am 2. Juni 2026) bietet noch keine Version 07 an, und der Erlass vom 13. August 2026 liegt im Belgischen Staatsblatt bisher nicht auf Deutsch vor. Maßgeblich sind die niederländische und die französische Fassung.",[11,719,721],{"id":720},"warum-wird-die-verplombung-abgeschafft","Warum wird die Verplombung abgeschafft?",[16,723,724],{},"Der Bericht an den König begründet die Aufhebung mit fünf Praxissituationen, die immer wieder zu Diskussionen über Sinn und Anwendung führten:",[221,726,727,730,737,740,747],{},[224,728,729],{},"Ist eine Plombe einmal entfernt, kann nur eine zugelassene Stelle neu verplomben — und das nur über eine erneute Kontrolle der Anlage;",[224,731,732,733,736],{},"bei einer als ",[20,734,735],{},"nicht konform"," beurteilten Anlage verlangte Buch 1 von der Stelle gar keine Verplombung;",[224,738,739],{},"die Verplombung galt ausschließlich für häusliche Anlagen;",[224,741,742,743,746],{},"bei einer wichtigen Änderung oder Erweiterung konnte sie ",[20,744,745],{},"teilweise"," erfolgen: Nur die von den Arbeiten betroffene Schutzeinrichtung musste verplombt werden;",[224,748,749],{},"die abschreckende Wirkung einer Plombe als Sicherheitsmaßnahme ist begrenzt.",[16,751,752],{},"Die Entscheidung fiel in Abstimmung mit Vertretern der Installateure, der zugelassenen Stellen und der öffentlichen Netzbetreiber. Der Bericht hält ausdrücklich fest, dass die Aufhebung die Sicherheit häuslicher Anlagen nicht beeinträchtigt.",[11,754,756],{"id":755},"wie-sah-so-eine-plombe-in-der-praxis-aus","Wie sah so eine Plombe in der Praxis aus?",[16,758,759,760,763],{},"Das AREI hat nie eine ",[20,761,762],{},"Form"," vorgeschrieben. Der Text verlangte lediglich eine „Plombierung\" durch die mit der Konformitätsprüfung beauftragte Person — kein bestimmtes Material, keine Farbe, kein Prägezeichen. In der Praxis bedeutete das meistens:",[221,765,766,773,776],{},[224,767,768,769,772],{},"eine Klemmenabdeckung über den ",[20,770,771],{},"Eingangspolen"," des Haupt-Differenzstromschutzes, mit zwei Ösen oder Bohrungen;",[224,774,775],{},"einen dünnen Metalldraht durch diese Ösen, zu einer geschlossenen Schlaufe geführt;",[224,777,778],{},"eine Bleiplombe oder Kunststoffplombe auf der Schlaufe, mit der Plombenzange verpresst, oft mit dem Zeichen der zugelassenen Stelle.",[16,780,781,782,785,786,789],{},"Die Plombe saß also am ",[20,783,784],{},"Eingang"," des Geräts, nicht am Ausgang: Sie belegte, dass alles dahinter über diesen Schutz von höchstens 300 mA gespeist wird, und ließ sich nicht ohne sichtbare Spur öffnen. Klar zu trennen davon sind die ",[20,787,788],{},"Plomben des Netzbetreibers"," an Anschluss und Zähler, auch am digitalen Zähler. Diese bleiben unangetastet und dürfen nie entfernt werden.",[11,791,793],{"id":792},"mein-haupt-fi-ist-nicht-verplombt-ist-das-ein-verstoß","Mein Haupt-FI ist nicht verplombt — ist das ein Verstoß?",[16,795,796],{},"Nicht zwangsläufig, und ab dem 1. November 2026 ohnehin nicht mehr. Eine fehlende Plombe an einer älteren Anlage hat meist einen dieser Gründe:",[221,798,799,805,808,815],{},[224,800,801,802,804],{},"Die Anlage wurde bei der Kontrolle ",[20,803,735],{}," beurteilt; dann verlangte Buch 1 keine Verplombung;",[224,806,807],{},"nach der Kontrolle wurde am Verteiler gearbeitet und die Plombe dabei verletzt — das ist für sich genommen kein Verstoß gegen Buch 1, kostet aber den Beweiswert;",[224,809,810,811,814],{},"bei einer Erweiterung wurde nur ",[20,812,813],{},"eine"," von mehreren Schutzeinrichtungen am Anfang verplombt;",[224,816,817],{},"Gerät oder Verteileraufbau ließen eine Verplombung der Eingangspole nicht zu.",[16,819,820],{},"Eine Plombe am Zählerkasten oder am Anschlusskabel ist etwas anderes: Sie stammt vom Verteilernetzbetreiber und hat mit der AREI-Vorschrift nichts zu tun. Gewissheit für deine Anlage gibt dir der letzte Prüfbericht: Dort stand bisher ausdrücklich, ob verplombt wurde.",[11,822,824],{"id":823},"darf-eine-vorhandene-plombe-jetzt-einfach-weg","Darf eine vorhandene Plombe jetzt einfach weg?",[16,826,827],{},"Ab dem 1. November 2026 folgt aus Buch 1 keine Pflicht mehr, eine Plombe am Differenzstromschutz anzubringen oder unversehrt zu halten. Entferne sie trotzdem nicht selbst:",[221,829,830,833,840],{},[224,831,832],{},"Arbeiten am Verteiler finden in unmittelbarer Nähe der Speiseleitung statt und gehören in Fachhand;",[224,834,835,836,839],{},"Plomben des Netzbetreibers an Zähler, Hauptsicherung oder Anschluss sind von dieser Änderung ",[20,837,838],{},"nicht"," betroffen und bleiben tabu;",[224,841,842],{},"eine unversehrte Plombe bleibt ein praktischer Beleg dafür, dass sich seit der letzten Kontrolle an der Einspeisung nichts geändert hat.",[11,844,846],{"id":845},"was-bedeutet-das-für-prüfberichte-und-dossiers","Was bedeutet das für Prüfberichte und Dossiers?",[16,848,849],{},"Berichte, die nach dem 1. November 2026 erstellt werden, führen die Verplombung nicht mehr auf. Erhalten bleiben:",[221,851,852,859,862],{},[224,853,854,855,858],{},"die Bestätigung, dass die zugelassene Stelle ",[20,856,857],{},"Eindrahtschemata und Positionspläne"," visiert hat — bei der Konformitätsprüfung wie beim Kontrollbesuch;",[224,860,861],{},"die Angabe des spätesten Termins für den nächsten Kontrollbesuch (Kapitel 6.5.);",[224,863,864],{},"die Beurteilung der Anlage nach den zu diesem Zeitpunkt geltenden Vorschriften.",[16,866,867,868,872],{},"Ältere Berichte mit Verplombungsvermerk bleiben gültig. Eine Anlage muss nicht erneut geprüft werden, weil eine Vorschrift wegfällt: Eine Kontrolle beurteilt die Anlage nach dem anwendbaren Recht, und der ",[29,869,871],{"href":870},"\u002Fde\u002Fblog\u002Felektrische-abnahme","Kontrollbesuch einer bestehenden Anlage"," folgt seiner eigenen Periodizität.",[11,874,876],{"id":875},"was-bedeutet-die-änderung-für-die-planelec-selbstprüfung","Was bedeutet die Änderung für die PlanElec-Selbstprüfung?",[16,878,879],{},"Nichts – und das ist folgerichtig. Die AREI\u002FRGIE-Selbstprüfung in PlanElec arbeitet am Projektmodell: Eindrahtschema, Positionsplan, Stromkreise, Schutzorgane und Verteiler. Plombieren ist eine Handlung des Prüfers an der errichteten Anlage, keine Eigenschaft eines Plans; die Verplombung war deshalb nie eine Prüfregel. Den Haupt-FI mit höchstens 300 mA am Speisepunkt prüft die Selbstprüfung weiterhin, denn diese Pflicht bleibt (4.2.4.3 b).",[16,881,882],{},"Für Bestandsanlagen hältst du je Stromkreis fest, aus welcher Zeit er stammt: vor dem 1. Oktober 1981, unter dem alten AREI, unter dem neuen AREI ab 1. Juni 2020 oder aktuelle Arbeiten. Die Selbstprüfung wendet darauf die zulässigen Abweichungen aus Teil 8 an und nennt sie in den Befunden. Der in PlanElec hinterlegte Regelwerksvolltext ist Buch 1 Version 06 (anwendbar seit 1. April 2026). Messungen und die Abnahme vor Ort macht die zugelassene Stelle.",[11,884,886],{"id":885},"quellen","Quellen",[51,888,889,899],{},[54,890,891],{},[57,892,893,896],{},[60,894,895],{},"Quelle",[60,897,898],{},"Inhalt",[70,900,901,912,923,934,946],{},[57,902,903,909],{},[75,904,905],{},[29,906,908],{"href":31,"rel":907},[33],"KE 13. August 2026, BS 15. September 2026",[75,910,911],{},"Erlasstext und Bericht an den König",[57,913,914,920],{},[75,915,916],{},[29,917,919],{"href":416,"rel":918},[33],"Konsolidierte Fassung in Justel",[75,921,922],{},"Amtliche Konsolidierung",[57,924,925,931],{},[75,926,927],{},[29,928,930],{"href":428,"rel":929},[33],"Buch 1 des AREI, anwendbar ab 1. November 2026 (PDF, NL)",[75,932,933],{},"Version 07, Volltext",[57,935,936,943],{},[75,937,938],{},[29,939,942],{"href":940,"rel":941},"https:\u002F\u002Feconomie.fgov.be\u002Fsites\u002Fdefault\u002Ffiles\u002FFiles\u002FPublications\u002Ffiles\u002FRGIE-Annexe-Livre-1-Installations-a-basse-tenstion-et-a-tres-basse-tension-2026-v07.pdf",[33],"Livre 1 du RGIE, ab 1. November 2026 (PDF, FR)",[75,944,945],{},"Version 07, französische Fassung",[57,947,948,955],{},[75,949,950],{},[29,951,954],{"href":952,"rel":953},"https:\u002F\u002Feconomie.fgov.be\u002Fde\u002Fpublication\u002Fallgemeine-vorschriften-fuer",[33],"FÖD Wirtschaft — deutsche AREI-Seite",[75,956,957],{},"Deutsche Ausgabe, Stand 2. Juni 2026",[16,959,960],{},"Dieser Beitrag fasst die amtlichen Texte zusammen; verbindlich ist der Wortlaut im Belgischen Staatsblatt.",[11,962,964],{"id":963},"verwandte-beiträge","Verwandte Beiträge",[221,966,967,973,978,984],{},[224,968,969],{},[29,970,972],{"href":971},"\u002Fde\u002Fblog\u002Farei-vorschriften-2026","AREI-Vorschriften 2026: die wichtigsten Änderungen",[224,974,975],{},[29,976,977],{"href":870},"Elektrische Abnahme in Belgien",[224,979,980],{},[29,981,983],{"href":982},"\u002Fde\u002Fblog\u002Finspektions-checkliste","Inspektions-Checkliste: was der Prüfer kontrolliert",[224,985,986],{},[29,987,989],{"href":988},"\u002Fde\u002Fblog\u002Ffi-typ-a-vs-typ-b","FI Typ A oder Typ B",[16,991,992],{},[29,993,995],{"href":994},"\u002Fde","Dein Elektrodossier in PlanElec aufbauen →",{"title":485,"searchDepth":486,"depth":486,"links":997},[998,999,1000,1001,1002,1003,1004,1005,1006,1007,1008],{"id":534,"depth":486,"text":535},{"id":560,"depth":486,"text":561},{"id":647,"depth":486,"text":648},{"id":720,"depth":486,"text":721},{"id":755,"depth":486,"text":756},{"id":792,"depth":486,"text":793},{"id":823,"depth":486,"text":824},{"id":845,"depth":486,"text":846},{"id":875,"depth":486,"text":876},{"id":885,"depth":486,"text":886},{"id":963,"depth":486,"text":964},"Ab dem 1. November 2026 entfällt die Pflicht, den Differenzstromschutz am Anfang einer Hausinstallation zu verplomben. Was der KE vom 13. August 2026 genau streicht, was unverändert bleibt und was das für Prüfberichte bedeutet.","de",{},"\u002Fblog\u002Frcd-sealing-abolished-2026.de",{"title":529,"description":1009},"Verplombung von FI-Schaltern: Was ab 1.11.2026 gilt","verplombung-differenzialschalter-entfaellt-2026","blog\u002Frcd-sealing-abolished-2026.de",[515,516,1018,1019,1020,1021,1022,1023,1024,1025,1026],"Verplombung","Versiegelung","Differenzstromschutz","FI-Schalter","Abnahme","zugelassene Stelle","Buch 1 Version 07","KE 13. August 2026","Belgien","dR0_-JZ_U7Fn15s3CHnNU9qms7rj5ZLdwZSuTYRo1eo",{"id":1029,"title":1030,"articleId":6,"body":1031,"category":499,"date":500,"description":1499,"extension":502,"lastUpdated":503,"locale":1500,"meta":1501,"navigation":506,"path":1502,"publishDate":500,"readTime":508,"refreshInterval":509,"seo":1503,"seoTitle":1504,"slug":6,"stem":1505,"tags":1506,"__hash__":1515},"blog\u002Fblog\u002Frcd-sealing-abolished-2026.en.md","What changes on 1 November 2026 for the sealing of residual current devices?",{"type":8,"value":1032,"toc":1486},[1033,1037,1056,1059,1063,1066,1139,1146,1150,1157,1160,1210,1214,1217,1242,1245,1249,1256,1271,1282,1286,1289,1310,1313,1317,1320,1335,1339,1342,1357,1365,1369,1372,1375,1379,1448,1451,1455,1480],[11,1034,1036],{"id":1035},"what-changes-on-1-november-2026","What changes on 1 November 2026?",[16,1038,1039,1040,1043,1044,1047,1048,1052,1053,39],{},"From ",[20,1041,1042],{},"1 November 2026",", a recognised inspection body no longer has to ",[20,1045,1046],{},"seal"," the residual current device placed at the origin of a Belgian domestic electrical installation when that installation is found compliant. The ",[29,1049,1051],{"href":31,"rel":1050},[33],"Royal Decree of 13 August 2026",", published in the Belgian Official Gazette of 15 September 2026 (numac 2026006432), removes the prescription from parts 4 and 6 of Book 1 of the AREI\u002FRGIE. Book 1 therefore moves to ",[20,1054,1055],{},"version 07",[16,1057,1058],{},"The requirement to install at least one RCD of no more than 300 mA at the origin of the installation is unchanged. What disappears is only the sealing of that device by the inspector — and the corresponding statement in the inspection report.",[11,1060,1062],{"id":1061},"which-provisions-are-removed-exactly","Which provisions are removed exactly?",[16,1064,1065],{},"The decree has five articles; three of them amend Book 1.",[51,1067,1068,1081],{},[54,1069,1070],{},[57,1071,1072,1075,1078],{},[60,1073,1074],{},"Article of the RD 13\u002F08\u002F2026",[60,1076,1077],{},"Provision in Book 1",[60,1079,1080],{},"Effect",[70,1082,1083,1096,1109,1121,1130],{},[57,1084,1085,1087,1093],{},[75,1086,77],{},[75,1088,1089,1090,1092],{},"Part 4, sub-section ",[20,1091,83],{},", third paragraph",[75,1094,1095],{},"Repealed in full: both the inaccessibility of the input terminals and the seal that had to make it permanent.",[57,1097,1098,1100,1106],{},[75,1099,92],{},[75,1101,1102,1103,1105],{},"Part 6, sub-section ",[20,1104,98],{}," (conclusions)",[75,1107,1108],{},"Replaced: the conformity inspection report now only certifies the visa on single-line diagrams and situation plans.",[57,1110,1111,1113,1118],{},[75,1112,107],{},[75,1114,1102,1115,1117],{},[20,1116,112],{},", second paragraph",[75,1119,1120],{},"Replaced: the control-visit report only states that diagrams and plans were visaed again.",[57,1122,1123,1125,1127],{},[75,1124,121],{},[75,1126,124],{},[75,1128,1129],{},"Entry into force on the first day of the second month after publication, i.e. 1 November 2026.",[57,1131,1132,1134,1136],{},[75,1133,132],{},[75,1135,124],{},[75,1137,1138],{},"Execution by the minister responsible for Energy.",[16,1140,1141,1142,1145],{},"The deleted paragraph in 4.2.4.3., b. required adequate measures to make the input terminals of the RCD(s) inaccessible, and stated that this inaccessibility had to be made permanent by a seal applied by the person carrying out the conformity inspection. The whole paragraph goes, not just the word sealing. General protection against electric shock by ",[20,1143,1144],{},"direct contact"," (section 4.2.2., through enclosures and insulation among others) remains fully in force: a distribution board must still shield its live parts.",[11,1147,1149],{"id":1148},"is-sealing-the-only-change-in-version-07","Is sealing the only change in version 07?",[16,1151,1152,1153,1156],{},"Yes. A word-by-word comparison of the complete Dutch and French texts of versions 06 and 07 shows only the three passages above and the version marking on the title page. ",[20,1154,1155],{},"Nothing else changes in substance","; all other variations are pagination and line breaks.",[16,1158,1159],{},"Do not confuse this with two other dates:",[51,1161,1162,1175],{},[54,1163,1164],{},[57,1165,1166,1169,1172],{},[60,1167,1168],{},"Date",[60,1170,1171],{},"Decree",[60,1173,1174],{},"Scope",[70,1176,1177,1187,1200],{},[57,1178,1179,1181,1184],{},[75,1180,180],{},[75,1182,1183],{},"RD of 6 October 2025",[75,1185,1186],{},"Book 1 version 06: earthed direct-current systems (TN, TT, IT) added.",[57,1188,1189,1191,1194],{},[75,1190,191],{},[75,1192,1193],{},"RD of 20 July 2026",[75,1195,1196,1199],{},[20,1197,1198],{},"Book 3"," only (high-voltage overhead lines) — not domestic installations.",[57,1201,1202,1204,1207],{},[75,1203,206],{},[75,1205,1206],{},"RD of 13 August 2026",[75,1208,1209],{},"Book 1 version 07: sealing of the RCD abolished.",[11,1211,1213],{"id":1212},"why-is-the-seal-being-abolished","Why is the seal being abolished?",[16,1215,1216],{},"The report to the King justifies the repeal with five practical situations that kept raising questions about the purpose and application of the measure:",[221,1218,1219,1222,1229,1232,1239],{},[224,1220,1221],{},"once a seal has been removed, only a recognised body can apply a new one, and only through a new inspection of the installation;",[224,1223,1224,1225,1228],{},"where an installation was declared ",[20,1226,1227],{},"non-compliant",", Book 1 did not require the body to seal at all;",[224,1230,1231],{},"sealing applied only to domestic installations;",[224,1233,1234,1235,1238],{},"for a significant modification or extension the sealing could be ",[20,1236,1237],{},"partial",": only the RCD affected by the work had to be sealed;",[224,1240,1241],{},"the deterrent value of a seal as a safety measure is limited.",[16,1243,1244],{},"The decision was taken in consultation with representatives of installers, recognised bodies and public grid operators. The report states explicitly that the repeal does not reduce the safety of domestic installations.",[11,1246,1248],{"id":1247},"what-did-such-a-seal-look-like-in-practice","What did such a seal look like in practice?",[16,1250,1251,1252,1255],{},"The AREI never prescribed a ",[20,1253,1254],{},"form",". The text required only a seal applied by the person responsible for the conformity inspection — no specific material, colour or marking. In practice this usually meant:",[221,1257,1258,1265,1268],{},[224,1259,1260,1261,1264],{},"a terminal cover over the ",[20,1262,1263],{},"input terminals"," of the main RCD, with two eyelets or holes;",[224,1266,1267],{},"a thin metal wire threaded through those eyelets into a closed loop;",[224,1269,1270],{},"a lead or plastic seal crimped onto the loop with sealing pliers, often carrying the mark of the recognised body.",[16,1272,1273,1274,1277,1278,1281],{},"The seal therefore sat on the ",[20,1275,1276],{},"input"," side of the device, not the output: it evidenced that everything downstream was fed through that maximum 300 mA protection, and it could not be broken without leaving a visible trace. This is entirely separate from the ",[20,1279,1280],{},"grid operator's seals"," on the service connection and the meter, including a digital meter. Those stay in place and must never be removed.",[11,1283,1285],{"id":1284},"my-main-rcd-is-not-sealed-is-that-a-violation","My main RCD is not sealed — is that a violation?",[16,1287,1288],{},"Not necessarily, and from 1 November 2026 certainly not. A missing seal on an older installation usually has one of these explanations:",[221,1290,1291,1297,1300,1307],{},[224,1292,1293,1294,1296],{},"the installation was declared ",[20,1295,1227],{}," at the inspection, in which case Book 1 required no sealing;",[224,1298,1299],{},"work was done on the board after the inspection and the seal was broken — not in itself a breach of Book 1, but the evidential value is gone;",[224,1301,1302,1303,1306],{},"during an extension only ",[20,1304,1305],{},"one"," of several RCDs at the origin was sealed;",[224,1308,1309],{},"the device or the board construction did not allow the input terminals to be sealed.",[16,1311,1312],{},"A seal on the meter cabinet or the service cable is a different matter: it belongs to the distribution grid operator and has nothing to do with the AREI prescription. For your own installation, the last inspection report is the reference: until now it stated explicitly whether sealing had been carried out.",[11,1314,1316],{"id":1315},"can-an-existing-seal-simply-be-removed-now","Can an existing seal simply be removed now?",[16,1318,1319],{},"From 1 November 2026, Book 1 no longer requires a seal on the RCD to be applied or kept intact. Still, do not remove it yourself:",[221,1321,1322,1325,1332],{},[224,1323,1324],{},"work inside a distribution board happens close to the supply cable and belongs in professional hands;",[224,1326,1327,1328,1331],{},"grid operator seals on the meter, main fuse or connection are ",[20,1329,1330],{},"not"," affected by this change and remain off limits;",[224,1333,1334],{},"an intact seal remains practical evidence that nothing has changed on the supply side since the last inspection.",[11,1336,1338],{"id":1337},"what-does-this-mean-for-inspection-reports-and-dossiers","What does this mean for inspection reports and dossiers?",[16,1340,1341],{},"Reports drawn up after 1 November 2026 will no longer mention sealing. What remains:",[221,1343,1344,1351,1354],{},[224,1345,1346,1347,1350],{},"confirmation that the recognised body visaed the ",[20,1348,1349],{},"single-line diagrams and situation plans",", both at the conformity inspection and at the control visit;",[224,1352,1353],{},"the latest date for the next control visit (chapter 6.5.);",[224,1355,1356],{},"the assessment of the installation against the prescriptions in force at that time.",[16,1358,1359,1360,1364],{},"Older reports mentioning a seal remain valid. An installation does not need re-inspection because a prescription disappears: an inspection assesses the installation under the applicable law, and the ",[29,1361,1363],{"href":1362},"\u002Fen\u002Fblog\u002Felectrical-inspection","control visit of an existing installation"," follows its own periodicity.",[11,1366,1368],{"id":1367},"what-does-the-change-mean-for-the-planelec-self-check","What does the change mean for the PlanElec self-check?",[16,1370,1371],{},"Nothing – and that is consistent. The AREI\u002FRGIE self-check in PlanElec works on the project model: single-line diagram, situation plan, circuits, protective devices and distribution board. Sealing is an act by the inspector on the installed system, not a property of a plan, so it was never a check rule. The main RCD of no more than 300 mA at the origin is still checked, because that obligation remains (4.2.4.3(b)).",[16,1373,1374],{},"For existing installations you record for each circuit which period it dates from: before 1 October 1981, under the old AREI, under the new AREI from 1 June 2020, or current work. The self-check applies the permitted Part 8 deviations and names them in its findings. The regulatory full text in PlanElec is Book 1 version 06 (applicable since 1 April 2026). Measurements and the on-site inspection are carried out by the approved inspection body.",[11,1376,1378],{"id":1377},"sources","Sources",[51,1380,1381,1391],{},[54,1382,1383],{},[57,1384,1385,1388],{},[60,1386,1387],{},"Source",[60,1389,1390],{},"Content",[70,1392,1393,1404,1415,1426,1437],{},[57,1394,1395,1401],{},[75,1396,1397],{},[29,1398,1400],{"href":31,"rel":1399},[33],"RD 13 August 2026, Official Gazette 15 September 2026",[75,1402,1403],{},"Decree text and report to the King",[57,1405,1406,1412],{},[75,1407,1408],{},[29,1409,1411],{"href":416,"rel":1410},[33],"Consolidated version in Justel",[75,1413,1414],{},"Official consolidation",[57,1416,1417,1423],{},[75,1418,1419],{},[29,1420,1422],{"href":428,"rel":1421},[33],"Book 1 of the AREI applicable from 1 November 2026 (PDF, NL)",[75,1424,1425],{},"Version 07, full text",[57,1427,1428,1434],{},[75,1429,1430],{},[29,1431,1433],{"href":940,"rel":1432},[33],"Livre 1 of the RGIE from 1 November 2026 (PDF, FR)",[75,1435,1436],{},"Version 07, French text",[57,1438,1439,1445],{},[75,1440,1441],{},[29,1442,1444],{"href":440,"rel":1443},[33],"FPS Economy — AREI\u002FRGIE overview page",[75,1446,1447],{},"All books and amending decrees",[16,1449,1450],{},"This article summarises the official texts; the wording published in the Belgian Official Gazette is binding.",[11,1452,1454],{"id":1453},"related-articles","Related articles",[221,1456,1457,1463,1468,1474],{},[224,1458,1459],{},[29,1460,1462],{"href":1461},"\u002Fen\u002Fblog\u002Farei-regulations-2026","AREI\u002FRGIE regulations 2026: the key changes",[224,1464,1465],{},[29,1466,1467],{"href":1362},"Electrical inspection in Belgium",[224,1469,1470],{},[29,1471,1473],{"href":1472},"\u002Fen\u002Fblog\u002Finspection-checklist","Inspection checklist: what the inspector verifies",[224,1475,1476],{},[29,1477,1479],{"href":1478},"\u002Fen\u002Fblog\u002Frcd-type-a-vs-b","RCD type A or type B",[16,1481,1482],{},[29,1483,1485],{"href":1484},"\u002Fen","Build your electrical dossier in PlanElec →",{"title":485,"searchDepth":486,"depth":486,"links":1487},[1488,1489,1490,1491,1492,1493,1494,1495,1496,1497,1498],{"id":1035,"depth":486,"text":1036},{"id":1061,"depth":486,"text":1062},{"id":1148,"depth":486,"text":1149},{"id":1212,"depth":486,"text":1213},{"id":1247,"depth":486,"text":1248},{"id":1284,"depth":486,"text":1285},{"id":1315,"depth":486,"text":1316},{"id":1337,"depth":486,"text":1338},{"id":1367,"depth":486,"text":1368},{"id":1377,"depth":486,"text":1378},{"id":1453,"depth":486,"text":1454},"From 1 November 2026 the mandatory sealing of the RCD at the origin of a Belgian domestic installation disappears. What the Royal Decree of 13 August 2026 removes exactly, what stays unchanged, and what it means for inspection reports.","en",{},"\u002Fblog\u002Frcd-sealing-abolished-2026.en",{"title":1030,"description":1499},"RCD Sealing: What Changes on 1 November 2026","blog\u002Frcd-sealing-abolished-2026.en",[515,516,1507,1508,1509,1510,1511,1512,1513,1514],"sealing","RCD","residual current device","electrical inspection","recognised body","Book 1 version 07","Royal Decree 13 August 2026","Belgium","z1AHXDXHkEvT6wZmYjnTZU3orRxBMxj2JZtkpKNP9PE",{"id":1517,"title":1518,"articleId":6,"body":1519,"category":499,"date":500,"description":1969,"extension":502,"lastUpdated":503,"locale":1970,"meta":1971,"navigation":506,"path":1972,"publishDate":500,"readTime":508,"refreshInterval":509,"seo":1973,"seoTitle":1974,"slug":1975,"stem":1976,"tags":1977,"__hash__":1986},"blog\u002Fblog\u002Frcd-sealing-abolished-2026.fr.md","Qu’est-ce qui change le 1er novembre 2026 pour le plombage des différentiels ?",{"type":8,"value":1520,"toc":1956},[1521,1525,1544,1547,1551,1554,1626,1633,1637,1644,1647,1697,1701,1704,1729,1732,1736,1743,1758,1769,1773,1776,1793,1796,1800,1803,1818,1822,1825,1840,1848,1852,1855,1858,1860,1918,1921,1925,1950],[11,1522,1524],{"id":1523},"quest-ce-qui-change-le-1er-novembre-2026","Qu’est-ce qui change le 1er novembre 2026 ?",[16,1526,1527,1528,1531,1532,1535,1536,1541,1542,39],{},"À partir du ",[20,1529,1530],{},"1er novembre 2026",", un organisme agréé ne doit ",[20,1533,1534],{},"plus sceller"," le dispositif de protection à courant différentiel-résiduel placé à l’origine d’une installation électrique domestique lorsque celle-ci est déclarée conforme. L’",[29,1537,1540],{"href":1538,"rel":1539},"https:\u002F\u002Fwww.ejustice.just.fgov.be\u002Fcgi\u002Farticle.pl?language=fr&sum_date=2026-09-15&lg_txt=f&numac_search=2026006432",[33],"arrêté royal du 13 août 2026",", publié au Moniteur belge du 15 septembre 2026 (numac 2026006432), supprime la prescription dans les parties 4 et 6 du livre 1 du RGIE. Le livre 1 passe ainsi en ",[20,1543,1055],{},[16,1545,1546],{},"L’obligation de placer à l’origine de l’installation au moins un différentiel de 300 mA au maximum reste, elle, inchangée. Seul disparaît le plombage de cet appareil par l’agent-visiteur — et la mention correspondante dans le rapport de contrôle.",[11,1548,1550],{"id":1549},"quelles-dispositions-sont-exactement-supprimées","Quelles dispositions sont exactement supprimées ?",[16,1552,1553],{},"L’arrêté compte cinq articles, dont trois modifient le livre 1.",[51,1555,1556,1569],{},[54,1557,1558],{},[57,1559,1560,1563,1566],{},[60,1561,1562],{},"Article AR 13\u002F08\u002F2026",[60,1564,1565],{},"Disposition du livre 1",[60,1567,1568],{},"Effet",[70,1570,1571,1584,1596,1608,1617],{},[57,1572,1573,1575,1581],{},[75,1574,77],{},[75,1576,1577,1578,1580],{},"Partie 4, sous-section ",[20,1579,83],{},", 3e alinéa",[75,1582,1583],{},"Abrogé intégralement : tant l’inaccessibilité des bornes d’entrée que le plombage censé la rendre permanente.",[57,1585,1586,1588,1593],{},[75,1587,92],{},[75,1589,1590,1591,1105],{},"Partie 6, sous-section ",[20,1592,98],{},[75,1594,1595],{},"Remplacé : le rapport du contrôle de conformité n’atteste plus que le visa des schémas unifilaires et des plans de position.",[57,1597,1598,1600,1605],{},[75,1599,107],{},[75,1601,1590,1602,1604],{},[20,1603,112],{},", 2e alinéa",[75,1606,1607],{},"Remplacé : le rapport de visite de contrôle mentionne uniquement le nouveau visa des schémas et plans.",[57,1609,1610,1612,1614],{},[75,1611,121],{},[75,1613,124],{},[75,1615,1616],{},"Entrée en vigueur le premier jour du deuxième mois suivant la publication, soit le 1er novembre 2026.",[57,1618,1619,1621,1623],{},[75,1620,132],{},[75,1622,124],{},[75,1624,1625],{},"Exécution par le ministre compétent pour l’Énergie.",[16,1627,1628,1629,1632],{},"L’alinéa supprimé en 4.2.4.3., b. disait : « Des mesures adéquates sont prises pour que les bornes d’entrée du ou des dispositif(s) de protection à courant différentiel-résiduel visés au 1er alinéa soient inaccessibles. A cet effet, la permanence de cette inaccessibilité est réalisée par un plombage placé par la personne visée à la section 6.4.1. et chargée d’en faire le contrôle de conformité avant mise en usage. » C’est donc l’alinéa entier qui disparaît, pas seulement le mot plombage. La protection générale contre les chocs électriques par ",[20,1630,1631],{},"contact direct"," (section 4.2.2., notamment par enveloppes et isolation) reste intégralement applicable : un tableau doit toujours protéger ses parties actives.",[11,1634,1636],{"id":1635},"le-plombage-est-il-la-seule-modification-de-la-version-07","Le plombage est-il la seule modification de la version 07 ?",[16,1638,1639,1640,1643],{},"Oui. Une comparaison mot à mot des textes complets néerlandais et français des versions 06 et 07 ne fait apparaître que les trois passages ci-dessus et la mention de version en page de titre. ",[20,1641,1642],{},"Sur le fond, rien d’autre ne change"," ; les autres écarts relèvent de la pagination et des coupures de lignes.",[16,1645,1646],{},"À ne pas confondre avec deux autres dates :",[51,1648,1649,1661],{},[54,1650,1651],{},[57,1652,1653,1655,1658],{},[60,1654,1168],{},[60,1656,1657],{},"Arrêté",[60,1659,1660],{},"Portée",[70,1662,1663,1673,1687],{},[57,1664,1665,1667,1670],{},[75,1666,180],{},[75,1668,1669],{},"AR du 6 octobre 2025",[75,1671,1672],{},"Livre 1 version 06 : intégration des schémas mis à la terre en courant continu.",[57,1674,1675,1677,1680],{},[75,1676,191],{},[75,1678,1679],{},"AR du 20 juillet 2026",[75,1681,1682,1683,1686],{},"Uniquement le ",[20,1684,1685],{},"livre 3"," (lignes aériennes haute tension) — pas le domestique.",[57,1688,1689,1691,1694],{},[75,1690,206],{},[75,1692,1693],{},"AR du 13 août 2026",[75,1695,1696],{},"Livre 1 version 07 : suppression du plombage du différentiel.",[11,1698,1700],{"id":1699},"pourquoi-supprimer-le-plombage","Pourquoi supprimer le plombage ?",[16,1702,1703],{},"Le rapport au Roi motive l’abrogation par cinq situations de terrain qui alimentaient les discussions sur l’intérêt et l’application de la mesure :",[221,1705,1706,1709,1716,1719,1726],{},[224,1707,1708],{},"une fois le scellé retiré, seul un organisme agréé peut en replacer un, et uniquement par un nouveau contrôle de l’installation ;",[224,1710,1711,1712,1715],{},"lorsque l’installation est déclarée ",[20,1713,1714],{},"non conforme",", le livre 1 n’imposait pas à l’organisme de sceller ;",[224,1717,1718],{},"le plombage ne s’appliquait qu’aux installations domestiques ;",[224,1720,1721,1722,1725],{},"lors d’une modification ou extension importante, le plombage pouvait être ",[20,1723,1724],{},"partiel"," : seul le différentiel concerné par les travaux devait être scellé ;",[224,1727,1728],{},"le caractère dissuasif d’un scellé comme mesure de sécurité est limité.",[16,1730,1731],{},"La décision a été prise en concertation avec les représentants des installateurs, des organismes agréés et des gestionnaires de réseau public. Le rapport précise que l’abrogation ne porte pas atteinte à la sécurité des installations domestiques.",[11,1733,1735],{"id":1734},"à-quoi-ressemblait-un-plombage-en-pratique","À quoi ressemblait un plombage en pratique ?",[16,1737,1738,1739,1742],{},"Le RGIE n’a jamais prescrit de ",[20,1740,1741],{},"forme",". Le texte exigeait seulement un « plombage » placé par la personne chargée du contrôle de conformité — ni matériau, ni couleur, ni marquage déterminés. Dans la pratique, cela se traduisait généralement par :",[221,1744,1745,1752,1755],{},[224,1746,1747,1748,1751],{},"un cache-bornes recouvrant les ",[20,1749,1750],{},"bornes d’entrée"," du différentiel de tête, percé de deux œillets ;",[224,1753,1754],{},"un fil métallique fin passé dans ces œillets et formant une boucle fermée ;",[224,1756,1757],{},"un plomb ou un scellé plastique serti sur la boucle à la pince à plomber, souvent au sigle de l’organisme agréé.",[16,1759,1760,1761,1764,1765,1768],{},"Le scellé se trouvait donc à l’",[20,1762,1763],{},"entrée"," du différentiel, pas à sa sortie : il attestait que tout l’aval était alimenté à travers cette protection de 300 mA maximum, et il ne pouvait être rompu sans laisser de trace visible. À distinguer nettement des ",[20,1766,1767],{},"scellés du gestionnaire de réseau"," sur le raccordement et le compteur, y compris un compteur numérique : ceux-là restent en place et ne peuvent jamais être retirés.",[11,1770,1772],{"id":1771},"mon-différentiel-de-tête-nest-pas-plombé-est-ce-une-infraction","Mon différentiel de tête n’est pas plombé — est-ce une infraction ?",[16,1774,1775],{},"Pas nécessairement, et plus du tout à partir du 1er novembre 2026. L’absence de scellé sur une installation plus ancienne s’explique généralement par l’une de ces raisons :",[221,1777,1778,1784,1787,1790],{},[224,1779,1780,1781,1783],{},"l’installation a été déclarée ",[20,1782,1714],{}," lors du contrôle ; le livre 1 n’imposait alors pas de sceller ;",[224,1785,1786],{},"des travaux ont été réalisés au tableau après le contrôle et le scellé a été rompu — ce qui n’est pas en soi une infraction au livre 1, mais fait perdre sa valeur de preuve ;",[224,1788,1789],{},"lors d’une extension, un seul différentiel de tête sur plusieurs a été scellé ;",[224,1791,1792],{},"l’appareil ou la construction du tableau ne permettait pas de sceller les bornes d’entrée.",[16,1794,1795],{},"Un scellé sur le coffret du compteur ou sur le câble de raccordement est autre chose : il appartient au gestionnaire de réseau de distribution et ne relève pas de la prescription RGIE. Pour votre installation, le dernier rapport de contrôle fait foi : jusqu’ici, il indiquait explicitement si le plombage avait été réalisé.",[11,1797,1799],{"id":1798},"peut-on-désormais-retirer-un-scellé-existant","Peut-on désormais retirer un scellé existant ?",[16,1801,1802],{},"À partir du 1er novembre 2026, le livre 1 n’impose plus de placer ni de conserver un scellé sur le différentiel. Ne le retirez pas vous-même pour autant :",[221,1804,1805,1808,1815],{},[224,1806,1807],{},"intervenir dans un tableau reste une intervention à proximité du câble d’alimentation et relève d’un professionnel ;",[224,1809,1810,1811,1814],{},"les scellés du gestionnaire de réseau sur le compteur, le coupe-circuit ou le raccordement ne sont ",[20,1812,1813],{},"pas"," concernés par cette modification et restent interdits d’accès ;",[224,1816,1817],{},"un scellé intact reste une preuve pratique que rien n’a changé côté alimentation depuis le dernier contrôle.",[11,1819,1821],{"id":1820},"quel-effet-sur-les-rapports-de-contrôle-et-les-dossiers","Quel effet sur les rapports de contrôle et les dossiers ?",[16,1823,1824],{},"Les rapports établis après le 1er novembre 2026 ne mentionneront plus le plombage. Subsistent :",[221,1826,1827,1834,1837],{},[224,1828,1829,1830,1833],{},"l’attestation que l’organisme agréé a visé les ",[20,1831,1832],{},"schémas unifilaires et plans de position",", tant au contrôle de conformité qu’à la visite de contrôle ;",[224,1835,1836],{},"l’indication de la date limite de la prochaine visite de contrôle (chapitre 6.5.) ;",[224,1838,1839],{},"l’appréciation de l’installation au regard des prescriptions en vigueur à ce moment.",[16,1841,1842,1843,1847],{},"Les rapports antérieurs mentionnant un plombage restent valables. Une installation ne doit pas être recontrôlée parce qu’une prescription disparaît : un contrôle apprécie l’installation selon le droit applicable, et la ",[29,1844,1846],{"href":1845},"\u002Ffr\u002Fblog\u002Fcontrole-electrique","visite de contrôle d’une installation existante"," suit sa propre périodicité.",[11,1849,1851],{"id":1850},"quel-effet-sur-lauto-contrôle-de-planelec","Quel effet sur l’auto-contrôle de PlanElec ?",[16,1853,1854],{},"Aucun – et c’est logique. L’auto-contrôle RGIE de PlanElec travaille sur le modèle du projet : schéma unifilaire, plan de position, circuits, protections et tableau. Plomber est un geste de l’agent-visiteur sur l’installation posée, pas une propriété d’un plan ; le plombage n’a donc jamais été une règle de contrôle. Le différentiel principal de 300 mA au maximum à l’origine reste en revanche vérifié, car cette obligation demeure (4.2.4.3 b).",[16,1856,1857],{},"Pour une installation existante, vous indiquez pour chaque circuit sa période : avant le 1er octobre 1981, sous l’ancien RGIE, sous le nouveau RGIE à partir du 1er juin 2020 ou travaux actuels. L’auto-contrôle y applique les dérogations admises de la partie 8 et les nomme dans ses constats. Le texte réglementaire intégré à PlanElec est le livre 1 version 06 (applicable depuis le 1er avril 2026). Les mesures et le contrôle sur place relèvent de l’organisme agréé.",[11,1859,1378],{"id":1377},[51,1861,1862,1871],{},[54,1863,1864],{},[57,1865,1866,1868],{},[60,1867,1387],{},[60,1869,1870],{},"Contenu",[70,1872,1873,1884,1895,1906],{},[57,1874,1875,1881],{},[75,1876,1877],{},[29,1878,1880],{"href":1538,"rel":1879},[33],"AR du 13 août 2026, MB du 15 septembre 2026",[75,1882,1883],{},"Texte de l’arrêté et rapport au Roi",[57,1885,1886,1892],{},[75,1887,1888],{},[29,1889,1891],{"href":416,"rel":1890},[33],"Version consolidée dans Justel",[75,1893,1894],{},"Consolidation officielle",[57,1896,1897,1903],{},[75,1898,1899],{},[29,1900,1902],{"href":940,"rel":1901},[33],"Livre 1 du RGIE applicable à partir du 1er novembre 2026 (PDF)",[75,1904,1905],{},"Version 07, texte intégral",[57,1907,1908,1915],{},[75,1909,1910],{},[29,1911,1914],{"href":1912,"rel":1913},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fpublications\u002Freglement-general-sur-les",[33],"SPF Économie — page RGIE",[75,1916,1917],{},"Tous les livres et arrêtés modificatifs",[16,1919,1920],{},"Cet article résume les textes officiels ; seul le texte publié au Moniteur belge fait foi.",[11,1922,1924],{"id":1923},"articles-liés","Articles liés",[221,1926,1927,1933,1938,1944],{},[224,1928,1929],{},[29,1930,1932],{"href":1931},"\u002Ffr\u002Fblog\u002Freglementations-rgie-2026","Réglementation RGIE 2026 : les changements clés",[224,1934,1935],{},[29,1936,1937],{"href":1845},"Contrôle électrique en Belgique",[224,1939,1940],{},[29,1941,1943],{"href":1942},"\u002Ffr\u002Fblog\u002Fchecklist-controle","Checklist de contrôle : ce que vérifie l’agent-visiteur",[224,1945,1946],{},[29,1947,1949],{"href":1948},"\u002Ffr\u002Fblog\u002Fdifferentiel-type-a-vs-type-b","Différentiel de type A ou de type B",[16,1951,1952],{},[29,1953,1955],{"href":1954},"\u002Ffr","Construisez votre dossier électrique dans PlanElec →",{"title":485,"searchDepth":486,"depth":486,"links":1957},[1958,1959,1960,1961,1962,1963,1964,1965,1966,1967,1968],{"id":1523,"depth":486,"text":1524},{"id":1549,"depth":486,"text":1550},{"id":1635,"depth":486,"text":1636},{"id":1699,"depth":486,"text":1700},{"id":1734,"depth":486,"text":1735},{"id":1771,"depth":486,"text":1772},{"id":1798,"depth":486,"text":1799},{"id":1820,"depth":486,"text":1821},{"id":1850,"depth":486,"text":1851},{"id":1377,"depth":486,"text":1378},{"id":1923,"depth":486,"text":1924},"À partir du 1er novembre 2026, le plombage obligatoire du différentiel placé à l’origine d’une installation domestique disparaît. Ce que l’AR du 13 août 2026 supprime exactement, ce qui reste inchangé et l’effet sur les rapports de contrôle.","fr",{},"\u002Fblog\u002Frcd-sealing-abolished-2026.fr",{"title":1518,"description":1969},"Plombage des différentiels : ce qui change au 1\u002F11\u002F2026","plombage-differentiel-supprime-2026","blog\u002Frcd-sealing-abolished-2026.fr",[516,1978,1979,1980,1981,1982,1983,1984,1985],"plombage","scellage","différentiel","contrôle électrique","organisme agréé","livre 1 version 07","AR 13 août 2026","Belgique","e4trY_YtQGh_2cb930nutL7vzk1uc1rfHIvQIjIWusk",{"id":4,"title":5,"articleId":6,"body":1988,"category":499,"date":500,"description":501,"extension":502,"lastUpdated":503,"locale":504,"meta":2312,"navigation":506,"path":507,"publishDate":500,"readTime":508,"refreshInterval":509,"seo":2313,"seoTitle":511,"slug":512,"stem":513,"tags":2314,"__hash__":525},{"type":8,"value":1989,"toc":2299},[1990,1992,2003,2005,2007,2009,2069,2073,2075,2079,2081,2121,2123,2125,2141,2143,2145,2149,2159,2165,2167,2169,2183,2185,2187,2189,2199,2201,2203,2213,2217,2219,2221,2223,2225,2273,2275,2277,2295],[11,1991,14],{"id":13},[16,1993,18,1994,23,1996,27,1998,35,2001,39],{},[20,1995,22],{},[20,1997,26],{},[29,1999,34],{"href":31,"rel":2000},[33],[20,2002,38],{},[16,2004,42],{},[11,2006,46],{"id":45},[16,2008,49],{},[51,2010,2011,2021],{},[54,2012,2013],{},[57,2014,2015,2017,2019],{},[60,2016,62],{},[60,2018,65],{},[60,2020,68],{},[70,2022,2023,2033,2043,2053,2061],{},[57,2024,2025,2027,2031],{},[75,2026,77],{},[75,2028,80,2029,84],{},[20,2030,83],{},[75,2032,87],{},[57,2034,2035,2037,2041],{},[75,2036,92],{},[75,2038,95,2039,99],{},[20,2040,98],{},[75,2042,102],{},[57,2044,2045,2047,2051],{},[75,2046,107],{},[75,2048,95,2049,113],{},[20,2050,112],{},[75,2052,116],{},[57,2054,2055,2057,2059],{},[75,2056,121],{},[75,2058,124],{},[75,2060,127],{},[57,2062,2063,2065,2067],{},[75,2064,132],{},[75,2066,124],{},[75,2068,137],{},[16,2070,140,2071,144],{},[20,2072,143],{},[11,2074,148],{"id":147},[16,2076,151,2077,155],{},[20,2078,154],{},[16,2080,158],{},[51,2082,2083,2093],{},[54,2084,2085],{},[57,2086,2087,2089,2091],{},[60,2088,167],{},[60,2090,170],{},[60,2092,173],{},[70,2094,2095,2103,2113],{},[57,2096,2097,2099,2101],{},[75,2098,180],{},[75,2100,183],{},[75,2102,186],{},[57,2104,2105,2107,2109],{},[75,2106,191],{},[75,2108,194],{},[75,2110,197,2111,201],{},[20,2112,200],{},[57,2114,2115,2117,2119],{},[75,2116,206],{},[75,2118,209],{},[75,2120,212],{},[11,2122,216],{"id":215},[16,2124,219],{},[221,2126,2127,2129,2133,2135,2139],{},[224,2128,226],{},[224,2130,229,2131,233],{},[20,2132,232],{},[224,2134,236],{},[224,2136,239,2137,243],{},[20,2138,242],{},[224,2140,246],{},[16,2142,249],{},[11,2144,253],{"id":252},[16,2146,256,2147,260],{},[20,2148,259],{},[221,2150,2151,2155,2157],{},[224,2152,265,2153,269],{},[20,2154,268],{},[224,2156,272],{},[224,2158,275],{},[16,2160,278,2161,282,2163,286],{},[20,2162,281],{},[20,2164,285],{},[11,2166,290],{"id":289},[16,2168,293],{},[221,2170,2171,2175,2177,2181],{},[224,2172,298,2173,302],{},[20,2174,301],{},[224,2176,305],{},[224,2178,308,2179,312],{},[20,2180,311],{},[224,2182,315],{},[16,2184,318],{},[11,2186,322],{"id":321},[16,2188,325],{},[221,2190,2191,2193,2197],{},[224,2192,330],{},[224,2194,333,2195,337],{},[20,2196,336],{},[224,2198,340],{},[11,2200,344],{"id":343},[16,2202,347],{},[221,2204,2205,2209,2211],{},[224,2206,352,2207,356],{},[20,2208,355],{},[224,2210,359],{},[224,2212,362],{},[16,2214,365,2215,370],{},[29,2216,369],{"href":368},[11,2218,374],{"id":373},[16,2220,377],{},[16,2222,380],{},[11,2224,384],{"id":383},[51,2226,2227,2235],{},[54,2228,2229],{},[57,2230,2231,2233],{},[60,2232,393],{},[60,2234,396],{},[70,2236,2237,2246,2255,2264],{},[57,2238,2239,2244],{},[75,2240,2241],{},[29,2242,406],{"href":31,"rel":2243},[33],[75,2245,409],{},[57,2247,2248,2253],{},[75,2249,2250],{},[29,2251,418],{"href":416,"rel":2252},[33],[75,2254,421],{},[57,2256,2257,2262],{},[75,2258,2259],{},[29,2260,430],{"href":428,"rel":2261},[33],[75,2263,433],{},[57,2265,2266,2271],{},[75,2267,2268],{},[29,2269,442],{"href":440,"rel":2270},[33],[75,2272,445],{},[16,2274,448],{},[11,2276,452],{"id":451},[221,2278,2279,2283,2287,2291],{},[224,2280,2281],{},[29,2282,460],{"href":459},[224,2284,2285],{},[29,2286,465],{"href":368},[224,2288,2289],{},[29,2290,471],{"href":470},[224,2292,2293],{},[29,2294,477],{"href":476},[16,2296,2297],{},[29,2298,483],{"href":482},{"title":485,"searchDepth":486,"depth":486,"links":2300},[2301,2302,2303,2304,2305,2306,2307,2308,2309,2310,2311],{"id":13,"depth":486,"text":14},{"id":45,"depth":486,"text":46},{"id":147,"depth":486,"text":148},{"id":215,"depth":486,"text":216},{"id":252,"depth":486,"text":253},{"id":289,"depth":486,"text":290},{"id":321,"depth":486,"text":322},{"id":343,"depth":486,"text":344},{"id":373,"depth":486,"text":374},{"id":383,"depth":486,"text":384},{"id":451,"depth":486,"text":452},{},{"title":5,"description":501},[515,516,517,518,519,520,521,522,523,524],[]]