[{"data":1,"prerenderedAt":4311},["ShallowReactive",2],{"blog-post-de-altbau-arei-part-8":3,"blog-alternates-old-building-arei-part8":951},{"id":4,"title":5,"articleId":6,"body":7,"category":929,"date":930,"description":931,"extension":932,"lastUpdated":930,"locale":933,"meta":934,"navigation":935,"path":936,"publishDate":930,"readTime":937,"refreshInterval":938,"seo":939,"slug":940,"stem":941,"tags":942,"__hash__":950},"blog\u002Fblog\u002Fold-building-arei-part8.de.md","Altbau und AREI Part 8: Sonderregeln für bestehende Installationen","old-building-arei-part8",{"type":8,"value":9,"toc":889},"minimark",[10,14,23,26,31,38,49,58,60,64,71,76,79,83,90,94,122,130,132,136,139,143,187,191,227,239,243,246,269,273,280,284,305,309,312,314,318,325,329,423,427,430,456,458,462,466,473,477,484,496,500,570,585,587,591,597,601,608,630,634,653,655,659,666,670,684,688,699,703,714,718,780,782,786,840,842,846,873,875],[11,12,5],"h1",{"id":13},"altbau-und-arei-part-8-sonderregeln-für-bestehende-installationen",[15,16,17,18,22],"p",{},"Nicht jede Elektroinstallation in Belgien muss den neuesten AREI-Vorschriften entsprechen. Für ältere Gebäude gibt es mit ",[19,20,21],"strong",{},"Part 8 (Partie 8)"," ein eigenes Regelwerk, das bestimmte Abweichungen vom aktuellen Standard toleriert — solange keine unmittelbare Gefahr besteht. Dieser Artikel erklärt, wann Part 8 gilt, was erlaubt ist und wo die Grenzen liegen.",[24,25],"hr",{},[27,28,30],"h2",{"id":29},"was-ist-part-8","Was ist Part 8?",[15,32,33,34,37],{},"Part 8 des AREI (Allgemeines Reglement über die Elektrischen Installationen \u002F Règlement Général sur les Installations Électriques) ist eine ",[19,35,36],{},"Sonderregelung für bestehende Installationen",", die vor Inkrafttreten des aktuellen AREI errichtet und abgenommen wurden.",[15,39,40,41,44,45,48],{},"Das Grundprinzip: Solange eine Installation ",[19,42,43],{},"sicher"," funktioniert und ",[19,46,47],{},"keine unmittelbare Gefahr"," darstellt, muss sie nicht vollständig auf den neuesten Stand gebracht werden — auch wenn sie nicht allen aktuellen Vorschriften entspricht.",[50,51,52],"blockquote",{},[15,53,54,57],{},[19,55,56],{},"Wichtig:"," Part 8 ist kein Freibrief. Es definiert klar, welche Abweichungen toleriert werden und welche nicht.",[24,59],{},[27,61,63],{"id":62},"wann-gilt-part-8","Wann gilt Part 8?",[15,65,66,67,70],{},"Part 8 gilt für Installationen, die ",[19,68,69],{},"eine"," der folgenden Bedingungen erfüllen:",[72,73,75],"h3",{"id":74},"bedingung-1-installation-vor-dem-01101981","Bedingung 1: Installation vor dem 01.10.1981",[15,77,78],{},"Installationen, die vor dem 1. Oktober 1981 errichtet wurden (Datum des Inkrafttretens des ursprünglichen AREI), fallen grundsätzlich unter Part 8.",[72,80,82],{"id":81},"bedingung-2-unter-dem-alten-arei-abgenommen","Bedingung 2: Unter dem alten AREI abgenommen",[15,84,85,86,89],{},"Installationen, die unter einer früheren Version des AREI abgenommen wurden und seit der letzten Abnahme ",[19,87,88],{},"nicht wesentlich verändert"," wurden.",[72,91,93],{"id":92},"was-zählt-als-wesentliche-änderung","Was zählt als „wesentliche Änderung\"?",[95,96,97,104,110,116],"ul",{},[98,99,100,101],"li",{},"Hinzufügen ",[19,102,103],{},"neuer Stromkreise",[98,105,106,107],{},"Erweiterung des ",[19,108,109],{},"Verteilerkastens",[98,111,112,113],{},"Änderung der ",[19,114,115],{},"Zähleranlage",[98,117,118,119],{},"Umfangreiche ",[19,120,121],{},"Umverdrahtung",[50,123,124],{},[15,125,126,129],{},[19,127,128],{},"Achtung:"," Kleine Änderungen wie der Austausch einer Steckdose oder eines Schalters gelten NICHT als wesentliche Änderung.",[24,131],{},[27,133,135],{"id":134},"was-ist-unter-part-8-erlaubt-tolerierte-abweichungen","Was ist unter Part 8 erlaubt? (Tolerierte Abweichungen)",[15,137,138],{},"Die folgenden Punkte weichen vom aktuellen AREI ab, werden aber unter Part 8 bei der Kontrolle toleriert:",[72,140,142],{"id":141},"_1-alte-kabeltypen","1. Alte Kabeltypen",[144,145,146,159],"table",{},[147,148,149],"thead",{},[150,151,152,156],"tr",{},[153,154,155],"th",{},"Aktuelles AREI",[153,157,158],{},"Part 8 toleriert",[160,161,162,171,179],"tbody",{},[150,163,164,168],{},[165,166,167],"td",{},"XVB \u002F VOBst in Preflex",[165,169,170],{},"VOB-Kabel in alten Leerrohren",[150,172,173,176],{},[165,174,175],{},"Cca-Brandschutzklasse",[165,177,178],{},"Ältere Kabeltypen ohne CPR-Klassifizierung",[150,180,181,184],{},[165,182,183],{},"Mindestquerschnitt 2,5 mm² für Steckdosen",[165,185,186],{},"Mindestens 1 mm² bei Absicherung mit max. 6 A Sicherung oder 10 A Leitungsschutzschalter",[72,188,190],{"id":189},"_2-fehlerstromschutzschalter-rcd-differenzialschalter","2. Fehlerstromschutzschalter (RCD \u002F Differenzialschalter)",[144,192,193,201],{},[147,194,195],{},[150,196,197,199],{},[153,198,155],{},[153,200,158],{},[160,202,203,211,219],{},[150,204,205,208],{},[165,206,207],{},"30 mA RCD pro Steckdosenkreis",[165,209,210],{},"Kein 30 mA RCD nötig (nur 300 mA Haupt-RCD)",[150,212,213,216],{},[165,214,215],{},"30 mA RCD für Badezimmer Pflicht",[165,217,218],{},"Toleriert ohne, wenn kein direktes Risiko",[150,220,221,224],{},[165,222,223],{},"Max. 8 Kreise pro RCD",[165,225,226],{},"Mehr Kreise erlaubt",[50,228,229],{},[15,230,231,234,235,238],{},[19,232,233],{},"Hinweis:"," Auch unter Part 8 wird ein ",[19,236,237],{},"300 mA Haupt-RCD"," empfohlen und bei Neuinstallation des Zählers oft vom Netzbetreiber vorausgesetzt.",[72,240,242],{"id":241},"_3-steckdosen-ohne-erdungskontakt","3. Steckdosen ohne Erdungskontakt",[15,244,245],{},"Alte Steckdosen ohne Erdungsanschluss (die modernen belgischen Steckdosen sind Typ E mit Erdungsstift) werden unter Part 8 toleriert, sofern:",[95,247,248,255,266],{},[98,249,250,251,254],{},"Keine Geräte der ",[19,252,253],{},"Schutzklasse I"," (mit Metallgehäuse) angeschlossen werden.",[98,256,257,258,261,262,265],{},"Die Steckdose nicht im ",[19,259,260],{},"Badezimmer"," oder an ",[19,263,264],{},"feuchten Orten"," ist.",[98,267,268],{},"Der Stromkreis ansonsten intakt ist.",[72,270,272],{"id":271},"_4-kein-spd-überspannungsschutz","4. Kein SPD (Überspannungsschutz)",[15,274,275,276,279],{},"Das aktuelle AREI schreibt für Neuinstallationen einen SPD (Surge Protection Device) Typ 2 vor. Unter Part 8 ist das ",[19,277,278],{},"nicht erforderlich",".",[72,281,283],{"id":282},"_5-alte-verteilertechnik","5. Alte Verteilertechnik",[95,285,286,292,298],{},[98,287,288,291],{},[19,289,290],{},"Schmelzsicherungen"," statt MCBs sind erlaubt.",[98,293,294,297],{},[19,295,296],{},"Drehsicherungen"," (Diazed) werden toleriert.",[98,299,300,301,304],{},"Fehlende ",[19,302,303],{},"Beschriftung"," wird als Mangel vermerkt, führt aber nicht zum Durchfallen.",[72,306,308],{"id":307},"_6-keine-brandschutzklassifizierung-der-kabel","6. Keine Brandschutzklassifizierung der Kabel",[15,310,311],{},"Kabel ohne CPR-Klassifizierung (vor 2017 installiert) werden toleriert, da die CPR-Verordnung erst ab Juli 2017 für neue Installationen gilt.",[24,313],{},[27,315,317],{"id":316},"was-ist-nicht-erlaubt-auch-unter-part-8","Was ist NICHT erlaubt (auch unter Part 8)?",[15,319,320,321,324],{},"Bestimmte Zustände werden ",[19,322,323],{},"niemals toleriert",", unabhängig vom Alter der Installation:",[72,326,328],{"id":327},"absolut-unzulässig","Absolut unzulässig:",[144,330,331,341],{},[147,332,333],{},[150,334,335,338],{},[153,336,337],{},"Zustand",[153,339,340],{},"Warum?",[160,342,343,353,363,373,383,393,403,413],{},[150,344,345,350],{},[165,346,347],{},[19,348,349],{},"Blanke oder beschädigte Kabel",[165,351,352],{},"Unmittelbare Stromschlaggefahr",[150,354,355,360],{},[165,356,357],{},[19,358,359],{},"Fehlende Erdung komplett",[165,361,362],{},"Kein Schutz bei Isolationsfehler",[150,364,365,370],{},[165,366,367],{},[19,368,369],{},"Wasser in Kontakt mit Elektrik",[165,371,372],{},"Lebensgefahr",[150,374,375,380],{},[165,376,377],{},[19,378,379],{},"Zugängliche spannungsführende Teile",[165,381,382],{},"Direktes Berührungsrisiko",[150,384,385,390],{},[165,386,387],{},[19,388,389],{},"Überhitzte Kabel oder Verbindungen",[165,391,392],{},"Brandgefahr",[150,394,395,400],{},[165,396,397],{},[19,398,399],{},"Lose Verbindungen in Verteilerdosen",[165,401,402],{},"Lichtbogen-\u002FBrandgefahr",[150,404,405,410],{},[165,406,407],{},[19,408,409],{},"Abzweigdosen ohne Deckel",[165,411,412],{},"Berührungsschutz fehlt",[150,414,415,420],{},[165,416,417],{},[19,418,419],{},"Badezimmer-Steckdose in Zone 0 oder 1",[165,421,422],{},"Lebensgefahr, auch unter Part 8 verboten",[72,424,426],{"id":425},"sicherheitsrelevante-mindestanforderungen","Sicherheitsrelevante Mindestanforderungen:",[15,428,429],{},"Auch unter Part 8 muss gewährleistet sein:",[95,431,432,438,444,450],{},[98,433,434,437],{},[19,435,436],{},"Ausreichender Querschnitt"," für die tatsächliche Belastung (kein überlastetes 0,75 mm²-Kabel).",[98,439,440,443],{},[19,441,442],{},"Funktionierende Sicherungen"," (keine „gebrückten\" Sicherungen).",[98,445,446,449],{},[19,447,448],{},"Erdung des Hauptverteilers"," (Verbindung zur Erdungselektrode).",[98,451,452,455],{},[19,453,454],{},"Zugänglichkeit"," des Verteilerkastens.",[24,457],{},[27,459,461],{"id":460},"periodische-kontrolle","Periodische Kontrolle",[72,463,465],{"id":464},"alle-25-jahre-pflicht","Alle 25 Jahre Pflicht",[15,467,468,469,472],{},"Bestehende Installationen unter Part 8 müssen alle ",[19,470,471],{},"25 Jahre"," einer periodischen Kontrolle durch einen zugelassenen Kontrollorganismus unterzogen werden.",[72,474,476],{"id":475},"bei-eigentümerwechsel","Bei Eigentümerwechsel",[15,478,479,480,483],{},"Bei ",[19,481,482],{},"Verkauf einer Immobilie"," ist eine gültige Kontrollbescheinigung (weniger als 25 Jahre alt) Pflicht. Liegt keine vor, muss vor dem Verkauf eine Kontrolle durchgeführt werden.",[50,485,486],{},[15,487,488,491,492,495],{},[19,489,490],{},"18-Monate-Frist (Art. 8.4.2.2):"," Bei Kauf einer Immobilie mit negativem Prüfbericht hat der Käufer ",[19,493,494],{},"18 Monate"," ab Kaufdatum, um die Mängel zu beheben und eine Nachkontrolle durchführen zu lassen.",[72,497,499],{"id":498},"was-wird-bei-der-periodischen-kontrolle-geprüft","Was wird bei der periodischen Kontrolle geprüft?",[144,501,502,512],{},[147,503,504],{},[150,505,506,509],{},[153,507,508],{},"Prüfpunkt",[153,510,511],{},"Beurteilung",[160,513,514,522,530,538,546,554,562],{},[150,515,516,519],{},[165,517,518],{},"Sichtprüfung der Kabel und Verbindungen",[165,520,521],{},"Beschädigung, Überhitzung",[150,523,524,527],{},[165,525,526],{},"Erdungswiderstand messen",[165,528,529],{},"≤ 30 Ω (regulatorische Schwelle gemäß Art. 4.2.4.3b; darüber zusätzliche Schutzmaßnahmen nötig)",[150,531,532,535],{},[165,533,534],{},"Isolationswiderstand messen",[165,536,537],{},"> 0,5 MΩ",[150,539,540,543],{},[165,541,542],{},"RCD-Test (falls vorhanden)",[165,544,545],{},"Auslösezeit und -strom",[150,547,548,551],{},[165,549,550],{},"Kurzschlussschutz prüfen",[165,552,553],{},"Sicherungen \u002F MCBs vorhanden",[150,555,556,559],{},[165,557,558],{},"Schutz gegen direktes Berühren",[165,560,561],{},"Abdeckungen, IP-Schutz",[150,563,564,567],{},[165,565,566],{},"Dokumentation",[165,568,569],{},"Eindrahtschema + Situationsplan vorhanden?",[50,571,572],{},[15,573,574,576,577,580,581,584],{},[19,575,233],{}," Auch unter Part 8 müssen ein ",[19,578,579],{},"Eindrahtschema"," und ein ",[19,582,583],{},"Situationsplan"," vorhanden sein — auch wenn diese nachträglich erstellt werden müssen.",[24,586],{},[27,588,590],{"id":589},"die-kontaminationsregel-bei-teilrenovierung","Die Kontaminationsregel bei Teilrenovierung",[15,592,593,594,279],{},"Ein besonders wichtiger Aspekt bei Altbauten: die sogenannte ",[19,595,596],{},"Kontaminationsregel",[72,598,600],{"id":599},"wie-funktioniert-sie","Wie funktioniert sie?",[15,602,603,604,607],{},"Wenn Sie einen Teil Ihrer Installation ",[19,605,606],{},"wesentlich verändern"," (z. B. neue Stromkreise hinzufügen), gilt:",[609,610,611,618,624],"ol",{},[98,612,613,614,617],{},"Der ",[19,615,616],{},"neue Teil"," muss vollständig dem aktuellen AREI entsprechen.",[98,619,613,620,623],{},[19,621,622],{},"bestehende Teil"," wird weiterhin nach Part 8 beurteilt.",[98,625,626,629],{},[19,627,628],{},"ABER:"," Wenn der neue Teil den bestehenden Teil „kontaminiert\" (z. B. neue Kabel im selben Verteiler), kann der Kontrolleur entscheiden, dass der gesamte Verteiler dem aktuellen AREI entsprechen muss.",[72,631,633],{"id":632},"praktische-konsequenz","Praktische Konsequenz:",[95,635,636,643,650],{},[98,637,638,639,642],{},"Planen Sie Renovierungen so, dass neue und alte Teile ",[19,640,641],{},"klar getrennt"," sind.",[98,644,645,646,649],{},"Idealerweise einen ",[19,647,648],{},"separaten Unterverteiler"," für neue Stromkreise.",[98,651,652],{},"Dokumentieren Sie genau, was alt und was neu ist.",[24,654],{},[27,656,658],{"id":657},"empfehlung-schrittweise-modernisierung","Empfehlung: Schrittweise Modernisierung",[15,660,661,662,665],{},"Auch wenn Part 8 Abweichungen toleriert, empfiehlt sich eine ",[19,663,664],{},"schrittweise Modernisierung",":",[72,667,669],{"id":668},"priorität-1-sicherheitskritisch","Priorität 1 (Sicherheitskritisch)",[95,671,672,675,678,681],{},[98,673,674],{},"300 mA Haupt-RCD nachrüsten (falls nicht vorhanden)",[98,676,677],{},"Beschädigte Kabel ersetzen",[98,679,680],{},"Lose Verbindungen beheben",[98,682,683],{},"Erdung prüfen und ggf. verbessern",[72,685,687],{"id":686},"priorität-2-empfohlen","Priorität 2 (Empfohlen)",[95,689,690,693,696],{},[98,691,692],{},"30 mA Gruppen-RCDs für Badezimmer und Küche",[98,694,695],{},"Alte Schmelzsicherungen durch MCBs ersetzen",[98,697,698],{},"SPD Typ 2 nachrüsten",[72,700,702],{"id":701},"priorität-3-komfort-zukunftssicherheit","Priorität 3 (Komfort + Zukunftssicherheit)",[95,704,705,708,711],{},[98,706,707],{},"Verteiler modernisieren (mehr Reihen, Beschriftung)",[98,709,710],{},"Steckdosen mit Erdung nachrüsten",[98,712,713],{},"Vorbereitung für Wallbox \u002F PV-Anlage",[72,715,717],{"id":716},"kostenorientierung","Kostenorientierung",[144,719,720,730],{},[147,721,722],{},[150,723,724,727],{},[153,725,726],{},"Maßnahme",[153,728,729],{},"Geschätzte Kosten",[160,731,732,740,748,756,764,772],{},[150,733,734,737],{},[165,735,736],{},"300 mA Haupt-RCD nachrüsten",[165,738,739],{},"150–300 EUR",[150,741,742,745],{},[165,743,744],{},"30 mA Gruppen-RCD (pro Stück)",[165,746,747],{},"80–150 EUR",[150,749,750,753],{},[165,751,752],{},"SPD Typ 2",[165,754,755],{},"100–250 EUR",[150,757,758,761],{},[165,759,760],{},"MCB-Set (10 Stück)",[165,762,763],{},"50–100 EUR",[150,765,766,769],{},[165,767,768],{},"Neuer 4-Reihen-Verteiler (komplett)",[165,770,771],{},"500–1.500 EUR",[150,773,774,777],{},[165,775,776],{},"Vollständige Neuverkabelung (EFH)",[165,778,779],{},"5.000–15.000 EUR",[24,781],{},[27,783,785],{"id":784},"zusammenfassung","Zusammenfassung",[144,787,788,798],{},[147,789,790],{},[150,791,792,795],{},[153,793,794],{},"Frage",[153,796,797],{},"Antwort",[160,799,800,808,816,824,832],{},[150,801,802,805],{},[165,803,804],{},"Muss mein Altbau dem aktuellen AREI entsprechen?",[165,806,807],{},"Nicht vollständig, Part 8 erlaubt Abweichungen",[150,809,810,813],{},[165,811,812],{},"Brauche ich einen 30 mA RCD?",[165,814,815],{},"Unter Part 8 nicht Pflicht, aber dringend empfohlen",[150,817,818,821],{},[165,819,820],{},"Sind alte Steckdosen ohne Erdung erlaubt?",[165,822,823],{},"Unter Bedingungen ja (kein Badezimmer, keine Schutzklasse-I-Geräte)",[150,825,826,829],{},[165,827,828],{},"Wie oft muss kontrolliert werden?",[165,830,831],{},"Alle 25 Jahre + bei Eigentümerwechsel",[150,833,834,837],{},[165,835,836],{},"Was passiert bei Teilrenovierung?",[165,838,839],{},"Neuer Teil = aktuelles AREI, alter Teil = Part 8 (Kontaminationsregel beachten)",[24,841],{},[27,843,845],{"id":844},"verwandte-artikel","Verwandte Artikel",[95,847,848,855,861,867],{},[98,849,850],{},[851,852,854],"a",{"href":853},"\u002Fde\u002Fblog\u002Felektrische-kontrolle","Elektrische Kontrolle in Belgien: Was wird geprüft?",[98,856,857],{},[851,858,860],{"href":859},"\u002Fde\u002Fblog\u002Farei-2026-aenderungen","Was ändert sich mit dem AREI 2026?",[98,862,863],{},[851,864,866],{"href":865},"\u002Fde\u002Fblog\u002Fpreflex-vs-freie-verlegung","Preflex vs. freie Verlegung",[98,868,869],{},[851,870,872],{"href":871},"\u002Fde\u002Fblog\u002Fschaltschrank-planen-aufbau","Schaltschrank planen",[24,874],{},[15,876,877],{},[878,879,880,881,884,885],"em",{},"Auch für Altbauten erstellt ",[19,882,883],{},"PlanElec"," normgerechte Eindrahtschemas und Situationspläne — die Pflichtdokumente für jede Kontrolle. Dokumentieren Sie Ihre Installation jetzt digital. ",[851,886,888],{"href":887},"\u002F","Kostenlos starten →",{"title":890,"searchDepth":891,"depth":891,"links":892},"",2,[893,894,900,908,912,917,921,927,928],{"id":29,"depth":891,"text":30},{"id":62,"depth":891,"text":63,"children":895},[896,898,899],{"id":74,"depth":897,"text":75},3,{"id":81,"depth":897,"text":82},{"id":92,"depth":897,"text":93},{"id":134,"depth":891,"text":135,"children":901},[902,903,904,905,906,907],{"id":141,"depth":897,"text":142},{"id":189,"depth":897,"text":190},{"id":241,"depth":897,"text":242},{"id":271,"depth":897,"text":272},{"id":282,"depth":897,"text":283},{"id":307,"depth":897,"text":308},{"id":316,"depth":891,"text":317,"children":909},[910,911],{"id":327,"depth":897,"text":328},{"id":425,"depth":897,"text":426},{"id":460,"depth":891,"text":461,"children":913},[914,915,916],{"id":464,"depth":897,"text":465},{"id":475,"depth":897,"text":476},{"id":498,"depth":897,"text":499},{"id":589,"depth":891,"text":590,"children":918},[919,920],{"id":599,"depth":897,"text":600},{"id":632,"depth":897,"text":633},{"id":657,"depth":891,"text":658,"children":922},[923,924,925,926],{"id":668,"depth":897,"text":669},{"id":686,"depth":897,"text":687},{"id":701,"depth":897,"text":702},{"id":716,"depth":897,"text":717},{"id":784,"depth":891,"text":785},{"id":844,"depth":891,"text":845},"guide","2026-04-14","Was bei älteren Elektroinstallationen in Belgien gilt. AREI Part 8 erklärt: erlaubte Abweichungen, periodische Kontrolle und Tipps zur schrittweisen Modernisierung.","md","de",{},true,"\u002Fblog\u002Fold-building-arei-part8.de","8 min",12,{"title":5,"description":931},"altbau-arei-part-8","blog\u002Fold-building-arei-part8.de",[943,944,945,946,947,948,949],"altbau","AREI","Part 8","bestandsinstallation","renovierung","kontrolle","periodisch","_TLbU6gMz55zQGkPR7gfITgAejwEoqotZeHQPVySPXM",[952,1595,2503,3407],{"id":4,"title":5,"articleId":6,"body":953,"category":929,"date":930,"description":931,"extension":932,"lastUpdated":930,"locale":933,"meta":1592,"navigation":935,"path":936,"publishDate":930,"readTime":937,"refreshInterval":938,"seo":1593,"slug":940,"stem":941,"tags":1594,"__hash__":950},{"type":8,"value":954,"toc":1555},[955,957,961,963,965,969,975,981,983,985,989,991,993,995,999,1001,1019,1025,1027,1029,1031,1033,1063,1065,1095,1103,1105,1107,1121,1123,1127,1129,1143,1145,1147,1149,1151,1155,1157,1233,1235,1237,1255,1257,1259,1261,1265,1267,1271,1279,1281,1335,1345,1347,1349,1353,1355,1359,1373,1375,1387,1389,1391,1395,1397,1407,1409,1417,1419,1427,1429,1477,1479,1481,1523,1525,1527,1545,1547],[11,956,5],{"id":13},[15,958,17,959,22],{},[19,960,21],{},[24,962],{},[27,964,30],{"id":29},[15,966,33,967,37],{},[19,968,36],{},[15,970,40,971,44,973,48],{},[19,972,43],{},[19,974,47],{},[50,976,977],{},[15,978,979,57],{},[19,980,56],{},[24,982],{},[27,984,63],{"id":62},[15,986,66,987,70],{},[19,988,69],{},[72,990,75],{"id":74},[15,992,78],{},[72,994,82],{"id":81},[15,996,85,997,89],{},[19,998,88],{},[72,1000,93],{"id":92},[95,1002,1003,1007,1011,1015],{},[98,1004,100,1005],{},[19,1006,103],{},[98,1008,106,1009],{},[19,1010,109],{},[98,1012,112,1013],{},[19,1014,115],{},[98,1016,118,1017],{},[19,1018,121],{},[50,1020,1021],{},[15,1022,1023,129],{},[19,1024,128],{},[24,1026],{},[27,1028,135],{"id":134},[15,1030,138],{},[72,1032,142],{"id":141},[144,1034,1035,1043],{},[147,1036,1037],{},[150,1038,1039,1041],{},[153,1040,155],{},[153,1042,158],{},[160,1044,1045,1051,1057],{},[150,1046,1047,1049],{},[165,1048,167],{},[165,1050,170],{},[150,1052,1053,1055],{},[165,1054,175],{},[165,1056,178],{},[150,1058,1059,1061],{},[165,1060,183],{},[165,1062,186],{},[72,1064,190],{"id":189},[144,1066,1067,1075],{},[147,1068,1069],{},[150,1070,1071,1073],{},[153,1072,155],{},[153,1074,158],{},[160,1076,1077,1083,1089],{},[150,1078,1079,1081],{},[165,1080,207],{},[165,1082,210],{},[150,1084,1085,1087],{},[165,1086,215],{},[165,1088,218],{},[150,1090,1091,1093],{},[165,1092,223],{},[165,1094,226],{},[50,1096,1097],{},[15,1098,1099,234,1101,238],{},[19,1100,233],{},[19,1102,237],{},[72,1104,242],{"id":241},[15,1106,245],{},[95,1108,1109,1113,1119],{},[98,1110,250,1111,254],{},[19,1112,253],{},[98,1114,257,1115,261,1117,265],{},[19,1116,260],{},[19,1118,264],{},[98,1120,268],{},[72,1122,272],{"id":271},[15,1124,275,1125,279],{},[19,1126,278],{},[72,1128,283],{"id":282},[95,1130,1131,1135,1139],{},[98,1132,1133,291],{},[19,1134,290],{},[98,1136,1137,297],{},[19,1138,296],{},[98,1140,300,1141,304],{},[19,1142,303],{},[72,1144,308],{"id":307},[15,1146,311],{},[24,1148],{},[27,1150,317],{"id":316},[15,1152,320,1153,324],{},[19,1154,323],{},[72,1156,328],{"id":327},[144,1158,1159,1167],{},[147,1160,1161],{},[150,1162,1163,1165],{},[153,1164,337],{},[153,1166,340],{},[160,1168,1169,1177,1185,1193,1201,1209,1217,1225],{},[150,1170,1171,1175],{},[165,1172,1173],{},[19,1174,349],{},[165,1176,352],{},[150,1178,1179,1183],{},[165,1180,1181],{},[19,1182,359],{},[165,1184,362],{},[150,1186,1187,1191],{},[165,1188,1189],{},[19,1190,369],{},[165,1192,372],{},[150,1194,1195,1199],{},[165,1196,1197],{},[19,1198,379],{},[165,1200,382],{},[150,1202,1203,1207],{},[165,1204,1205],{},[19,1206,389],{},[165,1208,392],{},[150,1210,1211,1215],{},[165,1212,1213],{},[19,1214,399],{},[165,1216,402],{},[150,1218,1219,1223],{},[165,1220,1221],{},[19,1222,409],{},[165,1224,412],{},[150,1226,1227,1231],{},[165,1228,1229],{},[19,1230,419],{},[165,1232,422],{},[72,1234,426],{"id":425},[15,1236,429],{},[95,1238,1239,1243,1247,1251],{},[98,1240,1241,437],{},[19,1242,436],{},[98,1244,1245,443],{},[19,1246,442],{},[98,1248,1249,449],{},[19,1250,448],{},[98,1252,1253,455],{},[19,1254,454],{},[24,1256],{},[27,1258,461],{"id":460},[72,1260,465],{"id":464},[15,1262,468,1263,472],{},[19,1264,471],{},[72,1266,476],{"id":475},[15,1268,479,1269,483],{},[19,1270,482],{},[50,1272,1273],{},[15,1274,1275,491,1277,495],{},[19,1276,490],{},[19,1278,494],{},[72,1280,499],{"id":498},[144,1282,1283,1291],{},[147,1284,1285],{},[150,1286,1287,1289],{},[153,1288,508],{},[153,1290,511],{},[160,1292,1293,1299,1305,1311,1317,1323,1329],{},[150,1294,1295,1297],{},[165,1296,518],{},[165,1298,521],{},[150,1300,1301,1303],{},[165,1302,526],{},[165,1304,529],{},[150,1306,1307,1309],{},[165,1308,534],{},[165,1310,537],{},[150,1312,1313,1315],{},[165,1314,542],{},[165,1316,545],{},[150,1318,1319,1321],{},[165,1320,550],{},[165,1322,553],{},[150,1324,1325,1327],{},[165,1326,558],{},[165,1328,561],{},[150,1330,1331,1333],{},[165,1332,566],{},[165,1334,569],{},[50,1336,1337],{},[15,1338,1339,576,1341,580,1343,584],{},[19,1340,233],{},[19,1342,579],{},[19,1344,583],{},[24,1346],{},[27,1348,590],{"id":589},[15,1350,593,1351,279],{},[19,1352,596],{},[72,1354,600],{"id":599},[15,1356,603,1357,607],{},[19,1358,606],{},[609,1360,1361,1365,1369],{},[98,1362,613,1363,617],{},[19,1364,616],{},[98,1366,613,1367,623],{},[19,1368,622],{},[98,1370,1371,629],{},[19,1372,628],{},[72,1374,633],{"id":632},[95,1376,1377,1381,1385],{},[98,1378,638,1379,642],{},[19,1380,641],{},[98,1382,645,1383,649],{},[19,1384,648],{},[98,1386,652],{},[24,1388],{},[27,1390,658],{"id":657},[15,1392,661,1393,665],{},[19,1394,664],{},[72,1396,669],{"id":668},[95,1398,1399,1401,1403,1405],{},[98,1400,674],{},[98,1402,677],{},[98,1404,680],{},[98,1406,683],{},[72,1408,687],{"id":686},[95,1410,1411,1413,1415],{},[98,1412,692],{},[98,1414,695],{},[98,1416,698],{},[72,1418,702],{"id":701},[95,1420,1421,1423,1425],{},[98,1422,707],{},[98,1424,710],{},[98,1426,713],{},[72,1428,717],{"id":716},[144,1430,1431,1439],{},[147,1432,1433],{},[150,1434,1435,1437],{},[153,1436,726],{},[153,1438,729],{},[160,1440,1441,1447,1453,1459,1465,1471],{},[150,1442,1443,1445],{},[165,1444,736],{},[165,1446,739],{},[150,1448,1449,1451],{},[165,1450,744],{},[165,1452,747],{},[150,1454,1455,1457],{},[165,1456,752],{},[165,1458,755],{},[150,1460,1461,1463],{},[165,1462,760],{},[165,1464,763],{},[150,1466,1467,1469],{},[165,1468,768],{},[165,1470,771],{},[150,1472,1473,1475],{},[165,1474,776],{},[165,1476,779],{},[24,1478],{},[27,1480,785],{"id":784},[144,1482,1483,1491],{},[147,1484,1485],{},[150,1486,1487,1489],{},[153,1488,794],{},[153,1490,797],{},[160,1492,1493,1499,1505,1511,1517],{},[150,1494,1495,1497],{},[165,1496,804],{},[165,1498,807],{},[150,1500,1501,1503],{},[165,1502,812],{},[165,1504,815],{},[150,1506,1507,1509],{},[165,1508,820],{},[165,1510,823],{},[150,1512,1513,1515],{},[165,1514,828],{},[165,1516,831],{},[150,1518,1519,1521],{},[165,1520,836],{},[165,1522,839],{},[24,1524],{},[27,1526,845],{"id":844},[95,1528,1529,1533,1537,1541],{},[98,1530,1531],{},[851,1532,854],{"href":853},[98,1534,1535],{},[851,1536,860],{"href":859},[98,1538,1539],{},[851,1540,866],{"href":865},[98,1542,1543],{},[851,1544,872],{"href":871},[24,1546],{},[15,1548,1549],{},[878,1550,880,1551,884,1553],{},[19,1552,883],{},[851,1554,888],{"href":887},{"title":890,"searchDepth":891,"depth":891,"links":1556},[1557,1558,1563,1571,1575,1580,1584,1590,1591],{"id":29,"depth":891,"text":30},{"id":62,"depth":891,"text":63,"children":1559},[1560,1561,1562],{"id":74,"depth":897,"text":75},{"id":81,"depth":897,"text":82},{"id":92,"depth":897,"text":93},{"id":134,"depth":891,"text":135,"children":1564},[1565,1566,1567,1568,1569,1570],{"id":141,"depth":897,"text":142},{"id":189,"depth":897,"text":190},{"id":241,"depth":897,"text":242},{"id":271,"depth":897,"text":272},{"id":282,"depth":897,"text":283},{"id":307,"depth":897,"text":308},{"id":316,"depth":891,"text":317,"children":1572},[1573,1574],{"id":327,"depth":897,"text":328},{"id":425,"depth":897,"text":426},{"id":460,"depth":891,"text":461,"children":1576},[1577,1578,1579],{"id":464,"depth":897,"text":465},{"id":475,"depth":897,"text":476},{"id":498,"depth":897,"text":499},{"id":589,"depth":891,"text":590,"children":1581},[1582,1583],{"id":599,"depth":897,"text":600},{"id":632,"depth":897,"text":633},{"id":657,"depth":891,"text":658,"children":1585},[1586,1587,1588,1589],{"id":668,"depth":897,"text":669},{"id":686,"depth":897,"text":687},{"id":701,"depth":897,"text":702},{"id":716,"depth":897,"text":717},{"id":784,"depth":891,"text":785},{"id":844,"depth":891,"text":845},{},{"title":5,"description":931},[943,944,945,946,947,948,949],{"id":1596,"title":1597,"articleId":6,"body":1598,"category":929,"date":930,"description":2489,"extension":932,"lastUpdated":930,"locale":2490,"meta":2491,"navigation":935,"path":2492,"publishDate":930,"readTime":937,"refreshInterval":938,"seo":2493,"slug":2494,"stem":2495,"tags":2496,"__hash__":2502},"blog\u002Fblog\u002Fold-building-arei-part8.en.md","Old Buildings and AREI Part 8: Special Rules for Existing Installations",{"type":8,"value":1599,"toc":2452},[1600,1603,1609,1611,1615,1622,1633,1641,1643,1647,1654,1658,1661,1665,1672,1676,1702,1710,1712,1716,1719,1723,1760,1764,1800,1811,1815,1818,1840,1844,1850,1854,1875,1879,1882,1884,1888,1895,1899,1993,1997,2000,2026,2028,2032,2036,2043,2047,2054,2066,2070,2140,2154,2156,2160,2166,2170,2177,2198,2202,2220,2222,2226,2233,2237,2251,2255,2266,2270,2281,2285,2347,2349,2353,2407,2409,2413,2439,2441],[11,1601,1597],{"id":1602},"old-buildings-and-arei-part-8-special-rules-for-existing-installations",[15,1604,1605,1606,1608],{},"Not every electrical installation in Belgium needs to comply with the latest AREI\u002FRGIE regulations. For older buildings, ",[19,1607,21],{}," provides a dedicated set of rules that tolerates certain deviations from the current standard — as long as no immediate danger exists. This article explains when Part 8 applies, what is permitted, and where the limits lie.",[24,1610],{},[27,1612,1614],{"id":1613},"what-is-part-8","What Is Part 8?",[15,1616,1617,1618,1621],{},"Part 8 of the AREI (Algemeen Reglement op de Elektrische Installaties \u002F Règlement Général sur les Installations Électriques) is a ",[19,1619,1620],{},"special regulation for existing installations"," that were constructed and approved before the current AREI came into force.",[15,1623,1624,1625,1628,1629,1632],{},"The basic principle: as long as an installation functions ",[19,1626,1627],{},"safely"," and poses ",[19,1630,1631],{},"no immediate danger",", it does not need to be fully brought up to the latest standards — even if it does not meet all current requirements.",[50,1634,1635],{},[15,1636,1637,1640],{},[19,1638,1639],{},"Important:"," Part 8 is not a free pass. It clearly defines which deviations are tolerated and which are not.",[24,1642],{},[27,1644,1646],{"id":1645},"when-does-part-8-apply","When Does Part 8 Apply?",[15,1648,1649,1650,1653],{},"Part 8 applies to installations that meet ",[19,1651,1652],{},"one"," of the following conditions:",[72,1655,1657],{"id":1656},"condition-1-installation-before-01101981","Condition 1: Installation Before 01.10.1981",[15,1659,1660],{},"Installations constructed before 1 October 1981 (the date the original AREI came into force) fall under Part 8 by default.",[72,1662,1664],{"id":1663},"condition-2-approved-under-the-old-arei","Condition 2: Approved Under the Old AREI",[15,1666,1667,1668,1671],{},"Installations that were approved under a previous version of the AREI and have ",[19,1669,1670],{},"not been substantially modified"," since the last approval.",[72,1673,1675],{"id":1674},"what-counts-as-a-substantial-modification","What Counts as a \"Substantial Modification\"?",[95,1677,1678,1684,1690,1696],{},[98,1679,1680,1681],{},"Adding ",[19,1682,1683],{},"new circuits",[98,1685,1686,1687],{},"Expanding the ",[19,1688,1689],{},"distribution board",[98,1691,1692,1693],{},"Modifying the ",[19,1694,1695],{},"metering installation",[98,1697,1698,1699],{},"Extensive ",[19,1700,1701],{},"rewiring",[50,1703,1704],{},[15,1705,1706,1709],{},[19,1707,1708],{},"Note:"," Small changes such as replacing a socket outlet or switch do NOT count as a substantial modification.",[24,1711],{},[27,1713,1715],{"id":1714},"what-is-permitted-under-part-8-tolerated-deviations","What Is Permitted Under Part 8? (Tolerated Deviations)",[15,1717,1718],{},"The following points deviate from the current AREI but are tolerated under Part 8 during inspection:",[72,1720,1722],{"id":1721},"_1-old-cable-types","1. Old Cable Types",[144,1724,1725,1735],{},[147,1726,1727],{},[150,1728,1729,1732],{},[153,1730,1731],{},"Current AREI",[153,1733,1734],{},"Part 8 tolerates",[160,1736,1737,1744,1752],{},[150,1738,1739,1741],{},[165,1740,167],{},[165,1742,1743],{},"VOB cables in old conduits",[150,1745,1746,1749],{},[165,1747,1748],{},"Cca fire reaction class",[165,1750,1751],{},"Older cable types without CPR classification",[150,1753,1754,1757],{},[165,1755,1756],{},"Minimum cross-section 2.5 mm² for sockets",[165,1758,1759],{},"Minimum 1 mm² with max. 6A fuse or 10A MCB (Art. 8.2.1 Nr. 5)",[72,1761,1763],{"id":1762},"_2-residual-current-devices-rcd","2. Residual Current Devices (RCD)",[144,1765,1766,1774],{},[147,1767,1768],{},[150,1769,1770,1772],{},[153,1771,1731],{},[153,1773,1734],{},[160,1775,1776,1784,1792],{},[150,1777,1778,1781],{},[165,1779,1780],{},"30 mA RCD per socket circuit",[165,1782,1783],{},"No 30 mA RCD needed (only 300 mA main RCD)",[150,1785,1786,1789],{},[165,1787,1788],{},"30 mA RCD mandatory for bathroom",[165,1790,1791],{},"Tolerated without, if no direct risk",[150,1793,1794,1797],{},[165,1795,1796],{},"Max. 8 circuits per RCD",[165,1798,1799],{},"More circuits permitted",[50,1801,1802],{},[15,1803,1804,1806,1807,1810],{},[19,1805,1708],{}," Even under Part 8, a ",[19,1808,1809],{},"300 mA main RCD"," is recommended and often required by the grid operator when a new meter is installed.",[72,1812,1814],{"id":1813},"_3-socket-outlets-without-earth-contact","3. Socket Outlets Without Earth Contact",[15,1816,1817],{},"Old socket outlets (type C, without earth pin) are tolerated under Part 8, provided that:",[95,1819,1820,1827,1837],{},[98,1821,1822,1823,1826],{},"No ",[19,1824,1825],{},"Class I"," appliances (with metal housing) are connected.",[98,1828,1829,1830,1833,1834,279],{},"The socket is not in the ",[19,1831,1832],{},"bathroom"," or in a ",[19,1835,1836],{},"damp location",[98,1838,1839],{},"The circuit is otherwise intact.",[72,1841,1843],{"id":1842},"_4-no-spd-surge-protection","4. No SPD (Surge Protection)",[15,1845,1846,1847,279],{},"The current AREI requires a Type 2 SPD (Surge Protection Device) for new installations. Under Part 8, this is ",[19,1848,1849],{},"not required",[72,1851,1853],{"id":1852},"_5-old-distribution-technology","5. Old Distribution Technology",[95,1855,1856,1862,1868],{},[98,1857,1858,1861],{},[19,1859,1860],{},"Fuses"," instead of MCBs are permitted.",[98,1863,1864,1867],{},[19,1865,1866],{},"Screw-type fuses"," (Diazed) are tolerated.",[98,1869,1870,1871,1874],{},"Missing ",[19,1872,1873],{},"labelling"," is noted as a deficiency but does not cause a failure.",[72,1876,1878],{"id":1877},"_6-no-fire-reaction-classification-of-cables","6. No Fire Reaction Classification of Cables",[15,1880,1881],{},"Cables without CPR classification (installed before 2017) are tolerated, as the CPR regulation only applies from July 2017 for new installations.",[24,1883],{},[27,1885,1887],{"id":1886},"what-is-not-permitted-even-under-part-8","What Is NOT Permitted (Even Under Part 8)?",[15,1889,1890,1891,1894],{},"Certain conditions are ",[19,1892,1893],{},"never tolerated",", regardless of the installation's age:",[72,1896,1898],{"id":1897},"absolutely-impermissible","Absolutely Impermissible:",[144,1900,1901,1911],{},[147,1902,1903],{},[150,1904,1905,1908],{},[153,1906,1907],{},"Condition",[153,1909,1910],{},"Why?",[160,1912,1913,1923,1933,1943,1953,1963,1973,1983],{},[150,1914,1915,1920],{},[165,1916,1917],{},[19,1918,1919],{},"Bare or damaged cables",[165,1921,1922],{},"Immediate electrocution risk",[150,1924,1925,1930],{},[165,1926,1927],{},[19,1928,1929],{},"Complete absence of earthing",[165,1931,1932],{},"No protection in case of insulation fault",[150,1934,1935,1940],{},[165,1936,1937],{},[19,1938,1939],{},"Water in contact with electrics",[165,1941,1942],{},"Danger to life",[150,1944,1945,1950],{},[165,1946,1947],{},[19,1948,1949],{},"Accessible live parts",[165,1951,1952],{},"Direct contact risk",[150,1954,1955,1960],{},[165,1956,1957],{},[19,1958,1959],{},"Overheated cables or connections",[165,1961,1962],{},"Fire risk",[150,1964,1965,1970],{},[165,1966,1967],{},[19,1968,1969],{},"Loose connections in junction boxes",[165,1971,1972],{},"Arc\u002Ffire risk",[150,1974,1975,1980],{},[165,1976,1977],{},[19,1978,1979],{},"Junction boxes without covers",[165,1981,1982],{},"Contact protection missing",[150,1984,1985,1990],{},[165,1986,1987],{},[19,1988,1989],{},"Bathroom socket in zone 0 or 1",[165,1991,1992],{},"Danger to life, prohibited even under Part 8",[72,1994,1996],{"id":1995},"safety-related-minimum-requirements","Safety-Related Minimum Requirements:",[15,1998,1999],{},"Even under Part 8, the following must be ensured:",[95,2001,2002,2008,2014,2020],{},[98,2003,2004,2007],{},[19,2005,2006],{},"Adequate cross-section"," for the actual load (no overloaded 0.75 mm² cable).",[98,2009,2010,2013],{},[19,2011,2012],{},"Functioning fuses"," (no \"bridged\" fuses).",[98,2015,2016,2019],{},[19,2017,2018],{},"Earthing of the main board"," (connection to earth electrode).",[98,2021,2022,2025],{},[19,2023,2024],{},"Accessibility"," of the distribution board.",[24,2027],{},[27,2029,2031],{"id":2030},"periodic-inspection","Periodic Inspection",[72,2033,2035],{"id":2034},"every-25-years-mandatory","Every 25 Years Mandatory",[15,2037,2038,2039,2042],{},"Existing installations under Part 8 must undergo a periodic inspection every ",[19,2040,2041],{},"25 years"," by an approved control body.",[72,2044,2046],{"id":2045},"on-change-of-ownership","On Change of Ownership",[15,2048,2049,2050,2053],{},"When ",[19,2051,2052],{},"selling a property",", a valid inspection certificate (less than 25 years old) is mandatory. If none exists, an inspection must be carried out before the sale.",[50,2055,2056],{},[15,2057,2058,2061,2062,2065],{},[19,2059,2060],{},"18-month deadline (Art. 8.4.2.2):"," When purchasing a property with a negative inspection report, the buyer has ",[19,2063,2064],{},"18 months"," from the purchase date to remedy the defects and have a re-inspection carried out.",[72,2067,2069],{"id":2068},"what-is-checked-during-the-periodic-inspection","What Is Checked During the Periodic Inspection?",[144,2071,2072,2082],{},[147,2073,2074],{},[150,2075,2076,2079],{},[153,2077,2078],{},"Inspection Point",[153,2080,2081],{},"Assessment",[160,2083,2084,2092,2100,2108,2116,2124,2132],{},[150,2085,2086,2089],{},[165,2087,2088],{},"Visual inspection of cables and connections",[165,2090,2091],{},"Damage, overheating",[150,2093,2094,2097],{},[165,2095,2096],{},"Earth resistance measurement",[165,2098,2099],{},"≤ 30 Ohm (regulatory threshold per Art. 4.2.4.3b; above this, additional protective measures required)",[150,2101,2102,2105],{},[165,2103,2104],{},"Insulation resistance measurement",[165,2106,2107],{},"> 0.5 MOhm",[150,2109,2110,2113],{},[165,2111,2112],{},"RCD test (if present)",[165,2114,2115],{},"Trip time and current",[150,2117,2118,2121],{},[165,2119,2120],{},"Short-circuit protection check",[165,2122,2123],{},"Fuses \u002F MCBs present",[150,2125,2126,2129],{},[165,2127,2128],{},"Protection against direct contact",[165,2130,2131],{},"Covers, IP protection",[150,2133,2134,2137],{},[165,2135,2136],{},"Documentation",[165,2138,2139],{},"Single-line diagram + situation plan present?",[50,2141,2142],{},[15,2143,2144,1806,2146,2149,2150,2153],{},[19,2145,1708],{},[19,2147,2148],{},"single-line diagram"," and a ",[19,2151,2152],{},"situation plan"," must be available — even if they need to be created retrospectively.",[24,2155],{},[27,2157,2159],{"id":2158},"the-contamination-rule-for-partial-renovations","The Contamination Rule for Partial Renovations",[15,2161,2162,2163,279],{},"A particularly important aspect for old buildings: the so-called ",[19,2164,2165],{},"contamination rule",[72,2167,2169],{"id":2168},"how-does-it-work","How Does It Work?",[15,2171,2172,2173,2176],{},"When you ",[19,2174,2175],{},"substantially modify"," part of your installation (e.g., adding new circuits):",[609,2178,2179,2186,2192],{},[98,2180,2181,2182,2185],{},"The ",[19,2183,2184],{},"new part"," must fully comply with the current AREI.",[98,2187,2181,2188,2191],{},[19,2189,2190],{},"existing part"," continues to be assessed under Part 8.",[98,2193,2194,2197],{},[19,2195,2196],{},"BUT:"," If the new part \"contaminates\" the existing part (e.g., new cables in the same distribution board), the inspector may decide that the entire board must comply with the current AREI.",[72,2199,2201],{"id":2200},"practical-consequences","Practical Consequences:",[95,2203,2204,2210,2217],{},[98,2205,2206,2207,279],{},"Plan renovations so that new and old parts are ",[19,2208,2209],{},"clearly separated",[98,2211,2212,2213,2216],{},"Ideally, use a ",[19,2214,2215],{},"separate sub-board"," for new circuits.",[98,2218,2219],{},"Document precisely what is old and what is new.",[24,2221],{},[27,2223,2225],{"id":2224},"recommendation-gradual-modernisation","Recommendation: Gradual Modernisation",[15,2227,2228,2229,2232],{},"Even though Part 8 tolerates deviations, ",[19,2230,2231],{},"gradual modernisation"," is recommended:",[72,2234,2236],{"id":2235},"priority-1-safety-critical","Priority 1 (Safety-Critical)",[95,2238,2239,2242,2245,2248],{},[98,2240,2241],{},"Retrofit a 300 mA main RCD (if not present)",[98,2243,2244],{},"Replace damaged cables",[98,2246,2247],{},"Fix loose connections",[98,2249,2250],{},"Check and improve earthing if necessary",[72,2252,2254],{"id":2253},"priority-2-recommended","Priority 2 (Recommended)",[95,2256,2257,2260,2263],{},[98,2258,2259],{},"30 mA group RCDs for bathroom and kitchen",[98,2261,2262],{},"Replace old fuses with MCBs",[98,2264,2265],{},"Retrofit SPD Type 2",[72,2267,2269],{"id":2268},"priority-3-comfort-future-proofing","Priority 3 (Comfort + Future-Proofing)",[95,2271,2272,2275,2278],{},[98,2273,2274],{},"Modernise the board (more rows, labelling)",[98,2276,2277],{},"Retrofit socket outlets with earth",[98,2279,2280],{},"Preparation for EV charger \u002F PV system",[72,2282,2284],{"id":2283},"cost-orientation","Cost Orientation",[144,2286,2287,2297],{},[147,2288,2289],{},[150,2290,2291,2294],{},[153,2292,2293],{},"Measure",[153,2295,2296],{},"Estimated Cost",[160,2298,2299,2307,2315,2323,2331,2339],{},[150,2300,2301,2304],{},[165,2302,2303],{},"Retrofit 300 mA main RCD",[165,2305,2306],{},"EUR 150–300",[150,2308,2309,2312],{},[165,2310,2311],{},"30 mA group RCD (each)",[165,2313,2314],{},"EUR 80–150",[150,2316,2317,2320],{},[165,2318,2319],{},"SPD Type 2",[165,2321,2322],{},"EUR 100–250",[150,2324,2325,2328],{},[165,2326,2327],{},"MCB set (10 pieces)",[165,2329,2330],{},"EUR 50–100",[150,2332,2333,2336],{},[165,2334,2335],{},"New 4-row board (complete)",[165,2337,2338],{},"EUR 500–1,500",[150,2340,2341,2344],{},[165,2342,2343],{},"Complete rewiring (house)",[165,2345,2346],{},"EUR 5,000–15,000",[24,2348],{},[27,2350,2352],{"id":2351},"summary","Summary",[144,2354,2355,2365],{},[147,2356,2357],{},[150,2358,2359,2362],{},[153,2360,2361],{},"Question",[153,2363,2364],{},"Answer",[160,2366,2367,2375,2383,2391,2399],{},[150,2368,2369,2372],{},[165,2370,2371],{},"Does my old building need to comply with the current AREI?",[165,2373,2374],{},"Not fully, Part 8 permits deviations",[150,2376,2377,2380],{},[165,2378,2379],{},"Do I need a 30 mA RCD?",[165,2381,2382],{},"Not mandatory under Part 8, but strongly recommended",[150,2384,2385,2388],{},[165,2386,2387],{},"Are old sockets without earth permitted?",[165,2389,2390],{},"Under conditions yes (no bathroom, no Class I appliances)",[150,2392,2393,2396],{},[165,2394,2395],{},"How often must inspections take place?",[165,2397,2398],{},"Every 25 years + on change of ownership",[150,2400,2401,2404],{},[165,2402,2403],{},"What about partial renovation?",[165,2405,2406],{},"New part = current AREI, old part = Part 8 (contamination rule applies)",[24,2408],{},[27,2410,2412],{"id":2411},"related-articles","Related Articles",[95,2414,2415,2421,2427,2433],{},[98,2416,2417],{},[851,2418,2420],{"href":2419},"\u002Fen\u002Fblog\u002Felectrical-inspection","Electrical Inspection in Belgium: What Is Checked?",[98,2422,2423],{},[851,2424,2426],{"href":2425},"\u002Fen\u002Fblog\u002Farei-2026-changes","What Changes with the AREI 2026?",[98,2428,2429],{},[851,2430,2432],{"href":2431},"\u002Fen\u002Fblog\u002Fpreflex-vs-open-wiring","Preflex vs. Open Wiring",[98,2434,2435],{},[851,2436,2438],{"href":2437},"\u002Fen\u002Fblog\u002Fdistribution-board-planning-guide","Distribution Board Planning",[24,2440],{},[15,2442,2443],{},[878,2444,2445,2446,2448,2449],{},"Even for old buildings, ",[19,2447,883],{}," creates standards-compliant single-line diagrams and situation plans — the mandatory documents for every inspection. Document your installation digitally now. ",[851,2450,2451],{"href":887},"Start for free →",{"title":890,"searchDepth":891,"depth":891,"links":2453},[2454,2455,2460,2468,2472,2477,2481,2487,2488],{"id":1613,"depth":891,"text":1614},{"id":1645,"depth":891,"text":1646,"children":2456},[2457,2458,2459],{"id":1656,"depth":897,"text":1657},{"id":1663,"depth":897,"text":1664},{"id":1674,"depth":897,"text":1675},{"id":1714,"depth":891,"text":1715,"children":2461},[2462,2463,2464,2465,2466,2467],{"id":1721,"depth":897,"text":1722},{"id":1762,"depth":897,"text":1763},{"id":1813,"depth":897,"text":1814},{"id":1842,"depth":897,"text":1843},{"id":1852,"depth":897,"text":1853},{"id":1877,"depth":897,"text":1878},{"id":1886,"depth":891,"text":1887,"children":2469},[2470,2471],{"id":1897,"depth":897,"text":1898},{"id":1995,"depth":897,"text":1996},{"id":2030,"depth":891,"text":2031,"children":2473},[2474,2475,2476],{"id":2034,"depth":897,"text":2035},{"id":2045,"depth":897,"text":2046},{"id":2068,"depth":897,"text":2069},{"id":2158,"depth":891,"text":2159,"children":2478},[2479,2480],{"id":2168,"depth":897,"text":2169},{"id":2200,"depth":897,"text":2201},{"id":2224,"depth":891,"text":2225,"children":2482},[2483,2484,2485,2486],{"id":2235,"depth":897,"text":2236},{"id":2253,"depth":897,"text":2254},{"id":2268,"depth":897,"text":2269},{"id":2283,"depth":897,"text":2284},{"id":2351,"depth":891,"text":2352},{"id":2411,"depth":891,"text":2412},"What applies to older electrical installations in Belgium. AREI Part 8 explained: permitted deviations, periodic inspection, and tips for gradual modernisation.","en",{},"\u002Fblog\u002Fold-building-arei-part8.en",{"title":1597,"description":2489},"old-building-arei-part-8","blog\u002Fold-building-arei-part8.en",[2497,944,945,2498,2499,2500,2501],"old building","existing installation","renovation","inspection","periodic","o_HLin8dVqH9j4w7j3eDEByKMCInkqKYS4BfqGC2wco",{"id":2504,"title":2505,"articleId":6,"body":2506,"category":929,"date":930,"description":3392,"extension":932,"lastUpdated":930,"locale":3393,"meta":3394,"navigation":935,"path":3395,"publishDate":930,"readTime":937,"refreshInterval":938,"seo":3396,"slug":3397,"stem":3398,"tags":3399,"__hash__":3406},"blog\u002Fblog\u002Fold-building-arei-part8.fr.md","Ancien bâtiment et RGIE Partie 8 : Règles spéciales pour les installations existantes",{"type":8,"value":2507,"toc":3355},[2508,2511,2518,2520,2524,2531,2542,2550,2552,2556,2563,2567,2570,2574,2581,2585,2611,2619,2621,2625,2628,2632,2670,2674,2710,2722,2726,2729,2751,2755,2761,2765,2787,2791,2794,2796,2800,2807,2811,2905,2909,2912,2938,2940,2944,2948,2955,2959,2966,2978,2982,3050,3064,3066,3070,3076,3080,3087,3108,3112,3130,3132,3136,3143,3147,3161,3165,3176,3180,3191,3195,3251,3253,3257,3310,3312,3316,3342,3344],[11,2509,2505],{"id":2510},"ancien-bâtiment-et-rgie-partie-8-règles-spéciales-pour-les-installations-existantes",[15,2512,2513,2514,2517],{},"Toute installation électrique en Belgique ne doit pas forcément répondre aux dernières prescriptions du RGIE. Pour les bâtiments plus anciens, la ",[19,2515,2516],{},"Partie 8"," constitue un ensemble de règles spécifiques qui tolère certaines dérogations par rapport au standard actuel — tant qu'il n'existe pas de danger immédiat. Cet article explique quand la Partie 8 s'applique, ce qui est autorisé et où se trouvent les limites.",[24,2519],{},[27,2521,2523],{"id":2522},"quest-ce-que-la-partie-8","Qu'est-ce que la Partie 8 ?",[15,2525,2526,2527,2530],{},"La Partie 8 du RGIE (Règlement Général sur les Installations Électriques) est une ",[19,2528,2529],{},"réglementation spéciale pour les installations existantes"," qui ont été réalisées et réceptionnées avant l'entrée en vigueur du RGIE actuel.",[15,2532,2533,2534,2537,2538,2541],{},"Le principe de base : tant qu'une installation fonctionne de manière ",[19,2535,2536],{},"sûre"," et ne représente ",[19,2539,2540],{},"aucun danger immédiat",", elle n'a pas à être entièrement mise aux normes actuelles — même si elle ne répond pas à toutes les prescriptions en vigueur.",[50,2543,2544],{},[15,2545,2546,2549],{},[19,2547,2548],{},"Important :"," La Partie 8 n'est pas un blanc-seing. Elle définit clairement quelles dérogations sont tolérées et lesquelles ne le sont pas.",[24,2551],{},[27,2553,2555],{"id":2554},"quand-la-partie-8-sapplique-t-elle","Quand la Partie 8 s'applique-t-elle ?",[15,2557,2558,2559,2562],{},"La Partie 8 s'applique aux installations qui remplissent ",[19,2560,2561],{},"l'une"," des conditions suivantes :",[72,2564,2566],{"id":2565},"condition-1-installation-avant-le-01101981","Condition 1 : Installation avant le 01.10.1981",[15,2568,2569],{},"Les installations réalisées avant le 1er octobre 1981 (date d'entrée en vigueur du RGIE original) tombent en principe sous la Partie 8.",[72,2571,2573],{"id":2572},"condition-2-réceptionnée-sous-lancien-rgie","Condition 2 : Réceptionnée sous l'ancien RGIE",[15,2575,2576,2577,2580],{},"Les installations qui ont été réceptionnées sous une version antérieure du RGIE et qui n'ont ",[19,2578,2579],{},"pas été substantiellement modifiées"," depuis la dernière réception.",[72,2582,2584],{"id":2583},"quest-ce-quune-modification-substantielle","Qu'est-ce qu'une « modification substantielle » ?",[95,2586,2587,2593,2599,2605],{},[98,2588,2589,2590],{},"Ajout de ",[19,2591,2592],{},"nouveaux circuits",[98,2594,2595,2596],{},"Extension du ",[19,2597,2598],{},"tableau de distribution",[98,2600,2601,2602],{},"Modification de l'",[19,2603,2604],{},"installation de comptage",[98,2606,2607,2610],{},[19,2608,2609],{},"Recâblage"," important",[50,2612,2613],{},[15,2614,2615,2618],{},[19,2616,2617],{},"Attention :"," Les petites modifications comme le remplacement d'une prise ou d'un interrupteur ne comptent PAS comme modification substantielle.",[24,2620],{},[27,2622,2624],{"id":2623},"ce-qui-est-autorisé-sous-la-partie-8-dérogations-tolérées","Ce qui est autorisé sous la Partie 8 (Dérogations tolérées)",[15,2626,2627],{},"Les points suivants s'écartent du RGIE actuel, mais sont tolérés sous la Partie 8 lors du contrôle :",[72,2629,2631],{"id":2630},"_1-anciens-types-de-câbles","1. Anciens types de câbles",[144,2633,2634,2644],{},[147,2635,2636],{},[150,2637,2638,2641],{},[153,2639,2640],{},"RGIE actuel",[153,2642,2643],{},"Partie 8 tolère",[160,2645,2646,2654,2662],{},[150,2647,2648,2651],{},[165,2649,2650],{},"XVB \u002F VOBst en Preflex",[165,2652,2653],{},"Câbles VOB dans d'anciennes gaines",[150,2655,2656,2659],{},[165,2657,2658],{},"Classe de réaction au feu Cca",[165,2660,2661],{},"Types de câbles plus anciens sans classification CPR",[150,2663,2664,2667],{},[165,2665,2666],{},"Section minimale 2,5 mm² pour les prises",[165,2668,2669],{},"Minimum 1 mm² avec fusible max. 6 A ou disjoncteur max. 10 A (Art. 8.2.1 Nr. 5)",[72,2671,2673],{"id":2672},"_2-différentiels-rcd","2. Différentiels (RCD)",[144,2675,2676,2684],{},[147,2677,2678],{},[150,2679,2680,2682],{},[153,2681,2640],{},[153,2683,2643],{},[160,2685,2686,2694,2702],{},[150,2687,2688,2691],{},[165,2689,2690],{},"Différentiel 30 mA par circuit prises",[165,2692,2693],{},"Pas de 30 mA nécessaire (seulement 300 mA principal)",[150,2695,2696,2699],{},[165,2697,2698],{},"Différentiel 30 mA obligatoire pour salle de bain",[165,2700,2701],{},"Toléré sans, s'il n'y a pas de risque direct",[150,2703,2704,2707],{},[165,2705,2706],{},"Max. 8 circuits par RCD",[165,2708,2709],{},"Plus de circuits autorisés",[50,2711,2712],{},[15,2713,2714,2717,2718,2721],{},[19,2715,2716],{},"Note :"," Même sous la Partie 8, un ",[19,2719,2720],{},"différentiel principal 300 mA"," est recommandé et souvent exigé par le gestionnaire de réseau lors d'une nouvelle installation de compteur.",[72,2723,2725],{"id":2724},"_3-prises-sans-contact-de-terre","3. Prises sans contact de terre",[15,2727,2728],{},"Les anciennes prises (type C, sans broche de terre) sont tolérées sous la Partie 8, à condition que :",[95,2730,2731,2738,2748],{},[98,2732,2733,2734,2737],{},"Aucun appareil de ",[19,2735,2736],{},"classe de protection I"," (avec boîtier métallique) ne soit branché.",[98,2739,2740,2741,2744,2745,279],{},"La prise ne soit pas dans la ",[19,2742,2743],{},"salle de bain"," ou dans un ",[19,2746,2747],{},"lieu humide",[98,2749,2750],{},"Le circuit soit par ailleurs intact.",[72,2752,2754],{"id":2753},"_4-pas-de-parafoudre-spd","4. Pas de parafoudre (SPD)",[15,2756,2757,2758,279],{},"Le RGIE actuel prescrit un parafoudre (SPD) Type 2 pour les nouvelles installations. Sous la Partie 8, ce n'est ",[19,2759,2760],{},"pas requis",[72,2762,2764],{"id":2763},"_5-ancienne-technique-de-distribution","5. Ancienne technique de distribution",[95,2766,2767,2774,2780],{},[98,2768,2769,2770,2773],{},"Les ",[19,2771,2772],{},"fusibles"," au lieu de disjoncteurs sont autorisés.",[98,2775,2769,2776,2779],{},[19,2777,2778],{},"fusibles à vis"," (Diazed) sont tolérés.",[98,2781,2782,2783,2786],{},"L'absence d'",[19,2784,2785],{},"étiquetage"," est mentionnée comme défaut, mais n'entraîne pas un échec.",[72,2788,2790],{"id":2789},"_6-pas-de-classification-de-réaction-au-feu-des-câbles","6. Pas de classification de réaction au feu des câbles",[15,2792,2793],{},"Les câbles sans classification CPR (installés avant 2017) sont tolérés, car le règlement CPR ne s'applique qu'à partir de juillet 2017 pour les nouvelles installations.",[24,2795],{},[27,2797,2799],{"id":2798},"ce-qui-nest-pas-autorisé-même-sous-la-partie-8","Ce qui n'est PAS autorisé (même sous la Partie 8)",[15,2801,2802,2803,2806],{},"Certaines situations ne sont ",[19,2804,2805],{},"jamais tolérées",", quel que soit l'âge de l'installation :",[72,2808,2810],{"id":2809},"absolument-inadmissible","Absolument inadmissible :",[144,2812,2813,2823],{},[147,2814,2815],{},[150,2816,2817,2820],{},[153,2818,2819],{},"Situation",[153,2821,2822],{},"Pourquoi ?",[160,2824,2825,2835,2845,2855,2865,2875,2885,2895],{},[150,2826,2827,2832],{},[165,2828,2829],{},[19,2830,2831],{},"Câbles dénudés ou endommagés",[165,2833,2834],{},"Danger immédiat d'électrocution",[150,2836,2837,2842],{},[165,2838,2839],{},[19,2840,2841],{},"Absence totale de mise à la terre",[165,2843,2844],{},"Pas de protection en cas de défaut d'isolement",[150,2846,2847,2852],{},[165,2848,2849],{},[19,2850,2851],{},"Eau en contact avec l'électricité",[165,2853,2854],{},"Danger de mort",[150,2856,2857,2862],{},[165,2858,2859],{},[19,2860,2861],{},"Parties sous tension accessibles",[165,2863,2864],{},"Risque de contact direct",[150,2866,2867,2872],{},[165,2868,2869],{},[19,2870,2871],{},"Câbles ou connexions en surchauffe",[165,2873,2874],{},"Risque d'incendie",[150,2876,2877,2882],{},[165,2878,2879],{},[19,2880,2881],{},"Connexions desserrées dans les boîtes de dérivation",[165,2883,2884],{},"Risque d'arc\u002Fincendie",[150,2886,2887,2892],{},[165,2888,2889],{},[19,2890,2891],{},"Boîtes de dérivation sans couvercle",[165,2893,2894],{},"Protection contre les contacts manquante",[150,2896,2897,2902],{},[165,2898,2899],{},[19,2900,2901],{},"Prise de salle de bain en zone 0 ou 1",[165,2903,2904],{},"Danger de mort, interdit même sous Partie 8",[72,2906,2908],{"id":2907},"exigences-minimales-de-sécurité","Exigences minimales de sécurité :",[15,2910,2911],{},"Même sous la Partie 8, il faut garantir :",[95,2913,2914,2920,2926,2932],{},[98,2915,2916,2919],{},[19,2917,2918],{},"Section suffisante"," pour la charge réelle (pas de câble 0,75 mm² surchargé).",[98,2921,2922,2925],{},[19,2923,2924],{},"Fusibles fonctionnels"," (pas de fusibles « pontés »).",[98,2927,2928,2931],{},[19,2929,2930],{},"Mise à la terre du tableau principal"," (connexion à l'électrode de terre).",[98,2933,2934,2937],{},[19,2935,2936],{},"Accessibilité"," du tableau de distribution.",[24,2939],{},[27,2941,2943],{"id":2942},"contrôle-périodique","Contrôle périodique",[72,2945,2947],{"id":2946},"tous-les-25-ans-obligatoire","Tous les 25 ans obligatoire",[15,2949,2950,2951,2954],{},"Les installations existantes sous la Partie 8 doivent subir un contrôle périodique tous les ",[19,2952,2953],{},"25 ans"," par un organisme de contrôle agréé.",[72,2956,2958],{"id":2957},"lors-dun-changement-de-propriétaire","Lors d'un changement de propriétaire",[15,2960,2961,2962,2965],{},"Lors de la ",[19,2963,2964],{},"vente d'un bien immobilier",", une attestation de contrôle valide (de moins de 25 ans) est obligatoire. Si elle n'existe pas, un contrôle doit être effectué avant la vente.",[50,2967,2968],{},[15,2969,2970,2973,2974,2977],{},[19,2971,2972],{},"Délai de 18 mois (Art. 8.4.2.2) :"," Lors de l'achat d'un bien immobilier avec un rapport de contrôle négatif, l'acheteur dispose de ",[19,2975,2976],{},"18 mois"," à compter de la date d'achat pour remédier aux défauts et faire effectuer un recontrôle.",[72,2979,2981],{"id":2980},"que-vérifie-t-on-lors-du-contrôle-périodique","Que vérifie-t-on lors du contrôle périodique ?",[144,2983,2984,2994],{},[147,2985,2986],{},[150,2987,2988,2991],{},[153,2989,2990],{},"Point de contrôle",[153,2992,2993],{},"Évaluation",[160,2995,2996,3004,3012,3019,3027,3035,3043],{},[150,2997,2998,3001],{},[165,2999,3000],{},"Inspection visuelle des câbles et connexions",[165,3002,3003],{},"Dommages, surchauffe",[150,3005,3006,3009],{},[165,3007,3008],{},"Mesure de la résistance de terre",[165,3010,3011],{},"≤ 30 Ω (seuil réglementaire selon Art. 4.2.4.3b ; au-delà, des mesures de protection supplémentaires sont nécessaires)",[150,3013,3014,3017],{},[165,3015,3016],{},"Mesure de la résistance d'isolement",[165,3018,537],{},[150,3020,3021,3024],{},[165,3022,3023],{},"Test RCD (si présent)",[165,3025,3026],{},"Temps et courant de déclenchement",[150,3028,3029,3032],{},[165,3030,3031],{},"Vérification de la protection contre les courts-circuits",[165,3033,3034],{},"Fusibles \u002F disjoncteurs présents",[150,3036,3037,3040],{},[165,3038,3039],{},"Protection contre les contacts directs",[165,3041,3042],{},"Couvercles, protection IP",[150,3044,3045,3047],{},[165,3046,2136],{},[165,3048,3049],{},"Schéma unifilaire + plan de situation présents ?",[50,3051,3052],{},[15,3053,3054,2717,3056,3059,3060,3063],{},[19,3055,2716],{},[19,3057,3058],{},"schéma unifilaire"," et un ",[19,3061,3062],{},"plan de situation"," doivent être disponibles — même s'ils doivent être établis rétroactivement.",[24,3065],{},[27,3067,3069],{"id":3068},"la-règle-de-contamination-lors-dune-rénovation-partielle","La règle de contamination lors d'une rénovation partielle",[15,3071,3072,3073,279],{},"Un aspect particulièrement important pour les anciens bâtiments : la ",[19,3074,3075],{},"règle de contamination",[72,3077,3079],{"id":3078},"comment-fonctionne-t-elle","Comment fonctionne-t-elle ?",[15,3081,3082,3083,3086],{},"Lorsque vous modifiez ",[19,3084,3085],{},"substantiellement"," une partie de votre installation (par ex. ajout de nouveaux circuits) :",[609,3088,3089,3096,3102],{},[98,3090,3091,3092,3095],{},"La ",[19,3093,3094],{},"nouvelle partie"," doit entièrement répondre au RGIE actuel.",[98,3097,3091,3098,3101],{},[19,3099,3100],{},"partie existante"," continue d'être évaluée selon la Partie 8.",[98,3103,3104,3107],{},[19,3105,3106],{},"MAIS :"," Si la nouvelle partie « contamine » la partie existante (par ex. nouveaux câbles dans le même tableau), le contrôleur peut décider que l'ensemble du tableau doit répondre au RGIE actuel.",[72,3109,3111],{"id":3110},"conséquences-pratiques","Conséquences pratiques :",[95,3113,3114,3120,3127],{},[98,3115,3116,3117,279],{},"Planifiez les rénovations de manière à ce que les parties nouvelles et anciennes soient ",[19,3118,3119],{},"clairement séparées",[98,3121,3122,3123,3126],{},"Idéalement, un ",[19,3124,3125],{},"sous-tableau séparé"," pour les nouveaux circuits.",[98,3128,3129],{},"Documentez précisément ce qui est ancien et ce qui est nouveau.",[24,3131],{},[27,3133,3135],{"id":3134},"recommandation-modernisation-progressive","Recommandation : Modernisation progressive",[15,3137,3138,3139,3142],{},"Même si la Partie 8 tolère des dérogations, une ",[19,3140,3141],{},"modernisation progressive"," est recommandée :",[72,3144,3146],{"id":3145},"priorité-1-critique-pour-la-sécurité","Priorité 1 (Critique pour la sécurité)",[95,3148,3149,3152,3155,3158],{},[98,3150,3151],{},"Installer un différentiel principal 300 mA (s'il est absent)",[98,3153,3154],{},"Remplacer les câbles endommagés",[98,3156,3157],{},"Réparer les connexions desserrées",[98,3159,3160],{},"Vérifier et améliorer la mise à la terre si nécessaire",[72,3162,3164],{"id":3163},"priorité-2-recommandé","Priorité 2 (Recommandé)",[95,3166,3167,3170,3173],{},[98,3168,3169],{},"Différentiels de groupe 30 mA pour salle de bain et cuisine",[98,3171,3172],{},"Remplacer les anciens fusibles par des disjoncteurs",[98,3174,3175],{},"Installer un parafoudre Type 2",[72,3177,3179],{"id":3178},"priorité-3-confort-pérennité","Priorité 3 (Confort + pérennité)",[95,3181,3182,3185,3188],{},[98,3183,3184],{},"Moderniser le tableau (plus de rangées, étiquetage)",[98,3186,3187],{},"Installer des prises avec terre",[98,3189,3190],{},"Préparation pour borne de recharge \u002F installation PV",[72,3192,3194],{"id":3193},"orientation-des-coûts","Orientation des coûts",[144,3196,3197,3207],{},[147,3198,3199],{},[150,3200,3201,3204],{},[153,3202,3203],{},"Mesure",[153,3205,3206],{},"Coût estimé",[160,3208,3209,3216,3223,3230,3237,3244],{},[150,3210,3211,3214],{},[165,3212,3213],{},"Installer différentiel principal 300 mA",[165,3215,739],{},[150,3217,3218,3221],{},[165,3219,3220],{},"Différentiel de groupe 30 mA (par pièce)",[165,3222,747],{},[150,3224,3225,3228],{},[165,3226,3227],{},"Parafoudre Type 2",[165,3229,755],{},[150,3231,3232,3235],{},[165,3233,3234],{},"Set de disjoncteurs (10 pièces)",[165,3236,763],{},[150,3238,3239,3242],{},[165,3240,3241],{},"Nouveau tableau 4 rangées (complet)",[165,3243,771],{},[150,3245,3246,3249],{},[165,3247,3248],{},"Recâblage complet (maison)",[165,3250,779],{},[24,3252],{},[27,3254,3256],{"id":3255},"résumé","Résumé",[144,3258,3259,3268],{},[147,3260,3261],{},[150,3262,3263,3265],{},[153,3264,2361],{},[153,3266,3267],{},"Réponse",[160,3269,3270,3278,3286,3294,3302],{},[150,3271,3272,3275],{},[165,3273,3274],{},"Mon ancien bâtiment doit-il répondre au RGIE actuel ?",[165,3276,3277],{},"Pas entièrement, la Partie 8 autorise des dérogations",[150,3279,3280,3283],{},[165,3281,3282],{},"Ai-je besoin d'un différentiel 30 mA ?",[165,3284,3285],{},"Pas obligatoire sous Partie 8, mais fortement recommandé",[150,3287,3288,3291],{},[165,3289,3290],{},"Les anciennes prises sans terre sont-elles autorisées ?",[165,3292,3293],{},"Sous conditions oui (pas de salle de bain, pas d'appareils classe I)",[150,3295,3296,3299],{},[165,3297,3298],{},"À quelle fréquence faut-il contrôler ?",[165,3300,3301],{},"Tous les 25 ans + lors d'un changement de propriétaire",[150,3303,3304,3307],{},[165,3305,3306],{},"Que se passe-t-il en cas de rénovation partielle ?",[165,3308,3309],{},"Nouvelle partie = RGIE actuel, ancienne = Partie 8 (règle de contamination)",[24,3311],{},[27,3313,3315],{"id":3314},"articles-connexes","Articles connexes",[95,3317,3318,3324,3330,3336],{},[98,3319,3320],{},[851,3321,3323],{"href":3322},"\u002Ffr\u002Fblog\u002Fcontrole-electrique","Contrôle électrique en Belgique : Que vérifie-t-on ?",[98,3325,3326],{},[851,3327,3329],{"href":3328},"\u002Ffr\u002Fblog\u002Frgie-2026-changements","Que change le RGIE 2026 ?",[98,3331,3332],{},[851,3333,3335],{"href":3334},"\u002Ffr\u002Fblog\u002Fpreflex-vs-pose-libre","Preflex vs. pose libre",[98,3337,3338],{},[851,3339,3341],{"href":3340},"\u002Ffr\u002Fblog\u002Fplanifier-tableau-electrique","Planifier un tableau électrique",[24,3343],{},[15,3345,3346],{},[878,3347,3348,3349,3351,3352],{},"Même pour les anciens bâtiments, ",[19,3350,883],{}," crée des schémas unifilaires et des plans de situation conformes aux normes — les documents obligatoires pour chaque contrôle. Documentez votre installation dès maintenant en numérique. ",[851,3353,3354],{"href":887},"Commencer gratuitement →",{"title":890,"searchDepth":891,"depth":891,"links":3356},[3357,3358,3363,3371,3375,3380,3384,3390,3391],{"id":2522,"depth":891,"text":2523},{"id":2554,"depth":891,"text":2555,"children":3359},[3360,3361,3362],{"id":2565,"depth":897,"text":2566},{"id":2572,"depth":897,"text":2573},{"id":2583,"depth":897,"text":2584},{"id":2623,"depth":891,"text":2624,"children":3364},[3365,3366,3367,3368,3369,3370],{"id":2630,"depth":897,"text":2631},{"id":2672,"depth":897,"text":2673},{"id":2724,"depth":897,"text":2725},{"id":2753,"depth":897,"text":2754},{"id":2763,"depth":897,"text":2764},{"id":2789,"depth":897,"text":2790},{"id":2798,"depth":891,"text":2799,"children":3372},[3373,3374],{"id":2809,"depth":897,"text":2810},{"id":2907,"depth":897,"text":2908},{"id":2942,"depth":891,"text":2943,"children":3376},[3377,3378,3379],{"id":2946,"depth":897,"text":2947},{"id":2957,"depth":897,"text":2958},{"id":2980,"depth":897,"text":2981},{"id":3068,"depth":891,"text":3069,"children":3381},[3382,3383],{"id":3078,"depth":897,"text":3079},{"id":3110,"depth":897,"text":3111},{"id":3134,"depth":891,"text":3135,"children":3385},[3386,3387,3388,3389],{"id":3145,"depth":897,"text":3146},{"id":3163,"depth":897,"text":3164},{"id":3178,"depth":897,"text":3179},{"id":3193,"depth":897,"text":3194},{"id":3255,"depth":891,"text":3256},{"id":3314,"depth":891,"text":3315},"Ce qui s'applique aux anciennes installations électriques en Belgique. RGIE Partie 8 expliqué : dérogations autorisées, contrôle périodique et conseils pour une modernisation progressive.","fr",{},"\u002Fblog\u002Fold-building-arei-part8.fr",{"title":2505,"description":3392},"ancien-rgie-part-8","blog\u002Fold-building-arei-part8.fr",[3400,3401,2516,3402,3403,3404,3405],"ancien bâtiment","RGIE","installation existante","rénovation","contrôle","périodique","uPYhmrHk0H2zrnW2t52B5i74mpNM6ngQYiqTmjU6JJk",{"id":3408,"title":3409,"articleId":6,"body":3410,"category":929,"date":930,"description":4297,"extension":932,"lastUpdated":930,"locale":4298,"meta":4299,"navigation":935,"path":4300,"publishDate":930,"readTime":937,"refreshInterval":938,"seo":4301,"slug":4302,"stem":4303,"tags":4304,"__hash__":4310},"blog\u002Fblog\u002Fold-building-arei-part8.nl.md","Oudere installaties en AREI Part 8: Bijzondere regels voor bestaande installaties",{"type":8,"value":3411,"toc":4260},[3412,3415,3421,3423,3427,3434,3445,3453,3455,3459,3466,3470,3473,3477,3484,3488,3514,3522,3524,3528,3531,3535,3572,3576,3612,3624,3628,3631,3654,3658,3664,3668,3689,3693,3696,3698,3702,3709,3713,3807,3811,3814,3840,3842,3846,3850,3857,3861,3868,3880,3884,3953,3968,3970,3974,3981,3985,3992,4013,4017,4035,4037,4041,4048,4052,4066,4070,4081,4085,4096,4100,4155,4157,4161,4215,4217,4221,4247,4249],[11,3413,3409],{"id":3414},"oudere-installaties-en-arei-part-8-bijzondere-regels-voor-bestaande-installaties",[15,3416,3417,3418,3420],{},"Niet elke elektrische installatie in België moet aan de nieuwste AREI-voorschriften voldoen. Voor oudere gebouwen bestaat er met ",[19,3419,21],{}," een apart regelwerk dat bepaalde afwijkingen van de huidige standaard tolereert — zolang er geen onmiddellijk gevaar bestaat. Dit artikel legt uit wanneer Part 8 geldt, wat toegelaten is en waar de grenzen liggen.",[24,3422],{},[27,3424,3426],{"id":3425},"wat-is-part-8","Wat is Part 8?",[15,3428,3429,3430,3433],{},"Part 8 van het AREI (Algemeen Reglement op de Elektrische Installaties) is een ",[19,3431,3432],{},"bijzondere regeling voor bestaande installaties"," die vóór de inwerkingtreding van het huidige AREI werden aangelegd en gekeurd.",[15,3435,3436,3437,3440,3441,3444],{},"Het basisprincipe: zolang een installatie ",[19,3438,3439],{},"veilig"," functioneert en ",[19,3442,3443],{},"geen onmiddellijk gevaar"," vormt, hoeft ze niet volledig op de nieuwste stand gebracht te worden — ook al voldoet ze niet aan alle huidige voorschriften.",[50,3446,3447],{},[15,3448,3449,3452],{},[19,3450,3451],{},"Belangrijk:"," Part 8 is geen vrijbrief. Het definieert duidelijk welke afwijkingen getolereerd worden en welke niet.",[24,3454],{},[27,3456,3458],{"id":3457},"wanneer-geldt-part-8","Wanneer geldt Part 8?",[15,3460,3461,3462,3465],{},"Part 8 geldt voor installaties die aan ",[19,3463,3464],{},"één"," van de volgende voorwaarden voldoen:",[72,3467,3469],{"id":3468},"voorwaarde-1-installatie-vóór-01101981","Voorwaarde 1: Installatie vóór 01.10.1981",[15,3471,3472],{},"Installaties die vóór 1 oktober 1981 werden aangelegd (datum van inwerkingtreding van het oorspronkelijke AREI) vallen in principe onder Part 8.",[72,3474,3476],{"id":3475},"voorwaarde-2-onder-het-oude-arei-gekeurd","Voorwaarde 2: Onder het oude AREI gekeurd",[15,3478,3479,3480,3483],{},"Installaties die onder een eerdere versie van het AREI werden gekeurd en sindsdien ",[19,3481,3482],{},"niet wezenlijk gewijzigd"," zijn.",[72,3485,3487],{"id":3486},"wat-telt-als-wezenlijke-wijziging","Wat telt als \"wezenlijke wijziging\"?",[95,3489,3490,3496,3502,3508],{},[98,3491,3492,3493],{},"Toevoegen van ",[19,3494,3495],{},"nieuwe kringen",[98,3497,3498,3499],{},"Uitbreiding van de ",[19,3500,3501],{},"verdeelkast",[98,3503,3504,3505],{},"Wijziging van de ",[19,3506,3507],{},"meterinstallatie",[98,3509,3510,3511],{},"Omvangrijke ",[19,3512,3513],{},"herbekabeling",[50,3515,3516],{},[15,3517,3518,3521],{},[19,3519,3520],{},"Let op:"," Kleine wijzigingen zoals het vervangen van een stopcontact of schakelaar gelden NIET als wezenlijke wijziging.",[24,3523],{},[27,3525,3527],{"id":3526},"wat-is-onder-part-8-toegelaten-getolereerde-afwijkingen","Wat is onder Part 8 toegelaten? (Getolereerde afwijkingen)",[15,3529,3530],{},"De volgende punten wijken af van het huidige AREI, maar worden onder Part 8 bij de keuring getolereerd:",[72,3532,3534],{"id":3533},"_1-oude-kabeltypes","1. Oude kabeltypes",[144,3536,3537,3547],{},[147,3538,3539],{},[150,3540,3541,3544],{},[153,3542,3543],{},"Huidig AREI",[153,3545,3546],{},"Part 8 tolereert",[160,3548,3549,3556,3564],{},[150,3550,3551,3553],{},[165,3552,167],{},[165,3554,3555],{},"VOB-kabels in oude leidingen",[150,3557,3558,3561],{},[165,3559,3560],{},"Cca-brandveiligheidsklasse",[165,3562,3563],{},"Oudere kabeltypes zonder CPR-classificatie",[150,3565,3566,3569],{},[165,3567,3568],{},"Minimale doorsnede 2,5 mm² voor stopcontacten",[165,3570,3571],{},"Minimaal 1 mm² bij max. 6 A zekering of 10 A automaat (Art. 8.2.1 Nr. 5)",[72,3573,3575],{"id":3574},"_2-aardlekschakelaars-rcd-differentieelschakelaar","2. Aardlekschakelaars (RCD \u002F Differentieelschakelaar)",[144,3577,3578,3586],{},[147,3579,3580],{},[150,3581,3582,3584],{},[153,3583,3543],{},[153,3585,3546],{},[160,3587,3588,3596,3604],{},[150,3589,3590,3593],{},[165,3591,3592],{},"30 mA RCD per stopcontactkring",[165,3594,3595],{},"Geen 30 mA RCD nodig (alleen 300 mA hoofd-RCD)",[150,3597,3598,3601],{},[165,3599,3600],{},"30 mA RCD voor badkamer verplicht",[165,3602,3603],{},"Getolereerd zonder, als er geen direct risico is",[150,3605,3606,3609],{},[165,3607,3608],{},"Max. 8 kringen per RCD",[165,3610,3611],{},"Meer kringen toegelaten",[50,3613,3614],{},[15,3615,3616,3619,3620,3623],{},[19,3617,3618],{},"Opmerking:"," Ook onder Part 8 wordt een ",[19,3621,3622],{},"300 mA hoofd-RCD"," aanbevolen en bij nieuwe meterinstallatie vaak door de netbeheerder vereist.",[72,3625,3627],{"id":3626},"_3-stopcontacten-zonder-aardingcontact","3. Stopcontacten zonder aardingcontact",[15,3629,3630],{},"Oude stopcontacten (type C, zonder aardpen) worden onder Part 8 getolereerd, op voorwaarde dat:",[95,3632,3633,3640,3651],{},[98,3634,3635,3636,3639],{},"Geen toestellen van ",[19,3637,3638],{},"beschermingsklasse I"," (met metalen behuizing) worden aangesloten.",[98,3641,3642,3643,3646,3647,3650],{},"Het stopcontact niet in de ",[19,3644,3645],{},"badkamer"," of op ",[19,3648,3649],{},"vochtige plaatsen"," zit.",[98,3652,3653],{},"De kring verder intact is.",[72,3655,3657],{"id":3656},"_4-geen-spd-overspanningsbeveiliging","4. Geen SPD (overspanningsbeveiliging)",[15,3659,3660,3661,279],{},"Het huidige AREI schrijft voor nieuwe installaties een SPD (Surge Protection Device) Type 2 voor. Onder Part 8 is dit ",[19,3662,3663],{},"niet vereist",[72,3665,3667],{"id":3666},"_5-oude-verdeeltechniek","5. Oude verdeeltechniek",[95,3669,3670,3676,3682],{},[98,3671,3672,3675],{},[19,3673,3674],{},"Smeltzekeringen"," in plaats van MCBs zijn toegelaten.",[98,3677,3678,3681],{},[19,3679,3680],{},"Schroefzekeringen"," (Diazed) worden getolereerd.",[98,3683,3684,3685,3688],{},"Ontbrekende ",[19,3686,3687],{},"opschriften"," worden als gebrek vermeld, maar leiden niet tot afkeuring.",[72,3690,3692],{"id":3691},"_6-geen-brandveiligheidsclassificatie-van-kabels","6. Geen brandveiligheidsclassificatie van kabels",[15,3694,3695],{},"Kabels zonder CPR-classificatie (vóór 2017 geïnstalleerd) worden getolereerd, aangezien de CPR-verordening pas vanaf juli 2017 voor nieuwe installaties geldt.",[24,3697],{},[27,3699,3701],{"id":3700},"wat-is-niet-toegelaten-ook-onder-part-8","Wat is NIET toegelaten (ook onder Part 8)?",[15,3703,3704,3705,3708],{},"Bepaalde toestanden worden ",[19,3706,3707],{},"nooit getolereerd",", ongeacht de ouderdom van de installatie:",[72,3710,3712],{"id":3711},"absoluut-ongeoorloofd","Absoluut ongeoorloofd:",[144,3714,3715,3725],{},[147,3716,3717],{},[150,3718,3719,3722],{},[153,3720,3721],{},"Toestand",[153,3723,3724],{},"Waarom?",[160,3726,3727,3737,3747,3757,3767,3777,3787,3797],{},[150,3728,3729,3734],{},[165,3730,3731],{},[19,3732,3733],{},"Blote of beschadigde kabels",[165,3735,3736],{},"Onmiddellijk elektrocutiegevaar",[150,3738,3739,3744],{},[165,3740,3741],{},[19,3742,3743],{},"Volledig ontbrekende aarding",[165,3745,3746],{},"Geen bescherming bij isolatiefout",[150,3748,3749,3754],{},[165,3750,3751],{},[19,3752,3753],{},"Water in contact met elektriciteit",[165,3755,3756],{},"Levensgevaar",[150,3758,3759,3764],{},[165,3760,3761],{},[19,3762,3763],{},"Toegankelijke spanningvoerende delen",[165,3765,3766],{},"Direct aanrakingsrisico",[150,3768,3769,3774],{},[165,3770,3771],{},[19,3772,3773],{},"Oververhitte kabels of verbindingen",[165,3775,3776],{},"Brandgevaar",[150,3778,3779,3784],{},[165,3780,3781],{},[19,3782,3783],{},"Losse verbindingen in aftakdozen",[165,3785,3786],{},"Vlamboog-\u002Fbrandgevaar",[150,3788,3789,3794],{},[165,3790,3791],{},[19,3792,3793],{},"Aftakdozen zonder deksel",[165,3795,3796],{},"Aanrakingsbescherming ontbreekt",[150,3798,3799,3804],{},[165,3800,3801],{},[19,3802,3803],{},"Badkamer-stopcontact in zone 0 of 1",[165,3805,3806],{},"Levensgevaar, ook onder Part 8 verboden",[72,3808,3810],{"id":3809},"veiligheidsgerelateerde-minimumvereisten","Veiligheidsgerelateerde minimumvereisten:",[15,3812,3813],{},"Ook onder Part 8 moet gewaarborgd zijn:",[95,3815,3816,3822,3828,3834],{},[98,3817,3818,3821],{},[19,3819,3820],{},"Voldoende doorsnede"," voor de werkelijke belasting (geen overbelast 0,75 mm²-kabel).",[98,3823,3824,3827],{},[19,3825,3826],{},"Werkende zekeringen"," (geen \"overbrugde\" zekeringen).",[98,3829,3830,3833],{},[19,3831,3832],{},"Aarding van de hoofdverdeler"," (verbinding met aardingselektrode).",[98,3835,3836,3839],{},[19,3837,3838],{},"Toegankelijkheid"," van de verdeelkast.",[24,3841],{},[27,3843,3845],{"id":3844},"periodieke-keuring","Periodieke keuring",[72,3847,3849],{"id":3848},"elke-25-jaar-verplicht","Elke 25 jaar verplicht",[15,3851,3852,3853,3856],{},"Bestaande installaties onder Part 8 moeten elke ",[19,3854,3855],{},"25 jaar"," een periodieke keuring ondergaan door een erkend controleorganisme.",[72,3858,3860],{"id":3859},"bij-eigendomsoverdracht","Bij eigendomsoverdracht",[15,3862,3863,3864,3867],{},"Bij ",[19,3865,3866],{},"verkoop van een woning"," is een geldig keuringsattest (minder dan 25 jaar oud) verplicht. Ontbreekt dit, dan moet vóór de verkoop een keuring plaatsvinden.",[50,3869,3870],{},[15,3871,3872,3875,3876,3879],{},[19,3873,3874],{},"18-maandentermijn (Art. 8.4.2.2):"," Bij aankoop van een woning met een negatief keuringsverslag heeft de koper ",[19,3877,3878],{},"18 maanden"," vanaf de aankoopdatum om de gebreken te verhelpen en een herkeuring te laten uitvoeren.",[72,3881,3883],{"id":3882},"wat-wordt-bij-de-periodieke-keuring-gecontroleerd","Wat wordt bij de periodieke keuring gecontroleerd?",[144,3885,3886,3896],{},[147,3887,3888],{},[150,3889,3890,3893],{},[153,3891,3892],{},"Controlepunt",[153,3894,3895],{},"Beoordeling",[160,3897,3898,3906,3914,3921,3929,3937,3945],{},[150,3899,3900,3903],{},[165,3901,3902],{},"Visuele inspectie kabels en verbindingen",[165,3904,3905],{},"Beschadiging, oververhitting",[150,3907,3908,3911],{},[165,3909,3910],{},"Aardingsweerstand meten",[165,3912,3913],{},"≤ 30 Ω (reglementaire drempel conform Art. 4.2.4.3b; daarboven bijkomende beschermingsmaatregelen nodig)",[150,3915,3916,3919],{},[165,3917,3918],{},"Isolatieweerstand meten",[165,3920,537],{},[150,3922,3923,3926],{},[165,3924,3925],{},"RCD-test (indien aanwezig)",[165,3927,3928],{},"Uitschakeltijd en -stroom",[150,3930,3931,3934],{},[165,3932,3933],{},"Kortsluitbeveiliging controleren",[165,3935,3936],{},"Zekeringen \u002F MCBs aanwezig",[150,3938,3939,3942],{},[165,3940,3941],{},"Bescherming tegen direct aanraken",[165,3943,3944],{},"Afdekkingen, IP-bescherming",[150,3946,3947,3950],{},[165,3948,3949],{},"Documentatie",[165,3951,3952],{},"Éénlijnschema + situatieschema aanwezig?",[50,3954,3955],{},[15,3956,3957,3959,3960,3963,3964,3967],{},[19,3958,3618],{}," Ook onder Part 8 moeten een ",[19,3961,3962],{},"éénlijnschema"," en een ",[19,3965,3966],{},"situatieschema"," aanwezig zijn — ook als deze achteraf moeten worden opgesteld.",[24,3969],{},[27,3971,3973],{"id":3972},"de-besmettingsregel-bij-gedeeltelijke-renovatie","De besmettingsregel bij gedeeltelijke renovatie",[15,3975,3976,3977,3980],{},"Een bijzonder belangrijk aspect bij oudere gebouwen: de zogenaamde ",[19,3978,3979],{},"besmettingsregel"," (contamination rule).",[72,3982,3984],{"id":3983},"hoe-werkt-het","Hoe werkt het?",[15,3986,3987,3988,3991],{},"Wanneer u een deel van uw installatie ",[19,3989,3990],{},"wezenlijk wijzigt"," (bijv. nieuwe kringen toevoegen), geldt:",[609,3993,3994,4001,4007],{},[98,3995,3996,3997,4000],{},"Het ",[19,3998,3999],{},"nieuwe deel"," moet volledig voldoen aan het huidige AREI.",[98,4002,3996,4003,4006],{},[19,4004,4005],{},"bestaande deel"," wordt verder beoordeeld volgens Part 8.",[98,4008,4009,4012],{},[19,4010,4011],{},"MAAR:"," Als het nieuwe deel het bestaande deel \"besmet\" (bijv. nieuwe kabels in dezelfde verdeelkast), kan de controleur beslissen dat de hele verdeelkast aan het huidige AREI moet voldoen.",[72,4014,4016],{"id":4015},"praktische-gevolgen","Praktische gevolgen:",[95,4018,4019,4025,4032],{},[98,4020,4021,4022,3483],{},"Plan renovaties zo dat nieuwe en oude delen ",[19,4023,4024],{},"duidelijk gescheiden",[98,4026,4027,4028,4031],{},"Idealiter een ",[19,4029,4030],{},"aparte onderverdeler"," voor nieuwe kringen.",[98,4033,4034],{},"Documenteer precies wat oud en wat nieuw is.",[24,4036],{},[27,4038,4040],{"id":4039},"aanbeveling-stapsgewijze-modernisering","Aanbeveling: Stapsgewijze modernisering",[15,4042,4043,4044,4047],{},"Hoewel Part 8 afwijkingen tolereert, is een ",[19,4045,4046],{},"stapsgewijze modernisering"," aan te raden:",[72,4049,4051],{"id":4050},"prioriteit-1-veiligheidskritisch","Prioriteit 1 (Veiligheidskritisch)",[95,4053,4054,4057,4060,4063],{},[98,4055,4056],{},"300 mA hoofd-RCD bijplaatsen (indien niet aanwezig)",[98,4058,4059],{},"Beschadigde kabels vervangen",[98,4061,4062],{},"Losse verbindingen herstellen",[98,4064,4065],{},"Aarding controleren en eventueel verbeteren",[72,4067,4069],{"id":4068},"prioriteit-2-aanbevolen","Prioriteit 2 (Aanbevolen)",[95,4071,4072,4075,4078],{},[98,4073,4074],{},"30 mA groeps-RCDs voor badkamer en keuken",[98,4076,4077],{},"Oude smeltzekeringen vervangen door MCBs",[98,4079,4080],{},"SPD Type 2 bijplaatsen",[72,4082,4084],{"id":4083},"prioriteit-3-comfort-toekomstbestendigheid","Prioriteit 3 (Comfort + toekomstbestendigheid)",[95,4086,4087,4090,4093],{},[98,4088,4089],{},"Verdeelkast moderniseren (meer rijen, opschriften)",[98,4091,4092],{},"Stopcontacten met aarding bijplaatsen",[98,4094,4095],{},"Voorbereiding voor laadpaal \u002F zonnepanelen",[72,4097,4099],{"id":4098},"kostenoriëntatie","Kostenoriëntatie",[144,4101,4102,4112],{},[147,4103,4104],{},[150,4105,4106,4109],{},[153,4107,4108],{},"Maatregel",[153,4110,4111],{},"Geschatte kosten",[160,4113,4114,4121,4128,4134,4141,4148],{},[150,4115,4116,4119],{},[165,4117,4118],{},"300 mA hoofd-RCD bijplaatsen",[165,4120,739],{},[150,4122,4123,4126],{},[165,4124,4125],{},"30 mA groeps-RCD (per stuk)",[165,4127,747],{},[150,4129,4130,4132],{},[165,4131,2319],{},[165,4133,755],{},[150,4135,4136,4139],{},[165,4137,4138],{},"MCB-set (10 stuks)",[165,4140,763],{},[150,4142,4143,4146],{},[165,4144,4145],{},"Nieuwe 4-rijige verdeelkast (compleet)",[165,4147,771],{},[150,4149,4150,4153],{},[165,4151,4152],{},"Volledige herbekabeling (EGW)",[165,4154,779],{},[24,4156],{},[27,4158,4160],{"id":4159},"samenvatting","Samenvatting",[144,4162,4163,4173],{},[147,4164,4165],{},[150,4166,4167,4170],{},[153,4168,4169],{},"Vraag",[153,4171,4172],{},"Antwoord",[160,4174,4175,4183,4191,4199,4207],{},[150,4176,4177,4180],{},[165,4178,4179],{},"Moet mijn oud gebouw aan het huidige AREI voldoen?",[165,4181,4182],{},"Niet volledig, Part 8 staat afwijkingen toe",[150,4184,4185,4188],{},[165,4186,4187],{},"Heb ik een 30 mA RCD nodig?",[165,4189,4190],{},"Onder Part 8 niet verplicht, maar sterk aanbevolen",[150,4192,4193,4196],{},[165,4194,4195],{},"Zijn oude stopcontacten zonder aarding toegelaten?",[165,4197,4198],{},"Onder voorwaarden ja (geen badkamer, geen klasse-I-toestellen)",[150,4200,4201,4204],{},[165,4202,4203],{},"Hoe vaak moet er gekeurd worden?",[165,4205,4206],{},"Elke 25 jaar + bij eigendomsoverdracht",[150,4208,4209,4212],{},[165,4210,4211],{},"Wat bij gedeeltelijke renovatie?",[165,4213,4214],{},"Nieuw deel = huidig AREI, oud deel = Part 8 (besmettingsregel in acht nemen)",[24,4216],{},[27,4218,4220],{"id":4219},"gerelateerde-artikelen","Gerelateerde artikelen",[95,4222,4223,4229,4235,4241],{},[98,4224,4225],{},[851,4226,4228],{"href":4227},"\u002Fblog\u002Felektrische-keuring","Elektrische keuring in België: Wat wordt gecontroleerd?",[98,4230,4231],{},[851,4232,4234],{"href":4233},"\u002Fblog\u002Farei-2026-wijzigingen","Wat verandert er met het AREI 2026?",[98,4236,4237],{},[851,4238,4240],{"href":4239},"\u002Fblog\u002Fpreflex-vs-vrije-bedrading","Preflex vs. vrije bedrading",[98,4242,4243],{},[851,4244,4246],{"href":4245},"\u002Fblog\u002Fverdeelkast-plannen-opbouw","Verdeelkast plannen",[24,4248],{},[15,4250,4251],{},[878,4252,4253,4254,4256,4257],{},"Ook voor oudere gebouwen maakt ",[19,4255,883],{}," normconforme éénlijnschema's en situatieschema's — de verplichte documenten voor elke keuring. Documenteer uw installatie nu digitaal. ",[851,4258,4259],{"href":887},"Gratis starten →",{"title":890,"searchDepth":891,"depth":891,"links":4261},[4262,4263,4268,4276,4280,4285,4289,4295,4296],{"id":3425,"depth":891,"text":3426},{"id":3457,"depth":891,"text":3458,"children":4264},[4265,4266,4267],{"id":3468,"depth":897,"text":3469},{"id":3475,"depth":897,"text":3476},{"id":3486,"depth":897,"text":3487},{"id":3526,"depth":891,"text":3527,"children":4269},[4270,4271,4272,4273,4274,4275],{"id":3533,"depth":897,"text":3534},{"id":3574,"depth":897,"text":3575},{"id":3626,"depth":897,"text":3627},{"id":3656,"depth":897,"text":3657},{"id":3666,"depth":897,"text":3667},{"id":3691,"depth":897,"text":3692},{"id":3700,"depth":891,"text":3701,"children":4277},[4278,4279],{"id":3711,"depth":897,"text":3712},{"id":3809,"depth":897,"text":3810},{"id":3844,"depth":891,"text":3845,"children":4281},[4282,4283,4284],{"id":3848,"depth":897,"text":3849},{"id":3859,"depth":897,"text":3860},{"id":3882,"depth":897,"text":3883},{"id":3972,"depth":891,"text":3973,"children":4286},[4287,4288],{"id":3983,"depth":897,"text":3984},{"id":4015,"depth":897,"text":4016},{"id":4039,"depth":891,"text":4040,"children":4290},[4291,4292,4293,4294],{"id":4050,"depth":897,"text":4051},{"id":4068,"depth":897,"text":4069},{"id":4083,"depth":897,"text":4084},{"id":4098,"depth":897,"text":4099},{"id":4159,"depth":891,"text":4160},{"id":4219,"depth":891,"text":4220},"Wat geldt voor oudere elektrische installaties in België. AREI Part 8 uitgelegd: toegelaten afwijkingen, periodieke keuring en tips voor stapsgewijze modernisering.","nl",{},"\u002Fblog\u002Fold-building-arei-part8.nl",{"title":3409,"description":4297},"oud-arei-part-8","blog\u002Fold-building-arei-part8.nl",[4305,944,945,4306,4307,4308,4309],"oudere installatie","bestaande installatie","renovatie","keuring","periodiek","NUYsPWj79zscyTrgUJpau0P_zivLrfC6l-07Z6xk5rw",1779375815083]