[{"data":1,"prerenderedAt":1650},["ShallowReactive",2],{"blog-post-de-arei-vorschriften-2026":3,"blog-alternates-arei-regulations-2026":389},{"id":4,"title":5,"articleId":6,"body":7,"category":359,"date":360,"description":361,"extension":362,"lastUpdated":360,"locale":363,"meta":364,"navigation":365,"path":366,"publishDate":367,"readTime":368,"refreshInterval":369,"seo":370,"slug":371,"stem":372,"tags":373,"__hash__":388},"blog\u002Fblog\u002Farei-regulations-2026.de.md","AREI-Vorschriften 2026: Die wichtigsten Änderungen","arei-regulations-2026",{"type":8,"value":9,"toc":343},"minimark",[10,15,28,31,35,40,43,72,81,85,92,113,116,120,123,149,153,156,182,186,193,207,215,219,230,241,244,248,300,304,307,333,336],[11,12,14],"h2",{"id":13},"überblick-über-die-änderungen-2026","Überblick über die Änderungen 2026",[16,17,18,19,23,24,27],"p",{},"Die belgischen Elektrovorschriften — auf Niederländisch als AREI (",[20,21,22],"em",{},"Algemeen Reglement op de Elektrische Installaties",") und auf Französisch als RGIE (",[20,25,26],{},"Règlement Général sur les Installations Électriques",") bekannt — werden regelmäßig aktualisiert, um mit dem technischen Fortschritt und den Sicherheitsanforderungen Schritt zu halten. Die Ausgabe 2026 führt mehrere wichtige Änderungen ein, die sowohl Neuinstallationen als auch Renovierungen betreffen.",[16,29,30],{},"Ob Sie als Hausbesitzer eine Renovierung planen, als Elektriker an Projekten arbeiten oder als Bauträger tätig sind — das Verständnis dieser Änderungen ist für die Einhaltung der Vorschriften unerlässlich.",[11,32,34],{"id":33},"die-wichtigsten-änderungen-im-überblick","Die wichtigsten Änderungen im Überblick",[36,37,39],"h3",{"id":38},"_1-verstärkter-schutz-für-e-auto-ladestationen","1. Verstärkter Schutz für E-Auto-Ladestationen",[16,41,42],{},"Mit der raschen Zunahme von Elektrofahrzeugen in Belgien verschärfen die Vorschriften 2026 die Anforderungen an Ladeinstallationen:",[44,45,46,54,60,66],"ul",{},[47,48,49,53],"li",{},[50,51,52],"strong",{},"Eigener Stromkreis erforderlich"," — Jeder Ladepunkt muss einen eigenen Stromkreis mit entsprechendem Schutz haben",[47,55,56,59],{},[50,57,58],{},"Lastmanagement"," — Installationen mit mehreren Ladepunkten müssen ein intelligentes Lastmanagement enthalten",[47,61,62,65],{},[50,63,64],{},"Kabeldimensionierung"," — Mindestquerschnitte für Ladestromkreise wurden erhöht",[47,67,68,71],{},[50,69,70],{},"FI-Schutz Typ B oder Typ A-EV"," — Ladeinstallationen erfordern FI-Schutzschalter vom Typ B oder Typ A-EV (mit integrierter DC-Fehlerstromsensorik ≥ 6 mA)",[73,74,75],"blockquote",{},[16,76,77,80],{},[50,78,79],{},"Auswirkung",": Wenn Sie eine E-Auto-Ladestation installieren, planen Sie einen eigenen Stromkreis mit entsprechendem Schutz ein. Die Nachrüstung eines bestehenden Stromkreises ist nicht mehr zulässig.",[36,82,84],{"id":83},"_2-überspannungsschutz-jetzt-pflicht","2. Überspannungsschutz jetzt Pflicht",[16,86,87,88,91],{},"Ein Überspannungsschutz (SPD — Surge Protection Device) ist bereits seit dem AREI 2020 für alle Neuinstallationen und größeren Renovierungen ",[50,89,90],{},"Pflicht",". Die Vorschriften 2026 bekräftigen dies und konkretisieren die Anforderungen:",[44,93,94,101,107,110],{},[47,95,96,97,100],{},"Mindestens ",[50,98,99],{},"Typ 2 SPD"," am Hauptverteiler",[47,102,103,106],{},[50,104,105],{},"Typ 3 SPD"," empfohlen für empfindliche Geräte",[47,108,109],{},"Muss mit den vorgelagerten Schutzeinrichtungen koordiniert sein",[47,111,112],{},"Regelmäßige Prüfung und Austausch nach Auslösung erforderlich",[16,114,115],{},"Diese Änderung spiegelt die zunehmende Empfindlichkeit moderner elektronischer Geräte und das wachsende Risiko von Spannungsspitzen aus dem Netz wider.",[36,117,119],{"id":118},"_3-aktualisierte-anforderungen-für-solaranlagen","3. Aktualisierte Anforderungen für Solaranlagen",[16,121,122],{},"Die Vorschriften für Photovoltaik-Anlagen (PV) wurden präzisiert:",[44,124,125,131,137,143],{},[47,126,127,130],{},[50,128,129],{},"DC-Trennschalter"," muss zugänglich und deutlich gekennzeichnet sein",[47,132,133,136],{},[50,134,135],{},"Lichtbogenerkennung"," (AFDD) wird jetzt für DC-Stromkreise empfohlen",[47,138,139,142],{},[50,140,141],{},"Batteriespeichersysteme"," müssen spezifische Belüftungs- und Brandschutzanforderungen erfüllen",[47,144,145,148],{},[50,146,147],{},"Dokumentation der bidirektionalen Energiemessung"," muss in der Installationsakte enthalten sein",[36,150,152],{"id":151},"_4-strengere-regeln-für-feuchträume","4. Strengere Regeln für Feuchträume",[16,154,155],{},"Die Klassifizierung von Feuchträumen (Zonen) und deren Schutzanforderungen wurden aktualisiert:",[44,157,158,164,170,176],{},[47,159,160,163],{},[50,161,162],{},"Zone 0"," (innerhalb der Badewanne\u002FDusche) — Nur SELV-Stromkreise (Sicherheitskleinspannung) erlaubt",[47,165,166,169],{},[50,167,168],{},"Zone 1"," (über der Badewanne\u002FDusche) — Mindestens IPX4 in Zone 1 (IPX5 nur bei Strahlwasser\u002FHochdruckreinigung)",[47,171,172,175],{},[50,173,174],{},"Zone 2"," (0,6m um Badewanne\u002FDusche) — 30mA FI-Schutz Pflicht, mindestens IPX4",[47,177,178,181],{},[50,179,180],{},"Bereich außerhalb der Zonen"," — Normale Installationsregeln, spritzwassergeschützte Geräte empfohlen",[36,183,185],{"id":184},"_5-digitale-dokumentation-akzeptiert","5. Digitale Dokumentation akzeptiert",[16,187,188,189,192],{},"Erstmals erkennen die Vorschriften ausdrücklich ",[50,190,191],{},"digitale Dokumentation"," an:",[44,194,195,198,201,204],{},[47,196,197],{},"Eindrahtschemas dürfen im digitalen PDF-Format eingereicht werden",[47,199,200],{},"Situationspläne können mit digitalen Werkzeugen (wie PlanElec) erstellt werden",[47,202,203],{},"Digitale Unterschriften werden auf Konformitätserklärungen akzeptiert",[47,205,206],{},"Elektronische Archivierung von Prüfberichten ist zulässig",[73,208,209],{},[16,210,211,214],{},[50,212,213],{},"Gute Nachricht",": Diese Änderung bestätigt offiziell die Verwendung von Tools wie PlanElec zur Erstellung Ihrer elektrischen Dokumentation.",[11,216,218],{"id":217},"was-das-für-bestehende-installationen-bedeutet","Was das für bestehende Installationen bedeutet",[16,220,221,222,225,226,229],{},"Die Vorschriften 2026 betreffen in erster Linie ",[50,223,224],{},"Neuinstallationen"," und ",[50,227,228],{},"größere Renovierungen",". Bestehende Installationen, die unter früheren Vorschriften geprüft wurden, bleiben gültig bis:",[44,231,232,235,238],{},[47,233,234],{},"Zur nächsten periodischen Prüfung (alle 25 Jahre)",[47,236,237],{},"Bei einer wesentlichen Änderung der Installation",[47,239,240],{},"Beim Verkauf der Immobilie",[16,242,243],{},"Es wird jedoch empfohlen, Ihre Installation proaktiv auf die neuen Standards zu aktualisieren, insbesondere hinsichtlich Überspannungsschutz und Feuchtraum-Anforderungen.",[11,245,247],{"id":246},"zeitplan-und-umsetzung","Zeitplan und Umsetzung",[249,250,251,264],"table",{},[252,253,254],"thead",{},[255,256,257,261],"tr",{},[258,259,260],"th",{},"Datum",[258,262,263],{},"Meilenstein",[265,266,267,276,284,292],"tbody",{},[255,268,269,273],{},[270,271,272],"td",{},"Januar 2026",[270,274,275],{},"Neue Vorschriften veröffentlicht",[255,277,278,281],{},[270,279,280],{},"März 2026",[270,282,283],{},"Übergangsfrist beginnt",[255,285,286,289],{},[270,287,288],{},"Juni 2026",[270,290,291],{},"Vollständige Durchsetzung für Neuinstallationen",[255,293,294,297],{},[270,295,296],{},"Dezember 2026",[270,298,299],{},"Vollständige Durchsetzung für größere Renovierungen",[11,301,303],{"id":302},"wie-planelec-aktuell-bleibt","Wie PlanElec aktuell bleibt",[16,305,306],{},"PlanElec wird kontinuierlich aktualisiert, um die neuesten AREI\u002FRGIE-Vorschriften widerzuspiegeln:",[44,308,309,315,321,327],{},[47,310,311,314],{},[50,312,313],{},"Symbolbibliothek"," aktualisiert mit neuen Komponentensymbolen",[47,316,317,320],{},[50,318,319],{},"Validierungsregeln"," prüfen die Konformität mit den Anforderungen 2026",[47,322,323,326],{},[50,324,325],{},"Vorlagen"," enthalten neue Pflichtelemente (SPD, E-Auto-Stromkreise)",[47,328,329,332],{},[50,330,331],{},"Exportformat"," generiert Dokumentation, die den neuen digitalen Akzeptanzstandards entspricht",[16,334,335],{},"Bleiben Sie konform, ohne den vollständigen Vorschriftentext studieren zu müssen. PlanElec stellt automatisch sicher, dass Ihre Dokumentation den neuesten Standards entspricht.",[16,337,338],{},[339,340,342],"a",{"href":341},"\u002F","Aktualisieren Sie Ihre elektrische Dokumentation mit PlanElec →",{"title":344,"searchDepth":345,"depth":345,"links":346},"",2,[347,348,356,357,358],{"id":13,"depth":345,"text":14},{"id":33,"depth":345,"text":34,"children":349},[350,352,353,354,355],{"id":38,"depth":351,"text":39},3,{"id":83,"depth":351,"text":84},{"id":118,"depth":351,"text":119},{"id":151,"depth":351,"text":152},{"id":184,"depth":351,"text":185},{"id":217,"depth":345,"text":218},{"id":246,"depth":345,"text":247},{"id":302,"depth":345,"text":303},"news","2026-01-02","Die neuesten Updates der belgischen Elektrovorschriften und was sie für Ihre Installation bedeuten.","md","de",{},true,"\u002Fblog\u002Farei-regulations-2026.de",null,"6 min",6,{"title":5,"description":361},"arei-vorschriften-2026","blog\u002Farei-regulations-2026.de",[374,375,376,377,378,379,380,381,382,383,384,385,386,387],"AREI","RGIE","Vorschriften 2026","Elektrovorschriften","Stromabnahme","Keuring","Eindrahtschema","Eendraadschema","Situationsplan","Überspannungsschutz","Wallbox","Solaranlage","Badezimmerzonen","Belgien","ehbQe1W8O9_XFaSsNDZFf6Aabp5qcIa4JEDLbTj1oZA",[390,621,971,1313],{"id":4,"title":5,"articleId":6,"body":391,"category":359,"date":360,"description":361,"extension":362,"lastUpdated":360,"locale":363,"meta":618,"navigation":365,"path":366,"publishDate":367,"readTime":368,"refreshInterval":369,"seo":619,"slug":371,"stem":372,"tags":620,"__hash__":388},{"type":8,"value":392,"toc":605},[393,395,401,403,405,407,409,427,433,435,439,453,455,457,459,477,479,481,499,501,505,515,521,523,529,537,539,541,577,579,581,599,601],[11,394,14],{"id":13},[16,396,18,397,23,399,27],{},[20,398,22],{},[20,400,26],{},[16,402,30],{},[11,404,34],{"id":33},[36,406,39],{"id":38},[16,408,42],{},[44,410,411,415,419,423],{},[47,412,413,53],{},[50,414,52],{},[47,416,417,59],{},[50,418,58],{},[47,420,421,65],{},[50,422,64],{},[47,424,425,71],{},[50,426,70],{},[73,428,429],{},[16,430,431,80],{},[50,432,79],{},[36,434,84],{"id":83},[16,436,87,437,91],{},[50,438,90],{},[44,440,441,445,449,451],{},[47,442,96,443,100],{},[50,444,99],{},[47,446,447,106],{},[50,448,105],{},[47,450,109],{},[47,452,112],{},[16,454,115],{},[36,456,119],{"id":118},[16,458,122],{},[44,460,461,465,469,473],{},[47,462,463,130],{},[50,464,129],{},[47,466,467,136],{},[50,468,135],{},[47,470,471,142],{},[50,472,141],{},[47,474,475,148],{},[50,476,147],{},[36,478,152],{"id":151},[16,480,155],{},[44,482,483,487,491,495],{},[47,484,485,163],{},[50,486,162],{},[47,488,489,169],{},[50,490,168],{},[47,492,493,175],{},[50,494,174],{},[47,496,497,181],{},[50,498,180],{},[36,500,185],{"id":184},[16,502,188,503,192],{},[50,504,191],{},[44,506,507,509,511,513],{},[47,508,197],{},[47,510,200],{},[47,512,203],{},[47,514,206],{},[73,516,517],{},[16,518,519,214],{},[50,520,213],{},[11,522,218],{"id":217},[16,524,221,525,225,527,229],{},[50,526,224],{},[50,528,228],{},[44,530,531,533,535],{},[47,532,234],{},[47,534,237],{},[47,536,240],{},[16,538,243],{},[11,540,247],{"id":246},[249,542,543,551],{},[252,544,545],{},[255,546,547,549],{},[258,548,260],{},[258,550,263],{},[265,552,553,559,565,571],{},[255,554,555,557],{},[270,556,272],{},[270,558,275],{},[255,560,561,563],{},[270,562,280],{},[270,564,283],{},[255,566,567,569],{},[270,568,288],{},[270,570,291],{},[255,572,573,575],{},[270,574,296],{},[270,576,299],{},[11,578,303],{"id":302},[16,580,306],{},[44,582,583,587,591,595],{},[47,584,585,314],{},[50,586,313],{},[47,588,589,320],{},[50,590,319],{},[47,592,593,326],{},[50,594,325],{},[47,596,597,332],{},[50,598,331],{},[16,600,335],{},[16,602,603],{},[339,604,342],{"href":341},{"title":344,"searchDepth":345,"depth":345,"links":606},[607,608,615,616,617],{"id":13,"depth":345,"text":14},{"id":33,"depth":345,"text":34,"children":609},[610,611,612,613,614],{"id":38,"depth":351,"text":39},{"id":83,"depth":351,"text":84},{"id":118,"depth":351,"text":119},{"id":151,"depth":351,"text":152},{"id":184,"depth":351,"text":185},{"id":217,"depth":345,"text":218},{"id":246,"depth":345,"text":247},{"id":302,"depth":345,"text":303},{},{"title":5,"description":361},[374,375,376,377,378,379,380,381,382,383,384,385,386,387],{"id":622,"title":623,"articleId":6,"body":624,"category":359,"date":360,"description":950,"extension":362,"lastUpdated":360,"locale":951,"meta":952,"navigation":365,"path":953,"publishDate":367,"readTime":368,"refreshInterval":369,"seo":954,"slug":6,"stem":955,"tags":956,"__hash__":970},"blog\u002Fblog\u002Farei-regulations-2026.en.md","AREI\u002FRGIE Regulations 2026: The Key Changes",{"type":8,"value":625,"toc":937},[626,630,639,642,646,650,653,679,687,691,698,718,721,725,728,754,758,761,784,788,795,809,817,821,832,843,846,850,896,900,903,929,932],[11,627,629],{"id":628},"overview-of-the-2026-updates","Overview of the 2026 Updates",[16,631,632,633,635,636,638],{},"The Belgian electrical regulations — known as AREI (",[20,634,22],{},") in Dutch and RGIE (",[20,637,26],{},") in French — receive regular updates to keep pace with technological advances and safety requirements. The 2026 edition introduces several important changes that affect both new installations and renovations.",[16,640,641],{},"Whether you're a homeowner planning a renovation, an electrician working on projects, or a property developer, understanding these changes is essential for ensuring compliance.",[11,643,645],{"id":644},"key-changes-at-a-glance","Key Changes at a Glance",[36,647,649],{"id":648},"_1-enhanced-protection-for-ev-charging","1. Enhanced Protection for EV Charging",[16,651,652],{},"With the rapid growth of electric vehicle adoption in Belgium, the 2026 regulations strengthen the requirements for EV charging installations:",[44,654,655,661,667,673],{},[47,656,657,660],{},[50,658,659],{},"Dedicated circuit required"," — Each charging point must have its own dedicated circuit with appropriate protection",[47,662,663,666],{},[50,664,665],{},"Load management"," — Installations with multiple charging points must include intelligent load management",[47,668,669,672],{},[50,670,671],{},"Cable sizing"," — Minimum cable cross-sections have been increased for charging circuits",[47,674,675,678],{},[50,676,677],{},"RCD Type B or Type A-EV"," — Charging installations require Type B or Type A-EV residual current devices (with integrated DC fault current sensing ≥ 6 mA)",[73,680,681],{},[16,682,683,686],{},[50,684,685],{},"Impact",": If you're installing an EV charger, budget for a dedicated circuit with appropriate protection. Retrofitting an existing circuit is no longer acceptable.",[36,688,690],{"id":689},"_2-surge-protection-now-mandatory","2. Surge Protection Now Mandatory",[16,692,693,694,697],{},"Surge protection (SPD — Surge Protection Device) has been ",[50,695,696],{},"mandatory"," since the AREI 2020 for all new installations and major renovations. The 2026 regulations reaffirm this and specify the requirements further:",[44,699,700,706,712,715],{},[47,701,702,705],{},[50,703,704],{},"Type 2 SPD"," minimum at the main distribution board",[47,707,708,711],{},[50,709,710],{},"Type 3 SPD"," recommended for sensitive equipment",[47,713,714],{},"Must be coordinated with the upstream protection devices",[47,716,717],{},"Regular testing and replacement after activation required",[16,719,720],{},"This change reflects the increasing sensitivity of modern electronic equipment and the growing risk of voltage surges from the grid.",[36,722,724],{"id":723},"_3-updated-requirements-for-solar-installations","3. Updated Requirements for Solar Installations",[16,726,727],{},"The regulations for photovoltaic (PV) installations have been refined:",[44,729,730,736,742,748],{},[47,731,732,735],{},[50,733,734],{},"DC disconnect switch"," must be accessible and clearly labeled",[47,737,738,741],{},[50,739,740],{},"Arc fault detection"," (AFDD) is now recommended for DC circuits",[47,743,744,747],{},[50,745,746],{},"Battery storage systems"," must comply with specific ventilation and fire protection requirements",[47,749,750,753],{},[50,751,752],{},"Bidirectional energy metering"," documentation must be included in the installation file",[36,755,757],{"id":756},"_4-stricter-rules-for-wet-areas","4. Stricter Rules for Wet Areas",[16,759,760],{},"The classification of wet areas (zones) and their protection requirements have been updated:",[44,762,763,768,773,778],{},[47,764,765,767],{},[50,766,162],{}," (inside bath\u002Fshower) — Only SELV (Safety Extra Low Voltage) circuits allowed",[47,769,770,772],{},[50,771,168],{}," (above bath\u002Fshower) — Minimum IPX4 (IPX5 only when jet water\u002Fhigh-pressure cleaning is present)",[47,774,775,777],{},[50,776,174],{}," (0.6m around bath\u002Fshower) — 30mA RCD protection mandatory, minimum IPX4",[47,779,780,783],{},[50,781,782],{},"Area outside the zones"," — Normal installation rules, splash-proof equipment recommended",[36,785,787],{"id":786},"_5-digital-documentation-accepted","5. Digital Documentation Accepted",[16,789,790,791,794],{},"For the first time, the regulations explicitly accept ",[50,792,793],{},"digital documentation",":",[44,796,797,800,803,806],{},[47,798,799],{},"Single-line diagrams may be submitted in digital PDF format",[47,801,802],{},"Floor plans can be generated from digital tools (like PlanElec)",[47,804,805],{},"Digital signatures are accepted on compliance declarations",[47,807,808],{},"Electronic archiving of inspection reports is permitted",[73,810,811],{},[16,812,813,816],{},[50,814,815],{},"Good news",": This change officially validates the use of tools like PlanElec for creating your electrical documentation.",[11,818,820],{"id":819},"what-this-means-for-existing-installations","What This Means for Existing Installations",[16,822,823,824,827,828,831],{},"The 2026 regulations primarily affect ",[50,825,826],{},"new installations"," and ",[50,829,830],{},"major renovations",". Existing installations that passed inspection under previous regulations remain valid until:",[44,833,834,837,840],{},[47,835,836],{},"The next periodic inspection (every 25 years)",[47,838,839],{},"A major modification to the installation",[47,841,842],{},"The sale of the property",[16,844,845],{},"However, it's recommended to proactively update your installation to meet the new standards, especially regarding surge protection and wet area requirements.",[11,847,849],{"id":848},"timeline-and-implementation","Timeline and Implementation",[249,851,852,862],{},[252,853,854],{},[255,855,856,859],{},[258,857,858],{},"Date",[258,860,861],{},"Milestone",[265,863,864,872,880,888],{},[255,865,866,869],{},[270,867,868],{},"January 2026",[270,870,871],{},"New regulations published",[255,873,874,877],{},[270,875,876],{},"March 2026",[270,878,879],{},"Transition period begins",[255,881,882,885],{},[270,883,884],{},"June 2026",[270,886,887],{},"Full enforcement for new installations",[255,889,890,893],{},[270,891,892],{},"December 2026",[270,894,895],{},"Full enforcement for major renovations",[11,897,899],{"id":898},"how-planelec-stays-current","How PlanElec Stays Current",[16,901,902],{},"PlanElec is continuously updated to reflect the latest AREI\u002FRGIE regulations:",[44,904,905,911,917,923],{},[47,906,907,910],{},[50,908,909],{},"Symbol library"," updated with new component symbols",[47,912,913,916],{},[50,914,915],{},"Validation rules"," check compliance with 2026 requirements",[47,918,919,922],{},[50,920,921],{},"Templates"," include new mandatory elements (SPD, EV circuits)",[47,924,925,928],{},[50,926,927],{},"Export format"," generates documentation that meets the new digital acceptance standards",[16,930,931],{},"Stay compliant without having to study the full regulation text. PlanElec ensures your documentation meets the latest standards automatically.",[16,933,934],{},[339,935,936],{"href":341},"Update your electrical documentation with PlanElec →",{"title":344,"searchDepth":345,"depth":345,"links":938},[939,940,947,948,949],{"id":628,"depth":345,"text":629},{"id":644,"depth":345,"text":645,"children":941},[942,943,944,945,946],{"id":648,"depth":351,"text":649},{"id":689,"depth":351,"text":690},{"id":723,"depth":351,"text":724},{"id":756,"depth":351,"text":757},{"id":786,"depth":351,"text":787},{"id":819,"depth":345,"text":820},{"id":848,"depth":345,"text":849},{"id":898,"depth":345,"text":899},"The latest updates to the Belgian electrical regulations and what they mean for your installation.","en",{},"\u002Fblog\u002Farei-regulations-2026.en",{"title":623,"description":950},"blog\u002Farei-regulations-2026.en",[374,375,957,958,959,960,961,962,380,963,964,965,966,967,968,969],"regulations 2026","electrical regulations","inspection","keuring","single-line diagram","eendraadschema","schéma unifilaire","situation plan","surge protection","EV charging","solar panels","bathroom zones","Belgium","1N5r4QSyqGaTxVnrPScx_lqRefOJnnEkd9ppDyvj5i0",{"id":972,"title":973,"articleId":6,"body":974,"category":359,"date":360,"description":1295,"extension":362,"lastUpdated":360,"locale":1296,"meta":1297,"navigation":365,"path":1298,"publishDate":367,"readTime":368,"refreshInterval":369,"seo":1299,"slug":1300,"stem":1301,"tags":1302,"__hash__":1312},"blog\u002Fblog\u002Farei-regulations-2026.fr.md","Réglementation RGIE 2026 : Les Changements Clés",{"type":8,"value":975,"toc":1282},[976,980,986,989,993,997,1000,1026,1033,1037,1044,1064,1067,1071,1074,1100,1104,1107,1130,1134,1141,1155,1163,1167,1178,1189,1192,1196,1241,1245,1248,1274,1277],[11,977,979],{"id":978},"aperçu-des-modifications-2026","Aperçu des modifications 2026",[16,981,982,983,985],{},"Les réglementations électriques belges — connues sous le nom de RGIE (",[20,984,26],{},"), ou AREI en néerlandais — sont régulièrement mises à jour pour suivre les avancées technologiques et les exigences de sécurité. L'édition 2026 introduit plusieurs changements importants qui affectent aussi bien les nouvelles installations que les rénovations.",[16,987,988],{},"Que vous soyez propriétaire planifiant une rénovation, électricien travaillant sur des projets, ou promoteur immobilier, comprendre ces changements est essentiel pour assurer la conformité.",[11,990,992],{"id":991},"les-changements-clés-en-bref","Les changements clés en bref",[36,994,996],{"id":995},"_1-protection-renforcée-pour-les-bornes-de-recharge-ve","1. Protection renforcée pour les bornes de recharge VE",[16,998,999],{},"Avec la croissance rapide des véhicules électriques en Belgique, la réglementation 2026 renforce les exigences pour les installations de recharge :",[44,1001,1002,1008,1014,1020],{},[47,1003,1004,1007],{},[50,1005,1006],{},"Circuit dédié obligatoire"," — Chaque point de charge doit avoir son propre circuit avec une protection appropriée",[47,1009,1010,1013],{},[50,1011,1012],{},"Gestion de charge"," — Les installations avec plusieurs points de charge doivent inclure une gestion intelligente de la charge",[47,1015,1016,1019],{},[50,1017,1018],{},"Dimensionnement des câbles"," — Les sections minimales des câbles pour les circuits de recharge ont été augmentées",[47,1021,1022,1025],{},[50,1023,1024],{},"Différentiel Type B"," — Les installations de recharge nécessitent désormais des différentiels de Type B (ou Type A avec détection DC)",[73,1027,1028],{},[16,1029,1030,1032],{},[50,1031,685],{}," : Si vous installez une borne de recharge VE, prévoyez un circuit dédié avec une protection appropriée. La mise à niveau d'un circuit existant n'est plus acceptable.",[36,1034,1036],{"id":1035},"_2-protection-contre-les-surtensions-désormais-obligatoire","2. Protection contre les surtensions désormais obligatoire",[16,1038,1039,1040,1043],{},"Bien que précédemment recommandée, la protection contre les surtensions (SPD — Surge Protection Device) est maintenant ",[50,1041,1042],{},"obligatoire"," pour toutes les nouvelles installations et rénovations majeures :",[44,1045,1046,1052,1058,1061],{},[47,1047,1048,1051],{},[50,1049,1050],{},"SPD Type 2"," minimum au tableau de distribution principal",[47,1053,1054,1057],{},[50,1055,1056],{},"SPD Type 3"," recommandé pour les équipements sensibles",[47,1059,1060],{},"Doit être coordonné avec les dispositifs de protection en amont",[47,1062,1063],{},"Contrôle régulier et remplacement après activation requis",[16,1065,1066],{},"Ce changement reflète la sensibilité croissante des équipements électroniques modernes et le risque grandissant de surtensions provenant du réseau.",[36,1068,1070],{"id":1069},"_3-exigences-mises-à-jour-pour-les-installations-solaires","3. Exigences mises à jour pour les installations solaires",[16,1072,1073],{},"Les réglementations pour les installations photovoltaïques (PV) ont été affinées :",[44,1075,1076,1082,1088,1094],{},[47,1077,1078,1081],{},[50,1079,1080],{},"Interrupteur-sectionneur DC"," doit être accessible et clairement étiqueté",[47,1083,1084,1087],{},[50,1085,1086],{},"Détection d'arc"," (AFDD) est désormais recommandée pour les circuits DC",[47,1089,1090,1093],{},[50,1091,1092],{},"Systèmes de stockage par batteries"," doivent respecter des exigences spécifiques de ventilation et de protection incendie",[47,1095,1096,1099],{},[50,1097,1098],{},"Documentation du comptage bidirectionnel"," doit être incluse dans le dossier d'installation",[36,1101,1103],{"id":1102},"_4-règles-plus-strictes-pour-les-pièces-humides","4. Règles plus strictes pour les pièces humides",[16,1105,1106],{},"La classification des pièces humides (zones) et leurs exigences de protection ont été mises à jour :",[44,1108,1109,1114,1119,1124],{},[47,1110,1111,1113],{},[50,1112,162],{}," (dans la baignoire\u002Fdouche) — Seuls les circuits TBTS (Très Basse Tension de Sécurité) autorisés",[47,1115,1116,1118],{},[50,1117,168],{}," (au-dessus de la baignoire\u002Fdouche) — Minimum IPX4 en zone 1 (IPX5 uniquement en cas de jets d'eau\u002Fnettoyage haute pression)",[47,1120,1121,1123],{},[50,1122,174],{}," (0,6m autour de la baignoire\u002Fdouche) — Protection différentielle 30mA obligatoire, IP X4 minimum",[47,1125,1126,1129],{},[50,1127,1128],{},"Zone en dehors des zones"," — Règles d'installation normales, équipement résistant aux éclaboussures recommandé",[36,1131,1133],{"id":1132},"_5-documentation-numérique-acceptée","5. Documentation numérique acceptée",[16,1135,1136,1137,1140],{},"Pour la première fois, la réglementation accepte explicitement la ",[50,1138,1139],{},"documentation numérique"," :",[44,1142,1143,1146,1149,1152],{},[47,1144,1145],{},"Les schémas unifilaires peuvent être soumis au format PDF numérique",[47,1147,1148],{},"Les plans de situation peuvent être générés avec des outils numériques (comme PlanElec)",[47,1150,1151],{},"Les signatures numériques sont acceptées sur les déclarations de conformité",[47,1153,1154],{},"L'archivage électronique des rapports de contrôle est autorisé",[73,1156,1157],{},[16,1158,1159,1162],{},[50,1160,1161],{},"Bonne nouvelle"," : Ce changement valide officiellement l'utilisation d'outils comme PlanElec pour la création de votre documentation électrique.",[11,1164,1166],{"id":1165},"ce-que-cela-signifie-pour-les-installations-existantes","Ce que cela signifie pour les installations existantes",[16,1168,1169,1170,1173,1174,1177],{},"La réglementation 2026 s'applique principalement aux ",[50,1171,1172],{},"nouvelles installations"," et aux ",[50,1175,1176],{},"rénovations majeures",". Les installations existantes ayant réussi le contrôle sous les réglementations précédentes restent valides jusqu'à :",[44,1179,1180,1183,1186],{},[47,1181,1182],{},"Le prochain contrôle périodique (tous les 25 ans)",[47,1184,1185],{},"Une modification majeure de l'installation",[47,1187,1188],{},"La vente du bien immobilier",[16,1190,1191],{},"Cependant, il est recommandé de mettre à jour proactivement votre installation pour répondre aux nouvelles normes, en particulier concernant la protection contre les surtensions et les exigences des pièces humides.",[11,1193,1195],{"id":1194},"calendrier-et-mise-en-œuvre","Calendrier et mise en œuvre",[249,1197,1198,1207],{},[252,1199,1200],{},[255,1201,1202,1204],{},[258,1203,858],{},[258,1205,1206],{},"Jalon",[265,1208,1209,1217,1225,1233],{},[255,1210,1211,1214],{},[270,1212,1213],{},"Janvier 2026",[270,1215,1216],{},"Nouvelles réglementations publiées",[255,1218,1219,1222],{},[270,1220,1221],{},"Mars 2026",[270,1223,1224],{},"Période de transition commence",[255,1226,1227,1230],{},[270,1228,1229],{},"Juin 2026",[270,1231,1232],{},"Application complète pour les nouvelles installations",[255,1234,1235,1238],{},[270,1236,1237],{},"Décembre 2026",[270,1239,1240],{},"Application complète pour les rénovations majeures",[11,1242,1244],{"id":1243},"comment-planelec-reste-à-jour","Comment PlanElec reste à jour",[16,1246,1247],{},"PlanElec est continuellement mis à jour pour refléter les dernières réglementations RGIE :",[44,1249,1250,1256,1262,1268],{},[47,1251,1252,1255],{},[50,1253,1254],{},"Bibliothèque de symboles"," mise à jour avec les nouveaux symboles de composants",[47,1257,1258,1261],{},[50,1259,1260],{},"Règles de validation"," vérifient la conformité avec les exigences 2026",[47,1263,1264,1267],{},[50,1265,1266],{},"Modèles"," incluent les nouveaux éléments obligatoires (SPD, circuits VE)",[47,1269,1270,1273],{},[50,1271,1272],{},"Format d'exportation"," génère une documentation conforme aux nouvelles normes d'acceptation numérique",[16,1275,1276],{},"Restez conforme sans avoir à étudier le texte réglementaire complet. PlanElec garantit automatiquement que votre documentation répond aux dernières normes.",[16,1278,1279],{},[339,1280,1281],{"href":341},"Mettez à jour votre documentation électrique avec PlanElec →",{"title":344,"searchDepth":345,"depth":345,"links":1283},[1284,1285,1292,1293,1294],{"id":978,"depth":345,"text":979},{"id":991,"depth":345,"text":992,"children":1286},[1287,1288,1289,1290,1291],{"id":995,"depth":351,"text":996},{"id":1035,"depth":351,"text":1036},{"id":1069,"depth":351,"text":1070},{"id":1102,"depth":351,"text":1103},{"id":1132,"depth":351,"text":1133},{"id":1165,"depth":345,"text":1166},{"id":1194,"depth":345,"text":1195},{"id":1243,"depth":345,"text":1244},"Les dernières mises à jour des réglementations électriques belges et ce qu'elles signifient pour votre installation.","fr",{},"\u002Fblog\u002Farei-regulations-2026.fr",{"title":973,"description":1295},"reglementations-rgie-2026","blog\u002Farei-regulations-2026.fr",[374,375,1303,1304,1305,963,962,1306,382,1307,1308,1309,1310,1311],"réglementation 2026","réglementations électriques","contrôle électrique","plan de situation","surtension","borne de recharge","panneaux solaires","salle de bain","Belgique","tbzX8CFyZHBWwLuaYTYlHo6bDFaUnabDLitR6Y5Sjmc",{"id":1314,"title":1315,"articleId":6,"body":1316,"category":359,"date":360,"description":1633,"extension":362,"lastUpdated":360,"locale":1634,"meta":1635,"navigation":365,"path":1636,"publishDate":367,"readTime":368,"refreshInterval":369,"seo":1637,"slug":1638,"stem":1639,"tags":1640,"__hash__":1649},"blog\u002Fblog\u002Farei-regulations-2026.nl.md","AREI-regelgeving 2026: De Belangrijkste Wijzigingen",{"type":8,"value":1317,"toc":1620},[1318,1322,1328,1331,1335,1339,1342,1368,1375,1379,1386,1405,1408,1412,1415,1441,1445,1448,1471,1475,1481,1495,1503,1507,1518,1529,1532,1536,1579,1583,1586,1612,1615],[11,1319,1321],{"id":1320},"overzicht-van-de-wijzigingen-2026","Overzicht van de wijzigingen 2026",[16,1323,1324,1325,1327],{},"De Belgische elektrische voorschriften — bekend als het AREI (",[20,1326,22],{},"), of RGIE in het Frans — worden regelmatig bijgewerkt om gelijke tred te houden met technologische vooruitgang en veiligheidseisen. De editie 2026 introduceert verschillende belangrijke wijzigingen die zowel nieuwe installaties als renovaties beïnvloeden.",[16,1329,1330],{},"Of u nu een huiseigenaar bent die een renovatie plant, een elektricien die aan projecten werkt, of een projectontwikkelaar — het begrijpen van deze wijzigingen is essentieel om aan de voorschriften te voldoen.",[11,1332,1334],{"id":1333},"de-belangrijkste-wijzigingen-in-het-kort","De belangrijkste wijzigingen in het kort",[36,1336,1338],{"id":1337},"_1-verbeterde-bescherming-voor-ev-laders","1. Verbeterde bescherming voor EV-laders",[16,1340,1341],{},"Met de snelle groei van elektrische voertuigen in België verscherpen de voorschriften 2026 de eisen voor laadinstallaties:",[44,1343,1344,1350,1356,1362],{},[47,1345,1346,1349],{},[50,1347,1348],{},"Eigen kring vereist"," — Elk laadpunt moet een eigen kring hebben met passende beveiliging",[47,1351,1352,1355],{},[50,1353,1354],{},"Lastbeheer"," — Installaties met meerdere laadpunten moeten intelligent lastbeheer bevatten",[47,1357,1358,1361],{},[50,1359,1360],{},"Kabeldimensionering"," — Minimale kabeldoorsneden voor laadkringen zijn verhoogd",[47,1363,1364,1367],{},[50,1365,1366],{},"Differentieelschakelaar Type B"," — Laadinstallaties vereisen nu Type B differentieelschakelaars (of Type A met DC-detectie)",[73,1369,1370],{},[16,1371,1372,1374],{},[50,1373,685],{},": Als u een EV-lader installeert, reken dan op een eigen kring met passende beveiliging. Het achteraf bijwerken van een bestaande kring is niet meer aanvaardbaar.",[36,1376,1378],{"id":1377},"_2-overspanningsbeveiliging-nu-verplicht","2. Overspanningsbeveiliging nu verplicht",[16,1380,1381,1382,1385],{},"Terwijl het voorheen slechts aanbevolen was, is overspanningsbeveiliging (SPD — Surge Protection Device) nu ",[50,1383,1384],{},"verplicht"," voor alle nieuwe installaties en grote renovaties:",[44,1387,1388,1394,1399,1402],{},[47,1389,1390,1391,1393],{},"Minimum ",[50,1392,704],{}," bij het hoofdverdeelbord",[47,1395,1396,1398],{},[50,1397,710],{}," aanbevolen voor gevoelige apparatuur",[47,1400,1401],{},"Moet gecoördineerd zijn met de bovenstroomse beveiligingsapparaten",[47,1403,1404],{},"Regelmatige controle en vervanging na activering vereist",[16,1406,1407],{},"Deze wijziging weerspiegelt de toenemende gevoeligheid van moderne elektronische apparatuur en het groeiende risico van spanningspieken uit het net.",[36,1409,1411],{"id":1410},"_3-bijgewerkte-eisen-voor-zonne-installaties","3. Bijgewerkte eisen voor zonne-installaties",[16,1413,1414],{},"De voorschriften voor fotovoltaïsche (PV) installaties zijn verfijnd:",[44,1416,1417,1423,1429,1435],{},[47,1418,1419,1422],{},[50,1420,1421],{},"DC-scheidingsschakelaar"," moet bereikbaar en duidelijk gelabeld zijn",[47,1424,1425,1428],{},[50,1426,1427],{},"Vlamboogdetectie"," (AFDD) wordt nu aanbevolen voor DC-kringen",[47,1430,1431,1434],{},[50,1432,1433],{},"Batterijopslagsystemen"," moeten voldoen aan specifieke ventilatie- en brandveiligheidseisen",[47,1436,1437,1440],{},[50,1438,1439],{},"Documentatie van bidirectionele energiemeting"," moet worden opgenomen in het installatiedossier",[36,1442,1444],{"id":1443},"_4-strengere-regels-voor-natte-ruimtes","4. Strengere regels voor natte ruimtes",[16,1446,1447],{},"De classificatie van natte ruimtes (zones) en hun beveiligingseisen zijn bijgewerkt:",[44,1449,1450,1455,1460,1465],{},[47,1451,1452,1454],{},[50,1453,162],{}," (in het bad\u002Fde douche) — Alleen SELV-kringen (Safety Extra Low Voltage) toegestaan",[47,1456,1457,1459],{},[50,1458,168],{}," (boven het bad\u002Fde douche) — Minimum IP X5 voor alle apparatuur",[47,1461,1462,1464],{},[50,1463,174],{}," (0,6m rond bad\u002Fdouche) — 30mA differentieelbescherming verplicht, minimum IP X4",[47,1466,1467,1470],{},[50,1468,1469],{},"Nieuwe Zone 3"," — Uitgebreid tot 2,4m rond het natte gebied, spatwaterdichte apparatuur vereist",[36,1472,1474],{"id":1473},"_5-digitale-documentatie-aanvaard","5. Digitale documentatie aanvaard",[16,1476,1477,1478,794],{},"Voor het eerst aanvaarden de voorschriften uitdrukkelijk ",[50,1479,1480],{},"digitale documentatie",[44,1482,1483,1486,1489,1492],{},[47,1484,1485],{},"Eendraadschema's mogen in digitaal PDF-formaat worden ingediend",[47,1487,1488],{},"Situatieplannen kunnen worden gegenereerd met digitale tools (zoals PlanElec)",[47,1490,1491],{},"Digitale handtekeningen worden aanvaard op conformiteitsverklaringen",[47,1493,1494],{},"Elektronische archivering van keuringsverslagen is toegestaan",[73,1496,1497],{},[16,1498,1499,1502],{},[50,1500,1501],{},"Goed nieuws",": Deze wijziging valideert officieel het gebruik van tools zoals PlanElec voor het aanmaken van uw elektrische documentatie.",[11,1504,1506],{"id":1505},"wat-dit-betekent-voor-bestaande-installaties","Wat dit betekent voor bestaande installaties",[16,1508,1509,1510,1513,1514,1517],{},"De voorschriften 2026 zijn voornamelijk van toepassing op ",[50,1511,1512],{},"nieuwe installaties"," en ",[50,1515,1516],{},"grote renovaties",". Bestaande installaties die onder eerdere voorschriften zijn goedgekeurd, blijven geldig tot:",[44,1519,1520,1523,1526],{},[47,1521,1522],{},"De volgende periodieke keuring (elke 25 jaar)",[47,1524,1525],{},"Een belangrijke wijziging aan de installatie",[47,1527,1528],{},"De verkoop van het onroerend goed",[16,1530,1531],{},"Het wordt echter aanbevolen om uw installatie proactief bij te werken naar de nieuwe normen, vooral wat betreft overspanningsbeveiliging en eisen voor natte ruimtes.",[11,1533,1535],{"id":1534},"tijdlijn-en-implementatie","Tijdlijn en implementatie",[249,1537,1538,1547],{},[252,1539,1540],{},[255,1541,1542,1544],{},[258,1543,260],{},[258,1545,1546],{},"Mijlpaal",[265,1548,1549,1557,1565,1572],{},[255,1550,1551,1554],{},[270,1552,1553],{},"Januari 2026",[270,1555,1556],{},"Nieuwe voorschriften gepubliceerd",[255,1558,1559,1562],{},[270,1560,1561],{},"Maart 2026",[270,1563,1564],{},"Overgangsperiode begint",[255,1566,1567,1569],{},[270,1568,288],{},[270,1570,1571],{},"Volledige handhaving voor nieuwe installaties",[255,1573,1574,1576],{},[270,1575,892],{},[270,1577,1578],{},"Volledige handhaving voor grote renovaties",[11,1580,1582],{"id":1581},"hoe-planelec-actueel-blijft","Hoe PlanElec actueel blijft",[16,1584,1585],{},"PlanElec wordt voortdurend bijgewerkt om de nieuwste AREI-voorschriften weer te geven:",[44,1587,1588,1594,1600,1606],{},[47,1589,1590,1593],{},[50,1591,1592],{},"Symbolenbibliotheek"," bijgewerkt met nieuwe componentsymbolen",[47,1595,1596,1599],{},[50,1597,1598],{},"Validatieregels"," controleren conformiteit met de eisen van 2026",[47,1601,1602,1605],{},[50,1603,1604],{},"Sjablonen"," bevatten nieuwe verplichte elementen (SPD, EV-kringen)",[47,1607,1608,1611],{},[50,1609,1610],{},"Exportformaat"," genereert documentatie die voldoet aan de nieuwe digitale aanvaardingsnormen",[16,1613,1614],{},"Blijf conform zonder de volledige regelgevingstekst te hoeven bestuderen. PlanElec zorgt er automatisch voor dat uw documentatie aan de nieuwste normen voldoet.",[16,1616,1617],{},[339,1618,1619],{"href":341},"Werk uw elektrische documentatie bij met PlanElec →",{"title":344,"searchDepth":345,"depth":345,"links":1621},[1622,1623,1630,1631,1632],{"id":1320,"depth":345,"text":1321},{"id":1333,"depth":345,"text":1334,"children":1624},[1625,1626,1627,1628,1629],{"id":1337,"depth":351,"text":1338},{"id":1377,"depth":351,"text":1378},{"id":1410,"depth":351,"text":1411},{"id":1443,"depth":351,"text":1444},{"id":1473,"depth":351,"text":1474},{"id":1505,"depth":345,"text":1506},{"id":1534,"depth":345,"text":1535},{"id":1581,"depth":345,"text":1582},"De laatste updates van de Belgische elektrische voorschriften en wat ze betekenen voor uw installatie.","nl",{},"\u002Fblog\u002Farei-regulations-2026.nl",{"title":1315,"description":1633},"arei-reglementen-2026","blog\u002Farei-regulations-2026.nl",[374,375,1641,1642,960,962,1643,1644,1645,1646,1647,1480,1648],"regelgeving 2026","elektrische voorschriften","situatieschema","overspanningsbeveiliging","EV-lader","zonnepanelen","badkamerzones","België","bYpktIPgPoqnO__eCawjwytLD0UEbJIbZdZgLgKoemg",1775151658037]