[{"data":1,"prerenderedAt":1208},["ShallowReactive",2],{"blog-post-de-inspektions-checkliste":3,"blog-alternates-inspection-checklist":287},{"id":4,"title":5,"articleId":6,"body":7,"category":262,"date":263,"description":264,"extension":265,"lastUpdated":263,"locale":266,"meta":267,"navigation":268,"path":269,"publishDate":263,"readTime":270,"refreshInterval":271,"seo":272,"slug":273,"stem":274,"tags":275,"__hash__":286},"blog\u002Fblog\u002Finspection-checklist.de.md","Was prüft der Kontrolleur bei der Stromabnahme?","inspection-checklist",{"type":8,"value":9,"toc":252},"minimark",[10,15,19,23,26,55,64,68,71,131,135,138,216,220,227,231,246],[11,12,14],"h2",{"id":13},"drei-bereiche-dokumentation-sichtprüfung-messungen","Drei Bereiche: Dokumentation, Sichtprüfung, Messungen",[16,17,18],"p",{},"Der Kontrolleur prüft Ihre Elektroinstallation in drei aufeinanderfolgenden Schritten. Fehlt bereits die Dokumentation, wird in der Regel gar nicht weiter geprüft — die Abnahme ist dann sofort durchgefallen.",[11,20,22],{"id":21},"_1-dokumentation","1. Dokumentation",[16,24,25],{},"Der Kontrolleur verlangt folgende Unterlagen:",[27,28,29,37,43,49],"ul",{},[30,31,32,36],"li",{},[33,34,35],"strong",{},"Eindrahtschema"," — vorhanden, vollständig und aktuell?",[30,38,39,42],{},[33,40,41],{},"Situationsplan"," — Raumplan mit eingezeichneten Steckdosen, Schaltern und Leuchten?",[30,44,45,48],{},[33,46,47],{},"Konformitätserklärung"," des Installateurs?",[30,50,51,54],{},[33,52,53],{},"Technische Datenblätter"," — Schaltschrank, FI-Schutzschalter, Sicherungsautomaten?",[56,57,58],"blockquote",{},[16,59,60,63],{},[33,61,62],{},"Achtung",": Der häufigste Durchfallgrund bei der Abnahme ist ein fehlendes oder fehlerhaftes Eindrahtschema. Ohne korrekte Dokumentation wird in den meisten Fällen gar nicht weiter gemessen.",[11,65,67],{"id":66},"_2-sichtprüfung","2. Sichtprüfung",[16,69,70],{},"Anschließend kontrolliert der Prüfer die Installation visuell:",[27,72,73,80,86,93,99,105,112,119,125],{},[30,74,75,76,79],{},"Richtiger ",[33,77,78],{},"Kabelquerschnitt"," pro Sicherung? (z.B. min. 2,5 mm² bei 16 A für Steckdosenstromkreise; für Beleuchtung reicht 1,5 mm² bei 16 A)",[30,81,82,85],{},[33,83,84],{},"30mA-FI-Schutzschalter"," für alle Steckdosenstromkreise vorhanden?",[30,87,88,89,92],{},"Maximal ",[33,90,91],{},"8 Stromkreise pro FI-Schutzschalter","?",[30,94,95,98],{},[33,96,97],{},"Badezimmerzonen"," eingehalten? (Zone 0, 1, 2 gemäß AREI Art. 7.1, Zone-Definitionen Art. 7.1.5)",[30,100,101,104],{},[33,102,103],{},"Erdungsanschluss"," vorhanden und zugänglich?",[30,106,107,108,111],{},"Alle ",[33,109,110],{},"Abzweigdosen"," geschlossen?",[30,113,114,115,118],{},"Kabel ordnungsgemäß ",[33,116,117],{},"befestigt"," und geschützt?",[30,120,121,124],{},[33,122,123],{},"Hauptschalter"," vorhanden und frei zugänglich?",[30,126,127,130],{},[33,128,129],{},"Überspannungsschutz (SPD)"," vorhanden? (Art. 4.5.1 verlangt allgemein Schutz vor Überspannungen nach den Regeln des Fachs — in der Praxis wird ein SPD Typ 2 empfohlen)",[11,132,134],{"id":133},"_3-messungen","3. Messungen",[16,136,137],{},"Zum Abschluss führt der Kontrolleur technische Messungen durch:",[139,140,141,157],"table",{},[142,143,144],"thead",{},[145,146,147,151,154],"tr",{},[148,149,150],"th",{},"Messung",[148,152,153],{},"Grenzwert",[148,155,156],{},"Instrument",[158,159,160,172,183,194,205],"tbody",{},[145,161,162,166,169],{},[163,164,165],"td",{},"Erdungswiderstand",[163,167,168],{},"≤ 30 Ohm (Art. 4.2.4.3b; bei Überschreitung zusätzliche RCDs erforderlich)",[163,170,171],{},"Erdungsmessgerät",[145,173,174,177,180],{},[163,175,176],{},"Isolationswiderstand",[163,178,179],{},"> 0,5 MOhm",[163,181,182],{},"Megger (Isolationsmessgerät)",[145,184,185,188,191],{},[163,186,187],{},"Schleifenimpedanz",[163,189,190],{},"Je nach MCB-Nennstrom",[163,192,193],{},"Schleifenimpedanzmessgerät",[145,195,196,199,202],{},[163,197,198],{},"FI-Auslösezeit",[163,200,201],{},"\u003C 300 ms bei Nennfehlerstrom I∆n, \u003C 40 ms bei 5× I∆n (gemäß IEC 61008)",[163,203,204],{},"FI-Tester",[145,206,207,210,213],{},[163,208,209],{},"Spannungsmessung",[163,211,212],{},"230V ±10%",[163,214,215],{},"Multimeter",[11,217,219],{"id":218},"ergebnis","Ergebnis",[16,221,222,223,226],{},"Nach der Prüfung erhalten Sie einen ",[33,224,225],{},"Kontrollbericht",". Bei Neubauten und größeren Renovierungen muss die Abnahme bestanden werden, bevor der Netzbetreiber den Stromanschluss freischaltet. Bei Mängeln erhalten Sie eine Frist zur Nachbesserung und müssen eine erneute Kontrolle beauftragen.",[11,228,230],{"id":229},"verwandte-artikel","Verwandte Artikel",[27,232,233,240],{},[30,234,235],{},[236,237,239],"a",{"href":238},"\u002Fde\u002Fblog\u002Felektrische-abnahme","Elektrische Abnahme in Belgien — was Sie wissen müssen",[30,241,242],{},[236,243,245],{"href":244},"\u002Fde\u002Fblog\u002Fsteckdosen-pro-stromkreis","Wie viele Steckdosen pro Stromkreis? (AREI-Grenzwerte)",[16,247,248],{},[236,249,251],{"href":250},"\u002F","Erstellen Sie jetzt Ihr AREI-konformes Eindrahtschema — kostenlos →",{"title":253,"searchDepth":254,"depth":254,"links":255},"",2,[256,257,258,259,260,261],{"id":13,"depth":254,"text":14},{"id":21,"depth":254,"text":22},{"id":66,"depth":254,"text":67},{"id":133,"depth":254,"text":134},{"id":218,"depth":254,"text":219},{"id":229,"depth":254,"text":230},"faq","2026-03-13","Dokumentation, Sichtprüfung, Messungen — erfahren Sie Punkt für Punkt, was der Kontrolleur bei einer elektrischen Abnahme in Belgien tatsächlich prüft und misst.","md","de",{},true,"\u002Fblog\u002Finspection-checklist.de","4 min",12,{"title":5,"description":264},"inspektions-checkliste","blog\u002Finspection-checklist.de",[276,277,278,279,280,35,281,41,282,165,176,283,284,285],"AREI","RGIE","Stromabnahme","Keuring","Checkliste","Eendraadschema","FI-Schutzschalter","Belgien","schéma unifilaire","plan de situation","o4jVNgLT2whYe_qxQjC7aWoSuhn1felsmdOjkiMdhQY",[288,456,711,959],{"id":4,"title":5,"articleId":6,"body":289,"category":262,"date":263,"description":264,"extension":265,"lastUpdated":263,"locale":266,"meta":453,"navigation":268,"path":269,"publishDate":263,"readTime":270,"refreshInterval":271,"seo":454,"slug":273,"stem":274,"tags":455,"__hash__":286},{"type":8,"value":290,"toc":445},[291,293,295,297,299,317,323,325,327,365,367,369,423,425,429,431,441],[11,292,14],{"id":13},[16,294,18],{},[11,296,22],{"id":21},[16,298,25],{},[27,300,301,305,309,313],{},[30,302,303,36],{},[33,304,35],{},[30,306,307,42],{},[33,308,41],{},[30,310,311,48],{},[33,312,47],{},[30,314,315,54],{},[33,316,53],{},[56,318,319],{},[16,320,321,63],{},[33,322,62],{},[11,324,67],{"id":66},[16,326,70],{},[27,328,329,333,337,341,345,349,353,357,361],{},[30,330,75,331,79],{},[33,332,78],{},[30,334,335,85],{},[33,336,84],{},[30,338,88,339,92],{},[33,340,91],{},[30,342,343,98],{},[33,344,97],{},[30,346,347,104],{},[33,348,103],{},[30,350,107,351,111],{},[33,352,110],{},[30,354,114,355,118],{},[33,356,117],{},[30,358,359,124],{},[33,360,123],{},[30,362,363,130],{},[33,364,129],{},[11,366,134],{"id":133},[16,368,137],{},[139,370,371,381],{},[142,372,373],{},[145,374,375,377,379],{},[148,376,150],{},[148,378,153],{},[148,380,156],{},[158,382,383,391,399,407,415],{},[145,384,385,387,389],{},[163,386,165],{},[163,388,168],{},[163,390,171],{},[145,392,393,395,397],{},[163,394,176],{},[163,396,179],{},[163,398,182],{},[145,400,401,403,405],{},[163,402,187],{},[163,404,190],{},[163,406,193],{},[145,408,409,411,413],{},[163,410,198],{},[163,412,201],{},[163,414,204],{},[145,416,417,419,421],{},[163,418,209],{},[163,420,212],{},[163,422,215],{},[11,424,219],{"id":218},[16,426,222,427,226],{},[33,428,225],{},[11,430,230],{"id":229},[27,432,433,437],{},[30,434,435],{},[236,436,239],{"href":238},[30,438,439],{},[236,440,245],{"href":244},[16,442,443],{},[236,444,251],{"href":250},{"title":253,"searchDepth":254,"depth":254,"links":446},[447,448,449,450,451,452],{"id":13,"depth":254,"text":14},{"id":21,"depth":254,"text":22},{"id":66,"depth":254,"text":67},{"id":133,"depth":254,"text":134},{"id":218,"depth":254,"text":219},{"id":229,"depth":254,"text":230},{},{"title":5,"description":264},[276,277,278,279,280,35,281,41,282,165,176,283,284,285],{"id":457,"title":458,"articleId":6,"body":459,"category":262,"date":263,"description":693,"extension":265,"lastUpdated":263,"locale":694,"meta":695,"navigation":268,"path":696,"publishDate":263,"readTime":270,"refreshInterval":271,"seo":697,"slug":6,"stem":698,"tags":699,"__hash__":710},"blog\u002Fblog\u002Finspection-checklist.en.md","What Does the Inspector Check During an Electrical Inspection?",{"type":8,"value":460,"toc":685},[461,465,468,472,475,501,509,513,516,575,579,582,651,655,662,666,680],[11,462,464],{"id":463},"three-areas-documentation-visual-inspection-measurements","Three areas: documentation, visual inspection, measurements",[16,466,467],{},"The inspector checks your electrical installation in three consecutive steps. If the documentation is already missing, the inspection typically stops right there — it's an automatic fail.",[11,469,471],{"id":470},"_1-documentation","1. Documentation",[16,473,474],{},"The inspector requires the following documents:",[27,476,477,483,489,495],{},[30,478,479,482],{},[33,480,481],{},"Single-line diagram"," — present, complete, and up to date?",[30,484,485,488],{},[33,486,487],{},"Situation plan"," — floor plan showing sockets, switches, and lights?",[30,490,491,494],{},[33,492,493],{},"Conformity declaration"," from the installer?",[30,496,497,500],{},[33,498,499],{},"Technical data sheets"," — distribution board, RCDs, circuit breakers?",[56,502,503],{},[16,504,505,508],{},[33,506,507],{},"Warning",": The most common reason for failing an inspection is a missing or incorrect single-line diagram. Without proper documentation, the inspector will in most cases not proceed to measurements.",[11,510,512],{"id":511},"_2-visual-inspection","2. Visual inspection",[16,514,515],{},"Next, the inspector visually checks the installation:",[27,517,518,525,531,537,543,549,556,563,569],{},[30,519,520,521,524],{},"Correct ",[33,522,523],{},"cable cross-section"," per breaker? (e.g. min. 2.5 mm² at 16A for socket circuits; for lighting 1.5 mm² at 16A is sufficient)",[30,526,527,530],{},[33,528,529],{},"30mA RCD"," present for all socket circuits?",[30,532,533,534,92],{},"Maximum ",[33,535,536],{},"8 circuits per RCD",[30,538,539,542],{},[33,540,541],{},"Bathroom zones"," respected? (Zone 0, 1, 2 per AREI Art. 7.1, zone definitions Art. 7.1.5)",[30,544,545,548],{},[33,546,547],{},"Earth connection"," present and accessible?",[30,550,551,552,555],{},"All ",[33,553,554],{},"junction boxes"," closed?",[30,557,558,559,562],{},"Cables properly ",[33,560,561],{},"secured"," and protected?",[30,564,565,568],{},[33,566,567],{},"Main switch"," present and freely accessible?",[30,570,571,574],{},[33,572,573],{},"Surge protection device (SPD)"," present? (Art. 4.5.1 requires general protection against overvoltages according to the rules of the trade — in practice, an SPD Type 2 is recommended)",[11,576,578],{"id":577},"_3-measurements","3. Measurements",[16,580,581],{},"Finally, the inspector performs technical measurements:",[139,583,584,596],{},[142,585,586],{},[145,587,588,591,594],{},[148,589,590],{},"Measurement",[148,592,593],{},"Limit",[148,595,156],{},[158,597,598,609,620,631,642],{},[145,599,600,603,606],{},[163,601,602],{},"Earth resistance",[163,604,605],{},"≤ 30 Ohm (Art. 4.2.4.3b; additional RCDs required if exceeded)",[163,607,608],{},"Earth resistance tester",[145,610,611,614,617],{},[163,612,613],{},"Insulation resistance",[163,615,616],{},"> 0.5 MOhm",[163,618,619],{},"Megger (insulation tester)",[145,621,622,625,628],{},[163,623,624],{},"Loop impedance",[163,626,627],{},"Depends on MCB rated current",[163,629,630],{},"Loop impedance tester",[145,632,633,636,639],{},[163,634,635],{},"RCD trip time",[163,637,638],{},"\u003C 300 ms at rated residual current I∆n, \u003C 40 ms at 5× I∆n (per IEC 61008)",[163,640,641],{},"RCD tester",[145,643,644,647,649],{},[163,645,646],{},"Voltage measurement",[163,648,212],{},[163,650,215],{},[11,652,654],{"id":653},"result","Result",[16,656,657,658,661],{},"After the inspection, you receive an ",[33,659,660],{},"inspection report",". For new builds and major renovations, the inspection must be passed before the grid operator activates the electricity connection. If deficiencies are found, you are given a deadline for corrections and must schedule a re-inspection.",[11,663,665],{"id":664},"related-articles","Related articles",[27,667,668,674],{},[30,669,670],{},[236,671,673],{"href":672},"\u002Fen\u002Fblog\u002Felectrical-inspection","Electrical inspection in Belgium — what you need to know",[30,675,676],{},[236,677,679],{"href":678},"\u002Fen\u002Fblog\u002Fsockets-per-circuit","How many sockets per circuit? (AREI limits)",[16,681,682],{},[236,683,684],{"href":250},"Create your AREI-compliant single-line diagram now — free →",{"title":253,"searchDepth":254,"depth":254,"links":686},[687,688,689,690,691,692],{"id":463,"depth":254,"text":464},{"id":470,"depth":254,"text":471},{"id":511,"depth":254,"text":512},{"id":577,"depth":254,"text":578},{"id":653,"depth":254,"text":654},{"id":664,"depth":254,"text":665},"Documentation, visual inspection, measurements — learn point by point what the inspector actually checks and measures during an electrical inspection in Belgium.","en",{},"\u002Fblog\u002Finspection-checklist.en",{"title":458,"description":693},"blog\u002Finspection-checklist.en",[276,277,700,701,702,703,704,35,284,705,41,285,706,707,708,709],"inspection","keuring","checklist","single-line diagram","eendraadschema","situation plan","RCD","earth resistance","insulation resistance","Belgium","Nyhw2LU6mvXeSMI83KtMeGxQI4MjPk7MzMHNIsxNLe4",{"id":712,"title":713,"articleId":6,"body":714,"category":262,"date":263,"description":945,"extension":265,"lastUpdated":263,"locale":946,"meta":947,"navigation":268,"path":948,"publishDate":263,"readTime":270,"refreshInterval":271,"seo":949,"slug":950,"stem":951,"tags":952,"__hash__":958},"blog\u002Fblog\u002Finspection-checklist.fr.md","Que vérifie le contrôleur lors du contrôle électrique ?",{"type":8,"value":715,"toc":937},[716,720,723,725,728,754,762,766,769,827,831,834,903,907,914,918,932],[11,717,719],{"id":718},"trois-domaines-documentation-contrôle-visuel-mesures","Trois domaines : documentation, contrôle visuel, mesures",[16,721,722],{},"Le contrôleur vérifie votre installation électrique en trois étapes successives. Si la documentation est déjà manquante, le contrôle s'arrête généralement là — c'est un échec automatique.",[11,724,471],{"id":470},[16,726,727],{},"Le contrôleur exige les documents suivants :",[27,729,730,736,742,748],{},[30,731,732,735],{},[33,733,734],{},"Schéma unifilaire"," — présent, complet et à jour ?",[30,737,738,741],{},[33,739,740],{},"Plan de situation"," — plan des pièces avec prises, interrupteurs et luminaires indiqués ?",[30,743,744,747],{},[33,745,746],{},"Déclaration de conformité"," de l'installateur ?",[30,749,750,753],{},[33,751,752],{},"Fiches techniques"," — tableau de distribution, différentiels, disjoncteurs ?",[56,755,756],{},[16,757,758,761],{},[33,759,760],{},"Attention"," : La raison la plus fréquente d'échec au contrôle est un schéma unifilaire manquant ou erroné. Sans documentation correcte, le contrôleur ne procède dans la plupart des cas pas aux mesures.",[11,763,765],{"id":764},"_2-contrôle-visuel","2. Contrôle visuel",[16,767,768],{},"Ensuite, le contrôleur vérifie visuellement l'installation :",[27,770,771,777,783,789,795,801,808,815,821],{},[30,772,773,776],{},[33,774,775],{},"Section de câble"," correcte par disjoncteur ? (ex. min. 2,5 mm² pour 16A pour circuits de prises ; pour l'éclairage 1,5 mm² pour 16A suffit)",[30,778,779,782],{},[33,780,781],{},"Différentiel 30mA"," présent pour tous les circuits de prises ?",[30,784,533,785,788],{},[33,786,787],{},"8 circuits par différentiel"," ?",[30,790,791,794],{},[33,792,793],{},"Zones de salle de bain"," respectées ? (Zone 0, 1, 2 selon RGIE Art. 7.1, définitions des zones Art. 7.1.5)",[30,796,797,800],{},[33,798,799],{},"Raccordement de terre"," présent et accessible ?",[30,802,803,804,807],{},"Toutes les ",[33,805,806],{},"boîtes de dérivation"," fermées ?",[30,809,810,811,814],{},"Câbles correctement ",[33,812,813],{},"fixés"," et protégés ?",[30,816,817,820],{},[33,818,819],{},"Interrupteur principal"," présent et librement accessible ?",[30,822,823,826],{},[33,824,825],{},"Protection contre les surtensions (SPD)"," présente ? (Art. 4.5.1 exige de manière générale la protection contre les surtensions selon les règles de l'art — en pratique, un SPD Type 2 est recommandé)",[11,828,830],{"id":829},"_3-mesures","3. Mesures",[16,832,833],{},"Enfin, le contrôleur effectue des mesures techniques :",[139,835,836,848],{},[142,837,838],{},[145,839,840,843,846],{},[148,841,842],{},"Mesure",[148,844,845],{},"Limite",[148,847,156],{},[158,849,850,861,871,882,893],{},[145,851,852,855,858],{},[163,853,854],{},"Résistance de terre",[163,856,857],{},"≤ 30 Ohm (Art. 4.2.4.3b ; en cas de dépassement, RCDs supplémentaires requis)",[163,859,860],{},"Telluromètre",[145,862,863,866,868],{},[163,864,865],{},"Résistance d'isolement",[163,867,179],{},[163,869,870],{},"Mégohmmètre (Megger)",[145,872,873,876,879],{},[163,874,875],{},"Impédance de boucle",[163,877,878],{},"Selon courant nominal MCB",[163,880,881],{},"Mesureur d'impédance de boucle",[145,883,884,887,890],{},[163,885,886],{},"Temps de déclenchement différentiel",[163,888,889],{},"\u003C 300 ms au courant différentiel nominal I∆n, \u003C 40 ms à 5× I∆n (selon IEC 61008)",[163,891,892],{},"Testeur de différentiel",[145,894,895,898,900],{},[163,896,897],{},"Mesure de tension",[163,899,212],{},[163,901,902],{},"Multimètre",[11,904,906],{"id":905},"résultat","Résultat",[16,908,909,910,913],{},"Après le contrôle, vous recevez un ",[33,911,912],{},"rapport de contrôle",". Pour les nouvelles constructions et les rénovations importantes, le contrôle doit être réussi avant que le gestionnaire de réseau n'active le raccordement électrique. En cas de défauts, vous recevez un délai pour les corrections et devez planifier un nouveau contrôle.",[11,915,917],{"id":916},"articles-connexes","Articles connexes",[27,919,920,926],{},[30,921,922],{},[236,923,925],{"href":924},"\u002Ffr\u002Fblog\u002Fcontrole-electrique","Contrôle électrique en Belgique — ce qu'il faut savoir",[30,927,928],{},[236,929,931],{"href":930},"\u002Ffr\u002Fblog\u002Fprises-par-circuit","Combien de prises par circuit ? (Limites RGIE)",[16,933,934],{},[236,935,936],{"href":250},"Créez votre schéma unifilaire conforme RGIE — gratuit →",{"title":253,"searchDepth":254,"depth":254,"links":938},[939,940,941,942,943,944],{"id":718,"depth":254,"text":719},{"id":470,"depth":254,"text":471},{"id":764,"depth":254,"text":765},{"id":829,"depth":254,"text":830},{"id":905,"depth":254,"text":906},{"id":916,"depth":254,"text":917},"Documentation, contrôle visuel, mesures — découvrez point par point ce que le contrôleur vérifie et mesure réellement lors d'un contrôle électrique en Belgique.","fr",{},"\u002Fblog\u002Finspection-checklist.fr",{"title":713,"description":945},"checklist-controle","blog\u002Finspection-checklist.fr",[276,277,953,702,284,704,285,41,954,955,956,957,35,703],"contrôle","différentiel","résistance de terre","résistance d'isolement","Belgique","b-kVsCS7W-87F6zrtjKUm_QUk2en_IlTw9_ARbLfzFQ",{"id":960,"title":961,"articleId":6,"body":962,"category":262,"date":263,"description":1193,"extension":265,"lastUpdated":263,"locale":1194,"meta":1195,"navigation":268,"path":1196,"publishDate":263,"readTime":270,"refreshInterval":271,"seo":1197,"slug":1198,"stem":1199,"tags":1200,"__hash__":1207},"blog\u002Fblog\u002Finspection-checklist.nl.md","Wat controleert de keurder bij een elektrische keuring?",{"type":8,"value":963,"toc":1185},[964,968,971,975,978,1003,1011,1015,1018,1076,1080,1083,1151,1155,1162,1166,1180],[11,965,967],{"id":966},"drie-domeinen-documentatie-visuele-controle-metingen","Drie domeinen: documentatie, visuele controle, metingen",[16,969,970],{},"De keurder controleert uw elektrische installatie in drie opeenvolgende stappen. Als de documentatie al ontbreekt, stopt de keuring doorgaans meteen — het is een automatisch falen.",[11,972,974],{"id":973},"_1-documentatie","1. Documentatie",[16,976,977],{},"De keurder vereist de volgende documenten:",[27,979,980,985,991,997],{},[30,981,982,984],{},[33,983,281],{}," — aanwezig, volledig en up-to-date?",[30,986,987,990],{},[33,988,989],{},"Situatieplan"," — plattegrond met stopcontacten, schakelaars en lichtpunten?",[30,992,993,996],{},[33,994,995],{},"Conformiteitsverklaring"," van de installateur?",[30,998,999,1002],{},[33,1000,1001],{},"Technische fiches"," — verdeelbord, differentieelschakelaars, automaten?",[56,1004,1005],{},[16,1006,1007,1010],{},[33,1008,1009],{},"Let op",": De meest voorkomende reden voor het falen van een keuring is een ontbrekend of foutief eendraadschema. Zonder correcte documentatie gaat de keurder in de meeste gevallen niet verder met metingen.",[11,1012,1014],{"id":1013},"_2-visuele-controle","2. Visuele controle",[16,1016,1017],{},"Vervolgens controleert de keurder de installatie visueel:",[27,1019,1020,1027,1033,1039,1045,1051,1057,1064,1070],{},[30,1021,1022,1023,1026],{},"Correcte ",[33,1024,1025],{},"kabeldoorsnede"," per automaat? (bv. min. 2,5 mm² bij 16A)",[30,1028,1029,1032],{},[33,1030,1031],{},"30mA differentieel"," aanwezig voor alle stopcontactkringen?",[30,1034,1035,1036,92],{},"Maximaal ",[33,1037,1038],{},"8 kringen per differentieel",[30,1040,1041,1044],{},[33,1042,1043],{},"Badkamerzones"," gerespecteerd? (Zone 0, 1, 2 volgens AREI Art. 7.1, zone-definities Art. 7.1.5)",[30,1046,1047,1050],{},[33,1048,1049],{},"Aardingsaansluiting"," aanwezig en toegankelijk?",[30,1052,107,1053,1056],{},[33,1054,1055],{},"aftakdozen"," gesloten?",[30,1058,1059,1060,1063],{},"Kabels correct ",[33,1061,1062],{},"bevestigd"," en beschermd?",[30,1065,1066,1069],{},[33,1067,1068],{},"Hoofdschakelaar"," aanwezig en vrij toegankelijk?",[30,1071,1072,1075],{},[33,1073,1074],{},"Overspanningsbeveiliging (SPD)"," aanwezig? (Art. 4.5.1 vereist in het algemeen bescherming tegen overspanningen volgens de regels van het vak — in de praktijk wordt een SPD Type 2 aanbevolen)",[11,1077,1079],{"id":1078},"_3-metingen","3. Metingen",[16,1081,1082],{},"Tot slot voert de keurder technische metingen uit:",[139,1084,1085,1097],{},[142,1086,1087],{},[145,1088,1089,1092,1095],{},[148,1090,1091],{},"Meting",[148,1093,1094],{},"Grenswaarde",[148,1096,156],{},[158,1098,1099,1110,1120,1131,1142],{},[145,1100,1101,1104,1107],{},[163,1102,1103],{},"Aardingsweerstand",[163,1105,1106],{},"≤ 30 Ohm (Art. 4.2.4.3b; bij overschrijding bijkomende RCD's vereist)",[163,1108,1109],{},"Aardingsmeter",[145,1111,1112,1115,1117],{},[163,1113,1114],{},"Isolatieweerstand",[163,1116,179],{},[163,1118,1119],{},"Megger (isolatiemeter)",[145,1121,1122,1125,1128],{},[163,1123,1124],{},"Lusimpedantie",[163,1126,1127],{},"Afhankelijk van nominale stroom MCB",[163,1129,1130],{},"Lusimpedantiemeter",[145,1132,1133,1136,1139],{},[163,1134,1135],{},"Uitschakeltijd differentieel",[163,1137,1138],{},"\u003C 300 ms (300mA) \u002F \u003C 40 ms (30mA)",[163,1140,1141],{},"Differentieeltester",[145,1143,1144,1147,1149],{},[163,1145,1146],{},"Spanningsmeting",[163,1148,212],{},[163,1150,215],{},[11,1152,1154],{"id":1153},"resultaat","Resultaat",[16,1156,1157,1158,1161],{},"Na de keuring ontvangt u een ",[33,1159,1160],{},"keuringsverslag",". Bij nieuwbouw en grote renovaties moet de keuring geslaagd zijn voordat de netbeheerder de elektriciteitsaansluiting activeert. Bij gebreken krijgt u een termijn voor herstellingen en moet u een herkeuring laten uitvoeren.",[11,1163,1165],{"id":1164},"gerelateerde-artikelen","Gerelateerde artikelen",[27,1167,1168,1174],{},[30,1169,1170],{},[236,1171,1173],{"href":1172},"\u002Fblog\u002Felektrische-keuring","Elektrische keuring in België — wat u moet weten",[30,1175,1176],{},[236,1177,1179],{"href":1178},"\u002Fblog\u002Fstopcontacten-per-circuit","Hoeveel stopcontacten per stroomkring? (AREI-limieten)",[16,1181,1182],{},[236,1183,1184],{"href":250},"Maak nu uw AREI-conform eendraadschema — gratis →",{"title":253,"searchDepth":254,"depth":254,"links":1186},[1187,1188,1189,1190,1191,1192],{"id":966,"depth":254,"text":967},{"id":973,"depth":254,"text":974},{"id":1013,"depth":254,"text":1014},{"id":1078,"depth":254,"text":1079},{"id":1153,"depth":254,"text":1154},{"id":1164,"depth":254,"text":1165},"Documentatie, visuele controle, metingen — ontdek punt voor punt wat de keurder effectief controleert en meet bij een elektrische keuring in België.","nl",{},"\u002Fblog\u002Finspection-checklist.nl",{"title":961,"description":1193},"inspectie-checklist","blog\u002Finspection-checklist.nl",[276,277,701,702,704,1201,1202,1203,1204,1205,1206,35,284,285,41],"situatieschema","differentieel","aardingsweerstand","isolatieweerstand","automaat","België","HCt-ZXn96KL-R7idDyW3xsx8Pp8fpS6XdexnFiedy6E",1775151657938]