[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"blog-posts-en":3},[4,2139,3597,4264,4845,5439,6098,7617,8573,9363,10324,11005,11987,13147,14437,15125,15709,16796,17625,18662,19444,20343,21790,22390,23010,23546,24247,24912,25432,26424,27078,27448,27763,28460,28784,29208,30504,31281,32801,33955,34552,35210,35696,36359,36886,37385,37872,38449,39554,40298,40960,41097,42165,42801,43301,43972,44638,44927,45538,46690,47201,47593,47843,48420,49390,49951,50261,50779,51054,51986,52378,53382,53702,54562,55960,56758,57080,57533,57789,58221,58845,59166,59425,59761,60186,60496,60872,61498,62416,63372],{"id":5,"title":6,"articleId":7,"body":8,"category":2110,"date":2111,"description":2112,"extension":2113,"image":77,"labels":2114,"lastUpdated":2111,"locale":2119,"meta":2120,"navigation":2121,"ogImage":2122,"path":2123,"publishDate":2111,"readTime":2124,"refreshInterval":2053,"seo":2125,"seoTitle":2126,"slug":2127,"stem":2128,"tags":2129,"__hash__":2136,"kind":2137,"href":2138},"blog\u002Fblog\u002Fbest-single-line-diagram-software-2026.en.md","Single-line diagram software in Belgium: 22 programs compared","best-single-line-diagram-software",{"type":9,"value":10,"toc":2043},"minimark",[11,18,33,57,60,71,78,83,126,130,137,373,378,497,503,506,510,524,1036,1040,1045,1048,1052,1055,1059,1062,1066,1069,1073,1076,1080,1087,1091,1094,1098,1101,1105,1108,1112,1115,1118,1129,1132,1146,1149,1159,1163,1173,1176,1186,1189,1199,1202,1212,1215,1225,1228,1238,1241,1251,1254,1264,1267,1277,1280,1290,1293,1303,1306,1316,1319,1329,1332,1345,1348,1358,1361,1371,1374,1388,1391,1401,1404,1414,1417,1427,1431,1460,1477,1488,1496,1500,1504,1507,1511,1514,1518,1521,1525,1528,1532,1539,1543,1575,1579,1585,1591,1597,1603,1614,1618,1622,1625,1629,1632,1636,1639,1643,1646,1650,1658,1662,1665,1669,1672,1676,1679,1682,1685,1974,1978,2006,2010,2013,2037],[12,13,14],"p",{},[15,16,17],"strong",{},"A free drawing tool is often enough for a single-line diagram and situation plan. For professionals, the shared installation model, verifiable AREI\u002FRGIE checks, where the software runs and team costs make the difference. This comparison assesses 22 programs from other vendors, the Atlas Contrôle tool for installation extensions, and PlanElec Sketch and Pro against those criteria.",[12,19,20,23,24,28,29,32],{},[15,21,22],{},"PlanElec Sketch"," is our Trikker alternative with strong value for money: single-line diagram and situation plan for free in the browser, also on a tablet, with no circuit limit, a PDF for the inspection and your existing ",[25,26,27],"code",{},".trik"," files. ",[15,30,31],{},"PlanElec Pro"," is a new generation of electrical documentation: floor plan, devices, circuits, distribution board and the documents generated from them belong to one project, the assistant works inside that model, and a self-check with 59 published checks flags open points after every change. Where another program fits better, its profile says so under \"Choose it if …\".",[12,34,35,38,39,44,45,51,52,56],{},[15,36,37],{},"Your Trikker archive can continue in Pro too:"," ",[40,41,43],"a",{"href":42},"\u002Fen\u002Fhelp\u002Fimport-trikker-projects","Batch import"," takes up to ",[15,46,47,48,50],{},"500 ",[25,49,27],{}," files per run"," into separate Pro projects. Every signed-in account can import without a subscription; subsequent use of Pro follows the ",[40,53,55],{"href":54},"\u002Fen\u002Fpricing","pricing and trial conditions",".",[12,58,59],{},"In Belgium, the AREI (in French: RGIE) is the general regulation on electrical installations. Before a home installation is used, sold or extended, an approved inspection body checks it (in Dutch: keuring), and the single-line diagram and situation plan are part of the file.",[12,61,62],{},[63,64,65,66,70],"em",{},"PlanElec makes Sketch and Pro. Information on other programs comes from their own websites as of 16 November 2026; method and ",[40,67,69],{"href":68},"#sources","sources"," are at the end of the article.",[12,72,73],{},[74,75],"img",{"alt":76,"src":77},"Electrical planning with digital devices.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-best-single-line-diagram-software-editorial.webp",[79,80,82],"h2",{"id":81},"in-short","In short",[84,85,86,93,99,105,111,117],"ul",{},[87,88,89,92],"li",{},[15,90,91],{},"Free and complete:"," several web tools produce the single-line diagram and situation plan for free, with limits on circuits, floors or watermarks. According to their vendors, PlanElec Sketch, Sparki and Gen-Schema draw without a circuit limit; UniPlan is free during its launch phase.",[87,94,95,98],{},[15,96,97],{},"Pay once:"," for one home you pay once between about EUR 12 (Masoël, per PDF) and EUR 50 (Voltuno Lifetime).",[87,100,101,104],{},[15,102,103],{},"Subscriptions for contractors:"," over twelve months, the cheapest professional plans for one person range from about EUR 188 (Volter, from 1 December 2026) to EUR 588 (Gridmind Pro), excluding VAT. For three people the spread widens: from EUR 288 to over EUR 1,000.",[87,106,107,110],{},[15,108,109],{},"AREI rule checks:"," many vendors describe automatic checks, with very different scope; ask for the list of checks. The inspection itself is carried out by the approved inspection body.",[87,112,113,116],{},[15,114,115],{},"Offline and Mac:"," installed programs (Trikker, Listrik) and some web apps keep working without a network; scope and duration vary widely. Since 13 November 2026, Trikker runs on Mac out of beta, only on Macs with Apple silicon.",[87,118,119,122,123,125],{},[15,120,121],{},"Taking over Trikker files:"," according to their vendors, Voltuno (Lifetime), 1draad, Condui, SUPLAN, Sparki, PlanElec Sketch and PlanElec Pro read ",[25,124,27],{}," files.",[79,127,129],{"id":128},"the-table-cost-over-12-months","The table: cost over 12 months",[12,131,132,133,136],{},"Common basis: the cheapest plan for professional use according to the vendor, over twelve months, ",[15,134,135],{},"excluding VAT",". Prices a vendor states including VAT we divided by 1.21 and marked. Where the page does not state VAT, the amount is shown as published. One-off prices are listed separately, because they cover more than a year.",[138,139,140,162],"table",{},[141,142,143],"thead",{},[144,145,146,150,153,156,159],"tr",{},[147,148,149],"th",{},"Program",[147,151,152],{},"Cheapest professional plan according to the vendor",[147,154,155],{},"12 months, 1 person",[147,157,158],{},"12 months, 3 people",[147,160,161],{},"VAT according to vendor",[163,164,165,183,199,216,232,248,264,280,294,310,325,340,357],"tbody",{},[144,166,167,171,174,177,180],{},[168,169,170],"td",{},"1draad",[168,172,173],{},"subscription EUR 299\u002Fyear; or EUR 29 per project",[168,175,176],{},"EUR 299",[168,178,179],{},"not stated",[168,181,182],{},"excl.",[144,184,185,188,191,194,197],{},[168,186,187],{},"Amperio",[168,189,190],{},"Pro EUR 374.40\u002Fyear (launch rate)",[168,192,193],{},"EUR 374.40",[168,195,196],{},"EUR 739.20 (2 editors at EUR 182.40 each)",[168,198,182],{},[144,200,201,204,207,210,213],{},[168,202,203],{},"As Built Plan",[168,205,206],{},"EUR 30\u002Fmonth with 3 diagrams\u002Fmonth",[168,208,209],{},"EUR 360",[168,211,212],{},"EUR 360 (unlimited users)",[168,214,215],{},"monthly: not stated",[144,217,218,221,224,227,230],{},[168,219,220],{},"Condui",[168,222,223],{},"EUR 300\u002Fyear",[168,225,226],{},"EUR 300",[168,228,229],{},"EUR 720 (team EUR 45 + EUR 15\u002Fmonth)",[168,231,182],{},[144,233,234,237,240,243,245],{},[168,235,236],{},"Eendraadschema.app",[168,238,239],{},"Professioneel EUR 299.90\u002Fyear",[168,241,242],{},"EUR 247.85 (from incl.)",[168,244,179],{},[168,246,247],{},"incl.",[144,249,250,253,256,259,262],{},[168,251,252],{},"ElectriCAD",[168,254,255],{},"Pro EUR 240\u002Fyear per user",[168,257,258],{},"EUR 240",[168,260,261],{},"EUR 720",[168,263,182],{},[144,265,266,269,272,275,278],{},[168,267,268],{},"Gridmind",[168,270,271],{},"Pro EUR 49\u002Fmonth",[168,273,274],{},"EUR 588",[168,276,277],{},"team access, number not stated",[168,279,179],{},[144,281,282,285,288,290,292],{},[168,283,284],{},"Hoskens ElektroCAD",[168,286,287],{},"Starter EUR 240\u002Fyear per user, 1 device",[168,289,258],{},[168,291,261],{},[168,293,182],{},[144,295,296,299,302,305,308],{},[168,297,298],{},"Schematicals",[168,300,301],{},"Pro 12M EUR 250, per computer",[168,303,304],{},"EUR 250",[168,306,307],{},"EUR 750",[168,309,182],{},[144,311,312,315,318,321,323],{},[168,313,314],{},"SUPLAN",[168,316,317],{},"Elektriciteit, yearly billing EUR 294",[168,319,320],{},"EUR 294",[168,322,179],{},[168,324,182],{},[144,326,327,330,333,335,338],{},[168,328,329],{},"Trikker",[168,331,332],{},"EUR 360\u002Fyear, per computer",[168,334,209],{},[168,336,337],{},"EUR 1,080",[168,339,182],{},[144,341,342,345,348,351,354],{},[168,343,344],{},"Volter",[168,346,347],{},"from 1 Dec 2026: EUR 19\u002Fmonth; Team EUR 29\u002Fmonth for 3",[168,349,350],{},"EUR 188.40 (from incl.)",[168,352,353],{},"EUR 287.64 (from incl.)",[168,355,356],{},"incl., excl. also shown",[144,358,359,362,365,368,370],{},[168,360,361],{},"PlanElec Pro (our own product)",[168,363,364],{},"subscription EUR 290\u002Fyear with 3 editor seats",[168,366,367],{},"EUR 290",[168,369,367],{},[168,371,372],{},"no VAT (final price)",[12,374,375],{},[15,376,377],{},"One-off prices and paying per project:",[138,379,380,392],{},[141,381,382],{},[144,383,384,386,389],{},[147,385,149],{},[147,387,388],{},"One-off or per project",[147,390,391],{},"VAT",[163,393,394,404,414,423,432,441,450,459,468,478,488],{},[144,395,396,399,402],{},[168,397,398],{},"Masoël Schema Studio",[168,400,401],{},"EUR 15 per new PDF (EUR 12.40 excl.)",[168,403,247],{},[144,405,406,408,411],{},[168,407,361],{},[168,409,410],{},"site pass EUR 15 per property, editable for twelve months",[168,412,413],{},"none (final price)",[144,415,416,418,421],{},[168,417,203],{},[168,419,420],{},"EUR 15 per diagram",[168,422,182],{},[144,424,425,427,430],{},[168,426,220],{},[168,428,429],{},"EUR 20 to unlock one project",[168,431,182],{},[144,433,434,436,439],{},[168,435,236],{},[168,437,438],{},"Lifetime EUR 24.99 (EUR 20.65 excl.)",[168,440,247],{},[144,442,443,445,448],{},[168,444,170],{},[168,446,447],{},"EUR 29 per project; 5 projects EUR 95; 20 projects EUR 300",[168,449,182],{},[144,451,452,454,457],{},[168,453,187],{},[168,455,456],{},"Particulier EUR 29 for one job site, editable for six months",[168,458,247],{},[144,460,461,463,466],{},[168,462,268],{},[168,464,465],{},"DIY EUR 29 per file, 30 days of changes",[168,467,179],{},[144,469,470,473,476],{},[168,471,472],{},"PlanElektra",[168,474,475],{},"EUR 17 per PDF export; Lifetime EUR 39",[168,477,179],{},[144,479,480,483,486],{},[168,481,482],{},"Voltuno",[168,484,485],{},"Lifetime EUR 50",[168,487,182],{},[144,489,490,492,495],{},[168,491,298],{},[168,493,494],{},"Pro unlimited EUR 800, per computer",[168,496,182],{},[12,498,499,502],{},[15,500,501],{},"Free according to the vendor:"," Atlas Contrôle (extension only), Gen-Schema, GratisElektrischeSchemas.be, RGIE Maker, Sparki (AI assistant paid per use), Sparkling (dictation up to 2 hours a month), UniPlan (during the launch phase) and PlanElec Sketch. Listrik states no price.",[12,504,505],{},"PlanElec charges no VAT (small business exemption scheme); its amounts are final prices and are the same for private individuals and businesses. Where a price is \"excl.\", private individuals add 21% VAT. From 20 properties a year, the PlanElec Pro subscription costs less than individual site passes.",[79,507,509],{"id":508},"features-in-one-matrix","Features in one matrix",[12,511,512,513,516,517,520,521,523],{},"Legend: ",[15,514,515],{},"yes"," = described on the vendor's website; ",[15,518,519],{},"\"compliant\""," = the vendor claims compliance but describes no automatic check; ",[15,522,179],{}," = the website says nothing about it on the check date. That does not mean the feature is missing.",[138,525,526,550],{},[141,527,528],{},[144,529,530,532,535,538,541,544,547],{},[147,531,149],{},[147,533,534],{},"Situation plan",[147,536,537],{},"AREI checks according to the vendor",[147,539,540],{},"Offline according to the vendor",[147,542,543],{},"Platform",[147,545,546],{},"Interface languages",[147,548,549],{},"Trikker import",[163,551,552,571,591,610,630,650,669,688,707,727,744,761,781,799,816,836,855,876,895,914,935,956,976,994,1016],{},[144,553,554,556,558,561,563,566,569],{},[168,555,170],{},[168,557,515],{},[168,559,560],{},"\"compliant\" (AREI component library)",[168,562,515],{},[168,564,565],{},"browser",[168,567,568],{},"NL, FR, EN",[168,570,515],{},[144,572,573,575,577,580,583,586,589],{},[168,574,187],{},[168,576,515],{},[168,578,579],{},"yes, Book 1 during data entry",[168,581,582],{},"partly: viewing, tasks, photos; diagram and plan online",[168,584,585],{},"browser, also phone",[168,587,588],{},"FR, NL, EN",[168,590,179],{},[144,592,593,595,597,600,603,606,608],{},[168,594,203],{},[168,596,515],{},[168,598,599],{},"required fields; rule checks announced",[168,601,602],{},"no",[168,604,605],{},"browser, tablet, Android, iOS",[168,607,568],{},[168,609,179],{},[144,611,612,615,618,620,622,625,628],{},[168,613,614],{},"Atlas Contrôle (extensions only)",[168,616,617],{},"no, add it separately",[168,619,179],{},[168,621,179],{},[168,623,624],{},"website",[168,626,627],{},"FR, NL",[168,629,179],{},[144,631,632,634,636,639,642,645,648],{},[168,633,220],{},[168,635,515],{},[168,637,638],{},"yes, also free",[168,640,641],{},"yes, local projects",[168,643,644],{},"browser, installable as web app",[168,646,647],{},"NL, FR, DE, EN",[168,649,515],{},[144,651,652,654,656,659,661,664,667],{},[168,653,236],{},[168,655,515],{},[168,657,658],{},"yes (error check)",[168,660,179],{},[168,662,663],{},"browser, tablet; not optimised for phones",[168,665,666],{},"NL, FR",[168,668,179],{},[144,670,671,673,675,678,681,684,686],{},[168,672,252],{},[168,674,515],{},[168,676,677],{},"\"checked with Belor\", no compliance guarantee",[168,679,680],{},"yes, opened projects; a new project needs a network",[168,682,683],{},"browser, installable as app",[168,685,627],{},[168,687,179],{},[144,689,690,693,696,698,701,703,705],{},[168,691,692],{},"Gen-Schema",[168,694,695],{},"yes, from floor plans",[168,697,179],{},[168,699,700],{},"not stated (data stays local)",[168,702,565],{},[168,704,588],{},[168,706,179],{},[144,708,709,712,715,718,720,722,725],{},[168,710,711],{},"GratisElektrischeSchemas.be",[168,713,714],{},"yes, from a 3D model",[168,716,717],{},"yes, \"known AREI rules\"",[168,719,179],{},[168,721,565],{},[168,723,724],{},"NL",[168,726,179],{},[144,728,729,731,733,736,738,740,742],{},[168,730,268],{},[168,732,515],{},[168,734,735],{},"yes, in real time",[168,737,179],{},[168,739,565],{},[168,741,724],{},[168,743,179],{},[144,745,746,748,750,753,755,757,759],{},[168,747,284],{},[168,749,515],{},[168,751,752],{},"yes, named rules; not earthing",[168,754,179],{},[168,756,565],{},[168,758,568],{},[168,760,179],{},[144,762,763,766,768,771,774,777,779],{},[168,764,765],{},"Listrik",[168,767,515],{},[168,769,770],{},"\"compliant\" (AREI symbols)",[168,772,773],{},"yes, Pro up to 720 minutes",[168,775,776],{},"Windows",[168,778,724],{},[168,780,179],{},[144,782,783,785,787,790,792,795,797],{},[168,784,398],{},[168,786,515],{},[168,788,789],{},"not stated; no promise on the inspection",[168,791,179],{},[168,793,794],{},"browser, tablet, phone",[168,796,179],{},[168,798,179],{},[144,800,801,803,805,808,810,812,814],{},[168,802,472],{},[168,804,515],{},[168,806,807],{},"hints and guide, no automatic approval",[168,809,179],{},[168,811,565],{},[168,813,724],{},[168,815,179],{},[144,817,818,821,823,826,829,831,834],{},[168,819,820],{},"RGIE Maker",[168,822,179],{},[168,824,825],{},"yes, indicative power balance",[168,827,828],{},"not stated (stored in the browser)",[168,830,794],{},[168,832,833],{},"FR",[168,835,179],{},[144,837,838,840,842,845,847,850,853],{},[168,839,298],{},[168,841,515],{},[168,843,844],{},"\"compliant\", diagram generated from the plan",[168,846,179],{},[168,848,849],{},"Windows 10 and 11",[168,851,852],{},"website NL, FR, EN",[168,854,179],{},[144,856,857,860,862,865,867,870,873],{},[168,858,859],{},"Sparki",[168,861,515],{},[168,863,864],{},"yes: cross-section, RCD, sockets per circuit",[168,866,515],{},[168,868,869],{},"browser, phone, tablet, laptop",[168,871,872],{},"input in NL",[168,874,875],{},"yes, import and export",[144,877,878,881,883,886,889,891,893],{},[168,879,880],{},"Sparkling",[168,882,515],{},[168,884,885],{},"yes, built-in checks",[168,887,888],{},"no, announced without a date",[168,890,565],{},[168,892,833],{},[168,894,179],{},[144,896,897,899,901,904,907,910,912],{},[168,898,314],{},[168,900,515],{},[168,902,903],{},"no automatic check described",[168,905,906],{},"yes, up to 7 days after the last online visit",[168,908,909],{},"browser; app for iPhone, iPad, Mac",[168,911,666],{},[168,913,515],{},[144,915,916,918,920,923,926,929,932],{},[168,917,329],{},[168,919,515],{},[168,921,922],{},"\"compliant\"; Schemalezer (beta) flags uncertain circuits",[168,924,925],{},"yes: draw and save; licence and PDF need a network",[168,927,928],{},"Windows 10, 11; macOS 13+ with Apple silicon",[168,930,931],{},"NL, FR, EN, DE, PL, RO",[168,933,934],{},"own format",[144,936,937,940,942,945,948,951,954],{},[168,938,939],{},"UniPlan",[168,941,515],{},[168,943,944],{},"yes, with article reference",[168,946,947],{},"yes, drawing without a network",[168,949,950],{},"browser, phone, tablet, PC",[168,952,953],{},"FR, NL, DE, EN",[168,955,179],{},[144,957,958,960,962,965,968,971,974],{},[168,959,344],{},[168,961,515],{},[168,963,964],{},"yes, in real time with reference",[168,966,967],{},"in the app for a limited time",[168,969,970],{},"browser; apps for macOS, Windows, Ubuntu, iOS, Android",[168,972,973],{},"NL, FR, EN, DE",[168,975,179],{},[144,977,978,980,982,984,987,990,992],{},[168,979,482],{},[168,981,515],{},[168,983,770],{},[168,985,986],{},"yes, with Lifetime",[168,988,989],{},"browser, tablet",[168,991,568],{},[168,993,986],{},[144,995,996,999,1002,1005,1008,1011,1013],{},[168,997,998],{},"PlanElec Sketch (our own)",[168,1000,1001],{},"yes, with floors",[168,1003,1004],{},"no; \"Check documents\" lists missing details",[168,1006,1007],{},"keep drawing if the connection drops",[168,1009,1010],{},"browser, also tablet and phone",[168,1012,647],{},[168,1014,1015],{},"yes, without account",[144,1017,1018,1021,1023,1026,1029,1031,1033],{},[168,1019,1020],{},"PlanElec Pro (our own)",[168,1022,515],{},[168,1024,1025],{},"yes, self-check report on the supported rules",[168,1027,1028],{},"pilot: keep editing opened projects",[168,1030,565],{},[168,1032,647],{},[168,1034,1035],{},"yes, up to 500 files",[79,1037,1039],{"id":1038},"which-program-fits-the-way-you-work","Which program fits the way you work?",[1041,1042,1044],"h3",{"id":1043},"one-home-drawing-it-yourself","One home, drawing it yourself",[12,1046,1047],{},"If you are a homeowner or DIYer who needs the documents for a sale or an inspection, a free version is usually enough: according to their vendors, PlanElec Sketch, Gen-Schema, GratisElektrischeSchemas.be and RGIE Maker are free according to their vendors; Sparki is free except for its AI assistant, which is paid per use, and UniPlan is free during its launch phase. Voltuno (8 circuits, 1 floor) and Eendraadschema.app (15 circuits, 1 floor) are free with limits. For a larger home you pay once with Masoël, PlanElektra, Eendraadschema.app, Amperio Particulier, Gridmind DIY or Voltuno. You still agree the grid connection and the inspection with an electrician and the inspection body.",[1041,1049,1051],{"id":1050},"only-an-ev-charger-or-a-pv-system","Only an EV charger or a PV system",[12,1053,1054],{},"Atlas Contrôle draws only the extension for free (EV charger, PV, optionally a home battery); you add the situation plan yourself. As Built Plan lists PV and charging points as finished and complete homes as beta. For a full installation with PV strings you need a program that produces the complete diagram.",[1041,1056,1058],{"id":1057},"a-few-installations-a-year-as-a-contractor","A few installations a year as a contractor",[12,1060,1061],{},"Paying per project makes sense up to a handful of installations: 1draad, Condui, As Built Plan, the PlanElec site pass. Do the maths: with 1draad, the yearly subscription costs less than single projects from about eleven projects; with PlanElec, from 20 properties.",[1041,1063,1065],{"id":1064},"in-the-office-on-a-windows-pc","In the office on a Windows PC",[12,1067,1068],{},"Trikker, Schematicals and Listrik are installed programs with a licence per computer. Since version 2.0, Trikker also runs on Mac; according to its FAQ, Schematicals does not run on Mac directly.",[1041,1070,1072],{"id":1071},"on-the-job-site-also-without-a-network","On the job site, also without a network",[12,1074,1075],{},"SUPLAN (up to seven days after the last online visit), Volter (in the app for a limited time), ElectriCAD (opened projects), Condui (local projects), UniPlan, Sparki, 1draad and Voltuno (Lifetime) mention working without a network. Amperio mentions viewing, tasks and photos offline, with diagram and plan online. Trikker draws and saves offline but needs a connection for the licence check and the PDF. Before you buy, check exactly what you want to do offline.",[1041,1077,1079],{"id":1078},"arei-checks-while-you-enter-data","AREI checks while you enter data",[12,1081,1082,1083,56],{},"Amperio, Condui, Gridmind, Hoskens ElektroCAD, Sparki, Sparkling, UniPlan, Volter and PlanElec Pro describe an automatic check, each with its own scope. Hoskens, for example, states explicitly that earthing and equipotential bonding are not checked. Ask every vendor for the list of checks; PlanElec publishes its own in ",[40,1084,1086],{"href":1085},"\u002Fen\u002Fhelp\u002Fwhat-the-self-check-verifies","What the self-check verifies",[1041,1088,1090],{"id":1089},"dictation-and-ai","Dictation and AI",[12,1092,1093],{},"Amperio and Sparkling build the diagram and plan from dictation. Trikker's Schemalezer (beta, for licence holders) reads old diagrams and a dictated description. UniPlan connects to Claude or ChatGPT. Hoskens sells an AI diagram drawer as an add-on from EUR 19 per user per month. In the PlanElec assistant you type or dictate instructions across the whole Pro project.",[1041,1095,1097],{"id":1096},"as-a-team","As a team",[12,1099,1100],{},"Check what an extra seat costs and whether readers are free. As Built Plan charges per diagram, not per user. Volter Team includes three users, PlanElec Pro three editor seats; Amperio and PlanElec offer free read access. With Trikker and Schematicals you need a licence per computer.",[1041,1102,1104],{"id":1103},"working-in-german","Working in German",[12,1106,1107],{},"Condui, Trikker, UniPlan, Volter, PlanElec Sketch and PlanElec Pro have a German interface.",[79,1109,1111],{"id":1110},"program-by-program","Program by program",[12,1113,1114],{},"Every profile follows the same grid: what the program does according to its vendor, what it runs on, what it costs and when it suits you. Sorted alphabetically; our own products follow separately at the end.",[1041,1116,170],{"id":1117},"_1draad",[12,1119,1120,1121,1124,1125,1128],{},"1draad (in French 1filaire.be) runs in the browser and, according to its website, also offline. Drawing, saving and importing are free, also from a photo, scan or PDF of an existing diagram and from Trikker files; you pay only for the PDF or printout. ",[15,1122,1123],{},"Cost:"," EUR 29 per project, EUR 95 for 5, EUR 300 for 20, or EUR 99 a quarter or EUR 299 a year without automatic renewal, excluding VAT. ",[15,1126,1127],{},"Choose 1draad if"," you want to pay per finished project and take over old diagrams or Trikker files.",[1041,1130,187],{"id":1131},"amperio",[12,1133,1134,1135,1137,1138,1141,1142,56],{},"Amperio is a web app for electricians with single-line diagram, situation plan, job-site tracking and Book 1 checks during data entry; you draw, dictate or import a diagram from a PDF or photo. You can try one job site free for seven days. ",[15,1136,1123],{}," Pro EUR 39 a month at the launch rate or EUR 374.40 a year; each extra editor EUR 19 a month or EUR 182.40 a year, readers free, all excluding VAT. Particulier: EUR 29 including VAT for one job site. ",[15,1139,1140],{},"Choose Amperio if"," you dictate on site and want tasks and photos in the same app. More in ",[40,1143,1145],{"href":1144},"\u002Fen\u002Fblog\u002Famperio-alternative","Amperio or PlanElec",[1041,1147,203],{"id":1148},"as-built-plan",[12,1150,1151,1152,1154,1155,1158],{},"As Built Plan is a web app for a situation plan with an automatically generated single-line diagram. According to its roadmap, PV and charging points are finished and complete homes are in beta. According to its FAQ, the check currently covers required fields; AREI rules are to follow. Offline use is not yet possible, the FAQ says. ",[15,1153,1123],{}," EUR 15 per diagram plus VAT, or EUR 30 a month with three diagrams, unlimited users and devices; the first three diagrams are free. ",[15,1156,1157],{},"Choose As Built Plan if"," you mainly produce PV and charging-point files with several people.",[1041,1160,1162],{"id":1161},"atlas-contrôle","Atlas Contrôle",[12,1164,1165,1166,1168,1169,1172],{},"According to its own website, Atlas Contrôle is an inspection body accredited by BELAC. Free and without registration, you draw only the diagram of an extension there: an EV charger or PV system, optionally with a home battery. The tool does not produce a situation plan. For the PDF you enter an address and contact details. ",[15,1167,1123],{}," none. ",[15,1170,1171],{},"Choose Atlas Contrôle if"," you only take an extension to the inspection.",[1041,1174,220],{"id":1175},"condui",[12,1177,1178,1179,1181,1182,1185],{},"Condui runs in the browser, can be installed as a web app and edits local projects offline. Drawing and AREI checks are free, with unlimited local projects and one cloud project. Condui imports Trikker, DXF and DWG files and offers a German interface. ",[15,1180,1123],{}," EUR 20 per project, EUR 30 a month or EUR 300 a year for one user, each additional user EUR 15 a month; team for two EUR 45 a month, excluding VAT. ",[15,1183,1184],{},"Choose Condui if"," you want to start for free with checks and later work as a team in the cloud.",[1041,1187,236],{"id":1188},"eendraadschemaapp",[12,1190,1191,1192,1194,1195,1198],{},"Eendraadschema.app (in French schemaunifilaire.app) runs in the browser on desktop and tablet. For free you draw a diagram of up to 15 circuits and a plan for one floor, with a PDF without watermark and without an account. According to its changelog, you upload a floor plan and import DWG\u002FDXF. ",[15,1193,1123],{}," Lifetime EUR 24.99 one-off; Professioneel EUR 29.99 a month or EUR 299.90 a year with client files, logo and Peppol invoices, all including VAT. ",[15,1196,1197],{},"Choose Eendraadschema.app if"," you draw one home cheaply with a one-off payment or need prices including VAT.",[1041,1200,252],{"id":1201},"electricad",[12,1203,1204,1205,1207,1208,1211],{},"ElectriCAD (electricad.app) links situation plan and single-line diagram in the browser on PC, Mac and tablet, also as an installed app. Opened projects open without a network; creating a new project needs a connection. According to the vendor, the AREI check runs with Belor, without a compliance guarantee. You add plans as a PDF or image underlay; according to the website, ElectriCAD does not import DWG and DXF. ",[15,1206,1123],{}," free for 3 plans with watermark; Pro EUR 35 a month or EUR 240 a year per user, excluding VAT; there is no Pro trial. ",[15,1209,1210],{},"Choose ElectriCAD if"," you work on a tablet at the customer's and want to continue offline.",[1041,1213,692],{"id":1214},"gen-schema",[12,1216,1217,1218,1220,1221,1224],{},"Gen-Schema (gen-schema.kltk.be) creates the situation plan and the single-line diagram from devices on floor plans, as PDF or SVG in A4. According to its website, everything stays local on the device. The vendor calls it a demonstration project under development that may contain errors. ",[15,1219,1123],{}," currently free, without an account; the website promises free lifetime access to the first sign-ups. ",[15,1222,1223],{},"Choose Gen-Schema if"," you draw a simple home and accept a demonstration project.",[1041,1226,711],{"id":1227},"gratiselektrischeschemasbe",[12,1229,1230,1231,1233,1234,1237],{},"You rebuild your home in 3D and drag sockets, switches and lights into it; according to the website, the single-line diagram and situation plan are drawn up automatically, with a check against known AREI rules and PDF export. The page names no operator. ",[15,1232,1123],{}," free, according to the website without hidden costs. ",[15,1235,1236],{},"Choose it if"," you are a private individual who prefers working in a 3D model.",[1041,1239,268],{"id":1240},"gridmind",[12,1242,1243,1244,1246,1247,1250],{},"Gridmind starts from the distribution board: enter the main protection, RCDs and circuits, and the diagram is built automatically, with real-time AREI checks, situation plan and PDF. ",[15,1245,1123],{}," free for one active diagram with a watermarked PDF preview; DIY EUR 29 per file with 30 days of changes; Pro EUR 49 a month with team access. Whether VAT is included is not stated. ",[15,1248,1249],{},"Choose Gridmind if"," you think from the distribution board and pay once per file.",[1041,1252,284],{"id":1253},"hoskens-elektrocad",[12,1255,1256,1257,1259,1260,1263],{},"ElektroCAD by Hoskens is a web app for industry and housing. For homes, you enter the circuits; ElektroCAD generates the single-line diagram under the AREI, lays out a distribution board from Hager, Schneider, Legrand or ABB and checks named rules, but not earthing and equipotential bonding. Cable calculation and an inspection file are included. The 14-day trial comes without export and printing. ",[15,1258,1123],{}," Starter EUR 24 a month or EUR 240 a year per user and device, excluding VAT; AI diagram drawer as an add-on from EUR 19 a month. ",[15,1261,1262],{},"Choose ElektroCAD if"," you also design control cabinets and automation besides homes.",[1041,1265,765],{"id":1266},"listrik",[12,1268,1269,1270,1272,1273,1276],{},"Listrik is a Windows program for the situation plan and single-line diagram with all standard AREI symbols, a material list and labels; you place floor plans as an image underlay. According to the manual, the Pro version works offline for 720 minutes; the licence applies per PC. Without a licence, a test mode runs with two circuits. ",[15,1271,1123],{}," not stated. ",[15,1274,1275],{},"Choose Listrik if"," you want a lean Windows program and ask for the price directly.",[1041,1278,398],{"id":1279},"masoël-schema-studio",[12,1281,1282,1283,1285,1286,1289],{},"Masoël is an online shop for electrical material; its Schema Studio draws the single-line diagram and situation plan in the browser on computer, tablet and phone. Masoël explicitly makes no promise about passing the inspection. ",[15,1284,1123],{}," drawing is free, EUR 15 including VAT per new PDF, with a 3D file; you need an account to save. ",[15,1287,1288],{},"Choose Schema Studio if"," you draw one home and only want to pay for the finished PDF.",[1041,1291,472],{"id":1292},"planelektra",[12,1294,1295,1296,1298,1299,1302],{},"PlanElektra is a Dutch-language web app in which the single-line diagram and situation plan share the same points. An AI assistant reads a photo or PDF of the floor plan and suggests a layout. For free you draw with a watermarked PDF preview. ",[15,1297,1123],{}," EUR 17 per PDF export or Lifetime EUR 39 for unlimited exports; the page does not state VAT. ",[15,1300,1301],{},"Choose PlanElektra if"," you start from a floor plan and want to pay per export.",[1041,1304,820],{"id":1305},"rgie-maker",[12,1307,1308,1309,1311,1312,1315],{},"RGIE Maker (rgiemaker.be) is a free French-language assistant for the single-line diagram, without registration, on tablet and phone, with PDF export and an indicative power balance. Drawings stay in the browser; an optional account syncs them. The website does not mention a situation plan. ",[15,1310,1123],{}," free. ",[15,1313,1314],{},"Choose RGIE Maker if"," you only need a single-line diagram in French.",[1041,1317,298],{"id":1318},"schematicals",[12,1320,1321,1322,1324,1325,1328],{},"Schematicals by Automaticals is a Windows program: you draw the situation plan, and according to the vendor the single-line diagram is generated automatically. According to its FAQ, it runs on Mac only via Parallels, Boot Camp or CrossOver. You export labels as CSV. ",[15,1323,1123],{}," Pro EUR 45 for one month, EUR 140 for six, EUR 250 for twelve months or EUR 800 without time limit, excluding VAT, per computer; the trial has no time limit and is limited to three circuits. ",[15,1326,1327],{},"Choose Schematicals if"," you work on a Windows PC and prefer a licence without time limit.",[1041,1330,859],{"id":1331},"sparki",[12,1333,1334,1335,1337,1338,1340,1341,1344],{},"Sparki by Automation Services Kessel runs in the browser on phone, tablet and laptop and, according to the vendor, also without internet. It draws the single-line diagram and situation plan, checks cross-section against the circuit breaker, RCDs and sockets per circuit, and reads and writes ",[25,1336,27],{}," files. You type or speak your input in Dutch. ",[15,1339,1123],{}," free without a circuit limit; the AI assistant is paid per use, the page states no amount. ",[15,1342,1343],{},"Choose Sparki if"," you want to draw for free and offline and exchange Trikker files.",[1041,1346,880],{"id":1347},"sparkling",[12,1349,1350,1351,1353,1354,1357],{},"Sparkling (getsparkling.be) is a French-language AI copilot: you dictate the job site, and it produces the plan, single-line diagram and a quote, with built-in RGIE checks. According to its FAQ, offline use is not yet possible. ",[15,1352,1123],{}," free, dictation up to two hours a month; the page states no paid plans. ",[15,1355,1356],{},"Choose Sparkling if"," you want to combine site visit, diagram and quote in one dictation.",[1041,1359,314],{"id":1360},"suplan",[12,1362,1363,1364,1366,1367,1370],{},"SUPLAN runs in the browser on PC, Mac and tablet and as an app for iPhone, iPad and Mac. You work offline for up to seven days after your last online visit. The single-line diagram follows from the distribution board; SUPLAN opens Trikker files. SUPLAN describes no automatic check and states itself that it is not an inspection body. ",[15,1365,1123],{}," Elektriciteit EUR 35 a month or EUR 294 a year, Compleet EUR 45 or EUR 378, excluding VAT; five years for the price of four; 7-day trial with one file. ",[15,1368,1369],{},"Choose SUPLAN if"," you survey on site with an iPhone or iPad and need to work offline.",[1041,1372,329],{"id":1373},"trikker",[12,1375,1376,1377,1379,1380,1383,1384,56],{},"Trikker by Bluebits is an installed program for Windows 10 and 11 and, since Trikker 2.0 of 13 November 2026, out of beta also for macOS 13 or later on Macs with Apple silicon; Intel Macs are not supported. According to the vendor, a web version for browser and tablet is to follow as a beta in 2026. Drawing and saving work offline; according to the manual, the licence check and the PDF need a connection, and the PDF is created on Trikker's servers. According to the manual, exports other than the PDF also work offline; after a long period without a connection, Trikker falls back to the demo version. Floor plans as DWG\u002FDXF or PDF serve as background; Trikker does not write DWG or DXF. ",[15,1378,1123],{}," EUR 45 a month or EUR 360 a year excluding VAT, per computer; demo with 5 circuits and a watermark. ",[15,1381,1382],{},"Choose Trikker if"," you work on a fixed Windows PC or Apple silicon Mac and want to keep the established format. Switching: ",[40,1385,1387],{"href":1386},"\u002Fen\u002Fblog\u002Ftrikker-alternative","Trikker alternative",[1041,1389,939],{"id":1390},"uniplan",[12,1392,1393,1394,1396,1397,1400],{},"UniPlan is a web app for phone, tablet and PC: you draw the house and place the points, the single-line diagram is generated from the plan and checked against the RGIE, with an article reference per finding. According to the website, drawing works without a network. For commercial work it adds a multi-wire diagram and simulation; a connection to Claude or ChatGPT draws from a photo or description. ",[15,1395,1123],{}," free during the launch phase; its terms announce that paid plans may follow. ",[15,1398,1399],{},"Choose UniPlan if"," you want to start free with checks and can wait for later prices.",[1041,1402,344],{"id":1403},"volter",[12,1405,1406,1407,1409,1410,1413],{},"Volter (by Asenko) generates the single-line diagram automatically from the situation plan, with real-time compliance checks and a reference to the rule, \"a tool, not a guarantee\". It runs in the browser and as an app for macOS, Windows, Ubuntu, iOS and Android; in the app you work offline for a limited time. ",[15,1408,1123],{}," open beta until 30 November 2026; from 1 December EUR 19 a month (EUR 15.70 excl.) or Team EUR 29 a month (EUR 23.97 excl.) for three users. ",[15,1411,1412],{},"Choose Volter if"," you work on many devices and want an affordable team plan.",[1041,1415,482],{"id":1416},"voltuno",[12,1418,1419,1420,1422,1423,1426],{},"Voltuno is a web app for the single-line diagram, situation plan and inspection file on desktop, laptop and tablet. For free you draw a diagram of up to 8 circuits and a plan for one floor, with a PDF without watermark. ",[15,1421,1123],{}," Lifetime EUR 50 one-off excluding VAT, with unlimited diagrams, offline work, teamwork and Trikker file import. ",[15,1424,1425],{},"Choose Voltuno if"," you want to pay once and still work as a team.",[79,1428,1430],{"id":1429},"planelec-sketch-and-planelec-pro-our-own-products","PlanElec Sketch and PlanElec Pro (our own products)",[12,1432,1433,1435,1436,1438,1439,1442,1443,1446,1447,1450,1451,1453,1454],{},[15,1434,22],{}," draws the single-line diagram and situation plan for free in the browser, also on tablet and phone, without an account and without a limit on circuits, symbols or pages. You start from a template or open a Trikker file (",[25,1437,27],{},"), which is converted on the PlanElec server. The PDF comes in A4 or A3 with cover page and title block; you also export the diagram and plan as SVG, the material list as CSV and the whole drawing with ",[15,1440,1441],{},"Save as file",". Without an account, the PDF carries the PlanElec logo as a watermark; a free account removes it. If the connection drops, you keep drawing; the cloud and the handover to Pro wait until you are back online. ",[15,1444,1445],{},"Check documents"," shows missing details before the PDF. Sketch has no distribution board and no self-check report. ",[15,1448,1449],{},"Choose Sketch if"," you want a free alternative to Trikker: draw the diagram and plan for the inspection, keep working on your ",[25,1452,27],{}," files and work on a tablet at the customer's. ",[40,1455,1459],{"href":1456,"rel":1457},"https:\u002F\u002Fsketch.planelec.be\u002Fen\u002Fdraw",[1458],"nofollow","Open Sketch",[12,1461,1462,1464,1465,1469,1470,1472,1473,1476],{},[15,1463,31],{}," is built as a new generation of electrical documentation: instead of reconciling separate drawings, you manage one installation model in which floor plan, devices, circuits, distribution board, single-line diagram and situation plan belong together. It includes the PlanElec assistant with more than 100 planning commands, typed or dictated, floor plan recognition from PDF or scan, recognition of DIN modules on photos of the distribution board and a self-check report on the supported AREI rules, which gives orientation and does not replace the inspection. Teams work with roles and free read access, plus PV and KNX. You keep editing a previously opened project offline as a pilot; export, uploads and AI need internet (",[40,1466,1468],{"href":1467},"\u002Fen\u002Fhelp\u002Fuse-planelec-offline","Use PlanElec offline","). ",[15,1471,1123],{}," Try Pro for 1 month for EUR 0; site pass EUR 15 per property or subscription EUR 29 a month or EUR 290 a year with three editor seats, each extra seat EUR 12 a month or EUR 120 a year; final prices without VAT. ",[15,1474,1475],{},"Choose Pro if"," you plan the installation rather than just draw it: changes show up straight away in the diagram and the self-check, you can undo every assistant step, and the distribution board, PV, KNX and your team belong to the same project.",[12,1478,1479,1480,1483,1484,1487],{},"You move a Sketch drawing to Pro with ",[15,1481,1482],{},"Take it to Pro",", situation plan included; a Pro project does not go back to Sketch. With any signed-in account you import a whole Trikker archive into Pro, one project per file (",[40,1485,1486],{"href":42},"Import Trikker projects",").",[1489,1490],"help-figure",{":height":1491,":width":1492,"alt":1493,"caption":1494,"src":1495},"824","700","The ‘New project’ dialog in PlanElec Sketch: ‘Open a Trikker file’ at the top, below it the tasks ‘Draw the documents for the inspection’, ‘Add charging point’, ‘Prepare an apartment’, ‘Prepare a house’ and ‘Empty project’.","Starting in PlanElec Sketch without an account or location. Each card opens a drawing you then adapt; Sketch does not check AREI\u002FRGIE rules.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-start-tasks.webp",[79,1497,1499],{"id":1498},"four-questions-that-decide","Four questions that decide",[1041,1501,1503],{"id":1502},"where-do-you-work","Where do you work?",[12,1505,1506],{},"At a fixed office PC, installed programs fit. On the job site, what counts is what works without a network: drawing, saving, PDF, licence check. Does the program run on your tablet or phone, or only in a laptop browser?",[1041,1508,1510],{"id":1509},"does-the-program-check-while-you-enter-data-or-does-it-only-call-itself-compliant","Does the program check while you enter data, or does it only call itself compliant?",[12,1512,1513],{},"\"AREI-compliant\" on a website usually describes the symbols. A check during data entry reports concrete findings, such as a cross-section too small for the circuit breaker. Ask for the list of checks and for what is not checked.",[1041,1515,1517],{"id":1516},"do-the-diagram-and-the-plan-stay-together","Do the diagram and the plan stay together?",[12,1519,1520],{},"If you add a socket to the plan, it must appear in the diagram on the right circuit. Many programs link the two; some generate the diagram from the plan, others the plan from the diagram. Test this with a change after the first PDF.",[1041,1522,1524],{"id":1523},"what-does-it-cost-over-twelve-months-with-vat-and-colleagues","What does it cost over twelve months, with VAT and colleagues?",[12,1526,1527],{},"Calculate on the same basis: excluding or including VAT, per computer or per user, with or without extra seats, subscription or one-off. A price per PDF is cheap for one home and expensive for 30 installations a year.",[79,1529,1531],{"id":1530},"and-paper-excel-or-cad","And paper, Excel or CAD?",[12,1533,1534,1535,56],{},"The AREI does not prescribe any program. A single-line diagram may be drawn by hand or in Excel if it is complete, legible and uses the prescribed symbols. General CAD or drawing programs do not know the Belgian symbols and mandatory details out of the box. When paper is enough and when a tool pays off is explained in ",[40,1536,1538],{"href":1537},"\u002Fen\u002Fblog\u002Fplanelec-vs-excel-paper","Single-line diagram on paper, in Excel or with software?",[79,1540,1542],{"id":1541},"other-programs-we-looked-at","Other programs we looked at",[84,1544,1545,1551,1557,1563,1569],{},[87,1546,1547,1550],{},[15,1548,1549],{},"Kringly:"," its website only shows a live preview of a diagram; on the check date we found no details on price, situation plan or operator. That is why it is not in the table.",[87,1552,1553,1556],{},[15,1554,1555],{},"OhmCAD:"," electricad.be redirects to ohmcad.be, a different product in its pilot phase. We did not assess it.",[87,1558,1559,1562],{},[15,1560,1561],{},"JETPLAN:"," planning software from Germany for the German-speaking market, without reference to the AREI.",[87,1564,1565,1568],{},[15,1566,1567],{},"Calculation and manufacturer programs"," such as elec calc, Caneco BT, HagerCAD or Schneider configurators size installations or configure distribution boards. A Belgian single-line diagram with situation plan for homes is not their focus.",[87,1570,1571,1574],{},[15,1572,1573],{},"AutoCAD and Visio:"," general drawing programs without a Belgian symbol library out of the box.",[79,1576,1578],{"id":1577},"method","Method",[12,1580,1581,1584],{},[15,1582,1583],{},"What we included:"," programs with a Belgian website or Belgian focus that, according to the vendor, produce a single-line diagram for homes under the AREI. Programs without sufficient vendor information are listed in the previous section. Atlas Contrôle is not counted among the 22 programs because it only draws extensions; as a free offer from an inspection body, it still appears in the tables. PlanElec Sketch and Pro are not counted either.",[12,1586,1587,1590],{},[15,1588,1589],{},"How we collected the data:"," for each program we read the home page, the pricing page and, where available, FAQ, manual and llms.txt. Some pages were saved automatically as snapshots and reviewed on 16 November 2026; the rest we consulted directly on the same day. We quote marketing claims as such. We did not use vendors' comparison pages about other programs as a source. We did not test the programs ourselves, created no accounts and bought nothing.",[12,1592,1593,1596],{},[15,1594,1595],{},"What we do not do:"," we assess neither the quality of the diagrams nor compliance, and we publish no ranking. Whether a check is complete you can only find out in the program itself.",[12,1598,1599,1602],{},[15,1600,1601],{},"Conflict of interest:"," PlanElec sells PlanElec Pro and offers Sketch for free. The same legend applies to PlanElec; our details come from the documented product scope and the help articles. Every program gets a \"Choose it if …\" line, including where PlanElec is not the answer.",[12,1604,1605,1608,1609,1613],{},[15,1606,1607],{},"Updates:"," the vendors’ pages are fetched automatically on an ongoing basis. When a change shows up, we verify it at the source and add it with its date; we do not promise a weekly manual review of every row. Each source below shows its access date, and the date at the top shows the last content review. A full review is planned every three months. If you spot an error or a change, write to ",[40,1610,1612],{"href":1611},"mailto:info@planelec.be","info@planelec.be","; we correct the line and update the date.",[79,1615,1617],{"id":1616},"frequently-asked-questions","Frequently asked questions",[1041,1619,1621],{"id":1620},"which-single-line-diagram-software-is-the-best-in-belgium","Which single-line diagram software is the best in Belgium?",[12,1623,1624],{},"It depends on your work. For a single home, a free tool is enough; PlanElec Sketch draws the diagram and plan for free and opens Trikker files. For firms that want floor plan, distribution board, self-check and documents in one project, we build PlanElec Pro. If you mainly need job-site tracking with tasks and photos, look at Amperio; if you draw for long stretches offline at a fixed computer, Trikker. The tables compare all 22 programs against the same criteria.",[1041,1626,1628],{"id":1627},"is-there-free-software-for-the-single-line-diagram-and-situation-plan","Is there free software for the single-line diagram and situation plan?",[12,1630,1631],{},"Yes. According to their vendors, PlanElec Sketch, Gen-Schema (a demonstration project), GratisElektrischeSchemas.be and RGIE Maker are free to use. Sparki is free, but its AI assistant is paid per use; UniPlan is free during its launch phase, and its terms say paid plans may follow. PlanElec Sketch, Gen-Schema and Sparki explicitly draw without a circuit limit. Voltuno (8 circuits), Eendraadschema.app (15 circuits) and Condui (watermarked PDF for local projects) are free with limits. Watch for watermarks and whether the PDF is free.",[1041,1633,1635],{"id":1634},"does-trikker-run-on-mac","Does Trikker run on Mac?",[12,1637,1638],{},"Yes, out of beta since Trikker 2.0 of 13 November 2026, on macOS 13 or later and only on Macs with Apple silicon (M1 or newer). According to its FAQ, Trikker does not support Intel Macs. The web version for browser and tablet has been announced but not yet released. All browser programs in this list also run on a Mac without installation.",[1041,1640,1642],{"id":1641},"which-programs-check-the-arei-while-you-enter-data","Which programs check the AREI while you enter data?",[12,1644,1645],{},"According to their vendors, Amperio, Condui, Gridmind, Hoskens ElektroCAD, Sparki, Sparkling, UniPlan, Volter and PlanElec Pro, each with its own scope. As Built Plan currently checks required fields. Others call themselves \"compliant\" and mean the symbols.",[1041,1647,1649],{"id":1648},"can-i-take-my-trikker-files-to-another-program","Can I take my Trikker files to another program?",[12,1651,1652,1653,1655,1656,56],{},"According to their vendors, 1draad, Condui, SUPLAN, Sparki, Voltuno (with Lifetime), PlanElec Sketch and PlanElec Pro read ",[25,1654,27],{}," files. Always check the result against the original; not every symbol has a counterpart everywhere. How to switch step by step is shown in ",[40,1657,1387],{"href":1386},[1041,1659,1661],{"id":1660},"how-much-does-single-line-diagram-software-cost-per-year","How much does single-line diagram software cost per year?",[12,1663,1664],{},"For one person, the cheapest professional plans over twelve months range from about EUR 188 to EUR 588 excluding VAT; PlanElec Pro costs EUR 290 with three seats. For one home you pay once between about EUR 12 and EUR 50, or nothing.",[1041,1666,1668],{"id":1667},"which-programs-work-offline","Which programs work offline?",[12,1670,1671],{},"With different scope: Trikker and Listrik as installed programs; SUPLAN, Volter, ElectriCAD, Condui, UniPlan, Sparki, 1draad and Voltuno (Lifetime) according to their websites. Amperio works offline only for viewing, tasks and photos. PlanElec Pro keeps editing opened projects offline as a pilot.",[1041,1673,1675],{"id":1674},"does-software-guarantee-that-my-installation-passes-the-inspection","Does software guarantee that my installation passes the inspection?",[12,1677,1678],{},"No. The approved inspection body assesses the installation on site and the documents. Software helps make the diagram complete and consistent; which program drew it does not decide the outcome.",[79,1680,1681],{"id":69},"Sources",[12,1683,1684],{},"All pages accessed on 16 November 2026. Pages marked (S) we reviewed as an automated snapshot from the same day; the others we consulted directly.",[84,1686,1687,1701,1720,1728,1736,1752,1767,1779,1786,1793,1800,1813,1825,1833,1844,1851,1863,1871,1879,1890,1915,1927,1942,1953,1967],{},[87,1688,1689,1690,1695,1696],{},"1draad: ",[40,1691,1694],{"href":1692,"rel":1693},"https:\u002F\u002F1draad.be\u002F",[1458],"home page and prices"," (S), ",[40,1697,1700],{"href":1698,"rel":1699},"https:\u002F\u002Fwww.1filaire.be\u002F",[1458],"French version",[87,1702,1703,1704,1695,1709,1695,1714,1719],{},"Amperio: ",[40,1705,1708],{"href":1706,"rel":1707},"https:\u002F\u002Famperio.be\u002F",[1458],"home page",[40,1710,1713],{"href":1711,"rel":1712},"https:\u002F\u002Famperio.be\u002Fnl\u002Fprijzen",[1458],"prices",[40,1715,1718],{"href":1716,"rel":1717},"https:\u002F\u002Famperio.be\u002Fllms.txt",[1458],"llms.txt"," (S)",[87,1721,1722,1723],{},"As Built Plan: ",[40,1724,1727],{"href":1725,"rel":1726},"https:\u002F\u002Fasbuiltplan.be\u002Fnl\u002F",[1458],"home page, prices and FAQ",[87,1729,1730,1731],{},"Atlas Contrôle: ",[40,1732,1735],{"href":1733,"rel":1734},"https:\u002F\u002Fatlascontrole.be\u002Fschema-unifilaire\u002F",[1458],"schéma unifilaire",[87,1737,1738,1739,1695,1743,1695,1747,1719],{},"Condui: ",[40,1740,1713],{"href":1741,"rel":1742},"https:\u002F\u002Fcondui.be\u002Fnl\u002Fpricing\u002F",[1458],[40,1744,1708],{"href":1745,"rel":1746},"https:\u002F\u002Fcondui.be\u002Fnl\u002F",[1458],[40,1748,1751],{"href":1749,"rel":1750},"https:\u002F\u002Fcondui.be\u002Fnl\u002Ffeature-comparison\u002F",[1458],"feature comparison",[87,1753,1754,1755,1695,1759,1695,1763],{},"Eendraadschema.app: ",[40,1756,1694],{"href":1757,"rel":1758},"https:\u002F\u002Fwww.eendraadschema.app\u002F",[1458],[40,1760,1718],{"href":1761,"rel":1762},"https:\u002F\u002Fwww.eendraadschema.app\u002Fllms.txt",[1458],[40,1764,1700],{"href":1765,"rel":1766},"https:\u002F\u002Fwww.schemaunifilaire.app\u002F",[1458],[87,1768,1769,1770,1774,1775],{},"ElectriCAD: ",[40,1771,1708],{"href":1772,"rel":1773},"https:\u002F\u002Fwww.electricad.app\u002Ffr",[1458],", ",[40,1776,1713],{"href":1777,"rel":1778},"https:\u002F\u002Fwww.electricad.app\u002Ffr\u002Ftarifs",[1458],[87,1780,1781,1782],{},"Gen-Schema: ",[40,1783,1708],{"href":1784,"rel":1785},"https:\u002F\u002Fgen-schema.kltk.be",[1458],[87,1787,1788,1789],{},"GratisElektrischeSchemas.be: ",[40,1790,1708],{"href":1791,"rel":1792},"https:\u002F\u002Fgratiselektrischeschemas.be\u002F",[1458],[87,1794,1795,1796,1719],{},"Gridmind: ",[40,1797,1694],{"href":1798,"rel":1799},"https:\u002F\u002Fgridmind.be\u002F",[1458],[87,1801,1802,1803,1695,1808,1719],{},"Hoskens ElektroCAD: ",[40,1804,1807],{"href":1805,"rel":1806},"https:\u002F\u002Fhoskens.be\u002Felektrocad\u002F",[1458],"product page and prices",[40,1809,1812],{"href":1810,"rel":1811},"https:\u002F\u002Fhoskens.be\u002Felektrocad\u002Fhandleiding\u002F",[1458],"manual for homes",[87,1814,1815,1816,1774,1820],{},"Listrik: ",[40,1817,1708],{"href":1818,"rel":1819},"https:\u002F\u002Flistrik.be\u002F",[1458],[40,1821,1824],{"href":1822,"rel":1823},"https:\u002F\u002Fwww.listrik.be\u002F2024%20Handleiding%20LISTRIK%20NL.htm",[1458],"manual",[87,1826,1827,1828],{},"Masoël: ",[40,1829,1832],{"href":1830,"rel":1831},"https:\u002F\u002Fwww.masoel.be\u002Feendraadschema-situatieschema-tekenen\u002F",[1458],"Schema Studio",[87,1834,1835,1836,1695,1840,1719],{},"PlanElektra: ",[40,1837,1713],{"href":1838,"rel":1839},"https:\u002F\u002Fplanelektra.be\u002Fprijzen",[1458],[40,1841,1718],{"href":1842,"rel":1843},"https:\u002F\u002Fplanelektra.be\u002Fllms.txt",[1458],[87,1845,1846,1847],{},"RGIE Maker: ",[40,1848,1708],{"href":1849,"rel":1850},"https:\u002F\u002Frgiemaker.be\u002F",[1458],[87,1852,1853,1854,1695,1858],{},"Schematicals: ",[40,1855,1694],{"href":1856,"rel":1857},"https:\u002F\u002Fwww.automaticals.com\u002F",[1458],[40,1859,1862],{"href":1860,"rel":1861},"https:\u002F\u002Fwww.automaticals.com\u002FFAQ-Schematicals.html",[1458],"FAQ",[87,1864,1865,1866],{},"Sparki: ",[40,1867,1870],{"href":1868,"rel":1869},"https:\u002F\u002Fbytebolt.be\u002Fsparki\u002F",[1458],"product page",[87,1872,1873,1874,1719],{},"Sparkling: ",[40,1875,1878],{"href":1876,"rel":1877},"https:\u002F\u002Fgetsparkling.be\u002F",[1458],"home page and FAQ",[87,1880,1881,1882,1695,1886],{},"SUPLAN: ",[40,1883,1708],{"href":1884,"rel":1885},"https:\u002F\u002Fwww.suplan.be\u002F",[1458],[40,1887,1713],{"href":1888,"rel":1889},"https:\u002F\u002Fwww.suplan.be\u002Fprijzen\u002F",[1458],[87,1891,1892,1893,1774,1897,1695,1901,1774,1906,1695,1911,1719],{},"Trikker: ",[40,1894,1713],{"href":1895,"rel":1896},"https:\u002F\u002Fwww.trikker.be\u002Fpricing",[1458],[40,1898,1862],{"href":1899,"rel":1900},"https:\u002F\u002Fwww.trikker.be\u002Ffaq",[1458],[40,1902,1905],{"href":1903,"rel":1904},"https:\u002F\u002Fwww.trikker.be\u002Fblog\u002Fnieuws-2\u002Ftrikker-2-0-is-er-een-nieuwe-basis-voor-windows-en-macos-43",[1458],"Trikker 2.0 announcement",[40,1907,1910],{"href":1908,"rel":1909},"https:\u002F\u002Fwww.trikker.be\u002Fhandleiding",[1458],"online manual 2.0.4",[40,1912,1718],{"href":1913,"rel":1914},"https:\u002F\u002Fwww.trikker.be\u002Fllms.txt",[1458],[87,1916,1917,1918,1695,1922,1719],{},"UniPlan: ",[40,1919,1708],{"href":1920,"rel":1921},"https:\u002F\u002Funiplan.be\u002F",[1458],[40,1923,1926],{"href":1924,"rel":1925},"https:\u002F\u002Funiplan.be\u002Fconditions",[1458],"terms of use",[87,1928,1929,1930,1774,1934,1774,1938],{},"Volter: ",[40,1931,1708],{"href":1932,"rel":1933},"https:\u002F\u002Fvolter.be\u002F",[1458],[40,1935,1713],{"href":1936,"rel":1937},"https:\u002F\u002Fvolter.be\u002Fpricing",[1458],[40,1939,1862],{"href":1940,"rel":1941},"https:\u002F\u002Fvolter.be\u002Ffaq",[1458],[87,1943,1944,1945,1695,1949,1719],{},"Voltuno: ",[40,1946,1713],{"href":1947,"rel":1948},"https:\u002F\u002Fvoltuno.be\u002Fprijzen",[1458],[40,1950,1718],{"href":1951,"rel":1952},"https:\u002F\u002Fvoltuno.be\u002Fllms.txt",[1458],[87,1954,1955,1956,1774,1959,1774,1962,1774,1965],{},"PlanElec: ",[40,1957,1958],{"href":54},"pricing page",[40,1960,22],{"href":1961},"\u002Fen\u002Fproducts\u002Fsketch",[40,1963,31],{"href":1964},"\u002Fen\u002Fproducts\u002Fpro",[40,1966,1086],{"href":1085},[87,1968,1969],{},[40,1970,1973],{"href":1971,"rel":1972},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fpublications\u002Freglement-general-sur-les",[1458],"FPS Economy, AREI\u002FRGIE Book 1",[79,1975,1977],{"id":1976},"comparisons-in-detail","Comparisons in detail",[84,1979,1980,1985,1991,1996,2000],{},[87,1981,1982],{},[40,1983,1984],{"href":1386},"Trikker alternative: planning your switch to PlanElec",[87,1986,1987],{},[40,1988,1990],{"href":1989},"\u002Fen\u002Fblog\u002Ftrikker-sketch-pro-comparison","Trikker, PlanElec Sketch or PlanElec Pro: which tool for which job?",[87,1992,1993],{},[40,1994,1995],{"href":1144},"Amperio or PlanElec: comparison for Belgium",[87,1997,1998],{},[40,1999,1538],{"href":1537},[87,2001,2002],{},[40,2003,2005],{"href":2004},"\u002Fen\u002Fblog\u002Fgetting-started-guide","Getting started with PlanElec: from floor plan to first export",[79,2007,2009],{"id":2008},"which-next-step-fits-your-task","Which next step fits your task?",[12,2011,2012],{},"Compare on your next real installation: the same home, the same eight circuits, one change after the first PDF. That shows whether diagram, plan and checks stay in step.",[84,2014,2015,2025],{},[87,2016,2017,38,2020,2024],{},[15,2018,2019],{},"Draw the diagram and plan:",[40,2021,2023],{"href":1456,"rel":2022},[1458],"Draw the single-line diagram and situation plan in Sketch for free",", without an account, also from a Trikker file.",[87,2026,2027,38,2030,2033,2034,56],{},[15,2028,2029],{},"Plan and document the installation:",[40,2031,2032],{"href":1964},"Explore PlanElec Pro"," · ",[40,2035,2036],{"href":54},"Try Pro for 1 month and compare plans",[12,2038,2039,2042],{},[15,2040,2041],{},"Try Pro for 1 month:"," for one person, EUR 0, without payment details or an automatic switch to a subscription; the trial includes exports without masked areas. A confirmed account is required. With a valid VAT number you start immediately; without one you request approval.",{"title":2044,"searchDepth":2045,"depth":2045,"links":2046},"",2,[2047,2048,2049,2050,2062,2087,2088,2094,2095,2096,2097,2107,2108,2109],{"id":81,"depth":2045,"text":82},{"id":128,"depth":2045,"text":129},{"id":508,"depth":2045,"text":509},{"id":1038,"depth":2045,"text":1039,"children":2051},[2052,2054,2055,2056,2057,2058,2059,2060,2061],{"id":1043,"depth":2053,"text":1044},3,{"id":1050,"depth":2053,"text":1051},{"id":1057,"depth":2053,"text":1058},{"id":1064,"depth":2053,"text":1065},{"id":1071,"depth":2053,"text":1072},{"id":1078,"depth":2053,"text":1079},{"id":1089,"depth":2053,"text":1090},{"id":1096,"depth":2053,"text":1097},{"id":1103,"depth":2053,"text":1104},{"id":1110,"depth":2045,"text":1111,"children":2063},[2064,2065,2066,2067,2068,2069,2070,2071,2072,2073,2074,2075,2076,2077,2078,2079,2080,2081,2082,2083,2084,2085,2086],{"id":1117,"depth":2053,"text":170},{"id":1131,"depth":2053,"text":187},{"id":1148,"depth":2053,"text":203},{"id":1161,"depth":2053,"text":1162},{"id":1175,"depth":2053,"text":220},{"id":1188,"depth":2053,"text":236},{"id":1201,"depth":2053,"text":252},{"id":1214,"depth":2053,"text":692},{"id":1227,"depth":2053,"text":711},{"id":1240,"depth":2053,"text":268},{"id":1253,"depth":2053,"text":284},{"id":1266,"depth":2053,"text":765},{"id":1279,"depth":2053,"text":398},{"id":1292,"depth":2053,"text":472},{"id":1305,"depth":2053,"text":820},{"id":1318,"depth":2053,"text":298},{"id":1331,"depth":2053,"text":859},{"id":1347,"depth":2053,"text":880},{"id":1360,"depth":2053,"text":314},{"id":1373,"depth":2053,"text":329},{"id":1390,"depth":2053,"text":939},{"id":1403,"depth":2053,"text":344},{"id":1416,"depth":2053,"text":482},{"id":1429,"depth":2045,"text":1430},{"id":1498,"depth":2045,"text":1499,"children":2089},[2090,2091,2092,2093],{"id":1502,"depth":2053,"text":1503},{"id":1509,"depth":2053,"text":1510},{"id":1516,"depth":2053,"text":1517},{"id":1523,"depth":2053,"text":1524},{"id":1530,"depth":2045,"text":1531},{"id":1541,"depth":2045,"text":1542},{"id":1577,"depth":2045,"text":1578},{"id":1616,"depth":2045,"text":1617,"children":2098},[2099,2100,2101,2102,2103,2104,2105,2106],{"id":1620,"depth":2053,"text":1621},{"id":1627,"depth":2053,"text":1628},{"id":1634,"depth":2053,"text":1635},{"id":1641,"depth":2053,"text":1642},{"id":1648,"depth":2053,"text":1649},{"id":1660,"depth":2053,"text":1661},{"id":1667,"depth":2053,"text":1668},{"id":1674,"depth":2053,"text":1675},{"id":69,"depth":2045,"text":1681},{"id":1976,"depth":2045,"text":1977},{"id":2008,"depth":2045,"text":2009},"comparison","2026-11-16","Single-line diagram and situation plan under the Belgian AREI\u002FRGIE: 22 programs plus PlanElec compared on 12-month cost, VAT basis, checks, offline use and sources.","md",[2115,2116,2117,2118],"software-comparison","single-line-diagram","planelec-sketch","planelec-pro","en",{},true,"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-best-single-line-diagram-software-editorial.jpg","\u002Fblog\u002Fbest-single-line-diagram-software-2026.en","22 min",{"title":6,"description":2112},"Single-line diagram software Belgium: 22 programs compared","best-single-line-diagram-software-2026","blog\u002Fbest-single-line-diagram-software-2026.en",[2130,2131,2132,2133,2134,1387,2135],"single-line diagram software","electrical drawing software Belgium","situation plan","AREI","RGIE","software comparison","j2X6oKW_C3LO2bIM2jbeKjhTweyhkDfo8KvGJnkkQG8","blog","\u002Fblog\u002Fbest-single-line-diagram-software-2026",{"id":2140,"title":2141,"body":2142,"category":3575,"description":3576,"extension":2113,"guideId":3577,"image":2152,"locale":2119,"meta":3578,"navigation":2121,"order":3579,"path":3580,"publishedAt":3581,"readTime":3582,"seo":3583,"seoTitle":3584,"slug":3585,"stem":3586,"tags":3587,"updatedAt":3581,"__hash__":3593,"kind":3594,"href":3595,"date":3581,"labels":3596},"help\u002Fhelp\u002Fcomb-busbar-types.en.md","Which comb busbar fits my board? Types, notation and selection",{"type":9,"value":2143,"toc":3556},[2144,2147,2153,2158,2162,2165,2168,2218,2221,2226,2230,2291,2294,2299,2303,2419,2422,2425,2430,2434,2437,2660,2664,2667,2754,2758,2761,2814,2821,2825,2828,2861,2866,2870,2873,2973,2976,2981,2985,3101,3106,3110,3121,3128,3134,3138,3172,3264,3271,3275,3282,3343,3346,3353,3357,3411,3414,3421,3426,3430,3468,3479,3483,3485,3488],[12,2145,2146],{},"The right comb busbar depends on three questions: which network conductors does your supply provide (star network 3N~400\u002F230 V, delta network 3×230 V without N, or single-phase)? Which pole layouts do the devices in the row have? And which tooth sequence, pitch and connection type does the busbar have? This article shows the 13 forms the cabinet editor knows, assigns them to situations and explains how to make the choice in the editor. Type numbers come from manufacturer documents (Hager, Schneider Electric, FTG via Vander Elst, Siemens, Eaton; ABB and Gewiss only as dealer listings), as of 13\u002F11\u002F2026. They are not a recommendation and do not replace the datasheet of your devices.",[12,2148,2149],{},[74,2150],{"alt":2151,"src":2152},"3D illustration of two insulated comb busbars: fork contacts in the foreground and pin contacts in the background.","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-16\u002Fcomb-busbar-types.webp",[12,2154,2155],{},[40,2156],{"id":2157},"what",[79,2159,2161],{"id":2160},"what-does-a-comb-busbar-distribute-and-what-does-it-not","What does a comb busbar distribute, and what does it not?",[12,2163,2164],{},"A comb busbar (also phase rail) connects several devices mounted side by side to a common supply. Each tooth sits on a pole of a device and carries the network conductor of that pole. It replaces wiring from device to device, but neither the supply nor the protective devices.",[12,2166,2167],{},"Three levels can all be called “L1”:",[138,2169,2170,2183],{},[141,2171,2172],{},[144,2173,2174,2177,2180],{},[147,2175,2176],{},"Level",[147,2178,2179],{},"Question",[147,2181,2182],{},"Example",[163,2184,2185,2196,2207],{},[144,2186,2187,2190,2193],{},[168,2188,2189],{},"Network conductor of the supply",[168,2191,2192],{},"Which conductors does the service connection provide?",[168,2194,2195],{},"Star network: L1, L2, L3, N. Delta network: L1, L2, L3, no N",[144,2197,2198,2201,2204],{},[168,2199,2200],{},"Network conductor at the pole",[168,2202,2203],{},"Which conductor lies on which device pole?",[168,2205,2206],{},"Follows from the tooth sequence of the busbar",[144,2208,2209,2212,2215],{},[168,2210,2211],{},"Marking on the terminal",[168,2213,2214],{},"What kind of pole is the terminal?",[168,2216,2217],{},"“L1” on a 1P MCB: lies on L1, L2 or L3, depending on the tooth",[12,2219,2220],{},"The marking on the terminal never tells you which network conductor is present. In the delta network, the “N” terminal of a 1P+N device even carries a second line conductor.",[12,2222,2223],{},[40,2224],{"id":2225},"terms",[79,2227,2229],{"id":2228},"what-is-the-comb-busbar-called-in-catalogues-and-at-the-wholesaler","What is the comb busbar called in catalogues and at the wholesaler?",[138,2231,2232,2245],{},[141,2233,2234],{},[144,2235,2236,2239,2242],{},[147,2237,2238],{},"Language",[147,2240,2241],{},"Terms in catalogues and datasheets",[147,2243,2244],{},"Source",[163,2246,2247,2258,2269,2280],{},[144,2248,2249,2252,2255],{},[168,2250,2251],{},"English",[168,2253,2254],{},"comb busbar, phase rail, insulated busbar",[168,2256,2257],{},"Hager catalogue international",[144,2259,2260,2263,2266],{},[168,2261,2262],{},"Dutch",[168,2264,2265],{},"kamrail (Hager), kamgeleider and faserail (Vander Elst)",[168,2267,2268],{},"Hager datasheet (nl); Vander Elst datasheets",[144,2270,2271,2274,2277],{},[168,2272,2273],{},"French (Belgium)",[168,2275,2276],{},"barre de pontage (Hager Belgium), peigne de raccordement (Schneider, Vander Elst), peigne d’alimentation (Legrand)",[168,2278,2279],{},"Hager datasheet fr-BE; Schneider and Legrand catalogues",[144,2281,2282,2285,2288],{},[168,2283,2284],{},"German",[168,2286,2287],{},"Phasenschiene (Hager), Kammschiene (trade, PlanElec)",[168,2289,2290],{},"Hager catalogue DE",[12,2292,2293],{},"For databases and exports, ETIM class EC000215 applies; Vander Elst lists it as “Faserail” or “Peigne de raccordement”.",[12,2295,2296],{},[40,2297],{"id":2298},"notation",[79,2300,2302],{"id":2301},"how-do-you-read-the-notation-of-a-comb-busbar","How do you read the notation of a comb busbar?",[138,2304,2305,2318],{},[141,2306,2307],{},[144,2308,2309,2312,2315],{},[147,2310,2311],{},"Detail",[147,2313,2314],{},"Meaning",[147,2316,2317],{},"Example from datasheets",[163,2319,2320,2331,2342,2353,2364,2375,2386,2397,2408],{},[144,2321,2322,2325,2328],{},[168,2323,2324],{},"Pole layout",[168,2326,2327],{},"Which conductors the busbar carries: 1P, 2P, 3P, 3P+N (“3 phases plus N”) or 4P",[168,2329,2330],{},"Hager KDN363A: 3P. Hager KDN463A: 4P",[144,2332,2333,2336,2339],{},[168,2334,2335],{},"Pole sequence (tooth sequence)",[168,2337,2338],{},"Order of the conductors from division unit to division unit",[168,2340,2341],{},"L1·L2·L3 (Hager KDN363A). L1·L2·L3·N (Hager KDN463A). L1·N·L2·N·L3·N (Hager KDN451D)",[144,2343,2344,2347,2350],{},[168,2345,2346],{},"Position of N",[168,2348,2349],{},"For busbars with N: N to the right or left of the line conductor. This depends on the manufacturer",[168,2351,2352],{},"Hager, FTG and Siemens: N right. Schneider: N left (R9XFH412: N·L1·L2·L3)",[144,2354,2355,2358,2361],{},[168,2356,2357],{},"Group busbar (“IN\u002FOUT”)",[168,2359,2360],{},"The busbar changes its pole layout: a head under the RCD, then the outgoing ways",[168,2362,2363],{},"Hager KDN450D: head L1·L2·L3·N, then L1·N·L2·N·L3·N",[144,2365,2366,2369,2372],{},[168,2367,2368],{},"Omitted position",[168,2370,2371],{},"A place without a tooth, for example under the N pole of a four-pole RCD. This is not an N tooth: the busbar carries nothing there",[168,2373,2374],{},"Hager KDN363F: head L1·L2·L3·—, then L1·L2·L3 (four-pole RCD plus eight 1P MCBs on 12 TE)",[144,2376,2377,2380,2383],{},[168,2378,2379],{},"Pitch (division)",[168,2381,2382],{},"Distance between contacts. One division unit (TE) is one module. At half pitch (½ TE), two poles sit in one TE",[168,2384,2385],{},"FTG Eurovario: pitch 17.8 mm. Schneider: pitch 18 mm. ABB Unibis and Gewiss: half pitch, only as dealer listing",[144,2387,2388,2391,2394],{},[168,2389,2390],{},"Connection type",[168,2392,2393],{},"Fork or pin",[168,2395,2396],{},"Hager KDN363A: fork. Hager KB363A: pin. Siemens 5ST3720: pin, without end caps",[144,2398,2399,2402,2405],{},[168,2400,2401],{},"Cross-section and rated current",[168,2403,2404],{},"Cross-section of the busbar and the current it carries",[168,2406,2407],{},"10 mm² and 63 A (Hager KDN363A). 16 mm² and 80 A (Hager KDN451D). FTG Eurovario: up to 100 A",[144,2409,2410,2413,2416],{},[168,2411,2412],{},"Length in TE",[168,2414,2415],{},"How many division units the busbar covers",[168,2417,2418],{},"Hager: 12 TE (KDN363A), 18 TE (KDN363G), 54 TE (KDN451E), 57 TE (KDN363B), 58 TE (KDN450E)",[12,2420,2421],{},"End caps belong to this: Vander Elst points out that comb conductors are supplied without the end covers that ensure IP20 safety. FTG Eurovario is fully moulded and needs none; Siemens 5ST3720 has no end caps either.",[12,2423,2424],{},"Be careful with “4-pole”: the word means something different depending on the manufacturer. Hager calls L1·L2·L3·N four-pole, Vander Elst a busbar with L1+N-L2+N-L3+N. What matters is the written pole sequence, not the pole count.",[12,2426,2427],{},[40,2428],{"id":2429},"selection",[79,2431,2433],{"id":2432},"which-form-fits-which-situation","Which form fits which situation?",[12,2435,2436],{},"The editor knows 13 forms and 39 documented references. The table names the forms as their tiles are called in the editor.",[138,2438,2439,2458],{},[141,2440,2441],{},[144,2442,2443,2446,2449,2452,2455],{},[147,2444,2445],{},"Form in the editor",[147,2447,2448],{},"Tooth sequence",[147,2450,2451],{},"Pitch",[147,2453,2454],{},"Network",[147,2456,2457],{},"References in the catalogue",[163,2459,2460,2477,2493,2509,2525,2540,2555,2570,2585,2600,2615,2632,2646],{},[144,2461,2462,2465,2468,2471,2474],{},[168,2463,2464],{},"1P",[168,2466,2467],{},"L",[168,2469,2470],{},"1 TE",[168,2472,2473],{},"all",[168,2475,2476],{},"none",[144,2478,2479,2482,2485,2487,2490],{},[168,2480,2481],{},"2P, N right",[168,2483,2484],{},"L1·N (delta network: L1·L2)",[168,2486,2470],{},[168,2488,2489],{},"1×230 V, star, delta",[168,2491,2492],{},"Schneider R9XFH218; FTG ES20610, ES21210; Eaton 215642",[144,2494,2495,2498,2501,2503,2506],{},[168,2496,2497],{},"3P",[168,2499,2500],{},"L1·L2·L3",[168,2502,2470],{},[168,2504,2505],{},"star, delta",[168,2507,2508],{},"Hager KDN363A, KDN363B, KDN363G, KB363A; Schneider R9XFH312, R9XFH318; FTG ES31210, ES31216",[144,2510,2511,2514,2517,2519,2522],{},[168,2512,2513],{},"4P, N right",[168,2515,2516],{},"L1·L2·L3·N",[168,2518,2470],{},[168,2520,2521],{},"star",[168,2523,2524],{},"Hager KDN463A, KDN463B, KDN480B; FTG ES41210, ES41216, E50.418.101",[144,2526,2527,2530,2533,2535,2537],{},[168,2528,2529],{},"4P, N left",[168,2531,2532],{},"N·L1·L2·L3",[168,2534,2470],{},[168,2536,2521],{},[168,2538,2539],{},"Schneider R9XFH412, R9XFH457",[144,2541,2542,2545,2548,2550,2552],{},[168,2543,2544],{},"3 × P+N, N right",[168,2546,2547],{},"L1·N·L2·N·L3·N",[168,2549,2470],{},[168,2551,2521],{},[168,2553,2554],{},"Hager KDN451D, KDN451E, KDS563A; FTG ES41210N, ES41216N; Siemens 5ST3720",[144,2556,2557,2560,2563,2565,2567],{},[168,2558,2559],{},"3 × P+N, N left",[168,2561,2562],{},"N·L1·N·L2·N·L3",[168,2564,2470],{},[168,2566,2521],{},[168,2568,2569],{},"Schneider R9XFH518",[144,2571,2572,2575,2578,2580,2582],{},[168,2573,2574],{},"4P → P+N, N right",[168,2576,2577],{},"Head L1·L2·L3·N, then L1·N·L2·N·L3·N",[168,2579,2470],{},[168,2581,2521],{},[168,2583,2584],{},"Hager KDN450D, KDN450E; FTG ES41210FILS, ES41216FILS",[144,2586,2587,2590,2593,2595,2597],{},[168,2588,2589],{},"4P → P+N, N left",[168,2591,2592],{},"Head N·L1·L2·L3, then N·L1·N·L2·N·L3",[168,2594,2470],{},[168,2596,2521],{},[168,2598,2599],{},"Schneider R9XFH518G",[144,2601,2602,2605,2608,2610,2612],{},[168,2603,2604],{},"4P → 1P",[168,2606,2607],{},"Head L1·L2·L3·—, then L1·L2·L3",[168,2609,2470],{},[168,2611,2521],{},[168,2613,2614],{},"Hager KDN363F; FTG ESFI8LSSO, ESFI8LS16SO",[144,2616,2617,2620,2623,2626,2629],{},[168,2618,2619],{},"2P, N right, ½ TE",[168,2621,2622],{},"L1·N",[168,2624,2625],{},"½ TE",[168,2627,2628],{},"1×230 V, star",[168,2630,2631],{},"ABB ABBBVSU21810, ABBBVSU25510 (dealer listing)",[144,2633,2634,2637,2639,2641,2643],{},[168,2635,2636],{},"3P, ½ TE",[168,2638,2500],{},[168,2640,2625],{},[168,2642,2505],{},[168,2644,2645],{},"ABB ABBBBSU311210 (dealer listing)",[144,2647,2648,2651,2653,2655,2657],{},[168,2649,2650],{},"3 × P+N, ½ TE",[168,2652,2547],{},[168,2654,2625],{},[168,2656,2521],{},[168,2658,2659],{},"Gewiss GW99002 (dealer listing)",[1041,2661,2663],{"id":2662},"star-network-3n400230-v","Star network 3N~400\u002F230 V",[12,2665,2666],{},"The star network provides L1, L2, L3 and N. A single-phase circuit is connected between a line conductor and N.",[138,2668,2669,2681],{},[141,2670,2671],{},[144,2672,2673,2676,2678],{},[147,2674,2675],{},"Situation",[147,2677,2445],{},[147,2679,2680],{},"Note",[163,2682,2683,2693,2703,2713,2723,2733,2744],{},[144,2684,2685,2688,2690],{},[168,2686,2687],{},"Four-pole RCD feeds 1P MCBs",[168,2689,2604],{},[168,2691,2692],{},"The N pole of the RCD sits on the omitted position",[144,2694,2695,2698,2700],{},[168,2696,2697],{},"Four-pole RCD feeds 1P+N or 2P MCBs (2 TE each)",[168,2699,2574],{},[168,2701,2702],{},"After that, 3 × P+N, N right also fits",[144,2704,2705,2708,2710],{},[168,2706,2707],{},"1P+N or 2P devices with no RCD upstream, 2 TE each",[168,2709,2544],{},[168,2711,2712],{},"The devices spread over L1, L2, L3 in turn",[144,2714,2715,2718,2720],{},[168,2716,2717],{},"Three-pole devices without N",[168,2719,2497],{},[168,2721,2722],{},"Also 1P MCBs in turn on L1, L2, L3",[144,2724,2725,2728,2730],{},[168,2726,2727],{},"Devices with an N pole (3P+N, 4P)",[168,2729,2513],{},[168,2731,2732],{},"The editor rejects a 3P busbar: “N pole on line”",[144,2734,2735,2738,2741],{},[168,2736,2737],{},"Two-pole RCD feeds 2P outgoing ways",[168,2739,2740],{},"2P",[168,2742,2743],{},"All outgoing ways hang on one line conductor",[144,2745,2746,2749,2751],{},[168,2747,2748],{},"Compact 1P+N devices, 1 TE wide",[168,2750,2650],{},[168,2752,2753],{},"Documented only as a dealer listing (Gewiss)",[1041,2755,2757],{"id":2756},"delta-network-3230-v-without-n","Delta network 3×230 V without N",[12,2759,2760],{},"The delta network has L1, L2 and L3 but no N. A single-phase circuit is connected between two line conductors. Common practice is a four-pole RCD with a free N pole; PlanElec creates new RCDs on a three-phase supply as four-pole and leaves the N pole free in the delta network. This is not a manufacturer requirement. The two-pole RCD remains selectable.",[138,2762,2763,2773],{},[141,2764,2765],{},[144,2766,2767,2769,2771],{},[147,2768,2675],{},[147,2770,2445],{},[147,2772,2680],{},[163,2774,2775,2785,2795,2805],{},[144,2776,2777,2780,2782],{},[168,2778,2779],{},"RCD feeds 2P MCBs (2 TE each)",[168,2781,2497],{},[168,2783,2784],{},"A 2P device takes two consecutive teeth: L1·L2, L3·L1, L2·L3. Forms with N: “Other network”",[144,2786,2787,2790,2792],{},[168,2788,2789],{},"Three-pole devices",[168,2791,2497],{},[168,2793,2794],{},"Vander Elst explicitly specifies the three-pole comb conductors for the 3×230 V supply",[144,2796,2797,2800,2802],{},[168,2798,2799],{},"Compact 2P devices, 1 TE wide",[168,2801,2636],{},[168,2803,2804],{},"Documented only as a dealer listing (ABB Unibis)",[144,2806,2807,2809,2811],{},[168,2808,2737],{},[168,2810,2740],{},[168,2812,2813],{},"One pair of conductors",[12,2815,2816,2817,56],{},"On single-phase and two-phase circuits in domestic installations, the regulations say (AREI Art. 4.4.4.2): overcurrent detection is provided on both active conductors, unless at this level there is a residual-current protective device that also contains overcurrent detection on one of the line conductors and ensures the disconnection of both active conductors; this device has the required breaking capacity. You can read the text in the ",[40,2818,2820],{"href":2819},"\u002Fen\u002Fregelwerk","regulations",[1041,2822,2824],{"id":2823},"single-phase-supply","Single-phase supply",[12,2826,2827],{},"In single-phase, the supply provides L1 and N (or L1 and L2). The editor rejects forms that distribute over several line conductors.",[138,2829,2830,2840],{},[141,2831,2832],{},[144,2833,2834,2836,2838],{},[147,2835,2675],{},[147,2837,2445],{},[147,2839,2680],{},[163,2841,2842,2852],{},[144,2843,2844,2847,2849],{},[168,2845,2846],{},"All outgoing ways two-pole (2P or 1P+N, 2 TE)",[168,2848,2740],{},[168,2850,2851],{},"Vander Elst explicitly specifies two-pole types for 1×230 V",[144,2853,2854,2856,2859],{},[168,2855,2748],{},[168,2857,2858],{},"2P, ½ TE",[168,2860,2804],{},[12,2862,2863],{},[40,2864],{"id":2865},"not-fit",[79,2867,2869],{"id":2868},"when-does-a-form-not-fit","When does a form not fit?",[12,2871,2872],{},"In the editor, tiles that do not fit appear dimmed; the reason is behind the info icon.",[138,2874,2875,2884],{},[141,2876,2877],{},[144,2878,2879,2882],{},[147,2880,2881],{},"Message in the editor",[147,2883,2314],{},[163,2885,2886,2894,2901,2909,2917,2925,2933,2941,2949,2957,2965],{},[144,2887,2888,2891],{},[168,2889,2890],{},"Other network",[168,2892,2893],{},"The form is documented for a different network type, for example an N tooth in the delta network",[144,2895,2896,2898],{},[168,2897,2824],{},[168,2899,2900],{},"The form distributes over several line conductors",[144,2902,2903,2906],{},[168,2904,2905],{},"Pitch mismatch",[168,2907,2908],{},"The pole spacing of the devices differs from the pitch of the form",[144,2910,2911,2914],{},[168,2912,2913],{},"Tooth missing",[168,2915,2916],{},"A line pole would sit on a position without a tooth",[144,2918,2919,2922],{},[168,2920,2921],{},"Line on N tooth",[168,2923,2924],{},"A line pole would sit on an N tooth",[144,2926,2927,2930],{},[168,2928,2929],{},"N pole on line",[168,2931,2932],{},"An N pole would sit on a line tooth",[144,2934,2935,2938],{},[168,2936,2937],{},"N side mismatch",[168,2939,2940],{},"Form with N left, devices with N right",[144,2942,2943,2946],{},[168,2944,2945],{},"Line twice",[168,2947,2948],{},"A multi-pole device would get the same line conductor twice",[144,2950,2951,2954],{},[168,2952,2953],{},"Head does not fit RCD",[168,2955,2956],{},"The head of the group busbar does not match the poles of the RCD",[144,2958,2959,2962],{},[168,2960,2961],{},"RCD supplies too few",[168,2963,2964],{},"The outgoing ways need more line conductors than the RCD supplies",[144,2966,2967,2970],{},[168,2968,2969],{},"No devices",[168,2971,2972],{},"No outgoing ways are selected",[12,2974,2975],{},"Two consequences: a two-pole RCD cannot distribute three line conductors, and a 3P busbar without omission cannot feed a four-pole device, because its N pole would sit on a phase tooth.",[12,2977,2978],{},[40,2979],{"id":2980},"mistakes",[79,2982,2984],{"id":2983},"which-selection-mistakes-are-most-common","Which selection mistakes are most common?",[138,2986,2987,3000],{},[141,2988,2989],{},[144,2990,2991,2994,2997],{},[147,2992,2993],{},"Mistake",[147,2995,2996],{},"Consequence",[147,2998,2999],{},"How to avoid it",[163,3001,3002,3013,3024,3035,3046,3057,3068,3079,3090],{},[144,3003,3004,3007,3010],{},[168,3005,3006],{},"“4-pole” ordered by pole count",[168,3008,3009],{},"L1·L2·L3·N and L1+N-L2+N-L3+N are different busbars",[168,3011,3012],{},"Compare the written pole sequence in the datasheet with the row",[144,3014,3015,3018,3021],{},[168,3016,3017],{},"N left instead of N right",[168,3019,3020],{},"Schneider busbars have N left, Hager, FTG and Siemens right",[168,3022,3023],{},"Choose devices and busbar of one brand; the editor reports “N side mismatch”",[144,3025,3026,3029,3032],{},[168,3027,3028],{},"Busbar distributes other conductors than assumed",[168,3030,3031],{},"Phase load and voltage do not match the plan",[168,3033,3034],{},"Check the network conductor at the pole, not the marking on the terminal",[144,3036,3037,3040,3043],{},[168,3038,3039],{},"Fork and pin mixed up",[168,3041,3042],{},"The busbar does not match the device’s connection type",[168,3044,3045],{},"Derive the connection type from the device terminal and choose according to the datasheet",[144,3047,3048,3051,3054],{},[168,3049,3050],{},"Pitch and manufacturers mixed",[168,3052,3053],{},"Pitch 17.8 mm at FTG, 18 mm at Schneider: the fit is not documented",[168,3055,3056],{},"Use busbar and devices of the same manufacturer; Schneider names the compatible ranges per busbar",[144,3058,3059,3062,3065],{},[168,3060,3061],{},"Devices with an auxiliary contact on a standard busbar",[168,3063,3064],{},"Vander Elst and Legrand exclude them; Hager offers dedicated busbars",[168,3066,3067],{},"Choose a busbar released for auxiliary contacts",[144,3069,3070,3073,3076],{},[168,3071,3072],{},"Three-pole busbar for devices with an N pole",[168,3074,3075],{},"Vander Elst: “Suitable for devices with N conductor: No”",[168,3077,3078],{},"Choose a form with N",[144,3080,3081,3084,3087],{},[168,3082,3083],{},"Rated current of the busbar overlooked",[168,3085,3086],{},"10 mm² and 63 A versus 16 mm² and 80 A: the busbar has its own current limit",[168,3088,3089],{},"Compare the busbar’s current with the current at the infeed point",[144,3091,3092,3095,3098],{},[168,3093,3094],{},"Open teeth and ends not covered",[168,3096,3097],{},"Free teeth stay unprotected, ends without a cap are open",[168,3099,3100],{},"Fit covers (“Kamrailafscherming voor vrije aansluitpolen” at Hager) and end caps if the busbar has none",[12,3102,3103],{},[40,3104],{"id":3105},"planelec",[79,3107,3109],{"id":3108},"how-do-you-choose-the-comb-busbar-in-the-cabinet-editor","How do you choose the comb busbar in the cabinet editor?",[12,3111,3112,3113,3116,3117,3120],{},"The wiring tools are in pilot status. You see and change the comb busbar in the studio under ",[15,3114,3115],{},"Distribution board"," in the ",[15,3118,3119],{},"Wiring"," workspace. Every busbar is drawn with coloured lanes per network conductor and teeth in the colour of their conductor; the terminal marker on the device shows the network conductor of the pole, and the terminal marking appears in the tooltip (“Terminal … · Supply conductor …”).",[1489,3122],{":height":3123,":width":3124,"alt":3125,"caption":3126,"src":3127},"640","1130","Cabinet editor in a star network: four-pole RCD with four 1P MCBs, below it the comb busbar with the lanes L1, L2, L3 and a gap without a tooth under the N pole of the RCD.","Star network: comb busbar of the form “4P → 1P”, teeth in the colour of their conductor.","\u002Fhelp\u002Fcomb-busbar-types\u002Fen-busbar-star.png",[1489,3129],{":height":3123,":width":3130,"alt":3131,"caption":3132,"src":3133},"1212","The same row in a 3×230 V delta network: four-pole RCD with three 2P MCBs on the conductor pairs L1-L2, L2-L3 and L1-L3, below it the comb busbar without an N lane.","Delta network: form “3P” with conductor pairs and no N.","\u002Fhelp\u002Fcomb-busbar-types\u002Fen-busbar-delta.png",[1041,3135,3137],{"id":3136},"read-the-card-at-the-busbar","Read the card at the busbar",[3139,3140,3141,3148,3169],"ol",{},[87,3142,3143,3144,3147],{},"Click the busbar. The ",[15,3145,3146],{},"Comb busbar"," card opens.",[87,3149,3150,3151,3154,3155,3157,3158,3161,3162,3165,3166,56],{},"The card shows a miniature and chips: the ",[15,3152,3153],{},"Conductors"," (L1, L2, L3, N), the form (for example “4P → 1P”), manufacturer and type number, ",[15,3156,2451],{}," and ",[15,3159,3160],{},"Length"," in modules. A symbol tells you whether the busbar is derived (",[15,3163,3164],{},"Automatic",") or ",[15,3167,3168],{},"Saved",[87,3170,3171],{},"The info icon (“Why this type”) shows the reasons. At the bottom, the card links to this article (“Comb busbar types”).",[138,3173,3174,3183],{},[141,3175,3176],{},[144,3177,3178,3181],{},[147,3179,3180],{},"Reason in the card",[147,3182,2314],{},[163,3184,3185,3193,3201,3209,3217,3225,3233,3241,3249,3256],{},[144,3186,3187,3190],{},[168,3188,3189],{},"N via busbar",[168,3191,3192],{},"The busbar carries N itself",[144,3194,3195,3198],{},[168,3196,3197],{},"N via neutral block",[168,3199,3200],{},"N comes in via a neutral block",[144,3202,3203,3206],{},[168,3204,3205],{},"N pole without tooth",[168,3207,3208],{},"The N pole of the RCD sits on an omitted position",[144,3210,3211,3214],{},[168,3212,3213],{},"Delta: pairs, no N",[168,3215,3216],{},"In the delta network there are conductor pairs and no N",[144,3218,3219,3222],{},[168,3220,3221],{},"Fourth pole free",[168,3223,3224],{},"The fourth pole of the RCD stays unoccupied",[144,3226,3227,3230],{},[168,3228,3229],{},"Two poles per module",[168,3231,3232],{},"Half pitch",[144,3234,3235,3238],{},[168,3236,3237],{},"2P RCD: one conductor",[168,3239,3240],{},"The RCD passes on only one conductor",[144,3242,3243,3246],{},[168,3244,3245],{},"Fixed to L1 (L2, L3)",[168,3247,3248],{},"The outgoing ways are fixed to one conductor",[144,3250,3251,3253],{},[168,3252,2824],{},[168,3254,3255],{},"There is only one line conductor",[144,3257,3258,3261],{},[168,3259,3260],{},"Saved pattern",[168,3262,3263],{},"The busbar comes from the saved project",[1489,3265],{":height":3266,":width":3267,"alt":3268,"caption":3269,"src":3270},"450","914","Card at the comb busbar with miniature, conductor chips L1, L2, L3, form 3P, pitch 1 module, length 10 modules, the origin and reasons icons and the link Comb busbar types.","The card at the busbar summarises form, conductors, pitch and length.","\u002Fhelp\u002Fcomb-busbar-types\u002Fen-busbar-card.png",[1041,3272,3274],{"id":3273},"resolve-a-conflict-with-a-two-pole-rcd","Resolve a conflict with a two-pole RCD",[12,3276,3277,3278,3281],{},"If an outgoing way needs more line conductors than the RCD supplies, the busbar shows a warning sign (“RCD does not supply every conductor”). The card shows what the RCD supplies, what the circuits need and what is ",[15,3279,3280],{},"Missing",". There are two ways:",[138,3283,3284,3294],{},[141,3285,3286],{},[144,3287,3288,3291],{},[147,3289,3290],{},"Way",[147,3292,3293],{},"Effect",[163,3295,3296,3306],{},[144,3297,3298,3303],{},[168,3299,3300],{},[15,3301,3302],{},"RCD to 4P",[168,3304,3305],{},"The RCD becomes four-pole; the card gives the extra space in modules (for example “+2 mod.”)",[144,3307,3308,3318],{},[168,3309,3310,3313,3314,3317],{},[15,3311,3312],{},"On one conductor"," (delta network: ",[15,3315,3316],{},"On one pair",")",[168,3319,3320,3321,3324,3325,3328,3329,3332,3333,3157,3336,3339,3340],{},"You choose the ",[15,3322,3323],{},"Conductor"," or ",[15,3326,3327],{},"Conductor pair",", the ",[15,3330,3331],{},"Phase load"," bars show ",[15,3334,3335],{},"Before",[15,3337,3338],{},"After"," in kW, then ",[15,3341,3342],{},"Apply",[12,3344,3345],{},"A way can be blocked: “No room in the row”, “Article is 2-pole only” (“Already 4-pole” for an RCD that already has four poles), “Conductor does not fit” or “Not applied”. If three-pole outgoing ways remain, the card says “n × 3P remains”.",[1489,3347],{":height":3348,":width":3349,"alt":3350,"caption":3351,"src":3352},"1086","1028","Conflict with a two-pole RCD: the RCD supplies L1, the circuits need L1, L2 and L3; two ways, RCD to 4P and On one conductor, with conductor L2 chosen, phase-load bars and the Apply button.","Conflict with a two-pole RCD and its two ways.","\u002Fhelp\u002Fcomb-busbar-types\u002Fen-busbar-conflict.png",[1041,3354,3356],{"id":3355},"choose-the-form-in-the-busbar-editor","Choose the form in the busbar editor",[3139,3358,3359,3368,3379,3390,3396],{},[87,3360,3361,3362,3364,3365,3367],{},"In ",[15,3363,3119],{},", choose the ",[15,3366,3146],{}," tool and the devices of one row. Only MCBs and RCBOs can belong to a busbar group.",[87,3369,3370,3371,3374,3375,3378],{},"In the ",[15,3372,3373],{},"Physical busbar group"," panel, the ",[15,3376,3377],{},"Form"," section shows the forms as tiles with a miniature. Fitting ones come first, the best carries a star (“Best fit”), non-fitting ones are dimmed; the reason is behind the info icon.",[87,3380,3381,3382,3385,3386,3389],{},"Below, ",[15,3383,3384],{},"Manufacturer"," shows ",[15,3387,3388],{},"Generic"," and the references of the chosen form with chips for fork or pin, modules, cross-section and current. The origin (“Datasheet”, “Manufacturer page”, “Dealer listing”) is in the tooltip. The reference is optional.",[87,3391,3392,3393,3395],{},"A new busbar starts with the best form; if there is a reference from the board’s brand, it is preselected, otherwise ",[15,3394,3388],{}," applies. The choice sets pole sequence, pole count and pitch.",[87,3397,3398,3399,1774,3402,3324,3405,3408,3409,56],{},"The status ",[15,3400,3401],{},"Verified",[15,3403,3404],{},"Unverified",[15,3406,3407],{},"Incompatible"," shows whether manufacturer data supports the form. Check the preview and click ",[15,3410,3342],{},[12,3412,3413],{},"In the bill of materials, the busbar appears with manufacturer and type number (“Comb busbar Hager KDN451D”) or, without a reference, as “Comb busbar 3 × P+N, 12 modules, 1 module pitch (generic)”.",[1489,3415],{":height":3416,":width":3417,"alt":3418,"caption":3419,"src":3420},"1090","554","Form section in the busbar editor: tiles of the 13 forms, the best one (4P → 1P) with a star, non-fitting ones dimmed; below it Manufacturer with Generic and Hager KDN363F, FTG ESFI8LSSO and ESFI8LS16SO.","Choosing the form and the manufacturer reference in the busbar editor.","\u002Fhelp\u002Fcomb-busbar-types\u002Fen-busbar-editor.png",[12,3422,3423],{},[40,3424],{"id":3425},"limits",[79,3427,3429],{"id":3428},"what-are-the-limits-of-the-editor","What are the limits of the editor?",[84,3431,3432,3435,3441,3447,3453,3459,3462,3465],{},[87,3433,3434],{},"The tables show documented forms and references, not a complete type list. Only what the research of 13\u002F11\u002F2026 confirmed is included. Other manufacturers and ranges have their own tooth sequences.",[87,3436,3437,3440],{},[15,3438,3439],{},"Legrand"," and the ABB ranges BV-G and BV-S are missing: no tooth sequence is documented for them. For the ABB half pitch (Unibis) and Gewiss there are only dealer listings.",[87,3442,3443,3446],{},[15,3444,3445],{},"Busbars with two pitches"," in one piece (Schneider Resi9 XP, Hager narrow design) cannot be represented by the editor.",[87,3448,3449,3452],{},[15,3450,3451],{},"Vertical connectors"," between DIN rails are not part of the editor.",[87,3454,3455,3458],{},[15,3456,3457],{},"N left",": the forms with N left are documented (Schneider) but today fit no modelled device, because devices in the model carry N on the right.",[87,3460,3461],{},"A reference supports the form, not suitability for arbitrary devices. How the busbar physically ends at the free N pole of a four-pole RCD in the delta network is not documented in any datasheet; ask the manufacturer.",[87,3463,3464],{},"Module counts differ by market (Hager KDN451E: 54 TE per the Belgian datasheet, 57 TE in the older ordering guide). Your wholesaler’s datasheet is authoritative.",[87,3466,3467],{},"PlanElec plans the cabinet wiring in pilot status. The acceptance of the installation is carried out by the approved inspection body.",[12,3469,3470,3471,3157,3475,56],{},"Continue with ",[40,3472,3474],{"href":3473},"\u002Fen\u002Fhelp\u002Fplan-installation-and-distribution-boards#cabinet","Plan the installation and form sub-boards",[40,3476,3478],{"href":3477},"\u002Fen\u002Fhelp\u002Frecognise-a-distribution-board-from-a-photo","Recognise a distribution board from photos",[12,3480,3481],{},[40,3482],{"id":69},[79,3484,1681],{"id":69},[12,3486,3487],{},"All details on types, pole sequences, pitch, cross-section and current come from manufacturer documents retrieved on 13\u002F11\u002F2026. The product catalogue carries the evidence URL for every reference.",[84,3489,3490,3499,3517,3541,3550],{},[87,3491,3492,3493,3498],{},"Hager, ",[40,3494,3497],{"href":3495,"rel":3496},"https:\u002F\u002Fassets.hager.com\u002Fstep-content\u002FP%2FHA_42164755%2FDocument%2Fstd.lang.all%2F23DE0244-bes-kleinverteiler-modulargeraete.pdf",[1458],"Bestellübersicht Modulargeräte, as of 11\u002F2023",": tooth sequences of KDN363A, KDN363F, KDN463A, KDN451D, KDN450D.",[87,3500,3501,3502,1774,3507,1774,3512,56],{},"Hager datasheets: ",[40,3503,3506],{"href":3504,"rel":3505},"https:\u002F\u002Fassets.hager.com\u002Fstep-content\u002FP\u002FPDS_157201451401FR\u002FDocument\u002Fstd.lang.all\u002FKDN363A_1401_fr-BE.pdf",[1458],"KDN363A (fr-BE)",[40,3508,3511],{"href":3509,"rel":3510},"https:\u002F\u002Fassets.hager.com\u002Fstep-content\u002FP\u002FPDS_157201454801NL\u002FDocument\u002Fstd.lang.all\u002FKDN363A_4801_nl-NL.pdf",[1458],"KDN363A (nl)",[40,3513,3516],{"href":3514,"rel":3515},"https:\u002F\u002Fassets.hager.com\u002Fstep-content\u002FP\u002FPDS_157278531401NL\u002FDocument\u002Fstd.lang.all\u002FKB363A_1401_nl-BE.pdf",[1458],"KB363A (nl-BE)",[87,3518,3519,3520,3525,3526,1774,3531,1774,3536,56],{},"FTG, ",[40,3521,3524],{"href":3522,"rel":3523},"https:\u002F\u002Fwww.ftg-germany.de\u002Fwp-content\u002Fuploads\u002F2025\u002F09\u002F20250729_Eurovario.pdf",[1458],"Eurovario catalogue 07\u002F2025","; Vander Elst (Ftg datasheets), for example ",[40,3527,3530],{"href":3528,"rel":3529},"https:\u002F\u002Fwww.vanderelst.be\u002Fcdn\u002Fdatasheets\u002FFtg\u002FE50.312.101_nl_BE.pdf",[1458],"three-pole for 3×230 V",[40,3532,3535],{"href":3533,"rel":3534},"https:\u002F\u002Fwww.vanderelst.be\u002Fcdn\u002Fdatasheets\u002FFtg\u002FE80.258.100_nl_BE.pdf",[1458],"two-pole L-N for 1×230 V",[40,3537,3540],{"href":3538,"rel":3539},"https:\u002F\u002Fwww.vanderelst.be\u002Fcdn\u002Fdatasheets\u002FFtg\u002FE60.412.101_nl_BE.pdf",[1458],"three-pole + N",[87,3542,3543,3544,3549],{},"Schneider Electric, Resi9 XB (R9XFH…): datasheets via the evidence URLs in the catalogue. Legrand, ",[40,3545,3548],{"href":3546,"rel":3547},"https:\u002F\u002Fwww.legrand.fr\u002Fpro\u002Fcatalogue\u002F31619-peignes-bipolaires-equilibres-sur-3-phases\u002Fpeigne-dalimentation-bipolaire-equilibre-sur-3-phases-hx3-traditionnel-pour-bornes-a-vis-longueur-12-modules",[1458],"Peigne bipolaire équilibré sur 3 phases",": term and exclusion of auxiliary contacts.",[87,3551,3552,3553,3555],{},"AREI Art. 4.4.4.2: ",[40,3554,2820],{"href":2819},", part 4.",{"title":2044,"searchDepth":2045,"depth":2045,"links":3557},[3558,3559,3560,3561,3566,3567,3568,3573,3574],{"id":2160,"depth":2045,"text":2161},{"id":2228,"depth":2045,"text":2229},{"id":2301,"depth":2045,"text":2302},{"id":2432,"depth":2045,"text":2433,"children":3562},[3563,3564,3565],{"id":2662,"depth":2053,"text":2663},{"id":2756,"depth":2053,"text":2757},{"id":2823,"depth":2053,"text":2824},{"id":2868,"depth":2045,"text":2869},{"id":2983,"depth":2045,"text":2984},{"id":3108,"depth":2045,"text":3109,"children":3569},[3570,3571,3572],{"id":3136,"depth":2053,"text":3137},{"id":3273,"depth":2053,"text":3274},{"id":3355,"depth":2053,"text":3356},{"id":3428,"depth":2045,"text":3429},{"id":69,"depth":2045,"text":1681},"planning","Comb busbar types at a glance: read pole sequence, pitch, fork or pin, cross-section and length, find the right form for a star network, the Belgian 3×230 V delta network and a single-phase supply, and choose it in the cabinet editor.","comb-busbar-types",{},21,"\u002Fhelp\u002Fcomb-busbar-types.en","2026-11-13","9 min",{"title":2141,"description":3576},"Comb busbar: types, notation and selection guide","comb-busbar-types-and-selection","help\u002Fcomb-busbar-types.en",[3588,3589,3590,3591,3592],"comb busbar","phase rail","distribution board","delta network","pole sequence","xl0_lhaHR3EuUb_waqiLZdmHL7ffzckHZpbGYqOBfgA","help","\u002Fhelp\u002Fcomb-busbar-types-and-selection",[],{"id":3598,"title":3599,"articleId":3600,"body":3601,"category":4239,"date":4240,"description":4241,"extension":2113,"image":3619,"labels":4242,"lastUpdated":4240,"locale":2119,"meta":4245,"navigation":2121,"ogImage":4246,"path":4247,"publishDate":4240,"readTime":3582,"refreshInterval":4248,"seo":4249,"seoTitle":4250,"slug":3600,"stem":4251,"tags":4252,"__hash__":4262,"kind":2137,"href":4263},"blog\u002Fblog\u002Fgarden-house-garage-sub-board.en.md","Power to the garden shed or garage: how do I plan and draw the buried cable and sub-board under the AREI\u002FRGIE?","garden-house-garage-sub-board",{"type":9,"value":3602,"toc":4226},[3603,3614,3620,3625,3629,3632,3697,3709,3713,3716,3785,3797,3804,3808,3815,3819,3822,3894,3901,3905,3976,3983,3987,3994,3998,4001,4040,4047,4051,4094,4101,4106,4110,4166,4177,4180,4183,4187,4220],[12,3604,3605,3608,3609,3613],{},[15,3606,3607],{},"A garden shed, a detached garage or a carport gets its power from its own outgoing circuit in the main distribution board, a buried cable and, as soon as several circuits are needed, a sub-board."," The AREI\u002FRGIE requires a minimum depth of 0.60 m for the buried cable or, where that is technically impossible, continuous mechanical protection (sub-section 5.2.9.2 a). The sub-board is labelled (sub-section 3.1.3.3 a), shown with its location on the situation plan (sub-section 3.1.2.3 a) and given its own section in the single-line diagram. You can draw it for free in ",[40,3610,22],{"href":3611,"rel":3612},"https:\u002F\u002Fsketch.planelec.be\u002Fen\u002Fdraw?start=keuring",[1458],"; installation, sizing and inspection remain the job of the electrician and the accredited inspection body.",[12,3615,3616],{},[74,3617],{"alt":3618,"src":3619},"An electrician plans a route to a garden house and garage with a closed sub-board in a Belgian garden.","\u002Fimages\u002Fblog\u002Feditorial-2026-11-07\u002Fplanelec-garden-house-garage-sub-board-editorial.webp",[12,3621,3622],{},[15,3623,3624],{},"Status 7 November 2026, AREI\u002FRGIE Book 1 version 07. The AREI (Dutch) and RGIE (French) are the Belgian general regulations on electrical installations. Written by the PlanElec team, which builds Sketch and Pro.",[79,3626,3628],{"id":3627},"do-i-need-a-sub-board-or-is-one-circuit-enough","Do I need a sub-board, or is one circuit enough?",[12,3630,3631],{},"That depends on what goes into the outbuilding. The AREI\u002FRGIE does not require a sub-board; it sets how circuits, wiring and boards are installed and documented.",[138,3633,3634,3647],{},[141,3635,3636],{},[144,3637,3638,3641,3644],{},[147,3639,3640],{},"Use in the outbuilding",[147,3642,3643],{},"Typical solution",[147,3645,3646],{},"What appears on the diagram",[163,3648,3649,3660,3671,3686],{},[144,3650,3651,3654,3657],{},[168,3652,3653],{},"One light and one socket in the garden shed",[168,3655,3656],{},"One final circuit from the main board",[168,3658,3659],{},"One circuit with letter, protective device and buried cable",[144,3661,3662,3665,3668],{},[168,3663,3664],{},"Lighting, several sockets, a workbench in the garage",[168,3666,3667],{},"Feeder cable to a sub-board with its own circuits",[168,3669,3670],{},"Outgoing circuit in the main board, feeder, sub-board with circuits",[144,3672,3673,3676,3683],{},[168,3674,3675],{},"EV charging point under the carport",[168,3677,3678,3679],{},"Dedicated circuit; details in ",[40,3680,3682],{"href":3681},"\u002Fen\u002Fblog\u002Fev-charger-arei","EV charger under the AREI",[168,3684,3685],{},"Dedicated circuit with charging point",[144,3687,3688,3691,3694],{},[168,3689,3690],{},"Pond or well pump",[168,3692,3693],{},"Appliance in a fixed location, often on its own circuit",[168,3695,3696],{},"Circuit with fixed appliance",[12,3698,3699,3700,3704,3705,56],{},"For sockets, the same limit applies as in the house: at most eight single or multiple socket outlets per final circuit (sub-section 5.3.5.2 b, see ",[40,3701,3703],{"href":3702},"\u002Fen\u002Fblog\u002Fsockets-per-circuit","How many sockets per circuit?","). Which appliances need a dedicated circuit is listed in ",[40,3706,3708],{"href":3707},"\u002Fen\u002Fblog\u002Fdedicated-circuits-appliances","Dedicated circuits for appliances",[79,3710,3712],{"id":3711},"how-deep-must-the-cable-to-the-garden-shed-be-buried","How deep must the cable to the garden shed be buried?",[12,3714,3715],{},"Sub-section 5.2.9.2 a covers underground wiring:",[138,3717,3718,3728],{},[141,3719,3720],{},[144,3721,3722,3725],{},[147,3723,3724],{},"Requirement",[147,3726,3727],{},"Content",[163,3729,3730,3738,3746,3754,3769,3777],{},[144,3731,3732,3735],{},[168,3733,3734],{},"Suitable cables only",[168,3736,3737],{},"In the ground and in inaccessible underground ducts, only cables complying with the applicable standards (except independent protective conductors)",[144,3739,3740,3743],{},[168,3741,3742],{},"Minimum depth",[168,3744,3745],{},"0.60 m below the surface (ground level, top of paving or road surface), unless technically impossible",[144,3747,3748,3751],{},[168,3749,3750],{},"If 0.60 m is not possible",[168,3752,3753],{},"Protection by a continuous duct or an equivalent system of durable, resistant material",[144,3755,3756,3759],{},[168,3757,3758],{},"Cable protection (one of three conditions)",[168,3760,3761,3762,3765,3766,3768],{},"earthed screen and armour or reinforced outer sheath; ",[15,3763,3764],{},"or"," resistant outer sheath plus a continuous cover above the cable against tools; ",[15,3767,3764],{}," laying in a duct",[144,3770,3771,3774],{},[168,3772,3773],{},"Wall penetration",[168,3775,3776],{},"Carefully seal the hole after laying (sub-section 5.2.9.2 b)",[144,3778,3779,3782],{},[168,3780,3781],{},"Telecommunication cables",[168,3783,3784],{},"At least 0.50 m distance from existing telecommunication cables (sub-section 5.2.9.2 c.1)",[12,3786,3787,3788,3792,3793,56],{},"Which cable meets these conditions and which cross-section is needed is decided by the electrician. Long runs through the garden make voltage drop relevant; how to estimate it is shown in ",[40,3789,3791],{"href":3790},"\u002Fen\u002Fblog\u002Fvoltage-drop-cable-sizing","Calculating voltage drop",", and matching cross-section to protection in ",[40,3794,3796],{"href":3795},"\u002Fen\u002Fblog\u002Fcable-cross-section-breaker","Cable cross-section and circuit breaker",[1489,3798],{":height":3799,":width":3800,"alt":3801,"caption":3802,"src":3803},"400","720","Diagram of the supply to a garden shed: the main distribution board has an outgoing circuit with its protective device. From there a buried cable, at least 0.60 m deep or mechanically protected along its length, runs to the sub-board in the shed. The sub-board is labelled and feeds the circuits lighting, indoor sockets and an outdoor socket with a degree of protection matching the presence of water. Wall penetrations are sealed.","From the main board to the garden shed: outgoing circuit, buried cable and sub-board with its own circuits. Protective device and cross-section are set by the electrician.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fgarden-house-garage-sub-board\u002Foutbuilding-supply.en.svg",[79,3805,3807],{"id":3806},"may-the-cable-run-along-the-façade-or-the-fence","May the cable run along the façade or the fence?",[12,3809,3810,3811,56],{},"In the open air and surface-mounted, only cables may be installed; independent protective and bonding conductors and independent earthed live conductors such as PEN are exempt (sub-section 5.2.9.5). Fixings must keep the wiring undamaged and withstand the external influences. Outside buildings, installation follows good practice, taking the external influences into account (sub-section 5.2.9.14). A cable on the façade appears on the single-line diagram with its installation method; the available codes are explained in ",[40,3812,3814],{"href":3813},"\u002Fen\u002Fblog\u002Finstallation-methods-arei","Installation methods under the AREI",[79,3816,3818],{"id":3817},"what-degree-of-protection-do-outdoor-sockets-and-lights-need","What degree of protection do outdoor sockets and lights need?",[12,3820,3821],{},"The degree of protection depends on the presence of water where the equipment is used, which the AREI\u002FRGIE describes with codes AD1 to AD8 (sub-section 5.3.2.2, table 5.4). Classifying the location is the electrician's job.",[138,3823,3824,3837],{},[141,3825,3826],{},[144,3827,3828,3831,3834],{},[147,3829,3830],{},"Code",[147,3832,3833],{},"Presence of water",[147,3835,3836],{},"Minimum degree of protection",[163,3838,3839,3850,3861,3872,3883],{},[144,3840,3841,3844,3847],{},[168,3842,3843],{},"AD1",[168,3845,3846],{},"negligible",[168,3848,3849],{},"IPX0",[144,3851,3852,3855,3858],{},[168,3853,3854],{},"AD2",[168,3856,3857],{},"dripping water",[168,3859,3860],{},"IPX1",[144,3862,3863,3866,3869],{},[168,3864,3865],{},"AD3",[168,3867,3868],{},"spraying water",[168,3870,3871],{},"IPX3",[144,3873,3874,3877,3880],{},[168,3875,3876],{},"AD4",[168,3878,3879],{},"splashing water",[168,3881,3882],{},"IPX4",[144,3884,3885,3888,3891],{},[168,3886,3887],{},"AD5",[168,3889,3890],{},"water jets",[168,3892,3893],{},"IPX5",[12,3895,3896,3897,56],{},"Outdoor lighting fittings exposed to AD2 to AD4 may not be class 0 or 0I (sub-section 5.3.4.2 h). Which RCD protects the sockets in the shed is explained in ",[40,3898,3900],{"href":3899},"\u002Fen\u002Fblog\u002F30ma-rcd-per-socket","A 30 mA RCD for every socket?",[79,3902,3904],{"id":3903},"how-does-the-sub-board-appear-on-the-single-line-diagram-and-the-situation-plan","How does the sub-board appear on the single-line diagram and the situation plan?",[138,3906,3907,3920],{},[141,3908,3909],{},[144,3910,3911,3914,3917],{},[147,3912,3913],{},"Where",[147,3915,3916],{},"What belongs there",[147,3918,3919],{},"Reference",[163,3921,3922,3933,3944,3954,3965],{},[144,3923,3924,3927,3930],{},[168,3925,3926],{},"Single-line diagram",[168,3928,3929],{},"Outgoing circuit in the main board with protective device, feeder cable with type, cross-section, number of conductors and installation method, sub-board with its circuits, protective devices and loads",[168,3931,3932],{},"sub-section 3.1.2.2 a",[144,3934,3935,3938,3941],{},[168,3936,3937],{},"Circuit referencing",[168,3939,3940],{},"One capital letter per circuit, points numbered from the protective device",[168,3942,3943],{},"sub-section 3.1.2.1 a",[144,3945,3946,3948,3951],{},[168,3947,534],{},[168,3949,3950],{},"Location of the sub-board, sockets, light points, switches and fixed appliances in the outbuilding",[168,3952,3953],{},"sub-section 3.1.2.3 a",[144,3955,3956,3959,3962],{},[168,3957,3958],{},"On the board itself",[168,3960,3961],{},"Individual, indelible labelling and the supply voltage",[168,3963,3964],{},"sub-section 3.1.3.3 a",[144,3966,3967,3970,3973],{},[168,3968,3969],{},"At the protective devices",[168,3971,3972],{},"Every circuit identifiably labelled",[168,3974,3975],{},"sub-section 3.1.3.1",[12,3977,3978,3979,56],{},"The sub-board in the garden shed belongs to the same installation as the house as long as it hangs on the same meter. It therefore gets no diagram of its own, but a section in the diagram of the house. How main and sub-boards are structured is explained in ",[40,3980,3982],{"href":3981},"\u002Fen\u002Fblog\u002Fmulti-storey-electrical-planning","Electrical planning across several floors",[79,3984,3986],{"id":3985},"does-the-cable-route-through-the-garden-belong-on-the-plan","Does the cable route through the garden belong on the plan?",[12,3988,3989,3990,3993],{},"For homes, the AREI\u002FRGIE requires the situation plan to show the location of boards, boxes, sockets, light points, switches and fixed appliances (sub-section 3.1.2.3 a), not the route of a buried cable. Only for non-domestic installations must owners of underground wiring be able to provide its plans or the data needed to locate it (sub-section 3.1.2.1 b). Drawing the route anyway, with the depth and position of the duct, is a good habit: whoever later puts up a fence, plants a tree or builds a terrace knows where not to dig. In Sketch, the ",[15,3991,3992],{},"Text"," tool on the situation plan, placed where the cable leaves the house, is enough.",[79,3995,3997],{"id":3996},"is-this-a-substantial-extension","Is this a substantial extension?",[12,3999,4000],{},"An alteration or extension is substantial if it has an additional effect on the safety of persons or property that no conformity inspection has covered yet (section 2.11.2). A new outgoing circuit with a buried cable and its own board brings new protective devices and wiring; agree the classification with your electrician.",[138,4002,4003,4016],{},[141,4004,4005],{},[144,4006,4007,4010,4013],{},[147,4008,4009],{},"Classification",[147,4011,4012],{},"Plans",[147,4014,4015],{},"Inspection",[163,4017,4018,4029],{},[144,4019,4020,4023,4026],{},[168,4021,4022],{},"Substantial",[168,4024,4025],{},"Draw or update the single-line diagram and situation plan (sub-section 3.1.2.1 a)",[168,4027,4028],{},"Conformity inspection of the added and altered parts before use (sub-section 6.4.7.3)",[144,4030,4031,4034,4037],{},[168,4032,4033],{},"Not substantial",[168,4035,4036],{},"Short, dated and signed description; the situation plan shows the change (sub-section 3.1.2.1 a)",[168,4038,4039],{},"no conformity inspection before use required",[12,4041,4042,4043,56],{},"The consequences of alterations to an existing installation are covered in ",[40,4044,4046],{"href":4045},"\u002Fen\u002Fblog\u002Frenovation-electrical-plans","Renovation and electrical plans",[79,4048,4050],{"id":4049},"how-do-i-draw-the-shed-and-sub-board-in-planelec-sketch","How do I draw the shed and sub-board in PlanElec Sketch?",[3139,4052,4053,4061,4070,4077,4086],{},[87,4054,4055,4056,4060],{},"Open ",[40,4057,4059],{"href":3611,"rel":4058},[1458],"Sketch with ‘Draw the documents for the inspection’"," or your existing drawing of the house. Without an account the drawing stays in the browser.",[87,4062,3370,4063,4065,4066,4069],{},[15,4064,3926],{},", add the outgoing circuit to the shed at the main board and place the ",[15,4067,4068],{},"Sub-board"," from the library onto the cable of that circuit. Connect the lighting and socket circuits to the sub-board; Sketch assigns letters and numbers.",[87,4071,4072,4073,4076],{},"Enter type, cross-section, installation and length on the feeder cable once the electrician has set them; Sketch writes them next to the cable on the diagram. Until then, a ",[15,4074,4075],{},"note"," helps.",[87,4078,3370,4079,4081,4082,4085],{},[15,4080,534],{},", create a separate floor for the outbuilding (",[15,4083,4084],{},"Add floor",", for example ‘Garden shed’) and drag the sub-board, lights and sockets to their place.",[87,4087,4088,4090,4091,56],{},[15,4089,1445],{}," shows what is still missing, such as devices without a place on the situation plan. Then ",[15,4092,4093],{},"Create PDF",[1489,4095],{":height":4096,":width":4097,"alt":4098,"caption":4099,"src":4100},"711","1071","‘Situation plan’ in PlanElec Sketch with the floor tabs Ground floor, First floor and Attic; switches, lights and sockets with circuit references stand in the room, on the left the palette ‘From the single-line diagram’ with ticks on the placed circuits.","Each floor becomes its own sheet in the PDF; an outbuilding gets its own floor. The palette shows which devices from the diagram already have a place.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-situation-floors.webp",[12,4102,4103,4104,56],{},"Sketch is free; without an account the PDF carries a logo watermark, and a free account removes it. All limits are on the ",[40,4105,1958],{"href":54},[79,4107,4109],{"id":4108},"sketch-or-pro-what-do-you-need","Sketch or Pro: what do you need?",[138,4111,4112,4122],{},[141,4113,4114],{},[144,4115,4116,4119],{},[147,4117,4118],{},"Your situation",[147,4120,4121],{},"Tool",[163,4123,4124,4135,4144,4157],{},[144,4125,4126,4129],{},[168,4127,4128],{},"Owner sketching the extension before talking to the electrician",[168,4130,4131,4134],{},[15,4132,4133],{},"Sketch",", free",[144,4136,4137,4140],{},[168,4138,4139],{},"Electrician delivering the single-line diagram and situation plan of the extension",[168,4141,4142],{},[15,4143,4133],{},[144,4145,4146,4149],{},[168,4147,4148],{},"Contractor laying out main and sub-board in the board editor and needing a self-check report",[168,4150,4151,4154,4155],{},[15,4152,4153],{},"Pro",", taken over from Sketch with ",[15,4156,1482],{},[144,4158,4159,4162],{},[168,4160,4161],{},"Cable routes and lengths from the floor plan for the bill of materials",[168,4163,4164],{},[15,4165,4153],{},[12,4167,4168,4169,4172,4173,56],{},"What Pro adds with board planning, cable routes and the self-check is shown on the ",[40,4170,4171],{"href":1964},"PlanElec Pro product page","; how cable routes are created there is explained in the help guide ",[40,4174,4176],{"href":4175},"\u002Fen\u002Fhelp\u002Fswitch-chains-circuits-and-cable-routes","Switch chains, circuits and cable routes",[79,4178,4179],{"id":3425},"Limits",[12,4181,4182],{},"This article sets out the AREI\u002FRGIE requirements for buried cables, open-air installation, degree of protection and documentation. It does not size any cable, choose any protective device or assign any location to an AD code; that is the electrician's job. Sketch checks no AREI\u002FRGIE rules. Whether the extension complies is established by the accredited inspection body.",[79,4184,4186],{"id":4185},"official-source-and-further-reading","Official source and further reading",[84,4188,4189,4196,4202,4208,4214],{},[87,4190,4191,4195],{},[40,4192,4194],{"href":1971,"rel":4193},[1458],"FPS Economy: General regulations on electrical installations (RGIE), Book 1, French version"," – section 2.11.2, sub-sections 3.1.2.1 a, 3.1.2.2 a, 3.1.2.3 a, 3.1.3.1, 3.1.3.3 a, 5.2.9.2, 5.2.9.5, 5.2.9.14, 5.3.2.2, 5.3.4.2 h and 6.4.7.3",[87,4197,4198],{},[40,4199,4201],{"href":4200},"\u002Fen\u002Fblog\u002Fdistribution-board-planning-guide","Distribution board planning guide",[87,4203,4204],{},[40,4205,4207],{"href":4206},"\u002Fen\u002Fblog\u002Fcable-routes-and-lengths","Cable routes and lengths",[87,4209,4210],{},[40,4211,4213],{"href":4212},"\u002Fen\u002Fblog\u002Fsingle-line-diagram","Creating a single-line diagram step by step",[87,4215,4216],{},[40,4217,4219],{"href":4218},"\u002Fen\u002Fblog\u002Fsingle-line-diagram-existing-installation","Single-line diagram of an existing installation",[12,4221,4222],{},[40,4223,4225],{"href":3611,"rel":4224},[1458],"Draw the shed and sub-board for free in PlanElec Sketch →",{"title":2044,"searchDepth":2045,"depth":2045,"links":4227},[4228,4229,4230,4231,4232,4233,4234,4235,4236,4237,4238],{"id":3627,"depth":2045,"text":3628},{"id":3711,"depth":2045,"text":3712},{"id":3806,"depth":2045,"text":3807},{"id":3817,"depth":2045,"text":3818},{"id":3903,"depth":2045,"text":3904},{"id":3985,"depth":2045,"text":3986},{"id":3996,"depth":2045,"text":3997},{"id":4049,"depth":2045,"text":4050},{"id":4108,"depth":2045,"text":4109},{"id":3425,"depth":2045,"text":4179},{"id":4185,"depth":2045,"text":4186},"guide","2026-11-07","Buried cable at least 0.60 m deep or mechanically protected, sub-board labelled and shown on the situation plan, degree of protection according to water: how to plan the supply of a garden shed, garage or carport under the Belgian AREI\u002FRGIE and draw it in PlanElec Sketch.",[4243,4244,2116,2117],"distribution-board","cables-routing",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-11-07\u002Fshare\u002Fplanelec-garden-house-garage-sub-board-editorial.jpg","\u002Fblog\u002Fgarden-house-garage-sub-board.en",12,{"title":3599,"description":4241},"Garden shed and garage: buried cable and sub-board","blog\u002Fgarden-house-garage-sub-board.en",[4253,4254,4255,4256,4257,4258,4259,2133,2134,4260,22,4261],"power to garden shed","buried cable garden shed","garage sub-board","buried cable depth Belgium","outdoor socket IP rating","outbuilding electrics","single-line diagram sub-board","eendraadschema","Belgium","LPv35F6SqdV_QNQdtrWym3H-gZGkBTOqqsJKja1eHMM","\u002Fblog\u002Fgarden-house-garage-sub-board",{"id":4265,"title":4266,"articleId":4267,"body":4268,"category":4239,"date":4240,"description":4823,"extension":2113,"image":4281,"labels":4824,"lastUpdated":4826,"locale":2119,"meta":4827,"navigation":2121,"ogImage":4828,"path":4829,"publishDate":4240,"readTime":4830,"refreshInterval":2053,"seo":4831,"seoTitle":4832,"slug":4833,"stem":4834,"tags":4835,"__hash__":4843,"kind":2137,"href":4844},"blog\u002Fblog\u002Fshare-plans-with-team-read-access.en.md","How does an electrical contractor share plans with fitters, workshop and design office without emailing PDFs back and forth?","pro-team-read-access",{"type":9,"value":4269,"toc":4809},[4270,4276,4282,4287,4291,4294,4297,4301,4359,4378,4383,4387,4409,4477,4480,4484,4558,4562,4616,4621,4625,4653,4657,4671,4674,4678,4684,4688,4691,4695,4701,4750,4764,4766,4772,4774,4804],[12,4271,4272,4275],{},[15,4273,4274],{},"In PlanElec Pro you create projects in your company's organisation and invite colleagues, fitters and partners by email with a role: administrators and editors change the project, viewers see the single-line diagram, situation plan, distribution board and documents in read mode."," Read-only access is free and unlimited; Pro includes three editing seats. Everyone works on the current state instead of last week's PDF, which is exactly what the AREI\u002FRGIE, the Belgian general regulations on electrical installations, asks for: up-to-date plans, available to everyone who inspects, maintains or alters the installation (sub-section 3.1.2.1 d).",[12,4277,4278],{},[74,4279],{"alt":4280,"src":4281},"Two electricians review a tablet at a workbench in a Belgian home; the screen faces away from the camera.","\u002Fimages\u002Fblog\u002Feditorial-2026-11-07\u002Fplanelec-pro-team-read-access-editorial.webp",[12,4283,4284],{},[15,4285,4286],{},"Status 7 November 2026. Written by the PlanElec team, which builds Sketch and Pro.",[79,4288,4290],{"id":4289},"why-is-emailing-pdfs-not-enough","Why is emailing PDFs not enough?",[12,4292,4293],{},"A PDF is a snapshot. As soon as a circuit moves in the office, the fitter on site has an outdated plan, and nobody can tell which printout is right. The AREI\u002FRGIE requires diagrams, plans and documents to carry an unambiguous number, version and version date (section 3.1.2), and to be kept up to date and available on site to everyone authorised to supervise, inspect, maintain, repair or alter the installation (sub-section 3.1.2.1 d). In non-domestic installations, the owner, manager or operator provides up-to-date diagrams and plans to the staff carrying out work (section 9.1.1 no. 4 b).",[12,4295,4296],{},"A shared project does not solve distribution with more email, but with one current state. The AREI\u002FRGIE does not say in what form the plans must be available on site; a printed set at the distribution board remains readable without a network.",[79,4298,4300],{"id":4299},"which-roles-are-there-in-planelec-pro","Which roles are there in PlanElec Pro?",[138,4302,4303,4316],{},[141,4304,4305],{},[144,4306,4307,4310,4313],{},[147,4308,4309],{},"Role",[147,4311,4312],{},"Can",[147,4314,4315],{},"Editing seat?",[163,4317,4318,4328,4338,4348],{},[144,4319,4320,4323,4326],{},[168,4321,4322],{},"Owner",[168,4324,4325],{},"Everything, including managing members; owns the project",[168,4327,515],{},[144,4329,4330,4333,4336],{},[168,4331,4332],{},"Administrator",[168,4334,4335],{},"Edit everything and manage members",[168,4337,515],{},[144,4339,4340,4343,4346],{},[168,4341,4342],{},"Editor",[168,4344,4345],{},"Edit the project, export PDFs; no member management",[168,4347,515],{},[144,4349,4350,4353,4356],{},[168,4351,4352],{},"Viewer",[168,4354,4355],{},"Studio in read mode: read situation plan, single-line diagram, board and documents; no changes, no exports; download archived release copies",[168,4357,4358],{},"no, read-only access is free",[12,4360,4361,4362,4365,4366,1774,4368,3157,4370,4373,4374,4377],{},"The ",[15,4363,4364],{},"organisation"," adds the roles ",[15,4367,4322],{},[15,4369,4332],{},[15,4371,4372],{},"Member",". Owners and administrators manage members, invitations and the ",[15,4375,4376],{},"company profile"," with name, contact details, VAT and enterprise number, logo and colours; these details appear on every PDF of that company's projects. Anyone removed from the organisation loses all access to its projects; the company projects are retained.",[1489,4379],{":height":3799,":width":3800,"alt":4380,"caption":4381,"src":4382},"Roles in a PlanElec Pro project: owner, administrator and editor change the project and each take an editing seat; three seats are included in the subscription, each additional seat costs € 12 a month. Viewers such as fitters, workshop, clients and partners read the single-line diagram, situation plan, board and documents in read mode, without a seat and free of charge. Everyone sees the same current state.","Whoever changes needs an editing seat; whoever only reads gets free read-only access. Everyone works in the same project.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fpro-team-read-access\u002Froles-and-seats.en.svg",[79,4384,4386],{"id":4385},"what-does-a-fitter-see-in-read-mode","What does a fitter see in read mode?",[12,4388,4389,4390,4392,4393,4396,4397,1774,4400,1774,4403,3157,4406,4408],{},"A ",[15,4391,4352],{}," in the project sees the studio without tools, palettes and editing panels. ",[15,4394,4395],{},"Read only"," shows at the top. The situation plan, single-line diagram, board and documents are there to read; when the fitter taps a device, PlanElec shows ",[15,4398,4399],{},"Circuit",[15,4401,4402],{},"Protective device",[15,4404,4405],{},"Cable",[15,4407,3115],{},". Touch targets on a tablet are at least 44 pixels. Read mode is the interface; whether someone may write is still checked by the server.",[138,4410,4411,4424],{},[141,4412,4413],{},[144,4414,4415,4418,4421],{},[147,4416,4417],{},"Who",[147,4419,4420],{},"Typical role",[147,4422,4423],{},"What for",[163,4425,4426,4436,4446,4456,4467],{},[144,4427,4428,4431,4433],{},[168,4429,4430],{},"Fitter on site",[168,4432,4352],{},[168,4434,4435],{},"Which box belongs to which circuit, where each cable runs",[144,4437,4438,4441,4443],{},[168,4439,4440],{},"Workshop, board building",[168,4442,4352],{},[168,4444,4445],{},"Reading the board layout",[144,4447,4448,4451,4453],{},[168,4449,4450],{},"Designer or project manager in the office",[168,4452,4342],{},[168,4454,4455],{},"Changing the design, exporting documents",[144,4457,4458,4461,4464],{},[168,4459,4460],{},"Partner business, for example a solar installer",[168,4462,4463],{},"Editor or viewer",[168,4465,4466],{},"Planning their part or only reading",[144,4468,4469,4472,4474],{},[168,4470,4471],{},"Client, developer, architect",[168,4473,4352],{},[168,4475,4476],{},"Looking at the current state without changing anything",[12,4478,4479],{},"Changes by editors appear for everyone who has the project open: live collaboration synchronises changes, shows who is present and catches up on confirmed changes.",[79,4481,4483],{"id":4482},"how-do-i-invite-someone-into-a-project","How do I invite someone into a project?",[3139,4485,4486,4502,4512,4522,4542],{},[87,4487,4488,4491,4492,4495,4496,4499,4500,56],{},[15,4489,4490],{},"Create the organisation."," In the project list, ",[15,4493,4494],{},"Manage organizations"," leads to the overview; choose ",[15,4497,4498],{},"Create organization"," and fill in the ",[15,4501,4376],{},[87,4503,4504,4507,4508,4511],{},[15,4505,4506],{},"Bring colleagues into the organisation."," On the organisation's page, ",[15,4509,4510],{},"Invite by email"," with address and role. External people are not searched or suggested; you enter the full address.",[87,4513,4514,4517,4518,4521],{},[15,4515,4516],{},"Move the project into the organisation."," A personal project is moved with ",[15,4519,4520],{},"Transfer project to organization",". The organisation then becomes the owner; existing project permissions and invitations are removed and must be granted again.",[87,4523,4524,4527,4528,4531,4532,4535,4536,4538,4539,4541],{},[15,4525,4526],{},"Assign the project role."," In the studio, ",[15,4529,4530],{},"Share & team…"," in the project menu opens team management; from the project list, ",[15,4533,4534],{},"Manage members"," in the project card menu leads there too. Under ",[15,4537,4510],{}," you enter address and role; ",[15,4540,4352],{}," is the default.",[87,4543,4544,4547,4548,4551,4552,3324,4555,56],{},[15,4545,4546],{},"Accept the invitation."," The invited person opens the link in the email, signs in or creates an account and chooses ",[15,4549,4550],{},"Accept invitation",". Acceptance requires a confirmed email address that matches the invited one. Open invitations can be ",[15,4553,4554],{},"sent again",[15,4556,4557],{},"revoked",[79,4559,4561],{"id":4560},"who-needs-an-editing-seat-and-what-does-it-cost","Who needs an editing seat, and what does it cost?",[138,4563,4564,4574],{},[141,4565,4566],{},[144,4567,4568,4571],{},[147,4569,4570],{},"Offer",[147,4572,4573],{},"Price",[163,4575,4576,4584,4592,4600,4608],{},[144,4577,4578,4581],{},[168,4579,4580],{},"Pro monthly",[168,4582,4583],{},"€ 29 with three editing seats",[144,4585,4586,4589],{},[168,4587,4588],{},"Pro yearly",[168,4590,4591],{},"€ 290 with three editing seats (ten monthly instalments)",[144,4593,4594,4597],{},[168,4595,4596],{},"Each additional editing seat",[168,4598,4599],{},"€ 12 a month or € 120 a year",[144,4601,4602,4605],{},[168,4603,4604],{},"Read-only access",[168,4606,4607],{},"free and unlimited",[144,4609,4610,4613],{},[168,4611,4612],{},"Try Pro",[168,4614,4615],{},"€0 for one month for one person, immediately with a VAT number, no payment details",[12,4617,4618,4619,56],{},"A business with one designer, one project manager and five fitters who only read therefore manages with the base price: three seats for those who change things, five free read-only accesses. The price stays the same as long as the subscription runs without interruption. Details and Site pass per property are on the ",[40,4620,1958],{"href":54},[79,4622,4624],{"id":4623},"how-do-i-keep-versions-and-handovers-traceable","How do I keep versions and handovers traceable?",[84,4626,4627,4637,4647],{},[87,4628,4629,4632,4633,56],{},[15,4630,4631],{},"Dossier and archive."," Pro exports the single-line diagram, situation plan, board PDF, self-check report and a configurable installation dossier. Versioned archiving with a QR code confirms the origin and integrity of an archived PDF; it is not an AREI\u002FRGIE acceptance. How it works is explained in the help guide ",[40,4634,4636],{"href":4635},"\u002Fen\u002Fhelp\u002Farchive-and-verify-documents","Archive and verify documents",[87,4638,4639,4642,4643,56],{},[15,4640,4641],{},"On the way to your documents."," The step list in the export shows editors what is still open before the dossier; it is a completeness aid, not a statement about the inspection. More in ",[40,4644,4646],{"href":4645},"\u002Fen\u002Fhelp\u002Fexport-documents","Export documents",[87,4648,4649,4652],{},[15,4650,4651],{},"Company profile."," Name, contact details, logo and colours from the organisation's company profile appear on every PDF of its projects. All of a company's PDFs therefore carry the same sender, whoever exports them.",[79,4654,4656],{"id":4655},"how-does-the-current-state-reach-the-distribution-board","How does the current state reach the distribution board?",[12,4658,4659,4660,3116,4663,4666,4667,4670],{},"With ",[15,4661,4662],{},"Create release copy",[15,4664,4665],{},"Export"," area, Pro stores a PDF unchanged in the project archive: with its own document ID, a version number that increases per document type, a QR code on every page and a SHA-256 hash. Each version has a ",[15,4668,4669],{},"Sticker PDF",", a 40 × 40 mm label with QR code, version number and short ID that you can stick inside the board. Whoever scans the code sees on the verification page whether this version is current or has been replaced by a newer one. All project members, viewers included, can download archived PDFs and stickers.",[12,4672,4673],{},"The increasing version number helps keep versions unambiguous as section 3.1.2 requires. The QR code confirms the origin and integrity of the file, not conformity. Anyone with the code can open the PDF, so treat stickers like the document itself.",[79,4675,4677],{"id":4676},"what-happens-when-someone-leaves-the-company-or-a-partner-is-done","What happens when someone leaves the company or a partner is done?",[12,4679,4680,4681,4683],{},"If you remove someone from the organisation, all of their access to its projects ends; the company projects are retained. Someone who only worked on one project is removed there via ",[15,4682,4530],{},"; an invitation that is still open is revoked. If the person leaving owns the organisation, they first transfer ownership to another member. That way the knowledge about the installations stays in the company, not in a personal mailbox.",[79,4685,4687],{"id":4686},"does-this-work-on-a-tablet-and-phone-on-site","Does this work on a tablet and phone on site?",[12,4689,4690],{},"Yes, in the browser. Read mode is designed for the tablet, with touch targets of at least 44 pixels. Without a network, an opened project is readable only as far as it was prepared for local work beforehand; offline work is a pilot. For sites without reception, a printout of the current release copy with its sticker therefore belongs in the board as well.",[79,4692,4694],{"id":4693},"is-planelec-sketch-enough-for-a-team","Is PlanElec Sketch enough for a team?",[12,4696,4697,4698,4700],{},"No. Sketch is the tool for sole traders: free, in the browser, with an account on all your devices, but without team features. A drawing already made in Sketch is taken into a Pro project with ",[15,4699,1482],{}," and shared there; a Pro project does not go back to Sketch. Pro applies in Sketch and in Pro.",[138,4702,4703,4711],{},[141,4704,4705],{},[144,4706,4707,4709],{},[147,4708,4118],{},[147,4710,4121],{},[163,4712,4713,4722,4731,4741],{},[144,4714,4715,4718],{},[168,4716,4717],{},"Working alone, single-line diagram and situation plan as PDF",[168,4719,4720,4134],{},[15,4721,4133],{},[144,4723,4724,4727],{},[168,4725,4726],{},"Designer in the office, fitters on site, shared state",[168,4728,4729],{},[15,4730,4153],{},[144,4732,4733,4736],{},[168,4734,4735],{},"Partners or clients should read, not change",[168,4737,4738,4740],{},[15,4739,4153],{},", read-only access free",[144,4742,4743,4746],{},[168,4744,4745],{},"Board, self-check report and dossier in a team",[168,4747,4748],{},[15,4749,4153],{},[12,4751,4752,4753,4756,4757,4759,4760,56],{},"The difference between the two products is also covered in ",[40,4754,4755],{"href":1989},"Trikker, PlanElec Sketch or PlanElec Pro","; what else Pro does is on the ",[40,4758,4171],{"href":1964}," and in ",[40,4761,4763],{"href":4762},"\u002Fen\u002Fblog\u002Fwhat-can-you-do-with-planelec","What can you do with PlanElec?",[79,4765,4179],{"id":3425},[12,4767,4768,4769,4771],{},"Invitations go by email to a full address; PlanElec does not search for external people. Viewers create no exports and no release copies; that is reserved for editors, administrators and the owner. They can download archived versions. Offline work on opened projects is a pilot; the help guide ",[40,4770,1468],{"href":1467}," describes what is covered. Team features do not change responsibilities: the plans are drawn by the person responsible for carrying out the work (sub-section 3.1.2.1 a), and the inspection is done by the accredited inspection body.",[79,4773,4186],{"id":4185},[84,4775,4776,4782,4786,4792,4798],{},[87,4777,4778,4781],{},[40,4779,4194],{"href":1971,"rel":4780},[1458]," – section 3.1.2, sub-sections 3.1.2.1 a and d, section 9.1.1",[87,4783,4784],{},[40,4785,2005],{"href":2004},[87,4787,4788],{},[40,4789,4791],{"href":4790},"\u002Fen\u002Fblog\u002Fconnect-ai-assistant-mcp","Connect Claude or ChatGPT to PlanElec Pro via MCP",[87,4793,4794],{},[40,4795,4797],{"href":4796},"\u002Fen\u002Fblog\u002Fsingle-line-diagram-apartment-building-multiple-meters","Apartment building: how many single-line diagrams?",[87,4799,4800],{},[40,4801,4803],{"href":4802},"\u002Fen\u002Fblog\u002Fmigrate-trikker-archive","Migrate a Trikker archive to PlanElec Pro",[12,4805,4806],{},[40,4807,4808],{"href":54},"Try PlanElec Pro for a month →",{"title":2044,"searchDepth":2045,"depth":2045,"links":4810},[4811,4812,4813,4814,4815,4816,4817,4818,4819,4820,4821,4822],{"id":4289,"depth":2045,"text":4290},{"id":4299,"depth":2045,"text":4300},{"id":4385,"depth":2045,"text":4386},{"id":4482,"depth":2045,"text":4483},{"id":4560,"depth":2045,"text":4561},{"id":4623,"depth":2045,"text":4624},{"id":4655,"depth":2045,"text":4656},{"id":4676,"depth":2045,"text":4677},{"id":4686,"depth":2045,"text":4687},{"id":4693,"depth":2045,"text":4694},{"id":3425,"depth":2045,"text":4179},{"id":4185,"depth":2045,"text":4186},"Organisation, project roles and free read-only access: how to give fitters, workshop, partners and clients the current single-line diagram, situation plan and distribution board in PlanElec Pro, who needs an editing seat and what the Belgian AREI\u002FRGIE says about plan availability.",[4825,2118],"getting-started","2026-11-08",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-11-07\u002Fshare\u002Fplanelec-pro-team-read-access-editorial.jpg","\u002Fblog\u002Fshare-plans-with-team-read-access.en","8 min",{"title":4266,"description":4823},"Sharing plans in a team: read access in PlanElec Pro","share-plans-with-team-read-access","blog\u002Fshare-plans-with-team-read-access.en",[4836,4837,4838,4839,4840,4364,4841,2133,2134,31,4842,4261],"share electrical plans","read-only access","team electrical planning","fitters site plans","project roles","share single-line diagram","electrical contractor","rn9GJ44cDgzBas-vQrh65XRZoCgmommcVKP2q0okKLw","\u002Fblog\u002Fshare-plans-with-team-read-access",{"id":4846,"title":4847,"articleId":4848,"body":4849,"category":4239,"date":4240,"description":5419,"extension":2113,"image":4867,"labels":5420,"lastUpdated":4826,"locale":2119,"meta":5423,"navigation":2121,"ogImage":5424,"path":5425,"publishDate":4240,"readTime":3582,"refreshInterval":5426,"seo":5427,"seoTitle":4797,"slug":5428,"stem":5429,"tags":5430,"__hash__":5437,"kind":2137,"href":5438},"blog\u002Fblog\u002Fsingle-line-diagram-apartment-building-multiple-meters.en.md","Apartment building or a second home with its own meter: how many single-line diagrams do I need?","apartment-building-multiple-meters",{"type":9,"value":4850,"toc":5407},[4851,4862,4868,4872,4876,4883,4932,4935,4939,4942,4988,4998,5004,5008,5011,5071,5074,5078,5092,5096,5145,5148,5152,5155,5216,5219,5223,5226,5281,5286,5289,5293,5298,5347,5364,5366,5369,5371,5401],[12,4852,4853,4856,4857,4861],{},[15,4854,4855],{},"Every dwelling unit is a separate domestic installation with its own single-line diagram, its own situation plan and its own inspection; the common parts such as stairwell, corridors and garden are a further installation with plans of their own (AREI\u002FRGIE section 2.2.1.1, sub-section 3.1.2.1)."," A house with two flats and a meter for the stairwell therefore has three sets of plans. In ",[40,4858,22],{"href":4859,"rel":4860},"https:\u002F\u002Fsketch.planelec.be\u002Fen\u002Fdraw?start=appartement",[1458]," you create one location with several drawings for this; businesses that plan whole residential complexes work in PlanElec Pro with one project per installation.",[12,4863,4864],{},[74,4865],{"alt":4866,"src":4867},"An electrician reviews several closed meter enclosures in the entrance of a Belgian apartment building.","\u002Fimages\u002Fblog\u002Feditorial-2026-11-07\u002Fplanelec-apartment-building-multiple-meters-editorial.webp",[12,4869,4870],{},[15,4871,3624],{},[79,4873,4875],{"id":4874},"what-is-a-dwelling-unit-and-what-are-common-parts","What is a dwelling unit, and what are common parts?",[12,4877,4878,4879,4882],{},"The AREI\u002FRGIE distinguishes three parts of a ",[15,4880,4881],{},"residential complex"," (section 2.2.1.1):",[138,4884,4885,4898],{},[141,4886,4887],{},[144,4888,4889,4892,4895],{},[147,4890,4891],{},"Part",[147,4893,4894],{},"Definition under section 2.2.1.1",[147,4896,4897],{},"Type of installation",[163,4899,4900,4911,4922],{},[144,4901,4902,4905,4908],{},[168,4903,4904],{},"Dwelling unit",[168,4906,4907],{},"House or flat used as a home by one or more persons",[168,4909,4910],{},"domestic",[144,4912,4913,4916,4919],{},[168,4914,4915],{},"Common parts",[168,4917,4918],{},"Rooms that are neither dwelling units nor plant rooms: corridors, stairwells, gardens, car parks …",[168,4920,4921],{},"non-domestic",[144,4923,4924,4927,4930],{},[168,4925,4926],{},"Plant rooms",[168,4928,4929],{},"Rooms for the technical management, such as the boiler room or lift machinery",[168,4931,4921],{},[12,4933,4934],{},"For the plans of the common parts there is a relief: it is permitted to apply only the rules for domestic installations, i.e. a single-line diagram and situation plan in the usual format (sub-section 3.1.2.1 e). The same applies to labelling their distribution boards (sub-section 3.1.3.3 c). The relief names only the common parts; plant rooms follow the rules for non-domestic installations (sub-section 3.1.2.1 b), for example circuit diagrams with the data of sub-section 3.1.2.2 b.",[79,4936,4938],{"id":4937},"how-many-single-line-diagrams-does-an-apartment-building-need","How many single-line diagrams does an apartment building need?",[12,4940,4941],{},"One per installation. In practice a single-line diagram starts at the supply, that is at the meter: two meters mean two supplies and therefore two diagrams.",[138,4943,4944,4954],{},[141,4945,4946],{},[144,4947,4948,4951],{},[147,4949,4950],{},"Building",[147,4952,4953],{},"Sets of plans (single-line diagram + situation plan)",[163,4955,4956,4964,4972,4980],{},[144,4957,4958,4961],{},[168,4959,4960],{},"Single-family house with garage and garden shed on one meter",[168,4962,4963],{},"1; sub-boards belong in that one diagram",[144,4965,4966,4969],{},[168,4967,4968],{},"House with a granny flat that has its own meter",[168,4970,4971],{},"2: main home and granny flat",[144,4973,4974,4977],{},[168,4975,4976],{},"Two-flat house with a meter for hall and outdoor lighting",[168,4978,4979],{},"3: flat 1, flat 2, common parts",[144,4981,4982,4985],{},[168,4983,4984],{},"Residential complex with 8 flats, stairwell, underground car park, lift",[168,4986,4987],{},"8 for the flats, plans for the common parts, documents for the plant room under 3.1.2.1 b",[12,4989,4990,4991,4993,4994,4997],{},"Every dwelling unit has its own main distribution board; what is mandatory there and how risers run is explained in ",[40,4992,3982],{"href":3981},". If two dwelling units hang on ",[15,4995,4996],{},"one"," meter, agree the split with the grid operator and the inspection body before you plan. Whether a second home gets its own meter is not decided by the AREI\u002FRGIE but by the procedure of the distribution system operator (Fluvius, ORES, Sibelga or RESA).",[1489,4999],{":height":5000,":width":3800,"alt":5001,"caption":5002,"src":5003},"460","A two-flat house with three meters: meter 1 supplies flat 1, meter 2 supplies flat 2, meter 3 supplies the common parts with stairwell lighting, doorbell and outdoor lighting. Each of the three installations has its own single-line diagram, its own situation plan and its own inspection. In PlanElec Sketch the three drawings sit under one location.","One meter, one installation, one set of plans. Common parts may be documented in the format of a domestic installation (sub-section 3.1.2.1 e).","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fapartment-building-multiple-meters\u002Finstallations-per-meter.en.svg",[79,5005,5007],{"id":5006},"what-goes-on-the-diagram-of-a-flat-and-what-on-that-of-the-common-parts","What goes on the diagram of a flat, and what on that of the common parts?",[12,5009,5010],{},"The boundary is the meter that supplies a load, not the room it stands in.",[138,5012,5013,5023],{},[141,5014,5015],{},[144,5016,5017,5020],{},[147,5018,5019],{},"Load",[147,5021,5022],{},"Belongs on the diagram of …",[163,5024,5025,5033,5041,5049,5056,5063],{},[144,5026,5027,5030],{},[168,5028,5029],{},"Sockets, lighting, hob, water heater in the flat",[168,5031,5032],{},"the flat",[144,5034,5035,5038],{},[168,5036,5037],{},"Light in the private cellar box via the flat's meter",[168,5039,5040],{},"the flat (even though it is in the cellar)",[144,5042,5043,5046],{},[168,5044,5045],{},"Stairwell lighting, doorbell, door entry system",[168,5047,5048],{},"the common parts",[144,5050,5051,5054],{},[168,5052,5053],{},"Garage door and garage lighting via the common meter",[168,5055,5048],{},[144,5057,5058,5061],{},[168,5059,5060],{},"Charging point on the private parking space via the flat's meter",[168,5062,5032],{},[144,5064,5065,5068],{},[168,5066,5067],{},"Lift, boiler room",[168,5069,5070],{},"the plant-room documents (sub-section 3.1.2.1 b)",[12,5072,5073],{},"Every plan shows the installation address and the name of the responsible person (sub-section 3.1.2.1 a). With several flats under one house number, add the box or flat number so no plan gets mixed up; in the Sketch title block, that includes the EAN code of the meter in question.",[79,5075,5077],{"id":5076},"which-inspection-applies-when-a-single-flat-is-sold","Which inspection applies when a single flat is sold?",[12,5079,5080,5081,5084,5085,5087,5088,56],{},"When a flat with an old installation is sold, the obligation to have an inspection visit applies only to the ",[15,5082,5083],{},"private parts"," of that dwelling unit. Garages, parking spaces, storage rooms and other places that belong to the unit but are supplied through the meter in the name of the co-owners are excluded (sub-section 8.4.2.1). The sale therefore needs the single-line diagram and situation plan of the flat being sold, not those of the whole building. If they are missing, this is recorded as a violation in the report (sub-section 8.4.2.2 d). How to survey the current state yourself is shown in ",[40,5086,4219],{"href":4218},"; the other rules for a sale are in ",[40,5089,5091],{"href":5090},"\u002Fen\u002Fblog\u002Fproperty-sale-electrical-dossier","Electrical dossier when selling a property",[79,5093,5095],{"id":5094},"who-keeps-which-plans","Who keeps which plans?",[138,5097,5098,5110],{},[141,5099,5100],{},[144,5101,5102,5105,5108],{},[147,5103,5104],{},"Installation",[147,5106,5107],{},"Who holds the dossier",[147,5109,3919],{},[163,5111,5112,5123,5134],{},[144,5113,5114,5117,5120],{},[168,5115,5116],{},"Flat",[168,5118,5119],{},"Owner, manager or operator, in two copies; handed to the buyer on sale",[168,5121,5122],{},"section 9.1.2",[144,5124,5125,5128,5131],{},[168,5126,5127],{},"Common parts, plant rooms",[168,5129,5130],{},"Owner, manager or operator (in co-ownership usually the syndic of the association of co-owners); makes the plans available to the inspection body and staff",[168,5132,5133],{},"section 9.1.1",[144,5135,5136,5139,5142],{},[168,5137,5138],{},"All",[168,5140,5141],{},"Keep plans up to date and available on site for everyone authorised to inspect, maintain or alter the installation",[168,5143,5144],{},"sub-section 3.1.2.1 d",[12,5146,5147],{},"Separate sets of plans help exactly here: the syndic can pass on the common-parts documents without circulating the private plans of a flat.",[79,5149,5151],{"id":5150},"how-do-i-name-the-plans-so-nothing-gets-mixed-up","How do I name the plans so nothing gets mixed up?",[12,5153,5154],{},"Every diagram carries an unambiguous number, version and version date (section 3.1.2), and every distribution board is individually and indelibly labelled with its supply voltage (sub-section 3.1.3.3 a; for the common parts the same labelling is enough under sub-section 3.1.3.3 c). With several installations in one building, a fixed pattern for plan number and board name, identical on the plan and on the board, pays off:",[138,5156,5157,5170],{},[141,5158,5159],{},[144,5160,5161,5164,5167],{},[147,5162,5163],{},"Field",[147,5165,5166],{},"Example flat 1",[147,5168,5169],{},"Example common parts",[163,5171,5172,5183,5194,5205],{},[144,5173,5174,5177,5180],{},[168,5175,5176],{},"Installation address",[168,5178,5179],{},"12 Example Street, box 1",[168,5181,5182],{},"12 Example Street, common parts",[144,5184,5185,5188,5191],{},[168,5186,5187],{},"Meter EAN",[168,5189,5190],{},"EAN of meter 1",[168,5192,5193],{},"EAN of meter 3",[144,5195,5196,5199,5202],{},[168,5197,5198],{},"Plan number and version",[168,5200,5201],{},"F1-01, version B",[168,5203,5204],{},"CP-01, version A",[144,5206,5207,5210,5213],{},[168,5208,5209],{},"Board label",[168,5211,5212],{},"‘Board flat 1’",[168,5214,5215],{},"‘Board stairwell’",[12,5217,5218],{},"That way the inspection body, the syndic or the next electrician finds the right plan for every board, even when all meters hang in the same cellar room.",[79,5220,5222],{"id":5221},"how-do-i-draw-several-flats-in-planelec-sketch","How do I draw several flats in PlanElec Sketch?",[12,5224,5225],{},"Sketch is free and meant for owners, small landlords and sole traders.",[3139,5227,5228,5235,5246,5264,5274],{},[87,5229,4055,5230,5234],{},[40,5231,5233],{"href":4859,"rel":5232},[1458],"Sketch with the template ‘Prepare an apartment’"," or, for a whole house, ‘Prepare a house’. The templates are typical installations; adapt circuits and values.",[87,5236,5237,5238,5241,5242,5245],{},"With a free account, ",[15,5239,5240],{},"+ New"," asks for the address; confirm the house on the map with ",[15,5243,5244],{},"Use this location",". One location holds as many drawings as you like.",[87,5247,5248,5249,5251,5252,5255,5256,5259,5260,5263],{},"Create one drawing per flat and one for the common parts under the same location: at the next ",[15,5250,5240],{},", pick it under ",[15,5253,5254],{},"Your locations"," instead of entering a new address. Under ",[15,5257,5258],{},"Document"," → ",[15,5261,5262],{},"Document data",", enter for each drawing the address with box number, the customer, the EAN and the inspection body.",[87,5265,5266,5267,5270,5271,5273],{},"In each drawing, draw the ",[15,5268,5269],{},"single-line diagram"," from its own meter and the ",[15,5272,2132],{}," with the floors concerned; a private cellar box gets its own floor there.",[87,5275,5276,5278,5279,56],{},[15,5277,1445],{}," shows per drawing what is still missing; then one PDF per installation with ",[15,5280,4093],{},[12,5282,5283,5284,56],{},"Without Pro, an account holds up to three locations in the cloud, each with as many drawings as you like; without an account everything stays in the browser. A house with several flats therefore takes one location. The limits are on the ",[40,5285,1958],{"href":54},[1489,5287],{":height":1491,":width":1492,"alt":1493,"caption":5288,"src":1495},"‘Prepare an apartment’ opens a typical flat installation that you adapt. Each flat gets its own drawing; Sketch does not check AREI\u002FRGIE rules.",[79,5290,5292],{"id":5291},"when-is-planelec-pro-the-better-choice","When is PlanElec Pro the better choice?",[12,5294,5295,5296,56],{},"Pro is meant for electrical contractors, designers and developers who plan and hand over several flats at once. You create one project per installation; in an organisation all of the company's projects sit together, and each project has its board, self-check report and dossier. Fitters and site managers get free read-only access. A flat already drawn in Sketch is taken over with ",[15,5297,1482],{},[138,5299,5300,5308],{},[141,5301,5302],{},[144,5303,5304,5306],{},[147,5305,4118],{},[147,5307,4121],{},[163,5309,5310,5319,5329,5338],{},[144,5311,5312,5315],{},[168,5313,5314],{},"Owner selling a flat who needs its plans",[168,5316,5317,4134],{},[15,5318,4133],{},[144,5320,5321,5324],{},[168,5322,5323],{},"Landlord documenting two or three flats in one house",[168,5325,5326,5328],{},[15,5327,4133],{},", one location",[144,5330,5331,5334],{},[168,5332,5333],{},"Contractor planning a residential complex with one board per flat",[168,5335,5336],{},[15,5337,4153],{},[144,5339,5340,5343],{},[168,5341,5342],{},"Team with site management and fitters who only read",[168,5344,5345,4740],{},[15,5346,4153],{},[12,5348,5349,5350,5352,5353,5355,5356,5360,5361,5363],{},"The subscription costs € 29 a month or € 290 a year with three editing seats; Site pass costs € 15 per property. Details are on the ",[40,5351,1958],{"href":54}," and the ",[40,5354,4171],{"href":1964},". How roles and read-only access work is explained in ",[40,5357,5359],{"href":5358},"\u002Fen\u002Fblog\u002Fshare-plans-with-team-read-access","Sharing plans in a team: editors and read-only access in PlanElec Pro",". Whole Trikker archives are taken over by the ",[40,5362,549],{"href":42},", one project per file.",[79,5365,4179],{"id":3425},[12,5367,5368],{},"Sketch and Pro draw the installations you create; they do not decide which rooms are common or how many meters a building gets. The self-check in Pro assesses the supported rules per project, not the building as a whole. Each installation is inspected by the accredited inspection body.",[79,5370,4186],{"id":4185},[84,5372,5373,5379,5383,5389,5395],{},[87,5374,5375,5378],{},[40,5376,4194],{"href":1971,"rel":5377},[1458]," – section 2.2.1.1, sub-sections 3.1.2.1 a, b, d and e, 3.1.3.3 c, 8.4.2.1, 8.4.2.2 d and sections 9.1.1 and 9.1.2",[87,5380,5381],{},[40,5382,3982],{"href":3981},[87,5384,5385],{},[40,5386,5388],{"href":5387},"\u002Fen\u002Fblog\u002Fsingle-phase-vs-three-phase","Single-phase or three-phase? Grid connection in Belgium",[87,5390,5391],{},[40,5392,5394],{"href":5393},"\u002Fen\u002Fblog\u002Felectrical-inspection","Electrical inspection in Belgium",[87,5396,5397],{},[40,5398,5400],{"href":5399},"\u002Fen\u002Fblog\u002Fsingle-line-diagram-vs-situation-plan","Single-line diagram vs. situation plan",[12,5402,5403],{},[40,5404,5406],{"href":4859,"rel":5405},[1458],"Draw your flat for free in PlanElec Sketch →",{"title":2044,"searchDepth":2045,"depth":2045,"links":5408},[5409,5410,5411,5412,5413,5414,5415,5416,5417,5418],{"id":4874,"depth":2045,"text":4875},{"id":4937,"depth":2045,"text":4938},{"id":5006,"depth":2045,"text":5007},{"id":5076,"depth":2045,"text":5077},{"id":5094,"depth":2045,"text":5095},{"id":5150,"depth":2045,"text":5151},{"id":5221,"depth":2045,"text":5222},{"id":5291,"depth":2045,"text":5292},{"id":3425,"depth":2045,"text":4179},{"id":4185,"depth":2045,"text":4186},"One single-line diagram, one situation plan and one inspection per dwelling unit, plus separate plans for the common parts: how to organise flats, stairwell and plant room under the Belgian AREI\u002FRGIE and draw them in PlanElec Sketch or Pro.",[2116,5421,5422,2117,2118],"grid-connection","inspection",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-11-07\u002Fshare\u002Fplanelec-apartment-building-multiple-meters-editorial.jpg","\u002Fblog\u002Fsingle-line-diagram-apartment-building-multiple-meters.en",6,{"title":4847,"description":5419},"single-line-diagram-apartment-building-multiple-meters","blog\u002Fsingle-line-diagram-apartment-building-multiple-meters.en",[5431,5432,5433,5434,5435,4881,5436,2133,2134,2132,22,31],"single-line diagram apartment","single-line diagram apartment building Belgium","common parts","multiple meters","granny flat","electrical inspection selling a flat","VlDXHJcTQxxO3e0XaQ8j4aNab5vIjDxFngU6LHoliiE","\u002Fblog\u002Fsingle-line-diagram-apartment-building-multiple-meters",{"id":5440,"title":5441,"articleId":5442,"body":5443,"category":4239,"date":4240,"description":6080,"extension":2113,"image":5459,"labels":6081,"lastUpdated":4240,"locale":2119,"meta":6083,"navigation":2121,"ogImage":6084,"path":6085,"publishDate":4240,"readTime":6086,"refreshInterval":5426,"seo":6087,"seoTitle":4219,"slug":6088,"stem":6089,"tags":6090,"__hash__":6096,"kind":2137,"href":6097},"blog\u002Fblog\u002Fsingle-line-diagram-existing-installation.en.md","How do I draw the single-line diagram of my existing installation myself, for example before selling my home?","existing-installation-single-line-diagram",{"type":9,"value":5444,"toc":6066},[5445,5454,5460,5465,5469,5472,5522,5527,5531,5542,5549,5553,5556,5661,5668,5674,5678,5681,5707,5711,5714,5732,5737,5741,5744,5794,5801,5806,5813,5817,5905,5916,5920,5958,5962,5969,5971,6020,6025,6029,6032,6034,6060],[12,5446,5447,5453],{},[15,5448,5449,5450,56],{},"Yes, you can survey the current state of your installation and draw it yourself as a single-line diagram with a situation plan: read the distribution board, switch circuits off one by one to identify them, walk through the rooms and draw everything for free in ",[40,5451,22],{"href":3611,"rel":5452},[1458]," What you cannot see for certain without opening the board, above all cable type, cross-section and installation method, you mark as open and have your electrician complete. The plans show what is there; whether the installation complies is established by the accredited inspection body.",[12,5455,5456],{},[74,5457],{"alt":5458,"src":5459},"A homeowner and electrician review existing plans at a table in a Belgian home.","\u002Fimages\u002Fblog\u002Feditorial-2026-11-07\u002Fplanelec-existing-installation-single-line-diagram-editorial.webp",[12,5461,5462],{},[15,5463,5464],{},"Status 7 November 2026, AREI\u002FRGIE Book 1 version 07 (in force since 1 November 2026). The AREI (Dutch) and RGIE (French) are the Belgian general regulations on electrical installations; the inspection is often called the keuring. Written by the PlanElec team, which builds Sketch and Pro.",[79,5466,5468],{"id":5467},"when-do-i-need-a-single-line-diagram-of-my-existing-installation","When do I need a single-line diagram of my existing installation?",[12,5470,5471],{},"Three occasions are typical:",[138,5473,5474,5487],{},[141,5475,5476],{},[144,5477,5478,5481,5484],{},[147,5479,5480],{},"Occasion",[147,5482,5483],{},"What the AREI\u002FRGIE says",[147,5485,5486],{},"What you need",[163,5488,5489,5500,5511],{},[144,5490,5491,5494,5497],{},[168,5492,5493],{},"Selling a house or flat",[168,5495,5496],{},"Inspection visit when an old installation is sold (sub-section 8.4.2.2 a); if the plans are missing, this is recorded as a violation in the report (sub-section 8.4.2.2 d)",[168,5498,5499],{},"Single-line diagram and situation plan of the current state",[144,5501,5502,5505,5508],{},[168,5503,5504],{},"Minor alteration, such as one more socket",[168,5506,5507],{},"No new single-line diagram needed; a short, dated and signed description is enough, and the situation plan shows the change (sub-section 3.1.2.1 a)",[168,5509,5510],{},"An up-to-date plan to add the change to",[144,5512,5513,5516,5519],{},[168,5514,5515],{},"Substantial alteration or extension",[168,5517,5518],{},"The person responsible for carrying out the work draws single-line diagrams and situation plans (sub-section 3.1.2.1 a), followed by a conformity inspection",[168,5520,5521],{},"Your survey as the starting point for the electrician",[12,5523,5524,5525,56],{},"At a sale, the inspection body carries out the inspection even without plans. Its representative then writes a short description of the boards and a rough sketch. These documents may not be used as the single-line diagram and situation plan, and the missing plans are recorded as a violation in the report (sub-section 8.4.2.2 d). The other rules for a sale are covered in ",[40,5526,5091],{"href":5090},[79,5528,5530],{"id":5529},"am-i-allowed-to-draw-the-diagram-of-my-own-installation","Am I allowed to draw the diagram of my own installation?",[12,5532,5533,5534,5537,5538,5541],{},"For a ",[15,5535,5536],{},"new"," installation or a ",[15,5539,5540],{},"substantial"," alteration, the person responsible for carrying out the work draws the plans; their name, capacity and, where applicable, VAT number appear on them (sub-section 3.1.2.1 a). For the current state of an old installation at a sale, sub-section 8.4.2.2 d requires plans to be available; it does not say who draws them. So ask your inspection body before the appointment whether it accepts a survey you drew yourself, and have an electrician complete the open data.",[12,5543,5544,5545,56],{},"Your share is the legwork: finding rooms, sockets, light points and switches and assigning each to a circuit. That saves the electrician time on site. Both routes are costed in ",[40,5546,5548],{"href":5547},"\u002Fen\u002Fblog\u002Fcost-comparison-diy-vs-electrician","Drawing the single-line diagram yourself vs. hiring an electrician",[79,5550,5552],{"id":5551},"what-must-the-single-line-diagram-of-a-home-show","What must the single-line diagram of a home show?",[12,5554,5555],{},"Sub-section 3.1.2.2 a sets the minimum content. The table shows what you can record reliably yourself and what stays open:",[138,5557,5558,5571],{},[141,5559,5560],{},[144,5561,5562,5565,5568],{},[147,5563,5564],{},"Item under sub-section 3.1.2.2 a",[147,5566,5567],{},"Where to find it",[147,5569,5570],{},"Can you record it?",[163,5572,5573,5584,5594,5605,5615,5626,5636,5650],{},[144,5574,5575,5578,5581],{},[168,5576,5577],{},"Type and characteristics of residual current devices (RCDs)",[168,5579,5580],{},"Printed on the front: rated current, 30 mA or 300 mA, type A or AC",[168,5582,5583],{},"Yes, usually readable",[144,5585,5586,5589,5592],{},[168,5587,5588],{},"Type and characteristics of circuit breakers and fuses",[168,5590,5591],{},"Printed: for example C16, B20, C32; rating on the fuse link",[168,5593,5583],{},[144,5595,5596,5599,5602],{},[168,5597,5598],{},"Sockets, light points, switches",[168,5600,5601],{},"Switching off and walking through the rooms",[168,5603,5604],{},"Yes",[144,5606,5607,5610,5613],{},[168,5608,5609],{},"Fixed appliances (hob, water heater, heat pump …)",[168,5611,5612],{},"Switching off, the appliance's rating plate",[168,5614,5604],{},[144,5616,5617,5620,5623],{},[168,5618,5619],{},"Sources (solar inverter, battery)",[168,5621,5622],{},"Rating plate, installation documents",[168,5624,5625],{},"Partly",[144,5627,5628,5631,5634],{},[168,5629,5630],{},"Junction and branch boxes",[168,5632,5633],{},"Only visible where accessible",[168,5635,5625],{},[144,5637,5638,5641,5644],{},[168,5639,5640],{},"Cable: type, cross-section, number of conductors",[168,5642,5643],{},"At the terminals inside the board, in the box",[168,5645,5646,5649],{},[15,5647,5648],{},"No",", only with the board open – electrician",[144,5651,5652,5655,5658],{},[168,5653,5654],{},"Installation method",[168,5656,5657],{},"Concealed, in conduit, surface-mounted",[168,5659,5660],{},"Partly; leave open if in doubt",[12,5662,5663,5664,56],{},"Sub-section 3.1.2.1 a adds the installation address, voltage and type of current, a capital letter per circuit and the numbering of points in order from the protective device. Parts whose installation began before 1 October 1981 are marked \"older part\" on the diagram. Every diagram carries a number, a version and the date of that version (section 3.1.2). What the symbols look like is shown in ",[40,5665,5667],{"href":5666},"\u002Fen\u002Fblog\u002Farei-electrical-symbols-overview","AREI electrical symbols",[1489,5669],{":height":5670,":width":3800,"alt":5671,"caption":5672,"src":5673},"420","Five-step workflow: 1. Read and photograph the board without opening the cover. 2. Switch off each protective device and note what is dead. 3. Walk through the rooms and note sockets, light points, switches and appliances. 4. Draw the single-line diagram and situation plan in PlanElec Sketch, with open points as notes. 5. Check documents, create the PDF and complete the open data with the electrician. The inspection body inspects the installation.","From board to plan: you do the first three steps, the electrician adds cable data and test values.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fexisting-installation-single-line-diagram\u002Fsurvey-workflow.en.svg",[79,5675,5677],{"id":5676},"how-do-i-survey-the-board-without-taking-risks","How do I survey the board without taking risks?",[12,5679,5680],{},"Open only the door of the distribution board, never the cover over the terminals. Behind it are live parts; only an electrician works there.",[3139,5682,5683,5689,5695,5701],{},[87,5684,5685,5688],{},[15,5686,5687],{},"Photograph the front."," Each row separately, sharp enough to read the markings. Photograph any existing labels next to the breakers too.",[87,5690,5691,5694],{},[15,5692,5693],{},"Note the order."," From the supply through the main switch or main RCD to the group RCDs and the circuit breakers below them. This chain is the backbone of your diagram.",[87,5696,5697,5700],{},[15,5698,5699],{},"Read the values."," On the RCD: rated current, tripping current (for example 300 mA or 30 mA) and type; on the circuit breaker: curve and rated current, such as C16.",[87,5702,5703,5706],{},[15,5704,5705],{},"Look for sub-boards."," A garage, attic or cellar often has its own small board. It is fed from an outgoing circuit of the main board and gets its own section in the diagram.",[79,5708,5710],{"id":5709},"how-do-i-find-out-which-socket-is-on-which-circuit","How do I find out which socket is on which circuit?",[12,5712,5713],{},"Switch the circuit breakers off one at a time and walk through every room. Whatever is dead belongs to that circuit. A socket tester or a small lamp is quicker than switching on every appliance.",[84,5715,5716,5719,5722,5729],{},[87,5717,5718],{},"Tell the household before you switch off; think of the freezer, router and heating.",[87,5720,5721],{},"Note per room: sockets (a single or multiple socket outlet counts as one point), light points, switches and fixed appliances.",[87,5723,5724,5725,56],{},"A light point with two switches is a two-way circuit; which switch type belongs on the diagram is explained in ",[40,5726,5728],{"href":5727},"\u002Fen\u002Fblog\u002Fswitch-types-single-line-diagram","One-way, two-way or intermediate switching",[87,5730,5731],{},"If a point stays live with every breaker off, or a breaker feeds nothing you can find, note it as open. The electrician will sort it out.",[12,5733,5734,5735,56],{},"You end up with a list \"circuit → points per room\". It is the basis for both plans: the single-line diagram shows the electrical chain, the situation plan the position in the room. The difference is explained in ",[40,5736,5400],{"href":5399},[79,5738,5740],{"id":5739},"how-do-i-draw-the-existing-installation-in-planelec-sketch","How do I draw the existing installation in PlanElec Sketch?",[12,5742,5743],{},"Sketch is free, runs in the browser and needs no account for drawing. For your survey, Sketch is enough; you do not need Pro.",[3139,5745,5746,5753,5758,5767,5775,5783],{},[87,5747,4055,5748,5752],{},[40,5749,5751],{"href":3611,"rel":5750},[1458],"Sketch with the task ‘Draw the documents for the inspection’",". The drawing starts with the connection, meter and main protection.",[87,5754,3370,5755,5757],{},[15,5756,3926],{}," area, add your RCDs at the blue connection point, then the circuit breaker and loads for each circuit. Sketch assigns circuit letters and numbers automatically, in order from the protective device. A sub-board is placed from the library onto the cable of its outgoing circuit.",[87,5759,5760,5761,3324,5763,5766],{},"Anything you do not know goes on the diagram as a ",[15,5762,4075],{},[15,5764,5765],{},"free text",", for example \"cross-section open – electrician\". That way no gap gets lost.",[87,5768,3370,5769,5771,5772,5774],{},[15,5770,534],{}," area, create a floor per storey (",[15,5773,4084],{},") and drag the devices from the diagram to their place. With a free account you upload a floor plan as an image or PDF as the background; without an account you draw walls and rooms yourself.",[87,5776,5777,5778,5259,5780,5782],{},"Under ",[15,5779,5258],{},[15,5781,5262],{},", enter the installation address, the customer and the inspection body.",[87,5784,3370,5785,5788,5789,5791,5792,56],{},[15,5786,5787],{},"Print"," area, ",[15,5790,1445],{}," shows what is still missing and jumps to the spot. Then ",[15,5793,4093],{},[1489,5795],{":height":5796,":width":5797,"alt":5798,"caption":5799,"src":5800},"612","901","Single-line diagram in PlanElec Sketch after the task ‘Draw the documents for the inspection’: earthing, grid connection, kWh meter and 300 mA main RCD on the busbar, the searchable library on the left.","The starting point for the inspection documents: connection, meter and main protection are in place, and each circuit is added at the blue point. The values are examples and must match the installation.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-keuring-start.webp",[12,5802,5803,5804,56],{},"Without an account, the drawing stays in your browser; save it as a file as well. With a free account it is stored in the cloud and available on every device; without Pro, an account holds up to three locations. Without an account the PDF carries a logo watermark; a free account removes it. All limits are on the ",[40,5805,1958],{"href":54},[1489,5807],{":height":5808,":width":5809,"alt":5810,"caption":5811,"src":5812},"280","854","The ‘Check documents’ panel in PlanElec Sketch: ‘3 of 11 open’ with ‘EAN code missing’, ‘No inspection body chosen’ and ‘Situation plan missing’; eight points are done.","The list shows what your documents still lack and jumps to the spot with one click. It is a completeness aid, not an AREI\u002FRGIE check; the inspection is done by the accredited body.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-document-check.webp",[79,5814,5816],{"id":5815},"what-does-the-electrician-add-and-what-does-the-inspection-body-check","What does the electrician add, and what does the inspection body check?",[138,5818,5819,5835],{},[141,5820,5821],{},[144,5822,5823,5826,5829,5832],{},[147,5824,5825],{},"Task",[147,5827,5828],{},"You",[147,5830,5831],{},"Electrician",[147,5833,5834],{},"Inspection body",[163,5836,5837,5850,5861,5872,5883,5894],{},[144,5838,5839,5842,5845,5848],{},[168,5840,5841],{},"Record rooms, points and the assignment to circuits",[168,5843,5844],{},"✓",[168,5846,5847],{},"checks",[168,5849],{},[144,5851,5852,5855,5857,5859],{},[168,5853,5854],{},"Read the protective devices from the front",[168,5856,5844],{},[168,5858,5847],{},[168,5860],{},[144,5862,5863,5866,5868,5870],{},[168,5864,5865],{},"Add cable type, cross-section, number of conductors, installation method",[168,5867],{},[168,5869,5844],{},[168,5871],{},[144,5873,5874,5877,5879,5881],{},[168,5875,5876],{},"Fix faults noticed during the survey",[168,5878],{},[168,5880,5844],{},[168,5882],{},[144,5884,5885,5888,5890,5892],{},[168,5886,5887],{},"Inspection visit, measurements, report",[168,5889],{},[168,5891],{},[168,5893,5844],{},[144,5895,5896,5899,5901,5903],{},[168,5897,5898],{},"Sign and date the plans on conformity (new installations and substantial alterations, sub-section 3.1.2.1 a)",[168,5900],{},[168,5902,5844],{},[168,5904,5844],{},[12,5906,5907,5908,5910,5911,5915],{},"Give your electrician the PDF or the Sketch file. With PlanElec Pro, the drawing is taken over with ",[15,5909,1482],{},", and the board and self-check report are planned there; how the handover works is explained in ",[40,5912,5914],{"href":5913},"\u002Fen\u002Fblog\u002Fintroducing-planelec-sketch","Introducing PlanElec Sketch",". For you as the owner, Sketch costs nothing.",[79,5917,5919],{"id":5918},"which-mistakes-happen-most-often-during-a-survey","Which mistakes happen most often during a survey?",[84,5921,5922,5930,5936,5942,5948],{},[87,5923,5924,5927,5928,56],{},[15,5925,5926],{},"A multiple socket counted twice."," A double or triple socket outlet is one point. For the rule of eight sockets per circuit see ",[40,5929,3703],{"href":3702},[87,5931,5932,5935],{},[15,5933,5934],{},"A sub-board overlooked."," A second enclosure in the garage or cellar belongs on the diagram with its outgoing circuit and on the situation plan with its location (sub-section 3.1.2.3 a).",[87,5937,5938,5941],{},[15,5939,5940],{},"Circuit letters missing on the situation plan."," Every point on the plan carries the letter and number from the diagram (sub-section 3.1.2.1 a). Sketch carries them over automatically when you drag the devices from the diagram onto the plan.",[87,5943,5944,5947],{},[15,5945,5946],{},"Guessed values."," An estimated cross-section on the plan is worse than \"open\". Write only what you have read.",[87,5949,5950,5953,5954,56],{},[15,5951,5952],{},"Older parts not marked."," Parts from before 1 October 1981 are marked \"older part\". The special rules for old installations are covered in ",[40,5955,5957],{"href":5956},"\u002Fen\u002Fblog\u002Fold-building-arei-part-8","Old buildings and AREI part 8",[79,5959,5961],{"id":5960},"what-if-the-inspection-is-still-negative","What if the inspection is still negative?",[12,5963,5964,5965,56],{},"A negative report lists violations; at a sale, the buyer has 18 months from the deed of sale to have them corrected, followed by a new inspection visit (sub-section 8.4.2.2 a). Your survey is then the basis for the corrections: the electrician adds the changes, and the updated plan goes to the new inspection. How to read the report is explained in ",[40,5966,5968],{"href":5967},"\u002Fen\u002Fblog\u002Finspection-failed-what-now","Electrical inspection failed – what now?",[79,5970,4109],{"id":4108},[138,5972,5973,5981],{},[141,5974,5975],{},[144,5976,5977,5979],{},[147,5978,4118],{},[147,5980,4121],{},[163,5982,5983,5992,6001,6011],{},[144,5984,5985,5988],{},[168,5986,5987],{},"Owner surveying the existing installation for a sale or inspection",[168,5989,5990,4134],{},[15,5991,4133],{},[144,5993,5994,5997],{},[168,5995,5996],{},"Adding a small change to an existing plan",[168,5998,5999],{},[15,6000,4133],{},[144,6002,6003,6006],{},[168,6004,6005],{},"Electrical contractor who needs the board and a self-check report",[168,6007,6008,6010],{},[15,6009,4153],{},", taken over from Sketch",[144,6012,6013,6016],{},[168,6014,6015],{},"Several client projects in a team, with read access for fitters",[168,6017,6018],{},[15,6019,4153],{},[12,6021,6022,6023,56],{},"As an owner, you stay with Sketch. Pro is meant for businesses that plan complete installations; what it adds is shown on the ",[40,6024,4171],{"href":1964},[79,6026,6028],{"id":6027},"limits-of-this-guide","Limits of this guide",[12,6030,6031],{},"Sketch checks no AREI\u002FRGIE rules and measures nothing. It draws what you enter. Insulation resistance, earthing and RCDs are verified only by the measurements of the accredited inspection body. Do not open covers and do not work on live parts. A plan you surveyed yourself does not replace professional design for an extension.",[79,6033,4186],{"id":4185},[84,6035,6036,6042,6046,6052,6056],{},[87,6037,6038,6041],{},[40,6039,4194],{"href":1971,"rel":6040},[1458]," – section 3.1.2, sub-sections 3.1.2.1 a, 3.1.2.2 a, 3.1.2.3 a and 8.4.2.2",[87,6043,6044],{},[40,6045,4213],{"href":4212},[87,6047,6048],{},[40,6049,6051],{"href":6050},"\u002Fen\u002Fblog\u002Fdraw-situation-plan-guide","Drawing a situation plan: guide",[87,6053,6054],{},[40,6055,4046],{"href":4045},[87,6057,6058],{},[40,6059,5091],{"href":5090},[12,6061,6062],{},[40,6063,6065],{"href":3611,"rel":6064},[1458],"Draw your existing installation for free in PlanElec Sketch →",{"title":2044,"searchDepth":2045,"depth":2045,"links":6067},[6068,6069,6070,6071,6072,6073,6074,6075,6076,6077,6078,6079],{"id":5467,"depth":2045,"text":5468},{"id":5529,"depth":2045,"text":5530},{"id":5551,"depth":2045,"text":5552},{"id":5676,"depth":2045,"text":5677},{"id":5709,"depth":2045,"text":5710},{"id":5739,"depth":2045,"text":5740},{"id":5815,"depth":2045,"text":5816},{"id":5918,"depth":2045,"text":5919},{"id":5960,"depth":2045,"text":5961},{"id":4108,"depth":2045,"text":4109},{"id":6027,"depth":2045,"text":6028},{"id":4185,"depth":2045,"text":4186},"Existing installation without plans? Survey the board, circuits and rooms yourself, draw the single-line diagram and situation plan for free in PlanElec Sketch and know what your electrician adds, with AREI\u002FRGIE references.",[2116,6082,5422,2117],"renovation-existing",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-11-07\u002Fshare\u002Fplanelec-existing-installation-single-line-diagram-editorial.jpg","\u002Fblog\u002Fsingle-line-diagram-existing-installation.en","10 min",{"title":5441,"description":6080},"single-line-diagram-existing-installation","blog\u002Fsingle-line-diagram-existing-installation.en",[6091,6092,2132,6093,6094,6095,2133,2134,4260,1735,22,4261],"single-line diagram existing installation","draw single-line diagram yourself","electrical inspection home sale Belgium","identify circuits","older installation","t-ZvTrs0TVhuIUuSI_9kn3cFSnTOcNpXyedwPhoiMaY","\u002Fblog\u002Fsingle-line-diagram-existing-installation",{"id":6099,"title":6100,"articleId":6101,"body":6102,"category":4239,"date":7596,"description":7597,"extension":2113,"image":6115,"labels":7598,"lastUpdated":7600,"locale":2119,"meta":7601,"navigation":2121,"ogImage":7602,"path":7603,"publishDate":7596,"readTime":7604,"refreshInterval":5426,"seo":7605,"seoTitle":7606,"slug":7607,"stem":7608,"tags":7609,"__hash__":7615,"kind":2137,"href":7616},"blog\u002Fblog\u002Fknx-apartment-ets.en.md","How do I document a smart home installation from the distribution board to the dossier? A KNX apartment as a worked example","knx-apartment-ets",{"type":9,"value":6103,"toc":7571},[6104,6110,6116,6128,6132,6135,6138,6253,6364,6367,6371,6374,6499,6502,6509,6516,6522,6526,6540,6547,6554,6561,6565,6568,6663,6674,6679,6685,6688,6694,6697,6704,6711,6715,6718,6757,6760,6764,6771,6776,6796,6803,6807,6814,6821,6824,6895,6898,6903,6907,6914,6964,6969,6980,6986,6992,6998,7002,7019,7024,7029,7033,7054,7061,7103,7110,7114,7121,7126,7132,7137,7143,7147,7162,7167,7227,7238,7338,7343,7346,7353,7359,7402,7405,7409,7471,7473,7477,7480,7484,7487,7491,7494,7498,7501,7505,7508,7512,7522,7534,7538,7553,7555,7566],[12,6105,6106,6109],{},[15,6107,6108],{},"PlanElec plans and documents smart home installations for integrators and electricians from one project: the distribution board with modules, rails, terminals and wiring, the channel plan for the board door as PDF or CSV, the terminal plan, the functions by room, bus lines with a bus budget and the smart home dossier as draft or final."," This works today for KNX and vendor-neutral planning; Niko Home Control, Loxone, Shelly and Sonoff follow soon. In the team you comment directly on a module, hand out tasks and have documents approved. This article walks through a fictitious Brussels apartment with seven rooms, planned with KNX, with real images from PlanElec. For KNX there is an add-on at the end: proposed addresses and a group address file for ETS. This Pro workflow is for integrators and electrical contractors: it goes beyond drawing symbols to the channel plan, terminal plan and handover dossier.",[12,6111,6112],{},[74,6113],{"alt":6114,"src":6115},"Distribution board with KNX modules on the DIN rail, green bus cables and red and black bus terminals.","\u002Fimages\u002Fblog\u002Feditorial-2026-11-04\u002Fplanelec-knx-apartment-ets-editorial.webp",[12,6117,6118,6119,6123,6124,56],{},"As of 4 November 2026. The step-by-step guide is in the help centre: ",[40,6120,6122],{"href":6121},"\u002Fen\u002Fhelp\u002Fplan-knx-installation-and-prepare-ets","Plan and document a smart home installation: step by step with KNX",". How the documents come together as a dossier is described in ",[40,6125,6127],{"href":6126},"\u002Fen\u002Fhelp\u002Fplan-and-document-knx","Plan KNX: push buttons, channels and quantities",[79,6129,6131],{"id":6130},"what-does-planelec-document-for-a-smart-home-installation","What does PlanElec document for a smart home installation?",[12,6133,6134],{},"Bring verified modules, channel assignments and room functions together in Pro. Sketch can depict a home automation module in the diagram; structured planning and the automation documents shown here belong in Pro, while device programming uses the manufacturer’s software.",[12,6136,6137],{},"PlanElec covers the planning and documentation that the distribution board, installation work, handover and inspection need. Programming the devices stays in the manufacturer's software.",[138,6139,6140,6153],{},[141,6141,6142],{},[144,6143,6144,6147,6150],{},[147,6145,6146],{},"Document or planning step",[147,6148,6149],{},"What PlanElec does",[147,6151,6152],{},"For whom",[163,6154,6155,6165,6176,6187,6198,6209,6220,6231,6242],{},[144,6156,6157,6159,6162],{},[168,6158,3115],{},[168,6160,6161],{},"Modules on rails, terminal blocks, wiring, bus terminals; ABB i-bus types and vendor-neutral modules",[168,6163,6164],{},"Electrician, panel building",[144,6166,6167,6170,6173],{},[168,6168,6169],{},"Channel plan",[168,6171,6172],{},"Every channel with load, room, protective device, terminal and control point; A4 landscape as PDF or CSV",[168,6174,6175],{},"Board door, commissioning",[144,6177,6178,6181,6184],{},[168,6179,6180],{},"Terminal plan",[168,6182,6183],{},"Strips, terminals, targets and bridges per distribution board",[168,6185,6186],{},"Installation, service",[144,6188,6189,6192,6195],{},[168,6190,6191],{},"Functions by room",[168,6193,6194],{},"Which button operates which light or shutter",[168,6196,6197],{},"Client, integrator",[144,6199,6200,6203,6206],{},[168,6201,6202],{},"Bus lines and bus budget",[168,6204,6205],{},"Bus devices, power supply, bus current per module, estimates marked",[168,6207,6208],{},"Planning, commissioning",[144,6210,6211,6214,6217],{},[168,6212,6213],{},"Topology and quantities",[168,6215,6216],{},"Logical lines of the project, quantities without prices",[168,6218,6219],{},"Quote, ordering",[144,6221,6222,6225,6228],{},[168,6223,6224],{},"Smart home dossier",[168,6226,6227],{},"All documents behind one cover page, draft with watermark or final",[168,6229,6230],{},"Handover, archive",[144,6232,6233,6236,6239],{},[168,6234,6235],{},"Collaboration",[168,6237,6238],{},"Comments on the object, tasks, approvals of archived documents",[168,6240,6241],{},"Team, site management",[144,6243,6244,6247,6250],{},[168,6245,6246],{},"KNX only: addresses",[168,6248,6249],{},"Proposed physical and group addresses, files in ETS format",[168,6251,6252],{},"System integrator",[138,6254,6255,6274],{},[141,6256,6257],{},[144,6258,6259,6262,6265,6268,6271],{},[147,6260,6261],{},"Automation system",[147,6263,6264],{},"Central unit and connection",[147,6266,6267],{},"Lines and limits in the profile",[147,6269,6270],{},"Channel, terminal and function plan, dossier",[147,6272,6273],{},"Addresses and ETS files",[163,6275,6276,6291,6306,6321,6336,6350],{},[144,6277,6278,6281,6284,6287,6289],{},[168,6279,6280],{},"KNX",[168,6282,6283],{},"Bus power supply, TP and RF",[168,6285,6286],{},"Lines with 64 devices and bus-current budget",[168,6288,515],{},[168,6290,515],{},[144,6292,6293,6296,6299,6302,6304],{},[168,6294,6295],{},"Niko Home Control II (soon)",[168,6297,6298],{},"Connected Controller, rail bus",[168,6300,6301],{},"up to 12 modules per rail, up to 20 rails",[168,6303,515],{},[168,6305,602],{},[144,6307,6308,6311,6314,6317,6319],{},[168,6309,6310],{},"Loxone (soon)",[168,6312,6313],{},"Miniserver, Tree, Air, direct I\u002FO",[168,6315,6316],{},"2 Tree branches, 50 devices per branch, 24 V budget",[168,6318,515],{},[168,6320,602],{},[144,6322,6323,6326,6329,6332,6334],{},[168,6324,6325],{},"Shelly Pro \u002F Plus (soon)",[168,6327,6328],{},"no central unit, LAN or Wi-Fi",[168,6330,6331],{},"no bus line; load limits per channel",[168,6333,515],{},[168,6335,602],{},[144,6337,6338,6341,6344,6346,6348],{},[168,6339,6340],{},"Sonoff (soon)",[168,6342,6343],{},"no central unit, Wi-Fi or RF",[168,6345,6331],{},[168,6347,515],{},[168,6349,602],{},[144,6351,6352,6355,6358,6360,6362],{},[168,6353,6354],{},"Generic \u002F configurable",[168,6356,6357],{},"free",[168,6359,6357],{},[168,6361,515],{},[168,6363,602],{},[12,6365,6366],{},"The system profile decides which modules, control points and line types are offered; unknown manufacturer values remain open data.",[79,6368,6370],{"id":6369},"what-does-the-example-apartment-look-like","What does the example apartment look like?",[12,6372,6373],{},"The apartment is fictitious: 11 × 9.5 m, one floor, seven rooms around a hall. Every room has a push button at the door, each of the seven windows an electric shutter. The hall and the bathroom also get a motion detector. The living room and the bedroom have dimmable lighting. The planning uses KNX.",[138,6375,6376,6395],{},[141,6377,6378],{},[144,6379,6380,6383,6386,6389,6392],{},[147,6381,6382],{},"Room",[147,6384,6385],{},"Lights",[147,6387,6388],{},"Shutters",[147,6390,6391],{},"Control point",[147,6393,6394],{},"Detector",[163,6396,6397,6414,6430,6445,6459,6473,6486],{},[144,6398,6399,6402,6405,6408,6411],{},[168,6400,6401],{},"Living room",[168,6403,6404],{},"Ceiling light (dimmable), pendant (dimmable)",[168,6406,6407],{},"2",[168,6409,6410],{},"Quadruple push button",[168,6412,6413],{},"–",[144,6415,6416,6419,6422,6425,6428],{},[168,6417,6418],{},"Bedroom",[168,6420,6421],{},"Ceiling light (dimmable)",[168,6423,6424],{},"1",[168,6426,6427],{},"Double push button",[168,6429,6413],{},[144,6431,6432,6435,6438,6440,6443],{},[168,6433,6434],{},"Hall",[168,6436,6437],{},"Ceiling light",[168,6439,6413],{},[168,6441,6442],{},"Push button",[168,6444,515],{},[144,6446,6447,6450,6453,6455,6457],{},[168,6448,6449],{},"Kitchen",[168,6451,6452],{},"Ceiling light, LED strip worktop",[168,6454,6424],{},[168,6456,6427],{},[168,6458,6413],{},[144,6460,6461,6464,6467,6469,6471],{},[168,6462,6463],{},"Bathroom",[168,6465,6466],{},"Ceiling light, mirror light",[168,6468,6424],{},[168,6470,6427],{},[168,6472,515],{},[144,6474,6475,6478,6480,6482,6484],{},[168,6476,6477],{},"Toilet",[168,6479,6437],{},[168,6481,6424],{},[168,6483,6442],{},[168,6485,6413],{},[144,6487,6488,6491,6493,6495,6497],{},[168,6489,6490],{},"Kids room",[168,6492,6437],{},[168,6494,6424],{},[168,6496,6427],{},[168,6498,6413],{},[12,6500,6501],{},"The 230 V side is already in place: three circuits for lighting and shutters behind a 300 mA RCD, the bathroom behind a 30 mA RCD.",[12,6503,6504,6505,6508],{},"If the floor plan and single-line diagram already exist as a drawing in ",[40,6506,22],{"href":1456,"rel":6507},[1458],", you take them from Sketch into the Pro project: walls, rooms, doors, windows and the placed devices come across with their circuit, along with boards, circuits and cables. The handover only works in this direction; a Pro project does not go back to Sketch.",[1489,6510],{":height":6511,":width":6512,"alt":6513,"caption":6514,"src":6515},"642","829","Floor plan of the fictitious apartment with living room, bedroom, hall, kitchen, bathroom, toilet and kids room, lights in every room and shutters at all windows, still without push buttons.","Starting point: lights and shutters are in place, push buttons and detectors are still missing.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-floorplan.webp",[12,6517,6518],{},[74,6519],{"alt":6520,"src":6521},"White architectural model of an apartment with green bus lines running from the distribution board to push buttons, shutters and motion detectors.","\u002Fimages\u002Fblog\u002Feditorial-2026-11-04\u002Fplanelec-knx-apartment-concept.webp",[79,6523,6525],{"id":6524},"how-do-i-choose-the-automation-system","How do I choose the automation system?",[12,6527,3370,6528,6531,6532,6535,6536,6539],{},[15,6529,6530],{},"Smart home"," mode, the ",[15,6533,6534],{},"Channels"," panel opens. At the top is the ",[15,6537,6538],{},"Automation systems"," bar with KNX and Generic \u002F configurable; Niko Home Control II, Loxone, Shelly Pro \u002F Plus and Sonoff follow soon. One click activates the profile; a project can carry several systems. In the example apartment we choose KNX.",[1489,6541],{":height":6542,":width":6543,"alt":6544,"caption":6545,"src":6546},"828","440","Channels panel before activation: Automation systems bar with KNX and other profiles, below it the note that no system has been chosen yet.","Before activation the panel only offers the system choice.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-domotica-systems.webp",[12,6548,6549,6550,6553],{},"Next, the ",[15,6551,6552],{},"Domotica planning steps"," appear: System, Modules, Loads, Lines, Export. Each step shows its status and takes you with one click to the next open point.",[1489,6555],{":height":6556,":width":6557,"alt":6558,"caption":6559,"src":6560},"588","390","Five planning steps with System active and Modules, Loads, Lines and Export open, below them the Place module form.","KNX is active; the other four steps are still open.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-setup-guide.webp",[79,6562,6564],{"id":6563},"how-do-i-document-the-distribution-board-with-modules-rails-and-terminals","How do I document the distribution board with modules, rails and terminals?",[12,6566,6567],{},"For 10 lights, 3 of them dimmable, and 7 shutters, five modules on two DIN rails are enough. We deliberately mix ABB i-bus types with vendor-neutral templates.",[138,6569,6570,6587],{},[141,6571,6572],{},[144,6573,6574,6577,6580,6582,6584],{},[147,6575,6576],{},"Rail",[147,6578,6579],{},"Module",[147,6581,3384],{},[147,6583,6534],{},[147,6585,6586],{},"used",[163,6588,6589,6604,6617,6632,6648],{},[144,6590,6591,6594,6597,6600,6602],{},[168,6592,6593],{},"KNX 1",[168,6595,6596],{},"SV\u002FS 30.640.5.1 power supply",[168,6598,6599],{},"ABB",[168,6601,6413],{},[168,6603,6413],{},[144,6605,6606,6608,6611,6613,6615],{},[168,6607,6593],{},[168,6609,6610],{},"IPS\u002FS 3.1.1 IP interface",[168,6612,6599],{},[168,6614,6413],{},[168,6616,6413],{},[144,6618,6619,6621,6624,6626,6629],{},[168,6620,6593],{},[168,6622,6623],{},"SA\u002FS 12.16.2.2 switch actuator",[168,6625,6599],{},[168,6627,6628],{},"12",[168,6630,6631],{},"7",[144,6633,6634,6637,6640,6643,6646],{},[168,6635,6636],{},"KNX 2",[168,6638,6639],{},"Shutter actuator 8×",[168,6641,6642],{},"vendor-neutral",[168,6644,6645],{},"8",[168,6647,6631],{},[144,6649,6650,6652,6655,6657,6660],{},[168,6651,6636],{},[168,6653,6654],{},"Dimming actuator 4×",[168,6656,6642],{},[168,6658,6659],{},"4",[168,6661,6662],{},"3",[12,6664,6665,6666,6669,6670,6673],{},"Below the planning steps you open ",[15,6667,6668],{},"Place module",", choose module and rail and click ",[15,6671,6672],{},"Place",". PlanElec puts the module in the first free slot, creates its channels and assigns it to the default line. The list groups the templates by family.",[1489,6675],{":height":6542,":width":6543,"alt":6676,"caption":6677,"src":6678},"Open module list with power supplies, including the vendor-neutral KNX power supply and ABB SV\u002FS 30.640.5.1 and 30.320.2.1, followed by line couplers and IP interfaces.","Vendor-neutral templates and ABB types in one list, grouped by family.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-quick-place-templates.webp",[1489,6680],{":height":6681,":width":6557,"alt":6682,"caption":6683,"src":6684},"370","Place module form after placing the ABB SA\u002FS 12.16.2.2, with the confirmation that the module was placed and its channels created.","One click: module in the board, twelve channels in the table.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-quick-place-done.webp",[12,6686,6687],{},"Right after placing, the switch actuator appears with its twelve channels in the channel table, still without loads.",[1489,6689],{":height":6690,":width":6557,"alt":6691,"caption":6692,"src":6693},"799","Channel table with the ABB SA\u002FS 12.16.2.2 group and twelve empty switching channels CH1 to CH12.","Twelve switching channels, ready to be assigned.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-channels-after-sa-s.webp",[12,6695,6696],{},"In the distribution board editor the modules sit on their rails, together with the main switch, RCDs and circuit breakers. That is also where you maintain terminal blocks and wiring. PlanElec shows the ABB types in the manufacturer's style, with a red and black bus terminal.",[1489,6698],{":height":6699,":width":6700,"alt":6701,"caption":6702,"src":6703},"852","1372","Cabinet editor with the apartment board: supply row, bathroom 30 mA row and two KNX rails with five modules, the module palette on the left.","The whole board: 230 V protection at the top, KNX on rails of its own.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-cabinet-modules.webp",[1489,6705],{":height":6706,":width":6707,"alt":6708,"caption":6709,"src":6710},"287","452","Close-up of the KNX rails: ABB SV\u002FS, IPS\u002FS and SA\u002FS on KNX 1, shutter and dimming actuator on KNX 2, the ABB types with red and black bus terminals.","Close-up of the KNX rails with the ABB types and the vendor-neutral actuators.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-cabinet-knx-rows.webp",[79,6712,6714],{"id":6713},"abb-i-bus-or-vendor-neutral","ABB i-bus or vendor-neutral?",[12,6716,6717],{},"Both work in the same project. PlanElec lists 15 ABB i-bus modules with order numbers: SA\u002FS switch actuators, JRA\u002FS blind actuators, UD\u002FS dimming actuators, BE\u002FS binary inputs, the VAA\u002FS valve drive actuator, SV\u002FS power supplies, the LK\u002FS line coupler, the IPS\u002FS IP interface and the IPR\u002FS IP router. In the catalogue you filter the KNX group by manufacturer. For the other systems, vendor-neutral templates are available.",[138,6719,6720,6733],{},[141,6721,6722],{},[144,6723,6724,6727,6730],{},[147,6725,6726],{},"Route",[147,6728,6729],{},"Advantage",[147,6731,6732],{},"What to watch",[163,6734,6735,6746],{},[144,6736,6737,6740,6743],{},[168,6738,6739],{},"ABB i-bus type",[168,6741,6742],{},"Order number, bus current from manufacturer data, shown in the device's style",[168,6744,6745],{},"Check the datasheet before ordering",[144,6747,6748,6751,6754],{},[168,6749,6750],{},"Vendor-neutral",[168,6752,6753],{},"Free for any brand, quick for early planning",[168,6755,6756],{},"Enter channel rating and bus current yourself",[12,6758,6759],{},"ABB is a trademark of the ABB Group. PlanElec is not an ABB partner and uses no ABB or KNX logos.",[79,6761,6763],{"id":6762},"how-do-i-connect-push-buttons-and-motion-detectors-to-the-channels","How do I connect push buttons and motion detectors to the channels?",[12,6765,6766,6767,6770],{},"You place push buttons and detectors on the floor plan from the ",[15,6768,6769],{},"Control points & sensors"," catalogue: a push button, double push button or quadruple push button by the door, the motion detector on the ceiling. Bus control points join the line of their system without a further step.",[1489,6772],{":height":6511,":width":4096,"alt":6773,"caption":6774,"src":6775},"Floor plan with push buttons next to all seven doors, motion detectors in the hall and bathroom, lights and shutters in every room.","Seven push buttons, two motion detectors, seven shutters, ten lights.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-floorplan-controls.webp",[12,6777,6778,6779,3116,6782,6785,6786,3116,6788,6791,6792,6795],{},"In the channel matrix you connect every channel to its load and its control point: ",[15,6780,6781],{},"+",[15,6783,6784],{},"Loads"," column, ",[15,6787,6781],{},[15,6789,6790],{},"Control points"," column. ",[15,6793,6794],{},"Suggest by room"," proposes a distribution by room and channel type; existing assignments are kept.",[1489,6797],{":height":6798,":width":6799,"alt":6800,"caption":6801,"src":6802},"765","512","Suggest by room dialog explaining that unassigned floor plan loads are grouped by room and channel type onto free channels.","The room proposal distributes free loads; you then review it channel by channel.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-room-proposal.webp",[79,6804,6806],{"id":6805},"what-does-the-channel-plan-for-the-board-door-show","What does the channel plan for the board door show?",[12,6808,6809,6810,6813],{},"Every channel sits on one row with channel type, load, room, control points, terminal, protective device and ",[15,6811,6812],{},"Line \u002F PA","; the line appears in its colour, for example “KNX 1.1”. Room and protective device come from the project; you do not enter them twice. CH1 \"Ceiling light hall\" has two control points: the push button and the motion detector. Exactly these rows become the channel plan that you stick on the board door as A4 landscape or edit further as CSV.",[1489,6815],{":height":6816,":width":6817,"alt":6818,"caption":6819,"src":6820},"811","1322","Wide channel table: SA\u002FS channels CH1 to CH7 with lights, room, push buttons, motion detectors in the hall and bathroom, circuit breaker and line KNX 1.1, CH8 to CH12 as spares, below the dimming actuator with the note that the channel rated current is unknown.","Assigned channels with a check mark, spares without load; the dimming actuator lacks its channel rated current.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-channels-assigned.webp",[12,6822,6823],{},"On the right of each row is the channel's finding. For the vendor-neutral dimming actuator PlanElec reports \"The channel rated current is unknown\": the template does not know the rating of the actual device. Other findings are loads assigned twice, loads without a protective device, an unsuitable channel type and overload.",[138,6825,6826,6838],{},[141,6827,6828],{},[144,6829,6830,6833,6835],{},[147,6831,6832],{},"Finding",[147,6834,2314],{},[147,6836,6837],{},"What you do",[163,6839,6840,6851,6862,6873,6884],{},[144,6841,6842,6845,6848],{},[168,6843,6844],{},"Channel rating unknown",[168,6846,6847],{},"The channel has no rated current from template or input",[168,6849,6850],{},"Enter the value from the datasheet",[144,6852,6853,6856,6859],{},[168,6854,6855],{},"Load unknown",[168,6857,6858],{},"The light has no power rating",[168,6860,6861],{},"Add the power at the device",[144,6863,6864,6867,6870],{},[168,6865,6866],{},"Duplicate load",[168,6868,6869],{},"One load hangs on two channels",[168,6871,6872],{},"Remove one assignment",[144,6874,6875,6878,6881],{},[168,6876,6877],{},"Protective device missing",[168,6879,6880],{},"The supply path of the load has no circuit breaker",[168,6882,6883],{},"Check the circuit in the diagram",[144,6885,6886,6889,6892],{},[168,6887,6888],{},"Overload",[168,6890,6891],{},"Sum of loads above the channel rating",[168,6893,6894],{},"Spread the loads or choose another channel",[12,6896,6897],{},"In the narrow dock next to the floor plan the table stays readable: control points move below the loads, and the line sits at the module.",[1489,6899],{":height":6690,":width":6557,"alt":6900,"caption":6901,"src":6902},"Channel table in the narrow dock: switch actuator with line KNX 1.1, per channel the kind, the load and below it the control points push button and motion detector.","The same table in the dock next to the floor plan.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-channels-dock.webp",[79,6904,6906],{"id":6905},"is-one-bus-line-enough-for-the-apartment","Is one bus line enough for the apartment?",[12,6908,6909,6910,6913],{},"Yes, with plenty of headroom. In the ",[15,6911,6912],{},"Lines"," view all bus devices sit on line 1.1 in area 1. The power supply module is the ABB SV\u002FS 30.640.5.1, the supply capacity 640 mA.",[138,6915,6916,6929],{},[141,6917,6918],{},[144,6919,6920,6923,6926],{},[147,6921,6922],{},"Figure",[147,6924,6925],{},"Value in the example apartment",[147,6927,6928],{},"Limit",[163,6930,6931,6942,6953],{},[144,6932,6933,6936,6939],{},[168,6934,6935],{},"Bus devices",[168,6937,6938],{},"13",[168,6940,6941],{},"64 per line",[144,6943,6944,6947,6950],{},[168,6945,6946],{},"Bus current",[168,6948,6949],{},"132 mA, of which 11 devices with an estimate",[168,6951,6952],{},"640 mA",[144,6954,6955,6958,6961],{},[168,6956,6957],{},"Line coupler",[168,6959,6960],{},"none needed",[168,6962,6963],{},"from the second line",[1489,6965],{":height":6816,":width":6817,"alt":6966,"caption":6967,"src":6968},"Lines view with line KNX 1.1, power supply module ABB SV\u002FS 30.640.5.1, 640 mA, budget 132 mA with 11 estimated devices, 13 devices against a limit of 64; each device with a drag handle, checkbox, bus current and line selection.","Bus budget of line 1.1: known and estimated values shown separately.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-lines-budget.webp",[12,6970,6971,6972,6975,6976,6979],{},"You move devices between lines by dragging, several at once via the checkboxes; without a mouse via ",[15,6973,6974],{},"Move to",". ",[15,6977,6978],{},"Add area 2"," opens another area. Unlocked physical addresses follow the line. Each line has its own colour and carries its address as its name, for example “KNX 1.1”.",[12,6981,6982,6983,56],{},"Bus current you do not enter is set to typical values and marked \"estimated\". For the ABB types the values come from manufacturer data, for the vendor-neutral templates and the control points they are estimates. Before commissioning you compare them with the datasheets. The topology shows the line as a logical picture; you draw the bus cable on the floor plan with ",[15,6984,6985],{},"Route bus",[1489,6987],{":height":6988,":width":6817,"alt":6989,"caption":6990,"src":6991},"781","Logical topology of line 1.1 with power supply, IP interface, actuators and control points.","Logical topology, not a measured cable route.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-lines-topology.webp",[12,6993,6994],{},[74,6995],{"alt":6996,"src":6997},"Green KNX bus cable with the sheath stripped, red and black cores in red and black bus terminals, white and yellow cores left free.","\u002Fimages\u002Fblog\u002Feditorial-2026-11-04\u002Fplanelec-knx-bus-cable-detail.webp",[79,6999,7001],{"id":7000},"how-do-i-set-functions-and-scenes-per-room","How do I set functions and scenes per room?",[12,7003,3370,7004,7007,7008,7011,7012,3157,7015,7018],{},[15,7005,7006],{},"Functions"," view, ",[15,7009,7010],{},"Add scene"," creates a scene with target values. For \"Away\", all lights go off and all seven shutters go to 100 %. ",[15,7013,7014],{},"Central: all off",[15,7016,7017],{},"Central: close blinds"," create the two usual central functions in one click. The functions appear in the functions by room.",[1489,7020],{":height":6690,":width":6557,"alt":7021,"caption":7022,"src":7023},"Scene editor Away with the switching and dimming channels set to off and all shutters to 100 percent.","Scene “Away” with a target value per channel.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-scene-editor.webp",[1489,7025],{":height":6690,":width":6557,"alt":7026,"caption":7027,"src":7028},"Functions and scenes view with the buttons Add scene, Central: all off and Central: close blinds, and the scene Away with 17 participants.","17 participants in the scene “Away”.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-functions.webp",[79,7030,7032],{"id":7031},"which-documents-are-produced-for-installation-handover-and-inspection","Which documents are produced for installation, handover and inspection?",[12,7034,3361,7035,7037,7038,7041,7042,7045,7046,7049,7050,7053],{},[15,7036,4665],{}," mode, section ",[15,7039,7040],{},"Domotica",", you choose distribution board, sort order, version and status. Every document has a preview and PDF, the channel and terminal plans also CSV, the topology SVG. ",[15,7043,7044],{},"Download Domotica dossier"," bundles everything behind one cover page. ",[15,7047,7048],{},"Draft"," carries a watermark and works with open data too; ",[15,7051,7052],{},"Final"," requires export readiness, and the interface names the open points.",[1489,7055],{":height":7056,":width":7057,"alt":7058,"caption":7059,"src":7060},"764","1126","Domotica section of the export with board, sorting, version and status, and the cards channel plan, terminal plan, functions by room, topology, quantities and conformity report.","Domotica documents from the same project.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-export-domotica.webp",[138,7062,7063,7071],{},[141,7064,7065],{},[144,7066,7067,7069],{},[147,7068,6152],{},[147,7070,5258],{},[163,7072,7073,7080,7088,7095],{},[144,7074,7075,7077],{},[168,7076,4015],{},[168,7078,7079],{},"Single-line diagram with bus power supply, actuators and push buttons; situation plan",[144,7081,7082,7085],{},[168,7083,7084],{},"Electrician on site",[168,7086,7087],{},"Channel plan as board-door sheet, terminal plan, quantities",[144,7089,7090,7092],{},[168,7091,6252],{},[168,7093,7094],{},"Channel plan as CSV, functions by room, topology",[144,7096,7097,7100],{},[168,7098,7099],{},"Client",[168,7101,7102],{},"Functions by room, smart home dossier",[12,7104,7105,7106,56],{},"What of this belongs on the single-line diagram and the situation plan under the Belgian AREI\u002FRGIE (the national electrical installation regulations) is explained in ",[40,7107,7109],{"href":7108},"\u002Fen\u002Fblog\u002Fdomotica-knx-electrical-installation","Home automation and KNX in the electrical installation",[79,7111,7113],{"id":7112},"how-do-i-coordinate-the-project-in-the-team","How do I coordinate the project in the team?",[12,7115,7116,7117,7120],{},"Comments are attached directly to the object. In the distribution board you select the switch actuator and write a comment in ",[15,7118,7119],{},"Module properties",", for example: Please take the bus current of the motion detectors from the datasheet.",[1489,7122],{":height":6699,":width":6700,"alt":7123,"caption":7124,"src":7125},"Cabinet with the ABB SA\u002FS 12.16.2.2 selected and an open comment about the bus current of the motion detectors in Module properties.","Comment on the module, visible to everyone in the project.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-collaboration-module-thread.webp",[12,7127,3370,7128,7131],{},[15,7129,7130],{},"Notes & tasks"," panel you hand out tasks, for example to the electrician on site. Approvals of archived documents run through the same area.",[1489,7133],{":height":6542,":width":6543,"alt":7134,"caption":7135,"src":7136},"Notes and tasks panel with the task Print the channel plan and fix it to the board door.","Task for the installation: channel plan on the board door.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-collaboration-tasks.webp",[12,7138,7139,7140,56],{},"Related guide: ",[40,7141,7142],{"href":5358},"Share plans with fitters and the workshop through Pro read access",[79,7144,7146],{"id":7145},"what-does-knx-add-addresses-and-files-for-ets","What does KNX add: addresses and files for ETS?",[12,7148,7149,7150,7153,7154,7157,7158,7161],{},"For KNX, PlanElec also proposes addresses. In the ",[15,7151,7152],{},"Addresses"," view you choose the ",[15,7155,7156],{},"Group address scheme"," and click ",[15,7159,7160],{},"Propose addresses",". In the example apartment one step creates 13 physical addresses and 61 group addresses.",[1489,7163],{":height":6816,":width":6817,"alt":7164,"caption":7165,"src":7166},"Physical addresses of line KNX 1.1: power supply without address, IP interface 1.1.1, switch actuator 1.1.2, shutter actuator 1.1.3, dimming actuator 1.1.4, then push buttons and motion detectors with their room from 1.1.5.","First the modules in cabinet order, then the control points by room.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-addresses-physical.webp",[138,7168,7169,7179],{},[141,7170,7171],{},[144,7172,7173,7176],{},[147,7174,7175],{},"Device",[147,7177,7178],{},"Physical address",[163,7180,7181,7189,7197,7205,7212,7219],{},[144,7182,7183,7186],{},[168,7184,7185],{},"ABB SV\u002FS 30.640.5.1",[168,7187,7188],{},"none (power supply)",[144,7190,7191,7194],{},[168,7192,7193],{},"ABB IPS\u002FS 3.1.1",[168,7195,7196],{},"1.1.1",[144,7198,7199,7202],{},[168,7200,7201],{},"ABB SA\u002FS 12.16.2.2",[168,7203,7204],{},"1.1.2",[144,7206,7207,7209],{},[168,7208,6639],{},[168,7210,7211],{},"1.1.3",[144,7213,7214,7216],{},[168,7215,6654],{},[168,7217,7218],{},"1.1.4",[144,7220,7221,7224],{},[168,7222,7223],{},"Push buttons and motion detectors",[168,7225,7226],{},"from 1.1.5, by room",[12,7228,7229,7230,7233,7234,7237],{},"Group addresses have three levels. In the default scheme ",[15,7231,7232],{},"Trade \u002F floor \u002F object"," the main group is the trade, the middle group the floor and the sub group the running object; ",[15,7235,7236],{},"Floor \u002F trade \u002F object"," is the alternative.",[138,7239,7240,7256],{},[141,7241,7242],{},[144,7243,7244,7247,7250,7253],{},[147,7245,7246],{},"Main group",[147,7248,7249],{},"Trade",[147,7251,7252],{},"Example in the apartment",[147,7254,7255],{},"DPT",[163,7257,7258,7271,7284,7297,7311,7325],{},[144,7259,7260,7262,7265,7268],{},[168,7261,6424],{},[168,7263,7264],{},"Lighting",[168,7266,7267],{},"1\u002F1\u002F1 Hall ceiling light switching, 1\u002F1\u002F2 status",[168,7269,7270],{},"1.001",[144,7272,7273,7275,7278,7281],{},[168,7274,6407],{},[168,7276,7277],{},"Dimming",[168,7279,7280],{},"Living room ceiling light: switching, dimming, value",[168,7282,7283],{},"1.001, 3.007, 5.001",[144,7285,7286,7288,7291,7294],{},[168,7287,6662],{},[168,7289,7290],{},"Blinds",[168,7292,7293],{},"Kitchen shutter: up\u002Fdown, stop, position",[168,7295,7296],{},"1.008, 1.007, 5.001",[144,7298,7299,7302,7305,7308],{},[168,7300,7301],{},"5",[168,7303,7304],{},"Inputs",[168,7306,7307],{},"Motion detectors hall and bathroom: switching, brightness",[168,7309,7310],{},"1.001, 9.004",[144,7312,7313,7316,7319,7322],{},[168,7314,7315],{},"6",[168,7317,7318],{},"Scenes",[168,7320,7321],{},"Scene \"Away\"",[168,7323,7324],{},"17.001",[144,7326,7327,7329,7332,7335],{},[168,7328,6631],{},[168,7330,7331],{},"Central",[168,7333,7334],{},"\"All off\", \"Close blinds\"",[168,7336,7337],{},"1.001, 1.008",[1489,7339],{":height":6816,":width":6817,"alt":7340,"caption":7341,"src":7342},"Group addresses of main group 1 Lighting, middle group 1\u002F1 Apartment: one row per light with switching and status side by side, datapoint type 1.001 with its name, below the push button and detector reference.","One row per channel: switching and status side by side, below the push buttons and detectors that use them.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-addresses-groups.webp",[12,7344,7345],{},"A push button gets no group address of its own; every key refers to the group address of its channel. The motion detector has its own switching object and a brightness object. Spare channels stay without a group address. Each row shows a channel with the name of its load; further objects appear as “+3 objects”. Clicking an address opens the input field; changed and locked addresses are kept by every further proposal, and the lock appears on locked addresses and on hover.",[12,7347,7348,7349,7352],{},"For this, Export has the ",[15,7350,7351],{},"ETS preparation"," box. It does not depend on the dossier approval.",[1489,7354],{":height":7355,":width":7057,"alt":7356,"caption":7357,"src":7358},"138","ETS preparation box with Group addresses CSV (ETS), Group addresses XML (ETS) and Physical address list CSV.","Three files for ETS; PlanElec does not create the project file.","\u002Fhelp\u002Fknx-ets-preparation\u002Fen-export-ets.webp",[138,7360,7361,7370],{},[141,7362,7363],{},[144,7364,7365,7368],{},[147,7366,7367],{},"File",[147,7369,3727],{},[163,7371,7372,7383,7394],{},[144,7373,7374,7377],{},[168,7375,7376],{},"Group addresses CSV (ETS)",[168,7378,7379,7380],{},"Three-level format \"3\u002F1\", main, middle and sub group, DPT as ",[25,7381,7382],{},"DPST-x-y",[144,7384,7385,7388],{},[168,7386,7387],{},"Group addresses XML (ETS)",[168,7389,7390,7391],{},"Group addresses in the XML schema ",[25,7392,7393],{},"http:\u002F\u002Fknx.org\u002Fxml\u002Fga-export\u002F01",[144,7395,7396,7399],{},[168,7397,7398],{},"Physical address list CSV",[168,7400,7401],{},"Line, address, device, kind, room as a working list",[12,7403,7404],{},"In the description of every group address PlanElec writes which keys, detectors and scene members use it. Devices, parameters and links are created in ETS. The files follow the ETS format; we have not tested an import against a particular ETS version and do not promise one.",[79,7406,7408],{"id":7407},"where-are-the-limits","Where are the limits?",[138,7410,7411,7421],{},[141,7412,7413],{},[144,7414,7415,7418],{},[147,7416,7417],{},"PlanElec",[147,7419,7420],{},"Manufacturer software, installation or inspection",[163,7422,7423,7431,7439,7447,7455,7463],{},[144,7424,7425,7428],{},[168,7426,7427],{},"Planning and documentation of board, channels, terminals, lines",[168,7429,7430],{},"Programming the devices, parameters, logic",[144,7432,7433,7436],{},[168,7434,7435],{},"Channel, terminal and function plans, topology, dossier",[168,7437,7438],{},"Wiring on site, single-conductor wiring plan",[144,7440,7441,7444],{},[168,7442,7443],{},"Bus budget with entered and estimated values",[168,7445,7446],{},"Measurement, bus diagnostics, commissioning",[144,7448,7449,7452],{},[168,7450,7451],{},"Logical lines and bus cable on the floor plan",[168,7453,7454],{},"Surveyed cable routes, insulation testing",[144,7456,7457,7460],{},[168,7458,7459],{},"KNX only: address proposal and files in ETS format",[168,7461,7462],{},"ETS project file (.knxproj), links to communication objects",[144,7464,7465,7468],{},[168,7466,7467],{},"Planning findings and the project's AREI self-check",[168,7469,7470],{},"Acceptance by the approved inspection body",[79,7472,1617],{"id":1616},[1041,7474,7476],{"id":7475},"does-this-work-without-knx","Does this work without KNX?",[12,7478,7479],{},"Yes. Distribution board, channel plan, terminal plan, functions by room, dossier and collaboration apply today to KNX and vendor-neutral planning; Niko Home Control II, Loxone, Shelly and Sonoff follow soon. Lines and their limits follow the respective profile. Only the addresses and the files for ETS are KNX-specific.",[1041,7481,7483],{"id":7482},"can-i-stick-the-channel-plan-on-the-board-door","Can I stick the channel plan on the board door?",[12,7485,7486],{},"Yes. The channel plan is meant as an A4 landscape PDF, sorted by module, circuit breaker, room or terminal. As CSV you keep editing it.",[1041,7488,7490],{"id":7489},"what-is-the-difference-between-draft-and-final","What is the difference between draft and final?",[12,7492,7493],{},"A draft carries a watermark and also works with open data. Final requires export readiness; the interface names the open points. A final document is not an official certificate of conformity either.",[1041,7495,7497],{"id":7496},"do-i-need-abb-modules","Do I need ABB modules?",[12,7499,7500],{},"No. Vendor-neutral templates work for any brand. The ABB types come with order numbers and bus current from manufacturer data.",[1041,7502,7504],{"id":7503},"does-planelec-create-an-ets-project","Does PlanElec create an ETS project?",[12,7506,7507],{},"No. For KNX, PlanElec exports group addresses and physical addresses as files in ETS format. You create the ETS project, the devices and their links in ETS.",[1041,7509,7511],{"id":7510},"where-do-i-find-the-guide","Where do I find the guide?",[12,7513,7514,7515,7517,7518,7521],{},"In the help centre under ",[40,7516,6122],{"href":6121},". In the Studio, the ",[15,7519,7520],{},"Smart home tour"," in the learning center shows the same path in about three minutes.",[12,7523,7524,7527,7528,7530,7531,56],{},[15,7525,7526],{},"Documenting smart home for your next installation?"," Distribution board, channel plan, terminal plan and dossier are part of ",[40,7529,31],{"href":1964},"; plans are listed under ",[40,7532,7533],{"href":54},"Pricing",[79,7535,7537],{"id":7536},"related-articles","Related articles",[84,7539,7540,7545,7549],{},[87,7541,7542],{},[40,7543,7544],{"href":7108},"Home Automation and KNX in the Electrical Installation: What Belongs on the Plan and the Single-Line Diagram?",[87,7546,7547],{},[40,7548,6127],{"href":6126},[87,7550,7551],{},[40,7552,6122],{"href":6121},[79,7554,2009],{"id":2008},[84,7556,7557],{},[87,7558,7559,38,7562,2033,7564,56],{},[15,7560,7561],{},"For professional planning and your business:",[40,7563,2032],{"href":1964},[40,7565,2036],{"href":54},[12,7567,7568,7570],{},[15,7569,2041],{}," for one person, without payment details or an automatic switch to a subscription. With a valid VAT number you start immediately; without one you request approval. The trial includes exports without masked areas; a confirmed account is required.",{"title":2044,"searchDepth":2045,"depth":2045,"links":7572},[7573,7574,7575,7576,7577,7578,7579,7580,7581,7582,7583,7584,7585,7586,7594,7595],{"id":6130,"depth":2045,"text":6131},{"id":6369,"depth":2045,"text":6370},{"id":6524,"depth":2045,"text":6525},{"id":6563,"depth":2045,"text":6564},{"id":6713,"depth":2045,"text":6714},{"id":6762,"depth":2045,"text":6763},{"id":6805,"depth":2045,"text":6806},{"id":6905,"depth":2045,"text":6906},{"id":7000,"depth":2045,"text":7001},{"id":7031,"depth":2045,"text":7032},{"id":7112,"depth":2045,"text":7113},{"id":7145,"depth":2045,"text":7146},{"id":7407,"depth":2045,"text":7408},{"id":1616,"depth":2045,"text":1617,"children":7587},[7588,7589,7590,7591,7592,7593],{"id":7475,"depth":2053,"text":7476},{"id":7482,"depth":2053,"text":7483},{"id":7489,"depth":2053,"text":7490},{"id":7496,"depth":2053,"text":7497},{"id":7503,"depth":2053,"text":7504},{"id":7510,"depth":2053,"text":7511},{"id":7536,"depth":2045,"text":7537},{"id":2008,"depth":2045,"text":2009},"2026-11-04","Distribution board with modules and terminals, channel plan for the board door, terminal plan, functions by room, bus lines with bus budget and a dossier as draft or final – for KNX or vendor-neutral planning; Niko Home Control, Loxone, Shelly and Sonoff follow soon. Shown on a fictitious Brussels KNX apartment, with all limits.",[7599,2118],"smart-home","2026-11-11",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-11-04\u002Fshare\u002Fplanelec-knx-apartment-ets-editorial.jpg","\u002Fblog\u002Fknx-apartment-ets.en","17 min",{"title":6100,"description":7597},"Documenting smart home: board, channel plan, dossier","knx-planning-apartment-ets-preparation","blog\u002Fknx-apartment-ets.en",[6530,7610,6252,3115,6169,6180,6280,7611,7612,7613,7614,4261],"Building automation","Niko Home Control","Loxone","Shelly","ABB i-bus","7kTWiNcVGZHGinCPZz6uJFWLAz3edVwM1wQsGx5iimk","\u002Fblog\u002Fknx-planning-apartment-ets-preparation",{"id":7618,"title":6122,"body":7619,"category":8555,"description":8556,"extension":2113,"guideId":8557,"image":8558,"locale":2119,"meta":8559,"navigation":2121,"order":8560,"path":8561,"publishedAt":7596,"readTime":8562,"seo":8563,"seoTitle":8564,"slug":8565,"stem":8566,"tags":8567,"updatedAt":7600,"__hash__":8570,"kind":3594,"href":8571,"date":7596,"labels":8572},"help\u002Fhelp\u002Fknx-ets-preparation.en.md",{"type":9,"value":7620,"toc":8539},[7621,7627,7637,7641,7695,7700,7702,7735,7739,7757,7762,7764,7795,7799,7802,7806,7818,7823,7827,7850,7854,7857,7862,7866,7892,7912,7917,7921,7924,7929,7933,7979,7983,7988,7993,7997,8028,8032,8035,8040,8044,8070,8127,8142,8146,8151,8155,8168,8172,8177,8181,8205,8209,8262,8265,8344,8348,8355,8360,8364,8387,8391,8430,8433,8437,8441,8500,8504,8514,8518],[12,7622,7623,7626],{},[15,7624,7625],{},"In the Smart home mode you plan and document building automation from the same project as the floor plan and the single-line diagram: choose the automation system, put modules in the distribution board, assign lights and shutters to channels, link push buttons and motion detectors, check the lines."," This produces the channel plan for the board door as PDF or CSV, the terminal plan, the functions by room, topology and quantities, individually or as a Domotica dossier in draft or final. It works today for KNX and vendor-neutral planning; Niko Home Control II, Loxone, Shelly and Sonoff follow soon. Programming the devices stays in the manufacturer's software.",[12,7628,7629,7630,7634,7635,56],{},"The guide follows a KNX example: a fictitious Belgian apartment with seven rooms, a push button in every room, a shutter at every window and motion detectors in the hall and the bathroom. For KNX two sections are added at the end: proposed addresses and files for ETS. The whole story is told in the blog post ",[40,7631,7633],{"href":7632},"\u002Fen\u002Fblog\u002Fknx-planning-apartment-ets-preparation","Documenting a smart home installation with a KNX apartment",". Status, version and data hash of the documents are described in ",[40,7636,6127],{"href":6126},[79,7638,7640],{"id":7639},"what-do-i-need-before-i-start","What do I need before I start?",[138,7642,7643,7653],{},[141,7644,7645],{},[144,7646,7647,7650],{},[147,7648,7649],{},"Prerequisite",[147,7651,7652],{},"Why",[163,7654,7655,7663,7671,7679,7687],{},[144,7656,7657,7660],{},[168,7658,7659],{},"Floor plan with rooms",[168,7661,7662],{},"Rooms place control points and group addresses on the right floor",[144,7664,7665,7668],{},[168,7666,7667],{},"Lights and shutters placed",[168,7669,7670],{},"They are the loads you assign to the actuator channels",[144,7672,7673,7676],{},[168,7674,7675],{},"Circuits with protective device",[168,7677,7678],{},"Every switched load needs its circuit breaker in the single-line diagram",[144,7680,7681,7684],{},[168,7682,7683],{},"Distribution board with free DIN rail",[168,7685,7686],{},"PlanElec puts the automation modules there",[144,7688,7689,7692],{},[168,7690,7691],{},"Project role with edit rights",[168,7693,7694],{},"Viewers see the planning but cannot change it",[12,7696,7697],{},[40,7698],{"id":7699},"activate",[79,7701,6525],{"id":6524},[3139,7703,7704,7713,7723],{},[87,7705,7706,7707,7709,7710,7712],{},"In the mode bar on the left, choose ",[15,7708,6530],{},". The ",[15,7711,6534],{}," panel opens on the right.",[87,7714,3370,7715,7717,7718,3324,7720,7722],{},[15,7716,6538],{}," bar, click your system: ",[15,7719,6280],{},[15,7721,6354],{},". Niko Home Control II, Loxone, Shelly Pro \u002F Plus and Sonoff follow soon and are marked “Coming soon” in the bar. PlanElec then offers the modules, control points and line types of that system. In the example it is KNX.",[87,7724,7725,7726,7728,7729,3385,7732,56],{},"You can tell it worked from the ",[15,7727,6552],{},": step 1 ",[15,7730,7731],{},"System",[15,7733,7734],{},"Active",[1489,7736],{":height":6556,":width":6557,"alt":7737,"caption":7738,"src":6560},"Domotica planning steps: System active, Modules, Loads, Lines and Export still open; below, the Place module form with module and rail.","The five planning steps show the status; directly below you place the first module.",[12,7740,7741,7742,1774,7744,1774,7747,1774,7749,3157,7751,7753,7754,7756],{},"The five planning steps are ",[15,7743,7731],{},[15,7745,7746],{},"Modules",[15,7748,6784],{},[15,7750,6912],{},[15,7752,4665],{},". Each step shows its status, for example “Channels: 12” or “Assigned: 17 of 17”, and takes you with one click to whatever is still open. You can also choose the system in the project metadata under ",[15,7755,7610],{},"; the effect is the same. A project can carry several systems.",[12,7758,7759],{},[40,7760],{"id":7761},"modules",[79,7763,6564],{"id":6563},[3139,7765,7766,7771,7777,7784],{},[87,7767,7768,7769,56],{},"Below the planning steps, open ",[15,7770,6668],{},[87,7772,7773,7774,7776],{},"Choose the template under ",[15,7775,6579],{},". The list shows the modules of the chosen system, grouped by device family; for KNX, for example, power supply, line coupler, IP interface, switch, shutter, dimming and heating actuators and binary inputs, vendor-neutral and as ABB i-bus types with order numbers.",[87,7778,7779,7780,7157,7782,56],{},"Choose the DIN rail in the board under ",[15,7781,6576],{},[15,7783,6672],{},[87,7785,7786,7787,7790,7791,7794],{},"PlanElec puts the module in the first free slot, creates its channels and assigns power supply, bus devices and control points to the system's line, for KNX the default line ",[15,7788,7789],{},"1.1",". The message “… placed, channels created.” confirms the step; ",[15,7792,7793],{},"Place another module"," opens the form again.",[1489,7796],{":height":6542,":width":6543,"alt":7797,"caption":7798,"src":6678},"Open module list in Place module: KNX power supply, ABB SV\u002FS 30.640.5.1, ABB SV\u002FS 30.320.2.1, line couplers and IP interfaces, grouped by family.","Vendor-neutral templates and ABB i-bus types are in the same list, grouped by family.",[12,7800,7801],{},"In the example apartment, the rail “KNX 1” holds an ABB SV\u002FS 30.640.5.1 (640 mA power supply), an ABB IPS\u002FS 3.1.1 (IP interface) and an ABB SA\u002FS 12.16.2.2 (12-fold switch actuator); “KNX 2” holds a vendor-neutral 8× shutter actuator and a 4× dimming actuator. The cabinet shows the ABB types in the manufacturer’s style, with red and black bus terminals.",[1489,7803],{":height":6706,":width":6707,"alt":7804,"caption":7805,"src":6710},"Distribution board with two KNX rails: power supply, IP interface and 12-fold switch actuator on KNX 1, shutter and dimming actuator on KNX 2, the ABB types with red and black bus terminals.","The placed modules in the board, the ABB types with red and black bus terminals.",[12,7807,7808,7809,7811,7812,7814,7815,7817],{},"In the distribution board editor (",[15,7810,3115],{}," panel) the automation modules sit together with the main switch, RCDs and circuit breakers. There you maintain terminal blocks and wiring. The terminals of the automation channels, with strips, targets and bridges, are maintained in the ",[15,7813,6534],{}," panel under ",[15,7816,6180],{},". Order numbers and bus current of the ABB types come from the manufacturer’s data. Check them against the actual datasheet before ordering. ABB is a trademark of the ABB Group; PlanElec is not an ABB partner.",[12,7819,7820],{},[40,7821],{"id":7822},"controls",[79,7824,7826],{"id":7825},"how-do-i-plan-push-buttons-and-motion-detectors","How do I plan push buttons and motion detectors?",[3139,7828,7829,7832,7847],{},[87,7830,7831],{},"Close the panel so the floor plan is free, and open the catalog.",[87,7833,3361,7834,7836,7837,1774,7839,1774,7841,3324,7843,7846],{},[15,7835,6769],{},", choose a ",[15,7838,6442],{},[15,7840,6427],{},[15,7842,6410],{},[15,7844,7845],{},"Motion detector"," and click on the wall or ceiling in the room.",[87,7848,7849],{},"The floor plan shows the symbol in the room. Bus control points end up on the line of their system (line 1.1 for KNX) without any further step.",[1489,7851],{":height":6511,":width":4096,"alt":7852,"caption":7853,"src":6775},"Floor plan of the apartment with seven rooms: push buttons next to every door, motion detectors in the hall and bathroom, shutters at all windows and lights in every room.","A push button in every room, motion detectors in the hall and bathroom, shutters at all seven windows.",[12,7855,7856],{},"When addresses are proposed, motion and presence detectors get two objects of their own: a switch object (DPT 1.001) linked to the switching group address of the light channel, and a brightness object (DPT 9.004). A push button gets no group address of its own; its buttons refer to the group addresses of the channels they operate.",[12,7858,7859],{},[40,7860],{"id":7861},"channels",[79,7863,7865],{"id":7864},"how-do-i-assign-loads-and-push-buttons-to-the-channels","How do I assign loads and push buttons to the channels?",[12,7867,3370,7868,7870,7871,7874,7875,1774,7878,1774,7880,1774,7882,1774,7884,1774,7887,3157,7890,56],{},[15,7869,6534],{}," panel, choose the ",[15,7872,7873],{},"Channel matrix"," view. The channel table shows one group per module with board, rail, slot, type and line, and below it every channel with ",[15,7876,7877],{},"Channel type",[15,7879,6784],{},[15,7881,6382],{},[15,7883,6790],{},[15,7885,7886],{},"Terminal",[15,7888,7889],{},"Protection device",[15,7891,6812],{},[3139,7893,7894,7902,7909],{},[87,7895,3370,7896,7898,7899,7901],{},[15,7897,6784],{}," column, click ",[15,7900,6781],{}," and choose the light or shutter. PlanElec offers the loads that match the channel type.",[87,7903,3370,7904,7898,7906,7908],{},[15,7905,6790],{},[15,7907,6781],{}," and choose the push button or motion detector.",[87,7910,7911],{},"Repeat this for every channel. Room and protective device come from the project; you do not enter them twice.",[12,7913,7914,7916],{},[15,7915,6794],{}," distributes unassigned loads to free channels by room and channel type. Existing assignments are kept. Review the proposal channel by channel afterwards.",[1489,7918],{":height":6816,":width":6817,"alt":7919,"caption":7920,"src":6820},"Channel table of the ABB SA\u002FS 12.16.2.2: CH1 to CH7 with ceiling lights, LED strip and mirror light, push buttons and motion detectors, room, circuit breaker and line KNX 1.1; CH8 to CH12 as spares; below, the dimming actuator with a note that the channel rated current is unknown.","Seven assigned switching channels, five spares; for the dimming actuator PlanElec reports the missing channel rated current.",[12,7922,7923],{},"The right end of each row shows the channel’s finding. A check mark means no open planning data. An exclamation mark says what is missing, in the example “The channel rated current is unknown; check the device and enter its rating.” for the vendor-neutral dimming actuator. Other findings include a load assigned twice, a load without protective device, an unsuitable channel type or an overload. The findings are planning checks; the project’s AREI self-check stays separate. (The AREI, called RGIE in French, is the Belgian regulation for electrical installations.)",[12,7925,7926],{},[40,7927],{"id":7928},"lines",[79,7930,7932],{"id":7931},"how-do-i-check-lines-and-bus-budget","How do I check lines and bus budget?",[3139,7934,7935,7942,7956,7966,7973],{},[87,7936,3370,7937,7870,7939,7941],{},[15,7938,6534],{},[15,7940,6912],{}," view.",[87,7943,7944,7945,7948,7949,7952,7953,7955],{},"Click ",[15,7946,7947],{},"Assign unallocated devices"," if bus devices without a line are left. ",[15,7950,7951],{},"Add KNX line"," creates another line, ",[15,7954,6978],{}," another area. Each line has its own colour and carries its address as its name, for example “KNX 1.1”.",[87,7957,7958,7959,3157,7962,7965],{},"In the line card, choose ",[15,7960,7961],{},"Power supply module",[15,7963,7964],{},"Supply capacity (mA)",", for example 640 mA.",[87,7967,7968,7969,7972],{},"Enter the datasheet value under ",[15,7970,7971],{},"Bus current (mA)"," wherever you know it.",[87,7974,7975,7976,7978],{},"Drag devices between lines, several at once via the checkboxes; without a mouse use ",[15,7977,6974],{},". Unlocked physical addresses follow the line.",[1489,7980],{":height":6816,":width":6817,"alt":7981,"caption":7982,"src":6968},"Lines view with line KNX 1.1 in area 1, drag handles and checkboxes per device, power supply module ABB SV\u002FS 30.640.5.1, supply capacity 640 mA, bus budget 132 mA of 640 mA with 11 estimated devices, 13 devices against a limit of 64.","Line 1.1: 132 mA of 640 mA, eleven devices with estimated bus current; 13 of 64 devices.",[12,7984,7985,7986,56],{},"The budget shows the bus current against the supply and the number of devices against the limit of 64 devices per line. For values you have not entered, PlanElec uses typical values and marks them as “estimated”. Before commissioning, check them against the datasheets. A line is a logical planning state, not a measured cable route; you draw the bus cable on the floor plan with ",[15,7987,6985],{},[12,7989,7990],{},[40,7991],{"id":7992},"functions",[79,7994,7996],{"id":7995},"how-do-i-create-functions-scenes-and-central-functions","How do I create functions, scenes and central functions?",[3139,7998,7999,8005,8010,8025],{},[87,8000,3370,8001,7870,8003,7941],{},[15,8002,6534],{},[15,8004,7006],{},[87,8006,8007,8009],{},[15,8008,7010],{}," opens the scene editor. Enter a name, for example “Away”, then choose the channels and their target value: on or off for switching, a percentage for dimming and shutters.",[87,8011,8012,3157,8014,8016,8017,8020,8021,8024],{},[15,8013,7014],{},[15,8015,7017],{}," create the usual central functions in one click. ",[15,8018,8019],{},"Function from channel"," with ",[15,8022,8023],{},"Create"," turns a single channel into a function.",[87,8026,8027],{},"The functions appear in the functions by room. For KNX, scenes and central functions get their own group addresses with the address proposal (see below).",[1489,8029],{":height":6690,":width":6557,"alt":8030,"caption":8031,"src":7023},"Scene editor named Away: all switching and dimming channels set to off, all seven shutters to 100 percent.","Scene “Away”: lights off, all shutters closed.",[1489,8033],{":height":6690,":width":6557,"alt":7026,"caption":8034,"src":7028},"The scene “Away” with 17 participants; the central functions follow in the same list.",[12,8036,8037],{},[40,8038],{"id":8039},"documents",[79,8041,8043],{"id":8042},"which-documents-are-produced-for-the-board-door-installation-and-handover","Which documents are produced for the board door, installation and handover?",[3139,8045,8046,8054,8057],{},[87,8047,7706,8048,8050,8051,8053],{},[15,8049,4665],{}," and scroll to the ",[15,8052,7040],{}," section.",[87,8055,8056],{},"Choose board, sort order (module, circuit breaker, room or terminal), version and status.",[87,8058,8059,8060,3157,8063,8066,8067,8069],{},"Every document has ",[15,8061,8062],{},"Preview",[15,8064,8065],{},"PDF","; the channel and terminal plans also come as CSV, the topology as SVG. ",[15,8068,7044],{}," bundles everything behind one cover page.",[138,8071,8072,8080],{},[141,8073,8074],{},[144,8075,8076,8078],{},[147,8077,5258],{},[147,8079,3727],{},[163,8081,8082,8089,8096,8103,8111,8119],{},[144,8083,8084,8086],{},[168,8085,6169],{},[168,8087,8088],{},"Board, module, channel, load, room, protective device, terminal, control point; A4 landscape for the board door",[144,8090,8091,8093],{},[168,8092,6180],{},[168,8094,8095],{},"Strips, terminals, targets and bridges per board",[144,8097,8098,8100],{},[168,8099,6191],{},[168,8101,8102],{},"Keys and the loads they operate; scenes and central functions",[144,8104,8105,8108],{},[168,8106,8107],{},"Topology diagram",[168,8109,8110],{},"Logical lines of the project, also as SVG",[144,8112,8113,8116],{},[168,8114,8115],{},"Domotica quantities",[168,8117,8118],{},"Modules, power supplies, control points and signal cables as counts, no prices",[144,8120,8121,8124],{},[168,8122,8123],{},"Conformity report with Domotica",[168,8125,8126],{},"Self-check report with findings and check limits",[12,8128,8129,8131,8132,8134,8135,8138,8139,56],{},[15,8130,7048],{}," carries a watermark and also works with open data. ",[15,8133,7052],{}," requires export readiness; the interface names the open points and offers ",[15,8136,8137],{},"Address the next open item",". Status, version and data hash are explained in ",[40,8140,6127],{"href":8141},"\u002Fen\u002Fhelp\u002Fplan-and-document-knx#export",[1489,8143],{":height":7056,":width":7057,"alt":8144,"caption":8145,"src":7060},"Domotica section of the export with board, sorting, version and status, and the cards of the Domotica documents.","Domotica documents in the export: board, sorting, version and draft or final.",[12,8147,8148],{},[40,8149],{"id":8150},"team",[79,8152,8154],{"id":8153},"how-do-i-agree-open-points-with-the-team","How do I agree open points with the team?",[12,8156,8157,8158,8160,8161,8163,8164,8167],{},"Select a module in the cabinet and, in ",[15,8159,7119],{},", open the speech bubble icon next to the module name. There you write a comment directly on the module, for example about a bus current that still has to come from the datasheet. In the ",[15,8162,7130],{}," panel, under ",[15,8165,8166],{},"Tasks",", you create a task and assign it. Approvals of archived documents run through the same area.",[1489,8169],{":height":6699,":width":6700,"alt":8170,"caption":8171,"src":7125},"Cabinet with the ABB SA\u002FS 12.16.2.2 selected and an open comment in Module properties: Please take the bus current of the motion detectors from the datasheet.","Comment directly on the switch actuator; the number on the icon shows how many posts there are.",[12,8173,8174],{},[40,8175],{"id":8176},"addresses",[79,8178,8180],{"id":8179},"knx-only-how-does-planelec-propose-physical-addresses-and-group-addresses","KNX only: how does PlanElec propose physical addresses and group addresses?",[3139,8182,8183,8189,8200],{},[87,8184,3370,8185,7870,8187,7941],{},[15,8186,6534],{},[15,8188,7152],{},[87,8190,8191,8192,8194,8195,8197,8198,56],{},"Choose the ",[15,8193,7156],{},": ",[15,8196,7232],{}," (default) or ",[15,8199,7236],{},[87,8201,7944,8202,8204],{},[15,8203,7160],{},". The line below states the result, in the example “13 physical addresses and 61 group addresses proposed.” The proposal is a single undo step.",[1489,8206],{":height":6816,":width":6817,"alt":8207,"caption":8208,"src":7166},"KNX addresses: scheme Trade \u002F floor \u002F object, Propose addresses button, below it line 1.1 with the power supply without address, IP interface 1.1.1, switch actuator 1.1.2, shutter actuator 1.1.3, dimming actuator 1.1.4, and push buttons and motion detectors from 1.1.5 with their room.","Physical addresses of line 1.1: first the modules in cabinet order, then the control points by room.",[138,8210,8211,8221],{},[141,8212,8213],{},[144,8214,8215,8218],{},[147,8216,8217],{},"Rule",[147,8219,8220],{},"Proposal",[163,8222,8223,8230,8238,8246,8254],{},[144,8224,8225,8227],{},[168,8226,6957],{},[168,8228,8229],{},"x.y.0",[144,8231,8232,8235],{},[168,8233,8234],{},"Power supply",[168,8236,8237],{},"no physical address",[144,8239,8240,8243],{},[168,8241,8242],{},"Actuators and interfaces",[168,8244,8245],{},"from x.y.1 in cabinet order (board, rail, slot)",[144,8247,8248,8251],{},[168,8249,8250],{},"Bus control points",[168,8252,8253],{},"afterwards, by room",[144,8255,8256,8259],{},[168,8257,8258],{},"Devices without a line",[168,8260,8261],{},"no address; the summary counts them and the check reports them",[12,8263,8264],{},"Group addresses have three levels: main group, middle group, sub group. In the default scheme the main group is the trade, the middle group the floor (0 without floor) and the sub group the running object number.",[138,8266,8267,8278],{},[141,8268,8269],{},[144,8270,8271,8273,8275],{},[147,8272,7246],{},[147,8274,7249],{},[147,8276,8277],{},"Objects and datapoint type (DPT)",[163,8279,8280,8289,8298,8307,8317,8326,8335],{},[144,8281,8282,8284,8286],{},[168,8283,6424],{},[168,8285,7264],{},[168,8287,8288],{},"switch 1.001, status 1.001",[144,8290,8291,8293,8295],{},[168,8292,6407],{},[168,8294,7277],{},[168,8296,8297],{},"switch 1.001, relative dimming 3.007, brightness value 5.001, status 1.001 and 5.001",[144,8299,8300,8302,8304],{},[168,8301,6662],{},[168,8303,7290],{},[168,8305,8306],{},"up\u002Fdown 1.008, stop\u002Fslat 1.007, position 5.001, position status 5.001",[144,8308,8309,8311,8314],{},[168,8310,6659],{},[168,8312,8313],{},"Heating",[168,8315,8316],{},"setpoint and actual value 9.001, valve output 5.001, operating mode 20.102",[144,8318,8319,8321,8323],{},[168,8320,7301],{},[168,8322,7304],{},[168,8324,8325],{},"switch object 1.001; detector brightness 9.004",[144,8327,8328,8330,8332],{},[168,8329,7315],{},[168,8331,7318],{},[168,8333,8334],{},"scene 17.001",[144,8336,8337,8339,8341],{},[168,8338,6631],{},[168,8340,7331],{},[168,8342,8343],{},"switch 1.001 or up\u002Fdown 1.008",[1489,8345],{":height":6816,":width":6817,"alt":8346,"caption":8347,"src":7342},"Group addresses of main group 1 Lighting, middle group 1\u002F1 Apartment: row Ceiling light hall with switching 1\u002F1\u002F1 and status 1\u002F1\u002F2 side by side, datapoint type 1.001 with its name, below the push button and reference to 5\u002F1\u002F1.","Main group Lighting: one row per channel, switching and status side by side, below the push button and detector link.",[12,8349,8350,8351,8354],{},"Group addresses are only created for channels with at least one load; a spare channel stays without an address. Each row shows a channel with the name of its load; switching and status sit side by side, each with its datapoint type and name, further objects as “+3 objects”. Clicking an address opens the input field. PlanElec locks a changed address automatically; with the lock (",[15,8352,8353],{},"Lock address","), which appears on hover, you lock it explicitly. Every further proposal keeps locked addresses, and their numbers are not reassigned. The check reports duplicate or invalid addresses as conflicts.",[12,8356,8357],{},[40,8358],{"id":8359},"ets",[79,8361,8363],{"id":8362},"knx-only-how-do-i-download-the-addresses-as-files-for-ets","KNX only: how do I download the addresses as files for ETS?",[3139,8365,8366,8372,8384],{},[87,8367,7706,8368,8050,8370,8053],{},[15,8369,4665],{},[15,8371,7040],{},[87,8373,3370,8374,8376,8377,1774,8379,3324,8381,8383],{},[15,8375,7351],{}," box, download ",[15,8378,7376],{},[15,8380,7387],{},[15,8382,7398],{},". Without an address proposal, the box tells you to propose addresses first.",[87,8385,8386],{},"The files follow the ETS group address format. You create devices, parameters and the links to communication objects in ETS; check every address you take over there.",[1489,8388],{":height":7355,":width":7057,"alt":8389,"caption":8390,"src":7358},"ETS preparation box in the export with the buttons Group addresses CSV (ETS), Group addresses XML (ETS) and Physical address list CSV.","The three files in the ETS preparation box; PlanElec does not create an ETS project.",[138,8392,8393,8401],{},[141,8394,8395],{},[144,8396,8397,8399],{},[147,8398,7367],{},[147,8400,3727],{},[163,8402,8403,8413,8423],{},[144,8404,8405,8407],{},[168,8406,7376],{},[168,8408,8409,8410,8412],{},"Format “3\u002F1”: main, middle and sub group, address, description, DPT as ",[25,8411,7382],{},"; comma, UTF-8 with BOM",[144,8414,8415,8417],{},[168,8416,7387],{},[168,8418,8419,8420,8422],{},"Group address export in the XML schema ",[25,8421,7393],{}," with range names",[144,8424,8425,8427],{},[168,8426,7398],{},[168,8428,8429],{},"Line, physical address, device, type and room as a working list",[12,8431,8432],{},"Group addresses carry no link to communication objects. That is why the description of every group address states which buttons, detectors or scene participants use it; you create the link itself in ETS. We have not tested an import against a particular ETS version and do not promise one. The exports do not depend on the dossier release: you can download them while the project is still a draft.",[12,8434,8435],{},[40,8436],{"id":3425},[79,8438,8440],{"id":8439},"what-does-planelec-not-do","What does PlanElec not do?",[138,8442,8443,8453],{},[141,8444,8445],{},[144,8446,8447,8450],{},[147,8448,8449],{},"PlanElec does",[147,8451,8452],{},"Stays in the manufacturer's software or on site",[163,8454,8455,8463,8471,8478,8485,8492],{},[144,8456,8457,8460],{},[168,8458,8459],{},"Plans and documents board, channels, terminals and lines",[168,8461,8462],{},"Programming the devices, parameters and logic",[144,8464,8465,8468],{},[168,8466,8467],{},"Channel, terminal and function plans, topology, quantities, dossier",[168,8469,8470],{},"Wiring on site, single-conductor wiring plan, ordering",[144,8472,8473,8475],{},[168,8474,7443],{},[168,8476,8477],{},"Measuring the bus current, bus diagnostics, commissioning",[144,8479,8480,8482],{},[168,8481,7451],{},[168,8483,8484],{},"Measured cable routes, insulation testing",[144,8486,8487,8489],{},[168,8488,7459],{},[168,8490,8491],{},"ETS project (.knxproj), product databases, communication objects",[144,8493,8494,8497],{},[168,8495,8496],{},"Planning findings and the AREI self-check",[168,8498,8499],{},"Acceptance of the installation by the approved inspection body",[79,8501,8503],{"id":8502},"can-the-workflow-be-shown-in-the-studio","Can the workflow be shown in the Studio?",[12,8505,8506,8507,8510,8511,8513],{},"Yes. In the ",[15,8508,8509],{},"Learning center",", start the ",[15,8512,7520],{},". In about three minutes it shows the system, planning steps, Place module, channel table, lines, functions and the documents in the export, for KNX also addresses and ETS preparation, without changing your project. It skips steps whose target is still missing in the project.",[79,8515,8517],{"id":8516},"related-guides","Related guides",[84,8519,8520,8524,8529,8534],{},[87,8521,8522],{},[40,8523,6127],{"href":6126},[87,8525,8526],{},[40,8527,8528],{"href":4175},"Edit switch chains, circuits and cable routes",[87,8530,8531],{},[40,8532,8533],{"href":4645},"Exporting documents and assembling an installation dossier",[87,8535,8536],{},[40,8537,8538],{"href":1085},"What does PlanElec's AREI self-check verify?",{"title":2044,"searchDepth":2045,"depth":2045,"links":8540},[8541,8542,8543,8544,8545,8546,8547,8548,8549,8550,8551,8552,8553,8554],{"id":7639,"depth":2045,"text":7640},{"id":6524,"depth":2045,"text":6525},{"id":6563,"depth":2045,"text":6564},{"id":7825,"depth":2045,"text":7826},{"id":7864,"depth":2045,"text":7865},{"id":7931,"depth":2045,"text":7932},{"id":7995,"depth":2045,"text":7996},{"id":8042,"depth":2045,"text":8043},{"id":8153,"depth":2045,"text":8154},{"id":8179,"depth":2045,"text":8180},{"id":8362,"depth":2045,"text":8363},{"id":8439,"depth":2045,"text":8440},{"id":8502,"depth":2045,"text":8503},{"id":8516,"depth":2045,"text":8517},"automation","Step by step from the automation system to the dossier: modules in the distribution board, push buttons and motion detectors on the channels, channel plan for the board door, terminal plan, functions by room, lines with bus budget, draft or final and team work – for KNX or vendor-neutral planning; Niko Home Control, Loxone, Shelly and Sonoff follow soon. For KNX also addresses and files for ETS.","knx-ets-preparation","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fknx-ets-preparation.webp",{},20,"\u002Fhelp\u002Fknx-ets-preparation.en","13 min",{"title":6122,"description":8556},"Plan and document smart home, step by step","plan-knx-installation-and-prepare-ets","help\u002Fknx-ets-preparation.en",[6530,3115,6169,6180,8568,6280,7611,7612,7613,8569],"Bus line","ETS","GgWbrPiv3d9I9cgBimGhY2ad29iU8ezGw_kuyJ66RDc","\u002Fhelp\u002Fplan-knx-installation-and-prepare-ets",[],{"id":8574,"title":8575,"articleId":8576,"body":8577,"category":4239,"date":9345,"description":9346,"extension":2113,"image":9347,"labels":9348,"lastUpdated":9349,"locale":2119,"meta":9350,"navigation":2121,"ogImage":9351,"path":9352,"publishDate":9345,"readTime":4830,"refreshInterval":9353,"seo":9354,"seoTitle":9355,"slug":9356,"stem":9357,"tags":9358,"__hash__":9361,"kind":2137,"href":9362},"blog\u002Fblog\u002Fmigrate-trikker-archive.en.md","Move your Trikker archive to PlanElec Pro: batch import of .trik files","trikker-archive-migration",{"type":9,"value":8578,"toc":9321},[8579,8593,8599,8603,8612,8618,8622,8654,8657,8713,8720,8724,8727,8733,8876,8880,8883,8903,8906,8910,8916,8960,8964,8967,8990,8998,9002,9011,9020,9024,9027,9037,9041,9044,9048,9054,9137,9153,9160,9164,9170,9190,9196,9198,9202,9205,9209,9212,9216,9219,9223,9229,9236,9239,9243,9249,9253,9256,9260,9267,9314],[12,8580,8581,8587,8588,8590,8591,56],{},[15,8582,8583,8584,8586],{},"New in PlanElec Pro (since 30\u002F10\u002F2026): you move a whole archive of Trikker files (",[25,8585,27],{},") in one go."," You drop files, a folder or a ZIP archive with up to 500 files onto the import page. Every file becomes its own project, the original ",[25,8589,27],{}," file stays attached to the project, and you see up front which files come with notes. The import is open to every signed-in PlanElec account, including \"Try Pro\". This article shows how it works and, just as important, what it carries over today and what it does not. The operating details are in the guide: ",[40,8592,1486],{"href":42},[12,8594,8595,8598],{},[15,8596,8597],{},"Written by the PlanElec team. We make PlanElec Sketch and Pro."," Trikker is a trademark of its owner; we use the name only to refer to the product. Every statement about Trikker below comes from Trikker's public pages, linked at the end with the date we checked them. Statements about PlanElec describe the state on 08\u002F11\u002F2026; the import page in Pro is authoritative.",[79,8600,8602],{"id":8601},"who-is-the-batch-import-for","Who is the batch import for?",[12,8604,8605,8606,8611],{},"For installation firms and electricians who have worked with Trikker and now want their earlier work in PlanElec Pro as well. According to the Trikker manual, a Trikker project is a file that you store wherever you like, on your own computer (",[40,8607,8610],{"href":8608,"rel":8609},"https:\u002F\u002Fwww.trikker.be\u002Fhandleiding\u002Fv2.0-beta",[1458],"manual 2.0, section 16.2","). After years of work that usually means hundreds of files in folders by customer, year or site, sometimes spread over several computers.",[12,8613,8614,8615,8617],{},"For a single file you do not need an archive run: the entry ",[15,8616,1486],{}," accepts one file just like five hundred. The batch import pays off when a whole archive should land in your account at once, each customer file as a project, without repeating the same steps hundreds of times. It is not a quality statement about your old files and not a recommendation to stop using Trikker.",[79,8619,8621],{"id":8620},"what-do-you-need-before-you-start","What do you need before you start?",[84,8623,8624,8630,8648],{},[87,8625,8626,8629],{},[15,8627,8628],{},"A signed-in PlanElec account."," A subscription is not required; the import is open with \"Try Pro\" as well. Without an account, PlanElec Sketch remains the route for a single file (see below).",[87,8631,8632,8638,8639,8642,8643,8647],{},[15,8633,8634,8635,8637],{},"Your ",[25,8636,27],{}," files on your computer",", in a folder or in a ZIP archive. Trikker writes automatic backups as ",[25,8640,8641],{},".trikback"," files, by default every 5 minutes into a folder called \"Trikker Backups\" inside your Documents folder (",[40,8644,8646],{"href":8608,"rel":8645},[1458],"manual 2.0, section 14.1","). Those backups are not your project files. Leave them out of the selection, otherwise older versions of the same project end up in your list.",[87,8649,8650,8653],{},[15,8651,8652],{},"A browser."," It reads the selection and uploads the files. The conversion then runs on the server.",[12,8655,8656],{},"These are the limits of a single run:",[138,8658,8659,8668],{},[141,8660,8661],{},[144,8662,8663,8665],{},[147,8664,6928],{},[147,8666,8667],{},"Value",[163,8669,8670,8678,8686,8697,8705],{},[144,8671,8672,8675],{},[168,8673,8674],{},"Files per run",[168,8676,8677],{},"up to 500",[144,8679,8680,8683],{},[168,8681,8682],{},"ZIP archive",[168,8684,8685],{},"up to 200 MB",[144,8687,8688,8694],{},[168,8689,8690,8691,8693],{},"One unpacked ",[25,8692,27],{}," file",[168,8695,8696],{},"up to 32 MB",[144,8698,8699,8702],{},[168,8700,8701],{},"All unpacked files together",[168,8703,8704],{},"up to 500 MB",[144,8706,8707,8710],{},[168,8708,8709],{},"Runs at the same time",[168,8711,8712],{},"one per account",[12,8714,8715,8716,8719],{},"Hidden files and folders such as ",[25,8717,8718],{},"__MACOSX"," inside a ZIP are ignored. If your archive is larger, split it and import in several runs. Because identical files are recognised (see below), an overlap does no harm.",[79,8721,8723],{"id":8722},"how-does-the-import-work-step-by-step","How does the import work step by step?",[12,8725,8726],{},"In short: in the browser you choose the files, check the preview and upload; the server then handles the conversion, creates the projects and sends the completion e-mail.",[1489,8728],{":height":8729,":width":3800,"alt":8730,"caption":8731,"src":8732},"600","Diagram: the Trikker batch import in five steps, three in the browser (choose files, check the preview, upload) and two on the server (conversion in the background, completion e-mail with the report as CSV)","One run: up to 500 files, one project per file, and at the end an e-mail with a link to the report.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Ftrikker-archive-migration\u002Fbatch-import-flow.en.svg",[3139,8734,8735,8752,8769,8794,8808,8817,8827,8833,8851],{},[87,8736,8737,8740,8741,8743,8744,8747,8748,8751],{},[15,8738,8739],{},"Open the import."," Choose ",[15,8742,1486],{}," in the logo menu of a project (badge ",[15,8745,8746],{},"New","), in the project list next to ",[15,8749,8750],{},"New project",", or in the command palette.",[87,8753,8754,8757,8758,8761,8762,3324,8765,8768],{},[15,8755,8756],{},"Choose your files."," Drop files, a folder or a ZIP onto ",[15,8759,8760],{},"Drag files, a folder or a ZIP here",", or use ",[15,8763,8764],{},"Choose files",[15,8766,8767],{},"Choose folder",". Sub-folders are read; the folder path of each file is recorded.",[87,8770,8771,8774,8775,8778,8779,8782,8783,8786,8787,3324,8790,8793],{},[15,8772,8773],{},"Check the preview."," The list shows ",[15,8776,8777],{},"50 files checked"," and a status per file: ",[15,8780,8781],{},"Ready",", the number of notes (for example ",[15,8784,8785],{},"2 notes","), ",[15,8788,8789],{},"Already imported",[15,8791,8792],{},"Error",". Nothing has been created yet. For files with notes you see what is not carried over or adjusted.",[87,8795,8796,8799,8800,8803,8804,8807],{},[15,8797,8798],{},"Choose the destination."," Under ",[15,8801,8802],{},"Create in"," you pick ",[15,8805,8806],{},"My projects"," or an organisation you belong to.",[87,8809,8810,38,8813,8816],{},[15,8811,8812],{},"Decide about the opt-in.",[15,8814,8815],{},"Use files to improve the import"," is optional and off by default (see \"Failed files\").",[87,8818,8819,8822,8823,8826],{},[15,8820,8821],{},"Start."," The button reads ",[15,8824,8825],{},"Create 48 projects",". Duplicates and errors are skipped.",[87,8828,8829,8832],{},[15,8830,8831],{},"Let the files upload, then you may close the window."," As soon as \"All files are uploaded. You can close this window: we will email you once everything is done.\" appears, the server carries on by itself.",[87,8834,8835,8838,8839,8842,8843,8846,8847,8850],{},[15,8836,8837],{},"Follow the progress or wait for the e-mail."," The page ",[15,8840,8841],{},"Your Trikker projects are being created"," shows progress and the estimated remaining time and, under ",[15,8844,8845],{},"Recognised so far",", counters such as circuits, protective devices, sockets, light points and boards. ",[15,8848,8849],{},"Cancel the rest"," stops the run; finished projects stay.",[87,8852,8853,8856,8857,8860,8861,8864,8865,8868,8869,8872,8873,56],{},[15,8854,8855],{},"Read the report."," It is titled ",[15,8858,8859],{},"48 projects created"," and separates projects without notes, with notes, skipped duplicates and files not imported. ",[15,8862,8863],{},"View projects"," opens the project list, ",[15,8866,8867],{},"Report as CSV"," downloads the table, ",[15,8870,8871],{},"Import more files"," starts a new run. With exactly one project there is ",[15,8874,8875],{},"Open project",[79,8877,8879],{"id":8878},"what-does-the-report-show-per-file","What does the report show per file?",[12,8881,8882],{},"The report answers three questions:",[84,8884,8885,8891,8897],{},[87,8886,8887,8890],{},[15,8888,8889],{},"What was carried over?"," Counts of what PlanElec found: boards, circuits, devices.",[87,8892,8893,8896],{},[15,8894,8895],{},"What was not carried over?"," Grouped by topic: the drawing itself, the situation plan, layout and numbering, document data and print settings.",[87,8898,8899,8902],{},[15,8900,8901],{},"What was adjusted?"," Values that PlanElec does not know, such as some cable types or cross-sections, are replaced and the affected cables are marked for review. Combinations are modelled differently: a circuit breaker followed by a 30 mA residual current device, for example, becomes one combined device.",[12,8904,8905],{},"The report contains codes and counts, not an opinion about whether the diagram is correct. It tells you where to look; you still have to look.",[79,8907,8909],{"id":8908},"what-is-carried-over-today","What is carried over today?",[12,8911,8912,8913,8915],{},"The batch import uses the same conversion as the ",[25,8914,27],{}," import in PlanElec Sketch and turns the result into a Pro project. It reads files from Trikker 2.0 and from older versions such as Trikker 1.5. Today it carries over:",[84,8917,8918,8924,8930,8936,8942,8948,8954],{},[87,8919,8920,8923],{},[15,8921,8922],{},"The single-line diagram (eendraadschema)"," with its protection chain: supply, boards and sub-boards, main switch, protective devices. Where Pro models a combination differently, the report says so.",[87,8925,8926,8929],{},[15,8927,8928],{},"Circuits"," with their protection and cables.",[87,8931,8932,8935],{},[15,8933,8934],{},"Consumers"," such as sockets, lighting, appliances or a charging point, each connected to its circuit.",[87,8937,8938,8941],{},[15,8939,8940],{},"Customer, installation address, installer and approved inspection body data",", as far as the file contains it.",[87,8943,8944,8947],{},[15,8945,8946],{},"Notes"," on the single-line diagram, beside symbols or freely on the sheet, with colour and size.",[87,8949,8950,8953],{},[15,8951,8952],{},"The supply cable"," with the cable data present in the original.",[87,8955,8956,8959],{},[15,8957,8958],{},"The situation plan"," into the floor plan: floors, walls including representable curved walls, rooms, openings, straight and spiral stairs, device positions, texts, rectangles, clipart, dimensions, lines and areas; matching devices stay linked to their circuit.",[79,8961,8963],{"id":8962},"what-do-you-add-after-moving-your-archive","What do you add after moving your archive?",[12,8965,8966],{},"Your project stays editable. The report points to the places that need checking or adding to.",[84,8968,8969,8978,8984],{},[87,8970,8971,8974,8975,56],{},[15,8972,8973],{},"Backgrounds and connections."," Load DWG backgrounds directly into PlanElec to keep the project compact. Pro does not yet automatically attach embedded image\u002FPDF backgrounds. The report lists cable routes and symbols without a counterpart; freely drawn doors without a matching wall receive ",[25,8976,8977],{},"opening-off-wall",[87,8979,8980,8983],{},[15,8981,8982],{},"Layout details."," Fixed circuit letters as such (the letters appear in the circuit name, but Pro numbers by itself), manual page breaks and how sub-boards are displayed.",[87,8985,8986,8989],{},[15,8987,8988],{},"Document data and print options."," The logo (Pro prints the logo from your profile), phone and e-mail of the inspection body, date and revision, the document language and the print options.",[12,8991,8992,8993,8997],{},"If you only have a floor plan as a PDF, scan or image, the floor plan recognition in Pro reads it. It proposes walls, rooms, doors and windows and asks you to confirm the scale before you accept anything; see ",[40,8994,8996],{"href":8995},"\u002Fen\u002Fblog\u002Frecognise-floor-plan-cabinet-photo-ai","AI floor plan recognition",". Treat everything that is not listed under \"What is carried over today?\" as not carried over. The report of each file is the authority.",[79,8999,9001],{"id":9000},"how-does-planelec-recognise-duplicates-and-what-happens-to-the-original","How does PlanElec recognise duplicates, and what happens to the original?",[12,9003,9004,9007,9008,9010],{},[15,9005,9006],{},"Duplicates."," PlanElec compares files by content (a SHA-256 fingerprint), not by name. A copy in another folder, a file that is in your ZIP twice, or a file from an earlier run counts as a duplicate and is skipped. The comparison runs within the chosen destination, so in ",[15,9009,8806],{}," or in the organisation.",[12,9012,9013,9016,9017,9019],{},[15,9014,9015],{},"The original stays attached."," The ",[25,9018,27],{}," file is stored as a project file in the project files of the project. Your files on your computer are only read, never changed or deleted. So the original is still available if you want to compare it with the report or import it again later.",[79,9021,9023],{"id":9022},"failed-files-what-happens-to-them","Failed files: what happens to them?",[12,9025,9026],{},"Some files will not convert: damaged files, files that are not Trikker files, or content the converter cannot read. They get the status Error in the report, with a reason code, and no project is created for them.",[12,9028,9029,9030,9032,9033,9036],{},"With the opt-in ",[15,9031,8815],{}," (off by default), or with a click on ",[15,9034,9035],{},"Send for analysis",", PlanElec may analyse a file that did not import cleanly in order to improve the import; the original is then kept for up to 12 months. Without either, PlanElec deletes the original of a failed file after 30 days. The analysis does not change the result for your own file today. The usage statistics of the import contain counts and codes, not file names.",[79,9038,9040],{"id":9039},"how-long-does-it-take","How long does it take?",[12,9042,9043],{},"That depends on the number and size of the files. The import page shows an estimated remaining time. What matters: once the files are uploaded, you do not have to wait. PlanElec converts them in the background, creates the projects and sends an e-mail to your account when everything is done. The e-mail contains only numbers and a link to the report, no file names and no customer names. This is the duration of the technical process, not a statement about how much time the move saves you: checking the imported diagrams takes the time it takes.",[79,9045,9047],{"id":9046},"sketch-or-pro-which-one-for-which-job","Sketch or Pro: which one for which job?",[12,9049,9050,9051,9053],{},"PlanElec Sketch and PlanElec Pro both read ",[25,9052,27],{}," files, but for different jobs:",[138,9055,9056,9067],{},[141,9057,9058],{},[144,9059,9060,9062,9064],{},[147,9061,2179],{},[147,9063,22],{},[147,9065,9066],{},"Import Trikker projects in Pro",[163,9068,9069,9080,9091,9102,9113,9124],{},[144,9070,9071,9074,9077],{},[168,9072,9073],{},"How many files at once?",[168,9075,9076],{},"One file",[168,9078,9079],{},"One file, many files, a folder or a ZIP, up to 500",[144,9081,9082,9085,9088],{},[168,9083,9084],{},"Account",[168,9086,9087],{},"Not needed",[168,9089,9090],{},"Signed-in PlanElec account, also \"Try Pro\"",[144,9092,9093,9096,9099],{},[168,9094,9095],{},"Result",[168,9097,9098],{},"An editable drawing in the browser",[168,9100,9101],{},"One project per file in your account",[144,9103,9104,9107,9110],{},[168,9105,9106],{},"Report",[168,9108,9109],{},"Import report for the file",[168,9111,9112],{},"Report on the run, CSV, e-mail on completion",[144,9114,9115,9118,9121],{},[168,9116,9117],{},"Original file",[168,9119,9120],{},"Stays with you",[168,9122,9123],{},"Stored as a project file",[144,9125,9126,9131,9134],{},[168,9127,9128,9129],{},"Situation plan from the ",[25,9130,27],{},[168,9132,9133],{},"Goes into the drawing",[168,9135,9136],{},"Goes into the project's floor plan",[12,9138,9139,9140,9143,9144,9147,9148,9150,9151,56],{},"Without an account, or if you first want to see what a typical file turns into, open it in ",[40,9141,4133],{"href":1456,"rel":9142},[1458],". That is free, and you see the same kind of import report. After opening, Sketch points to the archive move (\"Move your whole Trikker archive?\", button ",[15,9145,9146],{},"Go to PlanElec Pro","). More about Sketch is in ",[40,9149,5914],{"href":5913},". The comparison of all three tools, with sources, is in ",[40,9152,4755],{"href":1989},[1489,9154],{":height":9155,":width":9156,"alt":9157,"caption":9158,"src":9159},"514","559","PlanElec Sketch after opening a .trik file: the import report with 15 symbols and one note beside the imported single-line diagram, below it ‘Move your whole Trikker archive?’","Sketch opens a single Trikker file in the browser and names what was not carried over. Always check the result; whole archives are imported by PlanElec Pro.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-trik-import-report.webp",[79,9161,9163],{"id":9162},"after-the-import-what-you-should-still-check","After the import: what you should still check",[12,9165,9166,9167,9169],{},"A project that was created from a ",[25,9168,27],{}," file is a starting point, not a signed-off document.",[3139,9171,9172,9175,9178,9181,9184],{},[87,9173,9174],{},"Open a few projects of different kinds (a house, an apartment, an extension) and compare the single-line diagram with the printed original.",[87,9176,9177],{},"Read the notes and the \"not carried over\" list of those files.",[87,9179,9180],{},"Check the circuits, the ratings of the protective devices and the cables marked for review.",[87,9182,9183],{},"Check your profile logo and print settings, add reported backgrounds and compare the floor plan and supply cable with the original.",[87,9185,9186,9187,9189],{},"Run the AREI\u002FRGIE self-check in Pro on projects you want to keep working on. It covers the supported rules and shows open points (",[40,9188,1086],{"href":1085},"). It is not a certificate. The content of every plan remains your responsibility, and the inspection is carried out by the approved inspection body.",[12,9191,9192,9193,56],{},"We do not guarantee that an imported diagram meets the AREI\u002FRGIE, and the import does not replace your own check. For the background to the two documents, see ",[40,9194,9195],{"href":5399},"single-line diagram or situation plan",[79,9197,1617],{"id":1616},[1041,9199,9201],{"id":9200},"do-i-need-a-subscription","Do I need a subscription?",[12,9203,9204],{},"No. You need a signed-in PlanElec account; the import is open with \"Try Pro\" as well.",[1041,9206,9208],{"id":9207},"does-trikker-need-to-be-installed-or-running","Does Trikker need to be installed or running?",[12,9210,9211],{},"No. The conversion reads the contents of the files. You only need the files themselves.",[1041,9213,9215],{"id":9214},"are-my-original-files-changed-or-deleted","Are my original files changed or deleted?",[12,9217,9218],{},"No. They are only read.",[1041,9220,9222],{"id":9221},"can-i-import-a-trikker-pdf-this-way","Can I import a Trikker PDF this way?",[12,9224,9225,9226,9228],{},"No. The import reads ",[25,9227,27],{}," files. A PDF of a floor plan can be read by the floor plan recognition, as described above.",[1041,9230,9232,9233,9235],{"id":9231},"what-happens-to-the-situation-plan-in-my-trik-files","What happens to the situation plan in my ",[25,9234,27],{}," files?",[12,9237,9238],{},"It goes into the project's floor plan: floors, walls, rooms, doors, windows, garage doors and stairs, with placed devices linked to their circuit. The report names anything from it that is not carried over.",[1041,9240,9242],{"id":9241},"can-i-try-it-with-one-file-first","Can I try it with one file first?",[12,9244,9245,9246,9248],{},"Yes: with ",[15,9247,1486],{}," and a single file, or without an account in PlanElec Sketch. Both use the same conversion.",[1041,9250,9252],{"id":9251},"i-have-more-than-500-files","I have more than 500 files.",[12,9254,9255],{},"Import the archive in several runs. Files that were imported before are skipped as duplicates.",[79,9257,9259],{"id":9258},"sources-and-date","Sources and date",[12,9261,9262,9263,9266],{},"The Trikker statements were checked again on ",[15,9264,9265],{},"20\u002F11\u002F2026",", in manual version 2.0.5. The Trikker pages show no publication date, so the date is the date of our check.",[138,9268,9269,9281],{},[141,9270,9271],{},[144,9272,9273,9276,9279],{},[147,9274,9275],{},"No.",[147,9277,9278],{},"Statement about Trikker",[147,9280,2244],{},[163,9282,9283,9299],{},[144,9284,9285,9287,9293],{},[168,9286,6424],{},[168,9288,9289,9290,9292],{},"A Trikker project is a ",[25,9291,27],{}," file that you store where you like, on your own computer (section 16.2)",[168,9294,9295],{},[40,9296,9298],{"href":8608,"rel":9297},[1458],"Trikker manual 2.0",[144,9300,9301,9303,9309],{},[168,9302,6407],{},[168,9304,9305,9306,9308],{},"Automatic backups are ",[25,9307,8641],{}," files, by default every 5 minutes in the folder \"Trikker Backups\" in the Documents folder (sections 4.2 and 14.1)",[168,9310,9311],{},[40,9312,9298],{"href":8608,"rel":9313},[1458],[12,9315,9316,9317,9320],{},"Features change. If something here is out of date, ",[40,9318,9319],{"href":1611},"write to us"," and we will correct it.",{"title":2044,"searchDepth":2045,"depth":2045,"links":9322},[9323,9324,9325,9326,9327,9328,9329,9330,9331,9332,9333,9334,9344],{"id":8601,"depth":2045,"text":8602},{"id":8620,"depth":2045,"text":8621},{"id":8722,"depth":2045,"text":8723},{"id":8878,"depth":2045,"text":8879},{"id":8908,"depth":2045,"text":8909},{"id":8962,"depth":2045,"text":8963},{"id":9000,"depth":2045,"text":9001},{"id":9022,"depth":2045,"text":9023},{"id":9039,"depth":2045,"text":9040},{"id":9046,"depth":2045,"text":9047},{"id":9162,"depth":2045,"text":9163},{"id":1616,"depth":2045,"text":1617,"children":9335},[9336,9337,9338,9339,9340,9342,9343],{"id":9200,"depth":2053,"text":9201},{"id":9207,"depth":2053,"text":9208},{"id":9214,"depth":2053,"text":9215},{"id":9221,"depth":2053,"text":9222},{"id":9231,"depth":2053,"text":9341},"What happens to the situation plan in my .trik files?",{"id":9241,"depth":2053,"text":9242},{"id":9251,"depth":2053,"text":9252},{"id":9258,"depth":2045,"text":9259},"2026-10-30","New in PlanElec Pro: move a whole archive of Trikker files (.trik) at once. Files, folder or ZIP, one project per file, one report, the original stays attached. Plus what is and is not carried over.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-planelec-vs-trikker-editorial.webp",[1373,2117,2118],"2026-11-20",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-planelec-vs-trikker-editorial.jpg","\u002Fblog\u002Fmigrate-trikker-archive.en",1,{"title":8575,"description":9346},"Trikker archive to PlanElec Pro: batch import","migrate-trikker-archive","blog\u002Fmigrate-trikker-archive.en",[329,9359,9360,27,31,5269,4260,2133,2134],"Trikker archive","batch import","wgUSn4b3JLy1Q1jNEI6ogSRL0XCVCBW4UUQQJlc4stc","\u002Fblog\u002Fmigrate-trikker-archive",{"id":9364,"title":9365,"body":9366,"category":10304,"description":10305,"extension":2113,"guideId":10306,"image":10307,"locale":2119,"meta":10308,"navigation":2121,"order":10309,"path":10310,"publishedAt":9345,"readTime":10311,"seo":10312,"seoTitle":10313,"slug":10314,"stem":10315,"tags":10316,"updatedAt":9349,"__hash__":10321,"kind":3594,"href":10322,"date":9345,"labels":10323},"help\u002Fhelp\u002Ftrikker-import.en.md","How do I import my Trikker projects into PlanElec?",{"type":9,"value":9367,"toc":10280},[9368,9377,9382,9386,9469,9481,9485,9495,9500,9504,9527,9531,9535,9583,9588,9593,9595,9685,9691,9695,9759,9764,9768,9771,9829,9832,9837,9841,9848,9908,9912,9941,9945,9952,10123,10126,10131,10135,10141,10146,10150,10203,10206,10211,10215,10228,10231,10233,10235,10238,10242,10245,10249,10259,10263,10266,10270,10273],[12,9369,9289,9370,9372,9373,9376],{},[25,9371,27],{}," file. ",[15,9374,9375],{},"You import it into PlanElec Pro with the entry \"Import Trikker projects\": a single file just like several files, a folder or a ZIP archive with up to 500 files."," Every file becomes its own project, and the original stays attached to the project as a file. The single-line diagram, boards, circuits, devices and situation plan with walls, rooms, doors, windows and stairs come along. You need a signed-in PlanElec account; a subscription is not required, \"Try Pro\" is enough. Without an account, you open a single file in PlanElec Sketch.",[12,9378,9379],{},[40,9380],{"id":9381},"ways",[79,9383,9385],{"id":9384},"which-route-fits-my-data","Which route fits my data?",[138,9387,9388,9400],{},[141,9389,9390],{},[144,9391,9392,9395,9398],{},[147,9393,9394],{},"You have …",[147,9396,9397],{},"Your route",[147,9399,9084],{},[163,9401,9402,9418,9435,9451],{},[144,9403,9404,9410,9415],{},[168,9405,9406,9407,9409],{},"an archive of many ",[25,9408,27],{}," files, a folder or a ZIP",[168,9411,9412,9414],{},[15,9413,1486],{}," in PlanElec Pro (main route, see below)",[168,9416,9417],{},"PlanElec account",[144,9419,9420,9425,9433],{},[168,9421,9422,9423,8693],{},"a single ",[25,9424,27],{},[168,9426,9427,9428,9430,9431],{},"the same route: ",[15,9429,1486],{},"; with exactly one project, the report offers ",[15,9432,8875],{},[168,9434,9417],{},[144,9436,9437,9442,9448],{},[168,9438,9422,9439,9441],{},[25,9440,27],{}," file and no account",[168,9443,9444,9445,9447],{},"PlanElec Sketch: open the file, check the diagram, then ",[15,9446,1482],{}," if you want to",[168,9449,9450],{},"none for Sketch",[144,9452,9453,9456,9467],{},[168,9454,9455],{},"a floor plan as PDF, scan, image or DXF",[168,9457,9458,9459,3157,9463],{},"import it or have it recognised, see ",[40,9460,9462],{"href":9461},"\u002Fen\u002Fhelp\u002Fimport-and-calibrate-a-floor-plan","Import and calibrate a floor plan",[40,9464,9466],{"href":9465},"\u002Fen\u002Fhelp\u002Frecognise-a-floor-plan-with-ai","Recognise a floor plan with AI",[168,9468,9417],{},[12,9470,9471,9472,9474,9475,9477,9478,9480],{},"Our recommendation: import ",[25,9473,27],{}," files with ",[15,9476,1486],{},". It is the one import route in Pro; it creates projects in your account and keeps the original. It takes the situation plan of the ",[25,9479,27],{}," file into the floor plan: floors, walls, rooms, doors, windows, garage doors, stairs and placed devices.",[79,9482,9484],{"id":9483},"which-trikker-versions-does-planelec-read","Which Trikker versions does PlanElec read?",[12,9486,9487,9488,9490,9491,9494],{},"PlanElec reads ",[25,9489,27],{}," files from ",[15,9492,9493],{},"Trikker 1.5.x and Trikker 2.0",". The test corpus covers 1.5.17, 1.5.98, 1.5.104, 2.0.0 and 2.0.2. Elements and values not yet known produce notes; readable parts come along. After importing, read the report and compare the result with your original.",[12,9496,9497],{},[40,9498],{"id":9499},"requirements",[79,9501,9503],{"id":9502},"what-do-you-need-for-the-import","What do you need for the import?",[84,9505,9506,9511,9522],{},[87,9507,9508,9510],{},[15,9509,8628],{}," The import is open to every signed-in account, including \"Try Pro\".",[87,9512,9513,9518,9519,9521],{},[15,9514,8634,9515,9517],{},[25,9516,27],{}," files"," on the computer you are working on. Trikker's automatic backups (",[25,9520,8641],{},") are not project files; leave them out.",[87,9523,9524,9526],{},[15,9525,8652],{}," It reads your selection, unpacks a ZIP and uploads each file. Everything after that runs on the server.",[12,9528,9529],{},[40,9530],{"id":3425},[79,9532,9534],{"id":9533},"which-limits-apply","Which limits apply?",[138,9536,9537,9545],{},[141,9538,9539],{},[144,9540,9541,9543],{},[147,9542,6928],{},[147,9544,8667],{},[163,9546,9547,9556,9562,9570,9576],{},[144,9548,9549,9551],{},[168,9550,8674],{},[168,9552,9553,9554,9517],{},"up to 500 ",[25,9555,27],{},[144,9557,9558,9560],{},[168,9559,8682],{},[168,9561,8685],{},[144,9563,9564,9568],{},[168,9565,8690,9566,8693],{},[25,9567,27],{},[168,9569,8696],{},[144,9571,9572,9574],{},[168,9573,8701],{},[168,9575,8704],{},[144,9577,9578,9580],{},[168,9579,8709],{},[168,9581,9582],{},"one run per account; a second one starts only after the first is completed or cancelled",[12,9584,8715,9585,9587],{},[25,9586,8718],{},", and a ZIP inside a ZIP, are skipped. If your archive is larger, split it and import in several runs. Duplicates are recognised, so an overlap does no harm.",[12,9589,9590],{},[40,9591],{"id":9592},"steps",[79,9594,8723],{"id":8722},[3139,9596,9597,9610,9620,9631,9641,9648,9654,9660,9673,9679],{},[87,9598,9599,9601,9602,9604,9605,8747,9607,9609],{},[15,9600,8739],{}," You find ",[15,9603,1486],{}," in three places: in the logo menu of a project (with the badge ",[15,9606,8746],{},[15,9608,8750],{},", and in the command palette. All of them open the same page.",[87,9611,9612,8757,9614,8761,9616,3324,9618,8768],{},[15,9613,8756],{},[15,9615,8760],{},[15,9617,8764],{},[15,9619,8767],{},[87,9621,9622,8774,9624,9626,9627,9630],{},[15,9623,8773],{},[15,9625,8777],{}," and a status per file (table below). Nothing has been created yet. Open the details of a file with notes to read what is not carried over. ",[15,9628,9629],{},"Clear selection"," starts over.",[87,9632,9633,8799,9635,9637,9638,9640],{},[15,9634,8798],{},[15,9636,8802],{}," you find ",[15,9639,8806],{}," and the organisations you belong to.",[87,9642,9643,38,9645,9647],{},[15,9644,8812],{},[15,9646,8815],{}," is optional and off by default (see privacy below).",[87,9649,9650,8822,9652,8826],{},[15,9651,8821],{},[15,9653,8825],{},[87,9655,9656,9659],{},[15,9657,9658],{},"Wait until the files are uploaded."," Then the message \"All files are uploaded. You can close this window: we will email you once everything is done.\" appears. Until then, keep the window open.",[87,9661,9662,8838,9665,9667,9668,9670,9671,8850],{},[15,9663,9664],{},"Follow the progress or close the window.",[15,9666,8841],{}," shows the status, the estimated remaining time and, under ",[15,9669,8845],{},", counters such as circuits, protective devices, sockets, light points and boards. Projects that are already created show up in your project overview right away. ",[15,9672,8849],{},[87,9674,9675,9678],{},[15,9676,9677],{},"Read the e-mail."," Once every file has a final state, PlanElec sends exactly one e-mail to your account, in the language of the run, with numbers and a link to the report. It contains no file names or customer names.",[87,9680,9681,9684],{},[15,9682,9683],{},"Open the report."," See the next section.",[12,9686,9687,9688,9690],{},"Success criterion: the report is titled ",[15,9689,8859],{},", and the projects appear in the project list you chose.",[1041,9692,9694],{"id":9693},"which-statuses-does-the-preview-show","Which statuses does the preview show?",[138,9696,9697,9709],{},[141,9698,9699],{},[144,9700,9701,9704,9706],{},[147,9702,9703],{},"Status",[147,9705,2314],{},[147,9707,9708],{},"What happens on start",[163,9710,9711,9723,9735,9748],{},[144,9712,9713,9717,9720],{},[168,9714,9715],{},[15,9716,8781],{},[168,9718,9719],{},"The file can be read.",[168,9721,9722],{},"A project is created.",[144,9724,9725,9730,9733],{},[168,9726,9727],{},[15,9728,9729],{},"with notes",[168,9731,9732],{},"The file can be read, but parts are adjusted or not carried over. The details name them.",[168,9734,9722],{},[144,9736,9737,9742,9745],{},[168,9738,9739],{},[15,9740,9741],{},"Duplicate",[168,9743,9744],{},"The same file (same content, not necessarily the same name) was already imported into the chosen destination, or appears twice in the run.",[168,9746,9747],{},"Skipped.",[144,9749,9750,9754,9757],{},[168,9751,9752],{},[15,9753,8792],{},[168,9755,9756],{},"The file is not a readable Trikker file.",[168,9758,9747],{},[12,9760,9761],{},[40,9762],{"id":9763},"report",[79,9765,9767],{"id":9766},"what-does-the-report-show","What does the report show?",[12,9769,9770],{},"The report opens through the link in the e-mail or, if you come back, on the same page. It gives the number of created projects, split into without notes, with notes, duplicates skipped and files not imported.",[138,9772,9773,9782],{},[141,9774,9775],{},[144,9776,9777,9780],{},[147,9778,9779],{},"Button",[147,9781,3293],{},[163,9783,9784,9793,9802,9811,9820],{},[144,9785,9786,9790],{},[168,9787,9788],{},[15,9789,8863],{},[168,9791,9792],{},"opens the project list with the new projects",[144,9794,9795,9799],{},[168,9796,9797],{},[15,9798,8875],{},[168,9800,9801],{},"appears when exactly one project was created and opens it",[144,9803,9804,9808],{},[168,9805,9806],{},[15,9807,8867],{},[168,9809,9810],{},"downloads a table with file name, folder, status, project path, number of notes and error code",[144,9812,9813,9817],{},[168,9814,9815],{},[15,9816,8871],{},[168,9818,9819],{},"starts a new run",[144,9821,9822,9826],{},[168,9823,9824],{},[15,9825,9035],{},[168,9827,9828],{},"appears next to a file that was not imported and releases it for analysis (see privacy)",[12,9830,9831],{},"The report contains codes and numbers. It tells you where to look; it does not confirm that a diagram is correct.",[12,9833,9834],{},[40,9835],{"id":9836},"scope",[79,9838,9840],{"id":9839},"what-can-you-reuse-from-trikker","What can you reuse from Trikker?",[12,9842,9843,9844,9847],{},"PlanElec brings across your single-line diagram ",[15,9845,9846],{},"and your situation plan as an editable starting point",". You keep working with your existing projects and add what they need.",[138,9849,9850,9860],{},[141,9851,9852],{},[144,9853,9854,9857],{},[147,9855,9856],{},"Area",[147,9858,9859],{},"Your result in PlanElec",[163,9861,9862,9869,9877,9885,9892,9900],{},[144,9863,9864,9866],{},[168,9865,3926],{},[168,9867,9868],{},"Supply, meter, boards and sub-boards, main switch, protection, circuits, cables and consumers. Pro adapts combinations to its model; the report explains each adaptation.",[144,9870,9871,9874],{},[168,9872,9873],{},"Devices",[168,9875,9876],{},"Sockets, light points, heaters and sounders. Boilers use a related appliance symbol; unverified boiler values remain available with a note. Data outlets on a power line move to a communication branch at the board, without inventing protection.",[144,9878,9879,9882],{},[168,9880,9881],{},"Project details",[168,9883,9884],{},"Customer with phone and mobile, installation address, EAN, installer, and the approved inspection body's name and address, where present.",[144,9886,9887,9889],{},[168,9888,534],{},[168,9890,9891],{},"Floors, walls with their thickness including representable curved walls, rooms, doors on walls, windows, garage doors, straight and spiral stairs, device positions, texts, rectangles, clipart, dimensions, lines and areas. Placed devices stay linked to their circuit wherever Pro has a counterpart.",[144,9893,9894,9897],{},[168,9895,9896],{},"Notes and supply cable",[168,9898,9899],{},"Notes on the diagram or symbol, and the supply cable with its available cable data. Missing sub-board supply cables are added with explicitly reported defaults.",[144,9901,9902,9905],{},[168,9903,9904],{},"Paper and print",[168,9906,9907],{},"Sketch keeps known paper sizes and existing material-list, circuit-list and network-system switches. In Pro, you set up output to fit your project; different print preferences are listed in the report.",[1041,9909,9911],{"id":9910},"what-do-you-add-after-importing","What do you add after importing?",[84,9913,9914,9923,9929,9935],{},[87,9915,9916,9919,9920,9922],{},[15,9917,9918],{},"Backgrounds:"," Embedded DWG backgrounds are deliberately kept separate from the drawing so your project stays compact and editable. Load the background directly into PlanElec. Pro does not yet automatically attach image\u002FPDF backgrounds embedded in a ",[25,9921,27],{}," file; the report counts them. Embedded clipart images come along and are reduced in size when needed.",[87,9924,9925,9928],{},[15,9926,9927],{},"Freely drawn doors:"," A door needs a matching wall. If PlanElec finds none within 10 cm, you get a counted note and place the opening in the right position.",[87,9930,9931,9934],{},[15,9932,9933],{},"Details:"," Cable routes on the situation plan are not yet reconstructed. Fixed circuit letters, page breaks and sub-board display are adapted to Pro. Pro uses the logo from your profile; inspection body contact details, date, revision and document language do not all come along.",[87,9936,9937,9940],{},[15,9938,9939],{},"Values and links:"," Unknown values and device positions remain visible in the report. A detail board without a matching supply circuit stays available with a note; no electrical connection is invented.",[1041,9942,9944],{"id":9943},"what-do-the-note-codes-mean","What do the note codes mean?",[12,9946,9947,9948,9951],{},"The notes show you ",[15,9949,9950],{},"what to check or add",". A number counts affected elements; for image sizes it describes the amount of image data.",[138,9953,9954,9964],{},[141,9955,9956],{},[144,9957,9958,9961],{},[147,9959,9960],{},"Report code",[147,9962,9963],{},"Meaning and next step",[163,9965,9966,9979,9988,10001,10020,10036,10058,10071,10084,10097,10110],{},[144,9967,9968,9976],{},[168,9969,9970,1774,9973],{},[25,9971,9972],{},"dwg-underlay-not-imported",[25,9974,9975],{},"embedded-files",[168,9977,9978],{},"Load backgrounds separately; the report counts the affected backgrounds.",[144,9980,9981,9985],{},[168,9982,9983],{},[25,9984,8977],{},[168,9986,9987],{},"A freely drawn opening found no wall: place it again on the situation plan.",[144,9989,9990,9998],{},[168,9991,9992,1774,9995],{},[25,9993,9994],{},"floor-plan-content",[25,9996,9997],{},"placement-unresolved",[168,9999,10000],{},"A plan element or its device link is not yet readable: compare with the original.",[144,10002,10003,10017],{},[168,10004,10005,1774,10008,1774,10011,1774,10014],{},[25,10006,10007],{},"unknown-element",[25,10009,10010],{},"unknown-attribute",[25,10012,10013],{},"unknown-section",[25,10015,10016],{},"invalid-value",[168,10018,10019],{},"An element, field or value is not yet known. Readable parts still import; check the indicated location.",[144,10021,10022,10033],{},[168,10023,10024,1774,10027,1774,10030],{},[25,10025,10026],{},"unverified-element",[25,10028,10029],{},"unverified-value",[25,10031,10032],{},"approximated",[168,10034,10035],{},"Imported with a related symbol or a provisional interpretation: check the property and symbol.",[144,10037,10038,10055],{},[168,10039,10040,1774,10043,1774,10046,1774,10049,1774,10052],{},[25,10041,10042],{},"kept-as-note",[25,10044,10045],{},"not-allowed-here",[25,10047,10048],{},"floating-not-imported",[25,10050,10051],{},"no-circuit-not-imported",[25,10053,10054],{},"skipped",[168,10056,10057],{},"The report explains whether the content remains as a note or a symbol needs adding.",[144,10059,10060,10068],{},[168,10061,10062,1774,10065],{},[25,10063,10064],{},"moved-to-communication-branch",[25,10066,10067],{},"moved-below-board",[168,10069,10070],{},"The element moved to a suitable location; check its connection and label.",[144,10072,10073,10081],{},[168,10074,10075,1774,10078],{},[25,10076,10077],{},"board-not-linked",[25,10079,10080],{},"board-feeder-ambiguous",[168,10082,10083],{},"Check and assign the supply of a sub-board.",[144,10085,10086,10094],{},[168,10087,10088,1774,10091],{},[25,10089,10090],{},"meta-not-carried",[25,10092,10093],{},"value-assumed",[168,10095,10096],{},"Add the listed title-block details or check the defaults used.",[144,10098,10099,10107],{},[168,10100,10101,1774,10104],{},[25,10102,10103],{},"clipart-image-too-large",[25,10105,10106],{},"clipart-image-unsupported",[168,10108,10109],{},"The image could not yet be carried over in a suitable form; add it separately.",[144,10111,10112,10120],{},[168,10113,10114,1774,10117],{},[25,10115,10116],{},"duplicate-walls-dropped",[25,10118,10119],{},"duplicate-id",[168,10121,10122],{},"Duplicate wall segments were merged or duplicate identifiers replaced; check the plan.",[12,10124,10125],{},"Damaged XML or exceeded size, complexity or time limits can cause a file to be refused. Other files in a Pro batch are processed independently. The report is your checklist, not a certificate of conformity.",[12,10127,10128],{},[40,10129],{"id":10130},"duplicates",[79,10132,10134],{"id":10133},"how-does-planelec-recognise-duplicates","How does PlanElec recognise duplicates?",[12,10136,10137,10138,10140],{},"PlanElec compares the content of the files through a fingerprint (SHA-256), not the name. A renamed copy, a file that is in the ZIP twice and a file from an earlier run are duplicates. The comparison runs within the chosen destination, either ",[15,10139,8806],{}," or the organisation, and only against projects that are not archived and that you are allowed to see.",[12,10142,10143],{},[40,10144],{"id":10145},"privacy",[79,10147,10149],{"id":10148},"what-happens-to-my-originals","What happens to my originals?",[138,10151,10152,10161],{},[141,10153,10154],{},[144,10155,10156,10158],{},[147,10157,7367],{},[147,10159,10160],{},"Retention",[163,10162,10163,10175,10185,10195],{},[144,10164,10165,10168],{},[168,10166,10167],{},"Created project",[168,10169,10170,10171,10174],{},"The original is stored as a project file in the ",[15,10172,10173],{},"Project files"," of the project and stays as long as the project exists. The temporary copy used for processing is deleted.",[144,10176,10177,10182],{},[168,10178,10179,10180],{},"File not imported, opt-in off and no click on ",[15,10181,9035],{},[168,10183,10184],{},"The original is deleted after 30 days.",[144,10186,10187,10192],{},[168,10188,10189,10190],{},"File not imported, with the opt-in or after ",[15,10191,9035],{},[168,10193,10194],{},"The original is kept for analysis for up to 12 months so that the import gets better for such files. The result for your own file does not change.",[144,10196,10197,10200],{},[168,10198,10199],{},"Duplicate or cancelled file",[168,10201,10202],{},"Not kept; PlanElec deletes leftovers after one day.",[12,10204,10205],{},"PlanElec deletes the list of files of a run (names, folders) 12 months after completion. Your files on your computer are only read, never changed. The usage statistics of the import contain numbers and codes, no file names.",[12,10207,10208],{},[40,10209],{"id":10210},"sketch",[79,10212,10214],{"id":10213},"how-do-i-open-a-single-file-in-sketch-and-take-it-to-pro","How do I open a single file in Sketch and take it to Pro?",[12,10216,10217,10218,10221,10222,10224,10225,10227],{},"PlanElec Sketch is the route without an account. Open the file through ",[15,10219,10220],{},"Document → Open"," or from the start page (\"Open Trikker file (.trik)\"), read the import report and carry on working on the single-line diagram. Afterwards Sketch shows the note \"Move your whole Trikker archive?\" with the button ",[15,10223,9146],{},". If you want to carry on planning in Pro, choose ",[15,10226,1482],{},". The situation plan comes along: floors, walls, rooms, openings, stairs, texts, rectangles and placed devices are then on the Pro floor plan. Sketch opens files up to 32 MiB.",[12,10229,10230],{},"Without an account, you draw plans, place symbols and open Trikker files (.trik). With a free account, you open your own project files, upload floor plans (image\u002FPDF\u002FDXF\u002FTIFF), logos and signatures and store 2 sites + 1 Drawing board (flex slot) in the cloud. Custom symbols require Pro. Without an account, the PDF carries the PlanElec logo as a watermark. A free account removes it; the line “Generated with planelec.be” remains. You can turn off the “Generated with planelec.be” line with active Pro access, including early-starter grants, or an active site pass for your site.",[79,10232,1617],{"id":1616},[1041,10234,9201],{"id":9200},[12,10236,10237],{},"No. The import is open to every signed-in account, including \"Try Pro\". Which Pro features you can use in the project afterwards depends on your plan.",[1041,10239,10241],{"id":10240},"does-trikker-need-to-be-installed","Does Trikker need to be installed?",[12,10243,10244],{},"No. The import reads the contents of the files.",[1041,10246,10248],{"id":10247},"can-i-import-a-trikker-pdf","Can I import a Trikker PDF?",[12,10250,10251,10252,10254,10255,10258],{},"Not with ",[15,10253,1486],{},". For a PDF with the floor plan, use ",[40,10256,10257],{"href":9465},"floor plan recognition"," or place it as a template.",[1041,10260,10262],{"id":10261},"what-happens-if-i-interrupt-a-run","What happens if I interrupt a run?",[12,10264,10265],{},"If the upload stands still for more than 30 minutes, PlanElec closes the run. Files that did not arrive appear in the report as not imported. Start them again afterwards; projects that were already created are skipped as duplicates.",[1041,10267,10269],{"id":10268},"is-an-imported-project-checked","Is an imported project checked?",[12,10271,10272],{},"No. It is a starting point. Compare a few projects with the original, read the notes and run the self-check in Pro. It shows open points and is not a certificate; the inspection is carried out by the approved inspection body.",[12,10274,10275,10276,10279],{},"More on the background and on moving a whole archive is in the blog article ",[40,10277,10278],{"href":4802},"Move your Trikker archive to PlanElec Pro",". Trikker is a trademark of its owner; PlanElec uses the name only to refer to the product.",{"title":2044,"searchDepth":2045,"depth":2045,"links":10281},[10282,10283,10284,10285,10286,10289,10290,10294,10295,10296,10297],{"id":9384,"depth":2045,"text":9385},{"id":9483,"depth":2045,"text":9484},{"id":9502,"depth":2045,"text":9503},{"id":9533,"depth":2045,"text":9534},{"id":8722,"depth":2045,"text":8723,"children":10287},[10288],{"id":9693,"depth":2053,"text":9694},{"id":9766,"depth":2045,"text":9767},{"id":9839,"depth":2045,"text":9840,"children":10291},[10292,10293],{"id":9910,"depth":2053,"text":9911},{"id":9943,"depth":2053,"text":9944},{"id":10133,"depth":2045,"text":10134},{"id":10148,"depth":2045,"text":10149},{"id":10213,"depth":2045,"text":10214},{"id":1616,"depth":2045,"text":1617,"children":10298},[10299,10300,10301,10302,10303],{"id":9200,"depth":2053,"text":9201},{"id":10240,"depth":2053,"text":10241},{"id":10247,"depth":2053,"text":10248},{"id":10261,"depth":2053,"text":10262},{"id":10268,"depth":2053,"text":10269},"getting_started","Import Trikker files (.trik) into PlanElec Pro one at a time or as an archive: entry point, choosing files or a ZIP, preview, destination, progress with e-mail, report. Plus limits, what is and is not carried over, and Sketch and floor plan import as alternatives.","trikker-import","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Ftrikker-import.webp",{},19,"\u002Fhelp\u002Ftrikker-import.en","12 min",{"title":9365,"description":10305},null,"import-trikker-projects","help\u002Ftrikker-import.en",[329,27,10317,9360,10318,10319,10320],"import","archive","ZIP","migration","d1nU8O95usiJgRkr2pzY9TnOXx0EWHDZHLsHrLnb5zU","\u002Fhelp\u002Fimport-trikker-projects",[],{"id":10325,"title":10326,"articleId":10327,"body":10328,"category":4239,"date":10983,"description":10984,"extension":2113,"image":10985,"labels":10986,"lastUpdated":10988,"locale":2119,"meta":10989,"navigation":2121,"ogImage":10990,"path":10991,"publishDate":10983,"readTime":6086,"refreshInterval":2053,"seo":10992,"seoTitle":10993,"slug":10994,"stem":10995,"tags":10996,"__hash__":11003,"kind":2137,"href":11004},"blog\u002Fblog\u002Fconnect-ai-assistant-mcp.en.md","How do you connect Claude or ChatGPT to PlanElec Pro through MCP?","planelec-pro-mcp-ai-assistants",{"type":9,"value":10329,"toc":10957},[10330,10340,10344,10347,10351,10354,10358,10361,10461,10464,10468,10471,10525,10531,10536,10540,10557,10566,10570,10593,10606,10610,10613,10617,10637,10641,10658,10662,10679,10683,10748,10755,10759,10762,10765,10769,10786,10790,10886,10892,10896,10899,10901,10905,10914,10918,10926,10930,10933,10937,10940,10944,10947,10951],[12,10331,10332,10335,10336,10339],{},[15,10333,10334],{},"With PlanElec Pro you can connect your own AI assistant, for example Claude or ChatGPT, to your projects through MCP (Model Context Protocol)."," You add PlanElec as a custom connection with the server URL ",[25,10337,10338],{},"https:\u002F\u002Fplanelec.be\u002Fmcp",", sign in to PlanElec with OAuth and review the requested permissions. With active PlanElec Pro, your assistant can then find your projects, read the saved planning status and, with write permission, create projects and make supported planning changes. Without Pro, you choose “Connect without Pro (public tools only)” on the consent page and use the calculators, the Synergrid list, the AREI search and the help guides. Your project roles keep applying, and you can revoke access at any time.",[10341,10342],"copy-field",{"test-id":10343,"value":10338},"blog-mcp-endpoint",[12,10345,10346],{},"PlanElec is not affiliated with OpenAI or Anthropic. Claude and ChatGPT are trademarks of their respective owners.",[79,10348,10350],{"id":10349},"what-is-mcp-in-two-sentences","What is MCP, in two sentences?",[12,10352,10353],{},"MCP is an open standard that gives an AI assistant access to specific functions of another application through an authenticated connection. For PlanElec this means: instead of copying project details into a chat, your assistant fetches them itself, with the rights you granted.",[79,10355,10357],{"id":10356},"what-can-your-assistant-do-with-planelec-today","What can your assistant do with PlanElec today?",[12,10359,10360],{},"The scope follows the tools that are actually released. The goal is to control the entire PlanElec app from the conversation, but that is not available yet. With active Pro, this is available today (as of November 2026):",[138,10362,10363,10375],{},[141,10364,10365],{},[144,10366,10367,10369,10372],{},[147,10368,9856],{},[147,10370,10371],{},"What your assistant can do",[147,10373,10374],{},"Needs write permission",[163,10376,10377,10387,10398,10408,10418,10429,10440,10451],{},[144,10378,10379,10382,10385],{},[168,10380,10381],{},"Read projects",[168,10383,10384],{},"List the projects you can access, read their details and summarise floor plan, circuits, distribution boards, cables and installation settings",[168,10386,5648],{},[144,10388,10389,10392,10395],{},[168,10390,10391],{},"Public tools",[168,10393,10394],{},"Check an inverter against the Synergrid C10\u002F26 list, look up inverter datasheets, calculate a cable cross-section with voltage drop or an LED strip, search AREI Book 1, find PlanElec help guides",[168,10396,10397],{},"No, also without Pro",[144,10399,10400,10403,10406],{},[168,10401,10402],{},"Manage projects",[168,10404,10405],{},"Create projects, change name, description and notes, archive and restore projects (no permanent deletion)",[168,10407,5604],{},[144,10409,10410,10413,10416],{},[168,10411,10412],{},"Edit the planning",[168,10414,10415],{},"Checked planning commands on floors, rooms, devices, circuits, cables and boards, including home automation\u002FKNX steps such as modules, channels and KNX addresses; list the available commands first",[168,10417,5604],{},[144,10419,10420,10423,10426],{},[168,10421,10422],{},"Floor plan underlay",[168,10424,10425],{},"Find DWG, DXF or image files in the project folder, check them as a floor plan (layers, unit) and import them as an underlay with a planning command",[168,10427,10428],{},"For the import",[144,10430,10431,10434,10437],{},[168,10432,10433],{},"Sketch drawings",[168,10435,10436],{},"List and summarise the drawings in your account, rename them, move them between personal and organisation, and create a handover link to Pro",[168,10438,10439],{},"For renaming and moving",[144,10441,10442,10445,10448],{},[168,10443,10444],{},"Company profile",[168,10446,10447],{},"Read and edit company profiles, as far as your role in the company allows",[168,10449,10450],{},"For changes",[144,10452,10453,10456,10459],{},[168,10454,10455],{},"Export readiness",[168,10457,10458],{},"Check which details the saved plan still lacks for an export and fetch a protected download link for documents that already exist",[168,10460,5648],{},[12,10462,10463],{},"Not available yet are, among others, generating a new PDF through the assistant, PV roof and string layout, uploading new files to the project folder, permanent deletion, bulk actions that need confirmation and the control of an open Studio session. Such steps still happen in the PlanElec Studio. To see which tools your connection currently shows, ask your assistant directly.",[79,10465,10467],{"id":10466},"what-works-without-pro-or-without-an-account","What works without Pro or without an account?",[12,10469,10470],{},"PlanElec offers two server addresses. Which tools your assistant sees depends on the address, the sign-in and your plan:",[138,10472,10473,10486],{},[141,10474,10475],{},[144,10476,10477,10480,10483],{},[147,10478,10479],{},"Access",[147,10481,10482],{},"Server URL",[147,10484,10485],{},"What your assistant sees",[163,10487,10488,10501,10513],{},[144,10489,10490,10493,10498],{},[168,10491,10492],{},"No account",[168,10494,10495],{},[25,10496,10497],{},"https:\u002F\u002Fplanelec.be\u002Fmcp\u002Fpublic",[168,10499,10500],{},"Only the public tools: Synergrid list, calculators, AREI search and help. No sign-in, no project data.",[144,10502,10503,10506,10510],{},[168,10504,10505],{},"Account without Pro",[168,10507,10508],{},[25,10509,10338],{},[168,10511,10512],{},"After “Connect without Pro (public tools only)”, the same public tools. Project and company permissions appear on the consent page as “Active with Pro only”.",[144,10514,10515,10518,10522],{},[168,10516,10517],{},"Account with active Pro",[168,10519,10520],{},[25,10521,10338],{},[168,10523,10524],{},"The full catalogue from the table above, limited by your consent and your project roles.",[1489,10526],{":height":10527,":width":3800,"alt":10528,"caption":10529,"src":10530},"548","Flow diagram: the AI assistant connects either to planelec.be\u002Fmcp\u002Fpublic, with no account and public tools only, or to planelec.be\u002Fmcp through PlanElec sign-in and the consent page. With active Pro this leads to the full catalogue with projects, planning commands, Sketch drawings, company profile and export readiness; with “Connect without Pro” it leads to the public tools.","Without Pro, the public tools remain. With active Pro, the same connection sees the full catalogue without reconnecting.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fplanelec-pro-mcp-ai-assistants\u002Fmcp-access-paths.en.svg",[12,10532,10533,10534,56],{},"The “Try Pro” plan, Sketch and single-property use do not unlock the full catalogue. If you book Pro later, your existing connection shows all tools on the next request; there is no need to reconnect. Plans are listed on the ",[40,10535,1958],{"href":54},[79,10537,10539],{"id":10538},"how-do-you-set-it-up-in-claude","How do you set it up in Claude?",[3139,10541,10542,10548,10554],{},[87,10543,4055,10544,10547],{},[15,10545,10546],{},"Customize → Connectors"," and add a custom connector. On Team and Enterprise plans, an owner or administrator must first allow the connector for the organisation.",[87,10549,10550,10551,10553],{},"Name it PlanElec and enter the server URL ",[25,10552,10338],{},". Use OAuth and follow the PlanElec sign-in.",[87,10555,10556],{},"Review the requested permissions and approve them. Enable PlanElec in a conversation and ask it to list your projects.",[12,10558,10559,10560,10565],{},"Anthropic describes custom connectors in its ",[40,10561,10564],{"href":10562,"rel":10563},"https:\u002F\u002Fsupport.claude.com\u002Fen\u002Farticles\u002F11175166-get-started-with-custom-connectors-using-remote-mcp",[1458],"help article on remote MCP",". Menus and plan availability are set by Anthropic and may change.",[79,10567,10569],{"id":10568},"how-do-you-set-it-up-in-chatgpt","How do you set it up in ChatGPT?",[3139,10571,10572,10579,10586],{},[87,10573,10574,10575,10578],{},"Open ChatGPT Plugins on the web, select the plus button and choose ",[15,10576,10577],{},"Add custom MCP server",". Your account or workspace must allow custom connections.",[87,10580,10581,10582,10585],{},"Name it PlanElec, enter the server URL under ",[15,10583,10584],{},"Connection"," and choose OAuth. Sign in to PlanElec and review the requested permissions.",[87,10587,10588,10589,10592],{},"Create the plugin, review the discovered tools and select PlanElec in a conversation with ",[25,10590,10591],{},"@",". Ask it to list your projects first.",[12,10594,10595,10596,10601,10602,56],{},"OpenAI describes the steps in its ",[40,10597,10600],{"href":10598,"rel":10599},"https:\u002F\u002Fdevelopers.openai.com\u002Fplugins\u002Fdeploy\u002Fconnect-chatgpt",[1458],"guide to connecting a custom MCP server",". Which plans and roles may add custom servers depends on OpenAI and your workspace settings. If your screen differs, follow the provider's current instructions. Further details are on the ",[40,10603,10605],{"href":10604},"\u002Fen\u002Fintegrations\u002Fai-assistants","integration page",[79,10607,10609],{"id":10608},"which-example-requests-fit-installers-engineering-offices-and-architects","Which example requests fit installers, engineering offices and architects?",[12,10611,10612],{},"The three scenarios below are illustrations, not customer references. Project names are invented. Adapt the wording to your own projects and always check the result against the project.",[1041,10614,10616],{"id":10615},"installer-project-status-for-the-site-meeting","Installer: project status for the site meeting",[84,10618,10619,10625,10631],{},[87,10620,10621,10624],{},[15,10622,10623],{},"Starting point:"," Before the next visit you want to know which circuits and distribution boards are recorded and what you last noted.",[87,10626,10627,10630],{},[15,10628,10629],{},"Example request:"," \"Read my PlanElec project 'House renovation' and its planning summary. Summarise the circuits, distribution boards, installation settings and existing project notes for a site meeting. Separate recorded information from follow-up questions and flag missing data.\"",[87,10632,10633,10636],{},[15,10634,10635],{},"Result you can check:"," A meeting brief with the recorded planning status, your existing notes and questions for the visit. Compare it with the project, then add points resolved on site in the Studio. Read access is enough.",[1041,10638,10640],{"id":10639},"engineering-office-compare-two-options-before-handover","Engineering office: compare two options before handover",[84,10642,10643,10648,10653],{},[87,10644,10645,10647],{},[15,10646,10623],{}," The original design and an alternative are in two separate PlanElec projects.",[87,10649,10650,10652],{},[15,10651,10629],{}," \"Compare the planning summaries of my projects 'Office – original design' and 'Office – alternative'. Put circuits, distribution boards and installation settings side by side in a table. Flag missing or truncated information and suggest questions for the handover.\"",[87,10654,10655,10657],{},[15,10656,10635],{}," A comparison table and concrete questions for the discussion. It covers only the summaries returned by the tools. Review spatial differences and technical sizing in the projects themselves.",[1041,10659,10661],{"id":10660},"architect-record-agreed-requirements","Architect: record agreed requirements",[84,10663,10664,10669,10674],{},[87,10665,10666,10668],{},[15,10667,10623],{}," After a meeting, three agreed points need to go into the shared planning project.",[87,10670,10671,10673],{},[15,10672,10629],{}," \"Read the notes in my project 'House – coordination'. Add these agreed points: a desk in the guest room, terrace lighting, provision for an EV charging point. Preserve the existing content and show me a draft of no more than 500 characters. Save it only after I confirm.\"",[87,10675,10676,10678],{},[15,10677,10635],{}," You review the draft and approve it explicitly. Afterwards the points appear in the project notes, which you see in PlanElec. This example needs write permission.",[79,10680,10682],{"id":10681},"what-do-permissions-and-data-protection-look-like","What do permissions and data protection look like?",[138,10684,10685,10694],{},[141,10686,10687],{},[144,10688,10689,10691],{},[147,10690,2179],{},[147,10692,10693],{},"Answer",[163,10695,10696,10704,10712,10720,10728,10740],{},[144,10697,10698,10701],{},[168,10699,10700],{},"Who can use the connection?",[168,10702,10703],{},"Any PlanElec account can connect. Projects, planning, Sketch drawings and company profiles come with active Pro; without Pro, the public tools remain. “Try Pro”, Sketch and single-property use do not unlock the full catalogue.",[144,10705,10706,10709],{},[168,10707,10708],{},"Which rights apply?",[168,10710,10711],{},"Your project roles still apply. Changes also require write permission in the OAuth consent. Every action is checked again on the server.",[144,10713,10714,10717],{},[168,10715,10716],{},"What does the assistant see?",[168,10718,10719],{},"The results of the tools it calls, such as project names, descriptions, notes and planning summaries. The consent screen also names addresses and contact details if you grant those permissions.",[144,10721,10722,10725],{},[168,10723,10724],{},"Who processes the data?",[168,10726,10727],{},"After the tool call, your AI provider processes the data under its own terms and privacy settings. Review the consent screen carefully.",[144,10729,10730,10733],{},[168,10731,10732],{},"How do you revoke access?",[168,10734,10735,10736,10739],{},"In PlanElec under ",[15,10737,10738],{},"My profile → Connected apps",", and in Claude or ChatGPT by removing the connection. Revocation stops future access; data already in earlier conversations is not deleted.",[144,10741,10742,10745],{},[168,10743,10744],{},"Does it use my PlanElec AI allowance?",[168,10746,10747],{},"No. The conversations run through your own AI subscription; its limits apply separately.",[12,10749,10750,10751,56],{},"Assistant answers are not an approval of the installation. PlanElec supports planning and self-checks; the recognised inspection body carries out the official inspection. For the assistant built into the Studio, see ",[40,10752,10754],{"href":10753},"\u002Fen\u002Fblog\u002Fai-assistant-electrical-planning","AI assistant for electrical planning",[79,10756,10758],{"id":10757},"what-should-you-do-first-after-connecting","What should you do first after connecting?",[12,10760,10761],{},"Start with read-only requests, because they change nothing and show you what your assistant actually sees. Ask it to list your PlanElec projects, then to summarise one project by name. Also ask which PlanElec tools are available in your connection: the list depends on the permissions you granted, your plan and what your AI provider supports. Only when the answers match your project should you allow changes.",[12,10763,10764],{},"Write permission is a separate step. It appears on the consent screen, and a connection without it stays read-only. Before the first change, ask the assistant to list the available operations and to show a draft of what it intends to save. PlanElec checks every action again on the server, and your project role still decides whether you may edit that project.",[1041,10766,10768],{"id":10767},"how-do-you-phrase-a-good-request","How do you phrase a good request?",[84,10770,10771,10774,10777,10780,10783],{},[87,10772,10773],{},"Name the project exactly as it appears in PlanElec, so the assistant does not guess between similar projects.",[87,10775,10776],{},"Give one task per request, for example reading, comparing or adding notes, and check the result before the next step.",[87,10778,10779],{},"Ask the assistant to separate recorded information from follow-up questions and to flag missing data, as in the scenarios above.",[87,10781,10782],{},"For changes, ask for a draft first and tell the assistant to save only after your confirmation.",[87,10784,10785],{},"Review the answer against the project itself. The assistant works from the saved project status, not from the browser tab you have open.",[1041,10787,10789],{"id":10788},"what-are-typical-setup-problems","What are typical setup problems?",[138,10791,10792,10805],{},[141,10793,10794],{},[144,10795,10796,10799,10802],{},[147,10797,10798],{},"Symptom",[147,10800,10801],{},"Likely cause",[147,10803,10804],{},"What to do",[163,10806,10807,10818,10831,10842,10853,10864,10875],{},[144,10808,10809,10812,10815],{},[168,10810,10811],{},"The sign-in was cancelled or the connection fails",[168,10813,10814],{},"OAuth was not completed",[168,10816,10817],{},"Start the connection again and finish the PlanElec sign-in and consent screen",[144,10819,10820,10823,10826],{},[168,10821,10822],{},"The consent page shows “PlanElec Pro required”",[168,10824,10825],{},"No active Pro access",[168,10827,10828,10829],{},"Choose “Connect without Pro” for the public tools, or book Pro. See the ",[40,10830,1958],{"href":54},[144,10832,10833,10836,10839],{},[168,10834,10835],{},"The assistant finds no projects, only calculators and help",[168,10837,10838],{},"Connected without Pro",[168,10840,10841],{},"Activate Pro; the same connection then shows the full catalogue",[144,10843,10844,10847,10850],{},[168,10845,10846],{},"The consent page says “Pro access not verified”",[168,10848,10849],{},"The access check is temporarily unavailable",[168,10851,10852],{},"Reconnect a little later; until then the page does not release the connection",[144,10854,10855,10858,10861],{},[168,10856,10857],{},"No option to add a custom connection",[168,10859,10860],{},"Your account or workspace does not allow it",[168,10862,10863],{},"Ask the workspace administrator, or follow your provider's current instructions",[144,10865,10866,10869,10872],{},[168,10867,10868],{},"No write tool is shown",[168,10870,10871],{},"Write permission, plan or provider support is missing",[168,10873,10874],{},"Ask the assistant for its PlanElec tools, then reconnect and review the consent screen",[144,10876,10877,10880,10883],{},[168,10878,10879],{},"The connection asks for a new approval",[168,10881,10882],{},"The permissions text changed since your last approval",[168,10884,10885],{},"Reconnect and review the current permissions",[12,10887,10888,10889,10891],{},"If the problem persists, the ",[40,10890,10605],{"href":10604}," links to help with connecting.",[79,10893,10895],{"id":10894},"what-is-coming-next","What is coming next?",[12,10897,10898],{},"The aim is that Pro users can control the entire PlanElec app through their own assistant, from project creation to preparing documentation. This expansion is in development, and the list above is the current state. Capabilities will be described here only once they are released.",[79,10900,1617],{"id":1616},[1041,10902,10904],{"id":10903},"what-does-the-connection-cost","What does the connection cost?",[12,10906,10907,10908,10910,10911,10913],{},"The full tool catalogue is part of PlanElec Pro; current plans are on the ",[40,10909,1958],{"href":54},". You can use the public tools without Pro: with an account through “Connect without Pro”, or without an account through ",[25,10912,10497],{},". Your Claude or ChatGPT subscription is separate and is billed by your provider.",[1041,10915,10917],{"id":10916},"does-it-work-with-sketch","Does it work with Sketch?",[12,10919,10920,10921,3157,10924,56],{},"Sketch alone does not unlock the full catalogue; without Pro you connect the public tools. With Pro, your assistant also reads the Sketch drawings in your account: it lists them, summarises boards, circuits and consumers, renames them, moves them between personal and organisation, and creates a handover link to Pro. You start the handover itself from that link in your browser. The summary does not pass on note texts, customer data or addresses, and the assistant cannot delete drawings. For the difference between the two products, see the ",[40,10922,10923],{"href":1964},"PlanElec Pro page",[40,10925,4755],{"href":1989},[1041,10927,10929],{"id":10928},"can-the-assistant-draw-my-electrical-installation","Can the assistant draw my electrical installation?",[12,10931,10932],{},"For supported planning commands, yes, with active Pro: it can read the saved project and make checked changes to floors, rooms, devices, circuits, cables and boards. PlanElec runs every command on the server with the same checks as in the Studio and does not save if new errors appear. Full app control is the goal but not available yet. Some steps, such as generating a new PDF or bulk deletions that need confirmation, remain in the Studio.",[1041,10934,10936],{"id":10935},"why-cant-my-assistant-see-a-write-tool","Why can't my assistant see a write tool?",[12,10938,10939],{},"The tools shown depend on the permissions you granted, your plan and the actions your AI provider supports. Ask the assistant to list its PlanElec tools. If permissions changed, reconnect and review the new consent screen.",[1041,10941,10943],{"id":10942},"do-i-need-to-install-a-server","Do I need to install a server?",[12,10945,10946],{},"No. PlanElec runs the remote MCP server. You only enter the URL in your assistant.",[1041,10948,10950],{"id":10949},"are-changes-checked-against-areirgie","Are changes checked against AREI\u002FRGIE?",[12,10952,10953,10954,10956],{},"Planning changes run through PlanElec's own commands and checks on the server. PlanElec's self-check shows findings; what it verifies is listed in ",[40,10955,8538],{"href":1085},". It does not replace the official inspection.",{"title":2044,"searchDepth":2045,"depth":2045,"links":10958},[10959,10960,10961,10962,10963,10964,10969,10970,10974,10975],{"id":10349,"depth":2045,"text":10350},{"id":10356,"depth":2045,"text":10357},{"id":10466,"depth":2045,"text":10467},{"id":10538,"depth":2045,"text":10539},{"id":10568,"depth":2045,"text":10569},{"id":10608,"depth":2045,"text":10609,"children":10965},[10966,10967,10968],{"id":10615,"depth":2053,"text":10616},{"id":10639,"depth":2053,"text":10640},{"id":10660,"depth":2053,"text":10661},{"id":10681,"depth":2045,"text":10682},{"id":10757,"depth":2045,"text":10758,"children":10971},[10972,10973],{"id":10767,"depth":2053,"text":10768},{"id":10788,"depth":2053,"text":10789},{"id":10894,"depth":2045,"text":10895},{"id":1616,"depth":2045,"text":1617,"children":10976},[10977,10978,10979,10980,10981,10982],{"id":10903,"depth":2053,"text":10904},{"id":10916,"depth":2053,"text":10917},{"id":10928,"depth":2053,"text":10929},{"id":10935,"depth":2053,"text":10936},{"id":10942,"depth":2053,"text":10943},{"id":10949,"depth":2053,"text":10950},"2026-10-27","PlanElec Pro connects to your own Claude or ChatGPT through MCP. What works today, what works without Pro, setup in both assistants, three example requests for installers, engineering offices and architects, permissions and limits.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-planelec-ai-assistant-editorial.webp",[10987,2118],"ai-automation","2026-11-06",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-planelec-ai-assistant-editorial.jpg","\u002Fblog\u002Fconnect-ai-assistant-mcp.en",{"title":10326,"description":10984},"Connect Claude or ChatGPT to PlanElec Pro (MCP)","connect-ai-assistant-mcp","blog\u002Fconnect-ai-assistant-mcp.en",[10997,10998,10999,11000,11001,31,11002],"AI","AI assistant","MCP","Claude","ChatGPT","data protection","TtTQ7p1mnVi5rubD6mxF6H-7-COIXm1_jh9X4sh1Ews","\u002Fblog\u002Fconnect-ai-assistant-mcp",{"id":11006,"title":11007,"articleId":11008,"body":11009,"category":11972,"date":11973,"description":11974,"extension":2113,"image":11975,"labels":11976,"lastUpdated":9349,"locale":2119,"meta":11977,"navigation":2121,"ogImage":11978,"path":11979,"publishDate":11973,"readTime":6086,"refreshInterval":9353,"seo":11980,"seoTitle":11981,"slug":11008,"stem":11982,"tags":11983,"__hash__":11985,"kind":2137,"href":11986},"blog\u002Fblog\u002Fintroducing-planelec-sketch.en.md","Introducing PlanElec Sketch: draw a single-line diagram for free in your browser","introducing-planelec-sketch",{"type":9,"value":11010,"toc":11951},[11011,11014,11028,11034,11038,11041,11066,11069,11073,11085,11096,11100,11182,11204,11206,11210,11213,11300,11303,11307,11324,11331,11343,11347,11356,11623,11626,11632,11636,11639,11662,11665,11669,11675,11744,11751,11755,11771,11777,11780,11789,11796,11798,11802,11805,11809,11812,11816,11822,11826,11829,11833,11836,11840,11843,11845,11851,11922,11927,11929,11947],[12,11012,11013],{},"Product details updated on 7 November 2026 (start dialog, “Check documents”, prices, Trikker import in Pro, handover to Pro); statements about other providers were not re-verified in this update. On 20 November 2026 we updated the Trikker platform details: Trikker 2.0 has been out of beta since 13 November 2026 and also runs on macOS (1).",[12,11015,11016,11019,11020,11022,11023,11027],{},[15,11017,11018],{},"PlanElec Sketch is a free web app for the two plans the Belgian AREI\u002FRGIE asks for: the single-line diagram (eendraadschema) and the situation plan."," You draw in your browser without an account and without a limit on circuits, symbols, pages or projects. Sketch opens Trikker files (",[25,11021,27],{},"), creates the PDF on your own device and hands the drawing over to PlanElec Pro with one click when you need more. ",[40,11024,11026],{"href":1456,"rel":11025},[1458],"Start drawing in Sketch",". Sketch is the free drawing route for homeowners, DIY enthusiasts and sole traders; Pro takes over when a business needs the distribution board, self-check report or teamwork.",[12,11029,11030,11033],{},[15,11031,11032],{},"Product status as of 7 November 2026; Trikker details checked on 16 October 2026. Written by the PlanElec team."," We make Sketch and Pro. Every statement about Trikker below comes from Trikker's public sources, linked at the end with the date we checked them. Trikker is a trademark of its owner; we use the name only to refer to the product.",[79,11035,11037],{"id":11036},"what-is-planelec-sketch","What is PlanElec Sketch?",[12,11039,11040],{},"Sketch is a drawing tool, not a planning suite. It does exactly two documents and does them quickly:",[84,11042,11043,11049,11055,11061],{},[87,11044,11045,11048],{},[15,11046,11047],{},"Single-line diagram."," You pick a symbol or a ready-made circuit and click a blue connection point. Layout, lines, circuit letters (A, B, …) and element numbers (A1, A2, …) follow automatically. Places where a symbol cannot go, such as a socket directly on the busbar, are not offered.",[87,11050,11051,11054],{},[15,11052,11053],{},"Situation plan."," With a free account, you import a floor plan as an image or PDF page, set the scale with two points and a real length, draw walls, doors and windows, and drag the devices from the diagram onto the plan. Each device carries its element number, and Sketch ticks off circuits that are fully placed.",[87,11056,11057,11060],{},[15,11058,11059],{},"Material list and circuit list"," from the diagram, optionally printed with the PDF.",[87,11062,11063,11065],{},[15,11064,8065],{}," in A4 or A3, landscape or portrait, with a frame and title block: installation address, client, EAN, installer with enterprise number and logo, approved inspection body, date and sheet number.",[12,11067,11068],{},"Sketch is meant for installers who want a quick diagram, for engineering offices that need a plan without a full project, and for homeowners who prepare the plans for the inspection (keuring) of their own installation.",[79,11070,11072],{"id":11071},"what-does-sketch-cost-and-where-is-my-drawing-stored","What does Sketch cost, and where is my drawing stored?",[12,11074,11075,11076,11078,11079,11081,11082,56],{},"Sketch is free. There is no separate Sketch plan: a subscription applies in Sketch and in Pro. Without an account, you draw plans, place symbols and open Trikker files (.trik). With a free account, you open your own project files, upload floor plans (image\u002FPDF\u002FDXF\u002FTIFF), logos and signatures and store drawings in the cloud. Without Pro, cloud space is limited; the current limit and all prices are on the ",[40,11077,1958],{"href":54},". Custom symbols require Pro. Without an account, the PDF carries the PlanElec logo as a watermark. A free account removes it; the line “Generated with planelec.be” remains. You can turn off the “Generated with planelec.be” line with active Pro access, including early-starter grants, or an active site pass for your site. Sketch shows both options under ",[15,11080,5787],{},", next to the free PDF, in ",[15,11083,11084],{},"For your business",[12,11086,11087,11088,11091,11092,11095],{},"Without an account, your drawing stays on your device. Sketch saves it automatically in your browser; you can also save it as a ",[25,11089,11090],{},".planelec.json"," file and reopen it later with a free account. When you are signed in, Sketch saves the drawing automatically in your PlanElec account, so it is available on every device. The PDF of a saved, unchanged account drawing carries a ",[15,11093,11094],{},"Verify document"," QR code. It leads to a verification page that confirms the version and origin of the drawing; it is not an AREI\u002FRGIE approval. Imported floor plan images are embedded in the file when you save. The PDF is created in your browser, not on a server. A Trikker file is read in your browser as well. To improve Sketch, PlanElec keeps imported files (Trikker files, floor plan images, opened drawings, logos) encrypted for 90 days; you can opt out with the checkbox when you open a file.",[79,11097,11099],{"id":11098},"how-do-i-start","How do I start?",[3139,11101,11102,11118,11154,11168],{},[87,11103,4055,11104,11108,11109,3324,11111,11114,11115,11117],{},[40,11105,11107],{"href":3611,"rel":11106},[1458],"Sketch directly with the task “Draw the documents for the inspection”",". The drawing starts with the connection, the meter and the main protection; you draw the rest. Without this link, Sketch opens an empty drawing and you choose ",[15,11110,5240],{},[15,11112,11113],{},"Examples"," at the top. Both open the ",[15,11116,8750],{}," dialog.",[87,11119,11120,11122,11123,11126,11127,11130,11131,38,11134,1774,11137,1774,11140,1774,11143,1774,11146,11149,11150,11153],{},[15,11121,5240],{}," first asks for the address of the installation. With an account, Sketch saves a project with a location in your account; with ",[15,11124,11125],{},"Continue without a location"," (and always without an account) it stays in this browser only. Then you pick a task: at the top ",[15,11128,11129],{},"Keep working on a Trikker file",", below it under ",[15,11132,11133],{},"Or start fresh",[15,11135,11136],{},"Draw the documents for the inspection",[15,11138,11139],{},"Add charging point",[15,11141,11142],{},"Prepare an apartment",[15,11144,11145],{},"Prepare a house",[15,11147,11148],{},"Empty project"," and, with an account, ",[15,11151,11152],{},"My drawings",". The templates are typical installations; adjust circuits and values to the real situation. You plan a PV system or building automation in PlanElec Pro.",[87,11155,11156,11157,11159,11160,11162,11163,3116,11165,11167],{},"Draw in the ",[15,11158,3926],{}," area, place devices under ",[15,11161,534],{}," and fill in the title block under ",[15,11164,5262],{},[15,11166,5258],{}," area.",[87,11169,5777,11170,1774,11172,11174,11175,11177,11178,11181],{},[15,11171,5787],{},[15,11173,1445],{}," shows what your documents still lack: empty fields in the title block, a missing inspection body, circuits without a protective device or devices without a place on the situation plan. One click takes you there. No step is required, and the inspection (keuring) is done by the approved inspection body. Then choose paper size and contents and click ",[15,11176,4093],{},". You can also choose the document language and print the ",[15,11179,11180],{},"Material list"," and circuit list with it.",[12,11183,11184,11185,1774,11189,1774,11194,1774,11199,56],{},"Want to see the result first? These example PDFs come from Sketch, with fictional data: ",[40,11186,2251],{"href":11187,"rel":11188},"https:\u002F\u002Fsketch.planelec.be\u002Fsamples\u002Fsingle-line-diagram-example.pdf",[1458],[40,11190,11193],{"href":11191,"rel":11192},"https:\u002F\u002Fsketch.planelec.be\u002Fsamples\u002Feendraadschema-voorbeeld.pdf",[1458],"Nederlands",[40,11195,11198],{"href":11196,"rel":11197},"https:\u002F\u002Fsketch.planelec.be\u002Fsamples\u002Fschema-unifilaire-exemple.pdf",[1458],"Français",[40,11200,11203],{"href":11201,"rel":11202},"https:\u002F\u002Fsketch.planelec.be\u002Fsamples\u002Feindrahtschema-beispiel.pdf",[1458],"Deutsch",[1489,11205],{":height":1491,":width":1492,"alt":1493,"caption":1494,"src":1495},[79,11207,11209],{"id":11208},"which-areirgie-requirements-does-the-sketch-pdf-cover","Which AREI\u002FRGIE requirements does the Sketch PDF cover?",[12,11211,11212],{},"Subsection 3.1.2.1 a of the AREI requires single-line diagrams and situation plans for every new domestic installation and for every significant modification or extension. This table shows where Sketch places the information that subsection asks for.",[138,11214,11215,11225],{},[141,11216,11217],{},[144,11218,11219,11222],{},[147,11220,11221],{},"AREI\u002FRGIE subsection 3.1.2.1 a requires",[147,11223,11224],{},"In Sketch",[163,11226,11227,11239,11254,11264,11272,11280,11290],{},[144,11228,11229,11232],{},[168,11230,11231],{},"Single-line diagrams and situation plans",[168,11233,11234,3157,11236,11238],{},[15,11235,3926],{},[15,11237,534],{}," areas, both in the same PDF",[144,11240,11241,11244],{},[168,11242,11243],{},"Name, capacity and VAT number of the person responsible for the work on both plans",[168,11245,11246,11247,11250,11251,11253],{},"Installer, address and ",[15,11248,11249],{},"Enterprise number"," under ",[15,11252,5262],{},", printed in the title block",[144,11255,11256,11259],{},[168,11257,11258],{},"Address of the installation on both plans",[168,11260,11261,11263],{},[15,11262,5176],{}," in the title block",[144,11265,11266,11269],{},[168,11267,11268],{},"Each final circuit has a capital letter; points numbered in order from the overcurrent protection",[168,11270,11271],{},"Circuit letters and element numbers are assigned automatically; a fixed letter is possible",[144,11273,11274,11277],{},[168,11275,11276],{},"On the situation plan, each point carries the circuit letter and the number from the single-line diagram",[168,11278,11279],{},"Devices dragged from the diagram keep their label (A1, B2, …)",[144,11281,11282,11285],{},[168,11283,11284],{},"Symbols from Table 2.23; other clearly identifiable symbols if defined in the legend",[168,11286,11287],{},[15,11288,11289],{},"Print the legend (symbols outside AREI table 2.23)",[144,11291,11292,11295],{},[168,11293,11294],{},"Plans signed and dated by the person responsible and the approved body after a conforming inspection",[168,11296,11297,11298],{},"Done on the printed plans at the inspection; Sketch prints the chosen ",[15,11299,5834],{},[12,11301,11302],{},"Sketch does not check your installation against the AREI\u002FRGIE. It gives you the plans; the content is your responsibility, and the inspection is done by the approved inspection body. Sketch's symbols follow the usual IEC 60617\u002FAREI drawing conventions; check on a real project whether the symbols you need are there.",[79,11304,11306],{"id":11305},"can-i-open-my-trikker-files-in-sketch","Can I open my Trikker files in Sketch?",[12,11308,11309,11310,3116,11312,11314,11315,11320,11321,11323],{},"Yes. Choose the task ",[15,11311,11129],{},[15,11313,8750],{}," dialog, open ",[40,11316,11319],{"href":11317,"rel":11318},"https:\u002F\u002Fsketch.planelec.be\u002Fen\u002Fdraw?start=trik",[1458],"Sketch directly with a Trikker file"," or drag the ",[25,11322,27],{}," file onto Sketch. Sketch reads files from Trikker 2.0 and from older versions such as Trikker 1.5, and turns the single-line diagram into an editable drawing: supply, protective devices, cables, sub-boards, circuits and loads.",[12,11325,11326,11327,11330],{},"Nothing disappears silently. Elements without a Sketch symbol, or at a position Sketch does not allow, stay on the diagram as a note. Related symbols are approximated, missing values get a default, and the import report lists every deviation with its location in the Trikker file. ",[15,11328,11329],{},"The situation plan comes along too:"," named floors, walls with their thickness, named rooms, doors with their swing, windows, garage doors, stairs, free texts and rectangles. Always check the imported diagram.",[12,11332,11333,11334,11336,11337,11340,11341,56],{},"Want to move your whole Trikker archive rather than one file? Use PlanElec Pro: its Trikker import takes many ",[25,11335,27],{}," files at once, one project with a report per file, and it is open to every signed-in account. After you open a Trikker file, Sketch points this out with ",[15,11338,11339],{},"Move your whole Trikker archive?",". How the import works and what it takes over is described in the help guide ",[40,11342,1486],{"href":42},[79,11344,11346],{"id":11345},"sketch-pro-and-trikker-side-by-side","Sketch, Pro and Trikker side by side",[12,11348,11349,11350,11352,11353,11355],{},"The compact overview. The detailed comparison with all sources is in ",[40,11351,4755],{"href":1989},"; the view from the Pro side is in ",[40,11354,1387],{"href":1386},". Numbers in the Trikker column refer to the source list at the end.",[138,11357,11358,11371],{},[141,11359,11360],{},[144,11361,11362,11365,11367,11369],{},[147,11363,11364],{},"Criterion",[147,11366,22],{},[147,11368,31],{},[147,11370,329],{},[163,11372,11373,11386,11399,11414,11427,11440,11452,11466,11481,11494,11506,11518,11530,11542,11555,11568,11584,11597,11611],{},[144,11374,11375,11378,11381,11383],{},[168,11376,11377],{},"Platform and installation",[168,11379,11380],{},"Browser, nothing to install",[168,11382,11380],{},[168,11384,11385],{},"Desktop program for Windows 10 and 11 and, out of beta since Trikker 2.0 of 13 Nov 2026, for macOS 13 or later on Apple silicon; web version announced (1)",[144,11387,11388,11390,11393,11396],{},[168,11389,9084],{},[168,11391,11392],{},"Draw and open Trikker files without an account; free account for other uploads and the cloud",[168,11394,11395],{},"Required",[168,11397,11398],{},"Licence per computer (2)",[144,11400,11401,11403,11406,11411],{},[168,11402,4573],{},[168,11404,11405],{},"Free; a subscription also applies in Sketch",[168,11407,11408,11409],{},"Try Pro for 1 month: EUR 0, exports without masked areas; site pass € 15 one-off per property; Subscription € 29\u002Fmonth or € 290\u002Fyear with three editing seats (+€ 12 per further seat per month). Price guarantee: the price stays for as long as the subscription runs without a break. Details on the ",[40,11410,1958],{"href":54},[168,11412,11413],{},"€45\u002Fmonth or €360\u002Fyear excl. VAT, per computer (2)",[144,11415,11416,11418,11421,11424],{},[168,11417,4179],{},[168,11419,11420],{},"No limit when drawing in the browser; limited cloud space without Pro",[168,11422,11423],{},"Plan without limits",[168,11425,11426],{},"Demo: max. 5 circuits, 1 plan page, watermark (2)",[144,11428,11429,11431,11434,11437],{},[168,11430,3926],{},[168,11432,11433],{},"Yes, automatic layout and circuit letters",[168,11435,11436],{},"Yes, derived from the project model",[168,11438,11439],{},"Yes (3)",[144,11441,11442,11444,11447,11450],{},[168,11443,534],{},[168,11445,11446],{},"Yes; floor plan upload (image\u002FPDF\u002FDXF\u002FTIFF) with a free account; draw manually without an account",[168,11448,11449],{},"Yes, devices at their real position on the floor plan",[168,11451,11439],{},[144,11453,11454,11457,11460,11463],{},[168,11455,11456],{},"Floor plan as background",[168,11458,11459],{},"With a free account: image\u002FPDF\u002FDXF\u002FTIFF",[168,11461,11462],{},"Image, PDF and DXF, several floors",[168,11464,11465],{},"Images, PDF, DWG and DXF (3)",[144,11467,11468,11472,11475,11478],{},[168,11469,4055,11470,9517],{},[25,11471,27],{},[168,11473,11474],{},"Yes, single-line diagram and situation plan with an import report",[168,11476,11477],{},"Yes, Trikker import for every account: single files or whole archives, one project with a report per file",[168,11479,11480],{},"Own format",[144,11482,11483,11486,11488,11491],{},[168,11484,11485],{},"AI floor plan recognition (PDF, scan, image)",[168,11487,5648],{},[168,11489,11490],{},"Yes: walls, rooms, doors, windows, supported device symbols, scale",[168,11492,11493],{},"Not described",[144,11495,11496,11499,11501,11504],{},[168,11497,11498],{},"AI switchboard recognition from photos",[168,11500,5648],{},[168,11502,11503],{},"Yes: visible DIN modules as a proposal for an empty board",[168,11505,11493],{},[144,11507,11508,11511,11513,11515],{},[168,11509,11510],{},"Read an existing single-line diagram (PDF, photo)",[168,11512,5648],{},[168,11514,5648],{},[168,11516,11517],{},"Schemalezer: separate AI web tool, beta, for licence holders; reads diagram and situation plan into Trikker (4)",[144,11519,11520,11522,11524,11527],{},[168,11521,10998],{},[168,11523,5648],{},[168,11525,11526],{},"Yes, requests in your own words across the whole project",[168,11528,11529],{},"Not described in the program (1)(3)",[144,11531,11532,11535,11537,11540],{},[168,11533,11534],{},"Switchboard planning",[168,11536,5648],{},[168,11538,11539],{},"Yes, with PDF",[168,11541,11493],{},[144,11543,11544,11547,11549,11552],{},[168,11545,11546],{},"PV",[168,11548,5648],{},[168,11550,11551],{},"Yes, strings, MPPTs and DC side",[168,11553,11554],{},"Symbols for PV, inverter, battery (3)",[144,11556,11557,11560,11562,11565],{},[168,11558,11559],{},"AREI\u002FRGIE self-check",[168,11561,5648],{},[168,11563,11564],{},"Yes, for the supported rules",[168,11566,11567],{},"In the Schemalezer, on the read diagram (4)",[144,11569,11570,11572,11578,11581],{},[168,11571,8065],{},[168,11573,11574,11575,11577],{},"Created in the browser, A4\u002FA3, landscape or portrait, with a title block. Without an account, the PDF carries the PlanElec logo as a watermark. A free account removes it; the line “Generated with planelec.be” remains. Account drawings carry a ",[15,11576,11094],{}," QR code",[168,11579,11580],{},"Single-line diagram, situation plan, switchboard, self-check report, dossier",[168,11582,11583],{},"Created on the vendor's servers (3)",[144,11585,11586,11588,11591,11594],{},[168,11587,11180],{},[168,11589,11590],{},"Yes, from the diagram",[168,11592,11593],{},"Detailed, manufacturer-neutral list (pilot)",[168,11595,11596],{},"Yes, Excel export (3)",[144,11598,11599,11602,11605,11608],{},[168,11600,11601],{},"Teamwork",[168,11603,11604],{},"No; with an account the drawing is in your cloud, without one on your device",[168,11606,11607],{},"Organisations, invitations, project roles",[168,11609,11610],{},"Local files, no cloud (3)",[144,11612,11613,11616,11618,11620],{},[168,11614,11615],{},"Languages",[168,11617,647],{},[168,11619,647],{},[168,11621,11622],{},"NL, FR, EN, DE, PL, RO (3)",[12,11624,11625],{},"\"Not described\" means we found it neither in the manual nor on the website; it does not prove that the feature is missing.",[12,11627,11628,11631],{},[15,11629,11630],{},"What we did not measure."," A stopwatch benchmark, such as the time to the first symbol, depends on hardware, connection and experience. We have no reproducible measurement, so we publish none. The figures in the table (installation, account, price, limits, platforms) are the measurable ones.",[79,11633,11635],{"id":11634},"ai-import-and-schema-reading-what-exists-today","AI import and schema reading: what exists today?",[12,11637,11638],{},"\"AI import\" means three different things, and the tools differ on each:",[84,11640,11641,11650,11656],{},[87,11642,11643,11646,11647,56],{},[15,11644,11645],{},"Floor plan from a PDF or scan:"," PlanElec Pro recognises walls, rooms, doors, windows, supported device symbols and the scale, also from a Trikker PDF export. You review the proposal before importing it. ",[40,11648,11649],{"href":8995},"How floor plan recognition works",[87,11651,11652,11655],{},[15,11653,11654],{},"Switchboard from photos:"," Pro proposes the visible DIN modules for an empty board. Wiring and electrical connections are not derived from a photo.",[87,11657,11658,11661],{},[15,11659,11660],{},"Reading an existing single-line diagram:"," Trikker offers this with its Schemalezer, a separate AI web tool in beta for licence holders. It reads a PDF, an image, a photo or a hand drawing into a Trikker file (4). Neither Sketch nor Pro reads a single-line diagram from a PDF or photo.",[12,11663,11664],{},"Sketch itself contains no AI. Its import is the Trikker file: structured data, read in your browser.",[79,11666,11668],{"id":11667},"when-is-sketch-enough-and-when-do-you-need-pro","When is Sketch enough, and when do you need Pro?",[12,11670,11671,11672,11674],{},"Choose by the result you need: stay in Sketch for the single-line diagram and situation plan. For further professional planning, use ",[15,11673,1482],{},"; continue the existing drawing in Pro rather than maintaining a second independent plan.",[138,11676,11677,11685],{},[141,11678,11679],{},[144,11680,11681,11683],{},[147,11682,4118],{},[147,11684,4121],{},[163,11686,11687,11694,11701,11709,11716,11723,11730,11737],{},[144,11688,11689,11692],{},[168,11690,11691],{},"Draw a single-line diagram and situation plan quickly and print a PDF",[168,11693,4133],{},[144,11695,11696,11699],{},[168,11697,11698],{},"Continue a Trikker diagram in the browser",[168,11700,4133],{},[144,11702,11703,11706],{},[168,11704,11705],{},"Take over a whole Trikker archive at once",[168,11707,11708],{},"Pro (Trikker import, for every account)",[144,11710,11711,11714],{},[168,11712,11713],{},"No account, no installation, no cost",[168,11715,4133],{},[144,11717,11718,11721],{},[168,11719,11720],{},"Turn a floor plan PDF or scan into an editable floor plan",[168,11722,4153],{},[144,11724,11725,11728],{},[168,11726,11727],{},"Plan the switchboard, PV or home automation",[168,11729,4153],{},[144,11731,11732,11735],{},[168,11733,11734],{},"Check the installation against the supported AREI\u002FRGIE rules",[168,11736,4153],{},[144,11738,11739,11742],{},[168,11740,11741],{},"Work as a team or deliver a complete dossier with cover and archive link",[168,11743,4153],{},[12,11745,7139,11746,2033,11749,56],{},[40,11747,11748],{"href":4218},"Record the single-line diagram of an existing installation",[40,11750,7142],{"href":5358},[79,11752,11754],{"id":11753},"how-do-i-take-a-sketch-drawing-to-pro","How do I take a Sketch drawing to Pro?",[12,11756,11757,11758,11760,11761,11764,11765,11767,11768,11770],{},"Open the ",[15,11759,5258],{}," area in Sketch. Under ",[15,11762,11763],{},"Continue in PlanElec Pro",", click ",[15,11766,1482],{},"; the same button also sits under ",[15,11769,5787],{},". Pro opens its import page. A drawing from your account opens in Pro directly; without an account you sign in or create one there, and the drawing is only uploaded when you create the project. Before Pro creates the project, the import page lists everything that is not taken over. Values that do not exist exactly like this in Pro, such as some cable types, are adjusted, and the affected cables are marked for review.",[1489,11772],{":height":11773,":width":3800,"alt":11774,"caption":11775,"src":11776},"692","Handover from PlanElec Sketch to PlanElec Pro with “Take it to Pro”. Coming along: the single-line diagram with boards and sub-boards, circuits and cables, project details such as client, installation address, EAN, installer and inspection body, notes as notes in the diagram, the supply before the meter as a cable of the incoming supply, and the situation plan with floors, walls, rooms, doors, windows, stairs, texts, shapes and the devices with their circuit. Not coming along: lines on the situation plan, symbols without a counterpart in Pro, contact details of the inspection body, logo, fixed circuit letters, page breaks, date, revision, document language and print options. Images of underlays only come along through the project file. A Pro project does not go back to Sketch.","What comes along with “Take it to Pro” and what does not. Pro's import page shows the list for your drawing before the project is created.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fintroducing-planelec-sketch\u002Fsketch-to-pro-handover.en.svg",[12,11778,11779],{},"The situation plan goes into the Pro floor plan: for each floor the name, walls, rooms, doors, windows, garage doors, straight stairs, free texts and shapes, plus the placed devices linked to their circuit. Notes become notes in the single-line diagram, the supply before the meter or main switch becomes a cable of the incoming supply, and each sub-board becomes a board of its own with its supply cable. Not taken over: lines on the situation plan, symbols without a counterpart in Pro, the contact details of the inspection body, the logo (Pro prints the logo from your profile), fixed circuit letters as such (they are kept in the circuit name), manual page breaks, how sub-boards are displayed, date, revision, document language and print options.",[12,11781,11782,11783,11786,11787,56],{},"Images of your underlays, meaning a floor plan as an image or PDF under the plan, only come along when you load the project file in Pro with ",[15,11784,11785],{},"Import Sketch file","; the link and the cloud drawing do not carry them. This route also helps when a drawing is too large for the direct handover. Projects move from Sketch to Pro, never back. What Pro adds with switchboard planning, the self-check report and teamwork is on the ",[40,11788,4171],{"href":1964},[1489,11790],{":height":11791,":width":11792,"alt":11793,"caption":11794,"src":11795},"925","544","PlanElec Pro, import page after ‘Take it to Pro’ in Sketch: ‘Your drawing is ready’ with 4 boards, 14 circuits and 14 devices, floor plan data, the box ‘What Pro makes of your drawing’ and ‘Good to know’ listing what is carried over differently.","Before Pro creates a project, the page shows what becomes of the Sketch drawing and what is adapted or not carried over. The check notes are a starting point, not a verified document.","\u002Fimages\u002Fblog\u002Fscreens\u002Fpro\u002Fen-sketch-import.webp",[79,11797,1617],{"id":1616},[1041,11799,11801],{"id":11800},"is-planelec-sketch-really-free","Is PlanElec Sketch really free?",[12,11803,11804],{},"Yes, for drawing. Without an account, you draw plans, place symbols and open Trikker files (.trik). With a free account, you open your own project files, upload floor plans (image\u002FPDF\u002FDXF\u002FTIFF), logos and signatures and store drawings in the cloud; without Pro, space there is limited. Custom symbols require Pro. Without an account, the PDF carries the PlanElec logo as a watermark. A free account removes it; the line “Generated with planelec.be” remains. You can turn off the “Generated with planelec.be” line with active Pro access, including early-starter grants, or an active site pass for your site.",[1041,11806,11808],{"id":11807},"do-i-need-to-install-anything","Do I need to install anything?",[12,11810,11811],{},"No. Sketch runs in the browser. Trikker is a desktop program; Pro also runs in the browser but needs an account.",[1041,11813,11815],{"id":11814},"is-sketch-a-trikker-alternative","Is Sketch a Trikker alternative?",[12,11817,11818,11819,11821],{},"For drawing the single-line diagram and situation plan, yes: Sketch is free, runs in the browser and opens ",[25,11820,27],{}," files. Trikker offers more on the drawing side, such as DWG backgrounds, six languages and the Schemalezer. If you need floor plan recognition, switchboard, PV or a self-check, look at Pro.",[1041,11823,11825],{"id":11824},"does-sketch-have-ai","Does Sketch have AI?",[12,11827,11828],{},"No. AI floor plan recognition, switchboard photo recognition and the assistant are part of PlanElec Pro.",[1041,11830,11832],{"id":11831},"can-sketch-read-a-paper-single-line-diagram","Can Sketch read a paper single-line diagram?",[12,11834,11835],{},"No. Sketch reads Trikker files. Reading an existing diagram from a photo or PDF is not available in Sketch or Pro today.",[1041,11837,11839],{"id":11838},"is-a-sketch-pdf-enough-for-the-inspection","Is a Sketch PDF enough for the inspection?",[12,11841,11842],{},"The PDF contains the single-line diagram, the situation plan and the title block with the data from subsection 3.1.2.1 a. You remain responsible for the content; the approved inspection body carries out the inspection and signs the plans.",[79,11844,9259],{"id":9258},[12,11846,11847,11848,56],{},"The Trikker statements were checked on ",[15,11849,11850],{},"16 October 2026",[138,11852,11853,11863],{},[141,11854,11855],{},[144,11856,11857,11859,11861],{},[147,11858,9275],{},[147,11860,9278],{},[147,11862,2244],{},[163,11864,11865,11883,11896,11908],{},[144,11866,11867,11869,11872],{},[168,11868,6424],{},[168,11870,11871],{},"Windows 10 and 11; macOS 13 or later on Apple silicon, out of beta since Trikker 2.0 of 13 Nov 2026 (checked on 20 Nov 2026); web version for browser and tablet announced; no AI on the homepage",[168,11873,11874,1774,11878],{},[40,11875,11877],{"href":1903,"rel":11876},[1458],"Trikker news, 13 Nov 2026",[40,11879,11882],{"href":11880,"rel":11881},"https:\u002F\u002Fwww.trikker.be\u002F",[1458],"trikker.be",[144,11884,11885,11887,11890],{},[168,11886,6407],{},[168,11888,11889],{},"€45\u002Fmonth or €360\u002Fyear excl. VAT; one computer per licence; demo with 5 circuits, 1 plan page, watermark",[168,11891,11892],{},[40,11893,11895],{"href":1895,"rel":11894},[1458],"trikker.be\u002Fpricing",[144,11897,11898,11900,11903],{},[168,11899,6662],{},[168,11901,11902],{},"Six languages; offline drawing; PDF on Trikker's servers; local files without cloud; image, PDF, DWG\u002FDXF import; Excel material list",[168,11904,11905],{},[40,11906,9298],{"href":8608,"rel":11907},[1458],[144,11909,11910,11912,11915],{},[168,11911,6659],{},[168,11913,11914],{},"Schemalezer: AI, beta, licence holders, PDF\u002Fimage\u002Fphoto\u002Fhand drawing to a Trikker file, AREI check of the read diagram",[168,11916,11917],{},[40,11918,11921],{"href":11919,"rel":11920},"https:\u002F\u002Fwww.trikker.be\u002Fen\u002Fblog\u002Fnieuws-2\u002Fnieuw-in-beta-de-schemalezer-zet-schema-en-situatieplan-in-minuten-om-naar-trikker-30",[1458],"Trikker news, 13 Oct 2026",[12,11923,11924,11925,9320],{},"The statements about Sketch and Pro follow the product as of 6 November 2026. Features and prices change. If something is out of date, ",[40,11926,9319],{"href":1611},[79,11928,2009],{"id":2008},[84,11930,11931,11939],{},[87,11932,11933,38,11936,56],{},[15,11934,11935],{},"For your own documents and small drawing jobs:",[40,11937,2023],{"href":1456,"rel":11938},[1458],[87,11940,11941,38,11943,2033,11945,56],{},[15,11942,7561],{},[40,11944,2032],{"href":1964},[40,11946,2036],{"href":54},[12,11948,11949,7570],{},[15,11950,2041],{},{"title":2044,"searchDepth":2045,"depth":2045,"links":11952},[11953,11954,11955,11956,11957,11958,11959,11960,11961,11962,11970,11971],{"id":11036,"depth":2045,"text":11037},{"id":11071,"depth":2045,"text":11072},{"id":11098,"depth":2045,"text":11099},{"id":11208,"depth":2045,"text":11209},{"id":11305,"depth":2045,"text":11306},{"id":11345,"depth":2045,"text":11346},{"id":11634,"depth":2045,"text":11635},{"id":11667,"depth":2045,"text":11668},{"id":11753,"depth":2045,"text":11754},{"id":1616,"depth":2045,"text":1617,"children":11963},[11964,11965,11966,11967,11968,11969],{"id":11800,"depth":2053,"text":11801},{"id":11807,"depth":2053,"text":11808},{"id":11814,"depth":2053,"text":11815},{"id":11824,"depth":2053,"text":11825},{"id":11831,"depth":2053,"text":11832},{"id":11838,"depth":2053,"text":11839},{"id":9258,"depth":2045,"text":9259},{"id":2008,"depth":2045,"text":2009},"news","2026-10-23","PlanElec Sketch is a free browser tool for the Belgian single-line diagram and situation plan: no account, no limits, opens Trikker files, PDF from your browser. With a matrix against PlanElec Pro and Trikker.","\u002Fimages\u002Fblog\u002Fintroducing-planelec-sketch\u002Fhero.webp",[4825,2116,2117,2118],{},"\u002Fimages\u002Fblog\u002Fintroducing-planelec-sketch\u002Fshare\u002Fhero.jpg","\u002Fblog\u002Fintroducing-planelec-sketch.en",{"title":11007,"description":11974},"PlanElec Sketch: free single-line diagram in the browser","blog\u002Fintroducing-planelec-sketch.en",[22,5269,2132,11984,1387,2133,2134],"free single-line diagram software","9GiquAsf_Vr9HYcRLfwbjtVmMFhbabeCrc_h2KN-x_U","\u002Fblog\u002Fintroducing-planelec-sketch",{"id":11988,"title":1990,"articleId":11989,"body":11990,"category":2110,"date":13133,"description":13134,"extension":2113,"image":13135,"labels":13136,"lastUpdated":2111,"locale":2119,"meta":13137,"navigation":2121,"ogImage":13138,"path":13139,"publishDate":13133,"readTime":8562,"refreshInterval":9353,"seo":13140,"seoTitle":13141,"slug":13142,"stem":13143,"tags":13144,"__hash__":13145,"kind":2137,"href":13146},"blog\u002Fblog\u002Ftrikker-sketch-pro-comparison.en.md","trikker-vs-sketch-vs-pro",{"type":9,"value":11991,"toc":13109},[11992,11997,12019,12038,12041,12046,12056,12060,12196,12200,12452,12455,12459,12462,12533,12544,12546,12552,12558,12564,12573,12577,12580,12618,12624,12629,12633,12639,12685,12690,12699,12701,12705,12708,12755,12763,12770,12774,12780,12810,12818,12822,12825,12865,12868,12872,12879,12976,12979,12981,12983,12986,12990,12997,13001,13007,13011,13017,13021,13024,13028,13031,13035,13038,13042,13048,13052,13081,13083,13088,13105],[12,11993,11994],{},[15,11995,11996],{},"Trikker, PlanElec Sketch and PlanElec Pro all draw a single-line diagram and a situation plan to the Belgian AREI\u002FRGIE wiring rules. Trikker and Sketch are drawing tools for those two documents; Pro is a new generation of electrical documentation in which both are derived from the planned installation.",[84,11998,11999,12005,12013],{},[87,12000,12001,12004],{},[15,12002,12003],{},"Choose Trikker"," if you draw at a fixed Windows PC or Apple-silicon Mac, often work offline for long stretches or export home automation addresses to Niko Home Control, and a licence per computer suits you.",[87,12006,12007,12010,12011,125],{},[15,12008,12009],{},"Choose PlanElec Sketch"," if you want to draw the same two documents without licence costs: in the browser, also on a tablet or phone at the client's, without installation, without a circuit limit and with your ",[25,12012,27],{},[87,12014,12015,12018],{},[15,12016,12017],{},"Choose PlanElec Pro"," if the job is more than two drawings: floor plan, circuits, distribution board and self-check in one project, PV and KNX, a team with three editing seats and fitters who read for free.",[12,12020,12021,38,12024,44,12027,12031,12032,12035,12036,56],{},[15,12022,12023],{},"Your Trikker archive becomes your starting point in PlanElec Pro.",[40,12025,12026],{"href":42},"Trikker batch import",[15,12028,47,12029,50],{},[25,12030,27],{},", as a file selection, folder or ZIP. Each successfully imported file becomes a separate Pro project with a single-line diagram and situation plan; the original stays attached to the project. The import report shows what you need to check. Archive import is available to ",[15,12033,12034],{},"every signed-in account, without a subscription",". Subsequent use of Pro follows the ",[40,12037,55],{"href":54},[12,12039,12040],{},"The tables below show which tool fits which job, what it costs over twelve months and where its limits are.",[12,12042,12043],{},[63,12044,12045],{},"PlanElec makes Sketch and Pro; Trikker belongs to another vendor. Information about Trikker comes from its public pages as of 16 November 2026; how we compared is explained under \"How we compared\".",[12,12047,12048,12049,12053,12054,56],{},"For an overview of other programs in Belgium, see ",[40,12050,12052],{"href":12051},"\u002Fen\u002Fblog\u002Fbest-single-line-diagram-software-2026","Single-line diagram software in Belgium compared",". If you have already decided to leave Trikker and are planning the move, read ",[40,12055,1387],{"href":1386},[79,12057,12059],{"id":12058},"which-tool-fits-which-job","Which tool fits which job?",[138,12061,12062,12074],{},[141,12063,12064],{},[144,12065,12066,12069,12072],{},[147,12067,12068],{},"Your job",[147,12070,12071],{},"Suitable tool",[147,12073,7652],{},[163,12075,12076,12089,12099,12110,12120,12130,12140,12153,12163,12174,12185],{},[144,12077,12078,12081,12083],{},[168,12079,12080],{},"Documents for the inspection (keuring) of your own home",[168,12082,22],{},[168,12084,12085,12086,12088],{},"Diagram and situation plan for free, no installation; ",[15,12087,1445],{}," lists missing details before the PDF",[144,12090,12091,12094,12096],{},[168,12092,12093],{},"Electrical dossier for selling a house",[168,12095,22],{},[168,12097,12098],{},"Two documents for one property, no subscription; no watermark with a free account",[144,12100,12101,12104,12107],{},[168,12102,12103],{},"Adding an EV charger to an existing installation",[168,12105,12106],{},"Sketch; Trikker if you already have it",[168,12108,12109],{},"Sketch has the start task \"Add charging point\"; Trikker includes charger symbols",[144,12111,12112,12115,12117],{},[168,12113,12114],{},"PV system with inverter, strings and battery",[168,12116,31],{},[168,12118,12119],{},"Strings per MPPT, DC protection and cable sections in the project; Sketch has no PV planning, Trikker has PV symbols",[144,12121,12122,12125,12127],{},[168,12123,12124],{},"Renovation with a new distribution board",[168,12126,31],{},[168,12128,12129],{},"Board, circuits and diagram in one project, with an indicative self-check report",[144,12131,12132,12135,12137],{},[168,12133,12134],{},"Business with a planner and fitters who only read",[168,12136,31],{},[168,12138,12139],{},"Subscription with three editing seats, read access free; Trikker is licensed per computer",[144,12141,12142,12147,12150],{},[168,12143,12144,12145,9517],{},"Existing archive with many ",[25,12146,27],{},[168,12148,12149],{},"Batch import in PlanElec Pro",[168,12151,12152],{},"Up to 500 files per run, with any signed-in account; Trikker of course keeps opening them",[144,12154,12155,12158,12160],{},[168,12156,12157],{},"Working on site without a network",[168,12159,329],{},[168,12161,12162],{},"Drawing and saving offline, only the PDF and licence check need a connection; Sketch keeps drawing if the connection drops, Pro as a pilot",[144,12164,12165,12168,12171],{},[168,12166,12167],{},"Working on a Mac or iPad",[168,12169,12170],{},"Mac: all three; iPad: Sketch or Pro",[168,12172,12173],{},"Trikker 2.0 runs on Apple silicon Macs, not on the iPad; Sketch and Pro run in the browser",[144,12175,12176,12179,12182],{},[168,12177,12178],{},"Documents in German",[168,12180,12181],{},"all three",[168,12183,12184],{},"Trikker 2.0 has a German interface; Sketch and Pro work in Dutch, French, German and English",[144,12186,12187,12190,12193],{},[168,12188,12189],{},"Turning an old paper, scanned or photographed diagram into an editable one",[168,12191,12192],{},"Trikker (Schemalezer, beta)",[168,12194,12195],{},"For licence holders; PlanElec recognises the floor plan from a PDF or scan, not the single-line diagram",[79,12197,12199],{"id":12198},"trikker-sketch-and-pro-side-by-side","Trikker, Sketch and Pro side by side",[138,12201,12202,12214],{},[141,12203,12204],{},[144,12205,12206,12208,12210,12212],{},[147,12207,11364],{},[147,12209,329],{},[147,12211,22],{},[147,12213,31],{},[163,12215,12216,12230,12243,12256,12268,12280,12294,12308,12321,12335,12348,12361,12373,12390,12413,12428,12442],{},[144,12217,12218,12221,12224,12227],{},[168,12219,12220],{},"Type",[168,12222,12223],{},"Installed program",[168,12225,12226],{},"Web app for the single-line diagram and situation plan",[168,12228,12229],{},"Web app for the whole installation",[144,12231,12232,12234,12237,12240],{},[168,12233,543],{},[168,12235,12236],{},"Windows 10 and 11; macOS 13 or later on Apple silicon (M1 or newer), out of beta since Trikker 2.0 of 13 Nov 2026; no Intel Macs, no iPad",[168,12238,12239],{},"Browser, also on tablet and phone",[168,12241,12242],{},"Browser; best on a laptop or desktop",[144,12244,12245,12248,12251,12254],{},[168,12246,12247],{},"Web version",[168,12249,12250],{},"Announced by the vendor as a beta for 2026, no date",[168,12252,12253],{},"is the web version",[168,12255,12253],{},[144,12257,12258,12260,12263,12265],{},[168,12259,4573],{},[168,12261,12262],{},"€45 per month or €360 per year",[168,12264,6357],{},[168,12266,12267],{},"Site pass €15 per property (one-off, twelve months); subscription €29 per month or €290 per year",[144,12269,12270,12272,12275,12277],{},[168,12271,391],{},[168,12273,12274],{},"excl. 21% VAT (€54.45 or €435.60 incl. VAT)",[168,12276,6413],{},[168,12278,12279],{},"no VAT; final prices (small business exemption scheme)",[144,12281,12282,12285,12288,12291],{},[168,12283,12284],{},"Billing unit",[168,12286,12287],{},"one licence per computer, on one PC at a time; moving it to another PC is free",[168,12289,12290],{},"per browser without an account; free account with two locations and one drawing board in the cloud",[168,12292,12293],{},"subscription per account with three editing seats, extra seat €12 per month; read access free; site pass per address",[144,12295,12296,12299,12302,12305],{},[168,12297,12298],{},"Free trial",[168,12300,12301],{},"Demo without account: max. 5 circuits, 1 plan page, watermark",[168,12303,12304],{},"entirely free, no limit on circuits, symbols or pages; without an account the PDF has a watermark",[168,12306,12307],{},"Try Pro for 1 month: €0, exports without masked areas, for one person",[144,12309,12310,12312,12315,12318],{},[168,12311,9084],{},[168,12313,12314],{},"no account, licence code; Schemalezer with the licence e-mail",[168,12316,12317],{},"not needed; free account for uploads and cloud",[168,12319,12320],{},"required",[144,12322,12323,12326,12329,12332],{},[168,12324,12325],{},"Offline",[168,12327,12328],{},"drawing and saving offline; licence check and PDF creation need internet",[168,12330,12331],{},"keep drawing if the connection drops, the drawing stays in the browser; cloud, handover to Pro and recognition online",[168,12333,12334],{},"pilot: continue projects opened beforehand; export, uploads and AI online",[144,12336,12337,12339,12342,12345],{},[168,12338,3926],{},[168,12340,12341],{},"yes, automatic layout, cable and protection properties",[168,12343,12344],{},"yes, automatic layout, circuit letters, ready-made circuits",[168,12346,12347],{},"yes, derived from the project's circuits, board and cables",[144,12349,12350,12352,12355,12358],{},[168,12351,534],{},[168,12353,12354],{},"yes, with symbols that stay linked to the diagram",[168,12356,12357],{},"yes, several floors; floor plan as image or PDF underlay with a free account",[168,12359,12360],{},"yes, floor-plan editor with devices at their real position",[144,12362,12363,12365,12368,12370],{},[168,12364,3115],{},[168,12366,12367],{},"part of the single-line diagram; board layout not described in the manual",[168,12369,602],{},[168,12371,12372],{},"board planning with PDF",[144,12374,12375,12378,12381,12387],{},[168,12376,12377],{},"Checks",[168,12379,12380],{},"AREI check in the Schemalezer (beta)",[168,12382,12383,12384,12386],{},"no self-check report; ",[15,12385,1445],{}," lists missing details",[168,12388,12389],{},"indicative AREI\u002FRGIE self-check report for the supported rules",[144,12391,12392,12395,12401,12406],{},[168,12393,12394],{},"Import",[168,12396,12397,12398,12400],{},"its own ",[25,12399,27],{}," files; DWG, DXF and PDF as background; the Schemalezer reads PDF and images",[168,12402,12403,12405],{},[25,12404,27],{}," files with situation plan, also without an account (internet needed); own project file and floor plan with an account",[168,12407,12408,12410,12411],{},[25,12409,27],{}," one by one or as an archive; floor-plan recognition from PDF, scan or image; Sketch drawings via ",[15,12412,1482],{},[144,12414,12415,12417,12420,12425],{},[168,12416,4665],{},[168,12418,12419],{},"PDF; bill of materials to Excel; home automation to Niko Home Control and Home Center; no DWG or DXF",[168,12421,12422,12423],{},"PDF in A4 or A3, SVG, bill of materials as CSV, project file via ",[15,12424,1441],{},[168,12426,12427],{},"PDF for diagram, plan, board, self-check report and dossier; lists as PDF and CSV (pilot); KNX addresses for ETS",[144,12429,12430,12433,12436,12439],{},[168,12431,12432],{},"Team",[168,12434,12435],{},"local files, no cloud sync",[168,12437,12438],{},"no teamwork",[168,12440,12441],{},"organisations, invitations, roles, read mode for viewers",[144,12443,12444,12446,12448,12450],{},[168,12445,11615],{},[168,12447,931],{},[168,12449,647],{},[168,12451,647],{},[12,12453,12454],{},"\"Not described\" never means \"does not exist\": we only list what we could check against a vendor source. No tool decides the inspection; the approved inspection body does.",[79,12456,12458],{"id":12457},"what-does-it-cost-over-twelve-months","What does it cost over twelve months?",[12,12460,12461],{},"Same basis: twelve months, amounts excluding VAT. Trikker states its prices excluding VAT; PlanElec charges no VAT, so its amounts are final prices. Private buyers add 21% VAT on Trikker.",[138,12463,12464,12477],{},[141,12465,12466],{},[144,12467,12468,12471,12473,12475],{},[147,12469,12470],{},"Scenario",[147,12472,329],{},[147,12474,22],{},[147,12476,31],{},[163,12478,12479,12493,12506,12520],{},[144,12480,12481,12484,12487,12490],{},[168,12482,12483],{},"One property, diagram and plan once",[168,12485,12486],{},"€45 (one month of subscription)",[168,12488,12489],{},"€0",[168,12491,12492],{},"€15 site pass, only needed for the board or self-check report",[144,12494,12495,12498,12501,12503],{},[168,12496,12497],{},"One person, ongoing projects",[168,12499,12500],{},"€360 (yearly subscription, one PC)",[168,12502,12489],{},[168,12504,12505],{},"€290 (yearly subscription)",[144,12507,12508,12511,12514,12517],{},[168,12509,12510],{},"Three people on three computers",[168,12512,12513],{},"€1,080 (three licences)",[168,12515,12516],{},"€0, without teamwork",[168,12518,12519],{},"€290 (three editing seats included)",[144,12521,12522,12525,12528,12530],{},[168,12523,12524],{},"Plus fitters who only read",[168,12526,12527],{},"one more licence per computer",[168,12529,6413],{},[168,12531,12532],{},"read access free",[12,12534,12535,12536,5352,12540,12543],{},"From 20 sites a year, the Pro yearly subscription costs less than separate site passes. With Trikker, also count a second device: according to the FAQ, a site laptop next to the office PC needs a second licence if both run at the same time. Prices change; the ",[40,12537,12539],{"href":1895,"rel":12538},[1458],"Trikker pricing page",[40,12541,12542],{"href":54},"PlanElec pricing page"," are authoritative.",[79,12545,1499],{"id":1498},[12,12547,12548,12551],{},[15,12549,12550],{},"1. Are you drawing documents or planning an installation?"," If what you need in the end is a single-line diagram and a situation plan as a PDF, Trikker or Sketch will do. If you want to keep the board, cables, circuits and checks together, you work in Pro with one shared project.",[12,12553,12554,12557],{},[15,12555,12556],{},"2. Where do you work?"," At a fixed desk with a Windows PC or an Apple silicon Mac, Trikker plays to its strengths. On a tablet at the client's, on an Intel Mac or on changing devices, a web app gives you more freedom.",[12,12559,12560,12563],{},[15,12561,12562],{},"3. How many people work with it?"," Trikker charges per computer. Pro charges per account, with three editing seats in the subscription and free read access for the workshop and fitters. Sketch is meant for one person.",[12,12565,12566,12569,12570,12572],{},[15,12567,12568],{},"4. What do you already have?"," An archive of ",[25,12571,27],{}," files comes with you into any of the three tools. An old diagram on paper is read into Trikker with the Schemalezer; a floor plan as a PDF or scan is recognised by PlanElec Pro.",[79,12574,12576],{"id":12575},"trikker-at-a-glance","Trikker at a glance",[12,12578,12579],{},"Trikker is an installed program for single-line diagrams and situation plans with linked symbols, a home automation module and a material list with cable lengths; according to the vendor, version 2.0 runs on a new foundation for Windows and macOS.",[84,12581,12582,12588,12594,12600,12606,12612],{},[87,12583,12584,12587],{},[15,12585,12586],{},"Platform."," Since 13 November 2026, Trikker 2.0 is \"no longer a beta\" according to the vendor: it runs on Windows 10 and 11 and natively on Apple silicon Macs from macOS 13, without Parallels or Boot Camp. According to the FAQ, Intel Macs and iPads are not supported. A web version for browser and tablet is to follow as a beta in 2026.",[87,12589,12590,12593],{},[15,12591,12592],{},"Offline at the desk."," According to manual 2.0.4, drawing and saving work without internet; the licence check and creating the PDF need a connection. According to the manual, exports other than the PDF also work offline. Your drawings are stored on your own computer, not on Trikker's servers.",[87,12595,12596,12599],{},[15,12597,12598],{},"Diagram logic."," In our test of the demo on 14 October 2026, the diagram arranged itself as soon as we clicked a connection point. Cable type, number of cores, installation method, phase and short-circuit current have their own fields.",[87,12601,12602,12605],{},[15,12603,12604],{},"Linked situation plan."," According to the FAQ, every symbol on the plan stays linked to its counterpart in the diagram, and Trikker shows whether each circuit is fully placed on the plan.",[87,12607,12608,12611],{},[15,12609,12610],{},"Home automation and bill of materials."," According to manual 2.0.4, there is a home automation module with addresses, an export to Niko Home Control and Home Center, and a bill of materials with cable lengths.",[87,12613,12614,12617],{},[15,12615,12616],{},"Schemalezer (beta)."," For customers with an active licence, an AI reads a single-line diagram and a situation plan from a PDF or image, including a scan, photo or hand sketch, and turns them into a Trikker diagram. You can also describe the installation by typing or dictating. According to Trikker you must check the result; according to the FAQ, the diagram and result are kept for 180 days.",[12,12619,12620,12623],{},[15,12621,12622],{},"Limits:"," a licence works on one computer at a time. Trikker does not write DWG or DXF; for AutoCAD you export a vector PDF. Teamwork runs through files, not through a shared project. According to manual 2.0.4, the dossier PDF is created on Trikker's servers; the program says so on first start.",[12,12625,12626,12628],{},[15,12627,1382],{}," you draw a lot at a fixed computer, often work without a network, export home automation to Niko Home Control, or want to read old paper diagrams in with the Schemalezer.",[79,12630,12632],{"id":12631},"planelec-sketch-at-a-glance","PlanElec Sketch at a glance",[12,12634,12635,12636,12638],{},"Sketch is our free alternative to Trikker for the two documents you need for the inspection: the single-line diagram and the situation plan. It runs in the browser, also on tablet and phone, reads your ",[25,12637,27],{}," files and is aimed at homeowners, sole traders and micro businesses who want to draw their documents without licence costs.",[84,12640,12641,12647,12653,12664,12670,12679],{},[87,12642,12643,12646],{},[15,12644,12645],{},"Drawing:"," you pick a symbol or a ready-made circuit and click a blue connection point; layout, lines and circuit letters follow. Templates and a searchable symbol library help you get started.",[87,12648,12649,12652],{},[15,12650,12651],{},"Situation plan:"," you draw it yourself or, with a free account, place a floor plan as an image or PDF underneath, set the scale with two points and drag the devices from the diagram onto the plan, floor by floor.",[87,12654,12655,12658,12659,6975,12661,12663],{},[15,12656,12657],{},"Output:"," the PDF is created in the browser, in A4 or A3, with a title block for installation, client, EAN, installer and approved inspection body. Diagram and plan also export as SVG, the bill of materials as CSV, and the drawing as a project file via ",[15,12660,1441],{},[15,12662,1445],{}," shows what is missing first.",[87,12665,12666,12669],{},[15,12667,12668],{},"Account:"," without an account the PDF carries the PlanElec logo as a watermark and the drawing stays in the browser. A free account removes the watermark, allows uploads and stores two locations and one drawing board in the cloud; the line \"Generated with planelec.be\" stays until you switch it off with Pro or a site pass.",[87,12671,12672,12675,12676,12678],{},[15,12673,12674],{},"Trikker files:"," Sketch opens a ",[25,12677,27],{}," file even without an account, including the situation plan, and lists in a report what was not carried over. The conversion runs on the PlanElec server, so you need internet.",[87,12680,12681,12684],{},[15,12682,12683],{},"Without a network:"," if the connection drops, you keep drawing; the drawing stays in the browser. Cloud, handover to Pro and recognition work again once you are online.",[12,12686,12687,12689],{},[15,12688,12622],{}," no distribution board, no self-check report, no PV planning, no home automation, no teamwork. Trikker symbols without a counterpart come into Sketch as a note on the diagram, and related symbols are approximated; so open a file with your special symbols and read the import report.",[12,12691,12692,12694,12695,56],{},[15,12693,1449],{}," you want to draw diagram and plan without licence costs, work on a tablet at the client's, or want to continue your Trikker files for free. ",[40,12696,12698],{"href":1456,"rel":12697},[1458],"Open Sketch in the browser",[1489,12700],{":height":9155,":width":9156,"alt":9157,"caption":9158,"src":9159},[79,12702,12704],{"id":12703},"planelec-pro-at-a-glance","PlanElec Pro at a glance",[12,12706,12707],{},"Pro is a new generation of electrical documentation: it starts from the installation, not from the drawing. Floor plan, devices, circuits, cables and distribution board form one project; the single-line diagram, situation plan and lists follow from it. The assistant works inside that model; the self-check runs after every change, and every step can be undone.",[84,12709,12710,12718,12726,12732,12738,12747],{},[87,12711,12712,12715,12716,56],{},[15,12713,12714],{},"Documents:"," single-line diagram, situation plan, distribution board, self-check report and a selectable dossier as PDF. ",[40,12717,4646],{"href":4645},[87,12719,12720,12723,12724,56],{},[15,12721,12722],{},"Self-check:"," an indicative AREI\u002FRGIE self-check report for the supported rules shows open points and coverage gaps. ",[40,12725,1086],{"href":1085},[87,12727,12728,12731],{},[15,12729,12730],{},"AI:"," the PlanElec assistant carries out instructions across the whole project; floor-plan recognition reads PDF, PNG, JPEG or WebP, including a PDF export from Trikker; board recognition suggests the DIN modules visible in photos. You check every suggestion before applying it.",[87,12733,12734,12737],{},[15,12735,12736],{},"PV and building automation:"," strings per MPPT, DC protection and cable sections; KNX documentation as a pilot.",[87,12739,12740,12743,12744,56],{},[15,12741,12742],{},"Team:"," organisations, invitations and project roles; the workshop and fitters read along with the Viewer role. ",[40,12745,12746],{"href":5358},"Share plans with your team",[87,12748,12749,12752,12753,56],{},[15,12750,12751],{},"Plans:"," Try Pro for 1 month: €0. Site pass €15 per property, valid for twelve months; subscription €29 per month or €290 per year with three editing seats, each extra seat €12 per month or €120 per year. The price stays as long as the subscription runs without a break. Pro applies in Sketch and in Pro. ",[40,12754,7533],{"href":54},[12,12756,12757,12759,12760,12762],{},[15,12758,12622],{}," Pro needs an account, and internet for export, uploads and AI. Without a connection you continue a previously opened project as a pilot (",[40,12761,1468],{"href":1467},"). The detailed bill of materials and the KNX documentation are pilots. A Pro project does not go back to Sketch.",[12,12764,12765,12767,12768,56],{},[15,12766,1475],{}," you plan the installation rather than just draw it: distribution board, self-check report, PV and KNX belong to the same project, several people plan together, and fitters read for free. ",[40,12769,2032],{"href":1964},[79,12771,12773],{"id":12772},"you-have-trikker-files-which-route","You have Trikker files: which route?",[1489,12775],{":height":12776,":width":3800,"alt":12777,"caption":12778,"src":12779},"524","Diagram: continuing one Trikker file leads to PlanElec Sketch, a whole archive to Import Trikker projects, and a switchboard, self-check report or team to PlanElec Pro.","Three routes for Trikker files. The import is not tied to a subscription; you only need Pro for a switchboard, self-check report or team.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Ftrikker-vs-sketch-vs-pro\u002Ftrikker-route.en.svg",[84,12781,12782,12792,12802],{},[87,12783,12784,12787,12788,12791],{},[15,12785,12786],{},"Continue one file:"," open it in ",[40,12789,22],{"href":1456,"rel":12790},[1458],", free and without an account.",[87,12793,12794,38,12797,12799,12800,1487],{},[15,12795,12796],{},"Take the whole archive along:",[15,12798,1486],{},", up to 500 files per run, with any signed-in account (",[40,12801,3594],{"href":42},[87,12803,12804,12807,12808,56],{},[15,12805,12806],{},"Board, self-check report or team:"," continue in Pro; bring Sketch drawings over with ",[15,12809,1482],{},[12,12811,12812,12813,3157,12816,56],{},"An imported project is a starting point, not a checked document: compare it with the original. Order of steps, running both in parallel and a checklist for the move are in ",[40,12814,12815],{"href":4802},"Move your Trikker archive",[40,12817,1387],{"href":1386},[79,12819,12821],{"id":12820},"test-all-three-with-the-same-job","Test all three with the same job",[12,12823,12824],{},"A comparison on paper does not replace a test in your daily work. Give all three tools the same small job; with the Trikker demo, the five-circuit limit lets you complete only part of it.",[3139,12826,12827,12833,12839,12845,12851,12856],{},[87,12828,12829,12832],{},[15,12830,12831],{},"Property:"," a single-storey detached house, main RCD 300 mA, one 30 mA RCD, eight circuits including kitchen, washing machine and a circuit for an EV charger.",[87,12834,12835,12838],{},[15,12836,12837],{},"Diagram:"," draw all eight circuits with protective device and cable.",[87,12840,12841,12844],{},[15,12842,12843],{},"Plan:"," draw the floor plan or place an existing plan underneath, and position every device.",[87,12846,12847,12850],{},[15,12848,12849],{},"Change:"," move a socket to another circuit and check that diagram and plan still match.",[87,12852,12853,12855],{},[15,12854,12657],{}," create a PDF with a title block and read it on screen and on paper.",[87,12857,12858,12861,12862,12864],{},[15,12859,12860],{},"Existing work:"," open an existing ",[25,12863,27],{}," file and compare it with the original.",[12,12866,12867],{},"Note for each tool how long it takes, which symbols are missing, what the PDF shows and what happens with the change. With Pro, also test the distribution board and the self-check report.",[79,12869,12871],{"id":12870},"how-we-compared","How we compared",[12,12873,12874,12875,12878],{},"We read Trikker's public pages and backed every statement with an access date. We did not use third-party reviews or other vendors' comparison pages as sources. We award no scores and no ranking; the tables describe properties. Our own test of Trikker was limited to the demo; we did not work with a full version. Trikker is a trademark of its owner; we use the name only to identify the product. Is something out of date? ",[40,12876,12877],{"href":1611},"Write to us"," and we will correct the row.",[138,12880,12881,12892],{},[141,12882,12883],{},[144,12884,12885,12887,12889],{},[147,12886,9278],{},[147,12888,2244],{},[147,12890,12891],{},"Accessed",[163,12893,12894,12907,12919,12932,12945,12965],{},[144,12895,12896,12899,12904],{},[168,12897,12898],{},"€45 per month or €360 per year excl. VAT, for private buyers €54.45 or €435.60; one PC per licence; demo with max. 5 circuits, 1 plan page, watermark; education licence not for official plans",[168,12900,12901],{},[40,12902,11895],{"href":1895,"rel":12903},[1458],[168,12905,12906],{},"16 Nov 2026",[144,12908,12909,12912,12917],{},[168,12910,12911],{},"Trikker 2.0 out of beta since 13 Nov 2026; Windows 10 and 11, macOS 13 or later with Apple silicon; six languages; printing straight to PDF; existing licences remain valid; web version as a beta in 2026",[168,12913,12914],{},[40,12915,11877],{"href":1903,"rel":12916},[1458],[168,12918,12906],{},[144,12920,12921,12924,12930],{},[168,12922,12923],{},"No Intel Macs, no iPad; one licence on one computer at a time, moving is free; local files; no DWG\u002FDXF export; DWG\u002FDXF as background; linked symbols; Schemalezer formats and 180-day retention",[168,12925,12926],{},[40,12927,12929],{"href":1899,"rel":12928},[1458],"Trikker FAQ",[168,12931,12906],{},[144,12933,12934,12937,12943],{},[168,12935,12936],{},"Drawing and saving offline, licence and PDF online; PDF created on Trikker's servers; demo limits; licence per device; bill of materials with cable lengths; home automation with export to Niko Home Control and Home Center",[168,12938,12939],{},[40,12940,12942],{"href":1908,"rel":12941},[1458],"Trikker online manual 2.0.4",[168,12944,12906],{},[144,12946,12947,12950,12962],{},[168,12948,12949],{},"Schemalezer as a beta for licence holders; description typed or dictated (NL, FR, EN)",[168,12951,12952,1774,12957],{},[40,12953,12956],{"href":12954,"rel":12955},"https:\u002F\u002Fwww.trikker.be\u002Fblog\u002Fnieuws-2\u002Fnieuw-in-beta-de-schemalezer-zet-schema-en-situatieplan-in-minuten-om-naar-trikker-30",[1458],"Schemalezer",[40,12958,12961],{"href":12959,"rel":12960},"https:\u002F\u002Fwww.trikker.be\u002Fblog\u002Fnieuws-2\u002Fbeschrijf-de-installatie-op-de-werf-trikker-maakt-er-meteen-een-schema-van-33",[1458],"description and dictation",[168,12963,12964],{},"6 Nov 2026",[144,12966,12967,12970,12973],{},[168,12968,12969],{},"Diagram logic and demo limits in practice",[168,12971,12972],{},"our own test with Trikker 2.0.0 (demo)",[168,12974,12975],{},"14 Oct 2026",[12,12977,12978],{},"On 16 November 2026 the trikker.be home page still mentioned the macOS beta of 30 September; the announcement of 13 November and the FAQ describe the release for everyone. We follow the newer pages. Statements about PlanElec follow our product description of 16 November 2026.",[79,12980,1617],{"id":1616},[1041,12982,11801],{"id":11800},[12,12984,12985],{},"Yes. Without an account you draw the diagram and plan with no limit on circuits, symbols or pages, open Trikker files and create the PDF; it then carries the PlanElec logo as a watermark. A free account removes it, allows uploads and stores two locations and one drawing board in the cloud. Custom symbols and more locations come with Pro.",[1041,12987,12989],{"id":12988},"does-trikker-run-on-a-mac-or-ipad","Does Trikker run on a Mac or iPad?",[12,12991,12992,12993,56],{},"On a Mac, yes: since 13 November 2026, Trikker 2.0 runs out of beta, natively, on Apple silicon Macs from macOS 13. According to the FAQ, Trikker does not support Intel Macs or the iPad; a web version for browser and tablet is announced as a beta for 2026. Sketch and Pro run in the browser, iPad included. More in ",[40,12994,12996],{"href":12995},"\u002Fen\u002Fblog\u002Ftrikker-2-0-mac","Trikker 2.0 for Mac",[1041,12998,13000],{"id":12999},"can-i-open-my-trikker-file-in-sketch","Can I open my Trikker file in Sketch?",[12,13002,13003,13004,13006],{},"Yes, even without an account, with an internet connection. Sketch takes over the single-line diagram and situation plan and lists in a report what was not carried over. With ",[15,13005,1482],{}," you then continue the drawing in Pro.",[1041,13008,13010],{"id":13009},"do-i-need-pro-to-import-my-trikker-archive","Do I need Pro to import my Trikker archive?",[12,13012,13013,13014,13016],{},"No. ",[15,13015,1486],{}," is open to any signed-in account, also during the Pro trial. You only need Pro for the distribution board, self-check report, team or exports without masked areas.",[1041,13018,13020],{"id":13019},"does-trikker-have-a-free-version","Does Trikker have a free version?",[12,13022,13023],{},"Trikker has a demo without an account, limited to five circuits, one page of situation plan and a watermark, and a free education licence that, according to Trikker, is not meant for official plans. The full version is a subscription per computer.",[1041,13025,13027],{"id":13026},"which-is-cheaper-for-a-business-with-three-people","Which is cheaper for a business with three people?",[12,13029,13030],{},"With Trikker you pay per computer, so three times €360 a year excl. VAT for three people. The Pro yearly subscription costs €290 and includes three editing seats; fitters read along for free. Sketch is free but has no teamwork.",[1041,13032,13034],{"id":13033},"can-i-work-without-internet","Can I work without internet?",[12,13036,13037],{},"Best with Trikker: drawing and saving work offline; the PDF and the licence check need a connection. Sketch keeps drawing if the connection drops; the drawing stays in the browser. Pro continues a previously opened project as a pilot; export, uploads and AI need internet.",[1041,13039,13041],{"id":13040},"is-a-sketch-diagram-enough-for-the-inspection","Is a Sketch diagram enough for the inspection?",[12,13043,13044,13045,13047],{},"Sketch produces a PDF with a title block, and ",[15,13046,1445],{}," lists missing details. That is a completeness aid. You remain responsible for the content of your plans; the inspection is done by the approved inspection body, whichever tool you draw with.",[79,13049,13051],{"id":13050},"further-reading","Further reading",[84,13053,13054,13058,13063,13067,13071,13075],{},[87,13055,13056],{},[40,13057,12052],{"href":12051},[87,13059,13060],{},[40,13061,13062],{"href":1386},"Trikker alternative: switching to PlanElec",[87,13064,13065],{},[40,13066,12815],{"href":4802},[87,13068,13069],{},[40,13070,12996],{"href":12995},[87,13072,13073],{},[40,13074,5400],{"href":5399},[87,13076,13077],{},[40,13078,13080],{"href":13079},"\u002Fen\u002Fblog\u002Fsolar-pv-ev-charger-single-line-diagram","Solar PV and EV charger in the single-line diagram",[79,13082,2009],{"id":2008},[12,13084,13085,13086,56],{},"Start in Sketch; if you need the distribution board, self-check or a team, bring the drawing over with ",[15,13087,1482],{},[84,13089,13090,13097],{},[87,13091,13092,38,13094,2024],{},[15,13093,2019],{},[40,13095,2023],{"href":1456,"rel":13096},[1458],[87,13098,13099,38,13101,2033,13103,56],{},[15,13100,2029],{},[40,13102,2032],{"href":1964},[40,13104,2036],{"href":54},[12,13106,13107,2042],{},[15,13108,2041],{},{"title":2044,"searchDepth":2045,"depth":2045,"links":13110},[13111,13112,13113,13114,13115,13116,13117,13118,13119,13120,13121,13131,13132],{"id":12058,"depth":2045,"text":12059},{"id":12198,"depth":2045,"text":12199},{"id":12457,"depth":2045,"text":12458},{"id":1498,"depth":2045,"text":1499},{"id":12575,"depth":2045,"text":12576},{"id":12631,"depth":2045,"text":12632},{"id":12703,"depth":2045,"text":12704},{"id":12772,"depth":2045,"text":12773},{"id":12820,"depth":2045,"text":12821},{"id":12870,"depth":2045,"text":12871},{"id":1616,"depth":2045,"text":1617,"children":13122},[13123,13124,13125,13126,13127,13128,13129,13130],{"id":11800,"depth":2053,"text":11801},{"id":12988,"depth":2053,"text":12989},{"id":12999,"depth":2053,"text":13000},{"id":13009,"depth":2053,"text":13010},{"id":13019,"depth":2053,"text":13020},{"id":13026,"depth":2053,"text":13027},{"id":13033,"depth":2053,"text":13034},{"id":13040,"depth":2053,"text":13041},{"id":13050,"depth":2045,"text":13051},{"id":2008,"depth":2045,"text":2009},"2026-10-21","Which tool for which job? Sketch free for diagram and plan, Pro for distribution board and self-check, Trikker for desktop work and home automation export.","\u002Fimages\u002Fblog\u002Feditorial-2026-11-19\u002Fplanelec-trikker-vs-sketch-vs-pro-editorial.webp",[1373,2115,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-11-19\u002Fshare\u002Fplanelec-trikker-vs-sketch-vs-pro-editorial.jpg","\u002Fblog\u002Ftrikker-sketch-pro-comparison.en",{"title":1990,"description":13134},"Trikker vs PlanElec Sketch vs Pro: choice by job","trikker-sketch-pro-comparison","blog\u002Ftrikker-sketch-pro-comparison.en",[329,22,7417,5269,2132,11984,2133,2134,2110],"JFfwZ8NFcjaA124Qf-6n519aXIQZLD_gisTji1I7aIE","\u002Fblog\u002Ftrikker-sketch-pro-comparison",{"id":13148,"title":1995,"articleId":13149,"body":13150,"category":2110,"date":14420,"description":14421,"extension":2113,"image":13207,"labels":14422,"lastUpdated":2111,"locale":2119,"meta":14423,"navigation":2121,"ogImage":14424,"path":14425,"publishDate":14420,"readTime":14426,"refreshInterval":2053,"seo":14427,"seoTitle":10313,"slug":14428,"stem":14429,"tags":14430,"__hash__":14435,"kind":2137,"href":14436},"blog\u002Fblog\u002Famperio-alternative.en.md","planelec-vs-amperio",{"type":9,"value":13151,"toc":14390},[13152,13158,13163,13203,13208,13213,13215,13218,13237,13240,13244,13469,13490,13494,13497,13501,13504,13508,13511,13515,13518,13522,13525,13630,13633,13637,13675,13679,13748,13752,13758,13815,13822,13826,13830,13833,13934,13949,13955,13959,13962,14030,14033,14037,14040,14111,14115,14118,14159,14167,14171,14175,14178,14182,14187,14191,14197,14201,14204,14208,14211,14215,14218,14222,14228,14232,14235,14239,14248,14251,14326,14328,14360,14362,14369,14386],[12,13153,13154,13157],{},[15,13155,13156],{},"PlanElec Pro and Amperio are both Belgian web apps for the single-line diagram, situation plan and inspection dossier, with dictation and AREI\u002FRGIE checks. Amperio is built around the site visit; PlanElec Pro is a new generation of electrical documentation in which floor plan, circuits, distribution board, single-line diagram and situation plan form one project."," In Pro you plan the whole installation: the assistant carries out requests across the whole project, typed or dictated in Dutch, French, German or English, and a self-check whose 59 checks and their limits are public runs after every change. Amperio fits better if the job site is your main workplace: tasks, before\u002Fafter photos and voice notes in the same app as the diagram, also offline, plus taking over an existing diagram from a photo or PDF. If you only need a single-line diagram and situation plan, you draw them for free in PlanElec Sketch, also from a Trikker file.",[12,13159,13160],{},[15,13161,13162],{},"Who needs Sketch, and who needs Pro?",[138,13164,13165,13174],{},[141,13166,13167],{},[144,13168,13169,13172],{},[147,13170,13171],{},"Your task",[147,13173,9397],{},[163,13175,13176,13184,13192],{},[144,13177,13178,13181],{},[168,13179,13180],{},"Homeowner, DIY enthusiast or sole trader: draw the single-line diagram and situation plan for inspection, sale or a small job",[168,13182,13183],{},"PlanElec Sketch: free in the browser; no distribution board editor or self-check report",[144,13185,13186,13189],{},[168,13187,13188],{},"Electrical contractor, planner, integrator or solar installer: distribution board, self-check, dossier, PV, KNX or a team",[168,13190,13191],{},"PlanElec Pro: site pass per property or a subscription for ongoing projects and teamwork",[144,13193,13194,13197],{},[168,13195,13196],{},"Start with the drawing and later plan the whole installation",[168,13198,13199,13200,13202],{},"Sketch → ",[15,13201,1482],{},"; transfer runs only from Sketch to Pro",[12,13204,13205],{},[74,13206],{"alt":76,"src":13207},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-planelec-vs-amperio-editorial.webp",[12,13209,13210],{},[63,13211,13212],{},"PlanElec makes Sketch and Pro. Information about Amperio comes from amperio.be (published by ONEIRIC SRL) as of 16 November 2026; sources and method are listed below under “Sources and check date”.",[79,13214,82],{"id":81},[12,13216,13217],{},"Amperio and PlanElec solve the same problem – a single-line diagram and situation plan for the AREI\u002FRGIE inspection – but start from a different workplace. Amperio is built around the site visit: dictating room by room, keeping track of tasks and photos, and looking up the diagram on a phone. PlanElec is built around one project model in which floor plan, devices, circuits and distribution board stay connected; drawing, the AI assistant and dictation are three ways into that same model.",[84,13219,13220,13225,13231],{},[87,13221,13222,13224],{},[15,13223,1140],{}," you want job-site tracking (tasks, before\u002Fafter photos, voice notes, sites per client) in the same app as the diagram, or want an existing single-line diagram taken over from a photo or PDF.",[87,13226,13227,13230],{},[15,13228,13229],{},"Choose PlanElec Sketch if"," you only need a single-line diagram and situation plan for the inspection: free in the browser, even without an account and on a tablet at the customer’s.",[87,13232,13233,13236],{},[15,13234,13235],{},"Choose PlanElec Pro if"," you plan the distribution board on DIN rails in an editor, work in German or English, want the floor plan recognised from a PDF or scan, or want to know exactly which AREI\u002FRGIE rules the software checks.",[12,13238,13239],{},"What both cost over twelve months is worked out for typical businesses in the section “What does it cost over 12 months?”.",[79,13241,13243],{"id":13242},"amperio-and-planelec-criterion-by-criterion","Amperio and PlanElec criterion by criterion",[138,13245,13246,13256],{},[141,13247,13248],{},[144,13249,13250,13252,13254],{},[147,13251,11364],{},[147,13253,7417],{},[147,13255,187],{},[163,13257,13258,13268,13279,13289,13299,13309,13319,13330,13341,13352,13363,13374,13384,13395,13405,13416,13427,13437,13448,13458],{},[144,13259,13260,13262,13265],{},[168,13261,4573],{},[168,13263,13264],{},"Sketch free; Pro: site pass EUR 15 per property, subscription EUR 29 a month or EUR 290 a year",[168,13266,13267],{},"Pro EUR 39 a month (launch rate, normally EUR 79) or EUR 374.40 a year; Particulier EUR 29 one-off for 1 job site",[144,13269,13270,13273,13276],{},[168,13271,13272],{},"VAT basis",[168,13274,13275],{},"Final prices; PlanElec charges no VAT (small business exemption scheme)",[168,13277,13278],{},"Pro excluding VAT; Particulier including VAT",[144,13280,13281,13283,13286],{},[168,13282,12284],{},[168,13284,13285],{},"Subscription with 3 editing seats, monthly or yearly; site pass per property, editable for 12 months",[168,13287,13288],{},"Pro subscription monthly without commitment or yearly, each extra editor charged on top; Particulier per job site, editable for 6 months",[144,13290,13291,13293,13296],{},[168,13292,12298],{},[168,13294,13295],{},"Sketch free with no time limit; Try Pro for 1 month for one person, without payment details",[168,13297,13298],{},"1 job site for 7 days, no credit card, up to 5 editors; PDF with trial watermark",[144,13300,13301,13303,13306],{},[168,13302,543],{},[168,13304,13305],{},"Browser, no installation; Pro best on a laptop or desktop, Sketch also on tablets and phones",[168,13307,13308],{},"Browser, no installation; the same site on tablet, computer and phone",[144,13310,13311,13313,13316],{},[168,13312,546],{},[168,13314,13315],{},"Dutch, French, German, English",[168,13317,13318],{},"French, Dutch, English",[144,13320,13321,13324,13327],{},[168,13322,13323],{},"Users in Pro",[168,13325,13326],{},"3 editing seats included, each extra seat EUR 12\u002Fmonth; read access free and unlimited",[168,13328,13329],{},"Each extra editor EUR 19\u002Fmonth excl. VAT; readers free",[144,13331,13332,13335,13338],{},[168,13333,13334],{},"Diagram and plan",[168,13336,13337],{},"Pro: one project model, single-line diagram and situation plan derived from floor plan, circuits and board. Sketch: draw diagram and plan, without a board",[168,13339,13340],{},"Each element exists once; plan and diagram update together; according to a video tutorial, the single-line diagram is generated from the plan and circuits carry the room name",[144,13342,13343,13346,13349],{},[168,13344,13345],{},"Floor plan",[168,13347,13348],{},"Drawing; PDF, DXF or image as underlay; several floors; 3D view",[168,13350,13351],{},"Rooms drawn or dictated with dimensions; one plan per level, roof included",[144,13353,13354,13357,13360],{},[168,13355,13356],{},"Taking over existing work",[168,13358,13359],{},"Trikker files (.trik) with diagram and situation plan, in Sketch or as a whole archive in Pro; floor plan recognition from PDF, scan or image; DIN modules from board photos; no diagram import from PDF or photo",[168,13361,13362],{},"Single-line diagram from PDF or photo, RCDs, circuit breakers and circuits rebuilt; architect’s plan as PDF, photo, DWG or DXF turned into a situation plan by AI; according to Amperio’s guides, boards from photos too; Trikker import not stated",[144,13364,13365,13368,13371],{},[168,13366,13367],{},"Voice input",[168,13369,13370],{},"Dictation in the AI assistant, NL\u002FFR\u002FDE\u002FEN; recognised text reviewed before sending",[168,13372,13373],{},"Room-by-room dictation for diagram, plan and tasks",[144,13375,13376,13378,13381],{},[168,13377,10998],{},[168,13379,13380],{},"More than 100 planning commands across the project; risky actions only after confirmation; up to 4 photos per request, for example of the board or a rating plate",[168,13382,13383],{},"Changes the diagram with one sentence, you confirm; AREI guide answers typed or spoken questions from Book 1, citing the passages",[144,13385,13386,13389,13392],{},[168,13387,13388],{},"AREI\u002FRGIE check",[168,13390,13391],{},"Pro: 59 published checks, 30 of them citing an AREI article; after every change by the assistant. Sketch does not check the installation",[168,13393,13394],{},"More than 40 Book 1 checks per circuit during input, with the article and a suggested fix",[144,13396,13397,13399,13402],{},[168,13398,3115],{},[168,13400,13401],{},"Board editor with DIN rails, board PDF, recognition from photos",[168,13403,13404],{},"The board builds itself from the diagram, in 3D or flat; labels at 1:1 scale on A4, a door legend and strips for label printers",[144,13406,13407,13410,13413],{},[168,13408,13409],{},"PV and home automation",[168,13411,13412],{},"PV strings per MPPT with DC protection; KNX documentation as a pilot",[168,13414,13415],{},"Panels, inverter, battery, charging point and DC branch with checks under chapter 7.112 and a dossier page of their own; automation bus, actuators and participants in diagram, plan and dossier",[144,13417,13418,13421,13424],{},[168,13419,13420],{},"Job-site tracking",[168,13422,13423],{},"Not included: no tasks, no before\u002Fafter photos",[168,13425,13426],{},"Tasks (dictated too), before\u002Fafter photos, voice notes, sites per client",[144,13428,13429,13431,13434],{},[168,13430,12325],{},[168,13432,13433],{},"Pro (pilot): keep editing projects opened online beforehand in floor plan, diagram and board; export, uploads, dictation and AI need a connection. Sketch: if the connection drops, you keep drawing and the drawing stays in the browser; cloud, handover to Pro and Trikker import need a connection",[168,13435,13436],{},"In the Pro plan: recently opened job sites viewable with diagram and plan; tasks, photos and voice notes without a network, synced later; editing diagram and plan needs a connection",[144,13438,13439,13442,13445],{},[168,13440,13441],{},"Documents",[168,13443,13444],{},"Sketch: PDF in A4 or A3 with cover page, title block and legend. Pro: single-line diagram, situation plan, board PDF, self-check report; dossier with cover, contents and versioned archive",[168,13446,13447],{},"Electrical dossier as one PDF: installation sheet, single-line diagram, plans with title block, legend and signatures, numbered and versioned; in French, Dutch or English",[144,13449,13450,13452,13455],{},[168,13451,11601],{},[168,13453,13454],{},"Pro: organisations, email invitations, project roles, read mode for viewers, live sync",[168,13456,13457],{},"Email invitation as editor or reader; shared sites, tasks and photos",[144,13459,13460,13463,13466],{},[168,13461,13462],{},"Export and data portability",[168,13464,13465],{},"Sketch: PDF (A4\u002FA3), SVG of diagram and plan, material list as CSV, drawing as a project file (.planelec.json). Pro: PDFs and dossier, lists as PDF and CSV (pilot), KNX addresses as files for ETS; projects stored encrypted in the EU",[168,13467,13468],{},"PDF dossier in French, Dutch or English; according to Amperio, project files, diagrams and plans can be exported at any time, also after cancelling; formats other than PDF not stated; hosting in the EU",[12,13470,13471,13472,1774,13475,1774,13477,1774,13479,1774,13481,1774,13485,1774,13487,13489],{},"PlanElec sources: ",[40,13473,13474],{"href":54},"pricing",[40,13476,22],{"href":1961},[40,13478,1486],{"href":42},[40,13480,1086],{"href":1085},[40,13482,13484],{"href":13483},"\u002Fen\u002Fhelp\u002Fstudio-activity-assistant","Activity and assistant in the studio",[40,13486,1468],{"href":1467},[40,13488,4646],{"href":4645},". Amperio sources with their access date are listed at the end of the article.",[79,13491,13493],{"id":13492},"which-questions-decide-between-amperio-and-planelec","Which questions decide between Amperio and PlanElec?",[12,13495,13496],{},"Four questions separate the two tools faster than any feature list.",[1041,13498,13500],{"id":13499},"where-do-you-work-most-on-site-or-at-your-desk","Where do you work most: on site or at your desk?",[12,13502,13503],{},"If you spend the day at customers’ homes and want to record tasks, before\u002Fafter photos and voice notes there, Amperio fits your day better: this job-site tracking is part of the product and, according to Amperio, also works without a network. If you plan the whole installation at the office, up to the distribution board, and take the documents to site, PlanElec Pro fits better. If all you need at the customer’s is a quick diagram and plan on a tablet, PlanElec Sketch is enough.",[1041,13505,13507],{"id":13506},"does-the-tool-check-during-entry-or-in-a-report","Does the tool check during entry or in a report?",[12,13509,13510],{},"According to Amperio, every circuit is checked as soon as it is entered against “more than forty” checks from Book 1, and the deviation appears where it occurs. Amperio does not publish a list of these checks. PlanElec Pro checks after every change made by the assistant and in the self-check report, with 59 checks whose list and limits are public. Sketch does not check the installation; there, “Check documents” only shows what is missing from the documents. Neither check is an inspection.",[1041,13512,13514],{"id":13513},"how-are-the-diagram-and-the-plan-linked","How are the diagram and the plan linked?",[12,13516,13517],{},"In Amperio, plan and diagram are updated together according to the vendor, and the single-line diagram is generated from the plan. In PlanElec Pro, the single-line diagram and the situation plan come from one project model that also includes the distribution board on DIN rails. In Sketch, you draw both the single-line diagram and the situation plan yourself; “Check documents” flags devices in the diagram without a place on the plan.",[1041,13519,13521],{"id":13520},"what-does-it-cost-over-12-months","What does it cost over 12 months?",[12,13523,13524],{},"Amounts according to both vendors’ pricing pages on 16 November 2026. Amperio Pro is quoted excluding VAT, Particulier including VAT; PlanElec quotes final prices without VAT (small business exemption scheme). As a private person, add 21% VAT to Amperio Pro; as a VAT-registered business, compare the amounts excluding VAT directly.",[138,13526,13527,13537],{},[141,13528,13529],{},[144,13530,13531,13533,13535],{},[147,13532,4118],{},[147,13534,7417],{},[147,13536,187],{},[163,13538,13539,13550,13561,13572,13583,13594,13604,13619],{},[144,13540,13541,13544,13547],{},[168,13542,13543],{},"Only a single-line diagram and situation plan, no subscription",[168,13545,13546],{},"Sketch: EUR 0",[168,13548,13549],{},"No permanent free plan; trial with 1 job site for 7 days",[144,13551,13552,13555,13558],{},[168,13553,13554],{},"Your own home, once",[168,13556,13557],{},"Sketch: EUR 0; with board or self-check report, one site pass: EUR 15",[168,13559,13560],{},"Particulier: EUR 29 including VAT, according to Amperio for your own installation",[144,13562,13563,13566,13569],{},[168,13564,13565],{},"Business with 2 properties a year",[168,13567,13568],{},"2 site passes: 2 × EUR 15",[168,13570,13571],{},"Pro for 2 months: EUR 78 excluding VAT, if both job sites fall in those months",[144,13573,13574,13577,13580],{},[168,13575,13576],{},"1 editor, paid yearly",[168,13578,13579],{},"EUR 290 (3 editing seats included)",[168,13581,13582],{},"EUR 374.40 excluding VAT",[144,13584,13585,13588,13591],{},[168,13586,13587],{},"1 editor, monthly × 12",[168,13589,13590],{},"EUR 348 (12 × EUR 29)",[168,13592,13593],{},"EUR 468 excluding VAT (12 × EUR 39)",[144,13595,13596,13599,13601],{},[168,13597,13598],{},"3 editors, paid yearly",[168,13600,367],{},[168,13602,13603],{},"EUR 739.20 excluding VAT (EUR 374.40 + 2 × EUR 182.40)",[144,13605,13606,13609,13612],{},[168,13607,13608],{},"3 editors, monthly × 12",[168,13610,13611],{},"EUR 348",[168,13613,13614,13615,3317],{},"EUR 924 excluding VAT (12 × ",[13616,13617,13618],"span",{},"EUR 39 + 2 × EUR 19",[144,13620,13621,13624,13627],{},[168,13622,13623],{},"Fitters who only read",[168,13625,13626],{},"Read access free",[168,13628,13629],{},"Readers free",[12,13631,13632],{},"A site pass covers twelve months. From 20 sites a year, the yearly subscription at EUR 290 costs less than site passes at EUR 15, without extra seats. According to Amperio, you keep the launch rate of EUR 39 a month as long as you stay subscribed; the regular price it quotes is EUR 79 excluding VAT. At PlanElec, the price stays the same as long as your subscription runs without a break. A fourth editor adds EUR 120 a year at PlanElec and EUR 182.40 excluding VAT at Amperio.",[79,13634,13636],{"id":13635},"where-is-amperio-stronger","Where is Amperio stronger?",[84,13638,13639,13645,13651,13657,13663,13669],{},[87,13640,13641,13644],{},[15,13642,13643],{},"Job-site tracking in the same app."," You dictate or type tasks, with subtasks, photos and voice notes; before and after photos stay linked to the site, and sites are grouped by client. PlanElec has no tasks and no before\u002Fafter photos; for that, you use a separate tool alongside it.",[87,13646,13647,13650],{},[15,13648,13649],{},"Looking things up and taking notes without a network."," According to Amperio, recently opened sites stay viewable offline, diagram and plan included, and you can create tasks, photos and voice memos without a network that sync later. PlanElec does not offer photos or notes without a connection.",[87,13652,13653,13656],{},[15,13654,13655],{},"Taking over an existing single-line diagram."," Amperio rebuilds RCDs, circuit breakers and circuits from a photo or PDF of a diagram. PlanElec takes over single-line diagrams only from Trikker files (.trik), not from a PDF or photo; such a diagram you plan again in PlanElec.",[87,13658,13659,13662],{},[15,13660,13661],{},"Board view and labels."," Amperio builds the distribution board from the diagram, in 3D or flat, and prints the labels at 1:1 scale on A4, along with a door legend and strips for label printers. PlanElec does not offer a label sheet.",[87,13664,13665,13668],{},[15,13666,13667],{},"The phone as a working tool."," Amperio explicitly positions the phone for tasks, photos and looking up the diagram at the client’s. PlanElec also runs on phones, but planning works better on a larger screen.",[87,13670,13671,13674],{},[15,13672,13673],{},"Students."," Amperio gives students free access on request with a school address.",[79,13676,13678],{"id":13677},"where-is-planelec-stronger","Where is PlanElec stronger?",[84,13680,13681,13687,13696,13705,13714,13722,13730,13736,13742],{},[87,13682,13683,13686],{},[15,13684,13685],{},"Four languages, including German."," The interface, dictation and documents are available in Dutch, French, German and English. For installers in East Belgium and German-speaking clients, that makes the difference.",[87,13688,13689,13692,13693,13695],{},[15,13690,13691],{},"A self-check you can read up on."," PlanElec Pro runs 59 checks; 30 cite a specific AREI article, the other 29 are labelled as practice rules or plausibility checks. What is checked, and what deliberately is not, is published in ",[40,13694,1086],{"href":1085},". Rule basis: AREI\u002FRGIE Book 1, version 07, applicable since 1 November 2026; reports cite the version that applies on their date.",[87,13697,13698,13701,13702,56],{},[15,13699,13700],{},"An assistant across the whole project."," The PlanElec assistant runs more than 100 planning commands: floor plan, rooms, devices, circuits, switching chains, cables, distribution board, automation\u002FKNX, PV strings and lighting control. After every change the self-check reviews the entire project, every change can be undone in one step, and risky actions only run after ",[15,13703,13704],{},"Confirm and run",[87,13706,13707,13710,13711,56],{},[15,13708,13709],{},"The distribution board is part of it."," You place protective devices on DIN rails, export the board as a PDF and turn board photos into a reviewable proposal of DIN modules. ",[40,13712,13713],{"href":3477},"Recognise a distribution board from a photo",[87,13715,13716,13719,13720],{},[15,13717,13718],{},"Reusing Trikker files."," PlanElec Sketch opens .trik files for free, even without an account. With an account, you import a whole Trikker archive into Pro, one project per file with single-line diagram and situation plan; the imported project is a starting point that you check. Amperio does not mention a Trikker import on its pages. ",[40,13721,1486],{"href":42},[87,13723,13724,13727,13728,56],{},[15,13725,13726],{},"Floor plan from a PDF or scan, with a scale check."," Walls, rooms with their area, doors, windows, supported device symbols and the scale come from a PDF, scan or image. Without a confirmed scale, the import stays locked. ",[40,13729,9466],{"href":9465},[87,13731,13732,13735],{},[15,13733,13734],{},"Editing diagram and plan offline (pilot)."," You keep editing an opened project without a connection in the floor plan, single-line diagram and board; on reconnecting, PlanElec syncs and you decide on conflicting changes yourself.",[87,13737,13738,13741],{},[15,13739,13740],{},"A versioned dossier."," You bundle documents with a cover page, table of contents, page numbers and your logo. Versions go into a private archive with a revocable QR link that proves origin and file integrity.",[87,13743,13744,13747],{},[15,13745,13746],{},"Three editing seats in Pro."," Pro includes three editing seats, each extra seat costs EUR 12 per month, and read access is free and unlimited. At Amperio, according to its pricing page, each extra editor costs EUR 19 per month excluding VAT.",[79,13749,13751],{"id":13750},"planelec-sketch-or-planelec-pro","PlanElec Sketch or PlanElec Pro?",[12,13753,13754,13755,13757],{},"PlanElec has two interfaces and one plan: Pro applies in Sketch and in Pro. You move a drawing from Sketch with ",[15,13756,1482],{},"; a Pro project does not go back to Sketch.",[138,13759,13760,13769],{},[141,13761,13762],{},[144,13763,13764,13766],{},[147,13765,13171],{},[147,13767,13768],{},"Suitable product",[163,13770,13771,13781,13789,13799,13807],{},[144,13772,13773,13776],{},[168,13774,13775],{},"Single-line diagram and situation plan for the inspection, your own home or a small job",[168,13777,13778,4134],{},[40,13779,4133],{"href":1456,"rel":13780},[1458],[144,13782,13783,13786],{},[168,13784,13785],{},"Keep working on Trikker files",[168,13787,13788],{},"Sketch, free; whole archives into Pro with an account",[144,13790,13791,13794],{},[168,13792,13793],{},"Distribution board, self-check report, PV or KNX for a single property",[168,13795,13796,13798],{},[40,13797,4153],{"href":1964},", single property EUR 15",[144,13800,13801,13804],{},[168,13802,13803],{},"20 or more sites a year, as a team or with read access for fitters",[168,13805,13806],{},"subscription, EUR 29 per month or EUR 290 per year",[144,13808,13809,13812],{},[168,13810,13811],{},"Try Pro first",[168,13813,13814],{},"Try Pro for 1 month: EUR 0, exports without masked areas",[1489,13816],{":height":13817,":width":13818,"alt":13819,"caption":13820,"src":13821},"510","896","The ‘Print’ area in PlanElec Sketch: on the left ‘Download PDF’ with the free PDF and watermark line, on the right ‘For your business’ with site pass at € 15 per object and The subscription at € 29 a month, below ‘Take it to Pro’.","The PDF stays free; you only pay for a PDF without the ‘Generated with planelec.be’ line or for moving to Pro. Prices as shown in the interface on 6 November 2026.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-print-business.webp",[12,13823,7139,13824,56],{},[40,13825,7142],{"href":5358},[79,13827,13829],{"id":13828},"dictation-in-amperio-and-planelec-what-is-the-difference","Dictation in Amperio and PlanElec: what is the difference?",[12,13831,13832],{},"Both programs let you speak the installation instead of typing it. In Amperio, the voice is central: you describe the room as you walk through it, one sentence creates a room or adds an RCD, and the AI proposes the change for you to confirm. In PlanElec, you dictate in the studio’s AI assistant, and the request acts on the whole project model.",[138,13834,13835,13846],{},[141,13836,13837],{},[144,13838,13839,13842,13844],{},[147,13840,13841],{},"Feature",[147,13843,7417],{},[147,13845,187],{},[163,13847,13848,13859,13869,13880,13891,13902,13913,13924],{},[144,13849,13850,13853,13856],{},[168,13851,13852],{},"Where you dictate",[168,13854,13855],{},"In the AI assistant; the request acts on floor plan, circuits, cables and board",[168,13857,13858],{},"In the diagram, the plan and tasks",[144,13860,13861,13863,13866],{},[168,13862,11615],{},[168,13864,13865],{},"NL, FR, DE and EN, in the interface language; recognition of Belgian technical terms",[168,13867,13868],{},"Dictation language not stated separately; interface FR, NL and EN",[144,13870,13871,13874,13877],{},[168,13872,13873],{},"Before the change",[168,13875,13876],{},"Recognised text appears in the input field; you correct it and send it yourself",[168,13878,13879],{},"“The AI proposes, the electrician decides”; you confirm the change",[144,13881,13882,13885,13888],{},[168,13883,13884],{},"After the change",[168,13886,13887],{},"AREI\u002FRGIE self-check of the whole project, one-step undo, entry in the project history",[168,13889,13890],{},"AREI checks during input, with the rule cited",[144,13892,13893,13896,13899],{},[168,13894,13895],{},"Plan and diagram",[168,13897,13898],{},"Floor plan, circuits and single-line diagram come from the same model",[168,13900,13901],{},"Plan and diagram update together",[144,13903,13904,13907,13910],{},[168,13905,13906],{},"Exact placement",[168,13908,13909],{},"Room, wall, height and distance in one sentence; positions are calculated",[168,13911,13912],{},"Not stated",[144,13914,13915,13918,13921],{},[168,13916,13917],{},"Without a network",[168,13919,13920],{},"Dictation needs a connection",[168,13922,13923],{},"Voice memos offline; editing diagram and plan needs a connection",[144,13925,13926,13929,13932],{},[168,13927,13928],{},"Recording length",[168,13930,13931],{},"Up to 2 minutes per recording",[168,13933,13912],{},[12,13935,13936,13937,13940,13941,13944,13945,13948],{},"Here is how it works in PlanElec: you choose ",[15,13938,13939],{},"Dictate"," in the assistant’s input bar and say, for example, “Hallway, north wall: three sockets, 30 cm above the finished floor, the first 45 cm from the left corner”. After ",[15,13942,13943],{},"Use recording",", the recognised text appears in the input field; you fix a misheard word before sending, because dictated text is never sent automatically. The assistant calculates the positions on the wall and places the sockets. If you also ask it to put them on a new socket circuit, that circuit appears straight away in the single-line diagram, because floor plan and diagram share one model. The self-check then reviews the whole project and reports new findings; ",[15,13946,13947],{},"Undo"," on the action card reverses the step.",[12,13950,13951,13952],{},"For East Belgium, language matters most: you dictate in German, the recognition knows terms such as Eindrahtschema or Fehlerstromschalter, and you produce the dossier in German. Transcription uses AI credit; PlanElec stores neither the recording nor the recognised text, only the request you send. ",[40,13953,13954],{"href":13483},"How do I dictate a task?",[79,13956,13958],{"id":13957},"taking-your-data-with-you-what-can-you-export-and-import","Taking your data with you: what can you export and import?",[12,13960,13961],{},"Before you choose, check how you get out again. There is no direct project exchange between Amperio and PlanElec in either direction.",[138,13963,13964,13974],{},[141,13965,13966],{},[144,13967,13968,13970,13972],{},[147,13969,2179],{},[147,13971,7417],{},[147,13973,187],{},[163,13975,13976,13987,13998,14009,14020],{},[144,13977,13978,13981,13984],{},[168,13979,13980],{},"What does the inspection body receive?",[168,13982,13983],{},"PDF of the single-line diagram and situation plan; in Pro also the board PDF, self-check report and dossier",[168,13985,13986],{},"Electrical dossier as one PDF with installation sheet, diagram and plans",[144,13988,13989,13992,13995],{},[168,13990,13991],{},"What can I export besides PDF?",[168,13993,13994],{},"Sketch: SVG, material list as CSV, project file (.planelec.json). Pro: lists as CSV (pilot), KNX addresses for ETS",[168,13996,13997],{},"According to Amperio, project files, diagrams and plans; formats other than PDF not stated",[144,13999,14000,14003,14006],{},[168,14001,14002],{},"What happens after the subscription ends?",[168,14004,14005],{},"PDFs and CSV files you created are yours; Sketch drawings can also be saved as a project file. The help does not describe an export of the whole Pro project for other programs",[168,14007,14008],{},"According to Amperio, data stays exportable after cancelling; Particulier job sites remain viewable and exportable after 6 months",[144,14010,14011,14014,14017],{},[168,14012,14013],{},"Which existing data does the tool read?",[168,14015,14016],{},"Trikker files (.trik) in Sketch and Pro; floor plan from PDF, scan or image; board from photos",[168,14018,14019],{},"Single-line diagram from PDF or photo; plan as PDF, photo, DWG or DXF; Trikker import not stated",[144,14021,14022,14025,14028],{},[168,14023,14024],{},"Can I open a project from the other tool?",[168,14026,14027],{},"No; you replan an Amperio project, with the Amperio PDF as a reference",[168,14029,13912],{},[12,14031,14032],{},"For an archive you still need to open in ten years, the PDF is what counts: it is the document at the inspection and when the home is sold. Keep it per job site, outside any software.",[79,14034,14036],{"id":14035},"how-do-you-switch-from-amperio-to-planelec","How do you switch from Amperio to PlanElec?",[12,14038,14039],{},"There is no direct import of Amperio projects. You can still take over the floor plan and the distribution board; circuits and diagram are planned again in PlanElec.",[3139,14041,14042,14048,14062,14078,14092,14103],{},[87,14043,14044,14047],{},[15,14045,14046],{},"Finish running sites."," Complete ongoing dossiers in Amperio and keep the PDF dossier of each site. Amperio states that your data remains exportable when you cancel.",[87,14049,14050,14053,14054,14057,14058,14061],{},[15,14051,14052],{},"Choose the planning approach."," For a new project, choose ",[15,14055,14056],{},"Plan from the floor plan"," (recommended) or ",[15,14059,14060],{},"Draw the single-line diagram first"," if you are used to starting from the diagram. You can switch later in the project settings without losing data.",[87,14063,14064,14067,14068,14070,14071,14074,14075,14077],{},[15,14065,14066],{},"Have the floor plan recognised."," Add the situation plan or the architect’s plan as a PDF or image under ",[15,14069,10173],{}," and start ",[15,14072,14073],{},"Recognise floor plan",". Check scale, rooms and areas, then transfer the result into an empty floor with ",[15,14076,12394],{},". Recognised symbols are socket outlet, double socket outlet, splash-proof socket outlet, switch and light point; anything PlanElec cannot assign with confidence is marked and not transferred.",[87,14079,14080,14083,14084,14087,14088,14091],{},[15,14081,14082],{},"Distribution board from photos."," In the board editor, open ",[15,14085,14086],{},"Cabinet photos",", upload your pictures and start ",[15,14089,14090],{},"Detect modules",". You import the reviewed proposal into an empty board; a photo does not show the wiring.",[87,14093,14094,14097,14098,14102],{},[15,14095,14096],{},"Plan circuits and diagram."," Dictate room by room in the assistant or let ",[40,14099,14101],{"href":14100},"\u002Fen\u002Fhelp\u002Fautomatic-planning","automatic planning"," propose switching chains, circuit assignment, cables and phases. Keep the Amperio PDF open alongside as a reference.",[87,14104,14105,14108,14109,56],{},[15,14106,14107],{},"Read the self-check and export."," Resolve the open points, then export the single-line diagram, situation plan and dossier. ",[40,14110,4646],{"href":4645},[79,14112,14114],{"id":14113},"test-task-the-same-job-site-in-both-tools","Test task: the same job site in both tools",[12,14116,14117],{},"The fairest judgement comes from a real job. Take a small job site you know well, for example a flat with kitchen, bathroom and an EV charger, and go through the same six steps in both tools. For Amperio, the free trial with one job site for seven days is enough; PlanElec Sketch needs no account, and for PlanElec Pro you use “Try Pro for 1 month”.",[3139,14119,14120,14129,14135,14141,14147,14153],{},[87,14121,14122,14125,14126,14128],{},[15,14123,14124],{},"Take over existing work:"," in Amperio, read an existing diagram from a photo or PDF; in PlanElec Pro, take over the architect’s plan as a PDF with ",[15,14127,14073],{}," or open a Trikker file.",[87,14130,14131,14134],{},[15,14132,14133],{},"Dictate one room:"," speak the kitchen with sockets, hob and lighting; then count what you had to correct by hand.",[87,14136,14137,14140],{},[15,14138,14139],{},"Plant an error:"," give one circuit a cross-section that is too small, or put too many circuits behind one RCD, and see where and how the tool reports it.",[87,14142,14143,14146],{},[15,14144,14145],{},"Carry a change through:"," move a socket and check whether the diagram and the plan follow. In PlanElec Pro you also see what the self-check reports; circuit assignment and distribution board are adjusted there through a proposal or an action of your own.",[87,14148,14149,14152],{},[15,14150,14151],{},"Go offline:"," in flight mode, look things up, take notes and draw; then record what was synchronised when you reconnected.",[87,14154,14155,14158],{},[15,14156,14157],{},"Export:"," create the PDF dossier and put it next to the document your inspection body usually receives.",[12,14160,14161,14162,14166],{},"To compare without a project of your own, the ",[40,14163,14165],{"href":14164},"\u002Fexamples\u002Fdossiers\u002Fplanelec-pilot-dossier-en.pdf","English pilot dossier as a PDF"," shows what PlanElec Pro produces; the example project is fictitious. Amperio offers a sample dossier for download on its home page.",[79,14168,14170],{"id":14169},"frequently-asked-questions-about-amperio-and-planelec","Frequently asked questions about Amperio and PlanElec",[1041,14172,14174],{"id":14173},"how-much-does-amperio-cost-per-year-and-how-much-does-planelec-cost","How much does Amperio cost per year, and how much does PlanElec cost?",[12,14176,14177],{},"Amperio Pro costs EUR 374.40 per year or EUR 39 per month excluding VAT at the launch rate, each extra editor EUR 19 per month; you start with one free site for 7 days. With Particulier, Amperio offers one site for a one-off EUR 29 including VAT, editable for six months. At PlanElec, you draw the single-line diagram and situation plan for free in Sketch. The subscription costs EUR 290 per year or EUR 29 per month with three editing seats, and the price stays for as long as the subscription runs without a break; a single property costs EUR 15, Try Pro for 1 month: EUR 0, exports without masked areas. These are final prices, because PlanElec charges no VAT (small business exemption scheme). For three editors you pay EUR 739.20 a year excluding VAT at Amperio and EUR 290 at PlanElec. Sources: both vendors’ pricing pages, as of 16 November 2026.",[1041,14179,14181],{"id":14180},"do-amperio-and-planelec-work-offline-on-site","Do Amperio and PlanElec work offline on site?",[12,14183,14184,14185,56],{},"Both partly, in different ways. Amperio lets you view recently opened sites and create tasks, photos and voice memos without a network; editing the diagram and plan needs a connection. In PlanElec, you keep editing a project you opened online beforehand in the floor plan, diagram and board without a connection; exporting, uploading, dictation and the AI features wait until you are back online. Offline work is a pilot in PlanElec Pro. In PlanElec Sketch, you keep drawing if the connection drops; the drawing stays in the browser, and cloud and handover to Pro resume once you are online. ",[40,14186,1468],{"href":1467},[1041,14188,14190],{"id":14189},"can-i-import-an-amperio-diagram-into-planelec","Can I import an Amperio diagram into PlanElec?",[12,14192,14193,14194,14196],{},"Not as a diagram. PlanElec does not read single-line diagrams from a PDF or photo. You take over the floor plan from a PDF or image with ",[15,14195,14073],{}," and the board from photos; you then plan circuits and diagram with the assistant or automatic planning.",[1041,14198,14200],{"id":14199},"can-i-work-as-a-team-and-what-does-it-cost","Can I work as a team, and what does it cost?",[12,14202,14203],{},"Yes, in both. In Amperio, you invite colleagues by email as editors or readers; each extra editor costs EUR 19 per month excluding VAT, readers are free, and during the free trial you can invite up to five editors. In PlanElec, you invite colleagues by email with a project role; Pro includes three editing seats, each extra seat costs EUR 12 per month, and anyone who only reads needs no seat. Try Pro covers one person without an organisation.",[1041,14205,14207],{"id":14206},"do-amperio-and-planelec-run-on-phones-and-tablets","Do Amperio and PlanElec run on phones and tablets?",[12,14209,14210],{},"Yes, both in the browser. Amperio aims the phone mainly at tasks, photos and looking things up. PlanElec Sketch is also meant for tablets and phones at the customer’s. PlanElec Pro adapts its workspace on tablets and phones and can be installed as a web app; detailed plans are best drawn on a laptop or desktop.",[1041,14212,14214],{"id":14213},"is-amperio-available-in-german","Is Amperio available in German?",[12,14216,14217],{},"No. Amperio offers its interface and dossier in French, Dutch and English; it does not mention a German version. PlanElec Sketch and PlanElec Pro are available in Dutch, French, German and English, and you choose the document language separately from the interface.",[1041,14219,14221],{"id":14220},"can-i-bring-trikker-files-into-amperio-or-planelec","Can I bring Trikker files into Amperio or PlanElec?",[12,14223,14224,14225,56],{},"In PlanElec, yes: Sketch opens a .trik file for free, even without an account, and with any signed-in account you import a whole archive into Pro, one project per file with single-line diagram and situation plan. Amperio does not mention a Trikker import on its product pages; according to Amperio, an existing diagram is read from a PDF or photo. Switching from Trikker is covered in ",[40,14226,14227],{"href":1386},"Trikker alternative PlanElec",[1041,14229,14231],{"id":14230},"does-the-arei-check-in-amperio-or-planelec-replace-the-inspection","Does the AREI check in Amperio or PlanElec replace the inspection?",[12,14233,14234],{},"No, each has its own role. Both check the data you enter and help you prepare for the inspection. The PlanElec self-check shows which supported rules were assessed and where data is missing; measurements and on-site conditions are outside its scope. The official inspection is carried out by the accredited inspection body.",[79,14236,14238],{"id":14237},"sources-and-check-date","Sources and check date",[12,14240,14241,14242,14244,14245,14247],{},"Marketing claims are reported as Amperio’s statements, not as our own test results. What these pages do not mention is marked “not stated”; that does not mean the feature is missing. PlanElec information comes from the documented product scope, the ",[40,14243,1958],{"href":54}," and the help guides. Spotted an error or a change? Write to ",[40,14246,1612],{"href":1611},"; we correct the row and update the date.",[12,14249,14250],{},"All pages last accessed on 16 November 2026; first check on 12 October 2026, further checks on 19 and 26 October and on 2, 6 and 12 November 2026.",[84,14252,14253,14276,14312],{},[87,14254,1703,14255,1774,14258,1774,14263,1774,14267,14270,14271],{},[40,14256,1708],{"href":1706,"rel":14257},[1458],[40,14259,14262],{"href":14260,"rel":14261},"https:\u002F\u002Famperio.be\u002Ftarifs",[1458],"pricing (FR)",[40,14264,14266],{"href":1711,"rel":14265},[1458],"pricing (NL)",[40,14268,1718],{"href":1716,"rel":14269},[1458]," with prices, offline scope, import, export and the list of video tutorials, ",[40,14272,14275],{"href":14273,"rel":14274},"https:\u002F\u002Famperio.be\u002Fguide-rgie",[1458],"RGIE guide",[87,14277,14278,14279,1774,14283,1774,14287,1774,14292,1774,14297,1774,14302,1774,14307],{},"Amperio, as of 6 November 2026: ",[40,14280,5269],{"href":14281,"rel":14282},"https:\u002F\u002Famperio.be\u002Fschema-unifilaire",[1458],[40,14284,2132],{"href":14285,"rel":14286},"https:\u002F\u002Famperio.be\u002Fplan-de-position",[1458],[40,14288,14291],{"href":14289,"rel":14290},"https:\u002F\u002Famperio.be\u002Fgestion-de-chantier",[1458],"job-site management",[40,14293,14296],{"href":14294,"rel":14295},"https:\u002F\u002Famperio.be\u002Fcontroles-rgie",[1458],"RGIE checks",[40,14298,14301],{"href":14299,"rel":14300},"https:\u002F\u002Famperio.be\u002Fschema-unifilaire-photovoltaique",[1458],"solar, battery and charger",[40,14303,14306],{"href":14304,"rel":14305},"https:\u002F\u002Famperio.be\u002Fetiquettes-tableau-electrique",[1458],"board and labels",[40,14308,14311],{"href":14309,"rel":14310},"https:\u002F\u002Famperio.be\u002Fdossier-electrique-rgie",[1458],"RGIE electrical dossier",[87,14313,1955,14314,1774,14316,1774,14318,1774,14320,1774,14322,1774,14324],{},[40,14315,13474],{"href":54},[40,14317,22],{"href":1961},[40,14319,31],{"href":1964},[40,14321,1086],{"href":1085},[40,14323,1468],{"href":1467},[40,14325,4646],{"href":4645},[79,14327,13051],{"id":13050},[84,14329,14330,14336,14341,14345,14350,14355],{},[87,14331,14332,14335],{},[40,14333,14334],{"href":13483},"Studio activity and assistant"," – dictate, confirm and undo",[87,14337,14338],{},[40,14339,14340],{"href":10753},"The PlanElec AI assistant for electrical planning",[87,14342,14343],{},[40,14344,9466],{"href":9465},[87,14346,14347],{},[40,14348,14349],{"href":1386},"Trikker alternative PlanElec: features and prices compared",[87,14351,14352],{},[40,14353,14354],{"href":1989},"Trikker, PlanElec Sketch or PlanElec Pro: which tool for single-line diagrams and situation plans in Belgium?",[87,14356,14357,14359],{},[40,14358,12052],{"href":12051}," – the market overview with all checked programs",[79,14361,2009],{"id":2008},[12,14363,14364,14365,14368],{},"Plan the same small job in both tools, or first look at the ",[40,14366,14367],{"href":14164},"pilot dossier"," that PlanElec Pro produces; the sample project is fictitious.",[84,14370,14371,14378],{},[87,14372,14373,38,14375,2024],{},[15,14374,2019],{},[40,14376,2023],{"href":1456,"rel":14377},[1458],[87,14379,14380,38,14382,2033,14384,56],{},[15,14381,2029],{},[40,14383,2032],{"href":1964},[40,14385,2036],{"href":54},[12,14387,14388,2042],{},[15,14389,2041],{},{"title":2044,"searchDepth":2045,"depth":2045,"links":14391},[14392,14393,14394,14400,14401,14402,14403,14404,14405,14406,14407,14417,14418,14419],{"id":81,"depth":2045,"text":82},{"id":13242,"depth":2045,"text":13243},{"id":13492,"depth":2045,"text":13493,"children":14395},[14396,14397,14398,14399],{"id":13499,"depth":2053,"text":13500},{"id":13506,"depth":2053,"text":13507},{"id":13513,"depth":2053,"text":13514},{"id":13520,"depth":2053,"text":13521},{"id":13635,"depth":2045,"text":13636},{"id":13677,"depth":2045,"text":13678},{"id":13750,"depth":2045,"text":13751},{"id":13828,"depth":2045,"text":13829},{"id":13957,"depth":2045,"text":13958},{"id":14035,"depth":2045,"text":14036},{"id":14113,"depth":2045,"text":14114},{"id":14169,"depth":2045,"text":14170,"children":14408},[14409,14410,14411,14412,14413,14414,14415,14416],{"id":14173,"depth":2053,"text":14174},{"id":14180,"depth":2053,"text":14181},{"id":14189,"depth":2053,"text":14190},{"id":14199,"depth":2053,"text":14200},{"id":14206,"depth":2053,"text":14207},{"id":14213,"depth":2053,"text":14214},{"id":14220,"depth":2053,"text":14221},{"id":14230,"depth":2053,"text":14231},{"id":14237,"depth":2045,"text":14238},{"id":13050,"depth":2045,"text":13051},{"id":2008,"depth":2045,"text":2009},"2026-10-12","Amperio or PlanElec Sketch\u002FPro? 12-month cost, AREI\u002FRGIE checks, offline scope, dictation, teams, import and export compared side by side for Belgium.",[2115,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-planelec-vs-amperio-editorial.jpg","\u002Fblog\u002Famperio-alternative.en","16 min",{"title":1995,"description":14421},"amperio-alternative","blog\u002Famperio-alternative.en",[187,7417,14431,5269,2132,14432,14433,2133,2134,14434],"Amperio alternative","dictation","job-site tracking","electrical planning Belgium","2hgM23KXozp5AefABdujNpmu0LXi5P_qlK1WyWZDe1k","\u002Fblog\u002Famperio-alternative",{"id":14438,"title":14439,"articleId":14440,"body":14441,"category":4239,"date":14420,"description":15109,"extension":2113,"image":14454,"labels":15110,"lastUpdated":10988,"locale":2119,"meta":15111,"navigation":2121,"ogImage":15112,"path":15113,"publishDate":14420,"readTime":15114,"refreshInterval":2053,"seo":15115,"seoTitle":15116,"slug":15117,"stem":15118,"tags":15119,"__hash__":15123,"kind":2137,"href":15124},"blog\u002Fblog\u002Fdictate-single-line-diagram.en.md","Dictate a single-line diagram: how do you speak an electrical installation into PlanElec?","voice-dictation",{"type":9,"value":14442,"toc":15089},[14443,14449,14455,14458,14462,14465,14526,14532,14536,14539,14640,14646,14650,14657,14660,14664,14667,14717,14720,14724,14729,14732,14765,14770,14774,14777,14780,14785,14789,14799,14805,14808,14812,14818,14821,14837,14841,14856,14859,14868,14872,14875,14936,14942,14946,14949,14999,15003,15041,15045,15049,15055,15059,15062,15066,15078,15082],[12,14444,14445,14448],{},[15,14446,14447],{},"Yes, PlanElec lets you dictate your electrical installation: in the studio you tap the microphone in the AI assistant, speak Dutch, French, German or English, and the recognised text lands in the input field."," Speech recognition knows Belgian technical terms such as AREI, RGIE, XVB or single-line diagram. You read the text, correct it if needed and only then send it – nothing goes out automatically. The PlanElec assistant then carries out the instruction in the project model: devices on the floor plan, circuits and protective devices in the topology, modules in the distribution board. The single-line diagram follows the circuit model, so you never redraw it. After every change the server checks the whole project with the AREI\u002FRGIE self-check, and every change can be undone in one step. You need a PlanElec account with a project in the PlanElec Pro studio (the Try Pro plan is enough), a browser with microphone access and an internet connection.",[12,14450,14451],{},[74,14452],{"alt":14453,"src":14454},"An electrician dictates a planning note into a smartphone.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-voice-dictation-editorial.webp",[12,14456,14457],{},"AREI (Dutch and German) and RGIE (French) are the two names of Belgium's general regulation for electrical installations; the keuring is the mandatory conformity inspection by an accredited body.",[79,14459,14461],{"id":14460},"how-do-i-dictate-a-single-line-diagram-in-planelec","How do I dictate a single-line diagram in PlanElec?",[12,14463,14464],{},"In PlanElec, \"dictating a single-line diagram\" means describing the installation – room, devices, dimensions, circuits, protection – while PlanElec builds the model that produces the single-line diagram, the situation plan and the distribution board. You dictate content, not lines. Here is how:",[3139,14466,14467,14488,14496,14506,14516],{},[87,14468,14469,14472,14473,14476,14477,8786,14480,14483,14484,14487],{},[15,14470,14471],{},"Open the project in the studio"," and show the ",[15,14474,14475],{},"Activity & assistant"," panel: use the bot button in the header (tooltip ",[15,14478,14479],{},"Open PlanElec assistant",[15,14481,14482],{},"⌘J"," on a Mac or ",[15,14485,14486],{},"Ctrl+J"," on Windows and Linux. On narrow screens the panel opens as a sheet.",[87,14489,14490,9016,14493,14495],{},[15,14491,14492],{},"Place the cursor and tap Dictate.",[15,14494,13939],{}," microphone button sits on the right of the input bar. The first time, your browser asks for permission to use the microphone.",[87,14497,14498,14501,14502,14505],{},[15,14499,14500],{},"Speak."," Level bars and a timer show ",[15,14503,14504],{},"Recording",". A recording lasts up to two minutes; ten seconds before the end, the timer announces the automatic stop.",[87,14507,14508,14511,14512,14515],{},[15,14509,14510],{},"Choose Use recording"," (tick) or press Enter. After a short ",[15,14513,14514],{},"Transcribing …",", the recognised text appears at the cursor position.",[87,14517,14518,14521,14522,14525],{},[15,14519,14520],{},"Review and send."," Fix a misheard word directly in the field, then send with ",[15,14523,14524],{},"Send message"," or Enter.",[12,14527,14528,14531],{},[15,14529,14530],{},"Discard recording"," (X) or Esc stops the recording without any text. While recording, the input field is read-only and sending is blocked – half a sentence never goes out by accident. You can dictate several times into the same message and type in between; each new piece of text is inserted at the cursor.",[79,14533,14535],{"id":14534},"which-sentences-does-the-assistant-understand-and-what-happens-next","Which sentences does the assistant understand – and what happens next?",[12,14537,14538],{},"Dictation is an input method for the PlanElec assistant. Anything you can type to it, you can also say. The table shows typical site-survey sentences and the result in the project.",[138,14540,14541,14554],{},[141,14542,14543],{},[144,14544,14545,14548,14551],{},[147,14546,14547],{},"Spoken sentence",[147,14549,14550],{},"What the assistant does",[147,14552,14553],{},"Where you see it",[163,14555,14556,14567,14577,14588,14599,14610,14620,14630],{},[144,14557,14558,14561,14564],{},[168,14559,14560],{},"\"Hallway, north wall: three sockets, 30 centimetres above finished floor, the first 45 centimetres from the left corner, centre distance 71 millimetres.\"",[168,14562,14563],{},"Places one frame with three sockets; the axes sit at 0.45 m, 0.521 m and 0.592 m.",[168,14565,14566],{},"Floor plan and situation plan",[144,14568,14569,14572,14575],{},[168,14570,14571],{},"\"Add a dedicated cooker circuit with protection to the kitchen.\"",[168,14573,14574],{},"Creates the circuit and the protective device in the topology.",[168,14576,3926],{},[144,14578,14579,14582,14585],{},[168,14580,14581],{},"\"Show me the automatic installation proposal for the main board.\"",[168,14583,14584],{},"Calculates consumers, circuits, protective devices and placement in the board – without changing anything.",[168,14586,14587],{},"Reply in the conversation",[144,14589,14590,14593,14596],{},[168,14591,14592],{},"\"Apply that proposal.\"",[168,14594,14595],{},"Applies exactly the reviewed proposal; existing circuits and placements stay.",[168,14597,14598],{},"Single-line diagram and board",[144,14600,14601,14604,14607],{},[168,14602,14603],{},"\"Switch the hallway spots from the two switches at the doors.\"",[168,14605,14606],{},"Builds the switching chain between switches and luminaires.",[168,14608,14609],{},"Floor plan and single-line diagram",[144,14611,14612,14615,14618],{},[168,14613,14614],{},"\"Create a cable route for every cable that has none.\"",[168,14616,14617],{},"Routes missing cables along the walls; existing routes stay untouched.",[168,14619,534],{},[144,14621,14622,14625,14628],{},[168,14623,14624],{},"\"Distribute the circuits across the board and balance the phases.\"",[168,14626,14627],{},"Places modules on DIN rails and spreads the loads across the phases.",[168,14629,3115],{},[144,14631,14632,14635,14638],{},[168,14633,14634],{},"\"Which check findings are still open?\"",[168,14636,14637],{},"Reads the self-check findings and explains the cause and the affected items.",[168,14639,14587],{},[12,14641,14642,14643,56],{},"Say dimensions the way you think of them on site: the assistant converts centimetres and millimetres to metres, and PlanElec computes the exact position from the wall geometry. \"North wall\" is the wall facing north as seen from inside the room; if no north direction is set, plan-up counts as north and the result says so. How corner, offset and height are interpreted in detail is covered in the help article ",[40,14644,14645],{"href":13483},"Activity and the assistant in the studio",[79,14647,14649],{"id":14648},"which-languages-can-i-dictate-in","Which languages can I dictate in?",[12,14651,14652,14653,14656],{},"All four PlanElec languages: ",[15,14654,14655],{},"Dutch, French, German and English."," Speech recognition works in the language of your interface. To dictate in French, switch the interface to French; replies, action cards and status messages then appear in French too.",[12,14658,14659],{},"That matters in Belgium's multilingual teams, in Brussels and along the language border: every colleague dictates in their own language into the same project. German-speaking installers in East Belgium get the interface, the assistant and the technical vocabulary fully in German, with Belgian terms such as AREI rather than German national standards.",[79,14661,14663],{"id":14662},"does-dictation-recognise-terms-like-xvb-residual-current-or-single-line-diagram","Does dictation recognise terms like XVB, residual current or single-line diagram?",[12,14665,14666],{},"Yes. With every recording, PlanElec passes a technical vocabulary to the speech recognition, which it recognises preferentially – up to 50 terms per language. Abbreviations and cable types apply to all languages; the trade terms are maintained per language:",[138,14668,14669,14678],{},[141,14670,14671],{},[144,14672,14673,14675],{},[147,14674,2238],{},[147,14676,14677],{},"Excerpt from the technical vocabulary",[163,14679,14680,14688,14695,14702,14710],{},[144,14681,14682,14685],{},[168,14683,14684],{},"All languages",[168,14686,14687],{},"AREI, RGIE, XVB, EXVB, XFVB, VOB, VTMB, KNX, PV, MPPT, EAN, TT, TN-S",[144,14689,14690,14692],{},[168,14691,2251],{},[168,14693,14694],{},"single-line diagram, situation plan, residual current, circuit breaker, distribution board, double socket, light point, two-way switch, intermediate switch, junction box, earth electrode, equipotential, charging station, inverter, finished floor, centre distance",[144,14696,14697,14699],{},[168,14698,2262],{},[168,14700,14701],{},"eendraadschema, situatieschema, differentieel, automaat, zekeringkast, verdeelkast, lichtpunt, wisselschakelaar, kruisschakelaar, aftakdoos, laadpaal, omvormer, keuring, afgewerkte vloer, asafstand",[144,14703,14704,14707],{},[168,14705,14706],{},"French",[168,14708,14709],{},"schéma unifilaire, plan de position, différentiel, disjoncteur, tableau électrique, point lumineux, va-et-vient, boîte de dérivation, borne de recharge, onduleur, contrôle RGIE, sol fini, entraxe",[144,14711,14712,14714],{},[168,14713,2284],{},[168,14715,14716],{},"Eindrahtschema, Situationsplan, Differenzialschalter, Fehlerstromschalter, Leitungsschutzschalter, Unterverteilung, Wechselschalter, Kreuzschalter, Abzweigdose, Potentialausgleich, Wallbox, Wechselrichter, Fertigfußboden, Achsabstand",[12,14718,14719],{},"XVB, EXVB, XFVB, VOB and VTMB are cable and conductor types common in Belgian installations. A technical vocabulary raises the hit rate; it does not guarantee it. That is why the text sits in the field first: if recognition writes \"XVB\" as \"X V B\", you fix it with two keystrokes.",[79,14721,14723],{"id":14722},"what-happens-before-my-project-changes","What happens before my project changes?",[1489,14725],{":height":8729,":width":3800,"alt":14726,"caption":14727,"src":14728},"Five-step flow chart: 1. Record on your device with Dictate, up to 2 minutes; discarding sends nothing. 2. After Use recording, the audio goes through PlanElec and OpenRouter to Scribe by ElevenLabs; only text comes back. 3. You review the text in the input field. Up to here the project stays unchanged. 4. After Send message the assistant carries out the instruction, directly or after confirmation. 5. Self-check after every change; every change is one undo step.","Only Send message turns dictated text into an instruction. Speech recognition is currently not restricted to EU endpoints; each recording uses AI allowance.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fvoice-dictation\u002Fdictation-flow.en.svg",[12,14730,14731],{},"Between your sentence and the change in the project there are up to three checkpoints:",[3139,14733,14734,14743,14749],{},[87,14735,14736,14739,14740,14742],{},[15,14737,14738],{},"The text."," Dictated text is never sent automatically. Only ",[15,14741,14524],{}," turns it into an instruction.",[87,14744,14745,14748],{},[15,14746,14747],{},"A preview on request."," Unsure about a dimension? Say \"show me a preview first\": for a row of boxes on a wall, the assistant returns a readable summary without placing anything. For circuits, the automatic installation proposal calculates consumers, circuits, protective devices and placement per board, again without changing the model. Later, exactly that proposal is applied; if the project has changed in the meantime, the proposal expires and has to be recalculated.",[87,14750,14751,14754,14755,14758,14759,3324,14761,14764],{},[15,14752,14753],{},"Confirmation when more is at stake."," Unambiguous, reversible changes – placing a socket, creating a circuit, routing a cable – run as soon as you send. Actions with wider impact, such as deleting rooms, removing circuits, changing walls or switching the earthing system, are put to you with ",[15,14756,14757],{},"Confirmation required",". You choose ",[15,14760,13704],{},[15,14762,14763],{},"Reject and cancel run",". The approval applies to exactly that action with exactly those values.",[12,14766,14767,14768,56],{},"If a value does not fit – the position falls inside a door, a box already sits there, the height exceeds the room height – the assistant places nothing and tells you why. Nothing is moved silently. And every executed change can be reverted from its action card with ",[15,14769,13947],{},[79,14771,14773],{"id":14772},"can-i-dictate-whole-project-changes-in-one-sentence","Can I dictate whole project changes in one sentence?",[12,14775,14776],{},"Yes. The PlanElec assistant works with more than 100 planning commands across the whole project model: floor plan, rooms, devices, circuits, switching chains, cables, distribution board, automation and KNX, PV strings and lighting control. Besides single commands it calls PlanElec's automatic planning – standard room equipment, circuit assignment, routes for all open cables, filling the distribution board and phase balancing.",[12,14778,14779],{},"A sentence such as \"Create a standard installation for this project, then route all cables and distribute the circuits across the board\" therefore triggers a chain. Each executed action shows up on its own card with status and requester and stays individually reversible. Before changing anything, the assistant reads the project structure, check findings and device catalogue – it plans on the state you are looking at. It acts with your project permissions: anyone who may only view a project cannot change it by dictation either. Deleting projects is not among its commands.",[12,14781,14782,14783,56],{},"What else the assistant does, how it answers technical questions with sources and how your team sees its changes is covered in ",[40,14784,10754],{"href":10753},[79,14786,14788],{"id":14787},"does-the-arei-self-check-run-after-dictation","Does the AREI self-check run after dictation?",[12,14790,14791,14792,3157,14795,14798],{},"Yes – after every change the assistant carries out from your dictated instruction. The server then checks the whole project with the same AREI\u002FRGIE self-check that the check report uses. An action only counts as complete once that check has run. The action card shows ",[15,14793,14794],{},"Applied and checked",[15,14796,14797],{},"Validation: … resolved, … new, … remaining",". So you find out while still on site whether the new circuit affects a protective device or a cross-section – not at export time.",[12,14800,14801,14802],{},"Dictation itself changes nothing: as long as the text only sits in the input field, the project stays as it is. Which rules the self-check covers and where its limits lie is explained in the guide ",[40,14803,14804],{"href":1085},"What does the PlanElec AREI self-check verify?",[12,14806,14807],{},"The self-check assesses the supported rules against your input. Measurements and on-site conditions belong to the conformity inspection before first use, carried out on site by an accredited body; it covers administrative checks, visual checks, tests and measurements (AREI, section 6.4.1). The self-check shows you open points; the accredited body carries out the inspection.",[79,14809,14811],{"id":14810},"does-dictation-work-on-a-tablet-or-phone-on-site","Does dictation work on a tablet or phone on site?",[12,14813,14814,14815,14817],{},"Yes, as long as the browser supports microphone recording. PlanElec runs in the browser without installation and can be installed as a web app; on tablet and phone the interface adapts. PlanElec only shows the ",[15,14816,13939],{}," button when the browser can record. Recordings from Safari and from Chromium or Firefox browsers are converted on the device into the same format, so they are all processed alike. For the microphone, PlanElec requests echo cancellation, noise suppression and automatic gain control from the browser.",[12,14819,14820],{},"Two things to plan for on site:",[84,14822,14823,14831],{},[87,14824,14825,14828,14829,56],{},[15,14826,14827],{},"Internet connection."," The recording goes through the PlanElec server to speech recognition. No connection, no dictation. Open projects can be edited offline as a pilot feature; dictation and the assistant are available again once you are back online. Details in the guide ",[40,14830,1468],{"href":1467},[87,14832,14833,14836],{},[15,14834,14835],{},"Microphone permission."," If the microphone is blocked, a notice appears below the input field. Allow access in your browser's site settings.",[79,14838,14840],{"id":14839},"where-does-my-voice-data-go","Where does my voice data go?",[12,14842,14843,14844,14846,14847,14850,14851,14855],{},"After ",[15,14845,13943],{},", your browser sends the recording to PlanElec. PlanElec forwards it through the AI service OpenRouter to the speech recognition model Scribe by ElevenLabs and receives only the recognised text back. ",[15,14848,14849],{},"Unlike the assistant's language model, speech recognition is currently not restricted to EU endpoints."," ElevenLabs is listed with purpose and location as a sub-processor in the ",[40,14852,14854],{"href":14853},"\u002Fen\u002Flegal\u002Favv","data processing agreement",". PlanElec therefore makes no commitment on EU processing or exclusion from training for recordings, as it does for typed instructions. If you want to avoid that, type the instruction.",[12,14857,14858],{},"PlanElec stores neither the recording nor its text. Only the instruction you send is stored – as part of the conversation history, so you and your team can trace changes. The operations log holds one line per recording with language, duration and status, without content, user ID or project ID; for the AI allowance, PlanElec books the duration and cost of the recording, not its content. Discarded recordings never leave your device.",[12,14860,14861,14862,14865,14866,56],{},"Transcription counts against your ",[15,14863,14864],{},"AI allowance",", like every AI feature. If it is not enough for a recording, a notice below the input field tells you. The size of the allowance depends on your plan: Try Pro includes a small AI allowance to try it out, Pro a larger one. Details are on the ",[40,14867,1958],{"href":54},[79,14869,14871],{"id":14870},"from-site-survey-to-pdf-dossier-what-does-a-workflow-look-like","From site survey to PDF dossier: what does a workflow look like?",[12,14873,14874],{},"This is how an electrical contractor uses dictation on a renovation, from the first visit to the documents for the keuring:",[3139,14876,14877,14886,14894,14900,14912,14918,14924],{},[87,14878,14879,14882,14883,56],{},[15,14880,14881],{},"Prepare the floor plan (office)."," Import the architect's plan as PDF, DXF or image, review the AI proposal with walls, rooms and openings, and apply it. The steps are in ",[40,14884,14885],{"href":8995},"Turning a PDF, scan or Trikker export into a floor plan",[87,14887,14888,14891,14892,56],{},[15,14889,14890],{},"Open the project on site."," On a tablet or phone, with a connection, and show ",[15,14893,14475],{},[87,14895,14896,14899],{},[15,14897,14898],{},"Dictate room by room."," One sentence per room with wall, offset, height and device. Review the text, send.",[87,14901,14902,14905,14906,14908,14909,14911],{},[15,14903,14904],{},"Check the action cards."," Read ",[15,14907,14794],{}," and the check result. If something is wrong: ",[15,14910,13947],{}," and dictate again.",[87,14913,14914,14917],{},[15,14915,14916],{},"Define the circuits."," \"Show me the automatic installation proposal for the main board\", review the proposal, have it applied. The single-line diagram follows the circuit model.",[87,14919,14920,14923],{},[15,14921,14922],{},"Finish in the office."," Work through open findings, add missing data such as cable lengths, fill the distribution board – by dictation, keyboard or mouse.",[87,14925,14926,14929,14930,14932,14933,56],{},[15,14927,14928],{},"Export the documents."," In ",[15,14931,4665],{}," mode, generate the single-line diagram, situation plan and self-check report as PDFs with your installer details, optionally assembled into a dossier. More in ",[40,14934,14935],{"href":4645},"Exporting documents",[12,14937,14938,14939,56],{},"Under AREI, the person responsible for carrying out the work draws up the single-line diagrams and situation plans; if the installation conforms, that person and the accredited body sign them (AREI, subsection 3.1.2.1 a). PlanElec gives you the basis; responsibility for the content stays with you. What a single-line diagram must contain is explained in ",[40,14940,14941],{"href":4212},"Creating a single-line diagram",[79,14943,14945],{"id":14944},"dictating-typing-or-drawing-which-fits-when","Dictating, typing or drawing: which fits when?",[12,14947,14948],{},"All three routes write into the same project model. You switch as the situation demands.",[138,14950,14951,14964],{},[141,14952,14953],{},[144,14954,14955,14958,14961],{},[147,14956,14957],{},"Input method",[147,14959,14960],{},"Strong for",[147,14962,14963],{},"Keep in mind",[163,14965,14966,14977,14988],{},[144,14967,14968,14971,14974],{},[168,14969,14970],{},"Dictating",[168,14972,14973],{},"Site surveys, busy hands, longer descriptions with dimensions in one sentence",[168,14975,14976],{},"Needs a connection and a microphone, two minutes per recording max",[144,14978,14979,14982,14985],{},[168,14980,14981],{},"Typing",[168,14983,14984],{},"Office work, targeted corrections, instructions with names you want spelled exactly",[168,14986,14987],{},"Same assistant, same check, same undo steps",[144,14989,14990,14993,14996],{},[168,14991,14992],{},"Drawing",[168,14994,14995],{},"Placing symbols directly, fine-tuning positions, visual control",[168,14997,14998],{},"On open projects also offline, as a pilot feature",[79,15000,15002],{"id":15001},"what-are-the-limits-of-dictation","What are the limits of dictation?",[84,15004,15005,15011,15017,15023,15029,15035],{},[87,15006,15007,15010],{},[15,15008,15009],{},"Text after you stop, not live."," Recognition processes the finished recording; the text appears once you use the recording.",[87,15012,15013,15016],{},[15,15014,15015],{},"Two minutes per recording."," Dictate longer instructions as several recordings into the same message.",[87,15018,15019,15022],{},[15,15020,15021],{},"Interface language."," Mixing languages within one recording is not supported.",[87,15024,15025,15028],{},[15,15026,15027],{},"Many recordings in a short time"," are throttled; after a moment you can continue.",[87,15030,15031,15034],{},[15,15032,15033],{},"Rows of boxes on a wall:"," at most five boxes per frame with a fixed 71 mm centre distance; the assistant places push buttons one by one.",[87,15036,15037,15040],{},[15,15038,15039],{},"No substitute for measurement and keuring."," The self-check assesses the supported rules against the captured data; the conformity inspection is carried out on site by the accredited body (AREI, section 6.4.1).",[79,15042,15044],{"id":15043},"frequently-asked-questions-about-dictation-in-planelec","Frequently asked questions about dictation in PlanElec",[1041,15046,15048],{"id":15047},"is-dictated-text-sent-automatically","Is dictated text sent automatically?",[12,15050,15051,15052,15054],{},"No. The text appears in the input field, and you decide with ",[15,15053,14524],{}," whether and when it becomes an instruction.",[1041,15056,15058],{"id":15057},"do-i-need-an-app","Do I need an app?",[12,15060,15061],{},"No. Dictation is part of the assistant in the browser. You can install PlanElec as a web app, but you don't have to.",[1041,15063,15065],{"id":15064},"can-i-dictate-in-planelec-sketch-too","Can I dictate in PlanElec Sketch too?",[12,15067,15068,15069,15071,15072,15075,15076,56],{},"No. Dictation is part of the assistant in the ",[40,15070,31],{"href":1964}," studio. In ",[40,15073,22],{"href":1456,"rel":15074},[1458]," you draw the single-line diagram and situation plan for free in the browser. If you later need the assistant, the distribution board or the self-check report, you move the drawing to Pro with ",[15,15077,1482],{},[1041,15079,15081],{"id":15080},"what-does-it-look-like-on-the-home-page","What does it look like on the home page?",[12,15083,4361,15084,15088],{},[40,15085,15087],{"href":15086},"\u002Fen#demo","dictation demo on the home page"," walks through choosing a room, dictating, reviewing and applying on a simulated example; the page records no audio. In the studio you then dictate into your own project.",{"title":2044,"searchDepth":2045,"depth":2045,"links":15090},[15091,15092,15093,15094,15095,15096,15097,15098,15099,15100,15101,15102,15103],{"id":14460,"depth":2045,"text":14461},{"id":14534,"depth":2045,"text":14535},{"id":14648,"depth":2045,"text":14649},{"id":14662,"depth":2045,"text":14663},{"id":14722,"depth":2045,"text":14723},{"id":14772,"depth":2045,"text":14773},{"id":14787,"depth":2045,"text":14788},{"id":14810,"depth":2045,"text":14811},{"id":14839,"depth":2045,"text":14840},{"id":14870,"depth":2045,"text":14871},{"id":14944,"depth":2045,"text":14945},{"id":15001,"depth":2045,"text":15002},{"id":15043,"depth":2045,"text":15044,"children":15104},[15105,15106,15107,15108],{"id":15047,"depth":2053,"text":15048},{"id":15057,"depth":2053,"text":15058},{"id":15064,"depth":2053,"text":15065},{"id":15080,"depth":2053,"text":15081},"In the PlanElec studio you dictate devices, circuits and dimensions to the AI assistant in Dutch, French, German or English. You review the recognised text before sending, every change runs through the AREI\u002FRGIE self-check and can be undone in a single step.",[10987,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-voice-dictation-editorial.jpg","\u002Fblog\u002Fdictate-single-line-diagram.en","11 min",{"title":14439,"description":15109},"Dictate a Single-Line Diagram: Voice Input on Site","dictate-single-line-diagram","blog\u002Fdictate-single-line-diagram.en",[15120,13367,3926,15121,10998,15122,2133,4261],"Dictation","PlanElec assistant","Site survey","TxdjMjg86SSj-HKUQ1daNQsTguPw3lwhPxeFTIylnK0","\u002Fblog\u002Fdictate-single-line-diagram",{"id":15126,"title":15127,"body":15128,"category":10304,"description":15690,"extension":2113,"guideId":15691,"image":15692,"locale":2119,"meta":15693,"navigation":2121,"order":15694,"path":15695,"publishedAt":14420,"readTime":4830,"seo":15696,"seoTitle":15697,"slug":15698,"stem":15699,"tags":15700,"updatedAt":14420,"__hash__":15706,"kind":3594,"href":15707,"date":14420,"labels":15708},"help\u002Fhelp\u002Foffline-work.en.md","Using PlanElec offline: keep editing projects without a connection",{"type":9,"value":15129,"toc":15678},[15130,15141,15145,15149,15204,15207,15210,15215,15219,15222,15331,15334,15339,15343,15346,15355,15358,15363,15367,15370,15400,15405,15410,15414,15420,15438,15445,15450,15454,15524,15527,15531,15535,15604,15609,15613,15616,15619,15624,15628,15654,15656],[12,15131,15132,15133,15136,15137,15140],{},"When you open a project online in the studio, PlanElec automatically prepares it for work without a connection. As soon as the status indicator shows ",[15,15134,15135],{},"Offline ready",", you can keep editing the floor plan, single-line diagram and distribution board without a network. Your changes stay on the device and sync with the server when you reconnect; if they contradict a change from another session, you decide. Exporting documents, uploading project files and photos, the AI assistant and AI recognition wait until you are back online. Offline work is in ",[15,15138,15139],{},"pilot",": the feature is switched on at planelec.be, and testing on building sites and tablets is still under way. Try the workflow once before an important appointment.",[12,15142,15143],{},[40,15144],{"id":9499},[79,15146,15148],{"id":15147},"what-do-i-need-to-work-offline","What do I need to work offline?",[138,15150,15151,15159],{},[141,15152,15153],{},[144,15154,15155,15157],{},[147,15156,3724],{},[147,15158,7652],{},[163,15160,15161,15169,15177,15185,15193],{},[144,15162,15163,15166],{},[168,15164,15165],{},"Open the project online in the studio once",[168,15167,15168],{},"Preparation only starts for the open project and only with a connection. A project you have never opened does not exist offline.",[144,15170,15171,15174],{},[168,15172,15173],{},"Valid sign-in",[168,15175,15176],{},"A local copy is only created from a confirmed session. Without one, you see “Not ready: Valid session required”.",[144,15178,15179,15182],{},[168,15180,15181],{},"Live sync switched on in the environment",[168,15183,15184],{},"Offline preparation builds on live sync. It is switched on at planelec.be; there is no setting for you to change.",[144,15186,15187,15190],{},[168,15188,15189],{},"Current browser with offline cache",[168,15191,15192],{},"Without a service worker, PlanElec shows “Not ready: Browser does not support the offline cache”.",[144,15194,15195,15198],{},[168,15196,15197],{},"Free storage and a suitable connection",[168,15199,15200,15201,1487],{},"PlanElec only downloads floor plan images with at least 200 MB in reserve, and not over mobile data or with data saver on (see ",[40,15202,4179],{"href":15203},"#limits",[12,15205,15206],{},"You do not need an organisation. Live sync also keeps your own sessions on several devices in step.",[12,15208,15209],{},"There is no “make available offline” button. PlanElec prepares the project in the background during quiet moments, re-checks it every 30 seconds and catches up on its own after an interruption.",[12,15211,15212],{},[40,15213],{"id":15214},"status",[79,15216,15218],{"id":15217},"how-do-i-know-a-project-is-ready-offline","How do I know a project is ready offline?",[12,15220,15221],{},"There is a round status icon at the bottom right of the status bar. Its tooltip shows the save state and the offline state; a click opens the details: save status, offline readiness and connection.",[138,15223,15224,15235],{},[141,15225,15226],{},[144,15227,15228,15231,15233],{},[147,15229,15230],{},"Indicator",[147,15232,2314],{},[147,15234,10804],{},[163,15236,15237,15249,15260,15271,15282,15296,15307,15320],{},[144,15238,15239,15243,15246],{},[168,15240,15241],{},[15,15242,15135],{},[168,15244,15245],{},"The project model and all floor plan images are verified on this device.",[168,15247,15248],{},"Nothing. You can go offline.",[144,15250,15251,15254,15257],{},[168,15252,15253],{},"“Model ready offline · 2 images missing”",[168,15255,15256],{},"You can work offline, but the listed floor plan images are missing. The reason appears below.",[168,15258,15259],{},"Fix the reason (storage, Wi-Fi) or work without those images.",[144,15261,15262,15265,15268],{},[168,15263,15264],{},"“Not ready: Preparing …”",[168,15266,15267],{},"Preparation is still running.",[168,15269,15270],{},"Keep the project open and online.",[144,15272,15273,15276,15279],{},[168,15274,15275],{},"“Not ready: Local project state not yet available”",[168,15277,15278],{},"The local project copy has not yet been stored durably.",[168,15280,15281],{},"Wait; if the message persists, reload the page while online.",[144,15283,15284,15287,15290],{},[168,15285,15286],{},"“Not ready: App not yet available offline”",[168,15288,15289],{},"The app itself is not yet fully stored on the device.",[168,15291,15292,15293,15295],{},"Stay online until ",[15,15294,15135],{}," appears.",[144,15297,15298,15301,15304],{},[168,15299,15300],{},"“Not ready: Local save failed”",[168,15302,15303],{},"The browser could not store the local copy.",[168,15305,15306],{},"Check free storage; PlanElec retries on its own.",[144,15308,15309,15312,15315],{},[168,15310,15311],{},"“Not ready: Live sync disabled”",[168,15313,15314],{},"Live sync is switched off in this environment. Normal saving to the server carries on.",[168,15316,15317,15318,56],{},"Work online; look for ",[15,15319,3168],{},[144,15321,15322,15325,15328],{},[168,15323,15324],{},"“A new app version is available. Reload the app to prepare it for offline use.”",[168,15326,15327],{},"A newer PlanElec version is active.",[168,15329,15330],{},"Reload while online; preparation then starts again.",[12,15332,15333],{},"“Offline ready” is the most recently verified state. The browser may delete local data itself when storage runs low; PlanElec notices at the next check and reports it.",[12,15335,15336],{},[40,15337],{"id":15338},"offline-scope",[79,15340,15342],{"id":15341},"what-can-i-edit-offline","What can I edit offline?",[12,15344,15345],{},"Offline, you can edit everything stored in the project model: walls, rooms, devices and cable routes in the floor plan, circuits in the single-line diagram and the layout of the distribution board, including mounting notes on devices. Undo and redo work as usual.",[12,15347,15348,15349,3324,15351,15354],{},"Without a connection the status icon shows ",[15,15350,12325],{},[15,15352,15353],{},"Saved locally",", and the details add “Local offline editing. Changes stay on this device; access and synchronization are checked when you reconnect.” PlanElec counts pending changes, for example “3 changes pending since 10:42”.",[12,15356,15357],{},"If you reload the page without a connection, PlanElec opens the prepared project from the local copy. Your changes are not lost.",[12,15359,15360],{},[40,15361],{"id":15362},"reconnect",[79,15364,15366],{"id":15365},"what-happens-when-the-connection-comes-back","What happens when the connection comes back?",[12,15368,15369],{},"PlanElec sends pending changes by itself as soon as the browser is back online, when you return to the tab, and then every 30 seconds while anything is pending. You do not need to start anything.",[3139,15371,15372,15386,15389],{},[87,15373,15374,15375,3324,15377,15379,15380,15383,15384,56],{},"The status icon moves from ",[15,15376,12325],{},[15,15378,15353],{}," through ",[15,15381,15382],{},"Saving..."," to ",[15,15385,3168],{},[87,15387,15388],{},"Changes others have made to other objects in the meantime are merged with yours. Both are kept.",[87,15390,15391,15392,15395,15396,15399],{},"Before syncing, the server checks your sign-in and access. If your session has expired, ",[15,15393,15394],{},"Session expired"," appears; choose ",[15,15397,15398],{},"Sign in again",". If someone has removed your edit rights, PlanElec shows “You no longer have edit permissions for this project.”",[12,15401,15402,15403,15295],{},"If an attempt fails, PlanElec waits a little longer each time, up to five minutes, and tries again. Keep the tab open until ",[15,15404,3168],{},[12,15406,15407],{},[40,15408],{"id":15409},"conflicts",[79,15411,15413],{"id":15412},"what-if-my-offline-changes-clash-with-someone-elses","What if my offline changes clash with someone else’s?",[12,15415,15416,15417,56],{},"If someone changed the same object as you, such as the same name, PlanElec does not merge silently. You see ",[15,15418,15419],{},"Changes could not be merged",[3139,15421,15422,15429,15435],{},[87,15423,15424,15425,15428],{},"Choose ",[15,15426,15427],{},"Download local backup",". You get a JSON file with your local project state.",[87,15430,15424,15431,15434],{},[15,15432,15433],{},"Load server version"," and confirm. The local changes of this session are replaced by the shared saved version; other tabs keep their local changes.",[87,15436,15437],{},"Re-enter the changes you want to keep in the current version.",[12,15439,15440,15441,56],{},"The backup contains no image files, and PlanElec does not offer an import for it. Keep the file and contact support if you need to recover content from it. The other save and sync messages are explained in ",[40,15442,15444],{"href":15443},"\u002Fen\u002Fhelp\u002Fsolve-common-problems#sync","Solving common problems",[12,15446,15447],{},[40,15448],{"id":15449},"online-only",[79,15451,15453],{"id":15452},"what-has-to-wait-until-i-am-back-online","What has to wait until I am back online?",[138,15455,15456,15465],{},[141,15457,15458],{},[144,15459,15460,15462],{},[147,15461,5825],{},[147,15463,15464],{},"Why online",[163,15466,15467,15478,15489,15497,15508,15516],{},[144,15468,15469,15475],{},[168,15470,15471,15472,15474],{},"Exporting documents, ",[15,15473,4662],{},", archiving",[168,15476,15477],{},"Export and archive are not part of offline work; the server checks and seals the release copy.",[144,15479,15480,15483],{},[168,15481,15482],{},"Uploading project files and photos",[168,15484,15485,15486,15488],{},"Files live in ",[15,15487,10173],{}," on the server. There is no upload queue.",[144,15490,15491,15494],{},[168,15492,15493],{},"Recognising a floor plan with AI, recognising a board from a photo",[168,15495,15496],{},"Recognition runs on the server.",[144,15498,15499,15505],{},[168,15500,15501,15502,15504],{},"AI assistant in the ",[15,15503,14475],{}," panel",[168,15506,15507],{},"The language model runs on the server.",[144,15509,15510,15513],{},[168,15511,15512],{},"Calculating the PV yield forecast",[168,15514,15515],{},"The simulation runs on the server.",[144,15517,15518,15521],{},[168,15519,15520],{},"Inviting members",[168,15522,15523],{},"The server manages invitations.",[12,15525,15526],{},"Plan these steps for the office or a break with a network. By then your offline edits are already synced, and you export from the current project.",[12,15528,15529],{},[40,15530],{"id":3425},[79,15532,15534],{"id":15533},"what-are-the-limits-of-offline-work","What are the limits of offline work?",[138,15536,15537,15546],{},[141,15538,15539],{},[144,15540,15541,15543],{},[147,15542,6928],{},[147,15544,15545],{},"What happens",[163,15547,15548,15556,15564,15572,15580,15588,15596],{},[144,15549,15550,15553],{},[168,15551,15552],{},"Storage",[168,15554,15555],{},"PlanElec only downloads floor plan images if at least 200 MB stays free afterwards. Otherwise: “Less than 200 MB free or storage capacity unknown”, and only the model is ready offline.",[144,15557,15558,15561],{},[168,15559,15560],{},"Mobile data and data saver",[168,15562,15563],{},"With data saver, a metered or mobile connection, or 2G, downloads pause (“Data saver enabled”, “Downloads paused on a metered connection”). Some browsers do not report the connection type; there PlanElec downloads over mobile data too.",[144,15565,15566,15569],{},[168,15567,15568],{},"Missing images",[168,15570,15571],{},"The indicator counts missing floor plan images. The model stays editable; only the background image is missing offline. PlanElec loads the active floor first.",[144,15573,15574,15577],{},[168,15575,15576],{},"Extra files",[168,15578,15579],{},"3D furniture models and interaction sounds are not guaranteed offline.",[144,15581,15582,15585],{},[168,15583,15584],{},"Device and browser",[168,15586,15587],{},"The local copy only applies to this browser on this device.",[144,15589,15590,15593],{},[168,15591,15592],{},"Closing the project, signing out",[168,15594,15595],{},"Both remove the offline preparation. Open the project online again before you go offline.",[144,15597,15598,15601],{},[168,15599,15600],{},"Permissions",[168,15602,15603],{},"Offline, PlanElec does not check permission changes. Current access counts when you reconnect.",[12,15605,15606],{},[40,15607],{"id":15608},"install",[79,15610,15612],{"id":15611},"do-i-need-to-install-planelec-as-a-web-app","Do I need to install PlanElec as a web app?",[12,15614,15615],{},"No. Offline work also runs in an ordinary browser tab. As a web app you get your own window without the browser bar and an icon on your home screen. Install PlanElec through your browser’s install function, on phone and tablet usually via “Add to Home Screen”. The app opens on the project overview. If you launch it again, it reuses the open window instead of opening a second one.",[12,15617,15618],{},"Installing alone does not make any project ready offline. What counts is the status indicator in the open project. On phones and tablets the studio keeps the screen on while it is visible.",[12,15620,15621],{},[40,15622],{"id":15623},"checklist",[79,15625,15627],{"id":15626},"how-do-i-prepare-for-a-site-visit","How do I prepare for a site visit?",[3139,15629,15630,15633,15639,15642,15645,15651],{},[87,15631,15632],{},"Open the project in the studio on Wi-Fi, starting with the floor you will need on site.",[87,15634,15635,15636,15638],{},"Wait until the indicator shows ",[15,15637,15135],{},". If it reports missing images, check the reason below it.",[87,15640,15641],{},"Keep the project open. Do not close it and do not sign out.",[87,15643,15644],{},"Work offline in one window per project.",[87,15646,15647,15648,15650],{},"Back on a network: wait for ",[15,15649,3168],{}," before you close the tab.",[87,15652,15653],{},"Only then export documents and upload photos.",[79,15655,13051],{"id":13050},[84,15657,15658,15663,15667,15672],{},[87,15659,15660],{},[40,15661,15444],{"href":15662},"\u002Fen\u002Fhelp\u002Fsolve-common-problems",[87,15664,15665],{},[40,15666,14935],{"href":4645},[87,15668,15669],{},[40,15670,15671],{"href":4635},"Archiving and verifying documents",[87,15673,15674],{},[40,15675,15677],{"href":15676},"\u002Fen\u002Fhelp\u002Fgetting-started","Getting started",{"title":2044,"searchDepth":2045,"depth":2045,"links":15679},[15680,15681,15682,15683,15684,15685,15686,15687,15688,15689],{"id":15147,"depth":2045,"text":15148},{"id":15217,"depth":2045,"text":15218},{"id":15341,"depth":2045,"text":15342},{"id":15365,"depth":2045,"text":15366},{"id":15412,"depth":2045,"text":15413},{"id":15452,"depth":2045,"text":15453},{"id":15533,"depth":2045,"text":15534},{"id":15611,"depth":2045,"text":15612},{"id":15626,"depth":2045,"text":15627},{"id":13050,"depth":2045,"text":13051},"PlanElec automatically prepares open projects for work without a connection. Requirements, status indicator, syncing when you reconnect, conflicts, limits and tips before a site visit. Pilot phase.","offline-work","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Foffline-work-en.webp",{},18,"\u002Fhelp\u002Foffline-work.en",{"title":15127,"description":15690},"Using PlanElec offline","use-planelec-offline","help\u002Foffline-work.en",[15701,15702,15703,15704,15705],"offline","live sync","web app","synchronisation","site visit","oz9sN5iJsFnFqEcBxDI37uLmV62ZGRO8_ud3DQM5SUs","\u002Fhelp\u002Fuse-planelec-offline",[],{"id":15710,"title":15711,"body":15712,"category":3575,"description":16777,"extension":2113,"guideId":16778,"image":16779,"locale":2119,"meta":16780,"navigation":2121,"order":16781,"path":16782,"publishedAt":16783,"readTime":3582,"seo":16784,"seoTitle":10313,"slug":16785,"stem":16786,"tags":16787,"updatedAt":16792,"__hash__":16793,"kind":3594,"href":16794,"date":16783,"labels":16795},"help\u002Fhelp\u002Fview-3d-lighting-study.en.md","How do I use the 3D view and the lighting study?",{"type":9,"value":15713,"toc":16764},[15714,15727,15731,15735,15738,15841,15847,15852,15856,15878,15887,15892,15896,15972,15975,15999,16032,16039,16044,16048,16051,16089,16094,16099,16103,16154,16165,16192,16197,16200,16205,16209,16212,16263,16266,16312,16315,16320,16324,16337,16375,16381,16386,16390,16405,16465,16468,16532,16535,16542,16546,16550,16620,16623,16628,16632,16730,16736,16738],[12,15715,15716,15717,15719,15720,3157,15723,15726],{},"The 3D view shows the same project state as the 2D floor plan: floors, walls, openings, stairs, furniture, devices and planned cable routes. Every user can open it without any extra activation. You need a browser with WebGL; without it, PlanElec shows a notice and you keep working in 2D without restrictions. In ",[15,15718,7264],{}," mode you place lights, compare the ",[15,15721,15722],{},"Everyday",[15,15724,15725],{},"Evening"," scenes, set a date and time for sun position and shadows, and read a heatmap with guidance values in lux. The lighting study supports planning and client conversations: it only calculates direct artificial light without reflections and does not replace a standards-based lighting design.",[12,15728,15729],{},[40,15730],{"id":9499},[79,15732,15734],{"id":15733},"what-do-i-need-for-the-3d-view","What do I need for the 3D view?",[12,15736,15737],{},"You do not need a special plan or role. Whether and how 3D appears depends on your browser and on the width of your workspace.",[138,15739,15740,15749],{},[141,15741,15742],{},[144,15743,15744,15746],{},[147,15745,2675],{},[147,15747,15748],{},"What PlanElec shows",[163,15750,15751,15763,15774,15789,15807,15820,15833],{},[144,15752,15753,15756],{},[168,15754,15755],{},"Browser with WebGL",[168,15757,15758,15759,15762],{},"The 3D view loads with the message ",[15,15760,15761],{},"Loading 3D view …"," and then shows the model.",[144,15764,15765,15768],{},[168,15766,15767],{},"Browser without WebGL",[168,15769,15770,15773],{},[15,15771,15772],{},"3D view unavailable",". The situation plan remains fully usable in 2D.",[144,15775,15776,15779],{},[168,15777,15778],{},"Graphics context reset by the browser",[168,15780,15781,15784,15785,15788],{},[15,15782,15783],{},"Rendering interrupted"," with a ",[15,15786,15787],{},"Reload"," button.",[144,15790,15791,15794],{},[168,15792,15793],{},"Wide desktop screen",[168,15795,15796,15797,1774,15800,3157,15803,15806],{},"View switcher with ",[15,15798,15799],{},"2D",[15,15801,15802],{},"3D",[15,15804,15805],{},"2D + 3D"," (split view from a studio workspace width of 1600 pixels).",[144,15808,15809,15812],{},[168,15810,15811],{},"Narrower windows and tablets",[168,15813,15814,15815,3324,15817,15819],{},"Only ",[15,15816,15799],{},[15,15818,15802],{},", one view at a time. A chosen split view automatically switches to a single view.",[144,15821,15822,15825],{},[168,15823,15824],{},"Phone in portrait",[168,15826,15827,15829,15830,15832],{},[15,15828,15799],{}," \u002F ",[15,15831,15802],{}," switcher in the header next to the project name.",[144,15834,15835,15838],{},[168,15836,15837],{},"Viewer role",[168,15839,15840],{},"You see 3D and the lighting study but cannot change the scene name, ambient brightness or light values.",[12,15842,15843,15844,15846],{},"While the notice replaces the model, tools that only work in 3D and the image export of the lighting scene are unavailable. Switch to ",[15,15845,15799],{}," with the view switcher instead.",[12,15848,15849],{},[40,15850],{"id":15851},"open-3d",[79,15853,15855],{"id":15854},"how-do-i-open-the-3d-view","How do I open the 3D view?",[3139,15857,15858,15861,15875],{},[87,15859,15860],{},"Open a project in the studio.",[87,15862,15863,15864,15866,15867,15869,15870,15829,15872,15874],{},"In the view switcher at the top of the workspace, choose ",[15,15865,15802],{}," or, on a wide screen, ",[15,15868,15805],{},". On a phone, ",[15,15871,15799],{},[15,15873,15802],{}," sits in the header.",[87,15876,15877],{},"The model appears with the active floor. Success check: the walls, rooms and devices of your floor plan stand in space.",[12,15879,15880,15881,3157,15883,15886],{},"Some work modes open in 3D directly: ",[15,15882,7264],{},[15,15884,15885],{},"Energy"," start in the 3D view, all other modes in 2D. Selection and project state are shared between 2D and 3D. Whatever you select in one view is also selected in the other.",[12,15888,15889],{},[40,15890],{"id":15891},"navigation",[79,15893,15895],{"id":15894},"how-do-i-move-around-in-the-3d-view","How do I move around in the 3D view?",[138,15897,15898,15907],{},[141,15899,15900],{},[144,15901,15902,15905],{},[147,15903,15904],{},"Input",[147,15906,3293],{},[163,15908,15909,15917,15925,15933,15941,15948,15956,15964],{},[144,15910,15911,15914],{},[168,15912,15913],{},"Drag with the left mouse button",[168,15915,15916],{},"Rotate the view",[144,15918,15919,15922],{},[168,15920,15921],{},"Drag with the right or middle mouse button, Shift + drag",[168,15923,15924],{},"Pan the view",[144,15926,15927,15930],{},[168,15928,15929],{},"Mouse wheel",[168,15931,15932],{},"Zoom",[144,15934,15935,15938],{},[168,15936,15937],{},"Arrow keys",[168,15939,15940],{},"Rotate in 5-degree steps",[144,15942,15943,15946],{},[168,15944,15945],{},"Plus \u002F minus",[168,15947,15932],{},[144,15949,15950,15953],{},[168,15951,15952],{},"Key 0",[168,15954,15955],{},"Reset view",[144,15957,15958,15961],{},[168,15959,15960],{},"One finger",[168,15962,15963],{},"Rotate",[144,15965,15966,15969],{},[168,15967,15968],{},"Two fingers",[168,15970,15971],{},"Zoom (pinch) and pan at the same time",[12,15973,15974],{},"The camera controls sit at the bottom left of the view:",[84,15976,15977,15983,15988],{},[87,15978,15979,15982],{},[15,15980,15981],{},"Fit view"," brings the whole model into frame.",[87,15984,15985,15987],{},[15,15986,15955],{}," restores the starting perspective.",[87,15989,15990,15991,15994,15995,15998],{},"With a selection, ",[15,15992,15993],{},"Show selection"," (the camera flies to the selected object) and ",[15,15996,15997],{},"Open in 2D"," (back to the floor plan with the same object in focus) are added.",[12,16000,16001,16002,1774,16005,3324,16008,16011,16012,3157,16015,16017,16018,1774,16021,3157,16024,16027,16028,16031],{},"For several storeys, choose ",[15,16003,16004],{},"Active floor",[15,16006,16007],{},"Stacked",[15,16009,16010],{},"Exploded"," in the floor bar or at the top right of the view. In ",[15,16013,16014],{},"Furniture",[15,16016,7264],{}," modes an extra button cycles through ",[15,16019,16020],{},"Walls up",[15,16022,16023],{},"Wall cutaway",[15,16025,16026],{},"Walls down",". Both modes start with the cutaway so you can look into the rooms. In ",[15,16029,16030],{},"Electrical"," mode the walls stand at full height, because devices and cables sit on the walls themselves. The wall view is a display setting and does not change your project.",[12,16033,16034,16035,56],{},"3D takes heights and floor positions from your floor plan. How to stack floors correctly is explained in ",[40,16036,16038],{"href":16037},"\u002Fen\u002Fhelp\u002Falign-floors-and-building-origin","Align floors and building origin",[12,16040,16041],{},[40,16042],{"id":16043},"furniture",[79,16045,16047],{"id":16046},"how-do-i-furnish-rooms","How do I furnish rooms?",[12,16049,16050],{},"Furniture helps you align sockets, switches and lights with how a room will be used. It is part of the floor plan and appears in 3D automatically.",[3139,16052,16053,16058,16078,16081],{},[87,16054,16055,16056,56],{},"In the mode bar, choose ",[15,16057,16014],{},[87,16059,11757,16060,16063,16064,15383,16067,1774,16069,1774,16072,3157,16075,56],{},[15,16061,16062],{},"Furnishings & outdoors"," catalogue. Categories range from ",[15,16065,16066],{},"Living",[15,16068,6449],{},[15,16070,16071],{},"Kitchen appliances",[15,16073,16074],{},"Sanitary",[15,16076,16077],{},"Outdoors",[87,16079,16080],{},"Pick an item and place it on the floor plan.",[87,16082,16083,16084,3324,16086,16088],{},"Switch to ",[15,16085,15802],{},[15,16087,15805],{},". Success check: the item stands in the room at the same spot as in 2D.",[12,16090,3361,16091,16093],{},[15,16092,16014],{}," mode you can also grab an item in 3D with the selection tool and move it. A short click only selects; a real drag moves. Releasing creates one undo step. The catalogue is a selection of common furnishings, not a complete manufacturer catalogue. Many electrical devices appear in 3D as simplified bodies rather than accurate product models.",[12,16095,16096],{},[40,16097],{"id":16098},"lighting-planning",[79,16100,16102],{"id":16101},"how-do-i-place-lights-in-lighting-mode","How do I place lights in Lighting mode?",[3139,16104,16105,16117,16124,16148],{},[87,16106,16055,16107,16109,16110,3157,16113,16116],{},[15,16108,7264],{},". PlanElec opens the 3D view with the ",[15,16111,16112],{},"Lighting planning",[15,16114,16115],{},"Lighting study"," panels; the light and lighting preview layers are on, cables and dimensions are hidden.",[87,16118,16119,16120,16123],{},"Place lights from the device palette. It also offers the ",[15,16121,16122],{},"Spot Grid",": drag a rectangle or click in the room.",[87,16125,3370,16126,16128,16129,1774,16132,1774,16135,1774,16138,1774,16141,3157,16144,16147],{},[15,16127,16112],{}," panel, edit ",[15,16130,16131],{},"Luminous flux (lm)",[15,16133,16134],{},"Colour temperature (K)",[15,16136,16137],{},"Beam angle (°)",[15,16139,16140],{},"Tilt (°)",[15,16142,16143],{},"Mounting height (m)",[15,16145,16146],{},"Group"," per room. Identical lights in a room are bundled in one row; change them together or expand the row.",[87,16149,16150,16151,16153],{},"Move lights directly in 3D if needed: in ",[15,16152,7264],{}," mode the selection tool grabs lights. Ceiling lights move freely within the room, wall lights follow the nearest wall.",[12,16155,4361,16156,16158,16159,3324,16161,16164],{},[15,16157,9703],{}," column shows ",[15,16160,7048],{},[15,16162,16163],{},"Linked",". A draft is a light point without a link to the electrical design. To link it:",[3139,16166,16167,16177,16183],{},[87,16168,16169,16170,16173,16174,56],{},"Open the row's ",[15,16171,16172],{},"Menu"," and choose ",[15,16175,16176],{},"Link to circuit",[87,16178,5777,16179,16182],{},[15,16180,16181],{},"Circuit or existing light point",", choose the target.",[87,16184,16185,16186,16189,16190,56],{},"Confirm with ",[15,16187,16188],{},"Adopt into electrical plan",". Success check: the status changes to ",[15,16191,16163],{},[12,16193,16194,16195,56],{},"Only this adoption creates a consumer or links an existing light point. PlanElec does not derive power or wiring from the lighting preview. Plan switching points and circuits as usual, see ",[40,16196,4176],{"href":4175},[12,16198,16199],{},"New lights get default luminous flux values: pendant light 800 lm, spotlight 400 lm, wall light 300 lm. Enter the values of the lights you actually plan before you judge the heatmap.",[12,16201,16202],{},[40,16203],{"id":16204},"light-preview",[79,16206,16208],{"id":16207},"how-does-the-lighting-preview-work-in-3d","How does the lighting preview work in 3D?",[12,16210,16211],{},"The lighting preview shows how the artificial light of your fittings looks in the furnished room. It is illustrative: the panel states explicitly that it is “no lux calculation or lighting compliance assessment”.",[3139,16213,16214,16222,16231,16249,16256],{},[87,16215,3361,16216,16218,16219,16221],{},[15,16217,7264],{}," mode, open the ",[15,16220,16115],{}," panel.",[87,16223,3370,16224,16226,16227,16230],{},[15,16225,8062],{}," section, switch on ",[15,16228,16229],{},"Lighting preview",". It is off when you open a project.",[87,16232,3370,16233,16236,16237,3324,16239,16241,16242,3328,16245,16248],{},[15,16234,16235],{},"Scene"," section, choose ",[15,16238,15722],{},[15,16240,15725],{},". For each scene you save a ",[15,16243,16244],{},"Scene name",[15,16246,16247],{},"Ambient brightness"," and, per light or light group, on\u002Foff and dimming.",[87,16250,16251,16252,16255],{},"Show ",[15,16253,16254],{},"Light cones"," when you want to check direction and beam angle.",[87,16257,16258,16259,16262],{},"Use ",[15,16260,16261],{},"Export scene as image"," to export a PNG of the current camera. Success check: the image carries the scene name and the illustrative-preview notice, without selection or hover highlights.",[12,16264,16265],{},"Scenes are saved per floor in the project and follow undo and project sync. They change neither wiring nor electrical power values.",[138,16267,16268,16284],{},[141,16269,16270],{},[144,16271,16272,16275,16278,16281],{},[147,16273,16274],{},"Quality level",[147,16276,16277],{},"Active lights",[147,16279,16280],{},"of which with shadows",[147,16282,16283],{},"Shadow resolution",[163,16285,16286,16298],{},[144,16287,16288,16291,16293,16295],{},[168,16289,16290],{},"Standard",[168,16292,6628],{},[168,16294,6659],{},[168,16296,16297],{},"1024 px",[144,16299,16300,16305,16307,16309],{},[168,16301,16302],{},[15,16303,16304],{},"Reduced quality",[168,16306,7315],{},[168,16308,6424],{},[168,16310,16311],{},"512 px",[12,16313,16314],{},"On touch devices the preview starts in reduced quality; you can switch at any time. Light points beyond this budget stay visible on the plan but do not contribute light to the preview. Room surfaces and furniture receive shadows. Simplified models and transparent planning walls limit what the image can tell you.",[12,16316,16317],{},[40,16318],{"id":16319},"daylight",[79,16321,16323],{"id":16322},"how-do-i-set-sun-position-and-shadows","How do I set sun position and shadows?",[12,16325,4361,16326,16329,16330,16332,16333,16336],{},[15,16327,16328],{},"Sun"," section of the ",[15,16331,16115],{}," panel is labelled ",[15,16334,16335],{},"Daylight study · Brussels location",". It aims a sun light with cast shadows in 3D.",[3139,16338,16339,16357,16363,16369],{},[87,16340,16341,16342,16345,16346,16349,16350,16353,16354,16356],{},"Set the ",[15,16343,16344],{},"North orientation",": click ",[15,16347,16348],{},"Set north",". North stays at the top in the dialog; rotate the house by dragging, with the arrow keys or with ",[15,16351,16352],{},"Rotate house"," (0°, 90°, 180°, 270°) and choose ",[15,16355,3342],{},". 0° means north at the top; rotation is clockwise. The orientation applies to the whole project.",[87,16358,16359,16360,56],{},"Choose a ",[15,16361,16362],{},"Date",[87,16364,16341,16365,16368],{},[15,16366,16367],{},"Time"," with the slider, in 10-minute steps, in the Europe\u002FBrussels time zone.",[87,16370,16371,16372,56],{},"Read the sun's azimuth and elevation below the slider. Success check: light and shadows in 3D move with the time. When the sun is below the horizon, the panel shows ",[15,16373,16374],{},"Sun below the horizon",[12,16376,16377,16378,16380],{},"Sunlight and shadows are only active in ",[15,16379,7264],{}," mode. The sun position comes from an astronomical approximation for a fixed site in Brussels; there is no project-specific location yet. Your browser remembers date and time per project; they are not saved in the project and not shared. The daylight study shows sun direction and shadows but does not calculate daylight values in lux and does not feed into the heatmap.",[12,16382,16383],{},[40,16384],{"id":16385},"heatmap",[79,16387,16389],{"id":16388},"what-does-the-illuminance-heatmap-show","What does the illuminance heatmap show?",[12,16391,16392,16393,16396,16397,16399,16400,3324,16402,16404],{},"The heatmap calculates, per room, the direct illuminance from your lights on a workplane at 0.8 m. It appears as a coloured area on the ",[15,16394,16395],{},"2D floor plan",". Because ",[15,16398,7264],{}," mode starts in 3D, switch to ",[15,16401,15799],{},[15,16403,15805],{}," to see it.",[3139,16406,16407,16420,16425,16448],{},[87,16408,3370,16409,16411,16412,16415,16416,16419],{},[15,16410,16115],{}," panel, open the ",[15,16413,16414],{},"Illumination"," section and switch on ",[15,16417,16418],{},"Illuminance heatmap"," (on by default).",[87,16421,16083,16422,16424],{},[15,16423,15799],{},". Success check: rooms with lights are shaded in colour.",[87,16426,16427,16428,16431,16432,16435,16436,16439,16440,16443,16444,16447],{},"Read the ",[15,16429,16430],{},"Results by room"," table: ",[15,16433,16434],{},"Ē (lx)"," is the mean, ",[15,16437,16438],{},"Emin (lx)"," the lowest value, ",[15,16441,16442],{},"Emin\u002FĒ"," the uniformity, ",[15,16445,16446],{},"Guidance (lx)"," the comparison value.",[87,16449,4361,16450,16452,16453,16456,16457,16460,16461,16464],{},[15,16451,9703],{}," column compares the mean with the lower guidance value: ",[15,16454,16455],{},"Reached"," at or above it, ",[15,16458,16459],{},"Just below"," from 80 %, ",[15,16462,16463],{},"Too low"," below that.",[12,16466,16467],{},"The calculation takes brightness and dimming of the active scene into account. Moving a light recalculates only the affected room. Each floor uses at most 4,000 calculation points.",[138,16469,16470,16480],{},[141,16471,16472],{},[144,16473,16474,16477],{},[147,16475,16476],{},"Room type",[147,16478,16479],{},"Guidance value in PlanElec",[163,16481,16482,16489,16496,16503,16511,16517,16525],{},[144,16483,16484,16486],{},[168,16485,6401],{},[168,16487,16488],{},"100–200 lx",[144,16490,16491,16493],{},[168,16492,6449],{},[168,16494,16495],{},"300–500 lx",[144,16497,16498,16500],{},[168,16499,6463],{},[168,16501,16502],{},"200 lx",[144,16504,16505,16508],{},[168,16506,16507],{},"Hallway",[168,16509,16510],{},"100 lx",[144,16512,16513,16515],{},[168,16514,6418],{},[168,16516,16510],{},[144,16518,16519,16522],{},[168,16520,16521],{},"Office",[168,16523,16524],{},"500 lx",[144,16526,16527,16530],{},[168,16528,16529],{},"other rooms",[168,16531,16510],{},[12,16533,16534],{},"These guidance values are reference points PlanElec uses for the status. They are not normative requirements, and the panel states below the table: “This is not a standards-based lighting design.”",[12,16536,16537,16538,16541],{},"A room shows ",[15,16539,16540],{},"Cannot calculate"," when it has no calculation points or when one of its lights has no known mounting height above 0.8 m. When the mounting height is missing from the plan, PlanElec uses the type and floor defaults.",[12,16543,16544],{},[40,16545],{"id":3425},[79,16547,16549],{"id":16548},"what-does-the-lighting-study-not-calculate","What does the lighting study not calculate?",[138,16551,16552,16564],{},[141,16553,16554],{},[144,16555,16556,16558,16561],{},[147,16557,9856],{},[147,16559,16560],{},"What you get",[147,16562,16563],{},"What is not included",[163,16565,16566,16577,16588,16599,16610],{},[144,16567,16568,16571,16574],{},[168,16569,16570],{},"3D lighting preview",[168,16572,16573],{},"Illustrative image with scenes, dimming and shadows",[168,16575,16576],{},"No lux values, no photorealistic or physically exact simulation",[144,16578,16579,16582,16585],{},[168,16580,16581],{},"Heatmap and table",[168,16583,16584],{},"Direct component at 0.8 m, mean, minimum, uniformity",[168,16586,16587],{},"No reflections, no light from neighbouring rooms, no tilted light cones, no wall obstruction",[144,16589,16590,16593,16596],{},[168,16591,16592],{},"Light data",[168,16594,16595],{},"Luminous flux, colour temperature, beam angle, mounting height",[168,16597,16598],{},"No manufacturer photometry (IES\u002FLDT), no manufacturer luminaire geometry, no LED strips",[144,16600,16601,16604,16607],{},[168,16602,16603],{},"Daylight study",[168,16605,16606],{},"Sun direction and shadows in 3D for Brussels",[168,16608,16609],{},"No project-specific location, no daylight values, no daylight in the heatmap",[144,16611,16612,16614,16617],{},[168,16613,9095],{},[168,16615,16616],{},"A planning aid for your client conversation",[168,16618,16619],{},"No lighting compliance assessment and no standards-based lighting calculation",[12,16621,16622],{},"If you need verifiable evidence, calculate the lighting with dedicated lighting design software and the manufacturer's photometric data. PlanElec gives you room geometry, light positions and mounting heights as a starting point.",[12,16624,16625],{},[40,16626],{"id":16627},"troubleshooting",[79,16629,16631],{"id":16630},"why-dont-i-see-a-model-shadows-or-values","Why don't I see a model, shadows or values?",[138,16633,16634,16644],{},[141,16635,16636],{},[144,16637,16638,16641],{},[147,16639,16640],{},"What you see",[147,16642,16643],{},"Cause and fix",[163,16645,16646,16658,16669,16685,16696,16707,16720],{},[144,16647,16648,16652],{},[168,16649,16650],{},[15,16651,15772],{},[168,16653,16654,16655,16657],{},"The browser does not provide WebGL. Keep working in ",[15,16656,15799],{}," or open the project in a current browser with graphics acceleration.",[144,16659,16660,16664],{},[168,16661,16662],{},[15,16663,15783],{},[168,16665,16666,16667,56],{},"The browser reset the graphics context. Click ",[15,16668,15787],{},[144,16670,16671,16677],{},[168,16672,16673,16674,16676],{},"No ",[15,16675,15805],{}," in the switcher",[168,16678,16679,16680,3157,16682,16684],{},"The workspace is narrower than 1600 pixels. Use ",[15,16681,15799],{},[15,16683,15802],{}," one after the other.",[144,16686,16687,16690],{},[168,16688,16689],{},"No sun shadows",[168,16691,16692,16693,16695],{},"Sun and shadows only work in ",[15,16694,7264],{}," mode. Also check that the sun is above the horizon at the chosen time.",[144,16697,16698,16701],{},[168,16699,16700],{},"Lights do not glow in 3D",[168,16702,16703,16704,16706],{},"Switch on ",[15,16705,16229],{},". Check on\u002Foff and dimming in the active scene. Lights beyond the budget do not contribute.",[144,16708,16709,16714],{},[168,16710,16711],{},[15,16712,16713],{},"No calculation: add rooms or enable the Lighting preview layer.",[168,16715,16716,16717,16719],{},"Draw closed rooms or switch on the ",[15,16718,16229],{}," layer.",[144,16721,16722,16727],{},[168,16723,16724,16726],{},[15,16725,16261],{}," is greyed out",[168,16728,16729],{},"The export needs a visible, fully loaded 3D view.",[12,16731,16732,16733,56],{},"For more help, see ",[40,16734,16735],{"href":15662},"Solve common problems",[79,16737,13051],{"id":13050},[84,16739,16740,16746,16750,16754,16758],{},[87,16741,16742],{},[40,16743,16745],{"href":16744},"\u002Fen\u002Fhelp\u002Fplace-and-connect-electrical-symbols","Place and connect electrical symbols",[87,16747,16748],{},[40,16749,4176],{"href":4175},[87,16751,16752],{},[40,16753,16038],{"href":16037},[87,16755,16756],{},[40,16757,9462],{"href":9461},[87,16759,16760],{},[40,16761,16763],{"href":16762},"\u002Fen\u002Fhelp\u002Fplan-a-pv-system","Plan a PV system",{"title":2044,"searchDepth":2045,"depth":2045,"links":16765},[16766,16767,16768,16769,16770,16771,16772,16773,16774,16775,16776],{"id":15733,"depth":2045,"text":15734},{"id":15854,"depth":2045,"text":15855},{"id":15894,"depth":2045,"text":15895},{"id":16046,"depth":2045,"text":16047},{"id":16101,"depth":2045,"text":16102},{"id":16207,"depth":2045,"text":16208},{"id":16322,"depth":2045,"text":16323},{"id":16388,"depth":2045,"text":16389},{"id":16548,"depth":2045,"text":16549},{"id":16630,"depth":2045,"text":16631},{"id":13050,"depth":2045,"text":13051},"The 3D view is available to every user. In Lighting mode you place lights, compare lighting scenes, set sun position and shadows and read a heatmap with guidance values – without a standards-based lighting calculation.","view-3d-lighting-study","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fview-3d-lighting-study.webp",{},17,"\u002Fhelp\u002Fview-3d-lighting-study.en","2026-10-11",{"title":15711,"description":16777},"3d-view-and-lighting-study","help\u002Fview-3d-lighting-study.en",[16788,16789,16790,16791,16385,16043],"3D view","lighting study","lighting planning","sun position","2026-11-10","cQpRJ-Ngq_co7wCnaMdyeIO6a0zEjjry9AhwqXvLeHs","\u002Fhelp\u002F3d-view-and-lighting-study",[],{"id":16797,"title":16798,"body":16799,"category":17606,"description":17607,"extension":2113,"guideId":17608,"image":17609,"locale":2119,"meta":17610,"navigation":2121,"order":17611,"path":17612,"publishedAt":16783,"readTime":4830,"seo":17613,"seoTitle":10313,"slug":17614,"stem":17615,"tags":17616,"updatedAt":16783,"__hash__":17622,"kind":3594,"href":17623,"date":16783,"labels":17624},"help\u002Fhelp\u002Fdocument-archive-verification.en.md","Archive documents with versions and verify them by QR code",{"type":9,"value":16800,"toc":17593},[16801,16812,16817,16821,16829,16917,16920,16948,16955,16960,16964,17029,17037,17042,17046,17091,17097,17103,17106,17111,17115,17141,17147,17151,17155,17172,17234,17245,17250,17254,17272,17275,17280,17284,17294,17356,17367,17370,17375,17379,17382,17402,17405,17410,17414,17446,17456,17460,17464,17510,17519,17524,17528,17583],[12,16802,4659,16803,3116,16805,16807,16808,16811],{},[15,16804,4662],{},[15,16806,4665],{}," area, PlanElec stores a PDF unchanged in the project archive. Every release copy gets a random document ID, a version number that increases per document type, a QR code on every page and a SHA-256 hash. Requirements: the project is saved, the document has no open corrections and your project role is Owner, Admin or Editor. Anyone who scans the QR code sees on the ",[15,16809,16810],{},"Document verification"," page whether this exact archive version is current, superseded or revoked. That check confirms archive provenance and file integrity only. It is not an inspection under AREI\u002FRGIE (the Belgian electrical installation regulations), not a conformity statement and not an electronic signature; the official inspection is carried out by an accredited inspection body.",[12,16813,16814],{},[40,16815],{"id":16816},"document-types",[79,16818,16820],{"id":16819},"which-documents-can-you-archive","Which documents can you archive?",[12,16822,16823,16824,15379,16826,16828],{},"Every PDF you release in ",[15,16825,4665],{},[15,16827,4662],{}," is archived. The documented scope covers these eight document types:",[138,16830,16831,16840],{},[141,16832,16833],{},[144,16834,16835,16838],{},[147,16836,16837],{},"Document in Export",[147,16839,9703],{},[163,16841,16842,16852,16861,16871,16880,16889,16898,16907],{},[144,16843,16844,16849],{},[168,16845,16846],{},[15,16847,16848],{},"Single-Line Diagram",[168,16850,16851],{},"available",[144,16853,16854,16859],{},[168,16855,16856],{},[15,16857,16858],{},"Site Plan",[168,16860,16851],{},[144,16862,16863,16868],{},[168,16864,16865],{},[15,16866,16867],{},"AREI\u002FRGIE self-check report",[168,16869,16870],{},"available, indicative; only with the self-check switched on",[144,16872,16873,16878],{},[168,16874,16875],{},[15,16876,16877],{},"Circuit List",[168,16879,15139],{},[144,16881,16882,16887],{},[168,16883,16884],{},[15,16885,16886],{},"Material List",[168,16888,15139],{},[144,16890,16891,16896],{},[168,16892,16893],{},[15,16894,16895],{},"Cable list",[168,16897,15139],{},[144,16899,16900,16905],{},[168,16901,16902],{},[15,16903,16904],{},"Distribution board layout",[168,16906,16851],{},[144,16908,16909,16914],{},[168,16910,16911],{},[15,16912,16913],{},"Installation dossier",[168,16915,16916],{},"available; field validation with real customer projects still open",[12,16918,16919],{},"If Export shows further document cards with the same button, they follow the same archive path. Each type has its own version sequence: the installation dossier is numbered separately from a single-line diagram released on its own.",[12,16921,16922,16925,16926,16928,16929,1774,16931,1774,16933,1774,16935,1774,16937,1774,16939,5352,16941,16944,16945,56],{},[15,16923,16924],{},"Not archived"," are the documents in the ",[15,16927,7040],{}," section: ",[15,16930,6169],{},[15,16932,6180],{},[15,16934,6191],{},[15,16936,8107],{},[15,16938,8115],{},[15,16940,8123],{},[15,16942,16943],{},"Domotica handover dossier"," are generated in the browser. Their data hash only identifies the captured export state; it is not an archive confirmation. See ",[40,16946,16947],{"href":6126},"Plan and document KNX",[12,16949,16950,16951,16954],{},"A download through ",[15,16952,16953],{},"Download draft"," does not enter the archive either. Drafts carry the mark \"DRAFT\" and remain local files.",[12,16956,16957],{},[40,16958],{"id":16959},"prerequisites",[79,16961,16963],{"id":16962},"what-has-to-be-in-place-before-release","What has to be in place before release?",[138,16965,16966,16975],{},[141,16967,16968],{},[144,16969,16970,16972],{},[147,16971,3724],{},[147,16973,16974],{},"How you recognise it",[163,16976,16977,16995,17003,17021],{},[144,16978,16979,16982],{},[168,16980,16981],{},"Project role",[168,16983,16984,1774,16986,3324,16989,16991,16992,16994],{},[15,16985,4322],{},[15,16987,16988],{},"Admin",[15,16990,4342],{},". A ",[15,16993,4352],{}," sees the archive but cannot release anything.",[144,16996,16997,17000],{},[168,16998,16999],{},"Saved state",[168,17001,17002],{},"No notice \"Local changes have not been saved yet.\" PlanElec always archives the state saved on the server.",[144,17004,17005,17008],{},[168,17006,17007],{},"No open corrections",[168,17009,17010,17011,3324,17014,17017,17018,56],{},"The document card shows ",[15,17012,17013],{},"Ready for release",[15,17015,17016],{},"Ready with warnings",", not ",[15,17019,17020],{},"Corrections needed",[144,17022,17023,17026],{},[168,17024,17025],{},"Complete values",[168,17027,17028],{},"The server never archives a version with hidden values.",[12,17030,17031,17032,17034,17035,56],{},"Typical corrections that block a release include \"Connection data not yet confirmed\", \"Place missing devices on the situation plan\", \"Review and confirm the single-line diagram\" and \"Complete circuit labels\". While any of them is open, ",[15,17033,4662],{}," stays disabled. A draft is still possible. How to prepare the documents is explained in ",[40,17036,4646],{"href":4645},[12,17038,17039],{},[40,17040],{"id":17041},"release",[79,17043,17045],{"id":17044},"how-do-you-create-a-release-copy","How do you create a release copy?",[3139,17047,17048,17053,17059,17070,17085],{},[87,17049,11757,17050,17052],{},[15,17051,4665],{}," area in the studio and save the project.",[87,17054,17055,17056,17058],{},"Check the document with ",[15,17057,8062],{}," and, where offered, choose format and options.",[87,17060,7944,17061,17063,17064,17067,17068,56],{},[15,17062,4662],{}," on the document card. For the dossier, the same button sits in the ",[15,17065,17066],{},"Dossier overview"," side panel, below ",[15,17069,16953],{},[87,17071,17072,17073,17076,17077,17080,17081,17084],{},"If the document has warnings, the dialog ",[15,17074,17075],{},"Confirm warnings for this release"," opens. Read the list. ",[15,17078,17079],{},"Confirm warnings and archive"," continues, ",[15,17082,17083],{},"Cancel"," stops.",[87,17086,17087,17088,56],{},"PlanElec generates the PDF, archives it and downloads the archived file. The step succeeded when the message \"Archive version … was created and downloaded.\" appears and the new version is listed in the ",[15,17089,17090],{},"Document archive",[12,17092,17093,17094,17096],{},"The confirmed warnings remain part of the archived release evidence. Confirmation applies only to the current revision and the selected output. The ",[15,17095,16886],{}," always carries such a warning: it contains model quantities and is not an approved procurement list.",[12,17098,17099,17100,17102],{},"If the self-check is switched off for the project, the dialog groups the findings into one line, for example \"3 check findings not assessed (self-check off)\". The ",[15,17101,16867],{}," cannot be released in that case.",[12,17104,17105],{},"If you change the project or the export selection during preparation, PlanElec stops. Start the export again afterwards; this keeps every archive version tied to a saved project state.",[12,17107,17108],{},[40,17109],{"id":17110},"sealing",[79,17112,17114],{"id":17113},"what-happens-to-the-pdf-when-it-is-archived","What happens to the PDF when it is archived?",[84,17116,17117,17123,17129,17135],{},[87,17118,17119,17122],{},[15,17120,17121],{},"Its own document ID:"," the server assigns a random UUID and stores the file in private project storage. It can only be retrieved with project access or with the access key from the QR code.",[87,17124,17125,17128],{},[15,17126,17127],{},"QR code on every page:"," each page gets a QR code in a white box at the bottom right, next to \"PlanElec\" and the first eight characters of the document ID.",[87,17130,17131,17134],{},[15,17132,17133],{},"SHA-256 hash:"," after adding the QR codes, the server computes the SHA-256 hash of the finished file and stores it. The file you download is exactly that file.",[87,17136,17137,17140],{},[15,17138,17139],{},"No active content:"," form fields, annotations, links and automatic actions are removed from the PDF.",[12,17142,17143,17144,56],{},"The archive accepts PDFs up to 20 MB and up to 200 pages. An archived version never changes. After a project change you create a new version; the old one remains as ",[15,17145,17146],{},"Superseded",[12,17148,17149],{},[40,17150],{"id":10318},[79,17152,17154],{"id":17153},"where-do-you-find-the-version-history","Where do you find the version history?",[12,17156,17157,17158,17160,17161,17163,17164,17167,17168,17171],{},"Below the documents in ",[15,17159,4665],{}," you find the ",[15,17162,17090],{}," section, titled ",[15,17165,17166],{},"Versioned PDF outputs",". Each row shows document type, version number (for example v2), status, time of creation, page count and the first twelve characters of the hash. ",[15,17169,17170],{},"Refresh"," reloads the list.",[138,17173,17174,17183],{},[141,17175,17176],{},[144,17177,17178,17181],{},[147,17179,17180],{},"Label",[147,17182,2314],{},[163,17184,17185,17195,17204,17214,17224],{},[144,17186,17187,17192],{},[168,17188,17189],{},[15,17190,17191],{},"Current",[168,17193,17194],{},"Newest version of this document type in the project",[144,17196,17197,17201],{},[168,17198,17199],{},[15,17200,17146],{},[168,17202,17203],{},"A newer version of the same type exists; the file stays available",[144,17205,17206,17211],{},[168,17207,17208],{},[15,17209,17210],{},"Revoked",[168,17212,17213],{},"Public QR access has been switched off",[144,17215,17216,17221],{},[168,17217,17218],{},[15,17219,17220],{},"Release copy",[168,17222,17223],{},"Created with stored release evidence (revision, confirmed warnings)",[144,17225,17226,17231],{},[168,17227,17228],{},[15,17229,17230],{},"Existing archive without release evidence",[168,17232,17233],{},"Older archive version from before release evidence was recorded",[12,17235,17236,17237,1774,17239,3157,17241,17244],{},"Each row offers ",[15,17238,8065],{},[15,17240,4669],{},[15,17242,17243],{},"Sticker PNG",". All project members, viewers included, can download these files.",[12,17246,17247],{},[40,17248],{"id":17249},"sticker",[79,17251,17253],{"id":17252},"how-do-you-print-the-qr-sticker","How do you print the QR sticker?",[3139,17255,17256,17261,17269],{},[87,17257,3370,17258,17260],{},[15,17259,17090],{},", pick the version you need.",[87,17262,7944,17263,17265,17266,17268],{},[15,17264,4669],{}," for a 40 × 40 mm label with \"PlanElec.be\", the QR code, the version number and a short ID. ",[15,17267,17243],{}," provides only the QR code as a 472 × 472 pixel image, which equals 40 mm at 300 dpi.",[87,17270,17271],{},"Print the label at actual size and scan it once as a check before sticking it on.",[12,17273,17274],{},"The sticker points to exactly this archive version. After a new release, print a new sticker as well. For a revoked version PlanElec no longer provides a sticker.",[12,17276,17277],{},[40,17278],{"id":17279},"verify",[79,17281,17283],{"id":17282},"what-does-the-verification-page-show-after-scanning","What does the verification page show after scanning?",[12,17285,17286,17287,17289,17290,17293],{},"The QR code opens the ",[15,17288,16810],{}," page at ",[25,17291,17292],{},"planelec.be\u002Fverify\u002F\u003Cdocument ID>",". It is reachable without signing in and is not indexed by search engines.",[138,17295,17296,17304],{},[141,17297,17298],{},[144,17299,17300,17302],{},[147,17301,5163],{},[147,17303,3727],{},[163,17305,17306,17325,17332,17340,17348],{},[144,17307,17308,17310],{},[168,17309,9703],{},[168,17311,17312,1774,17315,17318,17319,3324,17322],{},[15,17313,17314],{},"Current archive version",[15,17316,17317],{},"Superseded by a newer version"," (with the number of the newer version), ",[15,17320,17321],{},"Public access revoked",[15,17323,17324],{},"Document deleted",[144,17326,17327,17329],{},[168,17328,12220],{},[168,17330,17331],{},"Document type, for example single-line diagram",[144,17333,17334,17337],{},[168,17335,17336],{},"Version, pages, date",[168,17338,17339],{},"Version number, page count and time of archiving",[144,17341,17342,17345],{},[168,17343,17344],{},"SHA-256",[168,17346,17347],{},"Full hash of the archived file",[144,17349,17350,17353],{},[168,17351,17352],{},"Document ID",[168,17354,17355],{},"Full UUID",[12,17357,17358,17359,17362,17363,17366],{},"Project name, customer and address do not appear on the verification page. You open the content with ",[15,17360,17361],{},"Open archived PDF",". This only works if the link from the QR code is complete: it carries an access key after ",[25,17364,17365],{},"#access=",". The page removes that key from the address bar once loaded. If the key is missing, the page reports \"This link contains no access permission. Scan the complete QR code again.\" Before delivering the file, the server compares the hash of the stored file with the archive hash and delivers nothing if they differ.",[12,17368,17369],{},"Anyone holding the QR code can open the PDF. Treat printouts and stickers like the document itself.",[12,17371,17372],{},[40,17373],{"id":17374},"hash",[79,17376,17378],{"id":17377},"how-do-you-check-a-pdf-against-the-hash-yourself","How do you check a PDF against the hash yourself?",[12,17380,17381],{},"Compute the SHA-256 hash of the file you received and compare it with the value on the verification page:",[84,17383,17384,17390,17396],{},[87,17385,17386,17387],{},"macOS: ",[25,17388,17389],{},"shasum -a 256 file.pdf",[87,17391,17392,17393],{},"Windows (PowerShell): ",[25,17394,17395],{},"Get-FileHash file.pdf -Algorithm SHA256",[87,17397,17398,17399],{},"Linux: ",[25,17400,17401],{},"sha256sum file.pdf",[12,17403,17404],{},"If both values match, the file is identical to the archive version. The file name does not matter. A different value appears as soon as the PDF has been re-saved, signed afterwards, annotated or scanned. A printout cannot be checked by hash; use the QR code and open the archived PDF instead.",[12,17406,17407],{},[40,17408],{"id":17409},"revoke",[79,17411,17413],{"id":17412},"how-do-you-revoke-qr-access","How do you revoke QR access?",[3139,17415,17416,17431,17440],{},[87,17417,3370,17418,17420,17421,17424,17425,17427,17428,17430],{},[15,17419,17090],{},", find the version concerned and click ",[15,17422,17423],{},"Revoke QR",". Only the ",[15,17426,4322],{}," and an ",[15,17429,16988],{}," see this button.",[87,17432,17433,17434,8020,17437,56],{},"Confirm in the dialog ",[15,17435,17436],{},"Revoke public QR access?",[15,17438,17439],{},"Revoke access",[87,17441,17442,17443,17445],{},"The row then shows ",[15,17444,17210],{}," and the message \"Public QR access has been revoked.\" appears.",[12,17447,17448,17449,17451,17452,17455],{},"Printed QR codes for this version no longer open the PDF; the verification page shows ",[15,17450,17321],{},". Project members keep their access through the archive. ",[15,17453,17454],{},"Revocation cannot be undone."," If you need a valid QR code again, create a new release copy.",[12,17457,17458],{},[40,17459],{"id":9836},[79,17461,17463],{"id":17462},"what-does-the-verification-confirm-and-what-not","What does the verification confirm, and what not?",[138,17465,17466,17476],{},[141,17467,17468],{},[144,17469,17470,17473],{},[147,17471,17472],{},"The verification page confirms",[147,17474,17475],{},"The verification page does not confirm",[163,17477,17478,17486,17494,17502],{},[144,17479,17480,17483],{},[168,17481,17482],{},"The file was archived under this ID in a PlanElec project",[168,17484,17485],{},"That the installation complies with AREI\u002FRGIE or passed an inspection",[144,17487,17488,17491],{},[168,17489,17490],{},"The stored file has exactly the SHA-256 hash shown",[168,17492,17493],{},"A conformity statement or the opinion of an accredited inspection body",[144,17495,17496,17499],{},[168,17497,17498],{},"Whether this version is current, superseded, revoked or deleted",[168,17500,17501],{},"An electronic signature or the identity of a signatory",[144,17503,17504,17507],{},[168,17505,17506],{},"When the version was archived and how many pages it has",[168,17508,17509],{},"That the design is technically correct or was built that way on site",[12,17511,17512,17513,17515,17516,17518],{},"Even when archived, the ",[15,17514,16867],{}," remains a software-based self-check of the supported rules. Its coverage is described in ",[40,17517,1086],{"href":1085},". The official assessment of the installation is made by an accredited inspection body.",[12,17520,17521],{},[40,17522],{"id":17523},"messages",[79,17525,17527],{"id":17526},"which-messages-can-appear-while-archiving","Which messages can appear while archiving?",[138,17529,17530,17539],{},[141,17531,17532],{},[144,17533,17534,17537],{},[147,17535,17536],{},"Message",[147,17538,10804],{},[163,17540,17541,17549,17557,17565,17573],{},[144,17542,17543,17546],{},[168,17544,17545],{},"\"This output still requires corrections.\"",[168,17547,17548],{},"Resolve the open corrections on the document card",[144,17550,17551,17554],{},[168,17552,17553],{},"\"The project has not been fully saved yet. …\"",[168,17555,17556],{},"Resolve the save error, then start the export again",[144,17558,17559,17562],{},[168,17560,17561],{},"\"The project or export selection changed during preparation. …\"",[168,17563,17564],{},"Start the export again without editing in the meantime",[144,17566,17567,17570],{},[168,17568,17569],{},"\"This version is incomplete and cannot be archived. …\"",[168,17571,17572],{},"The values are hidden; this version stays a draft",[144,17574,17575,17578],{},[168,17576,17577],{},"\"The archive could not be loaded. Please retry.\"",[168,17579,15424,17580,17582],{},[15,17581,17170],{}," in the document archive",[12,17584,17585,17586,17588,17589,56],{},"Back to ",[40,17587,4646],{"href":4645}," or to the ",[40,17590,17592],{"href":17591},"\u002Fen\u002Fhelp","knowledge base",{"title":2044,"searchDepth":2045,"depth":2045,"links":17594},[17595,17596,17597,17598,17599,17600,17601,17602,17603,17604,17605],{"id":16819,"depth":2045,"text":16820},{"id":16962,"depth":2045,"text":16963},{"id":17044,"depth":2045,"text":17045},{"id":17113,"depth":2045,"text":17114},{"id":17153,"depth":2045,"text":17154},{"id":17252,"depth":2045,"text":17253},{"id":17282,"depth":2045,"text":17283},{"id":17377,"depth":2045,"text":17378},{"id":17412,"depth":2045,"text":17413},{"id":17462,"depth":2045,"text":17463},{"id":17526,"depth":2045,"text":17527},"exports","In Export you create a release copy: PlanElec archives the PDF unchanged with its own ID, QR code and SHA-256 hash. The verification page confirms origin and file integrity, not an AREI\u002FRGIE inspection or a signature.","document-archive-verification","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fdocument-archive-verification.webp",{},15,"\u002Fhelp\u002Fdocument-archive-verification.en",{"title":16798,"description":17607},"archive-and-verify-documents","help\u002Fdocument-archive-verification.en",[17617,17618,17619,17344,17620,17621],"document archive","release copy","QR code","versioning","verification","traY_rvz2jYxCWkLUOcgWUpPHTTohlhva2gwzBpih9I","\u002Fhelp\u002Farchive-and-verify-documents",[],{"id":17626,"title":17627,"body":17628,"category":3575,"description":18644,"extension":2113,"guideId":18645,"image":18646,"locale":2119,"meta":18647,"navigation":2121,"order":18648,"path":18649,"publishedAt":16783,"readTime":15114,"seo":18650,"seoTitle":10313,"slug":18651,"stem":18652,"tags":18653,"updatedAt":16792,"__hash__":18659,"kind":3594,"href":18660,"date":16783,"labels":18661},"help\u002Fhelp\u002Fpv-planning.en.md","How do you plan a PV system in PlanElec?",{"type":9,"value":17629,"toc":18632},[17630,17640,17645,17649,17771,17774,17779,17783,17850,17853,17858,17862,17925,17931,18020,18027,18033,18038,18042,18049,18072,18075,18121,18126,18130,18141,18225,18232,18235,18253,18258,18262,18327,18330,18404,18407,18434,18437,18442,18446,18479,18482,18487,18491,18498,18509,18515,18520,18524,18532,18553,18557,18561,18622],[12,17631,17632,17633,17635,17636,17639],{},"In PlanElec you plan a PV system in the studio's ",[15,17634,15885],{}," mode: you lay out module arrays on the roof surfaces in the 3D view, add an inverter in the ",[15,17637,17638],{},"PV system"," panel and assign the modules as strings to its MPPT inputs. You need a floor plan with a roof and an installation with at least one protective device the inverter can connect to. The result is a documented PV generator in the single-line diagram, one string symbol per string on the situation plan, a PVGIS-based yield forecast and a PV planning register in the self-check report. The string check compares the module and inverter data you document; structural design, shading by surrounding objects and testing of the installed system stay outside PlanElec. The official conformity inspection in Belgium (AREI in Dutch and German, RGIE in French) is carried out by an approved inspection body.",[12,17641,17642],{},[40,17643],{"id":17644},"overview",[79,17646,17648],{"id":17647},"which-steps-make-up-a-pv-design","Which steps make up a PV design?",[138,17650,17651,17663],{},[141,17652,17653],{},[144,17654,17655,17658,17661],{},[147,17656,17657],{},"Step",[147,17659,17660],{},"Where in PlanElec",[147,17662,9095],{},[163,17664,17665,17682,17698,17714,17731,17745,17760],{},[144,17666,17667,17670,17679],{},[168,17668,17669],{},"Roof and module arrays",[168,17671,17672,17674,17675,17678],{},[15,17673,15885],{}," mode, 3D view, ",[15,17676,17677],{},"PV modules"," bar",[168,17680,17681],{},"Arrays with module type, orientation and mounting",[144,17683,17684,17687,17695],{},[168,17685,17686],{},"Inverter and MPPTs",[168,17688,17689,17691,17692],{},[15,17690,17638],{}," panel → ",[15,17693,17694],{},"Add inverter",[168,17696,17697],{},"Inverter on its own circuit, with MPPT inputs",[144,17699,17700,17703,17711],{},[168,17701,17702],{},"Build strings",[168,17704,17705,3324,17708],{},[15,17706,17707],{},"Assign strings",[15,17709,17710],{},"Distribute automatically",[168,17712,17713],{},"Strings per MPPT, with live limit checks",[144,17715,17716,17719,17728],{},[168,17717,17718],{},"String on the situation plan",[168,17720,17721,17722,5259,17725],{},"Device palette ",[15,17723,17724],{},"Generation",[15,17726,17727],{},"Solar panel \u002F PV module",[168,17729,17730],{},"Exactly one symbol per string, linked to the inverter",[144,17732,17733,17736,17742],{},[168,17734,17735],{},"PV side of the single-line diagram",[168,17737,17738,17739,17741],{},"Select the inverter in the ",[15,17740,3926],{},", inspector",[168,17743,17744],{},"DC protection, AC isolation point, cable runs and frame PE",[144,17746,17747,17750,17757],{},[168,17748,17749],{},"Yield forecast",[168,17751,17752,17691,17754],{},[15,17753,17638],{},[15,17755,17756],{},"PV yield forecast",[168,17758,17759],{},"Annual and monthly yield, P50\u002FP90, loss chain, report",[144,17761,17762,17764,17768],{},[168,17763,13441],{},[168,17765,17766],{},[15,17767,4665],{},[168,17769,17770],{},"Self-check report with PV register, PV yield report, material list (pilot)",[12,17772,17773],{},"The order is a suggestion. You can also create the inverter in the single-line diagram first and lay out the roof later.",[12,17775,17776],{},[40,17777],{"id":17778},"roof-fields",[79,17780,17782],{"id":17781},"how-do-you-lay-out-module-arrays-on-the-roof","How do you lay out module arrays on the roof?",[3139,17784,17785,17794,17819,17839],{},[87,17786,4055,17787,17789,17790,17793],{},[15,17788,15885],{}," mode in the studio. The 3D view shows the whole building including its roof. PlanElec derives the roof surfaces from the floor plan; in the roof bar you choose the ",[15,17791,17792],{},"Roof shape"," and pitch.",[87,17795,3370,17796,17798,17799,17802,17803,17806,17807,17810,17811,17814,17815,17818],{},[15,17797,17677],{}," bar, pick a placement tool: ",[15,17800,17801],{},"Single module"," (one click), ",[15,17804,17805],{},"Row"," (drag a line), ",[15,17808,17809],{},"Array"," (drag a rectangle) or ",[15,17812,17813],{},"Entire roof surface"," (click a roof surface to fill it completely). With the ",[15,17816,17817],{},"Best layout"," toggle, a click on the surface opens the best format variants.",[87,17820,17821,17822,17825,17826,1774,17829,3324,17832,17835,17836,17838],{},"Set the defaults for new arrays first: portrait or landscape and, on flat roofs, ",[15,17823,17824],{},"Flat roof mounting"," (",[15,17827,17828],{},"Flat (0°)",[15,17830,17831],{},"South-facing racks",[15,17833,17834],{},"East-west",") with ",[15,17837,16140],{},". On pitched roofs the modules lie parallel to the roof.",[87,17840,17841,17842,17845,17846,17849],{},"Click an array with ",[15,17843,17844],{},"Select",". In the array menu, choose the ",[15,17847,17848],{},"Module type"," from the catalogue; its power and dimensions feed into string design and the yield forecast. Dragging moves the array, the handles resize it on the module grid and Delete removes it.",[12,17851,17852],{},"Success check: the bar shows the total module count and installed power in kWp. Every array operation is a single undo step. In the yield forecast, arrays without a module type are calculated with a standard module; assumed dimensions are flagged there.",[12,17854,17855],{},[40,17856],{"id":17857},"inverter-strings",[79,17859,17861],{"id":17860},"how-do-you-create-the-inverter-mppts-and-strings","How do you create the inverter, MPPTs and strings?",[3139,17863,17864,17873,17899,17906,17918],{},[87,17865,3361,17866,16218,17868,17870,17871,56],{},[15,17867,15885],{},[15,17869,17638],{}," panel and click ",[15,17872,17694],{},[87,17874,17875,17876,17879,17880,17883,17884,17887,17888,17891,17892,17895,17896,56],{},"In the dialog, search under ",[15,17877,17878],{},"Verified catalog"," or in the ",[15,17881,17882],{},"Synergrid list (all homologated inverters)"," and take over the device with ",[15,17885,17886],{},"Add to project",". If your model is not listed, choose ",[15,17889,17890],{},"Create without catalogue",". Missing manufacturer values stay empty and are never invented; add voltage limits under ",[15,17893,17894],{},"Device data"," and current limits per MPPT under ",[15,17897,17898],{},"Edit limits",[87,17900,17901,17902,17905],{},"PlanElec connects the inverter to a dedicated PV circuit. An existing circuit breaker already used for a generator is reused. Otherwise a new ",[15,17903,17904],{},"MCB PV inverter"," (default C 25 A, 2-pole) is created under the first residual current device. Adjust its rating to your inverter's rated AC current. If there is no protective device at all, PlanElec tells you to create a distribution board with a circuit breaker first.",[87,17907,17908,17909,17912,17913,3116,17915,17917],{},"In an MPPT section, click ",[15,17910,17911],{},"Assign modules",", or ",[15,17914,17707],{},[15,17916,17677],{}," bar. A banner shows the MPPT, the allowed string length and the keys.",[87,17919,17920,17921,17924],{},"Click the modules in chain order. The array chip adds all free modules of an array in serpentine order. ",[15,17922,17923],{},"Enter"," creates the string, Shift+Enter creates a parallel string on the same MPPT, Esc discards the draft and Backspace removes the last module.",[12,17926,17927,17928,17930],{},"Alternatively, ",[15,17929,17710],{}," assigns all free modules in one step. The summary lists the strings created per array and MPPT and the reasons any modules were left over, for example a module current that is too high for an MPPT.",[138,17932,17933,17945],{},[141,17934,17935],{},[144,17936,17937,17940,17943],{},[147,17938,17939],{},"Check during assignment",[147,17941,17942],{},"Basis",[147,17944,3293],{},[163,17946,17947,17958,17968,17978,17988,17999,18009],{},[144,17948,17949,17952,17955],{},[168,17950,17951],{},"Voc cold at −10 °C",[168,17953,17954],{},"inverter max. DC voltage, module system voltage",[168,17956,17957],{},"Error, blocks Enter",[144,17959,17960,17963,17966],{},[168,17961,17962],{},"Vmpp hot at +70 °C",[168,17964,17965],{},"MPPT minimum",[168,17967,17957],{},[144,17969,17970,17973,17976],{},[168,17971,17972],{},"Σ Imp, Σ Isc of parallel strings",[168,17974,17975],{},"MPPT current limits",[168,17977,17957],{},[144,17979,17980,17983,17986],{},[168,17981,17982],{},"number of parallel strings",[168,17984,17985],{},"MPPT max. parallel strings",[168,17987,17957],{},[144,17989,17990,17993,17996],{},[168,17991,17992],{},"Vmpp cold, start voltage",[168,17994,17995],{},"MPPT maximum, start voltage",[168,17997,17998],{},"Warning",[144,18000,18001,18004,18007],{},[168,18002,18003],{},"mixed roof surfaces, orientations, lengths",[168,18005,18006],{},"strings on the same MPPT",[168,18008,17998],{},[144,18010,18011,18014,18017],{},[168,18012,18013],{},"missing ratings",[168,18015,18016],{},"module or inverter data",[168,18018,18019],{},"Note “check incomplete”",[12,18021,18022,18023,18026],{},"You can deliberately create a blocked string with ",[15,18024,18025],{},"Create anyway"," (Ctrl\u002F⌘+Enter); the finding remains. If the draft is too long, the banner proposes an even split across several strings. For microinverters and optimisers the check reports \"not applicable\", because the manufacturer's rules apply there.",[12,18028,4361,18029,18032],{},[15,18030,18031],{},"Conflicts"," section counts modules without a string, missing module references, strings spanning several roof surfaces and strings mixing module types. PlanElec does not silently repair these conflicts: you adjust the string deliberately or redistribute.",[12,18034,18035],{},[40,18036],{"id":18037},"situation-plan",[79,18039,18041],{"id":18040},"how-does-a-string-appear-on-the-situation-plan","How does a string appear on the situation plan?",[12,18043,18044,18045,18048],{},"On the situation plan, a module symbol stands for ",[15,18046,18047],{},"one complete string",", not a single module. Every string of an inverter needs exactly one such symbol.",[3139,18050,18051,18062,18069],{},[87,18052,16083,18053,18055,18056,18058,18059,18061],{},[15,18054,16030],{}," mode and choose ",[15,18057,17727],{}," from the device palette under ",[15,18060,17724],{},". Place it where the array sits on the plan.",[87,18063,18064,18065,18068],{},"Select the symbol. In its toolbar, open ",[15,18066,18067],{},"Select PV string"," and pick the entry \"inverter · string\".",[87,18070,18071],{},"Repeat for each string. If no strings exist yet, the toolbar asks you to add an inverter with PV strings first.",[12,18073,18074],{},"The symbol then carries a label with the string, module count, module power and kWp. The self-check reports every mismatch:",[138,18076,18077,18088],{},[141,18078,18079],{},[144,18080,18081,18083,18086],{},[147,18082,17536],{},[147,18084,18085],{},"Cause",[147,18087,2176],{},[163,18089,18090,18101,18111],{},[144,18091,18092,18095,18098],{},[168,18093,18094],{},"\"… is missing from the situation plan\"",[168,18096,18097],{},"a documented string has no symbol",[168,18099,18100],{},"Info, input missing",[144,18102,18103,18106,18109],{},[168,18104,18105],{},"\"… is assigned n times in the situation plan\"",[168,18107,18108],{},"several symbols point to the same string",[168,18110,17998],{},[144,18112,18113,18116,18119],{},[168,18114,18115],{},"\"PV symbol without a valid string assignment\"",[168,18117,18118],{},"the symbol has no string, or one that no longer exists",[168,18120,18100],{},[12,18122,18123],{},[40,18124],{"id":18125},"single-line",[79,18127,18129],{"id":18128},"what-does-the-pv-side-of-the-single-line-diagram-show","What does the PV side of the single-line diagram show?",[12,18131,17738,18132,18134,18135,5259,18137,18140],{},[15,18133,3926],{},". You can also create an inverter there via the palette group ",[15,18136,17724],{},[15,18138,18139],{},"PV inverter",". The inspector groups the PV data in five sections:",[138,18142,18143,18153],{},[141,18144,18145],{},[144,18146,18147,18150],{},[147,18148,18149],{},"Inspector section",[147,18151,18152],{},"What you document",[163,18154,18155,18175,18185,18195,18215],{},[144,18156,18157,18162],{},[168,18158,18159],{},[15,18160,18161],{},"Inverter and AC connection",[168,18163,18164,18165,1774,18168,18171,18172],{},"manufacturer, type, ",[15,18166,18167],{},"Serial number",[15,18169,18170],{},"Nominal AC power (kW)",", voltage limits, operating mode, battery interface, AC phases, ",[15,18173,18174],{},"AC protective conductor (mm²)",[144,18176,18177,18182],{},[168,18178,18179],{},[15,18180,18181],{},"Common DC protection",[168,18183,18184],{},"common DC isolator and common type 2 DC surge protector, each with its installation status",[144,18186,18187,18192],{},[168,18188,18189],{},[15,18190,18191],{},"Module types",[168,18193,18194],{},"module data from the catalogue or your own input",[144,18196,18197,18202],{},[168,18198,18199],{},[15,18200,18201],{},"MPPTs and strings",[168,18203,18204,18207,18208,1774,18211,18214],{},[15,18205,18206],{},"String combining method"," (direct, Y branch, combiner), ",[15,18209,18210],{},"String fuse",[15,18212,18213],{},"DC cable run"," with route segments",[144,18216,18217,18222],{},[168,18218,18219],{},[15,18220,18221],{},"Module-frame and mounting-system PE",[168,18223,18224],{},"bonding groups with manufacturer requirement, cross-section, mechanical protection and length",[12,18226,18227,18228,18231],{},"From this the diagram shows single and parallel strings per MPPT, the Y branch or combiner, protective devices with their status, the ",[15,18229,18230],{},"AC isolation point",", the documented cable segments and the separate frame PE down to the earthing connection. Strings without an MPPT appear under \"Unassigned DC strings (open)\". Missing manufacturer limits stay visible and are not filled in.",[12,18233,18234],{},"For the frame PE, AREI 7.112.2 requires earthing of the modules' metal frames and their structures, unless the manufacturer prohibits it, with a protective conductor at least as large as the AC protective conductor and no smaller than 2.5 mm² with mechanical protection or 4 mm² without. The self-check compares your cross-section with that minimum. If you select \"Prohibited by manufacturer\", it expects a reference as evidence.",[12,18236,18237,18240,18241,18244,18245,18248,18249,18252],{},[15,18238,18239],{},"Deriving DC lengths:"," in the 3D view, place a ",[15,18242,18243],{},"Roof penetration"," anchor on the roof and assign it in the string row under ",[15,18246,18247],{},"Penetration",". PlanElec then derives three segments: across the roof to the penetration, vertically through the ceiling and through the building to the inverter. A typed length takes priority; ",[15,18250,18251],{},"Restore derived value"," returns to the geometry. If a segment is missing, the total length stays unknown rather than zero. The building segment is a direct connection; a custom route cannot be drawn for it yet.",[12,18254,18255],{},[40,18256],{"id":18257},"yield",[79,18259,18261],{"id":18260},"how-do-you-calculate-the-yield-forecast","How do you calculate the yield forecast?",[3139,18263,18264,18275,18309,18319],{},[87,18265,3370,18266,18268,18269,18271,18272,18274],{},[15,18267,17638],{}," panel, expand the ",[15,18270,17756],{}," and open the ",[15,18273,7304],{}," tab.",[87,18276,15424,18277,18280,18281,18284,18285,18288,18289,18291,18292,18294,18295,18298,18299,15784,18302,18304,18305],{},[15,18278,18279],{},"Set site",". PlanElec takes the installation address from the project metadata and searches Belgian addresses. Then set the north direction: in the ",[15,18282,18283],{},"Roof & modules"," step, ",[15,18286,18287],{},"North direction"," opens the ",[15,18290,16348],{}," dialog. Rotate the house to match the map and choose ",[15,18293,3342],{},"; the line then shows ",[15,18296,18297],{},"confirmed",". Without a site and a confirmed north direction the forecast does not run, and the result reports, for example, ",[15,18300,18301],{},"North direction missing",[15,18303,16348],{}," button. The north direction confirmed here applies to the forecast and starts from the project value, see ",[40,18306,18308],{"href":18307},"\u002Fen\u002Fhelp\u002Falign-floors-and-building-origin#north","How do I set north?",[87,18310,18311,18312,8194,18315,18318],{},"Review the ",[15,18313,18314],{},"Assumptions",[15,18316,18317],{},"System losses (%)"," (14 % by default), module technology, mounting, horizon (PVGIS terrain model or none) and radiation database.",[87,18320,7944,18321,7709,18324,18326],{},[15,18322,18323],{},"Calculate",[15,18325,9095],{}," tab shows annual yield, power, specific yield in kWh\u002FkWp and the monthly chart.",[12,18328,18329],{},"The calculation uses PVGIS 5.3 from the EU Joint Research Centre, per orientation group. Only coordinates and physical parameters are sent, never project or customer names.",[138,18331,18332,18342],{},[141,18333,18334],{},[144,18335,18336,18339],{},[147,18337,18338],{},"Result figure",[147,18340,18341],{},"What lies behind it",[163,18343,18344,18354,18364,18374,18384,18394],{},[144,18345,18346,18351],{},[168,18347,18348],{},[15,18349,18350],{},"P50 (median)",[168,18352,18353],{},"median of the annual yields from the individual years of the PVGIS database",[144,18355,18356,18361],{},[168,18357,18358],{},[15,18359,18360],{},"P90 (reached in 9 of 10 years)",[168,18362,18363],{},"10th percentile of the same years; with about 19 years, an estimate from a small sample",[144,18365,18366,18371],{},[168,18367,18368],{},[15,18369,18370],{},"Yield with flat loss",[168,18372,18373],{},"yield with the flat system loss",[144,18375,18376,18381],{},[168,18377,18378],{},[15,18379,18380],{},"Refined yield",[168,18382,18383],{},"flat loss split up: inverter efficiency curve and DC cabling from your design, other losses as the rest",[144,18385,18386,18391],{},[168,18387,18388],{},[15,18389,18390],{},"Clipping",[168,18392,18393],{},"limitation to rated AC power, per inverter in kWh\u002Fyear, share and hours",[144,18395,18396,18401],{},[168,18397,18398],{},[15,18399,18400],{},"Yield over 25 years",[168,18402,18403],{},"module warranty values, otherwise the flagged assumption of 0.5 % power loss per year",[12,18405,18406],{},"The loss chain needs an inverter with strings. Without rated AC power it calculates without clipping at a constant efficiency. Without a verified efficiency, the flagged 96 % assumption applies. The DC cable loss uses the length, the cross-section from the inspector and the module voltage; if anything is missing, the string uses 2 % and states why. If a battery is documented on the inverter, the clipping figure is an upper bound.",[12,18408,3370,18409,18412,18413,3324,18416,18419,18420,18423,18424,18427,18428,18431,18432,56],{},[15,18410,18411],{},"Variants"," tab you compare other modules with ",[15,18414,18415],{},"Same layout",[15,18417,18418],{},"Same area","; variants change neither the design nor the strings. When you change geometry, site, assumptions or strings, the result is marked ",[15,18421,18422],{},"Result is stale"," and the report stays locked until you recalculate. ",[15,18425,18426],{},"Open report"," creates the ",[15,18429,18430],{},"PV yield report"," from the frozen state; it is also available under ",[15,18433,4665],{},[12,18435,18436],{},"Limits: P50 and P90 describe past weather years, not a yield guarantee. Shading by objects in the scene is not taken into account and there is no financial calculation. A failed orientation group stays visible as a partial result, never as zero yield.",[12,18438,18439],{},[40,18440],{"id":18441},"self-consumption",[79,18443,18445],{"id":18444},"can-you-estimate-self-consumption-battery-storage-and-an-ev","Can you estimate self-consumption, battery storage and an EV?",[12,18447,18448,18449,18452,18453,18455,18456,18459,18460,18463,18464,18466,18467,18470,18471,18474,18475,18478],{},"Yes, as a ",[15,18450,18451],{},"pilot feature"," inside the yield forecast. In the ",[15,18454,7304],{}," tab, enter the annual consumption under ",[15,18457,18458],{},"Electricity consumption"," and choose a profile; under ",[15,18461,18462],{},"Electric vehicle"," you can add one or two vehicles. In the ",[15,18465,9095],{}," tab, ",[15,18468,18469],{},"Calculate self-consumption"," runs a quarter-hourly calculation for a typical year: self-consumption rate, self-sufficiency, grid import and feed-in per month. The ",[15,18472,18473],{},"Battery storage"," section compares the situation without and with the project battery and ranks capacities in the ",[15,18476,18477],{},"Size comparison","; the proposal is based on an assumed threshold.",[12,18480,18481],{},"The profiles are averaged Flemish households (Fluvius, 2024), not your meter; Wallonia and Brussels are assumed to follow the same curve. Peaks are smoothed, so the benefit of a battery may be overestimated. There are no tariffs, no savings or payback calculation, and these figures appear neither in the yield report nor in the dossier.",[12,18483,18484],{},[40,18485],{"id":18486},"self-check-report",[79,18488,18490],{"id":18489},"what-does-the-self-check-report-say-about-pv","What does the self-check report say about PV?",[12,18492,18493,18494,18497],{},"As soon as the project contains an inverter, the AREI\u002FRGIE self-check report adds the section ",[15,18495,18496],{},"PV installation data for inspection",". It is explicitly labelled as a project planning register and is not a report issued by an approved inspection body. For each inverter it lists:",[84,18499,18500,18503,18506],{},[87,18501,18502],{},"name, manufacturer and model,",[87,18504,18505],{},"serial number and maximum AC power,",[87,18507,18508],{},"PV generator with module count, kWp, number of MPPTs and strings.",[12,18510,18511,18512,18514],{},"This gives you the data that AREI 7.112.4 requires in the conformity inspection report for a domestic PV installation. Values you have not entered appear as \"Not provided\". The report also shows the findings of the PV rules, for example on frame PE under AREI 7.112.2 and on string design. Which rules PlanElec evaluates is listed in ",[40,18513,1086],{"href":1085},". If the self-check is switched off for the project, the report is not available.",[12,18516,18517],{},[40,18518],{"id":18519},"material-list",[79,18521,18523],{"id":18522},"what-does-the-material-list-take-from-the-pv-design","What does the material list take from the PV design?",[12,18525,18526,18527,11250,18529,18531],{},"The material list is a ",[15,18528,18451],{},[15,18530,4665],{},". From the PV DC side it only takes structured data: modules with type and count, protective devices explicitly documented as present, and known cable segments. Positive and negative conductors together count twice the route length; an accompanying PE\u002FPA conductor counts once. Integrated protective devices and an AC isolation point provided by the source protective device are not counted twice.",[12,18533,4361,18534,18537,18538,1774,18541,1774,18544,3324,18547,18550,18551,56],{},[15,18535,18536],{},"PV system bill of materials"," in the material overview adds mounting items with the status ",[15,18539,18540],{},"Documented",[15,18542,18543],{},"Assumption",[15,18545,18546],{},"Open",[15,18548,18549],{},"Sized externally",". Open items show a gap instead of zero. The DC count does not add frame PE, connectors, reserves or offcuts. The list is manufacturer-neutral, has no prices and is not an order list; structural design and fixings are sized with the manufacturer's configurator or by a structural engineer. See also ",[40,18552,4646],{"href":4645},[12,18554,18555],{},[40,18556],{"id":3425},[79,18558,18560],{"id":18559},"what-does-planelec-not-cover-for-pv","What does PlanElec not cover for PV?",[138,18562,18563,18572],{},[141,18564,18565],{},[144,18566,18567,18569],{},[147,18568,9856],{},[147,18570,18571],{},"Who or what decides",[163,18573,18574,18582,18590,18598,18606,18614],{},[144,18575,18576,18579],{},[168,18577,18578],{},"structural design, roof hooks, ballast",[168,18580,18581],{},"manufacturer's configurator or structural engineer",[144,18583,18584,18587],{},[168,18585,18586],{},"shading by neighbouring objects",[168,18588,18589],{},"your own assessment; PVGIS only considers the terrain horizon",[144,18591,18592,18595],{},[168,18593,18594],{},"DC conductor roles L+, L-, M, PEM, PEL",[168,18596,18597],{},"not modelled; you check conductor choice and insulation monitoring yourself",[144,18599,18600,18603],{},[168,18601,18602],{},"manufacturer approvals and certificates",[168,18604,18605],{},"the manufacturer's datasheets and documents",[144,18607,18608,18611],{},[168,18609,18610],{},"grid connection and notification",[168,18612,18613],{},"distribution system operator",[144,18615,18616,18619],{},[168,18617,18618],{},"conformity inspection",[168,18620,18621],{},"approved inspection body",[12,18623,18624,18625,18629,18630,56],{},"You plan the inverter circuit like any other circuit: see ",[40,18626,18628],{"href":18627},"\u002Fen\u002Fhelp\u002Fplan-installation-and-distribution-boards","Plan installation and distribution boards",". How to place and connect symbols on the situation plan is explained in ",[40,18631,16745],{"href":16744},{"title":2044,"searchDepth":2045,"depth":2045,"links":18633},[18634,18635,18636,18637,18638,18639,18640,18641,18642,18643],{"id":17647,"depth":2045,"text":17648},{"id":17781,"depth":2045,"text":17782},{"id":17860,"depth":2045,"text":17861},{"id":18040,"depth":2045,"text":18041},{"id":18128,"depth":2045,"text":18129},{"id":18260,"depth":2045,"text":18261},{"id":18444,"depth":2045,"text":18445},{"id":18489,"depth":2045,"text":18490},{"id":18522,"depth":2045,"text":18523},{"id":18559,"depth":2045,"text":18560},"Lay out modules on roof surfaces, assign strings to inverter MPPTs, document the PV side of the single-line diagram and estimate yield with PVGIS, limits included.","pv-planning","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fpv-planning-en.webp",{},14,"\u002Fhelp\u002Fpv-planning.en",{"title":17627,"description":18644},"plan-a-pv-system","help\u002Fpv-planning.en",[18654,18655,18656,18657,18658,5269,2133],"photovoltaics","PV string","inverter","MPPT","yield forecast","kWw0yTP68UoP5_JMdj4Y8nIcPaHL8hheQWhaHSGhc2E","\u002Fhelp\u002Fplan-a-pv-system",[],{"id":18663,"title":18664,"body":18665,"category":8555,"description":19426,"extension":2113,"guideId":19427,"image":19428,"locale":2119,"meta":19429,"navigation":2121,"order":19430,"path":19431,"publishedAt":16783,"readTime":19432,"seo":19433,"seoTitle":19434,"slug":19435,"stem":19436,"tags":19437,"updatedAt":16783,"__hash__":19441,"kind":3594,"href":19442,"date":16783,"labels":19443},"help\u002Fhelp\u002Fcabinet-photo-recognition.en.md","Recognise a distribution board from photos: review and import DIN modules",{"type":9,"value":18666,"toc":19414},[18667,18674,18677,18681,18685,18773,18779,18784,18788,18791,18886,18889,18894,18898,18937,18940,18944,18976,18979,18984,18988,19005,19008,19011,19016,19020,19028,19152,19155,19169,19172,19177,19181,19193,19196,19224,19227,19230,19235,19239,19246,19311,19320,19323,19327,19331,19406],[12,18668,18669,18670,18673],{},"In the cabinet editor, PlanElec reads photos of an existing distribution board and proposes the visible DIN modules: row, starting slot, width in module units (TE), module type and legible values such as rated current or sensitivity. You need a saved project, the project role Owner, Admin or Editor, and an ",[15,18671,18672],{},"empty"," board. You review and correct every proposal before importing it; only then do the modules take their places on the rails. Detection does not infer hidden wiring, circuits or protective relationships – you add that electrical design yourself afterwards.",[12,18675,18676],{},"Photo recognition is meant for existing installations and extensions in Belgium, where you want to capture the installed layout quickly as a starting point. Every run counts towards your daily limit and uses your AI allowance.",[12,18678,18679],{},[40,18680],{"id":9499},[79,18682,18684],{"id":18683},"what-do-you-need-for-photo-recognition","What do you need for photo recognition?",[138,18686,18687,18696],{},[141,18688,18689],{},[144,18690,18691,18693],{},[147,18692,3724],{},[147,18694,18695],{},"What applies",[163,18697,18698,18709,18725,18741,18749,18756,18764],{},[144,18699,18700,18703],{},[168,18701,18702],{},"Project",[168,18704,18705,18706,15788],{},"The project is open and saved. Only then does the cabinet editor show the ",[15,18707,18708],{},"Photos",[144,18710,18711,18714],{},[168,18712,18713],{},"Workspace",[168,18715,18716,18719,18720,3324,18722,56],{},[15,18717,18718],{},"Layout"," in the cabinet editor. The photo panel is not available in ",[15,18721,3119],{},[15,18723,18724],{},"Tables",[144,18726,18727,18729],{},[168,18728,16981],{},[168,18730,18731,1774,18733,3324,18735,18737,18738,18740],{},[15,18732,4322],{},[15,18734,16988],{},[15,18736,4342],{},". With the ",[15,18739,4352],{}," role, uploading, detecting and importing are blocked.",[144,18742,18743,18746],{},[168,18744,18745],{},"Board",[168,18747,18748],{},"A selected, empty board: no placed modules and no devices already assigned to this board.",[144,18750,18751,18753],{},[168,18752,18708],{},[168,18754,18755],{},"JPEG, PNG or WebP, at most six photos per board. Other file formats do not appear in the photo list.",[144,18757,18758,18761],{},[168,18759,18760],{},"Daily limit",[168,18762,18763],{},"20 detection runs per user per day. The counter restarts at midnight UTC (01:00 in Belgium, 02:00 during summer time).",[144,18765,18766,18768],{},[168,18767,14864],{},[168,18769,18770,18771,56],{},"Every run uses your personal AI allowance. You can see how much is left in the user menu under ",[15,18772,14864],{},[12,18774,18775,18776,18778],{},"If the board is not empty, ",[15,18777,14090],{}," stays disabled and the panel shows: “Detection is available for an empty board only.” This also applies when protective devices are already assigned to this board in the installation but not yet placed.",[12,18780,18781],{},[40,18782],{"id":18783},"recognised",[79,18785,18787],{"id":18786},"what-does-planelec-recognise-on-a-distribution-board-photo","What does PlanElec recognise on a distribution board photo?",[12,18789,18790],{},"Detection only describes what is visible and legible on the photos. Illegible or unclear details stay empty instead of being filled with default values.",[138,18792,18793,18803],{},[141,18794,18795],{},[144,18796,18797,18800],{},[147,18798,18799],{},"Item",[147,18801,18802],{},"Result in the proposal",[163,18804,18805,18813,18821,18829,18836,18844,18852,18864,18875],{},[144,18806,18807,18810],{},[168,18808,18809],{},"Visible DIN modules",[168,18811,18812],{},"One frame on the photo and one entry in the review list per module",[144,18814,18815,18818],{},[168,18816,18817],{},"Row and starting slot",[168,18819,18820],{},"Estimated top to bottom and left to right; empty if the position is unclear",[144,18822,18823,18826],{},[168,18824,18825],{},"Width",[168,18827,18828],{},"Approximate width in TE",[144,18830,18831,18833],{},[168,18832,17848],{},[168,18834,18835],{},"One of 17 types, including main switch, RCD, RCBO, AFDD, SPD, fuses, contactors, timers, energy meters and KNX devices",[144,18837,18838,18841],{},[168,18839,18840],{},"Legible values",[168,18842,18843],{},"Current (A), poles, tripping curve (B, C, D, K, Z), sensitivity (mA) and RCD type (A, B, F, AC), only if legible on the photo",[144,18845,18846,18849],{},[168,18847,18848],{},"Marking",[168,18850,18851],{},"The text that was read appears below the module in the review list",[144,18853,18854,18857],{},[168,18855,18856],{},"Illegible module",[168,18858,18859,18860,18863],{},"Type ",[15,18861,18862],{},"Unknown DIN module",", so that position and width are still kept",[144,18865,18866,18869],{},[168,18867,18868],{},"Wiring, circuits, protection path",[168,18870,18871,18874],{},[15,18872,18873],{},"Not detected."," Hidden conductors, bridges and electrical assignments are not inferred",[144,18876,18877,18880],{},[168,18878,18879],{},"Enclosure dimensions and default values",[168,18881,18882,18885],{},[15,18883,18884],{},"Not assumed."," Detection invents neither enclosure sizes nor typical ratings",[12,18887,18888],{},"PlanElec treats any text printed on a photo strictly as image content. It does not steer the detection.",[12,18890,18891],{},[40,18892],{"id":18893},"photos",[79,18895,18897],{"id":18896},"how-do-you-upload-and-link-the-photos","How do you upload and link the photos?",[3139,18899,18900,18912,18922,18931,18934],{},[87,18901,18902,18903,18905,18906,5259,18909,56],{},"In the studio, open ",[15,18904,3115],{}," and use the board selector in the top bar to choose the board you want to capture. If it does not exist yet, create it via ",[15,18907,18908],{},"More cabinet actions",[15,18910,18911],{},"New board",[87,18913,18914,18915,18917,18918,7709,18920,7712],{},"Stay in the ",[15,18916,18718],{}," workspace and click ",[15,18919,18708],{},[15,18921,14086],{},[87,18923,7944,18924,18927,18928,18930],{},[15,18925,18926],{},"Upload photos"," and choose one or more image files. The photos are stored in the project’s ",[15,18929,10173],{}," and linked to this board automatically.",[87,18932,18933],{},"To use photos already in the project, tick the checkbox in front of their name. If the panel says “No matching project photos yet.”, the project does not contain any JPEG, PNG or WebP image yet.",[87,18935,18936],{},"Check the tabs above the preview: every linked photo has its own tab. Clicking a tab shows that photo in the panel.",[12,18938,18939],{},"Success criterion: the photos you want are ticked and appear as tabs. If you try a seventh photo, PlanElec shows “Select at most 6 photos.” and does not link it.",[1041,18941,18943],{"id":18942},"which-photos-help-detection","Which photos help detection?",[84,18945,18946,18952,18961,18967],{},[87,18947,18948,18951],{},[15,18949,18950],{},"One board per run."," All linked photos must show the same board; detection treats them as views of a single cabinet.",[87,18953,18954,18957,18958,56],{},[15,18955,18956],{},"Combine an overview with close-ups."," If several photos show the same module, detection merges those views into one module with several ",[15,18959,18960],{},"photo views",[87,18962,18963,18966],{},[15,18964,18965],{},"Legible markings."," PlanElec only takes over values such as rated current or sensitivity if they are legible on the photo. Anything covered or blurred stays empty.",[87,18968,18969,18972,18973,56],{},[15,18970,18971],{},"Originals are kept."," For the analysis, PlanElec scales each photo down to at most 3200 pixels on its longest side. The original stays in the project files and provides the ",[15,18974,18975],{},"Crop at original resolution",[12,18977,18978],{},"The panel points this out: selected photos are sent to the AI service for analysis. Only link photos you are entitled to use for this purpose.",[12,18980,18981],{},[40,18982],{"id":18983},"recognise",[79,18985,18987],{"id":18986},"how-do-you-start-detection","How do you start detection?",[3139,18989,18990,18993,18998],{},[87,18991,18992],{},"Check that the right board is selected and the matching photos are linked.",[87,18994,7944,18995,18997],{},[15,18996,14090],{},". While the analysis runs, the button reads “Detecting …”.",[87,18999,19000,19001,19004],{},"Wait for the message “Detection ready for review.” Frames now surround the detected modules on the photo, with the ",[15,19002,19003],{},"Review detected modules"," section below.",[12,19006,19007],{},"Every run that reaches the AI service counts towards the daily limit of 20 runs – even if no usable proposal comes back. If your AI allowance is not sufficient, PlanElec says so explicitly, for example “Your remaining AI allowance is insufficient for this analysis.”",[12,19009,19010],{},"If you close the panel before importing, the latest proposal for this board is kept. The next time you open the panel, PlanElec loads it again – in its original form. Corrections you made in the review list without importing them are discarded.",[12,19012,19013],{},[40,19014],{"id":19015},"review",[79,19017,19019],{"id":19018},"how-do-you-review-and-correct-the-proposal","How do you review and correct the proposal?",[12,19021,4361,19022,19024,19025,19027],{},[15,19023,19003],{}," section lists every detected module with its fields. Clicking a frame on the photo selects the matching module; the ",[15,19026,18975],{}," shows it enlarged. This lets you compare marking and values directly with the original.",[138,19029,19030,19040],{},[141,19031,19032],{},[144,19033,19034,19037],{},[147,19035,19036],{},"Field or action",[147,19038,19039],{},"Purpose",[163,19041,19042,19051,19060,19069,19079,19089,19105,19118,19128,19142],{},[144,19043,19044,19048],{},[168,19045,19046],{},[15,19047,17180],{},[168,19049,19050],{},"Name of the module in the board. If left empty, PlanElec uses the module type name",[144,19052,19053,19057],{},[168,19054,19055],{},[15,19056,17848],{},[168,19058,19059],{},"Correct the type, for example when an RCBO was detected as a circuit breaker",[144,19061,19062,19066],{},[168,19063,19064],{},[15,19065,17805],{},[168,19067,19068],{},"DIN rail counted from the top; 1 is the top row",[144,19070,19071,19076],{},[168,19072,19073],{},[15,19074,19075],{},"Slot",[168,19077,19078],{},"Position in TE from the left edge of the row; 0 is the first place, half steps such as 2.5 are allowed",[144,19080,19081,19086],{},[168,19082,19083],{},[15,19084,19085],{},"Width (TE)",[168,19087,19088],{},"Module width in steps of 0.5 TE",[144,19090,19091,19102],{},[168,19092,19093,1774,19096,1774,19099],{},[15,19094,19095],{},"Current (A)",[15,19097,19098],{},"Poles",[15,19100,19101],{},"Sensitivity (mA)",[168,19103,19104],{},"Check, complete or clear the values that were read",[144,19106,19107,19115],{},[168,19108,19109,1774,19112,19114],{},[15,19110,19111],{},"Photo view 1",[15,19113,6407],{}," …",[168,19116,19117],{},"Jumps to the photo that shows the module at that position",[144,19119,19120,19125],{},[168,19121,19122],{},[15,19123,19124],{},"Reject",[168,19126,19127],{},"Removes a wrong entry from the proposal",[144,19129,19130,19139],{},[168,19131,19132,19135,19136],{},[15,19133,19134],{},"Merge into module"," + ",[15,19137,19138],{},"Merge",[168,19140,19141],{},"Combines two entries that show the same physical module on different photos",[144,19143,19144,19149],{},[168,19145,19146],{},[15,19147,19148],{},"Split",[168,19150,19151],{},"Detaches the last photo view as a separate module when two different modules were combined",[12,19153,19154],{},"How to proceed:",[3139,19156,19157,19160,19163,19166],{},[87,19158,19159],{},"Work through the list from top to bottom and compare each module with its frame and crop.",[87,19161,19162],{},"Reject entries that are not modules and merge modules that were detected twice.",[87,19164,19165],{},"Correct type, row, slot and width. If a module lacks a row or slot, the panel shows “Enter a row and starting slot for every module.”",[87,19167,19168],{},"Check the values that were read. PlanElec only takes over the tripping curve and RCD type if they were legible; they cannot be edited as separate fields in the review list.",[12,19170,19171],{},"Success criterion: every remaining module has a row and slot, and no modules overlap within the same row.",[12,19173,19174],{},[40,19175],{"id":19176},"apply",[79,19178,19180],{"id":19179},"what-happens-when-you-click-import-reviewed-modules","What happens when you click “Import reviewed modules”?",[3139,19182,19183,19190],{},[87,19184,19185,19186,19189],{},"Below the review list, click ",[15,19187,19188],{},"Import reviewed modules",". The button is active once at least one module remains, every module has a row and slot, and the board is empty.",[87,19191,19192],{},"PlanElec confirms “Modules imported.” The modules now sit in their places in the board.",[12,19194,19195],{},"On import:",[84,19197,19198,19206,19212,19218],{},[87,19199,19200,38,19203,19205],{},[15,19201,19202],{},"One undo step.",[15,19204,13947],{}," reverses the whole import at once.",[87,19207,19208,19211],{},[15,19209,19210],{},"Rows are added, not replaced."," If the board has fewer rows than were detected, PlanElec creates the missing ones. Existing rows, including ones you named yourself, are kept.",[87,19213,19214,19217],{},[15,19215,19216],{},"Row width grows as needed."," If a row is too short, PlanElec widens the rows to the widest imported layout. A row cannot exceed 72 TE.",[87,19219,19220,19223],{},[15,19221,19222],{},"Photos stay linked."," Every imported module keeps its photo views as evidence.",[12,19225,19226],{},"If “Could not import modules.” appears, two modules usually overlap in the same row, a module extends beyond 72 TE, or the board is no longer empty. Correct the values and try again.",[12,19228,19229],{},"You start the import yourself in the panel. The PlanElec assistant can neither link photos nor import a photo proposal, because this step requires a visual check in the editor.",[12,19231,19232],{},[40,19233],{"id":19234},"next-steps",[79,19236,19238],{"id":19237},"what-comes-after-the-import","What comes after the import?",[12,19240,19241,19242,19245],{},"The imported modules represent the board’s ",[15,19243,19244],{},"physical as-found state",". They show the values that were read, for example “C16”, but are not yet integrated electrically: they have no connection terminals, no circuit and no protection path.",[138,19247,19248,19257],{},[141,19249,19250],{},[144,19251,19252,19255],{},[147,19253,19254],{},"Next step",[147,19256,3913],{},[163,19258,19259,19273,19287,19300],{},[144,19260,19261,19264],{},[168,19262,19263],{},"Re-check a module against the photo",[168,19265,19266,19267,19269,19270,19272],{},"Keep the ",[15,19268,14086],{}," panel open and hover over an imported module in ",[15,19271,18718],{},": the panel shows its photo crop",[144,19274,19275,19278],{},[168,19276,19277],{},"Define circuits and protection paths",[168,19279,19280,19282,19283],{},[15,19281,5104],{}," area; see ",[40,19284,19286],{"href":19285},"\u002Fen\u002Fhelp\u002Fplan-installation-and-distribution-boards#assignment","Plan an installation and form distribution boards",[144,19288,19289,19292],{},[168,19290,19291],{},"Check row layout and enclosure",[168,19293,19294,19296,19297],{},[15,19295,18718],{}," workspace; see ",[40,19298,19299],{"href":3473},"Detail modules and enclosure",[144,19301,19302,19305],{},[168,19303,19304],{},"Rebuild automatically",[168,19306,19307,19310],{},[15,19308,19309],{},"Auto-Assign"," rebuilds the board completely after a confirmation, replacing the photographed arrangement",[12,19312,19313,19314,19316,19317,56],{},"To keep the photographed arrangement, do not use ",[15,19315,19309],{}," on this board. How Auto-Assign works is described in ",[40,19318,19319],{"href":14100},"Using and reviewing automatic planning",[12,19321,19322],{},"An imported as-found state is a planning state, not a survey with measurements. What sits behind covers, where conductors run and whether protective devices are correctly rated are checked on site. The official AREI\u002FRGIE inspection (keuring) is carried out by the accredited inspection body.",[12,19324,19325],{},[40,19326],{"id":3425},[79,19328,19330],{"id":19329},"which-messages-and-limits-apply","Which messages and limits apply?",[138,19332,19333,19343],{},[141,19334,19335],{},[144,19336,19337,19340],{},[147,19338,19339],{},"Message or situation",[147,19341,19342],{},"Cause and solution",[163,19344,19345,19358,19366,19374,19382,19390,19398],{},[144,19346,19347,19352],{},[168,19348,4361,19349,19351],{},[15,19350,18708],{}," button is missing",[168,19353,19354,19355,19357],{},"The project has not been saved yet, or you are not in the ",[15,19356,18718],{}," workspace",[144,19359,19360,19363],{},[168,19361,19362],{},"“Detection is available for an empty board only.”",[168,19364,19365],{},"Modules are placed on this board or devices are assigned to it. Choose an empty board or create a new one",[144,19367,19368,19371],{},[168,19369,19370],{},"“Select at most 6 photos.”",[168,19372,19373],{},"Untick another photo before linking a new one",[144,19375,19376,19379],{},[168,19377,19378],{},"“Could not detect modules in photos.”",[168,19380,19381],{},"The AI service did not return a valid proposal, or your daily limit of 20 runs has been reached. Try again later; the limit restarts at midnight UTC",[144,19383,19384,19387],{},[168,19385,19386],{},"Message about the AI allowance",[168,19388,19389],{},"Your personal AI allowance is insufficient or reserved for an analysis in progress. The user menu shows the current level",[144,19391,19392,19395],{},[168,19393,19394],{},"“Photo unavailable”",[168,19396,19397],{},"The file was removed from the project files or cannot be loaded. Link a different photo",[144,19399,19400,19403],{},[168,19401,19402],{},"“Could not import modules.”",[168,19404,19405],{},"Overlap within a row, position beyond 72 TE, or the board is no longer empty",[12,19407,19408,19409,19411,19412,56],{},"You will find more general problems in ",[40,19410,16735],{"href":15662},". How PlanElec recognises floor plans from PDFs and images is covered in ",[40,19413,9466],{"href":9465},{"title":2044,"searchDepth":2045,"depth":2045,"links":19415},[19416,19417,19418,19421,19422,19423,19424,19425],{"id":18683,"depth":2045,"text":18684},{"id":18786,"depth":2045,"text":18787},{"id":18896,"depth":2045,"text":18897,"children":19419},[19420],{"id":18942,"depth":2053,"text":18943},{"id":18986,"depth":2045,"text":18987},{"id":19018,"depth":2045,"text":19019},{"id":19179,"depth":2045,"text":19180},{"id":19237,"depth":2045,"text":19238},{"id":19329,"depth":2045,"text":19330},"PlanElec detects visible DIN modules on up to six photos, with row, starting slot, width and type, and proposes them for an empty distribution board. You review every module and import the layout in a single undoable step.","cabinet-photo-recognition","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fcabinet-photo-recognition.webp",{},13,"\u002Fhelp\u002Fcabinet-photo-recognition.en","7 min",{"title":18664,"description":19426},"Recognise a distribution board and DIN modules from photos","recognise-a-distribution-board-from-a-photo","help\u002Fcabinet-photo-recognition.en",[3590,19438,10997,19439,19440],"photo","DIN modules","existing installation","Ycipd6GPv4AB5OXLLSTsUdkso9EdSfi1kiT40hjyISQ","\u002Fhelp\u002Frecognise-a-distribution-board-from-a-photo",[],{"id":19445,"title":19446,"body":19447,"category":8555,"description":20330,"extension":2113,"guideId":20331,"image":20332,"locale":2119,"meta":20333,"navigation":2121,"order":4248,"path":20334,"publishedAt":16783,"readTime":3582,"seo":20335,"seoTitle":10313,"slug":20336,"stem":20337,"tags":20338,"updatedAt":4826,"__hash__":20340,"kind":3594,"href":20341,"date":16783,"labels":20342},"help\u002Fhelp\u002Ffloorplan-recognition.en.md","How do I get AI to recognise a floor plan?",{"type":9,"value":19448,"toc":20312},[19449,19466,19470,19474,19544,19550,19555,19559,19564,19568,19607,19611,19648,19652,19656,19663,19711,19723,19735,19739,19743,19755,19852,19859,19864,19868,19875,19880,19884,19890,19933,19939,19964,19969,19973,19978,20042,20059,20064,20068,20072,20100,20103,20109,20114,20118,20121,20191,20195,20199,20276,20280,20284,20290,20294],[12,19450,19451,19452,19455,19456,19458,19459,19462,19463,19465],{},"Floor plan recognition reads a plan page – PDF, PNG, JPEG or WebP, including a PDF export from Trikker – and turns it into a ",[15,19453,19454],{},"proposal",": walls, rooms with their calculated area, doors and windows, plus the electrical symbols PlanElec knows. You need at least the project role ",[15,19457,4342],{},". You review the proposal in the ",[15,19460,19461],{},"Recognition"," panel, correct it where needed and confirm the scale. Only then does ",[15,19464,12394],{}," write it into an empty floor, as a single undo step. No circuits, single-line diagram or cables are created; you plan those afterwards as usual.",[12,19467,19468],{},[40,19469],{"id":9499},[79,19471,19473],{"id":19472},"what-do-you-need","What do you need?",[138,19475,19476,19484],{},[141,19477,19478],{},[144,19479,19480,19482],{},[147,19481,3724],{},[147,19483,18695],{},[163,19485,19486,19501,19509,19517,19525,19536],{},[144,19487,19488,19490],{},[168,19489,16981],{},[168,19491,19492,1774,19494,3324,19496,18737,19498,19500],{},[15,19493,4322],{},[15,19495,16988],{},[15,19497,4342],{},[15,19499,4352],{}," role you cannot start a recognition.",[144,19502,19503,19506],{},[168,19504,19505],{},"File format",[168,19507,19508],{},"PDF, PNG, JPEG or WebP up to 50 MB. DXF and DWG are not recognised.",[144,19510,19511,19514],{},[168,19512,19513],{},"Plan page",[168,19515,19516],{},"A page that shows a floor plan. For a multi-page PDF you choose the page yourself.",[144,19518,19519,19522],{},[168,19520,19521],{},"Target floor",[168,19523,19524],{},"An empty floor without walls. Importing into a floor that already has drawing is blocked.",[144,19526,19527,19530],{},[168,19528,19529],{},"Scale",[168,19531,19532,19533,19535],{},"Must be confirmed before import. Without a confirmed scale, ",[15,19534,12394],{}," stays blocked.",[144,19537,19538,19541],{},[168,19539,19540],{},"Quota",[168,19542,19543],{},"30 recognition runs per user per day; every run also uses your AI allowance.",[12,19545,19546,19547,19549],{},"The file is stored in the project's ",[15,19548,10173],{},". You upload the plan once: it is the source for recognition and stays available as a project file afterwards.",[12,19551,19552],{},[40,19553],{"id":19554},"start",[79,19556,19558],{"id":19557},"where-do-you-start-recognition","Where do you start recognition?",[12,19560,19561,19562,16221],{},"There are two entry points. Both lead to the same result in the ",[15,19563,19461],{},[1041,19565,19567],{"id":19566},"on-an-empty-floor","On an empty floor",[3139,19569,19570,19578,19584,19590,19600],{},[87,19571,3361,19572,19574,19575,15295],{},[15,19573,13345],{}," mode, open a floor with no walls and no template. The card ",[15,19576,19577],{},"How would you like to start this floor?",[87,19579,15424,19580,19583],{},[15,19581,19582],{},"Recognise the plan automatically",", then your file.",[87,19585,19586,19587,19589],{},"PlanElec stores the plan in the project files and shows progress in three steps. ",[15,19588,17083],{}," stops the run.",[87,19591,19592,19593,19596,19597,19599],{},"For a single-page plan, recognition starts straight away. If the PDF has several pages, the ",[15,19594,19595],{},"Project file preview"," opens: go to the page with the floor plan and start ",[15,19598,14073],{}," there.",[87,19601,19602,19603,19606],{},"How you know it worked: the message “Floor plan recognised. Check the draft and measure a known distance.” appears and the ",[15,19604,19605],{},"Correct draft"," dialog opens.",[1041,19608,19610],{"id":19609},"from-the-project-files","From the project files",[3139,19612,19613,19626,19629,19639],{},[87,19614,11757,19615,19617,19618,19621,19622,19625],{},[15,19616,10173],{}," panel. Next to a PDF you find ",[15,19619,19620],{},"Recognise plan with AI",", next to an image ",[15,19623,19624],{},"Recognise photo with AI",". Both start floor plan recognition.",[87,19627,19628],{},"For a multi-page PDF, the preview opens instead. Choose the page there.",[87,19630,3370,19631,19633,19634,14070,19637,56],{},[15,19632,19595],{},", pick a method under ",[15,19635,19636],{},"Recognition method",[15,19638,14073],{},[87,19640,19641,19642,19644,19645,19647],{},"After the run, PlanElec switches to ",[15,19643,13345],{}," mode and opens the ",[15,19646,19461],{}," panel. The proposal is shown as a preview over the floor.",[12,19649,19650],{},[40,19651],{"id":1577},[79,19653,19655],{"id":19654},"what-does-the-automatic-method-do","What does the “Automatic” method do?",[12,19657,19658,19659,19662],{},"The default is ",[15,19660,19661],{},"Automatic (PDF vectors + AI)",". The server decides, page by page, where the walls come from:",[138,19664,19665,19678],{},[141,19666,19667],{},[144,19668,19669,19672,19675],{},[147,19670,19671],{},"Plan",[147,19673,19674],{},"Where the walls come from",[147,19676,19677],{},"What the AI adds",[163,19679,19680,19691,19702],{},[144,19681,19682,19685,19688],{},[168,19683,19684],{},"Vector PDF whose wall lines form closed rooms",[168,19686,19687],{},"straight from the PDF's lines",[168,19689,19690],{},"room names, room categories, windows, device symbols and dimension lines it reads",[144,19692,19693,19696,19699],{},[168,19694,19695],{},"Scanned PDF, or PDF without closed wall outlines",[168,19697,19698],{},"AI image recognition",[168,19700,19701],{},"for PDFs, also room names from the text layer and doors from the drawn door swings",[144,19703,19704,19707,19709],{},[168,19705,19706],{},"PNG, JPEG, WebP",[168,19708,19698],{},[168,19710,6413],{},[12,19712,19713,19714,19716,19717,3324,19720,56],{},"If the AI step fails on a vector PDF, the walls from the PDF remain as the proposal. The header of the ",[15,19715,19461],{}," panel shows which route was taken, for example ",[15,19718,19719],{},"PDF walls + AI",[15,19721,19722],{},"PDF wall proposal",[12,19724,19725,19728,19729,3116,19732,19734],{},[15,19726,19727],{},"LLM image recognition"," forces image recognition alone, without PDF vectors. Use it as an alternative when the automatic choice gives a weak result. ",[15,19730,19731],{},"Recognize again",[15,19733,19461],{}," panel reruns the same plan with the chosen method. Every new run counts towards the daily quota.",[12,19736,19737],{},[40,19738],{"id":19015},[79,19740,19742],{"id":19741},"what-is-in-the-proposal-and-how-do-you-review-it","What is in the proposal and how do you review it?",[12,19744,4361,19745,19747,19748,1774,19750,3324,19753,56],{},[15,19746,19461],{}," panel splits the proposal into sections. The top line shows the page and the status: ",[15,19749,8220],{},[15,19751,19752],{},"Input needed",[15,19754,8792],{},[138,19756,19757,19769],{},[141,19758,19759],{},[144,19760,19761,19764,19766],{},[147,19762,19763],{},"Section",[147,19765,16640],{},[147,19767,19768],{},"What you decide",[163,19770,19771,19784,19797,19811,19824,19836],{},[144,19772,19773,19778,19781],{},[168,19774,19775],{},[15,19776,19777],{},"Rooms",[168,19779,19780],{},"every closed room with its calculated area, the area printed on the plan and the difference",[168,19782,19783],{},"keep the name or clear it. Clearing only drops the name; the walls stay.",[144,19785,19786,19791,19794],{},[168,19787,19788],{},[15,19789,19790],{},"Openings",[168,19792,19793],{},"door or window with its width",[168,19795,19796],{},"tick or clear individual openings",[144,19798,19799,19803,19806],{},[168,19800,19801],{},[15,19802,19529],{},[168,19804,19805],{},"source, anchors in metres, deviation",[168,19807,19808],{},[15,19809,19810],{},"Confirm scale",[144,19812,19813,19818,19821],{},[168,19814,19815],{},[15,19816,19817],{},"Names",[168,19819,19820],{},"the room names that will be imported",[168,19822,19823],{},"a final check before import",[144,19825,19826,19830,19833],{},[168,19827,19828],{},[15,19829,9873],{},[168,19831,19832],{},"recognised symbols such as socket, switch, light point",[168,19834,19835],{},"tick or clear individual devices",[144,19837,19838,19843,19849],{},[168,19839,19840],{},[15,19841,19842],{},"Questions",[168,19844,19845,19846],{},"open points; blocking ones are marked ",[15,19847,19848],{},"blocking",[168,19850,19851],{},"resolve them before importing",[12,19853,19854,19855,19858],{},"These symbols are recognised: socket, double socket, waterproof socket, switched socket, switch, push button, doorbell push button, motion detector, light point, spot, wall light, fluorescent tube, transformer, Ethernet and coaxial outlet, distribution board, junction box, stove, oven, dishwasher, washing machine, dryer, fridge, extractor hood, boiler, roller shutter motor and smoke detector. A symbol outside this list appears as ",[15,19856,19857],{},"Unknown symbol"," and is not imported.",[12,19860,19861],{},[40,19862],{"id":19863},"printed-areas",[1041,19865,19867],{"id":19866},"printed-room-areas-as-a-cross-check","Printed room areas as a cross-check",[12,19869,19870,19871,19874],{},"Many architectural plans print the area of each room. That number comes from the annotation, not from the recognised walls, so it is an independent check. When it matches, ",[15,19872,19873],{},"✓ plan"," appears next to the room. If a room differs by 10 % or more, PlanElec flags it above the room list: a wall is probably in the wrong place. If the printed areas as a whole do not fit the scale, a question appears and you measure a known length.",[12,19876,19877],{},[40,19878],{"id":19879},"scale",[79,19881,19883],{"id":19882},"where-does-the-scale-come-from","Where does the scale come from?",[12,19885,19886,19887,19889],{},"A proposal without a confirmed scale is not imported. The ",[15,19888,19529],{}," section shows where it came from:",[138,19891,19892,19901],{},[141,19893,19894],{},[144,19895,19896,19899],{},[147,19897,19898],{},"Shown as",[147,19900,2244],{},[163,19902,19903,19913,19923],{},[144,19904,19905,19910],{},[168,19906,19907],{},[15,19908,19909],{},"From dimension lines",[168,19911,19912],{},"The AI reads the dimension lines on the page. Several independent dimension lines are evaluated together.",[144,19914,19915,19920],{},[168,19916,19917],{},[15,19918,19919],{},"From the PDF scale",[168,19921,19922],{},"The scale stored in the PDF. It is checked against the dimension lines read; if they contradict it, the dimension lines win.",[144,19924,19925,19930],{},[168,19926,19927],{},[15,19928,19929],{},"Two points, measured by you",[168,19931,19932],{},"You marked a known distance in the correction dialog and entered its length.",[12,19934,19935,19936,19938],{},"Your own measurement takes priority. If it contradicts several matching dimension lines, however, PlanElec uses the dimension lines and reports this under ",[15,19937,19842],{},". Check that you placed the right points.",[3139,19940,19941,19946,19949,19958],{},[87,19942,19943,19944,8053],{},"Read the source and deviation in the ",[15,19945,19529],{},[87,19947,19948],{},"Compare a distance whose length you know for certain with the proposal, for example a dimensioned outer wall.",[87,19950,19951,19952,19954,19955,56],{},"If it matches, choose ",[15,19953,19810],{},". The section then shows ",[15,19956,19957],{},"Scale confirmed",[87,19959,19960,19961,19963],{},"If it does not, open ",[15,19962,19605],{}," and measure the distance yourself.",[12,19965,19966],{},[40,19967],{"id":19968},"correct",[79,19970,19972],{"id":19971},"how-do-you-correct-the-draft","How do you correct the draft?",[12,19974,19975,19977],{},[15,19976,19605],{}," shows the original page with the recognised walls on top. If only the scale is missing, the dialog opens by itself. Changes are only written to the floor when you import.",[138,19979,19980,19988],{},[141,19981,19982],{},[144,19983,19984,19986],{},[147,19985,4121],{},[147,19987,19039],{},[163,19989,19990,20003,20013,20023,20033],{},[144,19991,19992,19997],{},[168,19993,19994],{},[15,19995,19996],{},"Measure distance",[168,19998,19999,20000],{},"mark two points of a known distance and enter the ",[15,20001,20002],{},"Length in metres",[144,20004,20005,20010],{},[168,20006,20007],{},[15,20008,20009],{},"Move corner",[168,20011,20012],{},"drag a corner to the right place; once selected, also with the arrow keys",[144,20014,20015,20020],{},[168,20016,20017],{},[15,20018,20019],{},"Add wall",[168,20021,20022],{},"click the start and end of a missing wall; existing corners snap",[144,20024,20025,20030],{},[168,20026,20027],{},[15,20028,20029],{},"Remove wall",[168,20031,20032],{},"click a wrong wall; its openings are removed with it",[144,20034,20035,20039],{},[168,20036,20037],{},[15,20038,13947],{},[168,20040,20041],{},"revert the last correction inside the dialog",[3139,20043,20044,20050,20053],{},[87,20045,20046,20047,20049],{},"Measure a known length with ",[15,20048,19996],{},", preferably a long one.",[87,20051,20052],{},"Check every room: it must be closed by walls all the way round. Add missing walls and move misplaced corners.",[87,20054,15424,20055,20058],{},[15,20056,20057],{},"Save draft",". The scale then counts as confirmed. If the target floor is empty and no question is blocking, PlanElec imports the draft straight away. Otherwise a message explains why, and you import it yourself later.",[12,20060,20061,20062,56],{},"A distorted photo or a plan with an unclear crop cannot be straightened in this dialog. In that case, place the plan as a template and set it up in the layer workbench, see ",[40,20063,9462],{"href":9461},[12,20065,20066],{},[40,20067],{"id":19176},[79,20069,20071],{"id":20070},"how-do-you-import-the-proposal-into-the-floor","How do you import the proposal into the floor?",[3139,20073,20074,20082,20087,20091],{},[87,20075,20076,20077,7870,20079,20081],{},"At the bottom of the ",[15,20078,19461],{},[15,20080,19521],{},". It must be empty.",[87,20083,20084,20085,56],{},"Check that the scale is confirmed and that no question shows ",[15,20086,19848],{},[87,20088,15424,20089,56],{},[15,20090,12394],{},[87,20092,20093,20094,20096,20097,56],{},"How you know it worked: the message “The proposal was imported.” appears and ",[15,20095,13345],{}," mode shows walls, rooms, openings and devices. The original page sits under the walls as the template ",[15,20098,20099],{},"Recognised plan page",[12,20101,20102],{},"The whole import is one undo step: ⌘Z or Ctrl+Z reverts it completely. If an element could not be placed – a door without a matching wall, or a device with no wall within reach, for instance – PlanElec reports how many elements were not imported. You place those by hand. Rooms receive their names and, where recognised, a room category. If the plan gives no heights for doors and windows, PlanElec uses default values; check them where it matters.",[12,20104,20105,20106,56],{},"If you recognised several floors separately, stack them afterwards: ",[40,20107,20108],{"href":16037},"Align floors and the building origin",[12,20110,20111],{},[40,20112],{"id":20113},"no-result",[79,20115,20117],{"id":20116},"what-if-recognition-finds-nothing-usable","What if recognition finds nothing usable?",[12,20119,20120],{},"If recognition started from the start card finds no usable floor plan – fewer than three walls – PlanElec discards the proposal. The plan is then placed on the floor as a template, the layer workbench opens and you trace the outer walls. Other situations:",[138,20122,20123,20133],{},[141,20124,20125],{},[144,20126,20127,20129,20131],{},[147,20128,2675],{},[147,20130,2314],{},[147,20132,19254],{},[163,20134,20135,20146,20157,20168,20180],{},[144,20136,20137,20140,20143],{},[168,20138,20139],{},"Daily quota used up",[168,20141,20142],{},"30 runs used today; failed runs count too",[168,20144,20145],{},"Try again the next day (UTC) or trace the plan",[144,20147,20148,20151,20154],{},[168,20149,20150],{},"Timeout",[168,20152,20153],{},"The run took too long",[168,20155,20156],{},"Try again or choose another method",[144,20158,20159,20162,20165],{},[168,20160,20161],{},"File not recognisable",[168,20163,20164],{},"Unsupported format or larger than 50 MB",[168,20166,20167],{},"Use PDF, PNG, JPEG or WebP",[144,20169,20170,20174,20177],{},[168,20171,20172],{},[15,20173,19752],{},[168,20175,20176],{},"Usually the scale is missing",[168,20178,20179],{},"Measure a known distance in the correction dialog",[144,20181,20182,20185,20188],{},[168,20183,20184],{},"AI allowance insufficient",[168,20186,20187],{},"Your remaining AI allowance is not enough for this run",[168,20189,20190],{},"Trace the plan from the template",[12,20192,20193],{},[40,20194],{"id":3425},[79,20196,20198],{"id":20197},"what-does-the-ai-not-recognise","What does the AI not recognise?",[138,20200,20201,20210],{},[141,20202,20203],{},[144,20204,20205,20207],{},[147,20206,6928],{},[147,20208,20209],{},"What it means",[163,20211,20212,20220,20234,20244,20252,20260,20268],{},[144,20213,20214,20217],{},[168,20215,20216],{},"No circuits, diagram or cables",[168,20218,20219],{},"Recognition covers the position and type of symbols. Circuit assignment, protective devices and the single-line diagram come afterwards.",[144,20221,20222,20225],{},[168,20223,20224],{},"Reuse Trikker project files directly",[168,20226,20227,20228,20230,20231,20233],{},"A PDF export from Trikker is recognised like any PDF. You import a ",[25,20229,27],{}," file as a project (diagram, circuits, devices and situation plan), see ",[40,20232,1486],{"href":42},". Walls, openings, stairs, device positions, texts, clipart, dimensions, lines and areas come along through this import.",[144,20235,20236,20239],{},[168,20237,20238],{},"No import without scale",[168,20240,20241,20242,19535],{},"Without a confirmed scale, ",[15,20243,12394],{},[144,20245,20246,20249],{},[168,20247,20248],{},"Empty floors only",[168,20250,20251],{},"Recognition does not add to an existing floor plan.",[144,20253,20254,20257],{},[168,20255,20256],{},"No DXF\u002FDWG recognition",[168,20258,20259],{},"Import a DXF as a scaled template through the regular import.",[144,20261,20262,20265],{},[168,20263,20264],{},"No sections or elevations",[168,20266,20267],{},"Recognition expects a floor plan; other sheet types do not produce a usable proposal.",[144,20269,20270,20273],{},[168,20271,20272],{},"A proposal is not a survey",[168,20274,20275],{},"Check dimensions, wall layout and symbols before planning further.",[12,20277,20278],{},[40,20279],{"id":10145},[79,20281,20283],{"id":20282},"what-happens-to-your-plan","What happens to your plan?",[12,20285,20286,20287,20289],{},"The file is stored in your project's project files. Only the selected page goes to the external AI provider: as an image and, for a PDF, together with that page's text. The request runs through an EU route; the provider does not store it and does not train on it. PlanElec logs every run with the page sent and the result, so a proposal can be traced later. The note “The page will be sent to an external AI provider for analysis.” sits directly on the ",[15,20288,14073],{}," action.",[79,20291,20293],{"id":20292},"what-next","What next?",[84,20295,20296,20301,20307],{},[87,20297,20298,20299],{},"Add symbols and connect them to the topology: ",[40,20300,16745],{"href":16744},[87,20302,20303,20304],{},"Plan circuits and boards: ",[40,20305,20306],{"href":18627},"Plan the installation and distribution boards",[87,20308,20309,20310],{},"Trace a plan without AI or calibrate the scale by hand: ",[40,20311,9462],{"href":9461},{"title":2044,"searchDepth":2045,"depth":2045,"links":20313},[20314,20315,20319,20320,20323,20324,20325,20326,20327,20328,20329],{"id":19472,"depth":2045,"text":19473},{"id":19557,"depth":2045,"text":19558,"children":20316},[20317,20318],{"id":19566,"depth":2053,"text":19567},{"id":19609,"depth":2053,"text":19610},{"id":19654,"depth":2045,"text":19655},{"id":19741,"depth":2045,"text":19742,"children":20321},[20322],{"id":19866,"depth":2053,"text":19867},{"id":19882,"depth":2045,"text":19883},{"id":19971,"depth":2045,"text":19972},{"id":20070,"depth":2045,"text":20071},{"id":20116,"depth":2045,"text":20117},{"id":20197,"depth":2045,"text":20198},{"id":20282,"depth":2045,"text":20283},{"id":20292,"depth":2045,"text":20293},"Upload a plan page as PDF, PNG, JPEG or WebP, review the AI proposal with walls, rooms, doors, windows and device symbols, confirm the scale and import everything into an empty floor.","floorplan-recognition","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Ffloorplan-recognition-en.webp",{},"\u002Fhelp\u002Ffloorplan-recognition.en",{"title":19446,"description":20330},"recognise-a-floor-plan-with-ai","help\u002Ffloorplan-recognition.en",[10257,10997,8065,19879,20339,329],"rooms","5JEiEq_bjlhx65-KWFhroqLozWWBUirpMhYm2DkmbV4","\u002Fhelp\u002Frecognise-a-floor-plan-with-ai",[],{"id":20344,"title":20345,"body":20346,"category":10304,"description":21774,"extension":2113,"guideId":16627,"image":21775,"locale":2119,"meta":21776,"navigation":2121,"order":21777,"path":21778,"publishedAt":16783,"readTime":6086,"seo":21779,"seoTitle":10313,"slug":21780,"stem":21781,"tags":21782,"updatedAt":21786,"__hash__":21787,"kind":3594,"href":21788,"date":16783,"labels":21789},"help\u002Fhelp\u002Ftroubleshooting.en.md","How do I solve common problems in PlanElec?",{"type":9,"value":20347,"toc":21759},[20348,20351,20355,20538,20543,20547,20558,20561,20606,20625,20628,20633,20637,20646,20664,20727,20734,20739,20743,20749,20774,20777,20780,20792,20801,20806,20810,20834,20882,20885,20910,20913,21005,21014,21026,21033,21038,21042,21048,21123,21126,21129,21170,21176,21181,21185,21188,21224,21270,21280,21285,21289,21295,21346,21349,21381,21384,21403,21410,21415,21419,21425,21446,21452,21457,21461,21464,21571,21576,21581,21585,21588,21656,21666,21674,21679,21683,21686,21728,21743,21747],[12,20349,20350],{},"Almost every block in PlanElec states its own cause: a scale that has not been confirmed, a device without a circuit, an open point before the release copy, an incomplete cable route, a module without a place on a rail, a sync state, a reached AI limit or a browser without WebGL. This page maps each message to its cause in the software and walks you to the fix step by step. You need a project open in the studio. When a message disappears, PlanElec no longer sees the issue in the data you entered. The professional review of the installation and the keuring, the official Belgian inspection by an approved body, remain separate.",[79,20352,20354],{"id":20353},"which-problem-do-you-have","Which problem do you have?",[138,20356,20357,20367],{},[141,20358,20359],{},[144,20360,20361,20363,20365],{},[147,20362,16640],{},[147,20364,18085],{},[147,20366,19763],{},[163,20368,20369,20385,20399,20413,20431,20445,20459,20476,20493,20507,20521],{},[144,20370,20371,20376,20379],{},[168,20372,20373,20374],{},"“Without a confirmed scale the import stays blocked.” or status ",[15,20375,19752],{},[168,20377,20378],{},"Scale of the recognised plan missing or not confirmed",[168,20380,20381],{},[40,20382,20384],{"href":20383},"#floorplan-scale","Import the floor plan",[144,20386,20387,20390,20393],{},[168,20388,20389],{},"“The plan has … pages. Pick the one with the floor plan in the preview.”",[168,20391,20392],{},"Multi-page PDF",[168,20394,20395],{},[40,20396,20398],{"href":20397},"#floorplan-pages","PDF and file format",[144,20400,20401,20404,20407],{},[168,20402,20403],{},"Device missing from the single-line diagram, “… devices without a circuit”",[168,20405,20406],{},"The device hangs from no protective device",[168,20408,20409],{},[40,20410,20412],{"href":20411},"#device-without-circuit","Device without a circuit",[144,20414,20415,20422,20425],{},[168,20416,20417,20419,20420],{},[15,20418,4662],{}," is disabled, status ",[15,20421,17020],{},[168,20423,20424],{},"At least one open point for this document",[168,20426,20427],{},[40,20428,20430],{"href":20429},"#export-blocked","Export blocked",[144,20432,20433,20436,20439],{},[168,20434,20435],{},"“Self-check is switched off” on the self-check report",[168,20437,20438],{},"Self-check switched off for the project",[168,20440,20441],{},[40,20442,20444],{"href":20443},"#self-check-off","Self-check off",[144,20446,20447,20450,20453],{},[168,20448,20449],{},"Red or yellow “!” marker on a symbol, orange dot on a device",[168,20451,20452],{},"Self-check finding, missing link or circuit colour",[168,20454,20455],{},[40,20456,20458],{"href":20457},"#colour-markers","Colour markings",[144,20460,20461,20467,20470],{},[168,20462,20463,20466],{},[15,20464,20465],{},"Route incomplete"," or “length missing for exact ΔU calculation”",[168,20468,20469],{},"Route not continuous, no length entered",[168,20471,20472],{},[40,20473,20475],{"href":20474},"#cable-length","Cable length",[144,20477,20478,20484,20487],{},[168,20479,20480,20483],{},[15,20481,20482],{},"Unassigned modules"," in the distribution board",[168,20485,20486],{},"Module exists but has no place on a DIN rail",[168,20488,20489],{},[40,20490,20492],{"href":20491},"#cabinet-unplaced","Place modules",[144,20494,20495,20498,20501],{},[168,20496,20497],{},"“Not ready: Live sync disabled”, “Conflict”, “reserved in another session”",[168,20499,20500],{},"Save and synchronisation state",[168,20502,20503],{},[40,20504,20506],{"href":20505},"#sync","Saving and sync",[144,20508,20509,20512,20515],{},[168,20510,20511],{},"“The daily quota for recognitions is used up.” or insufficient AI allowance",[168,20513,20514],{},"Daily recognition limit or AI allowance used up",[168,20516,20517],{},[40,20518,20520],{"href":20519},"#ai-limit","AI limit",[144,20522,20523,20529,20532],{},[168,20524,20525,3324,20527],{},[15,20526,15772],{},[15,20528,15783],{},[168,20530,20531],{},"No WebGL or graphics context reset",[168,20533,20534],{},[40,20535,20537],{"href":20536},"#fallback-3d","3D notice",[12,20539,20540],{},[40,20541],{"id":20542},"floorplan-scale",[79,20544,20546],{"id":20545},"why-cant-i-import-the-recognised-floor-plan","Why can’t I import the recognised floor plan?",[12,20548,20549,20550,20552,20553,16329,20555,20557],{},"AI floor-plan recognition only imports walls and rooms once the scale is confirmed. If something is missing, the run shows ",[15,20551,19752],{}," with “The plan needs more input before it can be applied, usually the scale. Please check and add it.” The ",[15,20554,19529],{},[15,20556,19461],{}," panel then reads: “Without a confirmed scale the import stays blocked.”",[12,20559,20560],{},"To unblock the import:",[3139,20562,20563,20578,20588,20596,20601],{},[87,20564,11757,20565,20567,20568,20570,20571,1774,20573,3324,20575,20577],{},[15,20566,19461],{}," panel in the studio. The ",[15,20569,19529],{}," section shows where the scale comes from, for example ",[15,20572,19909],{},[15,20574,19919],{},[15,20576,19929],{},", plus the anchors used, in metres.",[87,20579,20580,20581,16173,20583,20585,20586,56],{},"If the scale is missing or PlanElec reports “The room areas printed on the plan do not match the scale. Please measure a known length.”, open ",[15,20582,19605],{},[15,20584,19996],{},". Mark two points on a known distance, enter its length in metres and choose ",[15,20587,20057],{},[87,20589,20590,20591,20593,20594,56],{},"Check a second known length on the plan. If it matches, choose ",[15,20592,19810],{},". Success criterion: the section shows ",[15,20595,19957],{},[87,20597,8191,20598,20600],{},[15,20599,19521],{}," at the bottom of the panel. “The target floor must be empty.” If it is not, PlanElec reports “The target floor is not empty.” Create an empty floor or choose another one.",[87,20602,15424,20603,20605],{},[15,20604,12394],{},". The import is a single undo step.",[12,20607,20608,20609,20611,20612,20615,20616,20619,20620,3157,20623,56],{},"If you work without AI from an imported template, the layer workbench shows “No scale yet” in the ",[15,20610,19529],{}," step until you calibrate. Pick two points on a known distance there, or choose ",[15,20613,20614],{},"Calibrate"," in the toolbar, then finish with ",[15,20617,20618],{},"Done",". Details: ",[40,20621,9462],{"href":20622},"\u002Fen\u002Fhelp\u002Fimport-and-calibrate-a-floor-plan#calibrate",[40,20624,9466],{"href":9465},[12,20626,20627],{},"Recognition delivers a proposal. Check dimensions, wall lines and room boundaries against the original plan yourself before electrical planning.",[12,20629,20630],{},[40,20631],{"id":20632},"floorplan-pages",[79,20634,20636],{"id":20635},"what-if-the-pdf-has-several-pages-or-is-not-recognised","What if the PDF has several pages or is not recognised?",[12,20638,20639,20640,20642,20643,20645],{},"When you start on an empty floor with ",[15,20641,19582],{},", PlanElec files the document in the project’s document folder. For a multi-page PDF, PlanElec does not guess a page. You see “The plan has {count} pages. Pick the one with the floor plan in the preview.” and the ",[15,20644,19595],{}," opens.",[3139,20647,20648,20653,20658],{},[87,20649,3370,20650,20652],{},[15,20651,19595],{},", go to the page with the floor plan.",[87,20654,15424,20655,20657],{},[15,20656,14073],{},". Recognition runs for that page only.",[87,20659,20660,20661,20663],{},"Check the result in the ",[15,20662,19461],{}," panel as described above.",[138,20665,20666,20677],{},[141,20667,20668],{},[144,20669,20670,20672,20674],{},[147,20671,17536],{},[147,20673,18085],{},[147,20675,20676],{},"Fix",[163,20678,20679,20694,20705,20716],{},[144,20680,20681,20684,20687],{},[168,20682,20683],{},"“This file cannot be recognised. PDF, PNG, JPEG and WebP up to 50 MB are possible.”",[168,20685,20686],{},"Other format, e.g. DXF, or file too large",[168,20688,20689,20690,20693],{},"Import the DXF as a template via ",[15,20691,20692],{},"Upload a plan","; reduce the image or PDF",[144,20695,20696,20699,20702],{},[168,20697,20698],{},"“Automatic recognition found no usable floor plan. …”",[168,20700,20701],{},"No usable proposal",[168,20703,20704],{},"The plan is ready as a template: set it up and trace the outer walls",[144,20706,20707,20710,20713],{},[168,20708,20709],{},"“Recognition took too long and was stopped. …”",[168,20711,20712],{},"Time limit of the run",[168,20714,20715],{},"Try again or pick a different method",[144,20717,20718,20721,20724],{},[168,20719,20720],{},"“Recognition is not available yet — the file remains usable as a project file”",[168,20722,20723],{},"Feature not reachable for your account or role",[168,20725,20726],{},"Trace the file as a template",[12,20728,20729,20730,56],{},"For architect plans with several floors on one sheet, mark one area per floor plan during import: ",[40,20731,20733],{"href":20732},"\u002Fen\u002Fhelp\u002Fimport-and-calibrate-a-floor-plan#sections","Separate several floor plans on one sheet",[12,20735,20736],{},[40,20737],{"id":20738},"device-without-circuit",[79,20740,20742],{"id":20741},"why-does-a-device-not-appear-in-the-single-line-diagram","Why does a device not appear in the single-line diagram?",[12,20744,20745,20746,20748],{},"The single-line diagram draws each circuit from its protective device, with the loads connected to it. A device you placed on the floor plan but assigned to no circuit has no such path, so it does not appear yet. The self-check reports it as “\"{name}\" is not connected”, and ",[15,20747,5104],{}," lists the task “{count} devices without a circuit”.",[3139,20750,20751,20756,20763,20769],{},[87,20752,4055,20753,20755],{},[15,20754,5104],{},". With nothing selected, the side panel shows the open tasks.",[87,20757,20758,20759,20762],{},"For the devices without a circuit, choose ",[15,20760,20761],{},"Assign automatically",". The automatic-planning preview shows the circuit and protective device for each one; you apply it deliberately.",[87,20764,20765,20766,56],{},"For a targeted assignment, select the device and use ",[15,20767,20768],{},"Assign circuit",[87,20770,4055,20771,20773],{},[15,20772,3926],{},". Success criterion: the device sits under its circuit.",[12,20775,20776],{},"Do not create the device a second time to see it in the diagram. It stays the same object in floor plan, installation and diagram.",[12,20778,20779],{},"Two related messages:",[84,20781,20782,20789],{},[87,20783,20784,20785,20788],{},"“{name}: board open” means: electrically connected but not yet assigned to a distribution board. ",[15,20786,20787],{},"Form board"," opens the preview. The export then shows “Distribution-board assignment is open. Complete the installation.”",[87,20790,20791],{},"“Consumer {reference} is not placed on the situation plan” is the reverse case: the device exists electrically but has no symbol on the situation plan. For the situation-plan export the message is “Place missing devices on the situation plan”.",[12,20793,20794,20795,3157,20798,56],{},"More: ",[40,20796,20797],{"href":19285},"Assign an existing floor-plan device",[40,20799,20800],{"href":14100},"Automatic planning",[12,20802,20803],{},[40,20804],{"id":20805},"export-blocked",[79,20807,20809],{"id":20808},"why-is-create-release-copy-disabled","Why is “Create release copy” disabled?",[12,20811,3361,20812,20814,20815,20817,20818,20820,20821,3157,20824,20827,20828,3324,20831,56],{},[15,20813,4665],{},", each document has a card with a status and two routes: ",[15,20816,16953],{}," always gives you a PDF marked as a draft, as soon as the document has content. ",[15,20819,4662],{}," only becomes active when no blocker is open for that document. The header sums this up as ",[15,20822,20823],{},"Draft documents",[15,20825,20826],{},"Final submission",", each with ",[15,20829,20830],{},"Ready to export",[15,20832,20833],{},"Not ready yet",[138,20835,20836,20844],{},[141,20837,20838],{},[144,20839,20840,20842],{},[147,20841,9703],{},[147,20843,2314],{},[163,20845,20846,20855,20864,20873],{},[144,20847,20848,20852],{},[168,20849,20850],{},[15,20851,7048],{},[168,20853,20854],{},"The document has no content yet (“Add content for this document”).",[144,20856,20857,20861],{},[168,20858,20859],{},[15,20860,17020],{},[168,20862,20863],{},"At least one blocker is open. Only the draft is possible.",[144,20865,20866,20870],{},[168,20867,20868],{},[15,20869,17016],{},[168,20871,20872],{},"No blockers, but warnings. You confirm them before archiving.",[144,20874,20875,20879],{},[168,20876,20877],{},[15,20878,17013],{},[168,20880,20881],{},"No blockers and no warnings.",[12,20883,20884],{},"To find the blocker:",[3139,20886,20887,20892,20895,20904],{},[87,20888,4055,20889,20891],{},[15,20890,4665],{},". Below each card’s status, the first open point is shown as a link.",[87,20893,20894],{},"Click it. PlanElec switches to the view where you fix it.",[87,20896,20897,20898,20900,20901,20903],{},"Fix the point and return to ",[15,20899,4665],{},". The next blocker moves up until ",[15,20902,4662],{}," is active.",[87,20905,20906,20907,20909],{},"If only warnings remain, “Confirm warnings for this release” appears. With ",[15,20908,17079],{},", they become part of the stored release copy.",[12,20911,20912],{},"Common blockers in a new project:",[138,20914,20915,20925],{},[141,20916,20917],{},[144,20918,20919,20922],{},[147,20920,20921],{},"Text in the export",[147,20923,20924],{},"Where you fix it",[163,20926,20927,20940,20956,20969,20979,20989,20997],{},[144,20928,20929,20932],{},[168,20930,20931],{},"“Review and confirm the single-line diagram”",[168,20933,20934,5259,20936,20939],{},[15,20935,3926],{},[15,20937,20938],{},"Mark diagram as reviewed",". Any later change to the diagram clears the mark.",[144,20941,20942,20945],{},[168,20943,20944],{},"“Connection data not yet confirmed”",[168,20946,20947,20949,20950,5259,20953],{},[15,20948,5104],{}," → “Connection is an assumption” → ",[15,20951,20952],{},"Review and confirm",[15,20954,20955],{},"Confirm connection data",[144,20957,20958,20961],{},[168,20959,20960],{},"“Complete and confirm installation methods”, “Add breaking capacities”",[168,20962,20963,20965,20966],{},[15,20964,4665],{}," → section ",[15,20967,20968],{},"Complete missing details",[144,20970,20971,20974],{},[168,20972,20973],{},"“Place missing devices on the situation plan”",[168,20975,20976,20977],{},"Situation plan, see ",[40,20978,20412],{"href":20411},[144,20980,20981,20984],{},[168,20982,20983],{},"“Place missing modules on the DIN rails”",[168,20985,20986,20987],{},"Distribution board, see ",[40,20988,20492],{"href":20491},[144,20990,20991,20994],{},[168,20992,20993],{},"“Complete circuit labels”",[168,20995,20996],{},"Give every circuit a label; the link leads to the distribution board",[144,20998,20999,21002],{},[168,21000,21001],{},"“Check inconsistent references”",[168,21003,21004],{},"Single-line diagram: correct the references of the element named",[12,21006,21007,21009,21010,21013],{},[15,21008,20938],{}," stays disabled while findings are open: “Resolve the outstanding validation findings before marking the diagram as reviewed.” The ",[15,21011,21012],{},"Warnings"," button next to it jumps to the first open finding.",[12,21015,21016,21019,21020,7814,21023,56],{},[15,21017,21018],{},"Self-check errors and warnings:"," an error, missing input or a rule that could not be evaluated blocks the release copy. A warning does not block; it appears as a warning you confirm. You read the findings in the ",[15,21021,21022],{},"Analysis",[15,21024,21025],{},"Warnings · Validation",[12,21027,21028,21029,3157,21031,56],{},"If you have just changed something, the card shows “Local changes have not been saved yet. You can already download a draft.” The release copy follows once the state is saved. More: ",[40,21030,4646],{"href":4645},[40,21032,1086],{"href":1085},[12,21034,21035],{},[40,21036],{"id":21037},"colour-markers",[79,21039,21041],{"id":21040},"why-is-a-switch-or-a-light-marked-in-orange","Why is a switch or a light marked in orange?",[12,21043,21044,21045,21047],{},"Orange has one of two meanings in PlanElec, depending on the view: on the floor plan, a device with an orange dot is not yet linked to the installation, and a line or symbol drawn entirely in orange simply carries the colour of its circuit. Self-check findings do not colour any symbol in the ",[15,21046,3926],{},": they appear as a small marker at the corner of the symbol, a red circle with “!” for an error and a yellow triangle with “!” for a warning.",[138,21049,21050,21060],{},[141,21051,21052],{},[144,21053,21054,21056,21058],{},[147,21055,16640],{},[147,21057,3913],{},[147,21059,2314],{},[163,21061,21062,21074,21086,21098,21108],{},[144,21063,21064,21067,21071],{},[168,21065,21066],{},"Red circle with “!” at the corner of a symbol",[168,21068,21069],{},[15,21070,3926],{},[168,21072,21073],{},"The self-check reports an error for this element. If an element has both, the marker shows the error.",[144,21075,21076,21079,21083],{},[168,21077,21078],{},"Yellow triangle with “!” at the corner of a symbol",[168,21080,21081],{},[15,21082,3926],{},[168,21084,21085],{},"The self-check reports a warning for this element.",[144,21087,21088,21091,21095],{},[168,21089,21090],{},"Frame briefly pulsing around a symbol",[168,21092,21093],{},[15,21094,3926],{},[168,21096,21097],{},"A finding has just appeared, or you clicked it in the findings list. The frame disappears after a few seconds.",[144,21099,21100,21103,21105],{},[168,21101,21102],{},"Small orange dot at the top right of a device",[168,21104,13345],{},[168,21106,21107],{},"The device is not yet linked to any element of the installation. A green dot means linked.",[144,21109,21110,21113,21116],{},[168,21111,21112],{},"Device symbol or line entirely in orange",[168,21114,21115],{},"Floor plan, single-line diagram",[168,21117,21118,21119,21122],{},"Colour of the circuit or, in the ",[15,21120,21121],{},"Symbol type"," colour mode, of the symbol type. This is no finding.",[12,21124,21125],{},"Notes get no marker on the symbol and only appear in the findings list. This includes the recommendation to put a time-delayed type S RCD upstream of a 30 mA RCD (selectivity): it is a good-practice recommendation based on IEC 60364-5-53, not an AREI requirement for residential installations.",[12,21127,21128],{},"How to find the reason:",[3139,21130,21131,21136,21143,21148],{},[87,21132,3370,21133,21135],{},[15,21134,3926],{},", tap or click the marker on the symbol. The findings list opens with all findings for that element, each with its reason and a suggestion. The small legend at the top right of the diagram explains the markers.",[87,21137,21138,21139,7814,21141,56],{},"If you click a finding in the findings list, the single-line diagram jumps to the element and briefly highlights it. You also read all findings in the ",[15,21140,21022],{},[15,21142,21025],{},[87,21144,21145,21146,56],{},"An orange dot on the floor plan turns green as soon as the device is linked to the installation, for example by assigning it to a circuit: see ",[40,21147,20412],{"href":20411},[87,21149,21150,21151,21154,21155,3157,21157,21159,21160,21163,21164,21167,21168,15788],{},"You switch the ",[15,21152,21153],{},"Color mode"," between ",[15,21156,4399],{},[15,21158,21121],{}," in the symbol legend: on the floor plan via ",[15,21161,21162],{},"Layers"," at the bottom right (",[15,21165,21166],{},"Symbol legend"," section), in the single-line diagram via the ",[15,21169,21166],{},[12,21171,21172,21173,21175],{},"If the self-check is switched off for the project, the single-line diagram shows no check markers: see ",[40,21174,20444],{"href":20443},". The 3D view and the PDF export show no check markers.",[12,21177,21178],{},[40,21179],{"id":21180},"self-check-off",[79,21182,21184],{"id":21183},"when-should-you-switch-off-the-self-check-for-a-project","When should you switch off the self-check for a project?",[12,21186,21187],{},"The AREI self-check (AREI is the Belgian electrical installation regulation, RGIE in French) can be switched off per project. It is meant for professionals who document an existing, non-compliant installation as a baseline. For new planning it stays on.",[3139,21189,21190,21199,21205,21218],{},[87,21191,21192,21193,5259,21196,56],{},"Open the project menu (logo, top left) → ",[15,21194,21195],{},"Project settings…",[15,21197,21198],{},"General",[87,21200,21201,21202,56],{},"Switch off ",[15,21203,21204],{},"AREI self-check",[87,21206,21207,21208,11250,21211,21214,21215,56],{},"In the “Switch off self-check?” dialog, choose for example ",[15,21209,21210],{},"Document existing installation as baseline",[15,21212,21213],{},"Reason (optional)",", then confirm with ",[15,21216,21217],{},"Switch off",[87,21219,21220,21221,21223],{},"Success criterion: the studio shows the ",[15,21222,20444],{}," notice.",[138,21225,21226,21236],{},[141,21227,21228],{},[144,21229,21230,21233],{},[147,21231,21232],{},"What changes",[147,21234,21235],{},"Effect with the self-check switched off",[163,21237,21238,21246,21254,21262],{},[144,21239,21240,21243],{},[168,21241,21242],{},"Findings in the editor",[168,21244,21245],{},"“The AREI check keeps running in the background. Findings are not shown and exports carry no check marks.”",[144,21247,21248,21251],{},[168,21249,21250],{},"Self-check report",[168,21252,21253],{},"Blocked: “Self-check is switched off” or “Unavailable while the self-check is switched off.”",[144,21255,21256,21259],{},[168,21257,21258],{},"Rule, cable and connection findings",[168,21260,21261],{},"Become warnings; the release shows “{count} check findings not assessed (self-check off)”",[144,21263,21264,21267],{},[168,21265,21266],{},"Still blocking",[168,21268,21269],{},"Inconsistent references, missing content, unplaced devices, boards and modules, missing circuit labels, modules that cannot be rendered and the diagram review",[12,21271,21272,21273,21275,21276,21279],{},"Through the ",[15,21274,20444],{}," notice and ",[15,21277,21278],{},"Switch on self-check"," you return to the normal state at any time.",[12,21281,21282],{},[40,21283],{"id":21284},"cable-length",[79,21286,21288],{"id":21287},"why-is-a-cable-length-missing-or-does-it-say-route-incomplete","Why is a cable length missing or does it say “Route incomplete”?",[12,21290,21291,21292,21294],{},"PlanElec determines a cable’s length in this order: a measured length you enter takes precedence. Otherwise the length of the drawn route applies. If the route is not continuous, PlanElec does not output an estimate but shows ",[15,21293,20465],{},". Without a length, the self-check reports “Cable \"{label}\" — length missing for exact ΔU calculation”.",[138,21296,21297,21308],{},[141,21298,21299],{},[144,21300,21301,21304,21306],{},[147,21302,21303],{},"Display",[147,21305,18085],{},[147,21307,20676],{},[163,21309,21310,21323,21335],{},[144,21311,21312,21317,21320],{},[168,21313,21314],{},[15,21315,21316],{},"Not routed yet",[168,21318,21319],{},"The cable has no route yet",[168,21321,21322],{},"Draw the route automatically or by hand",[144,21324,21325,21329,21332],{},[168,21326,21327],{},[15,21328,20465],{},[168,21330,21331],{},"A section is missing, often the transition between floors",[168,21333,21334],{},"Add the missing section or riser",[144,21336,21337,21340,21343],{},[168,21338,21339],{},"“No connector has stops on both floors.”",[168,21341,21342],{},"No stair, shaft or riser connects the two floors",[168,21344,21345],{},"Create a vertical connector, then route",[12,21347,21348],{},"Completing the route:",[3139,21350,21351,21360,21366,21376],{},[87,21352,21353,21354,5259,21357,56],{},"On the situation plan, open ",[15,21355,21356],{},"Linking & cabling",[15,21358,21359],{},"Cable route",[87,21361,15424,21362,21365],{},[15,21363,21364],{},"Auto-route all"," for the active floor, or click a cable to edit its waypoints.",[87,21367,21368,21369,21372,21373,56],{},"For a cable between floors, choose ",[15,21370,21371],{},"Choose stair, shaft or riser"," and then ",[15,21374,21375],{},"Route via connector",[87,21377,21378,21379,56],{},"Success criterion: the length in metres replaces ",[15,21380,20465],{},[12,21382,21383],{},"Entering a measured length, for example in an existing installation:",[3139,21385,21386,21389,21394],{},[87,21387,21388],{},"Select the cable in the cable route or in the single-line diagram.",[87,21390,4055,21391,56],{},[15,21392,21393],{},"Edit cable type and conductors",[87,21395,21396,21397,16173,21400,56],{},"Enter ",[15,21398,21399],{},"Measured length (m)",[15,21401,21402],{},"Save cable details",[12,21404,21405,21406,56],{},"The measured length feeds the cable list and the voltage-drop calculation; the route’s geometric value is kept for comparison. More: ",[40,21407,21409],{"href":21408},"\u002Fen\u002Fhelp\u002Fswitch-chains-circuits-and-cable-routes#cable-routes","Plan and edit cable routes",[12,21411,21412],{},[40,21413],{"id":21414},"cabinet-unplaced",[79,21416,21418],{"id":21417},"why-are-modules-listed-under-unassigned-modules","Why are modules listed under “Unassigned modules”?",[12,21420,21421,21422,21424],{},"A module that exists in the project but does not sit on any DIN rail yet appears at the top of the distribution board under ",[15,21423,20482],{},", with the note “Present in the diagram, but not assigned to a DIN rail yet.” This happens, for example, when a protective device is created in the single-line diagram or in the installation. If you select it in another view, PlanElec says: “This module is not placed yet. Find it in the unplaced modules tray.”",[3139,21426,21427,21432,21440,21443],{},[87,21428,4055,21429,21431],{},[15,21430,3115],{}," for the board concerned.",[87,21433,3370,21434,21436,21437,21439],{},[15,21435,20482],{}," bar, click the module (",[15,21438,6672],{},"). PlanElec puts it on the next free slot.",[87,21441,21442],{},"If PlanElec reports “There is no free space in the assigned cabinet.”, first free up space on the rows or review the enclosure planning of the board.",[87,21444,21445],{},"Success criterion: the bar disappears once no module is left open.",[12,21447,21448,21449,56],{},"For the distribution-board PDF, an unplaced module is a blocker: “Place missing modules on the DIN rails”. More: ",[40,21450,21451],{"href":3473},"Specify modules and enclosure",[12,21453,21454],{},[40,21455],{"id":21456},"sync",[79,21458,21460],{"id":21459},"what-do-the-save-and-sync-messages-mean","What do the save and sync messages mean?",[12,21462,21463],{},"Your save state is shown by the round status icon in the status bar at the bottom right. A click opens the details: save status, offline readiness and connection.",[138,21465,21466,21476],{},[141,21467,21468],{},[144,21469,21470,21472,21474],{},[147,21471,17536],{},[147,21473,2314],{},[147,21475,10804],{},[163,21477,21478,21490,21505,21516,21533,21544,21558],{},[144,21479,21480,21482,21485],{},[168,21481,15311],{},[168,21483,21484],{},"Offline preparation requires live sync. Normal saving to the server carries on.",[168,21486,21487,21488,56],{},"Nothing. Look for ",[15,21489,3168],{},[144,21491,21492,21497,21500],{},[168,21493,21494,21496],{},[15,21495,15353],{},", “Saved in this browser. Server backup is still pending.”",[168,21498,21499],{},"Your changes are in the browser; the server does not have them yet.",[168,21501,21502,21503,15295],{},"Check the connection; keep the tab open until ",[15,21504,3168],{},[144,21506,21507,21510,21513],{},[168,21508,21509],{},"“An object you edited is currently reserved in another session. …”",[168,21511,21512],{},"Someone is editing the same object in another session.",[168,21514,21515],{},"Nothing. Your changes are kept locally and saving is retried automatically.",[144,21517,21518,21522,21525],{},[168,21519,21520],{},[15,21521,15419],{},[168,21523,21524],{},"Your changes contradict the shared saved version.",[168,21526,21527,21529,21530,21532],{},[15,21528,15427],{},", then ",[15,21531,15433],{}," and confirm.",[144,21534,21535,21538,21541],{},[168,21536,21537],{},"“Conflict: this project was changed elsewhere. Please reload.”",[168,21539,21540],{},"The project was saved elsewhere.",[168,21542,21543],{},"Reload the page and check your last change.",[144,21545,21546,21552,21555],{},[168,21547,21548,21551],{},[15,21549,21550],{},"Reload required",": “This page is running an older version. …”",[168,21553,21554],{},"A new app version is active.",[168,21556,21557],{},"Reload the page; your changes are saved locally.",[144,21559,21560,21564,21567],{},[168,21561,21562],{},[15,21563,15394],{},[168,21565,21566],{},"Your sign-in has expired.",[168,21568,21569,56],{},[15,21570,15398],{},[12,21572,21573,21575],{},[15,21574,15433],{}," replaces the local changes of this session with the saved project. Download the backup first if you want to keep them. Other tabs retain their local changes.",[12,21577,21578],{},[40,21579],{"id":21580},"ai-limit",[79,21582,21584],{"id":21583},"what-if-the-ai-allowance-or-the-daily-limit-is-reached","What if the AI allowance or the daily limit is reached?",[12,21586,21587],{},"AI features have two limits: daily per-user limits for floor-plan recognition (30 runs) and distribution-board recognition from photos (20 runs), and your account’s AI allowance, which all AI features share, including floor-plan recognition, distribution-board recognition from photos and the PlanElec assistant.",[138,21589,21590,21600],{},[141,21591,21592],{},[144,21593,21594,21596,21598],{},[147,21595,17536],{},[147,21597,18085],{},[147,21599,20676],{},[163,21601,21602,21613,21624,21635,21646],{},[144,21603,21604,21607,21610],{},[168,21605,21606],{},"“The daily quota for recognitions is used up. New runs are available tomorrow.”",[168,21608,21609],{},"Daily limit of floor-plan recognition reached",[168,21611,21612],{},"Start again the next day (UTC); trace the template in the meantime",[144,21614,21615,21618,21621],{},[168,21616,21617],{},"“Your remaining AI allowance is insufficient for this analysis.”",[168,21619,21620],{},"AI allowance too low for this run",[168,21622,21623],{},"Check the balance in the user menu; continue planning without AI",[144,21625,21626,21629,21632],{},[168,21627,21628],{},"“Allowance is reserved for an analysis in progress. Please try again in a few minutes.”",[168,21630,21631],{},"Another analysis is still running",[168,21633,21634],{},"Wait a moment and start again",[144,21636,21637,21640,21643],{},[168,21638,21639],{},"“Too many requests. Please try again later.”",[168,21641,21642],{},"Short throttling",[168,21644,21645],{},"Try again later",[144,21647,21648,21650,21653],{},[168,21649,19378],{},[168,21651,21652],{},"Board recognition failed, including when the daily limit is reached",[168,21654,21655],{},"Try again later or place the modules by hand",[12,21657,21658,21659,21661,21662,21665],{},"Your balance is shown in the user menu (your profile picture) under ",[15,21660,14864],{}," as “{percent}% available”, and in the settings under ",[15,21663,21664],{},"AI and data permissions",". Below it you see the day it refills: with a subscription the allowance renews every 30 days from its start, otherwise every calendar month, and unused allowance does not carry over. “Your AI allowance for this month has been used up.” means no AI runs are available until that day. Failed analyses charged by the provider also use allowance.",[12,21667,21668,21669,21671,21672,56],{},"Without AI you can still plan everything: import the plan as a template and trace it, place devices from the palette, place modules in the distribution board. On the assistant: ",[40,21670,14334],{"href":13483},". On photo recognition: ",[40,21673,13713],{"href":3477},[12,21675,21676],{},[40,21677],{"id":21678},"fallback-3d",[79,21680,21682],{"id":21681},"why-does-the-3d-view-only-show-a-notice","Why does the 3D view only show a notice?",[12,21684,21685],{},"The 3D view needs WebGL in the browser. If it is missing or the 3D view fails to start, PlanElec replaces the scene with an explained notice. The situation plan remains fully usable in 2D.",[138,21687,21688,21699],{},[141,21689,21690],{},[144,21691,21692,21695,21697],{},[147,21693,21694],{},"Notice",[147,21696,18085],{},[147,21698,20676],{},[163,21700,21701,21714],{},[144,21702,21703,21708,21711],{},[168,21704,21705,21707],{},[15,21706,15772],{},": “This browser does not provide WebGL. The situation plan remains fully usable in 2D.”",[168,21709,21710],{},"The browser does not provide WebGL",[168,21712,21713],{},"Enable WebGL or hardware acceleration in the browser, or use another current browser; keep working in 2D",[144,21715,21716,21721,21724],{},[168,21717,21718,21720],{},[15,21719,15783],{},": “The browser reset the graphics context.”",[168,21722,21723],{},"The browser reset the graphics context",[168,21725,15424,21726],{},[15,21727,15787],{},[12,21729,21730,21731,21733,21734,3157,21736,21738,21739,56],{},"PlanElec only offers the split ",[15,21732,15805],{}," view in a wide desktop window. On a phone you choose between ",[15,21735,15799],{},[15,21737,15802],{},". More: ",[40,21740,21742],{"href":21741},"\u002Fen\u002Fhelp\u002F3d-view-and-lighting-study","3D view and lighting study",[79,21744,21746],{"id":21745},"your-problem-is-not-listed","Your problem is not listed?",[12,21748,21749,21750,21752,21753,21755,21756,21758],{},"Start with the flow in ",[40,21751,15677],{"href":15676},": many blocks clear once the situation plan, installation, distribution board and single-line diagram are complete, in that order. Then check the open findings in the ",[15,21754,21022],{}," panel and, in ",[15,21757,4665],{},", the first blocker of each document.",{"title":2044,"searchDepth":2045,"depth":2045,"links":21760},[21761,21762,21763,21764,21765,21766,21767,21768,21769,21770,21771,21772,21773],{"id":20353,"depth":2045,"text":20354},{"id":20545,"depth":2045,"text":20546},{"id":20635,"depth":2045,"text":20636},{"id":20741,"depth":2045,"text":20742},{"id":20808,"depth":2045,"text":20809},{"id":21040,"depth":2045,"text":21041},{"id":21183,"depth":2045,"text":21184},{"id":21287,"depth":2045,"text":21288},{"id":21417,"depth":2045,"text":21418},{"id":21459,"depth":2045,"text":21460},{"id":21583,"depth":2045,"text":21584},{"id":21681,"depth":2045,"text":21682},{"id":21745,"depth":2045,"text":21746},"Missing scale, device not in the diagram, export blocked, cable length open, module not placed, sync message, AI limit or 3D notice: cause and fix for each message.","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Ftroubleshooting-en.webp",{},16,"\u002Fhelp\u002Ftroubleshooting.en",{"title":20345,"description":21774},"solve-common-problems","help\u002Ftroubleshooting.en",[16627,21783,19879,21784,21785,15704],"export","self-check","cable length","2026-11-18","f_THSHABQS3YcXBEvgNUjdGl2FlN5niAUY8FVo_KftQ","\u002Fhelp\u002Fsolve-common-problems",[],{"id":21791,"title":21792,"body":21793,"category":10304,"description":22371,"extension":2113,"guideId":22372,"image":22373,"locale":2119,"meta":22374,"navigation":2121,"order":22375,"path":22376,"publishedAt":22377,"readTime":3582,"seo":22378,"seoTitle":20108,"slug":22379,"stem":22380,"tags":22381,"updatedAt":16792,"__hash__":22387,"kind":3594,"href":22388,"date":22377,"labels":22389},"help\u002Fhelp\u002Ffloor-alignment-building-origin.en.md","How do I align floors on top of each other, and what does the building origin do?",{"type":9,"value":21794,"toc":22360},[21795,21809,21813,21922,21927,21931,21934,21937,21958,21961,21966,21970,21973,22049,22063,22071,22076,22080,22105,22111,22116,22120,22123,22126,22146,22151,22155,22187,22192,22196,22211,22216,22221,22225,22231,22290,22342,22345,22349],[12,21796,21797,21798,21801,21802,6975,21805,21808],{},"To stack floors exactly on top of each other, open the alignment for the floor that should move, show another floor as an overlay and set at least two ",[15,21799,21800],{},"point pairs"," (for example the bottom-right corner and a second corner). Alternatively, enter offset and rotation by hand. Then choose ",[15,21803,21804],{},"Save alignment",[15,21806,21807],{},"Set origin here"," is not for this: the building origin is one single point for the whole project, and moving it shifts every floor by the same vector. Their position relative to each other does not change.",[79,21810,21812],{"id":21811},"which-tool-for-which-goal","Which tool for which goal?",[138,21814,21815,21826],{},[141,21816,21817],{},[144,21818,21819,21822,21824],{},[147,21820,21821],{},"Goal",[147,21823,4121],{},[147,21825,3913],{},[163,21827,21828,21849,21872,21884,21898,21910],{},[144,21829,21830,21833,21839],{},[168,21831,21832],{},"Make one floor coincide with another (corners, walls)",[168,21834,21835,21838],{},[15,21836,21837],{},"Align floors"," with point pairs",[168,21840,21841,21842,21844,21845,21848],{},"Toolbar in ",[15,21843,13345],{}," mode, ",[15,21846,21847],{},"Manage floors"," menu, the floor's status badge in the building view",[144,21850,21851,21854,21869],{},[168,21852,21853],{},"Correct the alignment by a few centimetres",[168,21855,21856,21859,21860,1774,21863,1774,21866],{},[15,21857,21858],{},"Fine tuning",": arrows, ",[15,21861,21862],{},"X offset (m)",[15,21864,21865],{},"Y offset (m)",[15,21867,21868],{},"Rotation (°)",[168,21870,21871],{},"Alignment panel",[144,21873,21874,21877,21882],{},[168,21875,21876],{},"Use a stair or shaft as a shared point",[168,21878,21879],{},[15,21880,21881],{},"Adopt a stair or shaft",[168,21883,21871],{},[144,21885,21886,21889,21893],{},[168,21887,21888],{},"Fix the zero point of the whole building",[168,21890,21891],{},[15,21892,21807],{},[168,21894,21841,21895,21897],{},[15,21896,13345],{}," mode",[144,21899,21900,21903,21908],{},[168,21901,21902],{},"Return to the starting values",[168,21904,21905],{},[15,21906,21907],{},"Reset to assumptions",[168,21909,21871],{},[144,21911,21912,21915,21920],{},[168,21913,21914],{},"Enter finished-floor elevation, clear height and slab",[168,21916,21917],{},[15,21918,21919],{},"Physical heights",[168,21921,21871],{},[12,21923,21924],{},[40,21925],{"id":21926},"origin",[79,21928,21930],{"id":21929},"why-do-all-floors-move-when-i-set-the-origin","Why do all floors move when I set the origin?",[12,21932,21933],{},"The building origin is the zero point of the project's shared coordinate system. It exists once, not per floor. It is stored in the coordinates of the reference floor; if you click on another floor, the point is first transferred to the reference floor.",[12,21935,21936],{},"When you set it, PlanElec shifts the stored position of every floor by the same vector. The confirmation says so: “Building origin set. All floors keep their relative position.” The origin therefore changes where the coordinates start, not the distance between two floors. If two floors do not line up before, they still do not line up afterwards.",[12,21938,21939,21940,21942,21943,21945,21946,21949,21950,21953,21954,21957],{},"To set the origin: switch to ",[15,21941,13345],{}," mode, choose ",[15,21944,21807],{}," in the toolbar and click the point you want. Wall nodes snap, so the origin lands on a real building corner. As long as you have never set the origin and the reference floor is active, the chip ",[15,21947,21948],{},"Set origin here (bottom left)"," proposes the lower-left corner of the outer outline. ",[15,21951,21952],{},"Show origin & markers"," displays the marker, ",[15,21955,21956],{},"Go to origin"," centres the view on it.",[12,21959,21960],{},"If you want the bottom-right corner to be your zero point, set the origin there on the reference floor. That does not align the other floors; for that you need the alignment below.",[12,21962,21963],{},[40,21964],{"id":21965},"pairs",[79,21967,21969],{"id":21968},"how-do-i-align-a-floor-with-point-pairs","How do I align a floor with point pairs?",[12,21971,21972],{},"Point pairs are the most direct route when the floors have the same outer dimensions.",[3139,21974,21975,21978,21999,22018,22028,22031,22044],{},[87,21976,21977],{},"Activate the floor that should move. The reference floor does not move (see below).",[87,21979,21980,21981,21983,21984,21986,21987,3116,21990,21992,21993,21995,21996,56],{},"Open the alignment: ",[15,21982,21837],{}," in the toolbar in ",[15,21985,13345],{}," mode, or ",[15,21988,21989],{},"Align position …",[15,21991,21847],{}," menu of the floor selector, or click the floor's status badge in the building view. The stair toolbar also offers ",[15,21994,21837],{},". The panel is titled ",[15,21997,21998],{},"Align floors and define heights",[87,22000,5777,22001,22004,22005,6975,22008,1774,22011,3157,22014,22017],{},[15,22002,22003],{},"Reference overlay",", pick the floor to use as a template in ",[15,22006,22007],{},"Show another floor",[15,22009,22010],{},"Overlay opacity",[15,22012,22013],{},"Blink",[15,22015,22016],{},"Show reference"," (press and hold, or hold Alt) help you compare.",[87,22019,5777,22020,22023,22024,22027],{},[15,22021,22022],{},"Point pairs",", choose ",[15,22025,22026],{},"Set point pair",". It is only active with an overlay showing. The panel closes: first click the point in the current floor plan (“Select the point in the current floor plan”), then the same point in the overlay.",[87,22029,22030],{},"Repeat with a second point far from the first, for example the other corner of the bottom wall. From two point pairs onwards, offset and rotation are derived automatically; a single pair does not determine the rotation. Two points that coincide determine no position.",[87,22032,22033,22034,1774,22037,3157,22040,22043],{},"Check ",[15,22035,22036],{},"Average deviation",[15,22038,22039],{},"Largest deviation",[15,22041,22042],{},"Observed scale deviation",". Scale stays fixed at 50 plan units per metre; only offset and rotation change. Clear deviations show that the plans do not match exactly.",[87,22045,15424,22046,22048],{},[15,22047,21804],{},". Saving is a single undo step.",[12,22050,4659,22051,22054,22055,22058,22059,22062],{},[15,22052,22053],{},"Edit markers in the floor plan"," you drag the markers; ",[15,22056,22057],{},"Back to the alignment"," reopens the panel. Individual pairs can only be removed from three pairs onwards; ",[15,22060,22061],{},"Discard point pairs"," clears them all.",[12,22064,22065,22066,22023,22068,56],{},"A stair or shaft that connects the active floor with the reference floor can serve as a pair: under ",[15,22067,21881],{},[15,22069,22070],{},"Adopt",[12,22072,22073],{},[40,22074],{"id":22075},"numeric",[79,22077,22079],{"id":22078},"how-do-i-enter-offset-and-rotation-by-hand","How do I enter offset and rotation by hand?",[12,22081,5777,22082,22084,22085,1774,22087,3157,22089,22091,22092,1774,22095,1774,22098,3157,22101,22104],{},[15,22083,21858],{},", enter ",[15,22086,21862],{},[15,22088,21865],{},[15,22090,21868],{},". The offset applies in metres in the building's coordinate system; keep an overlay visible to check the result. The buttons ",[15,22093,22094],{},"Move up",[15,22096,22097],{},"Move down",[15,22099,22100],{},"Move left",[15,22102,22103],{},"Move right"," shift the floor by 1 cm, 10 cm with Shift.",[12,22106,22107,22108,22110],{},"While point pairs determine the position, these fields are locked (“Offset and rotation are derived from the point pairs and are therefore locked.”). Choose ",[15,22109,22061],{}," to work by hand again.",[12,22112,22113],{},[40,22114],{"id":22115},"reference",[79,22117,22119],{"id":22118},"which-floor-is-the-reference-floor","Which floor is the reference floor?",[12,22121,22122],{},"The panel names it at the top: “Building origin:” followed by the floor's name. The reference floor defines the building origin. By default it is the floor at level 0, otherwise the lowest. Its offset follows the origin you set and is not edited in the panel: no point pairs, fields and arrows locked.",[12,22124,22125],{},"The interface has no command for choosing the reference floor yourself. If you delete the reference floor, the neighbouring floor takes over the role, the origin returns to its default and the remaining floors keep their position relative to each other.",[12,22127,22128,22129,22132,22133,1774,22136,22139,22140,6975,22143,22145],{},"A new floor first sits in the same place as the reference. In ",[15,22130,22131],{},"Create floor",", the question “How does this floor sit relative to the reference?” offers ",[15,22134,22135],{},"Like the reference",[15,22137,22138],{},"Align now"," (opens the alignment straight away) or ",[15,22141,22142],{},"Later",[15,22144,22138],{}," is missing when the new floor would itself become the reference.",[12,22147,22148],{},[40,22149],{"id":22150},"reset",[79,22152,22154],{"id":22153},"how-do-i-undo-or-reset-an-alignment","How do I undo or reset an alignment?",[84,22156,22157,22162,22175],{},[87,22158,22159,22161],{},[15,22160,21907],{}," sets offset and rotation to zero, the status to “Assumed”, the heights to the defaults for the level and removes the overlay. On the reference floor it restores the offset that follows from the origin, without moving the origin.",[87,22163,22164,22165,22168,22169,3324,22172,56],{},"If you close the panel with unsaved changes, ",[15,22166,22167],{},"Discard the alignment?"," asks what to do: ",[15,22170,22171],{},"Keep editing",[15,22173,22174],{},"Discard",[87,22176,22177,22178,1774,22181,3324,22184,56],{},"The status display shows the state of each floor: ",[15,22179,22180],{},"Assumed",[15,22182,22183],{},"Confirmed",[15,22185,22186],{},"Needs review",[12,22188,22189],{},[40,22190],{"id":22191},"heights",[79,22193,22195],{"id":22194},"where-do-i-enter-floor-heights","Where do I enter floor heights?",[12,22197,22198,22199,8194,22201,1774,22204,3157,22207,22210],{},"In the same panel under ",[15,22200,21919],{},[15,22202,22203],{},"Finished-floor elevation (m)",[15,22205,22206],{},"Clear height (m)",[15,22208,22209],{},"Slab thickness above (m)",". Default values remain assumptions; only heights that actually change are confirmed when saved. If floors overlap in height, PlanElec refuses to save and names the minimum elevation required.",[12,22212,22213,22214,56],{},"Position and heights are saved together with ",[15,22215,21804],{},[12,22217,22218],{},[40,22219],{"id":22220},"north",[79,22222,22224],{"id":22223},"how-do-i-set-north-north-arrow","How do I set north (north arrow)?",[12,22226,22227,22228,22230],{},"You set the north direction once for the whole project in the ",[15,22229,16348],{}," dialog. North stays at the top there, and you rotate the house to match how it sits on the plot. The value applies to all floors and drives the north arrow on the situation plan and the sun position in the 3D view.",[3139,22232,22233,22265,22275,22282],{},[87,22234,22235,22236],{},"Open the dialog in one of these ways:\n",[84,22237,22238,22251,22262],{},[87,22239,22240,22241,22243,22244,22247,22248,22250],{},"in ",[15,22242,13345],{}," mode, click the compass rose above and to the right of the building (keyboard: focus the compass rose, then press Enter or Space). It belongs to the ",[15,22245,22246],{},"Dimensions"," layer in the ",[15,22249,21162],{}," menu and appears once walls are drawn;",[87,22252,22253,22254,7814,22256,22258,22259,22261],{},"in the ",[15,22255,16115],{},[15,22257,16344],{},", with ",[15,22260,16348],{},";",[87,22263,22264],{},"in the 3D view, click the north arrow next to the building.",[87,22266,22267,22268,22270,22271,22274],{},"Rotate the house: drag the outline with the mouse or use the arrow keys, holding Shift for 15° steps. ",[15,22269,16352],{}," offers 0°, 90°, 180° and 270°; type the exact angle in the ",[15,22272,22273],{},"House rotation"," field.",[87,22276,22277,22278,22281],{},"If the project has a location, ",[15,22279,22280],{},"Show site map"," displays the map behind the outline, so you can align the house with the aerial view.",[87,22283,16185,22284,22286,22287,22289],{},[15,22285,3342],{},". The compass rose shows the new angle; ",[15,22288,13947],{}," reverts the change in one step.",[138,22291,22292,22301],{},[141,22293,22294],{},[144,22295,22296,22299],{},[147,22297,22298],{},"Where does the north direction apply?",[147,22300,3293],{},[163,22302,22303,22311,22321,22334],{},[144,22304,22305,22308],{},[168,22306,22307],{},"Situation plan export",[168,22309,22310],{},"north arrow with the angle on every sheet",[144,22312,22313,22318],{},[168,22314,22315,22316],{},"3D view and ",[15,22317,16115],{},[168,22319,22320],{},"sun position and cast shadows",[144,22322,22323,22325],{},[168,22324,17756],{},[168,22326,22327,22328,22330,22331,22333],{},"starting value for north; in the ",[15,22329,18283],{}," step you confirm it with ",[15,22332,18287],{}," for the forecast",[144,22335,22336,22339],{},[168,22337,22338],{},"Assistant",[168,22340,22341],{},"compass direction of walls, for example \"north wall\"",[12,22343,22344],{},"0° means north at the top of the plan, counted clockwise. The north direction is independent of the building origin and of floor alignment: it does not rotate any drawing, it only records where north is. There is one value per project, not per floor.",[79,22346,22348],{"id":22347},"related","Related",[84,22350,22351,22356],{},[87,22352,22353,22355],{},[40,22354,9462],{"href":9461}," to set each plan to scale first.",[87,22357,22358,56],{},[40,22359,16745],{"href":16744},{"title":2044,"searchDepth":2045,"depth":2045,"links":22361},[22362,22363,22364,22365,22366,22367,22368,22369,22370],{"id":21811,"depth":2045,"text":21812},{"id":21929,"depth":2045,"text":21930},{"id":21968,"depth":2045,"text":21969},{"id":22078,"depth":2045,"text":22079},{"id":22118,"depth":2045,"text":22119},{"id":22153,"depth":2045,"text":22154},{"id":22194,"depth":2045,"text":22195},{"id":22223,"depth":2045,"text":22224},{"id":22347,"depth":2045,"text":22348},"Align one floor to another with point pairs or a numeric offset, and see why “Set origin here” moves all floors together.","floor-alignment-building-origin","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Ffloor-alignment-building-origin-en.webp",{},11,"\u002Fhelp\u002Ffloor-alignment-building-origin.en","2026-10-09",{"title":21792,"description":22371},"align-floors-and-building-origin","help\u002Ffloor-alignment-building-origin.en",[22382,22383,22384,22022,22385,22386],"Floors","Alignment","Building origin","Overlay","Heights","VWBZMpBq1WxZXlavgeqzHOI4PBvWBD5SgAuPmNDbj64","\u002Fhelp\u002Falign-floors-and-building-origin",[],{"id":22391,"title":22392,"articleId":22393,"body":22394,"category":4239,"date":22991,"description":22992,"extension":2113,"image":22412,"labels":22993,"lastUpdated":10988,"locale":2119,"meta":22995,"navigation":2121,"ogImage":22996,"path":22997,"publishDate":22991,"readTime":6086,"refreshInterval":4248,"seo":22998,"seoTitle":22999,"slug":23000,"stem":23001,"tags":23002,"__hash__":23008,"kind":2137,"href":23009},"blog\u002Fblog\u002Fled-strip-power-supply.en.md","LED Strip Calculation: Which Power Supply, How Many Feed Points, Which Cable Size?","led-strip-power-supply",{"type":9,"value":22395,"toc":22971},[22396,22407,22413,22417,22420,22434,22437,22560,22563,22567,22574,22577,22581,22584,22646,22652,22656,22663,22670,22676,22680,22683,22695,22698,22770,22780,22784,22787,22807,22811,22814,22820,22826,22836,22840,22846,22849,22852,22854,22858,22861,22865,22868,22872,22875,22879,22882,22886,22889,22893,22896,22900,22918,22936,22943,22945,22963],[12,22397,22398,22401,22402,22406],{},[15,22399,22400],{},"An LED strip draws its watts per metre times its length, its current is that power divided by the voltage, and you size the power supply with about 20% reserve. Five metres of 14.4 W\u002Fm strip at 24 V need 72 W and 3 A, so a 100 W power supply fits."," Two lengths then decide the quality: how far the strip may run from one feed point, and how long the cable from the power supply to the strip is. You calculate both in a minute with the ",[40,22403,22405],{"href":22404},"\u002Fen\u002Ftools\u002Fled-strip-calculator","free LED strip calculator",", then plan the installation in PlanElec all the way to the single-line diagram.",[12,22408,22409],{},[74,22410],{"alt":22411,"src":22412},"An electrician prepares an LED strip with its profile and power supply.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-led-strip-power-supply-editorial.webp",[79,22414,22416],{"id":22415},"how-do-you-calculate-the-power-and-current-of-an-led-strip","How do you calculate the power and current of an LED strip?",[12,22418,22419],{},"Two formulas are enough:",[84,22421,22422,22428],{},[87,22423,22424,22425],{},"power: ",[25,22426,22427],{},"P = W\u002Fm × length",[87,22429,22430,22431],{},"current: ",[25,22432,22433],{},"I = P \u002F U",[12,22435,22436],{},"Power per metre is in the datasheet and applies at full brightness. For multi-channel strips (CCT, RGB, RGBW) it is the value with all channels at full load. Plan with that value, even if you rarely run all colours at once. Use the length you actually install: a strip can only be cut at its cut marks, typically every 50 or 100 mm. With a 50 mm cut unit, 2.37 m becomes 2.35 m.",[138,22438,22439,22456],{},[141,22440,22441],{},[144,22442,22443,22446,22449,22451,22454],{},[147,22444,22445],{},"Strip 24 V, 14.4 W\u002Fm",[147,22447,22448],{},"Power",[147,22450,17191],{},[147,22452,22453],{},"Required with 20% reserve",[147,22455,8234],{},[163,22457,22458,22475,22492,22509,22526,22543],{},[144,22459,22460,22463,22466,22469,22472],{},[168,22461,22462],{},"2 m",[168,22464,22465],{},"28.8 W",[168,22467,22468],{},"1.2 A",[168,22470,22471],{},"34.6 W",[168,22473,22474],{},"36 W",[144,22476,22477,22480,22483,22486,22489],{},[168,22478,22479],{},"3 m",[168,22481,22482],{},"43.2 W",[168,22484,22485],{},"1.8 A",[168,22487,22488],{},"51.8 W",[168,22490,22491],{},"60 W",[144,22493,22494,22497,22500,22503,22506],{},[168,22495,22496],{},"5 m",[168,22498,22499],{},"72 W",[168,22501,22502],{},"3.0 A",[168,22504,22505],{},"86.4 W",[168,22507,22508],{},"100 W",[144,22510,22511,22514,22517,22520,22523],{},[168,22512,22513],{},"8 m",[168,22515,22516],{},"115.2 W",[168,22518,22519],{},"4.8 A",[168,22521,22522],{},"138.2 W",[168,22524,22525],{},"150 W",[144,22527,22528,22531,22534,22537,22540],{},[168,22529,22530],{},"10 m",[168,22532,22533],{},"144 W",[168,22535,22536],{},"6.0 A",[168,22538,22539],{},"172.8 W",[168,22541,22542],{},"185 W",[144,22544,22545,22548,22551,22554,22557],{},[168,22546,22547],{},"15 m",[168,22549,22550],{},"216 W",[168,22552,22553],{},"9.0 A",[168,22555,22556],{},"259.2 W",[168,22558,22559],{},"320 W",[12,22561,22562],{},"The power-supply column shows the next common commercial rating. Your power supply's datasheet sets the actual range.",[79,22564,22566],{"id":22565},"how-large-must-the-power-supply-be","How large must the power supply be?",[12,22568,22569,22570,22573],{},"Calculate ",[25,22571,22572],{},"power supply ≥ P × 1.2",". The 20% reserve keeps the power supply cool and long-lived and covers strip and supply tolerances. If the supply sits in a tight suspended ceiling, inside furniture or at high ambient temperature, the datasheet derating applies on top: many units deliver less than their rated power there.",[12,22575,22576],{},"The same formula answers the reverse question of how much strip an existing supply can carry. A 60 W supply delivers 50 W with reserve: just over 5 m of a 9.6 W\u002Fm strip or almost 3.5 m of a 14.4 W\u002Fm strip. If the largest supply is not enough, split the installation into sections, each with its own power supply.",[79,22578,22580],{"id":22579},"_12-v-24-v-or-48-v","12 V, 24 V or 48 V?",[12,22582,22583],{},"At the same power, doubling the voltage halves the current, and the voltage drop in the cable falls in the same ratio. For 60 W over a 5 m feed cable of 1.5 mm² copper:",[138,22585,22586,22602],{},[141,22587,22588],{},[144,22589,22590,22593,22596,22599],{},[147,22591,22592],{},"Voltage",[147,22594,22595],{},"Current at 60 W",[147,22597,22598],{},"Feed-cable voltage drop",[147,22600,22601],{},"in %",[163,22603,22604,22618,22632],{},[144,22605,22606,22609,22612,22615],{},[168,22607,22608],{},"12 V",[168,22610,22611],{},"5.0 A",[168,22613,22614],{},"0.58 V",[168,22616,22617],{},"4.9%",[144,22619,22620,22623,22626,22629],{},[168,22621,22622],{},"24 V",[168,22624,22625],{},"2.5 A",[168,22627,22628],{},"0.29 V",[168,22630,22631],{},"1.2%",[144,22633,22634,22637,22640,22643],{},[168,22635,22636],{},"48 V",[168,22638,22639],{},"1.25 A",[168,22641,22642],{},"0.15 V",[168,22644,22645],{},"0.3%",[12,22647,22648,22651],{},[15,22649,22650],{},"24 V is the standard for homes:"," widely available, longer runs per feed point than 12 V and, in bathrooms, within the SELV limits (see below). 12 V still makes sense for short furniture and niche strips or existing 12 V components. 48 V plays to its strengths on long lines and profile systems. 5 V is for digital pixel strips and very short pieces.",[79,22653,22655],{"id":22654},"when-does-an-led-strip-need-several-feed-points","When does an LED strip need several feed points?",[12,22657,22658,22659,22662],{},"Voltage also drops along the strip itself. Fed too far from one end, the far end becomes visibly dimmer, and RGB and RGBW strips shift in colour. Manufacturers therefore state a ",[15,22660,22661],{},"maximum length per feed point",". It is in the datasheet and decreases as the power per metre rises.",[12,22664,22665,22666,22669],{},"The calculation: ",[25,22667,22668],{},"feed points = length ÷ maximum length per feed point",", rounded up. A 12 m strip with a 5 m manufacturer length needs three feed points; each then carries a third of the current. Every feed point gets its own cable from the power supply, run in parallel. For a light cove around a room this means a central power supply and feed points at the corners, rather than one long band fed from one side.",[1489,22671],{":height":22672,":width":3800,"alt":22673,"caption":22674,"src":22675},"470","Diagram: a 230 V circuit with circuit breaker and RCD feeds a 24 V DC power supply with a SELV output of at least 207 W. Three separate cables run in parallel to three feed points of a 12 m strip at 14.4 W\u002Fm; each section is 4 m long and carries 2.4 A.","Worked example: 12 m × 14.4 W\u002Fm = 172.8 W and 7.2 A. With at most 5 m per feed point, the strip splits into three sections with their own cable, each carrying a third of the current.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fled-strip-power-supply\u002Ffeed-points.en.svg",[79,22677,22679],{"id":22678},"which-cross-section-for-the-cable-from-power-supply-to-strip","Which cross-section for the cable from power supply to strip?",[12,22681,22682],{},"Extra-low voltage means high currents at a low voltage, so every metre of cable counts. The formula is the familiar single-phase one without a power factor:",[12,22684,22685,22258,22688,22691,22692,22694],{},[25,22686,22687],{},"ΔU = 2 × ρ × L × I \u002F S",[25,22689,22690],{},"ρ"," = 0.0175 Ω·mm²\u002Fm for copper and ",[25,22693,2467],{}," the one-way length.",[12,22696,22697],{},"For a 24 V strip drawing 3 A:",[138,22699,22700,22716],{},[141,22701,22702],{},[144,22703,22704,22707,22710,22713],{},[147,22705,22706],{},"Feed cable",[147,22708,22709],{},"0.75 mm²",[147,22711,22712],{},"1.5 mm²",[147,22714,22715],{},"2.5 mm²",[163,22717,22718,22731,22743,22756],{},[144,22719,22720,22722,22725,22728],{},[168,22721,22496],{},[168,22723,22724],{},"0.70 V · 2.9%",[168,22726,22727],{},"0.35 V · 1.5%",[168,22729,22730],{},"0.21 V · 0.9%",[144,22732,22733,22735,22738,22740],{},[168,22734,22530],{},[168,22736,22737],{},"1.40 V · 5.8%",[168,22739,22724],{},[168,22741,22742],{},"0.42 V · 1.8%",[144,22744,22745,22747,22750,22753],{},[168,22746,22547],{},[168,22748,22749],{},"2.10 V · 8.8%",[168,22751,22752],{},"1.05 V · 4.4%",[168,22754,22755],{},"0.63 V · 2.6%",[144,22757,22758,22761,22764,22767],{},[168,22759,22760],{},"max. at 3%",[168,22762,22763],{},"5.1 m",[168,22765,22766],{},"10.3 m",[168,22768,22769],{},"17.1 m",[12,22771,22772,22773,22776,22777,56],{},"We design for ",[15,22774,22775],{},"at most 3% voltage drop"," on the feed cable so the strip lights evenly. The AREI\u002FRGIE sets no fixed percentage for extra-low-voltage feed cables; we adopt the 3% customary for lighting circuits as the design limit. Check the current-carrying capacity of thin cables separately against the manufacturer's data; the calculator therefore only proposes cross-sections from 0.75 mm². The basics of voltage drop at 230 V are in ",[40,22778,22779],{"href":3790},"Voltage drop calculation",[79,22781,22783],{"id":22782},"what-changes-with-rgb-rgbw-and-tunable-white","What changes with RGB, RGBW and tunable white?",[12,22785,22786],{},"Multi-channel strips split their power across channels: two for CCT (tunable white), three for RGB, four for RGBW, five for RGB+CCT. An RGBW strip of 19.2 W\u002Fm over 4 m draws 76.8 W and 3.2 A, i.e. 0.8 A per channel. That leads to three design points:",[84,22788,22789,22795,22801],{},[87,22790,22791,22794],{},[15,22792,22793],{},"Controller:"," it must supply the current per channel. 0.8 A is easy; 15 m of the same strip at 3 A per channel is beyond some controllers.",[87,22796,22797,22800],{},[15,22798,22799],{},"Number of cores:"," the common positive plus one conductor per channel. Mono needs 2 cores, CCT 3, RGB 4, RGBW 5, RGB+CCT 6.",[87,22802,22803,22806],{},[15,22804,22805],{},"Voltage drop:"," the common positive conductor carries the current of all channels, each channel conductor only its share. The effective current is therefore lower than for a single-channel strip of the same power. In the example with 5 m and 0.75 mm², that gives 1.9% instead of 3.1%. The calculator accounts for this automatically.",[79,22808,22810],{"id":22809},"what-does-the-areirgie-require-for-led-strips","What does the AREI\u002FRGIE require for LED strips?",[12,22812,22813],{},"The AREI (RGIE in French) is the Belgian wiring regulation, Book 1 of the general regulation on electrical installations.",[12,22815,22816,22819],{},[15,22817,22818],{},"Voltage and type of current belong on the single-line diagram."," Subsection 3.1.2.1 a requires them for every domestic installation. A strip behind a power supply is therefore documented as \"24 V ⎓\", not only with the 230 V circuit in front of it. Table 2.23 has its own symbol for this, the AC↔DC rectifier; a safety transformer with AC output gets the transformer symbol.",[12,22821,22822,22825],{},[15,22823,22824],{},"SELV needs an approved source and proper separation."," Subsection 4.2.5.3 a defines the approved sources: an LED power supply with a SELV output qualifies, \"low voltage\" on its own does not. Under 4.2.5.3 c you run SELV conductors 10 mm away from other circuits, with additional insulation, or in a cable that is fully insulated for the highest voltage present. This matters mostly in boxes shared by push button, controller and 230 V wiring.",[12,22827,22828,22831,22832,56],{},[15,22829,22830],{},"In bathrooms, zone and voltage count."," Table 7.2 under subsection 7.1.4.2 a allows at most 12 V AC or 30 V ripple-free DC in zones 0 and 1, and up to 25 V AC or 60 V DC in zone 2. A 24 V DC strip in a shower niche is therefore permitted if it is suitable for that zone. The SELV source, i.e. the power supply, sits outside zones 0 and 1 according to subsection 7.1.5.2. Which cables go into which zone is covered in ",[40,22833,22835],{"href":22834},"\u002Fen\u002Fblog\u002Fbathroom-cables-arei-zones","Which cables can I use in the bathroom?",[79,22837,22839],{"id":22838},"calculate-online","Calculate online",[12,22841,4361,22842,22845],{},[40,22843,22844],{"href":22404},"LED strip calculator"," shows every value from this article at a glance: power, total and per-channel current, required feed points, power-supply size, recommended feed-cable cross-section and the cross-section comparison with voltage drop, end voltage and maximum length. It covers 5, 12, 24 and 48 V, single-colour, CCT, RGB, RGBW and RGB+CCT strips, starts from typical strip types and takes your own datasheet values.",[12,22847,22848],{},"Every result can be shared as a link or printed, which makes it easy to agree with clients and suppliers. AI assistants in the browser use the calculator directly via WebMCP and return the same shareable link.",[12,22850,22851],{},"The roles are clear: the calculator delivers the design from your datasheet values. The manufacturer's datasheet confirms length per feed point, derating, heat dissipation in the profile and the cable's current-carrying capacity.",[79,22853,1617],{"id":1616},[1041,22855,22857],{"id":22856},"can-i-feed-the-strip-in-the-middle","Can I feed the strip in the middle?",[12,22859,22860],{},"Yes. A centre feed halves the length in each direction and counts as two feed points over half the strip length each. For long lines it is often neater than two cables to both ends.",[1041,22862,22864],{"id":22863},"does-every-led-strip-need-an-aluminium-profile","Does every LED strip need an aluminium profile?",[12,22866,22867],{},"From medium power upwards, yes: the profile dissipates heat and, together with the diffuser, shapes the light. The manufacturer sets how much power per metre is allowed without a profile.",[1041,22869,22871],{"id":22870},"how-many-metres-fit-on-a-100-w-power-supply","How many metres fit on a 100 W power supply?",[12,22873,22874],{},"With 20% reserve, just over 83 W is available: about 5.8 m at 14.4 W\u002Fm, 8.7 m at 9.6 W\u002Fm or 4.3 m at 19.2 W\u002Fm (RGBW).",[1041,22876,22878],{"id":22877},"can-i-connect-two-power-supplies-to-one-strip","Can I connect two power supplies to one strip?",[12,22880,22881],{},"Plan separate sections, each with its own power supply, instead. Only the manufacturer decides whether supplies may run in parallel or on a continuous strip.",[1041,22883,22885],{"id":22884},"does-the-power-supply-go-in-the-distribution-board-or-next-to-the-strip","Does the power supply go in the distribution board or next to the strip?",[12,22887,22888],{},"Both work. On the DIN rail in the board it stays accessible and cool, but needs long extra-low-voltage cables, so the cross-section table above decides. Placed near the strip, the feed cable stays short, but the supply must be accessible and suitable for its location.",[1041,22890,22892],{"id":22891},"which-cable-goes-between-controller-and-rgbw-strip","Which cable goes between controller and RGBW strip?",[12,22894,22895],{},"A five-core cable (common positive plus four channels), sized for the channel current and the length. RGB+CCT needs six cores.",[79,22897,22899],{"id":22898},"plan-led-lighting-in-planelec","Plan LED lighting in PlanElec",[12,22901,22902,22905,22906,22909,22910,22913,22914,22917],{},[15,22903,22904],{},"For the single-line diagram and situation plan",", you draw the lighting circuit for free in the browser with ",[40,22907,22],{"href":1456,"rel":22908},[1458],": place a light point of type ",[15,22911,22912],{},"LED strip",", a ",[15,22915,22916],{},"Transformer",", switches and push buttons, add the circuit in front of it with its protective devices and print everything as a PDF.",[12,22919,22920,1774,22923,22925,22926,1774,22928,22931,22932,22935],{},[15,22921,22922],{},"For electrical contractors",[40,22924,31],{"href":1964}," lets you place ",[15,22927,22912],{},[15,22929,22930],{},"Transformer (LV Lighting)",", switches and push buttons directly on the floor plan, assign them to circuits and generate the single-line diagram, situation plan and material list. The self-check monitors, among other things, the number of light points per circuit and the voltage drop. Controls with Shelly or KNX actuators and push buttons are planned in the same project, and the ",[40,22933,22934],{"href":21741},"lighting study in the 3D view"," shows how the light falls in the room.",[1489,22937],{":height":22938,":width":22939,"alt":22940,"caption":22941,"src":22942},"792","1029","PlanElec Sketch: lighting circuit with a 2P 20 A circuit breaker, a ‘Transformer’ as power supply and a luminaire of the kind ‘LED strip’.","You draw the power supply and the LED strip as a chain behind the breaker. Power, voltage and cross-section on the low-voltage side are your own calculation; Sketch does not check AREI\u002FRGIE rules.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-led-power-supply.webp",[79,22944,7537],{"id":7536},[84,22946,22947,22952,22957],{},[87,22948,22949],{},[40,22950,22951],{"href":3790},"Voltage drop calculation: how long can your cable be?",[87,22953,22954],{},[40,22955,22956],{"href":22834},"Which cables can I use in the bathroom? (AREI zones)",[87,22958,22959],{},[40,22960,22962],{"href":22961},"\u002Fen\u002Fblog\u002Fsmart-home-domotica-arei","Smart home and AREI: what you need to know about home automation",[12,22964,22965,22966,22970],{},"Official basis: ",[40,22967,22969],{"href":1971,"rel":22968},[1458],"FPS Economy, AREI\u002FRGIE Book 1 V06",", in particular subsection 3.1.2.1, table 2.23, subsection 4.2.5.3 and subsections 7.1.4.2 and 7.1.5.2.",{"title":2044,"searchDepth":2045,"depth":2045,"links":22972},[22973,22974,22975,22976,22977,22978,22979,22980,22981,22989,22990],{"id":22415,"depth":2045,"text":22416},{"id":22565,"depth":2045,"text":22566},{"id":22579,"depth":2045,"text":22580},{"id":22654,"depth":2045,"text":22655},{"id":22678,"depth":2045,"text":22679},{"id":22782,"depth":2045,"text":22783},{"id":22809,"depth":2045,"text":22810},{"id":22838,"depth":2045,"text":22839},{"id":1616,"depth":2045,"text":1617,"children":22982},[22983,22984,22985,22986,22987,22988],{"id":22856,"depth":2053,"text":22857},{"id":22863,"depth":2053,"text":22864},{"id":22870,"depth":2053,"text":22871},{"id":22877,"depth":2053,"text":22878},{"id":22884,"depth":2053,"text":22885},{"id":22891,"depth":2053,"text":22892},{"id":22898,"depth":2045,"text":22899},{"id":7536,"depth":2045,"text":7537},"2026-10-05","Calculate power, current, power-supply size, feed points and feed cable for 12, 24 and 48 V LED strips. Formulas, tables, the RGBW case, AREI\u002FRGIE rules for SELV and bathrooms, and a free calculator.",[22994,2117,2118],"lighting",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-led-strip-power-supply-editorial.jpg","\u002Fblog\u002Fled-strip-power-supply.en",{"title":22392,"description":22992},"LED Strip Calculation: Power Supply, Feeds, Cable Size","led-strip-power-supply-calculation","blog\u002Fled-strip-power-supply.en",[23003,23004,22994,23005,23006,23007],"led-strip","power-supply","voltage-drop","selv","calculator","iDaubl7R_81-a_63Ok9oF2yW1fGLBw_xTSlQ5sGgcMc","\u002Fblog\u002Fled-strip-power-supply-calculation",{"id":23011,"title":23012,"articleId":23013,"body":23014,"category":4239,"date":23534,"description":23535,"extension":2113,"image":10985,"labels":23536,"lastUpdated":10988,"locale":2119,"meta":23537,"navigation":2121,"ogImage":10990,"path":23538,"publishDate":23534,"readTime":6086,"refreshInterval":2053,"seo":23539,"seoTitle":23540,"slug":23541,"stem":23542,"tags":23543,"__hash__":23544,"kind":2137,"href":23545},"blog\u002Fblog\u002Fai-assistant-electrical-planning.en.md","AI assistant for electrical planning: what does the PlanElec assistant do in your project?","planelec-ai-assistant",{"type":9,"value":23015,"toc":23514},[23016,23022,23026,23029,23033,23036,23039,23042,23046,23049,23191,23196,23200,23203,23236,23245,23251,23257,23261,23267,23273,23336,23341,23352,23356,23366,23369,23373,23383,23392,23396,23403,23406,23410,23416,23419,23427,23431,23434,23437,23441,23445,23448,23452,23460,23464,23472,23476,23484,23488,23494,23498,23501,23505],[12,23017,23018,23021],{},[15,23019,23020],{},"The PlanElec assistant is the AI assistant in the PlanElec studio: you describe in your own words what should happen in the project, and it applies the change across the whole project model – floor plan, devices, circuits, cables, distribution board, KNX, PV strings and lighting control."," Clear, reversible changes run straight away; risky actions wait for your confirmation. After every change the server checks the entire project with the same AREI\u002FRGIE self-check used by the report, and you undo any change in one step. It answers technical questions with verified sources from the AREI text and the PlanElec help centre. The assistant is available to every signed-in account in the PlanElec Pro studio, including the Try Pro plan, and draws on your account's monthly AI allowance.",[12,23023,23024],{},[74,23025],{"alt":76,"src":10985},[12,23027,23028],{},"PlanElec is built for electrical planning in Belgium, so the rules referred to here are the Belgian AREI (in French: RGIE).",[79,23030,23032],{"id":23031},"what-is-the-planelec-assistant","What is the PlanElec assistant?",[12,23034,23035],{},"The PlanElec assistant is a language model that works through PlanElec's own planning commands. It does not draw freely on your plan; it works with the same commands as the interface: more than 100 planning commands covering the floor plan and situation plan, rooms, devices, circuits, switch chains, cables, distribution boards, automation and KNX, PV strings and lighting control. It also creates projects and floors and navigates the interface for you.",[12,23037,23038],{},"Before it changes anything, the assistant reads the project: overview, structure, current check findings and the device catalogue. It plans with exactly the state you have in front of you – not a copy or a guess.",[12,23040,23041],{},"The assistant acts with your project permissions. Someone who may view a project but not edit it cannot change it through the assistant either.",[79,23043,23045],{"id":23044},"what-can-the-assistant-do-in-a-project","What can the assistant do in a project?",[12,23047,23048],{},"The assistant covers the planning workflow from an empty project to a populated distribution board. The table shows typical instructions per area. The wording is illustrative – write the way you would brief a colleague.",[138,23050,23051,23062],{},[141,23052,23053],{},[144,23054,23055,23057,23060],{},[147,23056,9856],{},[147,23058,23059],{},"Example instruction",[147,23061,15545],{},[163,23063,23064,23075,23086,23096,23107,23116,23127,23138,23148,23159,23169,23180],{},[144,23065,23066,23069,23072],{},[168,23067,23068],{},"Project and floors",[168,23070,23071],{},"\"Create a new project and add a first floor.\"",[168,23073,23074],{},"Project and floor are created; the assistant can take you straight there.",[144,23076,23077,23080,23083],{},[168,23078,23079],{},"Floor plan and rooms",[168,23081,23082],{},"\"Split the living room into a lounge and a dining area and name both rooms.\"",[168,23084,23085],{},"Room geometry and names are updated in the floor plan.",[144,23087,23088,23090,23093],{},[168,23089,9873],{},[168,23091,23092],{},"\"Place three socket outlets in the kitchen.\"",[168,23094,23095],{},"The outlets appear on the floor plan, ready for a circuit and the single-line diagram.",[144,23097,23098,23101,23104],{},[168,23099,23100],{},"Standard equipment",[168,23102,23103],{},"\"Create a standard installation for this project.\"",[168,23105,23106],{},"Rooms receive a proposed basic set of devices that you then adjust.",[144,23108,23109,23111,23113],{},[168,23110,8928],{},[168,23112,14571],{},[168,23114,23115],{},"Circuit and protective device are created in the topology and appear in the single-line diagram.",[144,23117,23118,23121,23124],{},[168,23119,23120],{},"Switch chains and lighting",[168,23122,23123],{},"\"Control the hallway spots from the two switches by the doors.\"",[168,23125,23126],{},"The switch chain between switches and light points is built.",[144,23128,23129,23132,23135],{},[168,23130,23131],{},"Cables",[168,23133,23134],{},"\"Create a cable route for every cable that does not have one yet.\"",[168,23136,23137],{},"Missing routes follow the walls; existing routes stay as they are.",[144,23139,23140,23142,23145],{},[168,23141,3115],{},[168,23143,23144],{},"\"Lay out the circuits in the distribution board and balance the phases.\"",[168,23146,23147],{},"Modules are placed on DIN rails and loads are spread across the phases.",[144,23149,23150,23153,23156],{},[168,23151,23152],{},"KNX and automation",[168,23154,23155],{},"\"Assign the living-room lights to free channels on the KNX switching actuator.\"",[168,23157,23158],{},"The KNX actuator channel assignment is set and documented in the single-line diagram.",[144,23160,23161,23163,23166],{},[168,23162,11546],{},[168,23164,23165],{},"\"Propose the PV strings for the inverter.\"",[168,23167,23168],{},"Strings are assigned to MPPT inputs; missing data remains visible.",[144,23170,23171,23174,23177],{},[168,23172,23173],{},"Check findings",[168,23175,23176],{},"\"Explain the current validation findings in this project.\"",[168,23178,23179],{},"The assistant reads the self-check findings and explains cause and affected items.",[144,23181,23182,23185,23188],{},[168,23183,23184],{},"Technical question",[168,23186,23187],{},"\"Which AREI rule applies to residual-current protection? Show me the source.\"",[168,23189,23190],{},"An answer backed by verified sources from the AREI text and the PlanElec help centre.",[12,23192,23193,23194,56],{},"Many of these instructions use PlanElec's deterministic automation behind the scenes – room equipment, circuit assignment, cable routing or board layout. The assistant translates your instruction into the right commands and parameters. How the automation itself works is covered in the guide ",[40,23195,19319],{"href":14100},[79,23197,23199],{"id":23198},"how-do-you-open-the-assistant-and-give-it-an-instruction","How do you open the assistant and give it an instruction?",[12,23201,23202],{},"Open a project in the studio. There are three ways in:",[3139,23204,23205,23213,23220],{},[87,23206,4361,23207,23210,23211,1487],{},[15,23208,23209],{},"bot button in the header"," (tooltip ",[15,23212,14479],{},[87,23214,23215,14483,23217,23219],{},[15,23216,14482],{},[15,23218,14486],{}," on Windows and Linux.",[87,23221,4361,23222,8020,23225,3324,23228,23231,23232,23235],{},[15,23223,23224],{},"command search",[15,23226,23227],{},"⌘K",[15,23229,23230],{},"Ctrl+K",": type your instruction and choose ",[15,23233,23234],{},"Send to assistant: \"…\"",". Your search text goes straight to the assistant as an instruction.",[12,23237,23238,23239,23241,23242,23244],{},"The input field shows the example \"For example: Place three socket outlets in the kitchen …\". Describe the result you want and send it with ",[15,23240,14524],{}," or Enter; Shift+Enter adds a new line. While it works, the assistant shows its status (\"Working\", \"Running an action\"). ",[15,23243,17083],{}," stops a running instruction; changes already applied stay in place and can be undone one by one.",[12,23246,23247,23248,56],{},"A good instruction names the place and the result: \"Add a splash-proof socket outlet next to the washbasin in the bathroom\" is more precise than \"Finish the bathroom\". If something is missing, the assistant asks, or the action card reports ",[15,23249,23250],{},"More information or evidence is required",[12,23252,23253,23254,56],{},"The activity column, its filters and the history are explained in the guide ",[40,23255,23256],{"href":13483},"How do I use activity and the assistant in the studio?",[79,23258,23260],{"id":23259},"how-does-planelec-check-every-change-the-assistant-makes","How does PlanElec check every change the assistant makes?",[1489,23262],{":height":23263,":width":3800,"alt":23264,"caption":23265,"src":23266},"736","Flow chart: send an instruction, the assistant reads the project structure, check findings and device catalogue. Clear, reversible changes run straight away; actions with wider impact only after Confirm and run. The server then checks the whole project with the AREI\u002FRGIE self-check; every change is one undo step and appears in the project history with Assistant · on behalf of …","Every change by the assistant passes the same stations: run directly or after confirmation, checked on the server, undone one at a time. The official inspection stays with the accredited body.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fplanelec-ai-assistant\u002Fassistant-change-flow.en.svg",[12,23268,23269,23272],{},[15,23270,23271],{},"After every change the server checks the entire project with the same AREI\u002FRGIE self-check that the report uses."," An action only counts as complete once that check has run. The action card shows the result right away:",[138,23274,23275,23284],{},[141,23276,23277],{},[144,23278,23279,23282],{},[147,23280,23281],{},"Shown on the action card",[147,23283,2314],{},[163,23285,23286,23295,23304,23317,23327],{},[144,23287,23288,23292],{},[168,23289,23290],{},[15,23291,14794],{},[168,23293,23294],{},"The change is saved and the self-check has run afterwards.",[144,23296,23297,23301],{},[168,23298,23299],{},[15,23300,14797],{},[168,23302,23303],{},"How this change shifted the check findings.",[144,23305,23306,23314],{},[168,23307,23308,15829,23311],{},[15,23309,23310],{},"Target reached",[15,23312,23313],{},"Target not reached yet",[168,23315,23316],{},"Whether the outcome you asked for is actually present in the project.",[144,23318,23319,23324],{},[168,23320,23321],{},[15,23322,23323],{},"Affected items: …",[168,23325,23326],{},"How many items the change touched.",[144,23328,23329,23333],{},[168,23330,23331],{},[15,23332,14757],{},[168,23334,23335],{},"The action is waiting for your approval (see next section).",[12,23337,23338,23339,56],{},"The assistant reports new findings in the conversation. You see straight away whether an extra circuit affects, say, a protective device or a cable cross-section, rather than discovering it in the final report. Which rules the self-check covers is listed in ",[40,23340,8538],{"href":1085},[12,23342,23343,38,23346,23348,23349,56],{},[15,23344,23345],{},"Every change the assistant makes is exactly one undo step.",[15,23347,13947],{}," on the action card reverses it completely; with several instructions, one at a time, starting with the most recent. The card then shows ",[15,23350,23351],{},"Undone",[79,23353,23355],{"id":23354},"which-actions-do-you-have-to-confirm-explicitly","Which actions do you have to confirm explicitly?",[12,23357,23358,23359,23361,23362,3324,23364,56],{},"Clear, reversible changes – placing a socket outlet, renaming a room, creating a cable route – run immediately. Actions with wider impact are put to you for approval: the action card shows ",[15,23360,14757],{}," together with the planned parameters. You choose ",[15,23363,13704],{},[15,23365,14763],{},[12,23367,23368],{},"A confirmation applies to exactly that action with exactly those values. If the instruction changes, a new approval is needed. The assistant cannot delete projects – that decision stays with you.",[79,23370,23372],{"id":23371},"how-does-your-team-see-what-the-assistant-changed","How does your team see what the assistant changed?",[12,23374,23375,23376,23378,23379,23382],{},"Every action appears in the ",[15,23377,14475],{}," column as an action card with tool, status and the person who gave the instruction. In the project history, saved changes made by the assistant carry a bot tile and the note ",[15,23380,23381],{},"Assistant · on behalf of …"," with the name of the member who gave the instruction.",[12,23384,23385,23386,23388,23389,23391],{},"That keeps it clear across the team who asked for which change, even when you are looking at a colleague's history. The ",[15,23387,22338],{}," filter collects the assistant's conversations and actions; the ",[15,23390,12432],{}," filter shows every project change, including instructions your colleagues gave the assistant.",[79,23393,23395],{"id":23394},"how-does-the-assistant-answer-questions-about-the-arei-and-planelec","How does the assistant answer questions about the AREI and PlanElec?",[12,23397,23398,23399,23402],{},"The assistant answers technical questions with sources. It searches the PlanElec help centre, the full AREI\u002FRGIE text (Book 1) and the PlanElec blog, and lists the references under ",[15,23400,23401],{},"Verified sources",". AREI quotations cite the version in force on the date in question; since 1 November 2026 that is version 07. The server matches each reference against the actual texts; quotations that do not appear there are discarded.",[12,23404,23405],{},"That makes every answer checkable: you see which article or help section a statement comes from and can read it yourself. Good questions to start with are \"Which AREI rule applies to residual-current protection? Show me the source.\" or \"Why does the self-check flag a finding on the bathroom circuit?\".",[79,23407,23409],{"id":23408},"where-is-your-data-processed","Where is your data processed?",[12,23411,23412,23415],{},[15,23413,23414],{},"The language model runs in the EU region. The AI provider does not store your requests and does not train on them."," PlanElec routes requests only to providers with zero data retention; data collection by the provider is switched off. The AI service providers involved are listed as sub-processors in PlanElec's data processing agreement.",[12,23417,23418],{},"PlanElec itself stores your project and the assistant's conversations and actions so that you and your team can trace instructions and changes later.",[12,23420,23421,23422,23426],{},"These commitments apply to typed instructions. A dictated recording goes to a separate speech recognition service that is currently not restricted to the EU; what happens to the recording is explained in ",[40,23423,23425],{"href":23424},"\u002Fen\u002Fblog\u002Fdictate-single-line-diagram","Dictate a single-line diagram",". If you want to avoid that, type the instruction.",[79,23428,23430],{"id":23429},"what-does-the-assistant-do-and-who-is-responsible-for-design-and-inspection","What does the assistant do – and who is responsible for design and inspection?",[12,23432,23433],{},"The assistant does the work inside the planning model: placing devices, building circuits, routing cables, populating the board and explaining findings with sources. Professional responsibility for the design stays with you as the electrical contractor or designer; the official inspection (keuring) is carried out by an accredited inspection body.",[12,23435,23436],{},"The self-check assesses the supported rules on the basis of the project data you have entered. Measurements, on-site conditions and manufacturer evidence are checked by you on site and by the inspection body during the keuring. A project without findings therefore means: no errors in the supported rules that can be checked from the data – and a well-prepared basis for your own review and the inspection.",[79,23438,23440],{"id":23439},"frequently-asked-questions-about-the-planelec-assistant","Frequently asked questions about the PlanElec assistant",[1041,23442,23444],{"id":23443},"does-the-assistant-work-in-dutch-and-french","Does the assistant work in Dutch and French?",[12,23446,23447],{},"Yes. You write in Dutch, French, German or English, and the assistant replies in your language. The interface, action cards and status messages are available in all four languages as well.",[1041,23449,23451],{"id":23450},"can-i-dictate-instructions-to-the-assistant","Can I dictate instructions to the assistant?",[12,23453,23454,23455,23457,23458,56],{},"Yes. With the ",[15,23456,13939],{}," microphone button in the input field you speak your instruction; recognition knows technical terms such as XVB or single-line diagram. The recognised text appears in the field, and you review, correct and send it yourself. How this works on site is shown in ",[40,23459,23425],{"href":23424},[1041,23461,23463],{"id":23462},"can-the-assistant-delete-my-project","Can the assistant delete my project?",[12,23465,23466,23467,23469,23470,56],{},"No. Deleting projects is not one of the assistant's commands. Risky changes inside a project only run after ",[15,23468,13704],{},", and every applied change can be reversed with ",[15,23471,13947],{},[1041,23473,23475],{"id":23474},"what-does-the-assistant-cost","What does the assistant cost?",[12,23477,23478,23479,23481,23482,56],{},"The assistant has no price of its own. Like every AI feature, it draws on the monthly ",[15,23480,14864],{}," of the person using it; the share still available is shown in the user menu. The size of the allowance depends on your plan: Try Pro (no payment details) includes a small AI allowance to try it out, Pro a larger one that grows with every additional editing seat. Plans and scope are on the ",[40,23483,1958],{"href":54},[1041,23485,23487],{"id":23486},"who-can-use-the-assistant","Who can use the assistant?",[12,23489,23490,23491,23493],{},"Every signed-in account in the studio of ",[40,23492,31],{"href":1964},", with no separate activation and including Try Pro. Changing a project requires edit rights for that project.",[1041,23495,23497],{"id":23496},"does-the-assistant-replace-automatic-planning","Does the assistant replace automatic planning?",[12,23499,23500],{},"No, it uses it. Automatic planning delivers traceable, rule-based proposals; the assistant picks the right functions and parameters for your instruction and combines them with targeted individual changes.",[1041,23502,23504],{"id":23503},"can-i-bring-in-a-floor-plan-from-the-architect-or-from-trikker","Can I bring in a floor plan from the architect or from Trikker?",[12,23506,23507,23508,23511,23512,56],{},"Yes, through AI recognition in the project files. How a PDF, scan or Trikker export becomes an editable floor plan, and how to capture an existing distribution board from photos, is explained in ",[40,23509,23510],{"href":8995},"Turn a PDF, scan or Trikker export into a floor plan",". For a feature comparison with Trikker, see ",[40,23513,14227],{"href":1386},{"title":2044,"searchDepth":2045,"depth":2045,"links":23515},[23516,23517,23518,23519,23520,23521,23522,23523,23524,23525],{"id":23031,"depth":2045,"text":23032},{"id":23044,"depth":2045,"text":23045},{"id":23198,"depth":2045,"text":23199},{"id":23259,"depth":2045,"text":23260},{"id":23354,"depth":2045,"text":23355},{"id":23371,"depth":2045,"text":23372},{"id":23394,"depth":2045,"text":23395},{"id":23408,"depth":2045,"text":23409},{"id":23429,"depth":2045,"text":23430},{"id":23439,"depth":2045,"text":23440,"children":23526},[23527,23528,23529,23530,23531,23532,23533],{"id":23443,"depth":2053,"text":23444},{"id":23450,"depth":2053,"text":23451},{"id":23462,"depth":2053,"text":23463},{"id":23474,"depth":2053,"text":23475},{"id":23486,"depth":2053,"text":23487},{"id":23496,"depth":2053,"text":23497},{"id":23503,"depth":2053,"text":23504},"2026-10-03","The PlanElec assistant carries out plain-language instructions across the whole project – from floor plan and circuits to the distribution board. Every change runs through the AREI\u002FRGIE self-check and is a single undo step.",[10987,2118],{},"\u002Fblog\u002Fai-assistant-electrical-planning.en",{"title":23012,"description":23535},"AI Assistant for Electrical Planning: What It Does","ai-assistant-electrical-planning","blog\u002Fai-assistant-electrical-planning.en",[15121,10997,10998,14434,5269,2133,2134,21784,11002],"sAl8906B1wOtdcFZb52BIrZ0cWTfD3SNvDMa93a4mHE","\u002Fblog\u002Fai-assistant-electrical-planning",{"id":23547,"title":23548,"articleId":23549,"body":23550,"category":24234,"date":23534,"description":24235,"extension":2113,"image":23566,"labels":24236,"lastUpdated":10988,"locale":2119,"meta":24237,"navigation":2121,"ogImage":24238,"path":24239,"publishDate":23534,"readTime":6086,"refreshInterval":2053,"seo":24240,"seoTitle":24241,"slug":24242,"stem":24243,"tags":24244,"__hash__":24245,"kind":2137,"href":24246},"blog\u002Fblog\u002Frecognise-floor-plan-cabinet-photo-ai.en.md","How do you turn a PDF, scan or Trikker export into a floor plan – and a distribution board photo into modules?","ai-floor-plan-cabinet-recognition",{"type":9,"value":23551,"toc":24213},[23552,23561,23567,23573,23577,23580,23642,23645,23649,23659,23671,23682,23687,23691,23697,23730,23751,23755,23761,23800,23811,23816,23820,23826,23848,23859,23863,23874,23884,23888,23900,23959,23969,23973,23979,24040,24047,24066,24074,24078,24107,24115,24119,24125,24128,24132,24138,24151,24155,24159,24162,24166,24172,24176,24182,24186,24189,24193,24196,24200],[12,23553,23554,23557,23558,23560],{},[15,23555,23556],{},"PlanElec Pro turns an existing plan into an editable floor plan: add a PDF, scan or photo of the plan to your project files and choose Recognise floor plan."," PlanElec proposes walls, rooms with their area, doors and windows, and device symbols such as socket outlets, switches and light points. You review the proposal, confirm the scale and import everything into an empty floor as a single undo step, with the original page kept underneath as an underlay. An existing distribution board is captured the same way from photos: PlanElec detects the visible DIN modules, you review them and import them into an empty board. A Trikker project file (",[25,23559,27],{},") needs no recognition at all; the Trikker import brings it in, situation plan included.",[12,23562,23563],{},[74,23564],{"alt":23565,"src":23566},"An electrician surveys an installation in a living space.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-ai-floor-plan-cabinet-recognition-editorial.webp",[1489,23568],{":height":23569,":width":3800,"alt":23570,"caption":23571,"src":23572},"688","Two flows side by side. Left, floor plan from a plan: upload the plan page, recognise floor plan, correct draft, confirm scale, import into an empty floor; circuits, single-line diagram, cables and protective devices are not derived. Right, board from photos: upload photos, detect modules, review detected modules, merge or reject, import reviewed modules into the empty board; hidden wiring, circuits and protection paths are not derived.","Both recognitions produce a proposal that you review. Circuits, the diagram and the wiring are yours to plan afterwards.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fai-floor-plan-cabinet-recognition\u002Ftwo-recognition-routes.en.svg",[79,23574,23576],{"id":23575},"what-does-planelec-recognise-in-a-plan-or-photo","What does PlanElec recognise in a plan or photo?",[12,23578,23579],{},"AI recognition always produces a proposal that you review before importing it. The table shows what PlanElec recognises for each source and what you check.",[138,23581,23582,23594],{},[141,23583,23584],{},[144,23585,23586,23588,23591],{},[147,23587,2244],{},[147,23589,23590],{},"What PlanElec recognises",[147,23592,23593],{},"What you check",[163,23595,23596,23609,23620,23631],{},[144,23597,23598,23601,23606],{},[168,23599,23600],{},"Vector PDF, e.g. an architect's plan",[168,23602,23603,23605],{},[15,23604,3164],{}," method: if the PDF lines form closed rooms, the walls come straight from the PDF. AI adds room names, room categories, windows, device symbols and the dimension lines it reads",[168,23607,23608],{},"Wall layout, scale, match with the room areas printed on the plan",[144,23610,23611,23614,23617],{},[168,23612,23613],{},"Scan, photo or PDF without closed wall outlines (PNG, JPEG, WebP, PDF)",[168,23615,23616],{},"Walls, rooms with area, doors, windows and symbols via AI image recognition; for PDFs also room names from the text layer and doors from the drawn door swings",[168,23618,23619],{},"Walls at angles or partly hidden, scale, questions in the proposal",[144,23621,23622,23625,23628],{},[168,23623,23624],{},"Trikker plan as a PDF export",[168,23626,23627],{},"Like any PDF: floor plan, openings and supported symbols",[168,23629,23630],{},"Symbols flagged as cannot be matched – they are not imported",[144,23632,23633,23636,23639],{},[168,23634,23635],{},"Photos of a distribution board (up to 6 per board)",[168,23637,23638],{},"Visible DIN modules with row, slot, width and type, plus readable values such as current, poles or sensitivity",[168,23640,23641],{},"Type, position and values of each module; merging several views of the same module",[12,23643,23644],{},"Recognition knows 27 symbol types found on Belgian plans: socket outlets (single, double, splash-proof, with switch), switches, push buttons, bell buttons, motion detectors, light points, spots, wall lights, fluorescent tubes, transformers, Ethernet and coax outlets, distribution boards, junction boxes, cookers, ovens, dishwashers, washing machines, dryers, fridges, extractor hoods, water heaters, shutter motors and smoke detectors. It does not read circuits, wiring or the single-line diagram from plans or photos – you plan those afterwards in the project, with the assistant or automatic planning.",[79,23646,23648],{"id":23647},"which-files-can-planelec-recognise-as-a-floor-plan","Which files can PlanElec recognise as a floor plan?",[12,23650,23651,23653,23654,3364,23656,23658],{},[15,23652,14073],{}," handles PDF, PNG, JPEG and WebP up to 50 MB. In the ",[15,23655,19595],{},[15,23657,19636],{},":",[84,23660,23661,23666],{},[87,23662,23663,23665],{},[15,23664,19661],{}," – the default. The server decides per page: for a vector PDF with closed wall outlines the walls come from the PDF and AI adds the rest. Scans, images and PDFs without closed wall outlines go to AI image recognition. If AI fails on a vector PDF, the walls from the PDF remain as a proposal.",[87,23667,23668,23670],{},[15,23669,19727],{}," – always analyses the page as an image, even for a vector PDF. Use it as the alternative when the automatic choice gives a weak result.",[12,23672,23673,23674,19716,23676,3324,23678,23681],{},"The header of the ",[15,23675,19461],{},[15,23677,19719],{},[15,23679,23680],{},"AI recognition",". Recognition works on the page currently open in the preview, so for a multi-page PDF go to the floor you need first.",[12,23683,23684,23685,56],{},"AI recognition does not read DXF files. You add them through the standard import as a scaled template, and PlanElec takes the scale from the file's units. See ",[40,23686,9462],{"href":9461},[79,23688,23690],{"id":23689},"how-do-you-start-floor-plan-recognition","How do you start floor plan recognition?",[12,23692,23693,23694,23696],{},"You need at least the ",[15,23695,4342],{}," role in the project. There are two ways in:",[3139,23698,23699,23714],{},[87,23700,23701,23704,23705,23707,23708,23710,23711,23713],{},[15,23702,23703],{},"On an empty floor:"," in ",[15,23706,13345],{}," mode, open a floor without walls. The card ",[15,23709,19577],{}," offers ",[15,23712,19582],{},". Choose your file; PlanElec stores it in the project files and starts recognition.",[87,23715,23716,23719,23720,19621,23722,23724,23725,23727,23728,56],{},[15,23717,23718],{},"From the project files:"," next to a PDF you will find ",[15,23721,19620],{},[15,23723,19624],{},". For a multi-page PDF the ",[15,23726,19595],{}," opens instead; choose the page and method there and click ",[15,23729,14073],{},[12,23731,23732,23733,1774,23736,3157,23739,23742,23743,23745,23746,23748,23749,56],{},"Progress runs through ",[15,23734,23735],{},"Preparing page",[15,23737,23738],{},"Reading plan",[15,23740,23741],{},"Checking result","; ",[15,23744,17083],{}," stops the run. The proposal then appears in the ",[15,23747,19461],{}," panel, grouped into rooms, openings, scale, names, devices and any questions. Every step is described in the guide ",[40,23750,9466],{"href":9465},[79,23752,23754],{"id":23753},"how-does-planelec-determine-the-scale","How does PlanElec determine the scale?",[12,23756,23757,23758,23760],{},"The scale is what turns a plan page into a floor plan with correct dimensions. The ",[15,23759,19529],{}," section shows where it comes from:",[138,23762,23763,23771],{},[141,23764,23765],{},[144,23766,23767,23769],{},[147,23768,19898],{},[147,23770,2244],{},[163,23772,23773,23782,23791],{},[144,23774,23775,23779],{},[168,23776,23777],{},[15,23778,19909],{},[168,23780,23781],{},"AI reads the dimension lines on the page; several independent dimension lines are evaluated together",[144,23783,23784,23788],{},[168,23785,23786],{},[15,23787,19919],{},[168,23789,23790],{},"The scale stored in the PDF, cross-checked against the dimension lines read. If they contradict it, the dimension lines win",[144,23792,23793,23797],{},[168,23794,23795],{},[15,23796,19929],{},[168,23798,23799],{},"A known distance that you mark in the correction dialog and enter in metres",[12,23801,4361,23802,23805,23806,23808,23809,56],{},[15,23803,23804],{},"room areas printed on the plan"," serve as a cross-check. Each room shows its calculated area next to \"Printed on the plan: … m²\"; if both match, it reads ",[15,23807,19873],{},". If a room differs by 10 % or more, a wall is probably in the wrong place there. If your own measurement contradicts several matching dimension lines, PlanElec uses the dimension lines and says so under ",[15,23810,19842],{},[12,23812,23813,23815],{},[15,23814,19810],{}," releases the scale. Without a confirmed scale the import stays blocked, so no wrongly scaled floor plan ends up in the project.",[79,23817,23819],{"id":23818},"how-do-you-correct-the-proposal-before-importing-it","How do you correct the proposal before importing it?",[12,23821,23822,23823,23825],{},"In the proposal you untick room names, openings and devices you do not want to import. For the geometry, ",[15,23824,19605],{}," opens an editor on top of the original page:",[84,23827,23828,23833,23838,23843],{},[87,23829,23830,23832],{},[15,23831,19996],{}," – mark two points of a known distance and enter the length in metres.",[87,23834,23835,23837],{},[15,23836,20009],{}," – drag a corner into place, or nudge it with the arrow keys once selected.",[87,23839,23840,23842],{},[15,23841,20019],{}," – click the start and end of a missing wall; existing corners snap.",[87,23844,23845,23847],{},[15,23846,20029],{}," – delete a superfluous wall together with its openings.",[12,23849,23850,23852,23853,3324,23856,23858],{},[15,23851,20057],{}," also confirms the scale. Changes in the draft are only written to the floor when you import. ",[15,23854,23855],{},"Recognise again with AI",[15,23857,19731],{}," starts a new run if needed; every run counts towards the daily limit. The dialog cannot straighten a photo taken at an angle; in that case, add the plan as a template and trace it.",[79,23860,23862],{"id":23861},"how-do-you-import-the-recognised-floor-plan-into-the-project","How do you import the recognised floor plan into the project?",[12,23864,23865,23866,7157,23868,23870,23871,23873],{},"Choose an empty floor under ",[15,23867,19521],{},[15,23869,12394],{},". PlanElec writes walls, rooms with name and room category, openings and devices into the floor in one step and places the original page underneath as the template ",[15,23872,20099],{},", so you can compare plan and result at any time.",[12,23875,23876,23877,3324,23880,23883],{},"The entire import is undone in one step with ",[15,23878,23879],{},"⌘Z",[15,23881,23882],{},"Ctrl+Z",". Items that cannot be matched unambiguously to a wall or side of a room are reported as \"Not imported\", with their count; you place them by hand afterwards. Where the plan gives no heights for doors and windows, PlanElec uses default values for you to check.",[79,23885,23887],{"id":23886},"how-do-you-bring-a-trikker-plan-into-planelec","How do you bring a Trikker plan into PlanElec?",[12,23889,23890,23896,23897,23899],{},[15,23891,23892,23893,23895],{},"A Trikker project file (",[25,23894,27],{},") is imported directly – no AI recognition involved."," You only need the PDF export if the ",[25,23898,27],{}," file is missing.",[138,23901,23902,23914],{},[141,23903,23904],{},[144,23905,23906,23909,23911],{},[147,23907,23908],{},"What you have",[147,23910,6726],{},[147,23912,23913],{},"What arrives",[163,23915,23916,23931,23948],{},[144,23917,23918,23923,23928],{},[168,23919,23920,23922],{},[25,23921,27],{}," file, one or a whole archive",[168,23924,23925,23927],{},[40,23926,1486],{"href":42}," in PlanElec Pro, with any signed-in account",[168,23929,23930],{},"The single-line diagram with boards, protective devices, circuits, cables and loads, plus the situation plan: floors, walls with thickness, rooms, doors, windows, garage doors, stairs and placed devices linked to their circuit",[144,23932,23933,23938,23945],{},[168,23934,23935,23937],{},[25,23936,27],{}," file, only to keep drawing the diagram and situation plan",[168,23939,23940,23944],{},[40,23941,23943],{"href":11317,"rel":23942},[1458],"Start PlanElec Sketch with a Trikker file",", free in the browser",[168,23946,23947],{},"An editable drawing that you export as a PDF",[144,23949,23950,23953,23956],{},[168,23951,23952],{},"Only the PDF export of a Trikker plan",[168,23954,23955],{},"Floor plan recognition as described above",[168,23957,23958],{},"Floor plan, openings and supported symbols; circuits and the diagram are planned afterwards",[12,23960,23961,23962,3324,23964,23966,23967,56],{},"The import report lists what the Trikker import does not carry over, such as the cable runs of the situation plan. With the floor plan and devices in the project, you build circuits, switch chains, cable routes and the distribution board with the ",[40,23963,15121],{"href":10753},[40,23965,14101],{"href":14100},". A comparison of features and prices is in ",[40,23968,14227],{"href":1386},[79,23970,23972],{"id":23971},"how-do-you-capture-an-existing-distribution-board-from-photos","How do you capture an existing distribution board from photos?",[12,23974,23975,23976,23978],{},"For renovations, extensions or surveys of an existing installation, planning often starts at the board already on the wall. PlanElec reads the visible modules from photos and uses them to populate an ",[15,23977,18672],{}," board in the distribution board editor:",[3139,23980,23981,23994,23999,24003,24034],{},[87,23982,3370,23983,23986,23987,18917,23989,7709,23991,23993],{},[15,23984,23985],{},"Distribution Board"," area, select the board, stay in the ",[15,23988,18718],{},[15,23990,18708],{},[15,23992,14086],{}," panel opens.",[87,23995,15424,23996,23998],{},[15,23997,18926],{}," (JPEG, PNG or WebP) or tick photos already in the project – at most six per board. An overview plus close-ups of the same row is exactly what the feature expects.",[87,24000,7944,24001,56],{},[15,24002,14090],{},[87,24004,5777,24005,24007,24008,1774,24010,1774,24012,3157,24014,24016,24017,1774,24019,3324,24021,7709,24023,24025,24026,24028,24029,24031,24032,56],{},[15,24006,19003],{}," each module is listed with ",[15,24009,17848],{},[15,24011,17805],{},[15,24013,19075],{},[15,24015,19085],{},", plus readable values such as ",[15,24018,19095],{},[15,24020,19098],{},[15,24022,19101],{},[15,24024,18975],{}," shows the matching spot on the photo. If two photos show the same module, combine them with ",[15,24027,19138],{}," or separate them with ",[15,24030,19148],{},"; remove a false detection with ",[15,24033,19124],{},[87,24035,24036,24037,24039],{},"Import the result with ",[15,24038,19188],{}," – as a single undo step. PlanElec adds any missing rows, up to 72 TE per row.",[1489,24041],{":height":24042,":width":24043,"alt":24044,"caption":24045,"src":24046},"1024","1536","An open residential distribution board without its cover, photographed head-on: at the top a four-pole and two two-pole residual current devices, below them two rows of single-pole circuit breakers with blanking plates, at the bottom the neutral and earth bars.","Illustrative AI-generated example, not a photo of a real installation: this is what a usable input photo looks like – cover off, head-on, even light, every row in the frame.","\u002Fimages\u002Fblog\u002Fenrichment-2026-11\u002Fai-floor-plan-cabinet-recognition\u002Fcabinet-photo-input-example.webp",[12,24048,24049,24050,1774,24053,1774,24056,1774,24059,24062,24063,24065],{},"Recognition chooses from 17 module types, from ",[15,24051,24052],{},"Main switch",[15,24054,24055],{},"RCD",[15,24057,24058],{},"Circuit breaker",[15,24060,24061],{},"RCBO"," and surge protector to contactors, impulse relays, time switches, energy meters and KNX devices. It only fills in values that are readable on the photo; anything unreadable stays empty rather than being filled with defaults. A module it cannot read appears as ",[15,24064,18862],{},", so its position and width are kept.",[12,24067,24068,24069,24071,24072,56],{},"A photo shows the front of a board, so PlanElec does not infer hidden wiring, circuits or protection paths from it. The imported modules represent the physical layout; which module protects which circuit is something you define in the ",[15,24070,5104],{}," area. The complete procedure with every message is in the guide ",[40,24073,13713],{"href":3477},[79,24075,24077],{"id":24076},"how-many-recognitions-are-available-per-day","How many recognitions are available per day?",[138,24079,24080,24089],{},[141,24081,24082],{},[144,24083,24084,24086],{},[147,24085,13841],{},[147,24087,24088],{},"Daily limit per user",[163,24090,24091,24099],{},[144,24092,24093,24096],{},[168,24094,24095],{},"Floor plan recognition",[168,24097,24098],{},"30 runs",[144,24100,24101,24104],{},[168,24102,24103],{},"Distribution board detection (photos)",[168,24105,24106],{},"20 runs",[12,24108,24109,24110,24112,24113,56],{},"A run without a usable result counts too. The counters reset at midnight UTC; your uploaded project files remain fully usable in the meantime. Every run also draws on your account's ",[15,24111,14864],{},"; the share still available is shown in the user menu. The plans available for PlanElec Pro are on the ",[40,24114,1958],{"href":54},[79,24116,24118],{"id":24117},"what-happens-to-your-plans-and-photos","What happens to your plans and photos?",[12,24120,24121,24124],{},[15,24122,24123],{},"For the analysis, only the selected plan page or the selected photos are sent to the external AI provider. The request runs over an EU route; the provider does not store it and does not use it for training."," The interface flags this transfer at the action itself. The AI service providers involved are listed as sub-processors in PlanElec's data processing agreement.",[12,24126,24127],{},"Your original files stay in PlanElec as project files – the plan additionally as an underlay on the floor, the photos linked to the imported modules. PlanElec also logs every recognition run with its result, so a proposal can be traced later.",[79,24129,24131],{"id":24130},"what-comes-after-recognition","What comes after recognition?",[12,24133,24134,24135,24137],{},"With floor plan, rooms and devices in the project, the actual electrical design begins. Automatic planning adds room equipment, switch chains, circuit assignment, cable routes, phase balancing and board layout as editable proposals. The ",[40,24136,15121],{"href":10753}," carries out instructions such as \"Add a dedicated cooker circuit with protection to the kitchen\" directly and then checks the whole project with the AREI\u002FRGIE self-check.",[12,24139,24140,24141,24143,24144,24148,24149,56],{},"Which rules the self-check covers is listed in ",[40,24142,8538],{"href":1085},". The self-check shows you open points; the official inspection (keuring) is carried out by an accredited inspection body. How the electrical structure then becomes readable as one installation is described in ",[40,24145,24147],{"href":24146},"\u002Fen\u002Fblog\u002Ffrom-floor-plan-to-installation-and-distribution-board","From floor plan to installation and distribution board","; what Trikker 2.0 for Mac brings and what PlanElec already does is covered in ",[40,24150,12996],{"href":12995},[79,24152,24154],{"id":24153},"frequently-asked-questions-about-ai-recognition","Frequently asked questions about AI recognition",[1041,24156,24158],{"id":24157},"can-i-import-a-recognised-floor-plan-into-a-floor-that-already-has-walls","Can I import a recognised floor plan into a floor that already has walls?",[12,24160,24161],{},"No, imports only go into an empty target floor. Create a new floor if needed and import the proposal there. Floors recognised one by one are then aligned on top of each other.",[1041,24163,24165],{"id":24164},"does-planelec-also-recognise-circuits-on-a-plan","Does PlanElec also recognise circuits on a plan?",[12,24167,24168,24169,24171],{},"No. Recognition delivers geometry, rooms, openings and device symbols. Circuits and the single-line diagram are created in the project – with the assistant, automatic planning or by hand. If you have a ",[25,24170,27],{}," file, the diagram and circuits come in through the Trikker import.",[1041,24173,24175],{"id":24174},"what-happens-to-symbols-planelec-does-not-know","What happens to symbols PlanElec does not know?",[12,24177,24178,24179,24181],{},"They appear in the proposal as ",[15,24180,19857],{}," with the note \"Cannot be matched — not imported.\" You place the right device yourself after the import.",[1041,24183,24185],{"id":24184},"what-does-a-good-distribution-board-photo-look-like","What does a good distribution board photo look like?",[12,24187,24188],{},"Cover off, camera square to the board, even light without reflections. One overview shows every row; close-ups make ratings such as rated current or sensitivity readable. All photos in one run show the same board.",[1041,24190,24192],{"id":24191},"can-i-have-dxf-or-dwg-files-recognised","Can I have DXF or DWG files recognised?",[12,24194,24195],{},"No. AI recognition reads PDF, PNG, JPEG and WebP. Export the plan as a PDF for recognition, or import it as a DXF to use as a scaled template.",[1041,24197,24199],{"id":24198},"who-can-start-recognition","Who can start recognition?",[12,24201,24202,24203,1774,24205,3324,24207,24209,24210,24212],{},"Floor plan and distribution board recognition are started by project members with the ",[15,24204,4322],{},[15,24206,16988],{},[15,24208,4342],{}," role. The ",[15,24211,4352],{}," role cannot start a run.",{"title":2044,"searchDepth":2045,"depth":2045,"links":24214},[24215,24216,24217,24218,24219,24220,24221,24222,24223,24224,24225,24226],{"id":23575,"depth":2045,"text":23576},{"id":23647,"depth":2045,"text":23648},{"id":23689,"depth":2045,"text":23690},{"id":23753,"depth":2045,"text":23754},{"id":23818,"depth":2045,"text":23819},{"id":23861,"depth":2045,"text":23862},{"id":23886,"depth":2045,"text":23887},{"id":23971,"depth":2045,"text":23972},{"id":24076,"depth":2045,"text":24077},{"id":24117,"depth":2045,"text":24118},{"id":24130,"depth":2045,"text":24131},{"id":24153,"depth":2045,"text":24154,"children":24227},[24228,24229,24230,24231,24232,24233],{"id":24157,"depth":2053,"text":24158},{"id":24164,"depth":2053,"text":24165},{"id":24174,"depth":2053,"text":24175},{"id":24184,"depth":2053,"text":24185},{"id":24191,"depth":2053,"text":24192},{"id":24198,"depth":2053,"text":24199},"tutorial","PlanElec Pro recognises walls, rooms, doors, windows and device symbols in a PDF, scan or image, and populates an empty distribution board from photos. You review the proposal, confirm the scale and import it as a single undo step.",[10987,18037,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-ai-floor-plan-cabinet-recognition-editorial.jpg","\u002Fblog\u002Frecognise-floor-plan-cabinet-photo-ai.en",{"title":23548,"description":24235},"Floor Plan from PDF or Scan, Board from a Photo (AI)","recognise-floor-plan-cabinet-photo-ai","blog\u002Frecognise-floor-plan-cabinet-photo-ai.en",[10257,10997,8065,329,3590,19438,19440,14434],"TNtMb0WUpvV0KgP-hJY8ykZt2Xx-IzLE-YXwvv1RnBE","\u002Fblog\u002Frecognise-floor-plan-cabinet-photo-ai",{"id":24248,"title":24249,"articleId":24250,"body":24251,"category":11972,"date":24896,"description":24897,"extension":2113,"image":24299,"labels":24898,"lastUpdated":9349,"locale":2119,"meta":24899,"navigation":2121,"ogImage":24900,"path":24901,"publishDate":24896,"readTime":15114,"refreshInterval":2045,"seo":24902,"seoTitle":24903,"slug":24904,"stem":24905,"tags":24906,"__hash__":24910,"kind":2137,"href":24911},"blog\u002Fblog\u002Ftrikker-2-0-mac.en.md","Trikker 2.0 for Mac: what the new version brings – and what PlanElec does in the browser","trikker-2-0-mac-beta",{"type":9,"value":24252,"toc":24871},[24253,24259,24263,24295,24300,24330,24334,24337,24408,24411,24417,24421,24424,24433,24437,24440,24446,24453,24457,24464,24492,24497,24501,24504,24508,24514,24518,24529,24533,24536,24543,24546,24553,24557,24567,24572,24576,24585,24590,24597,24601,24604,24608,24611,24665,24670,24674,24786,24791,24793,24797,24800,24804,24813,24817,24820,24824,24827,24831,24834,24838,24848,24850,24867],[12,24254,24255,24258],{},[15,24256,24257],{},"Trikker 2.0 has been out of beta since 13 November 2026 and runs on Windows and, for the first time, on macOS."," That is good news for electricians who work on a Mac; Trikker requires macOS 13 or later and a Mac with Apple silicon. PlanElec runs on the Mac with nothing to install, right in the browser. You open an existing .trik file for free in PlanElec Sketch, even without an account, and carry on drawing the single-line diagram and situation plan. If you need more, you plan in PlanElec Pro and open the same project on the Windows PC in the office or on a tablet on site; from a Trikker PDF, Pro recognises the floor plan and turns it into an editable project.",[12,24260,24261],{},[15,24262,13162],{},[138,24264,24265,24273],{},[141,24266,24267],{},[144,24268,24269,24271],{},[147,24270,13171],{},[147,24272,9397],{},[163,24274,24275,24281,24287],{},[144,24276,24277,24279],{},[168,24278,13180],{},[168,24280,13183],{},[144,24282,24283,24285],{},[168,24284,13188],{},[168,24286,13191],{},[144,24288,24289,24291],{},[168,24290,13196],{},[168,24292,13199,24293,13202],{},[15,24294,1482],{},[12,24296,24297],{},[74,24298],{"alt":76,"src":24299},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-trikker-2-0-mac-beta-editorial.webp",[12,24301,24302,24303,3328,24307,3328,24312,24315,24316,3157,24320,24324,24325,24329],{},"Trikker information last checked on 20 November 2026, PlanElec information as of 6 November 2026. Trikker information comes from the ",[40,24304,24306],{"href":1903,"rel":24305},[1458],"announcement of 13 November 2026",[40,24308,24311],{"href":24309,"rel":24310},"https:\u002F\u002Fwww.trikker.be\u002Ffr\u002Fblog\u002Factualites-2\u002Ftrikker-2-0-en-beta-une-nouvelle-base-desormais-aussi-sur-macos-14",[1458],"beta announcement of 30 September 2026",[40,24313,12929],{"href":1899,"rel":24314},[1458]," and two Trikker posts on the Schemalezer dated ",[40,24317,24319],{"href":12954,"rel":24318},[1458],"13 October 2026",[40,24321,24323],{"href":12959,"rel":24322},[1458],"20 October 2026",". On 20 November 2026 the ",[40,24326,24328],{"href":11880,"rel":24327},[1458],"Trikker homepage"," still mentioned the macOS beta; we follow the more recent announcement and the FAQ.",[79,24331,24333],{"id":24332},"what-is-new-in-trikker-20","What is new in Trikker 2.0?",[12,24335,24336],{},"Trikker 2.0 is above all a new technical foundation. According to the developer, it represents more than a year of work.",[138,24338,24339,24352],{},[141,24340,24341],{},[144,24342,24343,24346,24349],{},[147,24344,24345],{},"Change",[147,24347,24348],{},"What Trikker states",[147,24350,24351],{},"Status on 20 November 2026",[163,24353,24354,24365,24375,24386,24397],{},[144,24355,24356,24359,24362],{},[168,24357,24358],{},"macOS",[168,24360,24361],{},"Trikker runs on the Mac for the first time, without Parallels or Boot Camp",[168,24363,24364],{},"Released; macOS 13 or later, only Macs with Apple silicon (M1 or newer)",[144,24366,24367,24369,24372],{},[168,24368,776],{},[168,24370,24371],{},"Trikker 2.0 for Windows 10 and 11",[168,24373,24374],{},"Released; the standard version per the FAQ",[144,24376,24377,24380,24383],{},[168,24378,24379],{},"PDF export",[168,24381,24382],{},"Print output directly as PDF",[168,24384,24385],{},"Part of Trikker 2.0",[144,24387,24388,24391,24394],{},[168,24389,24390],{},"Web version (iPad\u002FAndroid)",[168,24392,24393],{},"Per the announcement, a beta still in 2026; per the FAQ in autumn 2026",[168,24395,24396],{},"Announced, no fixed date",[144,24398,24399,24402,24405],{},[168,24400,24401],{},"Licences",[168,24403,24404],{},"Existing licences remain valid",[168,24406,24407],{},"Still per computer, per the FAQ",[12,24409,24410],{},"The beta ran from 30 September 2026. Since 13 November 2026, Trikker 2.0 is no longer a beta according to the developer and is the standard version according to the FAQ. According to the announcement, your existing diagrams open in the new version as they are; Trikker recommends switching from earlier versions.",[12,24412,24413,24414,24416],{},"Since October 2026 there is also the ",[15,24415,12956],{}," (schema reader), a separate Trikker web tool, in beta: it reads the single-line diagram and situation plan from PDF, PNG or JPG, including scans, photos and hand sketches, and transfers them to Trikker. Since 20 October 2026 it also drafts a single-line diagram from a spoken or typed description of the installation. Access comes with an active Trikker licence; according to the developer, you check the results in Trikker.",[79,24418,24420],{"id":24419},"is-trikker-now-available-for-mac","Is Trikker now available for Mac?",[12,24422,24423],{},"Yes. Since Trikker 2.0 of 13 November 2026, Trikker runs on the Mac out of beta, without Parallels or Boot Camp. According to Trikker you need macOS 13 (Ventura) or later and a Mac with Apple silicon (M1 or newer); according to the FAQ, Macs with an Intel processor are not supported. Also keep the licence in mind: according to the FAQ, a Trikker licence works on one computer at a time. Working in parallel on a Mac in the office and a laptop on site means two licences.",[12,24425,24426,24427,24430,24431,56],{},"If you only want to view or keep drawing a single Trikker file on your Mac, you do not need to install anything: ",[40,24428,22],{"href":1456,"rel":24429},[1458]," opens .trik files for free in the browser, without an account and on an Intel Mac too. You read the import report, carry on with the single-line diagram and situation plan and export both as a PDF. Without an account the PDF carries a logo watermark; with a free account it does not. The steps are in ",[40,24432,1486],{"href":42},[79,24434,24436],{"id":24435},"what-about-the-browser-ipad-or-android","What about the browser, iPad or Android?",[12,24438,24439],{},"Trikker has announced a web version for browser and tablet: according to the announcement of 13 November 2026 as a beta later this year, according to the FAQ for autumn 2026, without a fixed date. Until then, the FAQ says Trikker runs only on tablets with Windows, not on an iPad.",[12,24441,24442,24443,24445],{},"PlanElec was built for the browser from day one – on a Mac, on Windows, on Linux or on a tablet. You open Sketch without signing in. With an account, your Sketch drawings and Pro projects live in the cloud and are up to date on every device; without Pro the Sketch cloud is limited, see the ",[40,24444,1958],{"href":54},". No download, no update installer, no licence tied to a single computer.",[1489,24447],{":height":24448,":width":24449,"alt":24450,"caption":24451,"src":24452},"820","1180","Ground-floor situation plan of a detached house in PlanElec with utility room, hall with staircase, kitchen and living area, opened in the browser at tablet size","The same situation plan in a tablet browser – no app to install.","\u002Fimages\u002Fblog\u002Ftrikker-2-0-mac\u002Fen-tablet.png",[79,24454,24456],{"id":24455},"bring-trikker-plans-into-planelec-as-pdfs","Bring Trikker plans into PlanElec as PDFs",[12,24458,24459,24460,24463],{},"In PlanElec Pro you import one or many .trik files as projects; a signed-in account is enough, no subscription needed. The situation plan comes along into the floor plan: named floors, walls with their thickness, named rooms, doors with their swing, windows, garage doors and stairs, with placed devices linked to their circuit. The import report lists what is not carried over. Moving a whole archive is covered in ",[40,24461,24462],{"href":4802},"Move a Trikker archive to PlanElec Pro",". If you only have a plan as a PDF, PlanElec Pro reads it as a floor plan. This is how you get from a PDF to an editable floor plan:",[3139,24465,24466,24469,24475,24481,24487],{},[87,24467,24468],{},"Save the plan with Trikker 2.0's direct PDF export.",[87,24470,24471,24472,24474],{},"Add the PDF to the PlanElec project under ",[15,24473,10173],{},"; scans and photos as PNG, JPEG or WebP work too.",[87,24476,24477,24478,24480],{},"In the project file preview, start ",[15,24479,14073],{},". PlanElec reads vector PDFs directly from their vector data and scans or photos with AI image recognition.",[87,24482,24483,24484,24486],{},"Review the proposal: confirm the scale, compare rooms and areas and, in ",[15,24485,19605],{},", move corners or add and remove walls.",[87,24488,16258,24489,24491],{},[15,24490,12394],{}," to transfer it into an empty floor. The original page stays as an underlay; ⌘Z \u002F Ctrl+Z reverses the import completely.",[12,24493,24494,24495,56],{},"PlanElec transfers walls, rooms with their area, doors and windows, supported device symbols (socket outlet, double socket outlet, splash-proof socket outlet, switch, light point) and the scale. Symbols PlanElec cannot assign with confidence are marked and not transferred. You then plan circuits and the single-line diagram in PlanElec, with automatic planning and the PlanElec assistant. ",[40,24496,9462],{"href":9461},[79,24498,24500],{"id":24499},"what-you-can-plan-with-planelec-pro-today","What you can plan with PlanElec Pro today",[12,24502,24503],{},"Mac support answers the platform question. In daily work, something else matters more: whether floor plan, circuits, distribution board and documents fit together without entering anything twice. That is exactly what PlanElec Pro is built for; Sketch deliberately stays with the single-line diagram and situation plan, without distribution board or self-check report. All product images in this article come from a fictitious example project in PlanElec Pro (captured on 15 October 2026).",[1041,24505,24507],{"id":24506},"one-project-every-plan","One project, every plan",[12,24509,24510,24511,56],{},"You draw the floor plan or place an image, PDF or DXF underneath. Rooms can start with a suggested set of devices. Switching chains, circuits, cables, phases and cable routes are suggested automatically, and you fine-tune them. The situation plan and single-line diagram come from the same model: change a circuit and it changes everywhere. ",[40,24512,24513],{"href":14100},"See how automatic planning works",[1041,24515,24517],{"id":24516},"the-planelec-assistant-carries-out-requests","The PlanElec assistant carries out requests",[12,24519,24520,24521,24523,24524,24526,24527,56],{},"Open the PlanElec assistant with ⌘J \u002F Ctrl+J and write what you need, for example \"Place three socket outlets in the kitchen\". The assistant works across the whole project: floor plan, rooms, devices, circuits, cables, distribution board, PV strings and lighting control. After every change, PlanElec checks the project with the AREI\u002FRGIE self-check and flags new findings; you reverse any change with one click on ",[15,24522,13947],{},". Risky actions only run after ",[15,24525,13704],{},". Technical questions are answered with verified sources. The language model runs in the EU region; the AI provider does not store your requests or use them for training. ",[40,24528,14645],{"href":13483},[1041,24530,24532],{"id":24531},"solar-pv-properly-documented","Solar PV, properly documented",[12,24534,24535],{},"In PlanElec, a PV system is more than an inverter symbol. You record strings, MPPTs, module type and count, DC protection and the DC cable run with cable type, cross-section, installation method and length. All of it appears automatically on the single-line diagram and the situation plan. If something is missing, PlanElec flags it straight away.",[1489,24537],{":height":24538,":width":24539,"alt":24540,"caption":24541,"src":24542},"1003","1680","Single-line diagram in PlanElec with two PV strings on MPPT A and B, module frame earthing and the inverter inspector open on the South roof west string","Two PV strings on the single-line diagram; on the right, the \"South roof west\" string with MPPT, module type, frame earthing and DC cable run.","\u002Fimages\u002Fblog\u002Ftrikker-2-0-mac\u002Fen-pv.png",[12,24544,24545],{},"You place the modules themselves in energy mode, directly on the roof surface in the 3D view. PlanElec colours each module by its MPPT and checks every string against the module and inverter limits: open-circuit voltage in the cold, MPP voltage in the heat, currents and parallel strings. A string that does not fit stands out before it is on the roof.",[1489,24547],{":height":24548,":width":24549,"alt":24550,"caption":24551,"src":24552},"1080","1920","3D view in PlanElec: two-storey house with a gable roof and 16 PV modules in two colours for MPPT A and B; on the left, the PV system panel with voltage and current checks per string","Energy mode in 3D: 16 modules on the south roof, coloured by MPPT; on the left, the string check with voltages and currents against the inverter limits.","\u002Fimages\u002Fblog\u002Ftrikker-2-0-mac\u002Fen-3d.png",[1041,24554,24556],{"id":24555},"the-distribution-board-plans-along","The distribution board plans along",[12,24558,4659,24559,24561,24562,1774,24564,24566],{},[15,24560,19309],{},", you place protective devices on the DIN rails automatically, or drag them into position yourself. RCD groups, spare capacity and wiring stay visible, and PlanElec shows whether every circuit has been placed. The board becomes part of the design rather than a separate drawing. For existing installations, start from photos: under ",[15,24563,14086],{},[15,24565,14090],{}," recognises visible DIN modules with row, start position, width and type. You review the proposal and import it into an empty board; you complete the wiring, which a photo cannot show, in the planning.",[1489,24568],{":height":24538,":width":24539,"alt":24569,"caption":24570,"src":24571},"Distribution board editor in PlanElec with main switch, RCDs and circuit breakers on three DIN rails","The main board with main switch, RCD groups and circuit breakers, including the four-pole breaker for the inverter – every circuit is placed.","\u002Fimages\u002Fblog\u002Ftrikker-2-0-mac\u002Fen-schaltschrank.png",[1041,24573,24575],{"id":24574},"from-plan-to-complete-dossier","From plan to complete dossier",[12,24577,24578,24579,24581,24582,56],{},"Trikker 2.0 adds direct PDF export. PlanElec goes a step further: the single-line diagram, situation plan, distribution board and self-check report come together in ",[15,24580,4996],{}," installation dossier with cover page, table of contents, page numbers, your company details and your logo. Before you generate it, PlanElec shows for each document what is still missing, so you can tell at a glance whether all information is complete. Every version is archived and gets a QR link. ",[40,24583,24584],{"href":4645},"More about exports",[1489,24586],{":height":24538,":width":24539,"alt":24587,"caption":24588,"src":24589},"Export view in PlanElec with project data, document selection for the dossier and dossier overview with plan format and colour mode","One data source for every document: before download, the dossier shows what is still open.","\u002Fimages\u002Fblog\u002Ftrikker-2-0-mac\u002Fen-dossier.png",[12,24591,24592,24593,24596],{},"To see the result, open our ",[40,24594,24595],{"href":14164},"pilot dossier as a PDF"," – a fictitious example exported straight from the product.",[1041,24598,24600],{"id":24599},"working-together-on-one-project","Working together on one project",[12,24602,24603],{},"Share projects by e-mail invitation with colleagues, designers or clients. Roles decide who edits and who only views. Live sync keeps open sessions aligned, including your own on Mac and tablet. Inviting other people is part of the subscription: three editing seats are included, and view-only access costs nothing. With \"Try Pro\" you plan on your own.",[79,24605,24607],{"id":24606},"sketch-or-pro-what-do-you-need-on-your-mac","Sketch or Pro: what do you need on your Mac?",[12,24609,24610],{},"Both run in the browser. The task decides, not the operating system:",[138,24612,24613,24622],{},[141,24614,24615],{},[144,24616,24617,24619],{},[147,24618,13171],{},[147,24620,24621],{},"The right route",[163,24623,24624,24635,24645,24655],{},[144,24625,24626,24629],{},[168,24627,24628],{},"Open a .trik file, keep drawing the single-line diagram and situation plan, export a PDF for the inspection",[168,24630,24631,24634],{},[40,24632,22],{"href":1456,"rel":24633},[1458],", free, even without an account",[144,24636,24637,24640],{},[168,24638,24639],{},"Bring a whole Trikker archive across as projects",[168,24641,24642,24644],{},[15,24643,1486],{}," in Pro, with any signed-in account",[144,24646,24647,24650],{},[168,24648,24649],{},"Distribution board, self-check report, PV, building automation or teamwork",[168,24651,24652,24654],{},[40,24653,31],{"href":1964},": Try Pro for 1 month: EUR 0, exports without masked areas, Site pass for EUR 15 per building or Pro for EUR 29 a month",[144,24656,24657,24660],{},[168,24658,24659],{},"Continue a Sketch drawing later with a distribution board",[168,24661,24662,24664],{},[15,24663,1482],{},"; the route only runs from Sketch to Pro",[12,24666,24667,24668,56],{},"A subscription applies in Sketch and in Pro. The comparison of all three tools, with sources, is in ",[40,24669,4755],{"href":1989},[79,24671,24673],{"id":24672},"native-app-or-browser-which-suits-you","Native app or browser – which suits you?",[138,24675,24676,24688],{},[141,24677,24678],{},[144,24679,24680,24682,24685],{},[147,24681,11364],{},[147,24683,24684],{},"Native app (Trikker 2.0)",[147,24686,24687],{},"Browser (PlanElec)",[163,24689,24690,24700,24711,24722,24733,24743,24753,24764,24775],{},[144,24691,24692,24694,24697],{},[168,24693,5104],{},[168,24695,24696],{},"Download and install on each computer",[168,24698,24699],{},"None – a current browser is enough",[144,24701,24702,24705,24708],{},[168,24703,24704],{},"Updates",[168,24706,24707],{},"Install the new version",[168,24709,24710],{},"Automatic the next time you open it",[144,24712,24713,24716,24719],{},[168,24714,24715],{},"Multiple devices",[168,24717,24718],{},"One licence per computer in simultaneous use",[168,24720,24721],{},"One account, every device",[144,24723,24724,24727,24730],{},[168,24725,24726],{},"Tablet",[168,24728,24729],{},"Web version announced as a beta for 2026; Windows tablets today",[168,24731,24732],{},"In the browser, today",[144,24734,24735,24737,24740],{},[168,24736,11601],{},[168,24738,24739],{},"Not described on the pages we checked",[168,24741,24742],{},"Pro: sharing with roles, live sync",[144,24744,24745,24747,24750],{},[168,24746,10998],{},[168,24748,24749],{},"Schemalezer (beta, web, with a Trikker licence): single-line diagram from a description or dictation",[168,24751,24752],{},"Pro: PlanElec assistant, every change checked and reversible",[144,24754,24755,24758,24761],{},[168,24756,24757],{},"Plan from PDF\u002Fscan",[168,24759,24760],{},"Schemalezer (beta): diagram and situation plan from PDF, PNG or JPG",[168,24762,24763],{},"Pro: floor plan recognition, reviewed before import",[144,24765,24766,24769,24772],{},[168,24767,24768],{},"Without internet",[168,24770,24771],{},"Can be used offline for a while",[168,24773,24774],{},"Internet connection required",[144,24776,24777,24780,24783],{},[168,24778,24779],{},"Existing projects",[168,24781,24782],{},"Your Trikker files",[168,24784,24785],{},"Sketch: open a single .trik for free; Pro: import .trik files as projects, situation plan included, recognise the floor plan from a Trikker PDF",[12,24787,24788,24789,56],{},"If you often work offline or have many ongoing Trikker dossiers, the installed application serves you well. If you switch devices between office, site and client, want to work on a Mac without installing anything, or want to plan the board, PV and team in one project, you will find that in PlanElec in the browser. The Trikker information in this table comes from the announcement of 13 November 2026, the FAQ and the two Schemalezer posts, checked on 20 November 2026. For the detailed comparison including prices, see ",[40,24790,14227],{"href":1386},[79,24792,1617],{"id":1616},[1041,24794,24796],{"id":24795},"is-trikker-20-still-a-beta","Is Trikker 2.0 still a beta?",[12,24798,24799],{},"No. Since 13 November 2026, Trikker 2.0 is no longer a beta according to the developer and is the standard version for Windows and macOS according to the FAQ. The beta had started on 30 September 2026. The web version for browser and tablet has been announced but not yet released.",[1041,24801,24803],{"id":24802},"can-i-open-my-trikker-projects-in-planelec","Can I open my Trikker projects in PlanElec?",[12,24805,24806,24807,24809,24810,24812],{},"Yes, in two ways. You open a single .trik file for free in PlanElec Sketch, even without an account, and keep drawing there. In PlanElec Pro you import one or many .trik files as projects with ",[15,24808,1486],{},"; a signed-in account is enough. The diagram, circuits and devices come along, and so does the situation plan with floors, walls and their thickness, rooms, doors, windows, garage doors and stairs. The import report lists what is not carried over. If you only have a plan as a PDF, start ",[15,24811,14073],{}," in PlanElec Pro, review and import. Finish ongoing dossiers in Trikker.",[1041,24814,24816],{"id":24815},"how-much-does-planelec-cost","How much does PlanElec cost?",[12,24818,24819],{},"PlanElec Sketch is free, even without an account. For Pro there is Try Pro for 1 month: EUR 0, exports without masked areas, Site pass for EUR 15 per building, paid once, and Pro for EUR 29 a month or EUR 290 a year. Pro includes three editing seats; each additional seat costs EUR 12 a month or EUR 120 a year, and view-only access costs nothing. A subscription applies in Sketch and in Pro. Details are on the pricing page.",[1041,24821,24823],{"id":24822},"do-i-need-a-mac-or-windows","Do I need a Mac or Windows?",[12,24825,24826],{},"Neither. Sketch and Pro run in any current browser on macOS, Windows and Linux. All you need is an internet connection.",[1041,24828,24830],{"id":24829},"does-planelec-replace-the-official-inspection","Does PlanElec replace the official inspection?",[12,24832,24833],{},"No – the roles are clearly split. The AREI\u002FRGIE self-check in Pro, which also checks every assistant change, shows you the gaps before hand-over; it is not a certificate of conformity. The official inspection is carried out by an accredited inspection body.",[79,24835,24837],{"id":24836},"try-it-on-your-mac-now","Try it on your Mac now",[12,24839,24840,24841,24844,24845,24847],{},"Open a .trik file or a blank drawing in ",[40,24842,22],{"href":1456,"rel":24843},[1458],": free, in the browser, nothing to install. If you need a distribution board, self-check report, PV or teamwork, create a small project in ",[40,24846,31],{"href":1964},": have a Trikker PDF recognised or draw the floor plan, place sockets and lighting or ask the assistant to do it, check circuits and the board, export the dossier. Your own project shows whether PlanElec fits the way you work – on the device in front of you.",[79,24849,2009],{"id":2008},[84,24851,24852,24859],{},[87,24853,24854,38,24856,56],{},[15,24855,11935],{},[40,24857,2023],{"href":1456,"rel":24858},[1458],[87,24860,24861,38,24863,2033,24865,56],{},[15,24862,7561],{},[40,24864,2032],{"href":1964},[40,24866,2036],{"href":54},[12,24868,24869,7570],{},[15,24870,2041],{},{"title":2044,"searchDepth":2045,"depth":2045,"links":24872},[24873,24874,24875,24876,24877,24885,24886,24887,24894,24895],{"id":24332,"depth":2045,"text":24333},{"id":24419,"depth":2045,"text":24420},{"id":24435,"depth":2045,"text":24436},{"id":24455,"depth":2045,"text":24456},{"id":24499,"depth":2045,"text":24500,"children":24878},[24879,24880,24881,24882,24883,24884],{"id":24506,"depth":2053,"text":24507},{"id":24516,"depth":2053,"text":24517},{"id":24531,"depth":2053,"text":24532},{"id":24555,"depth":2053,"text":24556},{"id":24574,"depth":2053,"text":24575},{"id":24599,"depth":2053,"text":24600},{"id":24606,"depth":2045,"text":24607},{"id":24672,"depth":2045,"text":24673},{"id":1616,"depth":2045,"text":1617,"children":24888},[24889,24890,24891,24892,24893],{"id":24795,"depth":2053,"text":24796},{"id":24802,"depth":2053,"text":24803},{"id":24815,"depth":2053,"text":24816},{"id":24822,"depth":2053,"text":24823},{"id":24829,"depth":2053,"text":24830},{"id":24836,"depth":2045,"text":24837},{"id":2008,"depth":2045,"text":2009},"2026-10-02","Trikker 2.0 has been out of beta since 13 November 2026 and runs on Windows and macOS. What is new, how to bring .trik files and Trikker PDFs across and plan in the browser – on Mac, PC and tablet.",[1373,2115,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-trikker-2-0-mac-beta-editorial.jpg","\u002Fblog\u002Ftrikker-2-0-mac.en",{"title":24249,"description":24897},"Trikker 2.0 for Mac: the New Version vs. PlanElec","trikker-2-0-mac","blog\u002Ftrikker-2-0-mac.en",[329,24907,24908,24358,7417,1387,24909,3926,11546],"Trikker 2.0","Trikker Mac","Electrical planning Belgium","XeLuIShDmNfDf-_W2sId8sEgktbchkyJPgIP-1kRdo8","\u002Fblog\u002Ftrikker-2-0-mac",{"id":24913,"title":24914,"articleId":24915,"body":24916,"category":11972,"date":25415,"description":25416,"extension":2113,"image":24947,"labels":25417,"lastUpdated":10988,"locale":2119,"meta":25418,"navigation":2121,"ogImage":25419,"path":25420,"publishDate":25415,"readTime":6086,"refreshInterval":5426,"seo":25421,"seoTitle":25422,"slug":24915,"stem":25423,"tags":25424,"__hash__":25430,"kind":2137,"href":25431},"blog\u002Fblog\u002Frcd-sealing-abolished-2026.en.md","What changes on 1 November 2026 for the sealing of residual current devices?","rcd-sealing-abolished-2026",{"type":9,"value":24917,"toc":25402},[24918,24922,24942,24948,24951,24955,24958,25039,25046,25051,25055,25062,25065,25117,25121,25124,25149,25152,25156,25163,25178,25183,25194,25198,25201,25221,25224,25228,25231,25246,25250,25253,25268,25275,25282,25286,25289,25295,25297,25368,25371,25373,25397],[79,24919,24921],{"id":24920},"what-changed-on-1-november-2026","What changed on 1 November 2026?",[12,24923,24924,24925,24928,24929,24932,24933,24938,24939,56],{},"Since ",[15,24926,24927],{},"1 November 2026",", a recognised inspection body no longer has to ",[15,24930,24931],{},"seal"," the residual current device placed at the origin of a Belgian domestic electrical installation when that installation is found compliant. The ",[40,24934,24937],{"href":24935,"rel":24936},"https:\u002F\u002Fwww.ejustice.just.fgov.be\u002Fcgi\u002Farticle.pl?language=nl&sum_date=2026-09-15&lg_txt=n&numac_search=2026006432",[1458],"Royal Decree of 13 August 2026",", published in the Belgian Official Gazette of 15 September 2026 (numac 2026006432), removes the prescription from parts 4 and 6 of Book 1 of the AREI\u002FRGIE. Book 1 has therefore moved to ",[15,24940,24941],{},"version 07",[12,24943,24944],{},[74,24945],{"alt":24946,"src":24947},"Electrical components being prepared on a workbench.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-rcd-sealing-abolished-2026-editorial.webp",[12,24949,24950],{},"The requirement to install at least one RCD of no more than 300 mA at the origin of the installation is unchanged. What disappears is only the sealing of that device by the inspector — and the corresponding statement in the inspection report.",[79,24952,24954],{"id":24953},"which-provisions-were-removed-exactly","Which provisions were removed exactly?",[12,24956,24957],{},"The decree has five articles; three of them amend Book 1.",[138,24959,24960,24972],{},[141,24961,24962],{},[144,24963,24964,24967,24970],{},[147,24965,24966],{},"Article of the RD 13\u002F08\u002F2026",[147,24968,24969],{},"Provision in Book 1",[147,24971,3293],{},[163,24973,24974,24989,25004,25018,25029],{},[144,24975,24976,24979,24986],{},[168,24977,24978],{},"Art. 1",[168,24980,24981,24982,24985],{},"Part 4, sub-section ",[15,24983,24984],{},"4.2.4.3., b.",", third paragraph",[168,24987,24988],{},"Repealed in full: both the inaccessibility of the input terminals and the seal that had to make it permanent.",[144,24990,24991,24994,25001],{},[168,24992,24993],{},"Art. 2",[168,24995,24996,24997,25000],{},"Part 6, sub-section ",[15,24998,24999],{},"6.4.6.4., b.6."," (conclusions)",[168,25002,25003],{},"Replaced: the conformity inspection report now only certifies the visa on single-line diagrams and situation plans.",[144,25005,25006,25009,25015],{},[168,25007,25008],{},"Art. 3",[168,25010,24996,25011,25014],{},[15,25012,25013],{},"6.5.7.2., b.6.",", second paragraph",[168,25016,25017],{},"Replaced: the control-visit report only states that diagrams and plans were visaed again.",[144,25019,25020,25023,25026],{},[168,25021,25022],{},"Art. 4",[168,25024,25025],{},"—",[168,25027,25028],{},"Entry into force on the first day of the second month after publication, i.e. 1 November 2026.",[144,25030,25031,25034,25036],{},[168,25032,25033],{},"Art. 5",[168,25035,25025],{},[168,25037,25038],{},"Execution by the minister responsible for Energy.",[12,25040,25041,25042,25045],{},"The deleted paragraph in 4.2.4.3., b. required adequate measures to make the input terminals of the RCD(s) inaccessible, and stated that this inaccessibility had to be made permanent by a seal applied by the person carrying out the conformity inspection. The whole paragraph goes, not just the word sealing. General protection against electric shock by ",[15,25043,25044],{},"direct contact"," (section 4.2.2., through enclosures and insulation among others) remains fully in force: a distribution board must still shield its live parts.",[1489,25047],{":height":12776,":width":3800,"alt":25048,"caption":25049,"src":25050},"Comparison of version 06 and version 07: the RCD of at most 300 mA at the origin remains mandatory; the seal on the input terminals is repealed; the conformity inspection and control visit reports only mention the visa on diagrams and plans","Since 1 November 2026 only the seal and its mention in the report have gone; the 300 mA requirement at the origin remains (4.2.4.3(b)).","\u002Fimages\u002Fblog\u002Fdiagrams\u002Frcd-sealing-abolished-2026\u002Fsealing-v06-v07.en.svg",[79,25052,25054],{"id":25053},"is-sealing-the-only-change-in-version-07","Is sealing the only change in version 07?",[12,25056,25057,25058,25061],{},"Yes. A word-by-word comparison of the complete Dutch and French texts of versions 06 and 07 shows only the three passages above and the version marking on the title page. ",[15,25059,25060],{},"Nothing else changes in substance","; all other variations are pagination and line breaks.",[12,25063,25064],{},"Do not confuse this with two other dates:",[138,25066,25067,25079],{},[141,25068,25069],{},[144,25070,25071,25073,25076],{},[147,25072,16362],{},[147,25074,25075],{},"Decree",[147,25077,25078],{},"Scope",[163,25080,25081,25092,25106],{},[144,25082,25083,25086,25089],{},[168,25084,25085],{},"01\u002F04\u002F2026",[168,25087,25088],{},"RD of 6 October 2025",[168,25090,25091],{},"Book 1 version 06: earthed direct-current systems (TN, TT, IT) added.",[144,25093,25094,25097,25100],{},[168,25095,25096],{},"01\u002F10\u002F2026",[168,25098,25099],{},"RD of 20 July 2026",[168,25101,25102,25105],{},[15,25103,25104],{},"Book 3"," only (high-voltage overhead lines) — not domestic installations.",[144,25107,25108,25111,25114],{},[168,25109,25110],{},"01\u002F11\u002F2026",[168,25112,25113],{},"RD of 13 August 2026",[168,25115,25116],{},"Book 1 version 07: sealing of the RCD abolished.",[79,25118,25120],{"id":25119},"why-was-the-seal-abolished","Why was the seal abolished?",[12,25122,25123],{},"The report to the King justifies the repeal with five practical situations that kept raising questions about the purpose and application of the measure:",[84,25125,25126,25129,25136,25139,25146],{},[87,25127,25128],{},"once a seal has been removed, only a recognised body can apply a new one, and only through a new inspection of the installation;",[87,25130,25131,25132,25135],{},"where an installation was declared ",[15,25133,25134],{},"non-compliant",", Book 1 did not require the body to seal at all;",[87,25137,25138],{},"sealing applied only to domestic installations;",[87,25140,25141,25142,25145],{},"for a significant modification or extension the sealing could be ",[15,25143,25144],{},"partial",": only the RCD affected by the work had to be sealed;",[87,25147,25148],{},"the deterrent value of a seal as a safety measure is limited.",[12,25150,25151],{},"The decision was taken in consultation with representatives of installers, recognised bodies and public grid operators. The report states explicitly that the repeal does not reduce the safety of domestic installations.",[79,25153,25155],{"id":25154},"what-did-such-a-seal-look-like-in-practice","What did such a seal look like in practice?",[12,25157,25158,25159,25162],{},"The AREI never prescribed a ",[15,25160,25161],{},"form",". The text required only a seal applied by the person responsible for the conformity inspection — no specific material, colour or marking. In practice this usually meant:",[84,25164,25165,25172,25175],{},[87,25166,25167,25168,25171],{},"a terminal cover over the ",[15,25169,25170],{},"input terminals"," of the main RCD, with two eyelets or holes;",[87,25173,25174],{},"a thin metal wire threaded through those eyelets into a closed loop;",[87,25176,25177],{},"a lead or plastic seal crimped onto the loop with sealing pliers, often carrying the mark of the recognised body.",[1489,25179],{":height":24042,":width":24043,"alt":25180,"caption":25181,"src":25182},"Transparent terminal cover over the input terminals of an RCD, with a twisted seal wire through two eyelets and a round lead seal.","Illustration (AI-generated): what a typical seal on the input terminals looked like. Since 1 November 2026 the approved inspection body no longer fits one.","\u002Fimages\u002Fblog\u002Fenrichment-2026-11\u002Frcd-sealing-abolished-2026\u002Frcd-input-terminal-seal.webp",[12,25184,25185,25186,25189,25190,25193],{},"The seal therefore sat on the ",[15,25187,25188],{},"input"," side of the device, not the output: it evidenced that everything downstream was fed through that maximum 300 mA protection, and it could not be broken without leaving a visible trace. This is entirely separate from the ",[15,25191,25192],{},"grid operator's seals"," on the service connection and the meter, including a digital meter. Those stay in place and must never be removed.",[79,25195,25197],{"id":25196},"my-main-rcd-is-not-sealed-is-that-a-violation","My main RCD is not sealed — is that a violation?",[12,25199,25200],{},"Not necessarily, and since 1 November 2026 certainly not. A missing seal on an older installation usually has one of these explanations:",[84,25202,25203,25209,25212,25218],{},[87,25204,25205,25206,25208],{},"the installation was declared ",[15,25207,25134],{}," at the inspection, in which case Book 1 required no sealing;",[87,25210,25211],{},"work was done on the board after the inspection and the seal was broken — not in itself a breach of Book 1, but the evidential value is gone;",[87,25213,25214,25215,25217],{},"during an extension only ",[15,25216,4996],{}," of several RCDs at the origin was sealed;",[87,25219,25220],{},"the device or the board construction did not allow the input terminals to be sealed.",[12,25222,25223],{},"A seal on the meter cabinet or the service cable is a different matter: it belongs to the distribution grid operator and has nothing to do with the AREI prescription. For your own installation, the last inspection report is the reference: until now it stated explicitly whether sealing had been carried out.",[79,25225,25227],{"id":25226},"can-an-existing-seal-simply-be-removed-now","Can an existing seal simply be removed now?",[12,25229,25230],{},"Since 1 November 2026, Book 1 no longer requires a seal on the RCD to be applied or kept intact. Still, do not remove it yourself:",[84,25232,25233,25236,25243],{},[87,25234,25235],{},"work inside a distribution board happens close to the supply cable and belongs in professional hands;",[87,25237,25238,25239,25242],{},"grid operator seals on the meter, main fuse or connection are ",[15,25240,25241],{},"not"," affected by this change and remain off limits;",[87,25244,25245],{},"an intact seal remains practical evidence that nothing has changed on the supply side since the last inspection.",[79,25247,25249],{"id":25248},"what-does-this-mean-for-inspection-reports-and-dossiers","What does this mean for inspection reports and dossiers?",[12,25251,25252],{},"Reports drawn up since 1 November 2026 no longer mention sealing. What remains:",[84,25254,25255,25262,25265],{},[87,25256,25257,25258,25261],{},"confirmation that the recognised body visaed the ",[15,25259,25260],{},"single-line diagrams and situation plans",", both at the conformity inspection and at the control visit;",[87,25263,25264],{},"the latest date for the next control visit (chapter 6.5.);",[87,25266,25267],{},"the assessment of the installation against the prescriptions in force at that time.",[12,25269,25270,25271,25274],{},"Older reports mentioning a seal remain valid. An installation does not need re-inspection because a prescription disappears: an inspection assesses the installation under the applicable law, and the ",[40,25272,25273],{"href":5393},"control visit of an existing installation"," follows its own periodicity.",[12,25276,25277,25278,25281],{},"You can draw the single-line diagram and situation plan that the inspector visas for free in the browser with PlanElec Sketch: the start task ",[40,25279,11136],{"href":3611,"rel":25280},[1458]," begins with the connection, meter, main RCD and board. Sketch checks no AREI rule; the inspection is carried out by the approved inspection body.",[79,25283,25285],{"id":25284},"what-does-the-change-mean-for-the-planelec-self-check","What does the change mean for the PlanElec self-check?",[12,25287,25288],{},"Nothing – and that is consistent. The AREI\u002FRGIE self-check in PlanElec Pro works on the project model: single-line diagram, situation plan, circuits, protective devices and distribution board. Sealing is an act by the inspector on the installed system, not a property of a plan, so it was never a check rule. The main RCD of no more than 300 mA at the origin is still checked, because that obligation remains (4.2.4.3(b)).",[12,25290,25291,25292,25294],{},"For existing installations you record for each circuit which period it dates from: before 1 October 1981, under the old AREI, under the new AREI from 1 June 2020, or current work. The self-check applies the permitted Part 8 deviations and names them in its findings. Since 1 November 2026, the AREI reader and the reports in PlanElec cite Book 1 version 07, in the official French and Dutch wording. There is no official German version 07; the German text is the translation of version 06 with the three changed passages marked. PlanElec checks sealing neither before nor after 1 November 2026. The full scope is in ",[40,25293,1086],{"href":1085},". The self-check shows you open points; measurements and the on-site inspection are carried out by the approved inspection body.",[79,25296,1681],{"id":69},[138,25298,25299,25307],{},[141,25300,25301],{},[144,25302,25303,25305],{},[147,25304,2244],{},[147,25306,3727],{},[163,25308,25309,25320,25332,25344,25356],{},[144,25310,25311,25317],{},[168,25312,25313],{},[40,25314,25316],{"href":24935,"rel":25315},[1458],"RD 13 August 2026, Official Gazette 15 September 2026",[168,25318,25319],{},"Decree text and report to the King",[144,25321,25322,25329],{},[168,25323,25324],{},[40,25325,25328],{"href":25326,"rel":25327},"https:\u002F\u002Fwww.ejustice.just.fgov.be\u002Feli\u002Farrete\u002F2026\u002F08\u002F13\u002F2026006432\u002Fjustel",[1458],"Consolidated version in Justel",[168,25330,25331],{},"Official consolidation",[144,25333,25334,25341],{},[168,25335,25336],{},[40,25337,25340],{"href":25338,"rel":25339},"https:\u002F\u002Feconomie.fgov.be\u002Fsites\u002Fdefault\u002Ffiles\u002FFiles\u002FPublications\u002Ffiles\u002FAREI-Bijlage-Boek-1-installaties-op-laagspanning-en-op-zeer-lage-spanning-2026-v07.pdf",[1458],"Book 1 of the AREI applicable from 1 November 2026 (PDF, NL)",[168,25342,25343],{},"Version 07, full text",[144,25345,25346,25353],{},[168,25347,25348],{},[40,25349,25352],{"href":25350,"rel":25351},"https:\u002F\u002Feconomie.fgov.be\u002Fsites\u002Fdefault\u002Ffiles\u002FFiles\u002FPublications\u002Ffiles\u002FRGIE-Annexe-Livre-1-Installations-a-basse-tenstion-et-a-tres-basse-tension-2026-v07.pdf",[1458],"Livre 1 of the RGIE from 1 November 2026 (PDF, FR)",[168,25354,25355],{},"Version 07, French text",[144,25357,25358,25365],{},[168,25359,25360],{},[40,25361,25364],{"href":25362,"rel":25363},"https:\u002F\u002Feconomie.fgov.be\u002Fnl\u002Fpublicaties\u002Falgemeen-reglement-op-de",[1458],"FPS Economy — AREI\u002FRGIE overview page",[168,25366,25367],{},"All books and amending decrees",[12,25369,25370],{},"This article summarises the official texts; the wording published in the Belgian Official Gazette is binding.",[79,25372,7537],{"id":7536},[84,25374,25375,25381,25385,25391],{},[87,25376,25377],{},[40,25378,25380],{"href":25379},"\u002Fen\u002Fblog\u002Farei-regulations-2026","AREI\u002FRGIE regulations 2026: the key changes",[87,25382,25383],{},[40,25384,5394],{"href":5393},[87,25386,25387],{},[40,25388,25390],{"href":25389},"\u002Fen\u002Fblog\u002Finspection-checklist","Inspection checklist: what the inspector verifies",[87,25392,25393],{},[40,25394,25396],{"href":25395},"\u002Fen\u002Fblog\u002Frcd-type-a-vs-b","RCD type A or type B",[12,25398,25399],{},[40,25400,25401],{"href":1964},"Installation dossier and self-check in PlanElec Pro →",{"title":2044,"searchDepth":2045,"depth":2045,"links":25403},[25404,25405,25406,25407,25408,25409,25410,25411,25412,25413,25414],{"id":24920,"depth":2045,"text":24921},{"id":24953,"depth":2045,"text":24954},{"id":25053,"depth":2045,"text":25054},{"id":25119,"depth":2045,"text":25120},{"id":25154,"depth":2045,"text":25155},{"id":25196,"depth":2045,"text":25197},{"id":25226,"depth":2045,"text":25227},{"id":25248,"depth":2045,"text":25249},{"id":25284,"depth":2045,"text":25285},{"id":69,"depth":2045,"text":1681},{"id":7536,"depth":2045,"text":7537},"2026-09-27","Since 1 November 2026 the mandatory sealing of the RCD at the origin of a Belgian domestic installation no longer applies. What the Royal Decree of 13 August 2026 removes exactly, what stays unchanged, and what it means for inspection reports.",[2820,4243,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-rcd-sealing-abolished-2026-editorial.jpg","\u002Fblog\u002Frcd-sealing-abolished-2026.en",{"title":24914,"description":25416},"RCD Sealing: What Changes on 1 November 2026","blog\u002Frcd-sealing-abolished-2026.en",[2133,2134,17110,24055,25425,25426,25427,25428,25429,4261],"residual current device","electrical inspection","recognised body","Book 1 version 07","Royal Decree 13 August 2026","-kExXbTaer-CCESUwTGpf4RR5THnt6R-24-rP2JoMSc","\u002Fblog\u002Frcd-sealing-abolished-2026",{"id":25433,"title":7544,"articleId":25434,"body":25435,"category":4239,"date":26406,"description":26407,"extension":2113,"image":25453,"labels":26408,"lastUpdated":10988,"locale":2119,"meta":26409,"navigation":2121,"ogImage":26410,"path":26411,"publishDate":26406,"readTime":8562,"refreshInterval":4248,"seo":26412,"seoTitle":26413,"slug":26414,"stem":26415,"tags":26416,"__hash__":26422,"kind":2137,"href":26423},"blog\u002Fblog\u002Fdomotica-knx-basics.en.md","domotica-knx-basics",{"type":9,"value":25436,"toc":26392},[25437,25441,25448,25454,25457,25609,25613,25616,25630,25652,25656,25683,25686,25809,25813,25816,25851,25862,25865,25869,25872,25878,25884,25890,25913,25919,25933,25937,25940,25946,25952,25962,25968,25974,25978,25981,25988,25991,26011,26014,26018,26105,26116,26119,26123,26129,26212,26220,26224,26246,26262,26276,26279,26284,26289,26293,26296,26314,26317,26347,26350,26354,26379,26387],[79,25438,25440],{"id":25439},"what-does-a-knx-installation-have-to-show-on-the-single-line-diagram-and-the-situation-plan","What does a KNX installation have to show on the single-line diagram and the situation plan?",[12,25442,25443,25444,25447],{},"The inspection file covers the ",[15,25445,25446],{},"electrical"," installation: the bus power supply as a fixed appliance in the board together with its overcurrent protection, the KNX actuator as a control unit, every switched load circuit with its type, cross-section, number of conductors and installation method, and every push-button as a control unit with its reference. What does not belong there: group addresses, device parameters, scenes and logic. Those live in the ETS project and are not a matter for the AREI\u002FRGIE.",[12,25449,25450],{},[74,25451],{"alt":25452,"src":25453},"An electrician examines home automation components.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-domotica-knx-basics-editorial.webp",[12,25455,25456],{},"That dividing line is the whole article in one sentence. The rest explains why it runs there and what sits on each side.",[138,25458,25459,25478],{},[141,25460,25461],{},[144,25462,25463,25466,25469,25472,25475],{},[147,25464,25465],{},"Element",[147,25467,25468],{},"What it is electrically",[147,25470,25471],{},"On the single-line diagram",[147,25473,25474],{},"On the situation plan",[147,25476,25477],{},"In the ETS project",[163,25479,25480,25503,25528,25551,25573,25594],{},[144,25481,25482,25485,25488,25494,25500],{},[168,25483,25484],{},"KNX bus power supply",[168,25486,25487],{},"fixed appliance, a 230 V load in the board",[168,25489,25490,25491,3317],{},"yes, with its upstream overcurrent protective device (",[63,25492,25493],{},"3.1.2.2 a",[168,25495,25496,25497,3317],{},"at the location of the distribution board (",[63,25498,25499],{},"3.1.2.3 a",[168,25501,25502],{},"as a device on the line",[144,25504,25505,25508,25517,25523,25525],{},[168,25506,25507],{},"Bus cable between bus devices",[168,25509,25510,25511,1774,25514,3317],{},"extra-low-voltage line (",[63,25512,25513],{},"5.2.2.2",[63,25515,25516],{},"5.2.9.15",[168,25518,25519,25520,25522],{},"not among the mandatory data listed in ",[63,25521,25493],{}," for the load-circuit wiring",[168,25524,602],{},[168,25526,25527],{},"line and area topology",[144,25529,25530,25533,25540,25543,25548],{},[168,25531,25532],{},"KNX actuator in the board",[168,25534,25535,25536,25539],{},"control device under ",[63,25537,25538],{},"5.3.3.2 b"," and switching element",[168,25541,25542],{},"yes, as a fixed appliance in the load circuit",[168,25544,25545,25546,3317],{},"at the location of the board (",[63,25547,25499],{},[168,25549,25550],{},"yes, with application and parameters",[144,25552,25553,25556,25559,25565,25570],{},[168,25554,25555],{},"Actuator channel → luminaire",[168,25557,25558],{},"230 V load circuit",[168,25560,25561,25562,3317],{},"yes: type, cross-section, number of conductors, installation method; light point numbered (",[63,25563,25564],{},"3.1.2.1 a",[168,25566,25567,25568,3317],{},"light point with circuit letter and number (",[63,25569,25564],{},[168,25571,25572],{},"communication object of the channel",[144,25574,25575,25578,25581,25586,25591],{},[168,25576,25577],{},"Push-button \u002F control point",[168,25579,25580],{},"control unit on the bus, with no load circuit of its own",[168,25582,25583,25584,3317],{},"yes, as a control unit with a sequential number (",[63,25585,25564],{},[168,25587,25588,25589,3317],{},"circuit letter plus the number of the light point it controls (",[63,25590,25564],{},[168,25592,25593],{},"group address",[144,25595,25596,25599,25602,25604,25606],{},[168,25597,25598],{},"Group addresses, parameters, scenes",[168,25600,25601],{},"not electrical equipment",[168,25603,602],{},[168,25605,602],{},[168,25607,25608],{},"yes — and there only",[79,25610,25612],{"id":25611},"what-does-domotica-or-building-automation-mean","What does domotica or building automation mean?",[12,25614,25615],{},"Domotica is the usual Belgian term for automating a dwelling: operating, switching, controlling and linking lighting, shutters, heating and access through one shared control layer instead of one hard-wired switch per function. \"Building automation\" means the same thing one size up, in non-domestic work.",[12,25617,25618,25619,6975,25622,25625,25626,25629],{},"The AREI\u002FRGIE knows the term — not as a regulatory category of its own with its own duties, but as a ",[15,25620,25621],{},"symbol family",[63,25623,25624],{},"Table 2.23",", part of ",[63,25627,25628],{},"Chapter 2.13",", lists the control unit under letter J, \"Domotics\". It is \"represented by a rectangle consisting of two parts\": the lower part carries the basic symbol — the table gives a switch or a socket outlet with a switch as examples — and the upper part the type of control.",[12,25631,25632,25633,25636,25637,25640,25641,25643,25644,25647,25648,25651],{},"Two things follow. First, a home-automation control point is, in drawing terms, a ",[15,25634,25635],{},"control unit",", not a plain switch — and ",[63,25638,25639],{},"Sub-section 3.1.2.1 point a"," expressly requires control units to be numbered alongside light points and socket outlets. Second, the regulation prescribes no KNX-specific symbol. Where ",[63,25642,25624],{}," contains none, the same sub-section allows \"any other clearly identifiable symbol defined in the legend of the single-line diagrams and situation plans\". On a bus installation the legend is therefore not optional decoration. If you draw the single-line diagram in ",[40,25645,22],{"href":1456,"rel":25646},[1458],", you will find the ",[15,25649,25650],{},"Home automation module"," symbol for this (control on top, inputs and outputs below); the legend in the PDF explains it together with every other symbol used.",[79,25653,25655],{"id":25654},"what-is-knx-and-how-does-it-differ-from-a-conventional-installation","What is KNX and how does it differ from a conventional installation?",[12,25657,25658,25659,25662,25663,25666,25667,25670,25671,25674,25675,25678,25679,25682],{},"KNX is a manufacturer-independent standard for building automation. The KNX Association lists the approvals: ISO\u002FIEC approved KNX in 2006 as the International Standard ",[15,25660,25661],{},"ISO\u002FIEC 14543-3",", CENELEC in 2003 as the European Standard ",[15,25664,25665],{},"EN 50090",", CEN in 2006 as ",[15,25668,25669],{},"EN 13321-1"," (a mere reference to EN 50090) and ",[15,25672,25673],{},"EN 13321-2"," (KNXnet\u002FIP), SAC in 2007 as the Chinese Standard ",[15,25676,25677],{},"GB\u002FT 20965",", and ANSI\u002FASHRAE in 2005 as the US Standard ",[15,25680,25681],{},"ANSI\u002FASHRAE 135",". That is exactly what separates KNX from a system bus defined by a single manufacturer: the standard belongs to no brand.",[12,25684,25685],{},"Bus devices exchange information over one shared medium — in the KNX Association's words, \"twisted pair, radio frequency, power line or IP\u002FEthernet\". The information to be transmitted is \"packed in a telegram\" and sent from a sensor to actuators. In Belgian housing the twisted pair is the norm; the other media are mainly retrofit and coupling routes.",[138,25687,25688,25701],{},[141,25689,25690],{},[144,25691,25692,25695,25698],{},[147,25693,25694],{},"Aspect",[147,25696,25697],{},"Conventional installation",[147,25699,25700],{},"KNX installation",[163,25702,25703,25714,25725,25736,25747,25758,25773,25784,25799],{},[144,25704,25705,25708,25711],{},[168,25706,25707],{},"What the control point does",[168,25709,25710],{},"interrupts the load circuit itself, 230 V is present at the switch",[168,25712,25713],{},"puts a telegram on the bus; the actuator channel in the board switches the 230 V",[144,25715,25716,25719,25722],{},[168,25717,25718],{},"Wiring to the control point",[168,25720,25721],{},"load wiring, conductor count depending on the switching arrangement",[168,25723,25724],{},"bus cable at extra-low voltage",[144,25726,25727,25730,25733],{},[168,25728,25729],{},"Additional control point",[168,25731,25732],{},"one more intermediate switch plus two strapping conductors per section",[168,25734,25735],{},"one more push-button on the existing bus, assigned in ETS",[144,25737,25738,25741,25744],{},[168,25739,25740],{},"Changing a function after handover",[168,25742,25743],{},"rewiring",[168,25745,25746],{},"reparameterising in ETS, the wiring stays",[144,25748,25749,25752,25755],{},[168,25750,25751],{},"Where the function lives",[168,25753,25754],{},"in the wiring",[168,25756,25757],{},"decentralised, in sensor and actuator, not in a central unit",[144,25759,25760,25763,25770],{},[168,25761,25762],{},"Inspection documents",[168,25764,25765,25766,1774,25768,3317],{},"single-line diagram and situation plan (",[63,25767,25493],{},[63,25769,25499],{},[168,25771,25772],{},"the same documents with the same mandatory content, plus the ETS project as separate documentation the regulation does not govern",[144,25774,25775,25778,25781],{},[168,25776,25777],{},"Commissioning",[168,25779,25780],{},"energise and check",[168,25782,25783],{},"additionally addressing and programming with ETS",[144,25785,25786,25789,25792],{},[168,25787,25788],{},"Fault finding",[168,25790,25791],{},"measurement in the load circuit",[168,25793,25794,25795,25798],{},"measurement in the load circuit ",[15,25796,25797],{},"and"," bus diagnostics",[144,25800,25801,25804,25806],{},[168,25802,25803],{},"Dependence on the planning tool",[168,25805,2476],{},[168,25807,25808],{},"changes require the ETS project and access to it",[79,25810,25812],{"id":25811},"what-are-the-roles-of-bus-power-supply-sensor-push-button-actuator-channel-and-load","What are the roles of bus power supply, sensor, push-button, actuator, channel and load?",[12,25814,25815],{},"One chain makes it clearest. A ceiling light in the hallway is to be operated from a push-button beside the front door.",[3139,25817,25818,25827,25833,25839,25845],{},[87,25819,25820,25823,25824,25826],{},[15,25821,25822],{},"Bus power supply."," A module in the board is fed from a 230 V circuit and provides the operating voltage for all bus devices at its BUS+ and BUS− terminals. It is a fixed appliance and, like any other, needs an upstream overcurrent protective device. Without it the bus is dead and ",[15,25825,602],{}," push-button works — including the one in the hallway.",[87,25828,25829,25832],{},[15,25830,25831],{},"Push-button as sensor."," The push-button hangs on the bus, not on the load circuit. Pressing it produces a telegram that the push-button places on the bus. It carries no load current.",[87,25834,25835,25838],{},[15,25836,25837],{},"Telegram."," The telegram is addressed to a group address, not to a cable. Every device listening to that address receives it at the same time.",[87,25840,25841,25844],{},[15,25842,25843],{},"Actuator channel."," The switch actuator in the board has several channels. Precisely the channel whose communication object is linked to that group address closes its relay.",[87,25846,25847,25850],{},[15,25848,25849],{},"Load circuit and load."," Only here does current flow: from the overcurrent protective device, through the actuator channel, along the wiring to the luminaire. This part is an entirely ordinary electrical installation, sized, protected and documented by the ordinary rules.",[12,25852,25853,25854,25857,25858,25861],{},"The actuator channel is therefore the ",[15,25855,25856],{},"control device"," within the meaning of ",[63,25859,25860],{},"Sub-section 5.3.3.2",". Point b expressly permits, at extra-low and low voltage, contactors, control auxiliaries and \"electronic devices\" alongside switches and circuit-breakers, provided they comply with \"the relevant standards approved by the King or registered by the NBN, or with provisions ensuring at least an equivalent level of safety\". A KNX actuator is thus no exotic construction — but neither is it a free pass: the product's compliance with those standards remains a condition.",[12,25863,25864],{},"Point d of the same sub-section expressly allows one device to control several machines or appliances running simultaneously. A channel switching four spots of the same group is covered. The same point also makes clear that a control device is required even where the appliance's operation depends on a relay, a thermostat or a similar component — automation does not replace the control device, it is one.",[79,25866,25868],{"id":25867},"what-is-supplied-at-230-v-and-what-communicates-over-the-bus","What is supplied at 230 V and what communicates over the bus?",[12,25870,25871],{},"The split runs at the actuator's terminals, not along device categories.",[1489,25873],{":height":25874,":width":3800,"alt":25875,"caption":25876,"src":25877},"560","Three-level diagram: a circuit breaker feeds the bus power supply and the KNX actuator, actuator channel CH1 switches luminaire E1. Push-button S1 sends a telegram over the bus cable to the group address. Group addresses, parameters, scenes and logic exist only in the ETS project.","Bus power supply and actuator sit on both sides: 230 V at the input, bus at the output. Everything with a solid frame belongs in the inspection documents; the ETS project does not.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fdomotica-knx-basics\u002Fknx-230v-bus-ets.en.svg",[12,25879,25880,25883],{},[15,25881,25882],{},"Carrying 230 V:"," the supply to the bus power supply, the supply to the actuator, every switched outgoing circuit from an actuator channel to a luminaire or shutter motor, and everything already wired conventionally.",[12,25885,25886,25889],{},[15,25887,25888],{},"Running on the bus:"," push-buttons, presence and brightness sensors, room controllers, displays, and communication between actuators.",[12,25891,25892,25893,25896,25897,25900,25901,25904,25905,25908,25909,25912],{},"The bus cable is an ",[15,25894,25895],{},"extra-low-voltage line",". Its installation is governed by ",[63,25898,25899],{},"Sub-section 5.2.2.2",": all installation methods for low-voltage wiring apply to extra-low-voltage wiring as well, \"with relaxations regarding the electrical and\u002For mechanical properties\", except under external influences BE2, BE3 or CA2. ",[63,25902,25903],{},"Sub-section 5.2.9.15 point b"," confirms this for ELV installations and names the few provisions from ",[63,25906,25907],{},"Section 5.2.9"," that do not apply there. Whether the particular bus power supply delivers safety extra-low voltage — bringing ",[63,25910,25911],{},"Sub-section 5.2.2.3"," into play as well — is stated in the manufacturer's data sheet. That is a property of the product, not a property of \"KNX\".",[12,25914,25915,25916,25918],{},"Two further points of ",[63,25917,25860],{}," sit exactly on this boundary:",[84,25920,25921,25927],{},[87,25922,25923,25926],{},[15,25924,25925],{},"Point c",": except for measuring purposes, single-pole control devices are not fitted in neutral conductors. A single-pole switching channel belongs in the line conductor, not the neutral — the command coming from software changes nothing about that.",[87,25928,25929,25932],{},[15,25930,25931],{},"Point f",": control circuits are designed and arranged so as to limit risks arising from accidental contact of one or more points of the control circuit with the body or with earth, which could cause unintended starting or prevent the shutdown of the controlled machine or appliance. The bus is a control circuit in exactly that sense.",[79,25934,25936],{"id":25935},"what-does-the-inspection-need-and-what-belongs-to-the-ets-project","What does the inspection need, and what belongs to the ETS project?",[12,25938,25939],{},"The approved inspection body checks the electrical installation against the documents the regulation prescribes. KNX does not change that list.",[12,25941,5777,25942,25945],{},[63,25943,25944],{},"Sub-section 3.1.2.2 point a"," the single-line diagram states at least: the characteristics of the electrical wiring (type, cross-section, number of conductors), the installation methods, the type and characteristics of the residual current protective devices, the type and characteristics of the overcurrent protective devices, the switches, the connection boxes, the junction boxes, the socket outlets, the light points, the fixed machines and appliances, and the sources. Bus power supply and actuator are fixed appliances and fall under the same item as any other board module.",[12,25947,5777,25948,25951],{},[63,25949,25950],{},"Sub-section 3.1.2.3 point a"," the situation plan indicates the location of the distribution boards, connection and junction boxes, socket outlets, light points, switches, fixed machines and appliances, and sources shown on the single-line diagram.",[12,25953,25954,25955,25957,25958,25961],{},"The referencing required by ",[63,25956,25639],{}," is where sloppiness on a bus installation shows up fastest. On the single-line diagram each elementary circuit is identified by a capital letter; each light point, each socket outlet ",[15,25959,25960],{},"and each control unit"," receives a number \"giving the order in which these elements occur in the elementary circuit, starting from the overcurrent protective device upstream of the circuit\". On the situation plan, \"each switch and each control unit is identified by the letter of the circuit in which it is located and by the sequential number of the light point or appliance it controls\". A KNX push-button is such a control unit — the assignment \"this button operates that light point\" is therefore a fact of the inspection file, not only a fact of ETS.",[12,25963,5777,25964,25967],{},[63,25965,25966],{},"Sub-section 3.1.2.1 point d",", diagrams, plans and documents are kept up to date and made available on site to everyone authorised to supervise, inspect, maintain, repair or alter the installation. Whoever later changes an assignment in ETS updates the plan with it.",[12,25969,25970,25973],{},[15,25971,25972],{},"ETS, by contrast, holds:"," individual addresses, group addresses, application programs, parameters, scenes, time and logic functions, the line and area topology, and the project backup. None of that appears in the regulation, and none of it replaces something the regulation requires. The converse is equally true: a tidy ETS project is not a single-line diagram.",[79,25975,25977],{"id":25976},"when-is-knx-worthwhile-and-what-extra-effort-does-it-bring","When is KNX worthwhile, and what extra effort does it bring?",[12,25979,25980],{},"This section is trade practice, not regulation — the AREI\u002FRGIE says nothing on the matter.",[12,25982,25983,25984,25987],{},"KNX pays off where the number of control points, links or later changes is high: many control points for the same light, shutter control across whole façades, linking shading, heating and presence, uses that change over the years. From three or four control points onward the wiring effort of an intermediate-switch arrangement grows quickly; the conventional alternatives — push-buttons with an impulse relay — are described in ",[40,25985,25986],{"href":5727},"Two-way, intermediate or double switch"," and remain the cheaper answer for many single-family homes.",[12,25989,25990],{},"The extra effort is real and lands in three places:",[84,25992,25993,25999,26005],{},[87,25994,25995,25998],{},[15,25996,25997],{},"Design."," The bus cable route, board space for supply and actuators, spare channels, and a channel naming scheme that still reads clearly in five years.",[87,26000,26001,26004],{},[15,26002,26003],{},"Commissioning."," ETS licence, project work, addressing, programming and functional testing. That is a service in its own right with its own time budget, not a by-product of the wiring.",[87,26006,26007,26010],{},[15,26008,26009],{},"Handover and operation."," The ETS project belongs to the client and should be handed over. Without the project file and without someone holding ETS access, every later change becomes expensive.",[12,26012,26013],{},"The most common miscalculation is not the material price but the assumption that programming is finished once the wiring is.",[79,26015,26017],{"id":26016},"how-does-knx-differ-from-proprietary-systems-matter-home-assistant-and-wireless-retrofits","How does KNX differ from proprietary systems, Matter, Home Assistant and wireless retrofits?",[138,26019,26020,26034],{},[141,26021,26022],{},[144,26023,26024,26026,26029,26031],{},[147,26025,7731],{},[147,26027,26028],{},"What it is",[147,26030,25751],{},[147,26032,26033],{},"What of it belongs in the electrical file",[163,26035,26036,26049,26063,26077,26091],{},[144,26037,26038,26040,26043,26046],{},[168,26039,6280],{},[168,26041,26042],{},"manufacturer-independent standard (EN 50090, EN 13321-1, ISO\u002FIEC 14543-3)",[168,26044,26045],{},"decentralised, in sensor and actuator",[168,26047,26048],{},"bus power supply, actuator and all switched load circuits",[144,26050,26051,26054,26057,26060],{},[168,26052,26053],{},"Proprietary bus of one manufacturer",[168,26055,26056],{},"one supplier's system world, often technically similar but without a manufacturer-independent standard",[168,26058,26059],{},"manufacturer-dependent",[168,26061,26062],{},"the same equipment as with KNX; the symbol must be defined in the legend",[144,26064,26065,26068,26071,26074],{},[168,26066,26067],{},"Matter",[168,26069,26070],{},"IP-based connectivity protocol of the Connectivity Standards Alliance; runs on Wi-Fi and Thread, with Bluetooth Low Energy used for commissioning",[168,26072,26073],{},"in the device and the control app",[168,26075,26076],{},"only the fixed installation behind it; the device itself is usually plug-in",[144,26078,26079,26082,26085,26088],{},[168,26080,26081],{},"Home Assistant",[168,26083,26084],{},"open-source software on a server that brings existing systems — KNX included — together",[168,26086,26087],{},"in the software",[168,26089,26090],{},"nothing of its own; the server is an ordinary load",[144,26092,26093,26096,26099,26102],{},[168,26094,26095],{},"Wireless module behind the switch",[168,26097,26098],{},"relay module in the wall box, radio-controlled",[168,26100,26101],{},"in the module and the app",[168,26103,26104],{},"appears once the fixed wiring is altered for it",[12,26106,26107,26108,26111,26112,26115],{},"For the inspection the decisive distinction is not \"smart or not\" but ",[15,26109,26110],{},"fixed or not",". A plug-in adapter changes nothing about the fixed installation. A DIN-rail module in the board and an actuator switching a lighting circuit are part of the fixed installation. The boundary for Wi-Fi modules, smart sockets and smart lamps is covered in ",[40,26113,26114],{"href":22961},"Smart home and AREI","; this article stays with the wired bus.",[12,26117,26118],{},"Matter and KNX are not mutually exclusive, incidentally. Matter standardises how IP devices and apps understand each other, KNX the fixed automation in the building; in practice they meet in a gateway, not on the same cable.",[79,26120,26122],{"id":26121},"can-planelec-replace-ets","Can PlanElec replace ETS?",[12,26124,26125,26128],{},[15,26126,26127],{},"No, and that is not its job."," PlanElec documents the electrical installation together with the planned automation functions and prepares the addresses for ETS. ETS configures and programs the KNX devices. These are two work steps with two results, and you need both.",[138,26130,26131,26141],{},[141,26132,26133],{},[144,26134,26135,26137,26139],{},[147,26136,5825],{},[147,26138,7417],{},[147,26140,8569],{},[163,26142,26143,26152,26163,26172,26181,26191,26200],{},[144,26144,26145,26148,26150],{},[168,26146,26147],{},"Single-line diagram and situation plan with bus power supply, actuator, load circuits and push buttons",[168,26149,515],{},[168,26151,602],{},[144,26153,26154,26157,26160],{},[168,26155,26156],{},"Channel assignment: which channel switches which load, which button operates it",[168,26158,26159],{},"yes (planning)",[168,26161,26162],{},"yes (programming)",[144,26164,26165,26168,26170],{},[168,26166,26167],{},"Logical bus lines with supply and bus current budget",[168,26169,26159],{},[168,26171,515],{},[144,26173,26174,26177,26179],{},[168,26175,26176],{},"Terminal plan and board-door sheet",[168,26178,515],{},[168,26180,602],{},[144,26182,26183,26186,26189],{},[168,26184,26185],{},"Physical addresses and group addresses",[168,26187,26188],{},"yes (proposal, files in ETS format)",[168,26190,515],{},[144,26192,26193,26196,26198],{},[168,26194,26195],{},"Communication objects, parameters, scenes and logic",[168,26197,602],{},[168,26199,515],{},[144,26201,26202,26208,26210],{},[168,26203,26204,26205,9517],{},"Programming, live bus diagnostics, ",[25,26206,26207],{},".knxproj",[168,26209,602],{},[168,26211,515],{},[12,26213,26214,26215,26217,26218,56],{},"Whoever commissions a KNX installation needs ETS. Whoever presents it for inspection needs a single-line diagram and a situation plan. PlanElec delivers that second half and keeps it consistent with the channel planning. Since November 2026 PlanElec also proposes physical addresses and three-level group addresses with datapoint types and exports the group addresses as CSV or XML in ETS format. No ",[25,26216,26207],{}," file is created, and you link the communication objects in ETS. How the distribution board, channel plan, terminal plan and dossier come together on an example apartment is shown in ",[40,26219,7633],{"href":7632},[79,26221,26223],{"id":26222},"how-do-you-document-a-knx-installation-in-planelec","How do you document a KNX installation in PlanElec?",[12,26225,26226,26227,26229,26230,26232,26233,26235,26236,3157,26239,26242,26243,26245],{},"Switch to the ",[15,26228,6530],{}," mode and, in the ",[15,26231,6534],{}," panel, activate the KNX profile in the ",[15,26234,6538],{}," bar; one project can hold several systems. That gives you the manufacturer-neutral board modules ",[15,26237,26238],{},"KNX power supply",[15,26240,26241],{},"KNX actuator",", and on the floor plan you place push buttons from ",[15,26244,6769],{},". You configure the bus power supply by its bus current, 320 mA or 640 mA. The actuator gets a function (switching or blind), a channel count (4, 8, 12 or 16) and a rated current per channel (6, 10 or 16 A).",[12,26247,3370,26248,26250,26251,26253,26254,26257,26258,26261],{},[15,26249,6530],{}," area, you assign each channel its loads and control points; one push button can operate several channels, and several push buttons can share one channel. Under ",[15,26252,6912],{},", you assign modules and control points to the planned bus lines and choose the line's power supply. PlanElec shows known bus currents and unknown contributions separately. The single-line diagram shows the supply and the actuator once each; for every occupied channel, it shows an ",[25,26255,26256],{},"OUT"," power line to the load and a separate ",[25,26259,26260],{},"KNX IN"," line to the control point. You locate the push button on the situation plan with the push-button symbol.",[12,26263,5777,26264,26267,26268,26271,26272,26275],{},[15,26265,26266],{},"Export → Domotica",", you produce the channel plan, terminal plan, function list per room, topology diagram, home-automation bill of quantities and the self-check report, individually or bundled as a home-automation handover dossier. The ",[15,26269,26270],{},"draft"," carries a watermark and can be exported with open data. For the ",[15,26273,26274],{},"final version",", PlanElec checks that a protected bus power supply exists, that the actuators sit behind a circuit breaker or RCBO, that assigned loads have a power rating, that no consumer is assigned twice, that no channel would be overloaded and that a load marked as KNX-controlled actually has a channel. A push button without a channel assignment remains a warning and does not block.",[1489,26277],{":height":7056,":width":7057,"alt":7058,"caption":26278,"src":7060},"Export, Domotica section: every document with preview and PDF, bundled as a dossier.",[12,26280,26281,26282,56],{},"Lighting circuits and blind motors are supported. The illustrated step-by-step guide is in the knowledge base: ",[40,26283,16947],{"href":6126},[1489,26285],{":height":22938,":width":22939,"alt":26286,"caption":26287,"src":26288},"PlanElec Sketch: ‘Home automation module’ on its own circuit, the symbol reads ‘4 I · 8 O’; on the right ‘Inputs’ 4 and ‘Outputs’ 8.","The home automation module appears in the single-line diagram with its inputs and outputs; the switched loads go below it. Bus addresses and programming do not belong here; Sketch does not check AREI\u002FRGIE rules.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-domotics-module.webp",[79,26290,26292],{"id":26291},"what-does-the-areirgie-self-check-cover-for-knx","What does the AREI\u002FRGIE self-check cover for KNX?",[12,26294,26295],{},"The self-check is advisory and evaluates the supported rules from your project data. For automation installations, two checks are added:",[84,26297,26298,26308],{},[87,26299,26300,26303,26304,26307],{},[15,26301,26302],{},"Channel load:"," it compares the current sum of the documented load ratings with the channel's rated current (protection objective under ",[63,26305,26306],{},"Sub-section 4.4.1.1","). If a rating is missing, it reports a data gap rather than a pass.",[87,26309,26310,26313],{},[15,26311,26312],{},"Known bus current:"," it compares the known device currents on a line with the supply's capacity and warns when it is exceeded. Unknown contributions stay marked as open.",[12,26315,26316],{},"The rest of the bus planning you check against the manufacturer documentation:",[84,26318,26319,26325,26331,26341],{},[87,26320,26321,26324],{},[15,26322,26323],{},"Control logic:"," whether a push button is assigned to the right channel is your planning decision; electrically, even a wrong assignment is flawless.",[87,26326,26327,26330],{},[15,26328,26329],{},"Bus cable:"," routing, run length and number of devices per line are in the manufacturer documentation.",[87,26332,26333,26336,26337,26340],{},[15,26334,26335],{},"Product conformity:"," whether actuator and supply meet the standards required by ",[63,26338,26339],{},"Sub-section 5.3.3.2 point b"," is a property of the product, not of the drawing.",[87,26342,26343,26346],{},[15,26344,26345],{},"ETS data:"," parameterisation and cybersecurity of the installation belong to the ETS configuration.",[12,26348,26349],{},"The conformity inspection of the installed work, including its measurements, is carried out by the approved body.",[79,26351,26353],{"id":26352},"related-guidance","Related guidance",[84,26355,26356,26360,26365,26369,26374],{},[87,26357,26358],{},[40,26359,26114],{"href":22961},[87,26361,26362],{},[40,26363,26364],{"href":5727},"Two-way, intermediate or double switch on the single-line diagram",[87,26366,26367],{},[40,26368,4213],{"href":4212},[87,26370,26371],{},[40,26372,26373],{"href":6050},"Drawing a situation plan",[87,26375,26376],{},[40,26377,26378],{"href":5666},"AREI electrical symbols overview",[12,26380,26381,26382,26384,26385,56],{},"Smart home planning is part of ",[40,26383,31],{"href":1964},"; plans and seats are listed under ",[40,26386,7533],{"href":54},[12,26388,26389],{},[63,26390,26391],{},"Basis: AREI\u002FRGIE Book 1 V06 — Chapter 2.13 with Table 2.23 letter J, Sub-sections 3.1.2.1, 3.1.2.2, 3.1.2.3, 4.4.1.1, 5.2.2.2, 5.2.2.3, 5.2.9.15 and 5.3.3.2. Checked on 5 October 2026. KNX figures per the KNX Association's own publications (standardisation, technology). The official text, the actual installed state and the approved body's inspection remain decisive.",{"title":2044,"searchDepth":2045,"depth":2045,"links":26393},[26394,26395,26396,26397,26398,26399,26400,26401,26402,26403,26404,26405],{"id":25439,"depth":2045,"text":25440},{"id":25611,"depth":2045,"text":25612},{"id":25654,"depth":2045,"text":25655},{"id":25811,"depth":2045,"text":25812},{"id":25867,"depth":2045,"text":25868},{"id":25935,"depth":2045,"text":25936},{"id":25976,"depth":2045,"text":25977},{"id":26016,"depth":2045,"text":26017},{"id":26121,"depth":2045,"text":26122},{"id":26222,"depth":2045,"text":26223},{"id":26291,"depth":2045,"text":26292},{"id":26352,"depth":2045,"text":26353},"2026-09-25","A bus instead of strapping conductors: what a KNX installation shows on the single-line diagram and situation plan, what belongs in ETS and how PlanElec keeps the two apart – with the AREI\u002FRGIE reference beside each statement.",[7599,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-domotica-knx-basics-editorial.jpg","\u002Fblog\u002Fdomotica-knx-basics.en",{"title":7544,"description":26407},"Home Automation and KNX on the Plan and Single-Line Diagram","domotica-knx-electrical-installation","blog\u002Fdomotica-knx-basics.en",[2133,2134,6280,26417,26418,5269,26419,26420,26421,4261],"home automation","building automation","position plan","push-button","actuator","hyJrmogp9LmnBe7vAA38yCXrPrzXv2G1MeD4lZ8ikqE","\u002Fblog\u002Fdomotica-knx-electrical-installation",{"id":26425,"title":26426,"articleId":26427,"body":26428,"category":27063,"date":27064,"description":27065,"extension":2113,"image":26449,"labels":27066,"lastUpdated":10988,"locale":2119,"meta":27067,"navigation":2121,"ogImage":27068,"path":27069,"publishDate":27064,"readTime":3582,"refreshInterval":4248,"seo":27070,"seoTitle":10313,"slug":27071,"stem":27072,"tags":27073,"__hash__":27076,"kind":2137,"href":27077},"blog\u002Fblog\u002Fbreaking-capacity-mcb.en.md","Breaking capacity of an MCB: 3, 6 or 10 kA?","breaking-capacity-mcb",{"type":9,"value":26429,"toc":27051},[26430,26434,26445,26450,26460,26474,26478,26485,26496,26599,26605,26608,26614,26618,26629,26656,26662,26671,26675,26678,26704,26715,26723,26727,26738,26755,26760,26764,26774,26800,26814,26823,26827,26830,26896,26913,26919,26923,26933,26944,26957,26960,26966,26970,26976,26999,27008,27010,27036,27041],[79,26431,26433],{"id":26432},"what-do-3-ka-6-ka-and-10-ka-on-a-circuit-breaker-mean","What do 3 kA, 6 kA and 10 kA on a circuit breaker mean?",[12,26435,26436,26437,26440,26441,26444],{},"The kA figure is the ",[15,26438,26439],{},"breaking capacity",": the value of the current the protective device is able to interrupt at a specified voltage and under prescribed conditions of use and behaviour. That is the AREI definition, ",[63,26442,26443],{},"section 2.6.4",". A 3 kA breaker handles a 3,000 A short circuit at its point of installation; a higher short-circuit current destroys it instead of being cleared by it.",[12,26446,26447],{},[74,26448],{"alt":24946,"src":26449},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-breaking-capacity-mcb-editorial.webp",[12,26451,26452,26453,26456,26457,26459],{},"The figure has nothing to do with the rating printed on the front. A ",[25,26454,26455],{},"C16"," rated 3 kA and a ",[25,26458,26455],{}," rated 10 kA protect the same cable against the same overload — they differ only in how much short-circuit energy they themselves survive while clearing the fault.",[12,26461,26462,26463,26466,26467,17825,26470,26473],{},"What matters is therefore not your preference but the short-circuit current to be expected ",[15,26464,26465],{},"at the point of installation",". The AREI states it literally: the breaking capacity of a short-circuit protective device is ",[15,26468,26469],{},"at least equal to the prospective short-circuit current, as determined according to good practice, at the point where the device is installed",[63,26471,26472],{},"sub-section 4.4.2.1",", item 1).",[79,26475,26477],{"id":26476},"what-breaking-capacity-does-the-arei-require-in-a-dwelling","What breaking capacity does the AREI require in a dwelling?",[12,26479,26480,26481,26484],{},"Unlike the rated current, the regulation does not stop at a principle here: for domestic installations, ",[63,26482,26483],{},"sub-section 5.3.5.5 point e"," gives figures.",[12,26486,26487,26488,26491,26492,26495],{},"The starting point is a ceiling, not a device property. At the ",[15,26489,26490],{},"output terminals of the first overcurrent protective devices placed after the general residual current device(s)",", the prospective single-phase short-circuit current ",[15,26493,26494],{},"may not exceed 3,000 A",". Upstream of those output terminals, minimum values apply:",[138,26497,26498,26514],{},[141,26499,26500],{},[144,26501,26502,26505,26511],{},[147,26503,26504],{},"Position in the installation",[147,26506,26507,26508,3317],{},"AREI requirement (",[63,26509,26510],{},"5.3.5.5 e",[147,26512,26513],{},"Typical device choice",[163,26515,26516,26530,26543,26556,26570,26584],{},[144,26517,26518,26521,26527],{},[168,26519,26520],{},"Overcurrent device of the distribution network operator (ahead of the meter)",[168,26522,26523,26524],{},"minimum breaking capacity ",[15,26525,26526],{},"6,000 A",[168,26528,26529],{},"DNO device, not your choice",[144,26531,26532,26535,26540],{},[168,26533,26534],{},"Fuses and pin-type circuit breakers of the installation",[168,26536,26523,26537],{},[15,26538,26539],{},"3,000 A",[168,26541,26542],{},"legacy equipment, rarely installed new today",[144,26544,26545,26548,26553],{},[168,26546,26547],{},"Overcurrent protective devices of the installation in general",[168,26549,26523,26550,26552],{},[15,26551,26539],{},", marking “3000” inside a rectangle",[168,26554,26555],{},"breaker with Icn of 3 kA or higher",[144,26557,26558,26561,26567],{},[168,26559,26560],{},"First breakers downstream of the DNO device (pin-type breakers excepted)",[168,26562,26563,26564],{},"additionally a marking for ",[15,26565,26566],{},"energy limitation class 3",[168,26568,26569],{},"breaker carrying the class 3 marking",[144,26571,26572,26575,26581],{},[168,26573,26574],{},"Residual current devices and switching devices",[168,26576,26577,26578],{},"withstand ",[15,26579,26580],{},"I²t ≥ 22.5 kA²s at a current of 3,000 A",[168,26582,26583],{},"RCD marked “3000 A, 22,5 kA2s” (In ≤ 40 A)",[144,26585,26586,26589,26596],{},[168,26587,26588],{},"Final circuit breakers downstream of the output terminals above",[168,26590,26591,26592,26595],{},"follow from ",[63,26593,26594],{},"4.4.2.1"," item 1 the current prevailing there (≤ 3,000 A)",[168,26597,26598],{},"breaker with Icn ≥ 3 kA",[1489,26600],{":height":26601,":width":3800,"alt":26602,"caption":26603,"src":26604},"556","Protection chain of a dwelling: network operator protection at least 6000 A, main RCD I²t 22.5 kA²s at 3000 A, first overcurrent devices at least 3000 A with energy-limitation class 3, at most 3000 A short-circuit current at their output terminals, beyond that breaking capacity according to the short-circuit current at the point of installation.","The 3000 A is a ceiling at the output terminals of the first overcurrent devices; upstream, the minimum values of 5.3.5.5 e apply.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fbreaking-capacity-mcb\u002Fbreaking-capacity-chain.en.svg",[12,26606,26607],{},"Two readings fall away. First, “3 kA is always enough”: that holds only as long as the 3,000 A ceiling at those output terminals is actually respected. Second, “6 kA is mandatory”: the 6,000 A concerns the distribution network operator’s device, not your final circuit breakers. Fitting 6 kA in the board is a common and harmless margin, but it is not an AREI requirement for the outgoing ways.",[12,26609,26610,26611,26613],{},"For non-domestic installations the AREI gives no such figures. Only ",[63,26612,26472],{}," item 1 applies, and the short-circuit current has to be established at the point of installation.",[79,26615,26617],{"id":26616},"what-is-the-difference-between-icn-icu-and-ics-and-which-value-is-on-a-domestic-breaker","What is the difference between Icn, Icu and Ics — and which value is on a domestic breaker?",[12,26619,26620,26621,26624,26625,26628],{},"These three symbols do not come from the AREI but from the product standards of the devices. The AREI refers to them explicitly, to the standards approved by the King or registered by the NBN (",[63,26622,26623],{},"sub-section 5.3.5.5 point d"," for fuses, ",[63,26626,26627],{},"point a"," for the calibrating components).",[84,26630,26631,26644,26650],{},[87,26632,26633,26636,26637,26640,26641,26643],{},[15,26634,26635],{},"Icn"," — rated short-circuit capacity under IEC 60898-1, the standard for circuit breakers for household use. This is the value a DIN-rail breaker in a Belgian domestic board carries. It appears as an ampere figure ",[15,26638,26639],{},"without a unit, inside a rectangle"," — the “3000” of ",[63,26642,26510],{}," is exactly that marking.",[87,26645,26646,26649],{},[15,26647,26648],{},"Icu"," — ultimate short-circuit breaking capacity under IEC 60947-2, the standard for industrial circuit breakers. The device clears the short circuit but need not remain serviceable afterwards.",[87,26651,26652,26655],{},[15,26653,26654],{},"Ics"," — service short-circuit breaking capacity under the same standard: the current after which the device may stay in service. Ics is expressed as a percentage of Icu (for example 50 %, 75 % or 100 %).",[12,26657,26658,26659,26661],{},"The practical consequence for the drawing: when you plan a dwelling, you document ",[15,26660,26635],{},". Icu and Ics only appear once the board contains a circuit breaker to IEC 60947-2 — as the main switch of a larger installation, for instance.",[12,26663,26664,26665,17825,26668,1487],{},"The AREI does have its own term for the reinforced case: where the downstream protective device is a circuit breaker and the upstream device a fuse or a circuit breaker, that technique gives the downstream breaker a ",[15,26666,26667],{},"reinforced ultimate breaking capacity",[63,26669,26670],{},"sub-section 4.4.1.3",[79,26672,26674],{"id":26673},"what-determines-the-short-circuit-current-at-the-point-of-installation","What determines the short-circuit current at the point of installation?",[12,26676,26677],{},"The prospective short-circuit current is not a property of your installation alone. It follows from the impedance of the entire loop, from the supplying transformer to the fault, and drops with every metre of cable:",[84,26679,26680,26686,26692,26698],{},[87,26681,26682,26685],{},[15,26683,26684],{},"Rating and short-circuit voltage of the supplying transformer"," — the larger the substation, the higher the short-circuit current on the low-voltage side.",[87,26687,26688,26691],{},[15,26689,26690],{},"Length and cross-section of the service connection"," from the distribution cable to the meter box.",[87,26693,26694,26697],{},[15,26695,26696],{},"Length and cross-section of the cables inside the installation"," — which is why the value at a final circuit breaker is always lower than at the origin.",[87,26699,26700,26703],{},[15,26701,26702],{},"Number and nature of the connections in series"," — terminals, busbars, comb busbars.",[12,26705,26706,26707,26710,26711,26714],{},"The AREI mirrors this in its documentation duties. For non-domestic installations, the characteristics of the sources (apparent power, nominal voltages, nominal currents, impedances) must be stated, together with the installation method, the number and cross-section of the conductors and the ",[15,26708,26709],{},"length of the electrical cables"," — and explicitly the maximum prospective short-circuit currents above 3,000 A at the origin of the installation and at each distribution and switchgear assembly (",[63,26712,26713],{},"sub-section 3.1.2.2 point b","). Those are precisely the quantities that feed the calculation.",[12,26716,26717,26720,26721,26473],{},[15,26718,26719],{},"The dependable figure for your service connection comes from the distribution network operator."," It depends on the substation rating and the connection length; a rule of thumb for “the Belgian domestic connection” is no design basis. Ask for the number instead of estimating it – the AREI requires a determination “according to good practice” (",[63,26722,26472],{},[79,26724,26726],{"id":26725},"what-if-the-breaking-capacity-at-the-point-of-installation-is-not-enough","What if the breaking capacity at the point of installation is not enough?",[12,26728,26729,26730,26733,26734,26737],{},"The AREI explicitly permits a breaker with insufficient breaking capacity — under one condition. ",[63,26731,26732],{},"Sub-section 4.4.1.3"," states that the use of a protective device whose breaking capacity is lower than the prospective short-circuit current at the point where it is installed is permitted, but ",[15,26735,26736],{},"does not release you from installing another device upstream that has at least the necessary breaking capacity",". The upstream device then lets through no more energy than the downstream device and the protected cables can withstand without damage.",[12,26739,26740,26741,26744,26745,26748,26749,26752,26753,1487],{},"Where both devices in series are circuit breakers, the AREI calls this additional protection ",[15,26742,26743],{},"back-up protection"," — ",[63,26746,26747],{},"filiation"," in the RGIE. And it says at once where the design data comes from: to determine the characteristics of back-up protection, the ",[15,26750,26751],{},"back-up protection tables of the protective devices"," must be requested, drawn up in accordance with the product standards for circuit breakers (",[63,26754,26670],{},[12,26756,26757,26758,56],{},"That is the decisive point: back-up protection cannot be calculated and cannot be inferred from datasheets; it follows only from the tested combination of two specific device types from the same or an approved manufacturer. How this plays out in an installation with a sub-board per storey is covered in ",[40,26759,3982],{"href":3981},[79,26761,26763],{"id":26762},"where-does-the-breaking-capacity-appear-on-the-single-line-diagram-and-why-does-the-inspection-want-to-see-it","Where does the breaking capacity appear on the single-line diagram, and why does the inspection want to see it?",[12,26765,26766,26767,17825,26770,26773],{},"The single-line diagram of a domestic installation must state ",[15,26768,26769],{},"the type and characteristics of the overcurrent protective devices",[63,26771,26772],{},"sub-section 3.1.2.2 point a","). Breaking capacity is such a characteristic; the boxed ampere figure therefore belongs beside the rated current and the curve, at the breaker.",[12,26775,26776,26777,26779,26780,26782,26783,26785,26786,26789,26790,17825,26796,26799],{},"For ",[15,26778,4921],{}," installations this is more explicit still. There ",[63,26781,26713],{}," lists the characteristics of the protective devices individually and names “the rated current; the ",[15,26784,26439],{},"; the nature and characteristics of the interruption including the settings”. And the marking of each distribution and switchgear assembly carries there — besides identification number, supply voltage and earthing system — the ",[15,26787,26788],{},"maximum prospective short-circuit current at the assembly"," and, where applicable, ",[15,26791,26792,26793],{},"the use of the back-up protection technique under ",[63,26794,26795],{},"4.4.1.3",[63,26797,26798],{},"sub-section 3.1.3.3 point b","). The inspector can read the target value off the board and compare it with the breakers.",[12,26801,26802,26803,26806,26807,17825,26810,26813],{},"There is a second reason. ",[15,26804,26805],{},"Exceeding the permissible short-circuit power of the installed equipment"," is named by the AREI as an example of a ",[15,26808,26809],{},"substantial modification or extension",[63,26811,26812],{},"section 2.11.2",") — and a substantial modification triggers a fresh conformity inspection. So when the service connection is upgraded or the substation changes, review the breakers as well – otherwise a formal problem joins the technical one.",[12,26815,26816,26817,17825,26820,26822],{},"On the device itself the marking is prescribed in any case: “3000” inside a rectangle on small circuit breakers, and on RCDs without overcurrent protection rated In ≤ 40 A the indication “3000 A, 22,5 kA2s” — together on the same face and ",[15,26818,26819],{},"visible after installation",[63,26821,26483],{},"). With the figure on the diagram, that visual comparison on site takes seconds.",[79,26824,26826],{"id":26825},"how-does-breaking-capacity-differ-from-rated-current-and-the-bcd-curve","How does breaking capacity differ from rated current and the B\u002FC\u002FD curve?",[12,26828,26829],{},"Three separate properties, three separate rules — and a recurring confusion:",[138,26831,26832,26845],{},[141,26833,26834],{},[144,26835,26836,26839,26842],{},[147,26837,26838],{},"Property",[147,26840,26841],{},"Answers the question",[147,26843,26844],{},"Governing provision",[163,26846,26847,26866,26879],{},[144,26848,26849,26854,26857],{},[168,26850,26851],{},[15,26852,26853],{},"Rated current",[168,26855,26856],{},"At what point does the breaker trip on overload?",[168,26858,26859,8020,26862,26865],{},[63,26860,26861],{},"sub-section 4.4.1.4",[63,26863,26864],{},"table 4.11",": maximum per cross-section",[144,26867,26868,26873,26876],{},[168,26869,26870],{},[15,26871,26872],{},"B\u002FC\u002FD curve",[168,26874,26875],{},"How fast does it trip, at what multiple of the rated current?",[168,26877,26878],{},"product standard IEC 60898-1; the AREI prescribes no curve",[144,26880,26881,26886,26889],{},[168,26882,26883],{},[15,26884,26885],{},"Breaking capacity",[168,26887,26888],{},"Which short-circuit current does it survive while clearing?",[168,26890,26891,26893,26894],{},[63,26892,26472],{}," item 1, supplemented for dwellings by ",[63,26895,26510],{},[12,26897,26898,26901,26902,26905,26906,26909,26910,56],{},[63,26899,26900],{},"Table 4.11"," limits only the ",[15,26903,26904],{},"rated current"," per conductor cross-section — 1.5 mm² at most 16 A, 2.5 mm² at most 20 A, 6 mm² at most 40 A and so on. It says nothing about breaking capacity. A ",[25,26907,26908],{},"C20"," on 2.5 mm² can be fully table-compliant and still be undersized on breaking capacity. The full cross-section ↔ rating mapping is set out in ",[40,26911,26912],{"href":3795},"Cable cross-section and breaker rating",[12,26914,26915,26916,26918],{},"The curve, in turn, concerns operating time. The AREI only requires that the current be interrupted after a dead short circuit before the conductor temperature exceeds the permissible limit, and gives the adiabatic formula for that (",[63,26917,26472],{},", item 2). Which letter fits follows from the load and the circuit length, not from an AREI provision.",[79,26920,26922],{"id":26921},"how-do-you-record-breaking-capacity-in-planelec","How do you record breaking capacity in PlanElec?",[12,26924,26925,26928,26929,26932],{},[15,26926,26927],{},"In PlanElec Sketch (free, in the browser)"," you enter the breaking capacity on the protective device: 3, 4.5, 6 or 10 kA. Sketch prints the value next to the symbol, for example “6kA” below “2P - C 16A”, and includes it in the PDF. Sketch does not draw a boxed ampere figure and does not compare the value with the short-circuit current. With ",[40,26930,11136],{"href":3611,"rel":26931},[1458]," you start with the connection, meter, main RCD and distribution board.",[12,26934,26935,26939,26940,26943],{},[15,26936,3361,26937],{},[40,26938,31],{"href":1964}," two entries work together. The ",[15,26941,26942],{},"short-circuit current (Icc)"," at the supply is set in the project properties under the network configuration; the choices are 3, 4.5, 6 and 10 kA, with kA or A as the display unit. The value appears on the single-line diagram beneath the network connection label.",[12,26945,4361,26946,26949,26950,26953,26954,26956],{},[15,26947,26948],{},"breaking capacity Icn"," is set per breaker: select the MCB on the single-line diagram, then open the “Breaking capacity Icn” field in the inspector. The options are “Not documented” plus 1.5, 3, 4.5, 6, 10, 15, 20 and 25 kA. Since the update of 28 August 2026, a value that has been set appears as a boxed ampere figure at the breaker — 3 kA as ",[25,26951,26952],{},"3000",", without a unit, as ",[63,26955,26510],{}," prescribes for the device marking — and stays identical in editor, preview and PDF. Above 25 kA no rectangle is drawn, because that is where IEC 60898-1 ends.",[12,26958,26959],{},"“Not documented” is deliberately a state of its own rather than a silent 3 kA: the diagram shows only what you actually read on the device.",[1489,26961],{":height":6699,":width":26962,"alt":26963,"caption":26964,"src":26965},"1132","PlanElec Sketch: circuit breaker of the first lighting circuit selected, on the right ‘Breaking capacity’ 6kA and tripping curve C; the symbol reads ‘2P - C 16A’ and ‘6kA’.","You choose the breaking capacity per breaker and the diagram writes it next to the symbol. Whether 6 kA is enough at the point of installation depends on the short-circuit current; Sketch does not calculate it.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-mcb-breaking-capacity.webp",[79,26967,26969],{"id":26968},"what-the-arei-self-check-verifies-for-breaking-capacity","What the AREI self-check verifies for breaking capacity",[12,26971,26972,26973,26975],{},"The self-check is only available in PlanElec Pro; its full scope is in ",[40,26974,1086],{"href":1085},". The rule “Breaking capacity versus prospective short-circuit current” works with the two inputs from the previous section:",[84,26977,26978,26989,26996],{},[87,26979,26980,26981,26984,26985,26988],{},"It compares each breaker’s Icn with the threshold ",[25,26982,26983],{},"min(supply Icc, 3 kA)"," and reports an ",[15,26986,26987],{},"error"," if the device falls below it.",[87,26990,26991,26992,26995],{},"It only assesses with an ",[15,26993,26994],{},"explicitly set Icc",". Without that value you see “Breaking capacity not assessable” – the check counts as incomplete, not as passed.",[87,26997,26998],{},"If a breaker’s Icn is missing, it reports “not documented” as an open data gap.",[12,27000,27001,27002,27004,27005,27007],{},"The roles are clearly split. Icc is an input: the value comes from the distribution network operator or a calculation according to good practice. Back-up protection under ",[63,27003,26795],{}," is proven with the manufacturer’s combination tables. Energy-limitation class 3 and the I²t withstand of RCDs (22.5 kA²s at 3,000 A, ",[63,27006,26510],{},") are read on the real device. The assessment of the completed installation is carried out by the approved inspection body.",[79,27009,13051],{"id":13050},[84,27011,27012,27016,27021,27026,27032],{},[87,27013,27014],{},[40,27015,26912],{"href":3795},[87,27017,27018],{},[40,27019,27020],{"href":4200},"Distribution board planning",[87,27022,27023],{},[40,27024,27025],{"href":25395},"RCD type A versus type B",[87,27027,27028],{},[40,27029,27031],{"href":27030},"\u002Fen\u002Fblog\u002Fearthing-tt-vs-tns-belgium","Earthing systems TT and TN-S in Belgium",[87,27033,27034],{},[40,27035,3982],{"href":3981},[12,27037,27038],{},[40,27039,27040],{"href":1961},"Document breaking capacity for free with PlanElec Sketch →",[12,27042,27043],{},[63,27044,27045,27046,27050],{},"Regulatory basis: AREI\u002FRGIE Book 1 V06 — sections 2.6.4 and 2.11.2, sub-sections 3.1.2.2, 3.1.3.3, 4.4.1.3, 4.4.1.4 with table 4.11, 4.4.2.1 and 5.3.5.5. Icn, Icu and Ics come from IEC 60898-1 and IEC 60947-2 respectively, not from the AREI. The official text published by the ",[40,27047,27049],{"href":25362,"rel":27048},[1458],"FPS Economy"," prevails.",{"title":2044,"searchDepth":2045,"depth":2045,"links":27052},[27053,27054,27055,27056,27057,27058,27059,27060,27061,27062],{"id":26432,"depth":2045,"text":26433},{"id":26476,"depth":2045,"text":26477},{"id":26616,"depth":2045,"text":26617},{"id":26673,"depth":2045,"text":26674},{"id":26725,"depth":2045,"text":26726},{"id":26762,"depth":2045,"text":26763},{"id":26825,"depth":2045,"text":26826},{"id":26921,"depth":2045,"text":26922},{"id":26968,"depth":2045,"text":26969},{"id":13050,"depth":2045,"text":13051},"faq","2026-09-21","What 3 kA, 6 kA and 10 kA mean, the minimum values the AREI sets for domestic installations, what determines the short-circuit current at the point of installation, and how the figure reaches the single-line diagram.",[4243,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-breaking-capacity-mcb-editorial.jpg","\u002Fblog\u002Fbreaking-capacity-mcb.en",{"title":26426,"description":27065},"breaking-capacity-mcb-ka","blog\u002Fbreaking-capacity-mcb.en",[2133,2134,26439,27074,27075,5269,3590,4261],"short-circuit current","circuit breaker","xkepUzuDTt_MHLN3BgzTuOpsobJ9qQlQhgGjwzbGyLQ","\u002Fblog\u002Fbreaking-capacity-mcb-ka",{"id":27079,"title":23256,"body":27080,"category":10304,"description":27433,"extension":2113,"guideId":27434,"image":27435,"locale":2119,"meta":27436,"navigation":2121,"order":27437,"path":27438,"publishedAt":27439,"readTime":19432,"seo":27440,"seoTitle":10313,"slug":27434,"stem":27441,"tags":27442,"updatedAt":7600,"__hash__":27445,"kind":3594,"href":27446,"date":27439,"labels":27447},"help\u002Fhelp\u002Fstudio-aktivitaet-assistent.en.md",{"type":9,"value":27081,"toc":27421},[27082,27087,27091,27100,27110,27113,27117,27120,27126,27166,27173,27177,27198,27204,27207,27213,27231,27236,27288,27290,27295,27299,27310,27314,27317,27321,27326,27388,27391,27394,27398,27404,27411,27415],[12,27083,27084,27086],{},[15,27085,14475],{}," brings your conversations and tasks with the PlanElec assistant together with confirmed project changes. The assistant is available to every signed-in user: it carries out instructions directly in the project, checks every change with the AREI self-check and keeps it ready as a single undo step. Confirmed team changes appear once project history is enabled for your account.",[79,27088,27090],{"id":27089},"how-do-i-open-the-panel","How do I open the panel?",[12,27092,27093,27094,27096,27097,27099],{},"Open a project in the studio. Use the switch at the bottom of the side mode bar (rail), the bot button on the right of the header, or ",[15,27095,14482],{}," on a Mac \u002F ",[15,27098,14486],{},". The panel opens beside the workspace; on narrow screens it appears as a sheet.",[12,27101,16258,27102,27105,27106,27109],{},[15,27103,27104],{},"⌘K \u002F Ctrl+K"," to open command search. Then ",[15,27107,27108],{},"Send to assistant: “…”"," appears when your search has no matches or contains at least four words. Selecting it opens the panel and immediately sends the search text as a task.",[12,27111,27112],{},"Opening project history from the project menu or history button shows team activity in the studio. Outside the studio, it opens the separate history sheet.",[79,27114,27116],{"id":27115},"what-do-the-filters-show","What do the filters show?",[12,27118,27119],{},"The timeline groups entries by day, with the newest day first. Within a day, entries run from earliest to latest. The header also shows how many members are online.",[12,27121,27122,27123,56],{},"Each change made by a member shows who modified the project: avatar and name, the change and the time. A member who has left the project appears as ",[15,27124,27125],{},"Former member",[138,27127,27128,27137],{},[141,27129,27130],{},[144,27131,27132,27135],{},[147,27133,27134],{},"Filter",[147,27136,3727],{},[163,27138,27139,27148,27157],{},[144,27140,27141,27145],{},[168,27142,27143],{},[15,27144,5138],{},[168,27146,27147],{},"Loaded project changes, assistant messages and actions.",[144,27149,27150,27154],{},[168,27151,27152],{},[15,27153,12432],{},[168,27155,27156],{},"All loaded project changes, including assistant changes requested by other team members.",[144,27158,27159,27163],{},[168,27160,27161],{},[15,27162,22338],{},[168,27164,27165],{},"Assistant conversations and actions, plus saved changes marked as originating from the assistant.",[12,27167,27168,27169,27172],{},"The filter bar appears when both history and assistant access are available. With access to just one area, its content appears directly. You can load older project changes. Where a target is available, ",[15,27170,27171],{},"View"," opens its current state, not a historical project copy.",[79,27174,27176],{"id":27175},"how-do-i-give-and-review-a-task","How do I give and review a task?",[3139,27178,27179,27182,27188,27191],{},[87,27180,27181],{},"Type your question or describe the change you want in the input field.",[87,27183,27184,27185,27187],{},"Select ",[15,27186,14524],{}," or press Enter. Shift+Enter adds a new line.",[87,27189,27190],{},"Review the response and action cards, including the tool, status and person who requested each action.",[87,27192,27193,27194,3324,27196,56],{},"If an action requires confirmation, review it and choose ",[15,27195,13704],{},[15,27197,14763],{},[12,27199,27200,27201,27203],{},"While a task is running, the send button becomes ",[15,27202,17083],{}," (square icon). It stops the running task; it does not automatically reverse changes already made.",[79,27205,13954],{"id":27206},"how-do-i-dictate-a-task",[12,27208,27209,27210,27212],{},"When your browser supports microphone recording, the microphone button ",[15,27211,13939],{}," sits on the right of the input bar. The first time, your browser asks for permission to use the microphone for PlanElec.",[3139,27214,27215,27220,27223,27228],{},[87,27216,27217,27218,56],{},"Place the cursor where the text should appear in the input field and choose ",[15,27219,13939],{},[87,27221,27222],{},"Speak your task in the interface language, for example: “Hallway, north wall: three sockets, 30 centimetres above finished floor.” Level bars and a timer show that recording is running.",[87,27224,15424,27225,27227],{},[15,27226,13943],{}," (tick) or press Enter. After a short transcription, the recognised text appears at the cursor position.",[87,27229,27230],{},"Check and correct the text, then send it as usual. Dictated text is never sent automatically.",[12,27232,27233,27235],{},[15,27234,14530],{}," (X) or Esc ends the recording without text. A recording stops automatically after 2 minutes; the timer changes colour ten seconds before. If the browser blocks the microphone, a notice appears below the input field; allow access in your browser's site settings.",[138,27237,27238,27247],{},[141,27239,27240],{},[144,27241,27242,27244],{},[147,27243,2675],{},[147,27245,27246],{},"Notice below the input field",[163,27248,27249,27257,27265,27273,27280],{},[144,27250,27251,27254],{},[168,27252,27253],{},"Microphone access blocked",[168,27255,27256],{},"Allow access in the browser settings",[144,27258,27259,27262],{},[168,27260,27261],{},"No microphone found",[168,27263,27264],{},"Plug in a microphone or use another device",[144,27266,27267,27270],{},[168,27268,27269],{},"Nothing recognised",[168,27271,27272],{},"Speak again, more clearly",[144,27274,27275,27277],{},[168,27276,15027],{},[168,27278,27279],{},"Wait a moment",[144,27281,27282,27285],{},[168,27283,27284],{},"AI allowance not sufficient",[168,27286,27287],{},"Transcription counts towards the AI allowance",[79,27289,14840],{"id":14839},[12,27291,14843,27292,27294],{},[15,27293,13943],{},", your browser sends the recording to PlanElec. PlanElec forwards it through the AI service OpenRouter to the ElevenLabs speech recognition model Scribe and receives only the recognised text. The request asks for providers that neither store the data nor use it for training. PlanElec stores neither the recording nor its text; only what you then send as a task is saved. Discarded recordings never leave your device.",[79,27296,27298],{"id":27297},"can-i-send-the-assistant-a-photo","Can I send the assistant a photo?",[12,27300,27301,27302,27305,27306,27309],{},"Yes. ",[15,27303,27304],{},"Attach photo"," in the input area lets you choose up to four photos per task, for example of a distribution board, a type plate or the site; on phones and tablets ",[15,27307,27308],{},"Take photo"," opens the camera directly. You can also paste images or drag them into the input field. JPEG, PNG, WebP and HEIC are accepted (HEIC only if the browser can convert it). The assistant describes what is visible and says what it cannot read reliably. A photo is no substitute for an on-site electrical safety check; statements about AREI requirements are backed by sources as usual. People and licence plates are not analysed. Photos only work with GPT-6 Luna; with another model the button stays disabled.",[79,27311,27313],{"id":27312},"where-do-my-photos-go","Where do my photos go?",[12,27315,27316],{},"Your browser shrinks each photo to at most 1600 pixels and removes location and camera data (EXIF\u002FGPS) on the way. PlanElec checks the image and passes it on via OpenRouter to the language model in the EU for this one task only; the request requires providers that neither store the data nor use it for training. PlanElec does not store the photo: it does not end up in the project or in photo management. The conversation keeps only a note with number, format and size; after reloading the page the image itself is no longer shown.",[79,27318,27320],{"id":27319},"can-the-assistant-place-boxes-on-a-wall-with-exact-dimensions","Can the assistant place boxes on a wall with exact dimensions?",[12,27322,27323,27324,56],{},"Yes. One sentence with room, wall, distance and height is enough, for example: “Hallway, north wall: three sockets, 30 cm above the finished floor, the first 45 cm from the left corner, axis spacing 71 mm”. The assistant passes the dimensions in metres; the exact position is calculated from them. In this example the three sockets share one frame with their axes at 0.45 m, 0.521 m and 0.592 m. You can type the sentence or speak it with ",[15,27325,13939],{},[138,27327,27328,27338],{},[141,27329,27330],{},[144,27331,27332,27335],{},[147,27333,27334],{},"In the sentence",[147,27336,27337],{},"How it is applied",[163,27339,27340,27348,27356,27364,27372,27380],{},[144,27341,27342,27345],{},[168,27343,27344],{},"“north wall”, “east wall”",[168,27346,27347],{},"The wall that faces this compass direction as seen from inside the room. The set north direction applies; without a north direction, plan-up counts as north and the result says so.",[144,27349,27350,27353],{},[168,27351,27352],{},"“from the left corner”, “from the right corner”",[168,27354,27355],{},"Left and right are seen from inside the room, facing the wall. The distance is measured on the inner face from the inner corner, so the thickness of the adjoining wall is already deducted.",[144,27357,27358,27361],{},[168,27359,27360],{},"“the first 45 cm”, “centre 1.20 m”",[168,27362,27363],{},"Distance to the first box axis or to the centre of the frame.",[144,27365,27366,27369],{},[168,27367,27368],{},"“axis spacing 71 mm”, “double socket”",[168,27370,27371],{},"Several boxes in one shared frame with 71 mm axis spacing, at most five. Any other axis spacing is rejected.",[144,27373,27374,27377],{},[168,27375,27376],{},"“1.5 m apart”",[168,27378,27379],{},"Separate frames with this centre-to-centre distance.",[144,27381,27382,27385],{},[168,27383,27384],{},"“30 cm above the finished floor”",[168,27386,27387],{},"Height of the box centre, stored as the device’s own mounting height. Without a height, the standard height of the device type applies.",[12,27389,27390],{},"Several sockets in one frame become one device with several outlets, like a double socket. Switches, Ethernet and coaxial outlets in one frame form a shared frame group. Supported are sockets, splashproof sockets, switches, roller shutter switches (single only) and Ethernet and coaxial outlets. Push buttons are still placed one by one.",[12,27392,27393],{},"If a detail does not fit, the assistant places nothing and states the reason: for example when the position falls into a door, a box already sits at that spot at the same height, the height exceeds the room height, or several walls of the room face the same direction. Nothing is moved silently. On request, the assistant first creates a preview without changing anything. The placed row is a single undo step.",[79,27395,27397],{"id":27396},"how-can-i-recognise-an-assistant-change","How can I recognise an assistant change?",[12,27399,27400,27401,27403],{},"Each agent action appears with the person who requested it in the activity panel. Saved assistant changes have a bot tile and ",[15,27402,23381],{}," in project history. The name identifies the member who gave the task, including when you review another member's changes. The marker remains visible with history access even without your own chat access.",[12,27405,27406,27407,27410],{},"Outside the studio, the history sheet shows a small bot icon next to the actor. Hover over it or focus it with the keyboard to read ",[15,27408,27409],{},"Assistant on behalf of …",". Conversations and read-only actions are not saved project changes.",[79,27412,27414],{"id":27413},"can-i-undo-an-agent-action","Can I undo an agent action?",[12,27416,27417,27418,27420],{},"Supported, completed project changes offer ",[15,27419,13947],{}," on their action card. It is enabled only for the latest eligible change with a valid undo entry and matching project context. Answers, read-only actions and unsupported actions do not offer this option. A history entry alone is not a restore button. After undoing a change, check the action status and the project.",{"title":2044,"searchDepth":2045,"depth":2045,"links":27422},[27423,27424,27425,27426,27427,27428,27429,27430,27431,27432],{"id":27089,"depth":2045,"text":27090},{"id":27115,"depth":2045,"text":27116},{"id":27175,"depth":2045,"text":27176},{"id":27206,"depth":2045,"text":13954},{"id":14839,"depth":2045,"text":14840},{"id":27297,"depth":2045,"text":27298},{"id":27312,"depth":2045,"text":27313},{"id":27319,"depth":2045,"text":27320},{"id":27396,"depth":2045,"text":27397},{"id":27413,"depth":2045,"text":27414},"Follow project changes and assistant tasks in the studio, check who requested each action, and give the PlanElec assistant instructions in your own words.","studio-activity-assistant","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fstudio-activity-assistant-en.webp",{},10,"\u002Fhelp\u002Fstudio-aktivitaet-assistent.en","2026-09-15",{"title":23256,"description":27433},"help\u002Fstudio-aktivitaet-assistent.en",[27443,27444,22338,10997],"Studio","Project history","wBnFpQUjiUn2T3xKosdJ0UHNRCImpwn0_1lyhlHSYbw","\u002Fhelp\u002Fstudio-activity-assistant",[],{"id":27449,"title":24147,"articleId":27450,"body":27451,"category":27749,"date":27750,"description":27751,"extension":2113,"image":27472,"labels":27752,"lastUpdated":4240,"locale":2119,"meta":27753,"navigation":2121,"ogImage":27754,"path":27755,"publishDate":27750,"readTime":19432,"refreshInterval":10313,"seo":27756,"seoTitle":10313,"slug":27757,"stem":27758,"tags":27759,"__hash__":27761,"kind":2137,"href":27762},"blog\u002Fblog\u002Finstallation-topology.en.md","installation-topology",{"type":9,"value":27452,"toc":27738},[27453,27467,27473,27477,27482,27488,27491,27495,27498,27505,27508,27513,27517,27524,27529,27532,27537,27541,27555,27559,27565,27572,27576,27611,27616,27619,27623,27632,27688,27694,27701,27705,27716,27720,27733],[12,27454,27455,27456,27459,27460,27462,27463,27466],{},"A device in the floor plan shows ",[15,27457,27458],{},"where"," it is. The ",[15,27461,5104],{}," view in PlanElec Pro also makes clear ",[15,27464,27465],{},"what supplies and protects"," it. The same devices then form the basis for distribution boards, cabinet layouts and the single-line diagram. You enter each consumer only once and afterwards simply assign it.",[12,27468,27469],{},[74,27470],{"alt":27471,"src":27472},"Electricians prepare distribution board planning.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-installation-topology-editorial.webp",[79,27474,27476],{"id":27475},"how-is-the-installation-structured-in-planelec","How is the installation structured in PlanElec?",[12,27478,4361,27479,27481],{},[15,27480,5104],{}," view shows the shared electrical model from the supply down to the consumers: grid connection and meter, main board, protective devices, circuits and the supplied devices. The devices you placed in the floor plan are assigned to circuits. There is no second entry for the diagram or the board.",[1489,27483],{":height":27484,":width":3800,"alt":27485,"caption":27486,"src":27487},"690","Diagram of the radial structure: supply with grid connection and meter, below it the main board, then the main-board circuits and a sub-distribution board with exactly one feeder, that sub-board's circuits and finally the consumers. Floor-plan devices are assigned to these circuits. A note box describes the single supply per sub-board as a model boundary.","Every sub-distribution board hangs from exactly one upstream supply. This is a boundary of the PlanElec model, not a standards rule.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Finstallation-topology\u002Fradial-structure.en.svg",[12,27489,27490],{},"Planning is radial: each sub-distribution board needs one unambiguous upstream supply, meaning a feeder cable with an upstream protective device. This is a PlanElec model boundary, not a general statement about how many energy sources an installation may have. Local sources such as a PV system, and control relationships such as switch functions or bus assignments, are handled separately from the supply chain. Several independent grid connections in one project are not generally supported by this model.",[79,27492,27494],{"id":27493},"plan-the-electrical-structure-before-choosing-the-cabinet","Plan the electrical structure before choosing the cabinet",[12,27496,27497],{},"Electrical structure and physical implementation answer different questions. A circuit can already be planned while its board, enclosure or row layout remains open. These drafts survive saving and reloading; open items stay marked instead of being quietly assigned to a main board.",[1489,27499],{":height":27500,":width":27501,"alt":27502,"caption":27503,"src":27504},"810","1370","Complete example-home installation with supply, protective devices and consumers.","Supplies, protective devices and consumers form one installation. Physical board planning can remain open.","\u002Fhelp\u002Finstallation-topology\u002Fen-02-installation-overview.png",[12,27506,27507],{},"Select a consumer to see its supply and protection path. Search and collapsible branches make the installation easier to read. The tree view also keeps planning actions accessible on narrow screens.",[1489,27509],{":height":27500,":width":27501,"alt":27510,"caption":27511,"src":27512},"Installation tree view with the sub-board main switch selected, the status “Electrically connected · board open”, the action “Create a board from selection” and the supply and protection path from the grid connection.","“Board open” stays visible: the device is electrically connected but not yet assigned to a physical board.","\u002Fhelp\u002Finstallation-topology\u002Fen-03-draft-without-board.png",[79,27514,27516],{"id":27515},"an-example-using-existing-devices","An example using existing devices",[12,27518,27519,27520,27523],{},"In the fictional example, an existing living-room socket receives its circuit assignment. The related upper-floor protective devices are then selected and you click ",[15,27521,27522],{},"Create a board from selection",". A preview shows the entry point, modules and assignment effects before the distribution board is created.",[1489,27525],{":height":27526,":width":6799,"alt":27527,"caption":27527,"src":27528},"618","Preview for forming the upper-floor distribution board.","\u002Fhelp\u002Finstallation-topology\u002Fen-04-board-preview.png",[12,27530,27531],{},"Forming the frame is a confirmed action: the protective devices only belong to the physical board after you confirm. If the selection is contradictory, PlanElec explains why and you adjust it. Supplied sockets and lights remain outside the frame. A feeder is explicitly planned with its protective device and cable information such as conductor count, cross-section and length; drawing a frame creates no unknown feeders or protective devices.",[1489,27533],{":height":27500,":width":27501,"alt":27534,"caption":27535,"src":27536},"Distribution board and external consumers in the same installation.","Selected protective devices are assigned to a physical board after review. Supplied consumers remain outside its frame.","\u002Fhelp\u002Finstallation-topology\u002Fen-05-board-created.png",[79,27538,27540],{"id":27539},"can-this-be-done-automatically","Can this be done automatically?",[12,27542,27543,27544,27547,27548,27551,27552,27554],{},"To get started there is ",[15,27545,27546],{},"Complete installation automatically",": place consumers and a board in the floor plan, select the board and run the action. The proposal shows the target board, new circuits and protective devices, and the space required; only ",[15,27549,27550],{},"Apply proposal"," adds them to the plan. Existing circuits, cable data and module positions are kept. Devices that cannot be planned automatically and missing feeder data remain open items. You can undo the whole step at once. The guide ",[40,27553,19286],{"href":18627}," explains the preview in detail.",[79,27556,27558],{"id":27557},"how-reliable-is-the-enclosure-proposal","How reliable is the enclosure proposal?",[12,27560,27561,27562,56],{},"The cabinet remains editable. Enclosure proposals take the recorded module widths, reserve, terminals and accessories, and mounting assumptions into account; known placements are protected. With generic devices or open details, the result is an estimate. Once you record manufacturer data and installation conditions, it becomes specific. Even then it is not an optimal sizing and not an electrical or thermal approval: you check the mounting type, wiring space, heat dissipation and manufacturer conditions yourself. For board layout in general, see ",[40,27563,27564],{"href":4200},"Distribution board planning: layout and sizing according to AREI\u002FRGIE",[1489,27566],{":height":27567,":width":27568,"alt":27569,"caption":27570,"src":27571},"900","1440","Cabinet editor for the upper-floor sub-board with unplaced modules and the “Plan enclosure” panel: reserve, terminals and accessories, mounting type, required space and matching enclosures by capacity.","Enclosure planning adds up modules, reserve and accessories and labels the result as an estimated minimum space.","\u002Fhelp\u002Finstallation-topology\u002Fen-06-cabinet-planning.png",[79,27573,27575],{"id":27574},"continue-with-the-same-project","Continue with the same project",[138,27577,27578,27587],{},[141,27579,27580],{},[144,27581,27582,27585],{},[147,27583,27584],{},"Next view",[147,27586,9095],{},[163,27588,27589,27597,27604],{},[144,27590,27591,27594],{},[168,27592,27593],{},"Cabinet",[168,27595,27596],{},"Detail modules, rows and an enclosure using recorded space assumptions",[144,27598,27599,27601],{},[168,27600,3926],{},[168,27602,27603],{},"Review the same electrical installation on document sheets",[144,27605,27606,27608],{},[168,27607,4665],{},[168,27609,27610],{},"Produce documents from the saved version with a visible status",[1489,27612],{":height":27567,":width":27568,"alt":27613,"caption":27614,"src":27615},"Single-line diagram derived from the example project.","The single-line diagram and exported plans come from the same saved project version.","\u002Fhelp\u002Finstallation-topology\u002Fen-07-derived-schema.png",[12,27617,27618],{},"The single-line diagram and PDF exports use the same rendering as before, including board sheets and cross-references. The graphical installation view does not replace a diagram, and an open draft is not presented as a finished installation dossier. Diagram and dossier deliver the documents; the electrician signs off the design and the recognised inspection body carries out the inspection (keuring).",[79,27620,27622],{"id":27621},"what-changes-with-the-draw-the-single-line-diagram-first-approach","What changes with the “Draw the single-line diagram first” approach?",[12,27624,27625,27626,27628,27629,27631],{},"When you create a project you choose between two planning approaches: ",[15,27627,14056],{}," (default) and ",[15,27630,14060],{}," for users coming from classic drawing tools. With the second approach, the main board and supply head are ready as an assumption and you place symbols directly in the diagram; the floor plan can follow later.",[138,27633,27634,27644],{},[141,27635,27636],{},[144,27637,27638,27640,27642],{},[147,27639,2179],{},[147,27641,14056],{},[147,27643,14060],{},[163,27645,27646,27657,27668,27678],{},[144,27647,27648,27651,27654],{},[168,27649,27650],{},"Where do you start?",[168,27652,27653],{},"Rooms and devices in the floor plan",[168,27655,27656],{},"Symbols directly in the single-line diagram",[144,27658,27659,27662,27665],{},[168,27660,27661],{},"Situation plan in the dossier",[168,27663,27664],{},"Yes, from the floor plan",[168,27666,27667],{},"Only once a floor plan has been drawn",[144,27669,27670,27673,27675],{},[168,27671,27672],{},"Spatial checks",[168,27674,3342],{},[168,27676,27677],{},"Do not block the diagram or self-check report without a floor plan; all other checks apply",[144,27679,27680,27683,27686],{},[168,27681,27682],{},"Switching later",[168,27684,27685],{},"In the project settings, without data loss",[168,27687,27685],{},[12,27689,27690,27691,27693],{},"Trikker project files are imported through the ",[40,27692,549],{"href":42},", whichever approach you choose.",[1489,27695],{":height":27696,":width":27697,"alt":27698,"caption":27699,"src":27700},"774","672","PlanElec Pro, New project dialog, step 2 of 3 ‘Planning approach’: cards ‘Plan from the floor plan’ (recommended) and ‘Draw the single-line diagram first’, below four ways to start, from guided to no guidance.","The planning approach only sets the entry point, not the project type; you can change it later in the project settings.","\u002Fimages\u002Fblog\u002Fscreens\u002Fpro\u002Fen-new-project-planning.webp",[79,27702,27704],{"id":27703},"what-happens-to-existing-projects","What happens to existing projects?",[12,27706,27707,27708,27711,27712,56],{},"Existing devices and boards remain usable. The view presents their electrical structure as one continuous installation; the board editor remains editable for its concrete layout. The recommended sequence from situation plan to export is guidance, not a gate: you can continue working in whichever view suits your task. The first steps are covered in ",[40,27709,27710],{"href":2004},"Getting started with PlanElec","; how furniture, 3D views and lighting scenes complement the plan is described in ",[40,27713,27715],{"href":27714},"\u002Fen\u002Fblog\u002F3d-furniture-lighting","Furniture, 3D views and lighting scenes in PlanElec",[79,27717,27719],{"id":27718},"do-you-need-planelec-pro-for-this","Do you need PlanElec Pro for this?",[12,27721,27722,27723,27725,27726,27728,27729,27732],{},"Yes. Installation, cabinet and self-check report are part of ",[40,27724,31],{"href":1964},"; with “Try Pro for 1 month” you use the full Pro scope for one person for a month, with exports without masked areas. The plans are listed on the ",[40,27727,1958],{"href":54},". If you only need a single-line diagram and situation plan without a cabinet, draw them for free in ",[40,27730,22],{"href":1456,"rel":27731},[1458]," in your browser and hand the drawing over to Pro later when a cabinet or self-check report is needed.",[12,27734,27735,27736,56],{},"The illustrated guide covers assignment, open drafts, distribution boards, feeder planning, cabinets and export step by step: ",[40,27737,19286],{"href":18627},{"title":2044,"searchDepth":2045,"depth":2045,"links":27739},[27740,27741,27742,27743,27744,27745,27746,27747,27748],{"id":27475,"depth":2045,"text":27476},{"id":27493,"depth":2045,"text":27494},{"id":27515,"depth":2045,"text":27516},{"id":27539,"depth":2045,"text":27540},{"id":27557,"depth":2045,"text":27558},{"id":27574,"depth":2045,"text":27575},{"id":27621,"depth":2045,"text":27622},{"id":27703,"depth":2045,"text":27704},{"id":27718,"depth":2045,"text":27719},"product_update","2026-09-13","The new installation tree connects existing devices, protection paths, distribution boards and documents in one planning workflow.",[4243,4825,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-installation-topology-editorial.jpg","\u002Fblog\u002Finstallation-topology.en",{"title":24147,"description":27751},"from-floor-plan-to-installation-and-distribution-board","blog\u002Finstallation-topology.en",[7417,5104,27760],"Topology","WPl9YvE-DcPUKqnyGOq50JWAllib--AxWFLgrkJLHHo","\u002Fblog\u002Ffrom-floor-plan-to-installation-and-distribution-board",{"id":27764,"title":19286,"body":27765,"category":10304,"description":28448,"extension":2113,"guideId":27450,"image":28449,"locale":2119,"meta":28450,"navigation":2121,"order":28451,"path":28452,"publishedAt":27750,"readTime":15114,"seo":28453,"seoTitle":10313,"slug":28454,"stem":28455,"tags":28456,"updatedAt":16792,"__hash__":28457,"kind":3594,"href":28458,"date":27750,"labels":28459},"help\u002Fhelp\u002Finstallation-topology.en.md",{"type":9,"value":27766,"toc":28433},[27767,27772,27775,27779,27801,27804,27807,27811,27860,27865,27868,27889,27892,27897,27901,27906,27923,27928,27933,27937,27940,27973,27988,27993,27997,28000,28003,28007,28011,28015,28018,28063,28067,28071,28075,28091,28095,28102,28106,28109,28114,28118,28128,28232,28235,28265,28276,28302,28319,28323,28360,28363,28368,28371,28374,28377,28381,28386,28390,28395,28399,28404,28411,28420,28424,28427],[12,27768,3361,27769,27771],{},[15,27770,5104],{},", you plan which protective device supplies each circuit and its consumers. You use devices already placed in the floor plan. An enclosure and fixed module positions are not required yet. You can then form distribution boards, detail their cabinet layouts and review the resulting single-line diagram.",[12,27773,27774],{},"This guide follows one fictional home in the same project file. Its screenshots show real views of that example in the application. The sequence provides a starting point; existing projects and other valid planning approaches remain supported. A planning view or an exported draft does not establish electrical safety.",[79,27776,27778],{"id":27777},"quick-start-from-distribution-board-to-topology","Quick start: from distribution board to topology",[3139,27780,27781,27784,27792,27798],{},[87,27782,27783],{},"Place loads and a distribution board on the floor plan.",[87,27785,27786,27787,27789,27790,56],{},"Select the board and ",[15,27788,27546],{},". The same action is available in ",[15,27791,5104],{},[87,27793,27794,27795,27797],{},"Review the target board, new circuits, protection devices and required space. ",[15,27796,27550],{}," adds the plan and opens the board’s topology.",[87,27799,27800],{},"Open the cabinet view to inspect the prepared layout.",[12,27802,27803],{},"All unassigned loads without an assignment to another board are included. Existing circuits, cable data and module positions are preserved. An unconfigured cabinet receives an enclosure proposal; insufficient space in an existing enclosure is reported. Devices that require manual planning and missing feeder data remain open. One undo step reverses the operation. If the project changes, review the refreshed proposal before applying it. The preview lists every planned assignment by room with circuit, protection device and RCD. An empty circuit whose name matches the load is reused instead of adding another protection device.",[12,27805,27806],{},"The following sections explain manual editing and installation review.",[79,27808,27810],{"id":27809},"what-is-each-view-for","What is each view for?",[138,27812,27813,27822],{},[141,27814,27815],{},[144,27816,27817,27819],{},[147,27818,27171],{},[147,27820,27821],{},"What you plan here",[163,27823,27824,27832,27839,27846,27853],{},[144,27825,27826,27829],{},[168,27827,27828],{},"Floor plan \u002F situation plan",[168,27830,27831],{},"Device positions and physical cable routes",[144,27833,27834,27836],{},[168,27835,5104],{},[168,27837,27838],{},"Supply, protection paths, circuits and board boundaries",[144,27840,27841,27843],{},[168,27842,27593],{},[168,27844,27845],{},"Concrete devices, enclosure, rows and module positions",[144,27847,27848,27850],{},[168,27849,3926],{},[168,27851,27852],{},"Document representation of the same electrical installation",[144,27854,27855,27857],{},[168,27856,4665],{},[168,27858,27859],{},"Documents from the saved project version with a visible review status",[12,27861,27862],{},[40,27863],{"id":27864},"assignment",[79,27866,20797],{"id":27867},"assign-an-existing-floor-plan-device",[3139,27869,27870,27876,27881,27886],{},[87,27871,27872,27873,56],{},"Place devices in the floor plan or open an existing project. See ",[40,27874,27875],{"href":16744},"place and connect electrical symbols",[87,27877,4055,27878,27880],{},[15,27879,5104],{},", search for the device and select it in the tree or graphical view.",[87,27882,7944,27883,27885],{},[15,27884,20768],{},", choose the existing target circuit and confirm.",[87,27887,27888],{},"Check the displayed protection path. The floor-plan link takes you to the associated symbol.",[12,27890,27891],{},"This assigns the same device. Do not create another consumer just to see it in the diagram. In the example, the existing living-room socket receives its circuit assignment.",[1489,27893],{":height":27567,":width":27568,"alt":27894,"caption":27895,"src":27896},"The same living-room socket in the floor plan after its electrical assignment.","The floor-plan symbol stays in place; its electrical assignment has been completed.","\u002Fhelp\u002Finstallation-topology\u002Fen-01-floorplan-assignment.png",[79,27898,27900],{"id":27899},"move-loads-in-the-circuit-list","Move loads in the circuit list",[12,27902,4361,27903,27905],{},[15,27904,8928],{}," view lists every final circuit by board and RCD, with its loads, the sum of the recorded power and the phase. Loads without a circuit are shown at the top.",[3139,27907,27908,27915,27918],{},[87,27909,4055,27910,27912,27913,7941],{},[15,27911,5104],{}," and choose the ",[15,27914,8928],{},[87,27916,27917],{},"Drag a load onto the target circuit. Its cables move with it.",[87,27919,27920,27922],{},[15,27921,13947],{}," reverts the step completely.",[12,27924,27925,27926,56],{},"Only items connected directly to the circuit breaker can be moved; a junction box takes its loads with it. The room filter shows only circuits that supply the selected room. Without a mouse, select the load and use ",[15,27927,20768],{},[1489,27929],{":height":27500,":width":27501,"alt":27930,"caption":27931,"src":27932},"Circuit list of the example house with the main board and the upper-floor sub-board.","Each circuit is listed under its RCD with designation, rated current, phase and loads.","\u002Fhelp\u002Finstallation-topology\u002Fen-10-circuit-list.png",[79,27934,27936],{"id":27935},"resolve-open-tasks","Resolve open tasks",[12,27938,27939],{},"With nothing selected, the side panel lists open tasks – one line per problem, not per device.",[138,27941,27942,27951],{},[141,27943,27944],{},[144,27945,27946,27948],{},[147,27947,5825],{},[147,27949,27950],{},"Solution in the side panel",[163,27952,27953,27963],{},[144,27954,27955,27958],{},[168,27956,27957],{},"Loads without a circuit",[168,27959,27960,27962],{},[15,27961,20761],{}," opens the automatic planning proposal",[144,27964,27965,27968],{},[168,27966,27967],{},"Board open: electrically connected but not assigned to a board",[168,27969,27970,27972],{},[15,27971,20787],{}," opens the preview for the whole chain from its top device",[12,27974,27975,27976,27979,27980,27983,27984,27987],{},"Below are actions for the whole installation. ",[15,27977,27978],{},"Balance phases"," spreads single-phase circuits more evenly across L1–L3 on a three-phase supply without moving module positions. ",[15,27981,27982],{},"Add missing cables"," creates only missing cables; existing cables and their data stay unchanged. ",[15,27985,27986],{},"Calculate cable routes"," fills in missing routes on the floor plan and leaves manually drawn routes unchanged.",[12,27989,27990],{},[40,27991],{"id":27992},"supply-path",[79,27994,27996],{"id":27995},"read-the-complete-supply-and-protection-path","Read the complete supply and protection path",[12,27998,27999],{},"Return to the installation. The grid connection, meter, protective devices, circuits and consumers remain reachable together. Select a consumer to see its path back to the supply. Device references and circuit labels help you compare the floor plan and diagram.",[12,28001,28002],{},"Use search, expand\u002Fcollapse and the tree view for larger projects. A collapsed branch still exists. Control relationships, switching functions and bus assignments are additional relationships; they must not be treated as arbitrary supply connections.",[1489,28004],{":height":27500,":width":27501,"alt":28005,"caption":28006,"src":27504},"Installation overview of the example home from supply chain to consumers.","The overview uses existing devices in the project.",[12,28008,28009],{},[40,28010],{"id":26270},[79,28012,28014],{"id":28013},"continue-without-a-chosen-cabinet","Continue without a chosen cabinet",[12,28016,28017],{},"An undecided board is a saveable draft state. Save and reload the project: the open assignment remains open instead of being silently attached to a main board.",[138,28019,28020,28029],{},[141,28021,28022],{},[144,28023,28024,28027],{},[147,28025,28026],{},"State",[147,28028,19254],{},[163,28030,28031,28039,28047,28055],{},[144,28032,28033,28036],{},[168,28034,28035],{},"Not electrically assigned",[168,28037,28038],{},"Choose the supply or circuit",[144,28040,28041,28044],{},[168,28042,28043],{},"Electrically connected, board open",[168,28045,28046],{},"Plan a suitable physical group",[144,28048,28049,28052],{},[168,28050,28051],{},"Board chosen, layout open",[168,28053,28054],{},"Check the feeder and detail enclosure and modules",[144,28056,28057,28060],{},[168,28058,28059],{},"Modules placed",[168,28061,28062],{},"Review layout, electrical information and documents",[1489,28064],{":height":27500,":width":27501,"alt":28065,"caption":28066,"src":27512},"An electrically planned installation section with its physical board still open.","An electrical connection does not mean that cabinet planning is complete.",[12,28068,28069],{},[40,28070],{"id":4243},[79,28072,28074],{"id":28073},"form-a-distribution-board-from-a-selection","Form a distribution board from a selection",[3139,28076,28077,28080,28085,28088],{},[87,28078,28079],{},"Select related protective devices using individual tree checkboxes or multiple selection in the graphical view.",[87,28081,7944,28082,28084],{},[15,28083,27522],{}," and give it a clear name.",[87,28086,28087],{},"Read the preview: supply entry, modules, consumers outside the cabinet, existing board boundaries and affected placements.",[87,28089,28090],{},"Confirm only a suitable selection. If the selection conflicts, the application explains why; adjust it before continuing.",[1489,28092],{":height":27526,":width":6799,"alt":28093,"caption":28094,"src":27528},"Upper-floor distribution board preview showing entry point, modules and effects.","The selection rectangle alone does not create a saved board boundary.",[12,28096,28097,28098,28101],{},"After confirmation, the protective devices belong to the new physical board. Its supplied sockets and lights remain ",[15,28099,28100],{},"outside"," the frame. Electrically downstream boards are not enclosures physically nested inside each other.",[1489,28103],{":height":27500,":width":27501,"alt":28104,"caption":28105,"src":27536},"Confirmed distribution board with protective devices inside and consumers outside.","Physical board membership and the area supplied by that board have different meanings.",[12,28107,28108],{},"Next, check the feeder: select the actual upstream protective device and enter cable information such as conductor count, cross-section and length. Confirm that connection explicitly. Grouping invents neither a protective device nor a feeder cable. Radial planning requires one unambiguous upstream supply path; local sources such as PV are handled separately.",[12,28110,28111],{},[40,28112],{"id":28113},"breaker-sub-board",[79,28115,28117],{"id":28116},"how-do-i-connect-a-circuit-breaker-to-a-sub-distribution-board","How do I connect a circuit breaker to a sub-distribution board?",[12,28119,28120,28121,28123,28124,28127],{},"Create a new circuit breaker directly under the main switch or an RCD of the sub-board. Move an existing breaker into the existing sub-board with ",[15,28122,27522],{},". Feed the sub-board itself with ",[15,28125,28126],{},"Confirm feeder"," from a protective device in the upstream board.",[138,28129,28130,28143],{},[141,28131,28132],{},[144,28133,28134,28136,28141],{},[147,28135,21821],{},[147,28137,28138,28139],{},"Path in ",[15,28140,5104],{},[147,28142,9095],{},[163,28144,28145,28167,28184,28204,28219],{},[144,28146,28147,28150,28164],{},[168,28148,28149],{},"Create a new circuit breaker in the sub-board",[168,28151,28152,5259,28155,28157,28158,5259,28160,28163],{},[15,28153,28154],{},"Add equipment",[15,28156,12220],{}," = ",[15,28159,24058],{},[15,28161,28162],{},"Upstream device"," = RCD or main switch of the sub-board",[168,28165,28166],{},"the breaker belongs to the sub-board; its circuit is created in the same step",[144,28168,28169,28172,28181],{},[168,28170,28171],{},"Faster under a specific RCD",[168,28173,28174,28176,28177,28180],{},[15,28175,8928],{}," view → ",[15,28178,28179],{},"+ Circuit"," in that RCD's group",[168,28182,28183],{},"the same dialog with the RCD preselected",[144,28185,28186,28189,28201],{},[168,28187,28188],{},"Move an existing breaker into an existing sub-board",[168,28190,28191,28192,5259,28194,28197,28198],{},"select the breaker with its checkbox in the tree → ",[15,28193,27522],{},[15,28195,28196],{},"Target board"," = the sub-board → ",[15,28199,28200],{},"Move to board",[168,28202,28203],{},"the breaker hangs off the sub-board's entry; its circuits and loads move along",[144,28205,28206,28209,28216],{},[168,28207,28208],{},"Then place it under a specific RCD",[168,28210,28211,28212,28215],{},"select the breaker → ",[15,28213,28214],{},"Change supply"," → RCD of the same sub-board",[168,28217,28218],{},"the breaker sits under the chosen RCD",[144,28220,28221,28224,28229],{},[168,28222,28223],{},"Feed the sub-board from the main board",[168,28225,28226,28227],{},"select the sub-board → ",[15,28228,28126],{},[168,28230,28231],{},"feeder connected with protective device and cable data",[12,28233,28234],{},"To move an existing breaker step by step:",[3139,28236,28237,28242,28246,28254,28257],{},[87,28238,4055,28239,28241],{},[15,28240,5104],{}," and tick the circuit breaker in the tree. Several breakers can be selected at once.",[87,28243,7944,28244,56],{},[15,28245,27522],{},[87,28247,5777,28248,28250,28251,56],{},[15,28249,28196],{},", choose the existing sub-board instead of ",[15,28252,28253],{},"Create new board",[87,28255,28256],{},"Read the move notice. If existing cables change, confirm this explicitly.",[87,28258,28259,28260,6975,28262,28264],{},"Finish with ",[15,28261,28200],{},[15,28263,13947],{}," reverts the step.",[12,28266,28267,28269,28270,28272,28273,28275],{},[15,28268,28214],{}," only moves protective devices within the same board. To move one into another board, use the ",[15,28271,28196],{}," path; the dialog points this out. Single loads, on the other hand, you drag to another circuit in the ",[15,28274,8928],{}," view, also across boards.",[12,28277,28278,28279,28282,28283,3328,28285,28288,28289,28291,28292,28294,28295,28298,28299,56],{},"For the feeder, choose the ",[15,28280,28281],{},"Existing feeder protection"," in the upstream board, the ",[15,28284,3153],{},[15,28286,28287],{},"Cross-section (mm²)"," and optionally the cable length in the ",[15,28290,28126],{}," dialog. The protective device must already exist and must supply nothing else; create it first with ",[15,28293,28154],{}," if needed. The sub-board then shows ",[15,28296,28297],{},"Feeder connected"," instead of ",[15,28300,28301],{},"Feeder still open",[12,28303,28304,28305,28307,28308,28311,28312,17835,28315,28318],{},"If you plan the sub-board in the cabinet first, ",[15,28306,18911],{}," (menu ",[15,28309,28310],{},"…"," in the cabinet editor, field ",[15,28313,28314],{},"Fed from",[15,28316,28317],{},"Create board"," adds, in one step, a main switch, a 30 mA RCD and a dedicated feeder breaker in the supplying board. Check the rating and cross-section of this feeder against the actual load afterwards.",[79,28320,28322],{"id":28321},"what-do-removal-and-deletion-change","What do removal and deletion change?",[138,28324,28325,28334],{},[141,28326,28327],{},[144,28328,28329,28332],{},[147,28330,28331],{},"Action",[147,28333,3293],{},[163,28335,28336,28344,28352],{},[144,28337,28338,28341],{},[168,28339,28340],{},"Dissolve board grouping",[168,28342,28343],{},"Remove the physical group; retain electrical devices for planning",[144,28345,28346,28349],{},[168,28347,28348],{},"Remove module placement",[168,28350,28351],{},"Remove the row position; retain the electrical device",[144,28353,28354,28357],{},[168,28355,28356],{},"Delete an electrical device",[168,28358,28359],{},"Change the electrical object and its affected connections",[12,28361,28362],{},"Read each preview or confirmation, then review the affected views. Related electrical changes can be followed with undo\u002Fredo.",[12,28364,28365],{},[40,28366],{"id":28367},"cabinet",[79,28369,19299],{"id":28370},"detail-modules-and-enclosure",[12,28372,28373],{},"Open the cabinet from the selected distribution board. Existing devices are carried over and unplaced modules remain findable. Choose concrete modules, check their width in module units (TE) and plan the rows.",[12,28375,28376],{},"Enclosure planning shows the module requirement and uses your entered reserve and terminal\u002Faccessory allowance. Check mounting type, wiring space, heat dissipation and manufacturer conditions. With generic modules or missing information, the space requirement remains an estimate. A proposed enclosure is not approval for construction.",[1489,28378],{":height":27567,":width":27568,"alt":28379,"caption":28380,"src":27571},"Cabinet editor with the selected distribution board and its enclosure planning.","Electrical assignment and row position are separately editable. Rearranging the same cabinet does not change the protection path.",[12,28382,28383],{},[40,28384],{"id":28385},"schema-export",[79,28387,28389],{"id":28388},"review-the-single-line-diagram-and-export-documents","Review the single-line diagram and export documents",[12,28391,4055,28392,28394],{},[15,28393,3926],{},". The same consumers, protective devices and boards appear in the document view. Check board-specific sheets and cross-references. The diagram is rendered from the project model; it is not a screenshot of the installation tree.",[1489,28396],{":height":27567,":width":27568,"alt":28397,"caption":28398,"src":27615},"Single-line diagram derived from the shared project model.","Moving or zooming the topology view does not change PDF coordinates.",[12,28400,16083,28401,28403],{},[15,28402,4665],{},", check the saved version and choose the required documents. Open assignments, cable information and reviews remain visible. A download offered as a draft remains a draft. Producing documents does not replace professional review or the official inspection.",[1489,28405],{":height":28406,":width":28407,"alt":28408,"caption":28409,"src":28410},"1273","1800","Actual exported document from the saved example project.","The document uses the same devices. Its visible status describes its intended use.","\u002Fhelp\u002Finstallation-topology\u002Fen-08-export-result.png",[12,28412,28413,28414,3157,28417,56],{},"Read more: ",[40,28415,28416],{"href":4645},"export documents",[40,28418,28419],{"href":1085},"what the self-check verifies",[79,28421,28423],{"id":28422},"work-on-a-tablet-phone-or-with-the-keyboard","Work on a tablet, phone or with the keyboard",[12,28425,28426],{},"On narrow screens, the tree view takes priority. Use checkboxes and named actions for assignment and board grouping. Arrow keys move through the tree, Enter opens the selected item and Space selects an item for multiple selection.",[1489,28428],{":height":28429,":width":6557,"alt":28430,"caption":28431,"src":28432},"844","Mobile tree view with the same devices and accessible planning actions.","The graphical view and the tree edit the same project.","\u002Fhelp\u002Finstallation-topology\u002Fen-09-mobile-tree.png",{"title":2044,"searchDepth":2045,"depth":2045,"links":28434},[28435,28436,28437,28438,28439,28440,28441,28442,28443,28444,28445,28446,28447],{"id":27777,"depth":2045,"text":27778},{"id":27809,"depth":2045,"text":27810},{"id":27867,"depth":2045,"text":20797},{"id":27899,"depth":2045,"text":27900},{"id":27935,"depth":2045,"text":27936},{"id":27995,"depth":2045,"text":27996},{"id":28013,"depth":2045,"text":28014},{"id":28073,"depth":2045,"text":28074},{"id":28116,"depth":2045,"text":28117},{"id":28321,"depth":2045,"text":28322},{"id":28370,"depth":2045,"text":19299},{"id":28388,"depth":2045,"text":28389},{"id":28422,"depth":2045,"text":28423},"Assign existing floor-plan devices, check protection paths and develop an electrical plan into distribution boards, cabinet layouts and a single-line diagram.","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Finstallation-topology.webp",{},9,"\u002Fhelp\u002Finstallation-topology.en",{"title":19286,"description":28448},"plan-installation-and-distribution-boards","help\u002Finstallation-topology.en",[5104,27760,3115,27593,3926],"3fHCAD4ZZ3x_j7EB0Rs8Zy5ms0gfvxSj3V_mADGqrI4","\u002Fhelp\u002Fplan-installation-and-distribution-boards",[],{"id":28461,"title":28462,"articleId":28463,"body":28464,"category":27749,"date":28771,"description":28772,"extension":2113,"image":28478,"labels":28773,"lastUpdated":10988,"locale":2119,"meta":28774,"navigation":2121,"ogImage":28775,"path":28776,"publishDate":28771,"readTime":28777,"refreshInterval":10313,"seo":28778,"seoTitle":28779,"slug":28463,"stem":28780,"tags":28781,"__hash__":28782,"kind":2137,"href":28783},"blog\u002Fblog\u002F3d-furniture-lighting.en.md","PlanElec adds a new perspective: furniture, 3D views and lighting scenes","3d-furniture-lighting",{"type":9,"value":28465,"toc":28756},[28466,28473,28479,28484,28488,28497,28504,28508,28518,28523,28542,28546,28562,28575,28580,28591,28595,28606,28609,28611,28629,28665,28668,28672,28681,28686,28689,28694,28698,28702,28705,28709,28712,28716,28722,28726,28736,28740,28743],[12,28467,28468,28469,28472],{},"Where will the sofa go? How does a pendant light look above the dining table? How do the floors line up? In PlanElec Pro you view your project in space and discuss it more easily with clients and your team: ",[15,28470,28471],{},"furniture, matching 2D top views, an illustrative lighting preview, a daylight study and a heatmap of direct illuminance complete the 3D viewer."," The 3D view is available to every user without activation; without WebGL you keep working in 2D with nothing lost.",[12,28474,28475],{},[74,28476],{"alt":28477,"src":28478},"An electrician and a homeowner discuss a pendant light location.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-3d-furniture-lighting-editorial.webp",[1489,28480],{":height":24538,":width":24539,"alt":28481,"caption":28482,"src":28483},"Furnished living and dining room with an open kitchen in the PlanElec 3D viewer","The furnished living and dining room is visible in the 3D viewer.","\u002Fimages\u002Fblog\u002F3d-furniture-lighting\u002Fen-wohnen-3d.png",[79,28485,28487],{"id":28486},"furniture-gives-the-floor-plan-a-sense-of-scale","Furniture gives the floor plan a sense of scale",[12,28489,28490,28491,28493,28494,28496],{},"A room becomes tangible once the sofa, table and kitchen units are in it. In ",[15,28492,16014],{}," mode you open the ",[15,28495,16062],{}," catalogue with 52 items in the categories Living, Dining and working, Sleeping and storage, Kitchen, Kitchen appliances, Sanitary and Outdoors. Each item has a top view for the 2D plan and a model for 3D; position, dimensions in centimetres and rotation are shared by both views.",[12,28498,28499,28500,28503],{},"This lets you check, for example, whether a socket outlet sits sensibly next to the sofa or a light fits the planned dining area. You place and rotate furniture, adjust its dimensions and hide it when needed. Whether it appears in the exported situation plan is up to you: the export has its own switch, ",[15,28501,28502],{},"Include furnishings and outdoor objects",". The catalogue is a selection of typical furnishings, not a manufacturer catalogue; many appliances appear in 3D as simplified shapes.",[79,28505,28507],{"id":28506},"one-project-two-perspectives","One project, two perspectives",[12,28509,28510,28511,1774,28513,3157,28515,28517],{},"The view switcher moves between ",[15,28512,15799],{},[15,28514,15802],{},[15,28516,15805],{},". The split view appears once the studio workspace is at least 1600 pixels wide and works well for coordination: the position in the plan on the left, its spatial effect on the right. Selection and project state are shared by both views; you do not need a second model.",[1489,28519],{":height":24538,":width":24539,"alt":28520,"caption":28521,"src":28522},"The same furnished room shown as a 2D floor plan and a 3D view side by side","The split view shows the floor plan on the left and the 3D viewer on the right.","\u002Fimages\u002Fblog\u002F3d-furniture-lighting\u002Fen-grundriss-und-3d.png",[12,28524,28525,28526,28529,28530,28533,28534,3157,28536,28538,28539,28541],{},"Placement is more flexible too: hold ",[15,28527,28528],{},"Shift"," to turn off snapping temporarily. On tablets and phones, the ",[15,28531,28532],{},"Place freely"," switch does the same. For furniture, it also lets you set the rotation without angle steps. In ",[15,28535,16014],{},[15,28537,7264],{}," mode, 3D opens with the ",[15,28540,16023],{}," so you can look into the rooms.",[79,28543,28545],{"id":28544},"try-out-lighting-scenes","Try out lighting scenes",[12,28547,3361,28548,28550,28551,3157,28553,28555,28556,28558,28559,28561],{},[15,28549,7264],{}," mode, PlanElec opens the 3D view with the ",[15,28552,16112],{},[15,28554,16115],{}," panels. You place lights one by one or as a ",[15,28557,16122],{},". In the ",[15,28560,16112],{}," panel you set lumens, colour temperature, beam angle, tilt, mounting height and group per room; groups let you control the dining and living areas together, for example.",[12,28563,4361,28564,3157,28566,28568,28569,28571,28572,28574],{},[15,28565,15722],{},[15,28567,15725],{}," scenes let you compare different moods. Ambient brightness, lights switched on and dimming change how the room feels; optional ",[15,28570,16254],{}," make the aim visible. ",[15,28573,16261],{}," saves a scene as a PNG to share in a meeting.",[1489,28576],{":height":24538,":width":24539,"alt":28577,"caption":28578,"src":28579},"Exported evening scene with warm light, shadows and visible light cones","The evening scene shows warm light cones and the preview controls.","\u002Fimages\u002Fblog\u002F3d-furniture-lighting\u002Fen-lichtszene.png",[12,28581,28582,28585,28586,3157,28588,28590],{},[15,28583,28584],{},"The lighting preview shows mood and direction; it does not calculate lux values."," A newly placed light starts as a draft. Only ",[15,28587,16176],{},[15,28589,16188],{}," make it part of the electrical design; PlanElec does not derive power or wiring from the preview.",[79,28592,28594],{"id":28593},"how-does-daylight-fall-into-the-room","How does daylight fall into the room?",[12,28596,4361,28597,28599,28600,28602,28603,28605],{},[15,28598,16335],{}," section in the ",[15,28601,16115],{}," panel sets up sunlight with shadows in 3D. You set the project's ",[15,28604,16344],{}," once, choose a date and time, and watch light and shadow move through the rooms.",[12,28607,28608],{},"The sun position is calculated for a fixed location in Brussels; there is no project-specific location. The study does not calculate daylight values in lux.",[79,28610,16389],{"id":16388},[12,28612,4361,28613,28615,28616,28618,28619,28622,28623,1774,28625,3324,28627,56],{},[15,28614,16418],{}," calculates the direct illuminance of your lights per room on a working plane at 0.8 m and colours the 2D floor plan. The ",[15,28617,16430],{}," table gives the mean Ē, the minimum Emin and the uniformity; a traffic light compares the mean with a stored ",[15,28620,28621],{},"guidance"," value: ",[15,28624,16455],{},[15,28626,16459],{},[15,28628,16463],{},[138,28630,28631,28639],{},[141,28632,28633],{},[144,28634,28635,28637],{},[147,28636,16560],{},[147,28638,16563],{},[163,28640,28641,28649,28657],{},[144,28642,28643,28646],{},[168,28644,28645],{},"Direct component of artificial light at 0.8 m per room",[168,28647,28648],{},"Reflections, light from neighbouring rooms, daylight",[144,28650,28651,28654],{},[168,28652,28653],{},"Mean, minimum, uniformity",[168,28655,28656],{},"Manufacturer photometry (IES\u002FLDT)",[144,28658,28659,28662],{},[168,28660,28661],{},"Traffic light against guidance values, e.g. kitchen 300–500 lx",[168,28663,28664],{},"Standard requirements or a lighting compliance report",[12,28666,28667],{},"The heatmap supports planning and client conversations; it is not a standards-based lighting calculation. If you need a verifiable lighting calculation, use lighting design software with the manufacturer's photometric data; PlanElec gives you room geometry, light positions and mounting heights as the starting point.",[79,28669,28671],{"id":28670},"see-floors-and-dimensions-in-context","See floors and dimensions in context",[12,28673,4659,28674,1774,28676,3157,28678,28680],{},[15,28675,16004],{},[15,28677,16007],{},[15,28679,16010],{},", the viewer shows only the current floor, the whole building or the floors pulled apart. This lets you review layout and furnishings across several floors together.",[1489,28682],{":height":24538,":width":24539,"alt":28683,"caption":28684,"src":28685},"Two furnished storeys in the exploded 3D view","The exploded view shows both furnished storeys.","\u002Fimages\u002Fblog\u002F3d-furniture-lighting\u002Fen-geschosse.png",[12,28687,28688],{},"Optional dimensions show room measurements and ceiling height. Unconfirmed default heights stay marked as assumptions, so you never mistake a planning value for a measured one.",[1489,28690],{":height":24538,":width":24539,"alt":28691,"caption":28692,"src":28693},"3D view with room dimensions and a height labelled as an assumption","Dimension lines show the room measurements; the unconfirmed height remains marked as an assumption.","\u002Fimages\u002Fblog\u002F3d-furniture-lighting\u002Fen-abmessungen.png",[79,28695,28697],{"id":28696},"frequently-asked-questions-about-3d-furniture-and-lighting","Frequently asked questions about 3D, furniture and lighting",[1041,28699,28701],{"id":28700},"do-i-need-to-activate-the-3d-view","Do I need to activate the 3D view?",[12,28703,28704],{},"No. In PlanElec Pro the 3D view is available to every user without a feature switch. You need a browser with WebGL; without it, PlanElec shows a notice and you continue in the 2D floor plan with the same project. With the Viewer role you see 3D and the lighting study but cannot change values.",[1041,28706,28708],{"id":28707},"does-the-lighting-study-replace-a-lighting-calculation","Does the lighting study replace a lighting calculation?",[12,28710,28711],{},"No. The lighting preview, daylight study and heatmap are planning and discussion aids. The heatmap only calculates the direct component of your lights against guidance values; a lighting compliance report is done in lighting design software.",[1041,28713,28715],{"id":28714},"does-the-furniture-appear-on-the-situation-plan","Does the furniture appear on the situation plan?",[12,28717,28718,28719,28721],{},"If you want it to. When exporting, ",[15,28720,28502],{}," switches furniture on the situation plan on or off.",[1041,28723,28725],{"id":28724},"is-3d-available-in-planelec-sketch","Is 3D available in PlanElec Sketch?",[12,28727,28728,28729,28733,28734,56],{},"No. If you only need the single-line diagram and situation plan, draw them ",[40,28730,28732],{"href":1456,"rel":28731},[1458],"for free in PlanElec Sketch in your browser"," and export them as a PDF. 3D, furniture and the lighting study are part of ",[40,28735,31],{"href":1964},[79,28737,28739],{"id":28738},"what-you-gain","What you gain",[12,28741,28742],{},"Furniture and lighting ideas live in the same project as the electrical design. You discuss socket outlets, switches and lights where furniture and people will actually be, rather than on an abstract line in the plan.",[12,28744,28745,28746,28748,28749,28751,28752,56],{},"The captures show a prepared example project. Open your project, add furniture and switch to ",[15,28747,15805],{}," to see the floor plan and spatial view together. Every step, navigation and limit is covered in the guide ",[40,28750,21742],{"href":21741},"; the full scope is on the ",[40,28753,28755],{"href":28754},"\u002Fen\u002Ffeatures","feature overview",{"title":2044,"searchDepth":2045,"depth":2045,"links":28757},[28758,28759,28760,28761,28762,28763,28764,28770],{"id":28486,"depth":2045,"text":28487},{"id":28506,"depth":2045,"text":28507},{"id":28544,"depth":2045,"text":28545},{"id":28593,"depth":2045,"text":28594},{"id":16388,"depth":2045,"text":16389},{"id":28670,"depth":2045,"text":28671},{"id":28696,"depth":2045,"text":28697,"children":28765},[28766,28767,28768,28769],{"id":28700,"depth":2053,"text":28701},{"id":28707,"depth":2053,"text":28708},{"id":28714,"depth":2053,"text":28715},{"id":28724,"depth":2053,"text":28725},{"id":28738,"depth":2045,"text":28739},"2026-09-12","Furniture in your floor plan, 2D and 3D side by side, lighting scenes, a daylight study and a heatmap with guidance values: how PlanElec Pro makes your project easy to see and discuss.",[22994,4825,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-3d-furniture-lighting-editorial.jpg","\u002Fblog\u002F3d-furniture-lighting.en","6 min",{"title":28462,"description":28772},"PlanElec in 3D: Furniture, 3D Views and Lighting Scenes","blog\u002F3d-furniture-lighting.en",[7417,15802,16014,7264],"4RoHPVsNgZ6yUmrkKpf_QFAPltAJF7gJpvftoPqlkGE","\u002Fblog\u002F3d-furniture-lighting",{"id":28785,"title":6127,"body":28786,"category":8555,"description":29194,"extension":2113,"guideId":29195,"image":28938,"locale":2119,"meta":29196,"navigation":2121,"order":29197,"path":29198,"publishedAt":28771,"readTime":3582,"seo":29199,"seoTitle":10313,"slug":29200,"stem":29201,"tags":29202,"updatedAt":29204,"__hash__":29205,"kind":3594,"href":29206,"date":28771,"labels":29207},"help\u002Fhelp\u002Fknx-planning-documentation.en.md",{"type":9,"value":28787,"toc":29181},[28788,28793,28798,28802,28805,28825,28831,28846,28852,28860,28865,28868,28872,28876,28882,28889,28896,28900,28917,28927,28933,28939,28943,28949,28954,28959,28963,28968,28973,28977,28983,28987,28996,29051,29054,29059,29063,29076,29079,29083,29089,29092,29096,29100,29114,29127,29130,29144,29148,29152,29155,29157],[12,28789,4659,28790,28792],{},[15,28791,7040],{}," planning enabled, PlanElec documents modules, channels, control points, keys, bus lines and terminals in one project. Exports include channel and terminal plans, functions by room, logical topology, quantities and a handover dossier with the self-check report. An active automation profile and access for your account are required. PlanElec prepares physical addresses, group addresses and datapoint types for the ETS import; the planning does not replace programming in ETS or an official certificate of conformity.",[12,28794,28795],{},[40,28796],{"id":28797},"practical-example",[79,28799,28801],{"id":28800},"practical-example-two-lights-controlled-from-two-locations","Practical example: two lights controlled from two locations",[12,28803,28804],{},"This fictional example documents a ceiling light and a wall light in a living room, operated from two push buttons. The screenshots show the French interface. Channel assignments, the missing-power warning and quantities were checked; the images do not show a fully validated installation dossier.",[3139,28806,28807,28813,28819],{},[87,28808,28809,28812],{},[15,28810,28811],{},"Profile and devices:"," select KNX in the project metadata. Place the two lights and two push buttons from the control points and sensors category on the situation plan. Give them distinct names. Add the power supply and actuator to the cabinet.",[87,28814,28815,28818],{},[15,28816,28817],{},"Electrical connections:"," in Installation, check the circuit, the modules’ supply and their cabinet assignment. If a light is unavailable in the receiver list, check its electrical connection. A logical channel assignment does not replace the protection path.",[87,28820,28821,28824],{},[15,28822,28823],{},"Channel:"," assign both lights and both buttons to CH1. The example uses “Plafonnier salon”, “Applique salon”, “Poussoir entrée” and “Poussoir canapé”. The buttons use a Bus connection here. Add a clear note describing the intended function.",[1489,28826],{":height":28827,":width":28828,"alt":28829,"caption":28829,"src":28830},"220","1790","CH1 links two lights with two buttons. The unassigned terminal remains visible. French interface, fictional data.","\u002Fhelp\u002Fknx-example\u002Ffr-04-matrice-affectations.jpg",[3139,28832,28834,28840],{"start":28833},4,[87,28835,28836,28839],{},[15,28837,28838],{},"Missing data:"," if the matrix reports a missing light power rating, enter the actual device specifications. Entering the fictional values of 24 W and 12 W removed that warning. This does not constitute a complete electrical compatibility check.",[87,28841,28842,28845],{},[15,28843,28844],{},"Line and supply:"," assign devices under Lines and explicitly select the line’s power supply module. Then check the bus current: unknown contributions remain open data. A logical line is not a measured cable route.",[1489,28847],{":height":28848,":width":28849,"alt":28850,"caption":28850,"src":28851},"1009","2073","The line has a 640 mA power supply, but three bus-current contributions are unknown. Consumption has therefore not been fully checked. French interface.","\u002Fhelp\u002Fknx-example\u002Ffr-05-ligne-alimentation.jpg",[3139,28853,28854],{"start":5426},[87,28855,28856,28859],{},[15,28857,28858],{},"Quantities:"," open Export → Domotica and download the automation quantities as a draft. Compare the result with the intended devices. The checked export contains one power supply, one actuator and two push buttons. The two lights are not included in this automation list; add them from the rest of your material overview. This example provides neither cable lengths nor manufacturer order references.",[1489,28861],{":height":28862,":width":26962,"alt":28863,"caption":28863,"src":28864},"1600","Actual exported PDF: one power supply, one actuator and two push buttons. The BROUILLON watermark marks the document as a draft, not a certificate.","\u002Fhelp\u002Fknx-example\u002Ffr-06-quantites.png",[12,28866,28867],{},"For inspection documents, also check the situation plan, device references, complete single-line diagram and outstanding export findings. The quantities shown here do not confirm those steps. The following sections explain the available documents and their status.",[12,28869,28870],{},[40,28871],{"id":7699},[79,28873,28875],{"id":28874},"how-do-i-enable-domotica-planning","How do I enable Domotica planning?",[12,28877,28878,28879,28881],{},"Open the project metadata and select the appropriate building automation profile, such as KNX. Profiles determine which devices and connection types are offered. The ",[15,28880,7040],{}," area appears when access is enabled. If it is absent, this feature is unavailable for that project or account; selecting a profile does not grant access by itself.",[12,28883,28884,28885,28888],{},"Switching between active system profiles preserves existing assignments. Confirming ",[15,28886,28887],{},"No building automation",", however, removes the logical Domotica planning document and its automation assignments; placed floor-plan devices remain. Review the confirmation before removing the profile and check retained devices and connections after a change. Unknown manufacturer values remain unknown and must be checked against the actual product.",[12,28890,28891,28894],{},[40,28892],{"id":28893},"devices",[40,28895],{"id":7822},[79,28897,28899],{"id":28898},"how-do-i-document-push-buttons-and-their-keys","How do I document push buttons and their keys?",[12,28901,28902,28903,28905,28906,28909,28910,28912,28913,28916],{},"Place devices from ",[15,28904,6769],{}," on the floor plan. Select a device and use ",[15,28907,28908],{},"Configure control point",". Choose the actual ",[15,28911,10584],{}," and check the ",[15,28914,28915],{},"Voltage class",". The voltage class is a planning input, not electrical evidence.",[12,28918,16258,28919,28922,28923,28926],{},[15,28920,28921],{},"Key \u002F input assignments"," to associate documented keys with channels. One control point can operate several channels, and several control points can share a channel. A channel assignment without a key index remains valid but appears as ",[15,28924,28925],{},"Key not documented"," in the function list. RF\u002FIP is shown as a wireless control connection and does not create a physical cable route.",[12,28928,28929,28931],{},[40,28930],{"id":7761},[40,28932],{"id":7861},[1489,28934],{":height":13817,":width":28935,"alt":28936,"caption":28937,"src":28938},"952","Channel matrix with one CH1 card for a ceiling light and push-button input, room and protection device, and an empty terminal field.","The card documents CH1 with its ceiling light, push-button input, room and protection device; the empty terminal field remains visible as an open planning value.","\u002Fhelp\u002Fworkflows\u002Fen-domotica-channels.png",[79,28940,28942],{"id":28941},"how-do-i-create-a-cabinet-door-channel-sheet","How do I create a cabinet-door channel sheet?",[12,28944,28945,28946,28948],{},"Place suitable modules in the cabinet and add their channels. The channel matrix in ",[15,28947,7040],{}," links each channel to its loads and control points. Use understandable channel names and add notes where needed. Multiple loads and control points are retained in full; their logical association does not replace a protection path or a documented cable route.",[12,28950,4361,28951,28953],{},[15,28952,6169],{}," uses the same data and ordering. It lists board, module, channel, load, room, protection, terminal, control point and note. Select the board in the export area and sort by module, protection device, room or terminal. The A4 landscape PDF is the cabinet-door sheet; CSV supports further editing. Blank fields indicate missing planning information, not confirmation that an item is unnecessary.",[12,28955,28956],{},[40,28957],{"id":28958},"schema",[79,28960,28962],{"id":28961},"how-are-lines-and-terminals-included","How are lines and terminals included?",[12,28964,5777,28965,28967],{},[15,28966,6912],{},", assign modules and control points to planned bus lines and document their power supplies and, where applicable, couplers. Known bus currents and unknown contributions are shown separately. The topology diagram represents these logical relationships; its connectors are not measured bus cable routes.",[12,28969,3361,28970,28972],{},[15,28971,6180],{},", select a board and maintain strips, terminal numbers, types, destinations and manual bridges. Prefilling requires an explicit action. Existing terminals remain the source for both matrix and export; PDF rows do not write numbering back into the project. This is not an individual conductor wiring diagram.",[12,28974,28975],{},[40,28976],{"id":21783},[1489,28978],{":height":28979,":width":28935,"alt":28980,"caption":28981,"src":28982},"141","Domotica export options for board, sorting, version and draft or final status.","These controls define the Domotica export scope and status; they do not confirm complete document data or a passed check.","\u002Fhelp\u002Fworkflows\u002Fen-domotica-export.png",[79,28984,28986],{"id":28985},"what-is-included-in-the-domotica-handover-dossier","What is included in the Domotica handover dossier?",[12,28988,28989,28990,28992,28993,28995],{},"Open the export area and its ",[15,28991,7040],{}," section. Select board, sorting, version and status. Each document card offers a preview and PDF; channel and terminal plans also offer CSV, and topology offers SVG. ",[15,28994,7044],{}," combines all six document types after a cover page.",[138,28997,28998,29007],{},[141,28999,29000],{},[144,29001,29002,29004],{},[147,29003,5258],{},[147,29005,29006],{},"Content and limitation",[163,29008,29009,29016,29023,29030,29037,29044],{},[144,29010,29011,29013],{},[168,29012,6169],{},[168,29014,29015],{},"All channel assignments for the selected boards, A4 landscape",[144,29017,29018,29020],{},[168,29019,6180],{},[168,29021,29022],{},"Documented terminals, destinations and bridges, A4 landscape",[144,29024,29025,29027],{},[168,29026,6191],{},[168,29028,29029],{},"Keys and assigned loads in plain language; planned functions, not verified programming",[144,29031,29032,29034],{},[168,29033,8107],{},[168,29035,29036],{},"Logical lines of the whole project, also as a complete SVG; large PDF diagrams use overlapping pages",[144,29038,29039,29041],{},[168,29040,8115],{},[168,29042,29043],{},"Counts of modules, supplies, control points and existing signal cable segments; no prices or estimated metres",[144,29045,29046,29048],{},[168,29047,8123],{},[168,29049,29050],{},"Existing self-check findings and check limitations; a missing check run is explicitly identified",[12,29052,29053],{},"Board selection limits channel, terminal and function plans. Topology, quantities and the conformity report always cover the entire project. Functions are grouped by the control point’s room; their loads may be elsewhere.",[12,29055,29056],{},[40,29057],{"id":29058},"readiness",[79,29060,29062],{"id":29061},"when-can-i-select-final","When can I select FINAL?",[12,29064,29065,29068,29069,29072,29073,29075],{},[15,29066,29067],{},"DRAFT"," remains available when planning data exists and appears as a watermark on every PDF page and in SVG. CSV starts with a status and metadata row. ",[15,29070,29071],{},"FINAL"," requires the existing export readiness conditions to be met. The interface lists open items and offers ",[15,29074,8137],{},". Later planning changes can block final export again.",[12,29077,29078],{},"The Domotica self-check distinguishes findings, missing inputs and checks that were explicitly not performed. Unknown loads or channel ratings do not constitute a passed check. Even a final document is not an official certificate of conformity.",[79,29080,29082],{"id":29081},"what-do-version-date-and-hash-mean","What do version, date and hash mean?",[12,29084,29085,29088],{},[15,29086,29087],{},"Version"," is a freely chosen document label, initially A. PDF metadata contains project, board scope, version, creation time and a SHA-256 data hash; the dossier also displays these on its cover. Version, time, status and hash appear on every PDF page. Data and language are captured at the start. Changing planning data or export options invalidates an open preview.",[12,29090,29091],{},"The hash identifies the export inputs and options. It is not a signature, a hash of the finished PDF or confirmation of archival storage. Keep the actual document issued for handover.",[12,29093,29094],{},[40,29095],{"id":8359},[79,29097,29099],{"id":29098},"how-do-i-prepare-the-ets-import","How do I prepare the ETS import?",[12,29101,29102,29103,29105,29106,29108,29109,6975,29111,29113],{},"In the Domotica tab, open the ",[15,29104,7152],{}," view and choose the group address scheme: ",[15,29107,7232],{}," (default, e.g. 1\u002F1\u002F1 = lighting, ground floor, first object) or ",[15,29110,7236],{},[15,29112,7160],{}," assigns in one undoable step:",[84,29115,29116,29119,29122],{},[87,29117,29118],{},"physical addresses per KNX line from area and line: line coupler x.y.0, actuators from x.y.1 in cabinet order, then bus control points by room; power supplies get no address,",[87,29120,29121],{},"three-level group addresses with a datapoint type per channel: switching and status 1.001, dimming 3.007 and 5.001, blinds 1.008, 1.007 and 5.001, heating 9.001, 5.001 and 20.102,",[87,29123,29124,29125,7941],{},"one group address (17.001) per scene and one per central function from the ",[15,29126,7006],{},[12,29128,29129],{},"You can overwrite any address. An overwritten address, or one locked with the padlock, is kept by every further proposal. The self-check reports duplicate addresses as a conflict.",[12,29131,5777,29132,29134,29135,29134,29137,29139,29140,29143],{},[15,29133,4665],{}," › ",[15,29136,7040],{},[15,29138,7351],{},", download the group addresses as CSV (ETS format \"3\u002F1\" with main, middle and sub group) or XML and import them in ETS with ",[15,29141,29142],{},"Import group addresses",". The physical address list as CSV helps when adding and programming the devices. Check the imported addresses in ETS; devices, parameters and links to communication objects are created there.",[12,29145,29146],{},[40,29147],{"id":3425},[79,29149,29151],{"id":29150},"what-remains-outside-this-documentation","What remains outside this documentation?",[12,29153,29154],{},"PlanElec proposes KNX addresses and exports group addresses for the ETS import, but it does not create an ETS project file, select product database entries, link communication objects or program devices. Logical lines, key assignments, bus budgets and terminal plans do not prove actual programming, bus diagnostics, insulation or manufacturer compatibility. The quantities list does not order products. The self-check report states its limited scope; professional assessment of the real installation remains necessary.",[79,29156,8517],{"id":8516},[84,29158,29159,29164,29168,29172,29176],{},[87,29160,29161],{},[40,29162,29163],{"href":6121},"Plan and document a smart home installation",[87,29165,29166],{},[40,29167,8528],{"href":4175},[87,29169,29170],{},[40,29171,16745],{"href":16744},[87,29173,29174],{},[40,29175,4646],{"href":4645},[87,29177,29178],{},[40,29179,29180],{"href":1085},"What the AREI self-check verifies",{"title":2044,"searchDepth":2045,"depth":2045,"links":29182},[29183,29184,29185,29186,29187,29188,29189,29190,29191,29192,29193],{"id":28800,"depth":2045,"text":28801},{"id":28874,"depth":2045,"text":28875},{"id":28898,"depth":2045,"text":28899},{"id":28941,"depth":2045,"text":28942},{"id":28961,"depth":2045,"text":28962},{"id":28985,"depth":2045,"text":28986},{"id":29061,"depth":2045,"text":29062},{"id":29081,"depth":2045,"text":29082},{"id":29098,"depth":2045,"text":29099},{"id":29150,"depth":2045,"text":29151},{"id":8516,"depth":2045,"text":8517},"Assign two lights and two push buttons, document the power supply and bus line, and export an initial material list with an illustrated example.","knx-planning-documentation",{},8,"\u002Fhelp\u002Fknx-planning-documentation.en",{"title":6127,"description":29194},"plan-and-document-knx","help\u002Fknx-planning-documentation.en",[6280,26417,29203,26421,5269,21783,4261],"push button","2026-11-03","p0FPe1qTb4CjUblYK-AYqB2lzhA6rcy9veRNm7M2MQI","\u002Fhelp\u002Fplan-and-document-knx",[],{"id":29209,"title":29210,"articleId":29211,"body":29212,"category":4239,"date":30485,"description":30486,"extension":2113,"image":29226,"labels":30487,"lastUpdated":10988,"locale":2119,"meta":30489,"navigation":2121,"ogImage":30490,"path":30491,"publishDate":30485,"readTime":30492,"refreshInterval":4248,"seo":30493,"seoTitle":30494,"slug":30495,"stem":30496,"tags":30497,"__hash__":30502,"kind":2137,"href":30503},"blog\u002Fblog\u002Fbill-of-materials-electrical.en.md","Bill of materials for an electrical installation: which items belong on it?","bill-of-materials-electrical",{"type":9,"value":29213,"toc":30467},[29214,29218,29221,29227,29393,29396,29406,29410,29427,29437,29440,29444,29450,29460,29578,29592,29596,29599,29736,29739,29748,29752,29755,29885,29888,29915,29921,29925,29928,29931,29970,29976,29980,29987,29990,30020,30028,30032,30038,30041,30074,30085,30089,30092,30095,30098,30113,30122,30126,30186,30190,30193,30199,30203,30216,30234,30237,30241,30258,30261,30298,30305,30316,30340,30346,30382,30389,30393,30400,30428,30430,30456,30462],[79,29215,29217],{"id":29216},"which-items-belong-on-the-bill-of-materials-for-an-electrical-installation","Which items belong on the bill of materials for an electrical installation?",[12,29219,29220],{},"Seven groups: distribution board, protective devices, cables, boxes, switches and sockets, earthing, small material. A list is not complete because all seven headings appear on it, but because every item has a traceable origin — a count from the plan, a rule from the AREI, or an explicitly stated assumption of your own business. Without that origin the quantity cannot be checked, and by the next revision of the plan it can no longer be corrected either.",[12,29222,29223],{},[74,29224],{"alt":29225,"src":29226},"Electricians sort installation materials on a workbench.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-bill-of-materials-electrical-editorial.webp",[138,29228,29229,29245],{},[141,29230,29231],{},[144,29232,29233,29236,29239,29242],{},[147,29234,29235],{},"Item group",[147,29237,29238],{},"Typical individual items",[147,29240,29241],{},"Quantity derives from",[147,29243,29244],{},"Regulatory anchor",[163,29246,29247,29265,29287,29304,29325,29344,29372],{},[144,29248,29249,29251,29254,29257],{},[168,29250,3115],{},[168,29252,29253],{},"Enclosure with back panel and door, rows and DIN rails, cover plates, busbars, end caps, feed terminals, labelling",[168,29255,29256],{},"Module count per row, separation by energy tariff",[168,29258,29259,1774,29262],{},[63,29260,29261],{},"5.3.5.1 points a and c",[63,29263,29264],{},"3.1.3.1",[144,29266,29267,29270,29273,29276],{},[168,29268,29269],{},"Protective devices",[168,29271,29272],{},"Main isolating switch, residual current devices 300 mA and 30 mA, circuit breakers, surge protective device where applicable",[168,29274,29275],{},"Number of final circuits and their allocation to the RCD groups",[168,29277,29278,1774,29281,1774,29284],{},[63,29279,29280],{},"5.3.5.1 point b",[63,29282,29283],{},"4.2.4.3 point b",[63,29285,29286],{},"5.2.1.2",[144,29288,29289,29291,29294,29297],{},[168,29290,23131],{},[168,29292,29293],{},"Cable per type, core count and cross-section in metres; conduit, pre-wired conduit, buried cable",[168,29295,29296],{},"Cable route per circuit plus allowance",[168,29298,29299,1774,29302],{},[63,29300,29301],{},"3.1.2.2 point a",[63,29303,29286],{},[144,29305,29306,29309,29312,29315],{},[168,29307,29308],{},"Boxes",[168,29310,29311],{},"Junction and branch boxes, flush or hollow-wall device boxes, ceiling and wall outlet boxes, draw boxes",[168,29313,29314],{},"Number of devices plus number of branch points",[168,29316,29317,1774,29319,1774,29322],{},[63,29318,29301],{},[63,29320,29321],{},"5.2.6.1",[63,29323,29324],{},"5.3.5.2 point a",[144,29326,29327,29330,29333,29336],{},[168,29328,29329],{},"Switches and sockets",[168,29331,29332],{},"Inserts, rockers and covers, frames per combination, damp-location variants with gasket",[168,29334,29335],{},"Number of control points and sockets from the situation plan",[168,29337,29338,1774,29341],{},[63,29339,29340],{},"3.1.2.3 point a",[63,29342,29343],{},"5.3.5.2 points a and b",[144,29345,29346,29349,29352,29355],{},[168,29347,29348],{},"Earthing",[168,29350,29351],{},"Earth loop, earthing conductor, earth disconnecting link, main equipotential bonding conductor, supplementary bonding conductors, terminals",[168,29353,29354],{},"Building perimeter, number of extraneous conductive parts, bathrooms",[168,29356,29357,1774,29360,1774,29363,1774,29366,1774,29369],{},[63,29358,29359],{},"5.4.2.1",[63,29361,29362],{},"5.4.2.2",[63,29364,29365],{},"5.4.3.5",[63,29367,29368],{},"5.4.4.1",[63,29370,29371],{},"5.4.4.2",[144,29373,29374,29377,29380,29383],{},[168,29375,29376],{},"Small material",[168,29378,29379],{},"Fixings and clips, terminals, strain reliefs, box lids, labelling material, gaskets",[168,29381,29382],{},"Ratio per item — company convention",[168,29384,29385,1774,29388,1774,29391],{},[63,29386,29387],{},"5.2.9.5",[63,29389,29390],{},"5.2.6.2 point b",[63,29392,29264],{},[12,29394,29395],{},"The last row is marked differently on purpose: for small material the AREI states no quantities. It states conditions from which the items follow — more on that below.",[12,29397,29398,29399,3157,29403,56],{},"This article deliberately contains no prices: a price range without a named source and date is wrong within a quarter and gets quoted onward regardless. For how to make quotations comparable, see ",[40,29400,29402],{"href":29401},"\u002Fen\u002Fblog\u002Felectrical-plan-costs","How much does an electrical plan cost?",[40,29404,29405],{"href":5547},"Cost comparison: drawing it yourself versus hiring an electrician",[79,29407,29409],{"id":29408},"is-a-bill-of-materials-required-by-the-arei","Is a bill of materials required by the AREI?",[12,29411,29412,29413,29416,29417,29420,29421,17017,29424,56],{},"No. The AREI knows the material list only as a ",[15,29414,29415],{},"permitted annex"," to the file: schematics, plans and documents \"may be supplemented by documents describing the various characteristics of the electrical equipment and\u002For products in more detail\" (",[63,29418,29419],{},"sub-section 3.1.2.1 point c","). The verb is ",[63,29422,29423],{},"may",[63,29425,29426],{},"shall",[12,29428,29429,29430,29433,29434,1487],{},"Mandatory for a new domestic installation are the single-line diagram and the situation plan, drawn up by the person responsible for carrying out the work (",[63,29431,29432],{},"sub-section 3.1.2.1 point a","). If you attach the material list as an annex, it shares the regime of annexes: it is kept up to date and held on site at the disposal of anyone authorised to supervise, inspect, maintain, repair or modify the installation (",[63,29435,29436],{},"sub-section 3.1.2.1 point d",[12,29438,29439],{},"Practical consequence: the material list is a tool for costing and procurement, not an inspection document. The inspector does not flag its absence. What they do flag is material in the installation that does not belong there — and that is exactly what a clean list prevents, because it fixes the selection up front.",[79,29441,29443],{"id":29442},"which-data-must-the-plan-carry-for-the-quantities-to-be-right","Which data must the plan carry for the quantities to be right?",[12,29445,29446,29447,29449],{},"The single-line diagram supplies almost the entire item list, but not the most important quantity. ",[63,29448,25944],{}," requires at minimum: type, cross-section and number of conductors of every cable, the installation method, type and characteristics of the residual current protective devices, type and characteristics of the overcurrent protective devices, the switches, the junction boxes, the branch boxes, the socket outlets, the lighting points, the fixed machines and appliances, and the sources.",[12,29451,29452,29453,29456,29457,29459],{},"That is a remarkably complete enumeration — and it contains ",[15,29454,29455],{},"no length",". The length of the cables is required only for non-domestic installations (",[63,29458,26713],{},"). In housing, therefore, the decisive input for the cable quantity appears in no mandatory document at all.",[138,29461,29462,29475],{},[141,29463,29464],{},[144,29465,29466,29469,29472],{},[147,29467,29468],{},"Quantity on the list",[147,29470,29471],{},"Input value",[147,29473,29474],{},"In a mandatory document?",[163,29476,29477,29492,29506,29518,29530,29542,29557,29568],{},[144,29478,29479,29482,29485],{},[168,29480,29481],{},"Number of sockets",[168,29483,29484],{},"Socket outlets on the diagram and the situation plan",[168,29486,29487,29488,1774,29490,3317],{},"yes (",[63,29489,25493],{},[63,29491,25499],{},[144,29493,29494,29497,29500],{},[168,29495,29496],{},"Number of switches",[168,29498,29499],{},"Switches on the diagram, their location on the plan",[168,29501,29487,29502,1774,29504,3317],{},[63,29503,25493],{},[63,29505,25499],{},[144,29507,29508,29511,29514],{},[168,29509,29510],{},"Number of boxes",[168,29512,29513],{},"Junction and branch boxes on the diagram",[168,29515,29487,29516,3317],{},[63,29517,25493],{},[144,29519,29520,29523,29526],{},[168,29521,29522],{},"Number of circuit breakers",[168,29524,29525],{},"Number of final circuits",[168,29527,29487,29528,3317],{},[63,29529,25493],{},[144,29531,29532,29535,29538],{},[168,29533,29534],{},"Cable type and cross-section",[168,29536,29537],{},"Type, cross-section, core count per cable",[168,29539,29487,29540,3317],{},[63,29541,25493],{},[144,29543,29544,29549,29552],{},[168,29545,29546],{},[15,29547,29548],{},"Cable length in metres",[168,29550,29551],{},"Route along walls, installation zones and storeys",[168,29553,29554],{},[15,29555,29556],{},"no — only for non-domestic installations",[144,29558,29559,29562,29565],{},[168,29560,29561],{},"Earthing material",[168,29563,29564],{},"Building perimeter, number of extraneous conductive parts",[168,29566,29567],{},"no — follows from chapter 5.4, not from the diagram",[144,29569,29570,29572,29575],{},[168,29571,29376],{},[168,29573,29574],{},"Installation method, fixing spacing, connection method",[168,29576,29577],{},"no — company convention",[12,29579,29580,29581,29584,29585,29588,29589,56],{},"The situation plan carries the ",[15,29582,29583],{},"location"," of that same equipment, not its count or its length (",[63,29586,29587],{},"sub-section 3.1.2.3 point a","). The cable quantity only emerges once a route has been drawn; the method is set out in ",[40,29590,29591],{"href":4206},"Cable routes and cable lengths",[79,29593,29595],{"id":29594},"how-many-protective-devices-do-i-need-and-where-does-the-number-come-from","How many protective devices do I need — and where does the number come from?",[12,29597,29598],{},"Not from experience, but from four rules that jointly fix the module count in the board. This is the part of the bill of materials that the AREI drives most directly.",[138,29600,29601,29612],{},[141,29602,29603],{},[144,29604,29605,29607,29609],{},[147,29606,8217],{},[147,29608,3919],{},[147,29610,29611],{},"Effect on quantity",[163,29613,29614,29626,29638,29650,29666,29682,29698,29710,29723],{},[144,29615,29616,29619,29623],{},[168,29617,29618],{},"Main board fitted with a main isolating switch; in domestic installations not below 40 A",[168,29620,29621],{},[63,29622,29280],{},[168,29624,29625],{},"1 item, rated current not below 40 A",[144,29627,29628,29631,29635],{},[168,29629,29630],{},"At the origin of the installation at least one RCD of at most 300 mA, providing isolation",[168,29632,29633],{},[63,29634,29283],{},[168,29636,29637],{},"at least 1 item at 300 mA",[144,29639,29640,29643,29647],{},[168,29641,29642],{},"Immediately downstream at least one high or very high sensitivity device, to which sockets, lighting, the bathroom, washing machine, tumble dryer and dishwasher are connected",[168,29644,29645],{},[63,29646,29283],{},[168,29648,29649],{},"at least 1 item at 30 mA",[144,29651,29652,29659,29663],{},[168,29653,29654,29655,29658],{},"At most ",[15,29656,29657],{},"eight final circuits"," per such RCD",[168,29660,29661],{},[63,29662,29283],{},[168,29664,29665],{},"from the ninth affected circuit onward, a further 30 mA device",[144,29667,29668,29674,29679],{},[168,29669,29654,29670,29673],{},[15,29671,29672],{},"eight socket outlets"," per final circuit",[168,29675,29676],{},[63,29677,29678],{},"5.3.5.2 point b",[168,29680,29681],{},"from the ninth socket onward, another circuit with breaker and cable",[144,29683,29684,29691,29695],{},[168,29685,29686,29687,29690],{},"At least ",[15,29688,29689],{},"two separate lighting circuits"," in dwellings with more than two rooms or areas",[168,29692,29693],{},[63,29694,29678],{},[168,29696,29697],{},"minimum 2 lighting circuits",[144,29699,29700,29703,29707],{},[168,29701,29702],{},"A separate circuit per appliance with a fixed location rated 2600 W or more, and for washing machine, dishwasher, tumble dryer, electric cooker, hob and oven",[168,29704,29705],{},[63,29706,29286],{},[168,29708,29709],{},"1 circuit, 1 protective device and 1 cable per named appliance",[144,29711,29712,29715,29720],{},[168,29713,29714],{},"RCDs in domestic installations at least type A; at the origin of the installation a rated current of at least 40 A",[168,29716,29717],{},[63,29718,29719],{},"5.3.5.3 point a",[168,29721,29722],{},"rules out type AC and sets a floor on the frame size",[144,29724,29725,29728,29733],{},[168,29726,29727],{},"Protective and control devices on different energy tariffs grouped on separate panels at least 10 cm apart, or in separate boards",[168,29729,29730],{},[63,29731,29732],{},"5.3.5.1 point c",[168,29734,29735],{},"enlarges the enclosure or forces a second one",[12,29737,29738],{},"This chain explains why a bill of materials built from a room count is almost always too short: the number of sockets determines not only the socket items but, through the rule of eight, also the number of circuits, hence the number of breakers, the number of cables, and ultimately the size of the enclosure.",[12,29740,29741,29742,29745,29746,56],{},"Which appliances need their own circuit is covered in ",[40,29743,29744],{"href":3707},"Appliances that require a dedicated circuit","; the board layout itself in ",[40,29747,27020],{"href":4200},[79,29749,29751],{"id":29750},"which-earthing-material-is-routinely-forgotten","Which earthing material is routinely forgotten?",[12,29753,29754],{},"Most of it. Earthing appears on the single-line diagram as one symbol, but on the bill of materials as six to ten items with prescribed minimum cross-sections. Those cross-sections are figures from the regulation, not from a catalogue.",[138,29756,29757,29768],{},[141,29758,29759],{},[144,29760,29761,29763,29766],{},[147,29762,18799],{},[147,29764,29765],{},"Prescribed minimum",[147,29767,3919],{},[163,29769,29770,29783,29796,29809,29822,29835,29847,29859,29872],{},[144,29771,29772,29775,29778],{},[168,29773,29774],{},"Foundation earth loop",[168,29776,29777],{},"at least 35 mm² geometric cross-section, solid conductor or seven stranded cores, without welds",[168,29779,29780],{},[63,29781,29782],{},"5.4.2.1 points b.1.3 and b.1.2",[144,29784,29785,29788,29791],{},[168,29786,29787],{},"Metal of the earth loop",[168,29789,29790],{},"solid conductor: bare annealed electrolytic copper or lead-coated copper; 7-strand conductor: semi-rigid copper",[168,29792,29793],{},[63,29794,29795],{},"5.4.2.1 point b.1.4",[144,29797,29798,29801,29804],{},[168,29799,29800],{},"Fixing of the earth loop",[168,29802,29803],{},"copper only, or materials that cause no corrosion",[168,29805,29806],{},[63,29807,29808],{},"5.4.2.1 point b.1.5",[144,29810,29811,29814,29817],{},[168,29812,29813],{},"Supplementary electrode, horizontally laid",[168,29815,29816],{},"at least 35 mm², buried at least 0.80 m deep, minimum length 15 m",[168,29818,29819],{},[63,29820,29821],{},"5.4.2.1 point b.3",[144,29823,29824,29827,29830],{},[168,29825,29826],{},"Supplementary electrode, rod or pin",[168,29828,29829],{},"minimum length 1.50 m, of which at least 1.50 m driven below the −0.60 m level",[168,29831,29832],{},[63,29833,29834],{},"5.4.2.1 point b.4.1",[144,29836,29837,29840,29843],{},[168,29838,29839],{},"Earthing conductor",[168,29841,29842],{},"16 mm² copper with corrosion-protective coating, otherwise 25 mm² copper, 50 mm² for aluminium or steel",[168,29844,29845],{},[63,29846,29362],{},[144,29848,29849,29852,29855],{},[168,29850,29851],{},"Earth disconnecting link",[168,29853,29854],{},"a disconnecting device removable only with a tool",[168,29856,29857],{},[63,29858,29365],{},[144,29860,29861,29864,29867],{},[168,29862,29863],{},"Main equipotential bonding conductor",[168,29865,29866],{},"half the cross-section of the largest protective conductor, minimum 6 mm² copper, may be capped at 25 mm²",[168,29868,29869],{},[63,29870,29871],{},"5.4.4.1 point a",[144,29873,29874,29877,29880],{},[168,29875,29876],{},"Supplementary bonding conductors",[168,29878,29879],{},"at least 2.5 mm² if mechanically protected, 4 mm² if not",[168,29881,29882],{},[63,29883,29884],{},"5.4.4.2 point a",[12,29886,29887],{},"Three points that go missing in estimates:",[84,29889,29890,29900,29909],{},[87,29891,29892,29895,29896,29899],{},[15,29893,29894],{},"The earth loop is site material, not electrical material."," It is required for every new building whose foundation trench bottom reaches at least 60 cm (",[63,29897,29898],{},"5.4.2.1 point b.1.1","), and it is laid long before anyone thinks about sockets. Drawing up the electrical bill of materials after the shell is complete structurally puts this item out of view.",[87,29901,29902,17825,29905,29908],{},[15,29903,29904],{},"The ends remain accessible for inspection",[63,29906,29907],{},"5.4.2.1 point b.1.6","). That is an execution requirement with a material consequence: pit, cover, marking.",[87,29910,29911,29914],{},[15,29912,29913],{},"Main equipotential bonding is not a single terminal",", but one conductor per extraneous conductive part — water, gas, heating — with a clamp on the pipe concerned. The quantity follows from the building services, not from the electrical plan.",[12,29916,29917,29918,56],{},"Which earthing system applies is covered in ",[40,29919,29920],{"href":27030},"Earthing TT or TN-S",[79,29922,29924],{"id":29923},"why-are-junction-boxes-and-device-boxes-so-often-missing-from-the-list","Why are junction boxes and device boxes so often missing from the list?",[12,29926,29927],{},"Because mentally they belong to the cable and in the catalogue to the accessories — whereas the AREI names them explicitly as elements in their own right.",[12,29929,29930],{},"Four rules make them unavoidable:",[84,29932,29933,29943,29952,29961],{},[87,29934,29935,29938,29939,29942],{},[15,29936,29937],{},"Connections may only be made in specific places:"," in distribution and switchgear assemblies, in junction or branch boxes, at the terminals of switches or socket outlets, or in sufficiently large ceiling boxes from which luminaires are suspended (",[63,29940,29941],{},"sub-section 5.2.6.1","). Every branch on the plan is therefore a material item.",[87,29944,29945,17825,29948,29951],{},[15,29946,29947],{},"Connections inside conduit are prohibited",[63,29949,29950],{},"sub-section 5.2.9.3 point f","). A route drawn without a box is a non-compliant execution.",[87,29953,29954,17825,29957,29960],{},[15,29955,29956],{},"In junction, branch and draw boxes the conductors remain accessible; tees and elbows are prohibited",[63,29958,29959],{},"sub-section 5.2.9.3 point i.2","). This rules out the smallest possible box and feeds through to the frame size, hence the price.",[87,29962,29963,17825,29966,29969],{},[15,29964,29965],{},"Socket outlets built into walls are housed in metal boxes or in boxes of insulating material",[63,29967,29968],{},"sub-section 5.3.5.2 point a","). The device box is therefore not optional but mandatory material — one per flush point, and a different type in a hollow wall than in masonry.",[12,29971,29972,29973,29975],{},"On top of that, junction and branch boxes are part of the mandatory content of the single-line diagram (",[63,29974,26772],{},"). A diagram without them is incomplete — and so is a bill of materials derived from such a diagram.",[79,29977,29979],{"id":29978},"how-much-cable-allowance-should-i-include","How much cable allowance should I include?",[12,29981,29982,29983,29986],{},"On the ",[15,29984,29985],{},"size"," of an allowance the AREI says nothing — no percentage, no reserve length, no waste factor. Any figure you use is a convention of your own business and belongs in the calculation sheet as such.",[12,29988,29989],{},"What the regulation does fix are the conditions from which an allowance follows:",[84,29991,29992,29998,30004,30014],{},[87,29993,29994,29995,1487],{},"Connections at appliances must not be subjected to tensile or torsional forces (",[63,29996,29997],{},"sub-section 5.2.6.2 point b",[87,29999,30000,30001,1487],{},"In vertical runs, tensile forces from the cable's own weight must not act on the connection terminals (",[63,30002,30003],{},"sub-section 5.2.9.5",[87,30005,30006,30007,30010,30011,1487],{},"In conduit it must be possible ",[15,30008,30009],{},"at all times"," to draw in or remove conductors or cables (",[63,30012,30013],{},"sub-section 5.2.9.3 point e",[87,30015,30016,30017,30019],{},"In boxes the conductors remain accessible (",[63,30018,29959],{},"), which does not work without a loop inside the enclosure.",[12,30021,30022,30023,30025,30026,56],{},"The allowance is therefore not a safety cushion on an uncertain calculation, but a material item with a purpose. If you apply it as a flat percentage, document the percentage, its origin and the revision it applies to. Deriving the base length is covered in ",[40,30024,29591],{"href":4206},"; which accompanying material each installation method brings with it in ",[40,30027,3814],{"href":3813},[79,30029,30031],{"id":30030},"how-many-spare-ways-belong-in-the-distribution-board","How many spare ways belong in the distribution board?",[12,30033,30034,30035,30037],{},"The AREI prescribes ",[15,30036,602],{}," spare ways. A full-text sweep of the nine parts in the Dutch, French and German versions returns no passage naming a number of free modules, a percentage or a minimum reserve. Anyone quoting a figure is quoting a company convention — which is legitimate, as long as it is said that way.",[12,30039,30040],{},"What the regulation does require instead, and what points in practice in the same direction:",[84,30042,30043,30052,30058,30063,30068],{},[87,30044,30045,30046,30049,30050,1487],{},"Circuits are arranged so that they can later be identified during supervision, inspection, maintenance, repair, ",[15,30047,30048],{},"modification or extension"," of the installation (",[63,30051,3975],{},[87,30053,30054,30055,30057],{},"Control, protective and isolating devices are individually marked clearly, conspicuously and indelibly (",[63,30056,3975],{},"). Labelling material is therefore an item, not a courtesy.",[87,30059,30060,30061,1487],{},"Circuits connected upstream of the board's main switch must be identified as such (",[63,30062,3975],{},[87,30064,30065,30066,1487],{},"Every modification or extension is shown on the situation plan, which reflects the existing state at any moment (",[63,30067,29432],{},[87,30069,30070,30071,1487],{},"Equipment in the board remains easily accessible, in domestic installations without special means (",[63,30072,30073],{},"sub-section 5.3.5.1 point c",[12,30075,30076,30077,30080,30081,30084],{},"And one enclosure rule that is overlooked more often than spare ways: in domestic installations, distribution and switchgear assemblies are class I or II, ",[15,30078,30079],{},"with a back panel and a door",", made of non-combustible and non-hygroscopic material; the back panel must remain non-removable for the entire service life of the equipment (",[63,30082,30083],{},"sub-section 5.3.5.1 point a","). Door and back panel are therefore not an equipment option.",[79,30086,30088],{"id":30087},"where-is-the-boundary-between-material-cost-and-labour-cost","Where is the boundary between material cost and labour cost?",[12,30090,30091],{},"At the question of whether the quantity follows from the plan or from the execution.",[12,30093,30094],{},"Material cost follows from piece counts and metres and can be derived from the model. Labour cost follows from routes, substrates, accessibility and sequencing — quantities that appear neither on the single-line diagram nor on the situation plan. The same socket costs the same material whether it goes into a hollow wall or into concrete; the effort differs by a wide margin.",[12,30096,30097],{},"In practice, for estimating:",[84,30099,30100,30107,30110],{},[87,30101,30102,30103,30106],{},"A bill of materials is ",[15,30104,30105],{},"not half a quotation",". It is the half that can be checked.",[87,30108,30109],{},"Items that touch both — chases, penetrations, core drilling, scaffolding — belong explicitly on the labour side, otherwise they appear nowhere.",[87,30111,30112],{},"The installation method decides both sides at once: it determines which accompanying material is needed and how labour-intensive the execution becomes.",[12,30114,30115,30116,3157,30118,30121],{},"How to show both sides separately in a quotation is explained in ",[40,30117,29402],{"href":29401},[40,30119,30120],{"href":5547},"Cost comparison: yourself or an electrician",". Prices age, the method does not.",[79,30123,30125],{"id":30124},"which-estimating-mistakes-make-the-list-unusable","Which estimating mistakes make the list unusable?",[84,30127,30128,30139,30145,30151,30157,30168,30174,30180],{},[87,30129,30130,30133,30134,1774,30136,30138],{},[15,30131,30132],{},"Counted per room instead of per circuit."," The rules of eight — sockets per circuit and final circuits per RCD (",[63,30135,29678],{},[63,30137,29283],{},") — generate items that appear in no room-by-room list.",[87,30140,30141,30144],{},[15,30142,30143],{},"Straight-line distance instead of cable route."," Indoors the straight line sits systematically well below the real route; it is not an estimate but a lower bound.",[87,30146,30147,30150],{},[15,30148,30149],{},"Net lengths used without an allowance."," The allowance exists for the four reasons above, not out of caution.",[87,30152,30153,30156],{},[15,30154,30155],{},"Earthing material forgotten",", because it is one symbol on the diagram and a shell-construction topic on the schedule.",[87,30158,30159,30162,30163,30165,30166,1487],{},[15,30160,30161],{},"Device boxes and branch boxes treated as accessories",", although they are mandatory diagram content (",[63,30164,29301],{},") and compulsory in masonry (",[63,30167,29324],{},[87,30169,30170,30173],{},[15,30171,30172],{},"Frames and covers not listed separately."," A triple combination is one frame and three inserts, not three complete devices.",[87,30175,30176,30179],{},[15,30177,30178],{},"A circuit with no drawn cable drops out silently"," and makes the total length too small without any line being missing.",[87,30181,30182,30185],{},[15,30183,30184],{},"Prices carried over from an older revision"," without noting date and source. A quantity without a price is incomplete; a price without a date is wrong.",[79,30187,30189],{"id":30188},"how-is-the-bill-of-materials-produced-in-planelec-and-what-does-it-not-say","How is the bill of materials produced in PlanElec — and what does it not say?",[12,30191,30192],{},"In two stages. PlanElec Sketch counts what is in your drawing. PlanElec Pro, as a pilot feature, additionally derives individual parts and cable metres from the project model. Prices, articles, waste and small material are set by your business in both cases.",[1489,30194],{":height":30195,":width":3800,"alt":30196,"caption":30197,"src":30198},"578","Diagram: from plan to material list. Sketch counts the devices, protective devices and cable types in the drawing, Pro adds parts, enclosure and cable metres as a pilot feature, your business adds prices, waste, small material and the review before ordering.","From plan to material list: Sketch counts the drawing, Pro adds from the model, prices and ordering stay with your business.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fbill-of-materials-electrical\u002Fplan-to-material-list.en.svg",[1041,30200,30202],{"id":30201},"material-list-in-planelec-sketch","Material list in PlanElec Sketch",[12,30204,3361,30205,30208,30209,30211,30212,30215],{},[40,30206,22],{"href":1456,"rel":30207},[1458]," you open the ",[15,30210,11180],{}," tab. It shows the material list and the circuit list of your drawing; ",[15,30213,30214],{},"Export CSV"," takes it with you as a table.",[84,30217,30218,30221,30231],{},[87,30219,30220],{},"Identical devices and protective devices from the single-line diagram are merged and counted, such as sockets, switches, luminaires, RCDs and circuit breakers.",[87,30222,30223,30224,30226,30227,30230],{},"Cables are listed by type, without a quantity. If you enter a ",[15,30225,3160],{}," and optionally an ",[15,30228,30229],{},"Extra on material list"," on the cable, Sketch adds up those metres per cable type. The metres come from your input, not from a drawn cable route.",[87,30232,30233],{},"The supply and the distribution boards do not count as material. You add frames, cover plates, device boxes and board enclosures yourself.",[12,30235,30236],{},"The Sketch list is therefore a counting aid for the protective-device, switch and socket groups. The cable quantity and the mandatory items described above remain your calculation.",[1041,30238,30240],{"id":30239},"material-list-in-planelec-pro-pilot","Material list in PlanElec Pro (pilot)",[12,30242,3361,30243,30245,30246,30248,30249,30251,30252,30255,30256,56],{},[40,30244,31],{"href":1964}," the list is produced in the ",[15,30247,4665],{}," tab. The ",[15,30250,16886],{}," appears there as a separate document; the ",[15,30253,30254],{},"Open material overview"," button shows it in detail, and the PDF and CSV come from the same derivation. The detailed material list is a pilot feature: four reproducible, fictitious pilot dossiers demonstrate the export path, while field validation with real projects is still to come. A drawing started in Sketch moves to Pro with ",[15,30257,1482],{},[12,30259,30260],{},"What the overview contains:",[84,30262,30263,30285,30295],{},[87,30264,30265,30266,1774,30268,1774,30271,1774,30274,1774,30277,1774,30280,1774,30282,56],{},"Items in seven categories: ",[15,30267,8934],{},[15,30269,30270],{},"Equipment and inserts",[15,30272,30273],{},"Covers and frames",[15,30275,30276],{},"Installation material",[15,30278,30279],{},"Protection devices",[15,30281,23131],{},[15,30283,30284],{},"Distribution",[87,30286,30287,30288,3157,30291,30294],{},"Two views: ",[15,30289,30290],{},"By category",[15,30292,30293],{},"By room","; items with no room allocation appear separately so they do not vanish quietly.",[87,30296,30297],{},"A header showing the number of consumers, positions, parts and the cable length.",[12,30299,30300,30301,30304],{},"The overview breaks sockets, switches and selected connections down into manufacturer-neutral individual parts — inserts, covers, frames and installation boxes. Fixed appliances include a connection box, terminal and strain relief; appliance-specific accessories are not included. Enclosures and busbars follow the modelled row and module count. Material and cable items you enter yourself are marked ",[15,30302,30303],{},"Entered manually"," with the entry date and project revision and are never merged with calculated lines.",[12,30306,30307,30308,30311,30312,30315],{},"Six ",[15,30309,30310],{},"base assumptions"," are shown explicitly in the overview rather than acting in the background. The one that matters most for estimating: cable lengths are ",[15,30313,30314],{},"net lengths from the model; waste and installation allowances are not included."," Equally explicit: the device box follows an unambiguously linked wall; otherwise hollow-wall boxes are assumed for rooms containing hollow walls, and flush boxes elsewhere.",[12,30317,30318,30319,30321,30322,3157,30325,11250,30328,30331,30332,30335,30336,30339],{},"You set the allowance from the section above yourself: on the material list card in the ",[15,30320,4665],{}," tab, enter an ",[15,30323,30324],{},"Allowance (%)",[15,30326,30327],{},"Metres per connection",[15,30329,30330],{},"Project cable reserve","; reserves maintained per cable and manual lengths take precedence. The material list PDF and CSV then contain a ",[15,30333,30334],{},"Cable quantities"," section with totals per cable type, room and system, the reserve counted and the source of each length: calculated along the route, estimated without a route or fixed manually. A ",[15,30337,30338],{},"Check list"," names cables without an endpoint, without a determinable length or without a cable type. Your allowance thus stays a documented assumption rather than a hidden number.",[12,30341,30342,30343,30345],{},"What the list deliberately does ",[15,30344,25241],{}," do:",[84,30347,30348,30354,30360,30366],{},[87,30349,30350,30353],{},[15,30351,30352],{},"It quotes no prices and is not an order release."," All items are manufacturer-neutral and must be resolved to concrete articles and professionally verified before ordering.",[87,30355,30356,30359],{},[15,30357,30358],{},"It invents no missing quantities."," A circuit without a cable route appears at 0 m with the note \"Routing missing\" rather than being estimated. A suspiciously lean list usually contains exactly those lines.",[87,30361,30362,30365],{},[15,30363,30364],{},"It adds no earthing material"," that is not in the model. Earth loop, earthing conductor and bonding conductors are model content, not an automatic addition.",[87,30367,30368,30369,30372,30373,1774,30376,3324,30379,30381],{},"For PV installations it takes over the DC side with module, protection and string cable quantities. ",[15,30370,30371],{},"Open DC data"," — missing strings, module types or route lengths — are marked ",[15,30374,30375],{},"Known",[15,30377,30378],{},"Partial",[15,30380,3280],{}," instead of being papered over.",[1489,30383],{":height":30384,":width":30385,"alt":30386,"caption":30387,"src":30388},"894","1143","The ‘Material list’ area in PlanElec Sketch with ‘Export CSV’ and Excel export: RCDs, breakers, appliances and cables; only the cable with a length entered shows ‘15 m’.","The bill of materials follows from the diagram. Metres appear only when a cable has a length (here 12 m plus 3 m reserve); it contains no prices or labour time.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-materials.webp",[79,30390,30392],{"id":30391},"what-the-arei-self-check-does-not-do-here","What the AREI self-check does not do here",[12,30394,30395,30396,30399],{},"The self-check in PlanElec Pro assesses the planned ",[15,30397,30398],{},"installation",", not the completeness of a bill of materials. Specifically:",[84,30401,30402,30409,30416,30422,30425],{},[87,30403,30404,30405,30408],{},"It checks ",[15,30406,30407],{},"no quantities",". There is no rule that reports a missing, under-dimensioned or duplicated item.",[87,30410,30411,30412,30415],{},"For earthing it checks only whether main equipotential bonding and the earth electrode are ",[15,30413,30414],{},"documented"," and whether the earthing system fits — not the cross-section of the installed conductor or the metres of earth loop required.",[87,30417,30404,30418,30421],{},[15,30419,30420],{},"no prices, no availability and no article allocation."," Manufacturer-neutral items stay manufacturer-neutral.",[87,30423,30424],{},"It calculates voltage drop only when the path is complete; if a partial length is missing it reports a data gap instead of a result. For the bill of materials that means the cable quantity can be incomplete without any rule firing.",[87,30426,30427],{},"Measurement and inspection stay with the professional on site and the recognised inspection body; the official assessment is made exclusively by the recognised inspection body.",[79,30429,13051],{"id":13050},[84,30431,30432,30436,30440,30444,30448,30452],{},[87,30433,30434],{},[40,30435,29591],{"href":4206},[87,30437,30438],{},[40,30439,3814],{"href":3813},[87,30441,30442],{},[40,30443,27020],{"href":4200},[87,30445,30446],{},[40,30447,29744],{"href":3707},[87,30449,30450],{},[40,30451,29402],{"href":29401},[87,30453,30454],{},[40,30455,30120],{"href":5547},[12,30457,30458],{},[40,30459,30461],{"href":1456,"rel":30460},[1458],"Start a drawing in PlanElec Sketch and count the material →",[12,30463,30464],{},[63,30465,30466],{},"Regulatory basis: AREI\u002FRGIE Book 1 V06 — sub-sections 3.1.2.1, 3.1.2.2, 3.1.2.3, 3.1.3.1, 4.2.4.3, 5.2.1.2 with table 5.1, 5.2.6.1, 5.2.6.2, 5.2.9.3, 5.2.9.5, 5.3.5.1, 5.3.5.2, 5.3.5.3, 5.4.2.1, 5.4.2.2, 5.4.3.5, 5.4.4.1 and 5.4.4.2. The official text, the actual condition of the installation and the inspection by a recognised body remain decisive.",{"title":2044,"searchDepth":2045,"depth":2045,"links":30468},[30469,30470,30471,30472,30473,30474,30475,30476,30477,30478,30479,30483,30484],{"id":29216,"depth":2045,"text":29217},{"id":29408,"depth":2045,"text":29409},{"id":29442,"depth":2045,"text":29443},{"id":29594,"depth":2045,"text":29595},{"id":29750,"depth":2045,"text":29751},{"id":29923,"depth":2045,"text":29924},{"id":29978,"depth":2045,"text":29979},{"id":30030,"depth":2045,"text":30031},{"id":30087,"depth":2045,"text":30088},{"id":30124,"depth":2045,"text":30125},{"id":30188,"depth":2045,"text":30189,"children":30480},[30481,30482],{"id":30201,"depth":2053,"text":30202},{"id":30239,"depth":2053,"text":30240},{"id":30391,"depth":2045,"text":30392},{"id":13050,"depth":2045,"text":13051},"2026-08-31","Seven item groups, how they derive from the single-line diagram and the situation plan, the items that are routinely forgotten — earthing material, boxes, cable allowance, spare ways — and where the AREI fixes a quantity and where it does not.",[30488,2117,2118],"costs-materials",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-bill-of-materials-electrical-editorial.jpg","\u002Fblog\u002Fbill-of-materials-electrical.en","14 min",{"title":29210,"description":30486},"Bill of Materials for an Electrical Installation","bill-of-materials-electrical-installation","blog\u002Fbill-of-materials-electrical.en",[2133,2134,30498,30499,30500,30501,3590,5269,4261],"bill of materials","material list","cost estimating","earthing","rphbXfVR6_L0mKDNpgoqp42QCpGATLIv_2zzWaNuUIg","\u002Fblog\u002Fbill-of-materials-electrical-installation",{"id":30505,"title":30506,"articleId":30507,"body":30508,"category":4239,"date":30485,"description":31267,"extension":2113,"image":30525,"labels":31268,"lastUpdated":10988,"locale":2119,"meta":31269,"navigation":2121,"ogImage":31270,"path":31271,"publishDate":30485,"readTime":10311,"refreshInterval":4248,"seo":31272,"seoTitle":31273,"slug":30507,"stem":31274,"tags":31275,"__hash__":31279,"kind":2137,"href":31280},"blog\u002Fblog\u002Fcable-routes-and-lengths.en.md","Cable Routes and Lengths: How Do You Determine a Cable Length on an Electrical Plan?","cable-routes-and-lengths",{"type":9,"value":30509,"toc":31254},[30510,30514,30520,30526,30533,30635,30638,30642,30653,30670,30676,30679,30686,30689,30693,30696,30807,30813,30825,30829,30832,30845,30849,30856,30859,30884,30888,30907,30910,30937,30940,30944,30947,31035,31042,31045,31049,31054,31060,31065,31076,31079,31091,31093,31097,31104,31110,31117,31120,31123,31149,31157,31161,31164,31208,31211,31213,31241,31246],[79,30511,30513],{"id":30512},"how-do-you-determine-a-cable-length-on-an-electrical-plan","How do you determine a cable length on an electrical plan?",[12,30515,30516,30519],{},[15,30517,30518],{},"Measure the route the cable actually takes, not the straight line: horizontally along the walls within the installation zones, vertically to the device, with the detours around doors and windows and with the slack at the board and in the box."," The straight line is not a rough estimate of that route but a lower bound. In the example below, the real route is 68 % longer.",[12,30521,30522],{},[74,30523],{"alt":30524,"src":30525},"Electricians survey a cable route on site.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-cable-routes-and-lengths-editorial.webp",[12,30527,30528,30529,30532],{},"The length is the input to the voltage-drop calculation and therefore a criterion in choosing the conductor cross-section (",[63,30530,30531],{},"sub-section 5.2.1.2 point b","), and it is the unit of measure of your material costing. A guessed length makes both calculations worthless without anyone noticing.",[138,30534,30535,30548],{},[141,30536,30537],{},[144,30538,30539,30542,30545],{},[147,30540,30541],{},"Part of the route",[147,30543,30544],{},"What determines it",[147,30546,30547],{},"Where the value comes from",[163,30549,30550,30561,30572,30583,30595,30609,30623],{},[144,30551,30552,30555,30558],{},[168,30553,30554],{},"Horizontal run along the walls",[168,30556,30557],{},"Floor plan and the permitted installation zone",[168,30559,30560],{},"measurable from the plan",[144,30562,30563,30566,30569],{},[168,30564,30565],{},"Vertical run between the zone band and the device",[168,30567,30568],{},"Mounting height of the device relative to the horizontal band",[168,30570,30571],{},"mounting height minus band height",[144,30573,30574,30577,30580],{},[168,30575,30576],{},"Vertical run to the next storey",[168,30578,30579],{},"Storey height and position of the riser",[168,30581,30582],{},"architectural plan, section",[144,30584,30585,30588,30593],{},[168,30586,30587],{},"Detour around doors, windows and openings",[168,30589,30590],{},[63,30591,30592],{},"sub-section 5.2.9.10 point b",[168,30594,30560],{},[144,30596,30597,30600,30603],{},[168,30598,30599],{},"Buried run to an outbuilding",[168,30601,30602],{},"Trench route plus one descent and one ascent to burial depth",[168,30604,30605,30606],{},"minimum 0.60 m per ",[63,30607,30608],{},"sub-section 5.2.9.2 point a",[144,30610,30611,30614,30617],{},[168,30612,30613],{},"Slack at the termination point in the board",[168,30615,30616],{},"Terminal layout, wiring, later modifiability",[168,30618,30619,30620],{},"company convention — ",[15,30621,30622],{},"not a standard",[144,30624,30625,30628,30631],{},[168,30626,30627],{},"Slack in the box, switch or appliance",[168,30629,30630],{},"Connection method and space inside the enclosure",[168,30632,30619,30633],{},[15,30634,30622],{},[12,30636,30637],{},"The last two rows are marked that way deliberately: the AREI\u002FRGIE names no value at all for allowances or slack lengths. Why you still need slack is explained further down.",[79,30639,30641],{"id":30640},"why-is-the-straight-line-systematically-too-short","Why is the straight line systematically too short?",[12,30643,30644,30645,30648,30649,30652],{},"Because a cable embedded in a wall is not allowed to run diagonally. ",[63,30646,30647],{},"Sub-section 5.2.9.10 point b"," ties electrical lines embedded ",[15,30650,30651],{},"without conduit"," in the walls of rooms to a fixed pattern:",[84,30654,30655,30658,30661,30664,30667],{},[87,30656,30657],{},"The route consists exclusively of horizontal and vertical runs; horizontal runs in a ceiling are perpendicular to the vertical walls.",[87,30659,30660],{},"Horizontal runs lie 25 to 35 cm from the floor or from the ceiling, and likewise 25 to 35 cm above the underside of window lintels — provided the lines then stay at least 25 cm below the ceiling.",[87,30662,30663],{},"Vertical runs lie as close as possible to a corner of the room, or 10 to 20 cm from door frames and jambs.",[87,30665,30666],{},"Installation outside this zone pattern is carried out vertically above a visible electrical machine or appliance.",[87,30668,30669],{},"The covering plaster layer is not thinner than 0.4 cm.",[1489,30671],{":height":30672,":width":3800,"alt":30673,"caption":30674,"src":30675},"500","Wall elevation with board, door and switches: horizontal installation zones 25 to 35 cm below the ceiling and above the floor, vertical zones at the corner and 10 to 20 cm beside the door frame, a permitted vertical run above a switch and a diagonal that is not allowed.","Every permitted route consists of horizontal and vertical pieces. That is why the real cable is longer than the straight line.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fcable-routes-and-lengths\u002Finstallation-zones.en.svg",[12,30677,30678],{},"The pattern serves a safety purpose — whoever drills later should know where nothing runs — and has a side effect on length: every diagonal becomes a staircase of one horizontal and one vertical leg, and every doorway forces a detour above or below it.",[12,30680,30681,30682,30685],{},"A worked example. A switch sits in the opposite corner of a 4.8 × 3.6 m room, so 6.0 m from the board in a straight line. Along the walls it is 4.8 m plus 3.6 m, so 8.4 m. The horizontal band runs 30 cm above the floor. Add the drop from the termination point in the board down to the band, say 0.9 m, and the climb from the band up to the switch height of 110 cm, which is 0.8 m. Total: 10.1 m — ",[15,30683,30684],{},"68 % more than the straight line",", and that is before any slack.",[12,30687,30688],{},"For a socket outlet the last step almost disappears: if the horizontal band sits 25 to 35 cm above the floor and the socket at 30 cm, the vertical drop is close to zero. So treat switches and sockets separately instead of applying one flat percentage to everything.",[79,30690,30692],{"id":30691},"what-does-the-installation-method-mean-for-the-length","What does the installation method mean for the length?",[12,30694,30695],{},"It decides whether the zone pattern applies at all, and which geometric constraints are added.",[138,30697,30698,30709],{},[141,30699,30700],{},[144,30701,30702,30704,30707],{},[147,30703,5654],{},[147,30705,30706],{},"Effect on the route",[147,30708,3919],{},[163,30710,30711,30724,30737,30750,30765,30778,30791],{},[144,30712,30713,30716,30719],{},[168,30714,30715],{},"Embedded without conduit, in walls",[168,30717,30718],{},"Bound to the zone pattern; plaster cover ≥ 0.4 cm",[168,30720,30721],{},[63,30722,30723],{},"5.2.9.10 point b",[144,30725,30726,30729,30732],{},[168,30727,30728],{},"Embedded in concrete or cement",[168,30730,30731],{},"Cover ≥ 3 cm; the route follows formwork and reinforcement, not the shortest line",[168,30733,30734],{},[63,30735,30736],{},"5.2.9.10 point a",[144,30738,30739,30742,30745],{},[168,30740,30741],{},"Embedded in conduit",[168,30743,30744],{},"The zone pattern of 5.2.9.10 b does not apply by the letter of the text; instead minimum bending radii and the duty to be able to pull in and remove conductors at any time",[168,30746,30747],{},[63,30748,30749],{},"5.2.9.3 point e",[144,30751,30752,30755,30758],{},[168,30753,30754],{},"Surface, cable tray, cable ducting",[168,30756,30757],{},"Freer routing, but tensile forces from self-weight must not act on the terminals in vertical sections",[168,30759,30760,1774,30762],{},[63,30761,29387],{},[63,30763,30764],{},"5.2.9.6",[144,30766,30767,30770,30773],{},[168,30768,30769],{},"Under mouldings and skirting boards",[168,30771,30772],{},"The route follows the skirting, so in practice the room perimeter",[168,30774,30775],{},[63,30776,30777],{},"5.2.9.4",[144,30779,30780,30783,30786],{},[168,30781,30782],{},"Buried",[168,30784,30785],{},"At least 0.60 m deep unless technically impossible ⇒ two vertical legs on top of the trench length",[168,30787,30788],{},[63,30789,30790],{},"5.2.9.2 point a",[144,30792,30793,30796,30802],{},[168,30794,30795],{},"Extra-low voltage (ELV)",[168,30797,30798,30801],{},[63,30799,30800],{},"Point b"," of 5.2.9.10 is expressly excluded — bell and SELV wiring is not bound to the zone pattern",[168,30803,30804],{},[63,30805,30806],{},"5.2.9.15 point b",[12,30808,30809,30810,30812],{},"The bending radii for conduits bent on site are explicit: not less than ten times the outer diameter for metal conduits, eight times for flexible thermoplastic and five times for rigid thermoplastic conduits (",[63,30811,30013],{},"). For a 25 mm conduit that is 12.5 to 25 cm of radius per corner. In a dwelling with a dozen changes of direction per circuit, that adds up.",[12,30814,30815,30816,30820,30821,56],{},"Which method suits which case is covered in ",[40,30817,30819],{"href":30818},"\u002Fen\u002Fblog\u002Fpreflex-vs-open-wiring","Preflex versus loose wiring","; the cable types themselves in ",[40,30822,30824],{"href":30823},"\u002Fen\u002Fblog\u002Fxvb-vs-vob-cable","XVB versus VOB",[79,30826,30828],{"id":30827},"do-you-count-the-one-way-distance-or-the-round-trip","Do you count the one-way distance or the round trip?",[12,30830,30831],{},"The one-way distance, from the board to the load. The return conductor is in the formula, not in the input: single-phase carries a factor of 2, three-phase a factor of √3. Entering twice the length counts the return conductor twice and oversizes the cross-section for no reason.",[12,30833,30834,30835,30838,30839,30841,30842,56],{},"The criterion itself is not a number in the AREI\u002FRGIE. ",[63,30836,30837],{},"Section 5.2.5"," — \"Chute de tension\" in French, \"Spanningsval\" in Dutch, \"Spannungsänderung\" in German — only requires voltage drop to be limited to the values described in the rules of the trade. The widely used 3 % for lighting and 5 % for other final circuits are an interpretation following IEC\u002FNBN HD 60364-5-52. Calculation method, network arrangements and examples are in ",[40,30840,3791],{"href":3790},"; the cross-section to protection mapping in ",[40,30843,30844],{"href":3795},"Cable cross-section per breaker",[79,30846,30848],{"id":30847},"how-do-you-count-a-cable-split-at-a-junction-box","How do you count a cable split at a junction box?",[12,30850,30851,30852,30855],{},"Physically it is several cables; electrically it is one path. For voltage drop, what counts is the sum over the ",[15,30853,30854],{},"entire"," run from the upstream protective device to the load, not the longest individual segment. Three sections of 12 m each make 36 m, and calculating only the last leg understates the result by two thirds.",[12,30857,30858],{},"Why the split still has to exist in the model:",[84,30860,30861,30867,30872,30878],{},[87,30862,30863,30864,30866],{},"Each section can have its own cross-section and its own installation method. Both are mandatory single-line diagram content for domestic installations (",[63,30865,26772],{},"), and both weigh differently in the calculation.",[87,30868,30869,30870,1487],{},"Connection and junction boxes are themselves mandatory diagram content and must additionally appear with their position on the situation plan (",[63,30871,29587],{},[87,30873,30874,30875,30877],{},"Connections may only be made at defined places: in distribution and control assemblies, in connection or junction boxes, at the terminals of switches and socket outlets, or in sufficiently large ceiling boxes (",[63,30876,29941],{},"). A joint buried in the middle of a wall is not a routing option, it is a breach.",[87,30879,30880,30881,30883],{},"For embedded conduit installations there is more: in connection, junction and draw boxes the conductors and cables remain accessible, and tees and elbows are forbidden (",[63,30882,29959],{},"). The box is therefore also a geometric waypoint, not merely a terminating point.",[79,30885,30887],{"id":30886},"what-allowances-and-slack-are-customary-and-what-does-the-areirgie-say-about-them","What allowances and slack are customary — and what does the AREI\u002FRGIE say about them?",[12,30889,30890,30891,30894,30895,30898,30899,30902,30903,30906],{},"On the size of an allowance the AREI\u002FRGIE says ",[15,30892,30893],{},"nothing",". Neither ",[63,30896,30897],{},"section 5.2.5",", nor ",[63,30900,30901],{},"section 5.2.9",", nor the documentation requirements in ",[63,30904,30905],{},"section 3.1.2"," mention a percentage, a slack length or a waste factor. Any figure you use for it is a convention of your own firm — and belongs in your calculation sheet as exactly that.",[12,30908,30909],{},"What the regulation does fix are the conditions from which slack follows:",[84,30911,30912,30917,30922,30932],{},[87,30913,30914,30915,1487],{},"Connections to appliances must not be subjected to tensile and torsional forces (",[63,30916,29997],{},[87,30918,30919,30920,1487],{},"In vertical sections, tensile forces from the self-weight of the lines must not act on the connection terminals (",[63,30921,30003],{},[87,30923,30924,30925,30928,30929,30931],{},"In conduits it must be possible ",[15,30926,30927],{},"at any time"," to pull in or remove conductors or cables (",[63,30930,30013],{},"). A conduit route calculated to the millimetre makes precisely that impossible.",[87,30933,30016,30934,30936],{},[63,30935,29959],{},") — which does not work without a loop inside the enclosure.",[12,30938,30939],{},"In practice this means: the allowance is not a safety cushion on an uncertain calculation, it is a material item with a purpose. If you apply it as a flat percentage of the total length, document the percentage, where it comes from and which design stage it belongs to. A value without provenance is no longer traceable at the next stage and quietly finds its way into quotations.",[79,30941,30943],{"id":30942},"does-the-cable-length-have-to-appear-on-the-single-line-diagram","Does the cable length have to appear on the single-line diagram?",[12,30945,30946],{},"Here the AREI\u002FRGIE distinguishes two cases, and the distinction is often overlooked.",[138,30948,30949,30964],{},[141,30950,30951],{},[144,30952,30953,30956,30959,30962],{},[147,30954,30955],{},"Document and installation type",[147,30957,30958],{},"Required data about the line",[147,30960,30961],{},"Length required?",[147,30963,3919],{},[163,30965,30966,30982,31002,31017],{},[144,30967,30968,30971,30974,30978],{},[168,30969,30970],{},"Single-line diagram, domestic installation",[168,30972,30973],{},"Type, cross-section, number of conductors, installation method",[168,30975,30976],{},[15,30977,602],{},[168,30979,30980],{},[63,30981,29301],{},[144,30983,30984,30987,30993,30997],{},[168,30985,30986],{},"Circuit diagram, non-domestic installation",[168,30988,30989,30990],{},"Installation method, nature, number and cross-section of conductors ",[15,30991,30992],{},"and the length of the lines",[168,30994,30995],{},[15,30996,515],{},[168,30998,30999],{},[63,31000,31001],{},"3.1.2.2 point b",[144,31003,31004,31007,31010,31012],{},[168,31005,31006],{},"Common parts of a residential building",[168,31008,31009],{},"May be limited to the requirements for domestic installations",[168,31011,602],{},[168,31013,31014],{},[63,31015,31016],{},"3.1.2.1 point e",[144,31018,31019,31022,31028,31031],{},[168,31020,31021],{},"Situation plan, domestic installation",[168,31023,4361,31024,31027],{},[15,31025,31026],{},"position"," of boards, connection and junction boxes, socket outlets, light points, switches, fixed machines and appliances and sources",[168,31029,31030],{},"no — position, not length",[168,31032,31033],{},[63,31034,29340],{},[12,31036,31037,31038,31041],{},"In housing, the length is therefore a ",[15,31039,31040],{},"design quantity, not a drawing obligation",". That is precisely what makes it dangerous: because it need not appear anywhere on the diagram, nobody checks it — while the cross-section that follows from it does appear and is checked. Without a recorded length, you cannot justify afterwards why 2.5 mm² was chosen in one place and 4 mm² in another.",[12,31043,31044],{},"For a non-domestic installation the position is unambiguous: without a length figure, the circuit diagram is incomplete.",[79,31046,31048],{"id":31047},"from-length-to-material-list-and-price","From length to material list and price",[12,31050,3361,31051,31053],{},[40,31052,31],{"href":1964},", through two separate outputs that use the same resolved length.",[12,31055,4361,31056,31059],{},[15,31057,31058],{},"cable list"," gives one row per cable: type, number of cores, cross-section, length, From and To, the installation methods encountered along the route, and the CPR fire class; plus current, voltage drop in volts and percent, end voltage and the limit applied. If a length is missing, the row stays without a figure rather than showing an estimate.",[12,31061,4361,31062,31064],{},[15,31063,30499],{}," groups the same cables by specification and reports them in metres; where a price per metre exists, the line item follows from it. Two points belong explicitly with that:",[84,31066,31067,31073],{},[87,31068,31069,31070,31072],{},"The lengths shown are ",[15,31071,30314],{}," The allowance from the previous section is therefore not in there.",[87,31074,31075],{},"A circuit without a cable route does not disappear: it appears with 0 m and the note \"Routing missing\". A material list that looks suspiciously lean for a whole house usually contains exactly those rows.",[12,31077,31078],{},"The project overview draws the same distinction: it shows either a complete total length, or a subtotal marked \"≥\" together with the number of missing lengths, or no figure at all. An actual total of 0 m and an unknown length are two different states.",[12,31080,31081,31082,31085,31086,3157,31088,31090],{},"Without Pro you enter the length yourself: in ",[40,31083,22],{"href":1456,"rel":31084},[1458]," every cable in the single-line diagram has the fields ",[15,31087,3160],{},[15,31089,30229],{},". The diagram then shows, for example, \"12 m + 3 m\", and the Sketch material list adds up the metres per cable specification. Sketch does not calculate a cable route; the situation plan with the location of the devices required by 3.1.2.3 is drawn there for free in the browser.",[1489,31092],{":height":30384,":width":30385,"alt":30386,"caption":30387,"src":30388},[79,31094,31096],{"id":31095},"how-does-planelec-pro-route-cables-automatically-and-where-are-waypoints-still-needed","How does PlanElec Pro route cables automatically, and where are waypoints still needed?",[12,31098,31099,31100,31103],{},"In the situation plan of PlanElec Pro, under ",[15,31101,31102],{},"Linking & cabling → Cable route",". If cables exist in the topology, you route the whole active storey at once or one selected line individually.",[1489,31105],{":height":31106,":width":3800,"alt":31107,"caption":31108,"src":31109},"150","Cable-routing panel with automatic routing and manual waypoint tools.","The route is a planning aid; path, length and feasibility must be checked against the intended installation route.","\u002Fhelp\u002Fworkflows\u002Fen-cable-routing.png",[12,31111,31112,31113,31116],{},"The algorithm looks for the shortest path ",[15,31114,31115],{},"along the drawn walls",", not across the room: start and end points are projected onto the nearest wall edge, then a shortest-path search runs over the wall nodes. If there is no wall path — because the floor plan is interrupted there, for instance — the route falls back to the direct line. The reported length follows the visible polyline exactly; deliberately slanted wall segments are not artificially stretched to an orthogonal measure.",[12,31118,31119],{},"To adjust, select a cable line: a click on a section inserts a waypoint and starts dragging, a double-click removes it. A dragged waypoint is stored only on release and can be undone in a single step. When a circuit is rebuilt, the cable specification, manual length and saved route are preserved.",[12,31121,31122],{},"Four points worth knowing:",[84,31124,31125,31131,31137,31143],{},[87,31126,31127,31130],{},[15,31128,31129],{},"The automatic route is two-dimensional."," It lies in the plane of the storey; height differences within one storey — the climb into the zone band, the drop to the switch — do not enter the length. That is what waypoints, or the manual length, are for.",[87,31132,31133,31136],{},[15,31134,31135],{},"Between storeys"," you explicitly pick an existing staircase, shaft or riser. PlanElec invents no vertical connection. If one is missing, or reliable heights are missing, the route stays incomplete instead of reporting an apparent length. Where the connection exists, the height difference is counted.",[87,31138,31139,31142],{},[15,31140,31141],{},"The manual length takes precedence"," over the calculated route. That is the deliberate escape hatch for measured distances — and exactly the place where an old value can quietly survive if the route changes later.",[87,31144,31145,31148],{},[15,31146,31147],{},"Routing along the walls is an assumption about the execution",", not a finding. Whether the cable runs in the zone, in conduit or on the surface is decided by the installation method you set per section — not by the router.",[12,31150,31151,31152,31154,31155,56],{},"Step-by-step operation is in the guide ",[40,31153,4176],{"href":4175},". Which switch type sits at the end of the chain is covered in ",[40,31156,25986],{"href":5727},[79,31158,31160],{"id":31159},"what-the-self-check-calculates-on-length-and-what-stays-on-site","What the self-check calculates on length, and what stays on site",[12,31162,31163],{},"The self-check evaluates the supported rules against the data entered. Specifically on length:",[84,31165,31166,31172,31178,31187,31196],{},[87,31167,31168,31171],{},[15,31169,31170],{},"Voltage drop on a complete path:"," it calculates voltage drop over the whole route from the protective device to the load. If the length of any segment is missing or the path cannot be traced continuously, it reports a data gap instead of a result. A value calculated from partial data would be systematically too favourable.",[87,31173,31174,31177],{},[15,31175,31176],{},"Explicit assumptions:"," 80 % of the rated current of the upstream protective device as the load case, power factor 0.95, copper and a resistance model without reactance or temperature correction.",[87,31179,31180,31183,31184,31186],{},[15,31181,31182],{},"Guide values 3 % and 5 %:"," they follow the IEC\u002FNBN HD 60364-5-52 interpretation; ",[63,31185,30897],{}," refers to the rules of good practice.",[87,31188,31189,31192,31193,31195],{},[15,31190,31191],{},"Route and execution:"," whether the drawn route matches the actual installation, whether the zones of ",[63,31194,30723],{}," are respected and whether slack was provided shows on site, not on the drawing.",[87,31197,31198,31201,31202,31204,31205,31207],{},[15,31199,31200],{},"Current-carrying capacity:"," installation method, grouping and ambient temperature under ",[63,31203,26861],{}," belong to the design; ",[63,31206,26900],{}," only limits the protective device per cross-section.",[12,31209,31210],{},"Measurements and the official assessment are carried out by the accredited inspection body.",[79,31212,13051],{"id":13050},[84,31214,31215,31220,31224,31228,31233,31237],{},[87,31216,31217],{},[40,31218,31219],{"href":3790},"Calculating voltage drop: how long may the cable be?",[87,31221,31222],{},[40,31223,30844],{"href":3795},[87,31225,31226],{},[40,31227,30819],{"href":30818},[87,31229,31230],{},[40,31231,31232],{"href":30823},"XVB versus VOB: which cable for what?",[87,31234,31235],{},[40,31236,25986],{"href":5727},[87,31238,31239],{},[40,31240,26373],{"href":6050},[12,31242,31243],{},[40,31244,31245],{"href":1964},"Route your cables in PlanElec Pro →",[12,31247,31248],{},[63,31249,31250,31251,56],{},"Regulatory basis: AREI\u002FRGIE Book 1 V06 — sub-sections 3.1.2.1, 3.1.2.2, 3.1.2.3, 4.4.1.4 with Table 4.11, 5.2.1.2, 5.2.6.1, 5.2.6.2, 5.2.9.2, 5.2.9.3, 5.2.9.4, 5.2.9.5, 5.2.9.6, 5.2.9.10 and 5.2.9.15, plus Section 5.2.5. Official text: ",[40,31252,27049],{"href":1971,"rel":31253},[1458],{"title":2044,"searchDepth":2045,"depth":2045,"links":31255},[31256,31257,31258,31259,31260,31261,31262,31263,31264,31265,31266],{"id":30512,"depth":2045,"text":30513},{"id":30640,"depth":2045,"text":30641},{"id":30691,"depth":2045,"text":30692},{"id":30827,"depth":2045,"text":30828},{"id":30847,"depth":2045,"text":30848},{"id":30886,"depth":2045,"text":30887},{"id":30942,"depth":2045,"text":30943},{"id":31047,"depth":2045,"text":31048},{"id":31095,"depth":2045,"text":31096},{"id":31159,"depth":2045,"text":31160},{"id":13050,"depth":2045,"text":13051},"Measure the route, not the straight line: installation zones under AREI 5.2.9.10, installation method, segments at junction boxes, allowances from trade practice, and when the AREI\u002FRGIE requires the length on the diagram.",[4244,18037,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-cable-routes-and-lengths-editorial.jpg","\u002Fblog\u002Fcable-routes-and-lengths.en",{"title":30506,"description":31267},"Cable Routes and Lengths: Measuring Cables on a Plan","blog\u002Fcable-routes-and-lengths.en",[2133,2134,31276,21785,31277,31278,30499,2132,5269,4261],"cable route","voltage drop","installation method","rixpPJAYIDTpfvDTJhyOjmQ2F32eN67n96vhEjV_hYs","\u002Fblog\u002Fcable-routes-and-lengths",{"id":31282,"title":31283,"articleId":31284,"body":31285,"category":4239,"date":30485,"description":32786,"extension":2113,"image":31320,"labels":32787,"lastUpdated":10988,"locale":2119,"meta":32788,"navigation":2121,"ogImage":32789,"path":32790,"publishDate":30485,"readTime":10311,"refreshInterval":4248,"seo":32791,"seoTitle":32792,"slug":31284,"stem":32793,"tags":32794,"__hash__":32799,"kind":2137,"href":32800},"blog\u002Fblog\u002Finstallation-methods-arei.en.md","Installation methods under the AREI: which entry belongs on the single-line diagram?","installation-methods-arei",{"type":9,"value":31286,"toc":32771},[31287,31291,31315,31321,31327,31665,31671,31675,31688,31708,31712,31718,31783,31789,31805,31809,31812,31834,31847,31866,31870,31873,31944,31951,31957,31961,31971,31976,32012,32016,32025,32034,32045,32065,32085,32115,32119,32129,32132,32139,32145,32149,32152,32253,32275,32279,32287,32497,32502,32520,32557,32570,32576,32580,32583,32636,32641,32645,32733,32735,32758,32763],[79,31288,31290],{"id":31289},"which-installation-methods-does-the-arei-recognise-and-which-one-belongs-on-the-diagram","Which installation methods does the AREI recognise — and which one belongs on the diagram?",[12,31292,31293,31298,31299,15383,31301,23704,31304,31307,31308,31311,31312,31314],{},[15,31294,31295,31296,1487],{},"The single-line diagram of a dwelling states the installation method of every cable run, alongside cable type, cross-section and number of conductors (",[63,31297,26772],{}," You choose from the seventeen methods ",[63,31300,40],{},[63,31302,31303],{},"q",[63,31305,31306],{},"sub-section 5.2.2.1",": overhead lines, buried cables, surface and concealed wiring, skirtings, trunking and troughs, all the way to heating cables in ceilings and floors. Other methods are permitted under the relevant rules of the trade (",[63,31309,31310],{},"sub-section 5.2.2.4","). For most of the listed methods, ",[63,31313,30901],{}," adds its own binding rules.",[12,31316,31317],{},[74,31318],{"alt":31319,"src":31320},"An electrician positions electrical conduits in an unfinished building.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-installation-methods-arei-editorial.webp",[12,31322,31323,31324,31326],{},"The AREI states no purpose for this requirement, but the technical reason is clear: the current-carrying capacity IZ of a cable depends, among other things, on \"the installation method and the environment of the wiring\" (",[63,31325,26861],{},"). Without the installation method you cannot judge whether a cross-section suits the circuit.",[138,31328,31329,31347],{},[141,31330,31331],{},[144,31332,31333,31339,31341,31344],{},[147,31334,31335,31336,3317],{},"Letter (",[63,31337,31338],{},"5.2.2.1",[147,31340,5654],{},[147,31342,31343],{},"Typical residential use",[147,31345,31346],{},"Specific rules",[163,31348,31349,31368,31384,31399,31414,31430,31451,31467,31483,31502,31518,31534,31550,31569,31586,31603,31619,31635,31650],{},[144,31350,31351,31353,31356,31359],{},[168,31352,40],{},[168,31354,31355],{},"overhead lines",[168,31357,31358],{},"supply to an outbuilding",[168,31360,31361,31364,31365,3317],{},[63,31362,31363],{},"5.2.9.1"," (refers to book 3, ",[63,31366,31367],{},"chapter 7.1",[144,31369,31370,31373,31376,31379],{},[168,31371,31372],{},"b.1",[168,31374,31375],{},"directly buried",[168,31377,31378],{},"garden socket, carport",[168,31380,31381,31383],{},[63,31382,30790],{},": at least 0.60 m deep, cables only",[144,31385,31386,31389,31392,31395],{},[168,31387,31388],{},"b.2",[168,31390,31391],{},"buried with mechanical protection",[168,31393,31394],{},"cable under a warning tape",[168,31396,31397],{},[63,31398,30790],{},[144,31400,31401,31404,31407,31410],{},[168,31402,31403],{},"b.3",[168,31405,31406],{},"buried in ducts",[168,31408,31409],{},"crossing under a driveway or terrace",[168,31411,31412],{},[63,31413,30790],{},[144,31415,31416,31419,31422,31425],{},[168,31417,31418],{},"c",[168,31420,31421],{},"contact lines for rolling or sliding contacts",[168,31423,31424],{},"not relevant in housing",[168,31426,31427],{},[63,31428,31429],{},"5.2.1.4 point a",[144,31431,31432,31435,31438,31441],{},[168,31433,31434],{},"d",[168,31436,31437],{},"surface-mounted",[168,31439,31440],{},"visible XVB in cellar, garage, plant room",[168,31442,31443,31444,31447,31448,31450],{},"Definition ",[63,31445,31446],{},"5.2.2.1 d",": wall clearance ≤ 0.3 × D; ",[63,31449,29387],{},": in principle, cables only",[144,31452,31453,31456,31459,31462],{},[168,31454,31455],{},"e",[168,31457,31458],{},"in concealed conduits",[168,31460,31461],{},"new-build standard: VOB inside Preflex",[168,31463,31464],{},[63,31465,31466],{},"5.2.9.3",[144,31468,31469,31472,31475,31478],{},[168,31470,31471],{},"f",[168,31473,31474],{},"in mouldings, skirtings and architraves",[168,31476,31477],{},"renovation, visible trunking",[168,31479,31480,31482],{},[63,31481,30777],{},": insulated conductors or single-core cables only",[144,31484,31485,31488,31491,31494],{},[168,31486,31487],{},"g",[168,31489,31490],{},"in free air with clips, or on trays, ladders, brackets and similar supports",[168,31492,31493],{},"plant room, boiler room",[168,31495,31443,31496,31499,31500,31450],{},[63,31497,31498],{},"5.2.2.1 g",": clearance from all walls ≥ 0.3 × D; ",[63,31501,29387],{},[144,31503,31504,31507,31510,31513],{},[168,31505,31506],{},"h",[168,31508,31509],{},"in trunking and troughs",[168,31511,31512],{},"distribution run in a plant room",[168,31514,31515,31517],{},[63,31516,30764],{},": in troughs, in principle, cables only",[144,31519,31520,31523,31526,31529],{},[168,31521,31522],{},"i",[168,31524,31525],{},"in cable protection (ducting)",[168,31527,31528],{},"route above the floor",[168,31530,31531],{},[63,31532,31533],{},"5.2.9.7",[144,31535,31536,31539,31542,31545],{},[168,31537,31538],{},"j",[168,31540,31541],{},"in open, closed or sand-filled channels",[168,31543,31544],{},"floor channel, industrial use",[168,31546,31547],{},[63,31548,31549],{},"5.2.9.8",[144,31551,31552,31555,31558,31561],{},[168,31553,31554],{},"k",[168,31556,31557],{},"in structural voids, recesses and manufactured blocks",[168,31559,31560],{},"hollow blocks, suspended ceiling",[168,31562,31563,3157,31566],{},[63,31564,31565],{},"5.2.9.9",[63,31567,31568],{},"4.3.3.5 point b",[144,31570,31571,31574,31577,31580],{},[168,31572,31573],{},"l",[168,31575,31576],{},"behind wall panels",[168,31578,31579],{},"drywall, timber frame",[168,31581,31582,3157,31584],{},[63,31583,31565],{},[63,31585,31568],{},[144,31587,31588,31591,31594,31597],{},[168,31589,31590],{},"m",[168,31592,31593],{},"directly concealed, without conduits",[168,31595,31596],{},"XVB straight into the chase",[168,31598,31599,31602],{},[63,31600,31601],{},"5.2.9.10",": installation zones, concrete ≥ 3 cm, plaster ≥ 0.4 cm",[144,31604,31605,31608,31611,31614],{},[168,31606,31607],{},"n",[168,31609,31610],{},"in busbar trunking systems",[168,31612,31613],{},"rare in housing",[168,31615,31616],{},[63,31617,31618],{},"5.2.9.11",[144,31620,31621,31624,31627,31630],{},[168,31622,31623],{},"o",[168,31625,31626],{},"on insulators",[168,31628,31629],{},"legacy installations",[168,31631,31632],{},[63,31633,31634],{},"5.2.9.12",[144,31636,31637,31639,31642,31645],{},[168,31638,12],{},[168,31640,31641],{},"submerged in water",[168,31643,31644],{},"swimming-pool equipment",[168,31646,31647],{},[63,31648,31649],{},"5.2.2.1 point p",[144,31651,31652,31654,31657,31660],{},[168,31653,31303],{},[168,31655,31656],{},"in ceilings, floors and walls for heating cables and panels",[168,31658,31659],{},"underfloor heating, heating mats",[168,31661,31662],{},[63,31663,31664],{},"5.2.9.13",[12,31666,31667,31668,31670],{},"Other methods are permitted, but they fall under the residual clause: they must comply with \"the relevant rules of the trade\" (",[63,31669,31310],{},"). Working outside the list therefore means leaving the territory for which the AREI itself states a rule.",[79,31672,31674],{"id":31673},"what-separates-point-e-from-point-m","What separates point e from point m?",[12,31676,31677,31678,31680,31681,31683,31684,31687],{},"This is the pair that gets confused most often, because in everyday speech both are simply \"concealed\". The difference is the conduit. Point ",[63,31679,31455],{}," is literally \"in concealed conduits\" — the Dutch text says \"in verzonken buizen\", the French \"sous conduits encastrés\". Point ",[63,31682,31590],{}," is expressly \"directly concealed, ",[15,31685,31686],{},"without"," conduits\".",[12,31689,31690,31691,31693,31694,31697,31698,31693,31700,31703,31704,31707],{},"That is not wordplay but the boundary between two sets of rules. Point ",[63,31692,31455],{}," is governed by ",[63,31695,31696],{},"sub-section 5.2.9.3"," with the conduit rules: bending radii, conductors that remain drawable and removable at all times, no connections inside the conduit. Point ",[63,31699,31590],{},[63,31701,31702],{},"sub-section 5.2.9.10"," with the installation zones and the minimum covers. Which material to choose in each case, and what it costs, is compared in ",[40,31705,31706],{"href":30818},"Preflex versus open wiring","; this article describes the systematics that both variants sit inside.",[79,31709,31711],{"id":31710},"why-does-the-installation-method-govern-current-carrying-capacity","Why does the installation method govern current-carrying capacity?",[12,31713,31714,31717],{},[63,31715,31716],{},"Sub-section 4.4.1.4"," names five quantities that IZ depends on. The installation method is one of them, and it is the only one you cannot read off the cable itself.",[138,31719,31720,31733],{},[141,31721,31722],{},[144,31723,31724,31730],{},[147,31725,31726,31727],{},"Quantity per ",[63,31728,31729],{},"4.4.1.4",[147,31731,31732],{},"What it means on the plan",[163,31734,31735,31745,31753,31761,31772],{},[144,31736,31737,31740],{},[168,31738,31739],{},"conductor cross-section",[168,31741,31742,31743,3317],{},"entry on the single-line diagram (",[63,31744,29301],{},[144,31746,31747,31750],{},[168,31748,31749],{},"conductor insulation",[168,31751,31752],{},"cable type, for example XVB or VOB",[144,31754,31755,31758],{},[168,31756,31757],{},"construction of the wiring",[168,31759,31760],{},"single- or multi-core, armouring, screen",[144,31762,31763,31766],{},[168,31764,31765],{},"installation method and environment",[168,31767,31768,31769,31771],{},"installation method: entry on the single-line diagram (",[63,31770,29301],{},"); environment: not prescribed",[144,31773,31774,31777],{},[168,31775,31776],{},"ambient temperature",[168,31778,31779,31780],{},"where the cable runs, see ",[63,31781,31782],{},"5.2.3.1",[12,31784,31785,31786,31788],{},"The calculation itself is not in the AREI. The text only says that current-carrying capacity \"is calculated in accordance with the rules of the trade\" (",[63,31787,31729],{},"), and that the competent ministers may set out further rules. In practice the tables and correction factors therefore come from the NBN HD 60364-5-52 series, not from the AREI.",[12,31790,31791,31792,31794,31795,31798,31799,31802,31803,56],{},"What the AREI does fix is frequently mistaken for that: ",[63,31793,26864],{}," gives, for domestic installations, the ",[15,31796,31797],{},"maximum"," rated current per conductor cross-section, separately for the fuse and for the circuit breaker: at 1.5 mm² 10 A and 16 A, at 2.5 mm² 16 A and 20 A, at 4 mm² 20 A and 25 A, at 6 mm² 32 A and 40 A, at 10 mm² 50 A and 63 A. That table knows nothing about the installation method. It is a ceiling, not a clearance: the condition IZ ≥ IB from ",[63,31800,31801],{},"sub-section 5.2.1.2 point a"," has to be met on top of it. A larger cross-section does not conflict with table 4.11; the table caps the rated current for each cross-section, not the cross-section selected for a lower rated current. The cross-section-to-protection pairing is covered in ",[40,31804,26912],{"href":3795},[79,31806,31808],{"id":31807},"what-do-grouping-ambient-temperature-and-thermal-insulation-do-to-the-capacity","What do grouping, ambient temperature and thermal insulation do to the capacity?",[12,31810,31811],{},"All three lower IZ, and in all three cases the AREI supplies the boundary condition, not the factor.",[12,31813,31814,31817,31818,31821,31822,31825,31826,31829,31830,31833],{},[15,31815,31816],{},"Grouping."," The AREI defines the threshold precisely: a cable or insulated conductor counts as ",[15,31819,31820],{},"installed separately"," when it lies at least 20 mm away from any other cable or insulated conductor (",[63,31823,31824],{},"section 2.7.1","). Anything closer is installed \"in bunches or in a flat layer\". That distinction has a direct consequence in the AREI — but for fire propagation, not for heating: separately installed conductors and cables must have at least characteristic F1 or class Eca (",[63,31827,31828],{},"sub-section 5.2.7.2","); in bunches or a flat layer, at least F2 or class Cca (",[63,31831,31832],{},"sub-section 5.2.7.3","), and that applies \"regardless of the distance over which\" they are actually bunched. The thermal grouping factor itself again follows from the rules of the trade.",[12,31835,31836,38,31839,31842,31843,31846],{},[15,31837,31838],{},"Ambient temperature.",[63,31840,31841],{},"Sub-section 5.2.3.1"," requires wiring to suit both the lowest and the highest local ambient temperature and to be installed only within the temperature range stated by the manufacturer. ",[63,31844,31845],{},"Section 5.2.8"," adds to this: wiring must not be exposed to harmful temperatures near heating pipes, hot-air ducts or flues, and must keep sufficient distance or be separated by a heat shield. Routing a cable alongside the heating manifold changes its thermal environment — and that environment is part of the same entry as the installation method.",[12,31848,31849,31852,31853,31855,31856,31858,31859,31862,31863,31865],{},[15,31850,31851],{},"Thermal insulation."," The AREI contains ",[15,31854,602],{}," reduction factor of its own for cables in or under thermal insulation. \"Thermal insulation\" appears in the regulation as a precaution for temperatures below −25 °C (",[63,31857,31782],{},") and in the chapter on heating panels, where insulating material in contact with the heating installation must be non-combustible (",[63,31860,31861],{},"5.2.9.13 point b.5","). A cable running through an insulated pitched roof therefore falls under \"installation method and environment\" in ",[63,31864,31729],{}," and is assessed by the rules of the trade — not by an AREI table that does not exist.",[79,31867,31869],{"id":31868},"where-does-the-entry-belong-single-line-diagram-situation-plan-or-bill-of-materials","Where does the entry belong: single-line diagram, situation plan or bill of materials?",[12,31871,31872],{},"These three documents have clearly separated mandatory content in the AREI.",[138,31874,31875,31886],{},[141,31876,31877],{},[144,31878,31879,31881,31884],{},[147,31880,5258],{},[147,31882,31883],{},"Installation method required?",[147,31885,3919],{},[163,31887,31888,31902,31917,31931],{},[144,31889,31890,31893,31898],{},[168,31891,31892],{},"single-line diagram (domestic)",[168,31894,31895,31897],{},[15,31896,515],{},", explicitly",[168,31899,31900],{},[63,31901,29301],{},[144,31903,31904,31907,31913],{},[168,31905,31906],{},"situation plan (domestic)",[168,31908,31909,31910,31912],{},"no — it shows the ",[15,31911,31026],{}," of the components",[168,31914,31915],{},[63,31916,29340],{},[144,31918,31919,31922,31927],{},[168,31920,31921],{},"circuit diagram (non-domestic)",[168,31923,31924,31926],{},[15,31925,515],{},", together with length and conductor count",[168,31928,31929],{},[63,31930,31001],{},[144,31932,31933,31935,31938],{},[168,31934,30498],{},[168,31936,31937],{},"not prescribed",[168,31939,31940,31941],{},"permitted as an annex under ",[63,31942,31943],{},"3.1.2.1 point c",[12,31945,31946,31947,31950],{},"The bill of materials is not a mandatory document under the AREI. ",[63,31948,31949],{},"Sub-section 3.1.2.1 point c"," merely allows diagrams and plans to be supplemented by documents \"describing in more detail the various characteristics of the electrical equipment and\u002For products\". A cable list carrying the installation method per run is exactly such an annex: useful for pricing and execution; the entry still belongs on the single-line diagram itself.",[12,31952,31953,31954,31956],{},"How diagram and situation plan divide the work is set out in ",[40,31955,29591],{"href":4206},", which also explains why the length is mandatory only on the non-domestic circuit diagram.",[79,31958,31960],{"id":31959},"when-does-the-installation-method-change-within-one-cable-run","When does the installation method change within one cable run?",[12,31962,31963,31964,31967,31968,1487],{},"A cable run rarely has a single installation method. Out of the board, through the wall, across the ceiling, into the ground and back up an outside wall — that is four. The AREI has a term for this. The ",[15,31965,31966],{},"origin of the circuit"," is either the start of the wiring \"or the point where the cross-section, nature or construction of the wiring, or its installation method, changes\" (",[63,31969,31970],{},"section 2.6.1",[1489,31972],{":height":5670,":width":3800,"alt":31973,"caption":31974,"src":31975},"One cable from the board to the garden shed in four sections: e in concealed conduit, d surface-mounted in the garage, b.1 buried at least 0.60 m deep and d surface-mounted on the shed. Red diamonds mark each change as a new section under 2.6.1.","The least favourable section sets the sizing; the single-line diagram lists every method that occurs, in order.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Finstallation-methods-arei\u002Finstallation-method-per-section.en.svg",[12,31977,31978,31979,31981,31982,31984,31985,31988,31989,31992,31993,31995,31996,1774,31998,32000,32001,1774,32003,1774,32005,3157,32008,32011],{},"In practice: every change of method opens a separate stretch for assessment. For sizing, the least favourable stretch generally governs: under ",[63,31980,31801],{},", read with ",[63,31983,26861],{},", IZ must reach at least IB; ",[63,31986,31987],{},"sub-section 4.4.3.1"," generally places overload protection where a change reduces IZ for the protected wiring (exceptions: ",[63,31990,31991],{},"sub-section 4.4.3.3","). A cable that runs two metres inside a bundle of conduits before continuing freely across a ceiling is therefore not sized on the free stretch. For the representation, the AREI does not prescribe choosing every method, the longest one or the least favourable one (",[63,31994,26772],{},"). As a practical recommendation, document every method that occurs in route order because obligations attach to individual stretches: ",[63,31997,29387],{},[63,31999,31565],{}," read with ",[63,32002,31568],{},[63,32004,31601],{},[63,32006,32007],{},"5.2.7.1 point 3",[63,32009,32010],{},"5.2.7.3",". The inspector then compares the diagram with the visible installation.",[79,32013,32015],{"id":32014},"which-rules-apply-to-concealed-wiring","Which rules apply to concealed wiring?",[12,32017,32018,32019,8786,32022,32024],{},"For direct concealment without conduit (",[63,32020,32021],{},"point m",[63,32023,31702],{}," is the governing provision, and it is unusually concrete.",[12,32026,32027,32028,32031,32032,1487],{},"Wiring embedded in ",[15,32029,32030],{},"concrete or cement"," is covered by a layer of at least 3 cm; conductors with basic insulation only may not be embedded there at all (",[63,32033,26627],{},[12,32035,32036,32037,32040,32041,32044],{},"For wiring without conduit ",[15,32038,32039],{},"in the walls of rooms",", the installation-zone rules also apply according to the installation situation (",[63,32042,32043],{},"point b","):",[84,32046,32047,32050,32053,32056,32059,32062],{},[87,32048,32049],{},"the route consists exclusively of horizontal and vertical stretches, horizontal runs in a ceiling being perpendicular to the vertical walls;",[87,32051,32052],{},"horizontal runs lie 25 to 35 cm above the floor or below the ceiling, and likewise 25 to 35 cm above the underside of window lintels, provided they then remain at least 25 cm below the ceiling;",[87,32054,32055],{},"vertical runs lie as close as possible to a corner of the room, or 10 to 20 cm from door frames and architraves;",[87,32057,32058],{},"outside these zones, only a vertical run above a visible machine or appliance is permitted;",[87,32060,32061],{},"the wiring is subjected to no mechanical stress, neither during installation nor afterwards, and is fixed to the walls without damage;",[87,32063,32064],{},"the covering plaster layer is at least 0.4 cm thick.",[12,32066,32067,32068,32070,32071,32074,32075,32078,32079,32082,32083,1487],{},"For conduits, ",[63,32069,31696],{}," applies instead: conductors or cables must remain drawable and removable at all times (",[63,32072,32073],{},"point e","), connections inside the conduit are forbidden (",[63,32076,32077],{},"point f","), and in embedded conduits tees and elbows are not permitted while conductors stay accessible in junction, branch and draw boxes (",[63,32080,32081],{},"point i.2","). Conduits made of combustible material may only be used when embedded at least 3 cm deep in non-combustible materials (",[63,32084,32077],{},[12,32086,32087,32088,32091,32092,32094,32095,32098,32099,32101,32102,32104,32105,32108,32109,32111,32112,32114],{},"One important exception: for ",[15,32089,32090],{},"extra-low voltage installations (ELV)",", the zone pattern of ",[63,32093,30723],{}," expressly does not apply (",[63,32096,32097],{},"sub-section 5.2.9.15 point b","). For ELV, the first paragraph of ",[63,32100,29387],{},", the second paragraph of ",[63,32103,31565],{}," and the first paragraph of ",[63,32106,32107],{},"5.2.9.12 point a"," also do not apply (",[63,32110,30806],{},"). Bus, bell and control wiring at ELV therefore need not follow the zones; the other applicable rules of ",[63,32113,30901],{}," still do.",[79,32116,32118],{"id":32117},"what-applies-to-buried-cables","What applies to buried cables?",[12,32120,32121,32124,32125,32128],{},[63,32122,32123],{},"Sub-section 5.2.9.2 point a"," is one of the sharpest provisions in the chapter. In the ground and in inaccessible underground ducts, only ",[15,32126,32127],{},"cables"," may be installed, independent protective conductors excepted. The minimum depth is 0.60 m measured from the ground surface, \"unless technically impossible\". Where that depth cannot be reached, protection is provided instead by a continuous or sealed duct of durable, resistant material.",[12,32130,32131],{},"The cable must additionally satisfy one of three conditions: an earthed electrical screen with armouring or a reinforced outer sheath; or a resistant outer sheath plus a continuous cover that protects against tools during excavation and overhangs on both sides; or installation in a duct or an equivalent system. Once one of these is satisfied, no additional measures are required for protection against electric shock.",[12,32133,32134,32135,32138],{},"For marking in the ground, ",[63,32136,32137],{},"point d"," carries its own rules: markers at the ends of straight sections, at least every two hundred metres, with a surface of at least 0.01 m² and a lightning symbol in relief. Connections of low-voltage network users are exempt.",[12,32140,7139,32141,56],{},[40,32142,32144],{"href":32143},"\u002Fen\u002Fblog\u002Fgarden-house-garage-sub-board","Garden house, garage and sub-board in the diagram",[79,32146,32148],{"id":32147},"which-cable-is-allowed-in-which-installation-method","Which cable is allowed in which installation method?",[12,32150,32151],{},"The installation method restricts the choice of cable, independently of cross-section.",[138,32153,32154,32165],{},[141,32155,32156],{},[144,32157,32158,32160,32163],{},[147,32159,5654],{},[147,32161,32162],{},"Permitted",[147,32164,3919],{},[163,32166,32167,32180,32192,32203,32215,32228,32241],{},[144,32168,32169,32172,32175],{},[168,32170,32171],{},"buried",[168,32173,32174],{},"cables only",[168,32176,32177],{},[63,32178,32179],{},"5.2.9.2 a",[144,32181,32182,32185,32188],{},[168,32183,32184],{},"in free air and surface-mounted",[168,32186,32187],{},"in principle cables only; exceptions apply to certain independent protective, equipotential and earthed active conductors",[168,32189,32190],{},[63,32191,29387],{},[144,32193,32194,32197,32199],{},[168,32195,32196],{},"trough",[168,32198,32187],{},[168,32200,32201],{},[63,32202,30764],{},[144,32204,32205,32208,32211],{},[168,32206,32207],{},"trunking",[168,32209,32210],{},"insulated conductors as well; outside electrical service rooms with solid walls and a lid that opens only with a tool",[168,32212,32213],{},[63,32214,30764],{},[144,32216,32217,32220,32223],{},[168,32218,32219],{},"mouldings, skirtings, architraves",[168,32221,32222],{},"insulated conductors or single-core cables",[168,32224,32225],{},[63,32226,32227],{},"5.2.9.4 b",[144,32229,32230,32233,32236],{},[168,32231,32232],{},"conduits",[168,32234,32235],{},"insulated conductors or cables",[168,32237,32238],{},[63,32239,32240],{},"5.2.9.3 b",[144,32242,32243,32246,32249],{},[168,32244,32245],{},"structural voids",[168,32247,32248],{},"no conductors with basic insulation only",[168,32250,32251],{},[63,32252,31565],{},[12,32254,32255,32256,4759,32258,1774,32261,32264,32265,32267,32268,32270,32271,32274],{},"On top of that comes the reaction-to-fire class. In ",[15,32257,32245],{},[15,32259,32260],{},"mouldings, skirtings or architraves made of combustible materials",[63,32262,32263],{},"sub-section 4.3.3.5 point b"," expressly requires the characteristic or class of ",[63,32266,32010],{}," — that is, F2 or at least Cca. A timber-stud wall is a structural void. Which cable type suits which use is covered in ",[40,32269,30824],{"href":30823},"; for wet rooms the volume rules from ",[40,32272,32273],{"href":22834},"Bathroom cables and AREI zones"," apply on top.",[79,32276,32278],{"id":32277},"how-do-planelec-pro-and-sketch-record-the-installation-method-and-what-appears-in-the-export","How do PlanElec Pro and Sketch record the installation method, and what appears in the export?",[12,32280,32281,32283,32284,23658],{},[40,32282,31],{"href":1964}," knows fifteen installation methods and stores the AREI reference each one sits under. The names match the visible options in ",[15,32285,32286],{},"Edit cable",[138,32288,32289,32302],{},[141,32290,32291],{},[144,32292,32293,32296,32299],{},[147,32294,32295],{},"Choice in PlanElec",[147,32297,32298],{},"Short code",[147,32300,32301],{},"Stored AREI reference",[163,32303,32304,32316,32331,32344,32357,32370,32383,32396,32409,32422,32435,32447,32459,32471,32484],{},[144,32305,32306,32309,32312],{},[168,32307,32308],{},"Surface-mounted",[168,32310,32311],{},"AP",[168,32313,32314],{},[63,32315,31446],{},[144,32317,32318,32321,32324],{},[168,32319,32320],{},"Surface-mounted conduit",[168,32322,32323],{},"AR",[168,32325,32326,15829,32328],{},[63,32327,31446],{},[63,32329,32330],{},"5.2.9.3 h",[144,32332,32333,32336,32339],{},[168,32334,32335],{},"Concealed in flexible conduit",[168,32337,32338],{},"UR",[168,32340,32341],{},[63,32342,32343],{},"5.2.2.1 e",[144,32345,32346,32349,32352],{},[168,32347,32348],{},"Concealed direct",[168,32350,32351],{},"UD",[168,32353,32354],{},[63,32355,32356],{},"5.2.2.1 m",[144,32358,32359,32362,32365],{},[168,32360,32361],{},"Behind wall panels",[168,32363,32364],{},"HW",[168,32366,32367],{},[63,32368,32369],{},"5.2.2.1 l",[144,32371,32372,32375,32378],{},[168,32373,32374],{},"Skirting \u002F surround",[168,32376,32377],{},"FL",[168,32379,32380],{},[63,32381,32382],{},"5.2.2.1 f",[144,32384,32385,32388,32391],{},[168,32386,32387],{},"Underground",[168,32389,32390],{},"EV",[168,32392,32393],{},[63,32394,32395],{},"5.2.2.1 b.1 + b.2",[144,32397,32398,32401,32404],{},[168,32399,32400],{},"Underground in cable conduit",[168,32402,32403],{},"ER",[168,32405,32406],{},[63,32407,32408],{},"5.2.2.1 b.3",[144,32410,32411,32414,32417],{},[168,32412,32413],{},"Cable tray \u002F ladder",[168,32415,32416],{},"KW",[168,32418,32419],{},[63,32420,32421],{},"5.2.2.1 g + h",[144,32423,32424,32427,32430],{},[168,32425,32426],{},"Building cavity",[168,32428,32429],{},"FV",[168,32431,32432],{},[63,32433,32434],{},"5.2.2.1 k",[144,32436,32437,32440,32443],{},[168,32438,32439],{},"In conduit",[168,32441,32442],{},"IR",[168,32444,32445],{},[63,32446,31466],{},[144,32448,32449,32452,32455],{},[168,32450,32451],{},"Bundle of conduits",[168,32453,32454],{},"RB",[168,32456,32457],{},[63,32458,31466],{},[144,32460,32461,32464,32466],{},[168,32462,32463],{},"Overhead line",[168,32465,833],{},[168,32467,32468],{},[63,32469,32470],{},"5.2.2.1 a",[144,32472,32473,32476,32479],{},[168,32474,32475],{},"Cable protection",[168,32477,32478],{},"KS",[168,32480,32481],{},[63,32482,32483],{},"5.2.2.1 i",[144,32485,32486,32489,32492],{},[168,32487,32488],{},"Open, closed or sand-filled cable channel",[168,32490,32491],{},"KK",[168,32493,32494],{},[63,32495,32496],{},"5.2.2.1 j",[12,32498,32499,32500,56],{},"The method is attached to the segment, not to the whole cable: a route on the floor plan can carry a different method per stretch, and each stretch is drawn in its own colour with the two-letter short code. On the single-line diagram, PlanElec draws every method that occurs, in route order, by default; the first method is next to the protective device. From three methods onwards, the mark zone shows two symbols and “+n” for the remaining methods; the legend lists every method present, including those grouped under “+n”. The cable list gives the complete sequence for each cable. The per-stretch assignment remains in the cable model and in the per-stretch review. The cable list (CSV and PDF) records, for each cable, the method and length of every route segment in route order once every segment has an installation method; otherwise, it records the methods present without lengths. If a segment length is unknown, it shows “—”, never 0. It includes only the methods of that cable, not those of other cables in the same branch; the total cable length remains available in the length column. It can serve as a supplementary document under ",[63,32501,29419],{},[12,32503,32504,32505,32508,32509,32512,32513,32516,32517,32519],{},"The symbols use the geometry from table 2.23 category C: the circle ",[15,32506,32507],{},"on"," the carrier line is reserved exclusively for the ",[15,32510,32511],{},"overhead line","; the conduit circle sits ",[15,32514,32515],{},"beside"," the carrier line. Building cavity, cable tray, cable channel and cable protection have no dedicated symbol in table 2.23, so each receives its own clearly identifiable symbol with a legend in the diagram and PDF output (",[63,32518,29432],{},"). The cable menu, editor, preview and PDF use the same symbol source and carrier line.",[12,32521,32522,32523,7709,32526,32528,32529,32532,32533,32536,32537,32540,32541,32544,32545,32548,32549,32552,32553,32556],{},"In edit mode, click the wiring directly in the single-line diagram, even when no installation method has been documented yet; its accessible label is ",[15,32524,32525],{},"Edit cable line",[15,32527,32286],{}," menu shows the branch cables away from the protective device, in route order. When there is more than one cable or route segment, each cable is shown as ",[15,32530,32531],{},"Cable: {from} → {to}","; each segment appears as ",[15,32534,32535],{},"Route segment {number} · {length}",", or with “—” when its length is unknown. At the top, the ",[15,32538,32539],{},"Installation method for all route segments"," section applies the selected method to every segment in the branch; each individual segment can then be changed through its own installation-method option. As long as installation methods are missing or unconfirmed, the export tab shows a separate bulk-review section: ",[15,32542,32543],{},"Review cables step by step"," opens it, ",[15,32546,32547],{},"Choose an installation method"," is its selector; ",[15,32550,32551],{},"Fill empty intervals in selection"," fills empty fields only, and ",[15,32554,32555],{},"Confirm this cable’s installation methods"," confirms the entries cable by cable.",[12,32558,32559,32560,32563,32564,32566,32567,32569],{},"In the free ",[40,32561,22],{"href":1456,"rel":32562},[1458]," the choice is coarser and applies to the whole cable: the ",[15,32565,5654],{}," field offers \"In a wall\", \"On a wall\", \"Underground\" and \"Overhead\", plus the ",[15,32568,32439],{}," switch. Sketch draws the same table 2.23 category C marks on the line as Pro. That puts one installation method per cable on the diagram, as 3.1.2.2 point a requires, but only in these four steps; sections with their own installation method, the cable list and the fire-class check exist only in Pro.",[1489,32571],{":height":32572,":width":26962,"alt":32573,"caption":32574,"src":32575},"1052","PlanElec Sketch: cable of the first socket circuit selected; on the right ‘Length’ 12 m, ‘Extra on material list’ 3 m, ‘Fire class’ Cca, cross-section 2.5, type XVB, in conduit and ‘Installation method’ in the wall. The cable reads ‘XVB Cca 3G2,5’ and ‘12 m + 3 m’.","Type, fire class, cross-section, installation and length are written on the cable in the diagram. Sketch does not check whether the cross-section suits the breaker or the installation method.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-cable-properties.webp",[79,32577,32579],{"id":32578},"what-the-self-check-verifies-on-installation-methods-and-what-stays-on-site","What the self-check verifies on installation methods, and what stays on site",[12,32581,32582],{},"The self-check verifies the rules that can be decided from the recorded project data. For the installation method that means, concretely:",[84,32584,32585,32594,32621,32630],{},[87,32586,32587,32590,32591,32593],{},[15,32588,32589],{},"Cross-section against protection:"," the self-check verifies that the cable cross-section matches the rated current of the protective device. That is the pairing from ",[63,32592,26864],{},", which ignores the installation method. Current-carrying capacity under the recorded method, grouping, ambient temperature and insulation belong to the design.",[87,32595,32596,32599,32600,32602,32603,5259,32605,32607,32608,32610,32611,3157,32613,32616,32617,32620],{},[15,32597,32598],{},"Fire class in hollow walls:"," for route segments with the installation method ",[15,32601,32361],{},", and for endpoints in rooms with hollow walls, a cable without a documented cable-wide conduit must reach at least characteristic F2 or class Cca (",[63,32604,31568],{},[63,32606,32010],{},"). If the class is lower and no conduit is documented, PlanElec reports an error; if it is missing, a data gap. The ",[15,32609,32426],{}," selection, the exceptions under ",[63,32612,32007],{},[63,32614,32615],{},"5.2.7.3 point 1"," and the conduit rule in ",[63,32618,32619],{},"5.2.7.4"," are not yet part of the check.",[87,32622,32623,32626,32627,32629],{},[15,32624,32625],{},"Site dimensions:"," the installation zones of ",[63,32628,30723],{},", plaster or concrete cover and the depth of buried cables are not model data; the installer checks them on site.",[87,32631,32632,32635],{},[15,32633,32634],{},"Execution:"," whether the recorded method matches what was actually installed is a visual check on site. Measurements and the official assessment are carried out by the accredited inspection body.",[12,32637,32638,32639,56],{},"The full scope is listed in ",[40,32640,1086],{"href":1085},[79,32642,32644],{"id":32643},"which-mistakes-show-up-at-inspection","Which mistakes show up at inspection?",[84,32646,32647,32658,32666,32675,32685,32693,32716,32724],{},[87,32648,32649,32652,32653,3157,32655,32657],{},[15,32650,32651],{},"Insulated conductors instead of cables, surface-mounted or in a trough."," Loose VOB cores visible on a wall or lying in a trough breach ",[63,32654,29387],{},[63,32656,30764],{}," respectively: in principle, only cables are admitted there, subject to the exceptions stated in those provisions.",[87,32659,32660,32663,32664,56],{},[15,32661,32662],{},"Chase outside the installation zones."," Diagonal runs and routes straight across the middle of a wall are the classic finding under ",[63,32665,30723],{},[87,32667,32668,32671,32672,1487],{},[15,32669,32670],{},"Cover too thin."," Less than 0.4 cm of plaster over the cable, or less than 3 cm of concrete for embedded wiring (",[63,32673,32674],{},"5.2.9.10 points a and b",[87,32676,32677,32680,32681,32684],{},[15,32678,32679],{},"Connection inside the conduit."," Terminals and connectors within a conduit are forbidden (",[63,32682,32683],{},"5.2.9.3 point f","); connections in draw and junction boxes belong on a suitable terminal block.",[87,32686,32687,32690,32691,1487],{},[15,32688,32689],{},"Conduit no longer drawable."," Tight bends or overfilled conduits breach the requirement that conductors can be drawn in and removed at any time (",[63,32692,30749],{},[87,32694,32695,32698,32699,32701,32702,32704,32705,3324,32707,17825,32709,5259,32711,32713,32714,56],{},[15,32696,32697],{},"Structural void with Eca instead of F2\u002FCca"," — common in timber construction and suspended ceilings. PlanElec currently flags this only for ",[15,32700,32361],{}," and for rooms with hollow walls, not for the ",[15,32703,32426],{}," choice. Under the AREI, a conduit relieves the requirement only if it meets the conditions of ",[63,32706,32007],{},[63,32708,32615],{},[63,32710,31568],{},[63,32712,32010],{},"); conduits must also meet ",[63,32715,32619],{},[87,32717,32718,32721,32722,1487],{},[15,32719,32720],{},"Buried cable too shallow."," Less than 0.60 m without a continuous protective duct (",[63,32723,30790],{},[87,32725,32726,32729,32730,32732],{},[15,32727,32728],{},"Installation method missing from the diagram."," A single-line diagram carrying type, cross-section and conductor count but no installation method is incomplete (",[63,32731,29301],{},") — however cleanly the installation itself was executed.",[79,32734,13051],{"id":13050},[84,32736,32737,32741,32745,32750,32754],{},[87,32738,32739],{},[40,32740,26912],{"href":3795},[87,32742,32743],{},[40,32744,29591],{"href":4206},[87,32746,32747],{},[40,32748,32749],{"href":30823},"XVB versus VOB: which cable for what",[87,32751,32752],{},[40,32753,31706],{"href":30818},[87,32755,32756],{},[40,32757,4213],{"href":4212},[12,32759,32760],{},[40,32761,32762],{"href":1964},"Record installation methods in PlanElec Pro →",[12,32764,32765],{},[63,32766,32767,32768,56],{},"Regulatory basis: AREI\u002FRGIE book 1 V06 — sections 2.6.1, 2.7.1, 2.7.2, 5.2.2, 5.2.8, sub-sections 3.1.2.1, 3.1.2.2, 3.1.2.3, 4.3.3.5, 4.4.1.4 with table 4.11, 4.4.3.1, 5.2.1.2, 5.2.3.1, 5.2.7.2, 5.2.7.3 and section 5.2.9 with sub-sections 5.2.9.1 to 5.2.9.15. Official text: ",[40,32769,27049],{"href":1971,"rel":32770},[1458],{"title":2044,"searchDepth":2045,"depth":2045,"links":32772},[32773,32774,32775,32776,32777,32778,32779,32780,32781,32782,32783,32784,32785],{"id":31289,"depth":2045,"text":31290},{"id":31673,"depth":2045,"text":31674},{"id":31710,"depth":2045,"text":31711},{"id":31807,"depth":2045,"text":31808},{"id":31868,"depth":2045,"text":31869},{"id":31959,"depth":2045,"text":31960},{"id":32014,"depth":2045,"text":32015},{"id":32117,"depth":2045,"text":32118},{"id":32147,"depth":2045,"text":32148},{"id":32277,"depth":2045,"text":32278},{"id":32578,"depth":2045,"text":32579},{"id":32643,"depth":2045,"text":32644},{"id":13050,"depth":2045,"text":13051},"The installation method belongs on the single-line diagram. All seventeen methods from AREI 5.2.2.1, their rules in section 5.2.9, their effect on current-carrying capacity and typical inspection findings, with the article next to every statement.",[4244,2116,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-installation-methods-arei-editorial.jpg","\u002Fblog\u002Finstallation-methods-arei.en",{"title":31283,"description":32786},"Installation Methods (AREI) on the Single-Line Diagram","blog\u002Finstallation-methods-arei.en",[2133,2134,32795,5269,32796,32797,32798,4261],"installation methods","current-carrying capacity","cable installation","installation zones","qEXV5GDecHt2Mu0XrPRKmkAYCsoviSOvL-6xr3vuIsQ","\u002Fblog\u002Finstallation-methods-arei",{"id":32802,"title":32803,"articleId":32804,"body":32805,"category":4239,"date":30485,"description":33940,"extension":2113,"image":32827,"labels":33941,"lastUpdated":10988,"locale":2119,"meta":33942,"navigation":2121,"ogImage":33943,"path":33944,"publishDate":30485,"readTime":30492,"refreshInterval":4248,"seo":33945,"seoTitle":33946,"slug":32804,"stem":33947,"tags":33948,"__hash__":33953,"kind":2137,"href":33954},"blog\u002Fblog\u002Fmulti-storey-electrical-planning.en.md","Electrical planning across several floors: does every storey need its own board?","multi-storey-electrical-planning",{"type":9,"value":32806,"toc":33923},[32807,32811,32822,32828,32839,32849,32853,32856,32991,33005,33009,33013,33016,33025,33042,33053,33151,33183,33193,33197,33207,33213,33216,33244,33251,33256,33260,33278,33302,33312,33318,33322,33325,33328,33402,33412,33420,33424,33431,33437,33442,33455,33473,33498,33502,33505,33517,33533,33539,33543,33546,33561,33569,33582,33590,33601,33605,33612,33620,33624,33634,33637,33669,33679,33683,33692,33698,33716,33721,33725,33732,33738,33746,33759,33762,33790,33800,33803,33807,33810,33815,33833,33838,33879,33881,33913,33918],[79,32808,32810],{"id":32809},"does-every-storey-need-its-own-board","Does every storey need its own board?",[12,32812,32813,32814,32817,32818,32821],{},"No. The AREI\u002FRGIE knows no rule along the lines of \"one board per floor\". It requires a main distribution and switching board fitted with a general load-break switch whose rated current, in domestic installations, is not less than 40 A (",[63,32815,32816],{},"sub-section 5.3.5.1 point b","), and it requires distribution and switching boards in domestic installations to be easily accessible without special means (",[63,32819,32820],{},"point c","). Whether a second board upstairs belongs to that picture is your decision — not the standard's.",[12,32823,32824],{},[74,32825],{"alt":32826,"src":32827},"Electricians coordinate an installation across multiple floors.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-multi-storey-electrical-planning-editorial.webp",[12,32829,32830,32831,32834,32835,32838],{},"What the standard does impose are quantity limits, and those are exactly what drive the circuit count up in a three- or four-level terraced house: no more than eight single or multiple socket outlets per final circuit, and at least two separate lighting circuits for dwelling units comprising more than two rooms and\u002For locations (",[63,32832,32833],{},"sub-section 5.3.5.2 point b","), plus no more than eight final circuits per high-sensitivity residual current device (",[63,32836,32837],{},"sub-section 4.2.4.3 point b","). A sub-distribution board follows from those limits and from cable runs — not from a floor boundary.",[12,32840,32841,32842,32845,32846,32848],{},"The term the AREI\u002FRGIE uses helps frame the thinking: an ",[15,32843,32844],{},"elementary circuit"," is the part of an installation between two successive overcurrent protective devices — as a main circuit or a sub-circuit — or downstream of the last such device, in which case it is a final circuit (",[63,32847,31970],{},"). The riser feeding a sub-distribution board is therefore not a final circuit but a main circuit. Every rule aimed at final circuits — the eight sockets, the eight circuits per RCD — does not apply to it.",[79,32850,32852],{"id":32851},"when-does-a-sub-board-per-floor-make-sense-and-when-not","When does a sub-board per floor make sense — and when not?",[12,32854,32855],{},"The decision reads off four observable quantities: the number of final circuits, the longest cable run, accessibility, and the extension you already know is coming. The table below summarises what actually turns up in a Belgian dwelling; the standard column names the provision that creates the limit in the first place.",[138,32857,32858,32874],{},[141,32859,32860],{},[144,32861,32862,32864,32868,32871],{},[147,32863,2675],{},[147,32865,32867],{"align":32866},"center","One board is enough",[147,32869,32870],{"align":32866},"Sub-board per floor justified",[147,32872,32873],{},"AREI\u002FRGIE reference",[163,32875,32876,32888,32903,32917,32932,32947,32961,32976],{},[144,32877,32878,32881,32883,32885],{},[168,32879,32880],{},"Two levels, compact terraced house, under roughly 15 final circuits",[168,32882,5844],{"align":32866},[168,32884,25025],{"align":32866},[168,32886,32887],{},"no prescription; the count follows from 5.3.5.2 b and 4.2.4.3 b",[144,32889,32890,32893,32895,32897],{},[168,32891,32892],{},"More than 16 final circuits, so more than two high-sensitivity RCDs",[168,32894,25025],{"align":32866},[168,32896,5844],{"align":32866},[168,32898,32899,32900,3317],{},"at most 8 final circuits per high-sensitivity RCD (",[63,32901,32902],{},"4.2.4.3 b",[144,32904,32905,32908,32910,32912],{},[168,32906,32907],{},"Longest run well beyond 25–30 m from the board",[168,32909,25025],{"align":32866},[168,32911,5844],{"align":32866},[168,32913,32914,32915,3317],{},"voltage drop to be limited according to the rules of good practice (",[63,32916,30897],{},[144,32918,32919,32922,32924,32926],{},[168,32920,32921],{},"Attic with a heat pump, charge-point provision or a home office planned",[168,32923,25025],{"align":32866},[168,32925,5844],{"align":32866},[168,32927,32928,32929,3317],{},"supply power to be determined with diversity factors (",[63,32930,32931],{},"section 3.2.1",[144,32933,32934,32937,32939,32941],{},[168,32935,32936],{},"Board in the cellar, upper floor reachable only by ladder",[168,32938,25025],{"align":32866},[168,32940,5844],{"align":32866},[168,32942,32943,32944,3317],{},"easily accessible without special means (",[63,32945,32946],{},"5.3.5.1 c",[144,32948,32949,32952,32954,32956],{},[168,32950,32951],{},"Separate energy tariffs or a DSO meter of its own per level",[168,32953,25025],{"align":32866},[168,32955,5844],{"align":32866},[168,32957,32958,32959,3317],{},"separate panels at least 10 cm apart, or separate boards (",[63,32960,32946],{},[144,32962,32963,32966,32968,32970],{},[168,32964,32965],{},"A rental flat per floor, each with its own installation",[168,32967,25025],{"align":32866},[168,32969,5844],{"align":32866},[168,32971,32972,32973,3317],{},"every dwelling unit has its own domestic installation (term in ",[63,32974,32975],{},"2.2.1.1",[144,32977,32978,32981,32983,32985],{},[168,32979,32980],{},"Renovation, one storey stays untouched for now",[168,32982,5844],{"align":32866},[168,32984,25025],{"align":32866},[168,32986,32987,32988,3317],{},"the inspection is limited to the added or modified part (",[63,32989,32990],{},"6.4.7.3",[12,32992,32993,32994,32997,32998,33000,33001,33004],{},"Two arguments that regularly speak ",[15,32995,32996],{},"against"," a second board: every additional board is one more place that has to stay accessible, operable and maintainable without special means (",[63,32999,32946],{},"), and it has to carry an individual identification with the supply voltage clearly and conspicuously indicated (",[63,33002,33003],{},"sub-section 3.1.3.3 point a","). In a two-bedroom duplex that costs more than it saves in cable.",[12,33006,7139,33007,56],{},[40,33008,32144],{"href":32143},[79,33010,33012],{"id":33011},"how-do-i-size-the-riser-to-the-sub-board","How do I size the riser to the sub-board?",[12,33014,33015],{},"In three steps, only the last of which carries a number in the AREI\u002FRGIE.",[12,33017,33018,33021,33022,33024],{},[15,33019,33020],{},"First, the supply power."," When determining the supply power of an installation or of part of one, diversity and utilisation factors of the loads may be taken into account (",[63,33023,32931],{},"). The regulation puts no figure on it — which factor is appropriate is a matter of the rules of good practice and of how the floor will actually be used.",[12,33026,33027,33030,33031,33034,33038,33039,33041],{},[15,33028,33029],{},"Second, the current-carrying capacity."," The current-carrying capacity ",[63,33032,33033],{},"I",[33035,33036,33037],"sub",{},"Z"," of an electrical line depends on the conductor cross-section, the insulation, the make-up of the line, the installation method and the surroundings, and on the ambient temperature (",[63,33040,26861],{},"). A riser running 6 m vertically inside a closed shaft does not have the same capacity as the same cable laid freely on a cable tray — the installation method is part of the calculation, not cosmetics.",[12,33043,33044,33047,33048,17825,33050,33052],{},[15,33045,33046],{},"Third, the rating."," For domestic installations, ",[63,33049,26864],{},[63,33051,26861],{},") caps the maximum rated current of the protective device per conductor cross-section:",[138,33054,33055,33068],{},[141,33056,33057],{},[144,33058,33059,33062,33065],{},[147,33060,33061],{},"Conductor cross-section",[147,33063,33064],{},"Maximum rated current of the fuse",[147,33066,33067],{},"Maximum rated current of the circuit breaker",[163,33069,33070,33080,33089,33099,33110,33121,33131,33141],{},[144,33071,33072,33074,33077],{},[168,33073,22712],{},[168,33075,33076],{},"10 A",[168,33078,33079],{},"16 A",[144,33081,33082,33084,33086],{},[168,33083,22715],{},[168,33085,33079],{},[168,33087,33088],{},"20 A",[144,33090,33091,33094,33096],{},[168,33092,33093],{},"4 mm²",[168,33095,33088],{},[168,33097,33098],{},"25 A",[144,33100,33101,33104,33107],{},[168,33102,33103],{},"6 mm²",[168,33105,33106],{},"32 A",[168,33108,33109],{},"40 A",[144,33111,33112,33115,33118],{},[168,33113,33114],{},"10 mm²",[168,33116,33117],{},"50 A",[168,33119,33120],{},"63 A",[144,33122,33123,33126,33128],{},[168,33124,33125],{},"16 mm²",[168,33127,33120],{},[168,33129,33130],{},"80 A",[144,33132,33133,33136,33138],{},[168,33134,33135],{},"25 mm²",[168,33137,33130],{},[168,33139,33140],{},"100 A",[144,33142,33143,33146,33148],{},[168,33144,33145],{},"35 mm²",[168,33147,33140],{},[168,33149,33150],{},"125 A",[12,33152,33153,33154,33157,33158,33160,33162,33163,33165,33168,33169,33171,33173,33174,33176,33178,33179,33181,56],{},"That table is a ceiling, not a recommendation. It says what rating a cross-section will tolerate — not which cross-section is right for your riser. The additional condition sits in ",[63,33155,33156],{},"sub-section 4.4.3.2",": the rated current ",[63,33159,33033],{},[33035,33161,31607],{}," of the overload protective device must be at least the design current ",[63,33164,33033],{},[33035,33166,33167],{},"B"," of the circuit and lower than the current-carrying capacity ",[63,33170,33033],{},[33035,33172,33037],{}," of the line it protects; its conventional operating current ",[63,33175,33033],{},[33035,33177,31471],{}," does not exceed 1.45 times ",[63,33180,33033],{},[33035,33182,33037],{},[12,33184,33185,33188,33189,33192],{},[15,33186,33187],{},"Trade practice, not regulation:"," in a Belgian dwelling the calculation for a floor riser often gives 6 mm² with a C32 breaker, or 10 mm² with a C40. You often rate the sub-board's load-break switch at 40 A; the 40 A floor of ",[63,33190,33191],{},"5.3.5.1 b",", however, applies only to the main switch-disconnector of the main distribution board. The AREI\u002FRGIE prescribes none of these values; it only caps them.",[79,33194,33196],{"id":33195},"does-the-riser-have-to-be-protected-in-the-main-board","Does the riser have to be protected in the main board?",[12,33198,33199,33200,33203,33204,33206],{},"In principle yes, and at its origin. A short-circuit protective device is placed at the origin of every circuit made up of electrical lines with equivalent characteristics (",[63,33201,33202],{},"sub-section 4.4.2.2 point a","). For overload the principle is the same: the device is placed, as a rule, where a change of cross-section, nature, installation method or make-up reduces the current-carrying capacity of the conductors (",[63,33205,31987],{},") — that is, precisely where the main board's busbar continues into a 6 mm² cable.",[1489,33208],{":height":33209,":width":3800,"alt":33210,"caption":33211,"src":33212},"480","Simplified section through a house with ground floor and first floor: the main distribution board on the ground floor, after the grid connection and meter, feeds the ground-floor circuits and a riser to the sub-distribution board on the first floor, which feeds the first-floor circuits. Annotations: riser protected at its origin in the main board (AREI 4.4.2.2 a), shown on the single-line diagram with type, cross-section, number of conductors and installation method (3.1.2.2 a), sub-board located on the situation plan (3.1.2.3 a), circuit letters stay the same across floors.","The riser starts with its protective device in the main board; the first-floor sub-board appears on both the single-line diagram and the situation plan.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fmulti-storey-electrical-planning\u002Fsub-board-per-floor.en.svg",[12,33214,33215],{},"The regulation provides three derogations that genuinely occur in installations spread over several levels:",[84,33217,33218,33227,33236],{},[87,33219,33220,33223,33224,1487],{},[15,33221,33222],{},"Upstream protection suffices."," The short-circuit protective device may be omitted at the origin of a circuit, provided it is verified that the device placed upstream can still perform its function (",[63,33225,33226],{},"4.4.2.2 a",[87,33228,33229,33232,33233,1487],{},[15,33230,33231],{},"Three metres of latitude."," The protective device may sit on the line up to 3 m from the origin of the circuit, provided that stretch contains nothing liable to cause particular heating — connections, branches, reductions in cross-section, switchgear — and is not placed close to combustible materials (",[63,33234,33235],{},"4.4.2.2 b",[87,33237,33238,33241,33242,1487],{},[15,33239,33240],{},"The sum of the branches."," Overload protection may be dispensed with for an electrical line supplying several branches that are individually protected against overload, provided the sum of the rated or setting currents of those branch devices is lower than the rated or setting current of the device that would protect the line in question against overload (",[63,33243,31991],{},[12,33245,33246,33247,33250],{},"It is the third derogation that gets misread on risers. It does not allow the feeder to be left unprotected — it allows the ",[15,33248,33249],{},"overload"," protection to be omitted where the sum of the downstream ratings could never overload the line anyway. Short-circuit protection remains due. In a sub-board holding eight C16 and two C20, the ratings add up to 168 A; a 6 mm² riser does not fall under that exemption.",[12,33252,33253,33254,1487],{},"Do not forget the identification: circuits connected upstream of the main switch of the distribution and switching board must be identified as such (",[63,33255,3975],{},[79,33257,33259],{"id":33258},"does-the-areirgie-require-selectivity-between-main-and-sub-board","Does the AREI\u002FRGIE require selectivity between main and sub-board?",[12,33261,33262,33263,33266,33267,3157,33270,33273,33274,33277],{},"For an ordinary domestic installation: ",[15,33264,33265],{},"no."," The word selectivity appears in the AREI\u002FRGIE only in the context of safety installations and critical installations. There it says that the correct operation of a circuit with safety loads, respectively of a safety circuit, may not be affected by an electrical fault in another circuit, and that \"this requires selectivity between the protective devices\" (",[63,33268,33269],{},"sub-sections 5.5.7.1 point a",[63,33271,33272],{},"5.5.7.2","; identical wording for critical installations in ",[63,33275,33276],{},"chapter 5.6","). For the riser to the bedroom floor of a single-family house there is no equivalent prescription.",[12,33279,33280,33281,17825,33284,33286,33287,33289,33290,33292,33293,33296,33297,33299,33300,1487],{},"What the regulation does govern is the ",[15,33282,33283],{},"coordination of protective devices placed in series",[63,33285,26670],{},") — and that is a different thing from selectivity. Where several protective devices are placed in series, they may be coordinated so that, in the event of a downstream short circuit, the upstream device limits the energy passing through the downstream devices to a value that those devices and the lines they protect can withstand. Where the devices in series are circuit breakers, this accompanying protection has a name of its own: ",[63,33288,26743],{}," — the French text calls it ",[15,33291,26747],{},", the German one ",[15,33294,33295],{},"Backup-Schutz",". To determine its characteristics you have to request the manufacturers' back-up protection tables, drawn up in accordance with the product standards for circuit breakers (",[63,33298,26795],{},"). In non-domestic installations, the individual identification of the distribution and switching board must even state that the technique is being used (",[63,33301,26798],{},[12,33303,33304,33305,33307,33308,33311],{},"The difference in one sentence: ",[15,33306,26743],{}," lets a downstream breaker survive a short circuit it could not clear on its own, and gives it a reinforced ultimate breaking capacity. ",[15,33309,33310],{},"Selectivity"," makes sure a fault upstairs does not put the whole house in the dark. The first is a safety matter and is regulated; the second is a comfort and availability matter and, outside safety installations, a design decision.",[12,33313,33314,33317],{},[15,33315,33316],{},"Trade practice:"," grading — slower and larger upstream, faster and smaller downstream, and for RCDs additionally through sensitivity and time delay — is common and sensible in multi-storey installations. But it is an application of IEC 60364-5-53 and of manufacturer data, not an AREI\u002FRGIE obligation. Anyone defending it in an inspection report as an \"AREI requirement\" is citing a provision that does not exist.",[79,33319,33321],{"id":33320},"may-one-circuit-supply-several-floors","May one circuit supply several floors?",[12,33323,33324],{},"Yes. The AREI\u002FRGIE knows no rule limiting a final circuit to one level. A lighting circuit feeding the hall, the stairwell and the upstairs landing together is permitted — and in Belgian terraced houses it is the normal case, because the stairwell belongs geometrically to both levels.",[12,33326,33327],{},"All the quantity and assignment limits nevertheless remain fully applicable, and they count across floors:",[138,33329,33330,33340],{},[141,33331,33332],{},[144,33333,33334,33336,33338],{},[147,33335,6928],{},[147,33337,8667],{},[147,33339,3919],{},[163,33341,33342,33355,33367,33378,33390],{},[144,33343,33344,33347,33350],{},[168,33345,33346],{},"Single or multiple socket outlets per final circuit",[168,33348,33349],{},"at most 8",[168,33351,33352],{},[63,33353,33354],{},"5.3.5.2 b",[144,33356,33357,33360,33363],{},[168,33358,33359],{},"Separate lighting circuits for more than two rooms and\u002For locations",[168,33361,33362],{},"at least 2",[168,33364,33365],{},[63,33366,33354],{},[144,33368,33369,33372,33374],{},[168,33370,33371],{},"Final circuits per high or very high sensitivity RCD",[168,33373,33349],{},[168,33375,33376],{},[63,33377,32902],{},[144,33379,33380,33383,33386],{},[168,33381,33382],{},"RCD placed at the origin of the electrical installation",[168,33384,33385],{},"at most 300 mA",[168,33387,33388],{},[63,33389,32902],{},[144,33391,33392,33395,33398],{},[168,33393,33394],{},"Fixed appliances with a common operating device in a mixed circuit",[168,33396,33397],{},"count as 1 socket",[168,33399,33400],{},[63,33401,33354],{},[12,33403,33404,33405,33407,33408,33411],{},"The third and fourth rows work together the moment a sub-board enters the picture. Immediately downstream of the protective device placed at the origin of the electrical installation, at least one residual current device of high or very high sensitivity is placed, to which are connected at least the socket outlets not intended for fixed appliances, the lighting, the locations containing a bath and\u002For a shower, and the washing machines, tumble dryers and dishwashers — with at most eight final circuits per RCD (",[63,33406,32902],{},"). A bathroom on the upper floor fed from the board that sits there therefore needs that assignment ",[15,33409,33410],{},"there too","; the 300 mA device at the origin of the installation does not replace it.",[12,33413,33414,33415,33417,33418,56],{},"Two practical limits follow from the principle rather than from an article: a final circuit spread over three levels becomes long, and voltage drops in electrical lines are to be limited to the values described in the rules of good practice (",[63,33416,30897],{}," — the regulation itself quotes no percentage there). And a circuit scattered over three levels makes fault-finding awkward, because that part of the installation can no longer be isolated in one place. How to establish the corresponding lengths defensibly is covered in ",[40,33419,29591],{"href":4206},[79,33421,33423],{"id":33422},"how-do-i-take-the-riser-through-the-floor-slab","How do I take the riser through the floor slab?",[12,33425,33426,33427,33430],{},"The penetration itself is regulated. Where electrical lines pass through floors, they are protected at the level of the finished floor against mechanical damage and against liquids that may be spilled on the finished floor. Where the penetration is made with conductors run in conduits, those conduits are watertight and their upper end projects above the floor — at least as high as the skirting boards, if any, and at least 10 cm (",[63,33428,33429],{},"sub-section 5.2.1.5","). The same provision requires special precautions against water ingress and condensation for penetrations between rooms that may differ appreciably in humidity; unsealed conduits are then inclined towards the damper room.",[12,33432,33433,33434,33436],{},"For the vertical run inside a storey, the installation zones apply: electrical lines embedded without conduit in the walls of rooms follow horizontal and vertical routes only, the vertical runs lying as close as possible to a corner of the room or between 10 and 20 cm from door frames or casings (",[63,33435,30592],{},"). Horizontal runs lie between 25 and 35 cm from the floor or the ceiling.",[1489,33438],{":height":24042,":width":24043,"alt":33439,"caption":33440,"src":33441},"Illustration: shell-construction stairwell where a bundle of grey conduits runs vertically up the wall corner and through an opening in the concrete floor slab to an empty, open sub-distribution enclosure on the sand-lime brick wall of the upper floor.","Illustration (AI-generated) at shell stage: the vertical route runs in the corner of the room (5.2.9.10 b). The floor penetration is still open and unfinished here; the requirements of 5.2.1.5 apply at the level of the finished floor.","\u002Fimages\u002Fblog\u002Fenrichment-2026-11\u002Fmulti-storey-electrical-planning\u002Friser-through-floor-slab.webp",[12,33443,33444,33447,33448,1774,33451,33454],{},[15,33445,33446],{},"Cable trunking"," is an installation method named as such by the AREI\u002FRGIE (",[63,33449,33450],{},"sub-section 5.2.2.1 point h.1",[63,33452,33453],{},"figure 5.11",") — and the right choice as soon as several lines take the same vertical route. Two points to watch:",[84,33456,33457,33463],{},[87,33458,33459,33460,1487],{},"Where electrical lines of circuits at different voltages are used in a cable tray or in cable trunking, the connections for joints, terminations or branches are made in compartments that separate the lines at different voltages (",[63,33461,33462],{},"sub-section 5.2.9.6",[87,33464,33465,33466,33469,33470,33472],{},"Insulated conductors and cables installed in bunches or in a flat formation have at least characteristic F2, or at least class C",[33035,33467,33468],{},"ca"," — and this applies regardless of the distance over which they are actually bunched (",[63,33471,31832],{},"). A riser shaft with six cables is exactly such a bunch.",[12,33474,33475,33478,33479,33481,33482,8020,33484,33486,33487,3157,33490,33493,33494,33497],{},[15,33476,33477],{},"What the AREI\u002FRGIE does not regulate here:"," the fire-stopping of the shaft between storeys. The AREI\u002FRGIE requires a certain reaction to fire of wiring – for example property F2 or class C",[33035,33480,33468],{}," in building cavities (",[63,33483,32263],{},[63,33485,32010],{},") – and fire resistance only for safety and critical installations (",[63,33488,33489],{},"chapters 5.5",[63,33491,33492],{},"5.6",") and for special locations such as rooms with flammable liquid dielectric (",[63,33495,33496],{},"4.3.3.7 b","). Compartmentation of a residential building is governed by construction law – the basic fire-prevention standards and regional rules. Refer to the project's fire safety file for it, not to an AREI article.",[79,33499,33501],{"id":33500},"how-is-equipotential-bonding-run-across-several-levels","How is equipotential bonding run across several levels?",[12,33503,33504],{},"There are two equipotential bonds, and only one of them travels through the whole building.",[12,33506,33507,33510,33511,33514,33515,1487],{},[15,33508,33509],{},"Main equipotential bonding"," is building-wide. The main protective bonding conductor has a cross-section at least equal to half that of the largest protective conductor of the installation, the earthing conductor excluded, with a minimum of 6 mm² in copper; its cross-section may be limited to 25 mm² in copper, or to the electrically equivalent cross-section in another metal (",[63,33512,33513],{},"sub-section 5.4.4.1 point a","). This conductor carries green-and-yellow insulation and follows the prescriptions applicable to protective conductors (",[63,33516,32043],{},[12,33518,33519,33522,33523,17825,33526,33529,33530,1487],{},[15,33520,33521],{},"Supplementary equipotential bonding",", by contrast, is expressly local. In a location containing a bath and\u002For a shower, it locally connects all exposed conductive parts of the electrical equipment and all simultaneously accessible extraneous conductive parts ",[15,33524,33525],{},"situated in that location",[63,33527,33528],{},"sub-section 7.1.4.4","). A bathroom on the upper floor therefore gets its own supplementary bonding; it is not brought up from the ground floor. The cross-sections: at least half that of the protective conductor connected to an exposed conductive part, and in no case less than 2.5 mm² for mechanically protected conductors, 4 mm² for those that are not (",[63,33531,33532],{},"sub-section 5.4.4.2 point a",[12,33534,33535,33536,56],{},"The practical consequence for the riser: the protective conductor goes up in the same cable; extraneous conductive parts — water and heating pipes, metal structures — are bonded where they enter the building, via the main equipotential bonding, and not a second time per floor. Which earthing arrangement sits behind all of this is covered in ",[40,33537,33538],{"href":27030},"Earthing: TT or TN-S",[79,33540,33542],{"id":33541},"how-must-the-floors-appear-on-the-situation-plan-and-the-single-line-diagram","How must the floors appear on the situation plan and the single-line diagram?",[12,33544,33545],{},"The AREI\u002FRGIE separates the two documents cleanly, and that separation decides where a storey becomes visible at all.",[12,33547,4361,33548,33550,33551,33553,33554,33556,33557,33560],{},[15,33549,2132],{}," indicates the ",[15,33552,31026],{}," of the distribution and switching boards, the connection boxes and junction boxes, the socket outlets, the lighting points, the switches, the fixed machines and appliances, and the sources mentioned on the single-line diagram (",[63,33555,29587],{},"). The plural in \"distribution and switching boards\" is the decisive detail: a sub-board on the upper floor must be ",[15,33558,33559],{},"located"," on the situation plan. A diagram alone is not enough.",[12,33562,4361,33563,33565,33566,33568],{},[15,33564,5269],{}," carries the characteristics of the electrical lines — type, cross-section, number of conductors —, the installation methods, the type and characteristics of the residual current and overcurrent protective devices, the switches, the connection and junction boxes, the socket outlets, the lighting points, the fixed machines and appliances, and the sources (",[63,33567,26772],{},"). For a riser that means, concretely: type, cross-section, number of conductors and installation method are mandatory entries, not an extra.",[12,33570,33571,33572,33574,33575,33578,33579,33581],{},"As for identification: on the single-line diagram every elementary circuit is identified by a capital letter; every lighting point, socket outlet and control unit by a number giving the order in which they are met within the elementary circuit, starting from the overcurrent protective device upstream. On the situation plan those same elements carry the letter of their circuit and the sequence number assigned on the diagram (",[63,33573,29432],{},", figures 3.1 and 3.2). This identification is floor-independent — a circuit ",[25,33576,33577],{},"C"," running over two levels is called ",[25,33580,33577],{}," on both levels.",[12,33583,33584,33585,33587,33588,1487],{},"Every distribution and switching board additionally carries a clear, conspicuous and indelible individual identification, with the supply voltage clearly and conspicuously indicated (",[63,33586,33003],{},"), and the control, protection and isolation devices of circuits carry individual identifications, unless any possibility of confusion is ruled out (",[63,33589,3975],{},[12,33591,33592,33595,33596,33598,33599,56],{},[15,33593,33594],{},"What the AREI\u002FRGIE does not prescribe:"," that a separate sheet exists per floor, or that a separate diagram is drawn per board. Both are drawing practice — a very well-established practice, because a situation plan with two levels superimposed becomes unreadable. How the two documents delimit each other is covered in ",[40,33597,5400],{"href":5399},"; the make-up of a situation plan is treated in ",[40,33600,26373],{"href":6050},[79,33602,33604],{"id":33603},"does-every-floor-need-a-smoke-detector","Does every floor need a smoke detector?",[12,33606,33607,33608,33611],{},"That is ",[15,33609,33610],{},"not an AREI question."," The AREI\u002FRGIE does not require smoke detectors for domestic installations. The obligation comes from regional housing law: Flanders, Wallonia and Brussels each regulate independently how many detectors go where, and the requirements differ both in the number per level and in their scope for existing dwellings.",[12,33613,33614,33615,33619],{},"For multi-storey planning only the consequence matters: the detector evidence does not belong in the AREI inspection report but in the regional conformity, and where the detectors run on 230 V, their circuit appears on the single-line diagram like any other. The regional rules in detail are in ",[40,33616,33618],{"href":33617},"\u002Fen\u002Fblog\u002Fsmoke-detector-mandatory-belgium","Smoke detector obligations in Belgium"," — there and not here, so that only one maintained version exists.",[79,33621,33623],{"id":33622},"what-applies-if-i-convert-a-floor-later-on","What applies if I convert a floor later on?",[12,33625,33626,33627,33630,33631,33633],{},"A converted attic is almost always a ",[15,33628,33629],{},"significant extension",". The AREI\u002FRGIE defines it as a modification or extension of an electrical installation that has an additional impact — not yet covered by a conformity inspection — on the safety of persons or property, and it expressly cites \"the addition of a circuit in a domestic installation\" as an example (",[63,33632,26812],{},", definitions). A new sub-board with six circuits meets that several times over.",[12,33635,33636],{},"Three consequences follow:",[84,33638,33639,33649,33661],{},[87,33640,33641,33644,33645,33648],{},[15,33642,33643],{},"Inspection before commissioning."," Any significant modification or extension undergoes a conformity inspection before that modification or extension is put into use; this inspection is limited to the added or modified parts of the installation (",[63,33646,33647],{},"sub-section 6.4.7.3","). The old ground-floor installation is therefore not inspected automatically. Modifications or extensions that have an impact on an unmodified part must nevertheless be mentioned in the conformity inspection report.",[87,33650,33651,33654,33655,33657,33658,33660],{},[15,33652,33653],{},"300 mA for the whole installation."," In the case of a significant modification or extension in an old domestic electrical installation, the ",[15,33656,30854],{}," electrical installation is protected by at least one residual current device with a rated residual operating current of at most 300 mA (",[63,33659,32837],{},"). That is the prescription which regularly makes an attic conversion more expensive than budgeted.",[87,33662,33663,33666,33667,1487],{},[15,33664,33665],{},"The situation plan travels with it."," Any modification or extension made to a domestic electrical installation is shown on the situation plan, which gives the existing situation of the installation's components at all times. Any older part whose on-site execution began before 1 October 1981 and which appears on the single-line diagram is marked \"older part\" (",[63,33668,29432],{},[12,33670,33671,33672,33674,33675,56],{},"For modifications that cannot be qualified as significant, no new single-line diagram is required; a brief description of the modification, stating the name, capacity and address of those responsible for carrying out the work, dated and signed by them, is sufficient (",[63,33673,25564],{},"). The situation plan must nevertheless be kept current. The full sequence for a new build is set out in the ",[40,33676,33678],{"href":33677},"\u002Fen\u002Fblog\u002Fnew-build-single-line-diagram-checklist","New-build single-line diagram checklist",[79,33680,33682],{"id":33681},"single-family-house-or-apartment-building-does-that-change-the-answer","Single-family house or apartment building — does that change the answer?",[12,33684,33685,33686,33688,33689,33691],{},"Yes, and on a point that is often overlooked. As long as all the storeys belong to ",[15,33687,4996],{}," dwelling unit, the whole thing is a single domestic installation: one single-line diagram, one situation plan, one inspection, and the quantity limits of ",[63,33690,33354],{}," apply to that one unit.",[12,33693,33694,33695,33697],{},"The moment a dwelling unit of its own appears per floor, several domestic installations appear — each with its own main distribution and switching board with a general load-break switch of at least 40 A (",[63,33696,33191],{},"), its own diagram, its own situation plan and its own inspection. The eight sockets per final circuit then count per dwelling unit, not per building.",[12,33699,33700,33701,33703,33704,33707,33708,33711,33712,33715],{},"For the ",[15,33702,5433],{}," — stairwell lighting, bell installation, outdoor lighting, meter room — there is an explicit relaxation: by way of derogation from the prescriptions for non-domestic installations, it is permitted to limit oneself, for the diagrams, plans and documents of the common parts of a residential complex, to the prescriptions applicable to a domestic installation (",[63,33705,33706],{},"sub-section 3.1.2.1 point e","). The same goes for the identification of the corresponding distribution and switching boards (",[63,33709,33710],{},"sub-section 3.1.3.3 point c","). In practice: for the stairwell board a single-line diagram in the familiar domestic format is enough — you do not have to document prospective short-circuit currents, impedances or utilisation categories, as ",[63,33713,33714],{},"3.1.2.2 b"," would otherwise require.",[12,33717,7139,33718,56],{},[40,33719,33720],{"href":4796},"Document an apartment building with multiple meters",[79,33722,33724],{"id":33723},"how-do-i-align-the-floors-in-planelec","How do I align the floors in PlanElec?",[12,33726,33727,33728,33731],{},"For the single-line diagram and situation plan of a house, ",[40,33729,22],{"href":1456,"rel":33730},[1458]," is often enough, free in the browser: in the situation plan you create the floors as tabs, which you name and order; in the PDF, each floor with content gets its own sheets at 1:1 plan scale, and large floors are split across several part sheets. You draw the sub-board in the single-line diagram either inline or on a page of its own. Sketch has no point-pair alignment, no distribution board layout and no self-check; if you need those, carry the drawing over with \"Take it to Pro\", including floors, boards, sub-boards and circuits.",[12,33733,33734,33735,33737],{},"Everything that follows in this section and the next describes ",[15,33736,31],{},". There, floors are not separate drawings but levels of one shared building model. You create them, order them, and copy the outer contour or the building structure from one level to the next; a shared building origin keeps the plans superimposable, and a reference overlay shows the neighbouring floor at an adjustable opacity.",[12,33739,33740,33741,33743,33744,56],{},"The alignment itself runs on ",[15,33742,21800],{},": you place the same distinctive point first in the current plan and then in the displayed reference plan. From two point pairs onwards, offset and rotation are derived automatically. PlanElec then reports the mean and the largest deviation in centimetres, as well as the residual deviation per point pair; the arrow keys move by 1 cm, with Shift by 10 cm. The scale stays fixed — the alignment is rigid and never distorts a floor to pull points together. The steps are in the help article ",[40,33745,16038],{"href":16037},[12,33747,33748,33749,1774,33752,3157,33755,33758],{},"The vertical connection is an element in its own right, available as ",[15,33750,33751],{},"staircase",[15,33753,33754],{},"shaft",[15,33756,33757],{},"riser zone",". A staircase is drawn on one floor and appears on the neighbouring floor as the same editable element, mirrored — solid up to the cut line, dashed beyond it. Changes made to the projected twin are written back to the source floor. A point pair can be taken straight from a staircase or a shaft.",[12,33760,33761],{},"For the electrical side, more depends on this than it first appears:",[84,33763,33764,33770,33776,33782],{},[87,33765,33766,33769],{},[15,33767,33768],{},"Switch chains"," are project-wide. While drawing, you continue a chain via the floor selector; the display states how many members are on this floor and how many in total, across how many floors.",[87,33771,33772,33775],{},[15,33773,33774],{},"Circuit assignment"," works across floors: loads on several floors can be assigned together to an existing circuit breaker, and the selection survives a floor change.",[87,33777,33778,33781],{},[15,33779,33780],{},"Physical cable routes"," do run across floors, but in two kinds of leg: floor legs are drawn and edited locally on their own level, while the vertical leg is chosen through a connector instead of being drawn. The vertical length is derived from the storey heights and the horizontal offset as long as it has not been measured — and it feeds into the cable length and therefore into the voltage drop calculation. Storey heights are marked as an assumption or as a confirmed value; the default is 2.50 m clear height and 0.30 m slab thickness.",[87,33783,33784,33787,33788,1487],{},[15,33785,33786],{},"Sub-distribution boards"," are created as boards of their own, with a supply line from the upstream board. PlanElec creates the feeder circuit breaker in the supplying board, hangs the sub-board's main switch beneath it, and proposes a rating and cross-section based on the expected load and a diversity factor of 0.7. A board is assigned to a floor by the act of placing its symbol in that floor's plan (",[40,33789,19286],{"href":18627},[12,33791,33792,33793,33795,33796,33799],{},"On ",[15,33794,21783],{},", each floor gets its own page of the situation plan with its own title block; floors without drawn walls are skipped. The single-line diagram is built as ",[15,33797,33798],{},"one sheet per board",", main board first, and a single board may occupy several A4 pages. Between the sheets, PlanElec places cross-references in both directions: on the main board's sheet, the outgoing way to the sub-board carries that sub-board's sheet number, and on the sub-board's sheet, the incoming supply carries the sheet number of the supplying board.",[1489,33801],{":height":4096,":width":4097,"alt":4098,"caption":33802,"src":4100},"Each floor becomes its own sheet in the PDF; the palette shows which devices from the diagram already have a place. It does not replace checking against the site.",[79,33804,33806],{"id":33805},"what-the-self-check-covers-across-storeys-and-what-you-settle-yourself","What the self-check covers across storeys – and what you settle yourself",[12,33808,33809],{},"The AREI\u002FRGIE self-check exists only in PlanElec Pro. It evaluates the supported rules from the data recorded in the project and is an orientation, not a certificate of conformity. For multi-storey installations that means:",[12,33811,33812],{},[15,33813,33814],{},"What it checks:",[84,33816,33817,33820,33823,33830],{},[87,33818,33819],{},"That a supply line between two boards has a protective device of its own in the upstream board, points to an existing target board, and is consistently assigned on both sides. If one of these is missing, it is an error, not a remark.",[87,33821,33822],{},"The voltage drop using the actual cable length, including the vertical legs of routes that cross floors. If the length is missing, the result is not an error but a non-blocking notice that the entry is absent.",[87,33824,33825,33826,33829],{},"Grading between upstream and downstream residual current devices — explicitly as a ",[15,33827,33828],{},"practice recommendation under IEC 60364-5-53",", not as an AREI rule, and therefore as a warning you can override.",[87,33831,33832],{},"Smoke detector coverage per floor — likewise a non-blocking warning and explicitly a pointer to regional law, not to the AREI. Where bedrooms or hallways are recorded as a room type, PlanElec reports room by room; only where no such room type is recognisable on a floor is the per-floor rule used as a fallback.",[12,33834,33835],{},[15,33836,33837],{},"What you settle yourself:",[84,33839,33840,33846,33855,33861,33867,33873],{},[87,33841,4361,33842,33845],{},[15,33843,33844],{},"cross-section of the riser",". The line between two boards is maintained as a circuit with a protective device, but not as a cable segment of its own with a cross-section. The cross-section shown when the board is created is a preview of the calculation, not a stored value — it therefore appears neither in the cross-section check nor in the voltage drop calculation.",[87,33847,4361,33848,33851,33852,33854],{},[15,33849,33850],{},"ampere grading"," between the feeder protection and the sub-board's main switch. That is a deliberate choice: the coordination of protective devices placed in series runs, per ",[63,33853,26795],{},", on let-through energy and breaking capacity, and therefore on the manufacturer's back-up protection tables, not on the rated current.",[87,33856,33857,33860],{},[15,33858,33859],{},"Short-circuit selectivity between circuit breakers."," No rule addresses it — and under the AREI\u002FRGIE there is no obligation either, outside safety and critical installations.",[87,33862,4361,33863,33866],{},[15,33864,33865],{},"riser zone as a concept."," It is a type of vertical connector in the plan, serving the cable routing; no check rule evaluates it.",[87,33868,33869,33872],{},[15,33870,33871],{},"Fire-stopping, compartmentation and shaft closure."," That is governed by construction law, not by the AREI\u002FRGIE or the self-check.",[87,33874,33875,33878],{},[15,33876,33877],{},"Measurement and inspection."," The electrician takes measurements on site; the official assessment is made by the recognised inspection body.",[79,33880,13051],{"id":13050},[84,33882,33883,33888,33892,33896,33900,33904,33908],{},[87,33884,33885],{},[40,33886,33887],{"href":4200},"Planning a distribution board: layout and modules",[87,33889,33890],{},[40,33891,26373],{"href":6050},[87,33893,33894],{},[40,33895,29591],{"href":4206},[87,33897,33898],{},[40,33899,33538],{"href":27030},[87,33901,33902],{},[40,33903,33678],{"href":33677},[87,33905,33906],{},[40,33907,33618],{"href":33617},[87,33909,33910],{},[40,33911,26426],{"href":33912},"\u002Fen\u002Fblog\u002Fbreaking-capacity-mcb-ka",[12,33914,33915],{},[40,33916,33917],{"href":1964},"See PlanElec Pro: floors, sub-boards and self-check in one project →",[12,33919,33920],{},[63,33921,33922],{},"Regulatory basis: AREI\u002FRGIE Book 1 V06 — sub-section 2.2.1.1, sections 2.6.1 and 2.11.2, sub-sections 3.1.2.1, 3.1.2.2, 3.1.2.3, 3.1.3.1, 3.1.3.3, section 3.2.1, sub-sections 4.2.4.3, 4.3.3.5 and 4.3.3.7, chapter 4.4 (sub-sections 4.4.1.3, 4.4.1.4 with table 4.11, 4.4.2.2, 4.4.3.1, 4.4.3.2, 4.4.3.3), sub-sections 5.2.1.5, 5.2.2.1, 5.2.7.3, 5.2.9.6, 5.2.9.10, section 5.2.5, sub-sections 5.3.5.1, 5.3.5.2, 5.4.4.1, 5.4.4.2, 5.5.7.1, 5.5.7.2, 6.4.7.3 and 7.1.4.4. The official text, the actual state of the installation and the inspection by an approved body remain authoritative.",{"title":2044,"searchDepth":2045,"depth":2045,"links":33924},[33925,33926,33927,33928,33929,33930,33931,33932,33933,33934,33935,33936,33937,33938,33939],{"id":32809,"depth":2045,"text":32810},{"id":32851,"depth":2045,"text":32852},{"id":33011,"depth":2045,"text":33012},{"id":33195,"depth":2045,"text":33196},{"id":33258,"depth":2045,"text":33259},{"id":33320,"depth":2045,"text":33321},{"id":33422,"depth":2045,"text":33423},{"id":33500,"depth":2045,"text":33501},{"id":33541,"depth":2045,"text":33542},{"id":33603,"depth":2045,"text":33604},{"id":33622,"depth":2045,"text":33623},{"id":33681,"depth":2045,"text":33682},{"id":33723,"depth":2045,"text":33724},{"id":33805,"depth":2045,"text":33806},{"id":13050,"depth":2045,"text":13051},"When a sub-distribution board per floor earns its place, how to size and protect the riser, what the AREI\u002FRGIE actually says about selectivity, and how storeys appear on the situation plan and the single-line diagram — with the article reference beside every statement.",[18037,4243,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-multi-storey-electrical-planning-editorial.jpg","\u002Fblog\u002Fmulti-storey-electrical-planning.en",{"title":32803,"description":33940},"Several Floors: Does Every Storey Need Its Own Board?","blog\u002Fmulti-storey-electrical-planning.en",[2133,2134,33949,33950,33951,5269,26419,33952,4261],"floors","sub-distribution board","riser","multi-storey","1wY-spHGs6GFyKGcStO4ZpLJiBA1ak1tTbILCTgp5ak","\u002Fblog\u002Fmulti-storey-electrical-planning",{"id":33956,"title":33957,"articleId":33958,"body":33959,"category":4239,"date":30485,"description":34537,"extension":2113,"image":33987,"labels":34538,"lastUpdated":10988,"locale":2119,"meta":34540,"navigation":2121,"ogImage":34541,"path":34542,"publishDate":30485,"readTime":15114,"refreshInterval":4248,"seo":34543,"seoTitle":34544,"slug":33958,"stem":34545,"tags":34546,"__hash__":34550,"kind":2137,"href":34551},"blog\u002Fblog\u002Fswitch-types-single-line-diagram.en.md","Two-Way, Intermediate or Double Switch: Which One Belongs on the Single-Line Diagram?","switch-types-single-line-diagram",{"type":9,"value":33960,"toc":34523},[33961,33965,33982,33988,33996,34112,34122,34127,34131,34142,34145,34153,34157,34160,34163,34188,34191,34195,34200,34209,34231,34237,34241,34244,34247,34258,34261,34265,34272,34279,34282,34286,34289,34300,34313,34325,34329,34336,34374,34380,34384,34387,34394,34400,34404,34411,34421,34427,34430,34436,34443,34449,34453,34456,34481,34483,34513,34518],[79,33962,33964],{"id":33963},"which-arrangement-matches-how-many-control-points","Which arrangement matches how many control points?",[12,33966,33967,33968,1774,33971,33974,33975,1774,33978,33981],{},"The number of places from which you want to operate the same light point decides the arrangement. One place is a plain switch. Two places call for two two-way switches (",[63,33969,33970],{},"wisselschakelaar",[63,33972,33973],{},"va-et-vient","). Three or more places still use two two-way switches at the ends, with one intermediate switch (",[63,33976,33977],{},"kruisschakelaar",[63,33979,33980],{},"permutateur",") added per extra control point. The double switch falls outside that series: it operates two groups separately from a single place.",[12,33983,33984],{},[74,33985],{"alt":33986,"src":33987},"Electricians check light switches in a hallway.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-switch-types-single-line-diagram-editorial.webp",[12,33989,33990,33992,33993,33995],{},[63,33991,25624],{}," of the AREI\u002FRGIE, part of ",[63,33994,25628],{},", gives each of these functions its own symbol. The same table applies to the single-line diagram and to the situation plan of a domestic installation.",[138,33997,33998,34015],{},[141,33999,34000],{},[144,34001,34002,34004,34007,34010,34012],{},[147,34003,6790],{},[147,34005,34006],{},"Arrangement",[147,34008,34009],{},"Description in Table 2.23, section E",[147,34011,9873],{},[147,34013,34014],{},"Link between the points",[163,34016,34017,34032,34048,34064,34080,34095],{},[144,34018,34019,34021,34024,34027,34030],{},[168,34020,6424],{},[168,34022,34023],{},"simple switching",[168,34025,34026],{},"\"Switch — general symbol\"",[168,34028,34029],{},"1 switch",[168,34031,2476],{},[144,34033,34034,34037,34040,34043,34046],{},[168,34035,34036],{},"1, but two separate lighting groups",[168,34038,34039],{},"double switching",[168,34041,34042],{},"\"Single-pole changeover switch (double lighting: to close or open two circuits separately from a single place)\"",[168,34044,34045],{},"1 double switch with two channels",[168,34047,2476],{},[144,34049,34050,34052,34055,34058,34061],{},[168,34051,6407],{},[168,34053,34054],{},"two-way switching",[168,34056,34057],{},"\"Single-pole two-way switch (two directions: to close or open one circuit from two different places)\"",[168,34059,34060],{},"2 two-way switches",[168,34062,34063],{},"2 strapping conductors",[144,34065,34066,34068,34071,34074,34077],{},[168,34067,6662],{},[168,34069,34070],{},"intermediate switching",[168,34072,34073],{},"\"Intermediate switch … combined with two two-way switches at both ends\"",[168,34075,34076],{},"2 two-way switches + 1 intermediate switch",[168,34078,34079],{},"2 strapping conductors per section",[144,34081,34082,34085,34087,34090,34093],{},[168,34083,34084],{},"n ≥ 3",[168,34086,34070],{},[168,34088,34089],{},"same",[168,34091,34092],{},"2 two-way switches + (n − 2) intermediate switches",[168,34094,34079],{},[144,34096,34097,34100,34103,34106,34109],{},[168,34098,34099],{},"unlimited",[168,34101,34102],{},"push-button control",[168,34104,34105],{},"\"Push-button\" together with \"Impulse relay\"",[168,34107,34108],{},"1 push-button per place + 1 impulse relay in the board",[168,34110,34111],{},"1 shared control line, push-buttons in parallel",[12,34113,34114,34115,34118,34119,34121],{},"The AREI does not prescribe those conductor counts itself — they follow from the wiring principle. What it does require is that the single-line diagram state the type, cross-section and ",[15,34116,34117],{},"number of conductors"," of every electrical line, as well as the switches themselves (",[63,34120,25944],{},"). A two-way arrangement drawn as an ordinary lighting circuit therefore omits mandatory data.",[1489,34123],{":height":25874,":width":3800,"alt":34124,"caption":34125,"src":34126},"Four simplified wiring principles: simple switching with one control point (L, switch, lamp, N); double switching with one control point that switches two lamp groups separately via two contacts; two-way switching with two two-way switches and two strapping conductors; intermediate switching with an intermediate switch inserted in the strapping conductors between the two two-way switches.","Each extra control point adds one intermediate switch in the strapping conductors; double switching stays at one place and switches two groups separately (principle sketch, not the Table 2.23 symbols).","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fswitch-types-single-line-diagram\u002Fswitching-circuits.en.svg",[79,34128,34130],{"id":34129},"what-is-the-difference-between-a-two-way-switch-and-a-double-switch","What is the difference between a two-way switch and a double switch?",[12,34132,34133,34134,34137,34138,34141],{},"Both look \"double\" on the shelf, yet they do the opposite. A two-way switch diverts one circuit to either of two outputs: paired with a second two-way switch it operates ",[15,34135,34136],{},"the same"," light point from two places. The double switch — Table 2.23's \"single-pole changeover switch, double lighting\" — operates ",[15,34139,34140],{},"two different"," circuits separately from a single place.",[12,34143,34144],{},"Practical consequence: a double switch never replaces a two-way arrangement, and vice versa. Fitting a double switch in a hallway that needs two control points gives you two rockers, each turning on its own lamp, not one lamp operated from both ends.",[12,34146,34147,34148,34150,34151,1487],{},"Mind the terminology as well. The Dutch AREI text calls the double switch \"eenpolige omschakelaar (dubbele aansteking)\" and the French RGIE text \"commutateur unipolaire (double allumage)\"; the intermediate switch appears as \"kruisschakelaar\" and \"commutateur intermédiaire pour va-et-vient\", while site language says ",[63,34149,33980],{},". If you use different names, carry the Table 2.23 description into your legend — the regulation accepts any clearly identifiable symbol provided it is defined in the legend of the diagrams and plans (",[63,34152,25639],{},[79,34154,34156],{"id":34155},"how-many-conductors-does-a-two-way-arrangement-need","How many conductors does a two-way arrangement need?",[12,34158,34159],{},"Two strapping conductors run between the two two-way switches. Add to that the line conductor feeding the first switch, the switched conductor from the second switch to the light point, the neutral up to the luminaire, and the protective conductor where one is required. An intermediate switch does not change the principle: it is inserted into the straps, with two conductors on each side.",[12,34161,34162],{},"Two AREI rules govern the choice of those conductors:",[84,34164,34165,34178],{},[87,34166,34167,34170,34171,17825,34174,34177],{},[15,34168,34169],{},"Cross-section."," For electrical lines that are not an integral part of an appliance, a cross-section below 2.5 mm² is prohibited in principle. ",[63,34172,34173],{},"Table 5.1",[63,34175,34176],{},"Sub-section 5.2.1.2",") expressly allows 1.5 mm² for \"electrical lines belonging to circuits without socket outlets\" — precisely a pure lighting circuit with its switches.",[87,34179,34180,34183,34184,34187],{},[15,34181,34182],{},"Colour."," The green-and-yellow combination is reserved for protective conductors, protective-bonding conductors and earthed active conductors (PEN, PEM, PEL); using green and\u002For yellow for the insulation of other active conductors is prohibited (",[63,34185,34186],{},"Sub-section 5.1.6.2","). Blue is reserved for the neutral in circuits that have one. Where a circuit has no neutral, the blue-marked core of a multi-core cable may serve another purpose — but never as a protective or bonding conductor. A strap may therefore be blue in a cable without a neutral, never green-and-yellow.",[12,34189,34190],{},"For cable types, Table 2.23 supplies its own worked examples: an XVB cable Cca with a stated number of conductors of a stated cross-section, or individual H07V-U conductors Eca in a conduit in a wall. Put the type and installation method actually used into the diagram; both are mandatory content of the single-line diagram.",[79,34192,34194],{"id":34193},"which-symbol-goes-on-the-single-line-diagram-and-which-on-the-situation-plan","Which symbol goes on the single-line diagram, and which on the situation plan?",[12,34196,34197,34198,56],{},"The symbol is the same — Table 2.23 covers both documents. The difference lies in the question each document answers, and above all in the ",[15,34199,22115],{},[12,34201,34202,34203,34205,34206,34208],{},"The single-line diagram must show the switches, alongside junction and branch boxes, socket outlets, light points, fixed machines and appliances, the protective devices and the line data (",[63,34204,25944],{},"). Each elementary circuit is identified by a capital letter; each light point, socket outlet and control unit receives a sequence number in the order in which it is met in the circuit, starting from the upstream overcurrent protective device (",[63,34207,25639],{},", Figure 3.1).",[12,34210,34211,34212,34214,34215,34217,34218,17825,34221,34223,34224,34227,34228,34230],{},"The situation plan must give the ",[15,34213,29583],{}," of those same switches (",[63,34216,25950],{},"). And that is where the most frequently missed rule sits: each switch and each control unit is identified by the letter of the circuit it belongs to ",[15,34219,34220],{},"and by the sequence number of the light point or appliance it controls",[63,34222,25639],{},", Figure 3.2). Two two-way switches jointly operating light point ",[25,34225,34226],{},"B3"," therefore both carry the reference ",[25,34229,34226],{},", not two consecutive numbers of their own.",[12,34232,34233,34234,56],{},"That is exactly why the switch chain is not a cosmetic detail: without a recorded relationship between switch and light point, this reference cannot be assigned correctly. How the two documents interlock is set out in ",[40,34235,34236],{"href":5399},"single-line diagram versus situation plan",[79,34238,34240],{"id":34239},"when-are-push-buttons-with-an-impulse-relay-better-than-an-intermediate-arrangement","When are push-buttons with an impulse relay better than an intermediate arrangement?",[12,34242,34243],{},"From three or four control points onward, an intermediate arrangement's wiring grows quickly: every extra place needs two straps out and back. Push-buttons wired in parallel on one shared control line, together driving an impulse relay, scale better. Table 2.23 section E carries both symbols: the \"push-button\" and the \"impulse relay\" (télérupteur).",[12,34245,34246],{},"Two things to keep in mind:",[84,34248,34249,34252],{},[87,34250,34251],{},"The impulse relay sits in the distribution and switchgear assembly, so that is where it belongs on the single-line diagram, with its upstream protective device. It is not a property of the push-button in the hallway.",[87,34253,34254,34255,34257],{},"The regulation explicitly accepts \"control auxiliaries\" and \"electronic devices\" as control devices, alongside switches and circuit breakers (",[63,34256,26339],{},"). An impulse relay is therefore a regular solution, provided it complies with the relevant standards.",[12,34259,34260],{},"A related variant is the staircase timer or time switch; Table 2.23 provides a symbol for those too. The choice between impulse relay and timer is functional, not normative: the first holds until the next pulse, the second drops out after a set time.",[79,34262,34264],{"id":34263},"may-a-switch-be-single-pole-and-may-it-sit-in-the-neutral","May a switch be single-pole — and may it sit in the neutral?",[12,34266,34267,34268,34271],{},"Single-pole is permitted. ",[63,34269,34270],{},"Sub-section 5.3.3.2 point c"," states explicitly that, where no danger can result, not all active conductors need to be broken. A classic single-pole lighting switch breaking the line conductor falls within that.",[12,34273,34274,34275,34278],{},"The same provision immediately draws a limit: ",[15,34276,34277],{},"except for taking measurements, a single-pole control device is not placed in the neutral conductor."," A single-pole switch mistakenly wired into the neutral leaves the appliance live while it appears to be off. That is a classic inspection finding, and it cannot be derived from a drawing — it must be established on site with the circuit de-energised.",[12,34280,34281],{},"Double-pole switching remains possible and is sometimes wanted, for instance for a permanently connected appliance that must be fully separable from the supply. Table 2.23 lists both the \"double-pole switch\" and the \"double-pole two-way switch\" for that. Pole count is therefore a property of its own, separate from the switching function — not a different arrangement.",[79,34283,34285],{"id":34284},"how-many-light-points-may-one-switch-chain-feed","How many light points may one switch chain feed?",[12,34287,34288],{},"Two AREI rules are commonly conflated here.",[12,34290,34291,34292,34295,34296,34299],{},"The limit of eight applies to ",[15,34293,34294],{},"socket outlets",": the number of single or multiple socket outlets is limited to eight per final circuit (",[63,34297,34298],{},"Sub-section 5.3.5.2 point b","). A pure lighting circuit is not subject to it.",[12,34301,34302,34303,34305,34306,34309,34310,34312],{},"As soon as socket outlets, luminaires and other fixed appliances share the ",[15,34304,34089],{}," final circuit, the rules for socket circuits apply — and then the text matters: \"a single fixed appliance or a set of fixed appliances controlled by a common control device ",[13616,34307,34308],{},"is"," treated as one socket outlet\" (",[63,34311,34298],{},"). Four spotlights hanging off one switch chain therefore count as a single unit in such a mixed circuit, not as four.",[12,34314,34315,34316,17825,34319,34321,34322,56],{},"In addition, for dwelling units comprising more than two rooms and\u002For spaces, the circuits feeding the luminaires must be ",[15,34317,34318],{},"at least two separate circuits",[63,34320,34298],{},"). A single lighting circuit for a whole home is thus not a design choice but a shortcoming. The counting method in mixed circuits is worked through in ",[40,34323,34324],{"href":3702},"sockets per circuit",[79,34326,34328],{"id":34327},"where-may-the-switch-go-in-a-bathroom","Where may the switch go in a bathroom?",[12,34330,34331,34332,34335],{},"For rooms containing a bath and\u002For shower, ",[63,34333,34334],{},"Sub-section 7.1.5.2"," sets out volume by volume what is allowed. For control devices — an ordinary lighting switch among them — this gives:",[138,34337,34338,34348],{},[141,34339,34340],{},[144,34341,34342,34345],{},[147,34343,34344],{},"Volume",[147,34346,34347],{},"Control device permitted?",[163,34349,34350,34358,34366],{},[144,34351,34352,34355],{},[168,34353,34354],{},"volume 0",[168,34356,34357],{},"Not permitted, except as part of the fixed appliances allowed there and supplied by SELV with the source outside volumes 0 and 1 (point b)",[144,34359,34360,34363],{},[168,34361,34362],{},"volume 1",[168,34364,34365],{},"Only control devices supplied by SELV, with the source outside volumes 0 and 1 (point c, 4)",[144,34367,34368,34371],{},[168,34369,34370],{},"volume 2",[168,34372,34373],{},"Control devices supplied at low voltage are permitted (point d, 5), alongside the SELV variant (point d, 4)",[12,34375,34376,34377,56],{},"A 230 V two-way switch therefore belongs outside volumes 0 and 1. A ceiling pull-cord switch is a common solution and has its own symbol in Table 2.23 (\"single-pole pull-cord switch\"), but it does not escape the volume rules: what counts is the volume the equipment itself occupies. The volumes and the associated wiring rules are covered in ",[40,34378,34379],{"href":22834},"bathroom cables and AREI zones",[79,34381,34383],{"id":34382},"when-does-home-automation-replace-an-intermediate-arrangement","When does home automation replace an intermediate arrangement?",[12,34385,34386],{},"Once the same light point has to be operated from many places and in several scenes, a bus-based solution becomes more workable than an ever-growing intermediate arrangement. The regulation gives it its own section in Table 2.23: section J, \"Home automation\". The control unit is drawn there as a rectangle in two parts — the base symbol at the bottom (a switch, or a socket outlet with switch, for example) and the unit's control type at the top.",[12,34388,34389,34390,34393],{},"What home automation does not remove: every current-using appliance or electrical machine is operated through a control device, and that device is required even when operation depends on a relay, a thermostat or any similar organ (",[63,34391,34392],{},"Sub-section 5.3.3.2 point d","). The actuator in the board does not replace the required control device — it is one. What changes is the drawing: you document a control unit together with its control type instead of three intermediate switches in series.",[12,34395,34396,34397,56],{},"Selection criteria and the usual pitfalls of mixed installations are covered in ",[40,34398,34399],{"href":22961},"smart home and AREI",[79,34401,34403],{"id":34402},"how-does-the-switch-chain-come-about-in-planelec-and-what-changes-on-the-diagram","How does the switch chain come about in PlanElec, and what changes on the diagram?",[12,34405,34406,34407,34410],{},"In the PlanElec Pro floor plan, the ",[15,34408,34409],{},"Switch chain"," tool links a switch to the luminaires it operates. PlanElec can propose a chain for the unassigned switches and luminaires of a room; a valid chain contains at least one switch and one luminaire, and a device cannot belong to two chains at once. Across storeys the chain stays coherent project-wide; each floor shows only its local segments and the continuation markers.",[12,34412,4361,34413,34416,34417,34420],{},[15,34414,34415],{},"switching function"," is derived from the chain: one switch gives on\u002Foff, two switches become two-way switches at both ends, and from three onward the first and last stay two-way while the ones in between become intermediate switches. ",[15,34418,34419],{},"Pole count"," is chosen separately — the two properties are only combined at drawing time. From three control points the double-pole variant is not rendered, because the RGIE symbol set holds no double-pole intermediate switch; that combination is then drawn as single-pole.",[12,34422,34423,34424,34426],{},"Push-buttons, dimmers and the double switch are deliberately ",[15,34425,25241],{}," derived automatically. The double switch stays available as a manual choice precisely because it describes two separate circuits at one control point: you assign each luminaire deliberately to channel A or B.",[12,34428,34429],{},"The link between a switch and its light points is stored durably and updates the single-line diagram as soon as the devices are assigned to a circuit. Luminaires not yet placed remain in the same switching group and join the chain automatically when placed. Automatic lighting only fills in missing light points, using a transparent planning density of one point per started 8 m², and per 6 m² in kitchens and bathrooms; this is not an AREI\u002FRGIE minimum.",[12,34431,34432,34433,56],{},"Step-by-step operation is described in the Pro guide ",[40,34434,34435],{"href":4175},"switch chains, circuits and cable routes",[12,34437,34438,34439,34442],{},"To draw a two-way or intermediate arrangement in the single-line diagram only, for example for your own home, you can use ",[40,34440,22],{"href":1456,"rel":34441},[1458]," free in the browser. There you pick the switches yourself from the symbol library, in the groups “Switches and lights” and “Push buttons and remote switches” or via search; the table at the start of this article shows which arrangement matches how many control points.",[1489,34444],{":height":6699,":width":34445,"alt":34446,"caption":34447,"src":34448},"1084","Library in PlanElec Sketch with the search term ‘two-way’: among the results, ‘Two-way lighting circuit’ is marked with the favourite star; next to it the single-line diagram of the house template.","Search finds symbols and whole circuits, including by synonyms; the star files an entry under ‘Favourites’. Sketch does not check whether the symbol suits the installation.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-library-search.webp",[79,34450,34452],{"id":34451},"what-the-arei-self-check-checks-and-what-is-checked-on-site","What the AREI self-check checks and what is checked on site",[12,34454,34455],{},"The PlanElec Pro self-check is advisory and evaluates the supported rules from the data entered. For switches, that means:",[84,34457,34458,34465,34468,34471,34478],{},[87,34459,34460,34461,34464],{},"It checks the ",[15,34462,34463],{},"plausibility"," of every control group: a group contains at least one switch and at least one switched load. It flags groups without a switch, without a load or with only one element.",[87,34466,34467],{},"Whether the chosen arrangement matches the intended operation is your decision. Two two-way switches in two different rooms form a technically valid chain and a rarely sensible one.",[87,34469,34470],{},"Whether a single-pole switch really interrupts the line conductor rather than the neutral, you establish on site with the circuit de-energised; no drawing shows it.",[87,34472,34473,34474,34477],{},"An ",[15,34475,34476],{},"impulse relay",", a DIN-rail dimmer, a staircase timer or a twilight switch is not drawn in today's single-line diagram. Before export, PlanElec explicitly flags them as \"distribution-board modules that cannot be shown\", which you review or remove.",[87,34479,34480],{},"Measurements and the official assessment at the inspection are carried out by the approved inspection body.",[79,34482,26353],{"id":26352},[84,34484,34485,34490,34494,34498,34502,34508],{},[87,34486,34487],{},[40,34488,34489],{"href":5666},"AREI electrical symbols for both documents",[87,34491,34492],{},[40,34493,4213],{"href":4212},[87,34495,34496],{},[40,34497,26373],{"href":6050},[87,34499,34500],{},[40,34501,26114],{"href":22961},[87,34503,34504],{},[40,34505,34507],{"href":34506},"\u002Fen\u002Fblog\u002Fled-strip-power-supply-calculation","LED strip calculation: power supply, feed points and cable size",[87,34509,34510],{},[40,34511,34512],{"href":7108},"Home automation and KNX: what belongs on the plan and the single-line diagram?",[12,34514,34515],{},[40,34516,34517],{"href":1964},"PlanElec Pro: switch chains for single-line diagram and situation plan →",[12,34519,34520],{},[63,34521,34522],{},"Basis: AREI\u002FRGIE Book 1 V06 — Chapter 2.13 with Table 2.23, Sub-sections 3.1.2.1, 3.1.2.2, 3.1.2.3, 5.1.6.2, 5.2.1.2 with Table 5.1, 5.3.3.2, 5.3.5.2 and 7.1.5.2. Editorial review: PlanElec team, 6 November 2026.",{"title":2044,"searchDepth":2045,"depth":2045,"links":34524},[34525,34526,34527,34528,34529,34530,34531,34532,34533,34534,34535,34536],{"id":33963,"depth":2045,"text":33964},{"id":34129,"depth":2045,"text":34130},{"id":34155,"depth":2045,"text":34156},{"id":34193,"depth":2045,"text":34194},{"id":34239,"depth":2045,"text":34240},{"id":34263,"depth":2045,"text":34264},{"id":34284,"depth":2045,"text":34285},{"id":34327,"depth":2045,"text":34328},{"id":34382,"depth":2045,"text":34383},{"id":34402,"depth":2045,"text":34403},{"id":34451,"depth":2045,"text":34452},{"id":26352,"depth":2045,"text":26353},"The number of control points decides the wiring arrangement. Symbols from Table 2.23, conductors per variant, referencing on the situation plan and the boundary with home automation — with the AREI\u002FRGIE article beside each statement.",[34539,2116,2117,2118],"circuits",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-switch-types-single-line-diagram-editorial.jpg","\u002Fblog\u002Fswitch-types-single-line-diagram.en",{"title":33957,"description":34537},"Two-Way, Intermediate or Double Switch on the Diagram","blog\u002Fswitch-types-single-line-diagram.en",[2133,2134,34547,34548,34549,5269,2132,22994,4261],"two-way switch","intermediate switch","double switch","INnnYcDTMJJE8kxOPhPg-9SllZPpQCRgmrnec-nGz_k","\u002Fblog\u002Fswitch-types-single-line-diagram",{"id":34553,"title":34554,"articleId":34555,"body":34556,"category":4239,"date":35195,"description":35196,"extension":2113,"image":34576,"labels":35197,"lastUpdated":10988,"locale":2119,"meta":35198,"navigation":2121,"ogImage":35199,"path":35200,"publishDate":35195,"readTime":3582,"refreshInterval":4248,"seo":35201,"seoTitle":35202,"slug":35203,"stem":35204,"tags":35205,"__hash__":35208,"kind":2137,"href":35209},"blog\u002Fblog\u002Farei-electrical-symbols.en.md","AREI Electrical Symbols: Overview for Single-Line Diagram and Situation Plan","arei-electrical-symbols",{"type":9,"value":34557,"toc":35179},[34558,34562,34572,34577,34580,34584,34587,34602,34605,34609,34612,34726,34729,34733,34736,34742,34899,34905,34909,34912,34923,34926,34930,34933,34947,34950,34954,34957,34964,34969,34976,34980,34983,35000,35003,35007,35030,35034,35037,35040,35043,35047,35050,35053,35079,35097,35101,35104,35107,35114,35118,35126,35129,35132,35134,35136,35169,35174],[79,34559,34561],{"id":34560},"short-answer-table-223-is-the-basis-the-legend-defines-your-own-signs","Short answer: Table 2.23 is the basis, the legend defines your own signs",[12,34563,34564,34567,34568,34571],{},[15,34565,34566],{},"For a domestic installation's single-line diagram and situation plan, you use the graphical symbols in AREI\u002FRGIE Book 1, Chapter 2.13, Table 2.23."," The table expressly calls itself a ",[15,34569,34570],{},"non-exhaustive list",". If it has no suitable symbol, you use another unambiguous sign and define it in the legend of the diagram and plan (Subsection 3.1.2.1 a).",[12,34573,34574],{},[74,34575],{"alt":24946,"src":34576},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-arei-electrical-symbols-editorial.webp",[12,34578,34579],{},"The legend is therefore a clearly regulated tool: every sign stays unambiguous throughout the records, and the mandatory technical characteristics appear on the diagram as well. This guide covers domestic installations under Book 1 V06; for non-domestic installations and special circuit diagrams, Book 1 requires further details (3.1.2.2 b).",[79,34581,34583],{"id":34582},"three-layers-of-information","Three layers of information",[12,34585,34586],{},"Subsection 3.1.2.1 a connects Chapter 2.13 with domestic diagrams and plans and allows the legend route when Table 2.23 has no entry. In practical terms, the documents carry three distinct layers:",[3139,34588,34589,34596,34599],{},[87,34590,34591,34592,34595],{},"the ",[15,34593,34594],{},"base symbol"," identifies the equipment family;",[87,34597,34598],{},"labels and ratings describe its electrical properties on the diagram (3.1.2.2 a);",[87,34600,34601],{},"a circuit letter and sequence number connect the electrical topology to the physical location on the plan (3.1.2.3 a).",[12,34603,34604],{},"An RCD symbol without its type and ratings is incomplete. A line from a breaker to a socket says nothing yet about cable type, cross-section, conductor count or installation method. A point on the situation plan that does not share the single-line reference cannot be reliably reconciled with the circuit.",[79,34606,34608],{"id":34607},"the-principal-table-223-groups","The principal Table 2.23 groups",[12,34610,34611],{},"The overview below describes meaning, not the exact geometry of each official mark.",[138,34613,34614,34625],{},[141,34615,34616],{},[144,34617,34618,34620,34622],{},[147,34619,16146],{},[147,34621,11113],{},[147,34623,34624],{},"Purpose in the records",[163,34626,34627,34638,34649,34660,34671,34682,34693,34704,34715],{},[144,34628,34629,34632,34635],{},[168,34630,34631],{},"A. General marks",[168,34633,34634],{},"DC, AC, single-phase and three-phase AC",[168,34636,34637],{},"identify the nature of the supply",[144,34639,34640,34643,34646],{},[168,34641,34642],{},"B. Assemblies and boxes",[168,34644,34645],{},"distribution board, general box, connection\u002Fjunction box, service box, earthing switch",[168,34647,34648],{},"show structural nodes",[144,34650,34651,34654,34657],{},[168,34652,34653],{},"C. Wiring systems",[168,34655,34656],{},"underground, overhead, surface, concealed, in conduit, conductor count",[168,34658,34659],{},"describe construction and installation method",[144,34661,34662,34665,34668],{},[168,34663,34664],{},"D. Protective devices",[168,34666,34667],{},"fuse, circuit breaker with release letters M, O and Δ, RCD, earth electrode",[168,34669,34670],{},"show overcurrent and fault protection",[144,34672,34673,34676,34679],{},[168,34674,34675],{},"E. Switches and controls",[168,34677,34678],{},"two-way, intermediate, push-button, dimmer, remote-control switch, thermostat, detector",[168,34680,34681],{},"link controls to loads",[144,34683,34684,34687,34690],{},[168,34685,34686],{},"F. Socket outlets",[168,34688,34689],{},"single, multiple, splash-proof, earthed, child-protected, switched, data",[168,34691,34692],{},"distinguish connection-point functions",[144,34694,34695,34698,34701],{},[168,34696,34697],{},"G. Current-using equipment",[168,34699,34700],{},"lighting, heating, appliance, motor, EV charging point, kWh meter",[168,34702,34703],{},"identify fixed or located loads",[144,34705,34706,34709,34712],{},[168,34707,34708],{},"H. Sources and converters",[168,34710,34711],{},"transformer, photovoltaic cell, rectifier\u002Finverter, DC\u002FDC converter",[168,34713,34714],{},"record generation and conversion",[144,34716,34717,34720,34723],{},[168,34718,34719],{},"J. Home automation",[168,34721,34722],{},"base mark combined with local, wireless, programmed or sensor control",[168,34724,34725],{},"combine electrical function and control method",[12,34727,34728],{},"The groups are a toolkit, not a mandatory list: you use the signs your installation actually contains. Whether equipment is correctly selected and sized is shown by the design; the symbol represents it. You state the characteristics of sources either on the single-line diagram or keep them available in the installation file (note to Table 2.23).",[79,34730,34732],{"id":34731},"twelve-existing-catalogue-symbols-side-by-side","Twelve existing catalogue symbols side by side",[12,34734,34735],{},"The plate below shows twelve existing symbols from the PlanElec catalogue in black and white. It is a catalogue view, not a screenshot of a specific project. Read them from left to right, then row by row from top to bottom; that order matches the numbered table directly below. The raster plate enlarges the unchanged geometry from the source files. The name, position number and technical data provide the unambiguous meaning, not the shape by itself.",[1489,34737],{":height":8729,":width":34738,"alt":34739,"caption":34740,"src":34741},"660","Black-and-white plate of twelve existing PlanElec catalogue symbols for protection devices, switches, connection points, cables and PV.","The twelve symbols follow the same order as the table: from left to right, row by row.","\u002Fblog\u002Fsymbols\u002Fcatalog-12.png",[138,34743,34744,34757],{},[141,34745,34746],{},[144,34747,34748,34751,34754],{},[147,34749,34750],{},"No. and name",[147,34752,34753],{},"Meaning in the document",[147,34755,34756],{},"Common confusion",[163,34758,34759,34770,34785,34796,34807,34818,34829,34840,34851,34862,34877,34888],{},[144,34760,34761,34764,34767],{},[168,34762,34763],{},"1. Circuit breaker",[168,34765,34766],{},"Circuit breaker for overcurrent protection; rated current, curve, pole count and breaking capacity come from the technical data.",[168,34768,34769],{},"Its basic geometry is the same as the residual-current device; do not swap the name and residual-current characteristics.",[144,34771,34772,34775,34778],{},[168,34773,34774],{},"2. Residual-current device",[168,34776,34777],{},"Residual-current device; type, rated residual current, rated current and pole count complete the sign.",[168,34779,34780,34781,34784],{},"Its basic geometry is the same as the circuit breaker; ",[25,34782,34783],{},"30 mA"," alone does not define a particular RCD type.",[144,34786,34787,34790,34793],{},[168,34788,34789],{},"3. Main load-break switch",[168,34791,34792],{},"Load-break switch in the documented supply path.",[168,34794,34795],{},"Do not treat it as the downstream circuit breaker. Required in the main board, at least 40 A in domestic installations (5.3.5.1 b). The isolating function of the RCD at the supply point (4.2.4.3 b) is a separate requirement; the diagram shows unambiguously which device performs the main switch function.",[144,34797,34798,34801,34804],{},[168,34799,34800],{},"4. Socket outlet",[168,34802,34803],{},"Ordinary socket outlet on the single-line diagram and situation plan.",[168,34805,34806],{},"Do not read it as a switched, wet-area or data outlet.",[144,34808,34809,34812,34815],{},[168,34810,34811],{},"5. Wet-area socket outlet",[168,34813,34814],{},"Wet-area socket outlet with its own catalogue geometry.",[168,34816,34817],{},"The qualifier does not replace the real environmental or equipment data.",[144,34819,34820,34823,34826],{},[168,34821,34822],{},"6. Socket outlet with two-pole switch",[168,34824,34825],{},"Socket outlet with a two-pole switch.",[168,34827,34828],{},"An ordinary socket and a separately documented switch carry a different meaning.",[144,34830,34831,34834,34837],{},[168,34832,34833],{},"7. Lighting outlet",[168,34835,34836],{},"Lighting outlet or lighting point.",[168,34838,34839],{},"Do not confuse it with a wall luminaire or the switch controlling that point.",[144,34841,34842,34845,34848],{},[168,34843,34844],{},"8. Switch",[168,34846,34847],{},"General switch symbol for a control device.",[168,34849,34850],{},"Which lighting point it controls is stated by the reference, not by the sign.",[144,34852,34853,34856,34859],{},[168,34854,34855],{},"9. Connection or junction box",[168,34857,34858],{},"Connection or junction box as a topology node.",[168,34860,34861],{},"Do not treat it as a distribution board or a consumer.",[144,34863,34864,34867,34870],{},[168,34865,34866],{},"10. Three-conductor cable",[168,34868,34869],{},"Base symbol for a three-conductor cable; type, cross-section and installation method are added to the cable segment.",[168,34871,34872,34873,34876],{},"Three conductors are not a complete cable sizing and are not the same statement as a freely chosen ",[25,34874,34875],{},"3×"," notation.",[144,34878,34879,34882,34885],{},[168,34880,34881],{},"11. Solar panel \u002F PV module",[168,34883,34884],{},"Solar panel or PV module as a source in the documented PV path.",[168,34886,34887],{},"Do not confuse it with the inverter; string, protection and connection point must remain separately traceable.",[144,34889,34890,34893,34896],{},[168,34891,34892],{},"12. Inverter",[168,34894,34895],{},"Inverter between the sides recorded in the project.",[168,34897,34898],{},"The symbol stands for the function; manufacturer and technical limits are documented separately.",[12,34900,34901,34902,34904],{},"In PlanElec Pro, the help guide ",[40,34903,16745],{"href":16744}," explains how to place and connect a symbol on the plan before reusing it in the same project model. Catalogue symbols then appear in the diagram and plan; you confirm on site which devices are actually installed.",[79,34906,34908],{"id":34907},"a-wiring-symbol-is-more-than-a-line","A wiring symbol is more than a line",[12,34910,34911],{},"The single-line diagram records at least wiring-system type, cross-section, number of conductors and installation method (3.1.2.2 a). Table 2.23 supplies base marks and worked examples for surface or concealed wiring, conduit, underground and overhead routes, such as a five-core 4 mm² XVB-Cca cable in embedded conduit or four insulated 1.5 mm² H07V-U conductors in one conduit.",[12,34913,34914,34915,34918,34919,34922],{},"Notation should reflect the installed system. ",[25,34916,34917],{},"3G2.5",", for example, communicates three conductors including a green-yellow protective conductor, each 2.5 mm². A notation using ",[25,34920,34921],{},"×"," does not necessarily make the same PE statement. Concealed wiring must not be drawn as surface wiring, or vice versa, merely to simplify the page.",[12,34924,34925],{},"Cable sizing for current-carrying capacity, installation method, grouping, temperature, voltage drop, fault-loop conditions and protective-device selection is done separately; the symbol documents its result.",[79,34927,34929],{"id":34928},"protective-device-symbols-need-ratings","Protective-device symbols need ratings",[12,34931,34932],{},"Table 2.23 distinguishes fuses, automatic circuit breakers and residual-current devices. Capital letters next to a breaker identify its releases: M for the overcurrent release, O for the undervoltage release, Δ for residual-current sensitivity. The accompanying properties make the drawing useful:",[84,34934,34935,34938,34941,34944],{},[87,34936,34937],{},"rated current and characteristic for an overcurrent device (example in the table: 20 A, curve C);",[87,34939,34940],{},"RCD waveform type, rated residual operating current and rated current (example: 300 mA, type A, 40 A);",[87,34942,34943],{},"identified functions where a device has multiple releases;",[87,34945,34946],{},"the earthing connection that actually exists.",[12,34948,34949],{},"“30 mA” does not say whether an RCD is Type A, F or B, or whether it is instantaneous or selective. “20 A” without a characteristic and corresponding conductor data is not a complete circuit description. Copy values from the installed equipment and verified design, not from a sample drawing.",[79,34951,34953],{"id":34952},"one-reference-across-both-diagrams","One reference across both diagrams",[12,34955,34956],{},"Each elementary circuit receives a capital letter on the single-line diagram. Lighting points, socket outlets and control units are numbered in order starting at the upstream overcurrent device. The situation plan uses the same letter and number.",[12,34958,34959,34960,34963],{},"Therefore ",[25,34961,34962],{},"B4"," must identify the same item on both documents. A switch or control unit is referenced using its circuit and the number of the lighting point or appliance it controls. That keeps each switch's function clear, even where several switches share a room. Multiple, switched and data outlets are different things; where the distinction matters, you use the matching sign.",[1489,34965],{":height":3799,":width":3800,"alt":34966,"caption":34967,"src":34968},"Left, a simplified single-line excerpt of circuit B: protective device, then socket outlets B1, B2, B3 and lighting point B4 in electrical order. Right, a simplified room plan with the same labels at their real positions and a switch labelled B4 near the door.","Letter = circuit, number = point in electrical order: the switch carries the label of the lighting point it controls (simplified, not the official symbols).","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fsingle-line-vs-situation-plan\u002Freference-bridge.en.svg",[12,34970,34971,34972,34975],{},"If you draw both documents in ",[40,34973,22],{"href":1456,"rel":34974},[1458],", free in the browser, the single-line diagram assigns circuit letters in sequence, and the “From the single-line diagram” palette on the situation plan shows which devices still need a place.",[79,34977,34979],{"id":34978},"when-the-table-has-no-exact-symbol","When the table has no exact symbol",[12,34981,34982],{},"The legend rule supports new functions and specialist equipment. A defensible process is:",[3139,34984,34985,34988,34991,34994,34997],{},[87,34986,34987],{},"first test whether a general Table 2.23 mark plus a technical label is clear;",[87,34989,34990],{},"otherwise choose a simple mark that cannot be confused with an existing one;",[87,34992,34993],{},"define the mark, abbreviation and precise meaning in the legend;",[87,34995,34996],{},"use it consistently on every relevant page;",[87,34998,34999],{},"keep the electrical properties on the diagram or in the installation dossier.",[12,35001,35002],{},"A manufacturer's logo does not explain electrical function or connection. A personal sign without a legend does not meet 3.1.2.1 a, even if its author remembers the meaning.",[79,35004,35006],{"id":35005},"common-documentation-errors","Common documentation errors",[84,35008,35009,35012,35015,35018,35021,35024,35027],{},[87,35010,35011],{},"importing a DIN, IEC or software mark without checking its meaning in this drawing;",[87,35013,35014],{},"using one socket mark for ordinary, multiple, switched and data outlets;",[87,35016,35017],{},"omitting cable type, cross-section, conductor count or installation method;",[87,35019,35020],{},"labelling an RCD only “30 mA”, without type and rated current;",[87,35022,35023],{},"using different references on the single-line and position diagrams;",[87,35025,35026],{},"reducing a PV installation to a panel icon without source, inverter and relevant characteristics;",[87,35028,35029],{},"stylising the drawing until the official base mark or defined legend is no longer recognisable.",[79,35031,35033],{"id":35032},"inspect-the-final-pdf-not-only-the-editor","Inspect the final PDF, not only the editor",[12,35035,35036],{},"A correct symbol can become unusable through scaling or pagination. Review the export at ordinary reading size: does a page edge cut off a legend or rating, do lines cross identifiers, can ordinary and switched sockets still be distinguished, and is every label clearly attached to the intended device?",[12,35038,35039],{},"Do not make meaning depend on colour alone. Inspection records may be printed or copied in black and white. Shape, text and circuit reference must carry the information. Put the legend on affected pages or reference it unambiguously as part of the same document set, and keep abbreviations consistent.",[12,35041,35042],{},"Finally compare identifiers and counts across the two diagrams. This catches duplicate references, missing loads and accidentally copied marks early; the technical check follows.",[79,35044,35046],{"id":35045},"a-repeatable-workflow-from-survey-to-legend","A repeatable workflow from survey to legend",[12,35048,35049],{},"Do not begin with drawing. First make an equipment register in which every real point has a room, circuit, sequence number, function and the characteristics that will have to accompany its mark. Only then choose the closest base symbol from Table 2.23. That way the real function decides the symbol, not the other way round. A fixed fan, a socket outlet and a connection box may share one circuit, but they remain different items.",[12,35051,35052],{},"Review every entry in four passes:",[3139,35054,35055,35061,35067,35073],{},[87,35056,35057,35060],{},[15,35058,35059],{},"Base mark:"," does the family match, such as protective device, socket, luminaire, source or fixed machine?",[87,35062,35063,35066],{},[15,35064,35065],{},"Characteristics:"," are poles, rated current, residual-current sensitivity, wiring type, conductor count and cross-section present where needed to understand the circuit?",[87,35068,35069,35072],{},[15,35070,35071],{},"Reference:"," does the point on the situation plan use exactly the circuit letter and number assigned on the single-line diagram?",[87,35074,35075,35078],{},[15,35076,35077],{},"Legend:"," is every project-specific combination defined once and easy to find on every affected sheet?",[12,35080,35081,35082,35085,35086,15383,35089,35092,35093,35096],{},"Consider circuit ",[25,35083,35084],{},"K",": it starts downstream of an identified RCD and a 20 A protective device, continues through a recorded 3G2.5 cable and supplies three fixed connections. The protective device carries its ratings, the cable carries its wiring data, and the connections are referenced ",[25,35087,35088],{},"K1",[25,35090,35091],{},"K3",". One generic icon labelled “kitchen” does not replace that information. If ",[25,35094,35095],{},"K2"," later becomes a different appliance, the reference stays; you update the symbol, functional label and characteristics on both diagrams.",[79,35098,35100],{"id":35099},"handling-boundary-cases-without-hiding-information","Handling boundary cases without hiding information",[12,35102,35103],{},"For combined equipment, decide which electrical functions must remain visible for inspection and maintenance. A multi-socket assembly may be grouped if its quantity and switching remain unambiguous. A smart actuator with several outputs needs a base mark, a project legend code and a reference to its technical sheet; for home automation, Table 2.23 provides the two-part control-unit symbol of base mark and control type. A legend explains a sign missing from the table; it never hides a conductor path, protective function or energy source.",[12,35105,35106],{},"Version project-specific marks like any other installation data. When a definition changes, record the date and affected references, then inspect every sheet. Do not leave an obsolete legend beside the current PDFs in the handover folder. If the representation is uncertain, settle it with the responsible electrical professional and, where appropriate, the approved inspection body before work is executed.",[12,35108,4361,35109,35113],{},[40,35110,35112],{"href":1971,"rel":35111},[1458],"official AREI\u002FRGIE Book 1 publication"," remains the primary source. Check the edition applicable to the document date there. Manufacturer icon libraries and symbols borrowed from another country's standard do not replace Table 2.23 or the Belgian diagram rules.",[79,35115,35117],{"id":35116},"what-planelecs-symbol-catalogue-does","What PlanElec's symbol catalogue does",[12,35119,3361,35120,35123,35124,56],{},[40,35121,22],{"href":1456,"rel":35122},[1458]," you draw the single-line diagram and situation plan free in the browser. The symbol library is organised in groups such as “Protection and distribution”, “Outlets”, “Switches and lights” and “Push buttons and remote switches”, with search and favourites. Creating your own symbols requires ",[40,35125,31],{"href":1964},[12,35127,35128],{},"PlanElec Pro keeps each device once in the project: the single-line diagram and situation plan carry the same circuit reference, you export both as PDF, and the advisory AREI\u002FRGIE self-check report shows errors in the supported rules that can be decided from project data. It is not a certificate of conformity.",[12,35130,35131],{},"The roles are clear: the library keeps the representation consistent, you check the actual device, ratings, references and location before export, and the official assessment is made by the approved inspection body at the inspection.",[1489,35133],{":height":6699,":width":34445,"alt":34446,"caption":34447,"src":34448},[79,35135,26353],{"id":26352},[84,35137,35138,35143,35148,35153,35158,35164],{},[87,35139,35140],{},[40,35141,35142],{"href":5399},"Single-line diagram vs. situation plan: difference and coordination",[87,35144,35145],{},[40,35146,35147],{"href":4212},"Create a single-line diagram step by step",[87,35149,35150],{},[40,35151,35152],{"href":5727},"Two-way and intermediate switching in the single-line diagram",[87,35154,35155],{},[40,35156,35157],{"href":3795},"Cable cross-section and protective device",[87,35159,35160],{},[40,35161,35163],{"href":35162},"\u002Fen\u002Fblog\u002Fwhat-is-a-situation-plan","What is a situation plan?",[87,35165,35166],{},[40,35167,35168],{"href":22961},"Smart home and AREI: what to know about home automation",[12,35170,35171],{},[40,35172,35173],{"href":1961},"PlanElec Sketch: symbol library, single-line diagram and situation plan →",[12,35175,35176],{},[63,35177,35178],{},"Basis: AREI\u002FRGIE Book 1 V06, Chapter 2.13 (Table 2.23) and subsections 3.1.2.1 to 3.1.2.3. Editorial review: PlanElec team, 6 November 2026.",{"title":2044,"searchDepth":2045,"depth":2045,"links":35180},[35181,35182,35183,35184,35185,35186,35187,35188,35189,35190,35191,35192,35193,35194],{"id":34560,"depth":2045,"text":34561},{"id":34582,"depth":2045,"text":34583},{"id":34607,"depth":2045,"text":34608},{"id":34731,"depth":2045,"text":34732},{"id":34907,"depth":2045,"text":34908},{"id":34928,"depth":2045,"text":34929},{"id":34952,"depth":2045,"text":34953},{"id":34978,"depth":2045,"text":34979},{"id":35005,"depth":2045,"text":35006},{"id":35032,"depth":2045,"text":35033},{"id":35045,"depth":2045,"text":35046},{"id":35099,"depth":2045,"text":35100},{"id":35116,"depth":2045,"text":35117},{"id":26352,"depth":2045,"text":26353},"2026-08-29","Which symbols AREI\u002FRGIE Table 2.23 provides for Belgian domestic installations, when you introduce your own sign through the legend, and which data belongs next to every symbol on diagram and plan.",[2116,18037,2117],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-arei-electrical-symbols-editorial.jpg","\u002Fblog\u002Farei-electrical-symbols.en",{"title":34554,"description":35196},"AREI Electrical Symbols for Single-Line and Situation Plans","arei-electrical-symbols-overview","blog\u002Farei-electrical-symbols.en",[2133,2134,35206,25624,5269,26419,35207,4261],"electrical symbols","legend","6plEDlAWnOWcAKvBKE4jvt74dBLyhYzgX_yz7TWmx2U","\u002Fblog\u002Farei-electrical-symbols-overview",{"id":35211,"title":35212,"articleId":35213,"body":35214,"category":24234,"date":35195,"description":35682,"extension":2113,"image":35231,"labels":35683,"lastUpdated":10988,"locale":2119,"meta":35685,"navigation":2121,"ogImage":35686,"path":35687,"publishDate":35195,"readTime":6086,"refreshInterval":4248,"seo":35688,"seoTitle":35689,"slug":35213,"stem":35690,"tags":35691,"__hash__":35694,"kind":2137,"href":35695},"blog\u002Fblog\u002Fheat-pump-single-line-diagram.en.md","Heat Pump on a Single-Line Diagram: Showing the Circuit and Equipment Correctly","heat-pump-single-line-diagram",{"type":9,"value":35215,"toc":35661},[35216,35226,35232,35235,35239,35242,35268,35271,35275,35278,35281,35290,35293,35299,35311,35315,35318,35344,35351,35355,35358,35361,35378,35385,35389,35396,35416,35423,35427,35437,35454,35460,35464,35468,35471,35475,35478,35482,35485,35489,35492,35496,35499,35519,35522,35526,35529,35532,35552,35555,35559,35562,35565,35568,35574,35578,35581,35584,35604,35607,35610,35613,35617,35620,35626,35630,35641,35649,35653],[12,35217,35218,35221,35222,35225],{},[15,35219,35220],{},"On the single-line diagram, you draw a heat pump the way it is actually connected: every outgoing way with its circuit reference, overcurrent protection, residual current device (RCD), cable and electrical rating – separately for the outdoor unit, indoor unit and backup heater whenever they are supplied separately."," A single box saying “8 kW” is not enough. Depending on the system, the installation includes an outdoor unit, indoor module, electric backup heater, circulation pumps, controls or a domestic hot-water cylinder, supplied together or through several circuits. The diagram shows the ",[15,35223,35224],{},"installed electrical structure",", not the simplified hydraulic sketch from the brochure.",[12,35227,35228],{},[74,35229],{"alt":35230,"src":35231},"An electrician checks the connection of a closed heat pump.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-heat-pump-single-line-diagram-editorial.webp",[12,35233,35234],{},"AREI Book 1 V06 (the Belgian wiring regulations) sets no brand-specific heat-pump symbol and no universal RCD type. The general rules for circuits, protection, cables and documentation apply together with the electrical data of the exact device. Keeping those two apart cleanly avoids the typical mistakes.",[79,35236,35238],{"id":35237},"collect-the-electrical-data-first","Collect the electrical data first",[12,35240,35241],{},"Start with rating plates, datasheets and the distribution board, not with drawing. For every electrically supplied unit, record:",[84,35243,35244,35247,35250,35253,35256,35259,35262,35265],{},[87,35245,35246],{},"exact equipment designation and function;",[87,35248,35249],{},"single- or three-phase supply and rated voltage;",[87,35251,35252],{},"rated current or the protection the manufacturer requires;",[87,35254,35255],{},"inverter or variable-frequency technology, where present;",[87,35257,35258],{},"required residual-current protection and possible DC fault components;",[87,35260,35261],{},"cable type, number of conductors, cross-section and route;",[87,35263,35264],{},"local isolator or maintenance switch, if actually installed;",[87,35266,35267],{},"separate supply for an electric backup heater, crankcase heater, circulation pump or controls.",[12,35269,35270],{},"A datasheet saying “thermal output 8 kW” answers none of these questions. Thermal output, electrical input power and connection rating are different quantities. On the single-line diagram, the electrical execution is what counts.",[79,35272,35274],{"id":35273},"one-device-or-several-circuits","One device or several circuits?",[12,35276,35277],{},"A compact monobloc unit often has a single supply to the outdoor unit. A split system frequently supplies the outdoor and indoor units separately. An integrated backup heater runs through the same connection or needs its own, more heavily loaded circuit. Some controls are fed from the indoor unit; others have their own protection.",[12,35279,35280],{},"So do not draw this generic chain by default:",[35282,35283,35288],"pre",{"className":35284,"code":35286,"language":35287,"meta":2044},[35285],"language-text","Board → circuit breaker → heat pump\n","text",[25,35289,35286],{"__ignoreMap":2044},[12,35291,35292],{},"A real installation may look like this:",[1489,35294],{":height":35295,":width":3800,"alt":35296,"caption":35297,"src":35298},"565","Three separate circuits leave the main board: HP1 to the outdoor unit, HP2 to the indoor unit with controls, HP3 to the electric backup heater, each with overcurrent protection, an RCD as specified by the manufacturer and a cable. A dashed control or bus cable between outdoor and indoor unit is not a power circuit.","Only units that are actually supplied separately get a branch of their own with protection chain and cable data.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fheat-pump-single-line-diagram\u002Fheat-pump-circuits.en.svg",[12,35300,35301,1774,35304,3157,35307,35310],{},[25,35302,35303],{},"HP1",[25,35305,35306],{},"HP2",[25,35308,35309],{},"HP3"," are just a readable example. In the project, you follow the existing circuit logic: AREI 3.1.2.1 a identifies elementary circuits by a capital letter, and the situation plan repeats the letter and sequence number from the single-line diagram.",[79,35312,35314],{"id":35313},"what-belongs-on-each-outgoing-way","What belongs on each outgoing way?",[12,35316,35317],{},"The outgoing way is traceable from the board to the load. Document at least:",[3139,35319,35320,35323,35326,35329,35332,35335,35338,35341],{},[87,35321,35322],{},"circuit reference;",[87,35324,35325],{},"type, number of poles and rated current of the overcurrent protection;",[87,35327,35328],{},"upstream RCD with rated residual current and type;",[87,35330,35331],{},"cable or conductor type, number of conductors and cross-section;",[87,35333,35334],{},"phase assignment for a polyphase supply;",[87,35336,35337],{},"an unambiguous equipment name, such as “heat pump outdoor unit”;",[87,35339,35340],{},"relevant electrical power or rated current;",[87,35342,35343],{},"local isolator, contactor or load-management component, if part of the fixed installation.",[12,35345,35346,35347,35350],{},"For household installations, AREI Table 4.11 (Subsection 4.4.1.4) caps the rated current of the circuit breaker per cross-section, for example 20 A for 2.5 mm² and 25 A for 4 mm². Still, the ",[40,35348,35349],{"href":3795},"relationship between cable cross-section and breaker"," does not follow from appliance power alone: route length, installation method, grouping, ambient temperature, voltage drop, prospective fault current and manufacturer limits are part of the design.",[79,35352,35354],{"id":35353},"rcd-no-universal-type-for-every-heat-pump","RCD: no universal type for every heat pump",[12,35356,35357],{},"The regulatory classification is clear: a heat pump is a fixed appliance. AREI 4.2.4.3 b requires the high- or very-high-sensitivity group (30 mA) only for certain circuits – sockets not intended for fixed appliances, lighting, bathrooms and showers, and washing machines, tumble dryers and dishwashers. Fixed appliances such as electric heating installations may be connected directly downstream of the RCD at the origin of the installation (no more than 300 mA). If the earth electrode resistance exceeds 30 ohms, at least one RCD of no more than 100 mA per circuit or group of circuits supplements that protection.",[12,35359,35360],{},"The required type is set by the device. A heat pump with a power-electronic compressor can produce fault currents with waveforms that differ from a purely resistive load. That does not mean every heat pump needs Type B, nor that Type A is always sufficient. Check:",[84,35362,35363,35366,35369,35372,35375],{},[87,35364,35365],{},"the binding installation manual of the exact model;",[87,35367,35368],{},"whether the device has integrated DC fault-current detection;",[87,35370,35371],{},"the protective measure planned for the network and earthing system;",[87,35373,35374],{},"selectivity and allocation relative to upstream RCDs;",[87,35376,35377],{},"cumulative leakage currents from other loads.",[12,35379,35380,35381,35384],{},"The guide to ",[40,35382,35383],{"href":25395},"RCD Type A versus Type B"," separates waveform capability, high immunity and time selectivity. The diagram states the protective device actually installed, not an assumption from a generic table.",[79,35386,35388],{"id":35387},"use-a-clear-symbol-and-legend","Use a clear symbol and legend",[12,35390,35391,35392,35395],{},"Table 2.23 of AREI Book 1 V06 is explicitly a ",[15,35393,35394],{},"non-exhaustive"," symbol list. Where it has no suitable symbol, 3.1.2.1 a allows any other clearly identifiable symbol defined in the legend. One possible documentation distinguishes, for example:",[84,35397,35398,35404,35410],{},[87,35399,35400,35403],{},[25,35401,35402],{},"HP-O",": heat-pump outdoor unit;",[87,35405,35406,35409],{},[25,35407,35408],{},"HP-I",": heat-pump indoor unit;",[87,35411,35412,35415],{},[25,35413,35414],{},"BH",": electric backup heater.",[12,35417,35418,35419,35422],{},"Each abbreviation stays the same throughout the dossier and never also means a hydraulic pump or heating circuit. The ",[40,35420,35421],{"href":5666},"AREI electrical-symbol overview"," explains when standard symbols are enough and when a project legend is needed.",[79,35424,35426],{"id":35425},"keep-the-single-line-diagram-and-situation-plan-in-sync","Keep the single-line diagram and situation plan in sync",[12,35428,35429,35430,35433,35434,35436],{},"The single-line diagram answers ",[15,35431,35432],{},"how"," the heat pump is connected and protected. The situation plan shows ",[15,35435,27458],{}," the fixed electrical equipment is. Depending on the project, locate:",[84,35438,35439,35442,35445,35448,35451],{},[87,35440,35441],{},"outdoor and indoor units;",[87,35443,35444],{},"maintenance switch or isolator;",[87,35446,35447],{},"sub-board or control box;",[87,35449,35450],{},"fixed backup heater;",[87,35452,35453],{},"relevant cable routes where they matter for readability or later work.",[12,35455,35456,35457,35459],{},"Every location uses the same circuit reference as the single-line diagram. A hydraulic schematic supplements the dossier but replaces neither of the two electrical plans. See ",[40,35458,34236],{"href":5399}," for the division of roles.",[79,35461,35463],{"id":35462},"common-documentation-mistakes","Common documentation mistakes",[1041,35465,35467],{"id":35466},"writing-only-heat-pump-8-kw","Writing only “heat pump 8 kW”",[12,35469,35470],{},"That entry often confuses thermal and electrical power. Protection, supply and cable stay unclear.",[1041,35472,35474],{"id":35473},"forgetting-the-backup-heater","Forgetting the backup heater",[12,35476,35477],{},"A backup heater changes the electrical peak load considerably and often has its own connection. If it is part of the fixed installation, it belongs on the diagram.",[1041,35479,35481],{"id":35480},"replacing-manufacturer-requirements-with-a-rule-of-thumb","Replacing manufacturer requirements with a rule of thumb",[12,35483,35484],{},"A generic RCD or breaker suggestion replaces neither the specific datasheet nor a complete protection design.",[1041,35486,35488],{"id":35487},"presenting-the-design-as-as-built","Presenting the design as as-built",[12,35490,35491],{},"Cable route, phases or equipment variant can change during installation. Before completion, you compare the diagram, board labels and the installation on site.",[79,35493,35495],{"id":35494},"final-documentation-check","Final documentation check",[12,35497,35498],{},"Before handover, check:",[84,35500,35501,35504,35507,35510,35513,35516],{},[87,35502,35503],{},"Do the rating plate and equipment name match the diagram?",[87,35505,35506],{},"Are outdoor, indoor and auxiliary components complete?",[87,35508,35509],{},"Do poles, rated current and RCD data match the installed devices?",[87,35511,35512],{},"Are cable data and phases traceable?",[87,35514,35515],{},"Do circuit references agree on the single-line diagram, situation plan and board?",[87,35517,35518],{},"Are manufacturer documents and later changes in the installation dossier?",[12,35520,35521],{},"This check covers the documentation. The electrical design is done by the professional, and the required inspection by the approved inspection body.",[79,35523,35525],{"id":35524},"when-the-diagram-needs-updating-again","When the diagram needs updating again",[12,35527,35528],{},"Replacing the whole heat pump is not the only trigger. Review the plan when a backup heater is added, a higher connection rating is unlocked, a single-phase unit is replaced by a three-phase one, or an external controller is permanently connected. The same applies when an installer changes the RCD, protection or cable route.",[12,35530,35531],{},"Do not simply write the new model over the old symbol. Compare:",[84,35533,35534,35537,35540,35543,35546,35549],{},[87,35535,35536],{},"old and new electrical connection data;",[87,35538,35539],{},"the existing cable and the conductors actually available;",[87,35541,35542],{},"protective devices and manufacturer requirements;",[87,35544,35545],{},"phase allocation and effects on the board;",[87,35547,35548],{},"positions on the situation plan;",[87,35550,35551],{},"revision date and related equipment documents.",[12,35553,35554],{},"If a decommissioned circuit physically remains, the documentation makes its real state clear. A load shown as active on the diagram but disconnected on site misleads just as much as a new backup heater missing from the plan.",[79,35556,35558],{"id":35557},"worked-example-outdoor-unit-indoor-unit-and-backup-heater","Worked example: outdoor unit, indoor unit and backup heater",[12,35560,35561],{},"An installation consists of a three-phase outdoor unit, a separately supplied indoor unit and an electric backup heater. Do not draw a single block too quickly. Check on the delivered model and the actual wiring whether three outgoing ways exist or whether components are supplied internally from the outdoor unit. Only genuinely separate circuits get their own protection chain, cable data and reference.",[12,35563,35564],{},"For every existing way, you record the maximum electrical load from the binding manufacturer documentation, not the thermal heating output from the brochure. Add phases, neutral and protective conductor according to the real cable. A three-phase outdoor unit may sit alongside a single-phase control or indoor module; the shared function name “heat pump” hides that difference. Check the backup heater with particular care, as its connection rating and switching stages can clearly exceed the heat-pump figure.",[12,35566,35567],{},"On the situation plan, the outdoor unit, indoor unit, fixed isolation point and any separately supplied backup heater appear at their actual locations. Control, bus or sensor cables are not shown as power circuits. If they matter for maintenance, describe them clearly in the legend or manufacturer documentation, separate from the mains supply.",[1489,35569],{":height":22938,":width":35570,"alt":35571,"caption":35572,"src":35573},"1006","PlanElec Sketch: three appliance circuits ‘HP1 outdoor unit’ (4P C 20 A, 5G4), ‘HP2 indoor unit’ and ‘HP3 backup heater’ (2P 20 A each) on the board, on the right the properties of the HP1 circuit breaker.","Every separately fed unit gets its own circuit with protection and cable. Values and split are an example, the manufacturer's documents decide; Sketch does not check AREI\u002FRGIE rules.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-heat-pump-circuits.webp",[79,35575,35577],{"id":35576},"account-for-commissioning-data-and-operating-modes","Account for commissioning data and operating modes",[12,35579,35580],{},"After commissioning, compare the drawn way with the rating plate, terminals, installer menu and test record. Load limitation, a blocking contact or energy management affect operation, but do not replace the necessary sizing and protection assessment. Document only settings that are actually applied, secured against unintended change and relevant to the design.",[12,35582,35583],{},"Also check operating cases that normal operation easily hides:",[84,35585,35586,35589,35592,35595,35598,35601],{},[87,35587,35588],{},"defrosting with simultaneous backup heating;",[87,35590,35591],{},"emergency or anti-legionella operation with the electric heater;",[87,35593,35594],{},"start-up and inverter behaviour per the manufacturer;",[87,35596,35597],{},"separate supply for a drain-pan or trace heater;",[87,35599,35600],{},"shutdown and safe isolation for maintenance;",[87,35602,35603],{},"restart after a supply interruption or load shedding.",[12,35605,35606],{},"This list does not set protection or cross-section on its own. It shows which input data the designer clarifies with the exact manual and installation conditions. Measurements and disconnection conditions are checked on site by the professional.",[12,35608,35609],{},"Also record which component can remain live when the main way is switched off. Some controls, communication power supplies or auxiliary devices have a different supply, and a maintenance sketch shows it. Mark isolation points as acting together only when wiring and the manufacturer concept confirm it. That way the documentation prevents a supposedly fully isolated system from still being fed by a second way.",[12,35611,35612],{},"Carry this separation into the board labelling. One collective name for several ways makes maintenance and comparison with the plan harder. Use short, unambiguous function names and the same references on the diagram, situation plan and equipment. After labelling, verify by switching off each way in turn that every label really covers the expected part. The result belongs to the as-built check, not to an unverified design assumption.",[79,35614,35616],{"id":35615},"interfaces-with-pv-battery-and-load-management","Interfaces with PV, battery and load management",[12,35618,35619],{},"A heat pump may respond to self-consumption control without becoming a load “behind the PV inverter” if the real AC topology is different. Draw energy paths as they are electrically connected and explain communication contacts or smart-grid signals separately. With backup power, also establish whether the heat pump is actually supplied from the backup board and which starting and power limits apply; an app setting does not prove it.",[12,35621,4361,35622,35625],{},[40,35623,35112],{"href":1971,"rel":35624},[1458]," provides the general diagram and safety framework. Model-specific connection values, required external protection and connection variants come from the current instructions for the exact installed equipment.",[79,35627,35629],{"id":35628},"documenting-it-in-planelec","Documenting it in PlanElec",[12,35631,35632,35633,35636,35637,35640],{},"For a single job or your own home, you draw the branches for free in your browser with ",[40,35634,22],{"href":1456,"rel":35635},[1458],": the library contains the ",[15,35638,35639],{},"Heat pump"," as a load, you enter protective device, RCD and cable per branch and export the single-line diagram and situation plan as PDF. Sketch draws what you enter and does not check AREI rules.",[12,35642,3361,35643,35645,35646,35648],{},[40,35644,31],{"href":1964},", you assign heat-pump components to their actual circuits, record protection and cable details, and export the single-line diagram and situation plan as PDFs. The heat pump is stored there as a permanently connected fixed appliance that may sit downstream of the main RCD. The AREI\u002FRGIE self-check flags, among other things, a Type B-curve circuit breaker supplying a high-inrush load such as a heat pump – explicitly as a practice recommendation, not an AREI requirement. The rules the self-check covers are listed in ",[40,35647,1086],{"href":1085},". Project-specific symbols still need a clear legend. The roles are clear: the self-check shows you findings within the supported rules, the manufacturer's approval comes from the equipment documentation, and the official inspection is done by the approved inspection body.",[79,35650,35652],{"id":35651},"sources-and-reviewed-version","Sources and reviewed version",[12,35654,35655,35656,35660],{},"The regulatory basis is the official ",[40,35657,35659],{"href":1971,"rel":35658},[1458],"AREI\u002FRGIE Book 1 publication",", particularly Table 2.23, Part 3 on electrical plans (3.1.2.1), Subsection 4.2.4.3 b on RCDs in household installations and Table 4.11, together with the electrical installation manual for the exact heat-pump model. Reviewed against Book 1 V06 on 5 October 2026.",{"title":2044,"searchDepth":2045,"depth":2045,"links":35662},[35663,35664,35665,35666,35667,35668,35669,35675,35676,35677,35678,35679,35680,35681],{"id":35237,"depth":2045,"text":35238},{"id":35273,"depth":2045,"text":35274},{"id":35313,"depth":2045,"text":35314},{"id":35353,"depth":2045,"text":35354},{"id":35387,"depth":2045,"text":35388},{"id":35425,"depth":2045,"text":35426},{"id":35462,"depth":2045,"text":35463,"children":35670},[35671,35672,35673,35674],{"id":35466,"depth":2053,"text":35467},{"id":35473,"depth":2053,"text":35474},{"id":35480,"depth":2053,"text":35481},{"id":35487,"depth":2053,"text":35488},{"id":35494,"depth":2045,"text":35495},{"id":35524,"depth":2045,"text":35525},{"id":35557,"depth":2045,"text":35558},{"id":35576,"depth":2045,"text":35577},{"id":35615,"depth":2045,"text":35616},{"id":35628,"depth":2045,"text":35629},{"id":35651,"depth":2045,"text":35652},"Document the outdoor unit, indoor unit, backup heater, protection, cable and manufacturer data of a heat pump correctly under AREI Book 1 V06.",[35684,2116,2117,2118],"energy-systems",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-heat-pump-single-line-diagram-editorial.jpg","\u002Fblog\u002Fheat-pump-single-line-diagram.en",{"title":35212,"description":35682},"Heat Pump on a Single-Line Diagram: Circuit and Data","blog\u002Fheat-pump-single-line-diagram.en",[35639,3926,2133,4399,35692,35693,4261],"Outdoor unit","Backup heater","_Jofo4UfbzPy6EnFFRs25eHnTmJr7A2Rl_TlI-O2K6c","\u002Fblog\u002Fheat-pump-single-line-diagram",{"id":35697,"title":35698,"articleId":35699,"body":35700,"category":24234,"date":35195,"description":36346,"extension":2113,"image":35718,"labels":36347,"lastUpdated":10988,"locale":2119,"meta":36348,"navigation":2121,"ogImage":36349,"path":36350,"publishDate":35195,"readTime":15114,"refreshInterval":4248,"seo":36351,"seoTitle":36352,"slug":36353,"stem":36354,"tags":36355,"__hash__":36357,"kind":2137,"href":36358},"blog\u002Fblog\u002Fnew-build-single-line-checklist.en.md","Single-Line Diagram for a New Build: The AREI Checklist up to Inspection","new-build-single-line-checklist",{"type":9,"value":35701,"toc":36326},[35702,35706,35713,35719,35722,35726,35830,35834,35837,35854,35857,35860,35864,35867,35890,35893,35900,35902,35906,35909,35929,35934,35937,35941,35944,35947,35967,35970,35974,35977,35980,36000,36007,36011,36014,36017,36037,36040,36044,36047,36050,36053,36057,36064,36067,36084,36087,36091,36094,36097,36117,36120,36124,36127,36130,36134,36212,36215,36219,36222,36225,36229,36232,36235,36239,36242,36254,36258,36264,36270,36273,36279,36281,36315,36321],[79,35703,35705],{"id":35704},"what-must-a-new-build-single-line-diagram-contain","What must a new-build single-line diagram contain?",[12,35707,35708,35709,35712],{},"A single-line diagram for a Belgian new build shows the installation ",[15,35710,35711],{},"as actually built",": a title block with number, version, date, address and responsible person, the voltage and type of current, every distribution board, all residual current and overcurrent devices with their characteristics, cable type, cross-section, number of conductors and installation method, switches, boxes, socket outlets, lighting points, fixed appliances and sources. The situation plan shows the same elements with the same reference at their location. The basis is AREI\u002FRGIE Book 1 version 06, applicable since 1 April 2026, above all Section 3.1.2.",[12,35714,35715],{},[74,35716],{"alt":35717,"src":35718},"Electricians check the installation in a newly built home.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-new-build-single-line-checklist-editorial.webp",[12,35720,35721],{},"The single-line diagram and the situation plan are drawn up by the person responsible for carrying out the work (Subsection 3.1.2.1 a). Before the conformity inspection they match the installed state, not the first design. This checklist takes you there in ten steps. It covers the usual AC case; earthed DC systems, which version 06 now regulates, are a separate field where you do not simply carry over AC conductor roles and symbols.",[79,35723,35725],{"id":35724},"mandatory-content-at-a-glance","Mandatory content at a glance",[138,35727,35728,35739],{},[141,35729,35730],{},[144,35731,35732,35734,35737],{},[147,35733,18799],{},[147,35735,35736],{},"Required by",[147,35738,5258],{},[163,35740,35741,35752,35762,35771,35780,35790,35800,35809,35819],{},[144,35742,35743,35746,35749],{},[168,35744,35745],{},"Number, version and version date",[168,35747,35748],{},"Section 3.1.2",[168,35750,35751],{},"single-line diagram and situation plan",[144,35753,35754,35757,35760],{},[168,35755,35756],{},"Name, capacity and VAT number of the responsible person",[168,35758,35759],{},"Subsection 3.1.2.1 a",[168,35761,35751],{},[144,35763,35764,35767,35769],{},[168,35765,35766],{},"Address of the installation",[168,35768,35759],{},[168,35770,35751],{},[144,35772,35773,35776,35778],{},[168,35774,35775],{},"Voltage and type of current",[168,35777,35759],{},[168,35779,5269],{},[144,35781,35782,35785,35787],{},[168,35783,35784],{},"Capital letter per elementary circuit, sequence number per point",[168,35786,35759],{},[168,35788,35789],{},"single-line diagram, reference on the plan",[144,35791,35792,35795,35798],{},[168,35793,35794],{},"Cable type, cross-section, number of conductors and installation method",[168,35796,35797],{},"Subsection 3.1.2.2 a",[168,35799,5269],{},[144,35801,35802,35805,35807],{},[168,35803,35804],{},"Type and characteristics of residual current and overcurrent devices",[168,35806,35797],{},[168,35808,5269],{},[144,35810,35811,35814,35817],{},[168,35812,35813],{},"Switches, junction and branch boxes, socket outlets, lighting points, fixed appliances, sources",[168,35815,35816],{},"Subsections 3.1.2.2 a and 3.1.2.3 a",[168,35818,35751],{},[144,35820,35821,35824,35827],{},[168,35822,35823],{},"Symbols from Table 2.23 or an unambiguous legend",[168,35825,35826],{},"Chapter 2.13, Subsection 3.1.2.1 a",[168,35828,35829],{},"both documents",[79,35831,35833],{"id":35832},"_1-set-the-title-block-and-responsibility","1. Set the title block and responsibility",[12,35835,35836],{},"Give the document set a clear identity before you draw the first circuit:",[84,35838,35839,35842,35845,35848,35851],{},[87,35840,35841],{},"document number, version and the date of that version;",[87,35843,35844],{},"address of the installation;",[87,35846,35847],{},"name and capacity of the person responsible for the work, VAT number where applicable;",[87,35849,35850],{},"fields for dates and signatures;",[87,35852,35853],{},"voltage and type of current on the single-line diagram.",[12,35855,35856],{},"The single-line diagram and the situation plan carry the same version. A file name is not enough, because printouts and merged PDFs lose it. Nor is the export date the date on which the installation was surveyed.",[12,35858,35859],{},"The signature and visa of the approved body are only added during inspection, once the installation is found compliant (Subsection 3.1.2.1 a). A working version therefore carries no anticipated approval and no “AREI-compliant” statement.",[79,35861,35863],{"id":35862},"_2-establish-the-supply","2. Establish the supply",[12,35865,35866],{},"The diagram starts from the real supply, not from a template. Record:",[84,35868,35869,35872,35875,35878,35881,35884,35887],{},[87,35870,35871],{},"single-phase or three-phase supply;",[87,35873,35874],{},"nominal voltage and type of current;",[87,35876,35877],{},"neutral and protective conductor;",[87,35879,35880],{},"connection and meter arrangement;",[87,35882,35883],{},"rating of the supply protection and the main switch-disconnector;",[87,35885,35886],{},"earthing system and earthing concept, as far as design and protection need them;",[87,35888,35889],{},"additional sources such as a PV inverter or transformer.",[12,35891,35892],{},"No socket outlet tells you whether a supply is a 3×400 V network with neutral or a 3×230 V network. A wrong assumption carries through to the number of poles, the neutral, the wiring of the RCDs and the loads. Compare the connection contract, the board layout and a measurement; when in doubt, the grid operator confirms the supply data.",[12,35894,35895,35896,35899],{},"This is exactly where the start task \"Draw the documents for the inspection\" in ",[40,35897,22],{"href":3611,"rel":35898},[1458]," begins: it sets up the connection, meter, main protection and distribution board and leaves everything else empty until you enter the real installation. Sketch is free and runs in the browser.",[1489,35901],{":height":5796,":width":5797,"alt":5798,"caption":5799,"src":5800},[79,35903,35905],{"id":35904},"_3-capture-every-board-as-part-of-the-protection-chain","3. Capture every board as part of the protection chain",[12,35907,35908],{},"Record the main board and sub-boards with their feeds and interconnections. The path from the origin to every final circuit is fully traceable. Depending on the installation, this includes:",[84,35910,35911,35914,35917,35920,35923,35926],{},[87,35912,35913],{},"main switch and upstream protection;",[87,35915,35916],{},"RCDs with type, rated residual current, rated current and relevant characteristic;",[87,35918,35919],{},"fuses or circuit breakers with rating and curve;",[87,35921,35922],{},"busbars, links and sub-boards that explain the structure;",[87,35924,35925],{},"spare breakers shown as spares, without an invented cable or load;",[87,35927,35928],{},"a unique name for every board and outgoing way.",[1489,35930],{":height":8729,":width":3800,"alt":35931,"caption":35932,"src":35933},"Simplified protection chain of a Belgian dwelling: grid connection and meter, residual-current device at the origin of at most 300 mA, Type A, at least 40 A; downstream, a 30 mA residual-current device for circuit A (20 A circuit breaker, 2.5 mm², socket outlets A1 to A4) and circuit B (16 A, 1.5 mm², lighting B1 to B3), plus circuit C for a fixed appliance such as the hob directly after the 300 mA device.","Simplified example without official symbols: this is how the path from the origin to a final circuit reads. The breaker ratings are upper limits per cross-section; the drawing does not prove selectivity.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fsingle-line-diagram\u002Fprotection-cascade.en.svg",[12,35935,35936],{},"A 300 mA device followed by a 30 mA device does not prove selectivity on its own. Waveform type, increased immunity and time delay are separate properties. Short-circuit conditions, disconnection times and coordination according to the manufacturer belong to the technical design.",[79,35938,35940],{"id":35939},"_4-give-every-final-circuit-a-stable-reference","4. Give every final circuit a stable reference",[12,35942,35943],{},"Each elementary circuit gets a capital letter. You number lighting points, socket outlets and control devices in the order in which they occur in the circuit, starting from the upstream overcurrent device (Subsection 3.1.2.1 a). The same reference appears on the board label.",[12,35945,35946],{},"For every outgoing way the survey answers:",[84,35948,35949,35952,35955,35958,35961,35964],{},[87,35950,35951],{},"Which use and which loads belong to it?",[87,35953,35954],{},"Is it a lighting, socket, mixed or dedicated appliance circuit?",[87,35956,35957],{},"Which fixed appliances are connected?",[87,35959,35960],{},"Are there junction or branch boxes?",[87,35962,35963],{},"Which RCD protects the circuit?",[87,35965,35966],{},"Do the diagram, board label and situation plan agree?",[12,35968,35969],{},"“Kitchen” is not a usable name when lighting, worktop sockets, dishwasher and hob each have their own circuit. Names help orientation; only the electrical reference is unambiguous.",[79,35971,35973],{"id":35972},"_5-state-all-cable-data","5. State all cable data",[12,35975,35976],{},"Subsection 3.1.2.2 a requires type, cross-section, number of conductors and installation method. Record them per cable section. After a branch or junction box, the cable or installation method can change; a single cable label at the start of the circuit hides that.",[12,35978,35979],{},"The design behind the diagram goes further. Check separately:",[84,35981,35982,35985,35988,35991,35994,35997],{},[87,35983,35984],{},"design current, protective-device rating and current-carrying capacity;",[87,35986,35987],{},"installation method, grouping, ambient temperature and thermal insulation;",[87,35989,35990],{},"cable length and voltage drop;",[87,35992,35993],{},"short-circuit and fault-loop conditions;",[87,35995,35996],{},"minimum cross-sections and specific circuit rules;",[87,35998,35999],{},"the stated protective conductor against the cable actually installed.",[12,36001,36002,36003,36006],{},"Table 4.11 gives, for domestic installations, the highest fuse or circuit-breaker rating per cross-section, for example a 20 A circuit breaker for 2.5 mm². It is a ceiling, not a complete cable calculation. A neat label such as ",[25,36004,36005],{},"XVB 3G2,5"," is worthless if a different cable was installed on site.",[79,36008,36010],{"id":36009},"_6-record-loads-boxes-and-controls","6. Record loads, boxes and controls",[12,36012,36013],{},"The single-line diagram contains switches, junction and branch boxes, socket outlets, lighting points and fixed machines and appliances (Subsection 3.1.2.2 a). Use the symbols from Table 2.23. Where a sign is missing, define an unambiguous symbol in the legend.",[12,36015,36016],{},"Make visible what matters technically:",[84,36018,36019,36022,36025,36028,36031,36034],{},[87,36020,36021],{},"single or multiple socket outlet;",[87,36023,36024],{},"socket with earth contact, switched or special socket;",[87,36026,36027],{},"lighting point and actual switching function;",[87,36029,36030],{},"push button, relay, motion detector or home-automation control;",[87,36032,36033],{},"permanently connected appliance or ordinary socket load;",[87,36035,36036],{},"junction box or branch box.",[12,36038,36039],{},"A generic appliance symbol with clear text is better than an invented pictogram. Function, reference and connection are what count.",[79,36041,36043],{"id":36042},"_7-draw-sources-and-special-parts","7. Draw sources and special parts",[12,36045,36046],{},"PV installation, inverter, battery, generator and transformer belong in the electrical structure of the single-line diagram; the situation plan shows where they are. For a domestic low-voltage PV installation, the installation file additionally contains operating and maintenance instructions, safety instructions and the technical references and characteristics of the installed equipment such as make, model and power (Section 9.1.2).",[12,36048,36049],{},"A PV arrow next to the main board describes neither the connection point nor the protection chain. Draw which source can feed in, where it connects and which components lie in between. Whether a battery can export to the grid is something you take from the manufacturer documentation rather than guess.",[12,36051,36052],{},"Where safety or critical installations exist, a list and a plan of those installations are added; their sources, circuits and loads are clearly identified on the single-line diagram (Subsection 3.1.2.1 a).",[79,36054,36056],{"id":36055},"_8-keep-the-situation-plan-in-sync","8. Keep the situation plan in sync",[12,36058,36059,36060,36063],{},"Every board, box, socket outlet, luminaire, control, fixed appliance and source on the single-line diagram appears at its location on the situation plan (Subsection 3.1.2.3 a). The reference ",[25,36061,36062],{},"C3"," means the same element in both documents. Switches carry the letter of their circuit and the number of the point they control.",[12,36065,36066],{},"Check in both directions:",[3139,36068,36069,36072,36075,36078,36081],{},[87,36070,36071],{},"find every diagram element on the situation plan;",[87,36073,36074],{},"find every plan symbol on the single-line diagram;",[87,36076,36077],{},"compare letter and number;",[87,36079,36080],{},"confirm floor, room and board assignment;",[87,36082,36083],{},"include concealed boxes and outdoor elements.",[12,36085,36086],{},"You do not draw unknown cable routes. The situation plan locates the required components; additional cable or earthing plans are only produced from reliable data.",[79,36088,36090],{"id":36089},"_9-freeze-the-installed-state-before-the-conformity-inspection","9. Freeze the installed state before the conformity inspection",[12,36092,36093],{},"Before it is put into use, the new installation undergoes the conformity inspection (Chapter 6.4). The approved body measures the earth resistance and the insulation level and certifies in its report that the RCDs match the earth resistance, that the overcurrent devices match the circuit sections they protect and that the installation was built according to the single-line diagram and situation plan. It also checks the continuity of bonding and protective conductors (Subsection 6.4.6.4).",[12,36095,36096],{},"Shortly before the appointment, look for real deviations, not typos:",[84,36098,36099,36102,36105,36108,36111,36114],{},[87,36100,36101],{},"Was a different circuit breaker or RCD installed?",[87,36103,36104],{},"Did a cable cross-section or type change?",[87,36106,36107],{},"Was a socket outlet, luminaire or box added?",[87,36109,36110],{},"Was a circuit moved to a different RCD?",[87,36112,36113],{},"Do board labels and references match?",[87,36115,36116],{},"Do all pages belong to the same version?",[12,36118,36119],{},"Correct the installation and the documents together. A technical fault gets fixed, not airbrushed out of the drawing.",[79,36121,36123],{"id":36122},"_10-organise-the-file-and-future-changes","10. Organise the file and future changes",[12,36125,36126],{},"The file of a domestic installation contains the single-line diagram, the situation plan, the conformity inspection reports, any evidence about the equipment and, later, the documents for alterations. The owner keeps the file in two copies and hands it over to a new owner (Section 9.1.2).",[12,36128,36129],{},"After the inspection you keep the diagram up to date. Substantial alterations or extensions require updated diagrams and plans; for a non-substantial one, a short dated and signed description is enough, and the situation plan always shows the current state (Subsection 3.1.2.1 a). Keep the inspected version and every later version traceable.",[79,36131,36133],{"id":36132},"final-check","Final check",[84,36135,36138,36146,36152,36158,36164,36170,36176,36182,36188,36194,36200,36206],{"className":36136},[36137],"contains-task-list",[87,36139,36142,36145],{"className":36140},[36141],"task-list-item",[25188,36143],{"disabled":2121,"type":36144},"checkbox"," document number, version, date, address and responsible person complete",[87,36147,36149,36151],{"className":36148},[36141],[25188,36150],{"disabled":2121,"type":36144}," voltage, type of current and real supply configuration stated",[87,36153,36155,36157],{"className":36154},[36141],[25188,36156],{"disabled":2121,"type":36144}," all boards and sources included",[87,36159,36161,36163],{"className":36160},[36141],[25188,36162],{"disabled":2121,"type":36144}," residual current and overcurrent protection with characteristics recorded",[87,36165,36167,36169],{"className":36166},[36141],[25188,36168],{"disabled":2121,"type":36144}," every final circuit uniquely referenced",[87,36171,36173,36175],{"className":36172},[36141],[25188,36174],{"disabled":2121,"type":36144}," cable type, cross-section, number of conductors and installation method complete",[87,36177,36179,36181],{"className":36178},[36141],[25188,36180],{"disabled":2121,"type":36144}," socket outlets, lighting points, boxes, switches and fixed appliances present",[87,36183,36185,36187],{"className":36184},[36141],[25188,36186],{"disabled":2121,"type":36144}," symbols from Table 2.23 or unambiguously defined in the legend",[87,36189,36191,36193],{"className":36190},[36141],[25188,36192],{"disabled":2121,"type":36144}," references match the board and the situation plan",[87,36195,36197,36199],{"className":36196},[36141],[25188,36198],{"disabled":2121,"type":36144}," site changes reflected in both documents",[87,36201,36203,36205],{"className":36202},[36141],[25188,36204],{"disabled":2121,"type":36144}," additional documents for PV, safety or special installations added",[87,36207,36209,36211],{"className":36208},[36141],[25188,36210],{"disabled":2121,"type":36144}," design calculations and measurements completed outside the diagram",[12,36213,36214],{},"If you draw in Sketch, \"Check documents\" shows before the PDF what is formally missing: empty title block fields, a missing inspection body, circuits without a protective device and devices on the diagram without a place on the situation plan. It is a completeness aid, not a statement about the inspection; you can still create the PDF.",[79,36216,36218],{"id":36217},"align-design-site-and-commissioning","Align design, site and commissioning",[12,36220,36221],{},"A new build almost always changes between tender and commissioning. Keep an open deviation list: planned reference, executed change, who decided, affected plans and missing evidence. Typical cases are a relocated board, an extra outdoor socket, a different heat pump rating or a PV inverter added late. Only when every line is closed or explicitly marked as not executed does the design diagram become an as-built diagram.",[12,36223,36224],{},"Then walk through the installation with labels and measurement records. Do not switch circuits based on assumed room names. Compare the marking in the board with the reference on the diagram and the point on the situation plan. If conductors, protective devices or settings change during commissioning, the documentation follows; an early PDF export is not a final version.",[79,36226,36228],{"id":36227},"example-a-new-final-circuit-for-the-tumble-dryer","Example: a new final circuit for the tumble dryer",[12,36230,36231],{},"For a permanently connected tumble dryer, “utility room” is not enough. The file shows which board and which protective devices the circuit comes from, which reference it carries, which cable with how many conductors and which cross-section is installed and which appliance sits at the end. Washing machine, tumble dryer and dishwasher each get a dedicated circuit (Subsection 5.2.1.2) and are protected by an RCD of high or very high sensitivity (Subsection 4.2.4.3 b). The same reference appears at the real connection point on the situation plan. Appliance manual, ratings and settings are kept as technical documentation.",[12,36233,36234],{},"Then check the interfaces: is the protective-conductor path traceable? Does the connection method match the drawing? Did a dedicated supply become a shared run on site? Is a branch box missing from the diagram? These questions stop formally complete pages from preserving an outdated design state.",[79,36236,36238],{"id":36237},"hand-over-a-controlled-document-set","Hand over a controlled document set",[12,36240,36241],{},"Identify the final issue clearly with project, address, revision and export date. File the single-line diagram, situation plan, inspection report and technical documents in an ordered dossier. Mark working copies and superseded revisions separately as history. The owner then knows which files are current and that later changes have to be documented again.",[12,36243,4361,36244,36249,36250,56],{},[40,36245,36248],{"href":36246,"rel":36247},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Fcontrole-des-installations",[1458],"official FPS Economy page on domestic electrical inspections"," lists the minimum plans to present and summarises their content. The detailed requirements are in ",[40,36251,36253],{"href":1971,"rel":36252},[1458],"AREI\u002FRGIE Book 1, version 06",[79,36255,36257],{"id":36256},"preparing-with-planelec","Preparing with PlanElec",[12,36259,36260,36261,36263],{},"For the single-line diagram and situation plan alone, ",[40,36262,22],{"href":1961}," is enough: you draw both for free in the browser, drag devices from the single-line diagram onto the situation plan and see which ones still have no place. The PDF export puts every floor with content on its own sheets.",[12,36265,36266,36267,36269],{},"Contractors who also need the distribution board, self-check and team features work in ",[40,36268,31],{"href":1964},". There, one project model holds the floor plan, topology and boards; the single-line diagram and situation plan carry the same circuit references and leave as PDFs or as a compiled installation dossier with cover sheet. The advisory AREI\u002FRGIE self-check report tests the supported rules that can be decided from your input. You bring a Sketch drawing across with \"Take it to Pro\".",[12,36271,36272],{},"The roles are clearly split: PlanElec structures the documentation and shows open information. Supply verification, cable design, site survey and measurements remain the work of the professionals on site, and the approved body carries out the official conformity inspection.",[1489,36274],{":height":36275,":width":7057,"alt":36276,"caption":36277,"src":36278},"417","PlanElec Pro, export: the ‘On the way to your documents’ list with ‘2 of 6 done’; circuits and the board are done, project data, situation plan, confirming the single-line diagram and ‘Read the self-check’ are still open.","Each step fills the documents and leads to the open item with one click; the preview is always available. Acceptance is done by the accredited inspection body.","\u002Fimages\u002Fblog\u002Fscreens\u002Fpro\u002Fen-export-path.webp",[79,36280,26353],{"id":26352},[84,36282,36283,36288,36293,36298,36304,36310],{},[87,36284,36285],{},[40,36286,36287],{"href":5399},"Coordinate the single-line and situation plans",[87,36289,36290],{},[40,36291,36292],{"href":5666},"Understand AREI electrical symbols",[87,36294,36295],{},[40,36296,36297],{"href":5393},"Prepare for electrical inspection",[87,36299,36300],{},[40,36301,36303],{"href":36302},"\u002Fen\u002Fblog\u002Fmain-switch-mandatory-arei","Is a main switch mandatory under AREI?",[87,36305,36306],{},[40,36307,36309],{"href":36308},"\u002Fen\u002Fblog\u002Fbill-of-materials-electrical-installation","Drawing up a bill of materials for an electrical installation",[87,36311,36312],{},[40,36313,36314],{"href":33617},"Smoke detectors in Belgium: the rules per region",[12,36316,36317],{},[40,36318,36320],{"href":3611,"rel":36319},[1458],"Draw the documents for the inspection in PlanElec Sketch →",[12,36322,36323],{},[63,36324,36325],{},"Basis: AREI\u002FRGIE Book 1 V06, particularly Chapter 2.13, Section 3.1.2, Table 4.11, Subsection 4.2.4.3, Subsection 5.2.1.2, Chapter 6.4 and Section 9.1.2. The official text and the installed system remain decisive.",{"title":2044,"searchDepth":2045,"depth":2045,"links":36327},[36328,36329,36330,36331,36332,36333,36334,36335,36336,36337,36338,36339,36340,36341,36342,36343,36344,36345],{"id":35704,"depth":2045,"text":35705},{"id":35724,"depth":2045,"text":35725},{"id":35832,"depth":2045,"text":35833},{"id":35862,"depth":2045,"text":35863},{"id":35904,"depth":2045,"text":35905},{"id":35939,"depth":2045,"text":35940},{"id":35972,"depth":2045,"text":35973},{"id":36009,"depth":2045,"text":36010},{"id":36042,"depth":2045,"text":36043},{"id":36055,"depth":2045,"text":36056},{"id":36089,"depth":2045,"text":36090},{"id":36122,"depth":2045,"text":36123},{"id":36132,"depth":2045,"text":36133},{"id":36217,"depth":2045,"text":36218},{"id":36227,"depth":2045,"text":36228},{"id":36237,"depth":2045,"text":36238},{"id":36256,"depth":2045,"text":36257},{"id":26352,"depth":2045,"text":26353},"What a new-build single-line diagram must contain: title block, supply, protective devices, cables, loads, sources and the match with the situation plan under AREI Book 1 V06.",[2116,5422,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-new-build-single-line-checklist-editorial.jpg","\u002Fblog\u002Fnew-build-single-line-checklist.en",{"title":35698,"description":36346},"New Build Single-Line Diagram: AREI Checklist","new-build-single-line-diagram-checklist","blog\u002Fnew-build-single-line-checklist.en",[2133,2134,36356,5269,15623,26419,18618,4261],"new build","xc1apqiRlA07FbDBOmphmOZCHw28Lj2-OT0mHRfFtTI","\u002Fblog\u002Fnew-build-single-line-diagram-checklist",{"id":36360,"title":36361,"articleId":36362,"body":36363,"category":4239,"date":35195,"description":36872,"extension":2113,"image":36380,"labels":36873,"lastUpdated":10988,"locale":2119,"meta":36874,"navigation":2121,"ogImage":36875,"path":36876,"publishDate":35195,"readTime":3582,"refreshInterval":4248,"seo":36877,"seoTitle":36878,"slug":36879,"stem":36880,"tags":36881,"__hash__":36884,"kind":2137,"href":36885},"blog\u002Fblog\u002Fsingle-line-vs-situation-plan.en.md","Single-Line Diagram vs. Situation Plan: Difference and Coordination","single-line-vs-situation-plan",{"type":9,"value":36364,"toc":36856},[36365,36369,36375,36381,36384,36388,36475,36479,36482,36485,36489,36492,36518,36521,36524,36528,36531,36547,36550,36553,36557,36578,36582,36592,36596,36599,36622,36625,36629,36632,36635,36638,36642,36710,36714,36717,36720,36723,36726,36730,36733,36757,36760,36777,36781,36792,36795,36801,36805,36811,36816,36819,36821,36823,36825,36845,36851],[79,36366,36368],{"id":36367},"the-difference-in-one-sentence","The difference in one sentence",[12,36370,36371,36374],{},[15,36372,36373],{},"The single-line diagram shows how supply, protective devices, cables and loads are connected electrically; the situation plan, called a position plan in the regulation, shows where that equipment is located in the building."," The same circuit letter and sequence number link the electrical path to the real room.",[12,36376,36377],{},[74,36378],{"alt":36379,"src":36380},"Project documents and digital devices on a worktable.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-single-line-vs-situation-plan-editorial.webp",[12,36382,36383],{},"For a new domestic installation and for substantial modifications or extensions, you need both documents (AREI\u002FRGIE Book 1 V06, Subsection 3.1.2.1 a). They do not replace each other: a floor plan does not specify RCDs, breakers or conductor data, and an electrical tree does not locate the socket beside a particular door.",[79,36385,36387],{"id":36386},"both-documents-at-a-glance","Both documents at a glance",[138,36389,36390,36400],{},[141,36391,36392],{},[144,36393,36394,36396,36398],{},[147,36395,2179],{},[147,36397,3926],{},[147,36399,534],{},[163,36401,36402,36413,36423,36433,36443,36453,36464],{},[144,36403,36404,36407,36410],{},[168,36405,36406],{},"What does it show?",[168,36408,36409],{},"electrical structure from the supply point to the consumer",[168,36411,36412],{},"location of equipment on the floor plan",[144,36414,36415,36418,36420],{},[168,36416,36417],{},"AREI\u002FRGIE content",[168,36419,35797],{},[168,36421,36422],{},"Subsection 3.1.2.3 a",[144,36424,36425,36427,36430],{},[168,36426,19529],{},[168,36428,36429],{},"not to scale",[168,36431,36432],{},"a plan within the meaning of Chapter 2.12: to scale, with no prescribed ratio",[144,36434,36435,36437,36440],{},[168,36436,29269],{},[168,36438,36439],{},"type and characteristics of residual-current and overcurrent devices",[168,36441,36442],{},"location of the board",[144,36444,36445,36447,36450],{},[168,36446,23131],{},[168,36448,36449],{},"type, cross-section, number of conductors and installation method",[168,36451,36452],{},"location of junction and branch boxes",[144,36454,36455,36458,36461],{},[168,36456,36457],{},"Referencing",[168,36459,36460],{},"letter per circuit, number per point",[168,36462,36463],{},"the same combination at the real location",[144,36465,36466,36469,36472],{},[168,36467,36468],{},"Non-substantial change",[168,36470,36471],{},"a dated and signed short description is enough",[168,36473,36474],{},"the change is always drawn in",[79,36476,36478],{"id":36477},"a-shared-identity-and-revision","A shared identity and revision",[12,36480,36481],{},"Section 3.1.2 requires an unambiguous number, revision and revision date on all diagrams, plans and records. Domestic diagrams and plans also state the name, capacity and, where applicable, VAT number of the person responsible for the work, plus the installation address (3.1.2.1 a). Voltage and type of current appear on the single-line diagram.",[12,36483,36484],{},"When the approved body establishes conformity at the inspection, it dates and signs the diagram and plan together with the responsible person; with the inspection report, they become part of the installation file. A PDF you export before the inspection is therefore your well-prepared draft; it becomes approved through the approved body's endorsement.",[79,36486,36488],{"id":36487},"what-the-single-line-diagram-contains","What the single-line diagram contains",[12,36490,36491],{},"Subsection 3.1.2.2 a lists at least:",[84,36493,36494,36497,36500,36503,36506,36509,36512,36515],{},[87,36495,36496],{},"cable type, cross-section and number of conductors;",[87,36498,36499],{},"installation method of the cables;",[87,36501,36502],{},"type and characteristics of residual-current devices;",[87,36504,36505],{},"type and characteristics of overcurrent devices;",[87,36507,36508],{},"switches, junction boxes and branch boxes;",[87,36510,36511],{},"socket outlets and lighting points;",[87,36513,36514],{},"fixed machines and appliances;",[87,36516,36517],{},"sources such as transformer, solar cell, inverter or battery.",[12,36519,36520],{},"It answers structural questions: which RCD is upstream of circuit C, which breaker protects the cable, how many conductors of which cross-section run to the branch box, and which loads follow? Whether the box sits left or right of the door is not shown.",[12,36522,36523],{},"Each elementary circuit receives a capital letter. Lighting points, socket outlets and control units are numbered in order from the upstream overcurrent device. That sequence is an electrical reference, not a walking route through the rooms.",[79,36525,36527],{"id":36526},"what-the-situation-plan-contains","What the situation plan contains",[12,36529,36530],{},"Subsection 3.1.2.3 a requires the location of the items shown on the single-line diagram:",[84,36532,36533,36536,36539,36542,36544],{},[87,36534,36535],{},"distribution and switchgear boards;",[87,36537,36538],{},"junction and branch boxes;",[87,36540,36541],{},"socket outlets, lighting points and switches;",[87,36543,36514],{},[87,36545,36546],{},"sources such as solar cell, inverter, battery or transformer.",[12,36548,36549],{},"The basis is a legible floor plan that distinguishes storeys and rooms. Chapter 2.12 defines a plan as a to-scale representation of where the parts of the installation are; AREI\u002FRGIE does not prescribe a specific ratio such as 1:50. What counts is an unambiguous position: if a socket sits on one wall or worktop, you draw it there and not somewhere in the middle of the room. Concealed junction boxes matter in particular, because later work must be able to find them.",[12,36551,36552],{},"The situation plan is not a complete cable-route plan. Subsection 3.1.2.3 a calls for the locations of the listed items; you do not invent unknown routes. For the location of underground cables, Book 1 sets its own duties (Section 9.1.5).",[79,36554,36556],{"id":36555},"the-shared-reference-is-the-bridge","The shared reference is the bridge",[12,36558,36559,36560,36562,36563,15383,36566,36568,36569,36571,36572,36574,36575,36577],{},"Suppose circuit ",[25,36561,33167],{}," supplies three socket outlets and one lighting point. The single-line diagram identifies them ",[25,36564,36565],{},"B1",[25,36567,34962],{}," in electrical sequence. The situation plan places each reference at its real location. A switch controlling ",[25,36570,34962],{}," carries the letter ",[25,36573,33167],{}," and the number ",[25,36576,6659],{}," of the controlled point (3.1.2.1 a).",[1489,36579],{":height":3799,":width":3800,"alt":36580,"caption":36581,"src":34968},"Left, a simplified excerpt of the single-line diagram of circuit B: protective device, then socket outlets B1, B2, B3 and lighting point B4 in electrical order. Right, a room plan with B1 to B3 at their wall positions, lighting point B4 in the ceiling and switch B4 next to the door.","The same reference links both documents: the letter names the circuit, the number the point in electrical order, and the switch carries the reference of the lighting point it controls (AREI 3.1.2.1 a). Simplified drawing, not the official symbols.",[12,36583,36584,36585,36587,36588,36591],{},"Inspector and electrician can then move from the protective device to the load and from the room back to the board. If ",[25,36586,34226],{}," is missing from the floor plan, its location is unknown. If the plan shows a further socket ",[25,36589,36590],{},"B5"," that does not exist on the single-line diagram, the two documents describe different installation states.",[79,36593,36595],{"id":36594},"build-both-from-one-survey","Build both from one survey",[12,36597,36598],{},"Drawing the diagram first and the floor plan weeks later from memory creates contradictions. Produce both from the same survey:",[3139,36600,36601,36604,36607,36610,36613,36616,36619],{},[87,36602,36603],{},"record storeys, rooms, boards and sources;",[87,36605,36606],{},"record the protective chain and final circuits in the board;",[87,36608,36609],{},"assign every socket, appliance and box to the correct circuit;",[87,36611,36612],{},"create each reference once and reuse it in both views;",[87,36614,36615],{},"add cable and equipment properties to the electrical path;",[87,36617,36618],{},"verify positions on site;",[87,36620,36621],{},"export both documents with the same revision and status date.",[12,36623,36624],{},"A board label helps with assignment but does not prove it. In an existing installation, you identify circuits competently and with the supply isolated. A guessed concealed connection does not belong on the plans as an established fact.",[79,36626,36628],{"id":36627},"alterations-and-document-history","Alterations and document history",[12,36630,36631],{},"For a non-substantial alteration, a short description with the name, capacity and address of the responsible person, dated and signed, is enough instead of a new single-line diagram. You update the situation plan with every alteration or extension so that it always shows the existing layout. A substantial modification or extension, for example adding a circuit to a domestic installation (an example given in Chapter 2.11), requires new or updated diagrams and plans.",[12,36633,36634],{},"Parts whose on-site installation began before 1 October 1981 and which appear on the single-line diagram are marked as an \"older part\". The label places the existing work; it is neither proof of conformity nor an exemption. The derogations for old installations are assessed separately.",[12,36636,36637],{},"Manage both documents as a pair. A situation plan at revision 4 beside a single-line diagram at revision 2 leaves unclear what belongs together. Keep earlier endorsed revisions in the file rather than erasing the history.",[79,36639,36641],{"id":36640},"typical-inconsistencies","Typical inconsistencies",[138,36643,36644,36653],{},[141,36645,36646],{},[144,36647,36648,36651],{},[147,36649,36650],{},"Difference",[147,36652,2996],{},[163,36654,36655,36670,36678,36686,36694,36702],{},[144,36656,36657,36667],{},[168,36658,36659,36660,36663,36664],{},"single-line has ",[25,36661,36662],{},"C1–C6",", situation plan only ",[25,36665,36666],{},"C1–C5",[168,36668,36669],{},"one item cannot be located or is not electrically recorded",[144,36671,36672,36675],{},[168,36673,36674],{},"different circuit letter at the same point",[168,36676,36677],{},"location and protective device cannot be tied together reliably",[144,36679,36680,36683],{},[168,36681,36682],{},"PV inverter appears only on the floor plan",[168,36684,36685],{},"source and protective chain are missing from the diagram",[144,36687,36688,36691],{},[168,36689,36690],{},"branch box appears only on the single-line",[168,36692,36693],{},"its real location is unknown during maintenance",[144,36695,36696,36699],{},[168,36697,36698],{},"cross-section on the floor plan but not on the electrical path",[168,36700,36701],{},"the value is not tied to any specific cable",[144,36703,36704,36707],{},[168,36705,36706],{},"different address or revision",[168,36708,36709],{},"the documents may describe different installation states",[79,36711,36713],{"id":36712},"how-the-inspection-uses-both","How the inspection uses both",[12,36715,36716],{},"In the conformity inspection report for a domestic installation, the approved body certifies among other things that the installation was carried out in accordance with the single-line diagrams and situation plans (Subsection 6.4.6.4). The plans therefore have to be right, not merely present. The single-line diagram makes protection and wiring assignments traceable; the situation plan leads to the identified points on site. Visual inspection, tests and measurements complement the document check.",[12,36718,36719],{},"A mutually consistent pair can still contain a technical fault, such as an undersized cross-section. Conversely, technically sound work is poorly documented when the plans contradict each other. Keep three stages separate: the records are complete, the design has been competently checked, and the installed system has been officially inspected. Each stage has its own evidence.",[12,36721,36722],{},"After the inspection, the owner receives the endorsed plans and report for the file; the approved body keeps a copy for five years (3.1.2.1 a). The owner still keeps their own file current and makes it available for later work (9.1.2).",[12,36724,36725],{},"Treat the approved body's copy as a safety net, not version control. A later alteration kept only on a loose sheet makes the set inconsistent again. Attach each change to the correct revision of both documents.",[79,36727,36729],{"id":36728},"a-practical-reconciliation-before-release","A practical reconciliation before release",[12,36731,36732],{},"Do not just compare two pages side by side; work circuit by circuit. First write down the list of circuit letters. Then follow each circuit from its protective device to the last item and ask both documents the same questions: which points exist, which reference do they carry, where are they located, and what fixed function do they have? Record a mismatch as an open task instead of hiding it under a vague room label.",[12,36734,36735,36736,36739,36740,36743,36744,36747,36748,36750,36751,36753,36754,36756],{},"For circuit ",[25,36737,36738],{},"H",", the list might contain ceiling light ",[25,36741,36742],{},"H1",", wall light ",[25,36745,36746],{},"H2"," and their switches. The single-line diagram shows how these points sit electrically behind protection and cable; the situation plan shows ",[25,36749,36742],{}," in the hall and ",[25,36752,36746],{}," outdoors. If ",[25,36755,36746],{}," is missing from one sheet, the other is not automatically correct: survey and installed work decide, then you correct both documents.",[12,36758,36759],{},"Also run cross-circuit checks:",[84,36761,36762,36765,36768,36771,36774],{},[87,36763,36764],{},"Every board and fixed source on the single-line diagram has a findable location.",[87,36766,36767],{},"Every relevant junction and branch box uses the same identifier throughout.",[87,36769,36770],{},"Fixed machines are not represented only by room text on the floor plan.",[87,36772,36773],{},"Continuation references between sheets end at the intended circuit, not at a similarly named group.",[87,36775,36776],{},"Header, address, page numbering, date and revision visibly form one set.",[79,36778,36780],{"id":36779},"example-recording-a-small-extension","Example: recording a small extension",[12,36782,36783,36784,36787,36788,36791],{},"When a socket is added in a study, first establish which circuit it is actually connected to. If it is the next point on circuit ",[25,36785,36786],{},"D",", it becomes, for example, ",[25,36789,36790],{},"D6","; you add that code at its electrical position on the single-line diagram and at its physical position on the situation plan. You do not infer cable and protection from the neighbouring socket; you verify them at the real connection. Advance the date and revision of both sheets together.",[12,36793,36794],{},"Whether work is substantial or not is a professional judgement. The short description is not a catch-all for years of small changes kept outside the plans. As soon as assignment or current state is no longer clear, you consolidate the documents into a new revision.",[12,36796,4361,36797,36800],{},[40,36798,36248],{"href":36246,"rel":36799},[1458]," summarises the content and relationship of the two documents. The current Book 1 remains decisive; the examples there are guidance and do not replace a survey of your installation.",[79,36802,36804],{"id":36803},"what-planelec-handles","What PlanElec handles",[12,36806,3361,36807,36810],{},[40,36808,22],{"href":1456,"rel":36809},[1458],", you draw the single-line diagram and the situation plan free of charge in the browser. You drag devices from the single-line diagram onto the situation plan; the \"From the single-line diagram\" palette shows which devices still need a place. Before the PDF, \"Check documents\" lists, among other things, devices in the diagram that have no place on the situation plan yet. It is a completeness aid, not a statement about the inspection.",[12,36812,36813,36815],{},[40,36814,31],{"href":1964}," is the subscription for electrical contractors and designers. It works with one shared project model: every device exists once, and single-line diagram and situation plan carry the same circuit reference. On top of that come distribution board planning, the advisory AREI\u002FRGIE self-check report for the supported rules that can be decided from your data, and teamwork. You move a Sketch drawing across with \"Take it to Pro\", situation plan included.",[12,36817,36818],{},"The roles are clear: PlanElec helps you keep plan and diagram consistent; the on-site survey, measured values and confirmation of concealed cables come from the professional. The endorsement of the plans and the official inspection report come from the approved body.",[1489,36820],{":height":4096,":width":4097,"alt":4098,"caption":33802,"src":4100},[1489,36822],{":height":5808,":width":5809,"alt":5810,"caption":5811,"src":5812},[79,36824,26353],{"id":26352},[84,36826,36827,36831,36836,36840],{},[87,36828,36829],{},[40,36830,35163],{"href":35162},[87,36832,36833],{},[40,36834,36835],{"href":5666},"AREI symbols for both diagrams",[87,36837,36838],{},[40,36839,33678],{"href":33677},[87,36841,36842],{},[40,36843,36844],{"href":6050},"Draw a situation plan step by step",[12,36846,36847],{},[40,36848,36850],{"href":3611,"rel":36849},[1458],"Draw the single-line diagram and situation plan in PlanElec Sketch →",[12,36852,36853],{},[63,36854,36855],{},"Basis: AREI\u002FRGIE Book 1 V06, Chapter 2.12, Section 3.1.2, Subsection 6.4.6.4 and Section 9.1.2. Editorial review: PlanElec team, 6 November 2026.",{"title":2044,"searchDepth":2045,"depth":2045,"links":36857},[36858,36859,36860,36861,36862,36863,36864,36865,36866,36867,36868,36869,36870,36871],{"id":36367,"depth":2045,"text":36368},{"id":36386,"depth":2045,"text":36387},{"id":36477,"depth":2045,"text":36478},{"id":36487,"depth":2045,"text":36488},{"id":36526,"depth":2045,"text":36527},{"id":36555,"depth":2045,"text":36556},{"id":36594,"depth":2045,"text":36595},{"id":36627,"depth":2045,"text":36628},{"id":36640,"depth":2045,"text":36641},{"id":36712,"depth":2045,"text":36713},{"id":36728,"depth":2045,"text":36729},{"id":36779,"depth":2045,"text":36780},{"id":36803,"depth":2045,"text":36804},{"id":26352,"depth":2045,"text":26353},"A single-line diagram shows the electrical structure; a situation plan shows where equipment sits. Shared circuit references turn the two Belgian AREI\u002FRGIE records into one checkable dossier.",[2116,18037,2117],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-single-line-vs-situation-plan-editorial.jpg","\u002Fblog\u002Fsingle-line-vs-situation-plan.en",{"title":36361,"description":36872},"Single-Line Diagram vs. Situation Plan: the Difference","single-line-diagram-vs-situation-plan","blog\u002Fsingle-line-vs-situation-plan.en",[2133,2134,5269,26419,2132,36882,36883,4261],"circuit","electrical dossier","cDjm-58uZj-MsXAVdM4sNlc847X26Z4bxMnDMQwOQLM","\u002Fblog\u002Fsingle-line-diagram-vs-situation-plan",{"id":36887,"title":36888,"articleId":36889,"body":36890,"category":24234,"date":35195,"description":37370,"extension":2113,"image":36903,"labels":37371,"lastUpdated":10988,"locale":2119,"meta":37372,"navigation":2121,"ogImage":37373,"path":37374,"publishDate":35195,"readTime":15114,"refreshInterval":4248,"seo":37375,"seoTitle":37376,"slug":37377,"stem":37378,"tags":37379,"__hash__":37383,"kind":2137,"href":37384},"blog\u002Fblog\u002Fpv-ev-charger-single-line-diagram.en.md","Combining Solar PV and an EV Charger on a Single-Line Diagram","pv-ev-charger-single-line-diagram",{"type":9,"value":36891,"toc":37353},[36892,36898,36904,36907,36911,36919,36980,36991,36995,36998,37018,37021,37025,37028,37034,37037,37044,37048,37051,37074,37080,37084,37087,37090,37113,37119,37123,37126,37143,37146,37150,37153,37159,37162,37179,37182,37186,37189,37192,37196,37199,37202,37222,37226,37233,37236,37240,37243,37246,37249,37253,37256,37259,37276,37279,37283,37290,37293,37296,37300,37321,37329,37333,37350],[12,36893,36894,36897],{},[15,36895,36896],{},"On a single-line diagram, solar PV and an EV charger are two separate branches of the same distribution board."," The inverter feeds in on its AC side; a normal charger draws energy through its own final circuit. An energy manager measures and controls both, but never puts them in series. That is how you draw them: two outgoing ways, clear power-flow directions, protection in the right place and load management shown as control.",[12,36899,36900],{},[74,36901],{"alt":36902,"src":36903},"An electrician checks a charger beside an electric car, with rooftop solar panels in the background.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-pv-ev-charger-single-line-diagram-editorial.webp",[12,36905,36906],{},"A strong combined diagram shows sources, possible current directions, protection boundaries and measuring points. Anything only the design calculation, the manufacturer or the network operator can confirm, you document as evidence first and enter afterwards.",[79,36908,36910],{"id":36909},"continue-the-example-add-ev1-to-db1","Continue the example: add EV1 to DB1",[12,36912,36913,36914,36918],{},"In the shared fictional job from the ",[40,36915,36917],{"href":36916},"\u002Fen\u002Fblog\u002Fpv-system-diagram","PV guide",", S1 and S2 remain connected to DB1 through INV1. EV1 is a new unidirectional charging point at the parking space. Trace its branch to the actual connection in DB1; EV1 is not in series with INV1. The names explain the case without prescribing mandatory references.",[138,36920,36921,36934],{},[141,36922,36923],{},[144,36924,36925,36928,36931],{},[147,36926,36927],{},"Job addition",[147,36929,36930],{},"Evidence to check",[147,36932,36933],{},"Effect on the documents",[163,36935,36936,36947,36958,36969],{},[144,36937,36938,36941,36944],{},[168,36939,36940],{},"EV1 and supply cable",[168,36942,36943],{},"Manual, survey and sizing",[168,36945,36946],{},"Dedicated branch, cable and location",[144,36948,36949,36952,36955],{},[168,36950,36951],{},"Associated protection",[168,36953,36954],{},"Design and proof of integrated\u002Fexternal devices",[168,36956,36957],{},"Actual functions without double counting",[144,36959,36960,36963,36966],{},[168,36961,36962],{},"Metering or load control",[168,36964,36965],{},"Measuring point, phases and manufacturer setup",[168,36967,36968],{},"Control kept separate from power paths",[144,36970,36971,36974,36977],{},[168,36972,36973],{},"DB1 with PV and charger",[168,36975,36976],{},"Revised current and protection assessment",[168,36978,36979],{},"Shared board revision updated",[12,36981,4361,36982,36986,36987,36990],{},[40,36983,36985],{"href":36984},"\u002Fen\u002Fblog\u002Fsolar-pv-situation-plan","PV situation plan"," locates the same references. Use the ",[40,36988,36989],{"href":18627},"installation planning guide"," to review the entered electrical connections in the model. You prove conductor and equipment current capacity with sizing and datasheets, not with a value shown by load management.",[79,36992,36994],{"id":36993},"inventory-three-related-systems","Inventory three related systems",[12,36996,36997],{},"Separate these levels first:",[3139,36999,37000,37006,37012],{},[87,37001,37002,37005],{},[15,37003,37004],{},"Grid and main distribution:"," connection, meter, main protection, earthing and relevant boards.",[87,37007,37008,37011],{},[15,37009,37010],{},"PV generation:"," modules or strings, DC components, inverter, AC protection and point of connection.",[87,37013,37014,37017],{},[15,37015,37016],{},"Charging load:"," dedicated circuit, overcurrent protection, residual current device (RCD), cable, connection point and any load control.",[12,37019,37020],{},"If the manufacturer specifies a different approved system concept, such as a bidirectional charger or an integrated hybrid unit, you draw exactly that topology. Model, firmware and system documentation then go into the dossier.",[79,37022,37024],{"id":37023},"a-typical-common-ac-topology","A typical common AC topology",[12,37026,37027],{},"A conventional installation looks like this in simplified form:",[1489,37029],{":height":37030,":width":3800,"alt":37031,"caption":37032,"src":37033},"572","Distribution grid, meter and main board DB1 with energy flow in both directions. Below, two separate branches: PV branch with AC protection, inverter INV1 and PV DC side with strings S1 and S2; charging branch with its own overcurrent protection and RCD, cable, charger EV1 and vehicle, consumption only. Load control is connected with a dashed line as control.","Two branches on the same board: the PV branch can flow both ways, the charging branch only draws power. Load control steers and is not part of the energy path.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fpv-ev-charger-single-line-diagram\u002Fpv-ev-topology.en.svg",[12,37035,37036],{},"The two-way arrow shows a possible energy direction; the protection details still sit at the device. A unidirectional wallbox is a load branch, and it stays one even when its software offers “solar surplus charging”. Do not draw it as a generator.",[1489,37038],{":height":37039,":width":37040,"alt":37041,"caption":37042,"src":37043},"710","1114","‘Single-Line Diagram’ in PlanElec Pro (fictional example house): PV inverter with two strings on MPPT A and B behind a 30 mA type A RCD, next to it the carport charging point 3P+N C 20 A behind its own 30 mA type B RCD; its cable reads ‘Installation method missing’.","Pro draws the PV branch and the charging branch as separate circuits from the project and marks missing data. The RCD type follows the datasheet; the self-check does not replace the inspection by the accredited body.","\u002Fimages\u002Fblog\u002Fscreens\u002Fpro\u002Fen-pv-wallbox-single-line.webp",[79,37045,37047],{"id":37046},"document-the-pv-branch-completely","Document the PV branch completely",[12,37049,37050],{},"For household low-voltage PV installations up to 10 kVA, Chapter 7.112 of AREI Book 1 V06 adds specific measures to the general rules: marking of DC conductors and live AC conductors, warning signs (“Do not disconnect under load”, “Electrical installation always live”) and earthing of the module frames unless the manufacturer forbids it (Section 7.112.2). Make the installed chain traceable:",[84,37052,37053,37056,37059,37062,37065,37068,37071],{},[87,37054,37055],{},"PV generator and relevant string or module arrangement;",[87,37057,37058],{},"DC cables, polarity and cross-section;",[87,37060,37061],{},"DC isolation and protection when installed or integrated;",[87,37063,37064],{},"exact inverter model and maximum AC output;",[87,37066,37067],{},"AC cable, overcurrent protection, RCD and other designed protection;",[87,37069,37070],{},"precise connection point in the board;",[87,37072,37073],{},"associated warnings and identification.",[12,37075,4361,37076,37079],{},[40,37077,37078],{"href":36916},"PV system diagram guide"," covers this branch in more detail. Enter the manufacturer's actual data rather than a generic “PV protection” box.",[79,37081,37083],{"id":37082},"keep-the-charger-on-its-dedicated-circuit","Keep the charger on its dedicated circuit",[12,37085,37086],{},"AREI 7.22.3 requires a dedicated circuit for every connection point of a charging station, and connecting a charging station to the fixed installation through a plug and socket is prohibited. Where protection relies on automatic disconnection, 7.22.4.1 b requires each dedicated AC circuit to be protected individually by an RCD of no more than 30 mA. Protection must also keep working during insulation faults with a disturbing DC component: either through an RCD built for that purpose or through an RCD coordinated with a residual direct current detection device that takes the charger out of service. Under 7.22.4.2, each dedicated circuit also has its own overcurrent protection. These devices may sit in the board, in the charger or in a combination of both.",[12,37088,37089],{},"Show at least:",[84,37091,37092,37095,37098,37101,37104,37107,37110],{},[87,37093,37094],{},"circuit reference and phases;",[87,37096,37097],{},"overcurrent device, number of poles and rated current;",[87,37099,37100],{},"RCD type, rated residual current and any coordinated DC detection;",[87,37102,37103],{},"cable type, number of conductors and cross-section;",[87,37105,37106],{},"charger and number of connection points;",[87,37108,37109],{},"rated power or maximum charging current;",[87,37111,37112],{},"fixed control, metering or switching components.",[12,37114,37115,37116,37118],{},"If the charger is installed outdoors, 7.22.5.1 requires at least IP44 for the equipment. The acceptable combination follows from AREI, product standards and the exact manual together. ",[40,37117,35383],{"href":25395}," gives you the background; approval of the specific charger comes from its documentation.",[79,37120,37122],{"id":37121},"put-energy-management-in-the-right-place","Put energy management in the right place",[12,37124,37125],{},"Solar surplus charging or import limitation needs measurement and control. A system can include an energy meter, current transformers, controller, data link and controllable charger. Place the electrically relevant fixed parts where they are actually connected:",[84,37127,37128,37131,37134,37137,37140],{},[87,37129,37130],{},"measuring point at the supply or relevant board;",[87,37132,37133],{},"current transformers with correct phase and direction;",[87,37135,37136],{},"controller supply;",[87,37138,37139],{},"contactor or control contact if it performs electrical switching or enabling;",[87,37141,37142],{},"data link only as far as needed to explain the function.",[12,37144,37145],{},"A dashed line separates communication from power conductors; define it in the legend. “100% solar” does not belong on the diagram: production, building load, vehicle demand and control strategy change constantly.",[79,37147,37149],{"id":37148},"phases-and-power-balance","Phases and power balance",[12,37151,37152],{},"Draw the real phase allocation of inverter and charger. A single-phase inverter and a three-phase charger do not become one branch because a meter nets their energy. A software current limit controls operation; cable sizing and overcurrent protection are still proven separately.",[12,37154,4361,37155,37158],{},[40,37156,37157],{"href":3795},"cable cross-section and breaker relationship"," is therefore established fully and separately for the PV and charging branches.",[12,37160,37161],{},"The design review checks, among other things:",[84,37163,37164,37167,37170,37173,37176],{},[87,37165,37166],{},"supply capacity and permissible phase loading;",[87,37168,37169],{},"simultaneous generation and demand;",[87,37171,37172],{},"busbar and upstream device loading for every possible current direction;",[87,37174,37175],{},"short-circuit, selectivity and voltage-drop conditions;",[87,37177,37178],{},"measuring ranges and manufacturer limits of the control system.",[12,37180,37181],{},"The diagram records the chosen result; it is not the calculation itself.",[79,37183,37185],{"id":37184},"treat-bidirectional-charging-separately","Treat bidirectional charging separately",[12,37187,37188],{},"If the charger can export energy from the vehicle to the installation or grid, it is no longer only a load. AREI 7.22.5.4 then requires compliance with the rules for distributed generation units – protection against electric shock, overcurrent protection and safety disconnection – and the warning “Caution: possible feedback of electrical energy into the installation” on the charger and on the boards that supply it. Synergrid states that bidirectional, or technically bidirectional-capable, charging infrastructure falls under C10\u002F11 and C10\u002F26 approval; purely unidirectional chargers do not.",[12,37190,37191],{},"Show directions, isolation and protection functions exactly according to the approved system concept. A normal wallbox diagram does not fit Vehicle-to-Home or Vehicle-to-Grid.",[79,37193,37195],{"id":37194},"situation-plan-and-dossier","Situation plan and dossier",[12,37197,37198],{},"Locate modules, inverter, relevant isolators, boards, fixed metering, charger and associated parking space. Repeat the circuit references from the single-line diagram. Datasheets, declarations, settings and later changes belong in the installation dossier.",[12,37200,37201],{},"Your final review confirms:",[84,37203,37204,37207,37210,37213,37216,37219],{},[87,37205,37206],{},"the diagram, board labels and as-built installation agree;",[87,37208,37209],{},"both branches can be traced to their common point;",[87,37211,37212],{},"every energy-flow arrow points the right way;",[87,37214,37215],{},"protection sits on the correct side without fictitious duplicates;",[87,37217,37218],{},"load management is shown as control, never as protection;",[87,37220,37221],{},"the charging function is clearly identified as unidirectional or bidirectional.",[79,37223,37225],{"id":37224},"carry-later-changes-through-the-whole-system","Carry later changes through the whole system",[12,37227,37228,37229,56],{},"Combined systems often change after first handover: a different inverter, more panels, a second charging connector, a home battery or a new metering method. Update more than the device name; follow every affected branch back to the common board. How to integrate a home battery as a source in the installation is covered in ",[40,37230,37232],{"href":37231},"\u002Fen\u002Fblog\u002Fhome-battery-arei","Home battery and AREI",[12,37234,37235],{},"Record the added source or point, new AC values and possible directions, revised protection, sensor position and phases, cables, board ways and labels. A software limit always travels with the device version and stored settings. A battery or bidirectional vehicle is not an invisible app feature: as soon as energy from another source can reach the fixed installation, source, isolation, protection and warnings are in the technical documentation. Archive the old drawing and identify the current revision unambiguously.",[79,37237,37239],{"id":37238},"worked-case-adding-a-second-charging-point-to-existing-pv","Worked case: adding a second charging point to existing PV",[12,37241,37242],{},"A building already has a PV inverter and a unidirectional wallbox; now a second connection point is added. Do not just copy the first symbol. Establish whether this is another device, one station with two connection points or a different manufacturer architecture, and where overcurrent protection and RCD actually sit. AREI 7.22.4.2 allows shared overcurrent protection for several connection points that are not used simultaneously, provided each point keeps the required protection – for example when the rated current of the shared device does not exceed the lowest rated current of the connection points. That exception covers overcurrent protection only; it does not cover shared RCDs or cables.",[12,37244,37245],{},"Then update supply capacity, phase allocation and load management. The points may share the available power dynamically, but the drawing still identifies each one, its real electrical subdivision and its maximum permitted load. Current sensors match the measured conductors and direction. You prove the as-built wiring with the survey and device documentation, not with a software screen showing two parking bays.",[12,37247,37248],{},"Review the PV branch as well. If only demand changes, modules and inverter stay the same, but the common board and possible current directions may need reassessment. Adding a hybrid inverter or battery at the same time introduces another source or operating mode with its own protection, isolation and documentation logic.",[79,37250,37252],{"id":37251},"build-an-evidence-chain-for-commissioning","Build an evidence chain for commissioning",[12,37254,37255],{},"Link every important boundary on the diagram to evidence: rating plate or datasheet for power values, manufacturer architecture for integrated protection, test records for the completed installation and a configuration export for relevant limits. Mark assumptions as open. An RCD type or DC detection is shown as installed only once device and installation confirm it.",[12,37257,37258],{},"During the final review, walk through several energy states:",[3139,37260,37261,37264,37267,37270,37273],{},[87,37262,37263],{},"charging at night without PV generation;",[87,37265,37266],{},"PV generation with low building demand;",[87,37268,37269],{},"PV and vehicle against a dynamic import limit;",[87,37271,37272],{},"loss of load-management metering or communication;",[87,37274,37275],{},"for bidirectional equipment, energy returning from the vehicle.",[12,37277,37278],{},"For each state, path, limit, protection and fail-safe behaviour follow from the design and manufacturer concept. The single-line diagram does not show every software decision, but it shows every electrically relevant component and every possible source direction.",[79,37280,37282],{"id":37281},"keep-grid-and-product-approvals-distinct","Keep grid and product approvals distinct",[12,37284,37285,37286,56],{},"AREI documentation, Synergrid type approval and the distribution system operator's procedure answer different questions. A well-designed protection concept does not prove C10\u002F26 listing; a listed product does not prove correct installation in this building. Synergrid currently states that purely unidirectional chargers do not need C10\u002F26 approval because of C10\u002F11 ed.2.4; other technical or grid conditions may still apply. What to do if the device is not on the list is explained in ",[40,37287,37289],{"href":37288},"\u002Fen\u002Fblog\u002Fsynergrid-c10-26-list-inverter","Synergrid C10\u002F26 list",[12,37291,37292],{},"Keep model, firmware, uni- or bidirectional capability, network-operator correspondence and actual commissioning settings with the drawing revision. That shows which technical state an approval or inspection relied on.",[12,37294,37295],{},"Label the PV and charging ways in the board with the same references as the drawing. Where reverse power flow is possible, the required warning signs go on the locations actually affected; a note in the app is not enough. Before handover, compare every label, circuit reference, device type and energy direction with the final diagram.",[79,37297,37299],{"id":37298},"building-the-documents-in-planelec","Building the documents in PlanElec",[12,37301,37302,37303,37306,37307,17160,37310,37313,37314,37317,37318,37320],{},"For your own home, you draw both branches for free in your browser with ",[40,37304,22],{"href":1456,"rel":37305},[1458],": under ",[15,37308,37309],{},"Energy and generation",[15,37311,37312],{},"PV circuit"," with inverter and PV generator and the ",[15,37315,37316],{},"EV charger","; the start card ",[15,37319,11139],{}," adds a charging circuit to the board. Sketch draws what you enter, but it does not plan strings or check AREI rules.",[12,37322,3361,37323,37325,37326,37328],{},[40,37324,31],{"href":1964},", you record the PV and charging branches in one project model: strings per MPPT, inverter, AC isolation point and source protection on one side, the wallbox on its own circuit on the other. The single-line diagram and situation plan come from the same data and export as PDFs. How to create inverters, MPPTs and strings is explained in ",[40,37327,16763],{"href":16762},". The AREI\u002FRGIE self-check flags, among other things, a wallbox without its own circuit, without a 30 mA RCD or without suitable protection against DC fault currents, and it shows unassigned strings. The roles are clear: the self-check shows you findings within the supported rules; protection coordination and grid permission are settled through your design and the network operator, and the official inspection is carried out by an approved inspection body.",[79,37330,37332],{"id":37331},"official-sources","Official sources",[84,37334,37335,37342],{},[87,37336,37337,37341],{},[40,37338,37340],{"href":1971,"rel":37339},[1458],"AREI\u002FRGIE Book 1 from the FPS Economy",": Chapters 7.22 and 7.112 and Parts 3 and 9, reviewed at V06.",[87,37343,37344,37349],{},[40,37345,37348],{"href":37346,"rel":37347},"https:\u002F\u002Fwww.synergrid.be\u002Ffr\u002Fhomologation\u002Felectricite\u002Funites-de-production-decentralisee",[1458],"Synergrid: decentralised generation unit approval",": C10\u002F11 ed.2.4, C10\u002F26 and the distinction for bidirectional charging.",[12,37351,37352],{},"Technical review: 5 October 2026. Check current connection conditions with the network operator and manufacturer versions before execution.",{"title":2044,"searchDepth":2045,"depth":2045,"links":37354},[37355,37356,37357,37358,37359,37360,37361,37362,37363,37364,37365,37366,37367,37368,37369],{"id":36909,"depth":2045,"text":36910},{"id":36993,"depth":2045,"text":36994},{"id":37023,"depth":2045,"text":37024},{"id":37046,"depth":2045,"text":37047},{"id":37082,"depth":2045,"text":37083},{"id":37121,"depth":2045,"text":37122},{"id":37148,"depth":2045,"text":37149},{"id":37184,"depth":2045,"text":37185},{"id":37194,"depth":2045,"text":37195},{"id":37224,"depth":2045,"text":37225},{"id":37238,"depth":2045,"text":37239},{"id":37251,"depth":2045,"text":37252},{"id":37281,"depth":2045,"text":37282},{"id":37298,"depth":2045,"text":37299},{"id":37331,"depth":2045,"text":37332},"Draw the PV inverter, EV charger, dedicated circuits, protection, energy metering and possible reverse power flow correctly on one shared single-line diagram.",[35684,2116,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-pv-ev-charger-single-line-diagram-editorial.jpg","\u002Fblog\u002Fpv-ev-charger-single-line-diagram.en",{"title":36888,"description":37370},"Solar PV and EV Charger on One Single-Line Diagram","solar-pv-ev-charger-single-line-diagram","blog\u002Fpv-ev-charger-single-line-diagram.en",[37380,37316,3926,2133,37381,37382,4261],"Solar PV","Load management","Reverse power flow","TnHKjTL42ad8ahWAcw9u8MrjmWJeUPz90zSWA2V3ZFI","\u002Fblog\u002Fsolar-pv-ev-charger-single-line-diagram",{"id":37386,"title":37387,"articleId":37388,"body":37389,"category":24234,"date":35195,"description":37859,"extension":2113,"image":37402,"labels":37860,"lastUpdated":10988,"locale":2119,"meta":37861,"navigation":2121,"ogImage":37862,"path":37863,"publishDate":35195,"readTime":6086,"refreshInterval":4248,"seo":37864,"seoTitle":37865,"slug":37866,"stem":37867,"tags":37868,"__hash__":37870,"kind":2137,"href":37871},"blog\u002Fblog\u002Fpv-situation-plan.en.md","Drawing Solar PV on a Situation Plan: Modules, Inverter and Cable Routes","pv-situation-plan",{"type":9,"value":37390,"toc":37836},[37391,37397,37403,37406,37410,37417,37480,37486,37492,37496,37499,37522,37525,37529,37532,37549,37556,37560,37563,37580,37583,37587,37590,37593,37599,37602,37606,37609,37626,37631,37635,37638,37640,37654,37660,37664,37668,37671,37675,37678,37682,37685,37689,37692,37696,37699,37719,37722,37726,37746,37750,37753,37756,37760,37763,37766,37769,37773,37776,37779,37783,37786,37789,37792,37798,37802,37808,37816,37821,37827,37829],[12,37392,37393,37396],{},[15,37394,37395],{},"On the situation plan you draw where the fixed parts of the PV system actually are: module fields, inverter, fixed isolators, the board with the PV way and the cable routes in between."," AREI 3.1.2.3 a requires the situation plan to show the location of the sources – explicitly solar panel, inverter and battery – that appear on the single-line diagram. The single-line diagram explains the electrical chain; the situation plan makes it findable on site. For maintenance, alteration or inspection, a reader needs to see which roof face holds the modules, where the inverter is mounted and how the installation reaches the board.",[12,37398,37399],{},[74,37400],{"alt":37401,"src":37402},"Solar installers review the location of rooftop panels.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-pv-situation-plan-editorial.webp",[12,37404,37405],{},"The situation plan is neither a roof-structure design nor a duplicate DC schematic. It complements the single-line diagram without repeating all of its electrical detail.",[79,37407,37409],{"id":37408},"shared-example-job-db1-inv1-s1-and-s2","Shared example job: DB1, INV1, S1 and S2",[12,37411,37412,37413,37416],{},"The fictional job in the ",[40,37414,37415],{"href":36916},"PV documentation guide"," uses DB1 for the main board, INV1 in the technical room and S1\u002FS2 for the strings on the east and west roofs. These are editorial references, not an exported example project. For your job, use the actual designations.",[138,37418,37419,37431],{},[141,37420,37421],{},[144,37422,37423,37425,37428],{},[147,37424,3919],{},[147,37426,37427],{},"Find on the situation plan",[147,37429,37430],{},"Compare with the single-line diagram",[163,37432,37433,37444,37455,37466],{},[144,37434,37435,37438,37441],{},[168,37436,37437],{},"S1 \u002F S2",[168,37439,37440],{},"Roof slope and documented building entry",[168,37442,37443],{},"Confirmed string and MPPT1 \u002F MPPT2 input",[144,37445,37446,37449,37452],{},[168,37447,37448],{},"INV1",[168,37450,37451],{},"Actual mounting location in the technical room",[168,37453,37454],{},"Model reference and DC\u002FAC connections",[144,37456,37457,37460,37463],{},[168,37458,37459],{},"DB1",[168,37461,37462],{},"Main board at an unambiguous location",[168,37464,37465],{},"PV branch connection point",[144,37467,37468,37471,37474],{},[168,37469,37470],{},"EV1, later extension",[168,37472,37473],{},"Charging point at the parking space",[168,37475,37476,37477],{},"Separate branch in the ",[40,37478,37479],{"href":13079},"combined guide",[12,37481,37482,37483,37485],{},"An unsurveyed cable segment goes on the work list as an open item instead of getting a falsely precise route. Before handover, the contractor matches these references on the installation and both drawings. The ",[40,37484,36989],{"href":18627}," explains assignment and the derived diagram; the on-site spatial survey comes from the professional.",[1489,37487],{":height":37488,":width":3800,"alt":37489,"caption":37490,"src":37491},"533","Two plan sheets of the fictitious job. Roof sheet: string S2 on the west roof, string S1 on the east roof, both DC routes to building entry E. Ground floor sheet: from entry E the DC cable to INV1 in the technical room, the AC cable to DB1 and, dashed, the later extension to EV1 at the parking space.","The same references on every sheet: entry E links the roof sheet to the floor, and INV1 and DB1 sit at their actual location.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fpv-situation-plan\u002Fpv-plan-references.en.svg",[79,37493,37495],{"id":37494},"start-from-an-as-built-survey","Start from an as-built survey",[12,37497,37498],{},"Work from a recognisable plan with storeys, rooms, access points and important external areas. For a roof array, a roof plan or an extra elevation helps. Verify on site:",[84,37500,37501,37504,37507,37510,37513,37516,37519],{},[87,37502,37503],{},"actual module fields and orientation;",[87,37505,37506],{},"central inverters or microinverters;",[87,37508,37509],{},"fixed DC and AC isolation points where installed;",[87,37511,37512],{},"main or sub-distribution board receiving the PV connection;",[87,37514,37515],{},"fixed penetrations and important cable routes;",[87,37517,37518],{},"meter cabinet where needed to explain the connection;",[87,37520,37521],{},"battery, backup switching or another source included in the system.",[12,37523,37524],{},"Do not copy the quotation drawing without checking it. Module layout, inverter location and cable route frequently change during installation.",[79,37526,37528],{"id":37527},"what-to-show-on-the-roof","What to show on the roof",[12,37530,37531],{},"Make the module field unambiguous. Depending on scale, show:",[84,37533,37534,37537,37540,37543,37546],{},[87,37535,37536],{},"individual modules or clearly bounded module groups;",[87,37538,37539],{},"the relevant roof pitch, outbuilding, façade or ground area;",[87,37541,37542],{},"string references where they connect the plan to the single-line diagram;",[87,37544,37545],{},"fixed DC combiner or switching boxes;",[87,37547,37548],{},"useful roof edges, access points or fire compartments where they explain electrical location.",[12,37550,37551,37552,37555],{},"Every connector beneath every module does not belong on the situation plan. String arrangement, polarity, conductor data and the protection chain sit on the ",[40,37553,37554],{"href":36916},"PV single-line diagram",". You use identical string and equipment identifiers on both documents.",[79,37557,37559],{"id":37558},"locate-the-inverter-precisely","Locate the inverter precisely",[12,37561,37562],{},"Mark the actual mounting position and distinguish where relevant:",[84,37564,37565,37568,37571,37574,37577],{},[87,37566,37567],{},"central string inverter;",[87,37569,37570],{},"multiple inverters;",[87,37572,37573],{},"microinverters at the modules;",[87,37575,37576],{},"hybrid inverter and separate battery;",[87,37578,37579],{},"associated fixed isolation or switching devices.",[12,37581,37582],{},"A label saying only “garage” is often too vague in a large space. Put the symbol at the correct wall or technical zone. For outdoor equipment, identify the façade clearly.",[79,37584,37586],{"id":37585},"draw-useful-cable-routes","Draw useful cable routes",[12,37588,37589],{},"A serviceable plan shows how the fixed route runs from module field to inverter and onward to the board. Above all, include building penetrations, risers, ducts and changes of level that will later be concealed.",[12,37591,37592],{},"You distinguish DC and AC routes by line style or text, not colour alone, so that a black-and-white print stays readable:",[35282,37594,37597],{"className":37595,"code":37596,"language":35287,"meta":2044},[35285],"PV-DC  ─ ─ ─  DC route from the module field\nPV-AC  ─────  AC route to the distribution board\nDATA   ·····  fixed metering or communication route\n",[25,37598,37596],{"__ignoreMap":2044},[12,37600,37601],{},"Define each line in the legend. It does not state cable type or installation method; those data stay with the circuit on the single-line diagram.",[79,37603,37605],{"id":37604},"symbols-and-project-legend","Symbols and project legend",[12,37607,37608],{},"Table 2.23 of AREI Book 1 V06 is explicitly a non-exhaustive symbol list. Where it has no suitable symbol, 3.1.2.1 a allows any other clearly identifiable symbol defined in the legend of the single-line diagrams and situation plans. Ensure:",[84,37610,37611,37614,37617,37620,37623],{},[87,37612,37613],{},"sufficient size in the final PDF;",[87,37615,37616],{},"different form or text for inverter and battery;",[87,37618,37619],{},"stable references across pages;",[87,37621,37622],{},"meaning that does not rely only on colour;",[87,37624,37625],{},"clear distinction between electrical equipment and building objects.",[12,37627,4361,37628,37630],{},[40,37629,35421],{"href":5666}," explains the legend rule in more detail.",[79,37632,37634],{"id":37633},"share-references-with-the-single-line-diagram","Share references with the single-line diagram",[12,37636,37637],{},"AREI 3.1.2.1 a sets one referencing logic for both plans: on the situation plan, items carry the letter of their circuit and the sequence number from the single-line diagram. The inverter AC branch therefore carries the same identifier on the situation plan and the single-line diagram. String and equipment references used on both also agree.",[12,37639,36066],{},[3139,37641,37642,37645,37648,37651],{},[87,37643,37644],{},"Every fixed PV item on the situation plan can be found on the single-line diagram or in its legend.",[87,37646,37647],{},"Every spatially relevant PV component on the single-line diagram has a discoverable position.",[87,37649,37650],{},"Board and storey names match.",[87,37652,37653],{},"Address, date and document revision are the same.",[12,37655,37656,37657,37659],{},"See ",[40,37658,34236],{"href":5399}," for their separate roles.",[79,37661,37663],{"id":37662},"special-configurations","Special configurations",[1041,37665,37667],{"id":37666},"microinverters","Microinverters",[12,37669,37670],{},"For many identical units, a grouped symbol with quantity, type and related modules is clearer than overlapping marks. The electrical parallel connection stays visible on the single-line diagram.",[1041,37672,37674],{"id":37673},"home-battery","Home battery",[12,37676,37677],{},"Locate the battery, inverter, fixed isolation and any backup board. A battery is not a PV module and gets its own symbol. Location constraints come from design and manufacturer information; the plan records the installed position.",[1041,37679,37681],{"id":37680},"outbuilding-or-ground-array","Outbuilding or ground array",[12,37683,37684],{},"Show the route between buildings, the entry point and the sub-boards involved. An arrow marked “to house” without a precise destination makes every later job harder.",[1041,37686,37688],{"id":37687},"existing-installation","Existing installation",[12,37690,37691],{},"AREI 8.2.2 point 7 allows existing household PV installations up to 10 kVA that fall under that existing-installation regime to rely on a written description, possibly supplemented by photographs, instead of a situation plan under 3.1.2.3 a. The derogation does not apply to new construction or significant alterations; there, you draw an up-to-date situation plan. Whether a particular existing installation qualifies is for the professional to establish.",[79,37693,37695],{"id":37694},"dossier-and-photographs","Dossier and photographs",[12,37697,37698],{},"Photographs help document concealed routes, roofs and equipment labels; the structured electrical plans remain the basis. Retain:",[84,37700,37701,37704,37707,37710,37713,37716],{},[87,37702,37703],{},"final situation plan and single-line diagram;",[87,37705,37706],{},"module and inverter data;",[87,37708,37709],{},"available string and measurement records;",[87,37711,37712],{},"manuals and equipment declarations;",[87,37714,37715],{},"reports from the approved inspection body;",[87,37717,37718],{},"later changes under a new revision.",[12,37720,37721],{},"The owner keeps the dossier available and has it updated after alterations. For PV up to 10 kVA, 7.112.2 explicitly requires the items listed in Section 9.1.2 to be available for consultation by anyone concerned.",[79,37723,37725],{"id":37724},"pre-export-check","Pre-export check",[84,37727,37728,37731,37734,37737,37740,37743],{},[87,37729,37730],{},"Are module fields, inverters and fixed auxiliary devices at their actual locations?",[87,37732,37733],{},"Are DC and AC routes distinguishable and explained in the legend?",[87,37735,37736],{},"Do circuit, string and board references match the single-line diagram?",[87,37738,37739],{},"Are symbols and labels legible at the intended print size?",[87,37741,37742],{},"Does the plan show as-built conditions rather than the original offer?",[87,37744,37745],{},"Do both plans carry the same address, date and revision?",[79,37747,37749],{"id":37748},"organising-a-multi-sheet-plan","Organising a multi-sheet plan",[12,37751,37752],{},"If the roof, technical room and boards cannot fit legibly on one sheet, use named views. An overview connects the building, roof areas and distribution boards, while detail sheets enlarge arrays and equipment zones. Number every sheet and use explicit continuation notes such as “PV-DC continues on sheet LP02”.",[12,37754,37755],{},"Keep enough orientation on each view: storey, room, north arrow or recognisable façade. One equipment identifier appears at several positions only if several devices really exist. A reference table links symbol, equipment ID, circuit and sheet. A large installation stays traceable without shrinking labels or drawing long ambiguous lines across the page.",[79,37757,37759],{"id":37758},"worked-case-two-roof-faces-and-one-inverter-in-a-plant-room","Worked case: two roof faces and one inverter in a plant room",[12,37761,37762],{},"A house has modules on east- and west-facing roofs, two DC strings and one inverter in the plant room. Show two identified array areas rather than one icon at the centre of the roof. State which string reference belongs to each face and where its DC conductors enter the building. A shared route to the plant room is drawn only where the installed cables really share it.",[12,37764,37765],{},"Give the inverter a stable equipment reference and its actual wall position. If DC isolation, surge protection or other fixed equipment is external, locate it too and link its identifier to the single-line diagram. Integrated functions stay with the equipment record; you do not invent separate boxes. The AC route ends at the correct board and circuit; a line aimed merely at the nearest room adds no traceability.",[12,37767,37768],{},"Check the orientation of each roof detail. Roof face, eaves, ridge, north direction and recognisable building edges let a person find the array and entry point on site. The situation plan is not a mounting drawing showing every hook, but it shows every difference that matters for electrical assignment, safe work and later fault finding.",[79,37770,37772],{"id":37771},"survey-concealed-or-inaccessible-routes-honestly","Survey concealed or inaccessible routes honestly",[12,37774,37775],{},"Where an existing installation hides a route, you do not draw a geometrically precise one either. Mark the section as concealed or derived from retained documentation and keep the source of that information. Photographs of entries, labels, penetrations and the plant room narrow the uncertainty. A dashed line has that meaning only when the legend defines it.",[12,37777,37778],{},"Separate three evidence states: observed on site, supported by reliable technical records and still unresolved. Open items belong on the work list, not as confident lines on the final drawing. Before inspection, the responsible professional decides whether more surveying or access is required.",[79,37780,37782],{"id":37781},"carry-roof-alterations-through-the-documents","Carry roof alterations through the documents",[12,37784,37785],{},"After replacing modules, extending an array or changing an inverter, you review more than the roof outline. Update array and string identifiers, cable route, entry point, equipment location, DC and AC references and supporting technical records. Even where modules are replaced within an existing string, record the actual installed quantity and rating – exactly the data that 7.112.4 also lists for the inspection report. If strings are rearranged, the single-line diagram and situation plan carry the same new state.",[12,37787,37788],{},"Archive the superseded edition separately with its date. That makes clear whether a photograph or inspection report concerns the old or the current arrangement. An inverter cloud portal provides production data; the spatial survey and plan revision remain your job.",[12,37790,37791],{},"Check the final edition at the intended print size. A new array does not cover existing references, and a new cable route does not look like a building edge. Move detail frames deliberately, update the sheet index and check every continuation note. An extended roof installation then stays understandable on site without zooming or access to the editing file.",[12,37793,4361,37794,37797],{},[40,37795,36248],{"href":36246,"rel":37796},[1458]," explicitly includes energy sources on both diagrams and PV technical documentation in the dossier. The required detail follows the installation and the current official Book 1 V06, not a generic roof template.",[79,37799,37801],{"id":37800},"creating-the-plan-in-planelec","Creating the plan in PlanElec",[12,37803,3361,37804,37807],{},[40,37805,22],{"href":1456,"rel":37806},[1458],", you draw the single-line diagram and situation plan for free in your browser. If you place a source such as a PV generator, inverter or battery on the single-line diagram, Sketch points out when it has no place yet on the started situation plan and cites AREI 3.1.2.3 a. Sketch does not plan or check strings.",[12,37809,3361,37810,37812,37813,37815],{},[40,37811,31],{"href":1964},", a module symbol on the situation plan stands for a complete string and is assigned to exactly one string of the linked inverter; the self-check reports missing, duplicate and invalid string links. How to place the string symbols is explained in ",[40,37814,16763],{"href":16762},". Both plans use the same project data, so references do not drift apart, and you export them as PDF. The roles are clear: the AREI\u002FRGIE self-check shows you findings within the supported rules, the comparison with the installation happens on site, and the official inspection is done by the approved inspection body.",[1489,37817],{":height":6699,":width":27568,"alt":37818,"caption":37819,"src":37820},"PlanElec Sketch: library group ‘Energy and generation’, in the diagram a ‘Hybrid circuit with PV and battery’ with 10 kWh battery, 4.6 kVA inverter, DC isolator and PV generator 12 × 430 Wp; on the right the note that the PV generator is not on the situation plan yet (3.1.2.3 a).","Battery, inverter and modules enter the diagram as one circuit, with their ratings at the symbol. The note is information only; Sketch checks neither the grid registration nor the datasheet values.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-energy-hybrid.webp",[1489,37822],{":height":37823,":width":5809,"alt":37824,"caption":37825,"src":37826},"762","Situation plan of the upper floor in PlanElec Pro, ‘Electrical’ mode: fictional house with bathroom, landing, office and two bedrooms; on the south side one PV symbol for each of the two strings with circuit reference O1.","The module symbols of the strings carry the same reference on the plan as in the single-line diagram. Update position and cable routes after installation; the plan does not replace a survey on site.","\u002Fimages\u002Fblog\u002Fscreens\u002Fpro\u002Fen-pv-strings-plan.webp",[79,37828,35652],{"id":35651},[12,37830,37831,37832,37835],{},"The basis is the official ",[40,37833,35659],{"href":1971,"rel":37834},[1458],": Table 2.23, Part 3 (3.1.2.1 and 3.1.2.3), Chapter 7.112, the narrow existing-installation derogation in Part 8 (8.2.2 point 7) and the dossier requirements in Part 9. Reviewed against V06 on 5 October 2026.",{"title":2044,"searchDepth":2045,"depth":2045,"links":37837},[37838,37839,37840,37841,37842,37843,37844,37845,37851,37852,37853,37854,37855,37856,37857,37858],{"id":37408,"depth":2045,"text":37409},{"id":37494,"depth":2045,"text":37495},{"id":37527,"depth":2045,"text":37528},{"id":37558,"depth":2045,"text":37559},{"id":37585,"depth":2045,"text":37586},{"id":37604,"depth":2045,"text":37605},{"id":37633,"depth":2045,"text":37634},{"id":37662,"depth":2045,"text":37663,"children":37846},[37847,37848,37849,37850],{"id":37666,"depth":2053,"text":37667},{"id":37673,"depth":2053,"text":37674},{"id":37680,"depth":2053,"text":37681},{"id":37687,"depth":2053,"text":37688},{"id":37694,"depth":2045,"text":37695},{"id":37724,"depth":2045,"text":37725},{"id":37748,"depth":2045,"text":37749},{"id":37758,"depth":2045,"text":37759},{"id":37771,"depth":2045,"text":37772},{"id":37781,"depth":2045,"text":37782},{"id":37800,"depth":2045,"text":37801},{"id":35651,"depth":2045,"text":35652},"Locate PV modules, inverter, fixed isolators, distribution boards and cable routes on the situation plan, using the same references as the single-line diagram.",[35684,18037,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-pv-situation-plan-editorial.jpg","\u002Fblog\u002Fpv-situation-plan.en",{"title":37387,"description":37859},"Solar PV on a Situation Plan: Modules, Inverter, Routes","solar-pv-situation-plan","blog\u002Fpv-situation-plan.en",[37380,534,17677,37869,2133,21359,4261],"Inverter","_EZvyLp3jSipaqjCFJMWu9ELHP-5ZKyq8APwcBC96uc","\u002Fblog\u002Fsolar-pv-situation-plan",{"id":37873,"title":37874,"articleId":37875,"body":37876,"category":4239,"date":38429,"description":38430,"extension":2113,"image":37898,"labels":38431,"lastUpdated":10988,"locale":2119,"meta":38432,"navigation":2121,"ogImage":38433,"path":38434,"publishDate":38429,"readTime":19432,"refreshInterval":5426,"seo":38435,"seoTitle":38436,"slug":38437,"stem":38438,"tags":38439,"__hash__":38447,"kind":2137,"href":38448},"blog\u002Fblog\u002Fsynergrid-c10-26-list.en.md","Synergrid C10\u002F26 list: is my inverter on the list – and what if it is not?","synergrid-c10-26-list",{"type":9,"value":37877,"toc":38411},[37878,37893,37899,37903,37910,37920,37924,37977,37984,37988,37995,38101,38105,38112,38116,38169,38173,38181,38185,38226,38230,38236,38262,38265,38269,38291,38295,38298,38306,38309,38312,38319,38325,38329,38332,38335,38338,38342,38345,38348,38351,38353,38362,38368,38374,38380,38382,38397,38400],[12,37879,37880,37883,37884,37887,37888,37892],{},[15,37881,37882],{},"Short answer:"," the Synergrid C10\u002F26 list is the Belgian register of inverters, hybrid inverters and battery systems homologated under the technical prescription C10\u002F11. As a rule, the grid operators (Fluvius, ORES, RESA, Sibelga) accept only listed devices at registration – in the listed ",[15,37885,37886],{},"firmware version",". If a device is not listed, it needs an individual proof of conformity against C10\u002F11; whether that is sufficient is for the responsible grid operator to decide. To find out whether your device is on it, use the free ",[40,37889,37891],{"href":37890},"\u002Fen\u002Ftools\u002Fsynergrid-c10-26-inverter-check","Synergrid C10\u002F26 check by PlanElec",", which works from a dated copy of the official list.",[12,37894,37895],{},[74,37896],{"alt":37897,"src":37898},"A solar technician reviews documents beside an inverter.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-synergrid-c10-26-list-editorial.webp",[79,37900,37902],{"id":37901},"what-is-the-synergrid-c1026-list","What is the Synergrid C10\u002F26 list?",[12,37904,37905,37906,37909],{},"Synergrid is the federation of Belgian electricity and gas grid operators. The prescription ",[15,37907,37908],{},"C10\u002F11"," defines the technical requirements that decentralised generation units (PV inverters, home batteries, CHP, wind) must meet on the low-voltage grid: protection functions during grid disturbances, frequency and voltage behaviour, power control.",[12,37911,4361,37912,37915,37916,37919],{},[15,37913,37914],{},"C10\u002F26 list"," is its practical result: manufacturers have their devices tested against C10\u002F11, and approved device types are published with reference number, firmware version and technical data. Synergrid keeps the list up to date as an Excel file; the current edition refers to ",[15,37917,37918],{},"C10\u002F11 edition 2.4 (15\u002F10\u002F2025)",". It covers several thousand active devices; the check shows the exact count and the date of the imported data right above the results table.",[79,37921,37923],{"id":37922},"why-the-list-matters-for-registration-and-inspection","Why the list matters for registration and inspection",[138,37925,37926,37935],{},[141,37927,37928],{},[144,37929,37930,37932],{},[147,37931,17657],{},[147,37933,37934],{},"Role of the C10\u002F26 list",[163,37936,37937,37947,37957,37967],{},[144,37938,37939,37944],{},[168,37940,37941],{},[15,37942,37943],{},"Registration with the grid operator",[168,37945,37946],{},"Fluvius, ORES, RESA and Sibelga ask for the inverter type and expect a listed device",[144,37948,37949,37954],{},[168,37950,37951],{},[15,37952,37953],{},"Conformity inspection",[168,37955,37956],{},"The approved inspection body inspects the installation against the AREI; for PV up to 10 kVA, its report records number, type, serial number and maximum AC power of the inverters (7.112.4)",[144,37958,37959,37964],{},[168,37960,37961],{},[15,37962,37963],{},"Injection approval",[168,37965,37966],{},"Without recognised evidence for the device, the grid operator generally does not release feed-in",[144,37968,37969,37974],{},[168,37970,37971],{},[15,37972,37973],{},"Firmware update or replacement",[168,37975,37976],{},"A new firmware version or a replacement device again needs a matching list entry",[12,37978,37979,37980,37983],{},"For residential PV systems up to 10 kVA, AREI Chapter 7.112 also applies to the electrical installation itself – both must be right. The guide ",[40,37981,37982],{"href":36916},"PV system in the single-line diagram"," shows what the diagram looks like.",[79,37985,37987],{"id":37986},"how-to-read-a-list-entry","How to read a list entry",[12,37989,37990,37991,37994],{},"Each row describes ",[15,37992,37993],{},"one combination of model and firmware",". The key columns:",[138,37996,37997,38006],{},[141,37998,37999],{},[144,38000,38001,38004],{},[147,38002,38003],{},"Column",[147,38005,2314],{},[163,38007,38008,38021,38031,38041,38051,38061,38071,38081,38091],{},[144,38009,38010,38018],{},[168,38011,38012,38014,38015,3317],{},[15,38013,3919],{}," (e.g. ",[25,38016,38017],{},"GLV052-09-0003",[168,38019,38020],{},"Synergrid homologation number of the device – complements brand and model in the registration (not always unique per model)",[144,38022,38023,38028],{},[168,38024,38025],{},[15,38026,38027],{},"Brand \u002F series \u002F model",[168,38029,38030],{},"Manufacturer designation, exactly as on the rating plate",[144,38032,38033,38038],{},[168,38034,38035],{},[15,38036,38037],{},"Firmware",[168,38039,38040],{},"Tested software version; the homologation applies to this version only",[144,38042,38043,38048],{},[168,38044,38045],{},[15,38046,38047],{},"Pac,r (W)",[168,38049,38050],{},"Rated active power at the AC output",[144,38052,38053,38058],{},[168,38054,38055],{},[15,38056,38057],{},"Smax (VA)",[168,38059,38060],{},"Maximum apparent power – decisive for the power class; grid operators typically cap single-phase generation units at around 5 kVA (check the exact threshold with your grid operator)",[144,38062,38063,38068],{},[168,38064,38065],{},[15,38066,38067],{},"Phases",[168,38069,38070],{},"Single-phase or three-phase",[144,38072,38073,38078],{},[168,38074,38075],{},[15,38076,38077],{},"Application",[168,38079,38080],{},"Solar, storage, CHP, wind, backup",[144,38082,38083,38088],{},[168,38084,38085],{},[15,38086,38087],{},"Restrictions",[168,38089,38090],{},"Conditions under which the device is admitted (see below)",[144,38092,38093,38098],{},[168,38094,38095],{},[15,38096,38097],{},"Homologated since",[168,38099,38100],{},"Date of final (or provisional) homologation",[1041,38102,38104],{"id":38103},"why-the-firmware-version-counts","Why the firmware version counts",[12,38106,38107,38108,38111],{},"The protection functions under C10\u002F11 are software. A device running a firmware other than the listed one counts as ",[15,38109,38110],{},"not homologated"," at registration – even if the model itself is on the list. Read the firmware on the device or in the manufacturer's app and compare it with the list entry.",[1041,38113,38115],{"id":38114},"interpreting-restrictions-correctly","Interpreting restrictions correctly",[138,38117,38118,38127],{},[141,38119,38120],{},[144,38121,38122,38125],{},[147,38123,38124],{},"Restriction on the list",[147,38126,20209],{},[163,38128,38129,38139,38149,38159],{},[144,38130,38131,38136],{},[168,38132,38133],{},[15,38134,38135],{},"Only within a module \u003C 800 W",[168,38137,38138],{},"Admitted solely as part of a plug-in generation unit (balcony solar, plug-in battery)",[144,38140,38141,38146],{},[168,38142,38143],{},[15,38144,38145],{},"Small generating installations only",[168,38147,38148],{},"Not for larger installations with extended requirements",[144,38150,38151,38156],{},[168,38152,38153],{},[15,38154,38155],{},"High-voltage connection only",[168,38157,38158],{},"Not for domestic connections on the low-voltage grid",[144,38160,38161,38166],{},[168,38162,38163],{},[15,38164,38165],{},"Backup power system only",[168,38167,38168],{},"Homologated for backup supply only, not for feeding into the grid – the unit supplies an isolated part of the installation during an outage",[79,38170,38172],{"id":38171},"plug-in-solar-and-plug-in-batteries-the-same-list","Plug-in solar and plug-in batteries: the same list",[12,38174,38175,38176,38180],{},"Micro-inverters and plug-in batteries up to 800 W – Marstek, Zendure, Anker Solix, HomeWizard or Hoymiles, for instance – also need an entry on the C10\u002F26 list, usually with the restriction \"only in module \u003C 800 W\". A device sold in Germany or the Netherlands is not automatically admitted in Belgium: the Belgian grid protection settings under C10\u002F11 differ, and the manufacturer must have the Belgian variant homologated separately. So check before buying whether your exact model is listed. Even a listed plug-in device is registered with the grid operator, and the electrical installation itself remains subject to the AREI. If you are specifically after a battery, use the ",[40,38177,38179],{"href":38178},"\u002Fen\u002Ftools\u002Fhome-battery-synergrid-check","Synergrid C10\u002F26 check for home batteries",": the same list, focused on batteries and hybrid inverters.",[79,38182,38184],{"id":38183},"common-mistakes-in-practice","Common mistakes in practice",[3139,38186,38187,38200,38206,38212,38218],{},[87,38188,38189,38192,38193,3157,38196,38199],{},[15,38190,38191],{},"Model checked without its suffix"," – ",[25,38194,38195],{},"SUN2000-8KTL-M0",[25,38197,38198],{},"SUN2000-8KTL-M1"," are different entries.",[87,38201,38202,38205],{},[15,38203,38204],{},"Firmware not compared"," – the device is listed but installed with an older version.",[87,38207,38208,38211],{},[15,38209,38210],{},"Expired homologation overlooked"," – Synergrid withdraws entries; the device then appears under \"expired\".",[87,38213,38214,38217],{},[15,38215,38216],{},"Imported from abroad"," – same name, different country variant without Belgian homologation.",[87,38219,38220,38223,38224,56],{},[15,38221,38222],{},"Battery forgotten"," – the battery inverter needs a list entry too, not only the PV inverter. See ",[40,38225,37232],{"href":37231},[79,38227,38229],{"id":38228},"check-a-device-right-in-your-browser","Check a device right in your browser",[12,38231,4361,38232,38235],{},[40,38233,38234],{"href":37890},"Synergrid C10\u002F26 check"," loads a dated copy of the official list and makes it searchable:",[3139,38237,38238,38244,38250,38256],{},[87,38239,38240,38243],{},[15,38241,38242],{},"Type the brand"," – suggestions show how many models are listed per brand.",[87,38245,38246,38249],{},[15,38247,38248],{},"Refine the model"," – keep typing until the exact model appears; expired entries are flagged.",[87,38251,38252,38255],{},[15,38253,38254],{},"Read the result"," – the table shows firmware, Smax, Pac, phases, application, restrictions and the Synergrid reference; you sort and filter by phases, segment and status.",[87,38257,38258,38261],{},[15,38259,38260],{},"No match?"," – the check suggests technically comparable homologated devices of the same power class.",[12,38263,38264],{},"Filters and sorting live in the URL. Send the link straight to a customer or colleague and they see exactly the same selection.",[79,38266,38268],{"id":38267},"what-the-check-does-and-what-the-official-list-does","What the check does – and what the official list does",[12,38270,38271,38272,38277,38278,38280,38281,38283,38284,38286,38287,56],{},"The check is your fast way into the list; the authoritative statement remains the current ",[40,38273,38276],{"href":38274,"rel":38275},"https:\u002F\u002Fwww.synergrid.be\u002Fnl\u002Fhomologatie\u002Felektriciteit\u002Fdecentrale-productie-eenheden",[1458],"official list on synergrid.be",". In case of discrepancy the official list prevails. The electrical installation itself – protection, RCD, cable size, isolator – is outside the check; for that, ",[40,38279,31],{"href":1964}," has the AREI\u002FRGIE self-check on the single-line diagram. There you take the inverter straight from the ",[15,38282,17882],{}," into the project; the steps are in ",[40,38285,16763],{"href":16762},". Manufacturer data per model series is collected in the ",[40,38288,38290],{"href":38289},"\u002Fen\u002Ftools\u002Finverter-datasheets","inverter datasheets",[79,38292,38294],{"id":38293},"a-defensible-device-check-step-by-step","A defensible device check, step by step",[12,38296,38297],{},"Start from the label on the device that will actually be installed, not from a webshop title. Record manufacturer, complete model suffix, product reference, rated apparent power and firmware. Hybrid families often contain several power variants, regional variants or firmware branches. A search result that matches only the brand or the first part of the name is not enough.",[12,38299,38300,38301,38305],{},"Open the current ",[40,38302,38304],{"href":37346,"rel":38303},[1458],"Synergrid homologation page"," and the official list linked there. Match the row field by field. Read restrictions and notes, including permitted modes, external protection, export limitation, storage use or combinations with other components. For plug-and-play equipment, use Synergrid's dedicated Plug & Play information and the exact list entry; a normal decentralised-production entry does not automatically cover every plug-in configuration.",[12,38307,38308],{},"Save evidence with the project: the row or official reference, list date, firmware seen on site and the date you checked. Recheck before commissioning and notification, because the intended device, firmware or official data can change between quotation and installation. If the row is absent, you clarify the Belgian homologation with the manufacturer or importer and ask the relevant network operator which evidence it accepts. PlanElec's search is your reading aid; the attestation comes from the official source.",[12,38310,38311],{},"Keep three decisions separate. C10\u002F26 type homologation addresses the network-interface characteristics of the product. The approved inspection body assesses the electrical installation against the AREI\u002FRGIE. The distribution network operator handles notification and connection conditions. A positive result in one area does not automatically grant the other two.",[12,38313,38314,38315,38318],{},"On the single-line diagram, document the exact inverter and the associated protection, isolation and cable data. Keep the situation plan, manufacturer declarations, commissioning information and inspection report in the installation dossier. See ",[40,38316,38317],{"href":36916},"PV system documentation"," for the complete workflow. This review was performed on 5 October 2026; for a purchase or commissioning decision, always use the live official list.",[1489,38320],{":height":38321,":width":3800,"alt":38322,"caption":38323,"src":38324},"662","Flow of the device check: read the rating plate, compare the official list for model, firmware and restrictions. If a row matches exactly, keep the evidence with reference, list date, firmware and check date and check again before commissioning; otherwise clarify the homologation with manufacturer or importer and the DSO. Below, three separate decisions by Synergrid, the inspection body and the DSO.","A match proves the type homologation of the device. The inspection body assesses the installation, and the DSO handles registration.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fsynergrid-c10-26-list\u002Fdevice-check.en.svg",[1041,38326,38328],{"id":38327},"similar-rows-are-not-interchangeable","Similar rows are not interchangeable",[12,38330,38331],{},"Compare electrical variant, firmware range, Smax and notes as well as model text. A screenshot is not lasting evidence: keep the official file name or reference and the check date as well. A system combining inverter, battery and external network protection may need several related entries or proofs. Check every grid-connected function and the permitted combination.",[12,38333,38334],{},"After a firmware update, you reassess the existing documentation. The device working does not prove that this exact software version is covered by the published entry. Likewise, CE marking is not C10\u002F26 homologation: it is a different manufacturer responsibility and replaces neither the list entry nor the installation inspection.",[12,38336,38337],{},"For zero-export configurations, also document the components and settings required by the manufacturer and the network operator. An export limit does not automatically change the classification as a grid-connected unit. Have edge cases clarified in writing before ordering.",[1041,38339,38341],{"id":38340},"evidence-at-project-handover","Evidence at project handover",[12,38343,38344],{},"Hand over a short check note, not just a link: who compared which official list against which rating plate and which firmware, and when? Which restriction was read, and which component satisfies it? The next person on the project can then recheck in a targeted way before commissioning.",[12,38346,38347],{},"With a replacement device, the check starts again. Similar power or the same brand does not replace the exact reference. An earlier successful registration does not prove that a model installed later is covered either. Update the single-line diagram, equipment documents and registration data together, and have the electrical change assessed according to its actual scope.",[12,38349,38350],{},"A dated delivery note supports the identification when model variants look alike. If delivery note, rating plate and official row do not match, you resolve the contradiction before registration instead of bridging it with an assumption.",[79,38352,1617],{"id":1616},[12,38354,38355,38358,38359,38361],{},[15,38356,38357],{},"Do I have to put the Synergrid reference in the registration?","\nGrid operators primarily ask for brand, model and firmware version. The GLV reference is a useful addition but not always unique per model: Synergrid sometimes assigns the same reference to several models. So state the reference ",[15,38360,25797],{}," the model designation.",[12,38363,38364,38367],{},[15,38365,38366],{},"My device is listed, but the entry is \"expired\" – what now?","\nThe homologation has been withdrawn or has lapsed. For new installations the device is no longer admitted; existing installations are generally unaffected. When in doubt, ask the grid operator.",[12,38369,38370,38373],{},[15,38371,38372],{},"Does the list also apply in Wallonia and Brussels?","\nYes. C10\u002F11 and C10\u002F26 are Synergrid prescriptions and apply nationwide to all distribution grid operators.",[12,38375,38376,38379],{},[15,38377,38378],{},"How often does the list change?","\nSynergrid publishes new editions regularly. The check shows the date of the imported data, so you always know which state your result is based on.",[79,38381,7537],{"id":7536},[84,38383,38384,38389,38393],{},[87,38385,38386],{},[40,38387,38388],{"href":36916},"Documenting a PV system in the single-line diagram",[87,38390,38391],{},[40,38392,37232],{"href":37231},[87,38394,38395],{},[40,38396,5394],{"href":5393},[38398,38399],"hr",{},[12,38401,38402],{},[63,38403,38404,38405,38407,38408,56],{},"Take the inverter from the Synergrid list, check strings against the manufacturer limits and draw the situation plan: that is what ",[40,38406,31],{"href":1964}," does. A simple single-line diagram with a PV circuit you draw for free in ",[40,38409,22],{"href":1456,"rel":38410},[1458],{"title":2044,"searchDepth":2045,"depth":2045,"links":38412},[38413,38414,38415,38419,38420,38421,38422,38423,38427,38428],{"id":37901,"depth":2045,"text":37902},{"id":37922,"depth":2045,"text":37923},{"id":37986,"depth":2045,"text":37987,"children":38416},[38417,38418],{"id":38103,"depth":2053,"text":38104},{"id":38114,"depth":2053,"text":38115},{"id":38171,"depth":2045,"text":38172},{"id":38183,"depth":2045,"text":38184},{"id":38228,"depth":2045,"text":38229},{"id":38267,"depth":2045,"text":38268},{"id":38293,"depth":2045,"text":38294,"children":38424},[38425,38426],{"id":38327,"depth":2053,"text":38328},{"id":38340,"depth":2053,"text":38341},{"id":1616,"depth":2045,"text":1617},{"id":7536,"depth":2045,"text":7537},"2026-08-26","What the Synergrid C10\u002F26 list is, why grid operators require it, how to read reference, firmware, Smax and restrictions correctly – and how to check a device right in your browser.",[35684,5421,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-synergrid-c10-26-list-editorial.jpg","\u002Fblog\u002Fsynergrid-c10-26-list.en",{"title":37874,"description":38430},"Synergrid C10\u002F26 List: Is My Inverter on It?","synergrid-c10-26-list-inverter","blog\u002Fsynergrid-c10-26-list.en",[38440,38441,18656,38442,38443,38444,38445,38446],"synergrid","c10\u002F26","solar","pv","home battery","plug-in solar","grid operator registration","sa8lBnRx5QFupr21QhZuiT4TuBQDcAH8ta7YqW8XldQ","\u002Fblog\u002Fsynergrid-c10-26-list-inverter",{"id":38450,"title":1984,"articleId":38451,"body":38452,"category":2110,"date":39540,"description":39541,"extension":2113,"image":9347,"labels":39542,"lastUpdated":39543,"locale":2119,"meta":39544,"navigation":2121,"ogImage":9351,"path":39545,"publishDate":39540,"readTime":39546,"refreshInterval":2053,"seo":39547,"seoTitle":39548,"slug":39549,"stem":39550,"tags":39551,"__hash__":39552,"kind":2137,"href":39553},"blog\u002Fblog\u002Ftrikker-alternative.en.md","planelec-vs-trikker",{"type":9,"value":38453,"toc":39507},[38454,38460,38474,38478,38510,38514,38519,38523,38552,38556,38684,38688,38691,38760,38765,38767,38771,38823,38827,38830,38896,38899,38902,38904,38908,38911,38948,38951,38955,39006,39011,39015,39018,39087,39090,39094,39097,39101,39110,39134,39139,39143,39146,39171,39176,39180,39190,39194,39211,39215,39224,39228,39239,39243,39246,39263,39268,39272,39275,39311,39314,39318,39322,39332,39336,39344,39348,39353,39357,39360,39364,39367,39371,39374,39378,39381,39385,39391,39395,39401,39404,39453,39455,39478,39480,39486,39503],[12,38455,38456,38459],{},[15,38457,38458],{},"You can move from Trikker to PlanElec without a hard cut: open a single .trik file free of charge and without an account in PlanElec Sketch, move a whole archive into PlanElec Pro, and finish dossiers already in progress in Trikker."," To keep drawing, PlanElec Sketch is the free alternative: single-line diagram and situation plan in the browser, also on a tablet. PlanElec Pro is a new generation of electrical documentation: floor plan, circuits, distribution board and documents form one project instead of separate drawings. Staying with Trikker makes more sense if your desktop routine is well established, you often draw without a connection or you need the home automation export to Niko Home Control or Home Center. This article covers the switch itself: what carries over, what it costs, what works offline and how to test it in 30 minutes with your own files. It is written for Belgium, where the AREI\u002FRGIE (the Belgian wiring regulations) requires single-line diagrams and situation plans.",[12,38461,38462,38,38464,44,38466,12031,38470,12035,38472,56],{},[15,38463,12023],{},[40,38465,12026],{"href":42},[15,38467,47,38468,50],{},[25,38469,27],{},[15,38471,12034],{},[40,38473,55],{"href":54},[12,38475,38476],{},[15,38477,13162],{},[138,38479,38480,38488],{},[141,38481,38482],{},[144,38483,38484,38486],{},[147,38485,13171],{},[147,38487,9397],{},[163,38489,38490,38496,38502],{},[144,38491,38492,38494],{},[168,38493,13180],{},[168,38495,13183],{},[144,38497,38498,38500],{},[168,38499,13188],{},[168,38501,13191],{},[144,38503,38504,38506],{},[168,38505,13196],{},[168,38507,13199,38508,13202],{},[15,38509,1482],{},[12,38511,38512],{},[74,38513],{"alt":76,"src":9347},[12,38515,38516],{},[63,38517,38518],{},"PlanElec makes Sketch and Pro. All information about Trikker comes from trikker.be as of 16 November 2026; sources and method are at the end of the article.",[79,38520,38522],{"id":38521},"in-short-switch-or-stay-with-trikker","In short: switch or stay with Trikker?",[84,38524,38525,38531,38540,38546],{},[87,38526,38527,38530],{},[15,38528,38529],{},"Switching to Pro pays off"," if your drawings should become projects: floor plan, circuits, distribution board, single-line diagram and situation plan are connected, the assistant works across the whole project, a published self-check flags open points, and your team works in the browser on the same project, with three editing seats and free read-only access.",[87,38532,38533,38536,38537,38539],{},[15,38534,38535],{},"Switching to Sketch pays off"," if you simply want to keep drawing: open your ",[25,38538,27],{}," files for free and check them against the import report, output diagram and plan as PDF, in the browser on Mac, Windows or tablet, without a licence per computer.",[87,38541,38542,38545],{},[15,38543,38544],{},"Staying with Trikker"," suits you if you draw offline for long stretches, export home automation addresses to Niko Home Control or Home Center, read old paper diagrams with the Schema reader (beta), or your workflow around Trikker is well established.",[87,38547,38548,38551],{},[15,38549,38550],{},"Testing side by side"," costs nothing: a .trik file opens free of charge in Sketch, Try Pro costs €0 for one month, and your Trikker licence keeps running.",[79,38553,38555],{"id":38554},"planelec-and-trikker-at-a-glance","PlanElec and Trikker at a glance",[138,38557,38558,38569],{},[141,38559,38560],{},[144,38561,38562,38564,38566],{},[147,38563,11364],{},[147,38565,7417],{},[147,38567,38568],{},"Trikker (according to the vendor)",[163,38570,38571,38581,38591,38601,38612,38623,38633,38643,38653,38663,38674],{},[144,38572,38573,38575,38578],{},[168,38574,543],{},[168,38576,38577],{},"Browser on Windows, macOS and Linux; Sketch also on tablet and phone",[168,38579,38580],{},"Windows 10 and 11; macOS 13 or later on Apple silicon (M1 or newer), out of beta since Trikker 2.0 on 13\u002F11\u002F2026; Intel Macs not supported according to the FAQ; web version for browser and tablet announced as a beta for 2026",[144,38582,38583,38585,38588],{},[168,38584,4573],{},[168,38586,38587],{},"Sketch free; Try Pro €0; site pass € 15 per property or subscription € 29\u002Fmonth or € 290\u002Fyear with 3 editing seats; final prices without VAT (small business exemption scheme)",[168,38589,38590],{},"€45\u002Fmonth or €360\u002Fyear excl. VAT (€54.45 or €435.60 incl. VAT), per computer",[144,38592,38593,38595,38598],{},[168,38594,9873],{},[168,38596,38597],{},"one account on several devices, also at the same time",[168,38599,38600],{},"one licence runs on one computer at a time; moving it to another computer is free",[144,38602,38603,38606,38609],{},[168,38604,38605],{},"Single-line diagram and situation plan",[168,38607,38608],{},"Pro: from one shared project model; Sketch: draw diagram and plan",[168,38610,38611],{},"linked symbols and circuit references",[144,38613,38614,38617,38620],{},[168,38615,38616],{},"Backgrounds",[168,38618,38619],{},"image, PDF, DXF and DWG as background; AI floor plan recognition from PDF, scan or image (Pro)",[168,38621,38622],{},"images, DWG, DXF, SVG and PDF as background of the situation plan",[144,38624,38625,38627,38630],{},[168,38626,10997],{},[168,38628,38629],{},"assistant across the whole Pro project, typed or dictated; recognition of floor plans and cabinet photos",[168,38631,38632],{},"Schema reader (beta, for licence holders): diagram and situation plan from PDF, PNG or JPG; describe the installation by typing or dictating",[144,38634,38635,38637,38640],{},[168,38636,3115],{},[168,38638,38639],{},"distribution board editor in Pro, also filled from photos",[168,38641,38642],{},"not described in the vendor’s information",[144,38644,38645,38647,38650],{},[168,38646,12377],{},[168,38648,38649],{},"Pro: self-check report on the supported AREI\u002FRGIE rules (indicative); Sketch: “Check documents” as a completeness aid",[168,38651,38652],{},"“fully compliant with the latest AREI obligations” (marketing claim)",[144,38654,38655,38657,38660],{},[168,38656,11180],{},[168,38658,38659],{},"Sketch: device count as CSV; Pro: detailed lists as a pilot",[168,38661,38662],{},"from the diagram, with cable lengths; export as an Excel file",[144,38664,38665,38668,38671],{},[168,38666,38667],{},"Home automation export",[168,38669,38670],{},"KNX addresses as files for ETS (pilot)",[168,38672,38673],{},"Niko Home Control (floor plan image) and Home Center",[144,38675,38676,38678,38681],{},[168,38677,12325],{},[168,38679,38680],{},"see “What works without internet?”",[168,38682,38683],{},"draw and save offline; licence check and PDF need internet",[79,38685,38687],{"id":38686},"which-routes-away-from-trikker-are-there","Which routes away from Trikker are there?",[12,38689,38690],{},"The route depends on what you want to do with your Trikker files:",[138,38692,38693,38705],{},[141,38694,38695],{},[144,38696,38697,38700,38702],{},[147,38698,38699],{},"You want to …",[147,38701,9397],{},[147,38703,38704],{},"Cost",[163,38706,38707,38727,38742],{},[144,38708,38709,38715,38725],{},[168,38710,38711,38712,38714],{},"keep drawing a single ",[25,38713,27],{}," file and print it as PDF",[168,38716,38717,38718,8020,38721,38724],{},"load the file in ",[40,38719,22],{"href":1456,"rel":38720},[1458],[15,38722,38723],{},"Open Trikker file",", also without an account",[168,38726,6357],{},[144,38728,38729,38732,38739],{},[168,38730,38731],{},"have your whole archive as projects in your account",[168,38733,38734,38736,38737,3317],{},[15,38735,1486],{},": up to 500 files per run, one project per file (",[40,38738,4239],{"href":42},[168,38740,38741],{},"with any signed-in account, including Try Pro at €0",[144,38743,38744,38747,38755],{},[168,38745,38746],{},"work with a distribution board, self-check report, PV or a team",[168,38748,38749,38750,38752,38753],{},"plan in ",[40,38751,31],{"href":1964},"; bring Sketch drawings over with ",[15,38754,1482],{},[168,38756,38757,38758,3317],{},"site pass € 15 per property or subscription € 29\u002Fmonth or € 290\u002Fyear (",[40,38759,13474],{"href":54},[12,38761,38762,38763,56],{},"An imported project is a starting point, not a checked document; compare it with the original and read the report. Which of the three tools Trikker, Sketch and Pro fits which task is covered in ",[40,38764,4755],{"href":1989},[1489,38766],{":height":1491,":width":1492,"alt":1493,"caption":1494,"src":1495},[79,38768,38770],{"id":38769},"how-do-you-switch-from-trikker-step-by-step","How do you switch from Trikker step by step?",[3139,38772,38773,38779,38785,38796,38802,38811,38817],{},[87,38774,38775,38778],{},[15,38776,38777],{},"Take stock of your archive."," Collect your .trik files in one folder or ZIP. Separate dossiers in progress from finished installations; dossiers in progress stay in Trikker for now.",[87,38780,38781,38784],{},[15,38782,38783],{},"Open three typical files in Sketch."," Pick a small apartment, a house with a sub-distribution board and a file with many special symbols. Read each import report and compare diagram and plan with the Trikker printout.",[87,38786,38787,38790,38791,38793,38794,56],{},[15,38788,38789],{},"Create an account and import the archive."," With ",[15,38792,1486],{}," you upload files, a folder or a ZIP. PlanElec converts them in the background and creates one project per file; it recognises duplicates by their content. The individual steps are in ",[40,38795,10278],{"href":4802},[87,38797,38798,38801],{},[15,38799,38800],{},"Work through the reports."," For each file, the report lists what was approximated, filled in or not carried over. Check the projects you will need again soon first.",[87,38803,38804,38807,38808,38810],{},[15,38805,38806],{},"Start new jobs in PlanElec."," You plan every new installation in Sketch or Pro. If you usually start with the diagram, choose ",[15,38809,14060],{}," when you create the project.",[87,38812,38813,38816],{},[15,38814,38815],{},"Finish dossiers in progress in Trikker."," Moving a half-finished dossier rarely pays off; complete it where you started it.",[87,38818,38819,38822],{},[15,38820,38821],{},"Cancel the licence once nothing is open."," According to the pricing page, Trikker licences renew automatically and can be cancelled in the customer portal until just before renewal. Time the end so that your last Trikker dossiers are finished beforehand.",[79,38824,38826],{"id":38825},"what-carries-over-from-a-trik-file-and-what-does-not","What carries over from a .trik file, and what does not?",[12,38828,38829],{},"Sketch and the archive import in Pro use the same conversion on the PlanElec server. It reads files from Trikker 2.0 and from older versions such as Trikker 1.5.",[138,38831,38832,38844],{},[141,38833,38834],{},[144,38835,38836,38838,38841],{},[147,38837,4891],{},[147,38839,38840],{},"Carried over",[147,38842,38843],{},"Check or complete",[163,38845,38846,38856,38866,38877,38887],{},[144,38847,38848,38850,38853],{},[168,38849,3926],{},[168,38851,38852],{},"supply, incoming cable, distribution and sub-distribution boards, main switch, protective devices, circuits with protection and cables, loads",[168,38854,38855],{},"symbols without a counterpart stay as a note on the diagram; similar symbols are approximated, missing values filled with defaults",[144,38857,38858,38860,38863],{},[168,38859,534],{},[168,38861,38862],{},"floors with names, walls with thickness, rooms, doors, windows, garage doors, stairs, texts and rectangles; matching devices stay linked to their circuit",[168,38864,38865],{},"the report names cable routes in the plan and freely drawn doors without a matching wall",[144,38867,38868,38871,38874],{},[168,38869,38870],{},"Project data",[168,38872,38873],{},"customer, installation address, installer and approved inspection body, where the file contains them",[168,38875,38876],{},"logo (PlanElec prints the logo from your profile), phone and e-mail of the inspection body, date, revision",[144,38878,38879,38881,38884],{},[168,38880,18718],{},[168,38882,38883],{},"notes with colour and size",[168,38885,38886],{},"fixed circuit letters (they appear in the circuit name), manual page breaks, print options",[144,38888,38889,38891,38893],{},[168,38890,38616],{},[168,38892,6413],{},[168,38894,38895],{},"embedded image or PDF backgrounds; you reload DWG backgrounds in PlanElec",[12,38897,38898],{},"In Pro, the original .trik file stays attached to the project as a project file; the files on your computer are only read. The conversion needs internet. To improve the import, PlanElec keeps files read in Sketch for 90 days, encrypted; a checkbox when opening lets you object. The report for each file is always what counts.",[12,38900,38901],{},"If you only have a plan as PDF or scan, Pro recognises a floor plan from it (see below). PlanElec does not currently read a single-line diagram from a PDF or photo.",[1489,38903],{":height":9155,":width":9156,"alt":9157,"caption":9158,"src":9159},[79,38905,38907],{"id":38906},"can-you-get-your-data-out-again-later","Can you get your data out again later?",[12,38909,38910],{},"A switch is only as good as the way back. This is what you can take out:",[138,38912,38913,38922],{},[141,38914,38915],{},[144,38916,38917,38919],{},[147,38918,4121],{},[147,38920,38921],{},"Output",[163,38923,38924,38934,38941],{},[144,38925,38926,38928],{},[168,38927,22],{},[168,38929,38930,38931,38933],{},"PDF in A4 or A3; SVG of diagram and situation plan; material list as CSV; the drawing itself via ",[15,38932,1441],{}," as a PlanElec project file",[144,38935,38936,38938],{},[168,38937,31],{},[168,38939,38940],{},"PDF of single-line diagram, situation plan, distribution board and self-check report, separately or as a dossier; circuit, material and cable lists as PDF and CSV (pilot); KNX addresses as files for ETS; the imported .trik original stays attached to the project",[144,38942,38943,38945],{},[168,38944,38568],{},[168,38946,38947],{},"PDF (vector, readable in AutoCAD according to the FAQ); material list as Excel; home automation export to Niko Home Control and Home Center; according to the FAQ, Trikker does not write DWG or DXF",[12,38949,38950],{},"PlanElec does not create .trik files. If you want to go back to Trikker, use your original .trik files; they remain unchanged. Neither vendor names an open exchange format for single-line diagrams between Belgian programs.",[79,38952,38954],{"id":38953},"what-works-without-internet","What works without internet?",[138,38956,38957,38969],{},[141,38958,38959],{},[144,38960,38961,38963,38966],{},[147,38962],{},[147,38964,38965],{},"Possible without a connection",[147,38967,38968],{},"Needs internet",[163,38970,38971,38982,38992],{},[144,38972,38973,38976,38979],{},[168,38974,38975],{},"Trikker (according to manual 2.0.4 and the FAQ)",[168,38977,38978],{},"draw and save, “for a while” after activation",[168,38980,38981],{},"activation, regular licence check, PDF creation on Trikker’s servers; after a long period offline, Trikker falls back to the demo",[144,38983,38984,38986,38989],{},[168,38985,22],{},[168,38987,38988],{},"if the connection drops, you keep drawing; the drawing stays in this browser and the PDF is created in the browser",[168,38990,38991],{},"cloud, handover to Pro, text recognition, opening .trik files",[144,38993,38994,38997,39003],{},[168,38995,38996],{},"PlanElec Pro (pilot)",[168,38998,38999,39000,39002],{},"keep editing floor plan, diagram and distribution board of a project opened online beforehand, once ",[15,39001,15135],{}," appears",[168,39004,39005],{},"export, uploads, AI features, new projects; storage space and mobile data can limit the scope",[12,39007,39008,39009,56],{},"PlanElec does not offer a fully offline editor. If you regularly work in basements or new builds without a connection, open the project online beforehand and check its status. Details: ",[40,39010,1468],{"href":1467},[79,39012,39014],{"id":39013},"what-does-the-switch-cost-over-12-months","What does the switch cost over 12 months?",[12,39016,39017],{},"The import itself is free. What you pay afterwards depends on how many people plan and how many properties you handle per year. Trikker charges per computer, PlanElec per subscription with three editing seats or per property.",[138,39019,39020,39032],{},[141,39021,39022],{},[144,39023,39024,39026,39029],{},[147,39025,2675],{},[147,39027,39028],{},"Trikker (annual licence, excl. VAT)",[147,39030,39031],{},"PlanElec (final price)",[163,39033,39034,39045,39055,39065,39076],{},[144,39035,39036,39039,39042],{},[168,39037,39038],{},"Only drawing diagram and plan",[168,39040,39041],{},"€360 per computer",[168,39043,39044],{},"Sketch free",[144,39046,39047,39050,39052],{},[168,39048,39049],{},"A few properties a year with distribution board or self-check report",[168,39051,39041],{},[168,39053,39054],{},"site pass € 15 per property, valid for twelve months",[144,39056,39057,39059,39062],{},[168,39058,12497],{},[168,39060,39061],{},"€360 (monthly: €540)",[168,39063,39064],{},"subscription € 290 per year",[144,39066,39067,39070,39073],{},[168,39068,39069],{},"Three people at the same time",[168,39071,39072],{},"€1,080 for three computers",[168,39074,39075],{},"subscription € 290 per year, three editing seats included",[144,39077,39078,39081,39084],{},[168,39079,39080],{},"Four people at the same time",[168,39082,39083],{},"€1,440 for four computers",[168,39085,39086],{},"€ 290 + € 120 for the fourth seat",[12,39088,39089],{},"Private customers add 21% VAT to Trikker’s prices; VAT-registered businesses count the net amount. PlanElec charges no VAT (small business exemption scheme); its amounts are final prices. From 20 properties a year, the PlanElec annual subscription costs less than separate site passes. During the transition, count both costs: as long as you finish dossiers in Trikker, the Trikker licence keeps running.",[79,39091,39093],{"id":39092},"what-does-planelec-do-differently-after-the-switch","What does PlanElec do differently after the switch?",[12,39095,39096],{},"With Pro you change more than your drawing program, you change how you work: instead of managing drawings, you manage one connected project. A new circuit affects protection, load, cable, location and documents; PlanElec Pro keeps these data in one model and derives the single-line diagram, situation plan and documents from it.",[1041,39098,39100],{"id":39099},"the-planelec-assistant-works-across-the-whole-project","The PlanElec assistant works across the whole project",[12,39102,39103,39104,39106,39107,39109],{},"You describe the task in your own words, for example “Place three sockets in the kitchen”, and the assistant carries it out with more than 100 planning commands across the whole project: floor plan, rooms, devices, circuits, switching chains, cables, distribution board, automation\u002FKNX, PV strings and lighting control. With ",[15,39105,13939],{}," you speak Dutch, French, German or English; you check the recognised text before sending (",[40,39108,23425],{"href":23424},"). Three rules apply:",[84,39111,39112,39118,39126],{},[87,39113,39114,39117],{},[15,39115,39116],{},"Checked:"," after every change, PlanElec checks the project with the same AREI\u002FRGIE self-check as the report.",[87,39119,39120,39123,39124,56],{},[15,39121,39122],{},"Reversible:"," every change is one step you take back with ",[15,39125,13947],{},[87,39127,39128,39131,39132,56],{},[15,39129,39130],{},"Confirmed:"," the assistant starts risky actions only after ",[15,39133,13704],{},[12,39135,39136,39137,56],{},"The language model runs in the EU region; the AI provider does not store your requests or train on them. ",[40,39138,13484],{"href":13483},[1041,39140,39142],{"id":39141},"recognise-a-floor-plan-from-a-trikker-pdf-or-scan","Recognise a floor plan from a Trikker PDF or scan",[12,39144,39145],{},"A plan you print from Trikker as PDF can be read by PlanElec Pro as a floor plan:",[3139,39147,39148,39154,39160,39165],{},[87,39149,39150,39151,39153],{},"Place the PDF in the project under ",[15,39152,10173],{}," (PDF, PNG, JPEG or WebP).",[87,39155,39156,39157,39159],{},"Start ",[15,39158,14073],{}," in the preview. PlanElec reads vector PDFs from their vector data, scans and photos via AI image recognition.",[87,39161,39162,39163,56],{},"Confirm the scale, compare rooms and areas and adjust under ",[15,39164,19605],{},[87,39166,39167,39168,39170],{},"Transfer to an empty floor with ",[15,39169,12394],{},"; ⌘Z \u002F Ctrl+Z undoes the whole transfer.",[12,39172,39173,39174,56],{},"Walls, rooms with area, doors and windows, supported device symbols (socket, double socket, splash-proof socket, switch, light point) and the scale are carried over. Without a confirmed scale, the transfer stays locked. ",[40,39175,9462],{"href":9461},[1041,39177,39179],{"id":39178},"start-with-the-single-line-diagram-as-usual","Start with the single-line diagram as usual",[12,39181,5777,39182,22023,39185,39187,39188,56],{},[15,39183,39184],{},"Planning approach",[15,39186,14060],{}," when you create the project. The diagram opens large, main distribution board and installation head are ready, and you place symbols directly. As long as no floor plan is drawn, spatial checks do not block the diagram or the self-check report. For new domestic installations, however, the AREI\u002FRGIE requires a single-line diagram and a situation plan (subsection 3.1.2.1 a); you add the floor plan later in the same project. ",[40,39189,15677],{"href":15676},[1041,39191,39193],{"id":39192},"fill-a-distribution-board-from-photos","Fill a distribution board from photos",[12,39195,39196,39197,39199,39200,14070,39202,39204,39205,39207,39208,39210],{},"In the distribution board editor, under ",[15,39198,14086],{},", you upload pictures with ",[15,39201,18926],{},[15,39203,14090],{},". PlanElec recognises visible DIN modules with row, start position, width and type; after ",[15,39206,19003],{}," you transfer them to an empty board with ",[15,39209,19188],{},". A photo does not show the wiring; you make that assignment yourself.",[1041,39212,39214],{"id":39213},"planning-suggestions-pv-and-knx","Planning suggestions, PV and KNX",[12,39216,39217,39218,39220,39221,1487],{},"Rooms start with a suggested set of devices; switching chains, circuit assignment, cable suggestions, phase balancing and cable routes along walls all stay editable (",[40,39219,20800],{"href":14100},"). For PV you assign strings to MPPTs and document modules, DC protection and cable sections. The KNX pilot places power supply, actuators, push-buttons and channels on the single-line diagram and exports suggested addresses for ETS; device programming stays in ETS (",[40,39222,39223],{"href":6126},"KNX scope and limits",[1041,39225,39227],{"id":39226},"dossier-team-and-several-devices","Dossier, team and several devices",[12,39229,39230,39231,39234,39235,39238],{},"You bundle single-line diagram, situation plan, distribution board PDF and self-check report with cover page, table of contents, page numbering and company logo. Versioned exports get private archive storage and a revocable QR link; it proves the origin and integrity of the file, not the inspection (",[40,39232,39233],{"href":4645},"Understand document exports","). A fictional ",[40,39236,39237],{"href":14164},"English pilot dossier PDF"," shows the result. In a team, you share projects by invitation with roles for managing, editing and reading; live synchronisation aligns open sessions, including your own on several devices. Try Pro covers one person without an organisation.",[79,39240,39242],{"id":39241},"when-is-it-better-to-stay-with-trikker","When is it better to stay with Trikker?",[12,39244,39245],{},"Trikker also keeps diagram and situation plan together through linked symbols and offers an established desktop routine. Stay with Trikker if you:",[84,39247,39248,39251,39254,39257,39260],{},[87,39249,39250],{},"regularly draw for long periods without a connection and create the PDF later,",[87,39252,39253],{},"want to keep an established desktop workflow with local CAD backgrounds,",[87,39255,39256],{},"export home automation with addresses to Niko Home Control or Home Center,",[87,39258,39259],{},"want to read old diagrams from scans or photos with the Schema reader (beta),",[87,39261,39262],{},"work on a fixed computer and need no team features.",[12,39264,39265,39266,56],{},"For an overview of other programs, see ",[40,39267,12052],{"href":12051},[79,39269,39271],{"id":39270},"test-task-30-minutes-with-your-own-files","Test task: 30 minutes with your own files",[12,39273,39274],{},"Test the switch on your own work rather than on a demo:",[3139,39276,39277,39289,39295,39303],{},[87,39278,39279,23704,39282,39285,39286,39288],{},[15,39280,39281],{},"5 minutes:",[40,39283,22],{"href":1456,"rel":39284},[1458],", open a typical .trik file with a sub-distribution board using ",[15,39287,38723],{},". Read the import report.",[87,39290,39291,39294],{},[15,39292,39293],{},"10 minutes:"," compare circuits, protective devices and cables with your Trikker printout. Change one circuit and create the PDF.",[87,39296,39297,39299,39300,39302],{},[15,39298,39293],{}," take the drawing over with ",[15,39301,1482],{}," (free account, Try Pro) and open the distribution board and the self-check report. Note which findings stem from missing input.",[87,39304,39305,39307,39308,39310],{},[15,39306,39281],{}," import three more files with ",[15,39309,1486],{}," and read the reports.",[12,39312,39313],{},"If the result is good for your typical files, the archive import is worth it. If important symbols are missing, send us the location from the report.",[79,39315,39317],{"id":39316},"frequently-asked-questions-about-switching-from-trikker","Frequently asked questions about switching from Trikker",[1041,39319,39321],{"id":39320},"is-trikker-free","Is Trikker free?",[12,39323,39324,39325,39328,39329,39331],{},"No. According to the vendor, Trikker costs €45 per month or €360 per year excl. VAT, per computer (as of 16 November 2026). You can keep drawing for free in ",[40,39326,22],{"href":1456,"rel":39327},[1458],": single-line diagram and situation plan in the browser, also on Mac and tablet. You open a ",[25,39330,27],{}," file there without an account.",[1041,39333,39335],{"id":39334},"can-i-take-over-my-whole-trikker-archive","Can I take over my whole Trikker archive?",[12,39337,39338,39339,39341,39342,56],{},"Yes. With ",[15,39340,1486],{}," you upload up to 500 files per run, as a selection, folder or ZIP of up to 200 MB. Each file becomes a project with single-line diagram and situation plan; duplicates are skipped. This works with any signed-in account, including Try Pro; you do not need a subscription. What exactly carries over is listed in the report and in ",[40,39343,1486],{"href":42},[1041,39345,39347],{"id":39346},"does-trikker-now-run-on-a-mac","Does Trikker now run on a Mac?",[12,39349,39350,39351,56],{},"Yes, according to Trikker, since version 2.0 on 13 November 2026 and out of beta: on macOS 13 (Ventura) or later and only on Macs with Apple silicon (M1 or newer), without Parallels or Boot Camp. According to the FAQ, Trikker does not support Intel Macs. A web version for browser and tablet is due to appear as a beta in 2026. PlanElec runs in the browser without installation, including on older Macs and on tablets. More on Trikker 2.0: ",[40,39352,12996],{"href":12995},[1041,39354,39356],{"id":39355},"what-happens-to-my-trikker-licence","What happens to my Trikker licence?",[12,39358,39359],{},"Nothing, as long as you do not cancel it. Importing into PlanElec does not change your .trik files, and Trikker keeps working alongside. According to the pricing page, monthly and annual licences renew automatically and can be cancelled in the customer portal until just before renewal. Cancel only once your dossiers in progress are finished.",[1041,39361,39363],{"id":39362},"what-does-the-switch-cost","What does the switch cost?",[12,39365,39366],{},"The import is free. After that you pay only for what you use in PlanElec: Sketch is free, Pro costs a site pass of € 15 per property or € 29 per month or € 290 per year with three editing seats. According to the vendor, Trikker costs €360 per year excl. VAT per computer. The calculation for one to four people is in the table above.",[1041,39368,39370],{"id":39369},"can-planelec-read-a-single-line-diagram-from-a-pdf-or-photo","Can PlanElec read a single-line diagram from a PDF or photo?",[12,39372,39373],{},"Not currently. PlanElec takes over single-line diagrams from .trik files and recognises a floor plan with rooms, doors, windows and supported device symbols from a PDF, scan or image. You then plan the diagram in the project, with the assistant and planning suggestions. Trikker offers its licence holders the Schema reader (beta) for this.",[1041,39375,39377],{"id":39376},"can-i-go-back-to-trikker-if-planelec-does-not-suit-me","Can I go back to Trikker if PlanElec does not suit me?",[12,39379,39380],{},"Yes, with your original .trik files, which the import does not change; in Pro the original is also attached to the project. PlanElec does not create a .trik file from a PlanElec project. What you newly plan in PlanElec you take with you as PDF, SVG (Sketch) or CSV list.",[1041,39382,39384],{"id":39383},"does-the-self-check-report-replace-the-official-inspection","Does the self-check report replace the official inspection?",[12,39386,39387,39388,56],{},"No, each has its own role. The self-check report in Pro assesses the supported rules that can be checked from your input and shows missing data and coverage gaps. Professional design, on-site conditions and measurements are your responsibility; the official inspection (keuring) is carried out by the approved inspection body. ",[40,39389,39390],{"href":1085},"Supported checks and limits",[79,39392,39394],{"id":39393},"sources-and-date-checked","Sources and date checked",[12,39396,39397,39398,39400],{},"We have not bought or tested Trikker ourselves. Where the vendor says nothing, we write “not stated” or “not described”; that does not mean the feature is missing. Information about PlanElec comes from the documented product scope and the help articles. Spotted a mistake? Write to ",[40,39399,1612],{"href":1611}," and we will correct the line and the date.",[12,39402,39403],{},"All Trikker pages were checked on 16 November 2026. On that day, the trikker.be home page still mentioned the macOS beta; here we follow the more recent announcement of 13 November 2026 and the FAQ.",[84,39405,39406,39421,39427,39433,39443],{},[87,39407,1892,39408,1774,39412,1774,39415,1774,39418],{},[40,39409,39411],{"href":1895,"rel":39410},[1458],"pricing and licence terms",[40,39413,1862],{"href":1899,"rel":39414},[1458],[40,39416,1708],{"href":11880,"rel":39417},[1458],[40,39419,1718],{"href":1913,"rel":39420},[1458],[87,39422,1892,39423,39426],{},[40,39424,1910],{"href":1908,"rel":39425},[1458],", chapters on offline work, PDF creation, background formats, material list and export",[87,39428,1892,39429],{},[40,39430,39432],{"href":1903,"rel":39431},[1458],"announcement of Trikker 2.0 for Windows and macOS, 13 November 2026",[87,39434,1892,39435,3157,39439],{},[40,39436,39438],{"href":12954,"rel":39437},[1458],"Schema reader (beta)",[40,39440,39442],{"href":12959,"rel":39441},[1458],"describing and dictating",[87,39444,1955,39445,1774,39447,1774,39449,1774,39451],{},[40,39446,13474],{"href":54},[40,39448,1486],{"href":42},[40,39450,1468],{"href":1467},[40,39452,39233],{"href":4645},[79,39454,13051],{"id":13050},[84,39456,39457,39461,39466,39470,39474],{},[87,39458,39459],{},[40,39460,8575],{"href":4802},[87,39462,39463],{},[40,39464,39465],{"href":1989},"Trikker, PlanElec Sketch or PlanElec Pro: which tool for which task?",[87,39467,39468],{},[40,39469,12052],{"href":12051},[87,39471,39472],{},[40,39473,12996],{"href":12995},[87,39475,39476],{},[40,39477,4763],{"href":4762},[79,39479,2009],{"id":2008},[12,39481,39482,39483,39485],{},"Open one of your ",[25,39484,27],{}," files in Sketch and read the import report; it costs nothing and leaves your Trikker file unchanged.",[84,39487,39488,39495],{},[87,39489,39490,38,39492,2024],{},[15,39491,2019],{},[40,39493,2023],{"href":1456,"rel":39494},[1458],[87,39496,39497,38,39499,2033,39501,56],{},[15,39498,2029],{},[40,39500,2032],{"href":1964},[40,39502,2036],{"href":54},[12,39504,39505,2042],{},[15,39506,2041],{},{"title":2044,"searchDepth":2045,"depth":2045,"links":39508},[39509,39510,39511,39512,39513,39514,39515,39516,39517,39525,39526,39527,39537,39538,39539],{"id":38521,"depth":2045,"text":38522},{"id":38554,"depth":2045,"text":38555},{"id":38686,"depth":2045,"text":38687},{"id":38769,"depth":2045,"text":38770},{"id":38825,"depth":2045,"text":38826},{"id":38906,"depth":2045,"text":38907},{"id":38953,"depth":2045,"text":38954},{"id":39013,"depth":2045,"text":39014},{"id":39092,"depth":2045,"text":39093,"children":39518},[39519,39520,39521,39522,39523,39524],{"id":39099,"depth":2053,"text":39100},{"id":39141,"depth":2053,"text":39142},{"id":39178,"depth":2053,"text":39179},{"id":39192,"depth":2053,"text":39193},{"id":39213,"depth":2053,"text":39214},{"id":39226,"depth":2053,"text":39227},{"id":39241,"depth":2045,"text":39242},{"id":39270,"depth":2045,"text":39271},{"id":39316,"depth":2045,"text":39317,"children":39528},[39529,39530,39531,39532,39533,39534,39535,39536],{"id":39320,"depth":2053,"text":39321},{"id":39334,"depth":2053,"text":39335},{"id":39346,"depth":2053,"text":39347},{"id":39355,"depth":2053,"text":39356},{"id":39362,"depth":2053,"text":39363},{"id":39369,"depth":2053,"text":39370},{"id":39376,"depth":2053,"text":39377},{"id":39383,"depth":2053,"text":39384},{"id":39393,"depth":2045,"text":39394},{"id":13050,"depth":2045,"text":13051},{"id":2008,"depth":2045,"text":2009},"2026-08-22","Trikker costs €45 a month excl. VAT per computer. PlanElec Sketch is free in the browser, also on Mac: open .trik files without an account. Plus Pro and steps.",[2115,1373,2117,2118],"2026-11-19",{},"\u002Fblog\u002Ftrikker-alternative.en","15 min",{"title":1984,"description":39541},"Trikker alternative: free, also on Mac and tablet","trikker-alternative","blog\u002Ftrikker-alternative.en",[329,7417,1387,5269,2132,14434,2133,2134,11546,6280],"O4WoWft25FsiSKIq5jTgFXEB5z0mcgrR3i2jUllt0PA","\u002Fblog\u002Ftrikker-alternative",{"id":39555,"title":9462,"body":39556,"category":10304,"description":40281,"extension":2113,"guideId":40282,"image":40283,"locale":2119,"meta":40284,"navigation":2121,"order":40285,"path":40286,"publishedAt":40287,"readTime":8562,"seo":40288,"seoTitle":10313,"slug":40289,"stem":40290,"tags":40291,"updatedAt":16792,"__hash__":40295,"kind":3594,"href":40296,"date":40287,"labels":40297},"help\u002Fhelp\u002Ffloorplan-import-calibration.en.md",{"type":9,"value":39557,"toc":40269},[39558,39565,39569,39576,39580,39598,39636,39687,39690,39695,39699,39702,39770,39797,39800,39805,39809,39816,39842,39845,39849,39853,39863,39872,39877,39881,39909,39912,39943,39946,39950,39960,39963,39977,39982,39987,39991,39994,40069,40074,40079,40083,40086,40120,40123,40128,40132,40138,40168,40174,40184,40199,40257,40261,40264],[12,39559,39560,39561,39564],{},"An imported plan is a ",[15,39562,39563],{},"reference layer"," in PlanElec. You need an existing floor and a PNG, JPEG, WebP, PDF or DXF file. After import and calibration, the plan sits to scale under your drawing; you draw walls, rooms and electrical symbols over it as editable PlanElec data. That keeps an export legible even if you later hide or replace the original plan. If you would rather not trace walls and rooms yourself, AI can recognise them from a PDF or image as a proposal; the section \"Let PlanElec recognise the floor plan automatically\" explains how.",[12,39566,39567],{},[40,39568],{"id":10317},[1489,39570],{":height":39571,":width":39572,"alt":39573,"caption":39574,"src":39575},"614","768","Add-floor-plans dialog with file selection and import queue.","Before uploading, check file type, floor assignment and, where applicable, the selected pages or crops.","\u002Fhelp\u002Fworkflows\u002Fen-import-plan.png",[79,39577,39579],{"id":39578},"how-do-i-import-a-plan-reference","How do I import a plan reference?",[12,39581,3370,39582,39584,39585,39588,39589,39592,39593,3116,39595,39597],{},[15,39583,13345],{}," mode, select ",[15,39586,39587],{},"Floor Plans"," in the toolbar and then ",[15,39590,39591],{},"Add floor plan",". On an empty floor, ",[15,39594,20692],{},[15,39596,19577],{}," start dialog opens the same import dialog – for images, PDFs and DXF alike.",[3139,39599,39600,39610,39613,39616,39630],{},[87,39601,39602,39603,39606,39607,39609],{},"Drag the files into the ",[15,39604,39605],{},"Add floor plans"," dialog or use ",[15,39608,8764],{},". PNG, JPEG, WebP, PDF, DXF and DWG can be selected together.",[87,39611,39612],{},"For a PDF, select the pages you need; for a DXF or DWG, confirm the drawing unit and deselect layers you do not need.",[87,39614,39615],{},"Mark the sections if needed (see below).",[87,39617,39618,39619,39622,39623,39626,39627,56],{},"Check the floor assignment in the ",[15,39620,39621],{},"Import queue"," and finish with ",[15,39624,39625],{},"Upload layers",". A file that failed can be retried on its own with ",[15,39628,39629],{},"Try again",[87,39631,27184,39632,39635],{},[15,39633,39634],{},"Set up"," for a layer to open the layer workbench.",[138,39637,39638,39647],{},[141,39639,39640],{},[144,39641,39642,39645],{},[147,39643,39644],{},"Limit per run",[147,39646,8667],{},[163,39648,39649,39656,39664,39671,39679],{},[144,39650,39651,39653],{},[168,39652,21162],{},[168,39654,39655],{},"up to 20",[144,39657,39658,39661],{},[168,39659,39660],{},"Total size",[168,39662,39663],{},"up to 100 MB",[144,39665,39666,39668],{},[168,39667,8065],{},[168,39669,39670],{},"up to 25 MB and 50 pages",[144,39672,39673,39676],{},[168,39674,39675],{},"DXF",[168,39677,39678],{},"up to 30 MB",[144,39680,39681,39684],{},[168,39682,39683],{},"DWG",[168,39685,39686],{},"AutoCAD R13 to 2018, converted to DXF",[12,39688,39689],{},"DXF is processed in the browser as a reference image. Model Space and the selected layers are taken into account.",[12,39691,39692],{},[40,39693],{"id":39694},"dwg-dxf",[79,39696,39698],{"id":39697},"import-dwg-or-dxf-what-is-taken-over","Import DWG or DXF: what is taken over?",[12,39700,39701],{},"Import CAD plans from architects directly as DXF or DWG. PlanElec converts a DWG file to DXF automatically during import and turns the drawing into a scaled reference image. The scale comes from the drawing unit, so calibrating with a reference distance is usually not needed.",[138,39703,39704,39712],{},[141,39705,39706],{},[144,39707,39708,39710],{},[147,39709,2179],{},[147,39711,10693],{},[163,39713,39714,39730,39738,39746,39754,39762],{},[144,39715,39716,39719],{},[168,39717,39718],{},"Which DWG versions?",[168,39720,39721,39722,39725,39726,39729],{},"AutoCAD R13 to 2018. During conversion the dialog shows ",[15,39723,39724],{},"Converting DWG …","; afterwards the card says ",[15,39727,39728],{},"Converted from DWG"," with the version.",[144,39731,39732,39735],{},[168,39733,39734],{},"Which DXF?",[168,39736,39737],{},"ASCII DXF up to 30 MB. Export a binary DXF as ASCII DXF from your CAD program.",[144,39739,39740,39743],{},[168,39741,39742],{},"What is drawn?",[168,39744,39745],{},"Lines, polylines, circles, arcs, ellipses and splines from model space, including those inside blocks",[144,39747,39748,39751],{},[168,39749,39750],{},"What is not?",[168,39752,39753],{},"Text, dimensions and hatches, and paper space (layouts)",[144,39755,39756,39759],{},[168,39757,39758],{},"Which units?",[168,39760,39761],{},"mm, cm, m, inches and feet. If the unit is missing, PlanElec estimates it from the dimensions or asks you once.",[144,39763,39764,39767],{},[168,39765,39766],{},"Which layers?",[168,39768,39769],{},"Deselect layers you do not need before uploading, such as furniture or title blocks.",[3139,39771,39772,39775,39784,39787,39792],{},[87,39773,39774],{},"Export or save the floor plan in your CAD program as DWG (R13 to 2018) or as ASCII DXF. Ideally put each storey in its own file or its own area of model space.",[87,39776,3361,39777,21942,39779,5259,39781,39783],{},[15,39778,13345],{},[15,39780,39587],{},[15,39782,39591],{}," and drag the file into the dialog.",[87,39785,39786],{},"Check the detected drawing unit and deselect layers you do not need.",[87,39788,39789,39790,56],{},"Assign the floor and finish with ",[15,39791,39625],{},[87,39793,4055,39794,39796],{},[15,39795,39634],{},", check a known distance and set rotation and position.",[12,39798,39799],{},"If the dialog reports that the DWG version is not supported, that conversion failed or is currently unavailable, save the drawing as DXF in your CAD program and import that file. Automatic floor plan recognition works with PDFs and images; trace a DWG or DXF plan as a scaled reference.",[12,39801,39802],{},[40,39803],{"id":39804},"sections",[79,39806,39808],{"id":39807},"split-several-floor-plans-on-one-sheet","Split several floor plans on one sheet",[12,39810,39811,39812,39815],{},"Architects' drawings often carry the ground floor, upper floor and attic on the same page. In the ",[15,39813,39814],{},"Mark sections"," step, drag a rectangle around each floor plan – every rectangle becomes its own floor plan that you assign to its own storey.",[84,39817,39818,39824,39830,39836],{},[87,39819,39820,39823],{},[15,39821,39822],{},"Without a marking",", the whole page is used.",[87,39825,39826,39829],{},[15,39827,39828],{},"Name each section"," in the list below the preview. Every section of one sheet carries the same file name; only the name tells them apart in the queue and in the floor plan list.",[87,39831,39832,39835],{},[15,39833,39834],{},"Sections, elevations and title blocks stay unmarked."," Only what carries a rectangle is imported.",[87,39837,39838,39841],{},[15,39839,39840],{},"The section is applied while rasterising."," It is therefore rendered sharper than the same area within a fully imported page.",[12,39843,39844],{},"A rectangle can be moved after being drawn and resized at its corners. The arrows above the preview page through the selected pages; markings apply per page.",[12,39846,39847],{},[40,39848],{"id":69},[79,39850,39852],{"id":39851},"the-source-file-stays-in-the-project","The source file stays in the project",[12,39854,39855,39856,7814,39859,39862],{},"The uploaded file is kept and listed at the bottom of the ",[15,39857,39858],{},"Floor plans",[15,39860,39861],{},"Source files",". Several floor plans from one sheet reference the same file; it is stored only once.",[12,39864,39865,39866,39868,39869,39871],{},"For a survey of an existing installation or a keuring (the official Belgian inspection), the architect's drawing thus stays with the project as the basis of the documentation. If you need another section later, for instance because a storey was missed during the first import, upload the file again with ",[15,39867,39591],{}," and mark the section; cutting a section directly from the ",[15,39870,39861],{}," list is not available yet.",[12,39873,39874],{},[40,39875],{"id":39876},"calibrate",[79,39878,39880],{"id":39879},"set-scale-rotation-and-position","Set scale, rotation and position",[12,39882,4361,39883,39886,39887,1774,39890,1774,39892,3157,39894,39897,39898,39900,39901,39903,39904,23742,39906,39908],{},[15,39884,39885],{},"Set up layer"," workbench has the steps ",[15,39888,39889],{},"Crop",[15,39891,15963],{},[15,39893,19529],{},[15,39895,39896],{},"Position",". If the floor plan comes from a marked section, it starts at ",[15,39899,15963],{}," – the area was already defined during import. ",[15,39902,39889],{}," stays available for edge corrections. Panning and zooming remain available while the workbench is open, but drawing tools are locked. Your changes remain a draft until you select ",[15,39905,20618],{},[15,39907,17083],{}," discards them.",[12,39910,39911],{},"Calibrate an image or PDF layer with a known distance:",[3139,39913,39914,39926,39932,39935,39938],{},[87,39915,11757,39916,39918,39919,39921,39922,39925],{},[15,39917,19529],{}," step, or select ",[15,39920,20614],{}," in the toolbar (",[15,39923,39924],{},"Recalibrate"," for a layer that is already calibrated).",[87,39927,27184,39928,39931],{},[15,39929,39930],{},"Set reference length"," and place two points on a distance whose real length you know, for example between two dimension lines.",[87,39933,39934],{},"Enter the length in metres and check the preview.",[87,39936,39937],{},"If necessary, align the reference edge horizontally or vertically.",[87,39939,27184,39940,39942],{},[15,39941,20618],{}," only after checking the result.",[12,39944,39945],{},"For a DXF, PlanElec takes the scale from the drawing unit. If the file names no unit, PlanElec infers it from the dimensions or asks you once. The scale source stays visible in the workbench. Recalibrate manually whenever a known dimension does not match.",[79,39947,39949],{"id":39948},"continue-drawing-on-the-reference","Continue drawing on the reference",[12,39951,39952,39953,3324,39956,39959],{},"Adjust the layer's opacity and crop if required. Then draw closed exterior and interior walls with ",[15,39954,39955],{},"Polygon",[15,39957,39958],{},"Rectangle",". PlanElec derives rooms from the closed wall outlines; devices and cable routes use this editable wall graph, not pixels in the reference.",[12,39961,39962],{},"Check the following before planning the electrical installation:",[84,39964,39965,39968,39971,39974],{},[87,39966,39967],{},"Do one or more known dimensions match the configured scale?",[87,39969,39970],{},"Is the plan rotated and positioned correctly?",[87,39972,39973],{},"Are only relevant layers visible, without dimension chains or title blocks getting in the way?",[87,39975,39976],{},"Have exterior and interior walls been traced as PlanElec walls?",[12,39978,39979,39980,56],{},"For multiple floors, set up each floor separately. Aligning floors to each other is a separate task and does not replace calibration of an imported layer; see ",[40,39981,20108],{"href":16037},[12,39983,39984],{},[40,39985],{"id":39986},"recognize",[79,39988,39990],{"id":39989},"let-planelec-recognise-the-floor-plan-automatically","Let PlanElec recognise the floor plan automatically",[12,39992,39993],{},"Instead of tracing, you can have walls and rooms recognised from a plan. The result is a proposal that you review before it is applied to the floor.",[138,39995,39996,40004],{},[141,39997,39998],{},[144,39999,40000,40002],{},[147,40001,2179],{},[147,40003,10693],{},[163,40005,40006,40022,40030,40038,40050,40061],{},[144,40007,40008,40011],{},[168,40009,40010],{},"Where do I start?",[168,40012,40013,40014,40016,40017,40019,40020],{},"On an empty floor with ",[15,40015,19582],{}," in the start dialog, or for a stored file in the ",[15,40018,10173],{}," panel with ",[15,40021,14073],{},[144,40023,40024,40027],{},[168,40025,40026],{},"Which files?",[168,40028,40029],{},"PDF, PNG, JPEG and WebP; not DXF",[144,40031,40032,40035],{},[168,40033,40034],{},"What is recognised?",[168,40036,40037],{},"Walls, rooms with their area, doors and windows, and supported device symbols such as sockets, switches and light points",[144,40039,40040,40043],{},[168,40041,40042],{},"Where do I review it?",[168,40044,3370,40045,40047,40048],{},[15,40046,19461],{}," panel: rooms, openings, devices, questions and ",[15,40049,19529],{},[144,40051,40052,40055],{},[168,40053,40054],{},"What do I need?",[168,40056,40057,40058,40060],{},"Edit rights in the project, an empty target floor and a confirmed scale – without ",[15,40059,19810],{},", applying the proposal stays blocked",[144,40062,40063,40066],{},[168,40064,40065],{},"What is not imported?",[168,40067,40068],{},"Circuits, the single-line diagram and symbols that cannot be matched",[12,40070,40071,40072],{},"For recognition, the page is sent to an external AI provider for analysis; each run uses your AI allowance. If recognition finds no usable floor plan, the plan is ready as a template to trace and you continue as described above. The full process, including the correction editor, is covered in ",[40,40073,19446],{"href":9465},[12,40075,40076],{},[40,40077],{"id":40078},"replace",[79,40080,40082],{"id":40081},"replace-a-floor-plan-how-do-i-bring-in-a-new-plan-version","Replace a floor plan: how do I bring in a new plan version?",[12,40084,40085],{},"When the architect sends a new plan version, add it as an extra layer on the same floor, set it up, and then delete the old underlay. Your walls, rooms and devices stay unchanged, and you compare them directly with the new plan.",[3139,40087,40088,40098,40104,40114,40117],{},[87,40089,3361,40090,16218,40092,40094,40095,40097],{},[15,40091,13345],{},[15,40093,39858],{}," panel and choose ",[15,40096,39591],{},". Import the new file onto the same floor.",[87,40099,40100,40101,40103],{},"The new layer becomes active. Open ",[15,40102,39634],{}," and set scale, rotation and position; calibration and placement of the old layer are not carried over.",[87,40105,40106,40107,6975,40110,40113],{},"Compare both plans: hide a layer with the eye icon or lower the ",[15,40108,40109],{},"Opacity",[15,40111,40112],{},"Activate"," switches the active layer.",[87,40115,40116],{},"Adjust walls and devices where the plan has changed.",[87,40118,40119],{},"Delete the old layer with the trash icon, as described below.",[12,40121,40122],{},"A floor holds up to 10 floor plan layers. A dedicated button to replace a layer while keeping its calibration is not available yet; the extra-layer route lets you compare the old and new version before deleting.",[12,40124,40125],{},[40,40126],{"id":40127},"delete",[79,40129,40131],{"id":40130},"delete-a-floor-plan-how-do-i-remove-an-underlay","Delete a floor plan: how do I remove an underlay?",[12,40133,40134,40135,40137],{},"You delete an imported floor plan (image, PDF page or DXF, also called plan, underlay or reference layer) in the ",[15,40136,39858],{}," panel. The walls, rooms and devices you drew stay in place; only the reference layer is removed.",[3139,40139,40140,40153,40158],{},[87,40141,3361,40142,16218,40144,40146,40147,40149,40150,1487],{},[15,40143,13345],{},[15,40145,39858],{}," panel for the current floor with the ",[15,40148,39587],{}," button in the toolbar (group ",[15,40151,40152],{},"Building & floors",[87,40154,40155,40156,56],{},"In the card of the floor plan you want to remove, choose the red trash icon next to ",[15,40157,39634],{},[87,40159,40160,40161,40164,40165,56],{},"Confirm the ",[15,40162,40163],{},"Delete image?"," dialog with ",[15,40166,40167],{},"Delete",[12,40169,40170,40171,40173],{},"The layer is removed and retained for 7 days for recovery or undo. Right afterwards you bring it back with ",[15,40172,13947],{}," (arrow at the top right or Ctrl+Z, Mac: Cmd+Z). The panel has no separate trash with a restore button. If the deleted floor plan was active, the next floor plan of that floor becomes active.",[12,40175,40176,40177,40180,40181,40183],{},"If you only want the underlay out of sight for a while, hide it with the eye icon (",[15,40178,40179],{},"Hide layer",") or lower the ",[15,40182,40109],{}," instead of deleting it.",[12,40185,40186,40188,40189,40191,40192,40194,40195,40198],{},[15,40187,39861],{}," stay in the project when you delete a layer; the ",[15,40190,39858],{}," panel has no delete button for them. Every uploaded plan is also listed in the ",[15,40193,10173],{}," panel. Removing a file there with ",[15,40196,40197],{},"Delete permanently"," is irreversible.",[138,40200,40201,40210],{},[141,40202,40203],{},[144,40204,40205,40208],{},[147,40206,40207],{},"What should go?",[147,40209,3913],{},[163,40211,40212,40222,40235,40246],{},[144,40213,40214,40217],{},[168,40215,40216],{},"Only the floor plan of one floor",[168,40218,40219,40221],{},[15,40220,39858],{}," panel → trash icon",[144,40223,40224,40227],{},[168,40225,40226],{},"The whole floor with all its data",[168,40228,40229,40230,5259,40232],{},"Floor rail → ",[15,40231,21847],{},[15,40233,40234],{},"Delete …",[144,40236,40237,40240],{},[168,40238,40239],{},"The whole project from the list",[168,40241,40242,40243],{},"Project menu → ",[15,40244,40245],{},"Archive",[144,40247,40248,40251],{},[168,40249,40250],{},"Start over completely",[168,40252,40253],{},[40,40254,40256],{"href":40255},"\u002Fen\u002Fhelp\u002Fgetting-started#start-over","Start over",[79,40258,40260],{"id":40259},"what-importing-does-not-do","What importing does not do",[12,40262,40263],{},"A manual import only places a reference layer under your drawing. Rooms only exist once you draw the walls on it or apply a reviewed recognition proposal. Neither import nor recognition determines an electrical installation or produces an official survey. Check dimensions, wall layout and the real installation before placing symbols or exporting documents.",[12,40265,40266,40267,56],{},"Next: ",[40,40268,16745],{"href":16744},{"title":2044,"searchDepth":2045,"depth":2045,"links":40270},[40271,40272,40273,40274,40275,40276,40277,40278,40279,40280],{"id":39578,"depth":2045,"text":39579},{"id":39697,"depth":2045,"text":39698},{"id":39807,"depth":2045,"text":39808},{"id":39851,"depth":2045,"text":39852},{"id":39879,"depth":2045,"text":39880},{"id":39948,"depth":2045,"text":39949},{"id":39989,"depth":2045,"text":39990},{"id":40081,"depth":2045,"text":40082},{"id":40130,"depth":2045,"text":40131},{"id":40259,"depth":2045,"text":40260},"Use an image, PDF or DXF drawing as a scale-accurate reference, align the layer and draw the editable floor plan over it – or let AI propose walls and rooms.","floorplan-import-calibration","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Ffloorplan-import-calibration-en.webp",{},5,"\u002Fhelp\u002Ffloorplan-import-calibration.en","2026-08-21",{"title":9462,"description":40281},"import-and-calibrate-a-floor-plan","help\u002Ffloorplan-import-calibration.en",[40292,8065,39675,40293,19879,40294],"floor plan import","calibration","layer workbench","JwS82GNlmbRYsfHsZczkLL7Ap9GwgHordfN9NM-YnhU","\u002Fhelp\u002Fimport-and-calibrate-a-floor-plan",[],{"id":40299,"title":16745,"body":40300,"category":10304,"description":40944,"extension":2113,"guideId":40945,"image":40946,"locale":2119,"meta":40947,"navigation":2121,"order":5426,"path":40948,"publishedAt":40287,"readTime":8562,"seo":40949,"seoTitle":10313,"slug":40950,"stem":40951,"tags":40952,"updatedAt":21786,"__hash__":40957,"kind":3594,"href":40958,"date":40287,"labels":40959},"help\u002Fhelp\u002Fplace-and-connect-symbols.en.md",{"type":9,"value":40301,"toc":40929},[40302,40309,40314,40321,40325,40330,40344,40347,40352,40356,40377,40458,40462,40484,40487,40491,40513,40523,40528,40532,40537,40610,40620,40630,40633,40637,40646,40656,40659,40663,40669,40689,40693,40703,40720,40725,40729,40732,40735,40738,40760,40763,40768,40772,40778,40878,40891,40895,40909,40914,40918,40924],[12,40303,40304,40305,40308],{},"A symbol on the floor plan first describes its ",[15,40306,40307],{},"physical location",". Linking it to the electrical topology turns it into an assigned consumer or item of equipment for a circuit, diagram and documents.",[12,40310,40311],{},[40,40312],{"id":40313},"place",[1489,40315],{":height":40316,":width":40317,"alt":40318,"caption":40319,"src":40320},"51","926","Tool palette with the available electrical symbols for the selected room.","The palette is the starting point for placement; position, orientation and symbol variant still need review.","\u002Fhelp\u002Fworkflows\u002Fen-device-palette.png",[79,40322,40324],{"id":40323},"place-symbols-from-the-palette","Place symbols from the palette",[12,40326,3361,40327,40329],{},[15,40328,13345],{},", open the tool palette and select a socket, switch, light, fixed appliance, box or distribution board. The tool icons are shown in the palette; pointing at one shows its name.",[3139,40331,40332,40335,40338,40341],{},[87,40333,40334],{},"Select the symbol tool.",[87,40336,40337],{},"Place wall-mounted devices on the correct side of the wall. Sockets and switches snap to walls.",[87,40339,40340],{},"Place free lights or spots in the room.",[87,40342,40343],{},"Check the position, orientation and symbol variant after placing it.",[12,40345,40346],{},"A symbol can only be placed where the editor identifies a valid location. The preview shows the final geometry before you commit it. Correct the wall or room first if a symbol will not snap where you intend.",[12,40348,40349],{},[40,40350],{"id":40351},"rotate",[79,40353,40355],{"id":40354},"how-do-i-rotate-a-symbol-on-the-floor-plan","How do I rotate a symbol on the floor plan?",[12,40357,40358,40359,40362,40363,3157,40366,40369,40370,3157,40373,40376],{},"You rotate free-standing symbols such as the fluorescent tube, ceiling light, spot, detector or floor and furniture socket yourself: with the ",[15,40360,40361],{},"rotation handle"," above the selected symbol, with an angle in degrees in the device toolbar, with the ",[15,40364,40365],{},"Rotate 90° left",[15,40367,40368],{},"Rotate 90° right"," buttons, or with the ",[15,40371,40372],{},"Q",[15,40374,40375],{},"E"," keys. Sockets, switches, wall lights, distribution boards and the other wall-mounted devices align with their wall automatically and turn with it if you move the wall.",[138,40378,40379,40391],{},[141,40380,40381],{},[144,40382,40383,40385,40388],{},[147,40384,7175],{},[147,40386,40387],{},"Orientation on the plan",[147,40389,40390],{},"How to change it",[163,40392,40393,40408,40422,40433,40447],{},[144,40394,40395,40402,40405],{},[168,40396,40397,40398,40401],{},"Light, spot, ",[15,40399,40400],{},"Fluorescent Tube",", detector, floor, furniture and ceiling socket",[168,40403,40404],{},"free, 0° when placed",[168,40406,40407],{},"rotation handle, angle field, 90° buttons or Q\u002FE",[144,40409,40410,40416,40419],{},[168,40411,40412,40413,40415],{},"Socket, switch, wall light, ",[15,40414,22912],{},", splashproof socket, distribution board and other wall devices",[168,40417,40418],{},"follows the wall face",[168,40420,40421],{},"drag the symbol to the wall you want or to the other side of the wall",[144,40423,40424,40427,40430],{},[168,40425,40426],{},"Junction and connection box, appliances such as a stove or washing machine",[168,40428,40429],{},"like the wall when on a wall, rotatable when free in the room",[168,40431,40432],{},"drag it to a wall, or place it freely in the room and rotate it",[144,40434,40435,40438,40441],{},[168,40436,40437],{},"Shower and bathtub",[168,40439,40440],{},"in 90° steps",[168,40442,40443,40444],{},"select the fixture → ",[15,40445,40446],{},"Rotate 90°",[144,40448,40449,40452,40455],{},[168,40450,40451],{},"Window contact, shutter and gate drive",[168,40453,40454],{},"follow their opening",[168,40456,40457],{},"cannot be rotated",[1041,40459,40461],{"id":40460},"rotate-a-free-standing-symbol","Rotate a free-standing symbol",[3139,40463,40464,40470,40473,40476],{},[87,40465,40466,40467,40469],{},"Select the symbol on the floor plan. A round ",[15,40468,40361],{}," appears above it.",[87,40471,40472],{},"Drag the handle around the symbol. The angle snaps in 15° steps, so 45° and 90° are on the grid. Hold Shift to rotate without snapping; Esc cancels the rotation.",[87,40474,40475],{},"For an exact value, type the angle into the degree field of the device toolbar and confirm with Enter. Angles run clockwise from 0 to 359°; negative values and a comma as decimal separator are converted.",[87,40477,40478,40480,40481,40483],{},[15,40479,40372],{}," rotates the selected symbol 90° to the left, ",[15,40482,40375],{}," 90° to the right, and 15° each with Shift.",[12,40485,40486],{},"Each rotation is its own undo step. When you move the symbol within the room it keeps its angle; if it snaps to a wall, it takes the wall direction. The identifier, circuit label and count next to the symbol stay upright and readable at every angle. The site plan export and the 3D view show the symbol at the chosen angle. Locked symbols cannot be rotated.",[1041,40488,40490],{"id":40489},"wall-devices-and-the-wall-face","Wall devices and the wall face",[3139,40492,40493,40496,40499,40504,40507],{},[87,40494,40495],{},"Select the symbol and drag it to the wall you want. While you drag, PlanElec keeps recalculating position and orientation.",[87,40497,40498],{},"For the other side of the wall, drag the symbol across: into the neighbouring room for an interior wall, outwards onto the facade for an exterior wall.",[87,40500,4659,40501,40503],{},[15,40502,28532],{}," switched on, or while holding Shift, the symbol does not snap to the wall. It then keeps its current orientation and can be rotated like a free-standing symbol.",[87,40505,40506],{},"For a wall device the rotate button in the device toolbar is greyed out; its hint explains that the device follows its wall.",[87,40508,40509,40510,40512],{},"Select a shower or bathtub and use ",[15,40511,40446],{}," in the device toolbar to turn it a quarter turn clockwise. The bathroom zones are recalculated.",[12,40514,40515,40516,40518,40519,40522],{},"You align the ",[15,40517,40400],{}," (among the lights in the palette) through its rotation, for example along the worktop. Its symbol size is fixed; a length cannot be set. For several sockets or switches in a shared frame, choose the ",[15,40520,40521],{},"Cover frame orientation"," (horizontal or vertical), see below.",[12,40524,40525],{},[40,40526],{"id":40527},"outdoor",[79,40529,40531],{"id":40530},"how-do-i-place-an-outdoor-light-or-devices-outside-the-building","How do I place an outdoor light or devices outside the building?",[12,40533,40534,40535,56],{},"For devices on the facade, place the symbol on the outer face of an exterior wall. For a terrace, garden, balcony or carport, draw the area as a closed room and give it an outdoor room type. Single devices without an area go in with ",[15,40536,28532],{},[138,40538,40539,40549],{},[141,40540,40541],{},[144,40542,40543,40545,40547],{},[147,40544,2675],{},[147,40546,10804],{},[147,40548,9095],{},[163,40550,40551,40562,40596],{},[144,40552,40553,40556,40559],{},[168,40554,40555],{},"Wall light or splashproof socket on the facade",[168,40557,40558],{},"choose the tool and click just outside the exterior wall; the symbol snaps to the outer face. In the 3D view, hold Alt for this.",[168,40560,40561],{},"device on the facade, not assigned to a room",[144,40563,40564,40567,40593],{},[168,40565,40566],{},"Light or spot on a terrace, in the garden, on a balcony or under a carport",[168,40568,40569,40570,3324,40572,40574,40575,5259,40578,1774,40581,1774,40584,1774,40587,3324,40590],{},"draw the area as a closed room with ",[15,40571,39955],{},[15,40573,39958],{},", then right-click the room → ",[15,40576,40577],{},"Change room type",[15,40579,40580],{},"Outdoor area",[15,40582,40583],{},"Terrace",[15,40585,40586],{},"Balcony",[15,40588,40589],{},"Garden",[15,40591,40592],{},"Carport",[168,40594,40595],{},"the room counts as an outdoor location; the device belongs to it",[144,40597,40598,40601,40607],{},[168,40599,40600],{},"Single device without a drawn area, such as a light by the driveway",[168,40602,40603,40604,40606],{},"switch on ",[15,40605,28532],{}," or hold Shift, then place the device",[168,40608,40609],{},"device anywhere, not assigned to a room",[12,40611,40612,40613,40616,40617,40619],{},"If the editor reports ",[15,40614,40615],{},"No enclosed room was detected at this position.",", the chosen device needs a room: lights, spots and detectors are placed in rooms. Draw the outdoor area as a room or use ",[15,40618,28532],{},". A free-standing area outside the building is created as a secondary building, and its outline is drawn dashed as soon as it contains only outdoor rooms.",[12,40621,40622,40623,40626,40627,40629],{},"An area converted with ",[15,40624,40625],{},"Mark as outdoor surface"," (for example a path, driveway or lawn) does not count as a room. Place lights on it with ",[15,40628,28532],{}," as well. Floor, ceiling and furniture sockets always need an indoor room.",[12,40631,40632],{},"For devices in an outdoor room, PlanElec assumes IP44 and 30 mA residual current protection as requirements, and the self-check includes them in its residual current rule. Devices on the facade or without a room are not yet assessed as outdoor locations: check the IP rating and residual current protection of these devices yourself.",[79,40634,40636],{"id":40635},"create-shared-cover-frames","Create shared cover frames",[12,40638,40639,40640,40642,40643,40645],{},"An installation group is a physical combination with a shared two- to five-gang cover frame. It is ",[15,40641,25241],{}," a switch chain and ",[15,40644,25241],{}," a circuit.",[12,40647,40648,40649,40652,40653,40655],{},"Drag suitable devices together on the same wall side, or start the cover-frame tool. In the ",[15,40650,40651],{},"Installation group"," panel, choose horizontal or vertical and complete it with ",[15,40654,20618],{},". Moving one member moves the combination.",[12,40657,40658],{},"Switches, standard sockets, Ethernet and coax outlets can be grouped. IP44 sockets remain excluded because they use a sealed frame. Passive data outlets do not become 230 V consumers as a result.",[79,40660,40662],{"id":40661},"adjust-or-dissolve-a-shared-cover-frame","Adjust or dissolve a shared cover frame",[12,40664,40665,40666,40668],{},"The frame appears centred between the grouped devices; the device you started with does not jump to another spot. Right after grouping, a notice offers ",[15,40667,13947],{}," to revert the grouping in one step.",[12,40670,40671,40672,40675,40676,40678,40679,3157,40682,6975,40685,40688],{},"Click the shared frame to edit it. In the ",[15,40673,40674],{},"Shared frame"," panel you change the ",[15,40677,40521],{}," (horizontal or vertical) and the order with ",[15,40680,40681],{},"Previous position",[15,40683,40684],{},"Next position",[15,40686,40687],{},"Dissolve group"," in the toolbar of a grouped device splits the frame again: the devices end up side by side and can be edited individually once more.",[79,40690,40692],{"id":40691},"change-the-symbol-size-for-the-project","Change the symbol size for the project",[12,40694,40695,40696,40698,40699,40702],{},"Are the symbols for sockets, switches and lights too large for your plan? Open the ",[15,40697,21162],{}," menu at the bottom right, expand ",[15,40700,40701],{},"Symbol size"," and choose a step between 50% and 150%. The default is 100%.",[84,40704,40705,40712,40715],{},[87,40706,40707,40708,40711],{},"It is a ",[15,40709,40710],{},"project setting",": it applies to the whole project and to the situation plan export, not just the current view.",[87,40713,40714],{},"It scales the compact wall symbols and the shared cover frames. Positions, stored device dimensions and the 3D model stay unchanged.",[87,40716,40717,40718,56],{},"Each change is one step that you can revert with ",[15,40719,13947],{},[12,40721,40722],{},[40,40723],{"id":40724},"topology",[79,40726,40728],{"id":40727},"link-the-device-to-electrical-topology","Link the device to electrical topology",[12,40730,40731],{},"Open the placed device's properties and link it to a type-compatible node in the electrical topology. Socket, switch and light variants are treated as matching families. Connection and junction boxes only become electrically effective when they are genuinely linked.",[12,40733,40734],{},"Then review the list of unconnected components. It shows symbols that are located on the floor plan but are not yet part of the electrical model.",[12,40736,40737],{},"Keep these concepts separate:",[84,40739,40740,40745,40750,40755],{},[87,40741,40742,40744],{},[15,40743,39896],{},": where is the device on the floor plan?",[87,40746,40747,40749],{},[15,40748,40651],{},": which inserts share one cover frame?",[87,40751,40752,40754],{},[15,40753,27760],{},": which electrical node belongs to the device?",[87,40756,40757,40759],{},[15,40758,4399],{},": which protective device supplies that node?",[12,40761,40762],{},"Changing a cover frame changes neither a switching function nor a circuit assignment. Next, edit the switch chain for lighting control and assign devices to a circuit for electrical supply.",[12,40764,40765],{},[40,40766],{"id":40767},"numbering",[79,40769,40771],{"id":40770},"how-do-i-change-the-numbering-or-label-of-a-symbol","How do I change the numbering or label of a symbol?",[12,40773,40774,40775,40777],{},"The label next to a symbol, for example ",[15,40776,36062],{},", is assigned automatically from the electrical topology: the letter stands for the protective device, the number for the connection point in the circuit. You change it through the order in the single-line diagram, not by typing. A symbol without a circuit has no label yet.",[138,40779,40780,40791],{},[141,40781,40782],{},[144,40783,40784,40787,40789],{},[147,40785,40786],{},"What do you want to change?",[147,40788,3913],{},[147,40790,3293],{},[163,40792,40793,40820,40834,40845,40863],{},[144,40794,40795,40798,40817],{},[168,40796,40797],{},"Order, and with it the number or letter",[168,40799,40800,40801,8020,40804,40807,40808,40811,40812,40807,40814,40816],{},"single-line diagram → select the element → ",[15,40802,40803],{},"Order",[15,40805,40806],{},"Back","\u002F",[15,40809,40810],{},"Forward"," (or ",[15,40813,22100],{},[15,40815,22103],{},") or Alt+←\u002F→",[168,40818,40819],{},"the element swaps places with its neighbour; labels on the floor plan, in the diagram and in the lists follow",[144,40821,40822,40825,40831],{},[168,40823,40824],{},"Name of a device or module",[168,40826,40800,40827,40830],{},[15,40828,40829],{},"Name"," field",[168,40832,40833],{},"name text in the diagram; the label stays",[144,40835,40836,40839,40842],{},[168,40837,40838],{},"Description of a circuit",[168,40840,40841],{},"single-line diagram → double-click the description text, confirm with Enter, Esc discards",[168,40843,40844],{},"description in the diagram and the documents",[144,40846,40847,40850,40860],{},[168,40848,40849],{},"Assignment to another circuit",[168,40851,40852,5259,40854,40856,40857,40859],{},[15,40853,5104],{},[15,40855,20768],{},", or drag in the ",[15,40858,8928],{}," view",[168,40861,40862],{},"new label based on the target circuit",[144,40864,40865,40868,40875],{},[168,40866,40867],{},"Device identifier (for example L1, S2 or C7)",[168,40869,40870,40871,40874],{},"floor plan → select the device → ",[15,40872,40873],{},"Device identifier"," field in the device toolbar, Enter applies, Esc discards",[168,40876,40877],{},"new identifier on the plan, in the lighting circuit overview and in the export; it must be unique in the whole project",[12,40879,40880,40881,40884,40885,40887,40888,40890],{},"Letters follow the order of the protective devices; spare breakers are skipped. In addition, every device carries a ",[15,40882,40883],{},"device identifier"," that PlanElec assigns at placement (L for lights, S for switches and push buttons, C for sockets, D for boxes, E for other devices). It never changes by itself, not even when you move the device or assign another circuit. You can rename it in the ",[15,40886,40873],{}," field: up to 12 characters of letters, digits, dot, hyphen, slash and underscore, without spaces. An identifier that is already used in the project, also on another floor and regardless of upper or lower case, is rejected with a hint. The label derived from the single-line diagram, such as ",[15,40889,36062],{},", still cannot be typed freely.",[79,40892,40894],{"id":40893},"check-before-continuing","Check before continuing",[84,40896,40897,40900,40903,40906],{},[87,40898,40899],{},"Every symbol is in its intended real-world location.",[87,40901,40902],{},"Wall-mounted devices are aligned to the right wall side.",[87,40904,40905],{},"Cover-frame combinations represent the intended mounting, not assumed wiring.",[87,40907,40908],{},"All electrical devices are linked to the appropriate topology node.",[12,40910,40266,40911,56],{},[40,40912,40913],{"href":4175},"edit switch chains, circuits and cable routes",[79,40915,40917],{"id":40916},"continue-planning-the-electrical-installation","Continue planning the electrical installation",[12,40919,40920,40921,40923],{},"You can also assign existing devices to circuits in ",[15,40922,5104],{},", follow their protection paths and form distribution boards after a preview. Enclosures and module positions can remain open initially. The suggested sequence is guidance; existing projects and other valid starting points remain supported.",[12,40925,40926,56],{},[40,40927,40928],{"href":18627},"Illustrated installation planning guide",{"title":2044,"searchDepth":2045,"depth":2045,"links":40930},[40931,40932,40936,40937,40938,40939,40940,40941,40942,40943],{"id":40323,"depth":2045,"text":40324},{"id":40354,"depth":2045,"text":40355,"children":40933},[40934,40935],{"id":40460,"depth":2053,"text":40461},{"id":40489,"depth":2053,"text":40490},{"id":40530,"depth":2045,"text":40531},{"id":40635,"depth":2045,"text":40636},{"id":40661,"depth":2045,"text":40662},{"id":40691,"depth":2045,"text":40692},{"id":40727,"depth":2045,"text":40728},{"id":40770,"depth":2045,"text":40771},{"id":40893,"depth":2045,"text":40894},{"id":40916,"depth":2045,"text":40917},"Place devices at the right location, create shared cover frames and connect electrical symbols to the appropriate topology.","place-and-connect-symbols","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fplace-and-connect-symbols-en.webp",{},"\u002Fhelp\u002Fplace-and-connect-symbols.en",{"title":16745,"description":40944},"place-and-connect-electrical-symbols","help\u002Fplace-and-connect-symbols.en",[35206,40953,40954,40955,40956,40724],"sockets","switches","lights","cover frames","KyYNBj5vOuw-PNcYlc280qrbffhCKae0_Y4fAdRbcdk","\u002Fhelp\u002Fplace-and-connect-electrical-symbols",[],{"id":40961,"title":8528,"body":40962,"category":8555,"description":41081,"extension":2113,"guideId":41082,"image":41083,"locale":2119,"meta":41084,"navigation":2121,"order":41085,"path":41086,"publishedAt":40287,"readTime":3582,"seo":41087,"seoTitle":10313,"slug":41088,"stem":41089,"tags":41090,"updatedAt":41093,"__hash__":41094,"kind":3594,"href":41095,"date":40287,"labels":41096},"help\u002Fhelp\u002Fswitch-chains-circuits-cable-routes.en.md",{"type":9,"value":40963,"toc":41075},[40964,40977,40982,40986,40991,40994,40997,41001,41008,41012,41020,41023,41026,41031,41033,41037,41050,41053,41056,41058,41072],[12,40965,40966,40967,38,40970,38,40973,40976],{},"These three tools answer different questions: ",[15,40968,40969],{},"which switch controls which light?",[15,40971,40972],{},"Which circuit supplies which device?",[15,40974,40975],{},"Where does the cable physically run?"," Edit them in sequence so that the plan remains technically traceable.",[12,40978,40979],{},[40,40980],{"id":40981},"switch-chains",[79,40983,40985],{"id":40984},"link-switches-and-lights-as-a-chain","Link switches and lights as a chain",[12,40987,15424,40988,40990],{},[15,40989,34409],{}," in the floor plan. It links switches and the lights they control in a logical order. PlanElec can propose a chain for free switches and lights in one room; always check the proposal against the intended controls.",[12,40992,40993],{},"For a manual chain, deliberately select the participating devices. A valid chain includes at least one switch and one light. A device cannot belong to multiple switch chains at once. Across several floors, the chain remains project-wide; each floor shows only its local sections and continuation markers.",[12,40995,40996],{},"Switching function and pole count are separate settings. The application can derive a one-way, two-way or intermediate switching function from the chain; you choose the pole count explicitly. A double switch is one physical device with two separate channels: deliberately assign each light to channel A or B.",[12,40998,40999],{},[40,41000],{"id":34539},[1489,41002],{":height":41003,":width":41004,"alt":41005,"caption":41006,"src":41007},"149","576","Circuit-assignment panel with a selected target circuit.","The panel applies the selected devices together; electrical assignment does not define a real cable route.","\u002Fhelp\u002Fworkflows\u002Fen-circuit-assignment.png",[79,41009,41011],{"id":41010},"assign-devices-to-an-existing-circuit","Assign devices to an existing circuit",[12,41013,15424,41014,41016,41017,41019],{},[15,41015,20768],{},". In the panel, first select the target circuit or its MCB, then select devices, including through the floor selector. ",[15,41018,20618],{}," applies the selection together.",[12,41021,41022],{},"Devices that are not yet linked are created as consumers under the selected MCB and linked to their floor-plan symbol. When a device already belongs to another MCB, the application asks for explicit confirmation before moving it. Cancelling changes no project data; you can undo the entire confirmation in one step.",[12,41024,41025],{},"Circuit assignment describes electrical membership. It does not yet define the physical path through walls, shafts or floors.",[12,41027,41028],{},[40,41029],{"id":41030},"cable-routes",[1489,41032],{":height":31106,":width":3800,"alt":31107,"caption":31108,"src":31109},[79,41034,41036],{"id":41035},"plan-and-refine-the-cable-route","Plan and refine the cable route",[12,41038,41039,41040,41042,41043,41045,41046,41049],{},"In the situation plan, open ",[15,41041,31102],{},". When cables exist in the topology, use ",[15,41044,21364],{}," for the active floor or select a cable and choose ",[15,41047,41048],{},"Auto-route",". The automatic route follows drawn walls where possible; check it against the intended installation.",[12,41051,41052],{},"Select a cable line to edit it manually. Click a segment to add a waypoint and drag it immediately; double-click to remove a waypoint. Escape clears the selection or exits the mode. The displayed length is used by material lists, voltage-drop calculation and exports, so check every exceptional route.",[12,41054,41055],{},"For a cable between floors, explicitly select an existing stair, shaft or riser in the cable-route panel. PlanElec does not invent a vertical connection. If a required connector or reliable heights are missing, the route remains incomplete instead of showing a misleading length.",[79,41057,36133],{"id":36132},[84,41059,41060,41063,41066,41069],{},[87,41061,41062],{},"Test the switch chain against the intended controls, not only spatial proximity.",[87,41064,41065],{},"Check each device's circuit, protective device and topology.",[87,41067,41068],{},"Check cable route and length against the planned installation path.",[87,41070,41071],{},"Treat automatic proposals as editable planning assistance, not approval for construction.",[12,41073,41074],{},"You can then continue checking the distribution board and single-line diagram, and run the supported self-check.",{"title":2044,"searchDepth":2045,"depth":2045,"links":41076},[41077,41078,41079,41080],{"id":40984,"depth":2045,"text":40985},{"id":41010,"depth":2045,"text":41011},{"id":41035,"depth":2045,"text":41036},{"id":36132,"depth":2045,"text":36133},"Keep lighting control, circuit assignment and the physical cable path separate, and use the appropriate tool for each step.","switch-chains-circuits-cable-routes","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fswitch-chains-circuits-cable-routes-en.webp",{},7,"\u002Fhelp\u002Fswitch-chains-circuits-cable-routes.en",{"title":8528,"description":41081},"switch-chains-circuits-and-cable-routes","help\u002Fswitch-chains-circuits-cable-routes.en",[41091,34054,36882,41092,31276,21785],"switch chain","MCB","2026-08-30","HwH-bgHqpE-oJTzShPzHP8JCo5lhZ8l1B1vwh9GgBnU","\u002Fhelp\u002Fswitch-chains-circuits-and-cable-routes",[],{"id":41098,"title":8538,"body":41099,"category":42148,"description":42149,"extension":2113,"guideId":42150,"image":42151,"locale":2119,"meta":42152,"navigation":2121,"order":28833,"path":42153,"publishedAt":42154,"readTime":19432,"seo":42155,"seoTitle":10313,"slug":42156,"stem":42157,"tags":42158,"updatedAt":42161,"__hash__":42162,"kind":3594,"href":42163,"date":42154,"labels":42164},"help\u002Fhelp\u002Fself-check-coverage.en.md",{"type":9,"value":41100,"toc":42132},[41101,41104,41107,41113,41119,41126,41130,41145,41148,41152,41374,41376,41429,41433,41501,41505,41571,41575,41654,41658,41698,41702,41755,41759,42040,42043,42046,42049,42052,42055,42058,42061,42065,42068,42074,42080,42086,42092,42096,42099,42122,42126,42129],[12,41102,41103],{},"PlanElec contains two things that are easily confused.",[12,41105,41106],{},"AREI\u002FRGIE references are linked publicly only after the documented source and subject-matter approvals. Practice rules and plausibility checks make no claim to quote the regulations.",[12,41108,4361,41109,41112],{},[15,41110,41111],{},"automatic self-check"," covers only part of it. This page states exactly which part. We list the rules that are checked and, just as plainly, the areas where the application makes no statement — because an incomplete check presenting itself as complete is more dangerous than no check at all.",[41114,41115,41116],"blockquote",{},[12,41117,41118],{},"The self-check is preparation. Only an accredited inspection body issues the official assessment.",[1489,41120],{":height":41121,":width":41122,"alt":41123,"caption":41124,"src":41125},"485","384","AREI self-check popover with an incomplete finding and open points.","The report shows supported checks and open points as preparation; a missing project value is never treated as passed.","\u002Fhelp\u002Fworkflows\u002Fen-self-check.png",[79,41127,41129],{"id":41128},"what-is-checked-automatically","What is checked automatically",[12,41131,41132,41133,41136,41137,41140,41141,41144],{},"The application currently holds ",[15,41134,41135],{},"59 checks",". Of these, ",[15,41138,41139],{},"30"," point to a specific AREI article; the remaining ",[15,41142,41143],{},"29"," are practice rules or plausibility checks, marked as such, carrying no regulatory obligation.",[12,41146,41147],{},"A check only produces a result once the required project data has been entered. Where data is missing, the report marks the check as incomplete — never as passed.",[1041,41149,41151],{"id":41150},"protection","Protection",[138,41153,41154,41169],{},[141,41155,41156],{},[144,41157,41158,41161,41164,41166],{},[147,41159,41160],{},"Check",[147,41162,41163],{},"What is verified",[147,41165,17942],{},[147,41167,41168],{},"Severity",[163,41170,41171,41184,41197,41210,41223,41236,41248,41261,41274,41287,41299,41311,41324,41336,41349,41362],{},[144,41172,41173,41176,41179,41182],{},[168,41174,41175],{},"Main RCD",[168,41177,41178],{},"A residual current device of at most 300 mA must be present at the head of the installation.",[168,41180,41181],{},"AREI 4.2.4.3",[168,41183,8792],{},[144,41185,41186,41189,41192,41195],{},[168,41187,41188],{},"Max. circuits per high-sensitivity RCD",[168,41190,41191],{},"At most 8 final circuits per high-sensitivity residual current device (≤ 30 mA).",[168,41193,41194],{},"AREI 4.2.4.3.b",[168,41196,8792],{},[144,41198,41199,41202,41205,41208],{},[168,41200,41201],{},"Shutter actuator ratings",[168,41203,41204],{},"DIN-rail shutter actuators require an upstream MCB or RCBO; protective-device and motor loads stay within the catalogued input and channel ratings.",[168,41206,41207],{},"Practice rule",[168,41209,8792],{},[144,41211,41212,41215,41218,41221],{},[168,41213,41214],{},"Charging-point protection (EV charging)",[168,41216,41217],{},"A charging point requires its own circuit, a dedicated residual current device and at least IP44 outdoors.",[168,41219,41220],{},"AREI 7.22.4",[168,41222,8792],{},[144,41224,41225,41228,41231,41233],{},[168,41226,41227],{},"RCD selectivity (practice recommendation)",[168,41229,41230],{},"Practice recommendation: grade sensitivity and time between upstream and downstream RCDs (IEC 60364-5-53).",[168,41232,41207],{},[168,41234,41235],{},"Information",[144,41237,41238,41241,41244,41246],{},[168,41239,41240],{},"30 mA RCD for socket circuits",[168,41242,41243],{},"All socket circuits must be protected by a 30 mA residual current device.",[168,41245,41194],{},[168,41247,8792],{},[144,41249,41250,41253,41256,41259],{},[168,41251,41252],{},"Surge protection (SPD)",[168,41254,41255],{},"The presence of a surge protective device (SPD) is assessed; the AREI imposes no general obligation.",[168,41257,41258],{},"AREI 4.5.1",[168,41260,41235],{},[144,41262,41263,41266,41269,41272],{},[168,41264,41265],{},"Main switch min. 40 A",[168,41267,41268],{},"A main switch must be present and rated at least 40 A in domestic installations.",[168,41270,41271],{},"AREI 5.3.5.1.b",[168,41273,8792],{},[144,41275,41276,41279,41282,41285],{},[168,41277,41278],{},"Main RCD min. 40 A",[168,41280,41281],{},"The residual current device at the supply point must be rated at least 40 A.",[168,41283,41284],{},"AREI 5.3.5.3.a",[168,41286,8792],{},[144,41288,41289,41292,41295,41297],{},[168,41290,41291],{},"Distribution-board layout",[168,41293,41294],{},"Board: occupancy within the module count, one residual current device per row and roughly 20 % spare capacity.",[168,41296,41207],{},[168,41298,17998],{},[144,41300,41301,41304,41307,41309],{},[168,41302,41303],{},"Embedded wall heating: 100 mA RCD",[168,41305,41306],{},"Heating elements embedded in walls above 25 V AC require a separate 100 mA residual current device.",[168,41308,41194],{},[168,41310,8792],{},[144,41312,41313,41316,41319,41322],{},[168,41314,41315],{},"Pole configuration in residential installations",[168,41317,41318],{},"Single-pole breakers are not permitted in Belgian dwellings with a star configuration; use 1P+N.",[168,41320,41321],{},"AREI 4.4.4.2",[168,41323,17998],{},[144,41325,41326,41329,41332,41334],{},[168,41327,41328],{},"Trip characteristic versus load type",[168,41330,41331],{},"Practice recommendation: the breaker curve B, C or D must match the load type.",[168,41333,41207],{},[168,41335,17998],{},[144,41337,41338,41341,41344,41347],{},[168,41339,41340],{},"Protective device and link of the feeder",[168,41342,41343],{},"A feeder to a sub-board starts at its own protective device in the supplying board and is unambiguously linked to the sub-board.",[168,41345,41346],{},"AREI 4.4.2.2",[168,41348,8792],{},[144,41350,41351,41354,41357,41360],{},[168,41352,41353],{},"Breaking capacity versus prospective short-circuit current",[168,41355,41356],{},"The breaking capacity of each breaker must withstand the prospective short-circuit current; checked only when the value is recorded.",[168,41358,41359],{},"AREI 5.3.5.5",[168,41361,8792],{},[144,41363,41364,41367,41370,41372],{},[168,41365,41366],{},"Overcurrent protection of the sub-board feeder",[168,41368,41369],{},"If a sub-board is fed through an RCD only, the upstream protection must protect the feeder cable according to Table 4.11 or via the sum of the branch ratings; missing data leaves the check incomplete.",[168,41371,41346],{},[168,41373,8792],{},[1041,41375,29348],{"id":30501},[138,41377,41378,41390],{},[141,41379,41380],{},[144,41381,41382,41384,41386,41388],{},[147,41383,41160],{},[147,41385,41163],{},[147,41387,17942],{},[147,41389,41168],{},[163,41391,41392,41404,41417],{},[144,41393,41394,41396,41399,41402],{},[168,41395,33509],{},[168,41397,41398],{},"A main equipotential bonding rail must be present.",[168,41400,41401],{},"AREI 4.2.3.2",[168,41403,8792],{},[144,41405,41406,41409,41412,41415],{},[168,41407,41408],{},"Earth electrode (ring earth\u002Fearth rod)",[168,41410,41411],{},"For a TT or IT system, an earth electrode must be documented.",[168,41413,41414],{},"AREI 4.2.3",[168,41416,8792],{},[144,41418,41419,41422,41425,41427],{},[168,41420,41421],{},"Earthing and supply plausibility",[168,41423,41424],{},"Plausibility check: a public domestic 3×230 V connection recorded as a TN system requires review.",[168,41426,41207],{},[168,41428,17998],{},[1041,41430,41432],{"id":41431},"cables-and-sizing","Cables and sizing",[138,41434,41435,41447],{},[141,41436,41437],{},[144,41438,41439,41441,41443,41445],{},[147,41440,41160],{},[147,41442,41163],{},[147,41444,17942],{},[147,41446,41168],{},[163,41448,41449,41462,41475,41488],{},[144,41450,41451,41454,41457,41460],{},[168,41452,41453],{},"Cable cross-section",[168,41455,41456],{},"The cable cross-section must match the rating of the protective device.",[168,41458,41459],{},"AREI 5.2.2",[168,41461,8792],{},[144,41463,41464,41467,41470,41473],{},[168,41465,41466],{},"Voltage drop (ΔU)",[168,41468,41469],{},"Voltage drop computed from cable length: guide value 3 % for lighting and 5 % for other final circuits.",[168,41471,41472],{},"AREI 5.2.5",[168,41474,8792],{},[144,41476,41477,41480,41483,41486],{},[168,41478,41479],{},"CPR cable fire-performance class",[168,41481,41482],{},"Individually laid cables must have the F1 property or reach at least CPR class Eca; class Fca is not permitted.",[168,41484,41485],{},"AREI 5.2.7.2",[168,41487,8792],{},[144,41489,41490,41493,41496,41499],{},[168,41491,41492],{},"Cables in hollow walls: Cca\u002FPreflex",[168,41494,41495],{},"Cables in building cavities run in conduit (Preflex) or reach at least CPR class Cca.",[168,41497,41498],{},"AREI 4.3.3.5.b",[168,41500,8792],{},[1041,41502,41504],{"id":41503},"circuit-loading","Circuit loading",[138,41506,41507,41519],{},[141,41508,41509],{},[144,41510,41511,41513,41515,41517],{},[147,41512,41160],{},[147,41514,41163],{},[147,41516,17942],{},[147,41518,41168],{},[163,41520,41521,41534,41546,41559],{},[144,41522,41523,41526,41529,41532],{},[168,41524,41525],{},"Automation: channel load",[168,41527,41528],{},"Compares current calculated from documented load powers with the entered channel rating. Missing power or rating is a data gap. Does not check inrush current, power factor or internal protection. (AREI 4.4.1.1)",[168,41530,41531],{},"AREI 4.4.1.1",[168,41533,8792],{},[144,41535,41536,41539,41542,41544],{},[168,41537,41538],{},"Automation: known bus current",[168,41540,41541],{},"Compares known device and catalog currents with the planned bus capacity. Planning warning based on the profile catalog, no numerical AREI limit; safety objective AREI 4.4.1.1.",[168,41543,41207],{},[168,41545,17998],{},[144,41547,41548,41551,41554,41557],{},[168,41549,41550],{},"Max. contact points per final circuit",[168,41552,41553],{},"At most 8 sockets and fixed appliances per final circuit; lighting-only points are not counted.",[168,41555,41556],{},"AREI 5.3.5.2b",[168,41558,8792],{},[144,41560,41561,41564,41567,41569],{},[168,41562,41563],{},"Phase imbalance",[168,41565,41566],{},"Practice recommendation: imbalance between phases should stay below 30 %.",[168,41568,41207],{},[168,41570,17998],{},[1041,41572,41574],{"id":41573},"rooms-and-zones","Rooms and zones",[138,41576,41577,41589],{},[141,41578,41579],{},[144,41580,41581,41583,41585,41587],{},[147,41582,41160],{},[147,41584,41163],{},[147,41586,17942],{},[147,41588,41168],{},[163,41590,41591,41604,41616,41629,41642],{},[144,41592,41593,41596,41599,41602],{},[168,41594,41595],{},"30 mA protection for wet rooms",[168,41597,41598],{},"Sockets in damp rooms must be protected by a 30 mA residual current device.",[168,41600,41601],{},"AREI 7.1.4.3",[168,41603,8792],{},[144,41605,41606,41609,41612,41614],{},[168,41607,41608],{},"30 mA RCD for bathroom circuits",[168,41610,41611],{},"All circuits in bathrooms and damp rooms must be protected by a 30 mA residual current device.",[168,41613,41601],{},[168,41615,8792],{},[144,41617,41618,41621,41624,41627],{},[168,41619,41620],{},"Bathroom zones 0\u002F1\u002F2: permitted equipment",[168,41622,41623],{},"In bathroom volumes 0, 1 and 2 only certain equipment is permitted; distribution boards are prohibited there.",[168,41625,41626],{},"AREI 7.1.5.2",[168,41628,8792],{},[144,41630,41631,41634,41637,41640],{},[168,41632,41633],{},"Pool zones 0\u002F1\u002F2: equipment within the inspection zones",[168,41635,41636],{},"Equipment located in swimming-pool zones 0, 1 and 2 is reported as an inspection notice; the requirements of AREI 7.2.3 ff. must be checked by a professional.",[168,41638,41639],{},"AREI 7.2.2",[168,41641,41235],{},[144,41643,41644,41647,41650,41652],{},[168,41645,41646],{},"Smoke-detector coverage (recommendation)",[168,41648,41649],{},"Non-binding advice based on regional housing rules; the AREI itself does not mandate smoke detectors in dwellings.",[168,41651,41207],{},[168,41653,17998],{},[1041,41655,41657],{"id":41656},"topology-and-control","Topology and control",[138,41659,41660,41672],{},[141,41661,41662],{},[144,41663,41664,41666,41668,41670],{},[147,41665,41160],{},[147,41667,41163],{},[147,41669,17942],{},[147,41671,41168],{},[163,41673,41674,41686],{},[144,41675,41676,41679,41682,41684],{},[168,41677,41678],{},"Electric shutter control paths",[168,41680,41681],{},"Plausibility check: direct switches, actuator inputs, central controls and drive types together form a consistent control path.",[168,41683,41207],{},[168,41685,8792],{},[144,41687,41688,41691,41694,41696],{},[168,41689,41690],{},"Project integrity",[168,41692,41693],{},"References between diagram, situation plan and distribution board must point to existing objects.",[168,41695,41207],{},[168,41697,8792],{},[1041,41699,41701],{"id":41700},"photovoltaic-installation","Photovoltaic installation",[138,41703,41704,41716],{},[141,41705,41706],{},[144,41707,41708,41710,41712,41714],{},[147,41709,41160],{},[147,41711,41163],{},[147,41713,17942],{},[147,41715,41168],{},[163,41717,41718,41731,41743],{},[144,41719,41720,41723,41726,41729],{},[168,41721,41722],{},"PV installation compliance",[168,41724,41725],{},"PV installation: anti-islanding, earthing of module frames, warning signs and identification of DC and AC conductors.",[168,41727,41728],{},"AREI 7.112.2",[168,41730,8792],{},[144,41732,41733,41736,41739,41741],{},[168,41734,41735],{},"PV string design",[168,41737,41738],{},"Checks strings against the documented manufacturer limits of the inverter and modules.",[168,41740,41207],{},[168,41742,8792],{},[144,41744,41745,41748,41751,41753],{},[168,41746,41747],{},"Combined current in distribution boards with multiple sources",[168,41749,41750],{},"In a board with local generation, grid and source currents add up per phase on jointly loaded sections.",[168,41752,41207],{},[168,41754,8792],{},[1041,41756,41758],{"id":41757},"completeness-of-the-file","Completeness of the file",[138,41760,41761,41773],{},[141,41762,41763],{},[144,41764,41765,41767,41769,41771],{},[147,41766,41160],{},[147,41768,41163],{},[147,41770,17942],{},[147,41772,41168],{},[163,41774,41775,41788,41800,41811,41822,41833,41845,41857,41869,41881,41893,41904,41917,41929,41941,41953,41966,41979,41991,42004,42016,42028],{},[144,41776,41777,41780,41783,41786],{},[168,41778,41779],{},"Automation: controls in the diagram",[168,41781,41782],{},"For domestic installations, checks whether existing control points appear in the actual diagram input. Missing assignments can be completed in the channel matrix or through the module supply path. Not a complete symbol or extra-low-voltage check. (AREI 3.1.2.1.a)",[168,41784,41785],{},"AREI 3.1.2.1",[168,41787,8792],{},[144,41789,41790,41793,41796,41798],{},[168,41791,41792],{},"Automation supply protection",[168,41794,41795],{},"Planning check: supply protection, bus supply and unique, complete channel assignments must be documented. A finding blocks final export; this is no additional AREI requirement.",[168,41797,41207],{},[168,41799,8792],{},[144,41801,41802,41805,41807,41809],{},[168,41803,41804],{},"Unique load assignment",[168,41806,41795],{},[168,41808,41207],{},[168,41810,8792],{},[144,41812,41813,41816,41818,41820],{},[168,41814,41815],{},"Bus supply",[168,41817,41795],{},[168,41819,41207],{},[168,41821,8792],{},[144,41823,41824,41827,41829,41831],{},[168,41825,41826],{},"Actuator configuration",[168,41828,41795],{},[168,41830,41207],{},[168,41832,8792],{},[144,41834,41835,41838,41841,41843],{},[168,41836,41837],{},"Devices per line",[168,41839,41840],{},"Planning warning based on the profile catalog: Devices per line. Limits and assignments come from the profile catalog, not from AREI.",[168,41842,41207],{},[168,41844,17998],{},[144,41846,41847,41850,41853,41855],{},[168,41848,41849],{},"Lines per system",[168,41851,41852],{},"Planning warning based on the profile catalog: Lines per system. Limits and assignments come from the profile catalog, not from AREI.",[168,41854,41207],{},[168,41856,17998],{},[144,41858,41859,41862,41865,41867],{},[168,41860,41861],{},"Profile channel load",[168,41863,41864],{},"Planning warning based on the profile catalog: Profile channel load. Limits and assignments come from the profile catalog, not from AREI.",[168,41866,41207],{},[168,41868,17998],{},[144,41870,41871,41874,41877,41879],{},[168,41872,41873],{},"Channel kind and load",[168,41875,41876],{},"Planning warning based on the profile catalog: Channel kind and load. Limits and assignments come from the profile catalog, not from AREI.",[168,41878,41207],{},[168,41880,17998],{},[144,41882,41883,41886,41889,41891],{},[168,41884,41885],{},"Line assignment",[168,41887,41888],{},"Planning warning based on the profile catalog: Line assignment. Limits and assignments come from the profile catalog, not from AREI.",[168,41890,41207],{},[168,41892,17998],{},[144,41894,41895,41897,41900,41902],{},[168,41896,6957],{},[168,41898,41899],{},"Planning warning based on the profile catalog: Line coupler. Limits and assignments come from the profile catalog, not from AREI.",[168,41901,41207],{},[168,41903,17998],{},[144,41905,41906,41909,41912,41915],{},[168,41907,41908],{},"Voltage classes per bus line",[168,41910,41911],{},"Checks SELV together with FELV or LV on the same bus line (AREI 4.2.5.5.c). Warns about a logical contradiction; does not establish physical connections or source quality.",[168,41913,41914],{},"AREI 4.2.5.5.c",[168,41916,17998],{},[144,41918,41919,41922,41925,41927],{},[168,41920,41921],{},"KNX address conflicts",[168,41923,41924],{},"Checks that physical and group addresses are unique and valid. Planning check for the KNX address space, not an AREI requirement.",[168,41926,41207],{},[168,41928,17998],{},[144,41930,41931,41934,41937,41939],{},[168,41932,41933],{},"Missing KNX addresses",[168,41935,41936],{},"Once addressing has started, points out KNX devices without a physical address and channels without a group address. Information only, no export blocker.",[168,41938,41207],{},[168,41940,41235],{},[144,41942,41943,41946,41949,41951],{},[168,41944,41945],{},"Complete connections",[168,41947,41948],{},"Every element in the diagram must be connected; orphan nodes indicate an incomplete model.",[168,41950,41207],{},[168,41952,17998],{},[144,41954,41955,41958,41961,41964],{},[168,41956,41957],{},"Minimum number of lighting circuits",[168,41959,41960],{},"Practice recommendation: at least two lighting circuits per dwelling unit.",[168,41962,41963],{},"AREI 5.3.5.2.b",[168,41965,8792],{},[144,41967,41968,41971,41974,41977],{},[168,41969,41970],{},"Dedicated circuits for large appliances",[168,41972,41973],{},"Large appliances such as washing machine, dryer, dishwasher, hob and oven each require a dedicated circuit.",[168,41975,41976],{},"AREI 5.2.1.2",[168,41978,8792],{},[144,41980,41981,41984,41987,41989],{},[168,41982,41983],{},"Installation dossier (AREI 9.1.2)",[168,41985,41986],{},"The installation file requires a single-line diagram, a situation plan and a complete title block; PV needs additional documents.",[168,41988,41207],{},[168,41990,17998],{},[144,41992,41993,41996,41999,42002],{},[168,41994,41995],{},"Placement of connection\u002Fjunction boxes",[168,41997,41998],{},"Structural junction boxes must appear exactly once and consistently in the diagram.",[168,42000,42001],{},"AREI 3.1.2.3",[168,42003,17998],{},[144,42005,42006,42009,42012,42014],{},[168,42007,42008],{},"Consumers placed on the situation plan",[168,42010,42011],{},"Consumers from the single-line diagram must be placed on the situation plan through their link.",[168,42013,41207],{},[168,42015,17998],{},[144,42017,42018,42021,42024,42026],{},[168,42019,42020],{},"Unlinked electrical floor-plan symbols",[168,42022,42023],{},"Floor-plan devices without a link to the electrical topology are reported for information.",[168,42025,41207],{},[168,42027,41235],{},[144,42029,42030,42033,42036,42038],{},[168,42031,42032],{},"Switch-control group plausibility",[168,42034,42035],{},"Plausibility check: a control group contains at least one switch and at least one switched load.",[168,42037,41207],{},[168,42039,17998],{},[79,42041,7040],{"id":42042},"domotica",[12,42044,42045],{},"This section contains AREI checks, mandatory planning checks and profile warnings. It does not certify the entire extra-low-voltage installation, manufacturer conformity or physical bus routing. The bus supply source type cannot be recorded in the model (AREI 4.2.5.3.a).",[12,42047,42048],{},"Areas not checked automatically (not passed checks):",[12,42050,42051],{},"Disabled: not every internal extra-low-voltage component can be recorded and represented in the diagram. The claimed blanket June 2023 change is not established here. Only the documented control-point check is active.",[12,42053,42054],{},"Disabled: no evidence for a blanket requirement for a dedicated 30 mA bus circuit; type A is a general RCD requirement.",[12,42056,42057],{},"Disabled: cable adjacency, distance and insulation evidence cannot be recorded. The regulation permits several separation measures.",[12,42059,42060],{},"No automated symbol check: Table 2.23 J specifies the control-unit symbol (AREI 3.1.2.1.a). Users cannot correct missing catalog or renderer geometry.",[79,42062,42064],{"id":42063},"what-the-self-check-does-not-assess","What the self-check does not assess",[12,42066,42067],{},"These areas of Book 1 deliberately remain outside the automatic check:",[12,42069,42070,42073],{},[15,42071,42072],{},"Special installations and locations (Part 7)."," Of fourteen chapters, PlanElec touches three, each only in part: rooms containing a bath or shower (7.1), supply of electric road vehicles (7.22) and domestic photovoltaic installations (7.112). Not covered: swimming pools (7.2), saunas (7.3), construction sites and outdoor installations (7.4), conductive confined spaces (7.6), camping sites (7.8), marinas (7.9), fairground installations (7.11), fountains (7.100), stationary vehicles (7.101), explosive atmospheres (7.102) and industrial accumulator batteries (7.103).",[12,42075,42076,42079],{},[15,42077,42078],{},"The direct-current side."," The model has no separate roles for the L+, L-, M, PEM and PEL conductors. Conductor selection, colouring, combined protective conductors, DC residual current sensitivity, protection of the M conductor and permanent insulation monitoring in an IT system are therefore not verifiable. For photovoltaics this remains manual work.",[12,42081,42082,42085],{},[15,42083,42084],{},"The transitional provisions of articles 59 and 69."," Whether an exception applies to an existing installation depends on data that cannot be derived from a single-line diagram — among others the PEN cross-section, the actual start of work on site and the presence of a monitoring device. PlanElec does take the relaxations of Part 8 into account by presenting certain findings on existing parts as indications rather than errors, but does not decide the exception itself.",[12,42087,42088,42091],{},[15,42089,42090],{},"Inspections of installations (Part 6) and the rules of conduct (Part 9)"," fall outside the reach of a planning tool. Only the composition of the installation file is checked.",[79,42093,42095],{"id":42094},"what-software-cannot-establish-in-principle","What software cannot establish in principle",[12,42097,42098],{},"Even after further extension of the model, these points remain dependent on measurement, documentation or visual inspection on site:",[84,42100,42101,42104,42107,42110,42113,42116,42119],{},[87,42102,42103],{},"the actual wiring, continuity and polarity of the conductors;",[87,42105,42106],{},"the tripping characteristics and DC suitability of the devices actually installed;",[87,42108,42109],{},"insulation measurement and the operation of a permanent insulation monitoring device;",[87,42111,42112],{},"the mechanical and chemical resistance and corrosion state of the earthing;",[87,42114,42115],{},"the effectiveness of automatic disconnection and the real earth impedance;",[87,42117,42118],{},"the suitability and certification of inverters, batteries and PV components;",[87,42120,42121],{},"zoning, risk assessment and on-site conditions.",[79,42123,42125],{"id":42124},"what-this-means-for-your-inspection","What this means for your inspection",[12,42127,42128],{},"Use the self-check to catch avoidable mistakes early: a missing residual current device, a cross-section that does not match the protection, too many contact points on one circuit, an incomplete file. These are exactly the findings that otherwise surface only at inspection.",[12,42130,42131],{},"Do not rely on it for the cases listed above. There, your expertise and the judgement of the accredited body remain decisive.",{"title":2044,"searchDepth":2045,"depth":2045,"links":42133},[42134,42144,42145,42146,42147],{"id":41128,"depth":2045,"text":41129,"children":42135},[42136,42137,42138,42139,42140,42141,42142,42143],{"id":41150,"depth":2053,"text":41151},{"id":30501,"depth":2053,"text":29348},{"id":41431,"depth":2053,"text":41432},{"id":41503,"depth":2053,"text":41504},{"id":41573,"depth":2053,"text":41574},{"id":41656,"depth":2053,"text":41657},{"id":41700,"depth":2053,"text":41701},{"id":41757,"depth":2053,"text":41758},{"id":42042,"depth":2045,"text":7040},{"id":42063,"depth":2045,"text":42064},{"id":42094,"depth":2045,"text":42095},{"id":42124,"depth":2045,"text":42125},"compliance","The complete list of rules PlanElec checks automatically — and an equally explicit list of what the self-check does not assess.","self-check-coverage","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fself-check-coverage.webp",{},"\u002Fhelp\u002Fself-check-coverage.en","2026-08-17",{"title":8538,"description":42149},"what-the-self-check-verifies","help\u002Fself-check-coverage.en",[2133,2134,21784,5422,42159,42160],"coverage","validation","2026-10-14","RlOcUOyye-5uDEWj2C0p6B1ZAVNxpXyQCR5fk1JjWQA","\u002Fhelp\u002Fwhat-the-self-check-verifies",[],{"id":42166,"title":42167,"articleId":42168,"body":42169,"category":4239,"date":42788,"description":42789,"extension":2113,"image":42181,"labels":42790,"lastUpdated":10988,"locale":2119,"meta":42791,"navigation":2121,"ogImage":42792,"path":42793,"publishDate":42788,"readTime":4830,"refreshInterval":4248,"seo":42794,"seoTitle":10313,"slug":42168,"stem":42795,"tags":42796,"__hash__":42799,"kind":2137,"href":42800},"blog\u002Fblog\u002Fvoltage-drop-cable-sizing.en.md","Voltage Drop Calculation: How Long Can Your Cable Be?","voltage-drop-cable-sizing",{"type":9,"value":42170,"toc":42762},[42171,42177,42182,42186,42189,42192,42197,42201,42205,42215,42221,42225,42234,42254,42266,42273,42277,42280,42424,42427,42431,42434,42513,42516,42522,42526,42530,42533,42538,42548,42552,42555,42560,42569,42573,42580,42587,42591,42594,42598,42630,42632,42636,42639,42643,42646,42650,42653,42657,42664,42668,42671,42674,42677,42680,42684,42687,42691,42694,42698,42705,42712,42719,42721,42756],[12,42172,42173,42176],{},[15,42174,42175],{},"How long a cable can be is decided by voltage drop: a 2.5 mm² copper cable carrying 16 A at 230 V reaches the usual 5% at about 54 m, and a 1.5 mm² lighting circuit at 10 A reaches the 3% lighting value at about 31 m."," Beyond that, you need a larger cross-section, a shorter route or a sub-distribution board closer to the load. The circuit breaker does not answer this question: it protects the cable against overload but says nothing about the voltage that reaches the appliance. So always check both: does the cable suit the protective device, and does voltage drop stay within the target? The stricter requirement sets the cross-section.",[12,42178,42179],{},[74,42180],{"alt":30524,"src":42181},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-voltage-drop-cable-sizing-editorial.webp",[79,42183,42185],{"id":42184},"when-does-voltage-drop-matter","When does voltage drop matter?",[12,42187,42188],{},"Typical cases are long runs to a garage, garden room or outbuilding, outdoor lighting, feeders to sub-distribution boards, heat pumps and EV charging points. Besides distance, current, single- or three-phase supply, conductor material, cross-section, nominal voltage and power factor all count.",[12,42190,42191],{},"Always calculate the complete electrical route from the board. If it consists of several segments, such as the feeder to a sub-board plus the final circuit, their voltage drops add up. Calculating only the last section to the appliance understates the result.",[1489,42193],{":height":22672,":width":3800,"alt":42194,"caption":42195,"src":42196},"Chain from the main board through the sub-main (25 m, 6 mm², 25 A, 1.5%) to the sub-board and through the final circuit (30 m, 2.5 mm², 16 A, 2.8%) to the load. A bar adds up 4.3% against the 3% and 5% guide values; the last section alone would give a too optimistic 2.8%.","Worked example with copper, 230 V and cos φ 0.95: only the sum of both sections shows how much voltage is missing at the load.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fvoltage-drop-cable-sizing\u002Fcumulative-voltage-drop.en.svg",[12,42198,7139,42199,56],{},[40,42200,32144],{"href":32143},[79,42202,42204],{"id":42203},"what-the-areirgie-requires","What the AREI\u002FRGIE requires",[12,42206,42207,42208,3157,42211,42214],{},"Section 5.2.5 of AREI\u002FRGIE Book 1 (\"Voltage drop\") requires voltage drop to be limited to the values described in the rules of good practice. It sets no percentage. The familiar ",[15,42209,42210],{},"3% for lighting",[15,42212,42213],{},"5% for other final circuits"," come from the IEC\u002FNBN HD 60364-5-52 series and are the usual way those rules of good practice are applied.",[12,42216,42217,42218,56],{},"Subsection 5.2.1.2 b additionally requires voltage drop under normal operating conditions to be compatible with safe operation of the supplied equipment. The second check, cross-section against protection, is governed by Table 4.11 in subsection 4.4.1.4 for domestic installations. It limits the protective device per cross-section but does not prove current-carrying capacity for every installation method. The complete table with the fuse and circuit-breaker columns is in ",[40,42219,42220],{"href":3795},"cable cross-section by circuit breaker",[79,42222,42224],{"id":42223},"the-formula","The formula",[12,42226,42227,42229,42230,42233],{},[25,42228,2467],{}," is the ",[15,42231,42232],{},"one-way cable length",", not there and back:",[84,42235,42236,42242,42248],{},[87,42237,42238,42239],{},"single-phase: ",[25,42240,42241],{},"ΔU = 2 × ρ × L × I × cos φ \u002F S",[87,42243,42244,42245],{},"three-phase: ",[25,42246,42247],{},"ΔU = √3 × ρ × L × I × cos φ \u002F S",[87,42249,42250,42251],{},"percentage: ",[25,42252,42253],{},"ΔU% = ΔU \u002F Un × 100",[12,42255,42256,42258,42259,42261,42262,42265],{},[25,42257,22690],{}," is resistivity, ",[25,42260,33033],{}," current and ",[25,42263,42264],{},"S"," the cross-section in mm². PlanElec calculates with 0.0175 Ω·mm²\u002Fm for copper and 0.029 Ω·mm²\u002Fm for aluminium, a default power factor of 0.95 and the nominal voltage of the circuit: 230 V for single-phase final circuits, and for three-phase circuits the voltage between line conductors (230 V or 400 V). The resistance model leaves out reactance and temperature correction, which makes it a sound preliminary design for homes and small commercial installations.",[12,42267,42268,42269,42272],{},"Rearranged for length, it gives the longest permitted one-way run for a chosen limit: ",[25,42270,42271],{},"L_max = ΔU_max × S \u002F (2 × ρ × I × cos φ)"," for single-phase circuits.",[79,42274,42276],{"id":42275},"maximum-cable-length-per-cross-section","Maximum cable length per cross-section",[12,42278,42279],{},"The table below uses copper, power factor 0.95 and the full rated current of the breaker as the load. If the actual load is lower, the run can be proportionally longer.",[138,42281,42282,42298],{},[141,42283,42284],{},[144,42285,42286,42288,42291,42293,42295],{},[147,42287,4399],{},[147,42289,42290],{},"Cross-section",[147,42292,17191],{},[147,42294,6928],{},[147,42296,42297],{},"Max. one-way length",[163,42299,42300,42315,42328,42341,42356,42369,42383,42397,42411],{},[144,42301,42302,42305,42307,42309,42312],{},[168,42303,42304],{},"Lighting, 230 V",[168,42306,22712],{},[168,42308,33076],{},[168,42310,42311],{},"3%",[168,42313,42314],{},"approx. 31 m",[144,42316,42317,42319,42321,42323,42325],{},[168,42318,42304],{},[168,42320,22712],{},[168,42322,33079],{},[168,42324,42311],{},[168,42326,42327],{},"approx. 19 m",[144,42329,42330,42332,42334,42336,42338],{},[168,42331,42304],{},[168,42333,22715],{},[168,42335,33079],{},[168,42337,42311],{},[168,42339,42340],{},"approx. 32 m",[144,42342,42343,42346,42348,42350,42353],{},[168,42344,42345],{},"Sockets\u002Fappliances, 230 V",[168,42347,22715],{},[168,42349,33079],{},[168,42351,42352],{},"5%",[168,42354,42355],{},"approx. 54 m",[144,42357,42358,42360,42362,42364,42366],{},[168,42359,42345],{},[168,42361,22715],{},[168,42363,33088],{},[168,42365,42352],{},[168,42367,42368],{},"approx. 43 m",[144,42370,42371,42374,42376,42378,42380],{},[168,42372,42373],{},"Appliance circuit, 230 V",[168,42375,33093],{},[168,42377,33098],{},[168,42379,42352],{},[168,42381,42382],{},"approx. 55 m",[144,42384,42385,42388,42390,42392,42394],{},[168,42386,42387],{},"Hob\u002FEV charger, 230 V",[168,42389,33103],{},[168,42391,33106],{},[168,42393,42352],{},[168,42395,42396],{},"approx. 65 m",[144,42398,42399,42402,42404,42406,42408],{},[168,42400,42401],{},"Three-phase 3N~400\u002F230 V",[168,42403,22715],{},[168,42405,33079],{},[168,42407,42352],{},[168,42409,42410],{},"approx. 108 m",[144,42412,42413,42415,42417,42419,42421],{},[168,42414,42401],{},[168,42416,33103],{},[168,42418,33106],{},[168,42420,42352],{},[168,42422,42423],{},"approx. 130 m",[12,42425,42426],{},"The values apply to a single segment from the board. If the final circuit is fed from a sub-board, subtract the feeder's voltage drop first.",[79,42428,42430],{"id":42429},"which-voltage-applies-to-your-circuit","Which voltage applies to your circuit?",[12,42432,42433],{},"The most common mistake is confusing the network type with the circuit. The 400 V of a three-phase connection exists only between two line conductors. An ordinary socket or lighting circuit is connected between a line conductor and neutral even in such a home, and therefore sees 230 V.",[138,42435,42436,42451],{},[141,42437,42438],{},[144,42439,42440,42443,42445,42448],{},[147,42441,42442],{},"Supply network",[147,42444,4399],{},[147,42446,42447],{},"Nominal voltage",[147,42449,42450],{},"Factor",[163,42452,42453,42466,42478,42490,42502],{},[144,42454,42455,42458,42461,42464],{},[168,42456,42457],{},"1×230 V",[168,42459,42460],{},"single-phase",[168,42462,42463],{},"230 V",[168,42465,6407],{},[144,42467,42468,42471,42474,42476],{},[168,42469,42470],{},"3×230 V without N",[168,42472,42473],{},"single-phase, L–L",[168,42475,42463],{},[168,42477,6407],{},[144,42479,42480,42482,42485,42487],{},[168,42481,42470],{},[168,42483,42484],{},"three-phase",[168,42486,42463],{},[168,42488,42489],{},"√3",[144,42491,42492,42495,42498,42500],{},[168,42493,42494],{},"3N~400\u002F230 V",[168,42496,42497],{},"single-phase, L–N",[168,42499,42463],{},[168,42501,6407],{},[144,42503,42504,42506,42508,42511],{},[168,42505,42494],{},[168,42507,42484],{},[168,42509,42510],{},"400 V",[168,42512,42489],{},[12,42514,42515],{},"Because the factor and the reference voltage change together, the difference is large: the same 16 A over 30 m with 2.5 mm² gives 2.78% single-phase, but 1.38% as a three-phase circuit at 400 V. Calculating a single-phase circuit as three-phase produces a result roughly twice as favourable and leads to an undersized cable.",[12,42517,42518,42519,56],{},"In a network without a neutral, a single-phase circuit runs between two line conductors. The voltage there is also 230 V, and because both conductors carry the full current, factor 2 applies. To identify your network type, see ",[40,42520,42521],{"href":5387},"Single-phase or three-phase in Belgium",[79,42523,42525],{"id":42524},"two-worked-examples","Two worked examples",[1041,42527,42529],{"id":42528},"lighting-in-a-garden-room","Lighting in a garden room",[12,42531,42532],{},"A 45 m copper run supplies a lighting-only load of 8 A at 230 V. With 1.5 mm² and power factor 0.95:",[12,42534,42535],{},[25,42536,42537],{},"ΔU = 2 × 0.0175 × 45 × 8 × 0.95 \u002F 1.5 = 7.98 V",[12,42539,33607,42540,42543,42544,42547],{},[15,42541,42542],{},"3.47%",", above the 3% for lighting. With 2.5 mm², the loss falls to ",[15,42545,42546],{},"4.79 V or 2.08%",". For this criterion, 2.5 mm² is the first standard size that fits.",[1041,42549,42551],{"id":42550},"garage-socket-circuit","Garage socket circuit",[12,42553,42554],{},"A 30 m copper run carries 16 A at 230 V. With 2.5 mm²:",[12,42556,42557],{},[25,42558,42559],{},"ΔU = 2 × 0.0175 × 30 × 16 × 0.95 \u002F 2.5 = 6.38 V",[12,42561,33607,42562,42565,42566,56],{},[15,42563,42564],{},"2.78%",". Other final circuits use the 5% value, so 2.5 mm² passes the voltage-drop criterion. Whether the cable carries enough current in its actual installation method is a separate check, covered in ",[40,42567,42568],{"href":3813},"Installation methods under AREI",[79,42570,42572],{"id":42571},"calculate-online-for-free","Calculate online for free",[12,42574,4361,42575,42579],{},[40,42576,42578],{"href":42577},"\u002Fen\u002Ftools\u002Fcable-sizing-calculator-belgium","voltage-drop and cable-sizing calculator"," checks a selected cross-section or finds a preliminary size, free and without sign-up. It covers the three Belgian network types (1×230 V, 3×230 V and 3N~400\u002F230 V), distinguishes single-phase from three-phase circuits, and takes loads in A, W, kW or kVA for copper or aluminium. The result compares standard sizes and reports voltage drop and protection separately.",[12,42581,42582,42583,42586],{},"The calculation runs directly in the browser, so sliders and result respond instantly; the same calculation core is also available through the PlanElec API. The calculator is built for ",[15,42584,42585],{},"preliminary design",". Installation method, grouping, ambient temperature, insulation type, reactance, short-circuit withstand, disconnection conditions, terminals and manufacturer data belong to the professional design that follows.",[79,42588,42590],{"id":42589},"what-to-do-if-voltage-drop-is-too-high","What to do if voltage drop is too high",[12,42592,42593],{},"The most direct lever is a larger cross-section. Often a shorter route or a sub-board close to the loads is the better solution. Aluminium pays off on long feeders but needs suitable terminations and its own design checks. For an EV charger or heat pump, a three-phase supply sharply reduces current per phase at the same total power. Load management also keeps the service connection and protective device within their permitted range.",[79,42595,42597],{"id":42596},"common-mistakes","Common mistakes",[84,42599,42600,42606,42612,42618,42624],{},[87,42601,42602,42605],{},[15,42603,42604],{},"Applying 3% everywhere."," 3% applies to lighting, 5% to other final circuits.",[87,42607,42608,42611],{},[15,42609,42610],{},"Checking only the breaker table."," It does not contain length or actual load.",[87,42613,42614,42617],{},[15,42615,42616],{},"Entering the return distance too."," Enter the one-way length; factor 2 is already in the single-phase formula.",[87,42619,42620,42623],{},[15,42621,42622],{},"Forgetting upstream segments."," The voltage drops of all segments add up.",[87,42625,42626,42629],{},[15,42627,42628],{},"Treating voltage drop as the whole design."," Installation method and short-circuit behaviour are separate checks.",[79,42631,1617],{"id":1616},[1041,42633,42635],{"id":42634},"do-i-enter-the-cable-length-one-way-or-there-and-back","Do I enter the cable length one way or there and back?",[12,42637,42638],{},"One way: the distance from the board to the load. In a single-phase circuit, factor 2 covers the return conductor; three-phase uses √3.",[1041,42640,42642],{"id":42641},"can-a-lighting-circuit-use-15-mm","Can a lighting circuit use 1.5 mm²?",[12,42644,42645],{},"Yes. Table 5.1 under subsection 5.2.1.2 permits 1.5 mm² for circuits without socket outlets, protected under Table 4.11 by at most a 16 A circuit breaker or a 10 A fuse. A long run can still require 2.5 mm² or more because of voltage drop.",[1041,42647,42649],{"id":42648},"is-a-larger-cross-section-always-better","Is a larger cross-section always better?",[12,42651,42652],{},"It reduces losses but costs more, takes up space and must fit the terminals. Choose the first size that passes every relevant check.",[1041,42654,42656],{"id":42655},"what-else-does-the-inspection-need","What else does the inspection need?",[12,42658,42659,42660,42663],{},"The calculator delivers a traceable voltage-drop calculation. An ",[40,42661,42662],{"href":5393},"electrical inspection dossier"," also contains the single-line diagram, the situation plan and on-site measurements; the assessment is made by the accredited inspection body.",[79,42665,42667],{"id":42666},"from-a-preliminary-result-to-a-verifiable-design-record","From a preliminary result to a verifiable design record",[12,42669,42670],{},"A good calculation sheet records more than the final percentage. Note the board and circuit, every cable segment, the one-way route length, conductor material, phase connection, nominal voltage, design current and the source of that current: nameplate, manufacturer design sheet or explicit planning scenario. An assumed power factor stays visibly marked as an assumption.",[12,42672,42673],{},"Next, record the acceptance criterion and its source. Because section 5.2.5 refers to the rules of good practice, a project value may come from the applicable standard, a specification, a network operator requirement or equipment limits. The 3% and 5% in this article are the usual starting point; a sensitive load can require a narrower voltage range at its terminals.",[12,42675,42676],{},"Then keep the checks separate. Voltage drop answers one question. The conductor must also carry the current in its actual installation method, be coordinated with overload and short-circuit protection, meet disconnection conditions and thermal withstand, and fit the terminals and cable routes mechanically. Several individually acceptable segments can still add up to too much drop. The main feeder, sub-board feeder and final circuit therefore belong in one balance.",[12,42678,42679],{},"After installation, compare the documented route and conductor with the work on site. Measurements reveal supply conditions or contact resistances that a resistance-only model does not predict. When the route, material or phase assignment changes, update the single-line diagram and cable list. Such a record convinces the electrician and the inspector far more than a screenshot with a green tick.",[1041,42681,42683],{"id":42682},"tracking-changes","Tracking changes",[12,42685,42686],{},"Keep inputs and results for each design version. If the cable length changes with the real route, the supply changes from single- to three-phase or the load changes to another appliance, recalculate and note the source. Compare percentage, end voltage and the cumulative segments. A larger conductor improves voltage drop but does not answer any open question on protection, terminals or installation.",[1041,42688,42690],{"id":42689},"stating-the-result-correctly","Stating the result correctly",[12,42692,42693],{},"Do not write \"cable is compliant\", but for example: \"For the documented load, length, nominal voltage and stated project criterion, the resistance model gives this voltage drop.\" Add the points that are still open. A designer can then repeat the calculation, change inputs and attach the remaining sizing evidence. Mark a scenario calculation for a load that is not yet known as such, and replace it once the actual appliance is chosen. Also note whether the length comes from the plan, a measurement or a conservative assumption.",[79,42695,42697],{"id":42696},"checking-voltage-drop-in-your-project","Checking voltage drop in your project",[12,42699,3361,42700,42702,42703,56],{},[40,42701,31],{"href":1964},", you draw cable routes on the floor plan and their length flows into the circuit. The self-check uses it to calculate voltage drop for every final circuit against the 3% and 5% guide values and flags exceedances alongside the cross-section-versus-protection check. The rule coverage is listed in ",[40,42704,1086],{"href":1085},[12,42706,42707,42708,42711],{},"For a single house without a subscription, the calculator above is often enough. You then record the result in the free ",[40,42709,22],{"href":1456,"rel":42710},[1458],": for every cable you enter the cross-section and length in the single-line diagram. Sketch does not calculate the voltage drop itself.",[1489,42713],{":height":42714,":width":42715,"alt":42716,"caption":42717,"src":42718},"577","360","PlanElec Pro, ‘AREI\u002FRGIE check’ of a fictional example house: four errors, including 1.5 mm² behind 20 A protection (5.2.2), wallbox with a type A RCD instead of type B (7.22.4.1), no main equipotential bonding (4.2.3.2) and voltage drop 11.7% > 3% (5.2.5).","The self-check names the circuit and the AREI\u002FRGIE article for each finding and jumps to the spot with one click. It replaces neither measurement nor the inspection by the accredited body.","\u002Fimages\u002Fblog\u002Fscreens\u002Fpro\u002Fen-self-check.webp",[79,42720,7537],{"id":7536},[84,42722,42723,42728,42732,42737,42741,42746,42750],{},[87,42724,42725],{},[40,42726,42727],{"href":3795},"Cable cross-section by circuit breaker",[87,42729,42730],{},[40,42731,42521],{"href":5387},[87,42733,42734],{},[40,42735,42736],{"href":3681},"Installing an EV charger under AREI\u002FRGIE",[87,42738,42739],{},[40,42740,3708],{"href":3707},[87,42742,42743],{},[40,42744,42745],{"href":4206},"Determining cable routes and lengths on an electrical plan",[87,42747,42748],{},[40,42749,34507],{"href":34506},[87,42751,42752],{},[40,42753,42755],{"href":42754},"\u002Fen\u002Fblog\u002Fheat-pump-single-line-diagram","Showing a heat pump on the single-line diagram",[12,42757,22965,42758,42761],{},[40,42759,22969],{"href":1971,"rel":42760},[1458],", in particular section 3.2.2 (types of systems), subsections 4.4.1.4 and 5.2.1.2 and section 5.2.5.",{"title":2044,"searchDepth":2045,"depth":2045,"links":42763},[42764,42765,42766,42767,42768,42769,42773,42774,42775,42776,42782,42786,42787],{"id":42184,"depth":2045,"text":42185},{"id":42203,"depth":2045,"text":42204},{"id":42223,"depth":2045,"text":42224},{"id":42275,"depth":2045,"text":42276},{"id":42429,"depth":2045,"text":42430},{"id":42524,"depth":2045,"text":42525,"children":42770},[42771,42772],{"id":42528,"depth":2053,"text":42529},{"id":42550,"depth":2053,"text":42551},{"id":42571,"depth":2045,"text":42572},{"id":42589,"depth":2045,"text":42590},{"id":42596,"depth":2045,"text":42597},{"id":1616,"depth":2045,"text":1617,"children":42777},[42778,42779,42780,42781],{"id":42634,"depth":2053,"text":42635},{"id":42641,"depth":2053,"text":42642},{"id":42648,"depth":2053,"text":42649},{"id":42655,"depth":2053,"text":42656},{"id":42666,"depth":2045,"text":42667,"children":42783},[42784,42785],{"id":42682,"depth":2053,"text":42683},{"id":42689,"depth":2053,"text":42690},{"id":42696,"depth":2045,"text":42697},{"id":7536,"depth":2045,"text":7537},"2026-08-02","Calculate the voltage drop of your cable and see at which length a larger cross-section is needed. Formula, length table and free calculator for Belgium.",[4244,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-voltage-drop-cable-sizing-editorial.jpg","\u002Fblog\u002Fvoltage-drop-cable-sizing.en",{"title":42167,"description":42789},"blog\u002Fvoltage-drop-cable-sizing.en",[23005,42797,23007,42798],"cable-cross-section","arei","UMYk58j9yGHBJ4peZq7-m1ZVHA40LaQtx-4QxDO_DEo","\u002Fblog\u002Fvoltage-drop-cable-sizing",{"id":42802,"title":42803,"articleId":42804,"body":42805,"category":4239,"date":43284,"description":43285,"extension":2113,"image":42822,"labels":43286,"lastUpdated":10988,"locale":2119,"meta":43287,"navigation":2121,"ogImage":43288,"path":43289,"publishDate":43284,"readTime":10311,"refreshInterval":4248,"seo":43290,"seoTitle":43291,"slug":42804,"stem":43292,"tags":43293,"__hash__":43299,"kind":2137,"href":43300},"blog\u002Fblog\u002Fsingle-phase-vs-three-phase.en.md","Single-phase or three-phase? Belgian networks and building connections","single-phase-vs-three-phase",{"type":9,"value":42806,"toc":43266},[42807,42811,42817,42823,42834,42838,42906,42912,42916,42919,42923,42926,42963,42966,42969,42973,43002,43011,43015,43022,43025,43029,43032,43036,43039,43043,43046,43049,43053,43056,43070,43073,43077,43080,43088,43106,43112,43117,43121,43159,43163,43169,43175,43181,43185,43188,43191,43193,43237,43239,43261],[79,42808,42810],{"id":42809},"short-answer-look-at-the-network-and-the-connection-separately","Short answer: look at the network and the connection separately",[12,42812,42813,42816],{},[15,42814,42815],{},"In Belgium you decide between single-phase and three-phase in two steps."," First you identify the low-voltage network in your street: 230 V without a neutral (3×230 V) or 400\u002F230 V with a neutral (3N~400\u002F230 V). Then you choose the building connection: single-phase or three-phase. Single-phase is enough for many homes; an 11 or 22 kW EV charger or a three-phase large appliance needs a suitable three-phase connection. The grid operator confirms what is available at your address.",[12,42818,42819],{},[74,42820],{"alt":42821,"src":42822},"An electrician examines a closed meter cabinet.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-single-phase-vs-three-phase-editorial.webp",[12,42824,42825,42826,42829,42830,42833],{},"“Single-phase = 1×230 V” therefore describes the connection, not the street network. A single-phase 230 V connection is supplied either ",[15,42827,42828],{},"phase–neutral"," from a 400\u002F230 V network or ",[15,42831,42832],{},"phase–phase"," from a 3×230 V network. ORES states explicitly that a single-phase connection does not always include a neutral conductor.",[79,42835,42837],{"id":42836},"the-four-combinations","The four combinations",[138,42839,42840,42856],{},[141,42841,42842],{},[144,42843,42844,42847,42850,42853],{},[147,42845,42846],{},"Street network",[147,42848,42849],{},"Building connection",[147,42851,42852],{},"Conductors at the connection",[147,42854,42855],{},"Technical notation",[163,42857,42858,42871,42882,42895],{},[144,42859,42860,42863,42865,42868],{},[168,42861,42862],{},"400\u002F230 V with N",[168,42864,42460],{},[168,42866,42867],{},"L + N",[168,42869,42870],{},"1×230 V, L–N",[144,42872,42873,42875,42877,42880],{},[168,42874,42862],{},[168,42876,42484],{},[168,42878,42879],{},"L1 + L2 + L3 + N",[168,42881,42494],{},[144,42883,42884,42887,42889,42892],{},[168,42885,42886],{},"230 V without N",[168,42888,42460],{},[168,42890,42891],{},"two line conductors",[168,42893,42894],{},"1×230 V, L–L",[144,42896,42897,42899,42901,42904],{},[168,42898,42886],{},[168,42900,42484],{},[168,42902,42903],{},"three line conductors",[168,42905,42470],{},[1489,42907],{":height":42908,":width":3800,"alt":42909,"caption":42910,"src":42911},"520","Grid of street network and connection. 400\u002F230 V with N: single-phase L and N at 230 V, three-phase L1, L2, L3 and N with 230 V to neutral and 400 V between lines. 230 V without N: single-phase L1 and L2 at 230 V, three-phase L1, L2 and L3 at 230 V.","In Belgium, single-phase does not always mean line and neutral: on the 230 V network the circuit sits between two line conductors.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fsingle-phase-vs-three-phase\u002Fnetwork-and-connection.en.svg",[79,42913,42915],{"id":42914},"how-common-is-3230-v","How common is 3×230 V?",[12,42917,42918],{},"The 3×230 V network is everyday reality in Belgium. Fluvius still had 18,101 km of 230 V low-voltage network at the end of 2024, mainly in urban and western areas. Sibelga states that around 80% of the Brussels territory is supplied at 230 V. That does not make every Brussels household three-phase: Sibelga gives 9.2 kVA, single-phase 230 V at 40 A, as the standard for an average household.",[79,42920,42922],{"id":42921},"power-at-the-same-current-rating","Power at the same current rating",[12,42924,42925],{},"Available power depends on voltage, number of phases and connection current. For 40 A, ORES lists:",[138,42927,42928,42938],{},[141,42929,42930],{},[144,42931,42932,42934],{},[147,42933,10584],{},[147,42935,42937],{"align":42936},"right","Apparent power at 40 A",[163,42939,42940,42948,42956],{},[144,42941,42942,42945],{},[168,42943,42944],{},"Single-phase 230 V",[168,42946,42947],{"align":42936},"9.2 kVA",[144,42949,42950,42953],{},[168,42951,42952],{},"Three-phase 3×230 V",[168,42954,42955],{"align":42936},"15.9 kVA",[144,42957,42958,42960],{},[168,42959,42401],{},[168,42961,42962],{"align":42936},"27.7 kVA",[12,42964,42965],{},"The calculation: single-phase apparent power is voltage times current (230 V × 40 A ≈ 9.2 kVA). For a balanced three-phase load you multiply line-to-line voltage, current and √3 (230 V × 40 A × 1.73 ≈ 15.9 kVA; 400 V × 40 A × 1.73 ≈ 27.7 kVA). These figures give the technical order of magnitude. Your contracted capacity is set by the connection breaker and the grid operator; the real power an appliance can use also depends on its power factor.",[12,42967,42968],{},"With an unbalanced distribution, each line conductor counts on its own. A large total capacity does not help if many single-phase loads sit on the same phase.",[79,42970,42972],{"id":42971},"what-this-means-for-ev-chargers-heat-pumps-and-pv","What this means for EV chargers, heat pumps and PV",[84,42974,42975,42984,42993],{},[87,42976,42977,42980,42981,56],{},[15,42978,42979],{},"EV charger:"," 3.7 or 7.4 kW often works single-phase. 11 or 22 kW normally needs a suitable three-phase connection. Not every charger runs on 3×230 V; Sibelga points out limitations for 11\u002F22 kW charging. Design and obligations are covered in ",[40,42982,42983],{"href":3681},"EV chargers and the AREI",[87,42985,42986,42989,42990,56],{},[15,42987,42988],{},"Heat pump and hob:"," the nameplate decides. An appliance designed for 3N~400 V does not simply run on 3×230 V without a neutral. How to show the heat pump in the diagram is explained in ",[40,42991,42992],{"href":42754},"heat pump single-line diagram",[87,42994,42995,42998,42999,56],{},[15,42996,42997],{},"PV:"," the permitted inverter power and phase distribution are set by the grid operator for the specific connection; there is no single Belgian limit. More in ",[40,43000,43001],{"href":36916},"documenting a PV system",[12,43003,43004,43005,3157,43008,56],{},"Before buying a large appliance, always check both: ",[15,43006,43007],{},"single- or three-phase",[15,43009,43010],{},"230 V without N or 400\u002F230 V with N",[79,43012,43014],{"id":43013},"protection-and-rcds-on-a-3230-v-network","Protection and RCDs on a 3×230 V network",[12,43016,43017,43018,43021],{},"On a 3×230 V network, both active conductors of a 230 V circuit are line conductors. Book 1 of the AREI\u002FRGIE, Belgium's general regulations for electrical installations, requires in subsection 4.4.4.2 overcurrent detection on ",[15,43019,43020],{},"both active conductors"," in single-phase and two-phase circuits of domestic installations. Exception: a residual current device at the same level also contains overcurrent detection on one line conductor and disconnects both active conductors. In practice you therefore plan circuit breakers with two protected poles on 3×230 V. For three-phase circuits without a distributed neutral, subsection 4.4.4.3 sets out when one line conductor may remain without its own overcurrent detection.",[12,43023,43024],{},"An RCD does not need a neutral as a “reference”. It compares the currents in all active conductors passing through it. On 3×230 V it therefore measures and switches all line conductors involved together and protects just as effectively as on 3N~400\u002F230 V.",[79,43026,43028],{"id":43027},"distributing-the-phases-sensibly","Distributing the phases sensibly",[12,43030,43031],{},"With a three-phase connection, spread the single-phase loads as evenly as possible across the phases. The AREI sets no percentage for this. A warning threshold such as 30% is a design aid, not an AREI requirement. With a single-phase connection there is nothing to distribute. Document the assignment in the board and check it after every change.",[79,43033,43035],{"id":43034},"how-to-identify-your-connection","How to identify your connection",[12,43037,43038],{},"Look at the meter, the connection breaker and the incoming conductors without opening any parts sealed by the grid operator. ORES shows example photos of single-phase 230 V, 3×230 V and 3×400 V + N. Counting visible wires easily misleads, because the protective conductor, internal wiring or an older installation add to the count. Binding confirmation comes from the grid operator or an electrician.",[79,43040,43042],{"id":43041},"from-load-list-to-connection-decision","From load list to connection decision",[12,43044,43045],{},"Draw up a load list before you apply for more capacity. Separate continuous loads, short simultaneous peaks and controllable loads. Hob, heat pump, instantaneous water heater, EV charger and inverter have different profiles. The sum of all nameplates is therefore not automatically the capacity you need; dropping large loads without calculation is just as wrong. Load management limits peaks when it matches the appliance, meter and grid-operator procedure.",[12,43047,43048],{},"Record four data points per appliance: permitted supply voltage, need for a neutral, number of phases and maximum current per phase. Add inrush current, power factor and manufacturer conditions where they matter. “Three-phase” alone is not enough: a motor or charger for 3N~400 V may need a neutral or a different internal connection than a load for 3×230 V. Protection, cross-section, disconnection conditions and phase rotation are the electrician's call.",[79,43050,43052],{"id":43051},"upgrading-or-converting-with-the-grid-operator","Upgrading or converting with the grid operator",[12,43054,43055],{},"Costs and lead times are set by the competent grid operator; there is no Belgian flat rate. They depend on the requested capacity, the street infrastructure, the meter position and the required changes to the internal installation. Prepare your request like this:",[3139,43057,43058,43061,43064,43067],{},[87,43059,43060],{},"Have the EAN or connection reference, current rating and desired capacity ready.",[87,43062,43063],{},"Add appliance data and the planned commissioning date.",[87,43065,43066],{},"Ask explicitly about the available voltage, number of phases and neutral at the address.",[87,43068,43069],{},"Agree with the electrician what changes at the meter position, supply cable, main board, RCDs and phase distribution.",[12,43071,43072],{},"Only then can you compare the grid offer and internal works sensibly. After a significant change you update the single-line diagram and situation plan; whether a new inspection is required depends on the scope and nature of the change.",[79,43074,43076],{"id":43075},"the-supply-in-the-single-line-diagram","The supply in the single-line diagram",[12,43078,43079],{},"At the supply point, record voltage, type of current and connection configuration. Show the main protection and all active conductors unambiguously. On a 3×230 V network you do not draw a neutral; on 3N~400\u002F230 V it appears where it is actually distributed. After a conversion you check board occupancy, protective devices, conductors and final circuits and bring the drawings up to the as-built state. Keep the previous version and create a new, dated one.",[12,43081,3361,43082,43084,43085,43087],{},[40,43083,31],{"href":1964}," you document the street network (with or without neutral) and the building connection (single- or three-phase) as separate settings; the valid phase assignments for your circuits follow from them. The AREI\u002FRGIE self-check warns about single-pole circuit breakers in homes (4.4.4.2), about phase imbalance above 30% as a practice recommendation and about implausible combinations of a 3×230 V connection with the stored earthing system. The scope is listed in ",[40,43086,1086],{"href":1085},". The grid operator confirms the available network and capacity; the inspection is carried out by the recognised inspection body.",[12,43089,43090,43091,43094,43095,43097,43098,43101,43102,43105],{},"For a single-line diagram without a subscription, ",[40,43092,22],{"href":3611,"rel":43093},[1458]," is enough: the ",[15,43096,11136],{}," start begins with the connection and the main protection. On the supply you choose the network (",[15,43099,43100],{},"Supply",": 2x230V, 3x230V or 3x400V+N), on the protective device of each circuit the ",[15,43103,43104],{},"Phase"," L1, L2 or L3; it is printed in the diagram below the board. Sketch does not check the phase balance.",[1489,43107],{":height":43108,":width":41004,"alt":43109,"caption":43110,"src":43111},"1260","PlanElec Pro, the ‘Grid connection’ sheet: network with neutral 400\u002F230 V + N, three-phase connection 3N~400\u002F230 V and earthing system TT, with TN-S, TN-C, TN-C-S and IT as expert options; below, earth electrode present with type building earth.","Network form, building connection and earthing system are set separately; the self-check calculates with them. Which system you actually have is confirmed by the grid operator and the measurement on site.","\u002Fimages\u002Fblog\u002Fscreens\u002Fpro\u002Fen-supply.webp",[1489,43113],{":height":22938,":width":22939,"alt":43114,"caption":43115,"src":43116},"Single-line diagram in PlanElec Sketch: the grid connection selected, on the right the properties with ‘Supply’ 3x230V and ‘Earthing system’ TT.","You enter the network and the earthing system at the grid connection. The grid operator confirms which connection you have; Sketch does not check AREI\u002FRGIE rules.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-supply-three-phase.webp",[79,43118,43120],{"id":43119},"common-decision-errors","Common decision errors",[84,43122,43123,43129,43135,43141,43147,43153],{},[87,43124,43125,43128],{},[15,43126,43127],{},"Reading only the meter:"," the display does not fully explain the network and conductor configuration.",[87,43130,43131,43134],{},[15,43132,43133],{},"Treating 3×230 V and 3N~400\u002F230 V as equal:"," both are three-phase but give the appliance different voltages and conductors.",[87,43136,43137,43140],{},[15,43138,43139],{},"Treating kVA as kW:"," power factor and appliance determine the real power.",[87,43142,43143,43146],{},[15,43144,43145],{},"Taking charging power as connection capacity:"," the other simultaneous loads and load management are then missing.",[87,43148,43149,43152],{},[15,43150,43151],{},"Leaving the drawings after a conversion:"," supply, protection chain and phase assignment no longer match reality.",[87,43154,43155,43158],{},[15,43156,43157],{},"Opening sealed parts:"," you identify the connection from visible information, the grid operator or a professional.",[79,43160,43162],{"id":43161},"three-typical-starting-points","Three typical starting points",[12,43164,43165,43168],{},[15,43166,43167],{},"Existing 1×230 V:"," first check the actual rating and whether a neutral is present. An EV charger with limited single-phase power and load management is often feasible; vehicle, charger, household load and grid operator decide. A high kW figure in a brochure proves no available capacity.",[12,43170,43171,43174],{},[15,43172,43173],{},"Existing 3×230 V:"," spread single-phase loads across the phase pairs and explicitly check each three-phase appliance for operation without a neutral. An appliance that internally needs 230 V to neutral does not fit just because its data sheet says “three-phase”.",[12,43176,43177,43180],{},[15,43178,43179],{},"Existing 3N~400\u002F230 V:"," single-phase loads connect between line and neutral, three-phase appliances as specified by the manufacturer. A high calculated connection capacity does not lift the current limit per phase or the requirements for protection and cross-section.",[79,43182,43184],{"id":43183},"measurement-and-commissioning","Measurement and commissioning",[12,43186,43187],{},"You do not derive the final assignment from documents alone. A professional measures the actual voltage configuration, without opening grid-operator areas without authorisation, and checks phase rotation, neutral and protective conductor. After changes, the prescribed checks and measurements of the affected parts follow.",[12,43189,43190],{},"For controllable large loads, also watch their behaviour in operation. Load management must switch to a safe, documented state on loss of communication or incorrect readings. The configured limit matches the connection protection and accounts for peaks, not just averages. Changed settings are documented like any other design-relevant change.",[79,43192,1681],{"id":69},[84,43194,43195,43202,43209,43216,43223,43230],{},[87,43196,43197],{},[40,43198,43201],{"href":43199,"rel":43200},"https:\u002F\u002Fwww.ores.be\u002Fparticulier\u002Freconnaitre-informations-techniques\u002F",[1458],"ORES: Identifying technical connection information",[87,43203,43204],{},[40,43205,43208],{"href":43206,"rel":43207},"https:\u002F\u002Fwww.sibelga.be\u002Fen\u002Fconnections-meters\u002Fmy-connection\u002Felectrical-power",[1458],"Sibelga: Electrical capacity and connection types",[87,43210,43211],{},[40,43212,43215],{"href":43213,"rel":43214},"https:\u002F\u002Fwww.sibelga.be\u002Fen\u002Fconnections-meters\u002Felectric-charging\u002Fcharging-at-home",[1458],"Sibelga: Charging at home",[87,43217,43218],{},[40,43219,43222],{"href":43220,"rel":43221},"https:\u002F\u002Fover.fluvius.be\u002Fsites\u002Ffluvius\u002Ffiles\u002F2025-06\u002Finvesteringsplan-2026-2035-versie-publieke-consultatie.pdf",[1458],"Fluvius: Investment plan 2026–2035",[87,43224,43225],{},[40,43226,43229],{"href":43227,"rel":43228},"https:\u002F\u002Fdownload.schneider-electric.com\u002Ffiles?p_File_Id=905251744&p_File_Name=ECT114.pdf&p_Reference=ECT114&p_enDocType=Cahier+Technique",[1458],"Schneider Electric: RCD operating principle, including three-phase circuits without neutral",[87,43231,43232,43236],{},[40,43233,43235],{"href":1971,"rel":43234},[1458],"FPS Economy: RGIE\u002FAREI Book 1, version 06, current official publication",", subsections 4.4.4.2 and 4.4.4.3",[79,43238,7537],{"id":7536},[84,43240,43241,43246,43251,43256],{},[87,43242,43243],{},[40,43244,43245],{"href":3790},"Calculate voltage drop and choose a cable size",[87,43247,43248],{},[40,43249,43250],{"href":3681},"Installing an EV charger in Belgium",[87,43252,43253],{},[40,43254,43255],{"href":36916},"Registering and documenting a PV system",[87,43257,43258],{},[40,43259,43260],{"href":27030},"Earthing TT or TN-S in Belgium",[12,43262,43263],{},[40,43264,43265],{"href":1964},"Document the network and building connection separately in PlanElec Pro →",{"title":2044,"searchDepth":2045,"depth":2045,"links":43267},[43268,43269,43270,43271,43272,43273,43274,43275,43276,43277,43278,43279,43280,43281,43282,43283],{"id":42809,"depth":2045,"text":42810},{"id":42836,"depth":2045,"text":42837},{"id":42914,"depth":2045,"text":42915},{"id":42921,"depth":2045,"text":42922},{"id":42971,"depth":2045,"text":42972},{"id":43013,"depth":2045,"text":43014},{"id":43027,"depth":2045,"text":43028},{"id":43034,"depth":2045,"text":43035},{"id":43041,"depth":2045,"text":43042},{"id":43051,"depth":2045,"text":43052},{"id":43075,"depth":2045,"text":43076},{"id":43119,"depth":2045,"text":43120},{"id":43161,"depth":2045,"text":43162},{"id":43183,"depth":2045,"text":43184},{"id":69,"depth":2045,"text":1681},{"id":7536,"depth":2045,"text":7537},"2026-07-27","1×230 V, 3×230 V or 3N~400\u002F230 V: understand the Belgian street network, neutral conductor and connection phase count, and plan protection, EV charger and heat pump accordingly.",[5421,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-single-phase-vs-three-phase-editorial.jpg","\u002Fblog\u002Fsingle-phase-vs-three-phase.en",{"title":42803,"description":43285},"Single-Phase or Three-Phase? Connections in Belgium","blog\u002Fsingle-phase-vs-three-phase.en",[2133,2134,42460,42484,4261,43294,43295,43296,37316,43297,43298,5269],"Fluvius","ORES","Sibelga","heat pump","solar panels","0mvVhlTtxhm5yGVKrulxp_unRSDnb-tSWllE2k-g4oE","\u002Fblog\u002Fsingle-phase-vs-three-phase",{"id":43302,"title":43303,"articleId":43304,"body":43305,"category":4239,"date":43956,"description":43957,"extension":2113,"image":43327,"labels":43958,"lastUpdated":4826,"locale":2119,"meta":43959,"navigation":2121,"ogImage":43960,"path":43961,"publishDate":43956,"readTime":30492,"refreshInterval":4248,"seo":43962,"seoTitle":10313,"slug":43304,"stem":43963,"tags":43964,"__hash__":43970,"kind":2137,"href":43971},"blog\u002Fblog\u002Frenovation-electrical-plans.en.md","Renovation and AREI: When Do You Need New Electrical Plans?","renovation-electrical-plans",{"type":9,"value":43306,"toc":43929},[43307,43311,43322,43328,43331,43336,43340,43436,43440,43472,43475,43479,43482,43488,43491,43495,43502,43509,43512,43516,43519,43539,43543,43546,43566,43569,43576,43578,43582,43586,43590,43593,43596,43600,43603,43606,43610,43613,43616,43620,43623,43627,43631,43634,43638,43641,43645,43648,43652,43656,43679,43682,43686,43692,43697,43701,43704,43707,43782,43791,43795,43798,43831,43834,43861,43865,43876,43878,43909,43915,43917,43926],[79,43308,43310],{"id":43309},"when-does-a-renovation-lead-to-new-plans-and-an-inspection","When does a renovation lead to new plans and an inspection?",[12,43312,43313,43314,43317,43318,43321],{},"The electrical scope decides, not the word “renovation”. A ",[15,43315,43316],{},"substantial alteration or extension"," needs an updated single-line diagram and situation plan and undergoes a conformity inspection before it is put into use. That inspection is limited to the added or modified parts; an unchanged part is only included for the characteristics the alteration affects (AREI\u002FRGIE Book 1, Subsection 6.4.7.3). A ",[15,43319,43320],{},"non-substantial alteration"," does not need a new single-line diagram: a short dated and signed description is enough, and the situation plan still shows the change (Subsection 3.1.2.1 a). For your own home renovation, start by drawing the existing installation in Sketch and discuss the planned changes with your electrician.",[12,43323,43324],{},[74,43325],{"alt":43326,"src":43327},"Electricians survey an existing residential installation.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-renovation-electrical-plans-editorial.webp",[12,43329,43330],{},"The AREI contains no list that automatically classifies every moved socket as “substantial” or “non-substantial”. Agree the classification with your electrician before work starts and, when in doubt, with the inspection body.",[1489,43332],{":height":42908,":width":3800,"alt":43333,"caption":43334,"src":43335},"Flow: a non-substantial alteration needs no new single-line diagram but a dated and signed short description and no inspection before use; a substantial alteration needs updated plans and a conformity inspection of the new and modified parts; for an old installation from before 1981, at least one 300 mA RCD then protects the whole installation","Whether a renovation triggers new plans and an inspection depends on whether it counts as a substantial or non-substantial alteration (3.1.2.1 a, 6.4.7.3).","\u002Fimages\u002Fblog\u002Fdiagrams\u002Frenovation-electrical-plans\u002Frenovation-decision.en.svg",[79,43337,43339],{"id":43338},"which-work-triggers-what","Which work triggers what?",[138,43341,43342,43354],{},[141,43343,43344],{},[144,43345,43346,43348,43350,43352],{},[147,43347,2675],{},[147,43349,13441],{},[147,43351,4015],{},[147,43353,3919],{},[163,43355,43356,43369,43382,43394,43408,43422],{},[144,43357,43358,43360,43363,43366],{},[168,43359,5515],{},[168,43361,43362],{},"draw up or update the single-line diagram and situation plan",[168,43364,43365],{},"conformity inspection of modified and added parts before use",[168,43367,43368],{},"3.1.2.1 a, 6.4.7.3",[144,43370,43371,43374,43377,43380],{},[168,43372,43373],{},"The alteration affects an unchanged part",[168,43375,43376],{},"document the effect",[168,43378,43379],{},"the unchanged part is inspected for the modified characteristics and mentioned in the report",[168,43381,32990],{},[144,43383,43384,43387,43390,43392],{},[168,43385,43386],{},"Non-substantial alteration",[168,43388,43389],{},"dated, signed short description; situation plan shows the current state",[168,43391,4039],{},[168,43393,25564],{},[144,43395,43396,43399,43402,43405],{},[168,43397,43398],{},"Substantial alteration of an old installation (begun before 1 October 1981)",[168,43400,43401],{},"as above; older parts marked “older part” on the diagram",[168,43403,43404],{},"whole installation behind at least one RCD of at most 300 mA at the origin",[168,43406,43407],{},"3.1.2.1 a, 4.2.4.3 b",[144,43409,43410,43413,43416,43419],{},[168,43411,43412],{},"Complete renewal of the installation",[168,43414,43415],{},"full set of plans, as for a new installation",[168,43417,43418],{},"conformity inspection before use",[168,43420,43421],{},"Chapter 6.4",[144,43423,43424,43427,43430,43433],{},[168,43425,43426],{},"Like-for-like replacement of a device",[168,43428,43429],{},"record type and characteristics of the replacement",[168,43431,43432],{},"classified by the electrician as soon as location, cable, protection or function changes",[168,43434,43435],{},"no specific rule",[79,43437,43439],{"id":43438},"a-practical-decision-path","A practical decision path",[3139,43441,43442,43448,43454,43460,43466],{},[87,43443,43444,43447],{},[15,43445,43446],{},"Is the work purely non-electrical?"," Painting or new flooring does not change the electrical installation.",[87,43449,43450,43453],{},[15,43451,43452],{},"Is only one device replaced like for like?"," Document the replacement and check that characteristics and protection concept stay the same.",[87,43455,43456,43459],{},[15,43457,43458],{},"Are new cables, circuits, sources or a new board added?"," Treat the project as a possible substantial alteration or extension until the electrician has classified it.",[87,43461,43462,43465],{},[15,43463,43464],{},"Do voltage, supply type, earthing or the protection chain change?"," Then the effect reaches beyond the new component.",[87,43467,43468,43471],{},[15,43469,43470],{},"Which existing sections are affected?"," Delimit them by circuit, board and real cable route.",[12,43473,43474],{},"A new sub-board, an extra circuit for an EV charger or heat pump, a board replacement or a change of supply therefore goes to your electrician early. A cover plate, luminaire or switch replaced like for like, without changing the electrical characteristics, is closer to maintenance.",[79,43476,43478],{"id":43477},"is-there-a-contamination-rule","Is there a “contamination rule”?",[12,43480,43481],{},"No. The popular term claims that any small change makes the whole house subject to inspection under current rules. Book 1 does not say that. The inspection of a substantial alteration covers the modified and added parts; an unchanged part is only inspected for the characteristics that the alteration shifts (Subsection 6.4.7.3).",[12,43483,43484,43485,43487],{},"There is, however, one rule that reaches the whole installation, and it concerns old installations: when an old domestic installation as referred to in Part 8 undergoes a substantial alteration or extension, at least one RCD of at most 300 mA at the origin protects the ",[15,43486,30854],{}," installation (Subsection 4.2.4.3 b). Plan this RCD into any larger renovation of a house with an old installation.",[12,43489,43490],{},"Delimit the work clearly: record which circuits, cable sections, protective devices and rooms are touched. Mark the existing installation, the new part and shared protection or supply points. This documentation makes the inspection scope understandable; what the approved body inspects, it decides itself.",[79,43492,43494],{"id":43493},"what-part-8-really-does","What Part 8 really does",[12,43496,43497,43498,43501],{},"Part 8 contains specific derogations for ",[15,43499,43500],{},"existing parts",", depending on when they were installed. Section 8.2.1 covers old domestic installations whose construction began before 1 October 1981; Section 8.2.2 covers installations inspected under the former AREI. Every derogation has a precise scope and often conditions. New or substantially altered parts are designed to current requirements.",[12,43503,43504,43505,43508],{},"Important for the documents: for existing parts of old installations, Section 8.2.1 No. 7 allows a ",[15,43506,43507],{},"simplified"," single-line diagram with address, nominal voltage, cross-section of the main board’s supply cable, type and cross-section of the outgoing ways and the residual current and other protective devices with their characteristics, and a simplified situation plan with sockets, switches, lighting points and fixed appliances.",[12,43510,43511],{},"For each existing section, record the installation period, existing inspection reports, cable and protection data and later changes. A house from the 1960s often contains components from several decades. The year the building was constructed therefore does not prove which derogation applies to a given circuit.",[79,43513,43515],{"id":43514},"house-with-existing-plans","House with existing plans",[12,43517,43518],{},"If a current single-line diagram and situation plan exist:",[3139,43520,43521,43527,43533],{},[87,43522,43523,43526],{},[15,43524,43525],{},"Update the plans:"," draw new circuits and changed positions.",[87,43528,43529,43532],{},[15,43530,43531],{},"Distinguish old and new:"," make modified and unchanged parts recognisable.",[87,43534,43535,43538],{},[15,43536,43537],{},"Raise the version:"," adjust number, version and version date, then present the updated plans to the approved body.",[79,43540,43542],{"id":43541},"house-without-plans","House without plans",[12,43544,43545],{},"Many older houses have no documents at all. Then:",[3139,43547,43548,43554,43560],{},[87,43549,43550,43553],{},[15,43551,43552],{},"New and substantially altered parts"," get a complete single-line diagram and situation plan (Subsection 3.1.2.1 a).",[87,43555,43556,43559],{},[15,43557,43558],{},"Existing parts from before 1981"," that appear on the diagram are marked “older part”; for them, the simplified set under Section 8.2.1 No. 7 is sufficient.",[87,43561,43562,43565],{},[15,43563,43564],{},"The installation file"," under Section 9.1.2 contains the diagrams and plans of the installation. If they are missing at the inspection visit on sale, the approved body records this as an infringement; its brief description and rough sketch do not replace a single-line diagram (Subsection 8.4.2.2 d).",[12,43567,43568],{},"If you are renovating anyway, survey the existing installation at the same time. That survey belongs in the quotation as a separate item.",[12,43570,43571,43572,43575],{},"You can draw the simplified plan of the existing installation and the new parts for free in the browser with ",[40,43573,22],{"href":1456,"rel":43574},[1458],": single-line diagram and situation plan, even without an account. With a free account you place an existing floor plan or old plan underneath as an image or PDF. Before the PDF, “Check documents” shows what is still missing, such as empty title block fields, circuits without a protective device or devices on the diagram without a place on the situation plan. Whether the installation conforms is assessed by the approved inspection body.",[1489,43577],{":height":5808,":width":5809,"alt":5810,"caption":5811,"src":5812},[12,43579,7139,43580,56],{},[40,43581,11748],{"href":4218},[79,43583,43585],{"id":43584},"documentation-during-a-renovation","Documentation during a renovation",[1041,43587,43589],{"id":43588},"survey-without-dangerous-assumptions","Survey without dangerous assumptions",[12,43591,43592],{},"Start with existing inspection reports, plans, invoices and labels and compare them with the real board. For the survey, a professional switches circuits off in a controlled way and records which points actually go dead; work on live parts and inside the board belongs in qualified hands. A presumed cable route stays marked as a presumption, not drawn as fact.",[12,43594,43595],{},"Make a list per circuit: reference, rooms supplied, visible cable type and cross-section, protective device, RCD, known boxes and permanently connected appliances. Keep unknown values separate from confirmed ones. Photos record labels and condition; they replace neither measurement nor diagram.",[1041,43597,43599],{"id":43598},"split-the-renovation-into-work-packages","Split the renovation into work packages",[12,43601,43602],{},"Separate safety defects, adjustments needed for the new scope and desired comfort extensions. You then see what must be settled before commissioning and what can follow later. Look at shared points first: main board, earthing, supply and shared RCDs connect several rooms. A new kitchen circuit is local in space but touches the board and its protection chain electrically.",[12,43604,43605],{},"For each package, document the initial state, the planned change, the affected existing characteristics and the final state. Settle the substantial or non-substantial classification before plastering. Inspection scope, measurements and accessible test points determine the schedule and the appointment.",[1041,43607,43609],{"id":43608},"produce-the-as-built-state","Produce the as-built state",[12,43611,43612],{},"Do not copy planned positions into the final version without checking. Compare sockets, switches, lighting points, boxes and fixed appliances room by room, then match each circuit with its protective device, cable data and board position. Older parts whose construction began before 1 October 1981 carry the note “older part” on the single-line diagram when they are shown.",[12,43614,43615],{},"Diagrams and plans carry number, version and version date. A short change note names the rooms or circuits worked on. Keep earlier approved versions; they show when each existing section was created. The current plans stay available on site for supervision, inspection, maintenance, repair and alteration (Subsection 3.1.2.1 d).",[1041,43617,43619],{"id":43618},"handle-the-inspection-report","Handle the inspection report",[12,43621,43622],{},"Give the approved body the requested plans and documents in readable form. A finding does not disappear with a nicer drawing: a measured value, wrong execution or unsuitable equipment is fixed technically. Then the installation and the documents are brought back to the same state. Inspection report, signed plans, measurements and manufacturer documents go into the installation file.",[79,43624,43626],{"id":43625},"three-examples-of-scope","Three examples of scope",[1041,43628,43630],{"id":43629},"the-bathroom-is-completely-renewed","The bathroom is completely renewed",[12,43632,43633],{},"New cables, sockets, lighting and protective measures are recorded as the new scope of work. Also document which supply and which board branch feed the bathroom. The electrician checks bathroom zones, protection, cables and bonding against the real execution. Other rooms are not inspected by default; shared or affected characteristics are part of the scope, though.",[1041,43635,43637],{"id":43636},"an-existing-circuit-is-repaired","An existing circuit is repaired",[12,43639,43640],{},"Replace the faulty device like for like, record type and characteristics and have the safe restoration checked. As soon as location, cable, protection or function changes, the electrician reclassifies the work. The word “repair” does not hide a real extension.",[1041,43642,43644],{"id":43643},"the-board-is-replaced","The board is replaced",[12,43646,43647],{},"A new board touches many shared protection and assignment data. Before removal, all outgoing ways are recorded unambiguously. After the work, labels, RCD groups, phases, cables and diagrams match the installed layout. Unknown old circuits are identified before connection, not carried forward under generic names.",[12,43649,7139,43650,56],{},[40,43651,32144],{"href":32143},[79,43653,43655],{"id":43654},"questions-for-the-first-meeting","Questions for the first meeting",[84,43657,43658,43661,43664,43667,43670,43673,43676],{},[87,43659,43660],{},"Which parts will be new, moved, replaced or left unchanged?",[87,43662,43663],{},"Which existing data are proven, and which must be measured or opened up?",[87,43665,43666],{},"Which shared protection or supply points are affected?",[87,43668,43669],{},"Is the work a substantial alteration or extension, and who confirms that?",[87,43671,43672],{},"Is it an old installation that needs an RCD at the origin after the work?",[87,43674,43675],{},"Which plans, descriptions, measurements and manufacturer documents are needed?",[87,43677,43678],{},"When do the inspection and the document release take place in the schedule?",[12,43680,43681],{},"In occupied homes, also plan safe intermediate states. Unfinished circuits stay clearly out of service and labelled. Temporary supplies are installed properly and documented separately. After each phase, record which parts already match the as-built plan and which are still a working state.",[79,43683,43685],{"id":43684},"planning-effort-and-cost","Planning effort and cost",[12,43687,43688,43689,56],{},"Cost depends on the survey, missing documentation, number of circuits, measurements, the scope of the works and the inspection body. Price ranges found online are no substitute for a quotation. Ask for separate items for survey, design, execution, first inspection and possible rework; how to compare such quotations is explained in ",[40,43690,43691],{"href":29401},"What does an electrical plan cost?",[12,43693,43694,43695,56],{},"For the plans themselves: you draw the single-line diagram and situation plan for free in PlanElec Sketch. The distribution board and the self-check report are part of PlanElec Pro, as site pass per property or as a subscription; current prices are on the ",[40,43696,1958],{"href":54},[79,43698,43700],{"id":43699},"what-planelec-contributes-to-renovations","What PlanElec contributes to renovations",[12,43702,43703],{},"Draw the existing installation and confirmed changes in Sketch with consistent circuit references. Distinguish planned work from completed work so the PDF clearly identifies its status.",[12,43705,43706],{},"Which tool fits depends on who draws up the documents:",[138,43708,43709,43721],{},[141,43710,43711],{},[144,43712,43713,43715,43718],{},[147,43714,5825],{},[147,43716,43717],{},"PlanElec Sketch (free, in the browser)",[147,43719,43720],{},"PlanElec Pro (contractors)",[163,43722,43723,43733,43743,43754,43763,43773],{},[144,43724,43725,43728,43730],{},[168,43726,43727],{},"Draw existing and new parts as single-line diagram and situation plan",[168,43729,515],{},[168,43731,43732],{},"yes, linked to floor plan and topology",[144,43734,43735,43738,43741],{},[168,43736,43737],{},"Place an old plan underneath as an image or PDF and calibrate it",[168,43739,43740],{},"yes, with a free account",[168,43742,515],{},[144,43744,43745,43748,43751],{},[168,43746,43747],{},"Show what is missing before the PDF",[168,43749,43750],{},"“Check documents”",[168,43752,43753],{},"step list “On the way to your documents” in the export",[144,43755,43756,43759,43761],{},[168,43757,43758],{},"Plan the distribution board",[168,43760,602],{},[168,43762,515],{},[144,43764,43765,43768,43770],{},[168,43766,43767],{},"AREI\u002FRGIE self-check report for the supported rules",[168,43769,602],{},[168,43771,43772],{},"yes, indicative",[144,43774,43775,43778,43780],{},[168,43776,43777],{},"Installation dossier with cover page and document index",[168,43779,602],{},[168,43781,515],{},[12,43783,43784,43785,43787,43788,43790],{},"If you need the board or the self-check report, you take the Sketch drawing to ",[40,43786,31],{"href":1964}," with “Take it to Pro”; the handover only goes from Sketch to Pro. In Pro, the project records the period in which the installation was built, and the self-check shows certain findings on existing parts under Part 8 as a note rather than an error. It does not decide the derogation itself (",[40,43789,28419],{"href":1085},"). The roles are clear: PlanElec provides the structured documentation, the electrician designs and installs, and the approved body gives the official assessment.",[79,43792,43794],{"id":43793},"checklist-for-renovators","Checklist for renovators",[12,43796,43797],{},"Before you start:",[84,43799,43801,43807,43813,43819,43825],{"className":43800},[36137],[87,43802,43804,43806],{"className":43803},[36141],[25188,43805],{"disabled":2121,"type":36144}," Is the work a substantial alteration or extension?",[87,43808,43810,43812],{"className":43809},[36141],[25188,43811],{"disabled":2121,"type":36144}," Existing electrical plans and inspection reports located?",[87,43814,43816,43818],{"className":43815},[36141],[25188,43817],{"disabled":2121,"type":36144}," Old installation? Then plan the RCD at the origin.",[87,43820,43822,43824],{"className":43821},[36141],[25188,43823],{"disabled":2121,"type":36144}," Budget for survey, documentation and inspection planned?",[87,43826,43828,43830],{"className":43827},[36141],[25188,43829],{"disabled":2121,"type":36144}," Electrician involved early?",[12,43832,43833],{},"After the renovation:",[84,43835,43837,43843,43849,43855],{"className":43836},[36137],[87,43838,43840,43842],{"className":43839},[36141],[25188,43841],{"disabled":2121,"type":36144}," Single-line diagram and situation plan match the installed state?",[87,43844,43846,43848],{"className":43845},[36141],[25188,43847],{"disabled":2121,"type":36144}," All new circuits on the single-line diagram?",[87,43850,43852,43854],{"className":43851},[36141],[25188,43853],{"disabled":2121,"type":36144}," Inspection body booked?",[87,43856,43858,43860],{"className":43857},[36141],[25188,43859],{"disabled":2121,"type":36144}," Report and any findings handled with the electrician?",[79,43862,43864],{"id":43863},"official-source","Official source",[84,43866,43867,43873],{},[87,43868,43869],{},[40,43870,43872],{"href":1971,"rel":43871},[1458],"FPS Economy: RGIE\u002FAREI Book 1, Version 07 since 1 November 2026",[87,43874,43875],{},"Especially relevant: Section 3.1.2, Subsection 4.2.4.3 b, Subsection 6.4.7.3, Sections 8.2.1 and 8.4.2 and Section 9.1.2.",[79,43877,7537],{"id":7536},[84,43879,43880,43885,43890,43895,43900,43904],{},[87,43881,43882],{},[40,43883,43884],{"href":5956},"Old wiring in Belgium: AREI Part 8 explained",[87,43886,43887],{},[40,43888,43889],{"href":29401},"What does an electrical plan cost? Cost factors 2026",[87,43891,43892],{},[40,43893,43894],{"href":25389},"What does the inspector check during the inspection?",[87,43896,43897],{},[40,43898,43899],{"href":5090},"Electrical dossier for property sales",[87,43901,43902],{},[40,43903,36309],{"href":36308},[87,43905,43906],{},[40,43907,43908],{"href":33677},"Single-line diagram for a new build: the AREI checklist up to inspection",[12,43910,43911],{},[40,43912,43914],{"href":1456,"rel":43913},[1458],"Draw the existing installation and the renovation for free in PlanElec Sketch →",[79,43916,2009],{"id":2008},[84,43918,43919],{},[87,43920,43921,38,43923,56],{},[15,43922,11935],{},[40,43924,2023],{"href":1456,"rel":43925},[1458],[12,43927,43928],{},"The drawing records your data. Clarify unknown installation details with a qualified electrician; the official inspection is carried out by the approved inspection body.",{"title":2044,"searchDepth":2045,"depth":2045,"links":43930},[43931,43932,43933,43934,43935,43936,43937,43938,43944,43949,43950,43951,43952,43953,43954,43955],{"id":43309,"depth":2045,"text":43310},{"id":43338,"depth":2045,"text":43339},{"id":43438,"depth":2045,"text":43439},{"id":43477,"depth":2045,"text":43478},{"id":43493,"depth":2045,"text":43494},{"id":43514,"depth":2045,"text":43515},{"id":43541,"depth":2045,"text":43542},{"id":43584,"depth":2045,"text":43585,"children":43939},[43940,43941,43942,43943],{"id":43588,"depth":2053,"text":43589},{"id":43598,"depth":2053,"text":43599},{"id":43608,"depth":2053,"text":43609},{"id":43618,"depth":2053,"text":43619},{"id":43625,"depth":2045,"text":43626,"children":43945},[43946,43947,43948],{"id":43629,"depth":2053,"text":43630},{"id":43636,"depth":2053,"text":43637},{"id":43643,"depth":2053,"text":43644},{"id":43654,"depth":2045,"text":43655},{"id":43684,"depth":2045,"text":43685},{"id":43699,"depth":2045,"text":43700},{"id":43793,"depth":2045,"text":43794},{"id":43863,"depth":2045,"text":43864},{"id":7536,"depth":2045,"text":7537},{"id":2008,"depth":2045,"text":2009},"2026-07-20","Which renovation triggers new plans and a conformity inspection: substantial and non-substantial alterations, modified and unchanged parts, old installations under Part 8 and the file obligation.",[6082,2117],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-renovation-electrical-plans-editorial.jpg","\u002Fblog\u002Frenovation-electrical-plans.en",{"title":43303,"description":43957},"blog\u002Frenovation-electrical-plans.en",[2133,2134,43965,43966,43967,43968,19440,43969,19440,5269,2132,4261,25426],"renovation","remodelling","electrical plans","re-inspection","Part 8","KCKZj0zAP7wAC9wDUdTKs78ZPchRD3t7UfwzY6cfVcY","\u002Fblog\u002Frenovation-electrical-plans",{"id":43973,"title":43974,"articleId":43975,"body":43976,"category":4239,"date":43956,"description":44625,"extension":2113,"image":43994,"labels":44626,"lastUpdated":4826,"locale":2119,"meta":44627,"navigation":2121,"ogImage":44628,"path":44629,"publishDate":43956,"readTime":15114,"refreshInterval":5426,"seo":44630,"seoTitle":44631,"slug":44632,"stem":44633,"tags":44634,"__hash__":44636,"kind":2137,"href":44637},"blog\u002Fblog\u002Fwhat-can-you-do-with-planelec.en.md","What Can You Do with PlanElec? From Floor Plan to Installation Dossier","planelec-capabilities-overview",{"type":9,"value":43977,"toc":44607},[43978,43990,43995,43999,44009,44015,44108,44114,44116,44118,44122,44208,44211,44215,44218,44222,44225,44234,44245,44248,44252,44255,44272,44277,44281,44284,44307,44313,44317,44320,44323,44326,44330,44336,44345,44349,44416,44419,44425,44432,44436,44439,44443,44446,44456,44462,44466,44489,44493,44498,44556,44559,44563,44566,44569,44572,44576,44579,44582,44585,44603],[12,43979,43980,43983,43984,43986,43987,43989],{},[15,43981,43982],{},"With PlanElec, you plan a Belgian electrical installation in a single project: from floor plan through devices, cables, circuits and distribution board to single-line diagram, situation plan, AREI\u002FRGIE self-check and PDF dossier."," You model the spatial and electrical structure once and derive plans, lists and check findings from it. The PlanElec assistant carries out instructions in your own words, and recognition turns PDFs, scans and board photos into editable proposals. That project model is ",[15,43985,31],{},", for electrical contractors, planners, integrators and solar installers. For a single-line diagram and a situation plan on their own, there is ",[15,43988,22],{},", free in the browser.",[12,43991,43992],{},[74,43993],{"alt":76,"src":43994},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-planelec-capabilities-overview-editorial.webp",[79,43996,43998],{"id":43997},"planelec-sketch-or-planelec-pro-what-do-you-need","PlanElec Sketch or PlanElec Pro: what do you need?",[12,44000,44001,44002,44005,44006,44008],{},"PlanElec has two environments for two tasks. ",[40,44003,22],{"href":1456,"rel":44004},[1458]," is the drawing tool for the single-line diagram and the situation plan: free in the browser, even without an account, on a computer just as on a tablet or phone at the customer's home. ",[40,44007,31],{"href":1964}," is the shared project model for firms that need the distribution board, the self-check report, PV, building automation and teamwork. The rest of this overview describes Pro.",[1489,44010],{":height":44011,":width":3800,"alt":44012,"caption":44013,"src":44014},"580","Diagram: comparison of PlanElec Sketch and PlanElec Pro. Sketch draws the single-line diagram and situation plan free of charge in the browser, even without an account, produces the PDF and keeps working on Trikker files; the distribution board and self-check report are not included. Pro offers the shared project model with floor plan, circuits, cable routes, distribution board, self-check report and dossier, PV, building automation and a team with read mode. An arrow labelled “Take it to Pro” runs only from Sketch to Pro.","With “Take it to Pro”, the drawing moves from Sketch to Pro, never back. One plan applies in both environments.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fplanelec-capabilities-overview\u002Fsketch-or-pro.en.svg",[138,44016,44017,44027],{},[141,44018,44019],{},[144,44020,44021,44023,44025],{},[147,44022,5825],{},[147,44024,22],{},[147,44026,31],{},[163,44028,44029,44039,44052,44062,44072,44080,44089,44099],{},[144,44030,44031,44034,44037],{},[168,44032,44033],{},"Draw single-line diagram and situation plan, PDF",[168,44035,44036],{},"yes, free",[168,44038,515],{},[144,44040,44041,44046,44049],{},[168,44042,44043,44044,3317],{},"Keep working on Trikker files (",[25,44045,27],{},[168,44047,44048],{},"yes, even without an account",[168,44050,44051],{},"yes, one by one or as a whole archive",[144,44053,44054,44056,44059],{},[168,44055,13345],{},[168,44057,44058],{},"draw it or place a plan as an image or PDF underlay",[168,44060,44061],{},"draw, import or recognise it with AI",[144,44063,44064,44067,44069],{},[168,44065,44066],{},"Find gaps before the PDF",[168,44068,43750],{},[168,44070,44071],{},"“On the way to your documents” in the export",[144,44073,44074,44076,44078],{},[168,44075,43758],{},[168,44077,602],{},[168,44079,515],{},[144,44081,44082,44085,44087],{},[168,44083,44084],{},"AREI\u002FRGIE self-check report and dossier",[168,44086,602],{},[168,44088,515],{},[144,44090,44091,44094,44097],{},[168,44092,44093],{},"PV, KNX and home automation",[168,44095,44096],{},"no, points to Pro",[168,44098,515],{},[144,44100,44101,44104,44106],{},[168,44102,44103],{},"Team with roles, read mode for viewers",[168,44105,602],{},[168,44107,515],{},[12,44109,44110,44111,44113],{},"The handover goes in one direction only. In Sketch, ",[15,44112,1482],{}," opens the Pro import page: the single-line diagram, boards including sub-boards, circuits, cables, project details and the situation plan with its floors, rooms and linked devices come along. Images of underlays only travel with the project file; whatever is not carried over is listed on the import page before the project is created. A Pro project never goes back to Sketch. One plan covers both: if you have Pro, you use it in Sketch and in Pro.",[1489,44115],{":height":1491,":width":1492,"alt":1493,"caption":1494,"src":1495},[1489,44117],{":height":11791,":width":11792,"alt":11793,"caption":11794,"src":11795},[79,44119,44121],{"id":44120},"the-planelec-pro-workflow-at-a-glance","The PlanElec Pro workflow at a glance",[138,44123,44124,44135],{},[141,44125,44126],{},[144,44127,44128,44130,44133],{},[147,44129,17657],{},[147,44131,44132],{},"What you do in PlanElec",[147,44134,9095],{},[163,44136,44137,44147,44157,44167,44177,44187,44198],{},[144,44138,44139,44141,44144],{},[168,44140,18702],{},[168,44142,44143],{},"Create the building, floors and metadata",[168,44145,44146],{},"Shared basis for plans and title blocks",[144,44148,44149,44151,44154],{},[168,44150,13345],{},[168,44152,44153],{},"Draw walls and rooms, calibrate a reference image or recognise a plan",[168,44155,44156],{},"Spatial model",[144,44158,44159,44161,44164],{},[168,44160,9873],{},[168,44162,44163],{},"Place sockets, switches, lights, fixed connections and boards",[168,44165,44166],{},"Situation plan and consumer base",[144,44168,44169,44171,44174],{},[168,44170,27760],{},[168,44172,44173],{},"Connect circuits, protection devices, cables and branches",[168,44175,44176],{},"Electrical model",[144,44178,44179,44181,44184],{},[168,44180,3115],{},[168,44182,44183],{},"Arrange modules on DIN rails and check protection chains",[168,44185,44186],{},"Editable board layout",[144,44188,44189,44192,44195],{},[168,44190,44191],{},"Diagram and check",[168,44193,44194],{},"Review the single-line diagram and run the AREI\u002FRGIE self-check",[168,44196,44197],{},"Findings and a documentable diagram",[144,44199,44200,44202,44205],{},[168,44201,4665],{},[168,44203,44204],{},"Produce individual PDFs or a selectable installation dossier",[168,44206,44207],{},"Project documents for review and coordination",[12,44209,44210],{},"At every step you can call on the PlanElec assistant: it works across the whole project model and has every change checked by the self-check.",[79,44212,44214],{"id":44213},"one-project-model-instead-of-separate-drawings","One project model instead of separate drawings",[12,44216,44217],{},"In traditional workflows the same information lives in several files: the floor plan, the diagram, the board sketch and a spreadsheet. PlanElec stores rooms, devices, electrical connections, circuits, cables and protection devices in one linked model. Move a device and its position changes on the situation plan. Change its electrical connection and the topology and single-line diagram follow. You still review every result, but you no longer maintain unrelated drawings.",[79,44219,44221],{"id":44220},"build-the-floor-plan-and-situation-plan","Build the floor plan and situation plan",[12,44223,44224],{},"In the floor-plan editor, you draw exterior and interior walls as a polygon, rectangle or individual wall segments. Closed areas become rooms that you name and classify. Doors, windows, stairs, dimensions, bathroom zones and multiple floors are part of it. An existing plan can be imported as an image, PDF or DXF underlay, rotated and calibrated against a known distance.",[12,44226,44227,44229,44230,44233],{},[15,44228,14073],{}," is faster: from a PDF, scan or photo (including a Trikker PDF export), PlanElec proposes walls, rooms with their area, doors, windows and supported device symbols. PlanElec reads the scale from dimension lines or the PDF scale, or you measure two points yourself. You correct the draft and import it into an empty floor; without a confirmed scale, the import stays locked. The article ",[40,44231,44232],{"href":8995},"Recognise floor plans and boards with AI"," has the details.",[12,44235,44236,44237,44239,44240,44242,44243,56],{},"If you are coming from Trikker, import ",[25,44238,27],{}," project files with ",[15,44241,1486],{},", one by one or as a whole archive. Each file becomes its own project with single-line diagram, project details and the situation plan as floor plan; anything not carried over is listed in the report. An imported project is a starting point, not a checked document. The steps are in ",[40,44244,1486],{"href":42},[12,44246,44247],{},"Then you place electrical symbols on walls or freely in the room: sockets and switches, lights and spotlights, fixed connections and special equipment such as a heat pump or EV charger, junction and branch boxes, and boards. The situation plan uses exactly those positions. A 3D view is available to all users; on small screens or without WebGL, you keep working in the 2D views.",[79,44249,44251],{"id":44250},"plan-with-the-planelec-assistant","Plan with the PlanElec assistant",[12,44253,44254],{},"You describe a task in your own words, in Dutch, French, German or English, and the assistant carries it out. It works with more than 100 planning commands across the whole project model: floor plan, rooms, devices, circuits, switch chains, cables, distribution board, automation\u002FKNX, PV strings and lighting control.",[84,44256,44257,44262,44267],{},[87,44258,44259,44261],{},[15,44260,39116],{}," after every change, PlanElec checks the project with the AREI\u002FRGIE self-check.",[87,44263,44264,44266],{},[15,44265,39122],{}," every change is a single undo step and appears in the project history with the person who requested it.",[87,44268,44269,44271],{},[15,44270,39130],{}," clear, reversible instructions run directly; risky actions wait for your confirmation. It never deletes projects.",[12,44273,44274,44275,56],{},"The assistant answers technical questions with verified sources from the PlanElec help and the full AREI\u002FRGIE text. The language model runs in the EU region; the AI provider does not store your requests or train on them. Read more in ",[40,44276,10754],{"href":10753},[79,44278,44280],{"id":44279},"prepare-repetitive-planning-automatically","Prepare repetitive planning automatically",[12,44282,44283],{},"PlanElec takes routine work off your hands. Every automatic step delivers a proposal that you review on its own:",[84,44285,44286,44289,44292,44295,44298,44301,44304],{},[87,44287,44288],{},"proposals for sockets, lighting, standard equipment and spotlight grids;",[87,44290,44291],{},"automatic chaining of unassigned switches and lights in a room;",[87,44293,44294],{},"cable segments from the topology and routes along the walls;",[87,44296,44297],{},"automatic grouping and assignment of consumers to circuits;",[87,44299,44300],{},"separate handling of supported special appliances; an EV charger gets its own protection chain;",[87,44302,44303],{},"load distribution across several boards and phase balancing across L1, L2 and L3;",[87,44305,44306],{},"automatic placement of protection devices on DIN rails with 20 percent spare space.",[12,44308,44309,44310,44312],{},"Automatic assignment places standard circuits behind 30 mA residual current devices and connects no more than eight final circuits to each of them. That follows the limit in AREI\u002FRGIE Book 1, subsection 4.2.4.3.b, for residual current devices with high or very high sensitivity. Every proposal can be moved and reassigned; you add or override cable routes and lengths by hand. The guide ",[40,44311,20800],{"href":14100}," shows the workflow in detail.",[79,44314,44316],{"id":44315},"plan-the-board-and-single-line-diagram-together","Plan the board and single-line diagram together",[12,44318,44319],{},"In the distribution board editor, you arrange the main switch, residual current devices (RCDs), circuit breakers and supported accessories on a real module grid. Protection devices are placed automatically, and you move or connect them by hand afterwards. With several phases, PlanElec shows the modelled loads and warns about a clear imbalance. Enclosure proposals take recorded module widths, spare space and accessories into account; with open data, they remain an estimate, not a thermal approval.",[12,44321,44322],{},"For existing installations, you upload photos of the board: PlanElec detects visible DIN modules with row, start position, width and type. You review the proposal and import it into an empty board. Hidden wiring is not visible in a photo; you define the electrical connections in the planning.",[12,44324,44325],{},"PlanElec derives the single-line diagram from the electrical topology. Consumer branches, protection devices, branches and cable data stay linked to the project model. When you change an assignment, the diagram is rebuilt from the current state. Missing or incorrect links stay visible instead of disappearing into a drawing.",[79,44327,44329],{"id":44328},"document-pv-knx-and-home-automation","Document PV, KNX and home automation",[12,44331,44332,44333,44335],{},"For photovoltaics, you assign strings to the inverter's MPPTs and document modules, DC protection, cable sections and frame PE. The same data feeds the single-line diagram, situation plan and material list. Missing string assignments or manufacturer data stay visible. PlanElec calculates the PV yield with PVGIS for the confirmed project location. Self-consumption, home battery and charging one or two electric cars are a ",[15,44334,15139],{},": the calculation runs on request with a standard household profile instead of your meter data and states no savings and no payback.",[12,44337,44338,44339,44341,44342,56],{},"KNX documentation is available in a pilot scope: KNX power supply, switching and blind actuators, channel assignment and push buttons appear in the single-line diagram, and a missing supply, missing protection or overload blocks the final export. For ETS, PlanElec proposes physical addresses, group addresses and datapoint types and exports the group addresses as files in the ETS format (CSV and XML), together with a list of the physical addresses. You still create devices, parameters and the links to communication objects in ETS; PlanElec does not generate an ETS project file. With an active automation profile, you also export channel and terminal plans, room functions, topology and quantities individually or as a home-automation handover dossier. More in ",[40,44340,7109],{"href":7108}," and, worked through for an apartment, in ",[40,44343,44344],{"href":7632},"KNX planning: apartment and ETS preparation",[79,44346,44348],{"id":44347},"which-documents-can-you-export","Which documents can you export?",[138,44350,44351,44360],{},[141,44352,44353],{},[144,44354,44355,44357],{},[147,44356,38921],{},[147,44358,44359],{},"Status today",[163,44361,44362,44370,44377,44384,44392,44400,44408],{},[144,44363,44364,44367],{},[168,44365,44366],{},"Single-line diagram as a multi-page PDF",[168,44368,44369],{},"Available",[144,44371,44372,44375],{},[168,44373,44374],{},"Situation plan PDF",[168,44376,44369],{},[144,44378,44379,44382],{},[168,44380,44381],{},"Advisory AREI\u002FRGIE self-check report",[168,44383,44369],{},[144,44385,44386,44389],{},[168,44387,44388],{},"Distribution board PDF",[168,44390,44391],{},"Available as soon as board data exists",[144,44393,44394,44397],{},[168,44395,44396],{},"Selectable installation dossier",[168,44398,44399],{},"Available with cover, index, page numbering and versioned archiving",[144,44401,44402,44405],{},[168,44403,44404],{},"Circuit, cable and detailed material lists",[168,44406,44407],{},"Pilot: manufacturer-neutral, no prices, default assumptions visible",[144,44409,44410,44413],{},[168,44411,44412],{},"Home-automation documents",[168,44414,44415],{},"With an active automation profile; watermarked draft, final once readiness is met",[12,44417,44418],{},"All professional documents carry your approved installer details and, optionally, your logo. You archive the dossier in versions on the server: every page carries the same dossier UUID, a 40 mm QR sticker leads to the archived version, and a SHA-256 check proves the file's origin and integrity. This archiving confirms the file, not the AREI\u002FRGIE compliance of the installation.",[12,44420,44421,44422,44424],{},"The material list breaks modelled assemblies down into quantities and shows them by category or room. Cable quantities are net lengths without an automatic waste factor. Known, partial and missing data are marked \"Known\", \"Partial\" and \"Missing\". Use the list as a basis for review and quotation; it is not an approval to order. ",[40,44423,14935],{"href":4645}," describes the status of each document and the download steps.",[12,44426,44427,44428,44431],{},"What your documents still need is shown at the top of the export in the step list ",[15,44429,44430],{},"On the way to your documents",": project details, circuits, situation plan, board, diagram review and self-check, each open or done, with a jump to the right place. In the header, the badge “Documents: x of y” sums up the same status. The list is a completeness aid; the approved inspection body carries out the inspection.",[79,44433,44435],{"id":44434},"what-does-planelec-check-against-the-areirgie","What does PlanElec check against the AREI\u002FRGIE?",[12,44437,44438],{},"The software-based self-check verifies a documented subset of the rules that can be decided from the recorded project data. It shows findings for supported areas and explicitly flags known coverage gaps and incomplete checks. A clean run means that, within the supported rules, PlanElec finds no error in your data. The report is your self-check, not a certificate of conformity; the official assessment is made by a recognized inspection body.",[1041,44440,44442],{"id":44441},"how-large-is-that-coverage-exactly","How large is that coverage exactly?",[12,44444,44445],{},"An installer asked us directly: does PlanElec cover all of Book 1, including every exception, or the most common cases? The answer: the most common cases, clearly delimited.",[12,44447,4361,44448,44451,44452,44455],{},[15,44449,44450],{},"integrated rule text"," is complete: Book 1, Parts 1 to 9, in the version that applies on the date in question. Since 1 November 2026 that is version 07 (Royal Decree of 13 August 2026); compared with version 06, it only removes the sealing of the residual current device at the origin of the installation. PlanElec carries the official French and Dutch texts of version 07. PlanElec does not check the sealing itself. The ",[15,44453,44454],{},"automatic check logic"," focuses on protective measures, earthing, cable sizing and completeness of the file in a domestic AC installation. Of the fourteen chapters on special installations in Part 7, it touches three in part: rooms containing a bath or shower (7.1), supply of electric road vehicles (7.22) and domestic photovoltaic installations (7.112). Not included are the DC side with the L+, L-, M, PEM and PEL conductors and the transitional exceptions in articles 59 and 69 of the amending Royal Decree of 6 October 2025.",[12,44457,44458,44461],{},[40,44459,44460],{"href":1085},"The full list of what the self-check does and does not verify"," is in the knowledge base.",[79,44463,44465],{"id":44464},"who-is-planelec-for","Who is PlanElec for?",[84,44467,44468,44477,44483],{},[87,44469,44470,44473,44474,44476],{},[15,44471,44472],{},"Sole traders, micro-businesses and homeowners"," who need a single-line diagram and a situation plan draw them free of charge in ",[40,44475,22],{"href":1961},". Homeowners agree the plan and the work with a qualified electrician before the inspection.",[87,44478,44479,44482],{},[15,44480,44481],{},"Electrical contractors"," get one continuous path in PlanElec Pro from survey through board and self-check report to dossier, with colleagues in the same project.",[87,44484,44485,44488],{},[15,44486,44487],{},"Planners, integrators and solar installers"," model spatial and electrical relationships together, document PV and building automation and adjust alternatives traceably.",[79,44490,44492],{"id":44491},"what-does-planelec-cost","What does PlanElec cost?",[12,44494,44495,44496,23658],{},"The paid plans have been running since 2 November 2026. PlanElec Sketch stays free; Pro can be tried, used per property or taken as a subscription. The binding terms are on the ",[40,44497,1958],{"href":54},[138,44499,44500,44510],{},[141,44501,44502],{},[144,44503,44504,44506,44508],{},[147,44505,19671],{},[147,44507,4573],{},[147,44509,25078],{},[163,44511,44512,44524,44534,44545],{},[144,44513,44514,44516,44519],{},[168,44515,4133],{},[168,44517,44518],{},"EUR 0, even without an account",[168,44520,44521,44522],{},"Draw the single-line diagram and situation plan and produce the PDF; with a free account, uploads, PDF without the logo watermark and drawings in the cloud; without Pro, cloud storage is limited, the current limit is on the ",[40,44523,1958],{"href":54},[144,44525,44526,44528,44531],{},[168,44527,4612],{},[168,44529,44530],{},"EUR 0 for 1 month",[168,44532,44533],{},"Full Pro scope for one person, exports without masked areas; immediate start with a valid VAT number, otherwise request approval",[144,44535,44536,44539,44542],{},[168,44537,44538],{},"Site pass",[168,44540,44541],{},"EUR 15 per property, one-off",[168,44543,44544],{},"All documents without masking for one confirmed property address",[144,44546,44547,44550,44553],{},[168,44548,44549],{},"subscription",[168,44551,44552],{},"EUR 29 per month or EUR 290 per year",[168,44554,44555],{},"All projects and documents without masking, three editor seats, read access free of charge",[12,44557,44558],{},"One plan covers both environments: Pro applies in Sketch and in Pro. The subscription price stays the same for as long as the subscription runs without interruption. A site pass covers twelve months. From 20 sites per year, the yearly subscription at EUR 290 costs less than site passes at EUR 15, without additional seats. All AI features use your account's monthly AI allowance.",[79,44560,44562],{"id":44561},"a-practical-approval-workflow","A practical approval workflow",[12,44564,44565],{},"Treat every automatic step as a proposal with a named reviewer. Fix the building geometry and rooms first, then place only equipment that is really planned. Check switch chains and junction boxes before assigning circuits, because topology errors propagate into cable segments and the single-line diagram. Replace default values with real conductor and protection data.",[12,44567,44568],{},"At the board, check phases, upstream protection, RCD groups, spare modules and the electrical paths between devices. The grid arranges the modules; measured fault conditions, prospective short-circuit current, installation method and manufacturer limits are yours to assess as the professional.",[12,44570,44571],{},"Before export, run the self-check and read both findings and coverage notices. Green means the supported checks find no problem in your data. Then reconcile the situation plan and single-line diagram with the installed work and add measurements and manufacturer documents. The official inspection is carried out by a recognized inspection body.",[79,44573,44575],{"id":44574},"team-handover-and-a-clean-revision","Team handover and a clean revision",[12,44577,44578],{},"In Pro, you work as an organisation in the same project: members join by invitation, and each person has the project role of administrator, editor or viewer. A viewer, for example in the workshop or on site, sees the studio in read mode without tools: situation plan, single-line diagram, board and documents to read. Decide per project who approves the floor plan, topology, board and comparison with the as-built state. Hand over open fields as open instead of filling them with plausible-sounding assumptions. The next person can then see whether a cable length was measured, calculated from the floor plan or overridden manually. The same discipline applies to appliance power, phase assignment and protection components.",[12,44580,44581],{},"An example: a dishwasher circuit is added in a kitchen. The change starts with the appliance on the floor plan, followed by the electrical connection, circuit, protection device, cable data and board position. The situation plan and single-line diagram are regenerated from the same state; you check that the new identifier matches in both documents. Instead of quietly replacing the old dossier, you archive a new version and note which circuits were added and what needs confirming on site.",[12,44583,44584],{},"In multi-board projects, you model the relationships between source and sub-distribution boards explicitly. Check which board actually supplies a circuit and whether the documents show the same hierarchy. Name unsupported parts of the installation in the handover so that nobody mistakes them for automatically checked.",[12,44586,44587,44588,3328,44590,44592,44593,44596,44597,44599,44600,56],{},"This overview was checked on 6 November 2026 against the ",[40,44589,28755],{"href":28754},[40,44591,1958],{"href":54},", the split between Sketch and Pro and the reachable editor and export workflow. If in doubt, the status shown in the product applies. Continue in the ",[40,44594,44595],{"href":17591},"help center","; start a project with ",[15,44598,4612],{},", or a single drawing free of charge in ",[40,44601,22],{"href":1456,"rel":44602},[1458],[12,44604,7139,44605,56],{},[40,44606,7142],{"href":5358},{"title":2044,"searchDepth":2045,"depth":2045,"links":44608},[44609,44610,44611,44612,44613,44614,44615,44616,44617,44618,44621,44622,44623,44624],{"id":43997,"depth":2045,"text":43998},{"id":44120,"depth":2045,"text":44121},{"id":44213,"depth":2045,"text":44214},{"id":44220,"depth":2045,"text":44221},{"id":44250,"depth":2045,"text":44251},{"id":44279,"depth":2045,"text":44280},{"id":44315,"depth":2045,"text":44316},{"id":44328,"depth":2045,"text":44329},{"id":44347,"depth":2045,"text":44348},{"id":44434,"depth":2045,"text":44435,"children":44619},[44620],{"id":44441,"depth":2053,"text":44442},{"id":44464,"depth":2045,"text":44465},{"id":44491,"depth":2045,"text":44492},{"id":44561,"depth":2045,"text":44562},{"id":44574,"depth":2045,"text":44575},"Floor plan, AI assistant, automatic circuit and board planning, single-line diagram, situation plan, self-check and PDF dossier: the feature overview with status and limits.",[4825,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-planelec-capabilities-overview-editorial.jpg","\u002Fblog\u002Fwhat-can-you-do-with-planelec.en",{"title":43974,"description":44625},"What Can You Do with PlanElec? Plan to Dossier","what-can-you-do-with-planelec","blog\u002Fwhat-can-you-do-with-planelec.en",[7417,44635,2132,5269,3590,14101,24379,2133,2134],"electrical planning","V8CEewXQJrQmUs2jXc2dU0B9M2lBK_yV3TqhWSOeidw","\u002Fblog\u002Fwhat-can-you-do-with-planelec",{"id":44639,"title":19319,"body":44640,"category":8555,"description":44913,"extension":2113,"guideId":44655,"image":44914,"locale":2119,"meta":44915,"navigation":2121,"order":2045,"path":44916,"publishedAt":43956,"readTime":3582,"seo":44917,"seoTitle":10313,"slug":44655,"stem":44918,"tags":44919,"updatedAt":44923,"__hash__":44924,"kind":3594,"href":44925,"date":43956,"labels":44926},"help\u002Fhelp\u002Fautomatic-planning.en.md",{"type":9,"value":44641,"toc":44902},[44642,44645,44651,44656,44662,44669,44673,44676,44679,44696,44699,44703,44706,44709,44715,44719,44723,44726,44729,44734,44737,44751,44754,44758,44762,44765,44785,44788,44793,44797,44800,44803,44805,44809,44813,44816,44819,44832,44835,44841,44845,44848,44885,44888,44892,44894,44898],[12,44643,44644],{},"PlanElec's automatic functions create editable proposals. They reduce repetitive work, but they cannot know which equipment will actually be installed, how a cable will run on site, or which product specifications your electrician will select.",[12,44646,44647,44648,56],{},"Use the same pattern each time: ",[15,44649,44650],{},"create proposal → review preview → apply → check technically",[12,44652,44653],{},[40,44654],{"id":44655},"automatic-planning",[1489,44657],{":height":44658,":width":3800,"alt":44659,"caption":44660,"src":44661},"594","Room actions sheet with suggestions for automatic planning.","The suggestions are an editable starting point and do not decide quantities or final positions.","\u002Fhelp\u002Fworkflows\u002Fen-room-automation.png",[12,44663,44664,44667],{},[40,44665],{"id":44666},"consumers",[40,44668],{"id":28893},[79,44670,44672],{"id":44671},"propose-devices-and-lighting-points","Propose devices and lighting points",[12,44674,44675],{},"The floor-plan editor includes helpers for automatic sockets, lighting, standard equipment, and spotlight grids. The proposals use the drawn rooms and geometry as their basis.",[12,44677,44678],{},"For a useful result:",[3139,44680,44681,44684,44687,44690,44693],{},[87,44682,44683],{},"draw closed, correctly named rooms;",[87,44685,44686],{},"set the required count or pattern where applicable;",[87,44688,44689],{},"inspect the proposed positions;",[87,44691,44692],{},"move, add, or remove points to match the real design;",[87,44694,44695],{},"review special zones and fixed appliances separately.",[12,44697,44698],{},"PlanElec does not silently add every missing appliance. You remain responsible for the design brief and final placement.",[1041,44700,44702],{"id":44701},"build-switch-chains-automatically","Build switch chains automatically",[12,44704,44705],{},"PlanElec can propose a switch chain for unassigned switches and lighting points in the same room. It normally starts with the free switch closest to a door and then connects nearby free points.",[12,44707,44708],{},"Always verify which switch controls which light. Edit the sequence manually when the real control logic differs.",[12,44710,44711,44712,44714],{},"If the position of a box is already fixed, no suggestion is needed: the PlanElec assistant places sockets, switches and data outlets exactly there from one sentence with wall, corner, distance and height. See ",[40,44713,13484],{"href":13483}," for how it works.",[12,44716,44717],{},[40,44718],{"id":32127},[79,44720,44722],{"id":44721},"generate-cable-specifications-and-routes","Generate cable specifications and routes",[12,44724,44725],{},"Once the electrical topology exists, PlanElec can create a cable segment for each parent-to-child connection. A real connection or junction box splits the connection into separate segments. A box that is only nearby is not silently inserted into the electrical path.",[12,44727,44728],{},"Automatic routing searches for a short route along the drawn walls on each floor. If the start and end are not connected through the same wall component, the router uses a direct fallback.",[12,44730,41039,44731,44733],{},[15,44732,31102],{}," in the top toolbar.",[12,44735,44736],{},"After routing:",[84,44738,44739,44742,44745,44748],{},[87,44740,44741],{},"check whether the route matches the intended installation;",[87,44743,44744],{},"add or move waypoints where required;",[87,44746,44747],{},"review cable type, cross-section, and installation method;",[87,44749,44750],{},"enter a manual length when the calculated route does not represent reality closely enough.",[12,44752,44753],{},"The resulting length feeds the material list, voltage-drop calculation, and validation. It is a net length without an automatic waste or reserve factor.",[12,44755,44756],{},[40,44757],{"id":34539},[79,44759,44761],{"id":44760},"assign-devices-to-circuits-automatically","Assign devices to circuits automatically",[12,44763,44764],{},"Automatic circuit assignment creates a proposal from the recorded devices and product rules. It supports decisions such as:",[84,44766,44767,44770,44773,44776,44779,44782],{},[87,44768,44769],{},"grouping standard lighting and socket points by room;",[87,44771,44772],{},"allowing no more than eight connection points on a standard circuit;",[87,44774,44775],{},"creating dedicated breakers for appliances including hobs, ovens, washing machines, tumble dryers, dishwashers, boilers, heat pumps, and saunas;",[87,44777,44778],{},"placing standard groups behind 30 mA RCDs;",[87,44780,44781],{},"assigning an EV charger a separate 30 mA RCD and three-phase breaker; with documented built-in 6 mA DC detection PlanElec proposes external Type A, otherwise Type B;",[87,44783,44784],{},"distributing assignments across boards in a multi-board project.",[12,44786,44787],{},"Review the preview before confirming it. Pay particular attention to mixed circuits, special appliances, existing manual assignments, and whether the defaults suit the actual project.",[12,44789,44790],{},[40,44791],{"id":44792},"phases",[79,44794,44796],{"id":44795},"balance-loads-across-phases","Balance loads across phases",[12,44798,44799],{},"For a three-phase or delta supply, PlanElec can distribute loads across L1, L2, and L3. The phase overview shows the calculated load on each phase and warns about a clear imbalance.",[12,44801,44802],{},"This remains a model calculation based on the entered loads. Real simultaneity, measurements, and network conditions require assessment outside the software.",[1489,44804],{":height":31106,":width":3800,"alt":31107,"caption":31108,"src":31109},[12,44806,44807],{},[40,44808],{"id":28367},[79,44810,44812],{"id":44811},"fill-the-distribution-board-automatically","Fill the distribution board automatically",[12,44814,44815],{},"Auto-fill places existing main switches, RCDs, and MCBs in free DIN-rail slots. Its default sequence is main RCD, group RCDs, and then circuit breakers. By default, it reserves about twenty percent of the rail capacity.",[12,44817,44818],{},"The distinction from circuit assignment matters:",[84,44820,44821,44826],{},[87,44822,44823,44825],{},[15,44824,33774],{}," creates and connects the electrical protection structure.",[87,44827,44828,44831],{},[15,44829,44830],{},"Auto-fill"," arranges those existing modules physically in the board.",[12,44833,44834],{},"After auto-fill, review the board size, TE widths, spare capacity, protection chains, and connection paths. Explicit paths through connection boxes are preserved when the board is filled again.",[12,44836,44837,44839],{},[40,44838],{"id":28958},[40,44840],{"id":19015},[79,44842,44844],{"id":44843},"final-review-of-an-automatic-proposal","Final review of an automatic proposal",[12,44846,44847],{},"After every automatic action, check:",[3139,44849,44850,44856,44862,44868,44874,44880],{},[87,44851,44852,44855],{},[15,44853,44854],{},"Completeness:"," are all real devices, boxes, and boards modeled?",[87,44857,44858,44861],{},[15,44859,44860],{},"Topology:"," is each parent-to-child connection correct, with nothing left unconnected?",[87,44863,44864,44867],{},[15,44865,44866],{},"Protection:"," do the RCD, MCB, pole configuration, and cable suit the application?",[87,44869,44870,44873],{},[15,44871,44872],{},"Space:"," are routes and positions practical on site?",[87,44875,44876,44879],{},[15,44877,44878],{},"Phases:"," is the allocation plausible for the entered loads?",[87,44881,44882,44884],{},[15,44883,12714],{}," do the situation plan and single-line diagram remain readable?",[12,44886,44887],{},"The AREI\u002FRGIE self-check helps with supported rules that can be evaluated from project data. It is not a declaration of conformity and does not replace an electrician's review or the official inspection.",[12,44889,3470,44890,56],{},[40,44891,14935],{"href":4645},[79,44893,40917],{"id":40916},[12,44895,40920,44896,40923],{},[15,44897,5104],{},[12,44899,44900,56],{},[40,44901,40928],{"href":18627},{"title":2044,"searchDepth":2045,"depth":2045,"links":44903},[44904,44907,44908,44909,44910,44911,44912],{"id":44671,"depth":2045,"text":44672,"children":44905},[44906],{"id":44701,"depth":2053,"text":44702},{"id":44721,"depth":2045,"text":44722},{"id":44760,"depth":2045,"text":44761},{"id":44795,"depth":2045,"text":44796},{"id":44811,"depth":2045,"text":44812},{"id":44843,"depth":2045,"text":44844},{"id":40916,"depth":2045,"text":40917},"Use PlanElec proposals for devices, switch chains, cable routes, circuits, phases, and the distribution board without skipping technical review.","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fautomatic-planning-en.webp",{},"\u002Fhelp\u002Fautomatic-planning.en",{"title":19319,"description":44913},"help\u002Fautomatic-planning.en",[14101,28893,44920,34539,44921,3590,44922],"cable routing","phase balancing","DIN rail","2026-10-10","eQnI2OfEYNOk-bHTViMHGGV3JzJGIBTPASqg84klmYM","\u002Fhelp\u002Fautomatic-planning",[],{"id":44928,"title":8533,"body":44929,"category":17606,"description":45525,"extension":2113,"guideId":45526,"image":45527,"locale":2119,"meta":45528,"navigation":2121,"order":2053,"path":45529,"publishedAt":43956,"readTime":15114,"seo":45530,"seoTitle":10313,"slug":45531,"stem":45532,"tags":45533,"updatedAt":16783,"__hash__":45535,"kind":3594,"href":45536,"date":43956,"labels":45537},"help\u002Fhelp\u002Fdocument-exports.en.md",{"type":9,"value":44930,"toc":45512},[44931,44939,44943,44950,44954,45042,45054,45058,45062,45071,45135,45157,45165,45169,45192,45240,45243,45249,45253,45296,45299,45303,45307,45310,45314,45318,45321,45326,45339,45343,45365,45368,45375,45379,45394,45399,45403,45443,45446,45452,45456,45475,45480,45484,45504],[12,44932,44933,44934,21844,44936,44938],{},"You create every document in the studio in the ",[15,44935,4665],{},[15,44937,13441],{}," panel. You need a saved project with content for the document in question, for example a topology for the single-line diagram. You download each document as a PDF draft first; once export readiness is met, you create a release copy, which PlanElec archives unchanged and with a version on the server. You can combine selected documents into an installation dossier with a cover, document index and continuous page numbering, for example as the file for handover or inspection. All outputs come from the same project model and carry the same project and installer details. The self-check report shows open points for the supported AREI\u002FRGIE rules (the Belgian electrical installation regulation); the official inspection is carried out by a recognised inspection body.",[12,44940,44941],{},[40,44942],{"id":17606},[1489,44944],{":height":44945,":width":44946,"alt":44947,"caption":44948,"src":44949},"223","870","Export view with a single-line diagram document card, preview, draft and locked final-delivery states.","The card status describes the available working state; a locked final-delivery state is released only after export readiness is met.","\u002Fhelp\u002Fworkflows\u002Fen-document-selection.png",[79,44951,44953],{"id":44952},"which-documents-are-available-and-what-is-their-status","Which documents are available, and what is their status?",[138,44955,44956,44967],{},[141,44957,44958],{},[144,44959,44960,44962,44964],{},[147,44961,5258],{},[147,44963,9703],{},[147,44965,44966],{},"Content and limits",[163,44968,44969,44980,44992,45004,45015,45031],{},[144,44970,44971,44975,44977],{},[168,44972,44973],{},[15,44974,16848],{},[168,44976,44369],{},[168,44978,44979],{},"Multi-page PDF from the electrical topology with title block; always black and white.",[144,44981,44982,44987,44989],{},[168,44983,44984,44986],{},[15,44985,16858],{}," (situation plan)",[168,44988,44369],{},[168,44990,44991],{},"PDF of floors, rooms and placed symbols with legend. Left out of the dossier when a project using \"Draw the single-line diagram first\" has no drawn floor plan.",[144,44993,44994,44998,45001],{},[168,44995,44996],{},[15,44997,16867],{},[168,44999,45000],{},"Available, advisory",[168,45002,45003],{},"Result of the supported rules that can be evaluated from the project data. Not available when the self-check is switched off for the project.",[144,45005,45006,45010,45012],{},[168,45007,45008],{},[15,45009,16904],{},[168,45011,44369],{},[168,45013,45014],{},"Selectable as soon as the distribution board contains data.",[144,45016,45017,45025,45028],{},[168,45018,45019,1774,45021,1774,45023],{},[15,45020,16877],{},[15,45022,16886],{},[15,45024,16895],{},[168,45026,45027],{},"Pilot",[168,45029,45030],{},"Manufacturer-neutral, model-based lists as PDF and CSV; no prices, not approved for ordering. Field acceptance is still open before general release.",[144,45032,45033,45037,45039],{},[168,45034,45035],{},[15,45036,16913],{},[168,45038,44369],{},[168,45040,45041],{},"Selected documents with a branded cover, document index, continuous page numbering and versioned server archiving. All pages carry the same dossier identifier. Field acceptance with real customer projects is still open.",[12,45043,45044,45045,1774,45048,3324,45051,45053],{},"Depending on the project, further entries appear, such as the ",[15,45046,45047],{},"Conductor list",[15,45049,45050],{},"Distribution board terminal plan",[15,45052,18430],{},". A current PV yield report is always included in the dossier. Treat these outputs like the lists: as working documents that you review technically. With an active automation profile, a smart home section also appears below the documents; those documents are not part of server archiving.",[12,45055,45056],{},[40,45057],{"id":15214},[79,45059,45061],{"id":45060},"what-do-draft-corrections-needed-and-ready-for-release-mean","What do Draft, Corrections needed and Ready for release mean?",[12,45063,45064,45065,1774,45067,3157,45069,56],{},"Each document card shows a status and the buttons ",[15,45066,8062],{},[15,45068,16953],{},[15,45070,4662],{},[138,45072,45073,45084],{},[141,45074,45075],{},[144,45076,45077,45079,45081],{},[147,45078,9703],{},[147,45080,2314],{},[147,45082,45083],{},"What you can do",[163,45085,45086,45098,45110,45123],{},[144,45087,45088,45092,45095],{},[168,45089,45090],{},[15,45091,7048],{},[168,45093,45094],{},"The document has no content yet; preview and download are locked.",[168,45096,45097],{},"Add the content in the project",[144,45099,45100,45104,45107],{},[168,45101,45102],{},[15,45103,17020],{},[168,45105,45106],{},"At least one item blocks the release copy. The first item is shown as a link below the status.",[168,45108,45109],{},"Download a draft; follow the link to the correction",[144,45111,45112,45116,45119],{},[168,45113,45114],{},[15,45115,17013],{},[168,45117,45118],{},"Nothing is open.",[168,45120,45121],{},[15,45122,4662],{},[144,45124,45125,45129,45132],{},[168,45126,45127],{},[15,45128,17016],{},[168,45130,45131],{},"No block, but warnings such as missing project details.",[168,45133,45134],{},"Create a release copy and explicitly confirm the warnings",[12,45136,45137,45138,1774,45141,1774,45144,1774,45147,1774,45150,3157,45153,45156],{},"Typical open items are ",[15,45139,45140],{},"Review and confirm the single-line diagram",[15,45142,45143],{},"Complete and confirm installation methods",[15,45145,45146],{},"Place missing devices on the situation plan",[15,45148,45149],{},"Place missing modules on the DIN rails",[15,45151,45152],{},"Complete circuit labels",[15,45154,45155],{},"Review the self-check findings",". A draft is marked DRAFT and is not an archived release copy.",[12,45158,45159,45162],{},[40,45160],{"id":45161},"metadata",[40,45163],{"id":45164},"branding",[79,45166,45168],{"id":45167},"check-project-details-installer-details-and-logo","Check project details, installer details and logo",[12,45170,45171,45172,45174,45175,45178,45179,45182,45183,45185,45186,3157,45189,56],{},"At the top of the ",[15,45173,13441],{}," panel, ",[15,45176,45177],{},"One data source for every document"," summarises project, customer, installation, installer and EAN. Use ",[15,45180,45181],{},"Edit metadata"," to complete them; the same fields are in the project menu under ",[15,45184,21195],{},", sections ",[15,45187,45188],{},"Customer & installation",[15,45190,45191],{},"Participants",[138,45193,45194,45203],{},[141,45195,45196],{},[144,45197,45198,45200],{},[147,45199,2311],{},[147,45201,45202],{},"Where it comes from",[163,45204,45205,45216,45226],{},[144,45206,45207,45210],{},[168,45208,45209],{},"Customer, installation address, EAN",[168,45211,45212,45213,45215],{},"Project settings, ",[15,45214,45188],{}," section",[144,45217,45218,45221],{},[168,45219,45220],{},"Installer, licence number, contact, inspection body",[168,45222,45212,45223,45225],{},[15,45224,45191],{}," section; empty company, enterprise number and address fields are taken from the project owner's profile",[144,45227,45228,45231],{},[168,45229,45230],{},"Company logo",[168,45232,45233,45234,1774,45237,45239],{},"Account menu ",[15,45235,45236],{},"My Profile",[15,45238,45230],{},": PNG or JPG, max 500 KB, at least 200 × 80 px and at most 2000 × 800 px",[12,45241,45242],{},"The single-line diagram, situation plan, self-check report and dossier cover all use the same snapshot of these details, including the logo, at export time. If the logo cannot be loaded, the document is still created, just without the logo. Missing details such as the customer name, installation address, installer or licence number, and an invalid EAN appear as warnings: drafts remain possible, and a release copy requires you to confirm these warnings explicitly.",[12,45244,45245,45247],{},[40,45246],{"id":28958},[40,45248],{"id":18125},[79,45250,45252],{"id":45251},"how-do-i-export-a-single-document","How do I export a single document?",[3139,45254,45255,45262,45270,45283,45288],{},[87,45256,26226,45257,45259,45260,23993],{},[15,45258,4665],{}," mode. The ",[15,45261,13441],{},[87,45263,3370,45264,3364,45266,45269],{},[15,45265,17066],{},[15,45267,45268],{},"Plan format"," A4 or A3. The single-line diagram and situation plan use that format; tables and the cover stay A4.",[87,45271,45272,45273,15383,45276,3324,45279,45282],{},"If needed, set ",[15,45274,45275],{},"Circuit colours",[15,45277,45278],{},"Colour",[15,45280,45281],{},"Black and white",". This applies to the situation plan and the cabinet view.",[87,45284,11757,45285,45287],{},[15,45286,8062],{}," on the document card and check the pages, title block and page edges.",[87,45289,7944,45290,45292,45293,56],{},[15,45291,16953],{}," and open the file outside PlanElec for a visual check. The lists also offer ",[15,45294,45295],{},"CSV",[12,45297,45298],{},"For the single-line diagram, check in particular that every consumer path reaches the correct circuit breaker and RCD, that cable type, cross-section and labels are present, and that spare modules do not appear as active circuits. Large diagrams are spread across several pages.",[12,45300,45301],{},[40,45302],{"id":18037},[79,45304,45306],{"id":45305},"what-should-i-check-on-the-situation-plan","What should I check on the situation plan?",[12,45308,45309],{},"The situation plan shows rooms, openings and electrical symbols in their positions. Check each floor for overlapping labels, missing devices and legibility in the selected format. The situation plan and single-line diagram share the title block and project notes; correct those details in the project, not in an individual PDF.",[12,45311,45312],{},[40,45313],{"id":21784},[79,45315,45317],{"id":45316},"what-does-the-areirgie-self-check-report-show","What does the AREI\u002FRGIE self-check report show?",[12,45319,45320],{},"The report summarises the findings PlanElec can evaluate from the recorded data and the supported rules. It states when a check is incomplete or when part of the installation falls outside the current coverage. For PV, it contains an installation register explicitly labelled as a planning register.",[12,45322,45323,45324],{},"A report without errors means: no errors within the supported rules that can be checked from the data. Measurements, manufacturer evidence, on-site conditions and rules that are not modelled stay outside its scope. Which rules are checked is described in ",[40,45325,8538],{"href":1085},[12,45327,45328,45331,45334,45337],{},[40,45329],{"id":45330},"lists",[40,45332],{"id":45333},"circuit-list",[40,45335],{"id":45336},"cable-list",[40,45338],{"id":18519},[79,45340,45342],{"id":45341},"reading-the-circuit-material-and-cable-lists-pilot","Reading the circuit, material and cable lists (pilot)",[84,45344,45345,45350,45357],{},[87,45346,4361,45347,45349],{},[15,45348,16877],{}," helps you check assignments and the protection chain.",[87,45351,11757,45352,8020,45354,45356],{},[15,45353,16886],{},[15,45355,30254],{},", by category or by room. Contributions without a room stay visible. Manually entered items are marked as such and are never merged with calculated rows.",[87,45358,11757,45359,8020,45361,45364],{},[15,45360,16895],{},[15,45362,45363],{},"Open cable list",". It shows segments and net lengths; a manual length overrides the calculated one.",[12,45366,45367],{},"The material list uses manufacturer-neutral default assumptions. It contains no prices, no specific manufacturer products and no automatic site reserve; household appliances count as connections. The card points this out with the note that the list contains model quantities and is not an approved procurement list. Use it as a reviewable starting point for a quotation.",[12,45369,45370,45372],{},[40,45371],{"id":28367},[40,45373],{"id":45374},"cabinet-pdf",[79,45376,45378],{"id":45377},"export-the-distribution-board-layout","Export the distribution board layout",[12,45380,4361,45381,45383,45384,45387,45388,3116,45391,45393],{},[15,45382,16904],{}," becomes selectable as soon as the board in the project contains data; no switch or activation is needed. With several boards, choose ",[15,45385,45386],{},"All distribution boards"," or a single board under ",[15,45389,45390],{},"Export scope",[15,45392,17066],{},". The scope applies to the cabinet layout, single-line diagram, conductor list and terminal plan; a single board keeps its sheet number from the complete diagram. Check rows, module positions, labels and spare space against the planned set-up.",[12,45395,45396],{},[40,45397],{"id":45398},"dossier",[79,45400,45402],{"id":45401},"assemble-an-installation-dossier","Assemble an installation dossier",[3139,45404,45405,45410,45423,45426,45432],{},[87,45406,45407,45408,56],{},"Complete the project details with ",[15,45409,45181],{},[87,45411,5777,45412,45415,45416,45418,45419,45422],{},[15,45413,45414],{},"Assemble the dossier",", tick only the documents that belong to the current working state. The ",[15,45417,17066],{}," lists them under ",[15,45420,45421],{},"Included documents"," in a fixed order.",[87,45424,45425],{},"Check the plan format, circuit colours and other options.",[87,45427,45428,45429,45431],{},"Open the dossier ",[15,45430,8062],{}," and check the cover, document index, order, title blocks and continuous page numbering.",[87,45433,7944,45434,45436,45437,45439,45440,45442],{},[15,45435,16953],{}," for a working copy, or ",[15,45438,4662],{}," once ",[15,45441,20826],{}," is ready.",[12,45444,45445],{},"A complete dossier contains the single-line diagram, situation plan and self-check report; the overview tells you whether your selection is complete or a partial output. With \"Draw the single-line diagram first\" and no floor plan, the dossier counts as complete without the situation plan.",[12,45447,45448,45450],{},[40,45449],{"id":17041},[40,45451],{"id":10318},[79,45453,45455],{"id":45454},"create-and-archive-a-release-copy","Create and archive a release copy",[12,45457,45458,45460,45461,45463,45464,8020,45466,1774,45468,1774,45470,3157,45472,45474],{},[15,45459,4662],{}," applies to the saved project state. If there are warnings, PlanElec shows them first; with ",[15,45462,17079],{},", they remain part of the stored copy. The copy then appears under ",[15,45465,17166],{},[15,45467,8065],{},[15,45469,4669],{},[15,45471,17243],{},[15,45473,17423],{},". Its QR code refers to that exact archive version. Drafts remain local downloads.",[12,45476,45477,45478,56],{},"Later project changes do not change an archived copy; for a new state, you create a new copy. Archiving confirms origin and file integrity. It is not an electrical inspection, a certificate of conformity or an electronic signature. How recipients verify a document via the QR code, and how you revoke a link, is explained in ",[40,45479,16798],{"href":4635},[79,45481,45483],{"id":45482},"final-check-before-sharing","Final check before sharing",[84,45485,45486,45489,45492,45495,45498,45501],{},[87,45487,45488],{},"Are project, customer, address, installer, logo and revision correct on every document?",[87,45490,45491],{},"Are all floors, circuits, symbols and cable labels legible?",[87,45493,45494],{},"Do the plan format and page order suit the purpose?",[87,45496,45497],{},"Have you reviewed automatically planned assignments and lengths?",[87,45499,45500],{},"Are open findings or coverage gaps in the self-check report visible and understood?",[87,45502,45503],{},"Does the dossier contain only the document versions you actually reviewed?",[12,45505,45506,45507,45509,45510,56],{},"Have the documentation reviewed by the responsible electrician; the official inspection is carried out by a recognised inspection body. To build up the project model, start with ",[40,45508,15677],{"href":15676},"; if something goes wrong, see ",[40,45511,16735],{"href":15662},{"title":2044,"searchDepth":2045,"depth":2045,"links":45513},[45514,45515,45516,45517,45518,45519,45520,45521,45522,45523,45524],{"id":44952,"depth":2045,"text":44953},{"id":45060,"depth":2045,"text":45061},{"id":45167,"depth":2045,"text":45168},{"id":45251,"depth":2045,"text":45252},{"id":45305,"depth":2045,"text":45306},{"id":45316,"depth":2045,"text":45317},{"id":45341,"depth":2045,"text":45342},{"id":45377,"depth":2045,"text":45378},{"id":45401,"depth":2045,"text":45402},{"id":45454,"depth":2045,"text":45455},{"id":45482,"depth":2045,"text":45483},"Download the single-line diagram, situation plan, self-check report, board layout and planning lists as drafts, combine them into an installation dossier and archive release copies with versions.","document-exports","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fdocument-exports-en.webp",{},"\u002Fhelp\u002Fdocument-exports.en",{"title":8533,"description":45525},"export-documents","help\u002Fdocument-exports.en",[24379,5269,2132,21784,34539,31058,30499,45534],"installation dossier","2Wz16Nd4TvxDE_Cb-9ZdwS2IfzZP2VwWvvNgpkhW9z4","\u002Fhelp\u002Fexport-documents",[],{"id":45539,"title":45540,"body":45541,"category":10304,"description":46679,"extension":2113,"guideId":4825,"image":46680,"locale":2119,"meta":46681,"navigation":2121,"order":9353,"path":46682,"publishedAt":43956,"readTime":15114,"seo":46683,"seoTitle":10313,"slug":4825,"stem":46684,"tags":46685,"updatedAt":2111,"__hash__":46687,"kind":3594,"href":46688,"date":43956,"labels":46689},"help\u002Fhelp\u002Fgetting-started.en.md","Getting started: from a new project to your first PDF",{"type":9,"value":45542,"toc":46660},[45543,45552,45557,45562,45566,45594,45659,45662,45667,45671,45674,45733,45748,45753,45757,45760,45825,45831,45851,45854,45861,45865,45868,45944,45950,45973,45976,46018,46021,46025,46029,46048,46053,46059,46063,46091,46098,46102,46106,46112,46120,46129,46131,46135,46173,46189,46193,46197,46204,46279,46282,46287,46291,46298,46302,46305,46328,46333,46337,46340,46349,46417,46425,46440,46446,46451,46455,46458,46563,46567,46590,46601,46605,46608,46620,46626,46630,46643,46650],[12,45544,45545,45546,45548,45549,45551],{},"To start your first project, you need a PlanElec account and an up-to-date browser. You create the project in the studio with ",[15,45547,8750],{},", choose one of two planning approaches and work from the floor plan or the single-line diagram through to the ",[15,45550,4665],{}," mode. There you download each document as a draft first. Every area works on the same project model, so the floor plan, installation, distribution board, single-line diagram and documents never need to be updated separately. The AREI\u002FRGIE self-check shows open points within the supported rules. AREI (French: RGIE) is the Belgian electrical installation regulation; the official inspection, the keuring, is carried out by a recognised inspection body.",[41114,45553,45554],{},[12,45555,45556],{},"Using PlanElec as an owner or self-builder? Have all decisions and documents reviewed by a qualified electrician before installation and inspection.",[12,45558,45559],{},[40,45560],{"id":45561},"project",[79,45563,45565],{"id":45564},"how-do-i-create-a-new-project","How do I create a new project?",[12,45567,45568,45569,45572,45573,45576,45577,45580,45581,3157,45583,45586,45587,45590,45591,45593],{},"If you do not have a project yet, PlanElec opens a start page with two cards after you sign in: ",[15,45570,45571],{},"Draw for free"," takes you to the free drawing app with ",[15,45574,45575],{},"Start with Sketch",", and ",[15,45578,45579],{},"Try Pro for one month"," is the form for the Pro trial, without payment details. ",[15,45582,8750],{},[15,45584,45585],{},"Import a Sketch drawing"," are ready as ways to start. You can reach this page again later through ",[15,45588,45589],{},"Overview"," in the menu of the app tile at the top left. ",[15,45592,8750],{}," takes you to the studio, where you create the project as follows.",[3139,45595,45596,45609,45621,45630,45636,45654],{},[87,45597,45598,45599,45602,45603,45605,45606,45608],{},"In the studio, open the ",[15,45600,45601],{},"Projects"," panel and click the plus button ",[15,45604,8750],{},". You can also find ",[15,45607,8750],{}," in the project menu, which you open with the blue PlanElec button at the top left.",[87,45610,3370,45611,45613,45614,45616,45617,45620],{},[15,45612,8750],{}," dialog, enter a ",[15,45615,40829],{}," with at least two characters. The ",[15,45618,45619],{},"Description"," is optional.",[87,45622,5777,45623,22023,45625,3324,45627,45629],{},[15,45624,39184],{},[15,45626,14056],{},[15,45628,14060],{}," (see the next section).",[87,45631,45632,45633],{},"For the floor plan approach, pick your entry point under ",[15,45634,45635],{},"How would you like to start?",[87,45637,5777,45638,45641,45642,1774,45645,1774,45648,3324,45651,56],{},[15,45639,45640],{},"Project type",", choose the occasion: ",[15,45643,45644],{},"New build",[15,45646,45647],{},"Document existing installation",[15,45649,45650],{},"Extension",[15,45652,45653],{},"Renovation",[87,45655,7944,45656,45658],{},[15,45657,8023],{},". PlanElec creates the project and opens it in the studio.",[12,45660,45661],{},"If the name is missing, the dialog jumps back to the name field and shows why. The choices in the dialog only change the assistance you receive; every editor tool remains available on every path.",[12,45663,45664],{},[40,45665],{"id":45666},"planning-path",[79,45668,45670],{"id":45669},"floor-plan-or-single-line-diagram-which-approach-fits","Floor plan or single-line diagram: which approach fits?",[12,45672,45673],{},"Both approaches create the same project type. Only the starting point differs.",[138,45675,45676,45693],{},[141,45677,45678],{},[144,45679,45680,45682,45685,45690],{},[147,45681,39184],{},[147,45683,45684],{},"Best for",[147,45686,45687,45688],{},"What happens after ",[15,45689,8023],{},[147,45691,45692],{},"Good to know",[163,45694,45695,45713],{},[144,45696,45697,45702,45705,45710],{},[168,45698,45699,45701],{},[15,45700,14056],{}," (Recommended)",[168,45703,45704],{},"Anyone who captures rooms and devices spatially",[168,45706,4361,45707,45709],{},[15,45708,13345],{}," mode opens; depending on your entry point, guidance or a template starts",[168,45711,45712],{},"The single-line diagram is generated from the recorded rooms, devices and circuits",[144,45714,45715,45719,45722,45730],{},[168,45716,45717],{},[15,45718,14060],{},[168,45720,45721],{},"Users switching from classic drawing tools",[168,45723,4361,45724,45726,45727,45729],{},[15,45725,16030],{}," mode opens with the ",[15,45728,3926],{}," maximised; a main board and supply head are ready as an assumption",[168,45731,45732],{},"You place symbols directly in the diagram. Without a drawn floor plan, the situation plan stays out of the dossier and spatial checks do not block the diagram or the self-check report. All other checks still apply",[12,45734,45735,45736,45738,45739,45741,45742,45744,45745,45747],{},"You can switch approach later in the project menu under ",[15,45737,21195],{},", section ",[15,45740,21198],{},". Switching only changes the starting point and export defaults; the diagram, floor plan and distribution board stay unchanged. Trikker files (",[25,45743,27],{},") become projects without starting from an empty one: ",[40,45746,1486],{"href":42},". PlanElec does not import project files from other planning tools.",[12,45749,45750],{},[40,45751],{"id":45752},"entry-modes",[79,45754,45756],{"id":45755},"start-with-guidance-from-a-template-or-without-guidance","Start with guidance, from a template or without guidance?",[12,45758,45759],{},"With the floor plan approach, the dialog offers four entry points:",[138,45761,45762,45772],{},[141,45763,45764],{},[144,45765,45766,45769],{},[147,45767,45768],{},"Entry point",[147,45770,45771],{},"What it does",[163,45773,45774,45795,45805,45815],{},[144,45775,45776,45781],{},[168,45777,45778,45701],{},[15,45779,45780],{},"Build with guidance",[168,45782,45783,45784,45787,45788,45791,45792,56],{},"Starts the ",[15,45785,45786],{},"Record the installation"," workflow and opens the coach in the ",[15,45789,45790],{},"Workflow"," panel. It leads you from the building to ",[15,45793,45794],{},"Review and confirm the diagram",[144,45796,45797,45802],{},[168,45798,45799],{},[15,45800,45801],{},"Start from a template",[168,45803,45804],{},"Loads a prepared starting project and also starts the guidance.",[144,45806,45807,45812],{},[168,45808,45809],{},[15,45810,45811],{},"Start with the situation plan",[168,45813,45814],{},"You place the consumers first and plan the installation afterwards; the cabinet and module positions stay open initially. Also starts the guidance.",[144,45816,45817,45822],{},[168,45818,45819],{},[15,45820,45821],{},"Without guidance",[168,45823,45824],{},"Opens the free editor directly with all tools and no coach.",[12,45826,5777,45827,45830],{},[15,45828,45829],{},"Choose a starting project",", three templates are available:",[84,45832,45833,45839,45845],{},[87,45834,45835,45838],{},[15,45836,45837],{},"Small apartment",": five rooms, standard consumers and a two-row main board.",[87,45840,45841,45844],{},[15,45842,45843],{},"Family house",": multiple floors, typical residential circuits and a three-row main board.",[87,45846,45847,45850],{},[15,45848,45849],{},"Existing installation survey",": a compact starting point for an older existing installation.",[12,45852,45853],{},"A template is an example, not a design for your building. Adapt rooms, devices and boards to the real installation. The coach marks steps that are already done in the project. You can skip a step or end the workflow; your project data stays as it is.",[12,45855,45856,45859],{},[40,45857],{"id":45858},"floorplan",[40,45860],{"id":18037},[79,45862,45864],{"id":45863},"draw-upload-or-let-ai-recognise-the-floor-plan","Draw, upload or let AI recognise the floor plan",[12,45866,45867],{},"The studio is organised into modes, which you select in the bar on the left. Each mode brings its own tools and panels:",[138,45869,45870,45880],{},[141,45871,45872],{},[144,45873,45874,45877],{},[147,45875,45876],{},"Mode",[147,45878,45879],{},"Used for",[163,45881,45882,45891,45900,45909,45918,45927,45935],{},[144,45883,45884,45888],{},[168,45885,45886],{},[15,45887,13345],{},[168,45889,45890],{},"Walls, rooms, doors, windows, stairs, plan templates and calibration",[144,45892,45893,45897],{},[168,45894,45895],{},[15,45896,16014],{},[168,45898,45899],{},"Furnishing as orientation on the plan",[144,45901,45902,45906],{},[168,45903,45904],{},[15,45905,16030],{},[168,45907,45908],{},"Devices, switch chains, circuits, cable routes, installation",[144,45910,45911,45915],{},[168,45912,45913],{},[15,45914,6530],{},[168,45916,45917],{},"Bus routes, distribution board and automation channels",[144,45919,45920,45924],{},[168,45921,45922],{},[15,45923,7264],{},[168,45925,45926],{},"Lighting planning and lighting study",[144,45928,45929,45933],{},[168,45930,45931],{},[15,45932,15885],{},[168,45934,17638],{},[144,45936,45937,45941],{},[168,45938,45939],{},[15,45940,4665],{},[168,45942,45943],{},"Review, download and archive documents",[12,45945,45946,45947,45949],{},"On an empty floor, PlanElec asks ",[15,45948,19577],{}," and offers three options:",[84,45951,45952,45958,45965],{},[87,45953,45954,45957],{},[15,45955,45956],{},"Draw a floor plan",": you create rooms directly on the situation plan.",[87,45959,45960,45962,45963,56],{},[15,45961,20692],{},": a PDF, image or DXF serves as a template to trace. Set up pages, sections and scale as described in ",[40,45964,9462],{"href":9461},[87,45966,45967,45969,45970,45972],{},[15,45968,19582],{},": walls and rooms arrive as a proposal from a PDF or image. You check the draft and measure a known distance before applying it. The page is sent to an external AI provider for analysis. See ",[40,45971,19446],{"href":9465}," for the process and its limits.",[12,45974,45975],{},"To draw it yourself:",[3139,45977,45978,45988,45995,46008,46011],{},[87,45979,3370,45980,45982,45983,3324,45985,45987],{},[15,45981,13345],{}," mode, select the ",[15,45984,39955],{},[15,45986,39958],{}," tool. Type exact dimensions while drawing: Tab switches fields, Enter confirms.",[87,45989,45990,45991,45994],{},"Close the outline. PlanElec detects closed areas as rooms; use ",[15,45992,45993],{},"Split room"," to divide a room.",[87,45996,45997,45998,1774,46001,3157,46004,46007],{},"Place ",[15,45999,46000],{},"Door",[15,46002,46003],{},"Window",[15,46005,46006],{},"Stairs"," in their real positions.",[87,46009,46010],{},"Select a room and set its room type, such as kitchen, bathroom or technical room. Later device recommendations depend on it.",[87,46012,46013,46014,46017],{},"Add further floors. You edit each floor separately; ",[40,46015,46016],{"href":16037},"aligning floors and the building origin"," explains how to stack them.",[12,46019,46020],{},"Success check: every room is closed, named and classified. That is the right moment to start placing devices.",[12,46022,46023],{},[40,46024],{"id":28893},[79,46026,46028],{"id":46027},"place-and-connect-devices","Place and connect devices",[3139,46030,46031,46036,46039,46045],{},[87,46032,26226,46033,46035],{},[15,46034,16030],{}," mode. The palette at the bottom shows room recommendations and the device catalogue.",[87,46037,46038],{},"Place sockets, switches, lights, fixed connections, junction boxes and the distribution board. Wall-mounted symbols snap to the wall.",[87,46040,46041,46042,46044],{},"Connect switches and lights with the ",[15,46043,34409],{}," tool. For unassigned switches and lights in a room, PlanElec proposes a chain; check the sequence before applying it.",[87,46046,46047],{},"Review the list of unconnected and unplaced components. A floor plan symbol only becomes part of the electrical model once its topology assignment is correct.",[12,46049,46050,46051,56],{},"For the palette, icons and topology in detail, see ",[40,46052,16745],{"href":16744},[12,46054,46055,46057],{},[40,46056],{"id":44655},[40,46058],{"id":28367},[79,46060,46062],{"id":46061},"plan-circuits-the-installation-and-the-distribution-board","Plan circuits, the installation and the distribution board",[3139,46064,46065,46075,46083,46088],{},[87,46066,11757,46067,46069,46070,46072,46073,56],{},[15,46068,5104],{}," panel. ",[15,46071,27546],{}," plans circuits and protection devices from the open consumers. Review the preview with the target board, circuits and protection devices, then click ",[15,46074,27550],{},[87,46076,46077,46078,46080,46081,56],{},"Assign individual devices with ",[15,46079,20768],{},", and define cable paths with ",[15,46082,21359],{},[87,46084,11757,46085,46087],{},[15,46086,3115],{}," panel. Automatic assignment places main switches, RCDs and circuit breakers on the DIN rails after a preview and keeps spare space free.",[87,46089,46090],{},"Check the protection chain, phase allocation, module positions and the warnings shown.",[12,46092,46093,46094,3157,46096,56],{},"Every automatic step is an editable proposal. Afterwards, check the board and circuit assignment, protection devices, cable data, junction boxes and calculated cable lengths. Read more in ",[40,46095,19319],{"href":14100},[40,46097,19286],{"href":18627},[12,46099,46100],{},[40,46101],{"id":28958},[79,46103,46105],{"id":46104},"review-the-single-line-diagram-and-the-self-check","Review the single-line diagram and the self-check",[12,46107,46108,46109,46111],{},"The single-line diagram is generated from the same topology. Open the ",[15,46110,3926],{}," panel and check circuit names, protection devices, cable data, installation methods and symbols. If an assignment is wrong, correct the consumer, circuit or cable section in the model, not just the drawing.",[12,46113,4361,46114,46116,46117,46119],{},[15,46115,21022],{}," panel shows the findings of the AREI\u002FRGIE self-check. It covers a documented subset of the rules that can be decided from the recorded data. A run without errors means: no errors within these supported rules. Measurements, on-site conditions and rules that are not modelled stay outside its scope. ",[40,46118,8538],{"href":1085}," describes the exact coverage.",[12,46121,46122,46124,46126],{},[40,46123],{"id":21783},[40,46125],{"id":17606},[40,46127],{"id":46128},"first-pdf",[1489,46130],{":height":44945,":width":44946,"alt":44947,"caption":44948,"src":44949},[79,46132,46134],{"id":46133},"how-do-i-get-to-my-first-pdf","How do I get to my first PDF?",[3139,46136,46137,46143,46151,46159,46164],{},[87,46138,26226,46139,45259,46141,23993],{},[15,46140,4665],{},[15,46142,13441],{},[87,46144,5777,46145,46147,46148,46150],{},[15,46146,45177],{},", review the project details and complete them with ",[15,46149,45181],{},": customer, installation address, installer, licence number and EAN.",[87,46152,29982,46153,46155,46156,46158],{},[15,46154,16848],{}," card, open the ",[15,46157,8062],{}," and check the pages and the title block.",[87,46160,7944,46161,46163],{},[15,46162,16953],{},". You receive a PDF marked as a draft for a visual check.",[87,46165,46166,46167,46169,46170,46172],{},"Read the card status: under ",[15,46168,17020],{},", the next item appears as a link, for example ",[15,46171,45140],{},". Clicking it takes you there.",[12,46174,46175,46176,3324,46178,46180,46181,46183,46184,46186,46187,56],{},"Only when a card shows ",[15,46177,17013],{},[15,46179,17016],{}," does ",[15,46182,4662],{}," become active; you confirm any warnings before archiving. PlanElec archives that copy on the server with a version. What is stored and how the QR code is verified is described in ",[40,46185,16798],{"href":4635},". All documents, statuses and the dossier are covered in ",[40,46188,14935],{"href":4645},[12,46190,46191],{},[40,46192],{"id":3594},[79,46194,46196],{"id":46195},"where-can-i-find-help-in-the-studio","Where can I find help in the studio?",[12,46198,46199,46200,46203],{},"The question-mark button ",[15,46201,46202],{},"Help"," in the header opens a menu with these entries:",[138,46205,46206,46215],{},[141,46207,46208],{},[144,46209,46210,46213],{},[147,46211,46212],{},"Entry",[147,46214,15545],{},[163,46216,46217,46227,46237,46247,46260,46270],{},[144,46218,46219,46224],{},[168,46220,46221],{},[15,46222,46223],{},"Quick help",[168,46225,46226],{},"Appears in the floor plan, installation, distribution board and single-line diagram views with five short steps.",[144,46228,46229,46234],{},[168,46230,46231],{},[15,46232,46233],{},"Start studio tour",[168,46235,46236],{},"Points out the project menu, mode bar, toolbar, palette, panels, view, floors, status, search and assistant in turn.",[144,46238,46239,46244],{},[168,46240,46241],{},[15,46242,46243],{},"Open hands-on tutorial",[168,46245,46246],{},"Eight hands-on chapters: Draw the floor plan, Place devices and the board, Create the roof, Lay out PV arrays, Generate the distribution board, Connect the PV system, Create and route cables, Check and export.",[144,46248,46249,46254],{},[168,46250,46251],{},[15,46252,46253],{},"Restart guided setup",[168,46255,46256,46257,46259],{},"Restarts the ",[15,46258,45786],{}," workflow and opens the coach.",[144,46261,46262,46267],{},[168,46263,46264],{},[15,46265,46266],{},"Open the related guide",[168,46268,46269],{},"Opens the knowledge base article for the current view in a new tab.",[144,46271,46272,46276],{},[168,46273,46274],{},[15,46275,16735],{},[168,46277,46278],{},"Opens the guide to typical problems, whatever view you are in.",[12,46280,46281],{},"The tour and the tutorial are only available in the studio.",[12,46283,46284],{},[40,46285],{"id":46286},"assistant",[79,46288,46290],{"id":46289},"ask-the-ai-assistant-for-help","Ask the AI assistant for help",[12,46292,3370,46293,46295,46296],{},[15,46294,14475],{}," panel, you write to the PlanElec assistant in English, Dutch, French or German. It answers technical questions with sources from the help pages and the full AREI\u002FRGIE text, and it carries out planning instructions in the project, for example for rooms, devices, circuits or the distribution board. Clear, reversible changes run directly; riskier actions need your confirmation first. Every change is its own undo step and appears in the project history. Each run uses your AI allowance. Read more in ",[40,46297,23256],{"href":13483},[79,46299,46301],{"id":46300},"checklist-before-your-first-download","Checklist before your first download",[12,46303,46304],{},"Before your first download, check that:",[84,46306,46307,46310,46313,46316,46319,46322,46325],{},[87,46308,46309],{},"all floors and rooms exist and are named and classified;",[87,46311,46312],{},"electrical symbols are in the right positions;",[87,46314,46315],{},"consumers are linked to the topology, a circuit and a board;",[87,46317,46318],{},"cable data and calculated or manual lengths have been checked;",[87,46320,46321],{},"the distribution board and protection chain match the planned set-up;",[87,46323,46324],{},"project, customer, installer and installation details are complete;",[87,46326,46327],{},"the self-check findings have been reviewed and assessed.",[12,46329,46330],{},[40,46331],{"id":46332},"autosave",[79,46334,46336],{"id":46335},"how-do-i-save-is-my-project-saved-automatically","How do I save? Is my project saved automatically?",[12,46338,46339],{},"Yes. PlanElec saves every change in the studio automatically, about 1.5 seconds after your last edit and, while you keep working, within a few seconds at the latest. This covers the whole project: floor plan, rooms, devices, circuits and all other project data. There is no Save button; you never need to save manually.",[12,46341,46342,46343,3324,46346,46348],{},"The save status appears in the round status indicator in the status bar at the bottom right of the studio. Click it for details: save status, time of the last save, connection (",[15,46344,46345],{},"Online",[15,46347,12325],{},") and the last complete server state.",[138,46350,46351,46359],{},[141,46352,46353],{},[144,46354,46355,46357],{},[147,46356,15230],{},[147,46358,2314],{},[163,46360,46361,46370,46379,46389,46398,46407],{},[144,46362,46363,46367],{},[168,46364,46365],{},[15,46366,3168],{},[168,46368,46369],{},"All changes are on the server.",[144,46371,46372,46376],{},[168,46373,46374],{},[15,46375,15382],{},[168,46377,46378],{},"The latest change is being sent.",[144,46380,46381,46386],{},[168,46382,46383],{},[15,46384,46385],{},"Unsaved",[168,46387,46388],{},"Changes are waiting for the next automatic save.",[144,46390,46391,46395],{},[168,46392,46393],{},[15,46394,15353],{},[168,46396,46397],{},"Changes are kept in this browser; the server backup is still pending.",[144,46399,46400,46404],{},[168,46401,46402],{},[15,46403,12325],{},[168,46405,46406],{},"No connection. Changes are saved locally.",[144,46408,46409,46414],{},[168,46410,46411],{},[15,46412,46413],{},"Save failed",[168,46415,46416],{},"The server did not accept the change; the details state the reason.",[12,46418,46419,46422,46423,56],{},[15,46420,46421],{},"Without an internet connection"," you can keep working. PlanElec keeps your changes in this browser and sends them automatically once the connection is back. If you close the tab, PlanElec still sends pending changes while closing; anything that does not arrive is caught up the next time you open the project in the same browser. Do not clear your browser data until the indicator shows ",[15,46424,3168],{},[12,46426,46427,46430,46431,7814,46433,46436,46437,56],{},[15,46428,46429],{},"If there is a conflict",", for example because the same project was changed on another device in the meantime, the status indicator reports it. PlanElec then keeps your local state as a draft. You find it in the ",[15,46432,45601],{},[15,46434,46435],{},"Recovered drafts"," and open it with ",[15,46438,46439],{},"Open draft as project copy",[12,46441,46442,46443,46445],{},"To take back a single step, use ",[15,46444,13947],{},": the arrow at the top right of the studio or Ctrl+Z (Mac: Cmd+Z).",[12,46447,46448],{},[40,46449],{"id":46450},"start-over",[79,46452,46454],{"id":46453},"how-do-i-start-over-or-clear-parts-of-a-project","How do I start over or clear parts of a project?",[12,46456,46457],{},"To start over completely, create a new project and archive the old one. To discard only parts, delete specific devices, rooms, an imported floor plan (underlay) or a floor. There is no \"clear everything\" button that empties a whole project at once.",[138,46459,46460,46472],{},[141,46461,46462],{},[144,46463,46464,46466,46469],{},[147,46465,21821],{},[147,46467,46468],{},"Path in the studio",[147,46470,46471],{},"Getting it back",[163,46473,46474,46486,46505,46520,46534,46549],{},[144,46475,46476,46479,46483],{},[168,46477,46478],{},"Start from scratch",[168,46480,40242,46481],{},[15,46482,8750],{},[168,46484,46485],{},"The existing project stays unchanged.",[144,46487,46488,46491,46495],{},[168,46489,46490],{},"Remove the old project from the list",[168,46492,40242,46493],{},[15,46494,40245],{},[168,46496,46497,5259,46499,5259,46502],{},[15,46498,45601],{},[15,46500,46501],{},"Show archive",[15,46503,46504],{},"Restore",[144,46506,46507,46510,46516],{},[168,46508,46509],{},"Remove all devices of a room, keep the walls",[168,46511,46512,46513],{},"Right-click the room → ",[15,46514,46515],{},"Remove devices",[168,46517,46518],{},[15,46519,13947],{},[144,46521,46522,46525,46530],{},[168,46523,46524],{},"Delete a room with its walls and devices",[168,46526,46512,46527],{},[15,46528,46529],{},"Delete room",[168,46531,46532],{},[15,46533,13947],{},[144,46535,46536,46539,46544],{},[168,46537,46538],{},"Delete an imported plan (image, PDF, DXF)",[168,46540,46541,46543],{},[15,46542,39858],{}," → trash icon",[168,46545,46546,46548],{},[15,46547,13947],{},"; the layer is retained for 7 days",[144,46550,46551,46554,46560],{},[168,46552,46553],{},"Delete a whole floor",[168,46555,40229,46556,5259,46558],{},[15,46557,21847],{},[15,46559,40234],{},[168,46561,46562],{},"The dialog warns that deletion is permanent.",[1041,46564,46566],{"id":46565},"create-a-new-project-and-archive-the-old-one","Create a new project and archive the old one",[3139,46568,46569,46572,46582],{},[87,46570,46571],{},"Open the project menu with the blue PlanElec button at the top left.",[87,46573,15424,46574,46576,46577,46579,46580,56],{},[15,46575,8750],{},". Alternatively, open the ",[15,46578,45601],{}," panel in the left rail and choose the plus icon ",[15,46581,8750],{},[87,46583,46584,46585,46587,46588,56],{},"Switch back to the old project and choose ",[15,46586,40245],{}," in the project menu. Confirm with ",[15,46589,40245],{},[12,46591,46592,46593,46595,46596,3157,46598,46600],{},"An archived project leaves the list and is kept in the archive. You bring it back in the ",[15,46594,45601],{}," panel via ",[15,46597,46501],{},[15,46599,46504],{},". Users with edit rights can archive. The interface does not offer permanent deletion of a whole project.",[1041,46602,46604],{"id":46603},"clear-or-delete-a-room","Clear or delete a room",[12,46606,46607],{},"In the floor plan, right-click a room; on a touch screen, press and hold the room.",[84,46609,46610,46615],{},[87,46611,46612,46614],{},[15,46613,46515],{}," removes all devices in the room. The walls stay.",[87,46616,46617,46619],{},[15,46618,46529],{}," removes the walls and all devices of the room. Interior walls shared with other rooms are kept.",[12,46621,46622,46623,46625],{},"Both actions ask for confirmation and form a single ",[15,46624,13947],{}," step.",[1041,46627,46629],{"id":46628},"delete-a-floor","Delete a floor",[12,46631,46632,46633,46635,46636,7709,46639,46642],{},"In the floor rail at the top right, open the ",[15,46634,21847],{}," menu (three-dot icon) and choose ",[15,46637,46638],{},"Delete ‹floor name› …",[15,46640,46641],{},"Delete floor?"," dialog lists the affected devices, stairs, switch chains, cable routes and floor-plan layers. The floor and all associated data are deleted; its floor-plan layers are retained for seven more days. The last remaining floor cannot be deleted.",[12,46644,46645,46646,56],{},"To remove only an imported floor plan, see the ",[40,46647,46649],{"href":46648},"\u002Fen\u002Fhelp\u002Fimport-and-calibrate-a-floor-plan#delete","floor-plan import guide",[12,46651,46652,46653,46655,46656,56],{},"A qualified electrician reviews inputs and exports before installation; the binding assessment is made by a recognised inspection body. If something does not work as expected, see ",[40,46654,16735],{"href":15662},". No account yet? ",[40,46657,46659],{"href":46658},"\u002Fauth\u002Fregister","Create a free account",{"title":2044,"searchDepth":2045,"depth":2045,"links":46661},[46662,46663,46664,46665,46666,46667,46668,46669,46670,46671,46672,46673,46674],{"id":45564,"depth":2045,"text":45565},{"id":45669,"depth":2045,"text":45670},{"id":45755,"depth":2045,"text":45756},{"id":45863,"depth":2045,"text":45864},{"id":46027,"depth":2045,"text":46028},{"id":46061,"depth":2045,"text":46062},{"id":46104,"depth":2045,"text":46105},{"id":46133,"depth":2045,"text":46134},{"id":46195,"depth":2045,"text":46196},{"id":46289,"depth":2045,"text":46290},{"id":46300,"depth":2045,"text":46301},{"id":46335,"depth":2045,"text":46336},{"id":46453,"depth":2045,"text":46454,"children":46675},[46676,46677,46678],{"id":46565,"depth":2053,"text":46566},{"id":46603,"depth":2053,"text":46604},{"id":46628,"depth":2053,"text":46629},"Create a project, choose the floor plan or the single-line diagram as your starting point, use guidance, a template or AI floor plan recognition, and produce your first draft PDF.","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fgetting-started-en.webp",{},"\u002Fhelp\u002Fgetting-started.en",{"title":45540,"description":46679},"help\u002Fgetting-started.en",[45561,46686,2132,28893,3590,5269,21783],"floor plan","EtAV0mMNRZJm9A-Ft61PilqnRdUl4Lrg_zDBpAhzgpc","\u002Fhelp\u002Fgetting-started",[],{"id":46691,"title":46692,"articleId":46693,"body":46694,"category":4239,"date":47187,"description":47188,"extension":2113,"image":46706,"labels":47189,"lastUpdated":4826,"locale":2119,"meta":47190,"navigation":2121,"ogImage":47191,"path":47192,"publishDate":47187,"readTime":39546,"refreshInterval":5426,"seo":47193,"seoTitle":47194,"slug":46693,"stem":47195,"tags":47196,"__hash__":47199,"kind":2137,"href":47200},"blog\u002Fblog\u002Fgetting-started-guide.en.md","Getting Started with PlanElec: From Floor Plan to First Export","getting-started-guide",{"type":9,"value":46695,"toc":47163},[46696,46702,46707,46712,46716,46725,46763,46774,46785,46788,46790,46794,46799,46811,46814,46818,46821,46824,46828,46836,46840,46843,46846,46851,46854,46858,46861,46867,46871,46879,46882,46886,46889,46895,46899,46902,46907,46916,46922,46924,46928,46931,46935,46938,46942,46945,46949,46952,46956,46959,46962,46966,47019,47023,47026,47029,47033,47037,47040,47043,47047,47050,47054,47057,47060,47064,47090,47094,47132,47147,47149,47159],[12,46697,46698,46701],{},[15,46699,46700],{},"Your first PlanElec project runs through eight steps: create the project, draw or recognise the floor plan, place devices, connect consumers, check cable routes, fill the distribution board, review the single-line diagram and self-check, and export the documents."," Everything happens in one shared project model. The key principle to start with: a symbol on the floor plan fixes where a device sits. Only its electrical assignment makes it part of the single-line diagram. This guide is for contractors and planners working in Pro from floor plan to dossier; Sketch covers drawing alone.",[12,46703,46704],{},[74,46705],{"alt":76,"src":46706},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-getting-started-guide-editorial.webp",[1489,46708],{":height":11792,":width":3800,"alt":46709,"caption":46710,"src":46711},"Diagram: the eight steps in three columns. Spatial, where does the device sit: project, location and floors, floor plan and rooms, place devices. Electrical, what feeds it: connect consumers and circuits, check cable routes, fill the distribution board. Document, what do you hand over: single-line diagram and self-check, export. Below, the shared project model and the planning approach “Draw the single-line diagram first”, which starts directly in the diagram.","All three views read the same project model. If you draw the single-line diagram first, you start in the middle column and add the floor plan later if needed.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fgetting-started-guide\u002Fthree-views.en.svg",[79,46713,46715],{"id":46714},"_1-create-the-project-location-and-floors","1. Create the project, location and floors",[12,46717,46718,46719,7709,46722,46724],{},"After signing in, open the project overview and choose ",[15,46720,46721],{},"Create project",[15,46723,8750],{}," dialog has three steps:",[3139,46726,46727,46733,46753],{},[87,46728,46729,46732],{},[15,46730,46731],{},"Name and project type:"," the project name, an optional description and the project type: new build, document existing installation, extension or renovation.",[87,46734,46735,38,46738,46740,46741,46743,46744,1774,46746,46748,46749,3324,46751,56],{},[15,46736,46737],{},"Planning approach:",[15,46739,14056],{}," is preselected and recommended. You capture rooms and devices on the floor plan, and the single-line diagram is generated from them. ",[15,46742,14060],{}," is meant for users coming from classic drawing tools: the main board and the installation head are ready as an assumption, you place symbols directly in the diagram and add the floor plan later if needed. On the floor-plan approach you also choose how to start: ",[15,46745,45780],{},[15,46747,45801],{}," (small apartment, family house or existing installation survey), ",[15,46750,45811],{},[15,46752,45821],{},[87,46754,46755,46758,46759,46762],{},[15,46756,46757],{},"Location:"," you confirm the site on the map, or choose ",[15,46760,46761],{},"Create without location"," and add it later. Features that need the location, such as the PV yield, stay blocked until then.",[12,46764,46765,46766,8020,46768,46770,46771,46773],{},"For your first project, choose ",[15,46767,14056],{},[15,46769,45780],{},": the guidance derives the next step from the actual project state, and you can pause it at any time without losing project data. You can switch the planning approach later in the project settings; diagram, floor plan and board stay unchanged. Without a drawn floor plan, the situation plan is left out of the dossier, while the single-line diagram and self-check report remain available. The guide ",[40,46772,15677],{"href":15676}," walks through the first clicks.",[12,46775,46776,46777,46781,46782,46784],{},"If all you need is a single-line diagram and a situation plan, for example as documents for the inspection of a home, draw both free of charge in ",[40,46778,46780],{"href":3611,"rel":46779},[1458],"PlanElec Sketch in your browser",", even without an account. The distribution board and the self-check report are only in Pro. If you need them later, bring the drawing along with ",[15,46783,1482],{},": single-line diagram, situation plan, boards, circuits and project details come along. There is no way back from Pro to Sketch.",[12,46786,46787],{},"Then create the building and its floors. Open the project metadata and enter the project name, installation address and installer. PlanElec reuses these details in title blocks, the self-check report and the dossier.",[1489,46789],{":height":27696,":width":27697,"alt":27698,"caption":27699,"src":27700},[79,46791,46793],{"id":46792},"_2-build-the-floor-plan-and-rooms","2. Build the floor plan and rooms",[12,46795,3370,46796,46798],{},[15,46797,13345],{}," area, draw exterior and interior walls as a polygon or rectangle. If you already have a plan, import it as a reference image and calibrate it against a known distance.",[12,46800,46801,46802,14070,46804,46806,46807,46810],{},"Recognition is faster: put a PDF, scan or photo (PDF, PNG, JPEG or WebP) in ",[15,46803,10173],{},[15,46805,14073],{}," from the preview. PlanElec proposes walls, rooms with their area, doors, windows and supported device symbols. You confirm the scale, correct the draft and import it into an empty floor. The article ",[40,46808,46809],{"href":8995},"Recognise a floor plan from a PDF or photo"," walks through the details.",[12,46812,46813],{},"As soon as walls enclose an area, PlanElec detects a room. Name and categorise every room, for example Kitchen, Utility room or Bedroom 1. Clean rooms pay off later: in equipment proposals, when grouping consumers, in the material view by room and during the technical review. Work one floor at a time and check the geometry before you place many devices; major changes are easier while the plan is still empty.",[79,46815,46817],{"id":46816},"_3-place-the-electrical-devices","3. Place the electrical devices",[12,46819,46820],{},"Open the device palette and place sockets, switches, lights, fixed connections, junction boxes and the distribution board in their planned positions. Wall-mounted devices snap to the wall; lights sit freely in the room.",[12,46822,46823],{},"For suitable rooms, PlanElec proposes sockets, lighting, a standard fit-out or a spotlight grid. You decide what stays, based on doors, windows, built-in units, use and wet zones. The proposals are an editable starting point; the design decisions are yours.",[1489,46825],{":height":44658,":width":3800,"alt":46826,"caption":46827,"src":44661},"Room actions for a living and kitchen area with automatic switch chain, lighting, sockets and standard fit-out.","The room actions give you an editable proposal; you decide the quantities and final positions.",[12,46829,46830,46831,46833,46834,56],{},"You can also tell the ",[15,46832,15121],{}," in your own words what you need, for example \"Place three sockets in the kitchen\". Open it with the bot button in the header or with ⌘J \u002F Ctrl+J. Every change the assistant makes is a single undo step, and PlanElec then checks the project with the AREI\u002FRGIE self-check. Read more in ",[40,46835,10754],{"href":10753},[79,46837,46839],{"id":46838},"_4-connect-switches-consumers-and-topology","4. Connect switches, consumers and topology",[12,46841,46842],{},"Link switches to the lights they actually control. For unassigned switches and lights in a room, PlanElec proposes a switch chain. The list of unconnected components then shows what is still missing.",[12,46844,46845],{},"Next, assign consumers to the right board and circuit. Automatic assignment groups ordinary lighting and socket points and handles supported special appliances such as a cooker, washing machine or EV charger separately. With several boards, multi-board assignment spreads the loads; in three-phase installations, phase balancing distributes them across L1, L2 and L3 and warns about a clear imbalance. Check protection devices, phase and cable data in the preview, and only then apply it.",[1489,46847],{":height":6699,":width":27568,"alt":46848,"caption":46849,"src":46850},"Situation plan of a living and kitchen area in PlanElec Pro: sockets, lights and fixed connections carry their circuit reference such as C1, E1 or F1.","Assigned devices show their circuit reference directly on the situation plan. You use it to trace a device to its circuit in the single-line diagram.","\u002Fhelp\u002Fworkflows\u002Fen-situation-plan.png",[12,46852,46853],{},"Connect junction and branch boxes as real topology nodes whenever a cable needs to be split into separate segments. Proximity is not enough: PlanElec does not insert a box into an electrical path automatically.",[79,46855,46857],{"id":46856},"_5-check-the-cable-routes","5. Check the cable routes",[12,46859,46860],{},"For connected devices, PlanElec calculates a cable route along the walls. Check start, end and path, and add manual waypoints where needed. A manually entered length takes precedence over the calculated one.",[12,46862,46863,46864,46866],{},"Cable type, cross-section, installation method and length must match the real installation. The calculated net lengths feed the cable list and material overview; you add offcuts and site reserve yourself. The guide ",[40,46865,20800],{"href":14100}," explains device, cable, circuit and board automation together.",[79,46868,46870],{"id":46869},"_6-fill-the-distribution-board","6. Fill the distribution board",[12,46872,11757,46873,46875,46876,46878],{},[15,46874,3115],{}," area, choose the enclosure, rows and pole configuration, and start ",[15,46877,19309],{},". PlanElec arranges the main switch, residual current devices (RCDs) and circuit breakers in the intended order on the DIN rails and keeps 20 percent of rail space free by default.",[12,46880,46881],{},"Then check module widths, protection groups and the connections from main switch to RCD and on to the circuit breakers. Add missing connections with the connector tool and move modules by hand where needed. In multi-phase installations, also check the phase overview. Facing an existing board? PlanElec detects the visible DIN modules in cabinet photos and, once you have reviewed them, imports them into an empty board.",[79,46883,46885],{"id":46884},"_7-review-the-single-line-diagram-and-self-check","7. Review the single-line diagram and self-check",[12,46887,46888],{},"PlanElec derives the single-line diagram from the electrical topology. Check that consumer branches, protection devices, cable data and branches appear in full. If an assignment is wrong, correct the relationship in the shared project model, not just in the drawing, and review the diagram again.",[12,46890,46891,46892,46894],{},"The AREI\u002FRGIE self-check reports findings in the rule areas PlanElec can evaluate from your project data. It is advisory: a clean run means the supported rules find no error in your data. Which rules those are is listed in ",[40,46893,1086],{"href":1085},". The inspection of the installed work is carried out by the recognized inspection body.",[79,46896,46898],{"id":46897},"_8-export-the-documents","8. Export the documents",[12,46900,46901],{},"Evaluate the Pro workflow on a small job: assign devices, lay out the board, read the self-check and select the documents you need. Assess the scope on your own project before choosing site pass or a subscription.",[12,46903,3370,46904,46906],{},[15,46905,4665],{}," area, you produce the single-line diagram, the situation plan and the advisory self-check report as PDFs. As soon as board data exists, the distribution board PDF is available too. The selectable installation dossier bundles the documents with a cover page, index and continuous page numbering. Circuit, material and cable lists are available as a pilot: manufacturer-neutral, without prices and with visible default assumptions.",[12,46908,46909,46910,46912,46913,46915],{},"At the top of the export, the step list ",[15,46911,44430],{}," shows what is still open: complete the project details, create circuits in the single-line diagram, place devices on the situation plan, fill the distribution board, review and confirm the single-line diagram, read the self-check. Each step is marked open or done, ",[15,46914,18546],{}," jumps to the right place, and the preview stays available at any time. In the header, the badge “Documents: x of y” shows the same status and opens the export. The list is a completeness aid: the self-check shows you open points; the approved inspection body carries out the inspection.",[12,46917,46918,46919,46921],{},"Before passing anything on, check metadata, legibility, page order and open findings. ",[40,46920,14935],{"href":4645}," describes the status of each document.",[1489,46923],{":height":36275,":width":7057,"alt":36276,"caption":36277,"src":36278},[79,46925,46927],{"id":46926},"making-your-first-run-dependable","Making your first run dependable",[12,46929,46930],{},"Keep your first project small and real: one floor with a board, two socket circuits, lighting and one fixed appliance. That makes it clear early on which information is spatial, electrical or documentary. A socket symbol on the floor plan answers where it is. Its circuit, protective device and cable answer how it is supplied. The export brings both views together; measurements you have not entered do not appear in it either.",[1041,46932,46934],{"id":46933},"take-inventory-before-you-place-anything","Take inventory before you place anything",[12,46936,46937],{},"Record the connection type and voltage, existing boards, rooms, floors and every visible electrical point. Sealed parts stay closed, and you do not infer the earthing system from the conductor count alone. For an existing installation, photos of the labels and a careful survey by a qualified person help more than assumptions. Mark unknown data as open rather than entering a plausible-looking cable type or protection rating.",[1041,46939,46941],{"id":46940},"review-devices-and-circuits-separately","Review devices and circuits separately",[12,46943,46944],{},"Place the board and the real devices first. Link switches to the lights they really control, then assign consumers to circuits. With every automatic proposal, check whether the proposed group is technically sound. PlanElec provides guided editing and proposals; approving the electrical design is your call as the professional. Cable length, installation method, grouping, ambient conditions, voltage drop, short-circuit current and manufacturer conditions are part of your review wherever the project does not capture them.",[1041,46946,46948],{"id":46947},"keep-three-views-aligned","Keep three views aligned",[12,46950,46951],{},"Use the same circuit identifiers in the board, the single-line diagram and the situation plan. After moving a device, splitting a circuit or changing a protection device, check all three views. A good interim test: can a second person start from a situation-plan symbol, follow its identifier to the right circuit and get back to the board? If so, the project is ready to be documented.",[1041,46953,46955],{"id":46954},"use-the-export-as-a-review-stage","Use the export as a review stage",[12,46957,46958],{},"Generate previews first. Check page breaks, clipped labels, legend, installation address, responsible person, plan revision and date. Then reopen the PDFs and compare them with the current project. Single-line diagram, situation plan, board PDF and dossier run in the normal workflow. The material list is a pilot with visible coverage limits; it supports planning and is not an approval to order.",[12,46960,46961],{},"The AREI\u002FRGIE self-check is advisory. A result without errors means the supported rules that can be decided from your data report no error. Measurements, manufacturer data, site conditions and unmodelled provisions are checked on site. Have the design, installed work and documents reviewed by a qualified electrician before commissioning; the official inspection is then carried out by the recognized inspection body.",[79,46963,46965],{"id":46964},"when-something-does-not-add-up","When something does not add up",[138,46967,46968,46977],{},[141,46969,46970],{},[144,46971,46972,46974],{},[147,46973,10798],{},[147,46975,46976],{},"What to check",[163,46978,46979,46987,46995,47003,47011],{},[144,46980,46981,46984],{},[168,46982,46983],{},"Device missing from the diagram",[168,46985,46986],{},"its electrical assignment, not just its position",[144,46988,46989,46992],{},[168,46990,46991],{},"Circuit missing from the plan",[168,46993,46994],{},"unplaced or incorrectly referenced devices",[144,46996,46997,47000],{},[168,46998,46999],{},"Protection rating looks implausible",[168,47001,47002],{},"resolve conductor data and design first, then change it",[144,47004,47005,47008],{},[168,47006,47007],{},"Export shows stale data",[168,47009,47010],{},"project metadata, current revision and last saved state",[144,47012,47013,47016],{},[168,47014,47015],{},"Self-check is incomplete",[168,47017,47018],{},"fill in open data; incomplete never means passed",[79,47020,47022],{"id":47021},"saving-alternatives-and-collaboration","Saving, alternatives and collaboration",[12,47024,47025],{},"Give the project and floors stable, clear names. Before trying a major automatic proposal or restructuring, check the saved state and create a comparison export where useful. A design alternative is not yet an installed system: mark clearly which option is planned, rejected or carried out on site.",[12,47027,47028],{},"When several people work on the project, agree who owns the floor plan, electrical assignment, board and final review. Nobody quietly renames shared circuit identifiers. A short change note with date, affected area and responsible person prevents a new spatial revision from being exported with an old electrical one.",[12,47030,7139,47031,56],{},[40,47032,7142],{"href":5358},[79,47034,47036],{"id":47035},"example-plan-one-room-end-to-end","Example: plan one room end to end",[12,47038,47039],{},"Use a kitchen as an exercise. Draw and name the room, then place general sockets, lighting and the fixed appliances actually planned. Link switches to their lights and keep high-load appliances separate where your design calls for it. Do not derive cable or breaker values from an appliance name: enter confirmed data and leave unknown lengths open.",[12,47041,47042],{},"Then check the situation-plan references, every consumer's path in the single-line diagram and the board layout. Consider whether additional sources or outdoor areas affect the scope. Export both plans and trace three devices in both directions. Once that chain works, move on to the next room.",[79,47044,47046],{"id":47045},"data-protection-and-project-data","Data protection and project data",[12,47048,47049],{},"Do not use real customer data in practice projects. A real dossier needs the name, installation address and responsible parties; share them only within the authorised project circle. Before sending, check that a preview contains no internal notes, old alternatives or incomplete data. The recipient needs the approved document version, not your entire working state.",[79,47051,47053],{"id":47052},"when-your-first-project-is-finished","When your first project is finished",[12,47055,47056],{},"A project is finished when the spatial points match the building, electrical assignments are traceable, board and drawings use the same identifiers, open data stays visible and a qualified person has reviewed the relevant decisions. The PDF is the result of that work, not its proof. The inspection that follows assesses the installed work.",[12,47058,47059],{},"Finally, archive the approved PDFs and note the matching project revision. If a device is moved or a circuit added later, start from that state. That keeps the difference between the earlier inspection, the new design and the later as-built state visible.",[79,47061,47063],{"id":47062},"checklist-before-the-first-download","Checklist before the first download",[84,47065,47066,47069,47072,47075,47078,47081,47084,47087],{},[87,47067,47068],{},"Building, floors and rooms are fully created and named.",[87,47070,47071],{},"All electrical devices are in the right position.",[87,47073,47074],{},"Consumers are linked to topology, circuit and board.",[87,47076,47077],{},"Cable routes and lengths are checked.",[87,47079,47080],{},"Protection chain and board layout are plausible.",[87,47082,47083],{},"Single-line diagram and situation plan are visually reviewed.",[87,47085,47086],{},"Project metadata is complete for the intended document revision.",[87,47088,47089],{},"Self-check findings and coverage gaps are understood and assessed.",[79,47091,47093],{"id":47092},"further-reading-and-official-source","Further reading and official source",[84,47095,47096,47100,47105,47110,47114,47118,47122,47126],{},[87,47097,47098],{},[40,47099,35147],{"href":4212},[87,47101,47102],{},[40,47103,47104],{"href":6050},"Draw a situation plan",[87,47106,47107],{},[40,47108,47109],{"href":4200},"Plan a distribution board",[87,47111,47112],{},[40,47113,3982],{"href":3981},[87,47115,47116],{},[40,47117,27715],{"href":27714},[87,47119,47120],{},[40,47121,24147],{"href":24146},[87,47123,47124],{},[40,47125,4763],{"href":4762},[87,47127,47128],{},[40,47129,47131],{"href":1971,"rel":47130},[1458],"FPS Economy: official RGIE\u002FAREI books, Book 1 version 07 (applicable since 1 November 2026)",[12,47133,47134,47135,47137,47138,47140,47141,47144,47145,56],{},"PlanElec takes you from floor plan to dossier. The installation work is the qualified electrician's responsibility; the official assessment is made by a recognized inspection body. You will find more guides in the ",[40,47136,44595],{"href":17591}," and the full scope in the ",[40,47139,28755],{"href":28754},". With ",[15,47142,47143],{},"Try Pro for 1 month",", one person can evaluate the full Pro editor and exports without masked areas; choose site pass or a subscription for continued use if needed. The terms are on the ",[40,47146,1958],{"href":54},[79,47148,2009],{"id":2008},[84,47150,47151],{},[87,47152,47153,38,47155,2033,47157,56],{},[15,47154,7561],{},[40,47156,2032],{"href":1964},[40,47158,2036],{"href":54},[12,47160,47161,7570],{},[15,47162,2041],{},{"title":2044,"searchDepth":2045,"depth":2045,"links":47164},[47165,47166,47167,47168,47169,47170,47171,47172,47173,47179,47180,47181,47182,47183,47184,47185,47186],{"id":46714,"depth":2045,"text":46715},{"id":46792,"depth":2045,"text":46793},{"id":46816,"depth":2045,"text":46817},{"id":46838,"depth":2045,"text":46839},{"id":46856,"depth":2045,"text":46857},{"id":46869,"depth":2045,"text":46870},{"id":46884,"depth":2045,"text":46885},{"id":46897,"depth":2045,"text":46898},{"id":46926,"depth":2045,"text":46927,"children":47174},[47175,47176,47177,47178],{"id":46933,"depth":2053,"text":46934},{"id":46940,"depth":2053,"text":46941},{"id":46947,"depth":2053,"text":46948},{"id":46954,"depth":2053,"text":46955},{"id":46964,"depth":2045,"text":46965},{"id":47021,"depth":2045,"text":47022},{"id":47035,"depth":2045,"text":47036},{"id":47045,"depth":2045,"text":47046},{"id":47052,"depth":2045,"text":47053},{"id":47062,"depth":2045,"text":47063},{"id":47092,"depth":2045,"text":47093},{"id":2008,"depth":2045,"text":2009},"2026-07-14","PlanElec step by step: create the project and floors, draw or recognise the floor plan, connect devices, fill the distribution board and export PDFs.",[4825,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-getting-started-guide-editorial.jpg","\u002Fblog\u002Fgetting-started-guide.en",{"title":46692,"description":47188},"Getting Started with PlanElec: Floor Plan to Export","blog\u002Fgetting-started-guide.en",[4825,47197,47198,28893,4243,2116,21783],"onboarding","floor-plan","FuJSMOsuVQJ_cPk8A33UupcK7YiLJBmXU_ejSfreIqA","\u002Fblog\u002Fgetting-started-guide",{"id":47202,"title":47203,"articleId":47204,"body":47205,"category":27063,"date":47573,"description":47574,"extension":2113,"image":47226,"labels":47575,"lastUpdated":2111,"locale":2119,"meta":47576,"navigation":2121,"ogImage":47577,"path":47578,"publishDate":47573,"readTime":19432,"refreshInterval":4248,"seo":47579,"seoTitle":47580,"slug":47204,"stem":47581,"tags":47582,"__hash__":47591,"kind":2137,"href":47592},"blog\u002Fblog\u002Fdedicated-circuits-appliances.en.md","Dedicated Circuit Required: Which Appliances Need Their Own Breaker?","dedicated-circuits-appliances",{"type":9,"value":47206,"toc":47555},[47207,47211,47221,47227,47238,47312,47318,47321,47325,47328,47332,47352,47356,47359,47362,47365,47367,47371,47377,47381,47384,47438,47444,47449,47453,47458,47472,47474,47478,47481,47485,47488,47492,47495,47499,47502,47506,47509,47513,47516,47518,47542,47550],[79,47208,47210],{"id":47209},"which-appliances-need-their-own-circuit","Which appliances need their own circuit?",[12,47212,47213,47216,47217,47220],{},[15,47214,47215],{},"In a dwelling, two groups of appliances get their own circuit:"," every appliance with a fixed location rated at ",[15,47218,47219],{},"2600 W"," or more and, regardless of power, the washing machine, dishwasher, tumble dryer, electric cooker, electric hob and electric oven. \"Fixed location\" also covers an appliance you move now and then, for example a freestanding cooker when cleaning; an electric radiator on wheels is a mobile appliance and falls outside the rule (AREI Book 1, part 2, definitions). Fixed electric heating is supplied by one or more separate circuits. That is the rule in Book 1 of the AREI\u002FRGIE, Belgium's general regulations for electrical installations, subsection 5.2.1.2.",[12,47222,47223],{},[74,47224],{"alt":47225,"src":47226},"An electrician checks laundry appliance connections.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-dedicated-circuits-appliances-editorial.webp",[12,47228,47229,47232,47233],{},[15,47230,47231],{},"In PlanElec Sketch:"," the house template already contains dedicated circuits for cooker, dishwasher, washing machine and dryer in a 30 mA group; you adapt it to your installation for free in the browser. Sketch does not check AREI rules. ",[40,47234,47237],{"href":47235,"rel":47236},"https:\u002F\u002Fsketch.planelec.be\u002Fen\u002Fdraw?start=woning",[1458],"Prepare a house in Sketch",[138,47239,47240,47251],{},[141,47241,47242],{},[144,47243,47244,47247,47249],{},[147,47245,47246],{},"Appliance",[147,47248,8217],{},[147,47250,3919],{},[163,47252,47253,47263,47273,47282,47292,47302],{},[144,47254,47255,47258,47261],{},[168,47256,47257],{},"Washing machine, dishwasher, tumble dryer",[168,47259,47260],{},"each on its own dedicated circuit",[168,47262,29286],{},[144,47264,47265,47268,47271],{},[168,47266,47267],{},"Electric cooker (hob and oven in one appliance)",[168,47269,47270],{},"one dedicated circuit",[168,47272,29286],{},[144,47274,47275,47278,47280],{},[168,47276,47277],{},"Separate hob and built-in oven",[168,47279,47260],{},[168,47281,29286],{},[144,47283,47284,47287,47290],{},[168,47285,47286],{},"Fixed electric heating",[168,47288,47289],{},"one or more separate circuits",[168,47291,29286],{},[144,47293,47294,47297,47300],{},[168,47295,47296],{},"Water heater, heat pump, sauna and others",[168,47298,47299],{},"own circuit from 2600 W at a fixed location",[168,47301,29286],{},[144,47303,47304,47306,47309],{},[168,47305,37316],{},[168,47307,47308],{},"one separate circuit per connection point; connecting via a socket is prohibited",[168,47310,47311],{},"7.22.3",[12,47313,47314,47315,56],{},"The rule sets the structure: one appliance, one circuit. You then choose breaker and cross-section for the appliance, based on its nameplate, the supply system, installation method, grouping, cable length, voltage drop and the manufacturer's instructions. The maximum per cross-section is in table 4.11 of subsection 4.4.1.4; the method is explained in ",[40,47316,47317],{"href":3795},"cable cross-section and breaker",[12,47319,47320],{},"\"Its own breaker\" is therefore the rule of thumb for the large household appliances, not a literal requirement in every case. For an EV charger, the overcurrent protection may sit in the charging equipment itself rather than in the distribution board (7.22.3). For fixed electric heating, several appliances may share a circuit, because the AREI allows \"one or more\" circuits (5.2.1.2).",[79,47322,47324],{"id":47323},"does-this-also-apply-to-an-existing-installation","Does this also apply to an existing installation?",[12,47326,47327],{},"The rule applies to new installations and to new or modified parts. In existing parts of an old domestic installation (started before 1 October 1981) and of an installation inspected under the old AREI, a circuit that is not dedicated to the appliance may stay in service (AREI Book 1, part 8, sections 8.2.1 and 8.2.2, point 5). A washing machine on the socket circuit is therefore not automatically a defect in such an installation. If you add a new circuit or replace the appliance with a more powerful one, subsection 5.2.1.2 applies.",[79,47329,47331],{"id":47330},"what-a-dedicated-circuit-gives-you","What a dedicated circuit gives you",[3139,47333,47334,47340,47346],{},[87,47335,47336,47339],{},[15,47337,47338],{},"No overload from neighbours:"," a powerful appliance often runs close to its rated current for long periods. On its own circuit it shares that load with nothing else.",[87,47341,47342,47345],{},[15,47343,47344],{},"Availability:"," if the breaker trips, only this appliance goes off, not half the kitchen.",[87,47347,47348,47351],{},[15,47349,47350],{},"Matched wiring:"," cross-section and protection fit exactly one appliance instead of a mix.",[79,47353,47355],{"id":47354},"apply-the-rule-appliance-by-appliance","Apply the rule appliance by appliance",[12,47357,47358],{},"Start with the nameplate and the installation manual. Record the rated power, single- or three-phase connection, the permitted connection method and any protection requirements from the manufacturer. A combined cooker (hob and oven in one appliance) is one circuit; a separate hob and a built-in oven each get their own dedicated circuit. A heat pump may need separate feeds for the outdoor unit, indoor unit and backup heater. Plan those cases one by one.",[12,47360,47361],{},"For a heat pump or water heater below 2600 W, the AREI does not explicitly prescribe a separate circuit. Follow at least the 2600 W rule; in practice you almost always choose a dedicated circuit.",[12,47363,47364],{},"On the single-line diagram, each appliance circuit gets its own reference with protective device, cable data and end appliance. The situation plan shows the same reference at the appliance location. If the appliance is later replaced by a more powerful one, you recheck the design.",[1489,47366],{":height":22938,":width":35570,"alt":35571,"caption":35572,"src":35573},[79,47368,47370],{"id":47369},"laundry-and-utility-room","Laundry and utility room",[12,47372,47373,47374,56],{},"The washing machine and tumble dryer each get their own circuit, and so does a water heater of 2600 W or more. Also plan an ordinary socket circuit for the iron and small appliances, so they are not plugged into the appliance sockets. How many sockets such a circuit may carry is covered in ",[40,47375,47376],{"href":3702},"how many sockets per circuit?",[79,47378,47380],{"id":47379},"which-rcd-goes-in-front-of-which-appliance-circuit","Which RCD goes in front of which appliance circuit?",[12,47382,47383],{},"A dedicated circuit does not yet say which RCD protects it. Subsection 4.2.4.3 b settles that: sockets, lighting, bathrooms and also the washing machine, tumble dryer and dishwasher go behind an RCD with high or very high sensitivity (30 mA at most), with at most eight final circuits per RCD. Fixed appliances, by contrast, may be connected to an additional RCD at the origin of the installation.",[138,47385,47386,47396],{},[141,47387,47388],{},[144,47389,47390,47392,47394],{},[147,47391,47246],{},[147,47393,24055],{},[147,47395,3919],{},[163,47397,47398,47408,47418,47428],{},[144,47399,47400,47403,47406],{},[168,47401,47402],{},"Washing machine, tumble dryer, dishwasher",[168,47404,47405],{},"high or very high sensitivity (30 mA at most), like sockets and lighting",[168,47407,32902],{},[144,47409,47410,47413,47416],{},[168,47411,47412],{},"Cooker, hob, oven, fixed electric heating",[168,47414,47415],{},"may go on an additional RCD at the origin of the installation (for example 300 mA)",[168,47417,32902],{},[144,47419,47420,47423,47426],{},[168,47421,47422],{},"Resistance heating embedded in walls (above 25 V AC)",[168,47424,47425],{},"its own RCD of 100 mA at most",[168,47427,32902],{},[144,47429,47430,47432,47435],{},[168,47431,37316],{},[168,47433,47434],{},"each circuit individually 30 mA at most, with protection against DC fault currents",[168,47436,47437],{},"7.22.4.1 b",[12,47439,47440,47441,56],{},"The \"may\" for cooker and heating is a permission, not a ban on 30 mA. More on the split in ",[40,47442,47443],{"href":3899},"do I need a 30 mA RCD for every socket?",[1489,47445],{":height":38321,":width":3800,"alt":47446,"caption":47447,"src":47448},"Diagram: washing machine, tumble dryer and dishwasher each get a dedicated circuit behind 30 mA at most; cooker, hob, oven and fixed electric heating may go on an additional RCD at the origin; an EV charger gets one circuit per connection point with its own 30 mA protection.","The dedicated circuit (5.2.1.2) and the choice of RCD (4.2.4.3(b), 7.22.4.1(b)) are two separate questions.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fdedicated-circuits-appliances\u002Fappliance-circuit-rcd.en.svg",[79,47450,47452],{"id":47451},"how-planelec-checks-appliance-circuits","How PlanElec checks appliance circuits",[12,47454,47455,47456,56],{},"For large appliances from the device catalogue – including cooker, oven, washing machine, tumble dryer, dishwasher and EV charger – the AREI\u002FRGIE self-check in PlanElec Pro flags an error as soon as the appliance shares its circuit with other loads. If no circuit breaker is assigned yet, it shows the missing input. The catalogue also always marks water heater, heat pump and sauna as appliances with their own circuit, even below 2600 W; that is stricter than the AREI. You read the 2600 W threshold for other appliances from the nameplate. The inspection of the installation is carried out by the approved inspection body. The rules covered are listed in ",[40,47457,28419],{"href":1085},[12,47459,47460,47461,47465,47466,47471],{},"In PlanElec Sketch (free, in the browser) you draw each appliance circuit with its protective device, cable and appliance, and place the appliance on the situation plan with the same designation. The house template already contains dedicated circuits for cooker, dishwasher, washing machine and dryer in a 30 mA group; you adapt it to your installation: ",[40,47462,47464],{"href":47235,"rel":47463},[1458],"open the house template",". For an EV charger, ",[40,47467,47470],{"href":47468,"rel":47469},"https:\u002F\u002Fsketch.planelec.be\u002Fen\u002Fdraw?start=laadpaal",[1458],"add a charging point"," inserts a circuit with its own 30 mA RCD. Sketch does not check AREI rules; that is the job of the self-check in Pro.",[79,47473,1617],{"id":1616},[1041,47475,47477],{"id":47476},"does-a-fridge-or-freezer-need-its-own-circuit","Does a fridge or freezer need its own circuit?",[12,47479,47480],{},"No. A fridge is an appliance with a fixed location, but the obligation only applies from 2600 W rated power (5.2.1.2). Ordinary fridges and freezers are far below that.",[1041,47482,47484],{"id":47483},"can-a-washing-machine-and-a-tumble-dryer-share-a-circuit","Can a washing machine and a tumble dryer share a circuit?",[12,47486,47487],{},"No. The AREI supplies the washing machine, dishwasher and tumble dryer each separately by a dedicated circuit (5.2.1.2). Two appliances on one circuit do not meet that.",[1041,47489,47491],{"id":47490},"does-an-induction-hob-always-need-its-own-circuit","Does an induction hob always need its own circuit?",[12,47493,47494],{},"Yes, regardless of its power. The electric hob is named explicitly in the list in 5.2.1.2. A separate built-in oven also gets its own circuit; only a cooker combining hob and oven in one appliance shares a single circuit.",[1041,47496,47498],{"id":47497},"does-an-air-conditioner-need-its-own-circuit","Does an air conditioner need its own circuit?",[12,47500,47501],{},"Only from 2600 W rated power for an appliance with a fixed location (5.2.1.2). Below that, the manufacturer's installation manual says what is needed.",[1041,47503,47505],{"id":47504},"do-i-have-to-change-my-old-installation-if-the-washing-machine-is-on-the-socket-circuit","Do I have to change my old installation if the washing machine is on the socket circuit?",[12,47507,47508],{},"Not automatically. In existing parts of old installations, or of installations inspected under the old AREI, such a circuit may stay in service (sections 8.2.1 and 8.2.2, point 5). For a new or modified circuit, or a more powerful appliance, subsection 5.2.1.2 applies.",[1041,47510,47512],{"id":47511},"which-rcd-goes-with-the-washing-machine-and-which-with-the-cooker","Which RCD goes with the washing machine and which with the cooker?",[12,47514,47515],{},"The washing machine goes behind an RCD of 30 mA at most; the cooker may go on an additional RCD at the origin of the installation (4.2.4.3 b). See the table above.",[79,47517,7537],{"id":7536},[84,47519,47520,47525,47530,47534,47538],{},[87,47521,47522],{},[40,47523,47524],{"href":3795},"Which cable cross-section for which circuit breaker?",[87,47526,47527],{},[40,47528,47529],{"href":3899},"Do I need a 30 mA RCD for every socket?",[87,47531,47532],{},[40,47533,3703],{"href":3702},[87,47535,47536],{},[40,47537,5394],{"href":5393},[87,47539,47540],{},[40,47541,42755],{"href":42754},[12,47543,47544,47545,47549],{},"Official source: ",[40,47546,47548],{"href":1971,"rel":47547},[1458],"AREI Book 1",", version 06 (until 31 October 2026) and version 07 (from 1 November 2026; these passages are unchanged in substance, only the sealing of the RCD is dropped in 4.2.4.3 b): part 2 (definitions), subsections 4.2.4.3, 4.4.1.4 and 5.2.1.2, sections 7.22.3 and 7.22.4 and part 8, sections 8.2.1 and 8.2.2.",[12,47551,47552],{},[40,47553,47554],{"href":1964},"Plan your appliance circuits in PlanElec Pro and check them yourself →",{"title":2044,"searchDepth":2045,"depth":2045,"links":47556},[47557,47558,47559,47560,47561,47562,47563,47564,47572],{"id":47209,"depth":2045,"text":47210},{"id":47323,"depth":2045,"text":47324},{"id":47330,"depth":2045,"text":47331},{"id":47354,"depth":2045,"text":47355},{"id":47369,"depth":2045,"text":47370},{"id":47379,"depth":2045,"text":47380},{"id":47451,"depth":2045,"text":47452},{"id":1616,"depth":2045,"text":1617,"children":47565},[47566,47567,47568,47569,47570,47571],{"id":47476,"depth":2053,"text":47477},{"id":47483,"depth":2053,"text":47484},{"id":47490,"depth":2053,"text":47491},{"id":47497,"depth":2053,"text":47498},{"id":47504,"depth":2053,"text":47505},{"id":47511,"depth":2053,"text":47512},{"id":7536,"depth":2045,"text":7537},"2026-07-13","Washing machine, cooker, tumble dryer and fixed-location appliances from 2600 W: the AREI requires a dedicated circuit. With references and RCD guidance.",[34539,4243,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-dedicated-circuits-appliances-editorial.jpg","\u002Fblog\u002Fdedicated-circuits-appliances.en",{"title":47203,"description":47574},"Dedicated Circuits: Which Appliances Need Their Own Breaker?","blog\u002Fdedicated-circuits-appliances.en",[2133,2134,47583,47584,47585,47586,47587,47588,47589,27075,47590,4261,25426],"dedicated circuit","individual circuit","washing machine","dryer","cooker","dishwasher","boiler","cable cross-section","_hKS8bkSXs8DQmfqdxxwv2F6gvjg2io2SSv8QZFBCDc","\u002Fblog\u002Fdedicated-circuits-appliances",{"id":47594,"title":47595,"articleId":47596,"body":47597,"category":27063,"date":47825,"description":47826,"extension":2113,"image":47613,"labels":47827,"lastUpdated":10988,"locale":2119,"meta":47828,"navigation":2121,"ogImage":47829,"path":47830,"publishDate":47825,"readTime":47831,"refreshInterval":4248,"seo":47832,"seoTitle":10313,"slug":47596,"stem":47833,"tags":47834,"__hash__":47841,"kind":2137,"href":47842},"blog\u002Fblog\u002Fsurge-protection-spd-mandatory.en.md","Is Surge Protection (SPD) Mandatory Under AREI?","surge-protection-spd-mandatory",{"type":9,"value":47598,"toc":47816},[47599,47603,47609,47614,47617,47621,47628,47684,47687,47691,47694,47700,47714,47717,47721,47724,47728,47731,47745,47753,47757,47766,47780,47786,47792,47794,47808],[79,47600,47602],{"id":47601},"short-answer-a-protection-goal-yes-a-mandatory-spd-type-no","Short answer: a protection goal yes, a mandatory SPD type no",[12,47604,47605,47608],{},[15,47606,47607],{},"AREI requires persons and property to be protected, according to good practice, against the harmful effects of overvoltages"," – for example from atmospheric phenomena or switching surges (AREI Book 1, section 4.5.1). Book 1 does not prescribe a specific device such as \"Type 2 SPD in the main board\" for homes. Whether to fit a surge protective device (SPD), and which one, is decided with the project's risk assessment and the manufacturer's data.",[12,47610,47611],{},[74,47612],{"alt":24946,"src":47613},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-surge-protection-spd-mandatory-editorial.webp",[12,47615,47616],{},"Chapter 4.5 explicitly regulates only two things: surge protective devices are designed and installed so that their operation poses no danger to persons and property (4.5.1). And in IT systems, an overvoltage limiter is connected where necessary at the origin of the installation between the earth electrode and the neutral or a line conductor (4.5.3).",[79,47618,47620],{"id":47619},"what-an-spd-does","What an SPD does",[12,47622,47623,47624,47627],{},"An SPD diverts short ",[15,47625,47626],{},"voltage spikes"," to earth before they reach equipment. Such spikes come from nearby lightning strikes, switching operations on the grid or other disturbances, and mainly hit sensitive electronics: computers, televisions, heat pumps and inverters.",[138,47629,47630,47643],{},[141,47631,47632],{},[144,47633,47634,47637,47640],{},[147,47635,47636],{},"SPD type",[147,47638,47639],{},"Protects against",[147,47641,47642],{},"Usual location",[163,47644,47645,47658,47671],{},[144,47646,47647,47652,47655],{},[168,47648,47649],{},[15,47650,47651],{},"Type 1",[168,47653,47654],{},"Partial lightning currents",[168,47656,47657],{},"At the origin, typically with an external lightning protection system",[144,47659,47660,47665,47668],{},[168,47661,47662],{},[15,47663,47664],{},"Type 2",[168,47666,47667],{},"Indirect overvoltages",[168,47669,47670],{},"In the main board – the usual choice in homes",[144,47672,47673,47678,47681],{},[168,47674,47675],{},[15,47676,47677],{},"Type 3",[168,47679,47680],{},"Residual overvoltages",[168,47682,47683],{},"Close to the equipment, as fine protection behind a Type 2",[12,47685,47686],{},"These types come from product standards, not from AREI.",[79,47688,47690],{"id":47689},"where-the-spd-sits-in-the-board","Where the SPD sits in the board",[12,47692,47693],{},"A Type 2 sits in the distribution board. Two arrangements are common:",[1489,47695],{":height":47696,":width":3800,"alt":47697,"caption":47698,"src":47699},"408","Two arrangements of a Type 2 SPD: in arrangement A the SPD branches off to PE after the 300 mA main RCD, in arrangement B before the main RCD with its own back-up fuse; AREI prescribes no arrangement (4.5.1)","Both arrangements are common; the manufacturer’s instructions, the earthing system and the installation concept decide which fits, not AREI (4.5.1).","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fsurge-protection-spd-mandatory\u002Fspd-installation-variants.en.svg",[84,47701,47702,47708],{},[87,47703,47704,47707],{},[15,47705,47706],{},"Arrangement A:"," Grid → main switch → main RCD (300 mA) → Type 2 SPD → group RCDs → circuit breakers",[87,47709,47710,47713],{},[15,47711,47712],{},"Arrangement B:"," Grid → main switch → Type 2 SPD with its own back-up fuse → main RCD (300 mA) → …",[12,47715,47716],{},"Which arrangement fits depends on the manufacturer's instructions, the earthing system and the installation concept. Back-up protection, connecting-lead lengths and coordination with other SPDs follow the datasheet; \"typically 20 A\" is not an AREI rule. In the single-line diagram you document the SPD actually installed with its type, connection method and protection data.",[79,47718,47720],{"id":47719},"does-this-apply-to-existing-installations","Does this apply to existing installations?",[12,47722,47723],{},"AREI has no general retrofit obligation along the lines of \"every home gets a Type 2\". Section 4.5.1 sets a protection goal. For an existing installation the electrician assesses lightning protection, supply, cable routing, sensitive loads and the manufacturer's concept – and documents the decision. For renovations, the modified part follows the rules applicable at the time of the work.",[79,47725,47727],{"id":47726},"spd-and-photovoltaics","SPD and photovoltaics",[12,47729,47730],{},"For PV, assess the AC and DC sides separately:",[84,47732,47733,47739],{},[87,47734,47735,47738],{},[15,47736,47737],{},"AC side:"," surge protection in the distribution board as described above.",[87,47740,47741,47744],{},[15,47742,47743],{},"DC side:"," Chapter 7.112 does not explicitly require a DC SPD for domestic PV installations. A DC SPD at the inverter is still common practice, especially with long DC runs across the roof; good practice and the manufacturer's data decide.",[41114,47746,47747],{},[12,47748,47749,47752],{},[15,47750,47751],{},"Tip:"," Many inverters already include a DC SPD. A look at the datasheet can save you an extra device.",[79,47754,47756],{"id":47755},"documenting-the-spd-in-planelec","Documenting the SPD in PlanElec",[12,47758,47759,47762,47763,56],{},[15,47760,47761],{},"In PlanElec Sketch"," you place the surge protective device as a symbol of its own in the single-line diagram, for the AC or the DC side. SPD type (1, 1+2, 2, 2+3 or 3), number of poles and Uc, Up, In and Iimp come from the datasheet; Sketch prints them next to the symbol. Sketch checks neither the type nor the location. You start for free in the browser with ",[40,47764,11136],{"href":3611,"rel":47765},[1458],[12,47767,47768,47772,47773,47776,47777,47779],{},[15,47769,3361,47770],{},[40,47771,31],{"href":1964}," you place the SPD as a module in the distribution board. If an AC SPD hangs directly off the output of the main switch (the position of arrangement B), Pro draws it in the single-line diagram as a branch with symbol and legend, including in the PDF. If it hangs off another device, for example after the main RCD (arrangement A), Pro does not draw it in the single-line diagram, and it is then missing from the PDF as well. The AREI\u002FRGIE self-check assesses whether surge protection is present and reports the result as ",[15,47774,47775],{},"information"," – in line with the regulation, since there is no general SPD obligation. The full scope is in ",[40,47778,1086],{"href":1085},". Sizing, discharge capacity and coordination are set according to the risk assessment and datasheet; costs come from a current project quotation.",[1489,47781],{":height":22938,":width":47782,"alt":47783,"caption":47784,"src":47785},"1085","PlanElec Sketch: ‘Surge protective device’ type 2, 3P+N on the board, with Uc 275 V, Up 1.5 kV and In 20 kA at the symbol; on the right the properties with the note on the datasheet.","You copy type, poles and ratings from the datasheet and Sketch prints them at the symbol. The values are examples; Sketch checks neither type nor location.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-spd-symbol.webp",[1489,47787],{":height":38321,":width":47788,"alt":47789,"caption":47790,"src":47791},"442","‘Single-Line Diagram’ in PlanElec Pro: ‘Surge protection’ type 2 (3P+N) as a branch between main switch and 300 mA RCD, below it meter and grid connection 3×400V+N.","When the SPD sits at the output of the main switch, Pro draws it as a branch with its symbol, also in the PDF. Type and ratings come from the datasheet; Pro does not check them.","\u002Fimages\u002Fblog\u002Fscreens\u002Fpro\u002Fen-spd-single-line.webp",[79,47793,7537],{"id":7536},[84,47795,47796,47800,47804],{},[87,47797,47798],{},[40,47799,3900],{"href":3899},[87,47801,47802],{},[40,47803,25390],{"href":25389},[87,47805,47806],{},[40,47807,37982],{"href":36916},[12,47809,47810],{},[63,47811,47812,47813,27050],{},"Legal basis: AREI\u002FRGIE Book 1, version 07 (Chapters 4.5 and 7.112 unchanged from version 06), Chapter 4.5 (sections 4.5.1 and 4.5.3) and Chapter 7.112. The official text published by the ",[40,47814,27049],{"href":25362,"rel":47815},[1458],{"title":2044,"searchDepth":2045,"depth":2045,"links":47817},[47818,47819,47820,47821,47822,47823,47824],{"id":47601,"depth":2045,"text":47602},{"id":47619,"depth":2045,"text":47620},{"id":47689,"depth":2045,"text":47690},{"id":47719,"depth":2045,"text":47720},{"id":47726,"depth":2045,"text":47727},{"id":47755,"depth":2045,"text":47756},{"id":7536,"depth":2045,"text":7537},"2026-07-06","AREI requires protection against overvoltages (section 4.5.1) but prescribes no specific SPD type. What that means for your distribution board, existing installations and PV.",[4243,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-surge-protection-spd-mandatory-editorial.jpg","\u002Fblog\u002Fsurge-protection-spd-mandatory.en","5 min",{"title":47595,"description":47826},"blog\u002Fsurge-protection-spd-mandatory.en",[2133,2134,47835,47836,47837,47838,47664,47839,3590,4261,25426,47840],"surge protection","SPD","Surge Protection Device","lightning protection","new installation","keuring","cTNiZDgwDdad2k_MaW9WnIAOoQS9C2w4kFAqIcZ0k0A","\u002Fblog\u002Fsurge-protection-spd-mandatory",{"id":47844,"title":47845,"articleId":47846,"body":47847,"category":4239,"date":48405,"description":48406,"extension":2113,"image":47877,"labels":48407,"lastUpdated":4240,"locale":2119,"meta":48408,"navigation":2121,"ogImage":48409,"path":48410,"publishDate":48405,"readTime":10311,"refreshInterval":4248,"seo":48411,"seoTitle":48412,"slug":47846,"stem":48413,"tags":48414,"__hash__":48418,"kind":2137,"href":48419},"blog\u002Fblog\u002Fproperty-sale-electrical-dossier.en.md","Electrical Dossier for a Property Sale in 2026: Rules and Records","property-sale-electrical-dossier",{"type":9,"value":47848,"toc":48386},[47849,47853,47872,47878,47881,47886,47890,47897,47905,47962,47965,47969,47973,47976,47979,47986,47988,47992,47996,48003,48064,48067,48070,48074,48077,48080,48100,48103,48107,48118,48123,48126,48129,48133,48136,48139,48143,48146,48150,48203,48206,48210,48213,48216,48220,48223,48227,48230,48233,48237,48282,48286,48289,48292,48306,48310,48313,48319,48332,48334,48336,48362,48368,48373,48375,48384],[79,47850,47852],{"id":47851},"what-applies-electrically-when-you-sell","What applies electrically when you sell",[12,47854,47855,47856,47859,47860,47863,47864,47867,47868,47871],{},"When you sell a flat or house in Belgium, you hand the buyer the ",[15,47857,47858],{},"installation file"," with the single-line diagram, situation plan and inspection reports (AREI\u002FRGIE Book 1, section 9.1.2). If the installation dates wholly or partly from before ",[15,47861,47862],{},"1 October 1981"," and that old part has never been inspected, you also have a ",[15,47865,47866],{},"control visit"," carried out by an approved inspection body before the sale (section 8.4.2). The date and handover of the report are recorded in the deed of sale. If the report is negative, the buyer has ",[15,47869,47870],{},"18 months from the deed of sale"," to have the infringements corrected and the installation inspected again – by a body of their choice. As a homeowner, start in Sketch: draw the existing installation and complete the missing plans for the sale dossier.",[12,47873,47874],{},[74,47875],{"alt":47876,"src":47877},"An electrician discusses project documents with a homeowner.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-property-sale-electrical-dossier-editorial.webp",[12,47879,47880],{},"So two questions belong apart: does the sale trigger a special inspection duty? And which documents belong in the file regardless? This guide answers both under AREI\u002FRGIE Book 1, version 07, applicable since 1 November 2026; the cited provisions are unchanged from version 06. It covers the electrical side; regional and notarial duties are for your notary.",[12,47882,47883],{},[15,47884,47885],{},"Editing and review: PlanElec team, 6 November 2026.",[79,47887,47889],{"id":47888},"when-does-the-sale-inspection-apply","When does the sale inspection apply?",[12,47891,47892,47893,47896],{},"Section 8.4.2 applies to the sale of a dwelling with an ",[15,47894,47895],{},"old domestic installation",", meaning one whose construction began before 1 October 1981, in two cases (8.4.2.1):",[84,47898,47899,47902],{},[87,47900,47901],{},"The installation has not been significantly modified or extended since 1 October 1981.",[87,47903,47904],{},"It has been significantly modified or extended, but the pre-1981 part has never had a control visit.",[138,47906,47907,47917],{},[141,47908,47909],{},[144,47910,47911,47913,47915],{},[147,47912,2675],{},[147,47914,18695],{},[147,47916,3919],{},[163,47918,47919,47930,47941,47951],{},[144,47920,47921,47924,47927],{},[168,47922,47923],{},"Old installation from before 1981, old part never inspected",[168,47925,47926],{},"The seller arranges a control visit; date and handover of the report in the deed",[168,47928,47929],{},"8.4.2.2 a",[144,47931,47932,47935,47938],{},[168,47933,47934],{},"The buyer demolishes or completely renews the installation",[168,47936,47937],{},"Statement in the deed instead of a visit; buyer informs the Directorate-General for Energy; new installation under chapter 6.4",[168,47939,47940],{},"8.4.2.2 a and b",[144,47942,47943,47946,47949],{},[168,47944,47945],{},"Court-ordered sale where no inspection is possible",[168,47947,47948],{},"Statement in the deed or auction record that no visit took place",[168,47950,47929],{},[144,47952,47953,47956,47959],{},[168,47954,47955],{},"Installation with a conformity inspection (under the former or current AREI)",[168,47957,47958],{},"No visit under 8.4.2; hand over the file and respect the periodic deadline from the last report",[168,47960,47961],{},"9.1.2, 6.5.2, 8.1.2",[12,47963,47964],{},"Convents, hospitals, prisons, care homes, boarding schools, hotels and educational institutions, among others, do not count as dwellings. In co-ownership, the duty only covers the private parts; garages, parking spaces or storage rooms supplied through the co-owners' meter are excluded. Dwellings being expropriated are exempt too (8.4.2.1).",[12,47966,7139,47967,56],{},[40,47968,33720],{"href":4796},[79,47970,47972],{"id":47971},"missing-plans-do-not-stop-the-inspection","Missing plans do not stop the inspection",[12,47974,47975],{},"If neither a single-line diagram nor a situation plan is available at the sale visit, the inspection body still carries out the inspection. The inspector draws up a short description of the boards with address, nominal voltage, supply cable cross-section, outgoing circuits, RCDs and protective devices, plus a rough sketch showing sockets, switches, light points and fixed appliances. These documents only record what was inspected; they do not replace the plans. The missing plans are recorded in the report as an infringement (8.4.2.2 d).",[12,47977,47978],{},"Up-to-date plans are therefore your best preparation: they make circuits, protective devices and connection points unambiguous and spare the buyer an infringement that rests purely on missing documents.",[12,47980,47981,47982,47985],{},"If they are missing, have them drawn up before the appointment. You can draw the existing state for free in ",[40,47983,22],{"href":3611,"rel":47984},[1458]," and agree it with your electrician: the start card “Draw the documents for the inspection” begins with the connection, the meter and the main protection, and you draw the rest. Before the PDF, “Check documents” shows what is still missing, such as no inspection body in the title block, circuits without a protective device or devices on the diagram without a place on the situation plan. Whether the installation conforms is decided by the approved inspection body.",[1489,47987],{":height":1491,":width":1492,"alt":1493,"caption":1494,"src":1495},[12,47989,7139,47990,56],{},[40,47991,11748],{"href":4218},[79,47993,47995],{"id":47994},"what-belongs-in-the-installation-file","What belongs in the installation file?",[12,47997,47998,47999,48002],{},"The owner of a domestic installation holds the file ",[15,48000,48001],{},"in duplicate"," and hands it to the new owner on sale; a tenant receives a copy (section 9.1.2). The file contains:",[138,48004,48005,48013],{},[141,48006,48007],{},[144,48008,48009,48011],{},[147,48010,9275],{},[147,48012,5258],{},[163,48014,48015,48022,48029,48036,48043,48050,48057],{},[144,48016,48017,48019],{},[168,48018,6424],{},[168,48020,48021],{},"Single-line diagram(s) of the installation",[144,48023,48024,48026],{},[168,48025,6407],{},[168,48027,48028],{},"Situation plan(s)",[144,48030,48031,48033],{},[168,48032,6662],{},[168,48034,48035],{},"Conformity inspection report(s) (chapter 6.4)",[144,48037,48038,48040],{},[168,48039,6659],{},[168,48041,48042],{},"Where applicable, control visit report(s) (chapter 6.5)",[144,48044,48045,48047],{},[168,48046,7301],{},[168,48048,48049],{},"Where applicable, evidence that equipment offers the required safety guarantees",[144,48051,48052,48054],{},[168,48053,7315],{},[168,48055,48056],{},"For significant modifications or extensions, the same documents as under 1, 2, 3 and 5",[144,48058,48059,48061],{},[168,48060,6631],{},[168,48062,48063],{},"Short descriptions of all non-significant modifications or extensions",[12,48065,48066],{},"For a domestic PV system under chapter 7.112, the file also includes the operating instructions (operation and maintenance), safety instructions and the technical references of the equipment such as make, model and power.",[12,48068,48069],{},"Only the approved inspection body issues the inspection report. Invoices, data sheets and as-built documents from your electrician supplement the file, but an installer's declaration does not take the place of the report.",[79,48071,48073],{"id":48072},"what-do-the-single-line-diagram-and-situation-plan-show","What do the single-line diagram and situation plan show?",[12,48075,48076],{},"The single-line diagram shows the electrical structure: boards, protective devices, circuits, conductor data and labels (3.1.2.2). The situation plan shows where the equipment sits in the building (3.1.2.3). Both show the current state; old building plans or a diagram from before a renovation are not enough if the installation has since been built differently. For old installations from before 1981, part 8 allows simplified plans with a defined minimum content (8.2.1 no. 7).",[12,48078,48079],{},"Before the inspection, a structured comparison pays off:",[3139,48081,48082,48085,48088,48091,48094,48097],{},[87,48083,48084],{},"name every board and outgoing circuit unambiguously;",[87,48086,48087],{},"record ratings and types of RCDs and overcurrent protection;",[87,48089,48090],{},"have conductor type and cross-section checked rather than estimated;",[87,48092,48093],{},"locate sockets, light points, switches and hard-wired appliances;",[87,48095,48096],{},"record earthing, the disconnecting link and equipotential bonding;",[87,48098,48099],{},"compare the plans with the labels and the real installation.",[12,48101,48102],{},"Do not enter hidden cable routes as established fact. Uncertainties are clarified by an electrician before the inspection.",[79,48104,48106],{"id":48105},"what-happens-with-a-negative-sale-report","What happens with a negative sale report?",[12,48108,48109,48110,48113,48114,48117],{},"A negative report does not block the sale. The seller records in the deed that the buyer must notify the body that issued the report in writing of their identity and the date of the deed. The buyer then has a new control visit carried out within ",[15,48111,48112],{},"18 months from the day of the deed of sale",". The buyer ",[15,48115,48116],{},"chooses the approved body freely","; a different body informs the first one (8.4.2.2 a). If infringements remain at the new visit, the rules for non-conforming old installations apply (8.4.2.3, 9.1.4).",[1489,48119],{":height":25874,":width":3800,"alt":48120,"caption":48121,"src":48122},"Sale inspection flow: the seller has a control visit carried out and the deed states the report date and handover; with a positive report the file goes to the buyer; with a negative report the buyer has a freely chosen body check whether the infringements are remedied at the end of 18 months from the deed; exception for demolition or complete renewal","The sale inspection under 8.4.2 only covers old installations whose old part was never inspected; the 18 months run from the deed of sale (8.4.2.2 a).","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fproperty-sale-electrical-dossier\u002Fsale-inspection-flow.en.svg",[12,48124,48125],{},"The 18 months only apply to this sale case. After a negative periodic control visit, the same body returns within one year (6.5.7.2 b.7), and for a new installation the affected part stays out of service until it has been inspected again (9.1.3.1). So check in the report which type of inspection and which deadline are meant.",[12,48127,48128],{},"A deadline is no permission to keep a visibly dangerous situation in place: have immediate hazards fixed straight away or take the affected part out of service.",[79,48130,48132],{"id":48131},"how-long-is-an-inspection-report-valid","How long is an inspection report valid?",[12,48134,48135],{},"For domestic installations, a control visit is due at the latest every 25 years after the conformity inspection (6.5.2); the exact date is stated in the report. That does not mean a blanket \"valid for 25 years for any sale\". Significant modifications, a stronger connection or an earlier negative report create their own inspection triggers, and the report has to match today's installation.",[12,48137,48138],{},"So check report type, date, result, address, scope of the installation and later changes. An old positive document is not enough if it describes a different installation.",[79,48140,48142],{"id":48141},"planning-costs-and-timing-realistically","Planning costs and timing realistically",[12,48144,48145],{},"The AREI sets no prices for plans, inspection or repairs, and no waiting times. Effort and timing depend on the installation, provider, region and the work identified. Get concrete quotes and coordinate the schedule with the notary, inspection body and electrician. The best preparation starts with three questions: what is in the file? When will the deed be signed? Which inspection trigger applies?",[79,48147,48149],{"id":48148},"roles-of-seller-buyer-notary-and-inspection-body","Roles of seller, buyer, notary and inspection body",[138,48151,48152,48162],{},[141,48153,48154],{},[144,48155,48156,48159],{},[147,48157,48158],{},"Party",[147,48160,48161],{},"Role in the sale",[163,48163,48164,48172,48180,48188,48196],{},[144,48165,48166,48169],{},[168,48167,48168],{},"Seller",[168,48170,48171],{},"Arranges the visit in the case of 8.4.2, hands over the report and the file",[144,48173,48174,48177],{},[168,48175,48176],{},"Approved inspection body",[168,48178,48179],{},"Inspects, issues the report and describes infringements",[144,48181,48182,48185],{},[168,48183,48184],{},"Notary",[168,48186,48187],{},"Includes the prescribed statements in the deed of sale",[144,48189,48190,48193],{},[168,48191,48192],{},"Buyer",[168,48194,48195],{},"Notifies the body of identity and deed date, has infringements corrected and re-inspected",[144,48197,48198,48200],{},[168,48199,5831],{},[168,48201,48202],{},"Surveys the installation, corrects defects and updates the plans",[12,48204,48205],{},"Keep these roles separate in communication too. If it is unclear who produced a document or which scope it covers, clarify that before handover.",[79,48207,48209],{"id":48208},"changes-between-inspection-and-deed-of-sale","Changes between inspection and deed of sale",[12,48211,48212],{},"An inspection is a snapshot. If circuits are added afterwards, the connection is upgraded, an EV charger or PV system is installed or protective devices are replaced, the report no longer fully reflects the state at handover. An updated diagram alone does not prove the change was inspected. Record the date, scope and person responsible for the work and ask the inspection body whether a new inspection is needed.",[12,48214,48215],{},"For a PV system, the additional information from 9.1.2 belongs in the file, not just a symbol on the single-line diagram. If the installed inverter does not match the plans or manufacturer documents are missing, close the gap with evidence, not an assumption.",[79,48217,48219],{"id":48218},"reading-the-report-correctly","Reading the report correctly",[12,48221,48222],{},"Do not read only the conclusion. Check the installation's identification, connection data, inspected scope, measured values, infringements, remarks, applicable derogations and the date of the re-inspection. A remark is not an infringement; conversely, a negative conclusion does not turn positive because some measurements look fine. If the report and the installation contradict each other, the inspection body is your contact.",[79,48224,48226],{"id":48225},"distinguishing-existing-parts-partial-and-complete-renovation","Distinguishing existing parts, partial and complete renovation",[12,48228,48229],{},"Part 8 contains derogations for certain old parts of an installation – not grandfather rights for the whole building. If only one room or board is changed, delimit the change clearly: the modified part follows current rules, unchanged parts keep their existing-installation rules. The exemption from the sale visit for complete renewal only applies if seller and buyer record it in the deed; the new installation then follows the conformity inspection of chapter 6.4.",[12,48231,48232],{},"Keep old and new plan versions with their dates rather than overwriting the earlier state, and mark which report belongs to which version. The buyer then sees which parts were inspected and which work followed. Photos and invoices supplement the history; they do not replace plans and report.",[79,48234,48236],{"id":48235},"handover-checklist","Handover checklist",[84,48238,48240,48246,48252,48258,48264,48270,48276],{"className":48239},[36137],[87,48241,48243,48245],{"className":48242},[36141],[25188,48244],{"disabled":2121,"type":36144}," Inspection trigger and any exemption clarified with notary and inspection body",[87,48247,48249,48251],{"className":48248},[36141],[25188,48250],{"disabled":2121,"type":36144}," Existing reports complete and linked to the address",[87,48253,48255,48257],{"className":48254},[36141],[25188,48256],{"disabled":2121,"type":36144}," Single-line diagram and situation plan match the actual state",[87,48259,48261,48263],{"className":48260},[36141],[25188,48262],{"disabled":2121,"type":36144}," Changes, PV system and technical documents added",[87,48265,48267,48269],{"className":48266},[36141],[25188,48268],{"disabled":2121,"type":36144}," Boards and circuits legibly labelled",[87,48271,48273,48275],{"className":48272},[36141],[25188,48274],{"disabled":2121,"type":36144}," Infringements, deadlines and responsibilities from the report understood",[87,48277,48279,48281],{"className":48278},[36141],[25188,48280],{"disabled":2121,"type":36144}," Installation file handed to the buyer, second copy kept",[79,48283,48285],{"id":48284},"checking-the-file-before-ordering-and-handover","Checking the file before ordering and handover",[12,48287,48288],{},"Before the inspection, lay out all documents and sort them by address, meter or EAN code, board and date. Check that the most recent plan really describes the dwelling being sold. A report for common parts, an old house number or a plan from before a renovation does not silently count as current evidence. Note contradictions and clarify with the notary and inspection body which documents are relevant to the sale.",[12,48290,48291],{},"After the inspection, transfer each finding with location, plan reference, responsible party and deadline into a task list. An electrician carries out and documents the corrections; only updated plans and, where needed, the re-inspection close the matter.",[12,48293,4361,48294,48299,48300,48305],{},[40,48295,48298],{"href":48296,"rel":48297},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Flivre-1-du-reglement-general",[1458],"FPS Economy FAQ for notaries and the property sector"," explains the sale visit, file contents and roles; the ",[40,48301,48304],{"href":48302,"rel":48303},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Fcontrole-des-installations\u002Ftypes-de-controle-des",[1458],"FPS Economy overview of inspection types"," narrows down the trigger.",[79,48307,48309],{"id":48308},"what-planelec-contributes","What PlanElec contributes",[12,48311,48312],{},"Use Sketch to draw the verified existing installation. Keep earlier reports and unknown circuit assignments alongside it; have the electrician clarify them before you finish the plans.",[12,48314,48315,48318],{},[15,48316,48317],{},"As an owner or seller",", you draw the single-line diagram and situation plan for free in PlanElec Sketch, even without an account, and export them as a PDF in A4 or A3. If you save the drawing in your free account, the PDF carries a QR code “Verify document”: it confirms the version and origin of the drawing, not the conformity of the installation. That way the buyer sees which plan version belongs to the file.",[12,48320,48321,48324,48325,48327,48328,48331],{},[15,48322,48323],{},"As an electrical contractor",", you record the installation in ",[40,48326,31],{"href":1964},", including the distribution board, and run the indicative AREI\u002FRGIE self-check for the supported rules. The installation dossier combines the documents with a cover page, document index and continuous page numbering; once ",[40,48329,48330],{"href":4635},"archived with versions",", every version can be checked by QR code for origin and integrity. The roles are clear: PlanElec delivers consistent plans and shows findings in the supported rules; measurements and the official report come from the approved inspection body.",[1489,48333],{":height":36275,":width":7057,"alt":36276,"caption":36277,"src":36278},[79,48335,13051],{"id":13050},[84,48337,48338,48343,48348,48352,48357],{},[87,48339,48340],{},[40,48341,48342],{"href":5393},"Preparing for an electrical inspection in Belgium",[87,48344,48345],{},[40,48346,48347],{"href":25389},"What does the inspector check?",[87,48349,48350],{},[40,48351,4213],{"href":4212},[87,48353,48354],{},[40,48355,48356],{"href":4045},"Renovation and AREI: when do you need new electrical plans?",[87,48358,48359],{},[40,48360,48361],{"href":5956},"Old buildings and AREI Part 8: special rules for existing installations",[12,48363,48364],{},[40,48365,48367],{"href":3611,"rel":48366},[1458],"Draw the plans for the installation file for free in PlanElec Sketch →",[12,48369,48370],{},[63,48371,48372],{},"Regulatory basis: AREI\u002FRGIE Book 1 V07, in particular part 8 section 8.4.2 and chapter 9.1. The official text, the specific inspection report and the assessment by the notary and approved inspection body are decisive.",[79,48374,2009],{"id":2008},[84,48376,48377],{},[87,48378,48379,38,48381,56],{},[15,48380,11935],{},[40,48382,2023],{"href":1456,"rel":48383},[1458],[12,48385,43928],{},{"title":2044,"searchDepth":2045,"depth":2045,"links":48387},[48388,48389,48390,48391,48392,48393,48394,48395,48396,48397,48398,48399,48400,48401,48402,48403,48404],{"id":47851,"depth":2045,"text":47852},{"id":47888,"depth":2045,"text":47889},{"id":47971,"depth":2045,"text":47972},{"id":47994,"depth":2045,"text":47995},{"id":48072,"depth":2045,"text":48073},{"id":48105,"depth":2045,"text":48106},{"id":48131,"depth":2045,"text":48132},{"id":48141,"depth":2045,"text":48142},{"id":48148,"depth":2045,"text":48149},{"id":48208,"depth":2045,"text":48209},{"id":48218,"depth":2045,"text":48219},{"id":48225,"depth":2045,"text":48226},{"id":48235,"depth":2045,"text":48236},{"id":48284,"depth":2045,"text":48285},{"id":48308,"depth":2045,"text":48309},{"id":13050,"depth":2045,"text":13051},{"id":2008,"depth":2045,"text":2009},"2026-06-29","Which electrical inspection is mandatory when you sell in Belgium, what goes into the installation file and when the 18-month deadline applies – per AREI\u002FRGIE Book 1, with references.",[6082,5422,2117],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-property-sale-electrical-dossier-editorial.jpg","\u002Fblog\u002Fproperty-sale-electrical-dossier.en",{"title":47845,"description":48406},"Electrical Dossier for a Property Sale in 2026","blog\u002Fproperty-sale-electrical-dossier.en",[2133,2134,48415,36883,48416,5269,26419,48417,4261,25426],"property sale","inspection report","notary","PthVX2lFKXPFDQ_WP0cAQM4V9Pcidm4ej1dZcGW2Dik","\u002Fblog\u002Fproperty-sale-electrical-dossier",{"id":48421,"title":48422,"articleId":48423,"body":48424,"category":4239,"date":49373,"description":49374,"extension":2113,"image":48434,"labels":49375,"lastUpdated":10988,"locale":2119,"meta":49376,"navigation":2121,"ogImage":49377,"path":49378,"publishDate":49373,"readTime":6086,"refreshInterval":4248,"seo":49379,"seoTitle":49380,"slug":48423,"stem":49381,"tags":49382,"__hash__":49388,"kind":2137,"href":49389},"blog\u002Fblog\u002Ftop-10-arei-violations.en.md","10 Important AREI Inspection Points: Identify, Avoid and Correct Them","top-10-arei-violations",{"type":9,"value":48425,"toc":49309},[48426,48429,48435,48439,48583,48587,48593,48723,48728,48730,48734,48740,48744,48747,48751,48754,48758,48772,48776,48779,48781,48785,48790,48793,48796,48799,48802,48805,48823,48826,48829,48831,48833,48837,48842,48845,48848,48851,48854,48857,48871,48874,48877,48879,48883,48888,48891,48894,48897,48900,48903,48914,48917,48920,48922,48926,48931,48934,48937,48940,48943,48946,48963,48966,48969,48971,48975,48980,48983,48986,48989,48992,48995,48998,49055,49065,49068,49071,49074,49076,49078,49082,49087,49090,49093,49096,49099,49102,49113,49116,49119,49121,49125,49130,49133,49136,49139,49142,49145,49156,49159,49162,49164,49168,49173,49176,49179,49182,49185,49188,49202,49205,49208,49210,49214,49219,49222,49225,49228,49231,49234,49245,49248,49251,49253,49257,49260,49272,49274,49279,49301],[12,48427,48428],{},"These ten points decide the outcome of a Belgian domestic inspection particularly often: RCD protection, plans, earthing, main switch, bathroom, cross-section and protection, number of circuits per RCD, labelling, mechanical cable protection and surge protection. For each one you get the rule from AREI\u002FRGIE Book 1 (version 07, applicable since 1 November 2026; the references are the same as in version 06), the reason behind it and the right correction. The order is a professional checklist, not a statistic – no reliable official frequency ranking exists. Your actual inspection report remains decisive.",[12,48430,48431],{},[74,48432],{"alt":48433,"src":48434},"An electrician checks a Belgian socket using a socket tester.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-top-10-arei-violations-editorial.webp",[12,48436,48437],{},[15,48438,47885],{},[138,48440,48441,48456],{},[141,48442,48443],{},[144,48444,48445,48447,48450,48453],{},[147,48446,9275],{},[147,48448,48449],{},"Inspection point",[147,48451,48452],{},"Core rule",[147,48454,48455],{},"Book 1 reference",[163,48457,48458,48470,48482,48494,48506,48518,48530,48543,48555,48569],{},[144,48459,48460,48462,48464,48467],{},[168,48461,6424],{},[168,48463,24055],{},[168,48465,48466],{},"300 mA at the origin; at most 30 mA for the prescribed circuits",[168,48468,48469],{},"4.2.4.3b, 5.3.5.3 a",[144,48471,48472,48474,48476,48479],{},[168,48473,6407],{},[168,48475,38605],{},[168,48477,48478],{},"Up to date, in the installation file, matching the installation",[168,48480,48481],{},"3.1.2, 9.1.2",[144,48483,48484,48486,48488,48491],{},[168,48485,6662],{},[168,48487,29348],{},[168,48489,48490],{},"Below 100 Ω; above 30 Ω a stricter RCD layout",[168,48492,48493],{},"4.2.3.2, 4.2.4.3b",[144,48495,48496,48498,48501,48504],{},[168,48497,6659],{},[168,48499,48500],{},"Main switch-disconnector",[168,48502,48503],{},"At least 40 A in domestic installations",[168,48505,33191],{},[144,48507,48508,48510,48513,48516],{},[168,48509,7301],{},[168,48511,48512],{},"Bathroom and shower",[168,48514,48515],{},"Zones 0, 1 and 2 with defined equipment",[168,48517,31367],{},[144,48519,48520,48522,48525,48528],{},[168,48521,7315],{},[168,48523,48524],{},"Cross-section and protection",[168,48526,48527],{},"Maximum rating per cross-section according to table 4.11",[168,48529,31729],{},[144,48531,48532,48534,48537,48540],{},[168,48533,6631],{},[168,48535,48536],{},"Circuits per RCD",[168,48538,48539],{},"At most eight final circuits per 30 mA RCD",[168,48541,48542],{},"4.2.4.3b",[144,48544,48545,48547,48550,48553],{},[168,48546,6645],{},[168,48548,48549],{},"Labelling",[168,48551,48552],{},"Every circuit clearly identified",[168,48554,29264],{},[144,48556,48557,48560,48563,48566],{},[168,48558,48559],{},"9",[168,48561,48562],{},"Mechanical cable protection",[168,48564,48565],{},"Cables suited to the installation method and stresses",[168,48567,48568],{},"5.2.1.5, 5.2.2",[144,48570,48571,48574,48577,48580],{},[168,48572,48573],{},"10",[168,48575,48576],{},"Surge protection",[168,48578,48579],{},"Protection objective according to good practice",[168,48581,48582],{},"4.5.1",[1041,48584,48586],{"id":48585},"which-points-the-planelec-pro-self-check-covers","Which points the PlanElec Pro self-check covers",[12,48588,48589,48590,48592],{},"The AREI\u002FRGIE self-check in ",[40,48591,31],{"href":1964}," checks part of these points against the project data you entered, before the inspection body arrives. It does not see measured values or the condition on site.",[138,48594,48595,48609],{},[141,48596,48597],{},[144,48598,48599,48601,48603,48606],{},[147,48600,9275],{},[147,48602,48449],{},[147,48604,48605],{},"Self-check",[147,48607,48608],{},"What is checked",[163,48610,48611,48623,48634,48645,48656,48667,48678,48689,48700,48711],{},[144,48612,48613,48615,48617,48620],{},[168,48614,6424],{},[168,48616,24055],{},[168,48618,48619],{},"partly",[168,48621,48622],{},"main RCD of at most 300 mA and at least 40 A; 30 mA for socket and bathroom circuits",[144,48624,48625,48627,48629,48631],{},[168,48626,6407],{},[168,48628,38605],{},[168,48630,48619],{},[168,48632,48633],{},"installation file with diagram, plan and title block; loads from the diagram placed on the situation plan",[144,48635,48636,48638,48640,48642],{},[168,48637,6662],{},[168,48639,29348],{},[168,48641,48619],{},[168,48643,48644],{},"main equipotential bonding and a documented earth electrode; not the measured earth resistance",[144,48646,48647,48649,48651,48653],{},[168,48648,6659],{},[168,48650,24052],{},[168,48652,515],{},[168,48654,48655],{},"present and at least 40 A in domestic installations",[144,48657,48658,48660,48662,48664],{},[168,48659,7301],{},[168,48661,48512],{},[168,48663,48619],{},[168,48665,48666],{},"permitted equipment in zones 0, 1 and 2 and 30 mA protection, as far as rooms and devices are entered",[144,48668,48669,48671,48673,48675],{},[168,48670,7315],{},[168,48672,48524],{},[168,48674,515],{},[168,48676,48677],{},"cross-section matching the rated current of the protective device",[144,48679,48680,48682,48684,48686],{},[168,48681,6631],{},[168,48683,48536],{},[168,48685,515],{},[168,48687,48688],{},"at most eight final circuits per 30 mA device, at most eight sockets and fixed appliances per circuit",[144,48690,48691,48693,48695,48697],{},[168,48692,6645],{},[168,48694,48549],{},[168,48696,602],{},[168,48698,48699],{},"no software sees the labels in the real distribution board",[144,48701,48702,48704,48706,48708],{},[168,48703,48559],{},[168,48705,48562],{},[168,48707,602],{},[168,48709,48710],{},"only the CPR class of individually laid cables and of cables in cavity walls is checked",[144,48712,48713,48715,48717,48720],{},[168,48714,48573],{},[168,48716,48576],{},[168,48718,48719],{},"notice",[168,48721,48722],{},"whether a surge protective device is present; no risk assessment",[12,48724,48725,48726,56],{},"“Partly” means: the rule is checked against the data you entered; whether the built installation matches the plan is assessed by the approved inspection body. The full scope and its limits are described in ",[40,48727,1086],{"href":1085},[38398,48729],{},[79,48731,48733],{"id":48732},"_1-missing-or-wrong-rcd","1. Missing or wrong RCD",[12,48735,48736,48739],{},[15,48737,48738],{},"AREI reference:"," Art. 4.2.4.3b (RCD at the origin and high-sensitivity group RCDs) \u002F Art. 5.3.5.3 a (type)",[1041,48741,48743],{"id":48742},"what-the-inspector-checks","What the inspector checks",[12,48745,48746],{},"At the origin of every domestic installation there is at least one RCD of at most 300 mA. Immediately after it comes at least one high- or very-high-sensitivity RCD (at most 30 mA) for sockets, lighting, rooms with a bath or shower, and the washing machine, tumble dryer and dishwasher. RCDs in domestic installations are at least type A; the one at the origin has a rated current of at least 40 A.",[1041,48748,48750],{"id":48749},"why-it-matters","Why it matters",[12,48752,48753],{},"The RCD detects residual currents, for example when current flows through a body to earth, and disconnects the circuit. If it is missing or wrongly assigned, an insulation fault remains life-threatening.",[1041,48755,48757],{"id":48756},"how-to-fix-it","How to fix it",[84,48759,48760,48763,48766,48769],{},[87,48761,48762],{},"Add missing RCDs and assign the prescribed circuits correctly.",[87,48764,48765],{},"At most eight final circuits per high-sensitivity RCD (Art. 4.2.4.3b).",[87,48767,48768],{},"Derive the type from the fault current spectrum, manufacturer documents and the special chapter. For charging points, chapter 7.22 requires a dedicated RCD of at most 30 mA per AC circuit plus protection against faults with a DC component; for inverters, the documentation of the specific variant applies.",[87,48770,48771],{},"Whether a time-delayed or selective RCD is needed follows from the coordination in the project, not from a blanket rule.",[1041,48773,48775],{"id":48774},"effort","Effort",[12,48777,48778],{},"Device, number of poles, space in the board, wiring and measurements determine the quote.",[38398,48780],{},[79,48782,48784],{"id":48783},"_2-missing-or-outdated-electrical-plans","2. Missing or outdated electrical plans",[12,48786,48787,48789],{},[15,48788,48738],{}," section 3.1.2 (diagrams and plans), Art. 9.1.2 no. 1 (single-line diagram) and no. 2 (situation plan)",[1041,48791,48743],{"id":48792},"what-the-inspector-checks-1",[12,48794,48795],{},"The file of a domestic installation includes a single-line diagram and a situation plan that show the installation as built. In a conformity inspection, the report expressly certifies that the installation was carried out according to those plans (6.4.6.4, b.4). Often the plans are missing entirely or show the state before later changes.",[1041,48797,48750],{"id":48798},"why-it-matters-1",[12,48800,48801],{},"Without up-to-date plans, neither the inspector nor an electrician can assess the installation safely, and in an emergency nobody knows which device supplies which area.",[1041,48803,48757],{"id":48804},"how-to-fix-it-1",[84,48806,48807,48810,48813,48816],{},[87,48808,48809],{},"Create the single-line diagram and situation plan, or update them to the actual state.",[87,48811,48812],{},"Document all circuits, fuses, RCDs and loads.",[87,48814,48815],{},"Briefly describe later non-significant changes and add them to the file (9.1.2 no. 7).",[87,48817,48818,48819,48822],{},"You can draw the plans for free in the browser with ",[40,48820,22],{"href":3611,"rel":48821},[1458],". Before the PDF, “Check documents” shows what is still missing, for example circuits without a protective device or devices in the diagram without a place on the situation plan.",[1041,48824,48775],{"id":48825},"effort-1",[12,48827,48828],{},"Starting data and the circuit tracing required determine the effort. The on-site survey is the electrician's job; software structures the result.",[38398,48830],{},[1489,48832],{":height":5808,":width":5809,"alt":5810,"caption":5811,"src":5812},[79,48834,48836],{"id":48835},"_3-faulty-earthing","3. Faulty earthing",[12,48838,48839,48841],{},[15,48840,48738],{}," Art. 4.2.3.2 (earthing installations), Art. 4.2.4.3b (earth value and RCD layout)",[1041,48843,48743],{"id":48844},"what-the-inspector-checks-2",[12,48846,48847],{},"Earthing is part of the protection concept. In a domestic installation the earth electrode resistance is below 100 Ω (4.2.3.2). A value above 30 Ω does not automatically mean faulty earthing: under Art. 4.2.4.3b it triggers a stricter RCD layout. There is a deficiency when the earthing is missing or damaged, the value reaches 100 Ω, or the RCD layout that belongs to the measured value is missing. Loose connections and corroded earthing conductors are assessed as well.",[1041,48849,48750],{"id":48850},"why-it-matters-2",[12,48852,48853],{},"Without effective earthing, metal enclosures can become live in a fault without the protective device disconnecting reliably.",[1041,48855,48757],{"id":48856},"how-to-fix-it-2",[84,48858,48859,48862,48865,48868],{},[87,48860,48861],{},"Have the earth resistance measured professionally.",[87,48863,48864],{},"Above 30 Ω, apply the layout of Art. 4.2.4.3b: at least two high- or very-high-sensitivity RCDs, each with at most 16 single or multiple socket outlets, and for the remaining circuits at least one RCD of at most 100 mA per circuit or group.",[87,48866,48867],{},"Decide with the electrician whether to improve the earth electrode, adapt the protection layout, or both.",[87,48869,48870],{},"Check all earth connections and inspect earthing conductors for corrosion.",[1041,48872,48775],{"id":48873},"effort-2",[12,48875,48876],{},"Measured value, existing situation, soil and the work required determine the solution.",[38398,48878],{},[79,48880,48882],{"id":48881},"_4-missing-main-switch","4. Missing main switch",[12,48884,48885,48887],{},[15,48886,48738],{}," Art. 5.3.5.1 b (main switch-disconnector)",[1041,48889,48743],{"id":48890},"what-the-inspector-checks-3",[12,48892,48893],{},"Every main distribution board has a main switch-disconnector that disconnects all line conductors and, where applicable, the neutral at the same time. In domestic installations its rated current suits the installation and is at least 40 A. A grid operator's overcurrent device may perform this function if it is designed for isolation.",[1041,48895,48750],{"id":48896},"why-it-matters-3",[12,48898,48899],{},"In a fire, water damage or an accident, the entire installation must be de-energised with a single action.",[1041,48901,48757],{"id":48902},"how-to-fix-it-3",[84,48904,48905,48908,48911],{},[87,48906,48907],{},"Install an all-pole main switch-disconnector of at least 40 A, four-pole for a three-phase installation with neutral.",[87,48909,48910],{},"Position the board so the switch is easily accessible without special tools (5.3.5.1 c).",[87,48912,48913],{},"Existing installations: under part 8, existing main switches from 25 A may stay in service in the cases listed there (8.2.1 no. 4, 8.2.2 no. 4).",[1041,48915,48775],{"id":48916},"effort-3",[12,48918,48919],{},"Rating, number of poles, space and board rework are assessed per project.",[38398,48921],{},[79,48923,48925],{"id":48924},"_5-bathroom-zones-not-respected","5. Bathroom zones not respected",[12,48927,48928,48930],{},[15,48929,48738],{}," chapter 7.1 (rooms containing a bath and\u002For shower)",[1041,48932,48743],{"id":48933},"what-the-inspector-checks-4",[12,48935,48936],{},"Chapter 7.1 divides the bathroom into zones. Zone 0 is the inside of the bath or of a shower tray at least 10 cm deep; with a shallower tray or no tray, it extends up to 10 cm above the floor within 1.20 m of the fixed water outlet. For a shower, zone 1 extends up to 1.20 m around the centre of the fixed water outlet and up to a height of 2.25 m; for a bath, its outer edge forms the boundary. Zone 2 only exists for a bath: a further 0.60 m around zone 1. Typical infringements are low-voltage sockets in zone 0 or 1, junction boxes in zone 0 and distribution boards in zones 0, 1 or 2.",[1041,48938,48750],{"id":48939},"why-it-matters-4",[12,48941,48942],{},"Water strongly reduces the body's resistance. The zones keep equipment as far from the bath and shower as its level of protection requires.",[1041,48944,48757],{"id":48945},"how-to-fix-it-4",[84,48947,48948,48951,48954,48957,48960],{},[87,48949,48950],{},"In zone 1, only SELV sockets and SELV controls with the source outside zones 0 and 1, plus suitable permanently connected appliances (7.1.5.2 c).",[87,48952,48953],{},"In zone 2, low-voltage sockets only with a very-high-sensitivity RCD or individually via an isolating transformer of at most 100 W (7.1.5.2 d).",[87,48955,48956],{},"In zones 1 and 2, at least protection against splashing water (external influence AD4, table 7.3); for low-voltage sockets in zone 2, the table's footnote allows IPXX.",[87,48958,48959],{},"All bathroom circuits behind an RCD of at most 30 mA (Art. 4.2.4.3b).",[87,48961,48962],{},"Existing bathrooms whose installation started before 1 March 2025 may, under conditions, keep the former zone layout (6.5.8.1 no. 3).",[1041,48964,48775],{"id":48965},"effort-4",[12,48967,48968],{},"Position, cable route, finishes and equipment determine the scope.",[38398,48970],{},[79,48972,48974],{"id":48973},"_6-cable-cross-section-too-small-for-the-fuse","6. Cable cross-section too small for the fuse",[12,48976,48977,48979],{},[15,48978,48738],{}," Art. 4.4.1.4 with table 4.11 (rating by cross-section) \u002F Art. 5.2.1.2 (selection of wiring)",[1041,48981,48743],{"id":48982},"what-the-inspector-checks-5",[12,48984,48985],{},"The protective device must match the conductor cross-section. A classic error: a 20 A circuit breaker on a 1.5 mm² cable that may only be protected at 16 A. Socket circuits also need at least 2.5 mm² (5.2.1.2).",[1041,48987,48750],{"id":48988},"why-it-matters-5",[12,48990,48991],{},"If a cable carries more current than it can handle, it heats up and can start a fire. The protective device must therefore never exceed the rating permitted for the cross-section.",[1041,48993,48757],{"id":48994},"how-to-fix-it-5",[12,48996,48997],{},"Maximum ratings for domestic installations according to table 4.11:",[138,48999,49000,49013],{},[141,49001,49002],{},[144,49003,49004,49007,49010],{},[147,49005,49006],{},"Copper cross-section",[147,49008,49009],{},"Max. fuse",[147,49011,49012],{},"Max. circuit breaker",[163,49014,49015,49023,49031,49039,49047],{},[144,49016,49017,49019,49021],{},[168,49018,22712],{},[168,49020,33076],{},[168,49022,33079],{},[144,49024,49025,49027,49029],{},[168,49026,22715],{},[168,49028,33079],{},[168,49030,33088],{},[144,49032,49033,49035,49037],{},[168,49034,33093],{},[168,49036,33088],{},[168,49038,33098],{},[144,49040,49041,49043,49045],{},[168,49042,33103],{},[168,49044,33106],{},[168,49046,33109],{},[144,49048,49049,49051,49053],{},[168,49050,33114],{},[168,49052,33117],{},[168,49054,33120],{},[84,49056,49057,49062],{},[87,49058,49059,49060],{},"Reduce the protective device to the permitted rating ",[15,49061,3764],{},[87,49063,49064],{},"replace the cable with a larger cross-section.",[12,49066,49067],{},"The table gives maximum values. Installation method, grouping and ambient temperature can require a larger cross-section (4.4.1.4).",[1041,49069,48775],{"id":49070},"effort-5",[12,49072,49073],{},"Reducing the protection and replacing the cable are technically different solutions with very different effort.",[38398,49075],{},[1489,49077],{":height":42714,":width":42715,"alt":42716,"caption":42717,"src":42718},[79,49079,49081],{"id":49080},"_7-too-many-circuits-per-rcd","7. Too many circuits per RCD",[12,49083,49084,49086],{},[15,49085,48738],{}," Art. 4.2.4.3b (at most eight final circuits per high-sensitivity RCD); Art. 5.3.5.2 b (at most eight sockets per final circuit)",[1041,49088,48743],{"id":49089},"what-the-inspector-checks-6",[12,49091,49092],{},"A high- or very-high-sensitivity RCD supplies at most eight final circuits. In older installations everything often hangs on a single device. Part 8 allows more circuits in existing old installations (8.2.1 no. 16, 8.2.2 no. 10); for new and significantly modified parts, the limit applies.",[1041,49094,48750],{"id":49095},"why-it-matters-6",[12,49097,49098],{},"Many circuits on one RCD add up leakage currents and increase the risk of nuisance tripping. In a fault, a large part of the home also loses power at once.",[1041,49100,48757],{"id":49101},"how-to-fix-it-6",[84,49103,49104,49107,49110],{},[87,49105,49106],{},"Add more 30 mA RCDs.",[87,49108,49109],{},"Split circuits sensibly, for example by floor or function.",[87,49111,49112],{},"At most eight single or multiple socket outlets per final circuit.",[1041,49114,48775],{"id":49115},"effort-6",[12,49117,49118],{},"Board space, split, sizing and measurements belong in the quote.",[38398,49120],{},[79,49122,49124],{"id":49123},"_8-missing-circuit-labelling","8. Missing circuit labelling",[12,49126,49127,49129],{},[15,49128,48738],{}," Art. 3.1.3.1 (identification of circuits)",[1041,49131,48743],{"id":49132},"what-the-inspector-checks-7",[12,49134,49135],{},"All protective devices in the board are clearly labelled, and the label shows which room or appliance each circuit supplies.",[1041,49137,48750],{"id":49138},"why-it-matters-7",[12,49140,49141],{},"Without labels, nobody quickly switches off the right circuit in an emergency, and maintenance becomes guesswork.",[1041,49143,48757],{"id":49144},"how-to-fix-it-7",[84,49146,49147,49150,49153],{},[87,49148,49149],{},"Fit all protective devices with durable, legible labels.",[87,49151,49152],{},"Name them by room and function, for example \"Kitchen sockets\", \"Bathroom lighting\".",[87,49154,49155],{},"Align labels with the single-line diagram: the same reference in the board, on the diagram and on the situation plan.",[1041,49157,48775],{"id":49158},"effort-7",[12,49160,49161],{},"Labelling itself is quick; safely identifying unknown circuits is electrician's work.",[38398,49163],{},[79,49165,49167],{"id":49166},"_9-cables-without-adequate-protection","9. Cables without adequate protection",[12,49169,49170,49172],{},[15,49171,48738],{}," Art. 5.2.2 (installation methods) \u002F Art. 5.2.1.5 (mechanical strength, penetrations)",[1041,49174,48743],{"id":49175},"what-the-inspector-checks-8",[12,49177,49178],{},"Every cable must be suitable for its installation method (5.2.2) and laid so that it keeps its mechanical strength. If it is particularly exposed to mechanical damage, it is armoured or specially protected (5.2.1.5). Typical infringements: cable types unsuitable for surface or open installation, cables hanging loose in the basement, or unprotected floor penetrations.",[1041,49180,48750],{"id":49181},"why-it-matters-8",[12,49183,49184],{},"Insulation damaged by nails, screws or rodents leads to short circuits and fires.",[1041,49186,48757],{"id":49187},"how-to-fix-it-8",[84,49189,49190,49193,49196,49199],{},[87,49191,49192],{},"Check cable type and installation method against the methods permitted in 5.2.2; put unsuitable cables in conduit or trunking, or replace them.",[87,49194,49195],{},"Protect exposed cables mechanically.",[87,49197,49198],{},"Protect floor penetrations at finished floor level; conduits there protrude at least 10 cm above the floor (5.2.1.5).",[87,49200,49201],{},"Design penetrations between rooms with very different humidity to prevent condensation.",[1041,49203,48775],{"id":49204},"effort-8",[12,49206,49207],{},"Cable, environment, protection method and building work determine the execution.",[38398,49209],{},[79,49211,49213],{"id":49212},"_10-surge-protection-not-assessed","10. Surge protection not assessed",[12,49215,49216,49218],{},[15,49217,48738],{}," Art. 4.5.1 (principle of surge protection)",[1041,49220,48743],{"id":49221},"what-the-inspector-checks-9",[12,49223,49224],{},"Art. 4.5.1 requires people and property to be protected, according to good practice, against the harmful effects of overvoltages, for example from atmospheric phenomena or switching. The text does not prescribe a specific type of surge protective device. What matters is that the electrician assesses the risk and documents the chosen solution.",[1041,49226,48750],{"id":49227},"why-it-matters-9",[12,49229,49230],{},"Overvoltages from lightning or grid disturbances destroy sensitive electronics. A surge protective device (SPD) diverts them to earth.",[1041,49232,48757],{"id":49233},"how-to-fix-it-9",[84,49235,49236,49239,49242],{},[87,49237,49238],{},"Assess the risk: lightning protection system, supply, cable lengths, PV and charging point.",[87,49240,49241],{},"Set type, location and upstream protection according to the risk assessment and manufacturer data; with external lightning protection, a type 1 lightning current arrester comes into play.",[87,49243,49244],{},"Document the SPD on the single-line diagram and check its status indicator regularly.",[1041,49246,48775],{"id":49247},"effort-9",[12,49249,49250],{},"Selection, coordination, connection and board rework are project-specific.",[38398,49252],{},[79,49254,49256],{"id":49255},"conclusion-two-passes-before-the-inspection","Conclusion: two passes before the inspection",[12,49258,49259],{},"Go through the ten points in two passes: first documents and references, then the actual condition, measured values and protective functions together with your electrician. A corrected drawing does not prove that a physical defect has been fixed; conversely, every completed correction belongs back on the diagram and situation plan. Mark every open point with its source and owner, and keep the dated version with the inspection report, measurement records and manufacturer documents.",[12,49261,49262,49263,5352,49267,49271],{},"PlanElec's AREI\u002FRGIE self-check reports findings on the supported rules, such as RCD assignment and circuit protection, before the inspection body arrives. The physical condition and measured values are assessed on site by the approved inspection body. Sources are ",[40,49264,49266],{"href":1971,"rel":49265},[1458],"AREI\u002FRGIE Book 1",[40,49268,49270],{"href":36246,"rel":49269},[1458],"official page on installation inspections","; they establish obligations, not a frequency ranking.",[38398,49273],{},[12,49275,49276],{},[15,49277,49278],{},"Related articles:",[84,49280,49281,49286,49291,49296],{},[87,49282,49283],{},[40,49284,49285],{"href":5967},"Electrical Inspection Failed – What Now?",[87,49287,49288],{},[40,49289,49290],{"href":3899},"A 30 mA RCD for Every Socket?",[87,49292,49293],{},[40,49294,49295],{"href":3795},"Cable Cross-Section per Circuit Breaker",[87,49297,49298],{},[40,49299,49300],{"href":22834},"Which Cables Can I Use in the Bathroom?",[12,49302,49303,38,49306],{},[15,49304,49305],{},"Plan with PlanElec and use the self-check to prepare for the technical and official inspection.",[40,49307,49308],{"href":1964},"Explore PlanElec Pro →",{"title":2044,"searchDepth":2045,"depth":2045,"links":49310},[49311,49312,49318,49324,49330,49336,49342,49348,49354,49360,49366,49372],{"id":48585,"depth":2053,"text":48586},{"id":48732,"depth":2045,"text":48733,"children":49313},[49314,49315,49316,49317],{"id":48742,"depth":2053,"text":48743},{"id":48749,"depth":2053,"text":48750},{"id":48756,"depth":2053,"text":48757},{"id":48774,"depth":2053,"text":48775},{"id":48783,"depth":2045,"text":48784,"children":49319},[49320,49321,49322,49323],{"id":48792,"depth":2053,"text":48743},{"id":48798,"depth":2053,"text":48750},{"id":48804,"depth":2053,"text":48757},{"id":48825,"depth":2053,"text":48775},{"id":48835,"depth":2045,"text":48836,"children":49325},[49326,49327,49328,49329],{"id":48844,"depth":2053,"text":48743},{"id":48850,"depth":2053,"text":48750},{"id":48856,"depth":2053,"text":48757},{"id":48873,"depth":2053,"text":48775},{"id":48881,"depth":2045,"text":48882,"children":49331},[49332,49333,49334,49335],{"id":48890,"depth":2053,"text":48743},{"id":48896,"depth":2053,"text":48750},{"id":48902,"depth":2053,"text":48757},{"id":48916,"depth":2053,"text":48775},{"id":48924,"depth":2045,"text":48925,"children":49337},[49338,49339,49340,49341],{"id":48933,"depth":2053,"text":48743},{"id":48939,"depth":2053,"text":48750},{"id":48945,"depth":2053,"text":48757},{"id":48965,"depth":2053,"text":48775},{"id":48973,"depth":2045,"text":48974,"children":49343},[49344,49345,49346,49347],{"id":48982,"depth":2053,"text":48743},{"id":48988,"depth":2053,"text":48750},{"id":48994,"depth":2053,"text":48757},{"id":49070,"depth":2053,"text":48775},{"id":49080,"depth":2045,"text":49081,"children":49349},[49350,49351,49352,49353],{"id":49089,"depth":2053,"text":48743},{"id":49095,"depth":2053,"text":48750},{"id":49101,"depth":2053,"text":48757},{"id":49115,"depth":2053,"text":48775},{"id":49123,"depth":2045,"text":49124,"children":49355},[49356,49357,49358,49359],{"id":49132,"depth":2053,"text":48743},{"id":49138,"depth":2053,"text":48750},{"id":49144,"depth":2053,"text":48757},{"id":49158,"depth":2053,"text":48775},{"id":49166,"depth":2045,"text":49167,"children":49361},[49362,49363,49364,49365],{"id":49175,"depth":2053,"text":48743},{"id":49181,"depth":2053,"text":48750},{"id":49187,"depth":2053,"text":48757},{"id":49204,"depth":2053,"text":48775},{"id":49212,"depth":2045,"text":49213,"children":49367},[49368,49369,49370,49371],{"id":49221,"depth":2053,"text":48743},{"id":49227,"depth":2053,"text":48750},{"id":49233,"depth":2053,"text":48757},{"id":49247,"depth":2053,"text":48775},{"id":49255,"depth":2045,"text":49256},"2026-06-20","Ten points where Belgian domestic installations often stumble at inspection – with limit values, AREI references and the right correction for each one.",[5422,2820,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-top-10-arei-violations-editorial.jpg","\u002Fblog\u002Ftop-10-arei-violations.en",{"title":48422,"description":49374},"10 Important AREI Inspection Points and How to Fix Them","blog\u002Ftop-10-arei-violations.en",[42798,49383,49384,5422,49385,30501,49386,49387],"violations","electrical-inspection","rcd","belgium","deficiencies","2jN9kLNgKJN9WhIMC2fjgpUqFj3sXE9zZXMXtMY2jG4","\u002Fblog\u002Ftop-10-arei-violations",{"id":49391,"title":49392,"articleId":49393,"body":49394,"category":4239,"date":49939,"description":49940,"extension":2113,"image":49407,"labels":49941,"lastUpdated":4240,"locale":2119,"meta":49942,"navigation":2121,"ogImage":49943,"path":49944,"publishDate":49939,"readTime":6086,"refreshInterval":4248,"seo":49945,"seoTitle":49285,"slug":49393,"stem":49946,"tags":49947,"__hash__":49949,"kind":2137,"href":49950},"blog\u002Fblog\u002Finspection-failed-what-now.en.md","Electrical Inspection Failed – What Now? Step by Step to the Re-Inspection","inspection-failed-what-now",{"type":9,"value":49395,"toc":49912},[49396,49402,49408,49411,49417,49421,49424,49428,49431,49435,49483,49488,49492,49495,49499,49502,49506,49509,49513,49516,49626,49630,49634,49637,49648,49652,49655,49659,49666,49680,49684,49691,49697,49701,49704,49706,49710,49713,49716,49733,49736,49740,49743,49746,49750,49754,49757,49764,49768,49771,49775,49778,49790,49794,49797,49801,49824,49827,49831,49834,49837,49863,49866,49868,49872,49888,49897,49899,49901,49910],[12,49397,49398,49401],{},[15,49399,49400],{},"After a negative inspection, you have every infringement in the report corrected, bring the single-line diagram and situation plan in line with the installation as built, and have the installation inspected again."," The deadline depends on the type of inspection: for a new installation, the affected part may only be put into use after correction and a new inspection. After a periodic control visit, the same inspection body returns within one year. After a sale inspection, the buyer has 18 months from the deed of sale and chooses the inspection body freely. If the negative report identifies missing or outdated plans, update them in Sketch; have technical defects corrected by a qualified professional.",[12,49403,49404],{},[74,49405],{"alt":49406,"src":49407},"Electricians prepare materials for remedial work.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-inspection-failed-what-now-editorial.webp",[12,49409,49410],{},"A negative report on its own does not tell you whether only documents are missing or whether there is a safety risk. The individual findings decide. This guide shows you how to read them, prioritise them, have them corrected and prove the result.",[12,49412,49413,49416],{},[15,49414,49415],{},"Editing and review: PlanElec team, 6 November 2026",", checked against AREI\u002FRGIE Book 1, version 07, applicable since 1 November 2026. For the deadlines and steps in this guide nothing changes compared with version 06; only the sealing of the RCD at the origin of the installation has been dropped.",[79,49418,49420],{"id":49419},"what-is-in-the-negative-report","What is in the negative report?",[12,49422,49423],{},"The approved inspection body's report lists the infringements of Book 1, any circuits with an insufficient insulation level, and the conclusion. For a control visit to a domestic installation, it also separates infringements, remarks and applicable derogations for existing installations (subsection 6.5.7.2, b.5). A remark is not an infringement – so check carefully which heading a finding is listed under.",[1041,49425,49427],{"id":49426},"reading-codes-and-priorities-correctly","Reading codes and priorities correctly",[12,49429,49430],{},"Internal codes and priority classes differ between inspection bodies and report templates. \"C1\", \"C2\" or \"C3\" therefore do not set a universal Belgian deadline; the legend of your report is what counts. If a finding is unclear, ask the inspection body in writing for the rule reference, the affected circuit and the evidence it expects. Any mention of immediate danger takes priority, whatever the code: do not switch the affected part back on yourself.",[79,49432,49434],{"id":49433},"deadlines-by-type-of-inspection","Deadlines by type of inspection",[138,49436,49437,49449],{},[141,49438,49439],{},[144,49440,49441,49444,49447],{},[147,49442,49443],{},"Type of inspection",[147,49445,49446],{},"What applies now",[147,49448,48455],{},[163,49450,49451,49462,49473],{},[144,49452,49453,49456,49459],{},[168,49454,49455],{},"Conformity inspection of a new installation or significant modification",[168,49457,49458],{},"The affected part may not be put into use; new conformity inspection after correction",[168,49460,49461],{},"9.1.3.1",[144,49463,49464,49467,49470],{},[168,49465,49466],{},"Periodic control visit",[168,49468,49469],{},"Correct without delay; new visit by the same body within one year",[168,49471,49472],{},"9.1.3.2, 6.5.7.2 b.6, b.7",[144,49474,49475,49478,49481],{},[168,49476,49477],{},"Sale inspection of an old domestic installation",[168,49479,49480],{},"The buyer has it inspected again no later than 18 months after the deed of sale; free choice of body",[168,49482,47929],{},[1489,49484],{":height":22672,":width":3800,"alt":49485,"caption":49486,"src":49487},"Three routes after a negative report: conformity inspection – the part stays out of use until the new inspection (9.1.3.1); periodic visit – correct without delay, follow-up visit by the same body (9.1.3.2, 6.5.7.2 b.6, b.7); sale inspection – re-inspection after 18 months from the deed of sale at a freely chosen body (8.4.2.2 a). In every case, correct the cause and update the plans (9.1.2).","The type of inspection decides who re-inspects and when; bringing the plans in line with the installation is needed in every case.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Finspection-failed-what-now\u002Fnegative-report-paths.en.svg",[1041,49489,49491],{"id":49490},"after-a-periodic-inspection","After a periodic inspection",[12,49493,49494],{},"The conclusion of the report states the date by which the additional visit by the same body must take place (6.5.7.2, b.6). If infringements remain at that second visit, the body sends a copy of the report to the Directorate-General for Energy (b.7). Until then, the work is carried out without delay and all appropriate measures are taken so that the infringements pose no danger while the installation stays in service.",[1041,49496,49498],{"id":49497},"for-a-new-installation","For a new installation",[12,49500,49501],{},"For a new installation or a significant modification, the affected part stays out of service until the infringements are corrected and inspected again (9.1.3.1). Coordinate the grid connection with the responsible grid operator as well; it only makes the power of a new installation available once a positive report exists (6.4.6.2).",[1041,49503,49505],{"id":49504},"when-selling-a-property","When selling a property",[12,49507,49508],{},"After a negative sale inspection, the buyer notifies the original inspection body in writing of their identity and the date of the deed of sale. No later than 18 months after that date, the buyer has the corrections inspected. The buyer chooses the body freely; a different body informs the first one (8.4.2.2 a). The relevant date is that of the notarial deed, not of a private purchase agreement.",[79,49510,49512],{"id":49511},"ten-inspection-areas-you-will-find-in-the-report","Ten inspection areas you will find in the report",[12,49514,49515],{},"These areas come up regularly in reports. They are not a statistical ranking, but a useful map for your findings.",[138,49517,49518,49529],{},[141,49519,49520],{},[144,49521,49522,49524,49527],{},[147,49523,9275],{},[147,49525,49526],{},"Inspection area",[147,49528,3919],{},[163,49530,49531,49541,49550,49560,49570,49579,49588,49597,49607,49616],{},[144,49532,49533,49535,49538],{},[168,49534,6424],{},[168,49536,49537],{},"RCD missing or unsuitable: 300 mA at the origin, at most 30 mA for the prescribed circuits, at least type A",[168,49539,49540],{},"4.2.4.3 b, 5.3.5.3 a",[144,49542,49543,49545,49548],{},[168,49544,6407],{},[168,49546,49547],{},"Single-line diagram or situation plan missing or not matching the installation",[168,49549,48481],{},[144,49551,49552,49554,49557],{},[168,49553,6662],{},[168,49555,49556],{},"Earth value and RCD layout do not fit together (below 100 Ω; above 30 Ω a stricter layout)",[168,49558,49559],{},"4.2.3.2, 4.2.4.3 b",[144,49561,49562,49564,49567],{},[168,49563,6659],{},[168,49565,49566],{},"Circuits in the board not clearly labelled",[168,49568,49569],{},"3.1.3",[144,49571,49572,49574,49577],{},[168,49573,7301],{},[168,49575,49576],{},"Cables not adequately protected mechanically for the installation method and stresses",[168,49578,48568],{},[144,49580,49581,49583,49586],{},[168,49582,7315],{},[168,49584,49585],{},"Bathroom zones and protection requirements not respected",[168,49587,31367],{},[144,49589,49590,49592,49595],{},[168,49591,6631],{},[168,49593,49594],{},"Main switch-disconnector missing or too small (at least 40 A in a home)",[168,49596,33191],{},[144,49598,49599,49601,49604],{},[168,49600,6645],{},[168,49602,49603],{},"Protective device and cross-section not coordinated",[168,49605,49606],{},"4.4.1.4, table 4.11",[144,49608,49609,49611,49614],{},[168,49610,48559],{},[168,49612,49613],{},"Surge protection not professionally assessed",[168,49615,48582],{},[144,49617,49618,49620,49623],{},[168,49619,48573],{},[168,49621,49622],{},"Regional smoke detector duty mixed up with AREI duties – check both legal areas separately",[168,49624,49625],{},"regional housing law, not AREI",[79,49627,49629],{"id":49628},"step-by-step-after-the-negative-inspection","Step by step after the negative inspection",[1041,49631,49633],{"id":49632},"step-1-read-the-report-line-by-line","Step 1: read the report line by line",[12,49635,49636],{},"Go through each finding and note:",[84,49638,49639,49642,49645],{},[87,49640,49641],{},"Which heading is it under: infringement, remark or derogation?",[87,49643,49644],{},"Where exactly is the problem: room, board, circuit?",[87,49646,49647],{},"What exactly is being flagged, and which rule is involved?",[1041,49649,49651],{"id":49650},"step-2-set-priorities","Step 2: set priorities",[12,49653,49654],{},"First come all findings that the report marks as immediate danger, a reason for disconnection or an obstacle to putting into use. Then plan the remaining infringements by dependency: cause and protection concept first, then workmanship, measurement and documentation.",[1041,49656,49658],{"id":49657},"step-3-bring-in-an-electrician","Step 3: bring in an electrician",[12,49660,49661,49662,49665],{},"You can organise the report, gather documents and compare the plans with the visible installation. Work in the board, on protective devices, on the earthing or on fixed wiring belongs with a ",[15,49663,49664],{},"qualified electrician",", for example:",[84,49667,49668,49671,49674,49677],{},[87,49669,49670],{},"adding or replacing an RCD",[87,49672,49673],{},"improving the earth electrode or adapting the RCD layout to the earth value",[87,49675,49676],{},"protecting cables mechanically or re-routing them",[87,49678,49679],{},"installing the main switch-disconnector",[1041,49681,49683],{"id":49682},"step-4-bring-the-plans-in-line-with-the-installation","Step 4: bring the plans in line with the installation",[12,49685,49686,49687,49690],{},"The single-line diagram and situation plan show ",[15,49688,49689],{},"the state after correction",". Do not copy assumed cross-sections or ratings; clarify unknown characteristics before exporting, or mark them explicitly as open.",[12,49692,48818,49693,49696],{},[40,49694,22],{"href":3611,"rel":49695},[1458],", even without an account. The start card “Draw the documents for the inspection” begins with the connection, the meter and the main protection; you add the rest according to your electrician’s as-built state. Before the PDF, “Check documents” shows what is still missing, for example an empty title-block field, circuits without a protective device or devices in the diagram without a place on the situation plan.",[1041,49698,49700],{"id":49699},"step-5-book-the-re-inspection","Step 5: book the re-inspection",[12,49702,49703],{},"Who inspects depends on the type of inspection: after a periodic visit it is the same body; after a sale inspection the buyer chooses freely. Use the report to clarify the scope before you book.",[1489,49705],{":height":5808,":width":5809,"alt":5810,"caption":5811,"src":5812},[79,49707,49709],{"id":49708},"turning-a-finding-into-a-verifiable-measure","Turning a finding into a verifiable measure",[12,49711,49712],{},"The report describes a result, not necessarily the cause. \"Insufficient insulation resistance\" can point to a damaged conductor, moisture or a connected appliance. For reference: each circuit must reach at least 500 kΩ at a 500 V test voltage (6.4.5.1). \"Plan does not match\" ranges from a missing socket to a wrong sequence of protective devices. So have the cause and extent established first, before a component is replaced.",[12,49714,49715],{},"For each finding, five questions help:",[3139,49717,49718,49721,49724,49727,49730],{},[87,49719,49720],{},"Which part of the installation was actually inspected?",[87,49722,49723],{},"Which rule or protective function is involved?",[87,49725,49726],{},"Which diagnosis or measurement confirms the cause?",[87,49728,49729],{},"Which correction removes the cause, not just the symptom?",[87,49731,49732],{},"Which evidence shows the inspection body the completed correction?",[12,49734,49735],{},"Several infringements are often linked. A changed distribution affects the single-line diagram, labelling, protective devices and measured values. New earthing work is finished before plans are finalised and measurements repeated. So plan one consistent final state rather than a series of contradictory interim states.",[79,49737,49739],{"id":49738},"separating-documentation-defects-from-workmanship-defects","Separating documentation defects from workmanship defects",[12,49741,49742],{},"A missing plan is not fixed by drawing an unverified plan. Survey the installation first – opening and measuring is the electrician's job. Then link each symbol to the real circuit and check that board labels, single-line diagram and situation plan use the same reference.",[12,49744,49745],{},"Conversely, a nicer drawing does not fix a workmanship defect. If a protective device is unsuitable, the earthing insufficient or a cable mechanically at risk, the installation is corrected and, where needed, measured again; the plan then follows the state as built. That way the inspection body finds up-to-date documents and a corrected installation at the re-inspection.",[12,49747,7139,49748,56],{},[40,49749,11748],{"href":4218},[79,49751,49753],{"id":49752},"special-case-a-sale","Special case: a sale",[12,49755,49756],{},"As the buyer, keep the report, the deed of sale and the installation file together. The 18 months run from the day of the deed. The deadline is no postponement for visible hazards: have unsafe parts assessed by an electrician immediately and, if needed, taken out of service.",[12,49758,49759,49760,49763],{},"If the building is demolished or the installation completely renewed, a separate route applies: seller and buyer record it in the deed, the buyer informs the Directorate-General for Energy, and the new installation follows the conformity inspection of chapter 6.4 (8.4.2.2 a and b). The ",[40,49761,48298],{"href":48296,"rel":49762},[1458]," answers further sale questions.",[79,49765,49767],{"id":49766},"planning-costs-realistically","Planning costs realistically",[12,49769,49770],{},"Fees and repair costs depend on the type of inspection, the body, travel, the number of boards, measurement effort and the actual defect. Ask the inspection body directly for its current fee. A good repair quote lists diagnosis, materials, labour, measurements, plan updates and the re-inspection separately – so you can see whether a concealed cable repair or a board rebuild is included.",[79,49772,49774],{"id":49773},"a-solid-file-for-the-re-inspection","A solid file for the re-inspection",[12,49776,49777],{},"Keep a table with one row per finding: report text, affected circuit, measure, responsible person, completion date and evidence. Photos supplement the file; they do not replace measurements. Update the plans after the actual work and then check labels and references once more.",[12,49779,4361,49780,49783,49784,49789],{},[40,49781,48304],{"href":48302,"rel":49782},[1458]," explains consequences and deadlines; the ",[40,49785,49788],{"href":49786,"rel":49787},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Forganismes-de-controle-agrees",[1458],"list of approved inspection bodies"," is official too.",[79,49791,49793],{"id":49792},"keeping-changes-under-control-until-the-re-inspection","Keeping changes under control until the re-inspection",[12,49795,49796],{},"After the corrections, freeze a documented state: dated plans, board labels, measurement records and photos of work that will later be concealed. Check every further change before the appointment against that state and record it. Otherwise one small additional cable breaks exactly the consistency that electrician and designer have just established. Ask all occupants to avoid temporary connections and their own alterations until the inspection. If a change is unavoidable, the responsible electrician receives the report, the current plans and a clear description of the change.",[79,49798,49800],{"id":49799},"final-check-before-the-new-appointment","Final check before the new appointment",[84,49802,49803,49806,49809,49812,49815,49818,49821],{},[87,49804,49805],{},"Every finding is linked to a completed measure.",[87,49807,49808],{},"Corrections that require a measurement have been measured and documented properly.",[87,49810,49811],{},"Circuit labels match in the board and on both plans.",[87,49813,49814],{},"New or removed appliances are updated on the situation plan.",[87,49816,49817],{},"Ratings and cable data on the single-line diagram match the installation.",[87,49819,49820],{},"Inspection body and type of inspection are confirmed.",[87,49822,49823],{},"Report, plans, EAN code and manufacturer documents are ready.",[12,49825,49826],{},"Every completed repair then goes into the re-inspection with clear evidence. Allow time for questions and, if needed, a second diagnosis: a finding is only closed when cause, workmanship and evidence line up.",[79,49828,49830],{"id":49829},"how-planelec-helps","How PlanElec helps",[12,49832,49833],{},"Record the verified state after corrective work in Sketch. Keep a separate trace from each finding to its corrective action so the report, diagram and situation plan describe the same installation.",[12,49835,49836],{},"After a negative report you need two things: plans that show the corrected state, and a look at design errors before the inspection body comes back.",[84,49838,49839,49847,49857],{},[87,49840,49841,49846],{},[15,49842,49843,49844,23658],{},"Update the plans with ",[40,49845,22],{"href":1961}," draw the single-line diagram and situation plan in the browser, without a subscription, as a PDF in A4 or A3. Without an account the PDF carries a logo watermark; a free account removes it.",[87,49848,49849,49854,49855,56],{},[15,49850,49851,49852,23658],{},"Check the design with ",[40,49853,31],{"href":1964}," for electrical contractors, Pro brings floor plan, circuits and distribution board together in one project. The AREI\u002FRGIE self-check reports findings in the supported rules, for example on the main RCD, 30 mA protection of socket circuits, cross-section versus protective device, or loads without a place on the situation plan. The exact scope is described in ",[40,49856,1086],{"href":1085},[87,49858,49859,49862],{},[15,49860,49861],{},"From Sketch to Pro:"," if you need the distribution board or the self-check report, take the Sketch drawing over with “Take it to Pro”.",[12,49864,49865],{},"The roles stay clear: the self-check shows findings from the project data you entered; measurements and the verdict on the installation come from the approved inspection body.",[38398,49867],{},[12,49869,49870],{},[15,49871,49278],{},[84,49873,49874,49880,49884],{},[87,49875,49876],{},[40,49877,49879],{"href":49878},"\u002Fen\u002Fblog\u002Ftop-10-arei-violations","10 important AREI inspection points",[87,49881,49882],{},[40,49883,49290],{"href":3899},[87,49885,49886],{},[40,49887,49295],{"href":3795},[12,49889,49890,38,49893],{},[15,49891,49892],{},"Bring your documents in line with the installation and go into the re-inspection with an organised file.",[40,49894,49896],{"href":3611,"rel":49895},[1458],"Draw the plans in PlanElec Sketch →",[1489,49898],{":height":42714,":width":42715,"alt":42716,"caption":42717,"src":42718},[79,49900,2009],{"id":2008},[84,49902,49903],{},[87,49904,49905,38,49907,56],{},[15,49906,11935],{},[40,49908,2023],{"href":1456,"rel":49909},[1458],[12,49911,43928],{},{"title":2044,"searchDepth":2045,"depth":2045,"links":49913},[49914,49917,49922,49923,49930,49931,49932,49933,49934,49935,49936,49937,49938],{"id":49419,"depth":2045,"text":49420,"children":49915},[49916],{"id":49426,"depth":2053,"text":49427},{"id":49433,"depth":2045,"text":49434,"children":49918},[49919,49920,49921],{"id":49490,"depth":2053,"text":49491},{"id":49497,"depth":2053,"text":49498},{"id":49504,"depth":2053,"text":49505},{"id":49511,"depth":2045,"text":49512},{"id":49628,"depth":2045,"text":49629,"children":49924},[49925,49926,49927,49928,49929],{"id":49632,"depth":2053,"text":49633},{"id":49650,"depth":2053,"text":49651},{"id":49657,"depth":2053,"text":49658},{"id":49682,"depth":2053,"text":49683},{"id":49699,"depth":2053,"text":49700},{"id":49708,"depth":2045,"text":49709},{"id":49738,"depth":2045,"text":49739},{"id":49752,"depth":2045,"text":49753},{"id":49766,"depth":2045,"text":49767},{"id":49773,"depth":2045,"text":49774},{"id":49792,"depth":2045,"text":49793},{"id":49799,"depth":2045,"text":49800},{"id":49829,"depth":2045,"text":49830},{"id":2008,"depth":2045,"text":2009},"2026-06-16","Your electrical inspection came back negative? Read the report, identify the applicable AREI deadline, plan safe corrections and prepare the re-inspection.",[5422,6082,2117],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-inspection-failed-what-now-editorial.jpg","\u002Fblog\u002Finspection-failed-what-now.en",{"title":49392,"description":49940},"blog\u002Finspection-failed-what-now.en",[5422,49384,49948,49387,43968,42798,49386],"failed","KKUhtjhkfGepYy5XHQao887si4yUM04qYvbJ8fuNrVw","\u002Fblog\u002Finspection-failed-what-now",{"id":49952,"title":49953,"articleId":49954,"body":49955,"category":27063,"date":50246,"description":50247,"extension":2113,"image":49968,"labels":50248,"lastUpdated":10988,"locale":2119,"meta":50249,"navigation":2121,"ogImage":50250,"path":50251,"publishDate":50246,"readTime":47831,"refreshInterval":4248,"seo":50252,"seoTitle":50253,"slug":49954,"stem":50254,"tags":50255,"__hash__":50259,"kind":2137,"href":50260},"blog\u002Fblog\u002Fsmart-home-domotica-arei.en.md","Smart Home and AREI: What You Need to Know About Home Automation","smart-home-domotica-arei",{"type":9,"value":49956,"toc":50238},[49957,49963,49969,49973,49976,49990,49993,49997,50003,50010,50013,50023,50027,50122,50125,50130,50133,50137,50140,50144,50151,50162,50166,50174,50190,50203,50205,50209,50226,50236],[12,49958,49959,49962],{},[15,49960,49961],{},"The AREI\u002FRGIE, Belgium's electrical installation regulation, does not treat smart home devices as a category of their own, but it does govern the fixed electrical installation they are built into."," Wi-Fi relays, smart plugs and DIN-rail modules are allowed as long as the installation behind them meets the rules and the modules are suitable for how they are mounted. DIN-rail modules and any change to the fixed wiring belong on the single-line diagram and the situation plan.",[12,49964,49965],{},[74,49966],{"alt":49967,"src":49968},"An electrician explains a wall control to a homeowner in the living room.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-smart-home-domotica-arei-editorial.webp",[79,49970,49972],{"id":49971},"what-is-allowed","What is allowed?",[12,49974,49975],{},"You can use smart home devices such as Wi-Fi relays (Shelly, Sonoff), smart plugs (TP-Link, Hue Smart Plug) or smart bulbs (Philips Hue, IKEA TRADFRI) as long as the fixed installation is right:",[84,49977,49978,49981,49984,49987],{},[87,49979,49980],{},"Cables are correctly sized and protected.",[87,49982,49983],{},"Circuit breakers and residual current devices (RCDs) are present and correctly assigned to the circuits.",[87,49985,49986],{},"The installation is earthed.",[87,49988,49989],{},"Permanently installed modules carry CE marking and are used within the purpose and installation conditions declared by the manufacturer.",[12,49991,49992],{},"A smart relay that switches a load is a control device. Electronic devices are expressly permitted for this if they meet the applicable standards or an equivalent safety level (AREI\u002FRGIE Sub-section 5.3.3.2 point b). If the module sits in a flush-mounted box, the box must be large enough to house the connections easily (Sub-section 5.2.6.1).",[79,49994,49996],{"id":49995},"din-rail-modules-in-the-distribution-board","DIN-rail modules in the distribution board",[12,49998,49999,50002],{},[15,50000,50001],{},"DIN-rail modules"," such as Shelly Pro, Shelly Pro 3EM or Sonoff DIN modules are a category of their own. They sit directly on the DIN rail in the distribution board and are therefore part of the fixed installation.",[12,50004,50005,50006,50009],{},"That is why ",[15,50007,50008],{},"DIN-rail modules appear on the single-line diagram",". Under AREI\u002FRGIE Sub-section 3.1.2.2 point a, the single-line diagram shows, among other things, residual current and overcurrent protective devices, switches and fixed machines and appliances; under Section 9.1.2, the diagram is part of the installation file the owner keeps. Draw the modules like any other board module.",[12,50011,50012],{},"For a device without a symbol of its own in Table 2.23, you may use any unambiguously identifiable symbol, provided the legend of the diagram and plan defines it (Sub-section 3.1.2.1 point a).",[12,50014,50015,50016,50019,50020,50022],{},"You can draw the single-line diagram with DIN-rail modules for free in the browser with ",[40,50017,22],{"href":1456,"rel":50018},[1458],": the ",[15,50021,25650],{}," symbol shows the control on top and the inputs and outputs below, and the legend in the PDF explains every symbol used.",[79,50024,50026],{"id":50025},"overview-smart-home-types-and-the-areirgie","Overview: smart home types and the AREI\u002FRGIE",[138,50028,50029,50045],{},[141,50030,50031],{},[144,50032,50033,50036,50039,50042],{},[147,50034,50035],{},"Smart home type",[147,50037,50038],{},"Location",[147,50040,50041],{},"Part of the fixed installation?",[147,50043,50044],{},"On the single-line diagram?",[163,50046,50047,50061,50073,50085,50096,50110],{},[144,50048,50049,50052,50055,50058],{},[168,50050,50051],{},"Wi-Fi relay (Shelly 1, Sonoff)",[168,50053,50054],{},"Flush box behind the switch",[168,50056,50057],{},"Yes, once it is permanently wired",[168,50059,50060],{},"Yes, if the fixed wiring is changed (e.g. neutral run to the switch); otherwise the diagram is unchanged",[144,50062,50063,50066,50069,50071],{},[168,50064,50065],{},"Smart plug (plug-in)",[168,50067,50068],{},"In an existing socket",[168,50070,5648],{},[168,50072,5648],{},[144,50074,50075,50078,50081,50083],{},[168,50076,50077],{},"Smart bulb",[168,50079,50080],{},"In an existing lamp holder",[168,50082,5648],{},[168,50084,5648],{},[144,50086,50087,50090,50092,50094],{},[168,50088,50089],{},"DIN-rail module (Shelly Pro)",[168,50091,3115],{},[168,50093,5604],{},[168,50095,5604],{},[144,50097,50098,50101,50104,50107],{},[168,50099,50100],{},"Smart thermostat (Nest, tado)",[168,50102,50103],{},"Wall-mounted",[168,50105,50106],{},"Yes, if permanently connected to 230 V",[168,50108,50109],{},"The supply circuit yes; battery-powered devices no",[144,50111,50112,50115,50118,50120],{},[168,50113,50114],{},"Smart door lock (battery)",[168,50116,50117],{},"Door frame",[168,50119,5648],{},[168,50121,5648],{},[12,50123,50124],{},"The table boils down to three questions:",[1489,50126],{":height":8729,":width":3800,"alt":50127,"caption":50128,"src":50129},"Decision tree: only plugged in, screwed in or battery-powered, then not on the diagram. On the DIN rail in the distribution board, then on the single-line diagram. Fixed wiring changed, then update the diagram or a description of the change and the situation plan, otherwise the diagram stays unchanged.","Three questions decide whether a smart home device belongs on the single-line diagram. The inspection does not check the app, scenes or automation rules.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fsmart-home-domotica-arei\u002Fsingle-line-decision.en.svg",[12,50131,50132],{},"For the third question, the AREI\u002FRGIE draws a line: a substantial change needs a new single-line diagram; for a change that is not substantial, a short, dated and signed description is enough. The situation plan is updated in both cases (Sub-section 3.1.2.1 point a).",[79,50134,50136],{"id":50135},"control-switching-and-isolation","Control, switching and isolation",[12,50138,50139],{},"Not every smart function needs a conventional wall switch. What matters is the device's function and the rules for control, switching, isolation, emergency action and maintenance. The smart relay is the load's control device (5.3.3.2). An app or cloud connection is not an isolating device unless the product and circuit are expressly designed for that. The manufacturer's instructions and the professional design of the fixed wiring settle it.",[79,50141,50143],{"id":50142},"what-does-the-inspection-keuring-check","What does the inspection (keuring) check?",[12,50145,50146,50147,50150],{},"During the conformity inspection, the approved body checks the ",[15,50148,50149],{},"electrical installation",", not the smart home logic:",[84,50152,50153,50156,50159],{},[87,50154,50155],{},"Wiring, protective devices and earthing are checked.",[87,50157,50158],{},"DIN-rail modules must appear on the single-line diagram, relays in switch boxes whenever the fixed wiring was changed for them.",[87,50160,50161],{},"The app, scenes and automation rules are not part of the inspection.",[79,50163,50165],{"id":50164},"documenting-smart-home-components-with-planelec","Documenting smart home components with PlanElec",[12,50167,50168,1774,50171,50173],{},[15,50169,50170],{},"For the single-line diagram and situation plan of your home",[40,50172,22],{"href":1961}," is enough: free in the browser, no subscription. You place circuits, protective devices, DIN-rail modules and control points and print diagram and plan as a PDF.",[12,50175,50176,1774,50179,50181,50182,50184,50185,50187,50188,56],{},[15,50177,50178],{},"For integrators and electrical contractors",[40,50180,31],{"href":1964}," also documents the distribution board with its modules and protective devices. You plan supported relay and Shelly channels in lighting control with an explicit cable preview. With an active automation profile – KNX, Niko Home Control II, Loxone, Shelly Pro \u002F Plus, Sonoff or generic – you plan channels, control points and terminals in the ",[15,50183,6530],{}," mode and export channel and terminal plans as a handover dossier. The steps are in the guide ",[40,50186,29163],{"href":6121},". The AREI\u002FRGIE self-check covers the electrical side; automation logic, cybersecurity and radio availability are down to the manufacturer and integrator. For bus systems such as KNX, read ",[40,50189,7109],{"href":7108},[12,50191,50192,50193,5352,50197,50202],{},"Official sources: ",[40,50194,50196],{"href":1971,"rel":50195},[1458],"FPS Economy: AREI\u002FRGIE Book 1 V06",[40,50198,50201],{"href":50199,"rel":50200},"https:\u002F\u002Fsingle-market-economy.ec.europa.eu\u002Fsingle-market\u002Fce-marking_en",[1458],"European Commission guidance on CE marking",". CE marking is the manufacturer's declaration under applicable EU law; the conformity of the Belgian installation is assessed at the inspection.",[38398,50204],{},[12,50206,50207],{},[15,50208,49278],{},[84,50210,50211,50216,50221],{},[87,50212,50213],{},[40,50214,50215],{"href":3707},"Dedicated circuits: which appliances need their own circuit?",[87,50217,50218],{},[40,50219,50220],{"href":49878},"Top 10 AREI violations",[87,50222,50223],{},[40,50224,50225],{"href":25379},"AREI regulations 2026: what has changed?",[12,50227,50228,38,50231,50235],{},[15,50229,50230],{},"Need smart home modules on the single-line diagram?",[40,50232,50234],{"href":1456,"rel":50233},[1458],"Draw the diagram in PlanElec Sketch"," – free in the browser.",[1489,50237],{":height":22938,":width":22939,"alt":26286,"caption":26287,"src":26288},{"title":2044,"searchDepth":2045,"depth":2045,"links":50239},[50240,50241,50242,50243,50244,50245],{"id":49971,"depth":2045,"text":49972},{"id":49995,"depth":2045,"text":49996},{"id":50025,"depth":2045,"text":50026},{"id":50135,"depth":2045,"text":50136},{"id":50142,"depth":2045,"text":50143},{"id":50164,"depth":2045,"text":50165},"2026-06-09","Does a smart home installation have to meet the AREI\u002FRGIE? The fixed electrical installation does. What is allowed, what goes on the single-line diagram and what the inspection checks.",[7599,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-smart-home-domotica-arei-editorial.jpg","\u002Fblog\u002Fsmart-home-domotica-arei.en",{"title":49953,"description":50247},"Smart Home and AREI: Home Automation Essentials","blog\u002Fsmart-home-domotica-arei.en",[7599,42042,42798,50256,50257,50258,5422],"shelly","din-rail","home-automation","bj6GpcmzABRfhGdIkDag7s2VsAK0dwEAbuFqsoFDDl0","\u002Fblog\u002Fsmart-home-domotica-arei",{"id":50262,"title":50263,"articleId":50264,"body":50265,"category":4239,"date":50764,"description":50765,"extension":2113,"image":50278,"labels":50766,"lastUpdated":10988,"locale":2119,"meta":50767,"navigation":2121,"ogImage":50768,"path":50769,"publishDate":50764,"readTime":10311,"refreshInterval":4248,"seo":50770,"seoTitle":50771,"slug":50264,"stem":50772,"tags":50773,"__hash__":50777,"kind":2137,"href":50778},"blog\u002Fblog\u002Fhome-battery-arei.en.md","Home Battery and AREI: Correctly Integrating Battery Storage into Your Electrical Installation","home-battery-arei",{"type":9,"value":50266,"toc":50737},[50267,50273,50279,50283,50286,50289,50293,50297,50300,50304,50307,50311,50314,50318,50321,50325,50328,50332,50335,50354,50358,50361,50377,50382,50386,50389,50403,50407,50414,50418,50421,50435,50438,50442,50445,50449,50452,50485,50489,50492,50495,50500,50505,50508,50512,50515,50528,50554,50557,50561,50564,50567,50571,50574,50577,50581,50604,50607,50611,50627,50642,50644,50648,50672,50676,50702,50704,50708,50725],[12,50268,50269,50272],{},[15,50270,50271],{},"The AREI has no dedicated chapter for household home batteries – the general provisions of Book 1 apply: protection against electric shock, overcurrent protection, isolation and overvoltage protection."," The actual design follows from AC or DC coupling, the inverter, grid-parallel operation, backup, manufacturer data and the grid operator's connection procedure. This guide gives you a documented review path from protection concept through the single-line diagram to registration.",[12,50274,50275],{},[74,50276],{"alt":50277,"src":50278},"Two technicians position a closed home battery.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-home-battery-arei-editorial.webp",[79,50280,50282],{"id":50281},"why-a-home-battery","Why a Home Battery?",[12,50284,50285],{},"A battery stores surplus energy and delivers it later. How much grid import or cost it actually saves depends on measured load and PV profiles, usable capacity, efficiency, control strategy, tariff, ageing and operating mode. Fixed savings or a payback period can only be supported with time-series data and a dated tariff model.",[12,50287,50288],{},"The regulatory picture is clear: Chapter 7.103 covers industrial accumulator batteries and explicitly excludes batteries and chargers used in household installations (Section 7.103.1). For a home battery, the general parts of Book 1 therefore apply. Where the battery is coupled with a PV installation, Chapter 7.112 (household low-voltage photovoltaic installations ≤ 10 kVA) applies to the PV part; the battery itself does not fall under it.",[79,50290,50292],{"id":50291},"arei-requirements-for-home-batteries","AREI Requirements for Home Batteries",[1041,50294,50296],{"id":50295},"ac-connection-protection-and-conductor","AC connection, protection and conductor",[12,50298,50299],{},"The battery or hybrid inverter is a source in the installation design. Circuit arrangement, overcurrent protection, conductor section, RCD type and switching rating follow from equipment ratings, earthing system, installation conditions, manufacturer instructions and applicable AREI rules. Generic combinations such as “always 20 A on 2.5 mm²” or “three-phase always needs Type B” do not survive a review. Integrated residual-current monitoring counts only as far as the exact device documentation and the rules allow.",[1041,50301,50303],{"id":50302},"isolation-point","Isolation point",[12,50305,50306],{},"The project needs a traceable isolation and switching concept. Which poles are switched, what may be integrated and where an additional isolator is required depend on topology, manufacturer evidence and the applicable provisions. The diagram shows every actual isolator and its assignment; you prove its suitability with the device data.",[1041,50308,50310],{"id":50309},"surge-protection-spd","Surge Protection (SPD)",[12,50312,50313],{},"AREI 4.5.1 sets the principle: persons and property are protected, according to good practice, against the harmful effects of overvoltages, for example from atmospheric phenomena or switching. It does not mandate a specific SPD type. A surge protection device at the AC connection is good practice for battery systems, and on the DC side as well – especially with outdoor cabling. Type and location follow from the risk assessment and manufacturer data.",[1041,50315,50317],{"id":50316},"location-and-ventilation-for-lithium-batteries","Location and ventilation for lithium batteries",[12,50319,50320],{},"Location, temperature limits, clearances, ventilation and fire or escape-route conditions follow the actual battery technology, manufacturer instructions and the project risk assessment. There is no universal 35°C threshold, and not all products share one cell chemistry. Retain the product type, operating limits and installation manual in the dossier.",[79,50322,50324],{"id":50323},"integration-in-the-single-line-diagram","Integration in the Single-Line Diagram",[12,50326,50327],{},"The single-line diagram shows the home battery with both of its sides:",[1041,50329,50331],{"id":50330},"dc-side","DC Side",[12,50333,50334],{},"The direct current side shows the path from the battery pack through the battery management system (BMS) to the inverter:",[84,50336,50337,50351],{},[87,50338,50339,5259,50342,5259,50345,5259,50348],{},[15,50340,50341],{},"Battery",[15,50343,50344],{},"BMS",[15,50346,50347],{},"DC disconnect switch",[15,50349,50350],{},"Hybrid inverter",[87,50352,50353],{},"For AC-coupled systems: battery → dedicated battery inverter → AC connection",[1041,50355,50357],{"id":50356},"ac-side","AC Side",[12,50359,50360],{},"The alternating current side shows the integration into the household installation:",[84,50362,50363,50374],{},[87,50364,50365,5259,50367,5259,50370,5259,50372],{},[15,50366,50350],{},[15,50368,50369],{},"AC disconnect switch",[15,50371,41092],{},[15,50373,3115],{},[87,50375,50376],{},"Where the way sits in the board – upstream or downstream of which RCD – follows from the protection concept, earthing system and manufacturer data. There is no standard position “directly after the main switch”.",[1489,50378],{":height":39571,":width":3800,"alt":50379,"caption":50380,"src":50381},"Two variants side by side. DC-coupled: PV generator and battery with BMS each run through a DC isolation to the hybrid inverter, then AC isolation point, overcurrent and residual current protection and distribution board. AC-coupled: PV inverter and battery inverter, each with its own protected AC branch in the board.","With DC coupling, PV and battery share the hybrid inverter; with AC coupling, the battery inverter gets its own protected branch. Protection values and isolation points come from the manufacturer’s documentation.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fhome-battery-arei\u002Fac-dc-coupling.en.svg",[1041,50383,50385],{"id":50384},"representation-in-the-diagram","Representation in the Diagram",[12,50387,50388],{},"In the single-line diagram, the home battery appears as its own branch, similar to the PV installation. It includes:",[84,50390,50391,50394,50397,50400],{},[87,50392,50393],{},"battery symbol (per IEC 60617 or clearly defined in the legend);",[87,50395,50396],{},"inverter symbol;",[87,50398,50399],{},"disconnect switch;",[87,50401,50402],{},"associated MCB and RCD.",[79,50404,50406],{"id":50405},"backup-emergency-power-function","Backup \u002F Emergency Power Function",[12,50408,50409,50410,50413],{},"Many home batteries offer a ",[15,50411,50412],{},"backup function",": when the grid fails, the battery keeps supplying selected circuits.",[1041,50415,50417],{"id":50416},"transfer-and-island-operation","Transfer and island operation",[12,50419,50420],{},"A backup function requires a documented transfer and islanding concept. Depending on the system, the inverter handles it internally or external switching equipment does; a marketing label alone proves neither safe grid separation nor permissible island operation:",[84,50422,50423,50429],{},[87,50424,50425,50428],{},[15,50426,50427],{},"Automatic Transfer Switch (ATS):"," a documented internal or external arrangement changes to island mode under its approved conditions.",[87,50430,50431,50434],{},[15,50432,50433],{},"Manual Transfer Switch:"," a changeover switch allows manual disconnection from the grid and operation in island mode.",[12,50436,50437],{},"Show the switching function and the boundary of the backed-up section on the single-line diagram. Which conductors are actually switched follows from the earthing system, neutral treatment, manufacturer evidence and grid-operator conditions. The goal is always the same: no dangerous backfeed into the isolated grid. “Always all-pole” is not a reliable standalone rule without that topology.",[1041,50439,50441],{"id":50440},"warning-signs","Warning signs",[12,50443,50444],{},"Markings make the actually possible feed-in and island states understandable. Position and wording follow from the real installation concept. For the PV part of a coupled installation, Section 7.112.2 requires warning signs stating “Do not disconnect under load” and “Electrical installation always live”; that does not translate into a standard battery sticker at two fixed locations.",[79,50446,50448],{"id":50447},"registration-with-the-grid-operator","Registration with the Grid Operator",[12,50450,50451],{},"Registration and connection procedures are regional and depend on the operating mode. Before ordering and commissioning, check the current process of the operator responsible for the address, particularly for equipment operating in parallel with the grid or technically capable of doing so:",[84,50453,50454,50460,50466,50474,50479],{},[87,50455,50456,50459],{},[15,50457,50458],{},"With an existing PV installation:"," modification notification – the installation is registered as PV + battery",[87,50461,50462,50465],{},[15,50463,50464],{},"Technical data:"," capacity (kWh), inverter power (kW), AC or DC coupling",[87,50467,50468,50471,50472],{},[15,50469,50470],{},"Homologation:"," C10\u002F11 ed. 2.4 and C10\u002F26 type approval apply to grid-parallel or technically capable generation units. Check model, variant and firmware with the ",[40,50473,38179],{"href":38178},[87,50475,50476,50478],{},[15,50477,12714],{}," bring the single-line diagram and situation plan up to the installed state; the competent operator confirms the submission package",[87,50480,50481,50484],{},[15,50482,50483],{},"Electrical inspection:"," the nature and scope of the alteration, together with Book 1, determine whether and which new inspection step is required",[79,50486,50488],{"id":50487},"separate-equipment-selection-from-economics","Separate equipment selection from economics",[12,50490,50491],{},"Compare dated manufacturer data and the exact Synergrid listing, not a brand ranking that quickly ages. Record at least AC active and apparent power, permitted phases, battery-voltage range, usable capacity, protection functions, firmware variant, parallel and backup behaviour, and expansion conditions.",[12,50493,50494],{},"An economic calculation needs project-specific inputs:",[12,50496,50497],{},[25,50498,50499],{},"annual effect = avoided import + valued services − extra losses − running costs",[12,50501,50502],{},[25,50503,50504],{},"scenario duration = investment \u002F cautiously estimated annual net effect",[12,50506,50507],{},"Both are scenarios, not forecasts. Calculate over several years with measured load and generation profiles, usable rather than nominal capacity, charge and discharge losses, power limits, degradation, warranty terms and a transparent tariff path. Regional incentives and network charges change over time; check them immediately before the decision.",[79,50509,50511],{"id":50510},"build-the-documentation-around-energy-paths","Build the documentation around energy paths",[12,50513,50514],{},"A useful diagram separates AC and DC as well as operating states. For every path, show source, conversion, protection, isolation and destination. In a DC-coupled system, the PV generator and battery share a hybrid inverter but each keeps its own electrical limits and manufacturer conditions. With AC coupling, a separate battery inverter feeds the AC side. The power of every source stays visible in the connection assessment.",[12,50516,50517,50518,1774,50521,3324,50524,50527],{},"Mark each item as ",[15,50519,50520],{},"known",[15,50522,50523],{},"taken from manufacturer evidence",[15,50525,50526],{},"still to verify",". The most important are:",[84,50529,50530,50533,50536,50539,50542,50545,50548,50551],{},[87,50531,50532],{},"rated power and maximum current per mode;",[87,50534,50535],{},"number of phases and intended phase allocation;",[87,50537,50538],{},"cable type, conductors, cross-section and installation method per segment;",[87,50540,50541],{},"overcurrent, residual-current and surge protection with their characteristics;",[87,50543,50544],{},"isolation points on the AC and DC side;",[87,50546,50547],{},"meters, current transformers or control contacts for power limitation;",[87,50549,50550],{},"firmware or variant covered by the homologation;",[87,50552,50553],{},"identification of grid-parallel and island paths.",[12,50555,50556],{},"This structure pays off in maintenance. An inverter replacement may alter protection, connection power, homologation and notification even when battery capacity stays unchanged.",[79,50558,50560],{"id":50559},"backup-is-a-separate-design-project","Backup is a separate design project",[12,50562,50563],{},"A product advertised as “backup” does not automatically supply the whole dwelling during an outage. Transfer arrangement, safe grid separation, neutral treatment, island earthing, selected loads, starting currents and behaviour at low state of charge are designed explicitly. Terms such as backup, EPS and whole-home backup are not interchangeable legal categories.",[12,50565,50566],{},"Create a load list for the backed-up section: lighting, communication, refrigeration or heating have different priorities and starting loads. Identify the backed-up circuits on the situation plan and determine whether a separate board or selective transfer is used. The responsible professional ensures that no dangerous backfeed into an isolated distribution grid is possible.",[79,50568,50570],{"id":50569},"prepare-the-inspection-and-registration-package","Prepare the inspection and registration package",[12,50572,50573],{},"The dossier holds more than a printout: updated single-line diagram and situation plan, product data, installation and protection instructions, Synergrid evidence for the exact variant, grid-interface settings, inspection report and regional registration confirmation. Record who carried out the installation and which parameters were confirmed at commissioning.",[12,50575,50576],{},"In Flanders, Fluvius explicitly links storage registration with AREI inspection and Synergrid technical conditions. Wallonia and Brussels have their own competent operators and procedures, so you do not copy Flemish thresholds or sequencing without checking the connection location. The competent body for the connection address at the time of registration is decisive.",[79,50578,50580],{"id":50579},"common-documentation-failures","Common documentation failures",[84,50582,50583,50586,50589,50592,50595,50598,50601],{},[87,50584,50585],{},"Battery and inverter merged into one symbol without electrical ratings.",[87,50587,50588],{},"AC- and DC-coupled variants with a similar product name mixed up.",[87,50590,50591],{},"Backup shown without the grid separation.",[87,50593,50594],{},"C10\u002F26 checked by brand instead of model and variant.",[87,50596,50597],{},"A manufacturer example of breaker or RCD selection applied to a different earthing system.",[87,50599,50600],{},"The old diagram kept in the dossier after an inverter replacement.",[87,50602,50603],{},"An economic calculation based on nominal capacity, ignoring losses and ageing.",[12,50605,50606],{},"A clearly marked open point always beats a plausible but invented value.",[79,50608,50610],{"id":50609},"home-batteries-and-planelec","Home batteries and PlanElec",[12,50612,3361,50613,50616,50617,50620,50621,11250,50624,50626],{},[40,50614,22],{"href":1456,"rel":50615},[1458],", you draw the home battery on the single-line diagram for free in your browser: the library offers a ",[15,50618,50619],{},"Battery circuit (AC-coupled)"," and a ",[15,50622,50623],{},"Hybrid circuit with PV and battery",[15,50625,37309],{},". The battery sits behind an inverter with the direction AC ↔ DC, and Sketch points out a source that is still missing from a started situation plan (AREI 3.1.2.3 a). Sketch does not assess protection values; it draws what you enter.",[12,50628,3361,50629,50631,50632,15383,50635,50638,50639,50641],{},[40,50630,31],{"href":1964},", you set the inverter’s ",[15,50633,50634],{},"Battery interface",[15,50636,50637],{},"Battery connected","; the single-line diagram then shows the DC storage at the inverter. An AC-coupled battery gets its own protected AC branch. As a pilot feature, the yield forecast shows how a battery affects self-consumption and grid import in the model; it uses averaged load profiles and makes no savings or payback claim (",[40,50640,16763],{"href":16762},"). Pro does not yet have a dedicated battery workflow with its own palette and export, so you back the protection and isolation concept, backed-up section and registration with the manufacturer documents. The roles are clear: the AREI\u002FRGIE self-check shows you findings within the supported rules, and the official inspection is carried out by the approved inspection body.",[1489,50643],{":height":6699,":width":27568,"alt":37818,"caption":37819,"src":37820},[79,50645,50647],{"id":50646},"current-primary-sources","Current primary sources",[84,50649,50650,50657,50664],{},[87,50651,50652,50656],{},[40,50653,50655],{"href":1971,"rel":50654},[1458],"FPS Economy: AREI\u002FRGIE books, Book 1 version 06",", including the DC-system changes applicable from 1 April 2026; Sections 4.5.1, 7.103.1 and 7.112.2.",[87,50658,50659,50663],{},[40,50660,50662],{"href":37346,"rel":50661},[1458],"Synergrid: homologation of decentralised generation units",", covering C10\u002F11 ed.2.4 and C10\u002F26 for grid-parallel or technically capable battery and hybrid inverters.",[87,50665,50666,50671],{},[40,50667,50670],{"href":50668,"rel":50669},"https:\u002F\u002Fwww.fluvius.be\u002Fnl\u002Fgroene-energie\u002Fthuisbatterij\u002Fopslagsysteem-aanmelden",[1458],"Fluvius: storage-system registration",", a regional primary source for Flanders; for Wallonia or Brussels, check the competent body separately.",[79,50673,50675],{"id":50674},"pre-installation-review-list","Pre-installation review list",[3139,50677,50678,50681,50684,50687,50690,50693,50696,50699],{},[87,50679,50680],{},"Describe grid-parallel, zero-export and backup modes separately.",[87,50682,50683],{},"Record the exact inverter model, firmware and current Synergrid status.",[87,50685,50686],{},"Draw AC and DC coupling with every energy path, rather than only a battery icon.",[87,50688,50689],{},"Derive protection and isolation from manufacturer evidence and the applicable AREI provisions.",[87,50691,50692],{},"Keep cable and location data project-specific; do not copy them from an example.",[87,50694,50695],{},"Check effects on existing PV, metering, connection capacity and phase balance.",[87,50697,50698],{},"Confirm inspection and notification documents with the operator responsible for the address.",[87,50700,50701],{},"After commissioning, retain settings, signed diagrams, inspection report and registration confirmation.",[38398,50703],{},[12,50705,50706],{},[15,50707,49278],{},[84,50709,50710,50715,50720],{},[87,50711,50712],{},[40,50713,50714],{"href":25379},"AREI Regulations 2026: What Has Changed?",[87,50716,50717],{},[40,50718,50719],{"href":3707},"Dedicated Circuits: Which Appliances Need Their Own Circuit?",[87,50721,50722],{},[40,50723,50724],{"href":3795},"Cable Cross-Section and Breaker: The Right Combination",[12,50726,50727,50736],{},[15,50728,50729,50730,50733,50734,56],{},"Draw home battery and PV for free on the single-line diagram with ",[40,50731,22],{"href":1456,"rel":50732},[1458],"; PV strings, distribution board and self-check report you plan in ",[40,50735,31],{"href":1964}," Protection, installation and registration you coordinate with the professional and the grid operator.",{"title":2044,"searchDepth":2045,"depth":2045,"links":50738},[50739,50740,50746,50751,50755,50756,50757,50758,50759,50760,50761,50762,50763],{"id":50281,"depth":2045,"text":50282},{"id":50291,"depth":2045,"text":50292,"children":50741},[50742,50743,50744,50745],{"id":50295,"depth":2053,"text":50296},{"id":50302,"depth":2053,"text":50303},{"id":50309,"depth":2053,"text":50310},{"id":50316,"depth":2053,"text":50317},{"id":50323,"depth":2045,"text":50324,"children":50747},[50748,50749,50750],{"id":50330,"depth":2053,"text":50331},{"id":50356,"depth":2053,"text":50357},{"id":50384,"depth":2053,"text":50385},{"id":50405,"depth":2045,"text":50406,"children":50752},[50753,50754],{"id":50416,"depth":2053,"text":50417},{"id":50440,"depth":2053,"text":50441},{"id":50447,"depth":2045,"text":50448},{"id":50487,"depth":2045,"text":50488},{"id":50510,"depth":2045,"text":50511},{"id":50559,"depth":2045,"text":50560},{"id":50569,"depth":2045,"text":50570},{"id":50579,"depth":2045,"text":50580},{"id":50609,"depth":2045,"text":50610},{"id":50646,"depth":2045,"text":50647},{"id":50674,"depth":2045,"text":50675},"2026-06-02","How do you install a home battery under the AREI? This guide covers circuit, isolation point, single-line diagram, backup operation and grid operator registration.",[35684,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-home-battery-arei-editorial.jpg","\u002Fblog\u002Fhome-battery-arei.en",{"title":50263,"description":50765},"Home Battery and AREI: Integrating Battery Storage","blog\u002Fhome-battery-arei.en",[37673,50774,42798,50775,38443,2116,50776],"energy-storage","photovoltaic","backup-power","twuwscHk7WnX2HVAGHd2DVzZvRkEURpEM5j3HQyFSmU","\u002Fblog\u002Fhome-battery-arei",{"id":50780,"title":50781,"articleId":50782,"body":50783,"category":27063,"date":51037,"description":51038,"extension":2113,"image":50803,"labels":51039,"lastUpdated":10988,"locale":2119,"meta":51040,"navigation":2121,"ogImage":51041,"path":51042,"publishDate":51037,"readTime":51043,"refreshInterval":4248,"seo":51044,"seoTitle":51045,"slug":51046,"stem":51047,"tags":51048,"__hash__":51052,"kind":2137,"href":51053},"blog\u002Fblog\u002Fsmoke-detector-mandatory.en.md","Smoke Detectors Mandatory in Belgium: Flanders, Wallonia, Brussels","smoke-detector-mandatory",{"type":9,"value":50784,"toc":51025},[50785,50789,50798,50804,50808,50858,50861,50868,50871,50878,50881,50888,50892,50898,50901,50915,50918,50922,50949,50953,50962,50976,50983,50985,51001],[79,50786,50788],{"id":50787},"short-answer-yes-in-all-three-regions","Short answer: yes, in all three regions",[12,50790,50791,50794,50795,56],{},[15,50792,50793],{},"Yes, smoke detectors are mandatory in Belgium – in Flanders, Wallonia and Brussels for every home, rented or owner-occupied."," The obligation sits in regional housing law, not in AREI, so start date, number and placement differ by region. Everywhere, the detector carries the CE marking and complies with ",[15,50796,50797],{},"NBN EN 14604",[12,50799,50800],{},[74,50801],{"alt":50802,"src":50803},"An electrician installs a smoke detector on a hallway ceiling.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-smoke-detector-mandatory-editorial.webp",[79,50805,50807],{"id":50806},"the-rules-by-region","The rules by region",[138,50809,50810,50823],{},[141,50811,50812],{},[144,50813,50814,50817,50820],{},[147,50815,50816],{},"Region",[147,50818,50819],{},"Mandatory for all homes since",[147,50821,50822],{},"Minimum equipment",[163,50824,50825,50836,50847],{},[144,50826,50827,50830,50833],{},[168,50828,50829],{},"Flanders",[168,50831,50832],{},"1 January 2020",[168,50834,50835],{},"at least 1 detector per floor, including directly accessible basements and attics",[144,50837,50838,50841,50844],{},[168,50839,50840],{},"Wallonia",[168,50842,50843],{},"1 July 2006 (existing homes)",[168,50845,50846],{},"1 detector per living level, 2 if the level exceeds 80 m²",[144,50848,50849,50852,50855],{},[168,50850,50851],{},"Brussels",[168,50853,50854],{},"1 January 2025 (rented homes since 1 July 2005)",[168,50856,50857],{},"detectors along the escape route from bedroom to front door",[1041,50859,50829],{"id":50860},"flanders",[12,50862,50863,50864,50867],{},"Every self-contained dwelling – house, apartment or studio – has ",[15,50865,50866],{},"at least one smoke detector on every floor",". Basements and attics count if they are directly accessible or house a technical installation. In rooming houses each room also gets a detector. A detector in every room on the shortest escape route from the bedroom to the outside is additionally recommended. For rentals, the landlord buys and installs the detectors; without them there is no certificate of conformity.",[1041,50869,50840],{"id":50870},"wallonia",[12,50872,50873,50874,50877],{},"One detector is required ",[15,50875,50876],{},"on each level with at least one habitable room",", preferably in halls and corridors: entrance hall, landing or the room the stairs lead into. A level larger than 80 m² needs two; a single-level apartment needs one below 80 m² and two above. From four required detectors, they are interconnected or replaced by a centralised fire detection system. For rentals, the owner covers installation and replacement, the tenant the battery.",[1041,50879,50851],{"id":50880},"brussels",[12,50882,50883,50884,50887],{},"Since 1 January 2025 the obligation covers ",[15,50885,50886],{},"all homes"," in the Brussels-Capital Region; for rented homes it has applied since 2005. Detectors go in every room on the route from the furthest bedroom to the front door. Accepted are detectors to NBN EN 14604, not of the ionisation type, with a built-in ten-year battery or mains connection. From four detectors, interconnected detectors or a central system are mandatory.",[79,50889,50891],{"id":50890},"smoke-detectors-and-arei-what-the-electrical-inspection-covers","Smoke detectors and AREI: what the electrical inspection covers",[12,50893,50894,50897],{},[15,50895,50896],{},"AREI does not regulate smoke detectors in homes."," The electrical inspection covers the electrical installation, so a missing battery-powered detector is not an AREI infringement. The dossier of a domestic installation contains the single-line diagram and situation plan (9.1.2). The situation plan shows boards, boxes, sockets, lighting points, switches, fixed appliances and sources that appear on the single-line diagram (3.1.2.3(a)).",[12,50899,50900],{},"That gives a clear distinction:",[84,50902,50903,50909],{},[87,50904,50905,50908],{},[15,50906,50907],{},"Battery detectors"," are not part of the electrical installation and need not appear on the situation plan.",[87,50910,50911,50914],{},[15,50912,50913],{},"Mains detectors (230 V)"," are fed from a circuit. As fixed appliances they appear on the single-line diagram and situation plan like any other load.",[12,50916,50917],{},"Many installers also draw battery detectors on the situation plan for information, so occupants find all safety-related devices in one place.",[79,50919,50921],{"id":50920},"maintenance-and-replacement","Maintenance and replacement",[84,50923,50924,50930,50936,50942],{},[87,50925,50926,50929],{},[15,50927,50928],{},"Monthly:"," press the test button.",[87,50931,50932,50935],{},[15,50933,50934],{},"Regularly:"," dust or vacuum the detector.",[87,50937,50938,50941],{},[15,50939,50940],{},"After 10 years:"," replace it – that is its typical service life.",[87,50943,50944,50945,50948],{},"When buying, look for ",[15,50946,50947],{},"CE marking and NBN EN 14604","; in Brussels also a built-in ten-year battery or mains connection.",[79,50950,50952],{"id":50951},"planning-smoke-detectors-in-planelec","Planning smoke detectors in PlanElec",[12,50954,50955,23704,50958,50961],{},[15,50956,50957],{},"For your own home:",[40,50959,22],{"href":1456,"rel":50960},[1458]," you find the smoke detector in the symbol library and place it on the situation plan for free in the browser – floor by floor, as your region requires. A mains-powered detector also goes into the single-line diagram as a load on its circuit.",[12,50963,50964,23704,50967,50969,50970,50973,50974,56],{},[15,50965,50966],{},"For electrical contractors:",[40,50968,31],{"href":1964}," you place smoke detectors on the floor plan and situation plan, and the self-check gives a ",[15,50971,50972],{},"recommendation",": it flags bedrooms, hallways and staircases without a detector and – where no rooms are typed – floors without a detector. Because AREI does not require smoke detectors, this appears as a warning based on regional housing law, not as an AREI error. The scope is in ",[40,50975,1086],{"href":1085},[1489,50977],{":height":50978,":width":50979,"alt":50980,"caption":50981,"src":50982},"670","949","Situation plan in PlanElec Sketch: fictional ground floor plan with a ‘Smoke detector’ in the hall and in both bedrooms.","You place the smoke detector from the symbol palette, floor by floor. How many detectors are needed where is set by your region; Sketch does not check it.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-smoke-detectors-plan.webp",[79,50984,7537],{"id":7536},[84,50986,50987,50992,50996],{},[87,50988,50989],{},[40,50990,50991],{"href":25379},"AREI regulations 2026",[87,50993,50994],{},[40,50995,50220],{"href":49878},[87,50997,50998],{},[40,50999,51000],{"href":5967},"Inspection failed – what now?",[12,51002,51003],{},[63,51004,51005,51006,1774,51011,1774,51016,51021,51022,1487],{},"Sources: ",[40,51007,51010],{"href":51008,"rel":51009},"https:\u002F\u002Fwww.vlaanderen.be\u002Fwoningkwaliteitsnormen\u002Frookmelders",[1458],"Smoke detectors in Flanders (Vlaanderen.be)",[40,51012,51015],{"href":51013,"rel":51014},"https:\u002F\u002Fwallonie.be\u002Ffr\u002Fdemarches\u002Fdisposer-de-detecteurs-incendie-dans-votre-logement",[1458],"Fire detectors in Wallonia (wallonie.be)",[40,51017,51020],{"href":51018,"rel":51019},"https:\u002F\u002Fwww.brussel.be\u002Frookmelders-verplicht-brussel",[1458],"Smoke detectors mandatory in Brussels (City of Brussels)","; AREI\u002FRGIE Book 1, version 07, subsection 3.1.2.3(a) and section 9.1.2 (",[40,51023,27049],{"href":25362,"rel":51024},[1458],{"title":2044,"searchDepth":2045,"depth":2045,"links":51026},[51027,51028,51033,51034,51035,51036],{"id":50787,"depth":2045,"text":50788},{"id":50806,"depth":2045,"text":50807,"children":51029},[51030,51031,51032],{"id":50860,"depth":2053,"text":50829},{"id":50870,"depth":2053,"text":50840},{"id":50880,"depth":2053,"text":50851},{"id":50890,"depth":2045,"text":50891},{"id":50920,"depth":2045,"text":50921},{"id":50951,"depth":2045,"text":50952},{"id":7536,"depth":2045,"text":7537},"2026-05-28","Yes, smoke detectors are mandatory in all three regions – under regional housing law, not AREI. Number, placement and start dates for Flanders, Wallonia and Brussels.",[2820,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-smoke-detector-mandatory-editorial.jpg","\u002Fblog\u002Fsmoke-detector-mandatory.en","4 min",{"title":50781,"description":51038},"Smoke Detectors Mandatory in Belgium: Rules by Region","smoke-detector-mandatory-belgium","blog\u002Fsmoke-detector-mandatory.en",[51049,51050,49386,50860,50870,50880,51051],"smoke-detector","fire-safety","safety","wGShlqxdzODiQnzOIT1pvAFmVYcwklkVhHV2Hjo8k8I","\u002Fblog\u002Fsmoke-detector-mandatory-belgium",{"id":51055,"title":51056,"articleId":51057,"body":51058,"category":4239,"date":51970,"description":51971,"extension":2113,"image":51071,"labels":51972,"lastUpdated":4240,"locale":2119,"meta":51973,"navigation":2121,"ogImage":51974,"path":51975,"publishDate":51970,"readTime":15114,"refreshInterval":4248,"seo":51976,"seoTitle":51977,"slug":51978,"stem":51979,"tags":51980,"__hash__":51984,"kind":2137,"href":51985},"blog\u002Fblog\u002Fev-charger-arei.en.md","EV Charger Installation According to AREI: The Complete Guide for Belgium","ev-charger-installation-arei",{"type":9,"value":51059,"toc":51932},[51060,51066,51072,51076,51176,51179,51185,51189,51193,51200,51204,51207,51211,51214,51218,51221,51225,51229,51293,51298,51309,51314,51322,51326,51391,51396,51407,51412,51423,51427,51430,51434,51438,51441,51519,51522,51526,51533,51555,51562,51566,51569,51573,51580,51583,51587,51597,51600,51604,51610,51614,51620,51623,51627,51630,51633,51636,51639,51643,51646,51649,51653,51656,51660,51700,51704,51714,51720,51734,51742,51745,51751,51753,51759,51763,51766,51769,51773,51817,51825,51829,51832,51834,51850,51852,51855,51867,51890,51894,51897,51907,51909,51911,51928],[12,51061,51062,51065],{},[15,51063,51064],{},"An EV charger in Belgium falls under Chapter 7.22 of AREI\u002FRGIE Book 1 (the Belgian wiring regulations): every connection point gets a dedicated circuit with its own overcurrent protection and its own residual current device (RCD) of no more than 30 mA, protection must also work for fault currents with a DC component, and connection through a plug and socket is prohibited."," On top of that come project-specific cable and protection design, an updated single-line diagram and clarification with the grid operator. This guide takes you through every point. Chapter 7.22 applies to charging stations whose installation or replacement started on or after 1 November 2022 (7.22.1). As a homeowner, draw the verified charging branch in Sketch; electrical contractors plan its integration with the distribution board and self-check report in Pro.",[12,51067,51068],{},[74,51069],{"alt":51070,"src":51071},"An electrician checks an installed EV charger.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-ev-charger-installation-arei-editorial.webp",[79,51073,51075],{"id":51074},"arei-722-at-a-glance","AREI 7.22 at a glance",[138,51077,51078,51090],{},[141,51079,51080],{},[144,51081,51082,51084,51087],{},[147,51083,3724],{},[147,51085,51086],{},"Book 1 V06 reference",[147,51088,51089],{},"What it means for your charger",[163,51091,51092,51102,51112,51122,51132,51143,51154,51165],{},[144,51093,51094,51097,51099],{},[168,51095,51096],{},"No connection through a plug and socket",[168,51098,47311],{},[168,51100,51101],{},"Permanently connected, not via a garage socket",[144,51103,51104,51107,51109],{},[168,51105,51106],{},"Dedicated circuit per connection point",[168,51108,47311],{},[168,51110,51111],{},"Two charging points = two dedicated circuits",[144,51113,51114,51117,51119],{},[168,51115,51116],{},"RCD ≤ 30 mA per circuit",[168,51118,47437],{},[168,51120,51121],{},"Individual per dedicated AC circuit, no TN-C",[144,51123,51124,51127,51129],{},[168,51125,51126],{},"Protection with a disturbing DC component",[168,51128,47437],{},[168,51130,51131],{},"Type B RCD, or Type A with suitable DC fault-current detection",[144,51133,51134,51137,51140],{},[168,51135,51136],{},"Overcurrent protection per circuit",[168,51138,51139],{},"7.22.4.2",[168,51141,51142],{},"Shared protection only for connection points not used simultaneously",[144,51144,51145,51148,51151],{},[168,51146,51147],{},"Outdoors at least IP44",[168,51149,51150],{},"7.22.5.1",[168,51152,51153],{},"Applies to the charger equipment installed outdoors",[144,51155,51156,51159,51162],{},[168,51157,51158],{},"Connection point close to the parking space",[168,51160,51161],{},"7.22.5.3",[168,51163,51164],{},"One connection point supplies one vehicle at a time",[144,51166,51167,51170,51173],{},[168,51168,51169],{},"Feedback possible",[168,51171,51172],{},"7.22.5.4",[168,51174,51175],{},"Rules for distributed generation and a warning sign on charger and board",[12,51177,51178],{},"Emergency switching under 7.22.5.2 does not apply to chargers that are part of a dwelling's electrical installation; for other chargers inside buildings it is required.",[1489,51180],{":height":51181,":width":3800,"alt":51182,"caption":51183,"src":51184},"656","Protection chain of an EV charger under AREI 7.22: distribution board, overcurrent protection per dedicated circuit, RCD of at most 30 mA, fixed wiring, charger. Right: the type choice: type A with proven DC fault detection in the device, otherwise type B.","One dedicated circuit per connection point with its own overcurrent protection and RCD; which RCD type is enough depends on the charger’s proven DC fault detection.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fev-charger-installation-arei\u002Fev-charger-protection.en.svg",[79,51186,51188],{"id":51187},"the-basic-requirements-in-detail","The basic requirements in detail",[1041,51190,51192],{"id":51191},"dedicated-circuit","Dedicated circuit",[12,51194,51195,51196,51199],{},"The charger ",[15,51197,51198],{},"gets"," a dedicated circuit per connection point (7.22.3). An existing circuit, such as the garage sockets, is not an option. The protective devices may sit in the board, in the charger or in a combination of both – what matters is that each connection point is protected separately.",[1041,51201,51203],{"id":51202},"residual-current-device-rcd","Residual Current Device (RCD)",[12,51205,51206],{},"Where protection relies on automatic disconnection, a dedicated RCD of no more than 30 mA protects each dedicated AC circuit (7.22.4.1 b). Which type it has to be depends on the charger – more below.",[1041,51208,51210],{"id":51209},"circuit-breaker-mcb","Circuit Breaker (MCB)",[12,51212,51213],{},"A correctly sized circuit breaker protects each dedicated circuit individually against overload and short circuit (7.22.4.2).",[1041,51215,51217],{"id":51216},"surge-protection-device-spd","Surge Protection Device (SPD)",[12,51219,51220],{},"AREI 4.5.1 generally requires protection against overvoltages according to good practice. Book 1 does not prescribe a specific SPD; whether one is needed follows from the risk assessment of the whole installation. Where one is fitted, it usually sits centrally in the distribution board and protects all circuits, including the charger circuit, against overvoltages from lightning or switching.",[79,51222,51224],{"id":51223},"single-phase-vs-three-phase-which-charger","Single-Phase vs. Three-Phase: Which Charger?",[1041,51226,51228],{"id":51227},"single-phase-37-kw-or-74-kw","Single-Phase – 3.7 kW or 7.4 kW",[138,51230,51231,51243],{},[141,51232,51233],{},[144,51234,51235,51237,51240],{},[147,51236,26838],{},[147,51238,51239],{},"3.7 kW (16 A)",[147,51241,51242],{},"7.4 kW (32 A)",[163,51244,51245,51254,51262,51271,51282],{},[144,51246,51247,51249,51252],{},[168,51248,10584],{},[168,51250,51251],{},"1-phase, 230V",[168,51253,51251],{},[144,51255,51256,51258,51260],{},[168,51257,17191],{},[168,51259,33079],{},[168,51261,33106],{},[144,51263,51264,51267,51269],{},[168,51265,51266],{},"Cable cross-section (example)",[168,51268,22715],{},[168,51270,33103],{},[144,51272,51273,51276,51279],{},[168,51274,51275],{},"Circuit breaker (example)",[168,51277,51278],{},"20 A Type C",[168,51280,51281],{},"32 A Type C",[144,51283,51284,51287,51290],{},[168,51285,51286],{},"Charging time (50 kWh battery, calculated)",[168,51288,51289],{},"~14 hours",[168,51291,51292],{},"~7 hours",[12,51294,51295],{},[15,51296,51297],{},"Advantages of single-phase:",[84,51299,51300,51303,51306],{},[87,51301,51302],{},"cheaper to install",[87,51304,51305],{},"simpler wiring",[87,51307,51308],{},"enough for many households charging overnight",[12,51310,51311],{},[15,51312,51313],{},"Disadvantages of single-phase:",[84,51315,51316,51319],{},[87,51317,51318],{},"limited charging power",[87,51320,51321],{},"at 7.4 kW, phase imbalance possible – clarify it with the grid operator",[1041,51323,51325],{"id":51324},"three-phase-11-kw-or-22-kw","Three-Phase – 11 kW or 22 kW",[138,51327,51328,51340],{},[141,51329,51330],{},[144,51331,51332,51334,51337],{},[147,51333,26838],{},[147,51335,51336],{},"11 kW (16 A)",[147,51338,51339],{},"22 kW (32 A)",[163,51341,51342,51351,51361,51371,51381],{},[144,51343,51344,51346,51349],{},[168,51345,10584],{},[168,51347,51348],{},"3-phase, 400V",[168,51350,51348],{},[144,51352,51353,51355,51358],{},[168,51354,17191],{},[168,51356,51357],{},"3x 16 A",[168,51359,51360],{},"3x 32 A",[144,51362,51363,51365,51368],{},[168,51364,51266],{},[168,51366,51367],{},"2.5 mm² (5G2.5)",[168,51369,51370],{},"6 mm² (5G6)",[144,51372,51373,51375,51378],{},[168,51374,51275],{},[168,51376,51377],{},"20 A 3-pole Type C",[168,51379,51380],{},"32 A 3-pole Type C",[144,51382,51383,51385,51388],{},[168,51384,51286],{},[168,51386,51387],{},"~5 hours",[168,51389,51390],{},"~2.5 hours",[12,51392,51393],{},[15,51394,51395],{},"Advantages of three-phase:",[84,51397,51398,51401,51404],{},[87,51399,51400],{},"considerably faster charging, if the vehicle charges on three phases",[87,51402,51403],{},"balanced load distribution",[87,51405,51406],{},"headroom for future vehicles",[12,51408,51409],{},[15,51410,51411],{},"Disadvantages of three-phase:",[84,51413,51414,51417,51420],{},[87,51415,51416],{},"more expensive installation",[87,51418,51419],{},"three-phase connection at the board required",[87,51421,51422],{},"higher material costs (larger cross-sections, more expensive protective devices)",[1041,51424,51426],{"id":51425},"selection-based-on-the-project","Selection based on the project",[12,51428,51429],{},"The right charging power follows from the project, not from a general recommendation. Available phases, connection capacity, main protection, simultaneous household load, the vehicle's on-board charger, daily energy need and possible load management are assessed together. A nominally stronger charger does not charge faster when the vehicle or connection limits the current.",[79,51431,51433],{"id":51432},"cable-and-protection-proper-sizing","Cable and Protection: Proper Sizing",[1041,51435,51437],{"id":51436},"cable-cross-section-overview","Cable Cross-Section Overview",[12,51439,51440],{},"For household installations, AREI Table 4.11 (Subsection 4.4.1.4) sets the maximum rated current of the circuit breaker per conductor cross-section: 20 A for 2.5 mm², 25 A for 4 mm², 40 A for 6 mm². Within that ceiling, actual current-carrying capacity depends on installation method, grouping and ambient temperature. The table shows typical examples for short runs in standard installation conditions:",[138,51442,51443,51459],{},[141,51444,51445],{},[144,51446,51447,51449,51452,51454,51456],{},[147,51448,22448],{},[147,51450,51451],{},"Cable type",[147,51453,42290],{},[147,51455,51275],{},[147,51457,51458],{},"Max. MCB per Table 4.11",[163,51460,51461,51475,51489,51504],{},[144,51462,51463,51466,51469,51471,51473],{},[168,51464,51465],{},"3.7 kW (1P, 16A)",[168,51467,51468],{},"XVB 3G2.5",[168,51470,22715],{},[168,51472,51278],{},[168,51474,33088],{},[144,51476,51477,51480,51483,51485,51487],{},[168,51478,51479],{},"7.4 kW (1P, 32A)",[168,51481,51482],{},"XVB 3G6",[168,51484,33103],{},[168,51486,51281],{},[168,51488,33109],{},[144,51490,51491,51494,51497,51499,51502],{},[168,51492,51493],{},"11 kW (3P, 16A)",[168,51495,51496],{},"XVB 5G2.5",[168,51498,22715],{},[168,51500,51501],{},"20 A 3P Type C",[168,51503,33088],{},[144,51505,51506,51509,51512,51514,51517],{},[168,51507,51508],{},"22 kW (3P, 32A)",[168,51510,51511],{},"XVB 5G6",[168,51513,33103],{},[168,51515,51516],{},"32 A 3P Type C",[168,51518,33109],{},[12,51520,51521],{},"Trip curve C is a common choice, not an AREI requirement; the manufacturer's instructions and selectivity decide. For long runs (roughly beyond 15 m), increase the cross-section where needed to limit voltage drop: 5.2.1.2 b requires voltage variation compatible with safe operation, and 5.2.5 limits it to the values of good practice. Plan the cable route in advance and calculate the voltage drop.",[1041,51523,51525],{"id":51524},"cable-type","Cable Type",[12,51527,51528,51529,51532],{},"In Belgium, ",[15,51530,51531],{},"XVB cable"," is commonly used for fixed installations:",[84,51534,51535,51540,51545,51550],{},[87,51536,51537,51539],{},[15,51538,51468],{}," for single-phase 16 A",[87,51541,51542,51544],{},[15,51543,51482],{}," for single-phase 32 A",[87,51546,51547,51549],{},[15,51548,51496],{}," for three-phase 16 A",[87,51551,51552,51554],{},[15,51553,51511],{}," for three-phase 32 A",[12,51556,51557,51558,51561],{},"In conduit (Preflex), ",[15,51559,51560],{},"VOB single cores"," (H07V-U) can be used; the conduit must then be sized accordingly.",[79,51563,51565],{"id":51564},"rcd-type-the-most-important-protection-device","RCD Type: The Most Important Protection Device",[12,51567,51568],{},"Choosing the right RCD is decisive for an EV charger – and can make a real difference in cost. AREI 7.22.4.1 b requires protection to remain effective during insulation faults with a disturbing DC component: either through an RCD built for that purpose, or through an RCD combined and coordinated with a residual direct current detection device that takes the charger out of service.",[1041,51570,51572],{"id":51571},"type-a-dc-fault-detection-in-the-charger-rdc-dd","Type A + DC fault detection in the charger (RDC-DD)",[12,51574,51575,51576,51579],{},"A Type A alone does not cover DC fault currents. If the manufacturer demonstrates suitable integrated DC fault detection for the exact charger (typically 6 mA DC, known as RDC-DD), it can form the second option of 7.22.4.1 b together with an upstream ",[15,51577,51578],{},"Type A RCD (30 mA)",". Without that documented evidence, you do not assume the combination.",[12,51581,51582],{},"The chosen Type A matches the network, poles, rating and the manufacturer's conditions. We deliberately give no price range without that data.",[1041,51584,51586],{"id":51585},"type-b-if-the-charger-has-no-dc-sensor","Type B (if the charger has no DC sensor)",[12,51588,51589,51590,51592,51593,51596],{},"If your charger has ",[15,51591,602],{}," integrated DC fault detection, you need a ",[15,51594,51595],{},"Type B RCD",". It also detects smooth DC fault currents that can occur with chargers.",[12,51598,51599],{},"Check the manufacturer's declaration on DC fault detection. That declaration – not the product name – shows that the combination of charger and upstream RCD meets the requirements.",[1041,51601,51603],{"id":51602},"type-a-si","Type A-SI",[12,51605,4389,51606,51609],{},[15,51607,51608],{},"Type A-SI RCD"," may be more robust against certain disturbance pulses depending on the manufacturer, but does not on its own cover the requirement for DC fault currents. The documented overall combination decides.",[79,51611,51613],{"id":51612},"surge-protection-spd-central-for-the-entire-installation","Surge Protection (SPD) – Central for the Entire Installation",[12,51615,51616,51617,51619],{},"AREI 4.5.1 generally requires protection against overvoltages according to good practice. No general SPD obligation follows from this. Where an ",[15,51618,47836],{}," is fitted, it sits in practice in the distribution board and protects all connected equipment, including the EV charger, against transient overvoltages. The AREI does not name a specific \"Type 2\" – that designation comes from the product standard IEC 61643-11.",[12,51621,51622],{},"You choose the SPD's back-up protection (fuse or circuit breaker) according to the manufacturer's instructions.",[79,51624,51626],{"id":51625},"grid-operator-and-direction-of-energy-flow","Grid operator and direction of energy flow",[12,51628,51629],{},"Notification, connection and capacity conditions are not derived generically from a rated power. Before ordering, check the current conditions of the grid operator responsible for the address. Have the EAN code, connection type, planned charging power, phases, load management and the exact technical product description ready.",[12,51631,51632],{},"Establish explicitly whether energy flows only from grid to vehicle or in both directions. Synergrid states that bidirectional or technically bidirectional chargers fall under C10\u002F11 edition 2.4 and require C10\u002F26 type approval. Strictly grid-to-vehicle chargers do not need C10\u002F26 under that rule; other notifications or grid-operator conditions may still apply. If the charger can feed back, AREI 7.22.5.4 additionally requires the rules for distributed generation units and the warning \"Caution: possible feedback of electrical energy into the installation\" on the charger and the board.",[12,51634,51635],{},"Record the answer with the exact model and manufacturer declaration. Disabling feedback in software is not enough if the device remains technically bidirectional; Synergrid explicitly covers that technical capability. After a change of firmware, operating mode or connection power, you recheck the grid question. Keep the confirmation, product data and any approval reference in the installation dossier so that electrician, grid operator and inspection body assess the same variant.",[12,51637,51638],{},"Before commissioning, also document phase assignment, configured current limit, load management and behaviour on loss of communication. These operating parameters are not electrical protection, but they determine the connection capacity actually drawn and match the planned concept.",[1041,51640,51642],{"id":51641},"record-the-handover-settings-together","Record the handover settings together",[12,51644,51645],{},"Create a short commissioning sheet for the electrician, user and later inspector: exact charger model, installed firmware, single- or three-phase operation, maximum current, upstream protection, RCD concept, DC fault detection and cable type. With dynamic load management, add the measuring point, communication path, failure behaviour and the limit actually set. If any item differs from the manual, diagram or board labelling, you resolve it before use.",[12,51647,51648],{},"Also define who may change settings and how a change is recorded. A charging current raised later loads cable, protective device, connection capacity and selectivity differently from the inspected configuration. Keep the settings record with photos of the labels, the datasheet, conformity documents and inspection report. Replacing the device means more than a new enclosure: protection combination, communication interface, charging mode and possible feedback capability are reassessed for the new model. Link these records to the diagram version and grid-operator response used for commissioning, so that no relevant software or device configuration lives on outside the drawings.",[79,51650,51652],{"id":51651},"updating-the-single-line-diagram","Updating the Single-Line Diagram",[12,51654,51655],{},"After installing an EV charger, you update the single-line diagram of your electrical installation. The charger appears as its own branch:",[1041,51657,51659],{"id":51658},"what-must-be-in-the-diagram","What Must Be in the Diagram?",[3139,51661,51662,51667,51672,51677,51682,51688,51694],{},[87,51663,51664,51666],{},[15,51665,51192],{}," per connection point",[87,51668,51669,51671],{},[15,51670,24055],{}," with type (A or B) and rated residual current",[87,51673,51674,51676],{},[15,51675,24058],{}," with rated current and number of poles",[87,51678,51679,51681],{},[15,51680,47836],{}," (surge protection), where present",[87,51683,51684,51687],{},[15,51685,51686],{},"EV charger symbol"," with power rating and number of connection points",[87,51689,51690,51693],{},[15,51691,51692],{},"Cable designation"," (e.g. XVB 5G2.5)",[87,51695,51696,51699],{},[15,51697,51698],{},"Phase assignment"," (three-phase: L1\u002FL2\u002FL3)",[1041,51701,51703],{"id":51702},"your-ev-charger-in-planelec-sketch-or-pro","Your EV charger in PlanElec Sketch or Pro",[12,51705,51706,51707,51710,51711,51713],{},"For the single-line diagram of a single charger, ",[40,51708,22],{"href":47468,"rel":51709},[1458]," is enough, free in your browser. The start card ",[15,51712,11139],{}," adds a circuit for a charging point to the board of your drawing: its own 30 mA RCD, circuit breaker, cable and charger. The prefilled values are an example; you adapt rated current, RCD type and cable to the device and your sizing. You draw the location on the situation plan and export both as PDF. Sketch draws what you enter and does not check AREI rules.",[12,51715,51716,51717,51719],{},"For electrical contractors, ",[40,51718,31],{"href":1964}," also checks the project:",[84,51721,51722,51725,51728,51731],{},[87,51723,51724],{},"You place the EV charger symbol on the floor plan and link it to its circuit.",[87,51726,51727],{},"The AREI\u002FRGIE self-check flags a charger without its own circuit, sharing its circuit with other loads, without a 30 mA RCD, or with neither a Type B RCD nor internal DC detection; for outdoor installation it reminds you of IP44.",[87,51729,51730],{},"You enter the phase assignment directly.",[87,51732,51733],{},"The single-line diagram and situation plan export as PDFs from the same project data.",[12,51735,51736,51737,47140,51739,51741],{},"The rules the self-check covers are listed in ",[40,51738,1086],{"href":1085},[15,51740,1482],{},", you move a Sketch drawing to Pro; the single-line diagram and situation plan come along.",[12,51743,51744],{},"The roles are clear: the self-check shows you findings within the supported rules, cable sizing and grid questions are settled by calculation and with the grid operator, and the official inspection is done by the approved inspection body.",[1489,51746],{":height":6699,":width":51747,"alt":51748,"caption":51749,"src":51750},"942","PlanElec Sketch after ‘Add charging point’: charging circuit with 30 mA RCD, 2P 32 A circuit breaker, XVB 3G6 cable and charging station; on the right the properties with ‘RCD type’ B, the symbol reads ‘Δ30mA B’.","You enter the RCD type in the properties and the symbol shows it. Whether type A with DC detection in the charger is enough or type B is needed follows from the datasheet; Sketch does not check it.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-charging-rcd-type-b.webp",[1489,51752],{":height":42714,":width":42715,"alt":42716,"caption":42717,"src":42718},[12,51754,7139,51755,2033,51757,56],{},[40,51756,32144],{"href":32143},[40,51758,33720],{"href":4796},[79,51760,51762],{"id":51761},"compare-costs-on-a-common-technical-scope","Compare costs on a common technical scope",[12,51764,51765],{},"A useful quotation separates charger, protective devices, cable route, groundworks, board adaptation, load management, design, inspection and any grid procedure. Prices depend heavily on product, cable length and access, connection capacity and the existing board. Have suppliers price the same technical description; a fixed online price range is not a project budget.",[12,51767,51768],{},"Compare warranty conditions and the documented protection combination as well, not just the device price, and keep that comparison basis with the quotation.",[79,51770,51772],{"id":51771},"common-mistakes-to-avoid","Common Mistakes to Avoid",[3139,51774,51775,51781,51787,51793,51799,51805,51811],{},[87,51776,51777,51780],{},[15,51778,51779],{},"No dedicated circuit, or connection through a socket:"," both contravene AREI 7.22.3 – the charger is permanently connected to its own circuit.",[87,51782,51783,51786],{},[15,51784,51785],{},"Wrong RCD:"," without DC fault detection in the charger, you need an RCD that handles DC fault currents – in practice Type B.",[87,51788,51789,51792],{},[15,51790,51791],{},"Surge protection not assessed:"," whether and how an SPD is used is assessed for the whole installation and coordinated per the manufacturer's instructions.",[87,51794,51795,51798],{},[15,51796,51797],{},"No updated single-line diagram:"," every change to the installation belongs in the diagram.",[87,51800,51801,51804],{},[15,51802,51803],{},"Grid conditions not checked:"," notification and connection rules depend on the operator and charging function; bidirectional or technically bidirectional equipment also enters the C10\u002F11 and C10\u002F26 scope.",[87,51806,51807,51810],{},[15,51808,51809],{},"Cable cross-section too small:"," especially for long runs, recalculate the voltage drop.",[87,51812,51813,51816],{},[15,51814,51815],{},"Outdoor charger without IP44:"," outdoors, 7.22.5.1 requires at least IP44 and protection against foreseeable mechanical stress.",[41114,51818,51819],{},[12,51820,51821,51824],{},[15,51822,51823],{},"Earthing:"," a safe EV charger relies on an intact earthing chain – earth electrode, main equipotential bonding and protective conductor. In older installations without proper earthing, the earthing is brought up to standard before the charger goes in.",[79,51826,51828],{"id":51827},"conclusion","Conclusion",[12,51830,51831],{},"An EV charger in Belgium gets, per connection point, a dedicated circuit with its own overcurrent protection, an RCD of at most 30 mA with effective protection against DC fault currents, project-specific cable and protection design, and updated drawings. Careful documentation makes the installation inspectable; the assessment is made by the approved inspection body.",[79,51833,37332],{"id":37331},[84,51835,51836,51844],{},[87,51837,51838,51843],{},[40,51839,51842],{"href":51840,"rel":51841},"https:\u002F\u002Feconomie.fgov.be\u002Fsites\u002Fdefault\u002Ffiles\u002FFiles\u002FPublications\u002Ffiles\u002FRGIE-Annexe-Livre-1-Installations-a-basse-tenstion-et-a-tres-basse-tension-2026.pdf",[1458],"AREI\u002FRGIE Book 1, 2026 edition – chapter 7.22",", reviewed at V06; Table 4.11 and Sections 4.5.1, 5.2.1.2, 5.2.5.",[87,51845,51846],{},[40,51847,51849],{"href":37346,"rel":51848},[1458],"Synergrid: C10\u002F26 scope for bidirectional or technically bidirectional charging infrastructure",[38398,51851],{},[79,51853,51854],{"id":7536},"Related Articles",[84,51856,51857,51862],{},[87,51858,51859],{},[40,51860,51861],{"href":3790},"Calculate voltage drop for a long charger supply",[87,51863,51864],{},[40,51865,51866],{"href":5547},"Cost Comparison: DIY vs. Hiring an Electrician",[84,51868,51869,51874,51880,51885],{},[87,51870,51871],{},[40,51872,51873],{"href":1537},"PlanElec vs. Excel\u002FPaper",[87,51875,51876],{},[40,51877,51879],{"href":51878},"\u002Fen\u002Fblog\u002Fsurge-protection-spd-mandatory","Is surge protection (SPD) mandatory under AREI?",[87,51881,51882],{},[40,51883,51884],{"href":37288},"Synergrid C10\u002F26 list: is your inverter on it?",[87,51886,51887],{},[40,51888,51889],{"href":5387},"Single-phase or three-phase: Belgian networks and building connections",[79,51891,51893],{"id":51892},"document-your-ev-charger-in-the-single-line-diagram","Document Your EV Charger in the Single-Line Diagram",[12,51895,51896],{},"Sketch records the protective device, cable and charging point as a drawing. If the contractor also needs integrated PV, distribution board planning and self-checks, transfer it to Pro and verify the technical data against manufacturer documentation.",[12,51898,51899,51900,51903,51904,51906],{},"Draw the charger circuit for free in your browser with ",[40,51901,22],{"href":47468,"rel":51902},[1458]," and export the single-line diagram and situation plan as PDF. As an electrical contractor, you check the project in ",[40,51905,31],{"href":1964}," with the AREI\u002FRGIE self-check before the approved inspection body inspects it.",[1489,51908],{":height":37039,":width":37040,"alt":37041,"caption":37042,"src":37043},[79,51910,2009],{"id":2008},[84,51912,51913,51920],{},[87,51914,51915,38,51917,56],{},[15,51916,11935],{},[40,51918,2023],{"href":1456,"rel":51919},[1458],[87,51921,51922,38,51924,2033,51926,56],{},[15,51923,7561],{},[40,51925,2032],{"href":1964},[40,51927,2036],{"href":54},[12,51929,51930,7570],{},[15,51931,2041],{},{"title":2044,"searchDepth":2045,"depth":2045,"links":51933},[51934,51935,51941,51946,51950,51955,51956,51959,51963,51964,51965,51966,51967,51968,51969],{"id":51074,"depth":2045,"text":51075},{"id":51187,"depth":2045,"text":51188,"children":51936},[51937,51938,51939,51940],{"id":51191,"depth":2053,"text":51192},{"id":51202,"depth":2053,"text":51203},{"id":51209,"depth":2053,"text":51210},{"id":51216,"depth":2053,"text":51217},{"id":51223,"depth":2045,"text":51224,"children":51942},[51943,51944,51945],{"id":51227,"depth":2053,"text":51228},{"id":51324,"depth":2053,"text":51325},{"id":51425,"depth":2053,"text":51426},{"id":51432,"depth":2045,"text":51433,"children":51947},[51948,51949],{"id":51436,"depth":2053,"text":51437},{"id":51524,"depth":2053,"text":51525},{"id":51564,"depth":2045,"text":51565,"children":51951},[51952,51953,51954],{"id":51571,"depth":2053,"text":51572},{"id":51585,"depth":2053,"text":51586},{"id":51602,"depth":2053,"text":51603},{"id":51612,"depth":2045,"text":51613},{"id":51625,"depth":2045,"text":51626,"children":51957},[51958],{"id":51641,"depth":2053,"text":51642},{"id":51651,"depth":2045,"text":51652,"children":51960},[51961,51962],{"id":51658,"depth":2053,"text":51659},{"id":51702,"depth":2053,"text":51703},{"id":51761,"depth":2045,"text":51762},{"id":51771,"depth":2045,"text":51772},{"id":51827,"depth":2045,"text":51828},{"id":37331,"depth":2045,"text":37332},{"id":7536,"depth":2045,"text":51854},{"id":51892,"depth":2045,"text":51893},{"id":2008,"depth":2045,"text":2009},"2026-05-25","AREI\u002FRGIE requirements for your EV charger in Belgium: dedicated circuit per connection point, RCD and DC fault-current protection, cable design, documentation and grid questions.",[35684,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-ev-charger-installation-arei-editorial.jpg","\u002Fblog\u002Fev-charger-arei.en",{"title":51056,"description":51971},"EV Charger Installation in Belgium: the AREI Guide","ev-charger-arei","blog\u002Fev-charger-arei.en",[37316,51981,2133,51982,30398,51983,4261,5269],"wallbox","electric vehicle","RCD protection","h5IjmM_j5jFzade8BQTXFeo-BUhzxeNYlZr5c0ooFvo","\u002Fblog\u002Fev-charger-arei",{"id":51987,"title":51988,"articleId":51989,"body":51990,"category":2110,"date":52363,"description":52364,"extension":2113,"image":52036,"labels":52365,"lastUpdated":4826,"locale":2119,"meta":52366,"navigation":2121,"ogImage":52367,"path":52368,"publishDate":52363,"readTime":4830,"refreshInterval":4248,"seo":52369,"seoTitle":52370,"slug":51989,"stem":52371,"tags":52372,"__hash__":52376,"kind":2137,"href":52377},"blog\u002Fblog\u002Fcost-comparison-diy-vs-electrician.en.md","Cost Comparison: Drawing Your Single-Line Diagram Yourself vs. Hiring an Electrician","cost-comparison-diy-vs-electrician",{"type":9,"value":51991,"toc":52346},[51992,51995,51999,52031,52037,52041,52123,52129,52133,52138,52143,52147,52151,52154,52158,52163,52168,52171,52175,52178,52182,52185,52189,52196,52200,52203,52218,52231,52237,52239,52243,52263,52266,52270,52293,52297,52300,52303,52307,52310,52312,52317,52323,52325,52342],[12,51993,51994],{},"Drawing the diagram yourself pays off when your starting data is verified; you hire an electrician when the as-built state is unknown or design and installation work is coming. The deciding factor is not a price list but who delivers which service: survey, drawing, technical responsibility and inspection. You draw your own plan for free in PlanElec Sketch; the work and the technical review stay with the electrician, and the recognized inspection body carries out the inspection. For the Belgian inspection, only one thing counts in the end: the single-line diagram and situation plan show the actual state.",[12,51996,51997],{},[15,51998,13162],{},[138,52000,52001,52009],{},[141,52002,52003],{},[144,52004,52005,52007],{},[147,52006,13171],{},[147,52008,9397],{},[163,52010,52011,52017,52023],{},[144,52012,52013,52015],{},[168,52014,13180],{},[168,52016,13183],{},[144,52018,52019,52021],{},[168,52020,13188],{},[168,52022,13191],{},[144,52024,52025,52027],{},[168,52026,13196],{},[168,52028,13199,52029,13202],{},[15,52030,1482],{},[12,52032,52033],{},[74,52034],{"alt":52035,"src":52036},"Electrical planning and project documents at a table.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-cost-comparison-diy-vs-electrician-editorial.webp",[79,52038,52040],{"id":52039},"compare-the-same-services","Compare the same services",[138,52042,52043,52055],{},[141,52044,52045],{},[144,52046,52047,52049,52052],{},[147,52048,5825],{},[147,52050,52051],{},"Yourself with PlanElec Sketch",[147,52053,52054],{},"Commission to a qualified electrician",[163,52056,52057,52068,52079,52090,52101,52112],{},[144,52058,52059,52062,52065],{},[168,52060,52061],{},"Record the as-built state",[168,52063,52064],{},"as far as data can be established safely and without intervention",[168,52066,52067],{},"professional identification and measurement",[144,52069,52070,52073,52076],{},[168,52071,52072],{},"Diagram and situation plan",[168,52074,52075],{},"draw in the browser, place the diagram's devices on the plan, PDF",[168,52077,52078],{},"depending on the quotation, drawing from supplied or surveyed data",[144,52080,52081,52084,52087],{},[168,52082,52083],{},"Technical design",[168,52085,52086],{},"remains professional work",[168,52088,52089],{},"can be commissioned explicitly",[144,52091,52092,52095,52098],{},[168,52093,52094],{},"Final technical review",[168,52096,52097],{},"organise separately",[168,52099,52100],{},"included if the quotation says so",[144,52102,52103,52106,52109],{},[168,52104,52105],{},"Official inspection",[168,52107,52108],{},"by an approved inspection body",[168,52110,52111],{},"also by an approved inspection body",[144,52113,52114,52117,52120],{},[168,52115,52116],{},"Cost basis",[168,52118,52119],{},"PlanElec Sketch EUR 0; your own time",[168,52121,52122],{},"project-specific quotation, no official unit rate",[12,52124,52125,52126,1487],{},"Complete project data makes doing it yourself straightforward; an unknown old installation needs a professional survey. The AREI states who draws up the single-line diagram: the person responsible for carrying out the work. If the inspection establishes conformity, they and the approved body sign and date the single-line diagram and situation plan (Subsection 3.1.2.1 a of ",[40,52127,36253],{"href":1971,"rel":52128},[1458],[79,52130,52132],{"id":52131},"the-route-from-your-own-plan-to-the-inspection","The route from your own plan to the inspection",[1489,52134],{":height":8729,":width":3800,"alt":52135,"caption":52136,"src":52137},"Diagram: decision and cost path from a plan you draw yourself in PlanElec Sketch, via the electrician, to the inspection by the recognized body","Drawing it yourself only covers the drawing item. Review, installation work and inspection remain separate cost items.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fcost-comparison-diy-vs-electrician\u002Fcost-path.en.svg",[12,52139,52140,52141,56],{},"Each step carries its own cost item: your time for drawing, the electrician's quotation and the inspection body's fee. How the inspection works is explained in ",[40,52142,5394],{"href":5393},[12,52144,7139,52145,56],{},[40,52146,11748],{"href":4218},[79,52148,52150],{"id":52149},"three-editable-scenarios","Three editable scenarios",[12,52152,52153],{},"The formulas are calculation items, not Belgian average prices. Enter your own quotation amounts and time values.",[1041,52155,52157],{"id":52156},"_1-existing-installation-with-good-records","1. Existing installation with good records",[12,52159,52160],{},[25,52161,52162],{},"external = survey per quotation + drawing + technical review + inspection",[12,52164,52165],{},[25,52166,52167],{},"own = own hours × personal time value + EUR 0 for PlanElec Sketch + technical review + inspection",[12,52169,52170],{},"If the floor plan, board, protective devices and circuit assignments are verified, your own work is mainly data entry and cross-checking. Unknown technical values stay marked as unknown instead of being estimated. Alternatively, a contractor reviews and draws exactly that limited data set.",[1041,52172,52174],{"id":52173},"_2-existing-installation-without-reliable-assignments","2. Existing installation without reliable assignments",[12,52176,52177],{},"Here the first question is which circuit feeds which device and which cable and protection data actually exist. Opening enclosures and measuring is not DIY work. In your own model, add a professional survey as a separate item. You can then draw the confirmed data in PlanElec Sketch yourself if you want to take over the drawing.",[1041,52179,52181],{"id":52180},"_3-new-or-substantially-altered-installation","3. New or substantially altered installation",[12,52183,52184],{},"For new circuits or sources, technical design comes before drawing. Manufacturer conditions, grid operator requirements and the AREI version shape the decisions. So do not compare a full-service quotation with drawing work alone; split design, installation, documentation and inspection. A substantial alteration is inspected before it is put into use (Subsection 6.4.7.3).",[79,52186,52188],{"id":52187},"which-documents-belong-in-the-comparison","Which documents belong in the comparison?",[12,52190,4361,52191,52195],{},[40,52192,52194],{"href":36246,"rel":52193},[1458],"official FPS Economy guidance"," names the single-line diagram and situation plan among the minimum documents for a domestic inspection. The diagram contains cable type, cross-section, number of conductors, installation method, residual current and overcurrent protection as well as switches, boxes, socket outlets, lighting points, fixed appliances and sources (Subsection 3.1.2.2 a); the situation plan shows where those items are. Both belong to the installation file (Section 9.1.2). That is the yardstick for the comparison, not the tool that draws the lines.",[79,52197,52199],{"id":52198},"what-planelec-does-today","What PlanElec does today",[12,52201,52202],{},"PlanElec has two workspaces: one for your own plan and one for the contractor.",[12,52204,52205,52207,52208,52212,52213,52217],{},[15,52206,22],{}," is the tool for the single-line diagram and situation plan. You draw ",[40,52209,52211],{"href":1456,"rel":52210},[1458],"in the browser",", for free and even without an account, also on a tablet or phone. The material list counts the devices in your drawing (cables without length) and exports as CSV; that helps you request quotations on the same quantities. \"Check documents\" shows before the PDF which details are still missing, such as the installation address or the inspection body; the inspection itself is carried out by the recognized body. Without an account the PDF carries a logo watermark; with a free account it does not. A ",[40,52214,52216],{"href":11187,"rel":52215},[1458],"sample PDF"," shows the result. Sketch does not include the distribution board or the self-check report.",[12,52219,52220,52224,52225,3157,52228,56],{},[15,52221,52222],{},[40,52223,31],{"href":1964}," is for the electrician or designer: floor plan, electrical topology and board planning in one model, single-line diagram and situation plan with the same references, and an AREI\u002FRGIE self-check. It tests the supported rules that can be decided from the project data and shows open points; it is an indicative check, not a conformity certificate. The material list and circuit list are available in Pro as a pilot feature, manufacturer-neutral and without prices. The electrician can take your Sketch drawing into Pro and continue planning there; a Pro project does not go back to Sketch. A broader comparison of approaches is in ",[40,52226,52227],{"href":1537},"PlanElec compared with Excel and paper",[40,52229,52230],{"href":12051},"Best single-line diagram software: five tools compared",[12,52232,52233,52234,52236],{},"In your own model, PlanElec Sketch counts as EUR 0. The electrician pays EUR 29 per month for Pro or EUR 15 per property for site pass; these are final prices for 2026 without a VAT line, details on the ",[40,52235,1958],{"href":54},". Your own time, professional work, installation work and the official inspection remain separate items.",[1489,52238],{":height":30384,":width":30385,"alt":30386,"caption":30387,"src":30388},[79,52240,52242],{"id":52241},"when-an-electrician-is-essential","When an electrician is essential",[84,52244,52245,52248,52251,52254,52257,52260],{},[87,52246,52247],{},"when the survey requires measurements or opening enclosures;",[87,52249,52250],{},"when conductor data, protection coordination or earthing is unclear;",[87,52252,52253],{},"when new circuits, PV, storage, an EV charger or backup power are planned;",[87,52255,52256],{},"when an inspection report lists technical infringements;",[87,52258,52259],{},"when manufacturer or grid operator conditions have to be assessed;",[87,52261,52262],{},"when you want to hand over responsibility for technical decisions.",[12,52264,52265],{},"Drawing yourself and installing yourself are two different things. PlanElec documents; the electrical competence comes from the qualified electrician. So agree your input and PDFs with a qualified electrician before the work and the inspection.",[79,52267,52269],{"id":52268},"quotation-check-in-seven-questions","Quotation check in seven questions",[3139,52271,52272,52275,52278,52281,52284,52287,52290],{},[87,52273,52274],{},"Who collects and verifies the starting data?",[87,52276,52277],{},"Are both plans and all boards included?",[87,52279,52280],{},"Are calculations included, or only graphical transfer?",[87,52282,52283],{},"Who checks technical plausibility?",[87,52285,52286],{},"How are changes and corrections charged?",[87,52288,52289],{},"Are VAT, travel and the inspection fee shown separately?",[87,52291,52292],{},"Which editable source format and which PDFs are handed over?",[79,52294,52296],{"id":52295},"the-decision-rule","The decision rule",[12,52298,52299],{},"Draw it yourself when the starting data is verified, the project stays manageable and a technical review is arranged for technical questions. Hire a contractor when the as-built state is unknown, design decisions are open, measurements are needed or someone has to take on technical coordination. Often a hybrid route works best: draw the existing information in PlanElec Sketch, mark unknowns clearly and have only the points that need electrical judgement reviewed.",[12,52301,52302],{},"Document the assumptions of both options. If the quotation excludes circuit tracing, record who supplies verified assignments. In your own model, value not only the tool but also learning time, survey and corrections. After work on the installation, the diagram and situation plan show the actual state again.",[79,52304,52306],{"id":52305},"hand-over-the-result-and-the-working-state","Hand over the result and the working state",[12,52308,52309],{},"Also compare what remains usable afterwards. A solid handover contains the released PDFs, their version data, the confirmed information behind them and a list of open points. Agree whether editable project data is handed over and who updates it at the next change. Without that agreement, the next extension may need a new survey, whichever route was cheaper at first. You save a PlanElec Sketch drawing as a project file or, with a free account, in the cloud; that way you keep the editable state in your own hands.",[79,52311,51828],{"id":51827},[12,52313,52314,52315,56],{},"Doing it yourself fits when verified data is available and you know the technical limits. Hiring an electrician is the better choice when survey, design or technical responsibility is needed. Calculate with your real quotations and documented time; in both cases the approved inspection body carries out the inspection. How the price of an electrical plan is built up is explained in ",[40,52316,29402],{"href":29401},[12,52318,52319],{},[40,52320,52322],{"href":1456,"rel":52321},[1458],"Draw your single-line diagram for free in PlanElec Sketch →",[79,52324,2009],{"id":2008},[84,52326,52327,52334],{},[87,52328,52329,38,52331,56],{},[15,52330,11935],{},[40,52332,2023],{"href":1456,"rel":52333},[1458],[87,52335,52336,38,52338,2033,52340,56],{},[15,52337,7561],{},[40,52339,2032],{"href":1964},[40,52341,2036],{"href":54},[12,52343,52344,7570],{},[15,52345,2041],{},{"title":2044,"searchDepth":2045,"depth":2045,"links":52347},[52348,52349,52350,52355,52356,52357,52358,52359,52360,52361,52362],{"id":52039,"depth":2045,"text":52040},{"id":52131,"depth":2045,"text":52132},{"id":52149,"depth":2045,"text":52150,"children":52351},[52352,52353,52354],{"id":52156,"depth":2053,"text":52157},{"id":52173,"depth":2053,"text":52174},{"id":52180,"depth":2053,"text":52181},{"id":52187,"depth":2045,"text":52188},{"id":52198,"depth":2045,"text":52199},{"id":52241,"depth":2045,"text":52242},{"id":52268,"depth":2045,"text":52269},{"id":52295,"depth":2045,"text":52296},{"id":52305,"depth":2045,"text":52306},{"id":51827,"depth":2045,"text":51828},{"id":2008,"depth":2045,"text":2009},"2026-05-19","Single-line diagram yourself with PlanElec Sketch (free) or by an electrician? Three scenarios for an existing installation, an unknown old installation and a new build, a quotation check and a clear decision rule for Belgium.",[30488,2116,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-cost-comparison-diy-vs-electrician-editorial.jpg","\u002Fblog\u002Fcost-comparison-diy-vs-electrician.en",{"title":51988,"description":52364},"Single-Line Diagram: DIY vs. Hiring an Electrician (Cost)","blog\u002Fcost-comparison-diy-vs-electrician.en",[52373,52374,5269,52375,7417,5422,4261],"costs","electrician","DIY","UwSw8KyOYfNJz7QeUGNvxzaCTR8Y_oTQW0WR2_WygsM","\u002Fblog\u002Fcost-comparison-diy-vs-electrician",{"id":52379,"title":1538,"articleId":52380,"body":52381,"category":2110,"date":53368,"description":53369,"extension":2113,"image":52429,"labels":53370,"lastUpdated":2111,"locale":2119,"meta":53371,"navigation":2121,"ogImage":53372,"path":53373,"publishDate":53368,"readTime":10311,"refreshInterval":4248,"seo":53374,"seoTitle":53375,"slug":52380,"stem":53376,"tags":53377,"__hash__":53380,"kind":2137,"href":53381},"blog\u002Fblog\u002Fplanelec-vs-excel-paper.en.md","planelec-vs-excel-paper",{"type":9,"value":52382,"toc":53336},[52383,52389,52393,52425,52430,52435,52437,52467,52471,52679,52685,52689,52692,52772,52775,52779,52782,52786,52789,52792,52796,52799,52803,52806,52913,52919,52923,52993,52997,53000,53004,53017,53020,53024,53038,53042,53045,53114,53119,53123,53126,53128,53130,53134,53137,53143,53147,53152,53156,53165,53169,53172,53196,53199,53203,53206,53208,53212,53217,53221,53224,53228,53231,53235,53238,53242,53245,53249,53254,53256,53261,53281,53283,53307,53309,53315,53332],[12,52384,52385,52388],{},[15,52386,52387],{},"Yes, you may draw a single-line diagram by hand, in Excel or in any drawing program: the Belgian electrical regulations (AREI in Dutch and German, RGIE in French) set the content and the identification, not the tool."," Paper is enough for a small installation that rarely changes. A tool pays off once several circuits, floors or later changes are involved, because you then have to realign the single-line diagram and the situation plan by hand after every change. That reconciliation is exactly what a tool takes off your hands: in PlanElec Sketch you draw diagram and plan for free with the same identifiers; PlanElec Pro is a new generation of electrical documentation in which both plans come from one project and a self-check with 59 published checks shows where data is missing or a supported AREI\u002FRGIE rule is broken.",[12,52390,52391],{},[15,52392,13162],{},[138,52394,52395,52403],{},[141,52396,52397],{},[144,52398,52399,52401],{},[147,52400,13171],{},[147,52402,9397],{},[163,52404,52405,52411,52417],{},[144,52406,52407,52409],{},[168,52408,13180],{},[168,52410,13183],{},[144,52412,52413,52415],{},[168,52414,13188],{},[168,52416,13191],{},[144,52418,52419,52421],{},[168,52420,13196],{},[168,52422,13199,52423,13202],{},[15,52424,1482],{},[12,52426,52427],{},[74,52428],{"alt":36379,"src":52429},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-planelec-vs-excel-paper-editorial.webp",[12,52431,52432],{},[63,52433,52434],{},"PlanElec offers two of the five methods compared: Sketch for free, Pro as a paid plan. How we checked is explained under \"Sources and date\".",[79,52436,82],{"id":81},[84,52438,52439,52445,52451,52457,52462],{},[87,52440,52441,52444],{},[15,52442,52443],{},"Every method is allowed."," The AREI\u002FRGIE requires identification, minimum content and symbols, not a specific program.",[87,52446,52447,52450],{},[15,52448,52449],{},"Paper suits"," a small installation with few circuits and the short description of a minor change.",[87,52452,52453,52456],{},[15,52454,52455],{},"Excel, Word and CAD"," make the document legible but know nothing about circuits: aligning diagram and situation plan stays your job.",[87,52458,52459,52461],{},[15,52460,22],{}," draws diagram and plan for free with the same identifiers and devices and produces a PDF with title block and legend; it does not check rules.",[87,52463,52464,52466],{},[15,52465,31],{}," manages the whole installation as one project: floor plan, circuits and distribution board, with diagram, plan, self-check report and dossier derived from it, for businesses and teams.",[79,52468,52470],{"id":52469},"paper-excel-cad-or-planelec-comparison-table","Paper, Excel, CAD or PlanElec: comparison table",[138,52472,52473,52492],{},[141,52474,52475],{},[144,52476,52477,52479,52482,52485,52488,52490],{},[147,52478,11364],{},[147,52480,52481],{},"Paper",[147,52483,52484],{},"Excel or Word",[147,52486,52487],{},"CAD or Visio",[147,52489,22],{},[147,52491,31],{},[163,52493,52494,52512,52532,52552,52570,52590,52610,52626,52642,52660],{},[144,52495,52496,52498,52501,52504,52507,52509],{},[168,52497,38704],{},[168,52499,52500],{},"Paper and time",[168,52502,52503],{},"Existing licence",[168,52505,52506],{},"Licence of the program",[168,52508,44518],{},[168,52510,52511],{},"Site pass EUR 15 per property or subscription from EUR 29 per month",[144,52513,52514,52517,52520,52523,52526,52529],{},[168,52515,52516],{},"Learning curve",[168,52518,52519],{},"None",[168,52521,52522],{},"Low, you build the symbols yourself",[168,52524,52525],{},"High, with no ready-made AREI\u002FRGIE library",[168,52527,52528],{},"Low: building blocks and templates",[168,52530,52531],{},"Higher: floor plan, circuits and board in one project",[144,52533,52534,52537,52540,52543,52546,52549],{},[168,52535,52536],{},"Symbols from Table 2.23",[168,52538,52539],{},"Drawn by hand",[168,52541,52542],{},"Inserted as image or shape",[168,52544,52545],{},"Library to build",[168,52547,52548],{},"Symbol library, legend in the PDF",[168,52550,52551],{},"Symbol catalogue with legend",[144,52553,52554,52557,52560,52562,52564,52567],{},[168,52555,52556],{},"Letter and number identifiers",[168,52558,52559],{},"By hand",[168,52561,52559],{},[168,52563,52559],{},[168,52565,52566],{},"Circuit letters in sequence",[168,52568,52569],{},"From the topology",[144,52571,52572,52575,52578,52581,52584,52587],{},[168,52573,52574],{},"Aligning diagram and situation plan",[168,52576,52577],{},"Two sheets, by hand",[168,52579,52580],{},"Two files, by hand",[168,52582,52583],{},"Two drawings, by hand",[168,52585,52586],{},"Place the diagram's devices on the plan",[168,52588,52589],{},"One project, both plans follow",[144,52591,52592,52595,52598,52601,52604,52607],{},[168,52593,52594],{},"Later change",[168,52596,52597],{},"Redraw or correct",[168,52599,52600],{},"Update each view separately",[168,52602,52603],{},"Update each drawing separately",[168,52605,52606],{},"Change the diagram, place new devices on the plan",[168,52608,52609],{},"Change once in the project",[144,52611,52612,52614,52616,52618,52620,52623],{},[168,52613,41160],{},[168,52615,52519],{},[168,52617,52519],{},[168,52619,52519],{},[168,52621,52622],{},"‘Check documents’: missing details, no rule check",[168,52624,52625],{},"Indicative AREI\u002FRGIE self-check of the supported rules",[144,52627,52628,52630,52632,52634,52636,52639],{},[168,52629,3115],{},[168,52631,52559],{},[168,52633,52559],{},[168,52635,52559],{},[168,52637,52638],{},"Not included",[168,52640,52641],{},"Board planning",[144,52643,52644,52646,52649,52652,52654,52657],{},[168,52645,24768],{},[168,52647,52648],{},"Always",[168,52650,52651],{},"Desktop programs, yes",[168,52653,52651],{},[168,52655,52656],{},"Keep drawing if the connection drops; cloud and handover to Pro need a connection",[168,52658,52659],{},"Pilot: keep editing a project opened earlier; export, uploads and AI need a connection",[144,52661,52662,52665,52668,52671,52673,52676],{},[168,52663,52664],{},"Taking your data with you",[168,52666,52667],{},"Original and scan",[168,52669,52670],{},"Your own file",[168,52672,52670],{},[168,52674,52675],{},"PDF, SVG, material list as CSV, drawing via ‘Save as file’",[168,52677,52678],{},"PDF, lists as PDF and CSV (pilot)",[12,52680,52681,52682,56],{},"In all five cases the official inspection is carried out by the accredited body. Other single-line diagram programs are compared side by side in our ",[40,52683,52684],{"href":12051},"market overview",[79,52686,52688],{"id":52687},"what-does-the-areirgie-require-of-the-single-line-diagram-and-situation-plan","What does the AREI\u002FRGIE require of the single-line diagram and situation plan?",[12,52690,52691],{},"The AREI\u002FRGIE sets content, identification and legibility, not the tool. The Book 1 requirements for domestic installations:",[138,52693,52694,52702],{},[141,52695,52696],{},[144,52697,52698,52700],{},[147,52699,3724],{},[147,52701,3919],{},[163,52703,52704,52711,52719,52726,52733,52740,52748,52756,52764],{},[144,52705,52706,52709],{},[168,52707,52708],{},"Diagrams, plans and documents state their number, version and version date unambiguously",[168,52710,35748],{},[144,52712,52713,52716],{},[168,52714,52715],{},"For every new installation and every significant change or extension, the person responsible for carrying out the work draws up the single-line diagrams and situation plans",[168,52717,52718],{},"Subsection 3.1.2.1, point a",[144,52720,52721,52724],{},[168,52722,52723],{},"That person's name, capacity and VAT number where applicable, plus the installation address, appear on diagram and plan",[168,52725,52718],{},[144,52727,52728,52731],{},[168,52729,52730],{},"Each circuit gets a capital letter, each light point, socket and control a sequence number; the situation plan uses the same identifier",[168,52732,52718],{},[144,52734,52735,52738],{},[168,52736,52737],{},"Voltage and type of current appear on the single-line diagram",[168,52739,52718],{},[144,52741,52742,52745],{},[168,52743,52744],{},"Symbols from Table 2.23; if a symbol is missing there, any unambiguous symbol defined in the legend is allowed",[168,52746,52747],{},"Chapter 2.13, Subsection 3.1.2.1, point a",[144,52749,52750,52753],{},[168,52751,52752],{},"The diagram states at least cable type, cross-section and number of conductors, installation method, type and characteristics of residual current and overcurrent protection, switches, boxes, sockets, light points, fixed appliances and sources",[168,52754,52755],{},"Subsection 3.1.2.2, point a",[144,52757,52758,52761],{},[168,52759,52760],{},"Diagrams and plans are kept up to date and available on site",[168,52762,52763],{},"Subsection 3.1.2.1, point d",[144,52765,52766,52769],{},[168,52767,52768],{},"The owner keeps the file with single-line diagram, situation plan and inspection report in two copies",[168,52770,52771],{},"Section 9.1.2",[12,52773,52774],{},"A plan that meets these points is acceptable, whatever it was made with. When the inspection finds the installation compliant, the person responsible for the work and the accredited body sign and date the diagram and plan (Subsection 3.1.2.1, point a).",[79,52776,52778],{"id":52777},"is-a-hand-drawn-single-line-diagram-accepted","Is a hand-drawn single-line diagram accepted?",[12,52780,52781],{},"Yes. On paper you start without any learning, and for a small installation with few circuits a neat hand-drawn plan is a complete document. The limits show at the first change: an extra socket shifts the sequence numbers in the circuit, and you have to update both the diagram and the situation plan by hand. Crossed-out corrections and hard-to-read handwriting make the plan harder for the inspector to check. Drawing the Table 2.23 symbols consistently takes time; every other symbol needs an entry in the legend.",[79,52783,52785],{"id":52784},"may-i-make-my-single-line-diagram-in-excel-or-word","May I make my single-line diagram in Excel or Word?",[12,52787,52788],{},"Yes. Excel brings order to lists and Word to the title block and legend, but neither knows anything about electrical relationships. You insert symbols as images or rebuild them from shapes. The structure of main switch, RCDs, circuit breakers and loads is laid out by hand and adjusted with every change. Larger diagrams outgrow an A4 page, and you set page breaks yourself.",[12,52790,52791],{},"Above all, a spreadsheet checks nothing: no cell tells you that too many circuits hang behind one RCD or that a cross-section does not match its protection. The situation plan lives in a second file, and you keep the identifiers in sync yourself.",[79,52793,52795],{"id":52794},"and-with-autocad-visio-or-another-drawing-program","And with AutoCAD, Visio or another drawing program?",[12,52797,52798],{},"A general CAD or diagramming program draws cleanly and to scale, floor plan included. For a single-line diagram under the AREI\u002FRGIE, though, you build a library of the Table 2.23 symbols if you do not have one, and you assign letters and numbers yourself. Diagram and situation plan are two drawings with no shared data. For design offices that already work in CAD this is a workable route; for an occasional diagram the learning effort is high.",[79,52800,52802],{"id":52801},"what-is-often-missing-from-a-self-drawn-diagram","What is often missing from a self-drawn diagram?",[12,52804,52805],{},"The AREI\u002FRGIE requires these points explicitly. They are easily missed when no tool asks for them. Check them before the inspection, whatever you draw with:",[138,52807,52808,52820],{},[141,52809,52810],{},[144,52811,52812,52815,52817],{},[147,52813,52814],{},"Check point",[147,52816,3919],{},[147,52818,52819],{},"How to recognise it",[163,52821,52822,52831,52842,52851,52861,52872,52882,52893,52903],{},[144,52823,52824,52826,52828],{},[168,52825,35745],{},[168,52827,35748],{},[168,52829,52830],{},"Title block filled in on diagram and plan, a new version after every change",[144,52832,52833,52836,52839],{},[168,52834,52835],{},"Person responsible for the work and installation address",[168,52837,52838],{},"3.1.2.1, point a",[168,52840,52841],{},"Name, capacity, VAT number where applicable, address on both plans",[144,52843,52844,52846,52848],{},[168,52845,35775],{},[168,52847,52838],{},[168,52849,52850],{},"Stated on the single-line diagram",[144,52852,52853,52856,52858],{},[168,52854,52855],{},"Same identifier in diagram and plan",[168,52857,52838],{},[168,52859,52860],{},"Every point on the situation plan carries the letter and number from the diagram",[144,52862,52863,52866,52869],{},[168,52864,52865],{},"Cables fully described",[168,52867,52868],{},"3.1.2.2, point a",[168,52870,52871],{},"Type, cross-section, number of conductors and installation method per circuit",[144,52873,52874,52877,52879],{},[168,52875,52876],{},"Protection devices fully described",[168,52878,52868],{},[168,52880,52881],{},"Type and characteristics of every RCD and circuit breaker",[144,52883,52884,52887,52890],{},[168,52885,52886],{},"Symbols and legend",[168,52888,52889],{},"Chapter 2.13, 3.1.2.1, point a",[168,52891,52892],{},"Symbols from Table 2.23, all others defined in the legend",[144,52894,52895,52898,52900],{},[168,52896,52897],{},"Changes on the situation plan",[168,52899,52838],{},[168,52901,52902],{},"The plan always shows the current location of every component",[144,52904,52905,52908,52910],{},[168,52906,52907],{},"Older parts",[168,52909,52838],{},[168,52911,52912],{},"Parts whose installation began before 1 October 1981 are marked as the older part",[12,52914,52915,52916,52918],{},"In PlanElec Sketch, ",[15,52917,1445],{}," flags some of these gaps, such as empty title block fields, a missing inspection body, circuits without a protection device and devices in the diagram without a place on the situation plan. It is a completeness aid: you can still create the PDF, and it says nothing about the inspection outcome.",[79,52920,52922],{"id":52921},"which-questions-decide-the-tool","Which questions decide the tool?",[138,52924,52925,52937],{},[141,52926,52927],{},[144,52928,52929,52931,52934],{},[147,52930,2179],{},[147,52932,52933],{},"If yes",[147,52935,52936],{},"If no",[163,52938,52939,52950,52961,52972,52982],{},[144,52940,52941,52944,52947],{},[168,52942,52943],{},"Do you draw more than one diagram a year?",[168,52945,52946],{},"A tool saves rebuilding symbols and title block every time",[168,52948,52949],{},"Paper or Sketch for the one-off",[144,52951,52952,52955,52958],{},[168,52953,52954],{},"Will the installation still change (extension, PV, charge point)?",[168,52956,52957],{},"A tool where diagram and plan share devices, so both plans stay current",[168,52959,52960],{},"A neat hand-drawn plan is enough",[144,52962,52963,52966,52969],{},[168,52964,52965],{},"Must others read or continue the plan (electrician, inspector, buyer)?",[168,52967,52968],{},"A legible PDF with legend and title block",[168,52970,52971],{},"Original and copy for the file",[144,52973,52974,52977,52979],{},[168,52975,52976],{},"Do you need a distribution board, self-check report or dossier?",[168,52978,31],{},[168,52980,52981],{},"PlanElec Sketch or paper",[144,52983,52984,52987,52990],{},[168,52985,52986],{},"Do you work in a team or on many properties?",[168,52988,52989],{},"PlanElec Pro on subscription",[168,52991,52992],{},"Site pass per property or Sketch",[79,52994,52996],{"id":52995},"what-does-planelec-do-differently","What does PlanElec do differently?",[12,52998,52999],{},"PlanElec has two environments: Sketch for the single-line diagram and situation plan, Pro for full planning with distribution board and self-check.",[1041,53001,53003],{"id":53002},"planelec-sketch-diagram-and-plan-drawn-for-free","PlanElec Sketch: diagram and plan drawn for free",[12,53005,3361,53006,53009,53010,53013,53014,53016],{},[40,53007,22],{"href":1456,"rel":53008},[1458]," you place supply, meter, protection devices, circuits, cables and loads as building blocks; Sketch assigns circuit letters in sequence. On the situation plan you drag the devices from the single-line diagram onto the floor plan, across several floors too. There is no limit on circuits, symbols or pages. The PDF comes in A4 or A3 with cover page, title block and legend, and diagram and plan are also available as SVG; a ",[40,53011,52216],{"href":11187,"rel":53012},[1458]," shows the result. Without an account the PDF carries a logo watermark; a free account removes it. You open Trikker files (",[25,53015,27],{},") directly in Sketch.",[12,53018,53019],{},"If you draw as a homeowner, agree the diagram and plan with an electrician before the work and the inspection. Under Subsection 3.1.2.1, point a, the person responsible for carrying out the work draws up the plans.",[1041,53021,53023],{"id":53022},"planelec-pro-one-project-two-plans","PlanElec Pro: one project, two plans",[12,53025,3361,53026,53028,53029,53031,53032,3157,53035,56],{},[40,53027,31],{"href":1964}," you place devices on the floor plan and connect them to a circuit, protection device and cable. From that topology, Pro builds the single-line diagram with main switch, RCDs, circuit breakers and loads; the situation plan uses the same devices and identifiers. Add a circuit and both plans follow. You bring a Sketch drawing into Pro with ",[15,53030,1482],{},"; a Pro project does not go back to Sketch. More in ",[40,53033,53034],{"href":4212},"The single-line diagram",[40,53036,53037],{"href":6050},"Drawing the situation plan",[1041,53039,53041],{"id":53040},"a-self-check-instead-of-gut-feeling-pro","A self-check instead of gut feeling (Pro)",[12,53043,53044],{},"The AREI\u002FRGIE self-check in Pro tests the project data against a documented subset of Book 1, version 07 (applicable since 1 November 2026; it only removes the sealing of the residual current device at the origin of the installation). The report cites the version in force on its date. A selection:",[138,53046,53047,53055],{},[141,53048,53049],{},[144,53050,53051,53053],{},[147,53052,41160],{},[147,53054,3919],{},[163,53056,53057,53064,53071,53078,53085,53093,53100,53107],{},[144,53058,53059,53062],{},[168,53060,53061],{},"RCD of at most 300 mA at the origin of the installation",[168,53063,41181],{},[144,53065,53066,53069],{},[168,53067,53068],{},"No more than 8 final circuits per RCD up to 30 mA",[168,53070,41194],{},[144,53072,53073,53076],{},[168,53074,53075],{},"RCD up to 30 mA for socket circuits",[168,53077,41194],{},[144,53079,53080,53083],{},[168,53081,53082],{},"Main switch of at least 40 A in domestic installations",[168,53084,41271],{},[144,53086,53087,53090],{},[168,53088,53089],{},"Protection matched to the conductor cross-section",[168,53091,53092],{},"AREI 4.4.1.4, Table 4.11",[144,53094,53095,53098],{},[168,53096,53097],{},"Voltage drop from the cable length (guide values 3% \u002F 5%)",[168,53099,41472],{},[144,53101,53102,53105],{},[168,53103,53104],{},"RCD up to 30 mA for rooms with a bath or shower",[168,53106,41601],{},[144,53108,53109,53112],{},[168,53110,53111],{},"No more than 8 single or multiple sockets per final circuit",[168,53113,41963],{},[12,53115,53116,53117,56],{},"A clean run means the supported rules find no error in your data. Measurements, site conditions and unmodelled rules are yours to check as the professional; the official inspection is carried out by the accredited body. The full rule list is in ",[40,53118,1086],{"href":1085},[1041,53120,53122],{"id":53121},"documents-that-match-pro","Documents that match (Pro)",[12,53124,53125],{},"Pro exports the single-line diagram and situation plan as PDF with title block, plus the indicative self-check report and a configurable installation dossier with cover page, table of contents and page numbering. Installer details and logo appear on every document. You maintain number, version and date for each new version.",[1489,53127],{":height":5808,":width":5809,"alt":5810,"caption":5811,"src":5812},[1489,53129],{":height":42714,":width":42715,"alt":42716,"caption":42717,"src":42718},[79,53131,53133],{"id":53132},"can-i-take-my-data-with-me-later","Can I take my data with me later?",[12,53135,53136],{},"A paper plan is yours as long as you keep the original and a copy; the AREI\u002FRGIE requires the file in two copies (Section 9.1.2). Excel, Word and CAD files stay with you, but you can only edit them as long as you have the program.",[12,53138,53139,53140,53142],{},"In PlanElec Sketch, a drawing made without an account stays in your browser. Clear the browser data and it is gone, so save it with ",[15,53141,1441],{},". With a free account it is also stored in your account. What comes out is PDF, SVG and the material list as CSV. In PlanElec Pro you export PDFs, circuit, material and cable lists as PDF and CSV (pilot). Whatever the tool, the document that counts is the signed PDF or paper in the installation file.",[79,53144,53146],{"id":53145},"does-it-work-without-internet","Does it work without internet?",[12,53148,53149,53150,56],{},"Paper always, desktop programs too. PlanElec Sketch runs in the browser: if the connection drops, you keep drawing and the drawing stays in the browser; cloud and handover to Pro work again once you are online. Trikker files open only with a connection, because the PlanElec server converts them. In PlanElec Pro you keep editing a project opened online earlier, as a pilot, even without a network; export, uploads and AI features need internet. Details in ",[40,53151,1468],{"href":1467},[79,53153,53155],{"id":53154},"what-does-a-single-line-diagram-tool-cost","What does a single-line diagram tool cost?",[12,53157,53158,53159,53161,53162,56],{},"Paper and Excel cost no money, but they cost time with every change. PlanElec Sketch costs nothing: drawing and PDF are free, even without an account. For electricians and designers, one plan covers Sketch and Pro: the subscription costs EUR 29 per month or EUR 290 per year with three editing seats, each further seat EUR 12 per month; a site pass unlocks one property for a one-off EUR 15 and covers twelve months. From 20 sites per year, the annual subscription at EUR 290 costs less than site passes at EUR 15, without extra seats. These are final prices; PlanElec charges no VAT (small business exemption scheme). All details are on the ",[40,53160,1958],{"href":54},". Professional checking and the inspection cost the same whatever the tool. How drawing it yourself compares with hiring an electrician is shown in the ",[40,53163,53164],{"href":5547},"cost comparison",[79,53166,53168],{"id":53167},"test-task-move-one-floor-from-paper-to-sketch","Test task: move one floor from paper to Sketch",[12,53170,53171],{},"Whether a tool pays off for you shows on an existing plan:",[3139,53173,53174,53177,53185,53188,53193],{},[87,53175,53176],{},"Take the paper diagram of one floor with its situation plan.",[87,53178,4055,53179,22023,53182,53184],{},[40,53180,22],{"href":1456,"rel":53181},[1458],[15,53183,11136],{}," and transfer supply, protection devices and circuits.",[87,53186,53187],{},"Place the devices from the diagram on the situation plan and compare letters and numbers with the original.",[87,53189,4055,53190,53192],{},[15,53191,1445],{}," and see which details are missing.",[87,53194,53195],{},"Change a circuit, for example an extra socket, and compare with what you would have had to update on paper.",[12,53197,53198],{},"If transferring reveals differences between diagram and plan, the exercise has already paid off, whatever tool you keep.",[79,53200,53202],{"id":53201},"when-is-paper-enough","When is paper enough?",[12,53204,53205],{},"For a minor change or extension, Subsection 3.1.2.1, point a, accepts a short, dated and signed description instead of a new single-line diagram; the change still appears on the situation plan. A small plan with few circuits can also be drawn neatly by hand, provided identifiers, symbols, legend and title details are correct. Once the installation grows or changes, a tool in which diagram and plan share the same devices saves you the double alignment.",[79,53207,1617],{"id":1616},[1041,53209,53211],{"id":53210},"which-symbols-must-i-use-in-the-single-line-diagram","Which symbols must I use in the single-line diagram?",[12,53213,53214,53215,56],{},"The symbols in Table 2.23 of Chapter 2.13 of the AREI\u002FRGIE. If a symbol is not there, you may use any unambiguous symbol that you define in the legend (Subsection 3.1.2.1, point a). An overview is in ",[40,53216,5667],{"href":5666},[1041,53218,53220],{"id":53219},"who-must-draw-up-and-sign-the-single-line-diagram","Who must draw up and sign the single-line diagram?",[12,53222,53223],{},"The person responsible for carrying out the work draws up the single-line diagram and situation plan, with name, capacity, VAT number where applicable and the installation address. When compliance is established, that person and the accredited body sign and date both plans (Subsection 3.1.2.1, point a).",[1041,53225,53227],{"id":53226},"do-i-need-a-new-diagram-for-a-small-change","Do I need a new diagram for a small change?",[12,53229,53230],{},"No, if the change is not significant. A short description with name, capacity and address of the person responsible, dated and signed, is enough. The situation plan must still be updated (Subsection 3.1.2.1, point a).",[1041,53232,53234],{"id":53233},"does-the-inspector-care-which-program-i-used","Does the inspector care which program I used?",[12,53236,53237],{},"The AREI\u002FRGIE names no program. What counts is content, identification, symbols and that diagram and plan match the installation. A free tool is as suitable as a hand-drawn plan.",[1041,53239,53241],{"id":53240},"how-many-copies-must-i-keep","How many copies must I keep?",[12,53243,53244],{},"The owner holds the installation file in two copies: single-line diagram, situation plan, inspection report and, where applicable, the descriptions of minor changes (Section 9.1.2).",[1041,53246,53248],{"id":53247},"what-does-single-line-diagram-software-cost","What does single-line diagram software cost?",[12,53250,53251,53252,56],{},"From EUR 0 to a subscription. PlanElec Sketch is free; PlanElec Pro costs EUR 15 per property or EUR 29 per month. Prices of other programs are compared in the ",[40,53253,52684],{"href":12051},[79,53255,9259],{"id":9258},[12,53257,53258,53259,56],{},"We checked the AREI\u002FRGIE statements against the text of Book 1 (as of 16 November 2026, version 07, applicable since 1 November 2026). For paper, Excel, Word and general drawing programs we only name properties of the method, no products and no prices. The PlanElec details come from the documented product scope and the help centre. Spotted an error? Write to ",[40,53260,1612],{"href":1611},[84,53262,53263,53270],{},[87,53264,53265,53269],{},[40,53266,53268],{"href":1971,"rel":53267},[1458],"FPS Economy: official RGIE\u002FAREI books",", Book 1: Section 3.1.2, Subsections 3.1.2.1 and 3.1.2.2, Chapter 2.13 with Table 2.23, Section 9.1.2; checked on 16 November 2026. Version 07 has applied since 1 November 2026 and changes none of these passages.",[87,53271,1955,53272,1774,53274,1774,53276,1774,53278,53280],{},[40,53273,1958],{"href":54},[40,53275,1086],{"href":1085},[40,53277,4646],{"href":4645},[40,53279,1468],{"href":1467},"; as of 16 November 2026.",[79,53282,13051],{"id":13050},[84,53284,53285,53289,53293,53297,53302],{},[87,53286,53287],{},[40,53288,5914],{"href":5913},[87,53290,53291],{},[40,53292,12052],{"href":12051},[87,53294,53295],{},[40,53296,4755],{"href":1989},[87,53298,53299],{},[40,53300,53301],{"href":5547},"Cost comparison: draw it yourself or hire an electrician",[87,53303,53304],{},[40,53305,53306],{"href":4762},"What you can do with PlanElec, from floor plan to installation dossier",[79,53308,2009],{"id":2008},[12,53310,53311,53312,53314],{},"Transfer one floor of your paper plan to Sketch and open ",[15,53313,1445],{},": the list shows what the plan is still missing.",[84,53316,53317,53324],{},[87,53318,53319,38,53321,2024],{},[15,53320,2019],{},[40,53322,2023],{"href":1456,"rel":53323},[1458],[87,53325,53326,38,53328,2033,53330,56],{},[15,53327,2029],{},[40,53329,2032],{"href":1964},[40,53331,2036],{"href":54},[12,53333,53334,2042],{},[15,53335,2041],{},{"title":2044,"searchDepth":2045,"depth":2045,"links":53337},[53338,53339,53340,53341,53342,53343,53344,53345,53346,53352,53353,53354,53355,53356,53357,53365,53366,53367],{"id":81,"depth":2045,"text":82},{"id":52469,"depth":2045,"text":52470},{"id":52687,"depth":2045,"text":52688},{"id":52777,"depth":2045,"text":52778},{"id":52784,"depth":2045,"text":52785},{"id":52794,"depth":2045,"text":52795},{"id":52801,"depth":2045,"text":52802},{"id":52921,"depth":2045,"text":52922},{"id":52995,"depth":2045,"text":52996,"children":53347},[53348,53349,53350,53351],{"id":53002,"depth":2053,"text":53003},{"id":53022,"depth":2053,"text":53023},{"id":53040,"depth":2053,"text":53041},{"id":53121,"depth":2053,"text":53122},{"id":53132,"depth":2045,"text":53133},{"id":53145,"depth":2045,"text":53146},{"id":53154,"depth":2045,"text":53155},{"id":53167,"depth":2045,"text":53168},{"id":53201,"depth":2045,"text":53202},{"id":1616,"depth":2045,"text":1617,"children":53358},[53359,53360,53361,53362,53363,53364],{"id":53210,"depth":2053,"text":53211},{"id":53219,"depth":2053,"text":53220},{"id":53226,"depth":2053,"text":53227},{"id":53233,"depth":2053,"text":53234},{"id":53240,"depth":2053,"text":53241},{"id":53247,"depth":2053,"text":53248},{"id":9258,"depth":2045,"text":9259},{"id":13050,"depth":2045,"text":13051},{"id":2008,"depth":2045,"text":2009},"2026-05-05","May you draw your Belgian single-line diagram by hand or in Excel? What the AREI\u002FRGIE requires, where paper, Excel and CAD fall short and when a tool pays off.",[2115,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-planelec-vs-excel-paper-editorial.jpg","\u002Fblog\u002Fplanelec-vs-excel-paper.en",{"title":1538,"description":53369},"Single-line diagram: paper, Excel or software?","blog\u002Fplanelec-vs-excel-paper.en",[7417,53378,53379,2110,5269,2133,5422],"Excel","paper","Kwa7Me0XGvdyObEXEpA2LRuRSZBVvkskp7945asw1BY","\u002Fblog\u002Fplanelec-vs-excel-paper",{"id":53383,"title":53384,"articleId":53385,"body":53386,"category":4239,"date":53687,"description":53688,"extension":2113,"image":53399,"labels":53689,"lastUpdated":4240,"locale":2119,"meta":53690,"navigation":2121,"ogImage":53691,"path":53692,"publishDate":53687,"readTime":4830,"refreshInterval":4248,"seo":53693,"seoTitle":53694,"slug":53695,"stem":53696,"tags":53697,"__hash__":53700,"kind":2137,"href":53701},"blog\u002Fblog\u002Fpv-system-documentation.en.md","PV single-line diagrams in Belgium: documentation for electrical contractors","pv-system-documentation",{"type":9,"value":53387,"toc":53677},[53388,53394,53400,53404,53429,53432,53438,53442,53544,53547,53551,53554,53559,53563,53575,53579,53582,53587,53591,53597,53602,53606,53609,53623,53638,53642,53658,53661,53663,53673],[12,53389,53390,53393],{},[15,53391,53392],{},"You document a PV system on the single-line diagram as one continuous chain: strings with their MPPT assignment, the inverter with its exact model reference, DC and AC cables, the isolation and protection functions actually present and an unambiguous connection to the board."," The situation plan and dossier carry the same references. This guide organises the work from roof survey to handover. It deliberately does not prescribe a universal cable size, circuit breaker and RCD combination – that follows from the actual installation. For solar installers and planners, Pro is the workspace: document the PV branch, distribution board and handover documents in the same project.",[12,53395,53396],{},[74,53397],{"alt":53398,"src":53399},"Two solar installers position a PV panel together on a Belgian rooftop.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-pv-system-documentation-editorial.webp",[79,53401,53403],{"id":53402},"example-job-add-pv-prepare-for-a-charging-point","Example job: add PV, prepare for a charging point",[12,53405,53406,53407,53410,53411,53413,53414,53416,53417,53420,53421,53424,53425,53428],{},"Our ",[15,53408,53409],{},"fictional editorial example"," is a house with main board ",[15,53412,37459],{},", two roof slopes and inverter ",[15,53415,37448],{}," in the technical room. ",[15,53418,53419],{},"S1"," is on the east slope and ",[15,53422,53423],{},"S2"," on the west. The confirmed manufacturer design assigns S1 to MPPT1 and S2 to MPPT2. A unidirectional charging point ",[15,53426,53427],{},"EV1"," is added later. These names connect the three articles; they are illustrative references, not mandatory designations or an exported PlanElec project.",[12,53430,53431],{},"Power, module counts, protective devices and cable sizes stay open until you have established them for the job. Two strings do not automatically imply two acceptable MPPT assignments: input voltage, current, parallel connections and manufacturer limits are checked separately.",[1489,53433],{":height":53434,":width":3800,"alt":53435,"caption":53436,"src":53437},"386","PV chain of the example job: S1 on the east roof to MPPT1 and S2 on the west roof to MPPT2 of INV1, then the AC isolation and protection actually installed and board DB1. Below, the data per element and the additional requirements of AREI 7.112.2.","Every reference from S1 to DB1 appears on the diagram with the data that the inspection report under 7.112.4 will also contain.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fpv-system-documentation\u002Fpv-chain.en.svg",[79,53439,53441],{"id":53440},"survey-matrix-for-the-contractor","Survey matrix for the contractor",[138,53443,53444,53458],{},[141,53445,53446],{},[144,53447,53448,53450,53452,53455],{},[147,53449,41235],{},[147,53451,2244],{},[147,53453,53454],{},"Destination in the dossier",[147,53456,53457],{},"Resolve before completion",[163,53459,53460,53474,53488,53502,53516,53530],{},[144,53461,53462,53465,53468,53471],{},[168,53463,53464],{},"S1\u002FS2: modules, count and assignment",[168,53466,53467],{},"Roof survey, module datasheet, string design",[168,53469,53470],{},"DC structure and spatial references",[168,53472,53473],{},"Actual configuration and MPPT limits",[144,53475,53476,53479,53482,53485],{},[168,53477,53478],{},"INV1: exact model, AC data",[168,53480,53481],{},"Nameplate, manufacturer documents",[168,53483,53484],{},"Diagram and equipment records",[168,53486,53487],{},"Variant, serial number, settings",[144,53489,53490,53493,53496,53499],{},[168,53491,53492],{},"DC and AC wiring",[168,53494,53495],{},"Measurements and execution records",[168,53497,53498],{},"Cable specifications and routes",[168,53500,53501],{},"Segments, cross-section and installation conditions",[144,53503,53504,53507,53510,53513],{},[168,53505,53506],{},"Isolation, protection and earthing",[168,53508,53509],{},"Design, instructions and survey",[168,53511,53512],{},"Actual functions on the diagram",[168,53514,53515],{},"Integrated or external, coordination",[144,53517,53518,53521,53524,53527],{},[168,53519,53520],{},"Connection to DB1",[168,53522,53523],{},"Board survey",[168,53525,53526],{},"Unambiguous injection point",[168,53528,53529],{},"Existing devices and possible currents",[144,53531,53532,53535,53538,53541],{},[168,53533,53534],{},"Document revision",[168,53536,53537],{},"Execution and inspection records",[168,53539,53540],{},"Drawing title block and handover list",[168,53542,53543],{},"Responsible person, date and open items",[12,53545,53546],{},"For household PV up to 10 kVA, AREI 7.112.4 lists exactly the data that will later appear in the inspection report: number and rated power of the modules, and number, type, serial number and maximum AC power of the inverters. Keep them properly in the matrix and they are ready on inspection day. Section 7.112.2 adds marking of DC conductors and live AC conductors, warning signs and earthing of the module frames.",[79,53548,53550],{"id":53549},"read-the-diagram-and-situation-plan-together","Read the diagram and situation plan together",[12,53552,53553],{},"Trace S1 and S2 to the confirmed INV1 inputs, then the AC connection to DB1. The situation plan carries the same references at their actual locations. A roof slope is not an electrical string: multiple strings on one slope remain individually identifiable.",[12,53555,3361,53556,53558],{},[40,53557,31],{"href":1964},", a PV module symbol on the situation plan represents a complete string and links to exactly one string of the associated inverter. The structured PV side shows single and parallel strings per MPPT, Y-branch or combiner, documented cable segments, entered protection and isolation functions, the AC isolation point and the frame PE to the earthing connection. Missing manufacturer limits and unassigned strings stay visible until you resolve them.",[1489,53560],{":height":24538,":width":24539,"alt":53561,"caption":53562,"src":24542},"Single-line diagram in PlanElec Pro with two PV strings on MPPT A and B, module frame earthing and the inverter inspector open on the South roof west string","Example project in PlanElec Pro: two PV strings on the single-line diagram; on the right, the “South roof west” string with MPPT, module type, frame earthing and DC cable run.",[12,53564,4361,53565,53567,53568,53571,53572,53574],{},[40,53566,36985],{"href":36984}," develops the spatial survey for this job. The ",[40,53569,53570],{"href":13079},"PV and charging point guide"," continues with EV1 as a separate extension. The ",[40,53573,36989],{"href":18627}," shows how you get from the electrical model to the diagram.",[79,53576,53578],{"id":53577},"record-protection-from-the-actual-design","Record protection from the actual design",[12,53580,53581],{},"An inverter name determines neither trip curve nor residual-current protection. Record the ratings, poles, function and location of the devices actually designed. An integrated function does not appear again as an invented external enclosure. You assess manufacturer requirements and applicable AREI\u002FRGIE rules together; an RCMU line in the datasheet does not do that assessment for you.",[12,53583,53584,53585,56],{},"For a battery or backup function, also record the genuinely supported operating modes, isolation and supplied sections. A hybrid inverter does not yet prove backup capability. The drawing stays understandable when energy reverses direction. How to integrate a home battery as a source in the installation is covered in ",[40,53586,37232],{"href":37231},[79,53588,53590],{"id":53589},"equipment-checks-and-the-grid-procedure","Equipment checks and the grid procedure",[12,53592,53593,53594,53596],{},"Use the ",[40,53595,38234],{"href":37890}," to search the exact inverter reference. Compare the result with the current official list and equipment documents. A match proves the device listing, not approval of the completed installation. No match means clarifying the reference – not picking a similarly named model.",[12,53598,53599,53600,56],{},"The official Synergrid page explains C10\u002F11, C10\u002F26 and their scope. You settle the connection procedure with the distribution operator responsible for the project address. Universal notification deadlines or compensation promises from sample articles do not belong in the job. What to do if your inverter is not on the list is explained in ",[40,53601,37289],{"href":37288},[79,53603,53605],{"id":53604},"check-the-handover-before-export","Check the handover before export",[12,53607,53608],{},"Use Pro to maintain verified inverter data, string assignments and the connection in the same project as the diagram and situation plan. Check the entered values against datasheets and the actual installation before exporting the dossier.",[3139,53610,53611,53614,53617,53620],{},[87,53612,53613],{},"Match S1, S2, INV1 and DB1 across both drawings and their supporting records.",[87,53615,53616],{},"Resolve open values against the executed installation instead of inventing typical values.",[87,53618,53619],{},"Associate equipment documents, measurements and inspection reports with the correct revision.",[87,53621,53622],{},"Update both drawings after any string, inverter or board change.",[12,53624,53625,53627,53628,53630,53631,53634,53635,53637],{},[40,53626,31],{"href":1964}," produces the single-line diagram, situation plan and PDF output from the same entered data; how to create strings and the inverter is explained in ",[40,53629,16763],{"href":16762},". For PV, the AREI\u002FRGIE self-check report contains an installation register with inverter identity, power, MPPTs, strings and modules – explicitly a planning register, not an inspection-body report. The roles are clear: the self-check shows you findings within the supported rules, design and measurements happen on site, and the official inspection is done by the approved inspection body. A simple single-line diagram with a PV circuit and no string check you draw for free in ",[40,53632,22],{"href":1456,"rel":53633},[1458]," and move to Pro with ",[15,53636,1482],{}," when needed.",[79,53639,53641],{"id":53640},"primary-sources","Primary sources",[84,53643,53644,53651],{},[87,53645,53646,53650],{},[40,53647,53649],{"href":1971,"rel":53648},[1458],"FPS Economy: current AREI\u002FRGIE Book 1",", the basis for project-specific assessment, in particular Chapter 7.112 (version V06).",[87,53652,53653,53657],{},[40,53654,53656],{"href":37346,"rel":53655},[1458],"Synergrid: decentralised generating units",", for equipment homologation and its relationship to the connection procedure.",[12,53659,53660],{},"Editorial review: 5 October 2026. Links lead to current official publications; check the version applicable to your job and the manufacturer instructions within the project.",[79,53662,2009],{"id":2008},[84,53664,53665],{},[87,53666,53667,38,53669,2033,53671,56],{},[15,53668,7561],{},[40,53670,2032],{"href":1964},[40,53672,2036],{"href":54},[12,53674,53675,7570],{},[15,53676,2041],{},{"title":2044,"searchDepth":2045,"depth":2045,"links":53678},[53679,53680,53681,53682,53683,53684,53685,53686],{"id":53402,"depth":2045,"text":53403},{"id":53440,"depth":2045,"text":53441},{"id":53549,"depth":2045,"text":53550},{"id":53577,"depth":2045,"text":53578},{"id":53589,"depth":2045,"text":53590},{"id":53604,"depth":2045,"text":53605},{"id":53640,"depth":2045,"text":53641},{"id":2008,"depth":2045,"text":2009},"2026-04-21","Document a Belgian PV extension properly: align strings, inverter, connection point and unresolved data across the single-line diagram, situation plan and dossier.",[35684,2116,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-pv-system-documentation-editorial.jpg","\u002Fblog\u002Fpv-system-documentation.en",{"title":53384,"description":53688},"PV Single-Line Diagrams in Belgium: Documentation","pv-system-diagram","blog\u002Fpv-system-documentation.en",[11546,43298,5269,2133,18656,53698,53699,43294],"grid operator","battery","OzGw0A2BwE2Wk9gDxZmvoLq4P9r73r9hFcfxjSacksI","\u002Fblog\u002Fpv-system-diagram",{"id":53703,"title":53704,"articleId":53705,"body":53706,"category":4239,"date":54547,"description":54548,"extension":2113,"image":53719,"labels":54549,"lastUpdated":10988,"locale":2119,"meta":54550,"navigation":2121,"ogImage":54551,"path":54552,"publishDate":54547,"readTime":6086,"refreshInterval":4248,"seo":54553,"seoTitle":54554,"slug":54555,"stem":54556,"tags":54557,"__hash__":54560,"kind":2137,"href":54561},"blog\u002Fblog\u002Fold-building-arei-part8.en.md","Old Buildings and AREI Part 8: Special Rules for Existing Installations","old-building-arei-part8",{"type":9,"value":53707,"toc":54522},[53708,53715,53720,53725,53727,53731,53734,53772,53775,53778,53783,53785,53789,53796,53799,53824,53827,53829,53833,53836,54073,54076,54078,54082,54085,54152,54155,54158,54160,54164,54168,54171,54175,54178,54189,54197,54201,54269,54272,54274,54280,54284,54287,54301,54305,54320,54322,54326,54330,54344,54348,54362,54366,54374,54378,54381,54383,54387,54390,54394,54397,54408,54410,54414,54418,54478,54480,54482,54509,54511],[12,53709,53710,53711,53714],{},"An older electrical installation in Belgium does not have to match today's AREI\u002FRGIE in every detail. ",[15,53712,53713],{},"Part 8 of AREI\u002FRGIE Book 1"," lists specific derogations for existing installations: for example thinner cables from 1 mm², socket and lighting circuits without a 30 mA RCD, or simplified plans. Anything part 8 does not expressly allow must comply with Book 1, and new or significantly modified parts are assessed under today's rules. This article shows you which installations part 8 covers, what it allows, what stays mandatory in every case and how to modernise sensibly.",[12,53716,53717],{},[74,53718],{"alt":43326,"src":53719},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-old-building-arei-part8-editorial.webp",[12,53721,53722,53724],{},[15,53723,49415],{},", checked against AREI\u002FRGIE Book 1, version 07, applicable since 1 November 2026. The cited provisions are unchanged from version 06; version 07 only abolishes the sealing of the RCD at the origin of the installation.",[38398,53726],{},[79,53728,53730],{"id":53729},"what-is-part-8","What is part 8?",[12,53732,53733],{},"Part 8 contains the \"special provisions relating to existing electrical installations\". An installation is existing when its construction on site began before the current Book 1 entered into force on 1 June 2020 and it has not undergone a conformity inspection under chapter 6.4 of the current Book (section 8.1.1). For domestic installations, part 8 distinguishes two groups, each with its own list of derogations:",[138,53735,53736,53748],{},[141,53737,53738],{},[144,53739,53740,53742,53745],{},[147,53741,16146],{},[147,53743,53744],{},"Characteristic",[147,53746,53747],{},"Derogations",[163,53749,53750,53761],{},[144,53751,53752,53755,53758],{},[168,53753,53754],{},"Old domestic installation",[168,53756,53757],{},"Construction started before 1 October 1981, with or without a visit under the former AREI",[168,53759,53760],{},"8.2.1",[144,53762,53763,53766,53769],{},[168,53764,53765],{},"Domestic installation under the former AREI",[168,53767,53768],{},"Construction from 1 October 1981, conformity inspection under the former AREI",[168,53770,53771],{},"8.2.2",[12,53773,53774],{},"For installations built from 1 June 2020 under the current Book 1, the derogations for existing parts are in subsection 6.5.8.1.",[12,53776,53777],{},"Part 8 is a closed list, not a general grandfather clause. Even under part 8, equipment may only stay in service if, when correctly installed, maintained and used, it does not endanger people's safety and is suited to the external influences (8.2.1 no. 1).",[1489,53779],{":height":22672,":width":3800,"alt":53780,"caption":53781,"src":53782},"Decision aid: work started before 1 Oct 1981 leads to the derogations of 8.2.1, from 1 Oct 1981 with inspection under the former AREI to 8.2.2, from 1 Jun 2020 part 8 does not apply but 6.5.8.1 for existing parts; new or substantially modified parts always follow the current Book 1","What counts is when work on each part of the installation started, not the year the house was built (8.1.1).","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fold-building-arei-part8\u002Fpart8-scope.en.svg",[38398,53784],{},[79,53786,53788],{"id":53787},"when-is-an-old-installation-assessed-under-todays-rules","When is an old installation assessed under today's rules?",[12,53790,53791,53792,53795],{},"As soon as you carry out a ",[15,53793,53794],{},"significant modification or extension",". A modification is significant when it has an additional impact on the safety of people or property that no conformity inspection has covered yet (definition in part 2). A new circuit in the board is typically significant; swapping a socket for an equivalent model is not. If in doubt, clarify the classification with your electrician and the inspection body before work starts.",[12,53797,53798],{},"For a significant modification:",[3139,53800,53801,53807,53814,53821],{},[87,53802,4361,53803,53806],{},[15,53804,53805],{},"new or modified part"," is inspected under the current Book 1 before it is put into use (6.4.7.3).",[87,53808,53809,53810,53813],{},"If the modification affects an ",[15,53811,53812],{},"unchanged part",", that part is inspected with regard to the modified characteristics (6.4.7.3).",[87,53815,53816,53817,53820],{},"For a significant modification of an old domestic installation, the ",[15,53818,53819],{},"entire installation"," must be protected by at least one RCD of at most 300 mA at the origin (4.2.4.3 b).",[87,53822,53823],{},"The remaining unchanged parts keep their part 8 derogations.",[12,53825,53826],{},"Non-significant changes to socket and lighting circuits without a 30 mA RCD remain expressly covered by the derogation (8.2.1 no. 16, 8.2.2 no. 10). They still go into the installation file as a short description (9.1.2 no. 7).",[38398,53828],{},[79,53830,53832],{"id":53831},"what-part-8-allows","What part 8 allows",[12,53834,53835],{},"The table lists the most important derogations for domestic installations. \"8.2.1\" applies to installations from before 1981, \"8.2.2\" to installations under the former AREI; several derogations in 8.2.2 also depend on the construction date.",[138,53837,53838,53853],{},[141,53839,53840],{},[144,53841,53842,53845,53848,53851],{},[147,53843,53844],{},"Topic",[147,53846,53847],{},"Current rule",[147,53849,53850],{},"Part 8 derogation",[147,53852,3919],{},[163,53854,53855,53868,53881,53895,53909,53923,53937,53950,53964,53978,53992,54006,54019,54032,54046,54059],{},[144,53856,53857,53859,53862,53865],{},[168,53858,42290],{},[168,53860,53861],{},"At least 2.5 mm², 1.5 mm² without sockets (5.2.1.2)",[168,53863,53864],{},"Cables from 1 mm² may stay; 1 mm² protected by a fuse of at most 6 A or a circuit breaker of at most 10 A",[168,53866,53867],{},"8.2.1 no. 5",[144,53869,53870,53873,53875,53878],{},[168,53871,53872],{},"Marking thin circuits",[168,53874,6413],{},[168,53876,53877],{},"Circuits below 1.5 mm²: red sign of at least 8 × 5 cm on the board door",[168,53879,53880],{},"8.2.1 no. 3",[144,53882,53883,53886,53889,53892],{},[168,53884,53885],{},"Fire behaviour of cables",[168,53887,53888],{},"Specified fire behaviour (4.3.3)",[168,53890,53891],{},"Cables without predetermined fire behaviour may stay",[168,53893,53894],{},"8.2.1 no. 5, 8.2.2 no. 5",[144,53896,53897,53900,53903,53906],{},[168,53898,53899],{},"30 mA RCD",[168,53901,53902],{},"For sockets and lighting (4.2.4.3 b)",[168,53904,53905],{},"Socket and lighting circuits without a high-sensitivity RCD; more than eight circuits per RCD",[168,53907,53908],{},"8.2.1 no. 16, 8.2.2 no. 10",[144,53910,53911,53914,53917,53920],{},[168,53912,53913],{},"RCD at the origin",[168,53915,53916],{},"At least 40 A, own isolating function",[168,53918,53919],{},"Devices below 40 A may stay; isolation via an upstream general switch",[168,53921,53922],{},"8.2.1 no. 2, 8.2.2 no. 2",[144,53924,53925,53928,53931,53934],{},[168,53926,53927],{},"Overcurrent protection",[168,53929,53930],{},"Energy limitation class 3 (5.3.5.5)",[168,53932,53933],{},"Devices without this marking may stay (8.2.2: construction before 31.12.2007)",[168,53935,53936],{},"8.2.1 no. 3, 8.2.2 no. 3",[144,53938,53939,53941,53944,53947],{},[168,53940,48500],{},[168,53942,53943],{},"At least 40 A (5.3.5.1 b)",[168,53945,53946],{},"At least 25 A (8.2.2: construction before 16.9.1991)",[168,53948,53949],{},"8.2.1 no. 4, 8.2.2 no. 4",[144,53951,53952,53955,53958,53961],{},[168,53953,53954],{},"Sockets without earth contact",[168,53956,53957],{},"Earth contact mandatory (5.3.5.2 b)",[168,53959,53960],{},"Allowed if the cable has no protective conductor and an RCD of at most 30 mA protects it",[168,53962,53963],{},"8.2.1 no. 6 b",[144,53965,53966,53969,53972,53975],{},[168,53967,53968],{},"Sockets per circuit",[168,53970,53971],{},"At most eight (5.3.5.2 b)",[168,53973,53974],{},"More than eight, if the permitted power of the cable is not exceeded",[168,53976,53977],{},"8.2.1 no. 6 b, 8.2.2 no. 6",[144,53979,53980,53983,53986,53989],{},[168,53981,53982],{},"Lighting circuits",[168,53984,53985],{},"Two separate circuits above two rooms (5.3.5.2 b)",[168,53987,53988],{},"A single lighting circuit",[168,53990,53991],{},"8.2.1 no. 14",[144,53993,53994,53997,54000,54003],{},[168,53995,53996],{},"Protective conductor",[168,53998,53999],{},"In every cable (5.2.1.3)",[168,54001,54002],{},"Cables without protective conductor may stay if they do not supply fixed class I appliances",[168,54004,54005],{},"8.2.1 no. 12",[144,54007,54008,54010,54013,54016],{},[168,54009,33509],{},[168,54011,54012],{},"Required (4.2.3.4)",[168,54014,54015],{},"May be missing",[168,54017,54018],{},"8.2.1 no. 13",[144,54020,54021,54023,54026,54029],{},[168,54022,29839],{},[168,54024,54025],{},"According to 5.4.2.2",[168,54027,54028],{},"Copper from 6 mm² may stay",[168,54030,54031],{},"8.2.1 no. 11",[144,54033,54034,54037,54040,54043],{},[168,54035,54036],{},"Conductor colours",[168,54038,54039],{},"Green-yellow only for protective conductors (5.1.6.2)",[168,54041,54042],{},"Protective conductors in another colour may stay; green-yellow live conductors are forbidden",[168,54044,54045],{},"8.2.1 no. 10",[144,54047,54048,54050,54053,54056],{},[168,54049,38605],{},[168,54051,54052],{},"Full content (3.1.2)",[168,54054,54055],{},"Simplified plans with minimum content (8.2.1); missing signature, VAT number or protective device type tolerated (8.2.2)",[168,54057,54058],{},"8.2.1 no. 7, 8.2.2 no. 7",[144,54060,54061,54064,54067,54070],{},[168,54062,54063],{},"Conformity inspection report",[168,54065,54066],{},"Belongs in the file (9.1.2)",[168,54068,54069],{},"Its absence is tolerated at the control visit",[168,54071,54072],{},"8.2.1 no. 9, 8.2.2 no. 9",[12,54074,54075],{},"For installations from before 1981, the simplified single-line diagram contains at least the address, nominal voltage, cross-section of the main board's supply cable, type and cross-section of the outgoing circuits, and the RCDs and protective devices with their characteristics; the simplified situation plan shows sockets, switches, light points and fixed appliances. The two plans do not need to match each other (8.2.1 no. 7).",[38398,54077],{},[79,54079,54081],{"id":54080},"what-remains-mandatory-even-under-part-8","What remains mandatory even under part 8",[12,54083,54084],{},"Part 8 contains no derogation for the following points. They are therefore checked in an old installation too:",[138,54086,54087,54096],{},[141,54088,54089],{},[144,54090,54091,54094],{},[147,54092,54093],{},"Duty",[147,54095,3919],{},[163,54097,54098,54104,54112,54120,54128,54136,54144],{},[144,54099,54100,54102],{},[168,54101,53061],{},[168,54103,32902],{},[144,54105,54106,54109],{},[168,54107,54108],{},"RCD of at most 30 mA for rooms with a bath or shower",[168,54110,54111],{},"4.2.4.3 b no. 3",[144,54113,54114,54117],{},[168,54115,54116],{},"RCD of at most 30 mA for washing machine, tumble dryer and dishwasher",[168,54118,54119],{},"4.2.4.3 b no. 4",[144,54121,54122,54125],{},[168,54123,54124],{},"Exposed parts of class I appliances connected to the protective conductor",[168,54126,54127],{},"4.2.4.3 a",[144,54129,54130,54133],{},[168,54131,54132],{},"Socket with earth pin only with a real connection to the earth electrode",[168,54134,54135],{},"8.2.1 no. 6",[144,54137,54138,54141],{},[168,54139,54140],{},"Single-line diagram and situation plan, at least in simplified form",[168,54142,54143],{},"8.2.1 no. 7, 8.4.2.2 d",[144,54145,54146,54149],{},[168,54147,54148],{},"Equipment that does not endanger safety in normal use",[168,54150,54151],{},"8.2.1 no. 1",[12,54153,54154],{},"On top of that come conditions that no derogation covers because they are immediately dangerous: bare or damaged cables, accessible live parts, junction boxes without covers, overheated or loose connections, bridged fuses, a protective device rated higher than the conductor permits, and low-voltage sockets in zone 0 or 1 of the bathroom.",[12,54156,54157],{},"Existing bathrooms have their own rule: rooms whose construction started before 1 March 2025 may use the former zone layout (6.5.8.1 no. 3). For installations from before 1981, part 8 also allows certain cables, underfloor heating and the absence of supplementary bonding to remain if zone 2 is extended to 1 m (8.2.1 no. 15.2).",[38398,54159],{},[79,54161,54163],{"id":54162},"control-visits-for-existing-installations","Control visits for existing installations",[1041,54165,54167],{"id":54166},"which-deadline-applies","Which deadline applies?",[12,54169,54170],{},"For an installation inspected under the former AREI, the first control visit takes place within the deadline stated in the last report under the former AREI (8.1.2); after that, a domestic installation is visited at the latest every 25 years (6.5.2). For old installations without a conformity inspection, chapter 8.4 sets its own triggers: before an increase in connection capacity (8.4.1), when a dwelling is sold (8.4.2) and in other cases (8.4.3). So always check the last report and the specific trigger.",[1041,54172,54174],{"id":54173},"when-selling","When selling",[12,54176,54177],{},"When selling a dwelling with an old installation that has not been significantly modified since 1 October 1981, or whose old part has not yet been visited, the seller arranges a control visit and records the report date in the deed of sale (8.4.2).",[41114,54179,54180],{},[12,54181,54182,54185,54186,54188],{},[15,54183,54184],{},"18-month deadline (8.4.2.2 a):"," if the report is negative, the buyer has it checked within ",[15,54187,48112],{}," that the infringements have been corrected. The buyer chooses the approved body freely.",[12,54190,54191,54192,54196],{},"These 18 months are not interchangeable with the re-visit after a periodic control visit, which the same body carries out within one year (6.5.7.2 b.7). The ",[40,54193,54195],{"href":48296,"rel":54194},[1458],"FPS Economy FAQ on Book 1"," explains the sale procedure.",[1041,54198,54200],{"id":54199},"what-the-control-visit-checks","What the control visit checks",[138,54202,54203,54212],{},[141,54204,54205],{},[144,54206,54207,54209],{},[147,54208,41160],{},[147,54210,54211],{},"Assessment",[163,54213,54214,54222,54230,54238,54246,54253,54261],{},[144,54215,54216,54219],{},[168,54217,54218],{},"Visual check of cables and connections",[168,54220,54221],{},"Damage, overheating, fixing",[144,54223,54224,54227],{},[168,54225,54226],{},"Earth resistance",[168,54228,54229],{},"Below 100 Ω (4.2.3.2); above 30 Ω a stricter RCD layout (4.2.4.3 b, with the part 8 derogations)",[144,54231,54232,54235],{},[168,54233,54234],{},"Insulation resistance",[168,54236,54237],{},"At least 500 kΩ per circuit at a 500 V test voltage (6.4.5.1, table 6.1)",[144,54239,54240,54243],{},[168,54241,54242],{},"RCDs",[168,54244,54245],{},"Presence, assignment and operation",[144,54247,54248,54250],{},[168,54249,53927],{},[168,54251,54252],{},"Protective device matched to the cross-section (4.4.1.4, table 4.11)",[144,54254,54255,54258],{},[168,54256,54257],{},"Protection against direct contact",[168,54259,54260],{},"Covers, boxes, boards",[144,54262,54263,54266],{},[168,54264,54265],{},"Documentation",[168,54267,54268],{},"Single-line diagram and situation plan present",[12,54270,54271],{},"The report expressly lists infringements, remarks and the part 8 derogations that apply to the installation (6.5.7.2 b.5). If the plans are missing at a sale visit, the inspector draws up a short description and a rough sketch so that it remains traceable what was inspected; the missing plans are still recorded as an infringement (8.4.2.2 d).",[38398,54273],{},[1489,54275],{":height":39572,":width":54276,"alt":54277,"caption":54278,"src":54279},"1108","Situation plan in PlanElec Sketch: a fictional floor plan as PDF underlay, the 10,00 dimension line chosen as reference; on the right ‘Calibrate scale’ with ‘Real distance (m)’ 10,00.","With ‘Import floor plan (image or PDF)…’ and two clicks on a known distance you bring an existing plan to scale; importing needs a free account. The underlay does not replace a survey on site.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-floorplan-calibrate.webp",[79,54281,54283],{"id":54282},"partial-renovation-what-the-so-called-contamination-rule-really-means","Partial renovation: what the so-called contamination rule really means",[12,54285,54286],{},"In the trade, people often speak of a \"contamination rule\": new work would force the whole installation up to today's standard. Book 1 does not know this concept. The actual rules are more precise:",[84,54288,54289,54292,54295,54298],{},[87,54290,54291],{},"New and significantly modified parts follow the current Book 1 (6.4.7.3).",[87,54293,54294],{},"Unchanged parts are inspected to the extent the modification affects their characteristics (6.4.7.3).",[87,54296,54297],{},"After a significant modification of an old domestic installation, at least one 300 mA RCD at the origin protects the whole installation (4.2.4.3 b).",[87,54299,54300],{},"All other part 8 derogations remain in place for the unchanged parts.",[1041,54302,54304],{"id":54303},"in-practice","In practice",[84,54306,54307,54314,54317],{},[87,54308,54309,54310,54313],{},"Plan new circuits so that old and new parts are ",[15,54311,54312],{},"clearly separated",", for example via a dedicated sub-distribution board.",[87,54315,54316],{},"Mark on the single-line diagram what is old and what is new.",[87,54318,54319],{},"Clarify contentious boundaries with the inspection body before work starts.",[38398,54321],{},[79,54323,54325],{"id":54324},"modernising-step-by-step","Modernising step by step",[1041,54327,54329],{"id":54328},"priority-1-duties-and-hazards","Priority 1: duties and hazards",[84,54331,54332,54335,54338,54341],{},[87,54333,54334],{},"Add an RCD of at most 300 mA at the origin if it is missing",[87,54336,54337],{},"30 mA RCD for the bathroom and for washing machine, tumble dryer and dishwasher",[87,54339,54340],{},"Replace damaged cables, fix loose connections, close boxes",[87,54342,54343],{},"Have the earthing measured and improved if needed",[1041,54345,54347],{"id":54346},"priority-2-clearly-more-safety","Priority 2: clearly more safety",[84,54349,54350,54353,54356,54359],{},[87,54351,54352],{},"30 mA RCD for socket and lighting circuits too",[87,54354,54355],{},"Install sockets with earth contact and a protective conductor",[87,54357,54358],{},"Replace old fuses with circuit breakers",[87,54360,54361],{},"Have surge protection assessed professionally (4.5.1)",[1041,54363,54365],{"id":54364},"priority-3-comfort-and-future","Priority 3: comfort and future",[84,54367,54368,54371],{},[87,54369,54370],{},"Modernise the board with spare capacity and clear labelling",[87,54372,54373],{},"Prepare for an EV charger or PV – the new circuit for it is a significant extension that requires a conformity inspection",[1041,54375,54377],{"id":54376},"define-the-work-before-asking-for-prices","Define the work before asking for prices",[12,54379,54380],{},"Have the existing installation surveyed, separate duties from voluntary improvements and get a dated quote for the specific building. Cable routes, finishes, accessibility, board condition and renovation scope drive the effort far more than any online price range.",[38398,54382],{},[79,54384,54386],{"id":54385},"clarify-the-installation-history-before-relying-on-a-derogation","Clarify the installation history before relying on a derogation",[12,54388,54389],{},"The year of construction alone is not enough. Build a timeline from earlier inspection reports, board labels, invoices, permits and the visible workmanship. Determine which parts existed before 1 October 1981, what was significantly modified or extended later, and whether that work was inspected. For each derogation you rely on, record the exact reference, the affected circuit, the evidence of age and the remaining safety conditions. Without evidence, the field stays open; cable colour or appearance is not a reliable date. The inspection body decides on applicability based on the actual installation.",[1041,54391,54393],{"id":54392},"survey-on-site","Survey on site",[12,54395,54396],{},"Photograph and label the board, fuses, RCDs, earth connections, visible cables and junction boxes without removing covers from live parts. Record each identified circuit first as the existing state. Unknown origin, unknown cross-section or illegible ratings stay explicitly open. The electrician then separates urgent measures, changes requiring inspection and voluntary modernisation. That way your diagram shows the existing installation as it is – not as a new build.",[12,54398,54399,54400,54403,54404,54407],{},"You can draw the existing state for free in the browser with ",[40,54401,22],{"href":1456,"rel":54402},[1458],": single-line diagram and situation plan, even without an account. With a free account you place an existing old plan underneath as an image or PDF and calibrate it instead of redrawing the floor plan. Electrical contractors working in PlanElec Pro can also ",[40,54405,54406],{"href":3477},"recognise a board with DIN modules from photos",": the result is a suggestion of the visible modules that you check before taking it over; hidden wiring is not inferred.",[38398,54409],{},[12,54411,7139,54412,56],{},[40,54413,11748],{"href":4218},[79,54415,54417],{"id":54416},"summary","Summary",[138,54419,54420,54428],{},[141,54421,54422],{},[144,54423,54424,54426],{},[147,54425,2179],{},[147,54427,10693],{},[163,54429,54430,54438,54446,54454,54462,54470],{},[144,54431,54432,54435],{},[168,54433,54434],{},"Must my old installation comply with today's AREI?",[168,54436,54437],{},"Yes, apart from the part 8 derogations; new and significantly modified parts in full",[144,54439,54440,54443],{},[168,54441,54442],{},"Do I need a 300 mA RCD at the origin?",[168,54444,54445],{},"Yes. Part 8 only allows devices below 40 A and upstream isolation, not omitting it",[144,54447,54448,54451],{},[168,54449,54450],{},"Do I need 30 mA RCDs?",[168,54452,54453],{},"Yes for the bathroom and washing machine, tumble dryer and dishwasher; recommended for sockets and lighting",[144,54455,54456,54459],{},[168,54457,54458],{},"Are sockets without earth contact allowed?",[168,54460,54461],{},"In installations from before 1981, if the cable has no protective conductor and a 30 mA RCD protects it",[144,54463,54464,54467],{},[168,54465,54466],{},"How often is it inspected?",[168,54468,54469],{},"By the deadline in the last report, then every 25 years; for old installations depending on the trigger",[144,54471,54472,54475],{},[168,54473,54474],{},"What about a partial renovation?",[168,54476,54477],{},"New part under the current Book 1, unchanged part keeps the part 8 derogations",[38398,54479],{},[79,54481,7537],{"id":7536},[84,54483,54484,54489,54494,54499,54504],{},[87,54485,54486],{},[40,54487,54488],{"href":5393},"Electrical Inspection in Belgium: The Complete Guide",[87,54490,54491],{},[40,54492,54493],{"href":25379},"AREI\u002FRGIE Regulations 2026: The Key Changes",[87,54495,54496],{},[40,54497,54498],{"href":30818},"Preflex vs. Open Wiring",[87,54500,54501],{},[40,54502,54503],{"href":4200},"Distribution Board Planning",[87,54505,54506],{},[40,54507,54508],{"href":5090},"Electrical dossier for a property sale: rules and records",[38398,54510],{},[12,54512,54513],{},[63,54514,54515,54516,54518,54519,54521],{},"For the distribution board and the self-check report, you take the drawing to ",[40,54517,31],{"href":1964},". There, the self-check shows certain findings on existing parts as a note rather than an error, but does not decide the part 8 derogation itself (",[40,54520,28419],{"href":1085},"). Whether a derogation applies to your installation is decided on site by the approved inspection body.",{"title":2044,"searchDepth":2045,"depth":2045,"links":54523},[54524,54525,54526,54527,54528,54533,54536,54542,54545,54546],{"id":53729,"depth":2045,"text":53730},{"id":53787,"depth":2045,"text":53788},{"id":53831,"depth":2045,"text":53832},{"id":54080,"depth":2045,"text":54081},{"id":54162,"depth":2045,"text":54163,"children":54529},[54530,54531,54532],{"id":54166,"depth":2053,"text":54167},{"id":54173,"depth":2053,"text":54174},{"id":54199,"depth":2053,"text":54200},{"id":54282,"depth":2045,"text":54283,"children":54534},[54535],{"id":54303,"depth":2053,"text":54304},{"id":54324,"depth":2045,"text":54325,"children":54537},[54538,54539,54540,54541],{"id":54328,"depth":2053,"text":54329},{"id":54346,"depth":2053,"text":54347},{"id":54364,"depth":2053,"text":54365},{"id":54376,"depth":2053,"text":54377},{"id":54385,"depth":2045,"text":54386,"children":54543},[54544],{"id":54392,"depth":2053,"text":54393},{"id":54416,"depth":2045,"text":54417},{"id":7536,"depth":2045,"text":7537},"2026-04-14","What applies to older electrical installations in Belgium: part 8 of the AREI\u002FRGIE with the key derogations, the duties without exception, control visits and step-by-step modernisation.",[6082,2820,2117],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-old-building-arei-part8-editorial.jpg","\u002Fblog\u002Fold-building-arei-part8.en",{"title":53704,"description":54548},"Old Buildings and AREI Part 8: Rules for Existing Systems","old-building-arei-part-8","blog\u002Fold-building-arei-part8.en",[54558,2133,43969,19440,43965,5422,54559],"old building","periodic","epb1fn9u5YUPWjZh1jFUZ6F_4jgXYzVuPPXcCxnHTUU","\u002Fblog\u002Fold-building-arei-part-8",{"id":54563,"title":54564,"articleId":54565,"body":54566,"category":4239,"date":55945,"description":55946,"extension":2113,"image":54578,"labels":55947,"lastUpdated":4240,"locale":2119,"meta":55948,"navigation":2121,"ogImage":55949,"path":55950,"publishDate":55945,"readTime":39546,"refreshInterval":4248,"seo":55951,"seoTitle":55952,"slug":55953,"stem":55954,"tags":55955,"__hash__":55958,"kind":2137,"href":55959},"blog\u002Fblog\u002Fdistribution-board-planning.en.md","Distribution Board Planning: Layout and Sizing According to AREI\u002FRGIE","distribution-board-planning",{"type":9,"value":54567,"toc":55910},[54568,54574,54579,54583,54585,54595,54599,54610,54697,54700,54704,54707,54775,54778,54782,54785,54789,54792,54903,54912,54916,54923,54927,54933,54941,54947,54951,55023,55032,55036,55043,55047,55114,55117,55120,55123,55125,55129,55133,55139,55143,55196,55200,55206,55209,55220,55223,55227,55230,55234,55312,55316,55423,55427,55530,55534,55636,55642,55646,55749,55753,55756,55767,55770,55776,55780,55783,55786,55789,55793,55796,55799,55802,55805,55809,55812,55821,55831,55835,55840,55844,55855,55857,55889,55894,55896,55906],[12,54569,54570,54573],{},[15,54571,54572],{},"You plan a distribution board (consumer unit, fuse box) in four steps: count the circuits, set the protection chain, distribute the groups across rows and plan spare capacity."," The AREI\u002FRGIE, Belgium's general regulations for electrical installations, provides fixed anchor points: a main switch of at least 40 A, an RCD of at most 300 mA at the origin of the installation, then 30 mA RCDs for sockets, lighting, bathroom and laundry appliances – with no more than eight final circuits per device. This guide covers the structure, the rules and a complete example for a single-family home. For electrical contractors, this workflow leads to Pro: plan the distribution board and keep its links to circuits and documents in the same project.",[12,54575,54576],{},[74,54577],{"alt":27471,"src":54578},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-distribution-board-planning-editorial.webp",[79,54580,54582],{"id":54581},"fundamentals-structure-of-a-distribution-board","Fundamentals: structure of a distribution board",[1041,54584,44922],{"id":50257},[12,54586,54587,54588,54591,54592,56],{},"All modules in the board clip onto standardised ",[15,54589,54590],{},"DIN rails"," (35 mm top-hat rail to EN 60715). Each rail forms a ",[15,54593,54594],{},"row",[1041,54596,54598],{"id":54597},"module-units-te","Module units (TE)",[12,54600,54601,54602,54605,54606,54609],{},"Module width is measured in ",[15,54603,54604],{},"TE"," (module units). One TE is ",[15,54607,54608],{},"18 mm",". Typical widths:",[138,54611,54612,54620],{},[141,54613,54614],{},[144,54615,54616,54618],{},[147,54617,6579],{},[147,54619,19085],{},[163,54621,54622,54630,54638,54646,54653,54661,54668,54675,54683,54690],{},[144,54623,54624,54627],{},[168,54625,54626],{},"Circuit breaker 1P+N",[168,54628,54629],{},"1 TE (compact) or 2 TE",[144,54631,54632,54635],{},[168,54633,54634],{},"Circuit breaker 2-pole",[168,54636,54637],{},"2 TE",[144,54639,54640,54643],{},[168,54641,54642],{},"Circuit breaker 3-pole",[168,54644,54645],{},"3 TE",[144,54647,54648,54651],{},[168,54649,54650],{},"RCD 2-pole (30\u002F300 mA)",[168,54652,54637],{},[144,54654,54655,54658],{},[168,54656,54657],{},"RCD 4-pole",[168,54659,54660],{},"4 TE",[144,54662,54663,54666],{},[168,54664,54665],{},"Main switch 2-pole",[168,54667,54637],{},[144,54669,54670,54673],{},[168,54671,54672],{},"Main switch 4-pole",[168,54674,54660],{},[144,54676,54677,54680],{},[168,54678,54679],{},"Surge protective device (SPD)",[168,54681,54682],{},"2–4 TE",[144,54684,54685,54688],{},[168,54686,54687],{},"Bell transformer",[168,54689,54637],{},[144,54691,54692,54695],{},[168,54693,54694],{},"Time switch",[168,54696,54637],{},[12,54698,54699],{},"The data sheets of the devices you actually install are what counts.",[1041,54701,54703],{"id":54702},"board-sizes","Board sizes",[12,54705,54706],{},"Boards are sized by number of rows and TE per row:",[138,54708,54709,54725],{},[141,54710,54711],{},[144,54712,54713,54716,54719,54722],{},[147,54714,54715],{},"Designation",[147,54717,54718],{},"Rows",[147,54720,54721],{},"TE per row",[147,54723,54724],{},"Total TE",[163,54726,54727,54739,54751,54763],{},[144,54728,54729,54732,54734,54737],{},[168,54730,54731],{},"1-row",[168,54733,6424],{},[168,54735,54736],{},"12–18",[168,54738,54736],{},[144,54740,54741,54744,54746,54748],{},[168,54742,54743],{},"2-row",[168,54745,6407],{},[168,54747,54736],{},[168,54749,54750],{},"24–36",[144,54752,54753,54756,54758,54760],{},[168,54754,54755],{},"3-row",[168,54757,6662],{},[168,54759,54736],{},[168,54761,54762],{},"36–54",[144,54764,54765,54768,54770,54772],{},[168,54766,54767],{},"4-row",[168,54769,6659],{},[168,54771,54736],{},[168,54773,54774],{},"48–72",[12,54776,54777],{},"For the single-family home in the example below, a 4-row board with 18 TE per row (72 TE) fits and leaves plenty of room for later extensions.",[1041,54779,54781],{"id":54780},"what-the-arei-requires-of-the-enclosure","What the AREI requires of the enclosure",[12,54783,54784],{},"In domestic installations the board is class I or II, with a back panel that cannot be removed for its entire service life, and a door. It is made of non-combustible, non-hygroscopic material and is easily accessible without special tools (subsection 5.3.5.1, points a and c). Protective devices for circuits on different energy tariffs sit on separate plates at least 10 cm apart or in a separate board, unless the grid operator allows otherwise.",[79,54786,54788],{"id":54787},"step-1-count-the-circuits","Step 1: count the circuits",[12,54790,54791],{},"List every circuit you need. The example home (3 bedrooms, 150 m², no PV) gives this list:",[138,54793,54794,54805],{},[141,54795,54796],{},[144,54797,54798,54800,54803],{},[147,54799,4399],{},[147,54801,54802],{},"Number in example",[147,54804,24058],{},[163,54806,54807,54816,54826,54836,54846,54856,54865,54874,54883,54893],{},[144,54808,54809,54811,54813],{},[168,54810,7264],{},[168,54812,6662],{},[168,54814,54815],{},"B10A or B16A (1.5 mm²)",[144,54817,54818,54821,54823],{},[168,54819,54820],{},"General sockets",[168,54822,7315],{},[168,54824,54825],{},"B16A or B20A (2.5 mm²)",[144,54827,54828,54831,54833],{},[168,54829,54830],{},"Oven",[168,54832,6424],{},[168,54834,54835],{},"B20A with 2.5 mm², B25A with 4 mm²",[144,54837,54838,54841,54843],{},[168,54839,54840],{},"Hob",[168,54842,6424],{},[168,54844,54845],{},"B32A with 6 mm² or three-phase per manufacturer",[144,54847,54848,54851,54853],{},[168,54849,54850],{},"Dishwasher",[168,54852,6424],{},[168,54854,54855],{},"B16A",[144,54857,54858,54861,54863],{},[168,54859,54860],{},"Washing machine",[168,54862,6424],{},[168,54864,54855],{},[144,54866,54867,54870,54872],{},[168,54868,54869],{},"Tumble dryer",[168,54871,6424],{},[168,54873,54855],{},[144,54875,54876,54879,54881],{},[168,54877,54878],{},"Fridge",[168,54880,6424],{},[168,54882,54855],{},[144,54884,54885,54888,54890],{},[168,54886,54887],{},"Water heater",[168,54889,6424],{},[168,54891,54892],{},"B16A or B20A",[144,54894,54895,54898,54900],{},[168,54896,54897],{},"EV charger (if present)",[168,54899,6424],{},[168,54901,54902],{},"per manufacturer, e.g. B32A with 6 mm² at 7.4 kW single-phase",[12,54904,54905,54906,54909,54910,56],{},"The maximum ratings per cross-section are in table 4.11 (subsection 4.4.1.4). Washing machine, tumble dryer, dishwasher, cooker, hob, oven and any appliance with a fixed location rated 2600 W or more get their own circuit (5.2.1.2). A socket circuit feeds at most ",[15,54907,54908],{},"8 sockets"," (5.3.5.2 b); pure lighting circuits have no fixed point limit. More in ",[40,54911,47376],{"href":3702},[79,54913,54915],{"id":54914},"step-2-set-the-protection-chain","Step 2: set the protection chain",[12,54917,54918,54919,54922],{},"You arrange protective devices ",[15,54920,54921],{},"hierarchically",", from the supply downwards:",[1041,54924,54926],{"id":54925},"protection-hierarchy","Protection hierarchy",[1489,54928],{":height":54929,":width":3800,"alt":54930,"caption":54931,"src":54932},"540","Protection chain: main switch, RCD at the origin up to 300 mA, then three 30 mA groups with at most eight final circuits each, and fixed appliances without 30 mA.","The protection chain from top to bottom: each 30 mA group carries at most eight final circuits (4.2.4.3 b); fixed appliances may sit directly behind the RCD at the origin.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fdistribution-board-planning\u002Fschutzkette.en.svg",[12,54934,54935,54936,54940],{},"You can draw this chain as a single-line diagram for free in the browser with PlanElec Sketch. The start task ",[40,54937,54939],{"href":3611,"rel":54938},[1458],"\"Draw the documents for the inspection\""," already places the connection and the main protection; rated current, residual current in mA, type and breaking capacity appear next to the symbol and in the PDF. Sketch does not check the chain and has no board editor – that is what PlanElec Pro does (see below).",[12,54942,54943,54944,56],{},"With a three-phase connection (3N~400\u002F230 V) you need a 4-pole main switch and RCD, plus multi-pole circuit breakers for three-phase outgoing circuits. The differences between Belgian network types are explained in ",[40,54945,54946],{"href":5387},"single-phase or three-phase?",[1041,54948,54950],{"id":54949},"what-the-arei-prescribes-for-the-protection-chain","What the AREI prescribes for the protection chain",[138,54952,54953,54963],{},[141,54954,54955],{},[144,54956,54957,54959,54961],{},[147,54958,25465],{},[147,54960,3724],{},[147,54962,3919],{},[163,54964,54965,54974,54983,54994,55003,55013],{},[144,54966,54967,54969,54972],{},[168,54968,24052],{},[168,54970,54971],{},"breaks all line conductors and, where applicable, the neutral at once; at least 40 A",[168,54973,33191],{},[144,54975,54976,54978,54981],{},[168,54977,53913],{},[168,54979,54980],{},"rated residual operating current at most 300 mA; provides the isolating function",[168,54982,32902],{},[144,54984,54985,54988,54991],{},[168,54986,54987],{},"All RCDs",[168,54989,54990],{},"at least Type A; at the origin a rated current of at least 40 A; disconnect all active conductors including N",[168,54992,54993],{},"5.3.5.3 a and c",[144,54995,54996,54998,55001],{},[168,54997,53899],{},[168,54999,55000],{},"directly after the origin; protects at least sockets, lighting, bathroom and washing machine, tumble dryer and dishwasher; at most eight final circuits",[168,55002,32902],{},[144,55004,55005,55008,55011],{},[168,55006,55007],{},"Fixed appliances",[168,55009,55010],{},"refrigeration, cooker, heating and other circuits not listed may sit directly behind the RCD at the origin",[168,55012,32902],{},[144,55014,55015,55018,55021],{},[168,55016,55017],{},"Electric wall heating > 25 V AC",[168,55019,55020],{},"its own RCD of at most 100 mA",[168,55022,32902],{},[12,55024,24924,55025,55027,55028,56],{},[15,55026,24927],{}," (Book 1 version 07, Royal Decree of 13 August 2026), the inspection body no longer seals the RCD at the origin; until 31 October 2026, version 06 still required the seal; the 300 mA requirement itself stays. Details are in ",[40,55029,55031],{"href":55030},"\u002Fen\u002Fblog\u002Frcd-sealing-abolished-2026","RCD sealing abolished",[1041,55033,55035],{"id":55034},"if-the-earth-electrode-resistance-exceeds-30-ω","If the earth electrode resistance exceeds 30 Ω",[12,55037,55038,55039,55042],{},"If the dispersion resistance of the earth electrode exceeds 30 Ω, you plan at least ",[15,55040,55041],{},"two"," RCDs of high or very high sensitivity. Each covers at most sixteen single or multiple sockets. The remaining circuits at the origin get at least one additional RCD of at most 100 mA per circuit or group of circuits (4.2.4.3 b). Reserve space for these extra devices in the first draft if the earth measurement is still pending.",[1041,55044,55046],{"id":55045},"rcd-types","RCD types",[138,55048,55049,55060],{},[141,55050,55051],{},[144,55052,55053,55055,55057],{},[147,55054,12220],{},[147,55056,53744],{},[147,55058,55059],{},"Design boundary",[163,55061,55062,55075,55088,55101],{},[144,55063,55064,55069,55072],{},[168,55065,55066],{},[15,55067,55068],{},"up to 300 mA, min. Type A",[168,55070,55071],{},"Protection at the origin of the dwelling",[168,55073,55074],{},"Rating and poles must fit; Type S is only one option where time selectivity is demonstrated",[144,55076,55077,55082,55085],{},[168,55078,55079],{},[15,55080,55081],{},"up to 30 mA, Type A",[168,55083,55084],{},"High- or very-high-sensitivity protection",[168,55086,55087],{},"For the circuits listed in 4.2.4.3 b; check additional equipment conditions in the manufacturer data",[144,55089,55090,55095,55098],{},[168,55091,55092],{},[15,55093,55094],{},"Type B",[168,55096,55097],{},"Also detects smooth DC residual currents",[168,55099,55100],{},"Only where the fault-current spectrum and equipment concept require it; not automatic for every charger or inverter",[144,55102,55103,55108,55111],{},[168,55104,55105],{},[15,55106,55107],{},"Type F",[168,55109,55110],{},"Detects specified mixed-frequency currents",[168,55112,55113],{},"Use only where the load, product standard and manufacturer documentation call for this characteristic",[12,55115,55116],{},"Equipment with semiconductors can produce disturbing DC components. Subsection 5.3.5.3, point f, lists several permitted solutions, including an RCD that keeps working with such faults or a DC fault-current detector installed in coordination with the RCD.",[1041,55118,33310],{"id":55119},"selectivity",[12,55121,55122],{},"You demonstrate selectivity between upstream and downstream RCDs from sensitivity, time-current characteristics, manufacturer coordination data and the complete protection concept. A time-delayed device can be part of the solution; on its own it does not guarantee selectivity.",[1489,55124],{":height":5796,":width":5797,"alt":5798,"caption":5799,"src":5800},[79,55126,55128],{"id":55127},"step-3-distribute-the-groups-across-rows","Step 3: distribute the groups across rows",[1041,55130,55132],{"id":55131},"arei-rule-at-most-8-final-circuits-per-30-ma-rcd","AREI rule: at most 8 final circuits per 30 mA RCD",[12,55134,55135,55136,55138],{},"Under subsection 4.2.4.3 b you connect at most ",[15,55137,29657],{}," to an RCD of high or very high sensitivity. Four to six circuits per device leaves headroom for later extensions.",[1041,55140,55142],{"id":55141},"typical-row-allocation","Typical row allocation",[138,55144,55145,55154],{},[141,55146,55147],{},[144,55148,55149,55151],{},[147,55150,17805],{},[147,55152,55153],{},"Contents",[163,55155,55156,55166,55176,55186],{},[144,55157,55158,55163],{},[168,55159,55160],{},[15,55161,55162],{},"Row 1",[168,55164,55165],{},"Main switch, RCD at the origin (300 mA), SPD, possibly bell transformer",[144,55167,55168,55173],{},[168,55169,55170],{},[15,55171,55172],{},"Row 2",[168,55174,55175],{},"RCD #1 (30 mA) with its circuits (lighting and living-area sockets)",[144,55177,55178,55183],{},[168,55179,55180],{},[15,55181,55182],{},"Row 3",[168,55184,55185],{},"RCD #2 (30 mA) with its circuits (kitchen and bedrooms)",[144,55187,55188,55193],{},[168,55189,55190],{},[15,55191,55192],{},"Row 4",[168,55194,55195],{},"RCD #3 (30 mA) with its circuits (bathroom, outdoor, garage, utility)",[79,55197,55199],{"id":55198},"step-4-plan-spare-capacity","Step 4: plan spare capacity",[12,55201,55202,55203,56],{},"Plan free positions; 20 to 30% of the TE is proven practice, not an AREI requirement. With 20 circuit breakers that means at least four to six free TE. Close empty positions with ",[15,55204,55205],{},"blanking plates",[12,55207,55208],{},"You need spare capacity for:",[84,55210,55211,55214,55217],{},[87,55212,55213],{},"future loads such as an EV charger, air conditioning or a sauna,",[87,55215,55216],{},"redistribution when an RCD carries too many circuits,",[87,55218,55219],{},"avoiding a later board replacement.",[12,55221,55222],{},"Spare capacity is more than free TE: also plan free terminals, enough trunking, accessible N and PE bars, room for measurements and a documented direction of extension.",[79,55224,55226],{"id":55225},"example-4-row-board-for-a-single-family-home","Example: 4-row board for a single-family home",[12,55228,55229],{},"A complete example for a Belgian single-family home (3 bedrooms, 150 m², single-phase, no PV):",[1041,55231,55233],{"id":55232},"row-1-supply-and-protection-18-te","Row 1 — Supply and protection (18 TE)",[138,55235,55236,55249],{},[141,55237,55238],{},[144,55239,55240,55242,55244,55246],{},[147,55241,39896],{},[147,55243,6579],{},[147,55245,54604],{},[147,55247,55248],{},"Function",[163,55250,55251,55263,55276,55287,55299],{},[144,55252,55253,55256,55259,55261],{},[168,55254,55255],{},"1–2",[168,55257,55258],{},"Main switch 2P",[168,55260,6407],{},[168,55262,33109],{},[144,55264,55265,55268,55271,55273],{},[168,55266,55267],{},"3–4",[168,55269,55270],{},"RCD 2P",[168,55272,6407],{},[168,55274,55275],{},"300 mA, Type A, 40 A",[144,55277,55278,55281,55283,55285],{},[168,55279,55280],{},"5–8",[168,55282,47836],{},[168,55284,6659],{},[168,55286,48576],{},[144,55288,55289,55292,55294,55296],{},[168,55290,55291],{},"9–10",[168,55293,54687],{},[168,55295,6407],{},[168,55297,55298],{},"8 V bell",[144,55300,55301,55304,55307,55309],{},[168,55302,55303],{},"11–18",[168,55305,55306],{},"Spare",[168,55308,6645],{},[168,55310,55311],{},"Blanking plates",[1041,55313,55315],{"id":55314},"row-2-group-1-lighting-and-living-area-18-te","Row 2 — Group 1: lighting and living area (18 TE)",[138,55317,55318,55330],{},[141,55319,55320],{},[144,55321,55322,55324,55326,55328],{},[147,55323,39896],{},[147,55325,6579],{},[147,55327,54604],{},[147,55329,55248],{},[163,55331,55332,55344,55356,55367,55378,55390,55401,55412],{},[144,55333,55334,55336,55339,55341],{},[168,55335,55255],{},[168,55337,55338],{},"RCD 30 mA",[168,55340,6407],{},[168,55342,55343],{},"Type A",[144,55345,55346,55348,55351,55353],{},[168,55347,6662],{},[168,55349,55350],{},"MCB B10A",[168,55352,6424],{},[168,55354,55355],{},"Lighting ground floor",[144,55357,55358,55360,55362,55364],{},[168,55359,6659],{},[168,55361,55350],{},[168,55363,6424],{},[168,55365,55366],{},"Lighting first floor",[144,55368,55369,55371,55373,55375],{},[168,55370,7301],{},[168,55372,55350],{},[168,55374,6424],{},[168,55376,55377],{},"Lighting cellar\u002Foutdoor",[144,55379,55380,55382,55385,55387],{},[168,55381,7315],{},[168,55383,55384],{},"MCB B16A",[168,55386,6424],{},[168,55388,55389],{},"Sockets living room",[144,55391,55392,55394,55396,55398],{},[168,55393,6631],{},[168,55395,55384],{},[168,55397,6424],{},[168,55399,55400],{},"Sockets dining room",[144,55402,55403,55405,55407,55409],{},[168,55404,6645],{},[168,55406,55384],{},[168,55408,6424],{},[168,55410,55411],{},"Sockets hallway",[144,55413,55414,55417,55419,55421],{},[168,55415,55416],{},"9–18",[168,55418,55306],{},[168,55420,48573],{},[168,55422,55311],{},[1041,55424,55426],{"id":55425},"row-3-group-2-kitchen-and-bedrooms-18-te","Row 3 — Group 2: kitchen and bedrooms (18 TE)",[138,55428,55429,55441],{},[141,55430,55431],{},[144,55432,55433,55435,55437,55439],{},[147,55434,39896],{},[147,55436,6579],{},[147,55438,54604],{},[147,55440,55248],{},[163,55442,55443,55453,55464,55476,55487,55498,55509,55520],{},[144,55444,55445,55447,55449,55451],{},[168,55446,55255],{},[168,55448,55338],{},[168,55450,6407],{},[168,55452,55343],{},[144,55454,55455,55457,55459,55461],{},[168,55456,6662],{},[168,55458,55384],{},[168,55460,6424],{},[168,55462,55463],{},"Sockets kitchen",[144,55465,55466,55468,55471,55473],{},[168,55467,6659],{},[168,55469,55470],{},"MCB B20A",[168,55472,6424],{},[168,55474,55475],{},"Oven (own circuit)",[144,55477,55478,55480,55482,55484],{},[168,55479,7301],{},[168,55481,55384],{},[168,55483,6424],{},[168,55485,55486],{},"Dishwasher (own circuit)",[144,55488,55489,55491,55493,55495],{},[168,55490,7315],{},[168,55492,55384],{},[168,55494,6424],{},[168,55496,55497],{},"Fridge (own circuit)",[144,55499,55500,55502,55504,55506],{},[168,55501,6631],{},[168,55503,55384],{},[168,55505,6424],{},[168,55507,55508],{},"Sockets bedroom 1",[144,55510,55511,55513,55515,55517],{},[168,55512,6645],{},[168,55514,55384],{},[168,55516,6424],{},[168,55518,55519],{},"Sockets bedrooms 2+3",[144,55521,55522,55524,55526,55528],{},[168,55523,55416],{},[168,55525,55306],{},[168,55527,48573],{},[168,55529,55311],{},[1041,55531,55533],{"id":55532},"row-4-group-3-bathroom-outdoor-utility-18-te","Row 4 — Group 3: bathroom, outdoor, utility (18 TE)",[138,55535,55536,55548],{},[141,55537,55538],{},[144,55539,55540,55542,55544,55546],{},[147,55541,39896],{},[147,55543,6579],{},[147,55545,54604],{},[147,55547,55248],{},[163,55549,55550,55560,55571,55582,55593,55604,55615,55626],{},[144,55551,55552,55554,55556,55558],{},[168,55553,55255],{},[168,55555,55338],{},[168,55557,6407],{},[168,55559,55343],{},[144,55561,55562,55564,55566,55568],{},[168,55563,6662],{},[168,55565,55384],{},[168,55567,6424],{},[168,55569,55570],{},"Sockets bathroom",[144,55572,55573,55575,55577,55579],{},[168,55574,6659],{},[168,55576,55384],{},[168,55578,6424],{},[168,55580,55581],{},"Washing machine (own circuit)",[144,55583,55584,55586,55588,55590],{},[168,55585,7301],{},[168,55587,55384],{},[168,55589,6424],{},[168,55591,55592],{},"Tumble dryer (own circuit)",[144,55594,55595,55597,55599,55601],{},[168,55596,7315],{},[168,55598,55470],{},[168,55600,6424],{},[168,55602,55603],{},"Water heater (own circuit)",[144,55605,55606,55608,55610,55612],{},[168,55607,6631],{},[168,55609,55384],{},[168,55611,6424],{},[168,55613,55614],{},"Outdoor sockets",[144,55616,55617,55619,55621,55623],{},[168,55618,6645],{},[168,55620,55384],{},[168,55622,6424],{},[168,55624,55625],{},"Garage",[144,55627,55628,55630,55632,55634],{},[168,55629,55416],{},[168,55631,55306],{},[168,55633,48573],{},[168,55635,55311],{},[12,55637,55638,55641],{},[15,55639,55640],{},"Total: 18 circuit breakers (compact 1P+N), 4 RCDs, SPD, main switch and bell transformer = 34 of 72 TE used, 53% spare."," Each 30 mA RCD carries six final circuits and stays below the limit of eight. The hob and a future EV charger fit in the spare positions.",[79,55643,55645],{"id":55644},"common-mistakes-in-board-planning","Common mistakes in board planning",[138,55647,55648,55659],{},[141,55649,55650],{},[144,55651,55652,55654,55656],{},[147,55653,2993],{},[147,55655,2996],{},[147,55657,55658],{},"Solution",[163,55660,55661,55672,55683,55694,55705,55716,55727,55738],{},[144,55662,55663,55666,55669],{},[168,55664,55665],{},"Too few rows",[168,55667,55668],{},"No space, no thermal headroom",[168,55670,55671],{},"Size from module count, wiring and enclosure data",[144,55673,55674,55677,55680],{},[168,55675,55676],{},"Omitting the SPD without analysis",[168,55678,55679],{},"Protection concept remains unproven",[168,55681,55682],{},"Check applicability and selection for the project",[144,55684,55685,55688,55691],{},[168,55686,55687],{},"More than 8 final circuits per 30 mA RCD",[168,55689,55690],{},"Breach of 4.2.4.3 b",[168,55692,55693],{},"Add another RCD",[144,55695,55696,55699,55702],{},[168,55697,55698],{},"Missing labels",[168,55700,55701],{},"Breach of 3.1.3.1",[168,55703,55704],{},"Label every protective device (circuit identifier and function)",[144,55706,55707,55710,55713],{},[168,55708,55709],{},"No RCD at the origin",[168,55711,55712],{},"Protection chain at the origin incomplete",[168,55714,55715],{},"Provide a device of at most 300 mA, at least Type A and 40 A",[144,55717,55718,55721,55724],{},[168,55719,55720],{},"Choosing EV charger protection by default",[168,55722,55723],{},"DC fault protection may be insufficient",[168,55725,55726],{},"Check chapter 7.22, integrated DC detection and manufacturer data together",[144,55728,55729,55732,55735],{},[168,55730,55731],{},"Ignoring the earth resistance",[168,55733,55734],{},"Too few RCDs above 30 Ω",[168,55736,55737],{},"Wait for the earth measurement or reserve space for extra devices",[144,55739,55740,55743,55746],{},[168,55741,55742],{},"No usable spare capacity",[168,55744,55745],{},"Extension becomes unnecessarily complex",[168,55747,55748],{},"Plan module, terminal and wiring reserve per project",[79,55750,55752],{"id":55751},"labelling-and-documentation","Labelling and documentation",[12,55754,55755],{},"Subsection 3.1.3.1 requires control, protective and isolating devices to be labelled clearly, conspicuously and indelibly. The board itself carries its own identifier and the supply voltage (3.1.3.3). Label each protective device with:",[84,55757,55758,55761,55764],{},[87,55759,55760],{},"the circuit identifier, identical to the single-line diagram and situation plan (on the single-line diagram a capital letter identifies the circuit, 3.1.2.1),",[87,55762,55763],{},"the function, for example “Lighting ground floor” or “Sockets kitchen”,",[87,55765,55766],{},"optionally the room or floor.",[12,55768,55769],{},"Use a label strip or stick the overview inside the door; most manufacturers supply writable inserts.",[12,55771,7139,55772,2033,55774,56],{},[40,55773,32144],{"href":32143},[40,55775,33720],{"href":4796},[79,55777,55779],{"id":55778},"from-a-layout-sketch-to-an-executable-design","From a layout sketch to an executable design",[12,55781,55782],{},"Counting modules is the spatial starting point. Before ordering, the electrician checks the connection data, earthing system, prospective short-circuit current, selectivity or back-up protection and the manufacturer approvals for combined devices. You therefore never copy rated current, breaking capacity or cross-section from an example without checking. Power dissipation in the closed enclosure, ambient temperature, ventilation and permitted terminal loading also shape the choice.",[12,55784,55785],{},"Work row by row. Record supply, main isolation, residual-current protection and surge protection as a traceable protection chain. Then arrange the final circuits, but do not mistake a visually tidy row for electrical selectivity. With PV, a battery, a generator or charging infrastructure, show clearly from which direction energy can flow and which parts may remain energised with the grid switched off. Manufacturer documents for the RCD, SPD, inverter or EV charger are binding design inputs.",[12,55787,55788],{},"Before export you align three levels: the physical occupancy of the board, the protection chain in the single-line diagram and the circuit identifiers on the situation plan show the same state. Book 1 V06 requires schemas, plans and documents to carry an unambiguous number, version and version date (section 3.1.2). For domestic installations, the name, capacity and VAT number (if applicable) of the person responsible and the installation address also appear on the single-line diagram and situation plan (3.1.2.1 a).",[79,55790,55792],{"id":55791},"board-handover-record","Board handover record",[12,55794,55795],{},"Before closing the cover, record for every outgoing circuit its identifier, purpose, number of poles, protective device, rated current, cable data and associated RCD. For controllable loads, add contactor, control circuit and manual operation. For multi-phase outgoing circuits, document the phases used; for single-phase circuits, a phase list helps you spot later imbalance. Check that each neutral is assigned to the correct RCD and that protective-conductor terminals stay accessible.",[12,55797,55798],{},"A photo complements the structured data but does not replace it. Terminal markings match the diagram and the label strip. Only record tightening torques or thermal follow-up checks when they come from manufacturer instructions or an execution record.",[12,55800,55801],{},"Also check mechanical accessibility: covers can still be fitted, conductors do not run in front of operating devices and measuring points remain reachable. Record separate N bars, links and supplies traceably. A spare position without a safe connection option is not usable spare capacity.",[12,55803,55804],{},"Keep the approved PDF together with the inspection report, measurement records and relevant data sheets in the installation file. When you extend later, do not overwrite the old file: increase the version, set a new version date and describe the change. That keeps it traceable which drawing showed the real board at which inspection.",[79,55806,55808],{"id":55807},"planning-the-board-in-planelec","Planning the board in PlanElec",[12,55810,55811],{},"Plan the board directly in Pro using confirmed protective devices, module widths and reserves. Sketch is the drawing route for diagram and situation plan; physical board layout and the self-check report belong in Pro.",[12,55813,26776,55814,1774,55817,55820],{},[15,55815,55816],{},"the single-line diagram alone",[40,55818,22],{"href":3611,"rel":55819},[1458]," is enough: free, in the browser, with PDF export. Sketch has no board editor and no self-check. If you need them, you hand the drawing over to PlanElec Pro.",[12,55822,55823,55824,55826,55827,55830],{},"In the board editor of ",[15,55825,31],{}," you place modules on DIN rails, by hand or with \"Auto-Assign\" by RCD group including spare capacity. Enclosure planning estimates the required TE from recorded module widths, spare capacity, terminals, accessories and mounting type and suggests matching enclosures; it is an estimate, not a release for execution. For existing installations, ",[40,55828,55829],{"href":3477},"Pro recognises visible DIN modules in a photo"," and turns them into a layout proposal you review; the wiring is not inferred.",[1489,55832],{":height":27567,":width":27568,"alt":55833,"caption":55834,"src":27571},"Board editor in PlanElec Pro with module palette, Auto-Assign and enclosure planning with 20% spare capacity and matching enclosures.","Enclosure planning in the board editor: spare capacity, terminals and mounting type determine the estimated TE requirement.",[12,55836,55837,55838,56],{},"The AREI\u002FRGIE self-check in Pro flags, among other things, an overfilled board, more than eight final circuits on a 30 mA RCD, a missing RCD at the origin, a main switch or main RCD below 40 A and socket circuits without 30 mA protection; less than 20% spare capacity appears as a tip. A missing value makes the check incomplete, never passed. Measurements, manufacturer evidence and the inspection by the recognised inspection body remain separate steps. The rules covered are listed in ",[40,55839,28419],{"href":1085},[79,55841,55843],{"id":55842},"official-basis","Official basis",[84,55845,55846,55852],{},[87,55847,55848],{},[40,55849,55851],{"href":1971,"rel":55850},[1458],"FPS Economy: RGIE\u002FAREI, Book 1",[87,55853,55854],{},"Book 1 V06: sections 3.1.2 and 3.1.3 (schemas, plans, labelling), subsections 4.2.4.3, 4.4.1.4, 5.2.1.2, 5.3.5.1 to 5.3.5.3; sealing abolished by version 07 from 01.11.2026.",[79,55856,7537],{"id":7536},[84,55858,55859,55863,55867,55872,55877,55881,55885],{},[87,55860,55861],{},[40,55862,14941],{"href":4212},[87,55864,55865],{},[40,55866,47529],{"href":3899},[87,55868,55869],{},[40,55870,55871],{"href":3795},"Cable cross-section and breaker: the right combination",[87,55873,55874],{},[40,55875,55876],{"href":36916},"PV system in the diagram",[87,55878,55879],{},[40,55880,36303],{"href":36302},[87,55882,55883],{},[40,55884,26426],{"href":33912},[87,55886,55887],{},[40,55888,51879],{"href":51878},[12,55890,55891],{},[40,55892,55893],{"href":1964},"Plan your board in PlanElec Pro and check it yourself →",[79,55895,2009],{"id":2008},[84,55897,55898],{},[87,55899,55900,38,55902,2033,55904,56],{},[15,55901,7561],{},[40,55903,2032],{"href":1964},[40,55905,2036],{"href":54},[12,55907,55908,7570],{},[15,55909,2041],{},{"title":2044,"searchDepth":2045,"depth":2045,"links":55911},[55912,55918,55919,55926,55930,55931,55937,55938,55939,55940,55941,55942,55943,55944],{"id":54581,"depth":2045,"text":54582,"children":55913},[55914,55915,55916,55917],{"id":50257,"depth":2053,"text":44922},{"id":54597,"depth":2053,"text":54598},{"id":54702,"depth":2053,"text":54703},{"id":54780,"depth":2053,"text":54781},{"id":54787,"depth":2045,"text":54788},{"id":54914,"depth":2045,"text":54915,"children":55920},[55921,55922,55923,55924,55925],{"id":54925,"depth":2053,"text":54926},{"id":54949,"depth":2053,"text":54950},{"id":55034,"depth":2053,"text":55035},{"id":55045,"depth":2053,"text":55046},{"id":55119,"depth":2053,"text":33310},{"id":55127,"depth":2045,"text":55128,"children":55927},[55928,55929],{"id":55131,"depth":2053,"text":55132},{"id":55141,"depth":2053,"text":55142},{"id":55198,"depth":2045,"text":55199},{"id":55225,"depth":2045,"text":55226,"children":55932},[55933,55934,55935,55936],{"id":55232,"depth":2053,"text":55233},{"id":55314,"depth":2053,"text":55315},{"id":55425,"depth":2053,"text":55426},{"id":55532,"depth":2053,"text":55533},{"id":55644,"depth":2045,"text":55645},{"id":55751,"depth":2045,"text":55752},{"id":55778,"depth":2045,"text":55779},{"id":55791,"depth":2045,"text":55792},{"id":55807,"depth":2045,"text":55808},{"id":55842,"depth":2045,"text":55843},{"id":7536,"depth":2045,"text":7537},{"id":2008,"depth":2045,"text":2009},"2026-04-07","Plan a distribution board under the AREI\u002FRGIE: main switch, 300 mA and 30 mA RCDs, at most 8 circuits per 30 mA RCD, row allocation, spare capacity and a complete example for a single-family home.",[4243,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-distribution-board-planning-editorial.jpg","\u002Fblog\u002Fdistribution-board-planning.en",{"title":54564,"description":55946},"Distribution Board Planning: Layout and Sizing (AREI)","distribution-board-planning-guide","blog\u002Fdistribution-board-planning.en",[3590,55956,44922,24055,41092,2133,3575,55957],"consumer unit","single-family home","Ir753GbLwHkYbmYHvmTOfQj82tR22VF4jE-N_Ijb0nc","\u002Fblog\u002Fdistribution-board-planning-guide",{"id":55961,"title":55962,"articleId":55963,"body":55964,"category":4239,"date":56742,"description":56743,"extension":2113,"image":55981,"labels":56744,"lastUpdated":4240,"locale":2119,"meta":56745,"navigation":2121,"ogImage":56746,"path":56747,"publishDate":56742,"readTime":8562,"refreshInterval":4248,"seo":56748,"seoTitle":56749,"slug":56750,"stem":56751,"tags":56752,"__hash__":56756,"kind":2137,"href":56757},"blog\u002Fblog\u002Fdraw-situation-plan.en.md","Draw a Situation Plan: Step-by-Step Guide According to AREI\u002FRGIE","draw-situation-plan",{"type":9,"value":55965,"toc":56715},[55966,55976,55982,55998,56001,56003,56007,56011,56014,56036,56042,56046,56049,56146,56148,56150,56154,56161,56168,56170,56174,56177,56183,56187,56219,56222,56241,56243,56260,56264,56267,56271,56296,56298,56302,56305,56308,56312,56315,56319,56323,56373,56376,56379,56382,56392,56394,56398,56401,56404,56430,56436,56438,56440,56531,56533,56537,56594,56598,56601,56604,56607,56611,56614,56617,56621,56624,56627,56629,56640,56642,56644,56677,56679,56692,56694,56711],[12,55967,55968,55971,55972,55975],{},[15,55969,55970],{},"You draw a situation plan in five steps: prepare the floor plan to scale, choose symbols from AREI\u002FRGIE Table 2.23, place every point at its real position, mark each point with the circuit letter and number from the single-line diagram, and finish the plan with a legend and title block."," For new domestic installations and for substantial modifications or extensions, it is one of the required plans together with the single-line diagram (AREI\u002FRGIE 3.1.2.1 a). The regulation calls it a position plan; in French it is the ",[63,55973,55974],{},"plan de position",". As a homeowner or sole trader, draw the situation plan in Sketch; if your business later needs the distribution board or self-check, transfer the drawing to Pro.",[12,55977,55978],{},[74,55979],{"alt":55980,"src":55981},"An electrician measures a room using a laser distance meter.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-draw-situation-plan-editorial.webp",[41114,55983,55984],{},[12,55985,55986,55989,55990,55993,55994,55997],{},[15,55987,55988],{},"In short:"," the single-line diagram shows the ",[63,55991,55992],{},"electrical structure"," (which protective device supplies which circuit, which switch controls which lighting point). The situation plan shows the ",[63,55995,55996],{},"physical position"," of each component on the floor plan.",[12,55999,56000],{},"This guide takes you step by step to a checkable situation plan. At the inspection, the approved control body assesses the complete dossier and the installed work.",[38398,56002],{},[79,56004,56006],{"id":56005},"step-1-prepare-the-floor-plan","Step 1: Prepare the floor plan",[1041,56008,56010],{"id":56009},"dimensions-and-scale","Dimensions and scale",[12,56012,56013],{},"The floor plan is the basis of your situation plan. You take it from the building plans or draw it yourself.",[84,56015,56016,56023,56029],{},[87,56017,56018,56019,56022],{},"Use a ",[15,56020,56021],{},"consistent scale"," (common: 1:50 or 1:100). AREI\u002FRGIE defines a plan as a to-scale representation of where the parts of the installation are (Chapter 2.12); it does not prescribe a particular ratio.",[87,56024,56025,56026,56],{},"Draw all ",[15,56027,56028],{},"walls, doors and windows",[87,56030,56031,56032,56035],{},"Mark the ",[15,56033,56034],{},"opening direction"," of doors (quarter circle); it determines where the switch logically goes.",[12,56037,3361,56038,56041],{},[40,56039,22],{"href":1456,"rel":56040},[1458],", you draw the floor plan free of charge in the browser with walls, doors, windows and rooms, including dimensions, or you place an existing plan underneath as an image or PDF and calibrate it. Each floor gets its own tab. In PlanElec Pro, you can also let Pro recognise walls and rooms from a PDF or scan as an editable proposal; without a confirmed scale, Pro does not adopt a recognised floor plan.",[1041,56043,56045],{"id":56044},"label-the-rooms","Label the rooms",[12,56047,56048],{},"Give every room a clear name. An abbreviation helps where space is tight:",[138,56050,56051,56062],{},[141,56052,56053],{},[144,56054,56055,56057,56059],{},[147,56056,3830],{},[147,56058,6382],{},[147,56060,56061],{},"What to watch when drawing",[163,56063,56064,56074,56084,56094,56104,56114,56124,56135],{},[144,56065,56066,56069,56071],{},[168,56067,56068],{},"LR",[168,56070,6401],{},[168,56072,56073],{},"sockets at their real wall position, lighting points, switches",[144,56075,56076,56079,56081],{},[168,56077,56078],{},"KI",[168,56080,6449],{},[168,56082,56083],{},"fixed appliances such as hob, oven and dishwasher shown separately",[144,56085,56086,56089,56091],{},[168,56087,56088],{},"BR",[168,56090,6418],{},[168,56092,56093],{},"sockets at their real position, lighting point and switch at the door",[144,56095,56096,56099,56101],{},[168,56097,56098],{},"BA",[168,56100,6463],{},[168,56102,56103],{},"zones 0, 1 and 2 and the position of every socket relative to them",[144,56105,56106,56109,56111],{},[168,56107,56108],{},"HA",[168,56110,6434],{},[168,56112,56113],{},"two-way or intermediate switching with every control point",[144,56115,56116,56119,56121],{},[168,56117,56118],{},"GA",[168,56120,55625],{},[168,56122,56123],{},"EV charger, outdoor sockets, board if located there",[144,56125,56126,56129,56132],{},[168,56127,56128],{},"CE",[168,56130,56131],{},"Cellar",[168,56133,56134],{},"board, meter, equipment such as heat pump or water heater",[144,56136,56137,56140,56143],{},[168,56138,56139],{},"OU",[168,56141,56142],{},"Outdoor",[168,56144,56145],{},"outdoor lights and sockets, outdoor units",[38398,56147],{},[1489,56149],{":height":4096,":width":4097,"alt":4098,"caption":33802,"src":4100},[79,56151,56153],{"id":56152},"step-2-use-areirgie-symbols","Step 2: Use AREI\u002FRGIE symbols",[12,56155,56156,56158,56159,56],{},[15,56157,25624],{}," in Chapter 2.13 is the official, non-exhaustive symbol list for the single-line diagram and situation plan. If a component has no symbol there, you use another clearly identifiable sign and define it in the legend (3.1.2.1 a). The full overview is in ",[40,56160,5667],{"href":5666},[41114,56162,56163],{},[12,56164,56165,56167],{},[15,56166,47751],{}," for common components, use the Table 2.23 symbols. Custom symbols must be unambiguous and appear in the legend; an unexplained symbol does not meet 3.1.2.1 a.",[38398,56169],{},[79,56171,56173],{"id":56172},"step-3-place-the-components","Step 3: Place the components",[12,56175,56176],{},"Now place the symbols on the floor plan. Subsection 3.1.2.3 a requires the location of boards, junction and branch boxes, socket outlets, lighting points, switches, fixed appliances and sources shown on the single-line diagram.",[1489,56178],{":height":56179,":width":3800,"alt":56180,"caption":56181,"src":56182},"380","Two versions of the same kitchen. Left, \"not like this\": symbols floating in the middle of the room without references. Right, \"like this\": socket outlets and appliances at their real wall and worktop positions with the references A1, A2, A3 and B1, and a junction box at its real location.","A symbol belongs where the component actually sits and carries its circuit reference; concealed junction boxes are also drawn at their real location. Simplified drawing, not the official symbols.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fdraw-situation-plan\u002Fsymbol-placement.en.svg",[1041,56184,56186],{"id":56185},"socket-outlets","Socket outlets",[84,56188,56189,56195,56201,56207,56213],{},[87,56190,56191,56194],{},[15,56192,56193],{},"On the wall",", at the actual position.",[87,56196,56197,56200],{},[15,56198,56199],{},"Kitchen:"," record worktop sockets and fixed appliances individually; number and dedicated circuits follow from use and design.",[87,56202,56203,56206],{},[15,56204,56205],{},"Living areas:"," draw every planned or existing socket; AREI\u002FRGIE does not prescribe a minimum number per floor area.",[87,56208,56209,56212],{},[15,56210,56211],{},"Bathroom:"," low-voltage sockets are allowed from zone 2 at the earliest, and only when protected by a very-high-sensitivity residual-current device (≤ 10 mA) or individually by an isolating transformer of no more than 100 W (7.1.5.2 d); otherwise they sit outside the zones. Zone 2 exists only for a bath; it is not defined for a shower (7.1.3.2 no. 3 b).",[87,56214,56215,56218],{},[15,56216,56217],{},"Outdoors:"," choose the IP rating to suit the real external influences; as indoors, socket outlets not intended for fixed appliances sit behind the additional RCD of ≤ 30 mA (4.2.4.3 b).",[1041,56220,56221],{"id":40954},"Switches",[84,56223,56224,56230,56238],{},[87,56225,56226,56229],{},[15,56227,56228],{},"Next to the door"," on the opening side, typically around 105 cm (common practice; Book 1 sets no fixed switch height).",[87,56231,56232,56235,56236,56],{},[15,56233,56234],{},"Two-way switches"," in rooms with several entrances and at the top and bottom of stairs; with three or more control points, add an intermediate switch. More in ",[40,56237,35152],{"href":5727},[87,56239,56240],{},"The reference shows the link to the light: the switch carries the letter of its circuit and the number of the lighting point it controls (3.1.2.1 a). A dashed line is an extra reading aid.",[1041,56242,7264],{"id":22994},[84,56244,56245,56251,56257],{},[87,56246,56247,56250],{},[15,56248,56249],{},"Ceiling lights"," at their planned position, otherwise in the centre of the room.",[87,56252,56253,56256],{},[15,56254,56255],{},"Wall lights"," at the wall position.",[87,56258,56259],{},"Draw every planned or existing lighting point; their number follows from use and design.",[1041,56261,56263],{"id":56262},"keep-smoke-detectors-separate","Keep smoke detectors separate",[12,56265,56266],{},"You can add smoke detectors as extra building information. The obligation comes from regional building and housing law and varies by region and use; check it against the current competent source. It is not part of the mandatory AREI\u002FRGIE position-plan content, so you keep it clearly separate from the circuit references on the plan.",[1041,56268,56270],{"id":56269},"special-loads","Special loads",[84,56272,56273,56278,56284,56290],{},[87,56274,56275,56277],{},[15,56276,42979],{}," in the garage or on an outside wall, on its own circuit.",[87,56279,56280,56283],{},[15,56281,56282],{},"Water heater \u002F instantaneous heater:"," record position, power and connection method; you define the circuit from the appliance requirements and applicable rules.",[87,56285,56286,56289],{},[15,56287,56288],{},"Heat pump \u002F air conditioning:"," mark the outdoor and indoor unit.",[87,56291,56292,56295],{},[15,56293,56294],{},"PV system:"," draw the inverter and any battery as sources (3.1.2.3 a).",[38398,56297],{},[79,56299,56301],{"id":56300},"step-4-follow-references-between-both-plans","Step 4: Follow references between both plans",[12,56303,56304],{},"Each elementary circuit gets a capital letter, each point a sequence number counted from the protective device. On the situation plan, every point carries the same combination as on the single-line diagram. Writing only the circuit letter next to every device is not enough: the number is what makes each point unambiguous.",[12,56306,56307],{},"In PlanElec Sketch, you drag devices from the single-line diagram onto the situation plan; the \"From the single-line diagram\" palette shows which devices still need a place, and completed circuits get a tick.",[1041,56309,56311],{"id":56310},"fictitious-product-example-finding-the-same-consumers","Fictitious product example: finding the same consumers",[12,56313,56314],{},"The two real views from PlanElec Pro show the same demonstration project at two working stages. They explain the link; warnings from the example state are still visible in the diagram.",[1489,56316],{":height":6699,":width":27568,"alt":56317,"caption":56318,"src":46850},"Situation plan of the fictitious project showing C1, E1, F1 and G1.","On the fictitious floor plan you find E1, F1 and G1 in the building. C1 connects the switch to its associated lighting point.",[1489,56320],{":height":27567,":width":27568,"alt":56321,"caption":56322,"src":27615},"Derived single-line diagram of the fictitious project showing circuits C, E, F and G.","The derived diagram shows the corresponding circuits and points. Visible warnings mark a working version still under review.",[138,56324,56325,56338],{},[141,56326,56327],{},[144,56328,56329,56332,56335],{},[147,56330,56331],{},"Reference on the floor plan",[147,56333,56334],{},"Entry in the diagram",[147,56336,56337],{},"Check on site",[163,56339,56340,56351,56362],{},[144,56341,56342,56345,56348],{},[168,56343,56344],{},"E1",[168,56346,56347],{},"E, point 1: oven",[168,56349,56350],{},"appliance identity and real connection point",[144,56352,56353,56356,56359],{},[168,56354,56355],{},"F1",[168,56357,56358],{},"F, point 1: dishwasher",[168,56360,56361],{},"connection point and documented assignment",[144,56363,56364,56367,56370],{},[168,56365,56366],{},"G1",[168,56368,56369],{},"G, point 1: washing machine",[168,56371,56372],{},"appliance and position in the room",[12,56374,56375],{},"In the example, C1 appears at the switch and at the associated lighting point: both refer to the same switched lighting point. The repeated reference is intentional here, not a duplicate error. Check the switching relationship before renumbering.",[12,56377,56378],{},"If you move a device, check its position and electrical assignment separately. If it changes circuit, update the reference in both documents. After additions, a second person traces floor plan, diagram and board labels by sampling.",[12,56380,56381],{},"These help articles describe the workflow in PlanElec Pro:",[84,56383,56384,56388],{},[87,56385,56386],{},[40,56387,9462],{"href":9461},[87,56389,56390],{},[40,56391,20306],{"href":18627},[38398,56393],{},[79,56395,56397],{"id":56396},"step-5-legend-and-title-block","Step 5: Legend and title block",[12,56399,56400],{},"Sketch covers the drawing: place devices with their circuit references and check every floor in the PDF. Move to Pro when those same devices also need to be represented in the distribution board and self-check report.",[12,56402,56403],{},"Complete your plan with:",[84,56405,56406,56412,56418,56424],{},[87,56407,56408,56411],{},[15,56409,56410],{},"a legend"," listing every symbol used and its meaning, especially custom signs;",[87,56413,56414,56417],{},[15,56415,56416],{},"a title block"," with the AREI\u002FRGIE required details: number, revision and revision date (3.1.2), installation address, and the name, capacity and, where applicable, VAT number of the person responsible for the work (3.1.2.1 a); plus the scale and space for signature and endorsement;",[87,56419,56420,56423],{},[15,56421,56422],{},"a north arrow"," (optional but useful);",[87,56425,56426,56429],{},[15,56427,56428],{},"storey identification"," for buildings with several levels; one sheet per storey stays most readable.",[12,56431,3361,56432,56435],{},[40,56433,22],{"href":1456,"rel":56434},[1458],", you add a cover sheet and title block and export the plan as PDF in A4 or A3; each floor with content gets its own sheets. Before the export, \"Check documents\" shows, among other things, empty fields in the title block and devices in the diagram without a place on the situation plan. It is a completeness aid, not a statement about the inspection.",[38398,56437],{},[79,56439,42597],{"id":42596},[138,56441,56442,56452],{},[141,56443,56444],{},[144,56445,56446,56448,56450],{},[147,56447,2993],{},[147,56449,2996],{},[147,56451,20676],{},[163,56453,56454,56465,56476,56487,56498,56509,56520],{},[144,56455,56456,56459,56462],{},[168,56457,56458],{},"treating the smoke-detector duty as an AREI rule",[168,56460,56461],{},"wrong basis for the check",[168,56463,56464],{},"check separately against the current regional source and label it",[144,56466,56467,56470,56473],{},[168,56468,56469],{},"treating an outdoor socket generically",[168,56471,56472],{},"IP rating or protection does not suit the external influences",[168,56474,56475],{},"check IP rating and RCD protection for the project",[144,56477,56478,56481,56484],{},[168,56479,56480],{},"missing labels or circuit numbers",[168,56482,56483],{},"points cannot be linked to the diagram",[168,56485,56486],{},"mark every point with letter and number",[144,56488,56489,56492,56495],{},[168,56490,56491],{},"unexplained symbols",[168,56493,56494],{},"does not meet 3.1.2.1 a",[168,56496,56497],{},"use Table 2.23; choose unambiguous custom signs and explain them in the legend",[144,56499,56500,56503,56506],{},[168,56501,56502],{},"switch on the wrong side of the door",[168,56504,56505],{},"impractical (not an AREI breach)",[168,56507,56508],{},"check the opening direction",[144,56510,56511,56514,56517],{},[168,56512,56513],{},"bathroom socket drawn in the wrong zone",[168,56515,56516],{},"plan and installation lead to a safety-relevant finding",[168,56518,56519],{},"check zones and protection against Chapter 7.1",[144,56521,56522,56525,56528],{},[168,56523,56524],{},"no legend",[168,56526,56527],{},"custom signs cannot be read",[168,56529,56530],{},"add a symbol table",[38398,56532],{},[79,56534,56536],{"id":56535},"checklist-before-the-inspection","Checklist before the inspection",[84,56538,56540,56546,56552,56558,56564,56570,56576,56582,56588],{"className":56539},[36137],[87,56541,56543,56545],{"className":56542},[36141],[25188,56544],{"disabled":2121,"type":36144}," All rooms labelled",[87,56547,56549,56551],{"className":56548},[36141],[25188,56550],{"disabled":2121,"type":36144}," All boards, boxes, sockets, switches, lighting points, fixed appliances and sources drawn",[87,56553,56555,56557],{"className":56554},[36141],[25188,56556],{"disabled":2121,"type":36144}," Smoke detectors, if shown, checked separately and labelled",[87,56559,56561,56563],{"className":56560},[36141],[25188,56562],{"disabled":2121,"type":36144}," Outdoor sockets recorded with project-specific IP rating and protection",[87,56565,56567,56569],{"className":56566},[36141],[25188,56568],{"disabled":2121,"type":36144}," Circuit letter and number at every point",[87,56571,56573,56575],{"className":56572},[36141],[25188,56574],{"disabled":2121,"type":36144}," References match the single-line diagram",[87,56577,56579,56581],{"className":56578},[36141],[25188,56580],{"disabled":2121,"type":36144}," Table 2.23 symbols, custom signs in the legend",[87,56583,56585,56587],{"className":56584},[36141],[25188,56586],{"disabled":2121,"type":36144}," Title block with number, revision, date, address and responsible person",[87,56589,56591,56593],{"className":56590},[36141],[25188,56592],{"disabled":2121,"type":36144}," One sheet per storey",[79,56595,56597],{"id":56596},"site-check-does-the-plan-match-the-building","Site check: does the plan match the building?",[12,56599,56600],{},"Once drawn, walk through the building with the plan. Start at the board and follow every circuit. Check not only that a socket exists, but that multiple socket, switched socket, junction box, fixed connection and lighting point are correctly distinguished. For switches, the reference must show which lighting point or appliance they control. Devices behind built-in furniture, outdoor elements, plant rooms and outbuildings are easily missed.",[12,56602,56603],{},"Then compare with the single-line diagram. An item referenced A3 on the situation plan appears there as the same item in circuit A. Contradictory assignments and devices moved after the fact are the most common causes of contradictory documents. For several storeys or building parts, a clear sheet structure helps; number, revision and revision date appear on every issued plan.",[12,56605,56606],{},"The situation plan shows the real state, not just the original intent. Mark a change as complete only once cable route and device position have been checked on site. For a non-substantial change, a short description is enough for the single-line diagram; you still draw the change on the situation plan (3.1.2.1 a). For substantial modifications or extensions, you create or update the single-line diagram and situation plan, and the affected work is inspected before it is put into use.",[79,56608,56610],{"id":56609},"what-the-plan-does-not-decide","What the plan does not decide",[12,56612,56613],{},"A symbol proves neither mounting height, IP rating, bathroom zone, earthing quality nor disconnection time. You establish those properties with on-site checks, measurements and manufacturer documentation. Smoke-detector duties come from regional building and housing law; the plan may show detectors, but the electrical inspection and regional requirements remain separate questions.",[12,56615,56616],{},"In PlanElec Pro, one shared project model keeps device position and electrical assignment together. Items not yet placed, not assigned to a circuit or imported only as a reference stay visibly open. The advisory self-check report shows you errors in the supported rules; the official assessment is made by the approved control body.",[1041,56618,56620],{"id":56619},"prepare-readability-for-the-inspection","Prepare readability for the inspection",[12,56622,56623],{},"Export the plan once at the intended sheet size. Symbols, references and room boundaries stay distinguishable without heavy zooming. Offset overlapping references and connect them with a clear leader line. Colour helps while editing but never carries meaning on its own, because printouts are often black and white.",[12,56625,56626],{},"Keep a list of open items for inaccessible boxes, unknown switching relationships or assumed cable routes. You resolve those before the final revision or mark them visibly as unknown. A clearly marked data gap is more honest than a symbol at an estimated position. Finally, have a second person trace references between situation plan, single-line diagram and board labels by sampling.",[79,56628,43864],{"id":43863},[84,56630,56631,56637],{},[87,56632,56633],{},[40,56634,56636],{"href":1971,"rel":56635},[1458],"FPS Economy: RGIE\u002FAREI Book 1, current official publication",[87,56638,56639],{},"Decisive are Book 1 V06, Chapter 2.12 (definition of a plan), Section 3.1.2 (content and referencing), Table 2.23 (symbols) and Chapter 7.1 (rooms with a bath or shower).",[38398,56641],{},[79,56643,7537],{"id":7536},[84,56645,56646,56651,56656,56660,56665,56669,56673],{},[87,56647,56648],{},[40,56649,56650],{"href":4212},"Creating a single-line diagram: step by step",[87,56652,56653],{},[40,56654,56655],{"href":5399},"Single-line diagram vs situation plan",[87,56657,56658],{},[40,56659,5394],{"href":5393},[87,56661,56662],{},[40,56663,56664],{"href":4200},"Distribution board planning: structure and sizing",[87,56666,56667],{},[40,56668,3982],{"href":3981},[87,56670,56671],{},[40,56672,36314],{"href":33617},[87,56674,56675],{},[40,56676,24147],{"href":24146},[38398,56678],{},[12,56680,56681],{},[63,56682,3361,56683,56685,56686,6975,56688],{},[15,56684,22],{},", you draw the situation plan and single-line diagram free of charge in the browser and export both as PDF. If you need a distribution board, a self-check report or teamwork, take the drawing over to ",[40,56687,31],{"href":1964},[40,56689,56691],{"href":1456,"rel":56690},[1458],"Draw your situation plan in Sketch →",[79,56693,2009],{"id":2008},[84,56695,56696,56703],{},[87,56697,56698,38,56700,56],{},[15,56699,11935],{},[40,56701,2023],{"href":1456,"rel":56702},[1458],[87,56704,56705,38,56707,2033,56709,56],{},[15,56706,7561],{},[40,56708,2032],{"href":1964},[40,56710,2036],{"href":54},[12,56712,56713,7570],{},[15,56714,2041],{},{"title":2044,"searchDepth":2045,"depth":2045,"links":56716},[56717,56721,56722,56729,56732,56733,56734,56735,56736,56739,56740,56741],{"id":56005,"depth":2045,"text":56006,"children":56718},[56719,56720],{"id":56009,"depth":2053,"text":56010},{"id":56044,"depth":2053,"text":56045},{"id":56152,"depth":2045,"text":56153},{"id":56172,"depth":2045,"text":56173,"children":56723},[56724,56725,56726,56727,56728],{"id":56185,"depth":2053,"text":56186},{"id":40954,"depth":2053,"text":56221},{"id":22994,"depth":2053,"text":7264},{"id":56262,"depth":2053,"text":56263},{"id":56269,"depth":2053,"text":56270},{"id":56300,"depth":2045,"text":56301,"children":56730},[56731],{"id":56310,"depth":2053,"text":56311},{"id":56396,"depth":2045,"text":56397},{"id":42596,"depth":2045,"text":42597},{"id":56535,"depth":2045,"text":56536},{"id":56596,"depth":2045,"text":56597},{"id":56609,"depth":2045,"text":56610,"children":56737},[56738],{"id":56619,"depth":2053,"text":56620},{"id":43863,"depth":2045,"text":43864},{"id":7536,"depth":2045,"text":7537},{"id":2008,"depth":2045,"text":2009},"2026-03-30","How to draw a checkable situation plan under AREI\u002FRGIE: floor plan, Table 2.23 symbols, circuit references matching the single-line diagram, legend, title block and a final site check.",[18037,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-draw-situation-plan-editorial.jpg","\u002Fblog\u002Fdraw-situation-plan.en",{"title":55962,"description":56743},"Draw a Situation Plan: Step-by-Step Guide (AREI\u002FRGIE)","draw-situation-plan-guide","blog\u002Fdraw-situation-plan.en",[2132,2133,56753,4239,56754,56755,46686],"symbols","drawing","electrical plan","NKjt2B92nHn6eDeB5trKuiG_v_L1ZE2O02s1_Gytafc","\u002Fblog\u002Fdraw-situation-plan-guide",{"id":56759,"title":56760,"articleId":56761,"body":56762,"category":27063,"date":57064,"description":57065,"extension":2113,"image":56774,"labels":57066,"lastUpdated":10988,"locale":2119,"meta":57067,"navigation":2121,"ogImage":57068,"path":57069,"publishDate":57064,"readTime":47831,"refreshInterval":4248,"seo":57070,"seoTitle":57071,"slug":56761,"stem":57072,"tags":57073,"__hash__":57078,"kind":2137,"href":57079},"blog\u002Fblog\u002Fpreflex-vs-open-wiring.en.md","Preflex vs. Open Wiring: Which Cable Method for Your Project?","preflex-vs-open-wiring",{"type":9,"value":56763,"toc":57055},[56764,56770,56775,56779,56782,56785,56789,56871,56876,56880,56883,56921,56924,56928,56931,56935,56938,56958,56961,56965,56997,57006,57008,57030,57047],[12,56765,56766,56769],{},[15,56767,56768],{},"In new builds, Preflex with VOB wires is the Belgian standard: the conduits go onto the slab or into the walls during the shell phase, and the wires stay replaceable later. In renovations, XVB cable without conduit is usually the faster option, in a wall chase, surface-mounted or in a cavity."," The AREI\u002FRGIE permits both methods; it governs how you carry them out.",[12,56771,56772],{},[74,56773],{"alt":31319,"src":56774},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-preflex-vs-open-wiring-editorial.webp",[79,56776,56778],{"id":56777},"what-is-preflex","What is Preflex?",[12,56780,56781],{},"In Belgium, Preflex is the common name for flexible corrugated plastic electrical conduit. It comes empty or with factory-pulled VOB wires. In new builds, it is laid during the shell phase on the concrete slab, in the screed or in wall chases, and then cast in or plastered over.",[12,56783,56784],{},"Open wiring here means cables without conduit, usually XVB: directly in a chase under plaster, surface-mounted, on a cable tray or in building cavities.",[79,56786,56788],{"id":56787},"preflex-and-open-wiring-compared","Preflex and open wiring compared",[138,56790,56791,56803],{},[141,56792,56793],{},[144,56794,56795,56797,56800],{},[147,56796,11364],{},[147,56798,56799],{},"Preflex with VOB wires",[147,56801,56802],{},"Open wiring with XVB",[163,56804,56805,56816,56827,56838,56849,56860],{},[144,56806,56807,56810,56813],{},[168,56808,56809],{},"Conductor type",[168,56811,56812],{},"Single-core wire (H07V-U\u002F-R) in conduit",[168,56814,56815],{},"Sheathed cable",[144,56817,56818,56821,56824],{},[168,56819,56820],{},"Typical use",[168,56822,56823],{},"New build, major renovation",[168,56825,56826],{},"Renovation, basement, plant room, extension",[144,56828,56829,56832,56835],{},[168,56830,56831],{},"Replacing wires later",[168,56833,56834],{},"yes, wires must remain pullable at all times (5.2.9.3)",[168,56836,56837],{},"only by opening up or using a new route",[144,56839,56840,56843,56846],{},[168,56841,56842],{},"Surface mounting",[168,56844,56845],{},"only the conduit, not the bare wire (5.2.9.5)",[168,56847,56848],{},"yes (5.2.9.5)",[144,56850,56851,56854,56857],{},[168,56852,56853],{},"Directly in a chase",[168,56855,56856],{},"not applicable",[168,56858,56859],{},"yes, within the installation zones (5.2.9.10)",[144,56861,56862,56865,56868],{},[168,56863,56864],{},"Material",[168,56866,56867],{},"conduit plus each wire separately",[168,56869,56870],{},"one cable with all cores",[1489,56872],{":height":22672,":width":3800,"alt":56873,"caption":56874,"src":56875},"Two wall sections. Left, a Preflex conduit with three VOB cores, embedded at least 3 cm deep; right, an XVB cable straight in the chase under at least 0.4 cm of plaster. Below, the rules from 5.2.9.3 and 5.2.9.10.","In conduit the cores stay replaceable; without conduit only a cable is allowed, and it must stay within the installation zones.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fpreflex-vs-open-wiring\u002Fpreflex-vs-chase.en.svg",[79,56877,56879],{"id":56878},"what-the-arei-requires-for-conduits","What the AREI requires for conduits",[12,56881,56882],{},"Subsection 5.2.9.3 governs installation in electrical conduits:",[84,56884,56885,56891,56897,56903,56909,56915],{},[87,56886,56887,56890],{},[15,56888,56889],{},"Diameter:"," conduits and fittings sized so that conductors can easily be pulled in and removed after installation (letter d).",[87,56892,56893,56896],{},[15,56894,56895],{},"Bending radius:"," at least eight times the outside diameter for flexible thermoplastic conduit (letter e).",[87,56898,56899,56902],{},[15,56900,56901],{},"No joints in the conduit:"," connections belong in pull or junction boxes on a suitable terminal block (letter f).",[87,56904,56905,56908],{},[15,56906,56907],{},"Combustible conduit:"," permitted only if embedded at least 3 cm deep in non-combustible materials (letter f).",[87,56910,56911,56914],{},[15,56912,56913],{},"Heat:"," no thermoplastic conduit where the temperature can exceed 60 °C in normal operation (letter f).",[87,56916,56917,56920],{},[15,56918,56919],{},"Embedded conduit:"," no tees or elbows; conductors remain accessible in the boxes (letter i.2).",[12,56922,56923],{},"The AREI sets no fill limit as a percentage. The test is that conductors can be pulled in and removed at any time.",[79,56925,56927],{"id":56926},"what-the-arei-requires-for-open-wiring","What the AREI requires for open wiring",[12,56929,56930],{},"Wiring embedded without conduit must be cable; conductors with basic insulation only are prohibited there (5.2.9.10). In the walls of rooms, installation zones apply: horizontal runs 25 to 35 cm below the ceiling or above the floor, vertical runs as close as possible to a corner or 10 to 20 cm beside door frames, and at least 0.4 cm of plaster cover. In concrete or cement, you need at least 3 cm of cover.",[79,56932,56934],{"id":56933},"which-fire-class-do-you-need","Which fire class do you need?",[12,56936,56937],{},"What counts is the CPR class of the cable, not of the conduit:",[84,56939,56940,56946,56952],{},[87,56941,56942,56945],{},[15,56943,56944],{},"Installed singly:"," at least F1 or class Eca (5.2.7.2).",[87,56947,56948,56951],{},[15,56949,56950],{},"In bundles or flat formation:"," at least F2 or class Cca (5.2.7.3).",[87,56953,56954,56957],{},[15,56955,56956],{},"In building cavities:"," also F2 or Cca (4.3.3.5 b and 5.2.9.9). A timber-frame or plasterboard stud wall is a building cavity.",[12,56959,56960],{},"Cables and conduits embedded at least 3 cm deep in non-combustible cladding are exempt (5.2.7.1 no. 3). If the Preflex conduit sits at least 3 cm deep in concrete or screed, this exemption applies. In a cavity, by contrast, the class of cable and conduit counts (5.2.9.9 with 5.2.7.3 and 5.2.7.4).",[79,56962,56964],{"id":56963},"which-method-when","Which method when?",[84,56966,56967,56973,56979,56985,56991],{},[87,56968,56969,56972],{},[15,56970,56971],{},"New build:"," Preflex with VOB wires, cast into or plastered into floors and walls.",[87,56974,56975,56978],{},[15,56976,56977],{},"Renovation with chases:"," XVB directly in the chase, within the installation zones.",[87,56980,56981,56984],{},[15,56982,56983],{},"Basement, garage, plant room:"," XVB surface-mounted or on a cable tray.",[87,56986,56987,56990],{},[15,56988,56989],{},"Timber frame, drywall, suspended ceiling:"," cable rated at least Cca or a suitable conduit system.",[87,56992,56993,56996],{},[15,56994,56995],{},"Partial renovation:"," combine both; new circuits in Preflex, existing wiring kept after inspection.",[12,56998,56999,57000,57003,57004,56],{},"For the cable types, see ",[40,57001,57002],{"href":30823},"XVB cable or VOB wire","; for the complete system, ",[40,57005,42568],{"href":3813},[79,57007,7537],{"id":7536},[84,57009,57010,57016,57021,57026],{},[87,57011,57012],{},[40,57013,57015],{"href":57014},"\u002Fen\u002Fblog\u002Farei-2026-changes","What Changes with the AREI 2026?",[87,57017,57018],{},[40,57019,57020],{"href":22834},"Bathroom Electrics: Zones and Cable Types",[87,57022,57023],{},[40,57024,57025],{"href":5956},"Old Buildings and AREI Part 8",[87,57027,57028],{},[40,57029,48356],{"href":4045},[12,57031,57032],{},[63,57033,57034,57035,57038,57039,57041,57042,57044,57045,1487],{},"New build with Preflex or renovation with open wiring: in ",[40,57036,22],{"href":1456,"rel":57037},[1458]," you draw the single-line diagram and situation plan for free in the browser and record type, fire class, installation method and ",[15,57040,32439],{}," for every cable; both export as PDF. ",[40,57043,31],{"href":1964}," checks more: the self-check flags cables in hollow walls below Cca without documented conduit (",[40,57046,28419],{"href":1085},[12,57048,57049],{},[63,57050,57051,57052,56],{},"Regulatory basis: AREI\u002FRGIE Book 1, version 06, subsections 4.3.3.5, 5.2.7.1–5.2.7.3, 5.2.9.3, 5.2.9.5, 5.2.9.9 and 5.2.9.10. Official text: ",[40,57053,27049],{"href":1971,"rel":57054},[1458],{"title":2044,"searchDepth":2045,"depth":2045,"links":57056},[57057,57058,57059,57060,57061,57062,57063],{"id":56777,"depth":2045,"text":56778},{"id":56787,"depth":2045,"text":56788},{"id":56878,"depth":2045,"text":56879},{"id":56926,"depth":2045,"text":56927},{"id":56933,"depth":2045,"text":56934},{"id":56963,"depth":2045,"text":56964},{"id":7536,"depth":2045,"text":7537},"2026-03-27","Preflex conduit or XVB installed directly? Comparison for new builds and renovations in Belgium, with the AREI\u002FRGIE rules on conduits, fire classes and installation zones.",[4244,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-preflex-vs-open-wiring-editorial.jpg","\u002Fblog\u002Fpreflex-vs-open-wiring.en",{"title":56760,"description":57065},"Preflex vs. Open Wiring: Which Cable Method?","blog\u002Fpreflex-vs-open-wiring.en",[57074,57075,36356,43965,2133,57076,57077],"preflex","wiring","fire safety","XVB","uSNt0G52RsNLVEyQ9GCsRcZVPLFBU1wOwl_0gNQmNjY","\u002Fblog\u002Fpreflex-vs-open-wiring",{"id":57081,"title":57082,"articleId":57083,"body":57084,"category":27063,"date":57518,"description":57519,"extension":2113,"image":57100,"labels":57520,"lastUpdated":2111,"locale":2119,"meta":57521,"navigation":2121,"ogImage":57522,"path":57523,"publishDate":57518,"readTime":3582,"refreshInterval":4248,"seo":57524,"seoTitle":10313,"slug":57083,"stem":57525,"tags":57526,"__hash__":57531,"kind":2137,"href":57532},"blog\u002Fblog\u002Frcd-type-a-vs-b.en.md","RCD Type A or Type B? The AREI Rule in 2026","rcd-type-a-vs-b",{"type":9,"value":57085,"toc":57503},[57086,57090,57096,57101,57104,57107,57116,57121,57125,57145,57148,57152,57232,57235,57239,57264,57267,57271,57274,57319,57322,57326,57346,57350,57353,57357,57360,57363,57367,57370,57374,57425,57429,57449,57453,57463,57474,57476,57478,57480,57495],[79,57087,57089],{"id":57088},"short-answer-at-least-type-a-type-b-only-for-smooth-dc-fault-current","Short answer: at least Type A, Type B only for smooth DC fault current",[12,57091,57092,57095],{},[15,57093,57094],{},"Every RCD in a Belgian domestic installation must be at least Type A"," (AREI Book 1, subsection 5.3.5.3(a)). You need Type B where smooth DC fault currents can occur and no other permitted combination covers them. For EV chargers the rule is fixed: either an RCD that keeps working with a DC fault component (for example Type B), or an RCD together with a residual direct-current detecting device, for example Type A plus an RDC-DD in the charging station (7.22.4.1(b)).",[12,57097,57098],{},[74,57099],{"alt":24946,"src":57100},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-rcd-type-a-vs-b-editorial.webp",[12,57102,57103],{},"For every other appliance the datasheet decides: which fault-current waveforms are possible, is DC monitoring built in, which external RCD does the manufacturer specify? \"Has an inverter\" is not on its own a reason for Type B.",[12,57105,57106],{},"This article covers domestic AC installations under Book 1, version 06, applicable since 1 April 2026. Earthed DC systems, which version 06 now regulates, are a separate topic.",[12,57108,57109,57111,57112],{},[15,57110,47231],{}," on the protective device you choose the type AC, A, F or B, and Sketch prints it next to the symbol, for example “Δ30mA B”. For the EV charger, “Add charging point” creates its own charging circuit with its own 30 mA device; you set the type from the data sheet yourself, Sketch does not check it. ",[40,57113,57115],{"href":47468,"rel":57114},[1458],"Add a charging point in Sketch",[1489,57117],{":height":44011,":width":3800,"alt":57118,"caption":57119,"src":57120},"Decision path: at least Type A for every RCD; charging point with its own 30 mA device, Type B or Type A plus RDC-DD; for heat pumps, PV and inverters the data sheet decides between Type A, F or B.","Type A is the floor; the AREI explicitly requires Type B or Type A with RDC-DD only for the charging point (7.22.4.1 b).","\u002Fimages\u002Fblog\u002Fdiagrams\u002Frcd-type-a-vs-b\u002Frcd-type-decision.en.svg",[79,57122,57124],{"id":57123},"type-high-immunity-and-selectivity-are-three-different-things","Type, high immunity and selectivity are three different things",[3139,57126,57127,57133,57139],{},[87,57128,57129,57132],{},[15,57130,57131],{},"AC, A, F or B"," states the fault-current waveforms for which tripping is guaranteed.",[87,57134,57135,57138],{},[15,57136,57137],{},"High immunity"," (manufacturer codes such as SI, HI or AP-R) reduces nuisance tripping under certain disturbances.",[87,57140,57141,57144],{},[15,57142,57143],{},"Selectivity or time delay"," describes timing relative to a downstream RCD. What counts is an S marking or a documented time characteristic.",[12,57146,57147],{},"A \"Type A-SI\" is therefore not automatically selective. Some A-SI devices trip instantaneously.",[79,57149,57151],{"id":57150},"all-rcd-types-at-a-glance","All RCD types at a glance",[138,57153,57154,57166],{},[141,57155,57156],{},[144,57157,57158,57160,57163],{},[147,57159,12220],{},[147,57161,57162],{},"Detects",[147,57164,57165],{},"Use in Belgian homes",[163,57167,57168,57181,57194,57207,57220],{},[144,57169,57170,57175,57178],{},[168,57171,57172],{},[15,57173,57174],{},"AC",[168,57176,57177],{},"Pure AC fault currents only",[168,57179,57180],{},"Does not meet the minimum Type A requirement",[144,57182,57183,57188,57191],{},[168,57184,57185],{},[15,57186,57187],{},"A",[168,57189,57190],{},"AC and pulsating DC fault currents",[168,57192,57193],{},"Minimum class (5.3.5.3(a)); appliance requirements still apply",[144,57195,57196,57201,57204],{},[168,57197,57198],{},[15,57199,57200],{},"A-SI",[168,57202,57203],{},"Same waveforms as Type A",[168,57205,57206],{},"Higher immunity to disturbances; not automatically selective",[144,57208,57209,57214,57217],{},[168,57210,57211],{},[15,57212,57213],{},"F",[168,57215,57216],{},"Additionally certain mixed frequencies",[168,57218,57219],{},"For certain single-phase inverter loads per the manufacturer",[144,57221,57222,57226,57229],{},[168,57223,57224],{},[15,57225,33167],{},[168,57227,57228],{},"Additionally smooth DC fault currents",[168,57230,57231],{},"When the protection concept or the manufacturer requires it",[12,57233,57234],{},"New in version 06: sensitivity classes now distinguish AC or pulsating DC from smooth DC. \"High sensitivity\" means more than 10 mA up to 30 mA for AC, and more than 20 mA up to 80 mA for smooth DC (2.6.4).",[79,57236,57238],{"id":57237},"four-ratings-on-the-device-you-must-not-confuse","Four ratings on the device you must not confuse",[84,57240,57241,57246,57252,57258],{},[87,57242,57243,57245],{},[15,57244,12220],{}," (A, F, B …): detected fault-current waveform.",[87,57247,57248,57251],{},[15,57249,57250],{},"IΔn"," (for example 30 or 300 mA): sensitivity to residual current.",[87,57253,57254,57257],{},[15,57255,57256],{},"In"," (for example 40 or 63 A): the current the RCD may carry continuously. It does not trip on overload, so a plain RCD needs coordinated overcurrent protection.",[87,57259,57260,57263],{},[15,57261,57262],{},"Short-circuit withstand"," or conditional short-circuit current: must suit the installation point (5.3.5.3(a)).",[12,57265,57266],{},"Number of poles, supply voltage and wiring matter too: all live conductors of the protected circuit pass through the core-balance transformer, and neutrals of different RCD groups are never mixed. The test button checks the internal mechanism – not the earthing resistance and not the complete protective measure. Only the measurements during inspection do that.",[79,57268,57270],{"id":57269},"when-do-you-need-type-b","When do you need Type B?",[12,57272,57273],{},"Type B comes into play when smooth DC fault currents are possible and no other combination permitted by AREI and the manufacturer covers that risk. Check the actual appliance:",[138,57275,57276,57285],{},[141,57277,57278],{},[144,57279,57280,57282],{},[147,57281,47246],{},[147,57283,57284],{},"What decides",[163,57286,57287,57297,57304,57311],{},[144,57288,57289,57291],{},[168,57290,37316],{},[168,57292,57293,57294,57296],{},"7.22.4.1(b): Type B ",[15,57295,3764],{}," RCD plus coordinated RDC-DD (in the installation, the charger or both)",[144,57298,57299,57301],{},[168,57300,35639],{},[168,57302,57303],{},"Datasheet of compressor drive, backup heater and controls; specified external RCD",[144,57305,57306,57308],{},[168,57307,18139],{},[168,57309,57310],{},"Inverter topology, internal residual-current monitoring, manufacturer's requirement for the external RCD",[144,57312,57313,57316],{},[168,57314,57315],{},"Several inverters on one RCD",[168,57317,57318],{},"Assess the sum of normal leakage currents and possible DC components together",[12,57320,57321],{},"\"Transformerless\" or \"has an inverter\" does not create a general Type B obligation. Conversely, Type B or F is not simply \"better\": a wider waveform range does not replace correct sensitivity, rated current, disconnection time, overcurrent protection or proper wiring.",[79,57323,57325],{"id":57324},"when-is-type-a-enough","When is Type A enough?",[84,57327,57328,57334,57340],{},[87,57329,57330,57333],{},[15,57331,57332],{},"Socket and lighting circuits:"," the usual 30 mA Type A RCD.",[87,57335,57336,57339],{},[15,57337,57338],{},"Ordinary household appliances"," such as washing machine, dishwasher, cooker and lighting, unless the manufacturer specifies otherwise.",[87,57341,57342,57345],{},[15,57343,57344],{},"EV charger with built-in RDC-DD:"," each charging circuit gets its own RCD of no more than 30 mA (7.22.4.1(b)). If the charging station has a residual DC detecting device coordinated with the external RCD, Type A is sufficient there. The charger's datasheet documents that coordination.",[79,57347,57349],{"id":57348},"new-modified-or-existing","New, modified or existing?",[12,57351,57352],{},"\"At least Type A\" is the selection basis for new domestic installations. For an existing installation, also check when it was built, which Part 8 deviations apply and whether a renovation or extension triggers current requirements for the modified part. An existing Type AC is therefore neither acceptable without review nor automatic proof that the whole installation is unusable.",[79,57354,57356],{"id":57355},"nuisance-tripping-cause-first-device-second","Nuisance tripping: cause first, device second",[12,57358,57359],{},"If an RCD trips for no apparent reason, \"fit an A-SI\" is not a diagnosis. First check insulation faults, moisture, swapped or shared neutrals, leakage currents and wiring errors. Only then assess whether a device with documented high immunity is suitable. High immunity must not weaken protection of persons.",[12,57361,57362],{},"A combined RCD\u002Fcircuit breaker (RCBO) provides residual-current and overcurrent protection for a single final circuit. Its type must still match the load, and coordination with the upstream RCD remains necessary. Record the actual device reference in the dossier – datasheet, wiring diagram and installation instructions – not just \"30 mA Type A\".",[79,57364,57366],{"id":57365},"selectivity-300-ma-ahead-of-30-ma-is-not-enough","Selectivity: 300 mA ahead of 30 mA is not enough",[12,57368,57369],{},"Grading 300 mA ahead of 30 mA does not guarantee selectivity. Check the ratio of rated residual currents, an explicitly selective or time-delayed characteristic on the upstream device, the manufacturer-approved combination, disconnection times and normal leakage currents. High immunity does not replace time\u002Fcurrent coordination. Only with that evidence does a fault reliably trip just the group RCD.",[79,57371,57373],{"id":57372},"arei-references-at-a-glance","AREI references at a glance",[138,57375,57376,57384],{},[141,57377,57378],{},[144,57379,57380,57382],{},[147,57381,47548],{},[147,57383,3724],{},[163,57385,57386,57394,57402,57409,57417],{},[144,57387,57388,57391],{},[168,57389,57390],{},"2.6.4",[168,57392,57393],{},"Sensitivity classes for AC\u002Fpulsating DC and for smooth DC",[144,57395,57396,57399],{},[168,57397,57398],{},"4.2.4.3(b)",[168,57400,57401],{},"No more than 300 mA at the origin; downstream, sensitive protection for the listed circuits",[144,57403,57404,57406],{},[168,57405,57398],{},[168,57407,57408],{},"Max. 8 final circuits per high- or very-high-sensitivity RCD",[144,57410,57411,57414],{},[168,57412,57413],{},"5.3.5.3(a)",[168,57415,57416],{},"In homes at least Type A; origin RCD at least 40 A; short-circuit withstand suited to the location",[144,57418,57419,57422],{},[168,57420,57421],{},"7.22.4.1(b)",[168,57423,57424],{},"EV charger: own RCD ≤ 30 mA per charging circuit; DC-proof RCD or RCD plus DC detection",[79,57426,57428],{"id":57427},"selection-in-six-steps","Selection in six steps",[3139,57430,57431,57434,57437,57440,57443,57446],{},[87,57432,57433],{},"Identify the circuit and every connected appliance.",[87,57435,57436],{},"Set the AREI minimum protection and sensitivity.",[87,57438,57439],{},"Check manufacturer documents for fault waveform, DC detection and the specified external RCD.",[87,57441,57442],{},"For cascades, prove time\u002Fcurrent coordination of the actual models.",[87,57444,57445],{},"Document type, sensitivity, rated current and delay in the single-line diagram.",[87,57447,57448],{},"Have the completed installation inspected by the approved inspection body.",[79,57450,57452],{"id":57451},"record-and-check-rcd-data-in-planelec","Record and check RCD data in PlanElec",[12,57454,57455,57458,57459,57462],{},[15,57456,57457],{},"Draw and document with PlanElec Sketch (free, in the browser):"," on the protective device you choose the kind (RCD or RCBO), the rated residual current in mA and the type AC, A, F or B. Sketch prints the data next to the symbol, for example “Δ30mA B” and “2P - 40A”, and exports the single-line diagram as a PDF. For the EV charger, ",[40,57460,57115],{"href":47468,"rel":57461},[1458]," creates its own charging circuit with its own 30 mA device; you set the type yourself – B, or A with RDC-DD according to the charging station data sheet. Sketch does not check the type or any AREI rules.",[12,57464,57465,23704,57468,57470,57471,57473],{},[15,57466,57467],{},"Check with PlanElec Pro:",[40,57469,31],{"href":1964}," you also record type, sensitivity and rated current for every RCD on the single-line diagram. The AREI\u002FRGIE self-check flags, among other things, a main RCD below 40 A, an EV charger without its own RCD, a charger RCD that is neither Type B nor paired with an RDC-DD confirmed in the inspector, and – as a practice recommendation based on IEC 60364-5-53 – an upstream RCD without time delay. The full scope is in ",[40,57472,1086],{"href":1085},". The self-check shows you open points; manufacturer coordination and measurements are verified on the real device, and the inspection is carried out by the approved inspection body.",[1489,57475],{":height":6699,":width":51747,"alt":51748,"caption":51749,"src":51750},[1489,57477],{":height":42714,":width":42715,"alt":42716,"caption":42717,"src":42718},[79,57479,7537],{"id":7536},[84,57481,57482,57486,57491],{},[87,57483,57484],{},[40,57485,3900],{"href":3899},[87,57487,57488],{},[40,57489,57490],{"href":3681},"Installing an EV charger under AREI",[87,57492,57493],{},[40,57494,50991],{"href":25379},[12,57496,57497],{},[63,57498,57499,57500,27050],{},"Legal basis: AREI\u002FRGIE Book 1, version 06, section 2.6.4 and subsections 4.2.4.3(b), 5.3.5.3(a) and 7.22.4.1(b). The official text published by the ",[40,57501,27049],{"href":25362,"rel":57502},[1458],{"title":2044,"searchDepth":2045,"depth":2045,"links":57504},[57505,57506,57507,57508,57509,57510,57511,57512,57513,57514,57515,57516,57517],{"id":57088,"depth":2045,"text":57089},{"id":57123,"depth":2045,"text":57124},{"id":57150,"depth":2045,"text":57151},{"id":57237,"depth":2045,"text":57238},{"id":57269,"depth":2045,"text":57270},{"id":57324,"depth":2045,"text":57325},{"id":57348,"depth":2045,"text":57349},{"id":57355,"depth":2045,"text":57356},{"id":57365,"depth":2045,"text":57366},{"id":57372,"depth":2045,"text":57373},{"id":57427,"depth":2045,"text":57428},{"id":57451,"depth":2045,"text":57452},{"id":7536,"depth":2045,"text":7537},"2026-03-25","In Belgian homes every RCD is at least Type A. When you need Type B or Type A with RDC-DD – EV charger, heat pump, PV – and why A-SI does not mean selective.",[4243,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-rcd-type-a-vs-b-editorial.jpg","\u002Fblog\u002Frcd-type-a-vs-b.en",{"title":57082,"description":57519},"blog\u002Frcd-type-a-vs-b.en",[49385,57527,57528,57529,42798,57530],"residual-current-device","type-a","type-b","ev-charger","UeHUEDPr-Z9VLdQ5KKz54H_sLeXsmSWrWohUbosBN80","\u002Fblog\u002Frcd-type-a-vs-b",{"id":57534,"title":57535,"articleId":57536,"body":57537,"category":27063,"date":57775,"description":57776,"extension":2113,"image":57564,"labels":57777,"lastUpdated":10988,"locale":2119,"meta":57778,"navigation":2121,"ogImage":57779,"path":57780,"publishDate":57775,"readTime":47831,"refreshInterval":4248,"seo":57781,"seoTitle":10313,"slug":57782,"stem":57783,"tags":57784,"__hash__":57787,"kind":2137,"href":57788},"blog\u002Fblog\u002Fmain-switch-mandatory.en.md","Is a Main Switch Mandatory? What AREI Requires","main-switch-mandatory",{"type":9,"value":57538,"toc":57765},[57539,57543,57559,57565,57568,57572,57638,57641,57646,57650,57664,57668,57671,57685,57689,57699,57703,57706,57710,57719,57729,57734,57741,57743,57757],[79,57540,57542],{"id":57541},"short-answer-yes-at-least-40-a-in-homes","Short answer: yes, at least 40 A in homes",[12,57544,57545,57548,57549,57552,57553,57555,57556,57558],{},[15,57546,57547],{},"Yes, a main switch is mandatory in Belgium."," Under AREI Book 1, subsection 5.3.5.1(b), every main distribution and switching board is fitted with a ",[15,57550,57551],{},"main switch-disconnector"," that breaks all line conductors and, where applicable, the neutral simultaneously. Its rated current suits the installation and is at least ",[15,57554,33098],{}," in general, at least ",[15,57557,33109],{}," in domestic installations.",[12,57560,57561],{},[74,57562],{"alt":57563,"src":57564},"An electrician operates a covered protective or switching device.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-main-switch-mandatory-editorial.webp",[12,57566,57567],{},"Unlike a plain disconnector, a switch-disconnector may be operated under load. That is exactly what makes it the main switch: one action and the whole installation is dead.",[79,57569,57571],{"id":57570},"the-requirements-at-a-glance","The requirements at a glance",[138,57573,57574,57585],{},[141,57575,57576],{},[144,57577,57578,57580,57583],{},[147,57579,3724],{},[147,57581,57582],{},"What AREI requires",[147,57584,3919],{},[163,57586,57587,57598,57608,57617,57627],{},[144,57588,57589,57592,57595],{},[168,57590,57591],{},"Present",[168,57593,57594],{},"Main switch-disconnector on the main distribution and switching board",[168,57596,57597],{},"5.3.5.1(b)",[144,57599,57600,57603,57606],{},[168,57601,57602],{},"All line conductors at once",[168,57604,57605],{},"One operation breaks all line conductors and, where applicable, the neutral",[168,57607,57597],{},[144,57609,57610,57612,57615],{},[168,57611,26853],{},[168,57613,57614],{},"suited to the installation; at least 25 A, at least 40 A in homes",[168,57616,57597],{},[144,57618,57619,57622,57625],{},[168,57620,57621],{},"Exception",[168,57623,57624],{},"The network operator's overcurrent device may perform the function if designed to provide isolation",[168,57626,57597],{},[144,57628,57629,57632,57635],{},[168,57630,57631],{},"Accessible",[168,57633,57634],{},"Board easy to operate and maintain; in homes reachable without special aids",[168,57636,57637],{},"5.3.5.1(c)",[12,57639,57640],{},"In practice \"all line conductors and, where applicable, the neutral\" means: two-pole on a single-phase supply, four-pole on 3N~400 V and three-pole on 3×230 V without neutral. AREI sets no fixed mounting height; what matters is that you can reach the board without a ladder, tools or moving furniture.",[1489,57642],{":height":3266,":width":3800,"alt":57643,"caption":57644,"src":57645},"Chain from the service connection through the main switch (breaks all line conductors and N if present, at least 40 A in homes) to the RCD at the origin (at most 300 mA, at least Type A, at least 40 A); alongside, the number of poles per supply system and the exception for the network operator’s device","The main switch sits between the service connection and the RCD at the origin; its number of poles follows the supply system (5.3.5.1(b)).","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fmain-switch-mandatory\u002Fmain-switch-position.en.svg",[79,57647,57649],{"id":57648},"what-the-main-switch-is-for","What the main switch is for",[3139,57651,57652,57658],{},[87,57653,57654,57657],{},[15,57655,57656],{},"Emergency disconnection:"," in a fire, flood or electrical accident, any occupant switches off the whole installation with one action – no expertise needed.",[87,57659,57660,57663],{},[15,57661,57662],{},"Isolation for work:"," anyone working on the installation first separates it safely from the grid.",[79,57665,57667],{"id":57666},"typical-findings-at-inspection","Typical findings at inspection",[12,57669,57670],{},"In older installations the main switch is sometimes missing entirely, or there is only a single-pole switch that does not break the neutral. Check these points before the inspection:",[84,57672,57673,57676,57679,57682],{},[87,57674,57675],{},"Is a main switch present?",[87,57677,57678],{},"Does it break all line conductors (and the neutral where present) at once?",[87,57680,57681],{},"Is its rated current at least 40 A in a home and suited to the installation?",[87,57683,57684],{},"Is the board freely accessible – not behind furniture or in a locked room?",[79,57686,57688],{"id":57687},"main-switch-and-main-fuse-are-two-different-things","Main switch and main fuse are two different things",[12,57690,57691,57692,57695,57696,56],{},"The main switch is ",[15,57693,57694],{},"not overcurrent protection",". It isolates; it does not protect. Overcurrent protection comes from the network operator's device ahead of the meter and the circuit breakers in the board. Conversely, the network operator's device may take over the main-switch function only if it is expressly designed for isolation (5.3.5.1(b)). The breaking capacity needed downstream is explained in ",[40,57697,57698],{"href":33912},"Breaking capacity of circuit breakers",[79,57700,57702],{"id":57701},"main-switch-and-the-rcd-at-the-origin","Main switch and the RCD at the origin",[12,57704,57705],{},"At the origin of a domestic installation there is also at least one RCD of at most 300 mA, at least Type A and rated at least 40 A (4.2.4.3(b), 5.3.5.3(a)). It provides the isolating function under 5.3.3.1 a.3. That is a requirement on this device, not an exception to 5.3.5.1(b): as a substitute for the main switch-disconnector, the AREI expressly names only the network operator's overcurrent device. Whether a single device fulfils both roles is shown by its ratings. In any case, the single-line diagram must make clear which device performs the main switch-disconnector function.",[79,57707,57709],{"id":57708},"planning-the-main-switch-in-planelec","Planning the main switch in PlanElec",[12,57711,57712,57714,57715,57718],{},[15,57713,47761],{}," you draw the main switch for free in the browser: as a breaker of the kind “switch disconnector” with its number of poles and rated current, which Sketch prints next to the symbol (for example “4P - 40A”). The start task ",[40,57716,11136],{"href":3611,"rel":57717},[1458]," begins with the connection, meter, main RCD and board; you add the main switch ahead of them. Sketch documents, but checks no AREI rule.",[12,57720,57721,57725,57726,57728],{},[15,57722,3361,57723],{},[40,57724,31],{"href":1964}," you place the main switch in the single-line diagram and the distribution board. The AREI\u002FRGIE self-check reports a missing main switch and a main switch below 40 A in a home as errors, as well as a missing RCD of at most 300 mA at the origin and one rated below 40 A. The full scope is in ",[40,57727,1086],{"href":1085},". The self-check shows you open points; the inspection of the completed installation is carried out by the approved inspection body.",[1489,57730],{":height":22938,":width":47782,"alt":57731,"caption":57732,"src":57733},"PlanElec Sketch: between meter and main RCD a protective device of the kind ‘Switch disconnector’ with ‘Poles’ 4 and ‘Rated current’ 40 A; the symbol reads ‘4P - 40A’.","This is how you draw the main switch for free ahead of the main RCD. The device's ratings show whether it qualifies; Sketch does not check AREI\u002FRGIE rules.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-main-switch-4p.webp",[1489,57735],{":height":57736,":width":57737,"alt":57738,"caption":57739,"src":57740},"910","1530","‘Distribution board’ in PlanElec Pro, view ‘Layout’: at the top main switch, 300 mA RCD and the surge protective device, below the row of the charging point and the final circuits; the module palette on the left.","You put main switch and SPD on the rail as modules and Pro carries them into the single-line diagram. The self-check reports a missing main switch; acceptance is done by the accredited body.","\u002Fimages\u002Fblog\u002Fscreens\u002Fpro\u002Fen-spd-cabinet.webp",[79,57742,7537],{"id":7536},[84,57744,57745,57749,57753],{},[87,57746,57747],{},[40,57748,25390],{"href":25389},[87,57750,57751],{},[40,57752,3900],{"href":3899},[87,57754,57755],{},[40,57756,5394],{"href":5393},[12,57758,57759],{},[63,57760,57761,57762,27050],{},"Legal basis: AREI\u002FRGIE Book 1, version 07 (the cited provisions are unchanged from version 06), subsection 5.3.5.1(b) and (c), supplemented by 4.2.4.3(b), 5.3.3.1 a.3 and 5.3.5.3(a). The official text published by the ",[40,57763,27049],{"href":25362,"rel":57764},[1458],{"title":2044,"searchDepth":2045,"depth":2045,"links":57766},[57767,57768,57769,57770,57771,57772,57773,57774],{"id":57541,"depth":2045,"text":57542},{"id":57570,"depth":2045,"text":57571},{"id":57648,"depth":2045,"text":57649},{"id":57666,"depth":2045,"text":57667},{"id":57687,"depth":2045,"text":57688},{"id":57701,"depth":2045,"text":57702},{"id":57708,"depth":2045,"text":57709},{"id":7536,"depth":2045,"text":7537},"2026-03-23","Yes: every main distribution board needs a main switch-disconnector that breaks all line conductors at once – at least 40 A in homes (AREI 5.3.5.1(b)). All requirements at a glance.",[4243,5421,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-main-switch-mandatory-editorial.jpg","\u002Fblog\u002Fmain-switch-mandatory.en",{"title":57535,"description":57776},"main-switch-mandatory-arei","blog\u002Fmain-switch-mandatory.en",[57785,42798,57786,4243,5422],"main-switch","mandatory","Vw_bHZLA-zhzdyQkTrVU4JldeRXxHAmIV0Q1EDuCosE","\u002Fblog\u002Fmain-switch-mandatory-arei",{"id":57790,"title":57791,"articleId":57792,"body":57793,"category":27063,"date":58207,"description":58208,"extension":2113,"image":57810,"labels":58209,"lastUpdated":10988,"locale":2119,"meta":58210,"navigation":2121,"ogImage":58211,"path":58212,"publishDate":58207,"readTime":4830,"refreshInterval":4248,"seo":58213,"seoTitle":10313,"slug":58214,"stem":58215,"tags":58216,"__hash__":58219,"kind":2137,"href":58220},"blog\u002Fblog\u002Fearthing-tt-vs-tns.en.md","TT or TN-S Earthing? The Difference Under AREI (2026)","earthing-tt-vs-tns",{"type":9,"value":57794,"toc":58193},[57795,57799,57805,57811,57814,57817,57821,57828,57898,57901,57907,57911,57914,57919,57940,57947,57951,57957,57961,57975,57978,57982,57988,57993,57996,58000,58053,58058,58062,58065,58068,58072,58075,58078,58081,58085,58088,58091,58118,58124,58128,58131,58135,58143,58161,58163,58168,58170,58185],[79,57796,57798],{"id":57797},"short-answer-the-fault-current-path-makes-the-difference","Short answer: the fault-current path makes the difference",[12,57800,57801,57804],{},[15,57802,57803],{},"In a TT system, fault current returns to the source through the local earth electrode and the ground; in a TN-S system it returns through the protective conductor."," That leads to different disconnection conditions: in TT the RCD does the disconnecting in practice, in TN-S the circuit breaker can also trip in time (AREI Book 1, subsection 4.2.3.4).",[12,57806,57807],{},[74,57808],{"alt":57809,"src":57810},"Protective conductors terminate at a neatly connected earthing bar.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-earthing-tt-vs-tns-editorial.webp",[12,57812,57813],{},"Which system your supply uses is established from the connection itself and the network operator's information – not from the building's age or use. AREI does not declare TT the Belgian domestic standard, nor TN-S a system for new builds or industry only.",[12,57815,57816],{},"This article covers domestic AC installations under Book 1, version 06, applicable since 1 April 2026. The new DC systems in version 06 are a separate topic.",[79,57818,57820],{"id":57819},"reading-the-letters-correctly","Reading the letters correctly",[12,57822,57823,57824,57827],{},"The first letter describes how the source relates to earth: ",[25,57825,57826],{},"T"," means one point of the source is directly earthed. The second letter describes how the exposed conductive parts of the consumer installation are connected:",[138,57829,57830,57842],{},[141,57831,57832],{},[144,57833,57834,57836,57839],{},[147,57835,7731],{},[147,57837,57838],{},"Exposed parts of the installation connected to …",[147,57840,57841],{},"Neutral and protective conductor",[163,57843,57844,57857,57876],{},[144,57845,57846,57851,57854],{},[168,57847,57848],{},[15,57849,57850],{},"TT",[168,57852,57853],{},"their own local earth electrode, independent of the source earth",[168,57855,57856],{},"separate",[144,57858,57859,57864,57867],{},[168,57860,57861],{},[15,57862,57863],{},"TN-S",[168,57865,57866],{},"the earthed point of the source via the protective conductor",[168,57868,57869,3157,57872,57875],{},[25,57870,57871],{},"N",[25,57873,57874],{},"PE"," separate throughout",[144,57877,57878,57883,57892],{},[168,57879,57880],{},[15,57881,57882],{},"TN-C-S",[168,57884,57885,57886,57889,57890],{},"the earthed point of the source via ",[25,57887,57888],{},"PEN",", later ",[25,57891,57874],{},[168,57893,57894,57895,57897],{},"combined as ",[25,57896,57888],{}," at first, then split",[12,57899,57900],{},"Whether TN-C-S is present is established from the connection and the network operator's information; it is not simply \"typical of old houses\".",[1489,57902],{":height":57903,":width":3800,"alt":57904,"caption":57905,"src":57906},"590","Two diagrams side by side. TT: the fault current flows from the appliance body through the protective conductor to the installation’s own earth electrode and back through the soil to the earthed star point of the network; the RCD disconnects. TN-S: the fault current returns metallically through the protective conductor PE to the star point.","The return path sets the size of the fault current and therefore which protective device disconnects. The own earth electrode below 100 Ω applies in both systems.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fearthing-tt-vs-tns\u002Ffault-current-path-tt-tns.en.svg",[79,57908,57910],{"id":57909},"tt-system-local-earth-electrode-and-rcd","TT system: local earth electrode and RCD",[12,57912,57913],{},"In a fault to an exposed part, current flows from the line conductor through the appliance's exposed part, the protective conductor, the local earth electrode and the ground back to the earthed point of the source. The earth is part of the fault loop; fault current stays well below a short-circuit current. That is why, in TT, automatic disconnection is usually provided by the RCD. The condition is (4.2.3.4 c.2):",[12,57915,57916],{},[25,57917,57918],{},"IΔn × RE ≤ UL",[12,57920,57921,57923,57924,57927,57928,57931,57932,57935,57936,57939],{},[25,57922,57250],{}," is the RCD's rated residual operating current, ",[25,57925,57926],{},"RE"," the earthing resistance of the exposed parts and ",[25,57929,57930],{},"UL"," the conventional touch-voltage limit (2.4.1, Table 2.3). The calculation ",[25,57933,57934],{},"50 V \u002F 0.3 A ≈ 166 Ω"," does not lift the domestic limit of ",[15,57937,57938],{},"below 100 Ω"," (4.2.3.2).",[12,57941,57942,57943,57946],{},"AREI also allows disconnection by overcurrent devices in TT, provided ",[25,57944,57945],{},"Ia ≤ U0 \u002F Zs"," is actually met (4.2.3.4 c.2). \"TT only works with an RCD\" is therefore too absolute – in practice the RCD remains the tool of choice.",[79,57948,57950],{"id":57949},"tn-s-system-return-path-through-the-protective-conductor","TN-S system: return path through the protective conductor",[12,57952,57953,57954,57956],{},"In TN-S, fault current returns through ",[25,57955,57874],{}," to the earthed point of the source. The fault loop must be low enough in impedance for the protective device to disconnect within the time of the safety curve (4.2.3.4 b.2):",[12,57958,57959],{},[25,57960,57945],{},[12,57962,57963,57966,57967,57970,57971,57974],{},[25,57964,57965],{},"Ia"," is the operating current of the protective device within the permitted time, ",[25,57968,57969],{},"U0"," the voltage to earth, ",[25,57972,57973],{},"Zs"," the fault-loop impedance.",[12,57976,57977],{},"This does not mean the network operator guarantees a particular earthing resistance, nor that RCDs become unnecessary: the domestic RCD requirements of 4.2.4.3 apply whatever the system. Conversely, a 30 mA RCD does not replace checking protective-conductor continuity and disconnection conditions.",[79,57979,57981],{"id":57980},"a-local-earth-electrode-in-tn-too","A local earth electrode in TN too",[12,57983,57984,57985,57987],{},"\"The PE comes with the supply\" does not mean a home can do without its own earth electrode. In domestic installations the electrode is built according to 5.4.2.1 and its earthing resistance is ",[15,57986,57938],{}," (4.2.3.2). Earthing conductor, disconnecting link, main protective conductor and bonding are part of the installation and are made accessible, durable and testable.",[1489,57989],{":height":24042,":width":24043,"alt":57990,"caption":57991,"src":57992},"Earth rod in an open inspection pit in front of a brick facade, with a connection clamp and a green-yellow earthing conductor running to the house.","An earth rod with its clamp in an inspection pit (AI-generated illustration). Electrode and earthing conductor are part of the installation, in TN as well.","\u002Fimages\u002Fblog\u002Fenrichment-2026-11\u002Fearthing-tt-vs-tns\u002Fearth-electrode-inspection-pit.webp",[12,57994,57995],{},"Which electrode type fits depends on new build or existing building, foundations and soil. What counts is execution and the measured value, not a standard rod length.",[79,57997,57999],{"id":57998},"_30-ω-and-100-ω-two-different-thresholds","30 Ω and 100 Ω: two different thresholds",[138,58001,58002,58014],{},[141,58003,58004],{},[144,58005,58006,58009,58012],{},[147,58007,58008],{},"Earthing resistance",[147,58010,58011],{},"Consequence for the home",[147,58013,3919],{},[163,58015,58016,58028,58040],{},[144,58017,58018,58023,58026],{},[168,58019,58020],{},[25,58021,58022],{},"RE ≤ 30 Ω",[168,58024,58025],{},"The normal domestic RCD rules apply.",[168,58027,57398],{},[144,58029,58030,58035,58038],{},[168,58031,58032],{},[25,58033,58034],{},"30 Ω \u003C RE \u003C 100 Ω",[168,58036,58037],{},"At least two high- or very-high-sensitivity RCDs with no more than 16 socket outlets each, plus at least one RCD ≤ 100 mA for the remaining circuits",[168,58039,57398],{},[144,58041,58042,58047,58050],{},[168,58043,58044],{},[25,58045,58046],{},"RE ≥ 100 Ω",[168,58048,58049],{},"Requirement not met; the earthing must be improved. Extra RCDs do not fix that.",[168,58051,58052],{},"4.2.3.2",[12,58054,58055,58056,56],{},"The sixteen counts socket outlets, not final circuits. Alongside it, the limit of eight final circuits per high- or very-high-sensitivity RCD still applies. Both counting rules apply at the same time – details in ",[40,58057,3900],{"href":3899},[79,58059,58061],{"id":58060},"what-the-measurement-tells-you","What the measurement tells you",[12,58063,58064],{},"Earthing resistance is determined by measurement using a suitable method. Soil moisture, temperature, corrosion, loose connections or a damaged earthing conductor change the value; a visual check is not enough. The inspection also covers protective conductors, bonding, RCDs and other protective measures.",[12,58066,58067],{},"The approved body's report states the measured earthing resistance. After the conformity inspection, domestic installations are re-inspected at least every 25 years (6.5.2). That interval does not cover later changes: an important modification or extension needs its own conformity inspection, and if a control visit finds infringements, the body sets a date for a follow-up visit in its report (6.5.7.2 b.6).",[79,58069,58071],{"id":58070},"earthing-and-bonding-belong-together","Earthing and bonding belong together",[12,58073,58074],{},"The electrode is only part of the protective measure. The earthing conductor connects it to the disconnecting link; from there, protective conductors and main equipotential bonding run to the conductive parts. Water, gas or heating pipes do not replace an earth electrode, but are included in the bonding according to the applicable rules.",[12,58076,58077],{},"A good earthing measurement does not compensate for a broken PE to a socket, and a continuous protective conductor says nothing about earthing resistance. Resistance, continuity, insulation, RCD operation and disconnection conditions are therefore checked separately. During renovation, pay particular attention to old combined neutral\u002Fprotective arrangements: an impermissible N-PE connection downstream of the separation point distorts RCD operation and readings.",[12,58079,58080],{},"For the dossier, what counts is the measurement date, the part of the installation measured and the report – not a figure passed on by word of mouth. Do not carry an old reading over to a new electrode, an extension or changed connections without re-checking.",[79,58082,58084],{"id":58083},"what-belongs-in-the-diagram-and-dossier","What belongs in the diagram and dossier?",[12,58086,58087],{},"Section 9.1.2 requires, among other things, the single-line diagram and situation plan for homes. Show the earthing and protective components actually present correctly: earthing conductor, disconnecting link, main equipotential bonding and protective devices with their assignment.",[12,58089,58090],{},"How to survey an installation:",[3139,58092,58093,58096,58106,58109,58112,58115],{},[87,58094,58095],{},"Check the supply connection and the network operator's information.",[87,58097,58098,58099,1774,58101,58103,58104,56],{},"Trace ",[25,58100,57871],{},[25,58102,57874],{}," and, where present, ",[25,58105,57888],{},[87,58107,58108],{},"Record the local electrode, disconnecting link and bonding.",[87,58110,58111],{},"Have earthing resistance and protective-conductor continuity measured.",[87,58113,58114],{},"Assess RCD and overcurrent protection including disconnection conditions.",[87,58116,58117],{},"Compare installation, board labelling, single-line diagram and situation plan.",[1489,58119],{":height":58120,":width":13818,"alt":58121,"caption":58122,"src":58123},"445","Print area of PlanElec Sketch, section ‘Contents’: ‘Print the cover page’, ‘Print the earthing system (TT, TN-S …) in the title block’, ‘Print the circuit list’, ‘Print the material list’ and legend.","This is where you choose what goes into the PDF, including the earthing system in the title block. The PDF is made in the browser; Sketch does not check AREI\u002FRGIE rules.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-print-contents.webp",[79,58125,58127],{"id":58126},"tt-or-tn-s-no-ranking","TT or TN-S: no ranking",[12,58129,58130],{},"Both systems are safe when design, network conditions, conductor routing and protective devices fit together. TT is not automatically better, TN-S not automatically more reliable. What matters is that fault current has a defined return path and disconnection happens in time in the specific case.",[79,58132,58134],{"id":58133},"documenting-earthing-in-planelec","Documenting earthing in PlanElec",[12,58136,3361,58137,58139,58140,58142],{},[40,58138,31],{"href":1964}," you set the earthing system (TT, TN-S, TN-C-S or IT) in the network configuration and document earth electrode, bonding and protective devices in the single-line diagram and situation plan, both exportable as PDF. The AREI\u002FRGIE self-check flags missing main equipotential bonding, a missing earth electrode in a TT or IT system, as a warning a dwelling without a confirmed earth electrode even in TN (4.2.3.2) and – as a plausibility check – a public 3×230 V supply stored as TN. The scope is in ",[40,58141,1086],{"href":1085},". Earthing resistance is measured on site by the electrician; the inspection is carried out by the approved inspection body.",[12,58144,58145,58146,7709,58149,58151,58152,58155,58156,23742,58158,58160],{},"Without a subscription you record the same details in the free ",[40,58147,22],{"href":3611,"rel":58148},[1458],[15,58150,11136],{}," start begins with the connection and the main protection. On the supply you choose the ",[15,58153,58154],{},"Earthing system"," (TT, TN, TN-S, TN-C, TN-C-S or IT), on the earth symbol you enter the measured ",[15,58157,54226],{},[15,58159,1445],{}," reminds you when it is missing. Sketch does not assess anything against the AREI.",[1489,58162],{":height":43108,":width":41004,"alt":43109,"caption":43110,"src":43111},[1489,58164],{":height":22938,":width":22939,"alt":58165,"caption":58166,"src":58167},"PlanElec Sketch: the earth electrode at the start of the single-line diagram selected, ‘Earth resistance’ 22 Ω; the symbol reads ‘\u003C22Ω’.","You enter the measured earth resistance at the electrode and the diagram shows it. The value is an example; the measurement decides, and Sketch does not check AREI\u002FRGIE limits.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-earth-electrode.webp",[79,58169,13051],{"id":13050},[84,58171,58172,58176,58181],{},[87,58173,58174],{},[40,58175,3900],{"href":3899},[87,58177,58178],{},[40,58179,58180],{"href":25395},"RCD Type A or Type B?",[87,58182,58183],{},[40,58184,25390],{"href":25389},[12,58186,58187],{},[63,58188,58189,58190,27050],{},"Legal basis: AREI\u002FRGIE Book 1, version 06, section 2.4.1, subsections 4.2.3.2, 4.2.3.4(b) and (c), 4.2.4.3(b) and 5.4.2.1, section 6.5.2, subsection 6.5.7.2 b.6 and section 9.1.2. The official text published by the ",[40,58191,27049],{"href":25362,"rel":58192},[1458],{"title":2044,"searchDepth":2045,"depth":2045,"links":58194},[58195,58196,58197,58198,58199,58200,58201,58202,58203,58204,58205,58206],{"id":57797,"depth":2045,"text":57798},{"id":57819,"depth":2045,"text":57820},{"id":57909,"depth":2045,"text":57910},{"id":57949,"depth":2045,"text":57950},{"id":57980,"depth":2045,"text":57981},{"id":57998,"depth":2045,"text":57999},{"id":58060,"depth":2045,"text":58061},{"id":58070,"depth":2045,"text":58071},{"id":58083,"depth":2045,"text":58084},{"id":58126,"depth":2045,"text":58127},{"id":58133,"depth":2045,"text":58134},{"id":13050,"depth":2045,"text":13051},"2026-03-20","TT or TN-S decides the fault-current path and the disconnection condition. Formulas, local earth electrode below 100 Ω and the 30 Ω rule for Belgian homes under AREI Book 1 V06.",[5421,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-earthing-tt-vs-tns-editorial.jpg","\u002Fblog\u002Fearthing-tt-vs-tns.en",{"title":57791,"description":58208},"earthing-tt-vs-tns-belgium","blog\u002Fearthing-tt-vs-tns.en",[30501,58217,58218,42798,49386],"tt-system","tn-s","3QoQotcT_uBaU5l9eBJXctVnYlTqMiAzXs_-u6EGyaU","\u002Fblog\u002Fearthing-tt-vs-tns-belgium",{"id":58222,"title":58223,"articleId":58224,"body":58225,"category":27063,"date":58831,"description":58832,"extension":2113,"image":58238,"labels":58833,"lastUpdated":10988,"locale":2119,"meta":58834,"navigation":2121,"ogImage":58835,"path":58836,"publishDate":58831,"readTime":19432,"refreshInterval":4248,"seo":58837,"seoTitle":58838,"slug":58224,"stem":58839,"tags":58840,"__hash__":58843,"kind":2137,"href":58844},"blog\u002Fblog\u002Fcable-cross-section-breaker.en.md","Cable Cross-Section per Circuit Breaker: Which Cable for Which Protection?","cable-cross-section-breaker",{"type":9,"value":58226,"toc":58819},[58227,58233,58239,58243,58246,58343,58346,58350,58353,58358,58495,58498,58502,58505,58540,58543,58547,58554,58558,58579,58584,58587,58625,58631,58635,58643,58653,58657,58660,58663,58689,58692,58696,58754,58758,58767,58778,58780,58782,58784,58811],[12,58228,58229,58232],{},[15,58230,58231],{},"In Belgian domestic installations, AREI Table 4.11 sets the largest breaker per copper cross-section: 16 A on 1.5 mm², 20 A on 2.5 mm², 25 A on 4 mm² and 40 A on 6 mm²."," Socket-outlet circuits always use at least 2.5 mm² under subsection 5.2.1.2. The protective device protects the cable, not the appliance: a breaker that is too large for the cross-section trips too late on overload, and the cable overheats.",[12,58234,58235],{},[74,58236],{"alt":58237,"src":58238},"An electrician compares cable materials on a workbench.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-cable-cross-section-breaker-editorial.webp",[79,58240,58242],{"id":58241},"quick-reference-breaker-minimum-cross-section","Quick reference: breaker → minimum cross-section",[12,58244,58245],{},"This overview reads Table 4.11 the way the question comes up on site: the breaker is given, and you need the smallest permitted copper cross-section.",[138,58247,58248,58259],{},[141,58249,58250],{},[144,58251,58252,58254,58257],{},[147,58253,24058],{},[147,58255,58256],{},"Minimum copper cross-section",[147,58258,56820],{},[163,58260,58261,58270,58280,58289,58298,58307,58317,58326,58335],{},[144,58262,58263,58265,58268],{},[168,58264,33076],{},[168,58266,58267],{},"1.5 mm² (Table 4.11 lists 1 mm², but Table 5.1 does not allow 1 mm² for new fixed wiring)",[168,58269,7264],{},[144,58271,58272,58274,58277],{},[168,58273,33079],{},[168,58275,58276],{},"1.5 mm²; socket-outlet circuits at least 2.5 mm² under 5.2.1.2",[168,58278,58279],{},"Lighting, circuits without sockets",[144,58281,58282,58284,58286],{},[168,58283,33088],{},[168,58285,22715],{},[168,58287,58288],{},"Socket circuit, appliance circuit",[144,58290,58291,58293,58295],{},[168,58292,33098],{},[168,58294,33093],{},[168,58296,58297],{},"Final circuit with a higher load",[144,58299,58300,58302,58304],{},[168,58301,33106],{},[168,58303,33103],{},[168,58305,58306],{},"Hob, instantaneous water heater",[144,58308,58309,58311,58314],{},[168,58310,33109],{},[168,58312,58313],{},"6 mm² (table ceiling)",[168,58315,58316],{},"Final circuit or supply cable",[144,58318,58319,58321,58323],{},[168,58320,33120],{},[168,58322,33114],{},[168,58324,58325],{},"Supply to a sub-distribution board",[144,58327,58328,58330,58332],{},[168,58329,33130],{},[168,58331,33125],{},[168,58333,58334],{},"Supply cable, main switch",[144,58336,58337,58339,58341],{},[168,58338,33140],{},[168,58340,33135],{},[168,58342,58334],{},[12,58344,58345],{},"The table is a ceiling for the protective device, not a finished cable calculation. Installation method, grouping, ambient temperature and voltage drop can require a larger cross-section; how to check them follows below.",[79,58347,58349],{"id":58348},"the-complete-table-411","The complete Table 4.11",[12,58351,58352],{},"The AREI states the relationship the other way round: for each conductor cross-section, the largest permitted rating of the protective device, separately for fuses and circuit breakers (subsection 4.4.1.4, applicable to domestic installations).",[12,58354,58355],{},[63,58356,58357],{},"Table 4.11 — Protective device rating by conductor cross-section (AREI 4.4.1.4)",[138,58359,58360,58373],{},[141,58361,58362],{},[144,58363,58364,58366,58368,58370],{},[147,58365,33061],{},[147,58367,49009],{"align":42936},[147,58369,49012],{"align":42936},[147,58371,58372],{},"Use in domestic installations",[163,58374,58375,58389,58401,58413,58424,58435,58445,58455,58465,58475,58485],{},[144,58376,58377,58380,58383,58386],{},[168,58378,58379],{},"0.5 mm²",[168,58381,58382],{"align":42936},"2 A",[168,58384,58385],{"align":42936},"4 A",[168,58387,58388],{},"control, monitoring, signalling and measuring circuits only",[144,58390,58391,58393,58395,58398],{},[168,58392,22709],{},[168,58394,58385],{"align":42936},[168,58396,58397],{"align":42936},"6 A",[168,58399,58400],{},"circuits integrated in distribution boards only",[144,58402,58403,58406,58408,58410],{},[168,58404,58405],{},"1 mm²",[168,58407,58397],{"align":42936},[168,58409,33076],{"align":42936},[168,58411,58412],{},"existing wiring from before 17 May 1986 only (Part 8)",[144,58414,58415,58417,58419,58421],{},[168,58416,22712],{},[168,58418,33076],{"align":42936},[168,58420,33079],{"align":42936},[168,58422,58423],{},"circuits without socket outlets",[144,58425,58426,58428,58430,58432],{},[168,58427,22715],{},[168,58429,33079],{"align":42936},[168,58431,33088],{"align":42936},[168,58433,58434],{},"generally permitted",[144,58436,58437,58439,58441,58443],{},[168,58438,33093],{},[168,58440,33088],{"align":42936},[168,58442,33098],{"align":42936},[168,58444,58434],{},[144,58446,58447,58449,58451,58453],{},[168,58448,33103],{},[168,58450,33106],{"align":42936},[168,58452,33109],{"align":42936},[168,58454,58434],{},[144,58456,58457,58459,58461,58463],{},[168,58458,33114],{},[168,58460,33117],{"align":42936},[168,58462,33120],{"align":42936},[168,58464,58434],{},[144,58466,58467,58469,58471,58473],{},[168,58468,33125],{},[168,58470,33120],{"align":42936},[168,58472,33130],{"align":42936},[168,58474,58434],{},[144,58476,58477,58479,58481,58483],{},[168,58478,33135],{},[168,58480,33130],{"align":42936},[168,58482,33140],{"align":42936},[168,58484,58434],{},[144,58486,58487,58489,58491,58493],{},[168,58488,33145],{},[168,58490,33140],{"align":42936},[168,58492,33150],{"align":42936},[168,58494,58434],{},[12,58496,58497],{},"The two columns are not interchangeable. For the same cable, the fuse limit sits one step below the breaker limit. Replacing a 16 A fuse with a 20 A breaker on 2.5 mm² raises the rated current, so the circuit needs a fresh assessment.",[79,58499,58501],{"id":58500},"table-51-the-exceptions-below-25-mm","Table 5.1: the exceptions below 2.5 mm²",[12,58503,58504],{},"Subsection 5.2.1.2 prohibits insulated conductors smaller than 2.5 mm² unless they are an integral part of a machine or appliance. Table 5.1 lists the exceptions exhaustively:",[138,58506,58507,58517],{},[141,58508,58509],{},[144,58510,58511,58514],{},[147,58512,58513],{},"Minimum",[147,58515,58516],{},"Only for",[163,58518,58519,58526,58533],{},[144,58520,58521,58523],{},[168,58522,22712],{},[168,58524,58525],{},"circuits without socket outlets; only a single socket of up to 2.5 A built into a luminaire is allowed",[144,58527,58528,58530],{},[168,58529,22709],{},[168,58531,58532],{},"circuits integrated in switchgear and controlgear assemblies that supply a single socket outlet",[144,58534,58535,58537],{},[168,58536,58379],{},[168,58538,58539],{},"control, monitoring, signalling and measuring circuits",[12,58541,58542],{},"The 1 mm² row in Table 4.11 therefore does not permit new 1 mm² wiring. Table 4.11 sets how large the protective device may be; Table 5.1 decides whether that cross-section may be installed at all.",[79,58544,58546],{"id":58545},"existing-installations-1-mm-wiring","Existing installations: 1 mm² wiring",[12,58548,58549,58550,58553],{},"For existing parts of domestic installations, section 8.2.2 (point 5, choice of wiring systems) contains a narrowly defined derogation: EMCB and EMCVB wiring of 1 mm² and CTLB and VTLB wiring of 0.75 mm² may remain in service if on-site execution began before ",[15,58551,58552],{},"17 May 1986"," and the wiring belongs to circuits without socket outlets. Their protective devices must suit the cross-section. This protects existing wiring; it is not a rule for new work. The age of the installation and the actual cable type must be demonstrable at inspection.",[79,58555,58557],{"id":58556},"what-the-table-does-not-decide","What the table does not decide",[12,58559,58560,58561,58564,58565,58568,58569,58572,58573,6975,58576,58578],{},"A complete selection links three currents: the design current of the load ",[25,58562,58563],{},"I_B",", the rated current of the protective device ",[25,58566,58567],{},"I_n"," and the current-carrying capacity of the cable ",[25,58570,58571],{},"I_Z",". As a rule, ",[25,58574,58575],{},"I_B ≤ I_n ≤ I_Z",[25,58577,58571],{}," is not a fixed value per mm²: subsection 4.4.1.4 makes it depend on cross-section, insulation, cable construction, installation method and ambient temperature.",[1489,58580],{":height":6543,":width":3800,"alt":58581,"caption":58582,"src":58583},"Diagram of three currents on one axis: design current IB, rated current In and current-carrying capacity IZ in that order. Table 4.11 caps In per cross-section; IZ drops with installation method, grouping, insulation and temperature.","Table 4.11 only caps the breaker per cross-section. Whether the cable carries the current in its installation method (IZ) is a separate check.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fcable-cross-section-breaker\u002Fib-in-iz.en.svg",[12,58585,58586],{},"So also check:",[84,58588,58589,58595,58601,58607,58613,58619],{},[87,58590,58591,58594],{},[15,58592,58593],{},"Cable:"," material, insulation and construction; the table values apply to copper.",[87,58596,58597,58600],{},[15,58598,58599],{},"Installation method:"," in conduit, in thermal insulation, on the wall, bundled or on a cable tray.",[87,58602,58603,58606],{},[15,58604,58605],{},"Grouping:"," the number of simultaneously loaded conductors and neighbouring circuits.",[87,58608,58609,58612],{},[15,58610,58611],{},"Environment:"," ambient temperature and heat dissipation.",[87,58614,58615,58618],{},[15,58616,58617],{},"Length and load:"," voltage drop over the actual cable length.",[87,58620,58621,58624],{},[15,58622,58623],{},"Short circuit:"," disconnection conditions, fault-loop impedance and the breaker's breaking capacity against the prospective short-circuit current.",[12,58626,58627,58628,58630],{},"A long run may need a larger cross-section because of voltage drop, and an unfavourable installation method lowers the current-carrying capacity. For non-domestic installations, Table 4.11 is not a blanket ceiling; there you determine ",[25,58629,58571],{}," according to the rules of good practice.",[79,58632,58634],{"id":58633},"voltage-drop-3-and-5-are-guide-values-not-an-arei-limit","Voltage drop: 3% and 5% are guide values, not an AREI limit",[12,58636,58637,58638,3157,58640,58642],{},"Section 5.2.5 (\"Voltage drop\") requires voltage drop to be limited to the values described in the rules of good practice. Subsection 5.2.1.2 b adds that it must be compatible with safe operation of the connected equipment. The AREI sets no percentage. In practice, designers work with ",[15,58639,42210],{},[15,58641,42213],{},": proven guide values for a first check. For long runs, motors, EV charging points or sensitive equipment, calculate with the actual conditions.",[12,58644,58645,58646,58649,58650,56],{},"The calculation needs cable length, conductor material, cross-section, current, power factor and the supply (single- or three-phase). The guide ",[40,58647,58648],{"href":3790},"Voltage drop and cable sizing"," shows how they interact. For a quick answer, use the ",[40,58651,58652],{"href":42577},"free cable sizing calculator",[79,58654,58656],{"id":58655},"replacing-an-old-fuse-with-a-circuit-breaker","Replacing an old fuse with a circuit breaker",[12,58658,58659],{},"A classic inspection finding is a protective device that is too large for the installed cross-section. Typical case: in an older installation, fuses were later replaced by breakers and nobody checked the cable behind them.",[12,58661,58662],{},"How to approach it:",[3139,58664,58665,58671,58677,58683],{},[87,58666,58667,58670],{},[15,58668,58669],{},"Identify the cable:"," which cross-section and cable type are actually installed, and how?",[87,58672,58673,58676],{},[15,58674,58675],{},"Classify the existing wiring:"," does a Part 8 derogation apply, for example to 1 mm² wiring from before 17 May 1986?",[87,58678,58679,58682],{},[15,58680,58681],{},"Pick the column:"," for 1.5 mm², Table 4.11 allows at most a 10 A fuse or a 16 A breaker; for 2.5 mm², at most 16 A or 20 A.",[87,58684,58685,58688],{},[15,58686,58687],{},"Check the circuit type:"," a socket-outlet circuit needs at least 2.5 mm², regardless of the breaker.",[12,58690,58691],{},"A 20 A breaker on 1.5 mm² is never permitted. The table ceiling is not an invitation to raise the protection either.",[79,58693,58695],{"id":58694},"arei-basis-at-a-glance","AREI basis at a glance",[138,58697,58698,58707],{},[141,58699,58700],{},[144,58701,58702,58705],{},[147,58703,58704],{},"AREI reference",[147,58706,8217],{},[163,58708,58709,58720,58732,58739,58746],{},[144,58710,58711,58714],{},[168,58712,58713],{},"Subsection 4.4.1.4",[168,58715,58716,58717,58719],{},"Current-carrying capacity ",[25,58718,58571],{},"; Table 4.11 with the maximum fuse and breaker rating per cross-section",[144,58721,58722,58725],{},[168,58723,58724],{},"Subsection 5.2.1.2",[168,58726,58727,58728,58731],{},"Choice of wiring: ",[25,58729,58730],{},"I_Z ≥ I_B",", compatible voltage drop, in principle at least 2.5 mm²",[144,58733,58734,58736],{},[168,58735,34173],{},[168,58737,58738],{},"Exhaustive exceptions below 2.5 mm²: 1.5 mm², 0.75 mm² and 0.5 mm² for defined uses",[144,58740,58741,58743],{},[168,58742,30837],{},[168,58744,58745],{},"Voltage drop limited to the values described in the rules of good practice",[144,58747,58748,58751],{},[168,58749,58750],{},"Section 8.2.2, point 5",[168,58752,58753],{},"Existing before 17 May 1986: EMCB\u002FEMCVB 1 mm² and CTLB\u002FVTLB 0.75 mm² in circuits without sockets",[79,58755,58757],{"id":58756},"checking-cross-section-and-protection-in-planelec","Checking cross-section and protection in PlanElec",[12,58759,3361,58760,58763,58764,58766],{},[40,58761,22],{"href":1456,"rel":58762},[1458]," you draw the single-line diagram for free in the browser, even without an account. On the protective device you enter the rated current and tripping curve; on the cable the type, number of cores, cross-section, installation method and length. That keeps the Table 4.11 pairing readable for every circuit. Sketch does not check these values against the AREI: its ",[15,58765,1445],{}," aid only flags missing information, such as a circuit without a protective device.",[12,58768,58769,58771,58772,58774,58775,58777],{},[40,58770,31],{"href":1964}," checks further: the self-check verifies that the cross-section matches the rated current of the protection (Table 4.11, using the fuse column behind a fuse) and calculates voltage drop from the cable length against the 3% and 5% guide values. The exact rule coverage is listed in ",[40,58773,1086],{"href":1085},". A Sketch drawing moves to Pro with ",[15,58776,1482],{},", circuits and cables included. Installation method, grouping and on-site measurements are assessed by the electrician; the official inspection is carried out by the accredited inspection body.",[1489,58779],{":height":32572,":width":26962,"alt":32573,"caption":32574,"src":32575},[1489,58781],{":height":42714,":width":42715,"alt":42716,"caption":42717,"src":42718},[79,58783,13051],{"id":13050},[84,58785,58786,58790,58794,58799,58803,58807],{},[87,58787,58788],{},[40,58789,58648],{"href":3790},[87,58791,58792],{},[40,58793,5394],{"href":5393},[87,58795,58796],{},[40,58797,58798],{"href":4212},"Create a single-line diagram",[87,58800,58801],{},[40,58802,36303],{"href":36302},[87,58804,58805],{},[40,58806,42745],{"href":4206},[87,58808,58809],{},[40,58810,26426],{"href":33912},[12,58812,58813],{},[63,58814,58815,58816,56],{},"Regulatory basis: AREI\u002FRGIE Book 1, version 06, applicable since 1 April 2026, in particular 4.4.1.4, 5.2.1.2, 5.2.5 and 8.2.2. Official text: ",[40,58817,27049],{"href":1971,"rel":58818},[1458],{"title":2044,"searchDepth":2045,"depth":2045,"links":58820},[58821,58822,58823,58824,58825,58826,58827,58828,58829,58830],{"id":58241,"depth":2045,"text":58242},{"id":58348,"depth":2045,"text":58349},{"id":58500,"depth":2045,"text":58501},{"id":58545,"depth":2045,"text":58546},{"id":58556,"depth":2045,"text":58557},{"id":58633,"depth":2045,"text":58634},{"id":58655,"depth":2045,"text":58656},{"id":58694,"depth":2045,"text":58695},{"id":58756,"depth":2045,"text":58757},{"id":13050,"depth":2045,"text":13051},"2026-03-18","Which cable cross-section for a 16, 20 or 32 A breaker in Belgium? AREI\u002FRGIE Table 4.11, minimum sizes for socket circuits and what else you need to check.",[4244,4243,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-cable-cross-section-breaker-editorial.jpg","\u002Fblog\u002Fcable-cross-section-breaker.en",{"title":58223,"description":58832},"Cable Cross-Section per Breaker: Which Cable for 16\u002F20 A?","blog\u002Fcable-cross-section-breaker.en",[42797,58841,42798,58842],"circuit-breaker","electrical-installation","DQEsy-ZBG-hAKCTbBTzvF617TsKyshEV1jSpjd-jQJU","\u002Fblog\u002Fcable-cross-section-breaker",{"id":58846,"title":58847,"articleId":58848,"body":58849,"category":27063,"date":59152,"description":59153,"extension":2113,"image":58861,"labels":59154,"lastUpdated":10988,"locale":2119,"meta":59155,"navigation":2121,"ogImage":59156,"path":59157,"publishDate":59152,"readTime":47831,"refreshInterval":4248,"seo":59158,"seoTitle":10313,"slug":58848,"stem":59159,"tags":59160,"__hash__":59164,"kind":2137,"href":59165},"blog\u002Fblog\u002Fxvb-vs-vob-cable.en.md","XVB cable or VOB wire: differences and choice in Belgium","xvb-vs-vob-cable",{"type":9,"value":58850,"toc":59142},[58851,58857,58862,58866,58873,58877,58888,58892,58982,58987,58992,58994,58997,59015,59018,59022,59081,59088,59091,59096,59100,59113,59115,59119],[12,58852,58853,58856],{},[15,58854,58855],{},"XVB is a sheathed cable; VOB is a single-core wire with basic insulation only."," That leads to the key rule: you can install XVB surface-mounted, on a cable tray and directly in a wall chase; under AREI\u002FRGIE, VOB belongs in electrical conduit or a closed trunking. Which product fits in the end depends on the route, the fire class and the actual data sheet, not on the price per metre.",[12,58858,58859],{},[74,58860],{"alt":58237,"src":58861},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-xvb-vs-vob-cable-editorial.webp",[79,58863,58865],{"id":58864},"what-is-xvb-cable","What is XVB cable?",[12,58867,58868,58869,58872],{},"XVB has ",[15,58870,58871],{},"XLPE"," (cross-linked polyethylene) core insulation and a PVC outer sheath. A designation such as 3G2.5 means three 2.5 mm² cores, one of them a green-yellow protective conductor. Check the number of cores, the protective conductor and the cross-section on the data sheet of the chosen product. Nexans, for example, offers XVB as a CPR class Cca variant.",[79,58874,58876],{"id":58875},"what-is-vob-wire","What is VOB wire?",[12,58878,58879,58880,58883,58884,58887],{},"VOB is a PVC-insulated single conductor. ",[15,58881,58882],{},"H07V-U"," has a solid conductor and ",[15,58885,58886],{},"H07V-R"," a stranded one, so VOB does not automatically mean flexible wire. Because the wire has only basic insulation, you install it in electrical conduit such as Preflex or in a suitable closed system. For H07V-U, Nexans states CPR class Eca.",[79,58889,58891],{"id":58890},"where-can-you-install-xvb-and-where-vob","Where can you install XVB and where VOB?",[138,58893,58894,58908],{},[141,58895,58896],{},[144,58897,58898,58900,58903,58906],{},[147,58899,5104],{},[147,58901,58902],{},"XVB (cable)",[147,58904,58905],{},"VOB (wire)",[147,58907,2133],{},[163,58909,58910,58922,58934,58945,58957,58969],{},[144,58911,58912,58915,58917,58920],{},[168,58913,58914],{},"In electrical conduit",[168,58916,515],{},[168,58918,58919],{},"yes, the standard case",[168,58921,31466],{},[144,58923,58924,58927,58929,58932],{},[168,58925,58926],{},"Surface-mounted or in open air",[168,58928,515],{},[168,58930,58931],{},"no, only cables permitted",[168,58933,29387],{},[144,58935,58936,58939,58941,58943],{},[168,58937,58938],{},"On an open cable tray",[168,58940,515],{},[168,58942,58931],{},[168,58944,30764],{},[144,58946,58947,58950,58952,58955],{},[168,58948,58949],{},"In closed trunking",[168,58951,515],{},[168,58953,58954],{},"yes; outside electrical service rooms solid-walled, openable only with a tool",[168,58956,30764],{},[144,58958,58959,58962,58965,58967],{},[168,58960,58961],{},"Embedded in a chase, without conduit",[168,58963,58964],{},"yes, within installation zones",[168,58966,602],{},[168,58968,31601],{},[144,58970,58971,58974,58977,58980],{},[168,58972,58973],{},"In building cavities (ceiling, floor)",[168,58975,58976],{},"yes, with F2 or at least Cca",[168,58978,58979],{},"not as loose wire; conduits must meet 5.2.7.4",[168,58981,31565],{},[12,58983,58984,58985,56],{},"For embedding without conduit, subsection 5.2.9.10 requires horizontal runs 25 to 35 cm below the ceiling or above the floor, vertical runs as close as possible to a corner or 10 to 20 cm beside door frames, and at least 0.4 cm of plaster cover. Wiring embedded in concrete or cement needs at least 3 cm of cover. The complete system of installation methods is explained in ",[40,58986,42568],{"href":3813},[1489,58988],{":height":42908,":width":3800,"alt":58989,"caption":58990,"src":58991},"Decision tree: if the wiring runs in a conduit or closed trunking, XVB and VOB are possible, otherwise only a cable such as XVB. Then the fire class: bunched or in a building void at least F2 or Cca, single at least F1 or Eca.","Route first, fire class second: you answer both questions for every section.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fxvb-vs-vob-cable\u002Fcable-or-core-decision.en.svg",[79,58993,56934],{"id":56933},[12,58995,58996],{},"Section 5.2.7 limits fire propagation through the CPR class:",[84,58998,58999,59004,59009],{},[87,59000,59001,59003],{},[15,59002,56944],{}," at least property F1 or class Eca (subsection 5.2.7.2).",[87,59005,59006,59008],{},[15,59007,56950],{}," at least F2 or class Cca (subsection 5.2.7.3).",[87,59010,59011,59014],{},[15,59012,59013],{},"In building cavities and combustible trunking or skirting:"," also F2 or Cca (subsection 4.3.3.5 b).",[12,59016,59017],{},"Exemptions include cables and conduits embedded at least 3 cm deep in non-combustible cladding (subsection 5.2.7.1 no. 3). What counts is the class of the product actually supplied, according to its declaration of performance; the name XVB or VOB alone does not fix it.",[79,59019,59021],{"id":59020},"comparing-costs-properly","Comparing costs properly",[138,59023,59024,59035],{},[141,59025,59026],{},[144,59027,59028,59030,59032],{},[147,59029,2179],{},[147,59031,57077],{},[147,59033,59034],{},"VOB",[163,59036,59037,59048,59059,59070],{},[144,59038,59039,59042,59045],{},[168,59040,59041],{},"What do you count?",[168,59043,59044],{},"Cable length with its included cores",[168,59046,59047],{},"Each wire's length plus the conduit",[144,59049,59050,59053,59056],{},[168,59051,59052],{},"Does the route suit it?",[168,59054,59055],{},"Supports, protection and surroundings",[168,59057,59058],{},"Conduit diameter, fill, continuity and accessibility",[144,59060,59061,59064,59067],{},[168,59062,59063],{},"Can existing routes be reused?",[168,59065,59066],{},"Check the route and connections",[168,59068,59069],{},"Check conduit condition and free passage",[144,59071,59072,59075,59078],{},[168,59073,59074],{},"What belongs in the price?",[168,59076,59077],{},"Cable, supports, accessories and labour",[168,59079,59080],{},"All wires, conduits, accessories and labour",[12,59082,59083,59084,59087],{},"A metre of 3G2.5 cable cannot be compared with a metre of a single 2.5 mm² wire. Compare quotes for the same route, the same number of conductors and the same work. VOB in conduit has one clear advantage: wires can be replaced or added later, because they must remain pullable at all times (5.2.9.3). The comparison ",[40,59085,59086],{"href":30818},"Preflex or open wiring"," covers this in detail.",[79,59089,48524],{"id":59090},"cross-section-and-protection",[12,59092,59093,59094,56],{},"The cable type does not replace sizing. Load, length, installation method and voltage drop determine the cross-section; Table 4.11 limits the breaker. The mapping is in ",[40,59095,42727],{"href":3795},[79,59097,59099],{"id":59098},"documenting-your-choice","Documenting your choice",[12,59101,59102,59103,59106,59107,59109,59110,59112],{},"Record the cable type, cross-section, number of cores, installation method and route for every segment. If the installation method changes, for example from conduit to cable tray, the plan must show it. In the free ",[40,59104,22],{"href":1456,"rel":59105},[1458]," you pick each cable's type (for example XVB, VOB or H07V-U), fire class, number of cores and cross-section; the single-line diagram then reads, for example, \"XVB Cca 3G2,5\". Sketch does not check these details. In ",[40,59108,31],{"href":1964}," the self-check flags cables installed singly below Eca and cables in hollow walls below Cca without documented conduit (",[40,59111,28419],{"href":1085},"). The on-site inspection is carried out by the accredited inspection body.",[1489,59114],{":height":32572,":width":26962,"alt":32573,"caption":32574,"src":32575},[79,59116,59118],{"id":59117},"sources-checked-on-5-october-2026","Sources checked on 5 October 2026",[84,59120,59121,59128,59135],{},[87,59122,59123],{},[40,59124,59127],{"href":59125,"rel":59126},"https:\u002F\u002Fwww.nexans.be\u002Ffr\u002Fproducts\u002FEnergy-up-to-1kV\u002FPVC\u002FPVC-unarmoured-cables\u002FXVB-Cca-0%2C30373.html",[1458],"Nexans — XVB Cca ULTIMO",[87,59129,59130],{},[40,59131,59134],{"href":59132,"rel":59133},"https:\u002F\u002Fwww.nexans.be\u002Ffr\u002Fproducts\u002FEnergy-up-to-1kV\u002FPVC\u002FPVC-wires\u002FH07V-U-Eca29393.html",[1458],"Nexans — H07V-U \u002F H07V-R",[87,59136,59137,59141],{},[40,59138,59140],{"href":1971,"rel":59139},[1458],"FPS Economy — AREI\u002FRGIE Book 1",", subsections 4.3.3.5, 5.2.7.1–5.2.7.3, 5.2.9.3, 5.2.9.5, 5.2.9.6, 5.2.9.9 and 5.2.9.10",{"title":2044,"searchDepth":2045,"depth":2045,"links":59143},[59144,59145,59146,59147,59148,59149,59150,59151],{"id":58864,"depth":2045,"text":58865},{"id":58875,"depth":2045,"text":58876},{"id":58890,"depth":2045,"text":58891},{"id":56933,"depth":2045,"text":56934},{"id":59020,"depth":2045,"text":59021},{"id":59090,"depth":2045,"text":48524},{"id":59098,"depth":2045,"text":59099},{"id":59117,"depth":2045,"text":59118},"2026-03-16","XVB or VOB? Where AREI\u002FRGIE lets you install sheathed cable and single-core wire, which fire class applies and how to compare costs properly.",[4244,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-xvb-vs-vob-cable-editorial.jpg","\u002Fblog\u002Fxvb-vs-vob-cable.en",{"title":58847,"description":59153},"blog\u002Fxvb-vs-vob-cable.en",[59161,59162,59163,30398,42798],"cable","xvb","vob","b67lGNboHyN8Sa2hsEcVhhT1FhgS8KQpWu2RqumeXpA","\u002Fblog\u002Fxvb-vs-vob-cable",{"id":59167,"title":59168,"articleId":59169,"body":59170,"category":27063,"date":59408,"description":59409,"extension":2113,"image":59182,"labels":59410,"lastUpdated":10988,"locale":2119,"meta":59411,"navigation":2121,"ogImage":59412,"path":59413,"publishDate":59408,"readTime":47831,"refreshInterval":4248,"seo":59414,"seoTitle":59415,"slug":59169,"stem":59416,"tags":59417,"__hash__":59423,"kind":2137,"href":59424},"blog\u002Fblog\u002Finspection-checklist.en.md","What Does the Inspector Check During an Electrical Inspection?","inspection-checklist",{"type":9,"value":59171,"toc":59398},[59172,59174,59177,59183,59261,59264,59268,59271,59330,59333,59337,59340,59344,59347,59351,59354,59358,59363,59369,59376,59388,59390,59392],[79,59173,48743],{"id":48742},[12,59175,59176],{},"When inspecting a domestic installation, the inspector from the approved inspection body checks four things: the documents, the visible condition of the installation, the operation of protective devices and two measured values – insulation resistance and earth electrode resistance. That is what AREI\u002FRGIE Book 1 lays down in section 6.4.1; the inspection takes place with the installation de-energised.",[12,59178,59179],{},[74,59180],{"alt":59181,"src":59182},"An on-site inspection of a Belgian residential installation.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-inspection-checklist-editorial.webp",[138,59184,59185,59195],{},[141,59186,59187],{},[144,59188,59189,59191,59193],{},[147,59190,9856],{},[147,59192,48743],{},[147,59194,48455],{},[163,59196,59197,59207,59218,59229,59240,59250],{},[144,59198,59199,59201,59204],{},[168,59200,13441],{},[168,59202,59203],{},"Single-line diagram and situation plan present and matching the installation as built; connection data, main switch, earth electrode type",[168,59205,59206],{},"3.1.2, 6.4.6.4 b.2 to b.4",[144,59208,59209,59212,59215],{},[168,59210,59211],{},"Visual check",[168,59213,59214],{},"Selection, mounting and installation of fixed equipment, covers, labelling, accessibility",[168,59216,59217],{},"6.4.3, 6.4.6.4 b.4",[144,59219,59220,59223,59226],{},[168,59221,59222],{},"Tests",[168,59224,59225],{},"Continuity of protective conductors and equipotential bonding; operation of protective devices",[168,59227,59228],{},"6.4.4, 6.4.6.4 b.4",[144,59230,59231,59234,59237],{},[168,59232,59233],{},"Insulation measurement",[168,59235,59236],{},"At least 500 kΩ per circuit at a 500 V DC test voltage, loads switched off",[168,59238,59239],{},"6.4.5.1, table 6.1",[144,59241,59242,59244,59247],{},[168,59243,54226],{},[168,59245,59246],{},"Measurement of the earth electrode; below 100 Ω in homes, above 30 Ω a stricter RCD layout applies",[168,59248,59249],{},"6.4.5.2, 4.2.3.2, 4.2.4.3 b",[144,59251,59252,59255,59258],{},[168,59253,59254],{},"Coordination in the report",[168,59256,59257],{},"RCDs match the earth value, overcurrent protection matches the wiring, installation follows the plans",[168,59259,59260],{},"6.4.6.4 b.4",[12,59262,59263],{},"If everything is in order, the inspector endorses the single-line diagram and situation plan, and the report states the date of the next control visit (6.4.6.4 b.6).",[79,59265,59267],{"id":59266},"prepare-the-documents-for-the-inspection","Prepare the documents for the inspection",[12,59269,59270],{},"This checklist is for electrical contractors preparing a domestic installation in Belgium for inspection. Establish the trigger, the age of the installation and the scope of work first; non-domestic installations have additional dossier requirements.",[138,59272,59273,59286],{},[141,59274,59275],{},[144,59276,59277,59280,59283],{},[147,59278,59279],{},"Document \u002F task",[147,59281,59282],{},"Responsible",[147,59284,59285],{},"Check before handover",[163,59287,59288,59298,59309,59320],{},[144,59289,59290,59292,59295],{},[168,59291,38605],{},[168,59293,59294],{},"Designer \u002F installation contractor",[168,59296,59297],{},"Compare references, actual installation and matching versions",[144,59299,59300,59303,59306],{},[168,59301,59302],{},"Previous reports and alterations",[168,59304,59305],{},"Owner \u002F contractor",[168,59307,59308],{},"Collect available reports and assign open findings",[144,59310,59311,59314,59317],{},[168,59312,59313],{},"Manufacturer documentation",[168,59315,59316],{},"Installation contractor",[168,59318,59319],{},"Link documents to the installed equipment and protection concept",[144,59321,59322,59325,59327],{},[168,59323,59324],{},"Inspection report",[168,59326,48176],{},[168,59328,59329],{},"Add to the installation file after the inspection",[12,59331,59332],{},"Complete each row: available, open, named owner and version date. The matrix allocates the work; the statutory contents of the installation file are set out in section 9.1.2. Only the approved body issues the inspection report – an installer's declaration does not take its place.",[79,59334,59336],{"id":59335},"prepare-visual-checks-and-measurements-separately","Prepare visual checks and measurements separately",[12,59338,59339],{},"On site, compare labels, covers, accessibility, conductor data, protective devices and the earth connection with the documents. The protection required depends on the circuit, its use and, where relevant, the part 8 rules for existing installations; a generic table of cross-sections, RCDs or surge protection is not enough. Assess your own preliminary measurements only with the right method and the applicable requirements.",[1041,59341,59343],{"id":59342},"rcd-testing-ma-is-not-a-time","RCD testing: mA is not a time",[12,59345,59346],{},"The rated residual current IΔn is a device characteristic; test current and trip time are separate quantities. Record device type, any time delay, test setting and result in the measurement log. \"30 mA\" or \"300 mA\" does not define a universal trip time – an equivalence such as \"300 mA = 300 ms\" is wrong. The test criteria depend on the device and the test method.",[79,59348,59350],{"id":59349},"organise-the-handover","Organise the handover",[12,59352,59353],{},"Every open point gets a named owner and a deadline. After every change, compare both plans with the installation again. Record the document version actually handed over and add the inspection report to it. Deadlines and follow-up depend on the inspection trigger and the findings.",[79,59355,59357],{"id":59356},"assemble-the-documents-in-planelec","Assemble the documents in PlanElec",[12,59359,3361,59360,59362],{},[40,59361,31],{"href":1964},", the single-line diagram, situation plan, distribution board view and AREI\u002FRGIE self-check report come from one shared project model. At the top of the export, the step list “On the way to your documents” shows what is still open – project data, circuits, situation plan, distribution board, diagram check and self-check – and jumps to the place concerned. You bundle the selected documents into an installation dossier with cover page, document index and continuous page numbering.",[12,59364,59365,59366,59368],{},"The self-check report shows findings in the supported rules; which rules those are is listed in ",[40,59367,1086],{"href":1085},". The site visit, measurements and the official report are handled by the approved inspection body.",[12,59370,59371,59372,59375],{},"If a small installation only needs a single-line diagram and situation plan, draw both for free in the browser with ",[40,59373,22],{"href":3611,"rel":59374},[1458],". Move the drawing across later with “Take it to Pro” once the distribution board or the self-check report come into play.",[84,59377,59378,59383],{},[87,59379,59380],{},[40,59381,59382],{"href":4645},"Export guide",[87,59384,59385],{},[40,59386,59387],{"href":14164},"Fictitious example dossier (PDF)",[1489,59389],{":height":36275,":width":7057,"alt":36276,"caption":36277,"src":36278},[79,59391,55843],{"id":55842},[12,59393,59394],{},[40,59395,59397],{"href":1971,"rel":59396},[1458],"FPS Economy – AREI\u002FRGIE Book 1 V07, sections 3.1.2, 6.4, 6.5 and 9.1.2",{"title":2044,"searchDepth":2045,"depth":2045,"links":59399},[59400,59401,59402,59405,59406,59407],{"id":48742,"depth":2045,"text":48743},{"id":59266,"depth":2045,"text":59267},{"id":59335,"depth":2045,"text":59336,"children":59403},[59404],{"id":59342,"depth":2053,"text":59343},{"id":59349,"depth":2045,"text":59350},{"id":59356,"depth":2045,"text":59357},{"id":55842,"depth":2045,"text":55843},"2026-03-13","Documents, visual checks, tests, measurements: point by point, what the inspector checks and measures during an electrical inspection in Belgium – with limit values and AREI references.",[5422,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-inspection-checklist-editorial.jpg","\u002Fblog\u002Finspection-checklist.en",{"title":59168,"description":59409},"What Does the Inspector Check in an Electrical Inspection?","blog\u002Finspection-checklist.en",[2133,2134,5422,47840,15623,5269,4260,59418,1735,2132,59419,59420,24055,59421,59422,4261],"Eindrahtschema","Situationsplan","plan de situation","earth resistance","insulation resistance","HtvXlj6rkI_RcBDJ065_WIfkXsQfzryh3j8h4ghVCZY","\u002Fblog\u002Finspection-checklist",{"id":59426,"title":59427,"articleId":59428,"body":59429,"category":27063,"date":59748,"description":59749,"extension":2113,"image":59449,"labels":59750,"lastUpdated":2111,"locale":2119,"meta":59751,"navigation":2121,"ogImage":59752,"path":59753,"publishDate":59748,"readTime":47831,"refreshInterval":4248,"seo":59754,"seoTitle":10313,"slug":59428,"stem":59755,"tags":59756,"__hash__":59759,"kind":2137,"href":59760},"blog\u002Fblog\u002Fsockets-per-circuit.en.md","How Many Sockets per Circuit? The AREI Rule","sockets-per-circuit",{"type":9,"value":59430,"toc":59738},[59431,59435,59444,59450,59458,59462,59520,59523,59528,59534,59538,59609,59618,59621,59630,59634,59666,59669,59676,59680,59690,59694,59703,59710,59712,59732],[79,59432,59434],{"id":59433},"maximum-8-sockets-per-circuit","Maximum 8 sockets per circuit",[12,59436,59437,59440,59441,59443],{},[15,59438,59439],{},"A final circuit in a dwelling feeds at most eight single or multiple socket outlets."," That is the rule in Book 1 of the AREI\u002FRGIE, Belgium's general regulations for electrical installations, subsection 5.3.5.2, point b. A double or triple socket counts as ",[15,59442,4996],{}," point. Pure lighting circuits have no fixed cap; instead, every dwelling unit with more than two rooms or areas needs at least two separate lighting circuits.",[12,59445,59446],{},[74,59447],{"alt":59448,"src":59449},"An electrician checks socket locations in a room.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-sockets-per-circuit-editorial.webp",[12,59451,59452,59454,59455],{},[15,59453,47231],{}," you draw every socket circuit for free in the browser, with a letter per circuit and a designation such as \"B3\" per socket that stays the same in the single-line diagram and the situation plan. You count the points yourself; Sketch does not check AREI rules. ",[40,59456,47237],{"href":47235,"rel":59457},[1458],[79,59459,59461],{"id":59460},"how-to-count","How to count",[138,59463,59464,59473],{},[141,59465,59466],{},[144,59467,59468,59470],{},[147,59469,10584],{},[147,59471,59472],{},"Counts towards the limit of eight",[163,59474,59475,59483,59490,59498,59505,59512],{},[144,59476,59477,59480],{},[168,59478,59479],{},"Single socket",[168,59481,59482],{},"1 point",[144,59484,59485,59488],{},[168,59486,59487],{},"Double or triple socket",[168,59489,59482],{},[144,59491,59492,59495],{},[168,59493,59494],{},"Light point on a pure lighting circuit",[168,59496,59497],{},"does not count",[144,59499,59500,59503],{},[168,59501,59502],{},"Fixed appliance on a mixed circuit",[168,59504,59482],{},[144,59506,59507,59510],{},[168,59508,59509],{},"Group of lights or appliances with one common control (mixed circuit)",[168,59511,59482],{},[144,59513,59514,59517],{},[168,59515,59516],{},"Appliance with a dedicated circuit (5.2.1.2)",[168,59518,59519],{},"does not belong on the socket circuit",[12,59521,59522],{},"Mixed circuits are allowed: sockets, luminaires and other fixed appliances may share a final circuit. The socket rule then applies to the whole circuit, and each fixed appliance – or each group behind one common switch – counts as one socket (5.3.5.2 b).",[1489,59524],{":height":8729,":width":3800,"alt":59525,"caption":59526,"src":59527},"Diagram of a mixed final circuit: a single, double and triple socket, a fixed appliance and a group of lights on one common switch each count as one point, five out of a maximum of eight.","Each socket counts once, however many plugs it takes; large appliances under 5.2.1.2 get a dedicated circuit.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fsockets-per-circuit\u002Fcounting-points-per-circuit.en.svg",[1489,59529],{":height":22938,":width":59530,"alt":59531,"caption":59532,"src":59533},"1293","House template in PlanElec Sketch: socket of circuit G selected, on the right ‘Quantity’ 2 for a double socket.","‘Quantity’ says how many sockets sit at the point. For the limit of eight, a double socket counts as one point; Sketch does not count by AREI\u002FRGIE.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-socket-count.webp",[79,59535,59537],{"id":59536},"cable-and-breaker-per-circuit-type","Cable and breaker per circuit type",[138,59539,59540,59556],{},[141,59541,59542],{},[144,59543,59544,59547,59550,59553],{},[147,59545,59546],{},"Circuit type",[147,59548,59549],{},"Typical cable",[147,59551,59552],{},"Max. circuit breaker (table 4.11)",[147,59554,59555],{},"Max. points",[163,59557,59558,59570,59583,59597],{},[144,59559,59560,59563,59565,59568],{},[168,59561,59562],{},"Sockets",[168,59564,51468],{},[168,59566,59567],{},"20 A (fuse: 16 A)",[168,59569,6645],{},[144,59571,59572,59574,59577,59580],{},[168,59573,7264],{},[168,59575,59576],{},"XVB 3G1.5",[168,59578,59579],{},"16 A (fuse: 10 A)",[168,59581,59582],{},"no fixed cap; at least 2 lighting circuits",[144,59584,59585,59588,59591,59594],{},[168,59586,59587],{},"Dedicated circuit 4 mm²",[168,59589,59590],{},"XVB 3G4",[168,59592,59593],{},"25 A (fuse: 20 A)",[168,59595,59596],{},"1 appliance",[144,59598,59599,59602,59604,59607],{},[168,59600,59601],{},"Dedicated circuit 6 mm²",[168,59603,51482],{},[168,59605,59606],{},"40 A (fuse: 32 A)",[168,59608,59596],{},[12,59610,59611,59612,59614,59615,59617],{},"Table 4.11 in subsection 4.4.1.4 gives the ",[15,59613,31797],{}," rated current per cross-section for domestic installations. Installation method, grouping and cable length can call for a larger cross-section; the method is in ",[40,59616,47317],{"href":3795},". Socket circuits need at least 2.5 mm²: under table 5.1, 1.5 mm² is only allowed for circuits without sockets.",[79,59619,59620],{"id":47209},"Which appliances need their own circuit",[12,59622,59623,59624,59626,59627,56],{},"Subsection 5.2.1.2 takes certain appliances off the socket circuit altogether. In domestic installations, every appliance with a fixed location rated at ",[15,59625,47219],{}," or more gets its own circuit. The washing machine, dishwasher, tumble dryer, electric cooker, hob and oven each get a dedicated circuit regardless of their power; fixed electric heating gets one or more separate circuits. Details and examples are in ",[40,59628,59629],{"href":3707},"dedicated circuits for appliances",[79,59631,59633],{"id":59632},"how-to-split-a-house-into-circuits","How to split a house into circuits",[3139,59635,59636,59642,59648,59654,59660],{},[87,59637,59638,59641],{},[15,59639,59640],{},"Place sockets room by room."," Start from what each space needs, not from circuits.",[87,59643,59644,59647],{},[15,59645,59646],{},"Group them into circuits."," Combine neighbouring sockets into final circuits of eight points at most. If you want more spare capacity or availability, plan smaller circuits.",[87,59649,59650,59653],{},[15,59651,59652],{},"Separate the dedicated circuits."," Everything listed in 5.2.1.2 gets its own circuit.",[87,59655,59656,59659],{},[15,59657,59658],{},"Spread the lighting."," At least two lighting circuits, so one trip does not leave the whole home in the dark.",[87,59661,59662,59665],{},[15,59663,59664],{},"Number consistently."," Circuit and point numbers match on the single-line diagram and the situation plan.",[12,59667,59668],{},"How many circuits a house ends up with follows from these steps – not from a rule of thumb.",[12,59670,59671,59672,59675],{},"You can draw these steps for free in the browser with PlanElec Sketch: every circuit gets a letter, every device a designation such as \"B3\" that stays the same in the single-line diagram and the situation plan. ",[40,59673,1459],{"href":1456,"rel":59674},[1458],". Sketch does not count points against AREI; you do that yourself or with the self-check in Pro.",[79,59677,59679],{"id":59678},"existing-installations-more-than-eight-only-in-existing-parts","Existing installations: more than eight only in existing parts",[12,59681,59682,59683,59686,59687,56],{},"Part 8 lets existing domestic installations keep more than eight sockets per final circuit ",[15,59684,59685],{},"in service",", provided the power of the connected fixed appliances and appliances with a fixed location does not exceed the permissible power of the wiring (section 8.2.1, item 6, for installations started before 1 October 1981; section 8.2.2, item 6, for installations under the former AREI). The derogation covers existing parts. New or modified circuits follow 5.3.5.2. More in ",[40,59688,59689],{"href":5956},"old buildings and AREI Part 8",[79,59691,59693],{"id":59692},"how-planelec-counts","How PlanElec counts",[12,59695,59696,59697,59699,59700,59702],{},"In PlanElec Pro, the AREI\u002FRGIE self-check counts sockets and fixed appliances per final circuit and flags more than eight as an error; pure lighting circuits are excluded. It also checks for at least two lighting circuits and for a dedicated circuit for large appliances. You see overruns while you design. The self-check shows you open items; the inspection of the installation is carried out by the approved inspection body. The rules covered are listed in ",[40,59698,28419],{"href":1085},". Pro, with distribution board and self-check report, is aimed at installers: ",[40,59701,31],{"href":1964},". PlanElec Sketch draws and documents but does not count against AREI.",[12,59704,47544,59705,59709],{},[40,59706,59708],{"href":1971,"rel":59707},[1458],"AREI Book 1, version 06",", subsections 4.4.1.4, 5.2.1.2 and 5.3.5.2 and Part 8.",[79,59711,7537],{"id":7536},[84,59713,59714,59718,59723,59727],{},[87,59715,59716],{},[40,59717,47529],{"href":3899},[87,59719,59720],{},[40,59721,59722],{"href":5393},"Electrical inspection in Belgium: process and documents",[87,59724,59725],{},[40,59726,34507],{"href":34506},[87,59728,59729],{},[40,59730,59731],{"href":30823},"XVB cable or VOB wire: differences and choice",[12,59733,59734],{},[40,59735,59737],{"href":47235,"rel":59736},[1458],"Draw your circuits for free in PlanElec Sketch →",{"title":2044,"searchDepth":2045,"depth":2045,"links":59739},[59740,59741,59742,59743,59744,59745,59746,59747],{"id":59433,"depth":2045,"text":59434},{"id":59460,"depth":2045,"text":59461},{"id":59536,"depth":2045,"text":59537},{"id":47209,"depth":2045,"text":59620},{"id":59632,"depth":2045,"text":59633},{"id":59678,"depth":2045,"text":59679},{"id":59692,"depth":2045,"text":59693},{"id":7536,"depth":2045,"text":7537},"2026-03-11","At most 8 sockets per final circuit, and a multiple socket counts as one: how to count, choose cable and breaker, and plan lighting and dedicated circuits under the AREI.",[34539,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-sockets-per-circuit-editorial.jpg","\u002Fblog\u002Fsockets-per-circuit.en",{"title":59427,"description":59749},"blog\u002Fsockets-per-circuit.en",[2133,2134,59757,36882,59758,59161,57077,5269,4260,59418,1735,5422,47840,50149,4261,2132],"socket","breaker","JqlDeYEp9cQGz6vOa9NiBVFSFYyMG_GJ7D6eIZ-cc6g","\u002Fblog\u002Fsockets-per-circuit",{"id":59762,"title":59763,"articleId":59764,"body":59765,"category":27063,"date":60170,"description":60171,"extension":2113,"image":59782,"labels":60172,"lastUpdated":10988,"locale":2119,"meta":60173,"navigation":2121,"ogImage":60174,"path":60175,"publishDate":60170,"readTime":19432,"refreshInterval":4248,"seo":60176,"seoTitle":10313,"slug":59764,"stem":60177,"tags":60178,"__hash__":60184,"kind":2137,"href":60185},"blog\u002Fblog\u002Fbathroom-cables-arei-zones.en.md","Which Cables Can I Use in the Bathroom? (AREI Zones)","bathroom-cables-arei-zones",{"type":9,"value":59766,"toc":60158},[59767,59771,59777,59783,59787,59794,59879,59884,59887,59891,59963,59966,59970,59996,59998,60001,60062,60065,60069,60076,60079,60094,60097,60100,60103,60107,60114,60121,60127,60129,60153],[79,59768,59770],{"id":59769},"which-cables-are-allowed-in-the-bathroom","Which cables are allowed in the bathroom",[12,59772,59773,59776],{},[15,59774,59775],{},"In the bathroom you install wiring without metal elements: typically an XVB cable or insulated single-core wires (VOB) in conduit."," Armoured cables and steel conduit are banned in the bathroom and up to 5 cm deep in its walls. Zones 1 and 2 only carry wiring that supplies equipment in zones 0, 1 and 2; zone 0 only carries the wiring of the SELV equipment allowed there. Every bathroom circuit is protected by an RCD of high or very high sensitivity located outside the bathroom. That is how Book 1 of the AREI\u002FRGIE, Belgium's general regulations for electrical installations, regulates it in chapter 7.1.",[12,59778,59779],{},[74,59780],{"alt":59781,"src":59782},"An electrician measures a bathroom.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-bathroom-cables-arei-zones-editorial.webp",[79,59784,59786],{"id":59785},"zones-0-1-and-2","Zones 0, 1 and 2",[12,59788,59789,59790,59793],{},"The official Dutch and French texts speak of ",[15,59791,59792],{},"volumes","; in practice most people say zones. They depend on whether you plan a bath or a shower (subsection 7.1.3.2).",[138,59795,59796,59812],{},[141,59797,59798],{},[144,59799,59800,59803,59806,59809],{},[147,59801,59802],{},"Zone",[147,59804,59805],{},"Bath",[147,59807,59808],{},"Shower",[147,59810,59811],{},"What is allowed",[163,59813,59814,59830,59846,59864],{},[144,59815,59816,59821,59824,59827],{},[168,59817,59818],{},[15,59819,59820],{},"Zone 0",[168,59822,59823],{},"inside the bath",[168,59825,59826],{},"Shower tray at least 10 cm deep: its interior up to 10 cm above its base. Otherwise: up to 10 cm above the floor within 1.20 m of each fixed water outlet",[168,59828,59829],{},"Only fixed, permanently connected equipment on SELV (source outside zones 0 and 1), at most 12 V AC; no sockets, no junction boxes",[144,59831,59832,59837,59840,59843],{},[168,59833,59834],{},[15,59835,59836],{},"Zone 1",[168,59838,59839],{},"above the bath up to 2.25 m (or up to a higher fixed water outlet), including the space under the bath",[168,59841,59842],{},"within 1.20 m of each fixed water outlet, up to 2.25 m or up to a higher outlet",[168,59844,59845],{},"SELV equipment, SELV sockets and SELV controls; low-voltage equipment only if permanently connected and intended by the manufacturer for zone 1",[144,59847,59848,59853,59856,59861],{},[168,59849,59850],{},[15,59851,59852],{},"Zone 2",[168,59854,59855],{},"0.60 m around zone 1",[168,59857,59858],{},[15,59859,59860],{},"not defined",[168,59862,59863],{},"Fixed equipment, switches, SELV sockets; 230 V sockets only behind an RCD of very high sensitivity (≤ 10 mA) or each via its own isolating transformer up to 100 W",[144,59865,59866,59871,59874,59876],{},[168,59867,59868],{},[15,59869,59870],{},"Outside the zones",[168,59872,59873],{},"rest of the room",[168,59875,59873],{},[168,59877,59878],{},"General rules of Book 1",[1489,59880],{":height":25874,":width":3800,"alt":59881,"caption":59882,"src":59883},"Two sections through a bathroom. Bathtub: zone 0 inside the tub, zone 1 above it up to 2.25 m, zone 2 0.60 m wide beside it. Shower without tray: zone 0 up to 0.10 m above the floor and zone 1 up to 2.25 m within 1.20 m of the water outlet, no zone 2. For each zone, the equipment allowed.","Simplified view without limiting walls. Subsection 7.1.3.2 and the figures in 7.1.3.3 and 7.1.3.4 are decisive.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Fbathroom-cables-arei-zones\u002Fbathroom-zones-section.en.svg",[12,59885,59886],{},"Fixed walls can limit the zones; the figures are in subsections 7.1.3.3 and 7.1.3.4. The required water resistance follows from table 7.3: zone 0 calls for external influence AD7 (at least IPX7), zones 1 and 2 for AD4 (at least IPX4). Exception per the footnote to table 7.3: low-voltage sockets in zone 2 and outside the zones may have degree of protection IPXX. The maximum SELV voltages are in tables 7.1 and 7.2. The equipment rules per zone are in subsection 7.1.5.2, points b to d. Distribution boards are banned in zones 0, 1 and 2, as is equipment that supplies or protects other rooms.",[79,59888,59890],{"id":59889},"cable-types-by-zone","Cable types by zone",[138,59892,59893,59906],{},[141,59894,59895],{},[144,59896,59897,59899,59901,59904],{},[147,59898,3119],{},[147,59900,59820],{},[147,59902,59903],{},"Zones 1 and 2",[147,59905,59870],{},[163,59907,59908,59922,59936,59949],{},[144,59909,59910,59914,59917,59920],{},[168,59911,59912],{},[15,59913,51531],{},[168,59915,59916],{},"only for zone-0 equipment, embedded in fixed walls",[168,59918,59919],{},"yes, if it supplies equipment in zone 0, 1 or 2",[168,59921,515],{},[144,59923,59924,59929,59932,59934],{},[168,59925,59926],{},[15,59927,59928],{},"VOB \u002F H07V-U in conduit",[168,59930,59931],{},"only for zone-0 equipment, in conduit in fixed walls",[168,59933,59919],{},[168,59935,515],{},[144,59937,59938,59943,59945,59947],{},[168,59939,59940],{},[15,59941,59942],{},"Single-core wires without conduit",[168,59944,602],{},[168,59946,602],{},[168,59948,602],{},[144,59950,59951,59956,59958,59960],{},[168,59952,59953],{},[15,59954,59955],{},"Armoured cable, steel conduit",[168,59957,602],{},[168,59959,602],{},[168,59961,59962],{},"not in the room nor up to 5 cm deep in its walls",[12,59964,59965],{},"For zones 1 and 2, subsection 7.1.5.2, point e, allows four installation methods: in conduit embedded in fixed walls (5.2.9.3), exposed or surface-mounted (5.2.9.5), in building cavities (5.2.9.9) and embedded without conduit (5.2.9.10). SELV wiring in zones 0, 1 and 2 needs protection by insulation as defined in subsection 4.2.5.4, point a, whatever the installation method.",[1041,59967,59969],{"id":59968},"what-to-check-on-the-conduit","What to check on the conduit",[84,59971,59972,59978,59984,59990],{},[87,59973,59974,59977],{},[15,59975,59976],{},"Fire behaviour of the conduit:"," a conduit that contributes to flame propagation may only be used when embedded at least 3 cm deep in non-combustible material (5.2.7.4 and 5.2.9.3, point f). In stud walls and suspended ceilings you therefore need a non-flame-propagating conduit. The property of your pre-wired conduit (Preflex) is printed on the conduit and its data sheet.",[87,59979,59980,59983],{},[15,59981,59982],{},"No loose single-core wires:"," conductors with basic insulation only, such as VOB, never go into a wall or cavity without conduit (5.2.9.9 and 5.2.9.10).",[87,59985,59986,59989],{},[15,59987,59988],{},"Bundled cables:"," conductors and cables laid in bundles need at least property F2 or fire class Cca; those laid singly at least F1 or Eca (5.2.7.2 and 5.2.7.3).",[87,59991,59992,59995],{},[15,59993,59994],{},"Through-runs:"," wiring that only passes through the bathroom to another room does not belong in zones 1 and 2. Route it outside the zones.",[79,59997,48524],{"id":59090},[12,59999,60000],{},"The bathroom follows the same maxima as the rest of the home (table 4.11 in subsection 4.4.1.4):",[138,60002,60003,60014],{},[141,60004,60005],{},[144,60006,60007,60010,60012],{},[147,60008,60009],{},"Use",[147,60011,42290],{},[147,60013,49012],{},[163,60015,60016,60024,60032,60041,60052],{},[144,60017,60018,60020,60022],{},[168,60019,7264],{},[168,60021,22712],{},[168,60023,33079],{},[144,60025,60026,60028,60030],{},[168,60027,59562],{},[168,60029,22715],{},[168,60031,33088],{},[144,60033,60034,60037,60039],{},[168,60035,60036],{},"Washing machine, tumble dryer (own circuit)",[168,60038,22715],{},[168,60040,33088],{},[144,60042,60043,60046,60049],{},[168,60044,60045],{},"Electric floor or wall heating",[168,60047,60048],{},"by power",[168,60050,60051],{},"per table 4.11",[144,60053,60054,60057,60060],{},[168,60055,60056],{},"Instantaneous water heater, large boiler",[168,60058,60059],{},"by power and manufacturer data",[168,60061,60051],{},[12,60063,60064],{},"Appliances with a fixed location of 2600 W or more get their own circuit (5.2.1.2). Heating elements embedded in fixed walls are allowed outside zone 0 if covered by a metal grid connected to the supplementary equipotential bonding (7.1.4.5).",[79,60066,60068],{"id":60067},"an-rcd-for-every-bathroom-circuit","An RCD for every bathroom circuit",[12,60070,60071,60072,60075],{},"Subsection 7.1.4.3 requires one or more RCDs of high or very high sensitivity, 30 mA in practice, for ",[15,60073,60074],{},"every circuit that supplies the bathroom",". The only exceptions are final circuits on SELV, with electrical separation or forming part of a safety installation. This applies equally to lighting, sockets and permanently connected appliances.",[12,60077,60078],{},"Two details decide the design:",[84,60080,60081,60087],{},[87,60082,60083,60084,60086],{},"The RCD is installed ",[15,60085,28100],{}," the bathroom.",[87,60088,60089,60090,60093],{},"In domestic installations it sits ",[15,60091,60092],{},"downstream"," of the RCD at the origin of the installation. The main RCD alone is not enough for the bathroom.",[12,60095,60096],{},"The same 30 mA RCD may also protect circuits in other rooms.",[79,60098,33521],{"id":60099},"supplementary-equipotential-bonding",[12,60101,60102],{},"Subsection 7.1.4.4 requires supplementary equipotential bonding in the bathroom: it locally connects the exposed conductive parts of electrical equipment to the simultaneously accessible extraneous conductive parts, such as metal water and heating pipes, a metal bath or a metal waste pipe. Exempt are SELV equipment, plastic pipes, radiators fed by plastic pipes and class II equipment.",[79,60104,60106],{"id":60105},"how-planelec-helps-with-the-bathroom","How PlanElec helps with the bathroom",[12,60108,3361,60109,60111,60112,56],{},[40,60110,31],{"href":1964}," you draw the bathtub or shower on the floor plan; PlanElec shows zones 0, 1 and 2 as a separate layer on top. You then assign each bathroom device its zone. The AREI\u002FRGIE self-check flags bathroom circuits without a 30 mA RCD and equipment not allowed in zone 0, 1 or 2, such as a mains socket or mains switch in zone 1. You choose cable type, conduit and installation method using the rules above. The rules covered are listed in ",[40,60113,28419],{"href":1085},[12,60115,60116,60117,60120],{},"If you are only renovating your own bathroom, draw the single-line diagram and situation plan with every socket, switch and light point for free in ",[40,60118,22],{"href":1456,"rel":60119},[1458]," and go through them with your electrician. Sketch does not know the zones; the professional checks the allocation. The inspection of the installation is carried out by the recognised inspection body.",[12,60122,47544,60123,60126],{},[40,60124,59708],{"href":1971,"rel":60125},[1458],", chapter 7.1 and subsections 4.4.1.4, 5.2.7.2 to 5.2.7.4 and 5.2.9.",[79,60128,7537],{"id":7536},[84,60130,60131,60135,60139,60144,60148],{},[87,60132,60133],{},[40,60134,47529],{"href":3899},[87,60136,60137],{},[40,60138,3708],{"href":3707},[87,60140,60141],{},[40,60142,60143],{"href":30823},"XVB cable or VOB wire?",[87,60145,60146],{},[40,60147,5394],{"href":5393},[87,60149,60150],{},[40,60151,60152],{"href":30818},"Preflex or open wiring: which cable method to choose?",[12,60154,60155],{},[40,60156,60157],{"href":1964},"Plan your bathroom in PlanElec Pro and check it yourself →",{"title":2044,"searchDepth":2045,"depth":2045,"links":60159},[60160,60161,60162,60165,60166,60167,60168,60169],{"id":59769,"depth":2045,"text":59770},{"id":59785,"depth":2045,"text":59786},{"id":59889,"depth":2045,"text":59890,"children":60163},[60164],{"id":59968,"depth":2053,"text":59969},{"id":59090,"depth":2045,"text":48524},{"id":60067,"depth":2045,"text":60068},{"id":60099,"depth":2045,"text":33521},{"id":60105,"depth":2045,"text":60106},{"id":7536,"depth":2045,"text":7537},"2026-03-09","XVB or VOB in conduit, with no metal elements: which wiring is allowed in bathroom zones 0, 1 and 2, how to install it and which RCD the bathroom needs.",[4244,2820,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-bathroom-cables-arei-zones-editorial.jpg","\u002Fblog\u002Fbathroom-cables-arei-zones.en",{"title":59763,"description":60171},"blog\u002Fbathroom-cables-arei-zones.en",[2133,2134,60179,60180,57077,59034,60181,32127,24055,60182,5422,47840,50149,4261,5269,4260,59418,1735,2132,60183],"bathroom","zones","Preflex","30mA","CPR","_qdddnVZxJ6TscQkvLq1ujHmkq0qXAahZ2OAFKVp9ZQ","\u002Fblog\u002Fbathroom-cables-arei-zones",{"id":60187,"title":60188,"articleId":60189,"body":60190,"category":27063,"date":60484,"description":60485,"extension":2113,"image":60202,"labels":60486,"lastUpdated":10988,"locale":2119,"meta":60487,"navigation":2121,"ogImage":60488,"path":60489,"publishDate":60484,"readTime":51043,"refreshInterval":4248,"seo":60490,"seoTitle":10313,"slug":60189,"stem":60491,"tags":60492,"__hash__":60494,"kind":2137,"href":60495},"blog\u002Fblog\u002Fwhat-is-a-situation-plan.en.md","What Is a Situation Plan?","what-is-a-situation-plan",{"type":9,"value":60191,"toc":60477},[60192,60198,60203,60207,60220,60226,60230,60242,60317,60320,60324,60357,60360,60363,60367,60371,60444,60458,60460,60471],[12,60193,60194,60197],{},[15,60195,60196],{},"A situation plan is the floor plan of your electrical installation: it shows where distribution boards, boxes, sockets, lighting points, switches, fixed appliances and sources are located in the building."," AREI\u002FRGIE calls it a position plan and requires it together with the single-line diagram for every new domestic installation and for substantial modifications or extensions (Subsection 3.1.2.1 a).",[12,60199,60200],{},[74,60201],{"alt":23565,"src":60202},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-what-is-a-situation-plan-editorial.webp",[79,60204,60206],{"id":60205},"a-floor-plan-of-your-electrical-installation","A floor plan of your electrical installation",[12,60208,60209,60210,60213,60214,60216,60217,60219],{},"A situation plan (Dutch: ",[63,60211,60212],{},"situatieplan",", French: ",[63,60215,55974],{},") is a simplified floor plan showing the ",[15,60218,40307],{}," of the electrical components. Each point carries the same reference as on the single-line diagram: the letter of its circuit and its sequence number.",[12,60221,60222,60223,60225],{},"The single-line diagram shows the electrical structure, meaning which protective device supplies which circuit. The situation plan shows ",[15,60224,27458],{}," each point is.",[79,60227,60229],{"id":60228},"what-does-areirgie-say","What does AREI\u002FRGIE say?",[12,60231,60232,60233,60236,60237,60241],{},"The current ",[40,60234,49266],{"href":51840,"rel":60235},[1458]," (Version 06) governs content and referencing; the Federal Public Service Economy's ",[40,60238,60240],{"href":36246,"rel":60239},[1458],"domestic-inspection guidance"," lists both plans among the documents to present.",[138,60243,60244,60254],{},[141,60245,60246],{},[144,60247,60248,60250,60252],{},[147,60249,53844],{},[147,60251,32873],{},[147,60253,3727],{},[163,60255,60256,60267,60277,60286,60295,60306],{},[144,60257,60258,60261,60264],{},[168,60259,60260],{},"Meaning of \"plan\"",[168,60262,60263],{},"Chapter 2.12",[168,60265,60266],{},"a to-scale representation of where the parts of the installation are; no specific scale ratio is prescribed",[144,60268,60269,60272,60274],{},[168,60270,60271],{},"Obligation",[168,60273,25564],{},[168,60275,60276],{},"single-line diagram and situation plan for new domestic installations and substantial modifications or extensions",[144,60278,60279,60281,60283],{},[168,60280,3727],{},[168,60282,25499],{},[168,60284,60285],{},"location of boards, junction and branch boxes, sockets, lighting points, switches, fixed appliances and sources",[144,60287,60288,60290,60292],{},[168,60289,36457],{},[168,60291,25564],{},[168,60293,60294],{},"circuit letter plus sequence number from the single-line diagram; switches carry the number of the point they control",[144,60296,60297,60300,60303],{},[168,60298,60299],{},"Symbols",[168,60301,60302],{},"Chapter 2.13, Table 2.23",[168,60304,60305],{},"official symbol list; you define missing symbols in the legend",[144,60307,60308,60311,60314],{},[168,60309,60310],{},"Installation file",[168,60312,60313],{},"9.1.2",[168,60315,60316],{},"the owner keeps single-line diagram, situation plan and inspection reports in the installation file",[12,60318,60319],{},"When the approved body establishes conformity at the inspection, it signs the diagram and plan together with the person responsible for the work. A missing or contradictory plan appears in the inspection report; only the approved inspection body determines the official outcome.",[79,60321,60323],{"id":60322},"what-must-be-on-the-situation-plan","What must be on the situation plan?",[84,60325,60326,60329,60332,60335,60338,60341,60344,60351,60354],{},[87,60327,60328],{},"a clear, simplified floor plan of each relevant storey",[87,60330,60331],{},"distribution and switchgear boards",[87,60333,60334],{},"junction and branch boxes",[87,60336,60337],{},"every socket, lighting point and switch",[87,60339,60340],{},"fixed machines and appliances such as hob, water heater or EV charger",[87,60342,60343],{},"sources such as a PV inverter or battery",[87,60345,60346,60347,60350],{},"for each point the circuit letter and number, ",[15,60348,60349],{},"identical"," to the single-line diagram",[87,60352,60353],{},"symbols from Table 2.23 and a legend for any custom signs",[87,60355,60356],{},"number, revision and date, installation address and details of the responsible person",[12,60358,60359],{},"You always draw a change on the situation plan, even when a short description is enough for the single-line diagram (3.1.2.1 a).",[12,60361,60362],{},"This is what it looks like in a fictitious example project from PlanElec Pro:",[1489,60364],{":height":6699,":width":27568,"alt":60365,"caption":60366,"src":46850},"Situation plan of a fictitious example project in PlanElec Pro: ground floor with the living and kitchen room, devices carrying the circuit references C1, E1, F1, G1 and H1, the symbol legend button at the top and the floor indicator on the right.","Fictitious example project from PlanElec Pro: every device sits in its place on the floor plan and carries its circuit letter and number; switch and lighting point share the reference C1.",[79,60368,60370],{"id":60369},"situation-plan-and-single-line-diagram-compared","Situation plan and single-line diagram compared",[138,60372,60373,60383],{},[141,60374,60375],{},[144,60376,60377,60379,60381],{},[147,60378,26838],{},[147,60380,534],{},[147,60382,3926],{},[163,60384,60385,60396,60406,60416,60425,60435],{},[144,60386,60387,60390,60393],{},[168,60388,60389],{},"Representation",[168,60391,60392],{},"floor plan with the location of points",[168,60394,60395],{},"diagram with one line per circuit",[144,60397,60398,60401,60404],{},[168,60399,60400],{},"Shows location",[168,60402,60403],{},"yes — exactly where",[168,60405,602],{},[144,60407,60408,60411,60413],{},[168,60409,60410],{},"Shows structure",[168,60412,602],{},[168,60414,60415],{},"yes — from the supply point to the consumer",[144,60417,60418,60420,60422],{},[168,60419,41151],{},[168,60421,36442],{},[168,60423,60424],{},"type, ratings and order",[144,60426,60427,60429,60432],{},[168,60428,23131],{},[168,60430,60431],{},"routes can be drawn",[168,60433,60434],{},"type, cross-section, number of conductors, installation method",[144,60436,60437,60439,60442],{},[168,60438,19529],{},[168,60440,60441],{},"to scale, without a prescribed ratio",[168,60443,36429],{},[12,60445,60446,60447,60450,60451,60453,60454,60457],{},"Both documents belong together and are equally mandatory. To draw one room by room, read ",[40,60448,60449],{"href":6050},"How to draw a situation plan","; the detailed comparison is in ",[40,60452,56655],{"href":5399},". You can draw both documents free of charge in the browser with ",[40,60455,22],{"href":1456,"rel":60456},[1458],", without an account; check your input with your electrician before the work and the inspection.",[79,60459,7537],{"id":7536},[84,60461,60462,60466],{},[87,60463,60464],{},[40,60465,56650],{"href":4212},[87,60467,60468],{},[40,60469,60470],{"href":29401},"How much does an electrical plan cost in Belgium?",[12,60472,60473],{},[40,60474,60476],{"href":1456,"rel":60475},[1458],"Draw your situation plan free in PlanElec Sketch →",{"title":2044,"searchDepth":2045,"depth":2045,"links":60478},[60479,60480,60481,60482,60483],{"id":60205,"depth":2045,"text":60206},{"id":60228,"depth":2045,"text":60229},{"id":60322,"depth":2045,"text":60323},{"id":60369,"depth":2045,"text":60370},{"id":7536,"depth":2045,"text":7537},"2026-03-06","A situation plan shows where the electrical components in your building are located. What AREI\u002FRGIE requires on it, how it links to the single-line diagram and what the inspection checks.",[18037,2117],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-what-is-a-situation-plan-editorial.jpg","\u002Fblog\u002Fwhat-is-a-situation-plan.en",{"title":60188,"description":60485},"blog\u002Fwhat-is-a-situation-plan.en",[2133,2134,2132,60493,59419,59420,5269,4260,59418,1735,5422,47840,46686,4261],"situatieschema","zMmIBWcg5xqVqfJQFFkv-Fu4h46mG0YWEILs9A3WySA","\u002Fblog\u002Fwhat-is-a-situation-plan",{"id":60497,"title":60498,"articleId":60499,"body":60500,"category":27063,"date":60859,"description":60860,"extension":2113,"image":60519,"labels":60861,"lastUpdated":2111,"locale":2119,"meta":60862,"navigation":2121,"ogImage":60863,"path":60864,"publishDate":60859,"readTime":4830,"refreshInterval":4248,"seo":60865,"seoTitle":10313,"slug":60499,"stem":60866,"tags":60867,"__hash__":60870,"kind":2137,"href":60871},"blog\u002Fblog\u002F30ma-rcd-per-socket.en.md","A 30 mA RCD for Every Socket? The AREI Rule (2026)","30ma-rcd-per-socket",{"type":9,"value":60501,"toc":60847},[60502,60506,60515,60520,60523,60526,60534,60538,60541,60585,60592,60595,60605,60609,60655,60658,60663,60667,60677,60681,60688,60709,60719,60723,60729,60732,60736,60743,60754,60757,60760,60774,60778,60781,60784,60788,60799,60811,60818,60820,60839],[79,60503,60505],{"id":60504},"short-answer-neither-per-socket-nor-per-circuit","Short answer: neither per socket nor per circuit",[12,60507,60508,60510,60511,60514],{},[15,60509,9275],{}," AREI does not require a dedicated 30 mA residual-current device (RCD) for every socket, nor a separate RCD for every socket circuit. In a new home, one high- or very-high-sensitivity RCD (30 mA maximum) protects the required final circuits together – ",[15,60512,60513],{},"up to eight final circuits per RCD"," (AREI Book 1, subsection 4.2.4.3(b)).",[12,60516,60517],{},[74,60518],{"alt":57563,"src":60519},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-30ma-rcd-per-socket-editorial.webp",[12,60521,60522],{},"You count circuits downstream of the RCD, not sockets. A power strip changes nothing: it plugs into an existing socket and creates neither a new circuit nor its own protection.",[12,60524,60525],{},"This article covers domestic AC installations under Book 1, version 06, applicable since 1 April 2026. DC installations, swimming pools and other special installations have additional rules.",[12,60527,60528,60530,60531],{},[15,60529,47231],{}," the house template starts with a 300 mA RCD at the origin and three 30 mA groups for lighting, sockets, and kitchen and wet rooms. It is an example you adapt to your installation for free in the browser; you count the final circuits per RCD yourself. ",[40,60532,47237],{"href":47235,"rel":60533},[1458],[79,60535,60537],{"id":60536},"what-arei-requires-for-a-new-installation","What AREI requires for a new installation",[12,60539,60540],{},"At the origin of the installation there is at least one RCD rated at no more than 300 mA. Immediately downstream follows at least one high- or very-high-sensitivity RCD, to which at least these circuits are connected (4.2.4.3(b)):",[138,60542,60543,60553],{},[141,60544,60545],{},[144,60546,60547,60550],{},[147,60548,60549],{},"Circuit or room",[147,60551,60552],{},"What it means for your design",[163,60554,60555,60563,60570,60578],{},[144,60556,60557,60560],{},[168,60558,60559],{},"Socket outlets not intended for fixed appliances",[168,60561,60562],{},"All ordinary socket circuits sit behind the 30 mA RCD.",[144,60564,60565,60567],{},[168,60566,7264],{},[168,60568,60569],{},"Lighting circuits are included in a new installation.",[144,60571,60572,60575],{},[168,60573,60574],{},"Rooms with a bath and\u002For shower",[168,60576,60577],{},"Circuits supplying these rooms get the sensitive protection.",[144,60579,60580,60582],{},[168,60581,47402],{},[168,60583,60584],{},"AREI names these appliances explicitly.",[12,60586,60587,60588,60591],{},"Each such RCD protects ",[15,60589,60590],{},"no more than eight final circuits",". Six suitable final circuits can therefore sit behind a single 30 mA RCD. Two groups of three are a design choice for better availability, not an obligation.",[12,60593,60594],{},"Fixed appliances such as a refrigerator, electric cooker or electric heating may connect, per circuit or group, to an additional RCD at the origin. That is not a back door for putting sockets or lighting behind 300 mA – and washing machines, dryers and dishwashers are explicitly on the 30 mA list. Heating by resistors embedded in walls at more than 25 V AC gets its own RCD of no more than 100 mA.",[12,60596,60597,60598,60601,60602,56],{},"In domestic installations the RCD must be ",[15,60599,60600],{},"at least Type A","; the one at the origin has a rated current of at least 40 A (5.3.5.3(a)). When Type A is not enough is explained in ",[40,60603,60604],{"href":25395},"RCD Type A or Type B",[79,60606,60608],{"id":60607},"three-eight-rules-that-get-mixed-up","Three \"eight\" rules that get mixed up",[138,60610,60611,60622],{},[141,60612,60613],{},[144,60614,60615,60617,60620],{},[147,60616,8217],{},[147,60618,60619],{},"What you count",[147,60621,3919],{},[163,60623,60624,60634,60645],{},[144,60625,60626,60629,60632],{},[168,60627,60628],{},"Max. 8 final circuits per 30 mA RCD",[168,60630,60631],{},"Circuits downstream of the RCD, not sockets",[168,60633,57398],{},[144,60635,60636,60639,60642],{},[168,60637,60638],{},"Max. 8 socket outlets per final circuit",[168,60640,60641],{},"Single or multiple socket outlets; a multiple outlet counts once",[168,60643,60644],{},"5.3.5.2(b)",[144,60646,60647,60650,60653],{},[168,60648,60649],{},"Mixed circuit (sockets, lighting, appliances)",[168,60651,60652],{},"Each fixed appliance, or group operated by one common control device, counts as one socket outlet",[168,60654,60644],{},[12,60656,60657],{},"A living room with four double sockets can therefore be a single final circuit. Conversely, eight circuits behind one RCD are already the limit, even if each feeds only one socket. Appliances that need their own circuit under 5.2.1.2 do not belong in a mixed circuit.",[1489,60659],{":height":25874,":width":3800,"alt":60660,"caption":60661,"src":60662},"Diagram: a 30 mA RCD downstream of the 300 mA device at the origin protects no more than eight final circuits; each final circuit carries no more than eight single or multiple socket outlets.","Two levels, two limits: per 30 mA RCD you count final circuits (4.2.4.3(b)), per final circuit you count socket outlets (5.3.5.2(b)).","\u002Fimages\u002Fblog\u002Fdiagrams\u002F30ma-rcd-per-socket\u002Fcount-circuits-not-sockets.en.svg",[79,60664,60666],{"id":60665},"cable-size-and-overcurrent-protection","Cable size and overcurrent protection",[12,60668,60669,60670,3324,60673,60676],{},"Socket circuits are run in copper of at least 2.5 mm² (5.2.1.2). Table 4.11 (4.4.1.4) limits their protection to ",[15,60671,60672],{},"20 A with a circuit breaker",[15,60674,60675],{},"16 A with a fuse",". That is a ceiling: installation method, grouping, ambient temperature, length and voltage drop can require a lower rating or a larger cross-section.",[79,60678,60680],{"id":60679},"earthing-resistance-above-30-ohms","Earthing resistance above 30 ohms",[12,60682,60683,60684,60687],{},"The 30-ohm threshold does not replace the 30 mA rule – it tightens it. If the earth electrode's dispersion resistance is ",[15,60685,60686],{},"higher than 30 ohms",", 4.2.4.3(b) requires:",[84,60689,60690,60696,60702],{},[87,60691,60692,60695],{},[15,60693,60694],{},"at least two"," high- or very-high-sensitivity RCDs,",[87,60697,60698,60701],{},[15,60699,60700],{},"no more than sixteen"," single or multiple socket outlets per RCD (a fixed appliance, or a group operated by one common control device, counts as a socket outlet),",[87,60703,60704,60705,60708],{},"for fixed-appliance circuits and all other circuits outside the 30 mA list, additionally at least one RCD of no more than ",[15,60706,60707],{},"100 mA"," per circuit or group of circuits.",[12,60710,60711,60712,60715,60716,56],{},"The sixteen counts socket outlets, not circuits; the eight-circuit limit still applies. A reading of exactly 30 ohms is not \"higher than 30 ohms\". In domestic installations the dispersion resistance must also be ",[15,60713,60714],{},"below 100 ohms"," (4.2.3.2). If that is not achieved, extra RCDs will not rescue the installation – the earthing itself has to be improved. More in ",[40,60717,60718],{"href":27030},"Earthing in Belgium: TT or TN-S?",[79,60720,60722],{"id":60721},"bathroom-30-ma-is-only-part-of-the-protection","Bathroom: 30 mA is only part of the protection",[12,60724,60725,60726,60728],{},"Circuits supplying a room with a bath or shower are protected by one or more high- or very-high-sensitivity RCDs installed ",[15,60727,28100],{}," the bathroom (7.1.4.3). SELV circuits, electrical separation and safety installations are exempt. The same RCD may also protect circuits in other rooms.",[12,60730,60731],{},"Zones 0, 1 and 2, permitted equipment, degree of protection and supplementary bonding (7.1.4.4) are separate requirements. A 30 mA RCD does not make a socket in a prohibited zone acceptable. For existing bathrooms whose execution began before 1 March 2025, 6.5.8.1 point 3 provides targeted deviations – not a rule for a new bathroom.",[79,60733,60735],{"id":60734},"existing-installations-transition-for-work-started-before-1-june-2023","Existing installations: transition for work started before 1 June 2023",[12,60737,60738,60739,60742],{},"For existing parts of domestic installations whose on-site execution began on or after 1 June 2020 and ",[15,60740,60741],{},"before 1 June 2023"," and that passed a conformity inspection under chapter 6.4, 6.5.8.1 point 1 provides a deviation; for older installations, the same deviations are in Part 8 (8.2.1 no. 16, 8.2.2 no. 10). Under that provision's conditions:",[84,60744,60745,60748,60751],{},[87,60746,60747],{},"socket and lighting circuits may remain in service without today's 30 mA protection, including after non-important modifications or extensions to those circuits;",[87,60749,60750],{},"more than eight final circuits may remain behind a sensitive RCD;",[87,60752,60753],{},"where the earthing resistance exceeds 30 ohms, instead of today's layout, one RCD for all lighting and, for each other circuit or group, one RCD with no more than sixteen socket outlets may remain in service.",[12,60755,60756],{},"This is not a blanket exemption for every older house. Start date and existing part must match; the approved inspection body is informed and records the deviation in its inspection report. For an important modification or extension of an old installation under Part 8, at least one RCD at the origin protects the whole installation (4.2.4.3(b)). New installations or projects started after 1 June 2023 cannot rely on this transition.",[12,60758,60759],{},"How to approach an existing installation:",[3139,60761,60762,60765,60768,60771],{},[87,60763,60764],{},"Establish when and how far the original work was carried out.",[87,60766,60767],{},"Decide whether this is an existing part, a non-important or an important modification.",[87,60769,60770],{},"Document the deviation applied.",[87,60772,60773],{},"Compare single-line diagram, situation plan and distribution board with what is actually installed.",[79,60775,60777],{"id":60776},"more-rcds-does-not-mean-never-a-power-cut","More RCDs does not mean: never a power cut",[12,60779,60780],{},"An RCD trips when it detects residual current. That is its job. Leakage currents, moisture or a faulty appliance will trip it. Several RCDs limit what goes dark – so that the fridge and the home office do not drop out together, for instance. Selectivity does not follow automatically; it depends on fault type, wiring and grading.",[12,60782,60783],{},"When surveying an installation, record not only \"30 mA\" but also type, rated current, number of poles and every final circuit actually connected. An outdated diagram easily suggests a correct count when neutrals or outgoing circuits in the board have since been rewired.",[79,60785,60787],{"id":60786},"plan-and-self-check-in-planelec","Plan and self-check in PlanElec",[12,60789,60790,60793,60794,60798],{},[15,60791,60792],{},"Drawing in PlanElec Sketch (free, in the browser):"," you draw the single-line diagram and situation plan without an account and export both as PDF. On the RCD you enter the rated residual current and the type; Sketch prints both next to the symbol, for example \"Δ30mA A\". Every circuit gets a letter, every device a designation such as \"B3\", which also appears on the situation plan. The house template starts with a 300 mA RCD at the origin and three 30 mA groups for lighting, sockets, and kitchen and wet rooms. It is an example you adapt to your installation: ",[40,60795,60797],{"href":47235,"rel":60796},[1458],"open the house template in Sketch",". Sketch does not check AREI rules; you count the eight final circuits per RCD yourself. An electrician carries out the work; the approved inspection body does the inspection.",[12,60800,60801,60804,60805,60807,60808,60810],{},[15,60802,60803],{},"Self-check in PlanElec Pro (for installers):"," the AREI\u002FRGIE self-check flags, among other things, a missing main RCD of no more than 300 mA, socket circuits without a 30 mA RCD, more than eight final circuits per sensitive RCD and more than eight sockets or appliances per final circuit. If a value is missing, the item stays incomplete, never passed. The exact list of rules it checks is in ",[40,60806,1086],{"href":1085},"; what else Pro covers is on ",[40,60809,31],{"href":1964},". You take a Sketch drawing over into Pro when you need the distribution board or the self-check report. The self-check shows you open items; measurements and the on-site inspection are done by the approved inspection body.",[1489,60812],{":height":60813,":width":60814,"alt":60815,"caption":60816,"src":60817},"404","776","Single-line diagram of the ‘Prepare a house’ template in PlanElec Sketch: 300 mA main RCD and three groups, each with a ‘Δ30mA A’ RCD, for lighting, sockets, and kitchen and wet rooms.","The house template assigns the final circuits to three 30 mA groups; cross-section and breaker are written on every outgoing circuit. It is a typical example, not an inspected plan.","\u002Fimages\u002Fblog\u002Fscreens\u002Fsketch\u002Fen-house-single-line.webp",[79,60819,13051],{"id":13050},[84,60821,60822,60826,60831,60835],{},[87,60823,60824],{},[40,60825,60604],{"href":25395},[87,60827,60828],{},[40,60829,60830],{"href":3702},"Sockets: how many per circuit?",[87,60832,60833],{},[40,60834,58798],{"href":4212},[87,60836,60837],{},[40,60838,5394],{"href":5393},[12,60840,60841],{},[63,60842,60843,60844,27050],{},"Legal basis: AREI\u002FRGIE Book 1, version 06, subsections 4.2.3.2, 4.2.4.3(b), 4.4.1.4 (Table 4.11), 5.2.1.2, 5.3.5.2(b), 5.3.5.3(a), 6.5.8.1, 7.1.4.3 and 7.1.4.4. The official text published by the ",[40,60845,27049],{"href":25362,"rel":60846},[1458],{"title":2044,"searchDepth":2045,"depth":2045,"links":60848},[60849,60850,60851,60852,60853,60854,60855,60856,60857,60858],{"id":60504,"depth":2045,"text":60505},{"id":60536,"depth":2045,"text":60537},{"id":60607,"depth":2045,"text":60608},{"id":60665,"depth":2045,"text":60666},{"id":60679,"depth":2045,"text":60680},{"id":60721,"depth":2045,"text":60722},{"id":60734,"depth":2045,"text":60735},{"id":60776,"depth":2045,"text":60777},{"id":60786,"depth":2045,"text":60787},{"id":13050,"depth":2045,"text":13051},"2026-03-04","No: AREI requires neither a 30 mA RCD per socket nor one per circuit. One 30 mA RCD protects up to eight final circuits – here is how to count, for new and existing installations.",[4243,2820,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-30ma-rcd-per-socket-editorial.jpg","\u002Fblog\u002F30ma-rcd-per-socket.en",{"title":60498,"description":60860},"blog\u002F30ma-rcd-per-socket.en",[2133,2134,60868,24055,25425,60869,60182,59757,36882,25426,47840,50149,4261,5269,2132],"Book 1 V06","differential switch","V0MBEaL14lM4FSP-9K96BvfJt9mpJBuOMyfAwZS5Wgs","\u002Fblog\u002F30ma-rcd-per-socket",{"id":60873,"title":60874,"articleId":60875,"body":60876,"category":4239,"date":61485,"description":61486,"extension":2113,"image":60925,"labels":61487,"lastUpdated":4826,"locale":2119,"meta":61488,"navigation":2121,"ogImage":61489,"path":61490,"publishDate":10313,"readTime":8562,"refreshInterval":4248,"seo":61491,"seoTitle":10313,"slug":60875,"stem":61492,"tags":61493,"__hash__":61496,"kind":2137,"href":61497},"blog\u002Fblog\u002Felectrical-plan-costs.en.md","How Much Does an Electrical Plan Cost? Cost Factors 2026","electrical-plan-costs",{"type":9,"value":60877,"toc":61458},[60878,60882,60885,60889,60921,60926,60933,60937,60949,60952,61016,61019,61023,61026,61118,61122,61125,61130,61133,61138,61141,61145,61148,61152,61155,61159,61165,61169,61174,61176,61179,61229,61234,61238,61302,61308,61310,61314,61319,61327,61336,61340,61363,61367,61370,61373,61377,61379,61383,61386,61390,61393,61397,61400,61404,61410,61414,61417,61421,61424,61426,61429,61435,61437,61454],[79,60879,60881],{"id":60880},"short-answer-the-price-follows-the-scope-of-work","Short answer: the price follows the scope of work",[12,60883,60884],{},"Belgium has no official flat rate for a single-line diagram and situation plan. The price comes from the specific job: is there a reliable survey, or does the installation have to be traced on site? Are only the two plans drawn, or do calculations, corrective work, a technical review and the official inspection belong to the job? A price range found online without a named sample, date, region and VAT status does not answer those questions.",[12,60886,60887],{},[15,60888,13162],{},[138,60890,60891,60899],{},[141,60892,60893],{},[144,60894,60895,60897],{},[147,60896,13171],{},[147,60898,9397],{},[163,60900,60901,60907,60913],{},[144,60902,60903,60905],{},[168,60904,13180],{},[168,60906,13183],{},[144,60908,60909,60911],{},[168,60910,13188],{},[168,60912,13191],{},[144,60914,60915,60917],{},[168,60916,13196],{},[168,60918,13199,60919,13202],{},[15,60920,1482],{},[12,60922,60923],{},[74,60924],{"alt":52035,"src":60925},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-electrical-plan-costs-editorial.webp",[12,60927,60928,60929,60932],{},"So compare ",[15,60930,60931],{},"the same result for the same scope",", not a software price against an electrician’s invoice. With PlanElec you draw the single-line diagram and situation plan in Sketch free of charge; The subscription costs EUR 15 per property as site pass or EUR 29 per month as a subscription. Your own time, measurements, materials, work on the installation, technical support and the inspection by an approved body are costed separately.",[79,60934,60936],{"id":60935},"which-documents-are-officially-required","Which documents are officially required?",[12,60938,60939,60940,3157,60944,60948],{},"The Belgian FPS Economy states that a domestic inspection requires at least the single-line diagram, the situation plan and, when available, the connection’s EAN code. The single-line diagram records cables, installation method, RCDs, overcurrent protection, switches, boxes, socket outlets, lighting points, fixed appliances and sources (AREI\u002FRGIE Book 1 V06, Subsection 3.1.2.2 a). The situation plan shows where those items are (Subsection 3.1.2.3 a). Together with the inspection reports, they form the installation file (Section 9.1.2). The primary sources are the ",[40,60941,60943],{"href":36246,"rel":60942},[1458],"official federal domestic-inspection guidance",[40,60945,60947],{"href":1971,"rel":60946},[1458],"AREI\u002FRGIE Book 1 version 06","; this English article summarises the official national-language material.",[12,60950,60951],{},"Which documents you need depends on the occasion:",[138,60953,60954,60964],{},[141,60955,60956],{},[144,60957,60958,60960,60962],{},[147,60959,5480],{},[147,60961,13441],{},[147,60963,3919],{},[163,60965,60966,60977,60986,60994,61005],{},[144,60967,60968,60971,60974],{},[168,60969,60970],{},"New installation",[168,60972,60973],{},"single-line diagram, situation plan, conformity inspection before use",[168,60975,60976],{},"3.1.2.1 a, Chapter 6.4",[144,60978,60979,60981,60984],{},[168,60980,5515],{},[168,60982,60983],{},"updated plans; inspection of the modified and added parts",[168,60985,43368],{},[144,60987,60988,60990,60992],{},[168,60989,43386],{},[168,60991,43389],{},[168,60993,25564],{},[144,60995,60996,60999,61002],{},[168,60997,60998],{},"Sale of a dwelling with an old installation",[168,61000,61001],{},"inspection visit; existing file made available",[168,61003,61004],{},"Section 8.4.2",[144,61006,61007,61010,61013],{},[168,61008,61009],{},"Supply capacity increase for an old installation",[168,61011,61012],{},"inspection visit before the increase",[168,61014,61015],{},"Section 8.4.1",[12,61017,61018],{},"If the single-line diagram and situation plan are missing at the inspection visit on sale, the approved body draws up a brief description and a rough sketch. These do not replace the plans, and the absence is recorded as an infringement in the report (Subsection 8.4.2.2 d). If you are selling, plan the drawings in good time.",[79,61020,61022],{"id":61021},"define-the-scope-before-the-price","Define the scope before the price",[12,61024,61025],{},"A quotation becomes comparable once every item is described. This list stops a cheap drawing quote from growing later with necessary work.",[138,61027,61028,61038],{},[141,61029,61030],{},[144,61031,61032,61035],{},[147,61033,61034],{},"Component",[147,61036,61037],{},"What is explicitly agreed",[163,61039,61040,61048,61056,61063,61070,61078,61086,61094,61102,61110],{},[144,61041,61042,61045],{},[168,61043,61044],{},"Survey",[168,61046,61047],{},"Are rooms, loads, boxes, cable routes and boards surveyed on site, or do you supply verified data?",[144,61049,61050,61053],{},[168,61051,61052],{},"Circuit tracing",[168,61054,61055],{},"Are the assignments known, or must they be established by switching, measuring and opening suitable points?",[144,61057,61058,61060],{},[168,61059,3926],{},[168,61061,61062],{},"Are all protective devices, conductor data, installation methods, sources and fixed appliances included?",[144,61064,61065,61067],{},[168,61066,534],{},[168,61068,61069],{},"Is there a usable floor plan, and are the references to the circuits unambiguous?",[144,61071,61072,61075],{},[168,61073,61074],{},"Calculations",[168,61076,61077],{},"Are sizing, short-circuit, selectivity or voltage-drop calculations part of the job?",[144,61079,61080,61083],{},[168,61081,61082],{},"Technical review",[168,61084,61085],{},"Does a qualified electrician check the as-built state and technical plausibility, or is it drawing only?",[144,61087,61088,61091],{},[168,61089,61090],{},"Corrective work",[168,61092,61093],{},"Is work on the board, cables or equipment included?",[144,61095,61096,61099],{},[168,61097,61098],{},"Inspection appointment",[168,61100,61101],{},"Is the approved body’s fee included or separate?",[144,61103,61104,61107],{},[168,61105,61106],{},"Revisions",[168,61108,61109],{},"How many technically justified correction rounds are included?",[144,61111,61112,61115],{},[168,61113,61114],{},"VAT and travel",[168,61116,61117],{},"Does the amount include VAT, travel and any extra appointments?",[79,61119,61121],{"id":61120},"an-editable-calculation-model-instead-of-invented-market-prices","An editable calculation model instead of invented market prices",[12,61123,61124],{},"Enter only values that come from your quotation or your own time estimate:",[12,61126,61127],{},[25,61128,61129],{},"Total scenario = survey + drawing + technical review + corrective work + inspection + travel + own time",[12,61131,61132],{},"Value your own work with a personal comparison rate:",[12,61134,61135],{},[25,61136,61137],{},"valued own time = documented hours × personal comparison rate per hour",[12,61139,61140],{},"That rate is not a Belgian market tariff. It shows that a weekend of work is not economically free. Conversely, an external flat fee is not expensive if survey, measurement, technical responsibility and revisions are included.",[1041,61142,61144],{"id":61143},"scenario-a-complete-data-is-available","Scenario A: complete data is available",[12,61146,61147],{},"The board is clearly labelled, circuit assignments are checked, a scaled floor plan exists and the protective-device data is legible. The work then consists mainly of taking over data, checking plausibility and drawing. For the drawing alone, PlanElec Sketch is enough; if you need the board, the self-check report and the dossier in the same model, you work in PlanElec Pro. An electrician checks the data in a targeted way.",[1041,61149,61151],{"id":61150},"scenario-b-old-installation-without-reliable-records","Scenario B: old installation without reliable records",[12,61153,61154],{},"If cross-sections, installation methods or assignments are unknown, drawing is the last step. First a competent person surveys the installation safely; opening enclosures, measuring and intervening belong in professional hands. Here the survey often costs more than producing the plans, and that is exactly the item that must appear clearly in the quotation.",[1041,61156,61158],{"id":61157},"scenario-c-renovation-with-open-design-decisions","Scenario C: renovation with open design decisions",[12,61160,61161,61162,56],{},"For new circuits, PV, a home battery, an EV charger, a heat pump or board changes, the technical design is settled first; the diagram documents that decision. Ask for a quotation that separates design, manufacturer data, grid operator conditions, execution and inspection. You will then see later which item changed. Which renovation triggers new plans is explained in ",[40,61163,61164],{"href":4045},"Renovation and AREI",[1041,61166,61168],{"id":61167},"scenario-d-sale-with-a-deadline","Scenario D: sale with a deadline",[12,61170,61171,61172,56],{},"Time pressure alone does not justify an express surcharge. Ask for a written quotation with delivery date, prerequisites and correction process. Agree who books the inspection visit and which existing reports belong in the file. A hastily drawn plan that does not show the as-built state does not solve the documentation problem. More in ",[40,61173,43899],{"href":5090},[79,61175,44492],{"id":44491},[12,61177,61178],{},"The paid plans have applied since 2 November 2026. PlanElec has two interfaces and one plan: Pro applies in Sketch and in Pro.",[138,61180,61181,61191],{},[141,61182,61183],{},[144,61184,61185,61187,61189],{},[147,61186,19671],{},[147,61188,4573],{},[147,61190,25078],{},[163,61192,61193,61202,61211,61220],{},[144,61194,61195,61197,61199],{},[168,61196,22],{},[168,61198,44518],{},[168,61200,61201],{},"draw the single-line diagram and situation plan in the browser, PDF in A4 or A3; without an account with a logo watermark, with a free account without. No distribution board, no self-check report",[144,61203,61204,61206,61208],{},[168,61205,4612],{},[168,61207,44530],{},[168,61209,61210],{},"full Pro editor for one person; exports without masked areas; immediate start with a valid VAT number, otherwise request approval",[144,61212,61213,61215,61217],{},[168,61214,44538],{},[168,61216,44541],{},[168,61218,61219],{},"all documents without masked areas for exactly one confirmed property address",[144,61221,61222,61224,61226],{},[168,61223,44549],{},[168,61225,44552],{},[168,61227,61228],{},"all projects and documents without masked areas, three editing seats, each further seat EUR 12 per month or EUR 120 per year; read-only access free",[12,61230,61231,61232,56],{},"In 2026 PlanElec uses the Belgian small business exemption scheme: no VAT is charged and the amounts are final prices. A site pass covers twelve months. From 20 sites per year, the yearly subscription at EUR 290 costs less than site passes at EUR 15, without additional seats. The subscription price stays for as long as the subscription runs without a break. Costs only arise once you book explicitly. The current details are on the ",[40,61233,1958],{"href":54},[1041,61235,61237],{"id":61236},"which-route-fits-your-situation","Which route fits your situation?",[138,61239,61240,61252],{},[141,61241,61242],{},[144,61243,61244,61247,61250],{},[147,61245,61246],{},"Starting point",[147,61248,61249],{},"Suitable route",[147,61251,4573],{},[163,61253,61254,61268,61278,61291],{},[144,61255,61256,61259,61265],{},[168,61257,61258],{},"You own the property and want to prepare the plans of your installation or draw a draft for your electrician",[168,61260,61261,61264],{},[40,61262,22],{"href":1456,"rel":61263},[1458]," in the browser",[168,61266,61267],{},"EUR 0",[144,61269,61270,61273,61276],{},[168,61271,61272],{},"You work on your own, draw the single-line diagram and situation plan, or continue Trikker files",[168,61274,61275],{},"PlanElec Sketch, without a watermark with a free account",[168,61277,61267],{},[144,61279,61280,61283,61288],{},[168,61281,61282],{},"Your business needs a distribution board, self-check report or installation dossier for one property",[168,61284,61285,61287],{},[40,61286,31],{"href":1964}," as site pass",[168,61289,61290],{},"EUR 15 per property",[144,61292,61293,61296,61299],{},[168,61294,61295],{},"Your business plans several properties on an ongoing basis or works as a team",[168,61297,61298],{},"PlanElec subscription",[168,61300,61301],{},"EUR 29 per month",[12,61303,61304,61305,61307],{},"A drawing started in Sketch moves to Pro with ",[15,61306,1482],{}," as soon as you need the distribution board or the self-check report. A Pro project does not go back to Sketch.",[1489,61309],{":height":13817,":width":13818,"alt":13819,"caption":13820,"src":13821},[79,61311,61313],{"id":61312},"what-planelec-contributes-today","What PlanElec contributes today",[12,61315,61316,61318],{},[15,61317,22],{}," draws the single-line diagram and situation plan in the browser and exports them as PDF or SVG. You open Trikker files (.trik) there and continue working on them. The Sketch material list counts the devices in the drawing and exports as CSV.",[12,61320,61321,61323,61324,56],{},[15,61322,31],{}," brings floor plan, electrical topology and board planning together in one project. The single-line diagram and situation plan are exported as PDFs, as is a compiled installation dossier with cover sheet and document index. The AREI\u002FRGIE self-check report evaluates, on an indicative basis, the supported rules that can be decided from your data and shows data gaps. The manufacturer-neutral material list with cable quantities is a pilot feature without prices and is not an order release; what both lists count is explained in ",[40,61325,61326],{"href":36308},"Bill of materials for an electrical installation",[12,61328,61329,61330,61333,61334,56],{},"The roles are therefore clear: PlanElec produces the plans from your project model and keeps the documents consistent. The on-site survey, technical design and installation stay with the electrician, and the approved body writes the inspection report. Whether that pays off for you depends on how complete your project data already is. Everything PlanElec can do is covered in ",[40,61331,61332],{"href":4762},"What you can do with PlanElec","; how it compares with Excel and paper is explained in ",[40,61335,52227],{"href":1537},[79,61337,61339],{"id":61338},"how-to-obtain-comparable-quotations","How to obtain comparable quotations",[3139,61341,61342,61345,61348,61351,61354,61357,61360],{},[87,61343,61344],{},"Describe the building, supply, number of boards and known circuits.",[87,61346,61347],{},"Mention special sources and loads such as PV, battery, EV charger or heat pump.",[87,61349,61350],{},"Share existing plans and inspection reports without guessing unknown data.",[87,61352,61353],{},"Ask for separate items for survey, drawing, technical review, execution and inspection.",[87,61355,61356],{},"Ask about VAT, travel, delivery format and correction rounds.",[87,61358,61359],{},"Compare not only the total but also responsibility and coverage.",[87,61361,61362],{},"After changes, document the as-built state and keep the documents in the installation file.",[79,61364,61366],{"id":61365},"agree-handover-and-revision-as-a-separate-service","Agree handover and revision as a separate service",[12,61368,61369],{},"A good quotation states not only “plan as PDF” but the handed-over working state. Agree which existing documents were checked, which data you supplied and which unknowns remain open. Record how many correction rounds are included, who reports changes after the site work and which file version then counts as the as-built state.",[12,61371,61372],{},"A short checklist helps at handover: do the circuit references match between board, single-line diagram and situation plan? Have new and removed devices been updated? Are assumptions marked as assumptions? Are datasheets and measurement records with the responsible party? Only this handover makes drawing, technical review and later maintenance comparable. A low quotation without agreed revisions quickly becomes more expensive at the next change.",[12,61374,7139,61375,56],{},[40,61376,7142],{"href":5358},[79,61378,1617],{"id":1616},[1041,61380,61382],{"id":61381},"which-data-should-i-gather-before-asking-for-a-quotation","Which data should I gather before asking for a quotation?",[12,61384,61385],{},"Start with everything visible without intervention: address and supply type, number and location of boards, legible ratings of RCDs and circuit breakers, circuit names, floor plan, earlier diagrams and inspection reports. Record fixed loads and sources separately. Mark unknown values explicitly as unknown. An invented cross-section makes a drawing look complete and technically worthless. Photos help with preparation; they do not replace safely establishing concealed cable data.",[1041,61387,61389],{"id":61388},"which-services-must-not-disappear-into-a-plan-price","Which services must not disappear into a “plan price”?",[12,61391,61392],{},"Changes to the installation, fault finding, measurement reports, sizing according to manufacturer conditions and resolving an inspection finding are separate services. Grid operator procedures for generation or storage do not run automatically either. If these steps are needed, they appear as separate items with result, responsible party and deadline. That protects both sides: you see what is delivered, and the contractor takes no responsibility for parts that were not ordered.",[1041,61394,61396],{"id":61395},"how-do-i-handle-changes-after-the-first-export","How do I handle changes after the first export?",[12,61398,61399],{},"Keep a traceable baseline version, enter confirmed changes in the project and situation plan and have technical changes checked. Record not just “kitchen changed” but which circuit, protective device, cable and points the change affects. The next correction round then stays a limited update rather than a new survey.",[1041,61401,61403],{"id":61402},"may-i-draw-the-diagram-myself","May I draw the diagram myself?",[12,61405,61406,61407,56],{},"The AREI states who draws up the single-line diagram: the person responsible for carrying out the work (Subsection 3.1.2.1 a). What matters is that the documents show the actual state correctly and are available during the inspection. Drawing yourself is not installing yourself: surveying live parts and installation work stay with professionals. For preparing the plans, PlanElec Sketch is enough, free in the browser; the professional confirms the actual state. A side-by-side comparison of both routes is in the ",[40,61408,61409],{"href":5547},"cost comparison: DIY or electrician",[1041,61411,61413],{"id":61412},"does-a-planelec-pdf-mean-the-installation-is-compliant","Does a PlanElec PDF mean the installation is compliant?",[12,61415,61416],{},"No. The PDF documents your project data, and the self-check report in Pro tests the supported rules on an indicative basis. Whether the inspected installation meets the regulations is established by the approved body in the prescribed procedure.",[1041,61418,61420],{"id":61419},"what-is-the-main-cost-driver","What is the main cost driver?",[12,61422,61423],{},"Not floor area, but uncertainty about the as-built state and the agreed scope. Known, verified data reduces survey effort; unknown cables, several boards or technical changes increase it.",[79,61425,51828],{"id":51827},[12,61427,61428],{},"A sound price for an electrical plan is a project-specific quotation. Separate survey, drawing, technical review, work and inspection, value your own time too and compare equivalent services. In PlanElec Sketch you draw the plans free of charge; The subscription costs EUR 15 per property or EUR 29 per month. Technical design, installation and inspection remain separate items.",[12,61430,61431],{},[40,61432,61434],{"href":1456,"rel":61433},[1458],"Draw a single-line diagram free in PlanElec Sketch →",[79,61436,2009],{"id":2008},[84,61438,61439,61446],{},[87,61440,61441,38,61443,56],{},[15,61442,11935],{},[40,61444,2023],{"href":1456,"rel":61445},[1458],[87,61447,61448,38,61450,2033,61452,56],{},[15,61449,7561],{},[40,61451,2032],{"href":1964},[40,61453,2036],{"href":54},[12,61455,61456,7570],{},[15,61457,2041],{},{"title":2044,"searchDepth":2045,"depth":2045,"links":61459},[61460,61461,61462,61463,61469,61472,61473,61474,61475,61483,61484],{"id":60880,"depth":2045,"text":60881},{"id":60935,"depth":2045,"text":60936},{"id":61021,"depth":2045,"text":61022},{"id":61120,"depth":2045,"text":61121,"children":61464},[61465,61466,61467,61468],{"id":61143,"depth":2053,"text":61144},{"id":61150,"depth":2053,"text":61151},{"id":61157,"depth":2053,"text":61158},{"id":61167,"depth":2053,"text":61168},{"id":44491,"depth":2045,"text":44492,"children":61470},[61471],{"id":61236,"depth":2053,"text":61237},{"id":61312,"depth":2045,"text":61313},{"id":61338,"depth":2045,"text":61339},{"id":61365,"depth":2045,"text":61366},{"id":1616,"depth":2045,"text":1617,"children":61476},[61477,61478,61479,61480,61481,61482],{"id":61381,"depth":2053,"text":61382},{"id":61388,"depth":2053,"text":61389},{"id":61395,"depth":2053,"text":61396},{"id":61402,"depth":2053,"text":61403},{"id":61412,"depth":2053,"text":61413},{"id":61419,"depth":2053,"text":61420},{"id":51827,"depth":2045,"text":51828},{"id":2008,"depth":2045,"text":2009},"2026-02-19","What drives the price of a Belgian electrical plan, how to compare quotations with an editable calculation model and what PlanElec Sketch and Pro cost since the paid plans started.",[30488,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-electrical-plan-costs-editorial.jpg","\u002Fblog\u002Felectrical-plan-costs.en",{"title":60874,"description":61486},"blog\u002Felectrical-plan-costs.en",[2133,2134,5269,4260,59418,1735,2132,59419,59420,61494,61495,56755,5422,47840,52374,48415,4261],"cost","price","einbfHF5_TpuqZvu6iAvpEQmshJ7m80o3RBnalvOS8U","\u002Fblog\u002Felectrical-plan-costs",{"id":61499,"title":61500,"articleId":49384,"body":61501,"category":4239,"date":62403,"description":62404,"extension":2113,"image":61514,"labels":62405,"lastUpdated":4240,"locale":2119,"meta":62406,"navigation":2121,"ogImage":62407,"path":62408,"publishDate":10313,"readTime":30492,"refreshInterval":4248,"seo":62409,"seoTitle":62410,"slug":49384,"stem":62411,"tags":62412,"__hash__":62414,"kind":2137,"href":62415},"blog\u002Fblog\u002Felectrical-inspection.en.md","Electrical Inspection in Belgium: Booking, Re-inspection and AREI Requirements",{"type":9,"value":61502,"toc":62380},[61503,61507,61510,61515,61518,61523,61527,61618,61621,61625,61631,61718,61724,61728,61731,61786,61789,61793,61822,61825,61829,61836,61854,61860,61867,61869,61873,61877,61880,61956,61959,61963,61966,61986,61990,61993,62019,62022,62027,62033,62037,62040,62057,62060,62063,62065,62069,62072,62076,62079,62082,62086,62089,62178,62181,62185,62188,62191,62195,62201,62207,62252,62260,62264,62267,62293,62298,62302,62305,62307,62310,62313,62351,62356,62362,62367,62369,62378],[79,61504,61506],{"id":61505},"what-is-an-electrical-inspection","What is an electrical inspection?",[12,61508,61509],{},"The electrical inspection – the keuring – is the check of your installation by an approved inspection body. A new installation is inspected for conformity with the AREI\u002FRGIE before it is put into use (Book 1, chapter 6.4); after that come control visits, at the latest every 25 years for a domestic installation (section 6.5.2). The inspector reviews the documents, examines the installation, tests the protective devices and measures insulation resistance and earth electrode resistance. For a new installation, the grid operator only makes the power available once a positive conformity report exists (subsection 6.4.6.2). For your own inspection documents, draw the single-line diagram and situation plan in Sketch; the approved body inspects the installation.",[12,61511,61512],{},[74,61513],{"alt":59181,"src":61514},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-electrical-inspection-editorial.webp",[12,61516,61517],{},"Which inspection applies to you depends on the trigger: new build, significant extension, periodic visit, sale of a home with an old installation, or an increase in connection capacity. This guide sorts the cases, lists the requirements an inspector typically checks in a home and shows you how to prepare documents that match the installation as built.",[12,61519,61520,61522],{},[15,61521,47885],{}," All references point to AREI\u002FRGIE Book 1, version 07, in force since 1 November 2026. Compared with version 06, only the sealing of the RCD at the origin of the installation has changed; the numbering is unchanged.",[79,61524,61526],{"id":61525},"when-do-you-need-an-inspection","When do you need an inspection?",[138,61528,61529,61541],{},[141,61530,61531],{},[144,61532,61533,61536,61539],{},[147,61534,61535],{},"Trigger",[147,61537,61538],{},"What is inspected",[147,61540,48455],{},[163,61542,61543,61553,61564,61575,61585,61596,61607],{},[144,61544,61545,61547,61550],{},[168,61546,60970],{},[168,61548,61549],{},"Conformity inspection before putting into use",[168,61551,61552],{},"chapter 6.4",[144,61554,61555,61558,61561],{},[168,61556,61557],{},"Significant modification or extension, for example a new circuit",[168,61559,61560],{},"Added or modified parts; affected unchanged parts with regard to the modified characteristics",[168,61562,61563],{},"subsection 6.4.7.3",[144,61565,61566,61569,61572],{},[168,61567,61568],{},"Non-significant modification, for example a socket on an existing circuit",[168,61570,61571],{},"No inspection before use; a short description goes into the installation file",[168,61573,61574],{},"section 9.1.2 no. 7",[144,61576,61577,61579,61582],{},[168,61578,49466],{},[168,61580,61581],{},"Domestic installations at the latest every 25 years, other installations every 5 years",[168,61583,61584],{},"section 6.5.2",[144,61586,61587,61590,61593],{},[168,61588,61589],{},"Sale of a dwelling with an old installation (before 1 October 1981)",[168,61591,61592],{},"Control visit arranged by the seller",[168,61594,61595],{},"section 8.4.2",[144,61597,61598,61601,61604],{},[168,61599,61600],{},"Higher connection capacity for an old domestic installation",[168,61602,61603],{},"Control visit before the grid operator increases the capacity",[168,61605,61606],{},"section 8.4.1",[144,61608,61609,61612,61615],{},[168,61610,61611],{},"Negative report",[168,61613,61614],{},"New inspection once the infringements are corrected",[168,61616,61617],{},"chapter 9.1, section 8.4.2",[12,61619,61620],{},"A modification is significant when it has an additional impact on the safety of people or property that no conformity inspection has covered yet (definition in part 2). Describe the actual work to your electrician and the inspection body instead of just ticking \"renovation\". That way the body schedules the right type of inspection and the right scope.",[79,61622,61624],{"id":61623},"booking-an-electrical-inspection-which-body","Booking an electrical inspection: which body?",[12,61626,61627,61628,56],{},"You book an electrical inspection with an approved inspection body: a body approved by the minister responsible for energy to carry out conformity inspections before use and control visits (section 6.3.1). To be approved, it must be accredited to NBN EN ISO\u002FIEC 17020 and meet the requirements for a type A inspection body (subsection 6.3.3.1 a). The competent authority may also carry out the inspection (sections 6.4.1 and 6.5.1). The current list of approved bodies is published by the ",[40,61629,27049],{"href":49786,"rel":61630},[1458],[138,61632,61633,61644],{},[141,61634,61635],{},[144,61636,61637,61639,61642],{},[147,61638,2675],{},[147,61640,61641],{},"What to know when booking",[147,61643,48455],{},[163,61645,61646,61656,61666,61676,61686,61697,61708],{},[144,61647,61648,61650,61653],{},[168,61649,60970],{},[168,61651,61652],{},"Book the inspection before first use; without a positive report the grid operator does not make power available",[168,61654,61655],{},"6.4.1, 6.4.6.2",[144,61657,61658,61661,61664],{},[168,61659,61660],{},"Significant modification or extension",[168,61662,61663],{},"Inspection before the new part is used; it is limited to the added or modified part",[168,61665,32990],{},[144,61667,61668,61670,61673],{},[168,61669,49466],{},[168,61671,61672],{},"The latest date is stated in the report of the previous inspection",[168,61674,61675],{},"6.4.6.4 b.6, 6.5.2",[144,61677,61678,61681,61684],{},[168,61679,61680],{},"Sale of a home with an old installation",[168,61682,61683],{},"The seller has the control visit carried out; the report date is recorded in the authentic deed",[168,61685,47929],{},[144,61687,61688,61691,61694],{},[168,61689,61690],{},"Connection capacity increase for an old installation",[168,61692,61693],{},"The inspection report accompanies the request for the increase",[168,61695,61696],{},"8.4.1",[144,61698,61699,61702,61705],{},[168,61700,61701],{},"Re-inspection after a negative periodic visit",[168,61703,61704],{},"The follow-up visit is carried out by the same approved body",[168,61706,61707],{},"6.5.7.2 b.6, 9.1.3.2",[144,61709,61710,61713,61716],{},[168,61711,61712],{},"Re-inspection after a sale inspection",[168,61714,61715],{},"The buyer chooses the approved body freely",[168,61717,47929],{},[12,61719,61720,61723],{},[15,61721,61722],{},"Have this information ready when booking."," The report states, among other things, the name and address of the owner, manager or operator, the installation's EAN code (if available), the address of the installation and the type of premises it supplies (subsections 6.4.6.4 b.1 and 6.5.7.2 b.1). For a conformity inspection, it also names the person responsible for carrying out the work, with VAT number where applicable, and the electricity distribution company. Practical questions to ask when booking are covered further down in this article.",[79,61725,61727],{"id":61726},"how-long-is-an-electrical-inspection-valid","How long is an electrical inspection valid?",[12,61729,61730],{},"A positive report confirms conformity at the time of the inspection; the next control visit must take place at the latest within the interval of section 6.5.2. For a domestic installation that is every 25 years, and the conformity inspection report itself states the latest date (subsection 6.4.6.4 b.6).",[138,61732,61733,61744],{},[141,61734,61735],{},[144,61736,61737,61739,61742],{},[147,61738,4897],{},[147,61740,61741],{},"Control visit at least",[147,61743,3919],{},[163,61745,61746,61757,61767,61777],{},[144,61747,61748,61751,61754],{},[168,61749,61750],{},"Domestic installation",[168,61752,61753],{},"every 25 years",[168,61755,61756],{},"6.5.2",[144,61758,61759,61762,61765],{},[168,61760,61761],{},"Other installations, for example non-domestic",[168,61763,61764],{},"every 5 years",[168,61766,61756],{},[144,61768,61769,61772,61775],{},[168,61770,61771],{},"Movable, mobile or temporary installation",[168,61773,61774],{},"every year",[168,61776,61756],{},[144,61778,61779,61782,61784],{},[168,61780,61781],{},"Installation in an explosive atmosphere zone",[168,61783,61774],{},[168,61785,61756],{},[12,61787,61788],{},"Book 1 does not provide for \"extending\" an inspection. As the date in your last report approaches, you have a new control visit carried out; the periodic interval then starts again. After a control visit of an old installation, too, sections 6.5.1 and 6.5.2 apply to every later visit (section 8.4.1 and subsection 8.4.2.3).",[1041,61790,61792],{"id":61791},"when-do-you-need-a-new-inspection-sooner","When do you need a new inspection sooner?",[84,61794,61795,61800,61805,61811,61816],{},[87,61796,61797,61799],{},[15,61798,61660],{},": conformity inspection of that part before use (subsection 6.4.7.3).",[87,61801,61802,61804],{},[15,61803,61680],{},": if the installation dates from before 1 October 1981 and that part has not yet had a control visit (subsection 8.4.2.1).",[87,61806,61807,61810],{},[15,61808,61809],{},"Connection capacity increase"," for an old domestic installation (section 8.4.1).",[87,61812,61813,61815],{},[15,61814,61611],{},": a re-inspection once the infringements are corrected (see below: bringing the installation into compliance and re-inspection).",[87,61817,61818,61821],{},[15,61819,61820],{},"Installation inspected under the old AREI",": the first control visit under section 6.5.2 takes place within the interval set in the last report under the old AREI (section 8.1.2).",[12,61823,61824],{},"If you sell a home whose installation has already had a conformity inspection or a control visit, it falls outside the scope of section 8.4.2. You still hand the file with diagrams, plans and reports to the new owner (section 9.1.2), and the interval from the last report continues to apply.",[79,61826,61828],{"id":61827},"the-documents-you-present","The documents you present",[12,61830,4361,61831,61835],{},[40,61832,61834],{"href":36246,"rel":61833},[1458],"FPS Economy page on domestic installation inspections"," lists at least the single-line diagram, the situation plan and – if available – the EAN code of the connection.",[84,61837,61838,61843,61848],{},[87,61839,61840,61842],{},[15,61841,3926],{}," (eendraadschema \u002F schéma unifilaire): all boards, circuits, protective devices and wiring with their characteristics (subsection 3.1.2.2).",[87,61844,61845,61847],{},[15,61846,534],{}," (situatieplan \u002F plan de position): the location of boards, boxes, sockets, light points, switches, fixed appliances and sources (subsection 3.1.2.3).",[87,61849,61850,61853],{},[15,61851,61852],{},"Manufacturer documents"," for special equipment. For a PV system, the file includes operating instructions, safety instructions and the technical data of the components (section 9.1.2).",[12,61855,61856,61857,56],{},"In a conformity inspection, the report expressly certifies that the installation was built according to the single-line diagram and situation plan (subsection 6.4.6.4, b.4). A plan showing an outdated state stands out just as much as a missing drawing. What a situation plan is exactly is explained in ",[40,61858,61859],{"href":35162},"What is a situation plan",[12,61861,61862,61863,61866],{},"You can draw both plans for free in the browser with ",[40,61864,22],{"href":3611,"rel":61865},[1458],", even without an account. The start card “Draw the documents for the inspection” begins with the connection, meter and main protection; you draw the rest of the installation and export the single-line diagram and situation plan as a PDF.",[1489,61868],{":height":1491,":width":1492,"alt":1493,"caption":1494,"src":1495},[12,61870,7139,61871,56],{},[40,61872,11748],{"href":4218},[79,61874,61876],{"id":61875},"the-requirements-an-inspector-checks-in-a-home","The requirements an inspector checks in a home",[12,61878,61879],{},"The table brings together Book 1 requirements that regularly sit at the centre of a domestic inspection. It does not replace the full text, but it shows you where to look before the appointment.",[138,61881,61882,61890],{},[141,61883,61884],{},[144,61885,61886,61888],{},[147,61887,3724],{},[147,61889,3919],{},[163,61891,61892,61898,61905,61913,61920,61928,61935,61942,61949],{},[144,61893,61894,61896],{},[168,61895,53061],{},[168,61897,32902],{},[144,61899,61900,61903],{},[168,61901,61902],{},"High- or very-high-sensitivity RCD (at most 30 mA) for sockets, lighting, bathroom\u002Fshower and washing machine, tumble dryer and dishwasher; at most eight final circuits per device",[168,61904,32902],{},[144,61906,61907,61910],{},[168,61908,61909],{},"Earth electrode resistance below 100 Ω; above 30 Ω at least two high-sensitivity RCDs with at most 16 sockets each and at most 100 mA for the remaining circuits",[168,61911,61912],{},"4.2.3.2 and 4.2.4.3 b",[144,61914,61915,61918],{},[168,61916,61917],{},"Protective device matched to the cross-section, e.g. 1.5 mm²: circuit breaker 16 A or fuse 10 A; 2.5 mm²: 20 A or 16 A",[168,61919,49606],{},[144,61921,61922,61925],{},[168,61923,61924],{},"Socket circuits at least 2.5 mm²; at most eight single or multiple socket outlets per final circuit",[168,61926,61927],{},"5.2.1.2 and 5.3.5.2 b",[144,61929,61930,61933],{},[168,61931,61932],{},"At least two separate lighting circuits when the dwelling has more than two rooms",[168,61934,33354],{},[144,61936,61937,61940],{},[168,61938,61939],{},"Dedicated circuit for washing machine, dishwasher, tumble dryer, cooker, hob, oven and every appliance with a fixed location from 2600 W",[168,61941,29286],{},[144,61943,61944,61947],{},[168,61945,61946],{},"Main switch-disconnector of at least 40 A in domestic installations",[168,61948,33191],{},[144,61950,61951,61954],{},[168,61952,61953],{},"Insulation resistance of at least 500 kΩ per circuit at a test voltage of 500 V DC",[168,61955,59239],{},[12,61957,61958],{},"The 30 Ω value is not a pass\u002Ffail line: above it, Book 1 requires a stricter RCD layout, and the earth must stay below 100 Ω in any case. A cable's current-carrying capacity also depends on installation method, insulation and ambient temperature (4.4.1.4). So have your electrician confirm the sizing and protection concept.",[1041,61960,61962],{"id":61961},"typical-stumbling-blocks","Typical stumbling blocks",[12,61964,61965],{},"These points come up often in practice; no reliable ranking exists:",[84,61967,61968,61971,61974,61977,61980,61983],{},[87,61969,61970],{},"single-line diagram missing or showing an outdated state",[87,61972,61973],{},"too few or wrongly assigned high-sensitivity RCDs",[87,61975,61976],{},"an earth resistance without the matching RCD layout",[87,61978,61979],{},"cables not adequately fixed or mechanically protected",[87,61981,61982],{},"junction boxes without covers or not accessible",[87,61984,61985],{},"only one lighting circuit in a dwelling with more than two rooms",[79,61987,61989],{"id":61988},"what-happens-during-the-inspection","What happens during the inspection?",[12,61991,61992],{},"The conformity inspection is carried out with the installation de-energised and has four parts (section 6.4.1):",[3139,61994,61995,62001,62007,62013],{},[87,61996,61997,62000],{},[15,61998,61999],{},"Administrative checks",": documents, installation data, comparison of single-line diagram and situation plan with the installation as built.",[87,62002,62003,62006],{},[15,62004,62005],{},"Visual checks",": equipment, wiring, covers, labelling and accessibility.",[87,62008,62009,62012],{},[15,62010,62011],{},"Checks by testing",": for example the operation of protective devices and the continuity of protective conductors and equipotential bonding.",[87,62014,62015,62018],{},[15,62016,62017],{},"Checks by measurement",": insulation resistance (6.4.5.1) and earth electrode resistance (6.4.5.2).",[12,62020,62021],{},"The report states the earth resistance and insulation level and certifies that RCDs and earth value, as well as overcurrent protection and wiring, are coordinated (6.4.6.4, b.4). If the installation conforms, the inspector endorses the single-line diagram and situation plan and states the date by which the next control visit must take place (b.6).",[1489,62023],{":height":54929,":width":3800,"alt":62024,"caption":62025,"src":62026},"Flowchart: prepare the documents, four-part conformity inspection (6.4.1), then either a positive report with endorsed plans and power made available by the grid operator, or a negative report with repairs and a new inspection (9.1.3.1)","How the conformity inspection of a new installation runs: with a positive report the inspector endorses the plans; with a negative report a new inspection follows the repairs.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Felectrical-inspection\u002Finspection-flow.en.svg",[12,62028,62029,62030,56],{},"Until 31 October 2026 (version 06), the inspector also sealed the RCD at the origin of a conforming installation. Since 1 November 2026, Book 1 version 07 applies: the sealing is gone and the report only certifies that the single-line diagram and situation plan have been endorsed (6.4.6.4 b.6). The details are in our article ",[40,62031,62032],{"href":55030},"RCD sealing is abolished",[79,62034,62036],{"id":62035},"compare-documents-and-installation-before-the-appointment","Compare documents and installation before the appointment",[12,62038,62039],{},"Check both plans systematically against the installation as built:",[3139,62041,62042,62045,62048,62051,62054],{},[87,62043,62044],{},"Do the circuit labels in the board, on the single-line diagram and on the situation plan match?",[87,62046,62047],{},"Are ratings, number of poles, cable type and cross-section recorded correctly?",[87,62049,62050],{},"Are new sockets, light points, fixed appliances and sources on the plan?",[87,62052,62053],{},"Can connection and junction boxes be found and reached?",[87,62055,62056],{},"Are the manufacturer documents for PV, charger, battery or other special equipment ready?",[12,62058,62059],{},"A neat drawing of an old state does not help you, and a technically sound installation still needs the prescribed plans. Mark open points and resolve them with your electrician before the appointment.",[12,62061,62062],{},"If you draw the plans in Sketch, “Check documents” shows what is still missing before the PDF: empty title block fields, a missing inspection body, circuits without a protective device and appliances in the diagram without a place on the situation plan. It is a completeness aid; whether the installation complies is assessed by the inspection body.",[1489,62064],{":height":5808,":width":5809,"alt":5810,"caption":5811,"src":5812},[79,62066,62068],{"id":62067},"prepare-for-visual-checks-and-measurements","Prepare for visual checks and measurements",[12,62070,62071],{},"Measured values are taken on the day, on your installation. Do not copy values from an old report and do not put estimated values on the plans. Make sure there is safe access to the board, the earth disconnecting link and every room; labels must be legible and covers complete. Announce special features such as PV, a battery, a backup function, a charging point or older parts of the installation in advance. Opening equipment and measuring live circuits is the electrician's job, not part of your preparation.",[79,62073,62075],{"id":62074},"questions-when-booking","Questions when booking",[12,62077,62078],{},"Tell the inspection body whether the use is domestic or non-domestic, which type of inspection you need, how many boards there are and which special sources exist. Ask whether documents are expected digitally or on paper, whether all rooms must be accessible and how an ongoing renovation is handled. Have the fee, payment method and rescheduling terms confirmed directly; another provider's published prices do not automatically apply to you.",[12,62080,62081],{},"For a sale inspection, share the construction year and earlier reports. For a significant extension, describe the existing part and the new part. For PV, storage or a charger, state the operating mode and the manufacturer documents. That lets the body plan the inspection type and duration correctly.",[79,62083,62085],{"id":62084},"what-does-an-electrical-inspection-or-re-inspection-cost","What does an electrical inspection or re-inspection cost?",[12,62087,62088],{},"Book 1 sets no fees: you agree the price of an inspection or re-inspection with the approved body. What the regulation does show is what determines the scope of the inspection – and therefore the work on site:",[138,62090,62091,62101],{},[141,62092,62093],{},[144,62094,62095,62097,62099],{},[147,62096,42450],{},[147,62098,48750],{},[147,62100,3919],{},[163,62102,62103,62113,62124,62135,62146,62157,62167],{},[144,62104,62105,62107,62110],{},[168,62106,49443],{},[168,62108,62109],{},"Conformity inspection, periodic control visit and sale inspection each have their own content and report",[168,62111,62112],{},"6.4, 6.5, 8.4.2",[144,62114,62115,62118,62121],{},[168,62116,62117],{},"Domestic or non-domestic",[168,62119,62120],{},"Different report content and a different interval",[168,62122,62123],{},"6.4.6.4, 6.4.6.5, 6.5.2",[144,62125,62126,62129,62132],{},[168,62127,62128],{},"Size of the installation",[168,62130,62131],{},"A control visit report states the number of boards and final circuits",[168,62133,62134],{},"6.5.7.2 b.3",[144,62136,62137,62140,62143],{},[168,62138,62139],{},"Domestic PV installation (≤ 10 kVA)",[168,62141,62142],{},"Additional tests: disconnection when grid voltage is absent and operation of the residual current device",[168,62144,62145],{},"7.112.3",[144,62147,62148,62151,62154],{},[168,62149,62150],{},"Missing plans during a sale inspection",[168,62152,62153],{},"The inspector draws up a summary description and sketch; the absence is recorded as an infringement",[168,62155,62156],{},"8.4.2.2 d",[144,62158,62159,62162,62165],{},[168,62160,62161],{},"Modification or extension",[168,62163,62164],{},"The inspection is limited to the added or modified part",[168,62166,32990],{},[144,62168,62169,62172,62175],{},[168,62170,62171],{},"Re-inspection",[168,62173,62174],{},"The check covers the removal of the infringements found",[168,62176,62177],{},"9.1.3.2",[12,62179,62180],{},"So ask for a price for your specific inspection type and installation, and have it confirmed whether a re-inspection is charged separately. Another body's fee or one from an old report does not automatically apply to you. If the single-line diagram and situation plan are ready, the inspector does not need to draw a makeshift sketch during a sale inspection – and you avoid an infringement at the same time.",[79,62182,62184],{"id":62183},"on-the-day","On the day",[12,62186,62187],{},"Have a contact person available who knows the installation. Do not remove fixed covers in advance unless the body asks you to; safe access matters more than improvised opening. Make sure pets, stored items or locked rooms do not block access.",[12,62189,62190],{},"Write down questions, but do not change the installation during the inspection. When you receive the report, check name and address, inspection type, scope of the installation and the documents listed. Raise technical objections in writing, referring to the specific finding. If a room or part of the installation was not accessible, read in the report how that affects the conclusion and ask whether an additional visit is needed.",[79,62192,62194],{"id":62193},"after-the-report","After the report",[12,62196,62197,62200],{},[15,62198,62199],{},"Positive report:"," it confirms the assessment at the time and within the scope of the inspection. Keep it with the single-line diagram and situation plan in the installation file, which you hold in duplicate and hand over to the new owner when you sell (section 9.1.2). Record every later modification in that file.",[12,62202,62203,62206],{},[15,62204,62205],{},"Negative report:"," deal with each infringement separately. The consequences depend on the type of inspection:",[138,62208,62209,62220],{},[141,62210,62211],{},[144,62212,62213,62215,62218],{},[147,62214,49443],{},[147,62216,62217],{},"Consequence of a negative report",[147,62219,3919],{},[163,62221,62222,62232,62242],{},[144,62223,62224,62227,62230],{},[168,62225,62226],{},"Conformity inspection before use",[168,62228,62229],{},"The affected part may not be put into use until the infringements are corrected and inspected again",[168,62231,49461],{},[144,62233,62234,62236,62239],{},[168,62235,49466],{},[168,62237,62238],{},"Correct the infringements without delay; new visit by the same body within one year",[168,62240,62241],{},"9.1.3.2, 6.5.7.2 b.6 and b.7",[144,62243,62244,62247,62250],{},[168,62245,62246],{},"Sale inspection of an old installation",[168,62248,62249],{},"The buyer has the corrections inspected within 18 months of the deed of sale and chooses the body freely",[168,62251,47929],{},[12,62253,4361,62254,62257,62258,56],{},[40,62255,48304],{"href":48302,"rel":62256},[1458]," explains the procedures further. For a step-by-step approach after a negative result, read ",[40,62259,5968],{"href":5967},[79,62261,62263],{"id":62262},"bringing-the-installation-into-compliance-and-re-inspection","Bringing the installation into compliance and re-inspection",[12,62265,62266],{},"Bringing your electrical installation into compliance means having every infringement in the report corrected and having the correction checked by an approved body. After a control visit, the work is carried out without delay and, as long as the installation stays in service, you take measures so the infringements pose no danger to people or property (subsection 9.1.3.2). After a conformity inspection, the affected part may only be used after correction and a new inspection (subsection 9.1.3.1).",[3139,62268,62269,62275,62281,62287],{},[87,62270,62271,62274],{},[15,62272,62273],{},"Read each infringement with its reference."," The report lists the infringements (subsections 6.4.6.4 b.5 and 6.5.7.2 b.5); deal with them one at a time.",[87,62276,62277,62280],{},[15,62278,62279],{},"Have the correction carried out and confirmed"," by your electrician, per infringement and with the circuit concerned.",[87,62282,62283,62286],{},[15,62284,62285],{},"Update the documents."," If the correction changes circuits, protective devices or points, update the single-line diagram and situation plan and record the change in the installation file (section 9.1.2). During a sale inspection, missing plans are an infringement in themselves (subsection 8.4.2.2 d).",[87,62288,62289,62292],{},[15,62290,62291],{},"Book the re-inspection with the right body."," After a periodic control visit, the same approved body carries out the follow-up visit before the date stated in the report (subsection 6.5.7.2 b.6). After a sale inspection, the buyer informs the body that issued the first report of their identity and the date of the deed, and has a body of their choice check that the infringements have been removed at the end of the 18-month period (subsection 8.4.2.2 a).",[12,62294,62295,62296,56],{},"Doing nothing has consequences: if infringements remain at the second visit after a periodic inspection, the approved body sends a copy of the report to the Directorate-General for Energy (subsection 6.5.7.2 b.7 d). The full approach after a negative result is in ",[40,62297,5968],{"href":5967},[79,62299,62301],{"id":62300},"record-the-inspected-scope-after-the-visit","Record the inspected scope after the visit",[12,62303,62304],{},"Note which boards, rooms, sources and operating modes were actually part of the inspection and compare that with the description in the report. A positive report for a clearly delimited part says nothing about parts added later or not visited. Keep the plan version presented at the inspection unchanged with the report, and create a new, dated version for later work. That way you can always show which state of the installation was assessed. If you later change fixed wiring, protective devices or PV, battery or charging functions, check whether a new conformity inspection is required.",[79,62306,49830],{"id":49829},[12,62308,62309],{},"Start in Sketch with the supply, protective devices and circuit assignments, then place the corresponding devices on the situation plan. Before the appointment, compare the drawing with the verified installation.",[12,62311,62312],{},"PlanElec comes in two versions, depending on who prepares the documents:",[138,62314,62315,62326],{},[141,62316,62317],{},[144,62318,62319,62322,62324],{},[147,62320,62321],{},"You are …",[147,62323,4121],{},[147,62325,16560],{},[163,62327,62328,62339],{},[144,62329,62330,62333,62336],{},[168,62331,62332],{},"Owner, self-builder or electrician who only needs the plans",[168,62334,62335],{},"PlanElec Sketch, free in the browser",[168,62337,62338],{},"Single-line diagram and situation plan from the symbol library, PDF in A4 or A3, “Check documents” before export",[144,62340,62341,62344,62348],{},[168,62342,62343],{},"Electrical contractor or designer",[168,62345,62346],{},[40,62347,31],{"href":1964},[168,62349,62350],{},"One project for floor plan, circuits and distribution board; from it single-line diagram, situation plan, AREI\u002FRGIE self-check report and an installation dossier with cover page, document index and continuous page numbering",[12,62352,62353,62354,56],{},"Without an account, the Sketch PDF carries a PlanElec watermark; a free account removes it. If you need distribution board planning or a self-check report, move the drawing across with “Take it to Pro”. What the self-check covers and where its limits are: ",[40,62355,1086],{"href":1085},[12,62357,62358,62359,56],{},"The roles are clearly split: the self-check shows you findings from the project data you entered, your electrician confirms sizing and workmanship, and the inspection with measurements is done by the approved inspection body. The list of approved bodies is published by the ",[40,62360,27049],{"href":49786,"rel":62361},[1458],[12,62363,62364],{},[40,62365,36850],{"href":3611,"rel":62366},[1458],[79,62368,2009],{"id":2008},[84,62370,62371],{},[87,62372,62373,38,62375,56],{},[15,62374,11935],{},[40,62376,2023],{"href":1456,"rel":62377},[1458],[12,62379,43928],{},{"title":2044,"searchDepth":2045,"depth":2045,"links":62381},[62382,62383,62384,62385,62388,62389,62392,62393,62394,62395,62396,62397,62398,62399,62400,62401,62402],{"id":61505,"depth":2045,"text":61506},{"id":61525,"depth":2045,"text":61526},{"id":61623,"depth":2045,"text":61624},{"id":61726,"depth":2045,"text":61727,"children":62386},[62387],{"id":61791,"depth":2053,"text":61792},{"id":61827,"depth":2045,"text":61828},{"id":61875,"depth":2045,"text":61876,"children":62390},[62391],{"id":61961,"depth":2053,"text":61962},{"id":61988,"depth":2045,"text":61989},{"id":62035,"depth":2045,"text":62036},{"id":62067,"depth":2045,"text":62068},{"id":62074,"depth":2045,"text":62075},{"id":62084,"depth":2045,"text":62085},{"id":62183,"depth":2045,"text":62184},{"id":62193,"depth":2045,"text":62194},{"id":62262,"depth":2045,"text":62263},{"id":62300,"depth":2045,"text":62301},{"id":49829,"depth":2045,"text":49830},{"id":2008,"depth":2045,"text":2009},"2026-01-08","Booking an electrical inspection with an approved body: how long it stays valid, when a re-inspection is needed, what drives the cost and what the inspector checks – with AREI references.",[5422,2117],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-electrical-inspection-editorial.jpg","\u002Fblog\u002Felectrical-inspection.en",{"title":61500,"description":62404},"Electrical Inspection: Booking, Re-inspection and Validity","blog\u002Felectrical-inspection.en",[2133,2134,25426,47840,62413,5269,4260,59418,1735,2132,59419,59420,42148,24055,30501,4261],"contrôle électrique","oKjNLG6KV0QqEdj7uSS1HfED_XnmYSs0FPGVxNC1afw","\u002Fblog\u002Felectrical-inspection",{"id":62417,"title":62418,"articleId":2116,"body":62419,"category":24234,"date":63360,"description":63361,"extension":2113,"image":62432,"labels":63362,"lastUpdated":4240,"locale":2119,"meta":63363,"navigation":2121,"ogImage":63364,"path":63365,"publishDate":10313,"readTime":14426,"refreshInterval":4248,"seo":63366,"seoTitle":10313,"slug":2116,"stem":63367,"tags":63368,"__hash__":63370,"kind":2137,"href":63371},"blog\u002Fblog\u002Fsingle-line-diagram.en.md","Creating a Single-Line Diagram: Step by Step under AREI\u002FRGIE",{"type":9,"value":62420,"toc":63327},[62421,62427,62433,62440,62444,62455,62458,62462,62515,62523,62527,62530,62612,62620,62624,62631,62635,62660,62663,62667,62670,62721,62724,62727,62731,62741,62755,62759,62762,62787,62789,62793,62796,62801,62805,62881,62887,62891,62895,62899,62910,62913,62917,62920,62924,62927,62931,62934,62948,62952,62955,62959,62991,62995,62998,63001,63005,63008,63011,63015,63018,63089,63102,63106,63109,63113,63117,63120,63124,63127,63130,63134,63137,63140,63144,63147,63151,63154,63157,63159,63170,63174,63179,63182,63260,63263,63265,63267,63304,63306,63323],[12,62422,62423,62426],{},[15,62424,62425],{},"You create a single-line diagram in four steps: record the consumers room by room, define protective devices and circuits, check the topology with unambiguous references, and export the diagram together with the situation plan as a PDF."," AREI\u002FRGIE sets out content and referencing in Section 3.1.2; the symbols are in Table 2.23. In PlanElec Pro, the diagram is derived directly from your project model: you add the technical data and check the result. For a drawing of your own installation or a small drawing job, start in Sketch; for the distribution board and self-check report, the contractor transfers the drawing to Pro.",[12,62428,62429],{},[74,62430],{"alt":62431,"src":62432},"Electricians prepare an installation project.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-single-line-diagram-editorial.webp",[12,62434,62435,62436,62439],{},"Want to see an example first? Open the ",[40,62437,62438],{"href":14164},"fictional PDF dossier",". It shows the real export structure with sample data; for your own installation, you enter the real values.",[79,62441,62443],{"id":62442},"what-is-a-single-line-diagram","What is a single-line diagram?",[12,62445,62446,62447,60213,62449,62451,62452,62454],{},"A single-line diagram (Dutch: ",[63,62448,4260],{},[63,62450,1735],{},", German: ",[63,62453,59418],{},") is a simplified electrical schematic that shows the structure of your entire installation with standardised symbols. A wiring diagram draws every conductor; the single-line diagram shows each circuit as one line and labels it with the number of conductors, cross-section and protection.",[12,62456,62457],{},"For every new domestic installation and every substantial modification or extension, the person responsible for carrying out the work prepares the single-line diagram and the situation plan, called a position plan in the regulation (AREI\u002FRGIE 3.1.2.1 a). Existing installations and non-substantial changes follow their own, narrower rules. At the inspection, the approved inspection body assesses the actual dossier and the installed work.",[79,62459,62461],{"id":62460},"what-do-you-need-the-single-line-diagram-for","What do you need the single-line diagram for?",[138,62463,62464,62473],{},[141,62465,62466],{},[144,62467,62468,62470],{},[147,62469,19039],{},[147,62471,62472],{},"What the diagram does",[163,62474,62475,62483,62491,62499,62507],{},[144,62476,62477,62480],{},[168,62478,62479],{},"Inspection (keuring)",[168,62481,62482],{},"required document for new installations and substantial modifications or extensions (3.1.2.1 a); when conformity is established, the responsible person and the approved body sign diagram and plan",[144,62484,62485,62488],{},[168,62486,62487],{},"Safety overview",[168,62489,62490],{},"shows every protective device and its order from the supply point to the consumer",[144,62492,62493,62496],{},[168,62494,62495],{},"Maintenance and faults",[168,62497,62498],{},"any electrician finds circuits and components by letter and number",[144,62500,62501,62504],{},[168,62502,62503],{},"Later changes",[168,62505,62506],{},"the basis for planning and documenting extensions",[144,62508,62509,62512],{},[168,62510,62511],{},"Sale of a dwelling",[168,62513,62514],{},"diagram and plan belong to the installation file you hand to the buyer (9.1.2); if they are missing at the sale inspection of an old installation (before 1981), the approved body records only a short description and a rough sketch and notes their absence as an infringement (8.4.2.2 d)",[41114,62516,62517],{},[12,62518,62519,62522],{},[15,62520,62521],{},"Important:"," the documents show the current state and are available on site (3.1.2.1 d). For a non-substantial change, a dated and signed short description is enough instead of a new diagram; you still update the situation plan.",[79,62524,62526],{"id":62525},"single-line-diagram-symbols-what-areirgie-table-223-covers","Single-line diagram symbols: what AREI\u002FRGIE Table 2.23 covers",[12,62528,62529],{},"Table 2.23 in Chapter 2.13 is the official, non-exhaustive symbol list for the single-line diagram and the situation plan. If a symbol is missing, you use another unambiguous sign and define it in the legend (3.1.2.1 a). The table is organised in groups:",[138,62531,62532,62541],{},[141,62533,62534],{},[144,62535,62536,62538],{},[147,62537,16146],{},[147,62539,62540],{},"Examples from Table 2.23",[163,62542,62543,62551,62559,62567,62574,62582,62589,62597,62605],{},[144,62544,62545,62548],{},[168,62546,62547],{},"A. General",[168,62549,62550],{},"direct current, alternating current, single-phase and three-phase AC",[144,62552,62553,62556],{},[168,62554,62555],{},"B. Switchgear",[168,62557,62558],{},"distribution board, junction and branch box, service connection box, earthing switch",[144,62560,62561,62564],{},[168,62562,62563],{},"C. Wiring",[168,62565,62566],{},"number of conductors and installation method (embedded, surface, in conduit, underground), e.g. three-core XVB-Cca 2.5 mm² surface-mounted",[144,62568,62569,62571],{},[168,62570,34664],{},[168,62572,62573],{},"fuse (e.g. 16 A gG), circuit breaker with release letters M, O and Δ, residual-current device (example 300 mA, type A, 40 A), earth electrode",[144,62575,62576,62579],{},[168,62577,62578],{},"E. Switches",[168,62580,62581],{},"switch, two-way and intermediate switch, series switch, dimmer, push button, time-delay switch, remote-control switch, thermostat, motion detector",[144,62583,62584,62586],{},[168,62585,34686],{},[168,62587,62588],{},"socket outlet, multiple socket, splash-proof socket, socket with earth contact, child-protected socket, data socket",[144,62590,62591,62594],{},[168,62592,62593],{},"G. Appliances",[168,62595,62596],{},"lighting point, wall light, cooker and hob, washing machine, dryer, dishwasher, water heater, motor, EV charger, kWh meter",[144,62598,62599,62602],{},[168,62600,62601],{},"H. Sources",[168,62603,62604],{},"transformer, solar cell, inverter, DC\u002FDC converter",[144,62606,62607,62609],{},[168,62608,34719],{},[168,62610,62611],{},"control unit with base symbol and control type (push button, wireless, programmed, sensor)",[12,62613,62614,62615,62617,62618,56],{},"The table has no dedicated symbol for surge protection or equipotential bonding. You draw such components with an unambiguous sign defined in the legend. The full overview is in ",[40,62616,5667],{"href":5666},"; switch types are covered in ",[40,62619,35152],{"href":5727},[79,62621,62623],{"id":62622},"drawing-a-single-line-diagram-step-by-step-with-planelec","Drawing a single-line diagram step by step with PlanElec",[12,62625,62626,62627,62630],{},"The following steps describe PlanElec Pro, where the diagram and situation plan come from one shared project model. If you draw the diagram for your own home yourself, you can also start straight away in ",[40,62628,22],{"href":1456,"rel":62629},[1458],": free in the browser and without an account. There you draw the single-line diagram and situation plan yourself, circuit letters are assigned in sequence, and you export both as a PDF. The technical rules from step 2 apply either way.",[1041,62632,62634],{"id":62633},"step-1-record-the-installation","Step 1: Record the installation",[3139,62636,62637,62640,62643],{},[87,62638,62639],{},"Open PlanElec Pro and create a new project.",[87,62641,62642],{},"Create the rooms of your building: living room, kitchen, bedrooms, bathroom, utility room.",[87,62644,62645,62646],{},"Place the electrical points in each room:\n",[84,62647,62648,62651,62654,62657],{},[87,62649,62650],{},"socket outlets (single, multiple, splash-proof)",[87,62652,62653],{},"lighting points and their switches",[87,62655,62656],{},"fixed appliances such as oven, hob or water heater",[87,62658,62659],{},"dedicated circuits for an EV charger, heat pump or PV system",[12,62661,62662],{},"If you already have a plan as a PDF or scan, PlanElec recognises walls, rooms and supported device symbols in it as an editable proposal. You give the PlanElec Assistant instructions in your own words, for example \"Place three sockets in the kitchen\".",[1041,62664,62666],{"id":62665},"step-2-define-protective-devices","Step 2: Define protective devices",[12,62668,62669],{},"PlanElec proposes circuits and protective devices as a starting point. The minimum AREI\u002FRGIE rules for domestic installations are mainly in Subsections 5.3.5.1 b (main switch) and 4.2.4.3 b (RCD protection):",[138,62671,62672,62681],{},[141,62673,62674],{},[144,62675,62676,62678],{},[147,62677,41151],{},[147,62679,62680],{},"AREI\u002FRGIE rule",[163,62682,62683,62690,62698,62706,62714],{},[144,62684,62685,62687],{},[168,62686,48500],{},[168,62688,62689],{},"in the main board; breaks all line conductors and, where applicable, the neutral simultaneously; at least 40 A",[144,62691,62692,62695],{},[168,62693,62694],{},"RCD at the supply point",[168,62696,62697],{},"at least one residual-current device of no more than 300 mA (at least Type A, at least 40 A); it additionally provides the isolating function",[144,62699,62700,62703],{},[168,62701,62702],{},"Additional RCD (≤ 30 mA)",[168,62704,62705],{},"required for socket outlets (except those for fixed appliances), lighting, rooms with a bath or shower, and washing machines, dryers and dishwashers; at most eight final circuits per device",[144,62707,62708,62711],{},[168,62709,62710],{},"Circuit breaker or fuse",[168,62712,62713],{},"matched to cross-section, installation method and load of the circuit",[144,62715,62716,62718],{},[168,62717,48576],{},[168,62719,62720],{},"where your installation requires it",[12,62722,62723],{},"Check every proposal against the equipment actually installed, its technical data and the complete sizing of the circuit. You set the type, rating and coordination of the RCDs for the actual protection chain.",[1489,62725],{":height":8729,":width":3800,"alt":35931,"caption":62726,"src":35933},"Simplified example without official symbols: every load can be traced back to the origin without a gap. The breaker ratings are upper limits per cross-section, not a finished sizing of your installation.",[1041,62728,62730],{"id":62729},"step-3-check-the-topology","Step 3: Check the topology",[12,62732,3361,62733,1774,62735,62737,62738,62740],{},[15,62734,5104],{},[15,62736,27546],{}," turns the placed consumers into a proposal with circuits and protective devices; ",[15,62739,27550],{}," adds it to your project.",[84,62742,62743,62746,62749,62752],{},[87,62744,62745],{},"Circuits are grouped by function: lighting, sockets, dedicated circuits.",[87,62747,62748],{},"Each circuit gets a letter, each point a sequence number (e.g. C1, D1).",[87,62750,62751],{},"The hierarchy from the supply point to the last consumer is visible.",[87,62753,62754],{},"Cable type and cross-section appear on every circuit.",[1041,62756,62758],{"id":62757},"step-4-derive-and-export-the-diagram","Step 4: Derive and export the diagram",[12,62760,62761],{},"PlanElec builds the single-line diagram from the circuits, protective devices, cables and consumers you entered:",[84,62763,62764,62770,62776,62782],{},[87,62765,62766,62769],{},[15,62767,62768],{},"Readable structure"," — from the board via the circuits to the consumers",[87,62771,62772,62775],{},[15,62773,62774],{},"Symbol catalogue"," — electrical symbols for the Belgian planning context",[87,62777,62778,62781],{},[15,62779,62780],{},"Automatic labelling"," — circuit references, cable types and protection ratings",[87,62783,62784,62786],{},[15,62785,24379],{}," — single-line diagram and situation plan from the same saved project state",[1489,62788],{":height":6699,":width":34445,"alt":34446,"caption":34447,"src":34448},[79,62790,62792],{"id":62791},"from-the-survey-to-one-shared-reference","From the survey to one shared reference",[12,62794,62795],{},"For an electrical contractor, the diagram starts with the survey, not with drawing. For each real point, record at least the room, function, circuit and sequence number. Add conductor data and protective-device characteristics as soon as you know them. Anything still missing stays visible in the project as an open review item until you complete or confirm it before export.",[12,62797,4361,62798,62800],{},[15,62799,5104],{}," view connects those entries into an electrical path. You assign an existing floor-plan device to its circuit; there is no need to create a second consumer. You then read the same project data in the single-line diagram and the situation plan.",[1489,62802],{":height":6699,":width":27568,"alt":62803,"caption":62804,"src":27504},"Installation overview of the fictional example house with supply, protective devices, circuits and consumers.","This is where you check assignments. Open data and warnings remain visible in the example project.",[138,62806,62807,62823],{},[141,62808,62809],{},[144,62810,62811,62814,62817,62820],{},[147,62812,62813],{},"On-site survey",[147,62815,62816],{},"Electrical assignment",[147,62818,62819],{},"Diagram representation",[147,62821,62822],{},"Situation-plan check",[163,62824,62825,62839,62853,62867],{},[144,62826,62827,62830,62833,62836],{},[168,62828,62829],{},"Device and room, for example a living-room socket",[168,62831,62832],{},"assign the existing floor-plan device to the right circuit",[168,62834,62835],{},"matching catalogue symbol on the circuit branch",[168,62837,62838],{},"same circuit letter and number at the point",[144,62840,62841,62844,62847,62850],{},[168,62842,62843],{},"Circuit and upstream protective device",[168,62845,62846],{},"trace the supply path back to the board",[168,62848,62849],{},"protective device, branch and consumer in order",[168,62851,62852],{},"the point stays at its real location and refers to the same circuit",[144,62854,62855,62858,62861,62864],{},[168,62856,62857],{},"Cable type, cross-section, conductor count and installation method",[168,62859,62860],{},"check the data of the affected cable section",[168,62862,62863],{},"cable information on that section",[168,62865,62866],{},"check the spatial route separately if the section changes",[144,62868,62869,62872,62875,62878],{},[168,62870,62871],{},"Revision, date and open review items",[168,62873,62874],{},"check the saved project state before export",[168,62876,62877],{},"title block, references and visible warnings",[168,62879,62880],{},"read plan and diagram as one document state",[12,62882,4361,62883,62886],{},[40,62884,62885],{"href":18627},"installation guide on assignment, distribution boards and diagram"," documents the full workflow with real product views. The following images show two more perspectives of the same fictional project; the labels are sample values.",[1489,62888],{":height":27567,":width":27568,"alt":62889,"caption":62890,"src":27896},"Situation plan of the fictional example house with spatial device references such as C1 and D1.","In the situation plan, you check the location and reference of the existing device before switching back to the diagram.",[1489,62892],{":height":27567,":width":27568,"alt":62893,"caption":62894,"src":27615},"Single-line diagram derived from the fictional project model with protection path, circuit branches and symbol legend.","A later working state of the same fictional project. The visible warning belongs to the example.",[79,62896,62898],{"id":62897},"example-a-single-line-diagram-as-a-pdf","Example: a single-line diagram as a PDF",[12,62900,4361,62901,62904,62905,62909],{},[40,62902,62903],{"href":14164},"PlanElec Pro example dossier"," contains a single-line diagram from a fictional project, together with the situation plan and the other export documents. Use it to understand document structure, circuit references and the link to the situation plan. In your own project, every value comes from the real installation. The ",[40,62906,62908],{"href":11187,"rel":62907},[1458],"Sketch example"," shows what a single-line diagram drawn by hand in PlanElec Sketch looks like as a PDF.",[79,62911,62912],{"id":51771},"Common mistakes to avoid",[1041,62914,62916],{"id":62915},"_1-incomplete-circuits","1. Incomplete circuits",[12,62918,62919],{},"Every consumer must be traceable back to the supply point through an unbroken chain of protective devices. Leave no \"floating\" connections.",[1041,62921,62923],{"id":62922},"_2-wrong-symbols","2. Wrong symbols",[12,62925,62926],{},"Use the symbols from Table 2.23. Typical mistakes are old DIN symbols or custom notation without a legend. The PlanElec catalogue keeps the representation consistent; the author is responsible for the technical content.",[1041,62928,62930],{"id":62929},"_3-missing-information","3. Missing information",[12,62932,62933],{},"Every circuit needs:",[84,62935,62936,62939,62942,62945],{},[87,62937,62938],{},"circuit letter and point numbers",[87,62940,62941],{},"cable type, number of conductors and cross-section (e.g. XVB 3G2.5) plus installation method",[87,62943,62944],{},"rating of the protective device (e.g. 16 A or 20 A); table values are upper limits, so check the conductor sizing in full",[87,62946,62947],{},"number and type of consumers",[1041,62949,62951],{"id":62950},"_4-outdated-diagram","4. Outdated diagram",[12,62953,62954],{},"After every change to the installation, you update the single-line diagram or, for a non-substantial change, attach the short description. The approved body signs diagram and plan only once it establishes that the installed work conforms (3.1.2.1 a).",[79,62956,62958],{"id":62957},"tips-for-a-clean-diagram","Tips for a clean diagram",[84,62960,62961,62967,62973,62979,62985],{},[87,62962,62963,62966],{},[15,62964,62965],{},"Keep it clear"," — no unnecessary crossings, no overlapping labels",[87,62968,62969,62972],{},[15,62970,62971],{},"Be consistent"," — the same notation style throughout",[87,62974,62975,62978],{},[15,62976,62977],{},"Include every circuit"," — doorbell and garden lighting too",[87,62980,62981,62984],{},[15,62982,62983],{},"State revision and date"," — every document carries number, revision and revision date (3.1.2)",[87,62986,62987,62990],{},[15,62988,62989],{},"Fill in the required details"," — installation address and the name, capacity and, where applicable, VAT number of the responsible person",[79,62992,62994],{"id":62993},"check-the-required-information-systematically","Check the required information systematically",[12,62996,62997],{},"Subsection 3.1.2.2 a requires at least the following on a domestic single-line diagram: cable characteristics (type, cross-section, number of conductors), installation method, type and characteristics of residual-current and overcurrent devices, switches, junction and branch boxes, socket outlets, lighting points, fixed machines and appliances, and sources such as solar cell, inverter or battery. Subsection 3.1.2.1 a adds voltage and type of current, the installation address and the details of the responsible person.",[12,62999,63000],{},"A capital letter identifies the elementary circuit. Lighting points, socket outlets and control units get a number in the order they appear in the circuit, starting from the upstream overcurrent device. The situation plan uses the same letter and number. A switch carries the letter of its circuit and the number of the lighting point or appliance it controls. That shared key makes both plans readable together.",[79,63002,63004],{"id":63003},"a-practical-circuit-walk","A practical circuit walk",[12,63006,63007],{},"Start at the supply and follow each branch to the last consumer. At every transition, ask: does the device really exist, is its function clear, is the cable fully described, and does the reference match the situation plan? Check junction and branch boxes with extra care; a flat list of symbols does not represent a real branch.",[12,63009,63010],{},"With several sources, the grid, PV inverter and any other modelled supply remain readable as separate paths. For PV, PlanElec shows strings per MPPT, DC protection and recorded cable sections in a structured way; unknown or unassigned data stays visible as a gap.",[79,63012,63014],{"id":63013},"single-line-diagram-with-solar-panels-what-must-be-on-it","Single-line diagram with solar panels: what must be on it?",[12,63016,63017],{},"Solar panels appear as a source on the single-line diagram: subsection 3.1.2.2 a explicitly lists sources such as the photovoltaic panel, inverter and battery in the minimum content, and the situation plan shows where they are (subsection 3.1.2.3 a). Symbols for the photovoltaic panel and the inverter are in group H of Table 2.23; the characteristics of the sources are either stated on the diagram or kept available in the installation file (note to group H). Domestic low-voltage PV installations up to 10 kVA must also meet the additional requirements of chapter 7.112.",[138,63019,63020,63031],{},[141,63021,63022],{},[144,63023,63024,63027,63029],{},[147,63025,63026],{},"What",[147,63028,3913],{},[147,63030,3919],{},[163,63032,63033,63042,63051,63060,63070,63079],{},[144,63034,63035,63038,63040],{},[168,63036,63037],{},"Panels, inverter and any battery as a source",[168,63039,5269],{},[168,63041,25493],{},[144,63043,63044,63047,63049],{},[168,63045,63046],{},"Location of panels, inverter and battery",[168,63048,2132],{},[168,63050,25499],{},[144,63052,63053,63056,63058],{},[168,63054,63055],{},"User instructions, safety instructions and technical references (brand, model, power)",[168,63057,47858],{},[168,63059,60313],{},[144,63061,63062,63065,63067],{},[168,63063,63064],{},"Marking of DC conductors and live AC conductors",[168,63066,30398],{},[168,63068,63069],{},"7.112.2",[144,63071,63072,63075,63077],{},[168,63073,63074],{},"Warning signs stating \"Do not disconnect under load\" and \"Electrical installation always live\", or equivalent",[168,63076,30398],{},[168,63078,63069],{},[144,63080,63081,63084,63086],{},[168,63082,63083],{},"Number and rated power of the panels; number, type, serial number and maximum AC power of the inverter(s)",[168,63085,48416],{},[168,63087,63088],{},"7.112.4",[12,63090,63091,63092,63095,63096,63098,63099,56],{},"How to work out strings, DC protection and the inverter in detail is covered in ",[40,63093,63094],{"href":36916},"PV single-line diagrams in Belgium",". If you combine PV with a charger, see ",[40,63097,36888],{"href":13079},"; the spatial side is in ",[40,63100,63101],{"href":36984},"Drawing Solar PV on a Situation Plan",[79,63103,63105],{"id":63104},"existing-installations-and-later-changes","Existing installations and later changes",[12,63107,63108],{},"For substantial modifications or extensions of a domestic installation, you create or update the single-line diagram and situation plan. For a non-substantial change, a short description with the name, capacity and address of the responsible person, dated and signed, is enough for the diagram; you still show the change on the situation plan (3.1.2.1 a). Parts whose installation began before 1 October 1981 are marked as an \"older part\" on the diagram. Part 8 contains narrow derogations for existing parts, not a general exemption from documentation or safety.",[12,63110,7139,63111,56],{},[40,63112,11748],{"href":4218},[79,63114,63116],{"id":63115},"electrical-correctness-before-visual-polish","Electrical correctness before visual polish",[12,63118,63119],{},"Clean lines make the diagram readable; they do not prove the sizing. Cross-section and protection depend on installation method, current-carrying capacity, grouping, temperature, voltage drop, short-circuit conditions and disconnection. The same applies to RCD type, selectivity, surge protection and manufacturer requirements. Use a custom symbol only if it is unambiguous and in the legend; Table 2.23 remains the official basis.",[79,63121,63123],{"id":63122},"example-of-a-complete-circuit-record","Example of a complete circuit record",[12,63125,63126],{},"\"Kitchen\" on its own is not a label. A usable record names circuit B, the upstream protective device, the RCD assignment, cable type, number of conductors, cross-section, installation method and the numbered consumers B1 to B6. A hard-wired hob is marked as its own appliance, separate from the general sockets. An existing branch box sits at its real position in the topology.",[12,63128,63129],{},"That makes errors traceable. If B4 is missing from the situation plan, either the plan is incomplete or the diagram has one consumer too many. If cross-section or type change after a box, you describe that section separately; one standard cable for the whole branch would be wrong.",[79,63131,63133],{"id":63132},"release-check-for-every-sheet","Release check for every sheet",[12,63135,63136],{},"Read the PDF at its real output size. Check the title block, sheet number, revision, date, address, responsible person, voltage and type of current. Then check that no lines or labels are cut off, no symbols overlap and the legend explains every custom sign. Across several sheets, continuations must stay recognisable.",[12,63138,63139],{},"Trace a sample from board to consumer and back: a lighting circuit with a switch, a fixed high-load appliance and a source such as PV. Open or unassigned data stays visible. Never delete a warning just to get a cleaner page.",[79,63141,63143],{"id":63142},"who-does-what","Who does what",[12,63145,63146],{},"The person responsible for the work prepares diagram and plan, identifies themselves on them and aligns the revision with the installed state. The electrician checks sizing, protection and the real installation. The approved inspection body carries out the inspection and signs once conformity is established. PlanElec Pro provides the project model, the documents and the self-check report for this; PlanElec Sketch provides the plans you draw yourself.",[79,63148,63150],{"id":63149},"archive-and-later-changes","Archive and later changes",[12,63152,63153],{},"Keep the inspected revision with situation plan, inspection report and supporting evidence in the installation file. After an extension, you do not overwrite that history: you compare the new design with the inspected state, increase the revision and document the affected circuits. That keeps clear what was already inspected, what was planned and what was actually installed.",[12,63155,63156],{},"The short description of a non-substantial change also goes into the installation file, dated and signed, and the situation plan stays current. If several small changes make the diagram hard to read, you prepare a consolidated new revision and check it in full against the real board.",[79,63158,43864],{"id":43863},[84,63160,63161,63167],{},[87,63162,63163],{},[40,63164,63166],{"href":1971,"rel":63165},[1458],"FPS Economy: RGIE\u002FAREI Book 1, Version 06",[87,63168,63169],{},"Plan content: Section 3.1.2; symbols: Chapter 2.13, Table 2.23; RCD protection: Subsections 4.2.4.3 b and 5.3.5.3 a; main switch: Subsection 5.3.5.1 b",[79,63171,63173],{"id":63172},"what-planelec-handles-for-your-single-line-diagram","What PlanElec handles for your single-line diagram",[12,63175,63176,63177,56],{},"Enter the verified protective devices and circuits in Sketch first, then link their devices to the situation plan. When the contractor needs the distribution board or self-check report, continue the same drawing with ",[15,63178,1482],{},[12,63180,63181],{},"PlanElec comes in two editions. Which one fits depends on whether you only need the drawings or also the distribution board, self-check and team features.",[138,63183,63184,63198],{},[141,63185,63186],{},[144,63187,63188,63190,63194],{},[147,63189],{},[147,63191,63192],{},[40,63193,22],{"href":1961},[147,63195,63196],{},[40,63197,31],{"href":1964},[163,63199,63200,63210,63220,63231,63241,63251],{},[144,63201,63202,63204,63207],{},[168,63203,6152],{},[168,63205,63206],{},"homeowners, DIY renovators and sole traders who draw the diagram and plan themselves",[168,63208,63209],{},"electrical contractors and designers",[144,63211,63212,63214,63217],{},[168,63213,14992],{},[168,63215,63216],{},"single-line diagram and situation plan in the browser, free and without an account; no limit on circuits, symbols or pages",[168,63218,63219],{},"shared project model: every device exists once and carries the same circuit reference on the diagram and the situation plan",[144,63221,63222,63225,63228],{},[168,63223,63224],{},"Before the PDF",[168,63226,63227],{},"\"Check documents\" shows missing information, such as circuits without a protective device or devices without a place on the situation plan",[168,63229,63230],{},"advisory AREI\u002FRGIE self-check report for the supported rules that can be decided from your input",[144,63232,63233,63235,63238],{},[168,63234,3115],{},[168,63236,63237],{},"sub-boards in the diagram or on their own page, no board planning",[168,63239,63240],{},"distribution board planning",[144,63242,63243,63245,63248],{},[168,63244,4665],{},[168,63246,63247],{},"PDF in A4 or A3; without an account with a PlanElec watermark, without it on a free account",[168,63249,63250],{},"PDF of diagram, situation plan, distribution board and self-check report, installation dossier with cover sheet",[144,63252,63253,63255,63257],{},[168,63254,6235],{},[168,63256,6413],{},[168,63258,63259],{},"organisations, project roles and read-only mode for viewers",[12,63261,63262],{},"If you later need the distribution board or the self-check, you move the Sketch drawing across with \"Take it to Pro\": diagram, boards, circuits, cables, project data and situation plan come along. In both cases the approved inspection body carries out the inspection; as a private owner, you agree your input with your electrician before installation and inspection.",[1489,63264],{":height":60813,":width":60814,"alt":60815,"caption":60816,"src":60817},[79,63266,8517],{"id":8516},[84,63268,63269,63273,63277,63282,63287,63292,63296,63300],{},[87,63270,63271],{},[40,63272,60449],{"href":6050},[87,63274,63275],{},[40,63276,56655],{"href":5399},[87,63278,63279],{},[40,63280,63281],{"href":4200},"Planning a distribution board",[87,63283,63284],{},[40,63285,63286],{"href":25389},"Preparing documents for the electrical inspection",[87,63288,63289],{},[40,63290,63291],{"href":5393},"Booking an electrical inspection, validity and re-inspection",[87,63293,63294],{},[40,63295,51879],{"href":51878},[87,63297,63298],{},[40,63299,36309],{"href":36308},[87,63301,63302],{},[40,63303,43908],{"href":33677},[79,63305,2009],{"id":2008},[84,63307,63308,63315],{},[87,63309,63310,38,63312,56],{},[15,63311,11935],{},[40,63313,2023],{"href":1456,"rel":63314},[1458],[87,63316,63317,38,63319,2033,63321,56],{},[15,63318,7561],{},[40,63320,2032],{"href":1964},[40,63322,2036],{"href":54},[12,63324,63325,7570],{},[15,63326,2041],{},{"title":2044,"searchDepth":2045,"depth":2045,"links":63328},[63329,63330,63331,63332,63338,63339,63340,63346,63347,63348,63349,63350,63351,63352,63353,63354,63355,63356,63357,63358,63359],{"id":62442,"depth":2045,"text":62443},{"id":62460,"depth":2045,"text":62461},{"id":62525,"depth":2045,"text":62526},{"id":62622,"depth":2045,"text":62623,"children":63333},[63334,63335,63336,63337],{"id":62633,"depth":2053,"text":62634},{"id":62665,"depth":2053,"text":62666},{"id":62729,"depth":2053,"text":62730},{"id":62757,"depth":2053,"text":62758},{"id":62791,"depth":2045,"text":62792},{"id":62897,"depth":2045,"text":62898},{"id":51771,"depth":2045,"text":62912,"children":63341},[63342,63343,63344,63345],{"id":62915,"depth":2053,"text":62916},{"id":62922,"depth":2053,"text":62923},{"id":62929,"depth":2053,"text":62930},{"id":62950,"depth":2053,"text":62951},{"id":62957,"depth":2045,"text":62958},{"id":62993,"depth":2045,"text":62994},{"id":63003,"depth":2045,"text":63004},{"id":63013,"depth":2045,"text":63014},{"id":63104,"depth":2045,"text":63105},{"id":63115,"depth":2045,"text":63116},{"id":63122,"depth":2045,"text":63123},{"id":63132,"depth":2045,"text":63133},{"id":63142,"depth":2045,"text":63143},{"id":63149,"depth":2045,"text":63150},{"id":43863,"depth":2045,"text":43864},{"id":63172,"depth":2045,"text":63173},{"id":8516,"depth":2045,"text":8517},{"id":2008,"depth":2045,"text":2009},"2026-01-05","How to create and draw a reviewable Belgian single-line diagram: required information, Table 2.23 symbols, an example, solar PV, circuit references and PDF export with PlanElec.",[2116,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-single-line-diagram-editorial.jpg","\u002Fblog\u002Fsingle-line-diagram.en",{"title":62418,"description":63361},"blog\u002Fsingle-line-diagram.en",[2133,2134,5269,4260,59418,1735,56753,63369,5422,47840,62413,24055,59757,2132,60493,59419,4261],"IEC 60617","uhh3M6j13Ci2c-mlZCdr-SrggKCPT-9HS4aXPOM5Ruk","\u002Fblog\u002Fsingle-line-diagram",{"id":63373,"title":54493,"articleId":63374,"body":63375,"category":11972,"date":63792,"description":63793,"extension":2113,"image":63391,"labels":63794,"lastUpdated":10988,"locale":2119,"meta":63795,"navigation":2121,"ogImage":63796,"path":63797,"publishDate":10313,"readTime":10311,"refreshInterval":5426,"seo":63798,"seoTitle":10313,"slug":63374,"stem":63799,"tags":63800,"__hash__":63805,"kind":2137,"href":63806},"blog\u002Fblog\u002Farei-regulations-2026.en.md","arei-regulations-2026",{"type":9,"value":63376,"toc":63772},[63377,63381,63387,63392,63409,63413,63417,63494,63498,63558,63561,63565,63568,63572,63578,63583,63588,63592,63595,63598,63618,63621,63625,63629,63632,63640,63644,63647,63651,63654,63658,63661,63667,63670,63687,63691,63697,63700,63704,63710,63716,63722,63726,63729,63732,63735,63738,63748,63759,63762,63764,63767],[79,63378,63380],{"id":63379},"what-has-applied-since-1-april-2026","What has applied since 1 April 2026",[12,63382,63383,63386],{},[15,63384,63385],{},"Since 1 November 2026, Book 1 version 07 of the AREI\u002FRGIE applies; it carries over the version of 1 April 2026 (version 06) and only removes the sealing of the RCD at the origin of the installation. The main change of the year comes from version 06: earthed direct-current systems are now regulated systematically – with DC versions of the TN, TT and IT systems, new conductor designations and new RCD sensitivity classes for smooth direct current."," For the classic AC domestic installation, neither version brings a blanket new obligation.",[12,63388,63389],{},[74,63390],{"alt":62431,"src":63391},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-arei-regulations-2026-editorial.webp",[12,63393,63394,63395,63399,63400,63404,63405,63408],{},"The Belgian AREI – RGIE in French – consists of three books; Book 1 governs low-voltage installations in homes. Version 06 is based on the Royal Decree of 6 October 2025, published on 29 October 2025; an erratum of 5 November 2025 only corrected the presentation, not the content. The FPS Economy describes the scope on its ",[40,63396,63398],{"href":1971,"rel":63397},[1458],"overview page for the current RGIE",", which also hosts ",[40,63401,63403],{"href":51840,"rel":63402},[1458],"version 06"," and the applicable ",[40,63406,24941],{"href":25350,"rel":63407},[1458],". Version 07 is officially available in French and Dutch; there is no official German translation yet, and there is no official English text.",[12,63410,63411],{},[15,63412,47885],{},[79,63414,63416],{"id":63415},"the-version-06-changes-at-a-glance","The version 06 changes at a glance",[138,63418,63419,63430],{},[141,63420,63421],{},[144,63422,63423,63425,63428],{},[147,63424,9856],{},[147,63426,63427],{},"What changed",[147,63429,48455],{},[163,63431,63432,63443,63453,63462,63473,63483],{},[144,63433,63434,63437,63440],{},[168,63435,63436],{},"Systems",[168,63438,63439],{},"Earthed DC systems TN (TN-S, TN-C, TN-C-S), TT and IT alongside the AC systems",[168,63441,63442],{},"2.2.1.2, 3.2.2.2",[144,63444,63445,63447,63450],{},[168,63446,3153],{},[168,63448,63449],{},"New designations L+, L−, M, plus PEM and PEL as combined protective and live conductors",[168,63451,63452],{},"part 2",[144,63454,63455,63457,63460],{},[168,63456,54242],{},[168,63458,63459],{},"Separate sensitivity classes for AC or pulsating DC and for smooth DC",[168,63461,57390],{},[144,63463,63464,63467,63470],{},[168,63465,63466],{},"Protection against electric shock",[168,63468,63469],{},"Automatic disconnection for DC TN\u002FTT\u002FIT added, insulation monitoring in IT systems clarified",[168,63471,63472],{},"4.2.3.4",[144,63474,63475,63477,63480],{},[168,63476,29348],{},[168,63478,63479],{},"New requirement for mechanical and chemical resistance and corrosion protection of the earthing installation",[168,63481,63482],{},"5.4.2.3",[144,63484,63485,63488,63491],{},[168,63486,63487],{},"Transition",[168,63489,63490],{},"For installations started earlier, certain two-phase TN circuits with a small PEN and IT systems without permanent monitoring remain permitted",[168,63492,63493],{},"4.2.3.4 e, 6.5.8.2 no. 5, 8.3.2.2 no. 7",[1041,63495,63497],{"id":63496},"the-new-rcd-sensitivity-classes","The new RCD sensitivity classes",[138,63499,63500,63513],{},[141,63501,63502],{},[144,63503,63504,63507,63510],{},[147,63505,63506],{},"Sensitivity",[147,63508,63509],{},"AC \u002F pulsating DC",[147,63511,63512],{},"Smooth DC",[163,63514,63515,63526,63537,63548],{},[144,63516,63517,63520,63523],{},[168,63518,63519],{},"Very high",[168,63521,63522],{},"at most 10 mA",[168,63524,63525],{},"at most 20 mA",[144,63527,63528,63531,63534],{},[168,63529,63530],{},"High",[168,63532,63533],{},"above 10 up to 30 mA",[168,63535,63536],{},"above 20 up to 80 mA",[144,63538,63539,63542,63545],{},[168,63540,63541],{},"Medium",[168,63543,63544],{},"above 30 up to 1000 mA",[168,63546,63547],{},"above 80 up to 1000 mA",[144,63549,63550,63553,63556],{},[168,63551,63552],{},"Low",[168,63554,63555],{},"above 1000 mA",[168,63557,63555],{},[12,63559,63560],{},"Where Book 1 requires a \"high-sensitivity\" RCD, for example for sockets and bathrooms (4.2.4.3 b), the 30 mA limit for AC is unchanged. What is new is the separate scale for smooth DC (2.6.4).",[1041,63562,63564],{"id":63563},"transitional-rule-for-installations-started-earlier","Transitional rule for installations started earlier",[12,63566,63567],{},"The transitional rules mainly concern non-domestic installations: if work on site started before the entry into force, two-phase TN circuits with a PEN cross-section below 10 mm² copper or 16 mm² aluminium may stay in service. IT systems without permanent insulation monitoring remain permitted if signalling a first fault is not required for safety reasons, no special case requires the monitoring and the basic requirement of 4.2.3.4 d.2 is met (6.5.8.2 no. 5; for older non-domestic installations 8.3.2.2 no. 7). Projects started before the cut-off date that only get their conformity inspection afterwards can apply this derogation via 4.2.3.4 e; the inspection body records it in the report. Whether the conditions are met cannot be read from a single-line diagram – your electrician clarifies that with the inspection body.",[79,63569,63571],{"id":63570},"since-1-november-2026-book-1-version-07","Since 1 November 2026: Book 1 version 07",[12,63573,63574,63575,63577],{},"The Royal Decree of 13 August 2026 (Belgian Official Gazette of 15.09.2026) removes from parts 4 and 6 of Book 1 the duty to seal the RCD at the origin of a conforming domestic installation. Book 1 thereby becomes version 07, applicable since ",[15,63576,24927],{},". A comparison of the full texts shows that this is the only substantive change compared with version 06. The numbering stays the same; references from version 06 remain valid.",[1489,63579],{":height":3799,":width":3800,"alt":63580,"caption":63581,"src":63582},"Timeline 2026: version 06 applies from 1 April to 31 October 2026 and brings earthed DC systems, new conductor designations and DC sensitivity classes for RCDs; version 07 applies since 1 November 2026 and only removes the sealing of the RCD at the origin of the installation.","Version 07 carries over version 06 except for the sealing; the version in force on the date of execution is decisive.","\u002Fimages\u002Fblog\u002Fdiagrams\u002Farei-regulations-2026\u002Fbook1-versions-2026.en.svg",[12,63584,63585,63586],{},"Details, references and the effect on inspection reports: ",[40,63587,24914],{"href":55030},[79,63589,63591],{"id":63590},"direct-current-gets-a-systematic-place","Direct current gets a systematic place",[12,63593,63594],{},"Photovoltaics, battery storage, DC distribution and devices that can feed back bring direct current into buildings that used to know only AC. Version 06 therefore adds earthed DC systems to the familiar system types (3.2.2.2). The letters TN, TT and IT still describe how live conductors, earth and exposed conductive parts relate; the protective measure now matches the DC source, the earthing and the disconnection behaviour.",[12,63596,63597],{},"Not every house needs a DC network as a result. But as soon as a DC part goes beyond typical device-internal PV wiring or forms its own earthed distribution, you do not document it like an ordinary AC circuit. Clarify at least the following with your electrician:",[84,63599,63600,63603,63606,63609,63612,63615],{},[87,63601,63602],{},"Where does the DC part of the installation start and end?",[87,63604,63605],{},"Is the system isolated from earth or deliberately earthed, and at which point?",[87,63607,63608],{},"Which live conductors are switched and isolated?",[87,63610,63611],{},"Which protective measure responds to an insulation fault?",[87,63613,63614],{},"Which disconnection conditions apply to the chosen TN, TT or IT arrangement?",[87,63616,63617],{},"Which manufacturer data limit voltage, polarity, protective device and cable routing?",[12,63619,63620],{},"The words \"battery\" or \"PV\" do not imply a particular earthing system or a universal protection solution. A qualified electrician does the design; the approved inspection body assesses the finished installation against the regulation in force and the documents presented.",[79,63622,63624],{"id":63623},"what-is-not-new-in-2026","What is not new in 2026",[1041,63626,63628],{"id":63627},"ev-chargers","EV chargers",[12,63630,63631],{},"The special chapter 7.22 on charging equipment existed before 2026. It requires a dedicated circuit per connection point (7.22.3), an individual RCD of at most 30 mA per AC circuit and protection against insulation faults with a DC component – either through an RCD built for that purpose or through an RCD coordinated with a DC fault current detection device (7.22.4.1 b). The right combination follows from the charger, the protection chain and the manufacturer's data sheet.",[12,63633,63634,63635,63639],{},"Bidirectional chargers add a grid-connection question: according to the ",[40,63636,63638],{"href":37346,"rel":63637},[1458],"Synergrid overview of decentralised generation units",", they fall under C10\u002F11 and require C10\u002F26 type approval. Purely unidirectional grid-to-vehicle chargers do not fall under C10\u002F26 for that reason alone.",[1041,63641,63643],{"id":63642},"bathrooms","Bathrooms",[12,63645,63646],{},"Baths and showers remain a separate chapter (7.1). Check zones, IP requirements, permitted equipment and RCD protection there in the current text. There is no general \"new zone 3 from 2026\". IPX5 is not prescribed across the board for zone 1 either: table 7.3 sets AD4 as a minimum, to be raised according to external influences, for example where cleaning with water jets is used. Survey the geometry and fixed water outlet precisely instead of copying a simplified online graphic.",[1041,63648,63650],{"id":63649},"surge-protection-pv-and-digital-documents","Surge protection, PV and digital documents",[12,63652,63653],{},"Surge protection, PV protection concepts and electronic documents are not new 2026 duties. Book 1 contains requirements and principles whose application depends on the installation, risk, equipment technology and execution date. An inspection report sent electronically is not a new substantive protection rule either.",[79,63655,63657],{"id":63656},"which-installation-falls-under-which-rule","Which installation falls under which rule?",[12,63659,63660],{},"The decisive question is: when was each part built, and what work is happening now? An existing installation continues to be assessed with its permitted derogations, while a new circuit meets current requirements. A significant modification or extension gets a conformity inspection before use, covering the change and its effects on the unchanged part (6.4.7.3).",[12,63662,4361,63663,63666],{},[40,63664,61834],{"href":36246,"rel":63665},[1458]," lists the triggers: before first use, for significant modifications or extensions, for certain capacity increases, when a dwelling is sold, and periodically. Small work such as an extra socket on an existing circuit can count as a non-significant extension; the classification depends on the actual scope.",[12,63668,63669],{},"For a renovation project, keep a short change list:",[3139,63671,63672,63675,63678,63681,63684],{},[87,63673,63674],{},"Record the existing installation with its date or probable construction period.",[87,63676,63677],{},"Distinguish new and unchanged parts on the plan.",[87,63679,63680],{},"Check the effect of new sources, storage or chargers on the board and protection chain.",[87,63682,63683],{},"Resolve open assumptions with the electrician and inspection body.",[87,63685,63686],{},"Update the single-line diagram and situation plan after the work.",[79,63688,63690],{"id":63689},"documentation-and-plans-what-the-inspection-requires","Documentation and plans: what the inspection requires",[12,63692,63693,63694,63696],{},"The FPS Economy lists at least the single-line diagram, the situation plan and – if available – the EAN code for a domestic inspection. The single-line diagram shows circuits, connections and equipment with their characteristics; the situation plan locates boards, boxes, sockets, light points, switches, fixed appliances and sources. Both belong in the installation file, together with inspection reports, descriptions of non-significant changes and technical documents, for example for PV components (9.1.2). You can draw the single-line diagram and situation plan for free in the browser with ",[40,63695,22],{"href":1961}," and export them as PDF.",[12,63698,63699],{},"For a DC system, the documents go beyond a device name: clear assignment of sources and cables, nominal voltages, polarity, isolation points, protective devices, earthing concept and a reference to the relevant manufacturer document. A clean plan replaces neither calculation nor measurement, but it shows whether everyone is talking about the same installation.",[79,63701,63703],{"id":63702},"practical-check-for-projects-in-2026","Practical check for projects in 2026",[12,63705,63706,63709],{},[15,63707,63708],{},"Check the applicable version."," Use the version in force on the planned execution date – version 06 until 31 October 2026, version 07 from 1 November 2026. The FPS Economy publications are authoritative.",[12,63711,63712,63715],{},[15,63713,63714],{},"Determine the scope."," Note whether the work is a new build, significant extension, small change, sale, periodic inspection or capacity increase. For chargers, check the direction of energy flow; bidirectional technology triggers grid operator requirements that a unidirectional charger does not.",[12,63717,63718,63721],{},[15,63719,63720],{},"Collect the evidence."," Keep cable and protective device selection, manufacturer instructions, measured values and plans together. For DC components, data sheets state the permitted earthing, fault current behaviour and disconnection; if that information is missing, request it from the manufacturer.",[79,63723,63725],{"id":63724},"organising-version-control-in-the-project","Organising version control in the project",[12,63727,63728],{},"Document which version applied to which decision: execution date, book version used, chapters concerned, open technical questions and responsible reviewers. If design continues after a regulatory change, compare the affected points specifically rather than discarding earlier decisions unchecked.",[12,63730,63731],{},"For manufacturer documents, the model, firmware or variant and issue date belong in the reference. Especially for inverters, batteries and chargers, variants that look alike often differ in fault current detection, earthing conditions or grid functions.",[12,63733,63734],{},"In meeting minutes, separate three levels: the binding AREI text, the electrician's technical interpretation and the rules the software self-check verifies. That keeps it traceable whether a point is legally required, chosen as good practice or not yet evaluated automatically. Before the inspection, a responsible person signs off the documented final state, confirming that plan, equipment status and installation as built are in sync.",[79,63736,6149],{"id":63737},"what-planelec-does",[12,63739,63740,63743,63744,63747],{},[15,63741,63742],{},"Look up the regulation."," You can read the full text of Book 1 in PlanElec’s ",[40,63745,63746],{"href":2819},"AREI\u002FRGIE reader",". The reader, article links and the PlanElec assistant cite the version in force on the relevant date: version 06 until 31 October 2026, version 07 since 1 November 2026.",[12,63749,63750,63753,63754,63756,63757,56],{},[15,63751,63752],{},"Plans and self-check."," For electrical contractors, ",[40,63755,31],{"href":1964}," takes you from floor plan through the electrical topology and the distribution board to single-line diagram, situation plan and installation file. The AREI\u002FRGIE self-check reports findings in the supported rules that can be decided from your project data; they are listed in ",[40,63758,1086],{"href":1085},[12,63760,63761],{},"The check logic covers a documented subset of these rules. It checks the sealing neither before nor after 1 November 2026. Earthed DC TN, TT and IT systems, their conductor roles and the related protection logic are not yet fully modelled; when PlanElec detects such DC parts, the check shows them as incompletely assessed instead of counting them as passed. For those points, the design, manufacturer documents and the inspection body provide the answer. The positive verdict on the installation comes from the approved inspection body.",[79,63763,82],{"id":81},[12,63765,63766],{},"The real change in 2026 is the systematic inclusion of earthed DC systems in Book 1, with new conductor designations and DC sensitivity classes for RCDs; since 1 November 2026, sealing has also been abolished. For existing AC domestic installations, this creates no blanket duty to rebuild. Identify the use case first, work with the current official text and document new AC and DC parts traceably – that gives electrician and inspection body a solid basis.",[12,63768,63769],{},[40,63770,63771],{"href":54},"Compare PlanElec Sketch and Pro plans →",{"title":2044,"searchDepth":2045,"depth":2045,"links":63773},[63774,63775,63779,63780,63781,63786,63787,63788,63789,63790,63791],{"id":63379,"depth":2045,"text":63380},{"id":63415,"depth":2045,"text":63416,"children":63776},[63777,63778],{"id":63496,"depth":2053,"text":63497},{"id":63563,"depth":2053,"text":63564},{"id":63570,"depth":2045,"text":63571},{"id":63590,"depth":2045,"text":63591},{"id":63623,"depth":2045,"text":63624,"children":63782},[63783,63784,63785],{"id":63627,"depth":2053,"text":63628},{"id":63642,"depth":2053,"text":63643},{"id":63649,"depth":2053,"text":63650},{"id":63656,"depth":2045,"text":63657},{"id":63689,"depth":2045,"text":63690},{"id":63702,"depth":2045,"text":63703},{"id":63724,"depth":2045,"text":63725},{"id":63737,"depth":2045,"text":6149},{"id":81,"depth":2045,"text":82},"2026-01-02","What changed in the Belgian AREI\u002FRGIE on 1 April 2026, what applies since 1 November 2026 with version 07, and how to assess the consequences for design, documentation and inspection.",[2820,2117,2118],{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-arei-regulations-2026-editorial.jpg","\u002Fblog\u002Farei-regulations-2026.en",{"title":54493,"description":63793},"blog\u002Farei-regulations-2026.en",[2133,2134,63801,63802,63803,5422,5269,2132,63804,43298,4261],"regulations 2026","electrical regulations","direct current","EV charging","Y4sRgbh0p1onFULHH8QRH_nha8TaBSCP8p3riUmNdFM","\u002Fblog\u002Farei-regulations-2026"]