[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"blog-post-en-ai-assistant-electrical-planning":3,"blog-alternates-blog-post-en-ai-assistant-electrical-planning-planelec-ai-assistant":572,"blog-next-steps-blog-post-en-ai-assistant-electrical-planning-planelec-ai-assistant":2524},{"id":4,"title":5,"articleId":6,"body":7,"category":547,"date":548,"description":549,"extension":550,"lastUpdated":551,"locale":552,"meta":553,"navigation":554,"path":555,"publishDate":548,"readTime":556,"refreshInterval":541,"seo":557,"seoTitle":558,"slug":559,"stem":560,"tags":561,"__hash__":571},"blog\u002Fblog\u002Fai-assistant-electrical-planning.en.md","AI assistant for electrical planning: what does the PlanElec assistant do in your project?","planelec-ai-assistant",{"type":8,"value":9,"toc":525},"minimark",[10,18,21,26,29,32,35,39,42,197,206,210,213,256,267,273,280,284,290,358,365,378,382,394,397,401,412,423,427,434,437,441,447,450,454,457,460,464,469,472,476,484,488,495,499,502,506,509,513],[11,12,13,17],"p",{},[14,15,16],"strong",{},"The PlanElec assistant is the AI assistant in the PlanElec studio: you describe in your own words what should happen in the project, and it applies the change across the whole project model – floor plan, devices, circuits, cables, distribution board, KNX, PV strings and lighting control."," Clear, reversible changes run straight away; risky actions wait for your confirmation. After every change the server checks the entire project with the same AREI\u002FRGIE self-check used by the report, and you undo any change in one step. It answers technical questions with verified sources from the AREI text and the PlanElec help centre. During Early Access the assistant is free for every signed-in account.",[11,19,20],{},"PlanElec is built for electrical planning in Belgium, so the rules referred to here are the Belgian AREI (in French: RGIE).",[22,23,25],"h2",{"id":24},"what-is-the-planelec-assistant","What is the PlanElec assistant?",[11,27,28],{},"The PlanElec assistant is a language model that works through PlanElec's own planning commands. It does not draw freely on your plan; it works with the same commands as the interface: more than 100 planning commands covering the floor plan and situation plan, rooms, devices, circuits, switch chains, cables, distribution boards, automation and KNX, PV strings and lighting control. It also creates projects and floors and navigates the interface for you.",[11,30,31],{},"Before it changes anything, the assistant reads the project: overview, structure, current check findings and the device catalogue. It plans with exactly the state you have in front of you – not a copy or a guess.",[11,33,34],{},"The assistant acts with your project permissions. Someone who may view a project but not edit it cannot change it through the assistant either.",[22,36,38],{"id":37},"what-can-the-assistant-do-in-a-project","What can the assistant do in a project?",[11,40,41],{},"The assistant covers the planning workflow from an empty project to a populated distribution board. The table shows typical instructions per area. The wording is illustrative – write the way you would brief a colleague.",[43,44,45,61],"table",{},[46,47,48],"thead",{},[49,50,51,55,58],"tr",{},[52,53,54],"th",{},"Area",[52,56,57],{},"Example instruction",[52,59,60],{},"What happens",[62,63,64,76,87,98,109,120,131,142,153,164,175,186],"tbody",{},[49,65,66,70,73],{},[67,68,69],"td",{},"Project and floors",[67,71,72],{},"\"Create a new project and add a first floor.\"",[67,74,75],{},"Project and floor are created; the assistant can take you straight there.",[49,77,78,81,84],{},[67,79,80],{},"Floor plan and rooms",[67,82,83],{},"\"Split the living room into a lounge and a dining area and name both rooms.\"",[67,85,86],{},"Room geometry and names are updated in the floor plan.",[49,88,89,92,95],{},[67,90,91],{},"Devices",[67,93,94],{},"\"Place three socket outlets in the kitchen.\"",[67,96,97],{},"The outlets appear on the floor plan, ready for a circuit and the single-line diagram.",[49,99,100,103,106],{},[67,101,102],{},"Standard equipment",[67,104,105],{},"\"Create a standard installation for this project.\"",[67,107,108],{},"Rooms receive a proposed basic set of devices that you then adjust.",[49,110,111,114,117],{},[67,112,113],{},"Circuits",[67,115,116],{},"\"Add a dedicated cooker circuit with protection to the kitchen.\"",[67,118,119],{},"Circuit and protective device are created in the topology and appear in the single-line diagram.",[49,121,122,125,128],{},[67,123,124],{},"Switch chains and lighting",[67,126,127],{},"\"Control the hallway spots from the two switches by the doors.\"",[67,129,130],{},"The switch chain between switches and light points is built.",[49,132,133,136,139],{},[67,134,135],{},"Cables",[67,137,138],{},"\"Create a cable route for every cable that does not have one yet.\"",[67,140,141],{},"Missing routes follow the walls; existing routes stay as they are.",[49,143,144,147,150],{},[67,145,146],{},"Distribution board",[67,148,149],{},"\"Lay out the circuits in the distribution board and balance the phases.\"",[67,151,152],{},"Modules are placed on DIN rails and loads are spread across the phases.",[49,154,155,158,161],{},[67,156,157],{},"KNX and automation",[67,159,160],{},"\"Assign the living-room lights to free channels on the KNX switching actuator.\"",[67,162,163],{},"The KNX actuator channel assignment is set and documented in the single-line diagram.",[49,165,166,169,172],{},[67,167,168],{},"PV",[67,170,171],{},"\"Propose the PV strings for the inverter.\"",[67,173,174],{},"Strings are assigned to MPPT inputs; missing data remains visible.",[49,176,177,180,183],{},[67,178,179],{},"Check findings",[67,181,182],{},"\"Explain the current validation findings in this project.\"",[67,184,185],{},"The assistant reads the self-check findings and explains cause and affected items.",[49,187,188,191,194],{},[67,189,190],{},"Technical question",[67,192,193],{},"\"Which AREI rule applies to residual-current protection? Show me the source.\"",[67,195,196],{},"An answer backed by verified sources from the AREI text and the PlanElec help centre.",[11,198,199,200,205],{},"Many of these instructions use PlanElec's deterministic automation behind the scenes – room equipment, circuit assignment, cable routing or board layout. The assistant translates your instruction into the right commands and parameters. How the automation itself works is covered in the guide ",[201,202,204],"a",{"href":203},"\u002Fen\u002Fhelp\u002Fautomatic-planning","Using and reviewing automatic planning",".",[22,207,209],{"id":208},"how-do-you-open-the-assistant-and-give-it-an-instruction","How do you open the assistant and give it an instruction?",[11,211,212],{},"Open a project in the studio. There are three ways in:",[214,215,216,228,238],"ol",{},[217,218,219,220,223,224,227],"li",{},"The ",[14,221,222],{},"bot button in the header"," (tooltip ",[14,225,226],{},"Open PlanElec assistant",").",[217,229,230,233,234,237],{},[14,231,232],{},"⌘J"," on a Mac or ",[14,235,236],{},"Ctrl+J"," on Windows and Linux.",[217,239,219,240,243,244,247,248,251,252,255],{},[14,241,242],{},"command search"," with ",[14,245,246],{},"⌘K"," or ",[14,249,250],{},"Ctrl+K",": type your instruction and choose ",[14,253,254],{},"Send to assistant: \"…\"",". Your search text goes straight to the assistant as an instruction.",[11,257,258,259,262,263,266],{},"The input field shows the example \"For example: Place three socket outlets in the kitchen …\". Describe the result you want and send it with ",[14,260,261],{},"Send message"," or Enter; Shift+Enter adds a new line. While it works, the assistant shows its status (\"Working\", \"Running an action\"). ",[14,264,265],{},"Cancel"," stops a running instruction; changes already applied stay in place and can be undone one by one.",[11,268,269,270,205],{},"A good instruction names the place and the result: \"Add a splash-proof socket outlet next to the washbasin in the bathroom\" is more precise than \"Finish the bathroom\". If something is missing, the assistant asks, or the action card reports ",[14,271,272],{},"More information or evidence is required",[11,274,275,276,205],{},"The activity column, its filters and the history are explained in the guide ",[201,277,279],{"href":278},"\u002Fen\u002Fhelp\u002Fstudio-activity-assistant","How do I use activity and the assistant in the studio?",[22,281,283],{"id":282},"how-does-planelec-check-every-change-the-assistant-makes","How does PlanElec check every change the assistant makes?",[11,285,286,289],{},[14,287,288],{},"After every change the server checks the entire project with the same AREI\u002FRGIE self-check that the report uses."," An action only counts as complete once that check has run. The action card shows the result right away:",[43,291,292,302],{},[46,293,294],{},[49,295,296,299],{},[52,297,298],{},"Shown on the action card",[52,300,301],{},"Meaning",[62,303,304,314,324,338,348],{},[49,305,306,311],{},[67,307,308],{},[14,309,310],{},"Applied and checked",[67,312,313],{},"The change is saved and the self-check has run afterwards.",[49,315,316,321],{},[67,317,318],{},[14,319,320],{},"Validation: … resolved, … new, … remaining",[67,322,323],{},"How this change shifted the check findings.",[49,325,326,335],{},[67,327,328,331,332],{},[14,329,330],{},"Target reached"," \u002F ",[14,333,334],{},"Target not reached yet",[67,336,337],{},"Whether the outcome you asked for is actually present in the project.",[49,339,340,345],{},[67,341,342],{},[14,343,344],{},"Affected items: …",[67,346,347],{},"How many items the change touched.",[49,349,350,355],{},[67,351,352],{},[14,353,354],{},"Confirmation required",[67,356,357],{},"The action is waiting for your approval (see next section).",[11,359,360,361,205],{},"The assistant reports new findings in the conversation. You see straight away whether an extra circuit affects, say, a protective device or a cable cross-section, rather than discovering it in the final report. Which rules the self-check covers is listed in ",[201,362,364],{"href":363},"\u002Fen\u002Fhelp\u002Fwhat-the-self-check-verifies","What does PlanElec's AREI self-check verify?",[11,366,367,370,371,374,375,205],{},[14,368,369],{},"Every change the assistant makes is exactly one undo step."," ",[14,372,373],{},"Undo"," on the action card reverses it completely; with several instructions, one at a time, starting with the most recent. The card then shows ",[14,376,377],{},"Undone",[22,379,381],{"id":380},"which-actions-do-you-have-to-confirm-explicitly","Which actions do you have to confirm explicitly?",[11,383,384,385,387,388,247,391,205],{},"Clear, reversible changes – placing a socket outlet, renaming a room, creating a cable route – run immediately. Actions with wider impact are put to you for approval: the action card shows ",[14,386,354],{}," together with the planned parameters. You choose ",[14,389,390],{},"Confirm and run",[14,392,393],{},"Reject and cancel run",[11,395,396],{},"A confirmation applies to exactly that action with exactly those values. If the instruction changes, a new approval is needed. The assistant cannot delete projects – that decision stays with you.",[22,398,400],{"id":399},"how-does-your-team-see-what-the-assistant-changed","How does your team see what the assistant changed?",[11,402,403,404,407,408,411],{},"Every action appears in the ",[14,405,406],{},"Activity & assistant"," column as an action card with tool, status and the person who gave the instruction. In the project history, saved changes made by the assistant carry a bot tile and the note ",[14,409,410],{},"Assistant · on behalf of …"," with the name of the member who gave the instruction.",[11,413,414,415,418,419,422],{},"That keeps it clear across the team who asked for which change, even when you are looking at a colleague's history. The ",[14,416,417],{},"Assistant"," filter collects the assistant's conversations and actions; the ",[14,420,421],{},"Team"," filter shows every project change, including instructions your colleagues gave the assistant.",[22,424,426],{"id":425},"how-does-the-assistant-answer-questions-about-the-arei-and-planelec","How does the assistant answer questions about the AREI and PlanElec?",[11,428,429,430,433],{},"The assistant answers technical questions with sources. It searches the PlanElec help centre, the full AREI\u002FRGIE text (Book 1) and the PlanElec blog, and lists the references under ",[14,431,432],{},"Verified sources",". The server matches each reference against the actual texts; quotations that do not appear there are discarded.",[11,435,436],{},"That makes every answer checkable: you see which article or help section a statement comes from and can read it yourself. Good questions to start with are \"Which AREI rule applies to residual-current protection? Show me the source.\" or \"Why does the self-check flag a finding on the bathroom circuit?\".",[22,438,440],{"id":439},"where-is-your-data-processed","Where is your data processed?",[11,442,443,446],{},[14,444,445],{},"The language model runs in the EU region. The AI provider does not store your requests and does not train on them."," PlanElec routes requests only to providers with zero data retention; data collection by the provider is switched off. The AI service providers involved are listed as sub-processors in PlanElec's data processing agreement.",[11,448,449],{},"PlanElec itself stores your project and the assistant's conversations and actions so that you and your team can trace instructions and changes later.",[22,451,453],{"id":452},"what-does-the-assistant-do-and-who-is-responsible-for-design-and-inspection","What does the assistant do – and who is responsible for design and inspection?",[11,455,456],{},"The assistant does the work inside the planning model: placing devices, building circuits, routing cables, populating the board and explaining findings with sources. Professional responsibility for the design stays with you as the electrical contractor or designer; the official inspection (keuring) is carried out by an accredited inspection body.",[11,458,459],{},"The self-check assesses the supported rules on the basis of the project data you have entered. Measurements, on-site conditions and manufacturer evidence are checked by you on site and by the inspection body during the keuring. A project without findings therefore means: no errors in the supported rules that can be checked from the data – and a well-prepared basis for your own review and the inspection.",[22,461,463],{"id":462},"frequently-asked-questions-about-the-planelec-assistant","Frequently asked questions about the PlanElec assistant",[465,466,468],"h3",{"id":467},"does-the-assistant-work-in-dutch-and-french","Does the assistant work in Dutch and French?",[11,470,471],{},"Yes. You write in Dutch, French, German or English, and the assistant replies in your language. The interface, action cards and status messages are available in all four languages as well.",[465,473,475],{"id":474},"can-the-assistant-delete-my-project","Can the assistant delete my project?",[11,477,478,479,481,482,205],{},"No. Deleting projects is not one of the assistant's commands. Risky changes inside a project only run after ",[14,480,390],{},", and every applied change can be reversed with ",[14,483,373],{},[465,485,487],{"id":486},"what-does-the-assistant-cost","What does the assistant cost?",[11,489,490,491,494],{},"During Early Access the PlanElec assistant is free, like the rest of PlanElec. You need a PlanElec account and a project in the studio. AI features draw on your account's ",[14,492,493],{},"AI allowance","; the share still available is shown in the user menu.",[465,496,498],{"id":497},"who-can-use-the-assistant","Who can use the assistant?",[11,500,501],{},"Every signed-in account, in the studio. No separate activation or special plan is required. Changing a project requires edit rights for that project.",[465,503,505],{"id":504},"does-the-assistant-replace-automatic-planning","Does the assistant replace automatic planning?",[11,507,508],{},"No, it uses it. Automatic planning delivers traceable, rule-based proposals; the assistant picks the right functions and parameters for your instruction and combines them with targeted individual changes.",[465,510,512],{"id":511},"can-i-bring-in-a-floor-plan-from-the-architect-or-from-trikker","Can I bring in a floor plan from the architect or from Trikker?",[11,514,515,516,520,521,205],{},"Yes, through AI recognition in the project files. How a PDF, scan or Trikker export becomes an editable floor plan, and how to capture an existing distribution board from photos, is explained in ",[201,517,519],{"href":518},"\u002Fen\u002Fblog\u002Frecognise-floor-plan-cabinet-photo-ai","Turn a PDF, scan or Trikker export into a floor plan",". For a feature comparison with Trikker, see ",[201,522,524],{"href":523},"\u002Fen\u002Fblog\u002Ftrikker-alternative","Trikker alternative PlanElec",{"title":526,"searchDepth":527,"depth":527,"links":528},"",2,[529,530,531,532,533,534,535,536,537,538],{"id":24,"depth":527,"text":25},{"id":37,"depth":527,"text":38},{"id":208,"depth":527,"text":209},{"id":282,"depth":527,"text":283},{"id":380,"depth":527,"text":381},{"id":399,"depth":527,"text":400},{"id":425,"depth":527,"text":426},{"id":439,"depth":527,"text":440},{"id":452,"depth":527,"text":453},{"id":462,"depth":527,"text":463,"children":539},[540,542,543,544,545,546],{"id":467,"depth":541,"text":468},3,{"id":474,"depth":541,"text":475},{"id":486,"depth":541,"text":487},{"id":497,"depth":541,"text":498},{"id":504,"depth":541,"text":505},{"id":511,"depth":541,"text":512},"guide","2026-10-03","The PlanElec assistant carries out plain-language instructions across the whole project – from floor plan and circuits to the distribution board. Every change runs through the AREI\u002FRGIE self-check and is a single undo step.","md","2026-10-05","en",{},true,"\u002Fblog\u002Fai-assistant-electrical-planning.en","9 min",{"title":5,"description":549},"AI Assistant for Electrical Planning: What It Does","ai-assistant-electrical-planning","blog\u002Fai-assistant-electrical-planning.en",[562,563,564,565,566,567,568,569,570],"PlanElec assistant","AI","AI assistant","electrical planning Belgium","single-line diagram","AREI","RGIE","self-check","data protection","qHyXW4l-2J2ZMlsWpy66Fu8Hlvc5cXxR2Oo9aXqvRxA",[573,928,1460,1991],{"id":4,"title":5,"articleId":6,"body":574,"category":547,"date":548,"description":549,"extension":550,"lastUpdated":551,"locale":552,"meta":925,"navigation":554,"path":555,"publishDate":548,"readTime":556,"refreshInterval":541,"seo":926,"seoTitle":558,"slug":559,"stem":560,"tags":927,"__hash__":571},{"type":8,"value":575,"toc":906},[576,580,582,584,586,588,590,592,594,704,708,710,712,736,742,746,750,752,756,810,814,822,824,832,834,836,842,848,850,854,856,858,862,864,866,868,870,872,874,876,878,884,886,890,892,894,896,898,900],[11,577,578,17],{},[14,579,16],{},[11,581,20],{},[22,583,25],{"id":24},[11,585,28],{},[11,587,31],{},[11,589,34],{},[22,591,38],{"id":37},[11,593,41],{},[43,595,596,606],{},[46,597,598],{},[49,599,600,602,604],{},[52,601,54],{},[52,603,57],{},[52,605,60],{},[62,607,608,616,624,632,640,648,656,664,672,680,688,696],{},[49,609,610,612,614],{},[67,611,69],{},[67,613,72],{},[67,615,75],{},[49,617,618,620,622],{},[67,619,80],{},[67,621,83],{},[67,623,86],{},[49,625,626,628,630],{},[67,627,91],{},[67,629,94],{},[67,631,97],{},[49,633,634,636,638],{},[67,635,102],{},[67,637,105],{},[67,639,108],{},[49,641,642,644,646],{},[67,643,113],{},[67,645,116],{},[67,647,119],{},[49,649,650,652,654],{},[67,651,124],{},[67,653,127],{},[67,655,130],{},[49,657,658,660,662],{},[67,659,135],{},[67,661,138],{},[67,663,141],{},[49,665,666,668,670],{},[67,667,146],{},[67,669,149],{},[67,671,152],{},[49,673,674,676,678],{},[67,675,157],{},[67,677,160],{},[67,679,163],{},[49,681,682,684,686],{},[67,683,168],{},[67,685,171],{},[67,687,174],{},[49,689,690,692,694],{},[67,691,179],{},[67,693,182],{},[67,695,185],{},[49,697,698,700,702],{},[67,699,190],{},[67,701,193],{},[67,703,196],{},[11,705,199,706,205],{},[201,707,204],{"href":203},[22,709,209],{"id":208},[11,711,212],{},[214,713,714,720,726],{},[217,715,219,716,223,718,227],{},[14,717,222],{},[14,719,226],{},[217,721,722,233,724,237],{},[14,723,232],{},[14,725,236],{},[217,727,219,728,243,730,247,732,251,734,255],{},[14,729,242],{},[14,731,246],{},[14,733,250],{},[14,735,254],{},[11,737,258,738,262,740,266],{},[14,739,261],{},[14,741,265],{},[11,743,269,744,205],{},[14,745,272],{},[11,747,275,748,205],{},[201,749,279],{"href":278},[22,751,283],{"id":282},[11,753,754,289],{},[14,755,288],{},[43,757,758,766],{},[46,759,760],{},[49,761,762,764],{},[52,763,298],{},[52,765,301],{},[62,767,768,776,784,794,802],{},[49,769,770,774],{},[67,771,772],{},[14,773,310],{},[67,775,313],{},[49,777,778,782],{},[67,779,780],{},[14,781,320],{},[67,783,323],{},[49,785,786,792],{},[67,787,788,331,790],{},[14,789,330],{},[14,791,334],{},[67,793,337],{},[49,795,796,800],{},[67,797,798],{},[14,799,344],{},[67,801,347],{},[49,803,804,808],{},[67,805,806],{},[14,807,354],{},[67,809,357],{},[11,811,360,812,205],{},[201,813,364],{"href":363},[11,815,816,370,818,374,820,205],{},[14,817,369],{},[14,819,373],{},[14,821,377],{},[22,823,381],{"id":380},[11,825,384,826,387,828,247,830,205],{},[14,827,354],{},[14,829,390],{},[14,831,393],{},[11,833,396],{},[22,835,400],{"id":399},[11,837,403,838,407,840,411],{},[14,839,406],{},[14,841,410],{},[11,843,414,844,418,846,422],{},[14,845,417],{},[14,847,421],{},[22,849,426],{"id":425},[11,851,429,852,433],{},[14,853,432],{},[11,855,436],{},[22,857,440],{"id":439},[11,859,860,446],{},[14,861,445],{},[11,863,449],{},[22,865,453],{"id":452},[11,867,456],{},[11,869,459],{},[22,871,463],{"id":462},[465,873,468],{"id":467},[11,875,471],{},[465,877,475],{"id":474},[11,879,478,880,481,882,205],{},[14,881,390],{},[14,883,373],{},[465,885,487],{"id":486},[11,887,490,888,494],{},[14,889,493],{},[465,891,498],{"id":497},[11,893,501],{},[465,895,505],{"id":504},[11,897,508],{},[465,899,512],{"id":511},[11,901,515,902,520,904,205],{},[201,903,519],{"href":518},[201,905,524],{"href":523},{"title":526,"searchDepth":527,"depth":527,"links":907},[908,909,910,911,912,913,914,915,916,917],{"id":24,"depth":527,"text":25},{"id":37,"depth":527,"text":38},{"id":208,"depth":527,"text":209},{"id":282,"depth":527,"text":283},{"id":380,"depth":527,"text":381},{"id":399,"depth":527,"text":400},{"id":425,"depth":527,"text":426},{"id":439,"depth":527,"text":440},{"id":452,"depth":527,"text":453},{"id":462,"depth":527,"text":463,"children":918},[919,920,921,922,923,924],{"id":467,"depth":541,"text":468},{"id":474,"depth":541,"text":475},{"id":486,"depth":541,"text":487},{"id":497,"depth":541,"text":498},{"id":504,"depth":541,"text":505},{"id":511,"depth":541,"text":512},{},{"title":5,"description":549},[562,563,564,565,566,567,568,569,570],{"id":929,"title":930,"articleId":6,"body":931,"category":547,"date":548,"description":1444,"extension":550,"lastUpdated":551,"locale":1445,"meta":1446,"navigation":554,"path":1447,"publishDate":548,"readTime":556,"refreshInterval":541,"seo":1448,"seoTitle":1449,"slug":1450,"stem":1451,"tags":1452,"__hash__":1459},"blog\u002Fblog\u002Fai-assistent-elektrische-planning.nl.md","AI-assistent voor elektrische planning: wat doet de PlanElec-assistent in jouw project?",{"type":8,"value":932,"toc":1425},[933,939,943,946,949,952,956,959,1107,1114,1118,1121,1158,1169,1175,1182,1186,1192,1259,1266,1279,1283,1295,1298,1302,1313,1323,1327,1334,1337,1341,1347,1350,1354,1357,1360,1364,1368,1371,1375,1384,1388,1395,1399,1402,1406,1409,1413],[11,934,935,938],{},[14,936,937],{},"De PlanElec-assistent is de AI-assistent in de studio van PlanElec: je beschrijft in je eigen woorden wat er in het project moet gebeuren, en hij voert het uit in het volledige projectmodel – grondplan, toestellen, stroomkringen, kabels, verdeelkast, KNX, PV-strings en lichtsturing."," Duidelijke, omkeerbare wijzigingen voert hij meteen uit; risicovolle acties pas na jouw bevestiging. Na elke wijziging controleert de server het hele project met dezelfde AREI\u002FRGIE-zelfcontrole als het controleverslag, en elke wijziging maak je in één stap ongedaan. Vakvragen beantwoordt hij met geverifieerde bronnen uit de AREI-tekst en de PlanElec-hulp. Tijdens de Early Access is de assistent gratis voor elk aangemeld account.",[22,940,942],{"id":941},"wat-is-de-planelec-assistent","Wat is de PlanElec-assistent?",[11,944,945],{},"De PlanElec-assistent is een taalmodel dat werkt met de planningscommando's van PlanElec. Hij tekent niet vrij in je plan, maar gebruikt dezelfde commando's die je zelf via de interface start: meer dan 100 planningscommando's voor grondplan en situatieplan, ruimtes, toestellen, stroomkringen, schakelketens, kabels, verdeelkast en verdeelborden, automatisering en KNX, PV-strings en lichtsturing. Daarnaast maakt hij projecten en verdiepingen aan en navigeert hij voor jou door de interface.",[11,947,948],{},"Voor hij iets wijzigt, leest de assistent het project: projectoverzicht, structuur, actuele controlebevindingen en de toestellencatalogus. Hij plant dus met precies de stand van zaken die je op dat moment voor je hebt – niet met een kopie of een gok.",[11,950,951],{},"De assistent werkt met jouw projectrechten. Wie een project mag bekijken maar niet bewerken, wijzigt het ook via de assistent niet.",[22,953,955],{"id":954},"wat-kan-de-assistent-in-een-project-doen","Wat kan de assistent in een project doen?",[11,957,958],{},"De assistent bestrijkt het planningsverloop van een leeg project tot een gevulde verdeelkast. De tabel toont typische opdrachten per domein. De formuleringen zijn voorbeelden: je schrijft zoals je een collega een opdracht geeft.",[43,960,961,974],{},[46,962,963],{},[49,964,965,968,971],{},[52,966,967],{},"Domein",[52,969,970],{},"Voorbeeldopdracht",[52,972,973],{},"Wat er gebeurt",[62,975,976,987,998,1009,1020,1031,1042,1053,1064,1075,1085,1096],{},[49,977,978,981,984],{},[67,979,980],{},"Project en verdiepingen",[67,982,983],{},"\"Maak een nieuw project aan en voeg een verdieping toe.\"",[67,985,986],{},"Project en verdieping worden aangemaakt; de assistent brengt je er meteen naartoe.",[49,988,989,992,995],{},[67,990,991],{},"Grondplan en ruimtes",[67,993,994],{},"\"Splits de woonkamer in een zit- en eethoek en geef beide ruimtes een naam.\"",[67,996,997],{},"Ruimtegeometrie en namen worden in het grondplan aangepast.",[49,999,1000,1003,1006],{},[67,1001,1002],{},"Toestellen",[67,1004,1005],{},"\"Plaats drie stopcontacten in de keuken.\"",[67,1007,1008],{},"De stopcontacten staan in het grondplan, klaar voor stroomkring en eendraadschema.",[49,1010,1011,1014,1017],{},[67,1012,1013],{},"Standaarduitrusting",[67,1015,1016],{},"\"Maak een standaardinstallatie voor dit project.\"",[67,1018,1019],{},"De ruimtes krijgen een voorgestelde basisuitrusting die je daarna aanpast.",[49,1021,1022,1025,1028],{},[67,1023,1024],{},"Stroomkringen",[67,1026,1027],{},"\"Voeg in de keuken een afzonderlijke kookkring met beveiliging toe.\"",[67,1029,1030],{},"Stroomkring en beveiliging worden in de topologie aangemaakt en verschijnen in het eendraadschema.",[49,1032,1033,1036,1039],{},[67,1034,1035],{},"Schakelketens en verlichting",[67,1037,1038],{},"\"Schakel de spots in de gang met de twee schakelaars aan de deuren.\"",[67,1040,1041],{},"De schakelketen tussen schakelaars en lichtpunten wordt opgebouwd.",[49,1043,1044,1047,1050],{},[67,1045,1046],{},"Kabels",[67,1048,1049],{},"\"Leg een kabeltraject aan voor alle kabels zonder verloop.\"",[67,1051,1052],{},"Ontbrekende kabeltrajecten volgen de muren; bestaande trajecten blijven ongewijzigd.",[49,1054,1055,1058,1061],{},[67,1056,1057],{},"Verdeelkast",[67,1059,1060],{},"\"Verdeel de stroomkringen over de verdeelkast en balanceer de fasen.\"",[67,1062,1063],{},"Modules komen op de DIN-rails en de belasting wordt over de fasen verdeeld.",[49,1065,1066,1069,1072],{},[67,1067,1068],{},"KNX en automatisering",[67,1070,1071],{},"\"Wijs de verlichting in de woonkamer toe aan vrije kanalen van de KNX-schakelactor.\"",[67,1073,1074],{},"De kanaaltoewijzing in de KNX-actor wordt ingesteld en in het eendraadschema gedocumenteerd.",[49,1076,1077,1079,1082],{},[67,1078,168],{},[67,1080,1081],{},"\"Stel de PV-strings voor de omvormer voor.\"",[67,1083,1084],{},"Strings worden aan de MPPT-ingangen toegewezen; ontbrekende gegevens blijven zichtbaar.",[49,1086,1087,1090,1093],{},[67,1088,1089],{},"Controlebevindingen",[67,1091,1092],{},"\"Leg de huidige validatiebevindingen in dit project uit.\"",[67,1094,1095],{},"De assistent leest de bevindingen van de zelfcontrole en legt oorzaak en betrokken elementen uit.",[49,1097,1098,1101,1104],{},[67,1099,1100],{},"Vakvraag",[67,1102,1103],{},"\"Welke AREI-regel geldt voor differentieelbeveiliging? Toon mij de bron.\"",[67,1105,1106],{},"Antwoord met geverifieerde bronnen uit de AREI-tekst en de PlanElec-hulp.",[11,1108,1109,1110,205],{},"Veel van deze opdrachten gebruiken op de achtergrond de deterministische automatisering van PlanElec: ruimte-uitrusting, toewijzing van stroomkringen, kabeltrajecten of de indeling van de verdeelkast. De assistent vertaalt je opdracht naar de juiste commando's en parameters. Hoe die automatisering werkt, lees je in de handleiding ",[201,1111,1113],{"href":1112},"\u002Fhelp\u002Fautomatische-planning","Automatische planning",[22,1115,1117],{"id":1116},"hoe-open-je-de-assistent-en-geef-je-een-opdracht","Hoe open je de assistent en geef je een opdracht?",[11,1119,1120],{},"Open een project in de studio. Je opent de assistent op drie manieren:",[214,1122,1123,1132,1141],{},[217,1124,1125,1126,223,1129,227],{},"Met de ",[14,1127,1128],{},"botknop in de bovenbalk",[14,1130,1131],{},"PlanElec-assistent openen",[217,1133,1134,1135,1137,1138,1140],{},"Met ",[14,1136,232],{}," op de Mac of ",[14,1139,236],{}," op Windows en Linux.",[217,1142,1143,1144,1147,1148,1150,1151,1153,1154,1157],{},"Via de ",[14,1145,1146],{},"opdrachtzoeker"," met ",[14,1149,246],{}," of ",[14,1152,250],{},": typ je opdracht en kies ",[14,1155,1156],{},"Naar de assistent sturen: '…'",". De zoektekst gaat meteen als opdracht naar de assistent.",[11,1159,1160,1161,1164,1165,1168],{},"In het invoerveld staat als voorbeeld \"Bijvoorbeeld: plaats drie stopcontacten in de keuken…\". Beschrijf het gewenste resultaat en verstuur met ",[14,1162,1163],{},"Bericht verzenden"," of Enter; Shift+Enter voegt een nieuwe regel in. Terwijl de assistent werkt, zie je de status (\"Bezig\", \"Actie wordt uitgevoerd\"). Met ",[14,1166,1167],{},"Annuleren"," stop je een lopende opdracht; wijzigingen die al zijn uitgevoerd, blijven bestaan en maak je afzonderlijk ongedaan.",[11,1170,1171,1172,205],{},"Een goede opdracht noemt plaats en resultaat: \"Voeg in de badkamer een spatwaterdicht stopcontact naast de lavabo toe\" is preciezer dan \"Werk de badkamer af\". Ontbreekt er informatie, dan vraagt de assistent ernaar, of de actiekaart meldt ",[14,1173,1174],{},"Meer informatie of bewijs is vereist",[11,1176,1177,1178,205],{},"De activiteitenkolom, de filters en de geschiedenis leggen we uit in de handleiding ",[201,1179,1181],{"href":1180},"\u002Fhelp\u002Fstudio-activiteit-assistent","Activiteit en assistent in de studio",[22,1183,1185],{"id":1184},"hoe-controleert-planelec-elke-wijziging-van-de-assistent","Hoe controleert PlanElec elke wijziging van de assistent?",[11,1187,1188,1191],{},[14,1189,1190],{},"Na elke wijziging controleert de server het volledige project met dezelfde AREI\u002FRGIE-zelfcontrole als het controleverslag."," Een actie geldt pas als afgerond wanneer die controle gelopen heeft. Op de actiekaart zie je het resultaat meteen:",[43,1193,1194,1204],{},[46,1195,1196],{},[49,1197,1198,1201],{},[52,1199,1200],{},"Melding op de actiekaart",[52,1202,1203],{},"Betekenis",[62,1205,1206,1216,1226,1239,1249],{},[49,1207,1208,1213],{},[67,1209,1210],{},[14,1211,1212],{},"Uitgevoerd en gecontroleerd",[67,1214,1215],{},"De wijziging is opgeslagen en de zelfcontrole is daarna uitgevoerd.",[49,1217,1218,1223],{},[67,1219,1220],{},[14,1221,1222],{},"Controle: … opgelost, … nieuw, … resterend",[67,1224,1225],{},"Hoe de controlebevindingen door deze wijziging verschoven zijn.",[49,1227,1228,1236],{},[67,1229,1230,331,1233],{},[14,1231,1232],{},"Doel bereikt",[14,1234,1235],{},"Doel nog niet bereikt",[67,1237,1238],{},"Of het beoogde resultaat van je opdracht effectief in het project staat.",[49,1240,1241,1246],{},[67,1242,1243],{},[14,1244,1245],{},"Betrokken elementen: …",[67,1247,1248],{},"Hoeveel elementen de wijziging raakt.",[49,1250,1251,1256],{},[67,1252,1253],{},[14,1254,1255],{},"Bevestiging vereist",[67,1257,1258],{},"De actie wacht op jouw akkoord (zie volgende sectie).",[11,1260,1261,1262,205],{},"Nieuwe bevindingen meldt de assistent meteen in het gesprek. Zo zie je direct of een extra stroomkring bijvoorbeeld een beveiliging of kabeldoorsnede raakt – niet pas in het eindverslag. Welke regels de zelfcontrole dekt, staat in ",[201,1263,1265],{"href":1264},"\u002Fhelp\u002Fwat-controleert-de-zelfcontrole","Wat controleert de AREI-zelfcontrole van PlanElec?",[11,1267,1268,1271,1272,1275,1276,205],{},[14,1269,1270],{},"Elke wijziging van de assistent is precies één stap ongedaan maken."," Met ",[14,1273,1274],{},"Ongedaan maken"," op de actiekaart draai je ze volledig terug; bij meerdere opdrachten één voor één, te beginnen met de meest recente. De kaart toont daarna ",[14,1277,1278],{},"Ongedaan gemaakt",[22,1280,1282],{"id":1281},"welke-acties-moet-je-uitdrukkelijk-bevestigen","Welke acties moet je uitdrukkelijk bevestigen?",[11,1284,1285,1286,1288,1289,1150,1292,205],{},"Duidelijke en omkeerbare wijzigingen – een stopcontact plaatsen, een ruimte hernoemen, een kabeltraject aanleggen – voert de assistent meteen uit. Acties met een grotere impact legt hij je ter goedkeuring voor: de actiekaart toont ",[14,1287,1255],{}," met de geplande parameters. Je kiest ",[14,1290,1291],{},"Bevestigen en uitvoeren",[14,1293,1294],{},"Weigeren en uitvoering annuleren",[11,1296,1297],{},"De bevestiging geldt voor precies deze actie met precies deze waarden. Verandert de opdracht, dan is een nieuwe goedkeuring nodig. Projecten verwijderen kan de assistent niet; die stap blijft bij jou.",[22,1299,1301],{"id":1300},"hoe-ziet-je-team-wat-de-assistent-heeft-gewijzigd","Hoe ziet je team wat de assistent heeft gewijzigd?",[11,1303,1304,1305,1308,1309,1312],{},"Elke actie verschijnt in de kolom ",[14,1306,1307],{},"Activiteit & assistent"," als actiekaart met tool, status en opdrachtgever. In de projectgeschiedenis dragen opgeslagen wijzigingen van de assistent een bot-tegel en de vermelding ",[14,1310,1311],{},"Assistent · in opdracht van …"," met de naam van het teamlid dat de opdracht gaf.",[11,1314,1315,1316,1319,1320,1322],{},"Zo blijft in het team zichtbaar wie welke wijziging heeft gevraagd, ook als je de geschiedenis van een collega bekijkt. De filter ",[14,1317,1318],{},"Assistent"," bundelt gesprekken en acties van de assistent; de filter ",[14,1321,421],{}," toont alle projectwijzigingen, inclusief de opdrachten die je collega's aan de assistent gaven.",[22,1324,1326],{"id":1325},"hoe-beantwoordt-de-assistent-vakvragen-over-het-arei-en-planelec","Hoe beantwoordt de assistent vakvragen over het AREI en PlanElec?",[11,1328,1329,1330,1333],{},"Vakvragen beantwoordt de assistent met onderbouwde bronnen. Hij doorzoekt de PlanElec-hulp, de volledige AREI-tekst (Boek 1) en de PlanElec-blog en toont de vindplaatsen onder ",[14,1331,1332],{},"Geverifieerde bronnen",". De server toetst elke bronvermelding aan de echte tekst; citaten die daar niet in staan, worden verworpen.",[11,1335,1336],{},"Zo is elk antwoord controleerbaar: je ziet uit welk artikel of welke hulpsectie een uitspraak komt en leest het zelf na. Goede vragen om te starten zijn \"Welke AREI-regel geldt voor differentieelbeveiliging? Toon mij de bron.\" of \"Waarom meldt de zelfcontrole een bevinding bij de badkamerkring?\".",[22,1338,1340],{"id":1339},"waar-worden-je-gegevens-verwerkt","Waar worden je gegevens verwerkt?",[11,1342,1343,1346],{},[14,1344,1345],{},"Het taalmodel draait in de EU-regio. De AI-aanbieder slaat je aanvragen niet op en traint er niet mee."," PlanElec stuurt aanvragen uitsluitend naar aanbieders zonder gegevensbewaring; gegevensverzameling door de aanbieder is uitgesloten. De betrokken AI-dienstverleners staan als subverwerkers in de verwerkersovereenkomst van PlanElec.",[11,1348,1349],{},"Je project en de gesprekken en acties van de assistent bewaart PlanElec zelf, zodat jij en je team opdrachten en wijzigingen later kunnen nagaan.",[22,1351,1353],{"id":1352},"wat-doet-de-assistent-en-wie-is-verantwoordelijk-voor-ontwerp-en-keuring","Wat doet de assistent – en wie is verantwoordelijk voor ontwerp en keuring?",[11,1355,1356],{},"De assistent doet het werk in het planningsmodel: toestellen plaatsen, stroomkringen opbouwen, kabeltrajecten aanleggen, de verdeelkast invullen en controlebevindingen met bronnen uitleggen. De vakinhoudelijke verantwoordelijkheid voor het ontwerp draag jij als installateur of studiebureau; de keuring doet het erkend organisme.",[11,1358,1359],{},"De zelfcontrole beoordeelt de ondersteunde regels op basis van de ingevoerde projectgegevens. Metingen, omstandigheden ter plaatse en fabrikantgegevens controleer jij op de werf en het erkend organisme bij de keuring. Een project zonder bevindingen betekent dus: geen fouten in de ondersteunde regels die met de gegevens te controleren zijn – en een goed voorbereide basis voor je eigen nazicht en de keuring.",[22,1361,1363],{"id":1362},"veelgestelde-vragen-over-de-planelec-assistent","Veelgestelde vragen over de PlanElec-assistent",[465,1365,1367],{"id":1366},"begrijpt-de-assistent-nederlands-en-frans","Begrijpt de assistent Nederlands en Frans?",[11,1369,1370],{},"Ja. Je schrijft in het Nederlands, Frans, Duits of Engels, en de assistent antwoordt in jouw taal. Ook de interface, de actiekaarten en de statusmeldingen zijn er in alle vier de talen.",[465,1372,1374],{"id":1373},"kan-de-assistent-mijn-project-verwijderen","Kan de assistent mijn project verwijderen?",[11,1376,1377,1378,1380,1381,1383],{},"Nee. Projecten verwijderen hoort niet bij de commando's van de assistent. Risicovolle wijzigingen binnen een project voert hij pas uit na ",[14,1379,1291],{},", en elke uitgevoerde wijziging draai je met ",[14,1382,1274],{}," terug.",[465,1385,1387],{"id":1386},"wat-kost-de-assistent","Wat kost de assistent?",[11,1389,1390,1391,1394],{},"Tijdens de Early Access is de PlanElec-assistent gratis, net als de rest van PlanElec. Je hebt een PlanElec-account en een project in de studio nodig. De AI-functies gebruiken het ",[14,1392,1393],{},"AI-tegoed"," van je account; het beschikbare deel zie je in het gebruikersmenu.",[465,1396,1398],{"id":1397},"wie-kan-de-assistent-gebruiken","Wie kan de assistent gebruiken?",[11,1400,1401],{},"Elk aangemeld account in de studio – zonder aparte activering of speciaal abonnement. Voor projectwijzigingen heb je bewerkingsrechten in dat project nodig.",[465,1403,1405],{"id":1404},"neemt-de-assistent-de-automatische-planning-over","Neemt de assistent de automatische planning over?",[11,1407,1408],{},"Nee, hij gebruikt ze. De automatische planning levert navolgbare, regelgebaseerde voorstellen; de assistent kiest de juiste functies en parameters voor je opdracht en combineert ze met gerichte afzonderlijke wijzigingen.",[465,1410,1412],{"id":1411},"kan-ik-een-grondplan-van-de-architect-of-uit-trikker-overnemen","Kan ik een grondplan van de architect of uit Trikker overnemen?",[11,1414,1415,1416,1420,1421,205],{},"Ja, via de AI-herkenning in de projectstukken. Hoe een pdf, scan of Trikker-export een bewerkbaar grondplan wordt en hoe je een bestaande verdeelkast via een foto vastlegt, lees je in ",[201,1417,1419],{"href":1418},"\u002Fblog\u002Fgrondplan-herkennen-verdeelkast-foto-ai","Grondplan overnemen uit pdf, scan of Trikker-export",". De functievergelijking met Trikker vind je in ",[201,1422,1424],{"href":1423},"\u002Fblog\u002Ftrikker-alternatief","Trikker-alternatief PlanElec",{"title":526,"searchDepth":527,"depth":527,"links":1426},[1427,1428,1429,1430,1431,1432,1433,1434,1435,1436],{"id":941,"depth":527,"text":942},{"id":954,"depth":527,"text":955},{"id":1116,"depth":527,"text":1117},{"id":1184,"depth":527,"text":1185},{"id":1281,"depth":527,"text":1282},{"id":1300,"depth":527,"text":1301},{"id":1325,"depth":527,"text":1326},{"id":1339,"depth":527,"text":1340},{"id":1352,"depth":527,"text":1353},{"id":1362,"depth":527,"text":1363,"children":1437},[1438,1439,1440,1441,1442,1443],{"id":1366,"depth":541,"text":1367},{"id":1373,"depth":541,"text":1374},{"id":1386,"depth":541,"text":1387},{"id":1397,"depth":541,"text":1398},{"id":1404,"depth":541,"text":1405},{"id":1411,"depth":541,"text":1412},"De PlanElec-assistent voert je opdrachten in gewone taal uit in het hele project – van grondplan en stroomkringen tot de verdeelkast. Elke wijziging doorloopt de AREI-zelfcontrole en maak je in één stap ongedaan.","nl",{},"\u002Fblog\u002Fai-assistent-elektrische-planning.nl",{"title":930,"description":1444},"AI-assistent voor elektrische planning: wat doet hij?","ai-assistent-elektrische-planning","blog\u002Fai-assistent-elektrische-planning.nl",[1453,563,1454,1455,1456,567,1457,1458],"PlanElec-assistent","AI-assistent","elektrische planning België","eendraadschema","zelfcontrole","gegevensbescherming","Ik-WzBZ39z2bvkcEtvMADLJAY2P3dSdQpoOhkhZ3wrs",{"id":1461,"title":1462,"articleId":6,"body":1463,"category":547,"date":548,"description":1974,"extension":550,"lastUpdated":551,"locale":1975,"meta":1976,"navigation":554,"path":1977,"publishDate":548,"readTime":556,"refreshInterval":541,"seo":1978,"seoTitle":1979,"slug":1980,"stem":1981,"tags":1982,"__hash__":1990},"blog\u002Fblog\u002Fassistant-ia-plan-electrique.fr.md","Assistant IA pour le plan électrique : que fait l’assistant PlanElec dans votre projet ?",{"type":8,"value":1464,"toc":1955},[1465,1471,1475,1478,1481,1484,1488,1491,1638,1645,1649,1652,1689,1700,1706,1713,1717,1723,1790,1797,1810,1814,1826,1829,1833,1844,1854,1858,1865,1868,1872,1878,1881,1885,1888,1891,1895,1899,1902,1906,1914,1918,1925,1929,1932,1936,1939,1943],[11,1466,1467,1470],{},[14,1468,1469],{},"L’assistant PlanElec est l’assistant IA du studio PlanElec : vous décrivez avec vos mots ce qui doit se passer dans le projet, et il l’applique dans l’ensemble du modèle – plan, appareils, circuits, câbles, tableau, KNX, strings PV et commande d’éclairage."," Il exécute directement les modifications claires et réversibles, et attend votre confirmation pour les actions sensibles. Après chaque modification, le serveur contrôle tout le projet avec le même autocontrôle RGIE que le rapport, et chaque modification s’annule en une seule étape. Pour les questions techniques, il répond avec des sources vérifiées issues du texte du RGIE et de l’aide PlanElec. Pendant l’Early Access, l’assistant est gratuit pour tout compte connecté.",[22,1472,1474],{"id":1473},"quest-ce-que-lassistant-planelec","Qu’est-ce que l’assistant PlanElec ?",[11,1476,1477],{},"L’assistant PlanElec est un modèle de langage qui travaille avec les commandes de planification de PlanElec. Il ne dessine pas librement dans votre plan : il appelle les mêmes commandes que vous déclenchez dans l’interface, soit plus de 100 commandes de planification pour le plan et le plan de position, les pièces, les appareils, les circuits, les chaînes de commande, les câbles, le tableau et les tableaux divisionnaires, l’automatisation et le KNX, les strings PV et la commande d’éclairage. Il crée aussi des projets et des niveaux, et vous guide dans l’interface.",[11,1479,1480],{},"Avant de modifier quoi que ce soit, l’assistant lit le projet : vue d’ensemble, structure, constats de contrôle en cours et catalogue d’appareils. Il planifie donc à partir de l’état exact que vous avez sous les yeux – pas d’une copie ni d’une supposition.",[11,1482,1483],{},"L’assistant agit avec vos droits sur le projet. Une personne qui peut consulter un projet sans le modifier ne le modifie pas non plus via l’assistant.",[22,1485,1487],{"id":1486},"que-peut-faire-lassistant-dans-un-projet","Que peut faire l’assistant dans un projet ?",[11,1489,1490],{},"L’assistant couvre la planification d’un projet vide jusqu’au tableau équipé. Le tableau ci-dessous présente des demandes types par domaine. Les formulations sont des exemples : vous écrivez comme vous confieriez une tâche à un collègue.",[43,1492,1493,1506],{},[46,1494,1495],{},[49,1496,1497,1500,1503],{},[52,1498,1499],{},"Domaine",[52,1501,1502],{},"Exemple de demande",[52,1504,1505],{},"Ce qui se passe",[62,1507,1508,1519,1530,1541,1552,1562,1573,1584,1595,1606,1616,1627],{},[49,1509,1510,1513,1516],{},[67,1511,1512],{},"Projet et niveaux",[67,1514,1515],{},"« Crée un nouveau projet et ajoute un étage. »",[67,1517,1518],{},"Le projet et le niveau sont créés ; l’assistant peut vous y amener directement.",[49,1520,1521,1524,1527],{},[67,1522,1523],{},"Plan et pièces",[67,1525,1526],{},"« Divise le séjour en salon et salle à manger et nomme les deux pièces. »",[67,1528,1529],{},"La géométrie et le nom des pièces sont modifiés dans le plan.",[49,1531,1532,1535,1538],{},[67,1533,1534],{},"Appareils",[67,1536,1537],{},"« Place trois prises dans la cuisine. »",[67,1539,1540],{},"Les prises apparaissent dans le plan, prêtes pour le circuit et le schéma unifilaire.",[49,1542,1543,1546,1549],{},[67,1544,1545],{},"Équipement standard",[67,1547,1548],{},"« Crée une installation standard pour ce projet. »",[67,1550,1551],{},"Les pièces reçoivent un équipement de base proposé, que vous ajustez ensuite.",[49,1553,1554,1556,1559],{},[67,1555,113],{},[67,1557,1558],{},"« Ajoute dans la cuisine un circuit dédié à la cuisinière avec sa protection. »",[67,1560,1561],{},"Le circuit et sa protection sont créés dans la topologie et apparaissent dans le schéma unifilaire.",[49,1563,1564,1567,1570],{},[67,1565,1566],{},"Commandes et éclairage",[67,1568,1569],{},"« Commande les spots du hall avec les deux interrupteurs près des portes. »",[67,1571,1572],{},"La chaîne de commande entre interrupteurs et points lumineux est constituée.",[49,1574,1575,1578,1581],{},[67,1576,1577],{},"Câbles",[67,1579,1580],{},"« Trace un chemin de câble pour tous les câbles sans tracé. »",[67,1582,1583],{},"Les tracés manquants suivent les murs ; les tracés existants restent inchangés.",[49,1585,1586,1589,1592],{},[67,1587,1588],{},"Tableau",[67,1590,1591],{},"« Répartis les circuits dans le tableau et équilibre les phases. »",[67,1593,1594],{},"Les modules sont placés sur les rails DIN et les charges réparties sur les phases.",[49,1596,1597,1600,1603],{},[67,1598,1599],{},"KNX et automatisation",[67,1601,1602],{},"« Attribue l’éclairage du séjour aux canaux libres de l’actionneur KNX. »",[67,1604,1605],{},"L’attribution des canaux de l’actionneur KNX est définie et documentée dans le schéma unifilaire.",[49,1607,1608,1610,1613],{},[67,1609,168],{},[67,1611,1612],{},"« Propose les strings PV pour l’onduleur. »",[67,1614,1615],{},"Les strings sont attribués aux entrées MPPT ; les données manquantes restent visibles.",[49,1617,1618,1621,1624],{},[67,1619,1620],{},"Constats de contrôle",[67,1622,1623],{},"« Explique les constats de validation actuels de ce projet. »",[67,1625,1626],{},"L’assistant lit les constats de l’autocontrôle et en explique la cause et les éléments concernés.",[49,1628,1629,1632,1635],{},[67,1630,1631],{},"Question technique",[67,1633,1634],{},"« Quelle règle du RGIE s’applique à la protection différentielle ? Montre-moi la source. »",[67,1636,1637],{},"Réponse avec des sources vérifiées issues du texte du RGIE et de l’aide PlanElec.",[11,1639,1640,1641,205],{},"Nombre de ces demandes s’appuient sur l’automatisation déterministe de PlanElec : équipement des pièces, attribution des circuits, chemins de câbles ou équipement du tableau. L’assistant traduit votre demande en commandes et paramètres adaptés. Le fonctionnement détaillé de cette automatisation est décrit dans le guide ",[201,1642,1644],{"href":1643},"\u002Ffr\u002Fhelp\u002Fplanification-automatique","Planification automatique",[22,1646,1648],{"id":1647},"comment-ouvrir-lassistant-et-lui-confier-une-tâche","Comment ouvrir l’assistant et lui confier une tâche ?",[11,1650,1651],{},"Ouvrez un projet dans le studio. Trois accès sont possibles :",[214,1653,1654,1664,1672],{},[217,1655,1656,1657,1660,1661,227],{},"Le ",[14,1658,1659],{},"bouton robot dans la barre supérieure"," (info-bulle ",[14,1662,1663],{},"Ouvrir l’assistant PlanElec",[217,1665,1666,1668,1669,1671],{},[14,1667,232],{}," sur Mac ou ",[14,1670,236],{}," sous Windows et Linux.",[217,1673,1674,1675,1678,1679,1681,1682,1684,1685,1688],{},"La ",[14,1676,1677],{},"recherche de commandes"," avec ",[14,1680,246],{}," ou ",[14,1683,250],{}," : tapez votre demande et choisissez ",[14,1686,1687],{},"Envoyer à l’assistant : « … »",". Le texte saisi part directement comme demande.",[11,1690,1691,1692,1695,1696,1699],{},"Le champ de saisie propose l’exemple « Par exemple : place trois prises dans la cuisine… ». Décrivez le résultat voulu et envoyez avec ",[14,1693,1694],{},"Envoyer le message"," ou Entrée ; Maj+Entrée insère une nouvelle ligne. Pendant le travail, l’assistant affiche son statut (« En cours », « Exécution d’une action »). ",[14,1697,1698],{},"Annuler"," interrompt une demande en cours ; les modifications déjà appliquées restent en place et s’annulent une par une.",[11,1701,1702,1703,205],{},"Une bonne demande précise le lieu et le résultat : « Ajoute une prise étanche à côté du lavabo dans la salle de bains » est plus précis que « Termine la salle de bains ». S’il manque une information, l’assistant la demande, ou la carte d’action indique ",[14,1704,1705],{},"Des informations ou preuves supplémentaires sont requises",[11,1707,1708,1709,205],{},"La colonne d’activité, ses filtres et l’historique sont expliqués dans le guide ",[201,1710,1712],{"href":1711},"\u002Ffr\u002Fhelp\u002Fstudio-activite-assistant","Activité et assistant dans le studio",[22,1714,1716],{"id":1715},"comment-planelec-contrôle-t-il-chaque-modification-de-lassistant","Comment PlanElec contrôle-t-il chaque modification de l’assistant ?",[11,1718,1719,1722],{},[14,1720,1721],{},"Après chaque modification, le serveur contrôle l’ensemble du projet avec le même autocontrôle RGIE que le rapport de contrôle."," Une action n’est considérée comme terminée qu’une fois ce contrôle exécuté. La carte d’action affiche le résultat :",[43,1724,1725,1735],{},[46,1726,1727],{},[49,1728,1729,1732],{},[52,1730,1731],{},"Indication sur la carte d’action",[52,1733,1734],{},"Signification",[62,1736,1737,1747,1757,1770,1780],{},[49,1738,1739,1744],{},[67,1740,1741],{},[14,1742,1743],{},"Appliquée et vérifiée",[67,1745,1746],{},"La modification est enregistrée et l’autocontrôle a été exécuté ensuite.",[49,1748,1749,1754],{},[67,1750,1751],{},[14,1752,1753],{},"Validation : … résolu(s), … nouveau(x), … restant(s)",[67,1755,1756],{},"L’effet de cette modification sur les constats de contrôle.",[49,1758,1759,1767],{},[67,1760,1761,331,1764],{},[14,1762,1763],{},"Objectif atteint",[14,1765,1766],{},"Objectif pas encore atteint",[67,1768,1769],{},"Si le résultat visé par votre demande est effectivement présent dans le projet.",[49,1771,1772,1777],{},[67,1773,1774],{},[14,1775,1776],{},"Éléments concernés : …",[67,1778,1779],{},"Le nombre d’éléments touchés par la modification.",[49,1781,1782,1787],{},[67,1783,1784],{},[14,1785,1786],{},"Confirmation requise",[67,1788,1789],{},"L’action attend votre accord (voir section suivante).",[11,1791,1792,1793,205],{},"L’assistant signale les nouveaux constats dans la conversation. Vous voyez immédiatement si un circuit supplémentaire touche par exemple une protection ou une section de câble, au lieu de le découvrir dans le rapport final. Les règles couvertes par l’autocontrôle sont détaillées dans ",[201,1794,1796],{"href":1795},"\u002Ffr\u002Fhelp\u002Fce-que-verifie-l-autocontrole","Que vérifie l’autocontrôle RGIE de PlanElec ?",[11,1798,1799,1802,1803,1806,1807,205],{},[14,1800,1801],{},"Chaque modification de l’assistant correspond à une seule étape d’annulation."," Avec ",[14,1804,1805],{},"Annuler la modification"," sur la carte d’action, vous la retirez entièrement ; pour plusieurs demandes, une à une en commençant par la plus récente. La carte indique ensuite ",[14,1808,1809],{},"Modification annulée",[22,1811,1813],{"id":1812},"quelles-actions-faut-il-confirmer-explicitement","Quelles actions faut-il confirmer explicitement ?",[11,1815,1816,1817,1819,1820,1681,1823,205],{},"L’assistant exécute directement les modifications claires et réversibles : placer une prise, renommer une pièce, tracer un chemin de câble. Les actions de plus grande portée sont soumises à votre accord : la carte d’action affiche ",[14,1818,1786],{}," avec les paramètres prévus. Vous choisissez ",[14,1821,1822],{},"Confirmer et exécuter",[14,1824,1825],{},"Refuser et annuler l’exécution",[11,1827,1828],{},"La confirmation vaut pour cette action précise, avec ces valeurs précises. Si la demande change, une nouvelle confirmation est nécessaire. L’assistant ne peut pas supprimer de projet : cette décision vous appartient.",[22,1830,1832],{"id":1831},"comment-léquipe-voit-elle-ce-que-lassistant-a-modifié","Comment l’équipe voit-elle ce que l’assistant a modifié ?",[11,1834,1835,1836,1839,1840,1843],{},"Chaque action apparaît dans la colonne ",[14,1837,1838],{},"Activité et assistant"," sous forme de carte avec l’outil, le statut et le donneur d’ordre. Dans l’historique du projet, les modifications enregistrées par l’assistant portent une vignette robot et la mention ",[14,1841,1842],{},"Assistant · pour le compte de …"," suivie du nom du membre qui a donné la consigne.",[11,1845,1846,1847,1849,1850,1853],{},"Toute l’équipe sait ainsi qui a demandé quelle modification, même en consultant l’historique d’un collègue. Le filtre ",[14,1848,417],{}," regroupe conversations et actions de l’assistant ; le filtre ",[14,1851,1852],{},"Équipe"," affiche toutes les modifications du projet, y compris celles demandées par vos collègues à l’assistant.",[22,1855,1857],{"id":1856},"comment-lassistant-répond-il-aux-questions-sur-le-rgie-et-planelec","Comment l’assistant répond-il aux questions sur le RGIE et PlanElec ?",[11,1859,1860,1861,1864],{},"L’assistant répond aux questions techniques avec des sources à l’appui. Il consulte l’aide PlanElec, le texte intégral du RGIE (Livre 1) et le blog PlanElec, et affiche les références sous ",[14,1862,1863],{},"Sources vérifiées",". Le serveur confronte chaque référence aux textes réels ; une citation qui n’y figure pas est écartée.",[11,1866,1867],{},"Chaque réponse devient ainsi vérifiable : vous voyez de quel article ou de quelle section d’aide provient une affirmation, et vous pouvez la relire vous-même. Pour commencer : « Quelle règle du RGIE s’applique à la protection différentielle ? Montre-moi la source. » ou « Pourquoi l’autocontrôle signale-t-il un constat sur le circuit de la salle de bains ? ».",[22,1869,1871],{"id":1870},"où-vos-données-sont-elles-traitées","Où vos données sont-elles traitées ?",[11,1873,1874,1877],{},[14,1875,1876],{},"Le modèle de langage tourne dans la région UE. Le fournisseur d’IA ne conserve pas vos demandes et ne s’en sert pas pour l’entraînement."," PlanElec n’achemine les demandes que vers des fournisseurs sans conservation des données ; toute collecte de données par le fournisseur est exclue. Les prestataires d’IA concernés figurent comme sous-traitants ultérieurs dans le contrat de sous-traitance de PlanElec.",[11,1879,1880],{},"PlanElec enregistre lui-même votre projet ainsi que les conversations et actions de l’assistant, pour que vous et votre équipe puissiez retracer demandes et modifications.",[22,1882,1884],{"id":1883},"ce-que-fait-lassistant-et-qui-répond-de-létude-et-du-contrôle","Ce que fait l’assistant – et qui répond de l’étude et du contrôle",[11,1886,1887],{},"L’assistant fait le travail dans le modèle de planification : placer des appareils, constituer des circuits, tracer des câbles, équiper le tableau et expliquer les constats avec leurs sources. La responsabilité technique de la conception vous revient en tant qu’installateur ou bureau d’études ; le contrôle de conformité revient à l’organisme agréé.",[11,1889,1890],{},"L’autocontrôle évalue les règles prises en charge à partir des données saisies dans le projet. Mesures, conditions sur place et justificatifs des fabricants, c’est vous qui les vérifiez sur le chantier, puis l’organisme agréé lors du contrôle. Un projet sans constat signifie donc : aucune erreur dans les règles prises en charge et vérifiables à partir des données – et une base bien préparée pour votre propre vérification et pour le contrôle.",[22,1892,1894],{"id":1893},"questions-fréquentes-sur-lassistant-planelec","Questions fréquentes sur l’assistant PlanElec",[465,1896,1898],{"id":1897},"lassistant-comprend-il-le-français-et-le-néerlandais","L’assistant comprend-il le français et le néerlandais ?",[11,1900,1901],{},"Oui. Vous écrivez en français, en néerlandais, en allemand ou en anglais, et l’assistant répond dans votre langue. L’interface, les cartes d’action et les statuts sont eux aussi disponibles dans les quatre langues.",[465,1903,1905],{"id":1904},"lassistant-peut-il-supprimer-mon-projet","L’assistant peut-il supprimer mon projet ?",[11,1907,1908,1909,1911,1912,205],{},"Non. La suppression de projets ne fait pas partie des commandes de l’assistant. Les modifications sensibles au sein d’un projet ne s’exécutent qu’après ",[14,1910,1822],{},", et chaque modification appliquée s’annule avec ",[14,1913,1805],{},[465,1915,1917],{"id":1916},"combien-coûte-lassistant","Combien coûte l’assistant ?",[11,1919,1920,1921,1924],{},"Pendant l’Early Access, l’assistant PlanElec est gratuit, comme l’ensemble de PlanElec. Il vous faut un compte PlanElec et un projet dans le studio. Les fonctions IA utilisent le ",[14,1922,1923],{},"Quota IA"," de votre compte ; la part disponible s’affiche dans le menu utilisateur.",[465,1926,1928],{"id":1927},"qui-peut-utiliser-lassistant","Qui peut utiliser l’assistant ?",[11,1930,1931],{},"Tout compte connecté, dans le studio. Aucune activation ni formule particulière n’est nécessaire. Les modifications de projet supposent des droits d’édition sur le projet concerné.",[465,1933,1935],{"id":1934},"lassistant-remplace-t-il-la-planification-automatique","L’assistant remplace-t-il la planification automatique ?",[11,1937,1938],{},"Non, il s’en sert. La planification automatique fournit des propositions fondées sur des règles et traçables ; l’assistant choisit les fonctions et paramètres adaptés à votre demande et les combine avec des modifications ciblées.",[465,1940,1942],{"id":1941},"puis-je-reprendre-un-plan-darchitecte-ou-un-plan-trikker","Puis-je reprendre un plan d’architecte ou un plan Trikker ?",[11,1944,1945,1946,1950,1951,205],{},"Oui, grâce à la reconnaissance par IA dans les pièces du projet. Comment un PDF, un scan ou un export Trikker devient un plan modifiable, et comment relever un tableau existant à partir de photos : c’est l’objet de l’article ",[201,1947,1949],{"href":1948},"\u002Ffr\u002Fblog\u002Freconnaitre-plan-tableau-photo-ia","Reprendre un plan depuis un PDF, un scan ou un export Trikker",". La comparaison des fonctions avec Trikker se trouve dans ",[201,1952,1954],{"href":1953},"\u002Ffr\u002Fblog\u002Falternative-trikker","Alternative à Trikker : PlanElec",{"title":526,"searchDepth":527,"depth":527,"links":1956},[1957,1958,1959,1960,1961,1962,1963,1964,1965,1966],{"id":1473,"depth":527,"text":1474},{"id":1486,"depth":527,"text":1487},{"id":1647,"depth":527,"text":1648},{"id":1715,"depth":527,"text":1716},{"id":1812,"depth":527,"text":1813},{"id":1831,"depth":527,"text":1832},{"id":1856,"depth":527,"text":1857},{"id":1870,"depth":527,"text":1871},{"id":1883,"depth":527,"text":1884},{"id":1893,"depth":527,"text":1894,"children":1967},[1968,1969,1970,1971,1972,1973],{"id":1897,"depth":541,"text":1898},{"id":1904,"depth":541,"text":1905},{"id":1916,"depth":541,"text":1917},{"id":1927,"depth":541,"text":1928},{"id":1934,"depth":541,"text":1935},{"id":1941,"depth":541,"text":1942},"L’assistant PlanElec exécute vos demandes en langage courant dans tout le projet – du plan aux circuits et au tableau. Chaque modification passe par l’autocontrôle RGIE et s’annule en une seule étape.","fr",{},"\u002Fblog\u002Fassistant-ia-plan-electrique.fr",{"title":1462,"description":1974},"Assistant IA pour le plan électrique : que fait-il ?","assistant-ia-plan-electrique","blog\u002Fassistant-ia-plan-electrique.fr",[1983,1984,1985,1986,1987,568,1988,1989],"assistant PlanElec","IA","assistant IA","plan électrique Belgique","schéma unifilaire","autocontrôle","protection des données","IFRbpzZRMg69-DWPENha-8O_l6BJHpsz2JOifg39ayc",{"id":1992,"title":1993,"articleId":6,"body":1994,"category":547,"date":548,"description":2507,"extension":550,"lastUpdated":551,"locale":2508,"meta":2509,"navigation":554,"path":2510,"publishDate":548,"readTime":556,"refreshInterval":541,"seo":2511,"seoTitle":2512,"slug":2513,"stem":2514,"tags":2515,"__hash__":2523},"blog\u002Fblog\u002Fki-assistent-elektroplanung.de.md","KI-Assistent für die Elektroplanung: Was erledigt der PlanElec-Assistent im Projekt?",{"type":8,"value":1995,"toc":2488},[1996,2002,2006,2009,2012,2015,2019,2022,2170,2177,2181,2184,2221,2232,2238,2245,2249,2255,2322,2329,2342,2346,2359,2362,2366,2377,2386,2390,2397,2400,2404,2410,2413,2417,2420,2423,2427,2431,2434,2438,2447,2451,2458,2462,2465,2469,2472,2476],[11,1997,1998,2001],{},[14,1999,2000],{},"Der PlanElec-Assistent ist der KI-Assistent im Studio von PlanElec: Du beschreibst in deinen Worten, was im Projekt passieren soll, und er setzt es im gesamten Projektmodell um – im Grundriss, bei Geräten, Stromkreisen, Kabeln, im Schaltschrank, bei KNX, PV-Strings und Lichtsteuerung."," Eindeutige, umkehrbare Änderungen führt er sofort aus, riskante Aktionen erst nach deiner Bestätigung. Nach jeder Änderung prüft der Server das ganze Projekt mit derselben AREI\u002FRGIE-Selbstprüfung, die auch der Prüfbericht verwendet, und jede Änderung nimmst du in einem Schritt zurück. Fachfragen beantwortet er mit geprüften Quellen aus AREI-Volltext und PlanElec-Hilfe. Im Early Access steht der Assistent jedem angemeldeten Konto kostenlos zur Verfügung.",[22,2003,2005],{"id":2004},"was-ist-der-planelec-assistent","Was ist der PlanElec-Assistent?",[11,2007,2008],{},"Der PlanElec-Assistent ist ein Sprachmodell, das mit den Planungsbefehlen von PlanElec arbeitet. Er „zeichnet“ nicht frei in deinen Plan, sondern ruft dieselben Befehle auf, die du auch über die Oberfläche auslöst: mehr als 100 Planungsbefehle für Grundriss und Positionsplan, Räume, Geräte, Stromkreise, Schaltketten, Kabel, Schaltschrank und Verteiler, Automation und KNX, PV-Strings und Lichtsteuerung. Dazu legt er Projekte und Geschosse an und navigiert für dich durch die Oberfläche.",[11,2010,2011],{},"Bevor er etwas ändert, liest der Assistent das Projekt: Projektübersicht, Struktur, aktuelle Prüfbefunde und den Gerätekatalog. Er plant also mit genau dem Stand, den du gerade vor dir hast – nicht mit einer Kopie oder einer Vermutung.",[11,2013,2014],{},"Der Assistent arbeitet mit deinen Projektrechten. Wer ein Projekt lesen, aber nicht bearbeiten darf, ändert es auch über den Assistenten nicht.",[22,2016,2018],{"id":2017},"was-kann-der-assistent-im-projekt-erledigen","Was kann der Assistent im Projekt erledigen?",[11,2020,2021],{},"Der Assistent deckt den Planungsablauf vom leeren Projekt bis zum bestückten Verteiler ab. Die Tabelle zeigt typische Aufträge je Bereich. Die Formulierungen sind Beispiele – du schreibst so, wie du einem Kollegen einen Auftrag gibst.",[43,2023,2024,2037],{},[46,2025,2026],{},[49,2027,2028,2031,2034],{},[52,2029,2030],{},"Bereich",[52,2032,2033],{},"Beispielauftrag",[52,2035,2036],{},"Was passiert",[62,2038,2039,2050,2061,2072,2083,2094,2105,2116,2127,2138,2148,2159],{},[49,2040,2041,2044,2047],{},[67,2042,2043],{},"Projekt und Geschosse",[67,2045,2046],{},"„Lege ein neues Projekt an und füge ein Obergeschoss hinzu.“",[67,2048,2049],{},"Projekt und Geschoss werden angelegt; der Assistent bringt dich anschließend direkt dorthin.",[49,2051,2052,2055,2058],{},[67,2053,2054],{},"Grundriss und Räume",[67,2056,2057],{},"„Teile das Wohnzimmer in Wohn- und Essbereich und benenne beide Räume.“",[67,2059,2060],{},"Raumgeometrie und Raumnamen werden im Grundriss geändert.",[49,2062,2063,2066,2069],{},[67,2064,2065],{},"Geräte",[67,2067,2068],{},"„Platziere drei Steckdosen in der Küche.“",[67,2070,2071],{},"Die Steckdosen erscheinen im Grundriss und stehen für Stromkreis und Eindrahtschema bereit.",[49,2073,2074,2077,2080],{},[67,2075,2076],{},"Standardausstattung",[67,2078,2079],{},"„Lege eine Standardinstallation für dieses Projekt an.“",[67,2081,2082],{},"Die Räume erhalten eine vorgeschlagene Grundausstattung, die du danach anpasst.",[49,2084,2085,2088,2091],{},[67,2086,2087],{},"Stromkreise",[67,2089,2090],{},"„Füge der Küche einen eigenen Herd-Stromkreis mit Absicherung hinzu.“",[67,2092,2093],{},"Stromkreis und Schutzgerät werden in der Topologie angelegt und erscheinen im Eindrahtschema.",[49,2095,2096,2099,2102],{},[67,2097,2098],{},"Schaltketten und Licht",[67,2100,2101],{},"„Schalte die Spots im Flur über die beiden Schalter an den Türen.“",[67,2103,2104],{},"Die Schaltkette zwischen Schaltern und Leuchten wird gebildet.",[49,2106,2107,2110,2113],{},[67,2108,2109],{},"Kabel",[67,2111,2112],{},"„Lege für alle Kabel ohne Verlauf einen Kabelweg an.“",[67,2114,2115],{},"Fehlende Kabelwege werden entlang der Wände geführt; vorhandene Verläufe bleiben unberührt.",[49,2117,2118,2121,2124],{},[67,2119,2120],{},"Schaltschrank",[67,2122,2123],{},"„Verteile die Stromkreise auf den Schaltschrank und gleiche die Phasen aus.“",[67,2125,2126],{},"Module werden auf DIN-Schienen gesetzt und die Lasten auf die Phasen verteilt.",[49,2128,2129,2132,2135],{},[67,2130,2131],{},"KNX und Automation",[67,2133,2134],{},"„Ordne die Leuchten im Wohnzimmer freien Kanälen des KNX-Schaltaktors zu.“",[67,2136,2137],{},"Die Kanalzuordnung im KNX-Aktor wird gesetzt und im Eindrahtschema dokumentiert.",[49,2139,2140,2142,2145],{},[67,2141,168],{},[67,2143,2144],{},"„Schlage die PV-Strings für den Wechselrichter vor.“",[67,2146,2147],{},"Strings werden den MPPT-Eingängen zugeordnet; fehlende Angaben bleiben sichtbar.",[49,2149,2150,2153,2156],{},[67,2151,2152],{},"Prüfbefunde",[67,2154,2155],{},"„Erkläre mir die aktuellen Validierungsbefunde in diesem Projekt.“",[67,2157,2158],{},"Der Assistent liest die Befunde der Selbstprüfung und erklärt Ursache und betroffene Elemente.",[49,2160,2161,2164,2167],{},[67,2162,2163],{},"Fachfrage",[67,2165,2166],{},"„Welche AREI-Regel gilt für Fehlerstrom-Schutzeinrichtungen? Zeig die Quelle.“",[67,2168,2169],{},"Antwort mit geprüften Quellen aus dem AREI-Volltext und der PlanElec-Hilfe.",[11,2171,2172,2173,205],{},"Viele dieser Aufträge nutzen im Hintergrund die deterministische Automatik von PlanElec – etwa Raumausstattung, Stromkreiszuordnung, Kabelwege oder Schrankbestückung. Der Assistent übersetzt deinen Auftrag in die passenden Befehle und Parameter. Wie die Automatik im Einzelnen arbeitet, zeigt der Leitfaden ",[201,2174,2176],{"href":2175},"\u002Fde\u002Fhelp\u002Fautomatische-planung","Automatische Planung",[22,2178,2180],{"id":2179},"wie-öffne-ich-den-assistenten-und-erteile-einen-auftrag","Wie öffne ich den Assistenten und erteile einen Auftrag?",[11,2182,2183],{},"Öffne ein Projekt im Studio. Zum Assistenten führen drei Wege:",[214,2185,2186,2195,2204],{},[217,2187,2188,2191,2192,227],{},[14,2189,2190],{},"Bot-Knopf in der Kopfleiste"," (Tooltip ",[14,2193,2194],{},"PlanElec-Assistent öffnen",[217,2196,2197,2199,2200,2203],{},[14,2198,232],{}," auf dem Mac beziehungsweise ",[14,2201,2202],{},"Strg+J"," unter Windows und Linux.",[217,2205,2206,2209,2210,2212,2213,2216,2217,2220],{},[14,2207,2208],{},"Befehlssuche"," mit ",[14,2211,246],{}," beziehungsweise ",[14,2214,2215],{},"Strg+K",": Tippe deinen Auftrag ein und wähle ",[14,2218,2219],{},"An den Assistenten senden: „…“",". Der Suchtext geht direkt als Auftrag an den Assistenten.",[11,2222,2223,2224,2227,2228,2231],{},"Im Eingabefeld steht als Beispiel „Zum Beispiel: Platziere drei Steckdosen in der Küche …“. Beschreibe das gewünschte Ergebnis und sende mit ",[14,2225,2226],{},"Nachricht senden"," oder Enter; Shift+Enter fügt eine neue Zeile ein. Während der Assistent arbeitet, zeigt er den Status („Arbeitet“, „Führt eine Aktion aus“). Mit ",[14,2229,2230],{},"Abbrechen"," beendest du einen laufenden Auftrag; bereits ausgeführte Änderungen bleiben bestehen und lassen sich einzeln zurücknehmen.",[11,2233,2234,2235,205],{},"Ein guter Auftrag nennt Ort und Ergebnis: „Füge im Badezimmer eine spritzwassergeschützte Steckdose neben dem Waschtisch hinzu“ ist präziser als „Mach das Bad fertig“. Fehlt eine Angabe, fragt der Assistent nach, oder die Aktionskarte meldet ",[14,2236,2237],{},"Benötigt weitere Angaben oder Nachweise",[11,2239,2240,2241,205],{},"Aktivitätsspalte, Filter und Verlauf erklärt der Hilfeartikel ",[201,2242,2244],{"href":2243},"\u002Fde\u002Fhelp\u002Fstudio-aktivitaet-assistent","Aktivität und Assistent im Studio",[22,2246,2248],{"id":2247},"wie-prüft-planelec-jede-änderung-des-assistenten","Wie prüft PlanElec jede Änderung des Assistenten?",[11,2250,2251,2254],{},[14,2252,2253],{},"Nach jeder Änderung prüft der Server das ganze Projekt mit derselben AREI\u002FRGIE-Selbstprüfung, die auch der Prüfbericht verwendet."," Eine Aktion gilt erst als abgeschlossen, wenn diese Prüfung gelaufen ist. Das Ergebnis siehst du direkt an der Aktionskarte:",[43,2256,2257,2267],{},[46,2258,2259],{},[49,2260,2261,2264],{},[52,2262,2263],{},"Anzeige an der Aktionskarte",[52,2265,2266],{},"Bedeutung",[62,2268,2269,2279,2289,2302,2312],{},[49,2270,2271,2276],{},[67,2272,2273],{},[14,2274,2275],{},"Ausgeführt und geprüft",[67,2277,2278],{},"Die Änderung ist gespeichert, die Selbstprüfung ist danach gelaufen.",[49,2280,2281,2286],{},[67,2282,2283],{},[14,2284,2285],{},"Prüfung: … behoben, … neu, … verbleibend",[67,2287,2288],{},"Wie sich die Prüfbefunde durch diese Änderung verschoben haben.",[49,2290,2291,2299],{},[67,2292,2293,331,2296],{},[14,2294,2295],{},"Ziel erreicht",[14,2297,2298],{},"Ziel noch nicht erreicht",[67,2300,2301],{},"Ob der Zielzustand deines Auftrags im Projekt tatsächlich vorliegt.",[49,2303,2304,2309],{},[67,2305,2306],{},[14,2307,2308],{},"Betroffene Elemente: …",[67,2310,2311],{},"Wie viele Elemente die Änderung berührt hat.",[49,2313,2314,2319],{},[67,2315,2316],{},[14,2317,2318],{},"Bestätigung erforderlich",[67,2320,2321],{},"Die Aktion wartet auf deine Freigabe (siehe nächster Abschnitt).",[11,2323,2324,2325,205],{},"Neue Befunde meldet der Assistent direkt im Gespräch. Du siehst also sofort, ob ein zusätzlicher Stromkreis etwa eine Absicherung oder einen Querschnitt betrifft – nicht erst im Bericht am Ende. Welche Regeln die Selbstprüfung abdeckt, steht im Leitfaden ",[201,2326,2328],{"href":2327},"\u002Fde\u002Fhelp\u002Fwas-die-selbstpruefung-kontrolliert","Was prüft die AREI-Selbstprüfung von PlanElec?",[11,2330,2331,2334,2335,2338,2339,205],{},[14,2332,2333],{},"Jede Änderung des Assistenten ist genau ein Rückgängig-Schritt."," Über ",[14,2336,2337],{},"Rückgängig"," an der Aktionskarte nimmst du sie vollständig zurück – bei mehreren Aufträgen nacheinander, beginnend mit der jüngsten Änderung. Die Karte zeigt danach ",[14,2340,2341],{},"Rückgängig gemacht",[22,2343,2345],{"id":2344},"welche-aktionen-muss-ich-ausdrücklich-bestätigen","Welche Aktionen muss ich ausdrücklich bestätigen?",[11,2347,2348,2349,2351,2352,2355,2356,205],{},"Eindeutige und umkehrbare Änderungen – eine Steckdose setzen, einen Raum umbenennen, einen Kabelweg anlegen – führt der Assistent sofort aus. Aktionen mit größerer Tragweite legt er dir zur Freigabe vor: Die Aktionskarte zeigt ",[14,2350,2318],{}," mit den geplanten Parametern. Du wählst ",[14,2353,2354],{},"Bestätigen und ausführen"," oder ",[14,2357,2358],{},"Ablehnen und Lauf abbrechen",[11,2360,2361],{},"Die Bestätigung gilt für genau diese Aktion mit genau diesen Werten. Ändert sich der Auftrag, braucht es eine neue Freigabe. Projekte löschen kann der Assistent nicht – dieser Schritt bleibt in deiner Hand.",[22,2363,2365],{"id":2364},"wie-sieht-das-team-was-der-assistent-geändert-hat","Wie sieht das Team, was der Assistent geändert hat?",[11,2367,2368,2369,2372,2373,2376],{},"Jede Aktion erscheint in der Spalte ",[14,2370,2371],{},"Aktivität & Assistent"," als Aktionskarte mit Werkzeug, Status und Auftraggeber. Im Projektverlauf tragen gespeicherte Änderungen des Assistenten eine Bot-Kachel und den Vermerk ",[14,2374,2375],{},"Assistent · im Auftrag von …"," mit dem Namen des Mitglieds, das den Auftrag erteilt hat.",[11,2378,2379,2380,2382,2383,2385],{},"So bleibt im Team nachvollziehbar, wer welche Änderung veranlasst hat – auch wenn du den Verlauf eines anderen Mitglieds ansiehst. Der Filter ",[14,2381,1318],{}," bündelt Gespräche und Aktionen des Assistenten, der Filter ",[14,2384,421],{}," zeigt alle Projektänderungen einschließlich der Assistentenaufträge deiner Kollegen.",[22,2387,2389],{"id":2388},"wie-beantwortet-der-assistent-fachfragen-zu-arei-und-planelec","Wie beantwortet der Assistent Fachfragen zu AREI und PlanElec?",[11,2391,2392,2393,2396],{},"Fachfragen beantwortet der Assistent mit belegten Quellen. Er durchsucht die PlanElec-Hilfe, den AREI\u002FRGIE-Volltext (Buch 1) und den PlanElec-Blog und zeigt die Fundstellen unter ",[14,2394,2395],{},"Geprüfte Quellen",". Der Server gleicht jede Quellenangabe mit dem tatsächlichen Text ab; Zitate, die dort nicht vorkommen, verwirft er.",[11,2398,2399],{},"Damit ist jede Antwort prüfbar: Du siehst, aus welchem Artikel oder Hilfeabschnitt eine Aussage stammt, und liest ihn selbst nach. Gute Einstiegsfragen sind „Welche AREI-Regel gilt für Fehlerstrom-Schutzeinrichtungen? Zeig mir die Quelle.“ oder „Warum meldet die Selbstprüfung beim Badezimmer-Stromkreis einen Befund?“.",[22,2401,2403],{"id":2402},"wo-werden-meine-daten-verarbeitet","Wo werden meine Daten verarbeitet?",[11,2405,2406,2409],{},[14,2407,2408],{},"Das Sprachmodell läuft in der EU-Region. Der KI-Anbieter speichert deine Anfragen nicht und trainiert nicht damit."," PlanElec leitet Anfragen ausschließlich an Anbieter ohne Datenspeicherung weiter; eine Datensammlung durch den Anbieter ist ausgeschlossen. Die beteiligten KI-Dienstleister stehen als Unterauftragsverarbeiter in der Auftragsverarbeitungsvereinbarung von PlanElec.",[11,2411,2412],{},"Dein Projekt sowie Gesprächs- und Aktionsverlauf des Assistenten speichert PlanElec selbst – damit du und dein Team Aufträge und Änderungen später nachvollziehen könnt.",[22,2414,2416],{"id":2415},"was-übernimmt-der-assistent-und-wer-verantwortet-planung-und-keuring","Was übernimmt der Assistent – und wer verantwortet Planung und Keuring?",[11,2418,2419],{},"Der Assistent erledigt die Arbeit im Planungsmodell: Er setzt Geräte, bildet Stromkreise, legt Kabelwege an, bestückt den Verteiler und erklärt Prüfbefunde mit Quellen. Die fachliche Verantwortung für die Planung trägst du als Elektrofachbetrieb oder Planer; die Abnahmeprüfung (Keuring) macht der zugelassene Kontrollorganismus.",[11,2421,2422],{},"Die Selbstprüfung bewertet die unterstützten Regeln anhand der erfassten Projektdaten. Messungen, Bedingungen vor Ort und Herstellernachweise kontrollierst du auf der Baustelle, der Kontrollorganismus bei der Keuring. Ein Projekt ohne Befunde heißt deshalb: keine Fehler in den unterstützten, anhand der Daten prüfbaren Regeln – und eine gut vorbereitete Grundlage für deine eigene Kontrolle und die Keuring.",[22,2424,2426],{"id":2425},"häufige-fragen-zum-planelec-assistenten","Häufige Fragen zum PlanElec-Assistenten",[465,2428,2430],{"id":2429},"versteht-der-assistent-niederländisch-französisch-und-englisch","Versteht der Assistent Niederländisch, Französisch und Englisch?",[11,2432,2433],{},"Ja. Du schreibst auf Niederländisch, Französisch, Deutsch oder Englisch, und der Assistent antwortet in deiner Sprache. Auch Oberfläche, Aktionskarten und Statusanzeigen gibt es in allen vier Sprachen.",[465,2435,2437],{"id":2436},"kann-der-assistent-mein-projekt-löschen","Kann der Assistent mein Projekt löschen?",[11,2439,2440,2441,2443,2444,2446],{},"Nein. Projekte zu löschen gehört nicht zu den Befehlen des Assistenten. Riskante Änderungen innerhalb eines Projekts führt er erst nach ",[14,2442,2354],{}," aus, und jede ausgeführte Änderung nimmst du mit ",[14,2445,2337],{}," zurück.",[465,2448,2450],{"id":2449},"was-kostet-der-assistent","Was kostet der Assistent?",[11,2452,2453,2454,2457],{},"Im Early Access ist der PlanElec-Assistent kostenlos – wie PlanElec insgesamt. Du brauchst ein PlanElec-Konto und ein Projekt im Studio. Die KI-Funktionen nutzen das ",[14,2455,2456],{},"KI-Kontingent"," deines Kontos; den verfügbaren Anteil siehst du im Nutzermenü.",[465,2459,2461],{"id":2460},"wer-kann-den-assistenten-nutzen","Wer kann den Assistenten nutzen?",[11,2463,2464],{},"Jedes angemeldete Konto im Studio – ohne Freischaltung und ohne Sondertarif. Für Projektänderungen brauchst du Bearbeitungsrechte im jeweiligen Projekt.",[465,2466,2468],{"id":2467},"ersetzt-der-assistent-die-automatische-planung","Ersetzt der Assistent die automatische Planung?",[11,2470,2471],{},"Nein, er nutzt sie. Die automatische Planung liefert nachvollziehbare, regelbasierte Vorschläge; der Assistent wählt die passenden Funktionen und Parameter für deinen Auftrag und kombiniert sie mit gezielten Einzeländerungen.",[465,2473,2475],{"id":2474},"kann-ich-einen-grundriss-vom-architekten-oder-aus-trikker-übernehmen","Kann ich einen Grundriss vom Architekten oder aus Trikker übernehmen?",[11,2477,2478,2479,2483,2484,205],{},"Ja, über die KI-Erkennung in den Projektunterlagen. Wie aus einem PDF, Scan oder Trikker-Export ein bearbeitbarer Grundriss wird und wie du einen bestehenden Schaltschrank per Foto erfasst, zeigt der Artikel ",[201,2480,2482],{"href":2481},"\u002Fde\u002Fblog\u002Fgrundriss-erkennen-schaltschrank-foto-ki","Grundriss aus PDF, Scan oder Trikker-Export übernehmen",". Den Funktionsvergleich mit Trikker findest du unter ",[201,2485,2487],{"href":2486},"\u002Fde\u002Fblog\u002Ftrikker-alternative","Trikker-Alternative PlanElec",{"title":526,"searchDepth":527,"depth":527,"links":2489},[2490,2491,2492,2493,2494,2495,2496,2497,2498,2499],{"id":2004,"depth":527,"text":2005},{"id":2017,"depth":527,"text":2018},{"id":2179,"depth":527,"text":2180},{"id":2247,"depth":527,"text":2248},{"id":2344,"depth":527,"text":2345},{"id":2364,"depth":527,"text":2365},{"id":2388,"depth":527,"text":2389},{"id":2402,"depth":527,"text":2403},{"id":2415,"depth":527,"text":2416},{"id":2425,"depth":527,"text":2426,"children":2500},[2501,2502,2503,2504,2505,2506],{"id":2429,"depth":541,"text":2430},{"id":2436,"depth":541,"text":2437},{"id":2449,"depth":541,"text":2450},{"id":2460,"depth":541,"text":2461},{"id":2467,"depth":541,"text":2468},{"id":2474,"depth":541,"text":2475},"Der PlanElec-Assistent setzt deine Aufträge in natürlicher Sprache im ganzen Projekt um – vom Grundriss über Stromkreise bis zum Schaltschrank. Jede Änderung prüft die AREI-Selbstprüfung, und jede nimmst du in einem Schritt zurück.","de",{},"\u002Fblog\u002Fki-assistent-elektroplanung.de",{"title":1993,"description":2507},"KI-Assistent für die Elektroplanung: Was er im Projekt tut","ki-assistent-elektroplanung","blog\u002Fki-assistent-elektroplanung.de",[2516,2517,2518,2519,2520,567,2521,2522],"PlanElec-Assistent","KI","KI-Assistent","Elektroplanung Belgien","Eindrahtschema","Selbstprüfung","Datenschutz","b1kFaP6zv2ZtudhIab7f-ex-b3-JTLDEucbFlEiJKF8",[]]