[{"data":1,"prerenderedAt":1650},["ShallowReactive",2],{"blog-post-en-arei-regulations-2026":3,"blog-alternates-arei-regulations-2026":389},{"id":4,"title":5,"articleId":6,"body":7,"category":358,"date":359,"description":360,"extension":361,"lastUpdated":359,"locale":362,"meta":363,"navigation":364,"path":365,"publishDate":366,"readTime":367,"refreshInterval":368,"seo":369,"slug":6,"stem":370,"tags":371,"__hash__":388},"blog\u002Fblog\u002Farei-regulations-2026.en.md","AREI\u002FRGIE Regulations 2026: The Key Changes","arei-regulations-2026",{"type":8,"value":9,"toc":342},"minimark",[10,15,28,31,35,40,43,72,81,85,92,112,115,119,122,148,152,155,181,185,192,206,214,218,229,240,243,247,299,303,306,332,335],[11,12,14],"h2",{"id":13},"overview-of-the-2026-updates","Overview of the 2026 Updates",[16,17,18,19,23,24,27],"p",{},"The Belgian electrical regulations — known as AREI (",[20,21,22],"em",{},"Algemeen Reglement op de Elektrische Installaties",") in Dutch and RGIE (",[20,25,26],{},"Règlement Général sur les Installations Électriques",") in French — receive regular updates to keep pace with technological advances and safety requirements. The 2026 edition introduces several important changes that affect both new installations and renovations.",[16,29,30],{},"Whether you're a homeowner planning a renovation, an electrician working on projects, or a property developer, understanding these changes is essential for ensuring compliance.",[11,32,34],{"id":33},"key-changes-at-a-glance","Key Changes at a Glance",[36,37,39],"h3",{"id":38},"_1-enhanced-protection-for-ev-charging","1. Enhanced Protection for EV Charging",[16,41,42],{},"With the rapid growth of electric vehicle adoption in Belgium, the 2026 regulations strengthen the requirements for EV charging installations:",[44,45,46,54,60,66],"ul",{},[47,48,49,53],"li",{},[50,51,52],"strong",{},"Dedicated circuit required"," — Each charging point must have its own dedicated circuit with appropriate protection",[47,55,56,59],{},[50,57,58],{},"Load management"," — Installations with multiple charging points must include intelligent load management",[47,61,62,65],{},[50,63,64],{},"Cable sizing"," — Minimum cable cross-sections have been increased for charging circuits",[47,67,68,71],{},[50,69,70],{},"RCD Type B or Type A-EV"," — Charging installations require Type B or Type A-EV residual current devices (with integrated DC fault current sensing ≥ 6 mA)",[73,74,75],"blockquote",{},[16,76,77,80],{},[50,78,79],{},"Impact",": If you're installing an EV charger, budget for a dedicated circuit with appropriate protection. Retrofitting an existing circuit is no longer acceptable.",[36,82,84],{"id":83},"_2-surge-protection-now-mandatory","2. Surge Protection Now Mandatory",[16,86,87,88,91],{},"Surge protection (SPD — Surge Protection Device) has been ",[50,89,90],{},"mandatory"," since the AREI 2020 for all new installations and major renovations. The 2026 regulations reaffirm this and specify the requirements further:",[44,93,94,100,106,109],{},[47,95,96,99],{},[50,97,98],{},"Type 2 SPD"," minimum at the main distribution board",[47,101,102,105],{},[50,103,104],{},"Type 3 SPD"," recommended for sensitive equipment",[47,107,108],{},"Must be coordinated with the upstream protection devices",[47,110,111],{},"Regular testing and replacement after activation required",[16,113,114],{},"This change reflects the increasing sensitivity of modern electronic equipment and the growing risk of voltage surges from the grid.",[36,116,118],{"id":117},"_3-updated-requirements-for-solar-installations","3. Updated Requirements for Solar Installations",[16,120,121],{},"The regulations for photovoltaic (PV) installations have been refined:",[44,123,124,130,136,142],{},[47,125,126,129],{},[50,127,128],{},"DC disconnect switch"," must be accessible and clearly labeled",[47,131,132,135],{},[50,133,134],{},"Arc fault detection"," (AFDD) is now recommended for DC circuits",[47,137,138,141],{},[50,139,140],{},"Battery storage systems"," must comply with specific ventilation and fire protection requirements",[47,143,144,147],{},[50,145,146],{},"Bidirectional energy metering"," documentation must be included in the installation file",[36,149,151],{"id":150},"_4-stricter-rules-for-wet-areas","4. Stricter Rules for Wet Areas",[16,153,154],{},"The classification of wet areas (zones) and their protection requirements have been updated:",[44,156,157,163,169,175],{},[47,158,159,162],{},[50,160,161],{},"Zone 0"," (inside bath\u002Fshower) — Only SELV (Safety Extra Low Voltage) circuits allowed",[47,164,165,168],{},[50,166,167],{},"Zone 1"," (above bath\u002Fshower) — Minimum IPX4 (IPX5 only when jet water\u002Fhigh-pressure cleaning is present)",[47,170,171,174],{},[50,172,173],{},"Zone 2"," (0.6m around bath\u002Fshower) — 30mA RCD protection mandatory, minimum IPX4",[47,176,177,180],{},[50,178,179],{},"Area outside the zones"," — Normal installation rules, splash-proof equipment recommended",[36,182,184],{"id":183},"_5-digital-documentation-accepted","5. Digital Documentation Accepted",[16,186,187,188,191],{},"For the first time, the regulations explicitly accept ",[50,189,190],{},"digital documentation",":",[44,193,194,197,200,203],{},[47,195,196],{},"Single-line diagrams may be submitted in digital PDF format",[47,198,199],{},"Floor plans can be generated from digital tools (like PlanElec)",[47,201,202],{},"Digital signatures are accepted on compliance declarations",[47,204,205],{},"Electronic archiving of inspection reports is permitted",[73,207,208],{},[16,209,210,213],{},[50,211,212],{},"Good news",": This change officially validates the use of tools like PlanElec for creating your electrical documentation.",[11,215,217],{"id":216},"what-this-means-for-existing-installations","What This Means for Existing Installations",[16,219,220,221,224,225,228],{},"The 2026 regulations primarily affect ",[50,222,223],{},"new installations"," and ",[50,226,227],{},"major renovations",". Existing installations that passed inspection under previous regulations remain valid until:",[44,230,231,234,237],{},[47,232,233],{},"The next periodic inspection (every 25 years)",[47,235,236],{},"A major modification to the installation",[47,238,239],{},"The sale of the property",[16,241,242],{},"However, it's recommended to proactively update your installation to meet the new standards, especially regarding surge protection and wet area requirements.",[11,244,246],{"id":245},"timeline-and-implementation","Timeline and Implementation",[248,249,250,263],"table",{},[251,252,253],"thead",{},[254,255,256,260],"tr",{},[257,258,259],"th",{},"Date",[257,261,262],{},"Milestone",[264,265,266,275,283,291],"tbody",{},[254,267,268,272],{},[269,270,271],"td",{},"January 2026",[269,273,274],{},"New regulations published",[254,276,277,280],{},[269,278,279],{},"March 2026",[269,281,282],{},"Transition period begins",[254,284,285,288],{},[269,286,287],{},"June 2026",[269,289,290],{},"Full enforcement for new installations",[254,292,293,296],{},[269,294,295],{},"December 2026",[269,297,298],{},"Full enforcement for major renovations",[11,300,302],{"id":301},"how-planelec-stays-current","How PlanElec Stays Current",[16,304,305],{},"PlanElec is continuously updated to reflect the latest AREI\u002FRGIE regulations:",[44,307,308,314,320,326],{},[47,309,310,313],{},[50,311,312],{},"Symbol library"," updated with new component symbols",[47,315,316,319],{},[50,317,318],{},"Validation rules"," check compliance with 2026 requirements",[47,321,322,325],{},[50,323,324],{},"Templates"," include new mandatory elements (SPD, EV circuits)",[47,327,328,331],{},[50,329,330],{},"Export format"," generates documentation that meets the new digital acceptance standards",[16,333,334],{},"Stay compliant without having to study the full regulation text. PlanElec ensures your documentation meets the latest standards automatically.",[16,336,337],{},[338,339,341],"a",{"href":340},"\u002F","Update your electrical documentation with PlanElec →",{"title":343,"searchDepth":344,"depth":344,"links":345},"",2,[346,347,355,356,357],{"id":13,"depth":344,"text":14},{"id":33,"depth":344,"text":34,"children":348},[349,351,352,353,354],{"id":38,"depth":350,"text":39},3,{"id":83,"depth":350,"text":84},{"id":117,"depth":350,"text":118},{"id":150,"depth":350,"text":151},{"id":183,"depth":350,"text":184},{"id":216,"depth":344,"text":217},{"id":245,"depth":344,"text":246},{"id":301,"depth":344,"text":302},"news","2026-01-02","The latest updates to the Belgian electrical regulations and what they mean for your installation.","md","en",{},true,"\u002Fblog\u002Farei-regulations-2026.en",null,"6 min",6,{"title":5,"description":360},"blog\u002Farei-regulations-2026.en",[372,373,374,375,376,377,378,379,380,381,382,383,384,385,386,387],"AREI","RGIE","regulations 2026","electrical regulations","inspection","keuring","single-line diagram","eendraadschema","Eindrahtschema","schéma unifilaire","situation plan","surge protection","EV charging","solar panels","bathroom zones","Belgium","1N5r4QSyqGaTxVnrPScx_lqRefOJnnEkd9ppDyvj5i0",[390,740,971,1313],{"id":391,"title":392,"articleId":6,"body":393,"category":358,"date":359,"description":720,"extension":361,"lastUpdated":359,"locale":721,"meta":722,"navigation":364,"path":723,"publishDate":366,"readTime":367,"refreshInterval":368,"seo":724,"slug":725,"stem":726,"tags":727,"__hash__":739},"blog\u002Fblog\u002Farei-regulations-2026.de.md","AREI-Vorschriften 2026: Die wichtigsten Änderungen",{"type":8,"value":394,"toc":707},[395,399,408,411,415,419,422,448,456,460,467,488,491,495,498,524,528,531,554,558,565,579,587,591,602,613,616,620,666,670,673,699,702],[11,396,398],{"id":397},"überblick-über-die-änderungen-2026","Überblick über die Änderungen 2026",[16,400,401,402,404,405,407],{},"Die belgischen Elektrovorschriften — auf Niederländisch als AREI (",[20,403,22],{},") und auf Französisch als RGIE (",[20,406,26],{},") bekannt — werden regelmäßig aktualisiert, um mit dem technischen Fortschritt und den Sicherheitsanforderungen Schritt zu halten. Die Ausgabe 2026 führt mehrere wichtige Änderungen ein, die sowohl Neuinstallationen als auch Renovierungen betreffen.",[16,409,410],{},"Ob Sie als Hausbesitzer eine Renovierung planen, als Elektriker an Projekten arbeiten oder als Bauträger tätig sind — das Verständnis dieser Änderungen ist für die Einhaltung der Vorschriften unerlässlich.",[11,412,414],{"id":413},"die-wichtigsten-änderungen-im-überblick","Die wichtigsten Änderungen im Überblick",[36,416,418],{"id":417},"_1-verstärkter-schutz-für-e-auto-ladestationen","1. Verstärkter Schutz für E-Auto-Ladestationen",[16,420,421],{},"Mit der raschen Zunahme von Elektrofahrzeugen in Belgien verschärfen die Vorschriften 2026 die Anforderungen an Ladeinstallationen:",[44,423,424,430,436,442],{},[47,425,426,429],{},[50,427,428],{},"Eigener Stromkreis erforderlich"," — Jeder Ladepunkt muss einen eigenen Stromkreis mit entsprechendem Schutz haben",[47,431,432,435],{},[50,433,434],{},"Lastmanagement"," — Installationen mit mehreren Ladepunkten müssen ein intelligentes Lastmanagement enthalten",[47,437,438,441],{},[50,439,440],{},"Kabeldimensionierung"," — Mindestquerschnitte für Ladestromkreise wurden erhöht",[47,443,444,447],{},[50,445,446],{},"FI-Schutz Typ B oder Typ A-EV"," — Ladeinstallationen erfordern FI-Schutzschalter vom Typ B oder Typ A-EV (mit integrierter DC-Fehlerstromsensorik ≥ 6 mA)",[73,449,450],{},[16,451,452,455],{},[50,453,454],{},"Auswirkung",": Wenn Sie eine E-Auto-Ladestation installieren, planen Sie einen eigenen Stromkreis mit entsprechendem Schutz ein. Die Nachrüstung eines bestehenden Stromkreises ist nicht mehr zulässig.",[36,457,459],{"id":458},"_2-überspannungsschutz-jetzt-pflicht","2. Überspannungsschutz jetzt Pflicht",[16,461,462,463,466],{},"Ein Überspannungsschutz (SPD — Surge Protection Device) ist bereits seit dem AREI 2020 für alle Neuinstallationen und größeren Renovierungen ",[50,464,465],{},"Pflicht",". Die Vorschriften 2026 bekräftigen dies und konkretisieren die Anforderungen:",[44,468,469,476,482,485],{},[47,470,471,472,475],{},"Mindestens ",[50,473,474],{},"Typ 2 SPD"," am Hauptverteiler",[47,477,478,481],{},[50,479,480],{},"Typ 3 SPD"," empfohlen für empfindliche Geräte",[47,483,484],{},"Muss mit den vorgelagerten Schutzeinrichtungen koordiniert sein",[47,486,487],{},"Regelmäßige Prüfung und Austausch nach Auslösung erforderlich",[16,489,490],{},"Diese Änderung spiegelt die zunehmende Empfindlichkeit moderner elektronischer Geräte und das wachsende Risiko von Spannungsspitzen aus dem Netz wider.",[36,492,494],{"id":493},"_3-aktualisierte-anforderungen-für-solaranlagen","3. Aktualisierte Anforderungen für Solaranlagen",[16,496,497],{},"Die Vorschriften für Photovoltaik-Anlagen (PV) wurden präzisiert:",[44,499,500,506,512,518],{},[47,501,502,505],{},[50,503,504],{},"DC-Trennschalter"," muss zugänglich und deutlich gekennzeichnet sein",[47,507,508,511],{},[50,509,510],{},"Lichtbogenerkennung"," (AFDD) wird jetzt für DC-Stromkreise empfohlen",[47,513,514,517],{},[50,515,516],{},"Batteriespeichersysteme"," müssen spezifische Belüftungs- und Brandschutzanforderungen erfüllen",[47,519,520,523],{},[50,521,522],{},"Dokumentation der bidirektionalen Energiemessung"," muss in der Installationsakte enthalten sein",[36,525,527],{"id":526},"_4-strengere-regeln-für-feuchträume","4. Strengere Regeln für Feuchträume",[16,529,530],{},"Die Klassifizierung von Feuchträumen (Zonen) und deren Schutzanforderungen wurden aktualisiert:",[44,532,533,538,543,548],{},[47,534,535,537],{},[50,536,161],{}," (innerhalb der Badewanne\u002FDusche) — Nur SELV-Stromkreise (Sicherheitskleinspannung) erlaubt",[47,539,540,542],{},[50,541,167],{}," (über der Badewanne\u002FDusche) — Mindestens IPX4 in Zone 1 (IPX5 nur bei Strahlwasser\u002FHochdruckreinigung)",[47,544,545,547],{},[50,546,173],{}," (0,6m um Badewanne\u002FDusche) — 30mA FI-Schutz Pflicht, mindestens IPX4",[47,549,550,553],{},[50,551,552],{},"Bereich außerhalb der Zonen"," — Normale Installationsregeln, spritzwassergeschützte Geräte empfohlen",[36,555,557],{"id":556},"_5-digitale-dokumentation-akzeptiert","5. Digitale Dokumentation akzeptiert",[16,559,560,561,564],{},"Erstmals erkennen die Vorschriften ausdrücklich ",[50,562,563],{},"digitale Dokumentation"," an:",[44,566,567,570,573,576],{},[47,568,569],{},"Eindrahtschemas dürfen im digitalen PDF-Format eingereicht werden",[47,571,572],{},"Situationspläne können mit digitalen Werkzeugen (wie PlanElec) erstellt werden",[47,574,575],{},"Digitale Unterschriften werden auf Konformitätserklärungen akzeptiert",[47,577,578],{},"Elektronische Archivierung von Prüfberichten ist zulässig",[73,580,581],{},[16,582,583,586],{},[50,584,585],{},"Gute Nachricht",": Diese Änderung bestätigt offiziell die Verwendung von Tools wie PlanElec zur Erstellung Ihrer elektrischen Dokumentation.",[11,588,590],{"id":589},"was-das-für-bestehende-installationen-bedeutet","Was das für bestehende Installationen bedeutet",[16,592,593,594,597,598,601],{},"Die Vorschriften 2026 betreffen in erster Linie ",[50,595,596],{},"Neuinstallationen"," und ",[50,599,600],{},"größere Renovierungen",". Bestehende Installationen, die unter früheren Vorschriften geprüft wurden, bleiben gültig bis:",[44,603,604,607,610],{},[47,605,606],{},"Zur nächsten periodischen Prüfung (alle 25 Jahre)",[47,608,609],{},"Bei einer wesentlichen Änderung der Installation",[47,611,612],{},"Beim Verkauf der Immobilie",[16,614,615],{},"Es wird jedoch empfohlen, Ihre Installation proaktiv auf die neuen Standards zu aktualisieren, insbesondere hinsichtlich Überspannungsschutz und Feuchtraum-Anforderungen.",[11,617,619],{"id":618},"zeitplan-und-umsetzung","Zeitplan und Umsetzung",[248,621,622,632],{},[251,623,624],{},[254,625,626,629],{},[257,627,628],{},"Datum",[257,630,631],{},"Meilenstein",[264,633,634,642,650,658],{},[254,635,636,639],{},[269,637,638],{},"Januar 2026",[269,640,641],{},"Neue Vorschriften veröffentlicht",[254,643,644,647],{},[269,645,646],{},"März 2026",[269,648,649],{},"Übergangsfrist beginnt",[254,651,652,655],{},[269,653,654],{},"Juni 2026",[269,656,657],{},"Vollständige Durchsetzung für Neuinstallationen",[254,659,660,663],{},[269,661,662],{},"Dezember 2026",[269,664,665],{},"Vollständige Durchsetzung für größere Renovierungen",[11,667,669],{"id":668},"wie-planelec-aktuell-bleibt","Wie PlanElec aktuell bleibt",[16,671,672],{},"PlanElec wird kontinuierlich aktualisiert, um die neuesten AREI\u002FRGIE-Vorschriften widerzuspiegeln:",[44,674,675,681,687,693],{},[47,676,677,680],{},[50,678,679],{},"Symbolbibliothek"," aktualisiert mit neuen Komponentensymbolen",[47,682,683,686],{},[50,684,685],{},"Validierungsregeln"," prüfen die Konformität mit den Anforderungen 2026",[47,688,689,692],{},[50,690,691],{},"Vorlagen"," enthalten neue Pflichtelemente (SPD, E-Auto-Stromkreise)",[47,694,695,698],{},[50,696,697],{},"Exportformat"," generiert Dokumentation, die den neuen digitalen Akzeptanzstandards entspricht",[16,700,701],{},"Bleiben Sie konform, ohne den vollständigen Vorschriftentext studieren zu müssen. PlanElec stellt automatisch sicher, dass Ihre Dokumentation den neuesten Standards entspricht.",[16,703,704],{},[338,705,706],{"href":340},"Aktualisieren Sie Ihre elektrische Dokumentation mit PlanElec →",{"title":343,"searchDepth":344,"depth":344,"links":708},[709,710,717,718,719],{"id":397,"depth":344,"text":398},{"id":413,"depth":344,"text":414,"children":711},[712,713,714,715,716],{"id":417,"depth":350,"text":418},{"id":458,"depth":350,"text":459},{"id":493,"depth":350,"text":494},{"id":526,"depth":350,"text":527},{"id":556,"depth":350,"text":557},{"id":589,"depth":344,"text":590},{"id":618,"depth":344,"text":619},{"id":668,"depth":344,"text":669},"Die neuesten Updates der belgischen Elektrovorschriften und was sie für Ihre Installation bedeuten.","de",{},"\u002Fblog\u002Farei-regulations-2026.de",{"title":392,"description":720},"arei-vorschriften-2026","blog\u002Farei-regulations-2026.de",[372,373,728,729,730,731,380,732,733,734,735,736,737,738],"Vorschriften 2026","Elektrovorschriften","Stromabnahme","Keuring","Eendraadschema","Situationsplan","Überspannungsschutz","Wallbox","Solaranlage","Badezimmerzonen","Belgien","ehbQe1W8O9_XFaSsNDZFf6Aabp5qcIa4JEDLbTj1oZA",{"id":4,"title":5,"articleId":6,"body":741,"category":358,"date":359,"description":360,"extension":361,"lastUpdated":359,"locale":362,"meta":968,"navigation":364,"path":365,"publishDate":366,"readTime":367,"refreshInterval":368,"seo":969,"slug":6,"stem":370,"tags":970,"__hash__":388},{"type":8,"value":742,"toc":955},[743,745,751,753,755,757,759,777,783,785,789,803,805,807,809,827,829,831,849,851,855,865,871,873,879,887,889,891,927,929,931,949,951],[11,744,14],{"id":13},[16,746,18,747,23,749,27],{},[20,748,22],{},[20,750,26],{},[16,752,30],{},[11,754,34],{"id":33},[36,756,39],{"id":38},[16,758,42],{},[44,760,761,765,769,773],{},[47,762,763,53],{},[50,764,52],{},[47,766,767,59],{},[50,768,58],{},[47,770,771,65],{},[50,772,64],{},[47,774,775,71],{},[50,776,70],{},[73,778,779],{},[16,780,781,80],{},[50,782,79],{},[36,784,84],{"id":83},[16,786,87,787,91],{},[50,788,90],{},[44,790,791,795,799,801],{},[47,792,793,99],{},[50,794,98],{},[47,796,797,105],{},[50,798,104],{},[47,800,108],{},[47,802,111],{},[16,804,114],{},[36,806,118],{"id":117},[16,808,121],{},[44,810,811,815,819,823],{},[47,812,813,129],{},[50,814,128],{},[47,816,817,135],{},[50,818,134],{},[47,820,821,141],{},[50,822,140],{},[47,824,825,147],{},[50,826,146],{},[36,828,151],{"id":150},[16,830,154],{},[44,832,833,837,841,845],{},[47,834,835,162],{},[50,836,161],{},[47,838,839,168],{},[50,840,167],{},[47,842,843,174],{},[50,844,173],{},[47,846,847,180],{},[50,848,179],{},[36,850,184],{"id":183},[16,852,187,853,191],{},[50,854,190],{},[44,856,857,859,861,863],{},[47,858,196],{},[47,860,199],{},[47,862,202],{},[47,864,205],{},[73,866,867],{},[16,868,869,213],{},[50,870,212],{},[11,872,217],{"id":216},[16,874,220,875,224,877,228],{},[50,876,223],{},[50,878,227],{},[44,880,881,883,885],{},[47,882,233],{},[47,884,236],{},[47,886,239],{},[16,888,242],{},[11,890,246],{"id":245},[248,892,893,901],{},[251,894,895],{},[254,896,897,899],{},[257,898,259],{},[257,900,262],{},[264,902,903,909,915,921],{},[254,904,905,907],{},[269,906,271],{},[269,908,274],{},[254,910,911,913],{},[269,912,279],{},[269,914,282],{},[254,916,917,919],{},[269,918,287],{},[269,920,290],{},[254,922,923,925],{},[269,924,295],{},[269,926,298],{},[11,928,302],{"id":301},[16,930,305],{},[44,932,933,937,941,945],{},[47,934,935,313],{},[50,936,312],{},[47,938,939,319],{},[50,940,318],{},[47,942,943,325],{},[50,944,324],{},[47,946,947,331],{},[50,948,330],{},[16,950,334],{},[16,952,953],{},[338,954,341],{"href":340},{"title":343,"searchDepth":344,"depth":344,"links":956},[957,958,965,966,967],{"id":13,"depth":344,"text":14},{"id":33,"depth":344,"text":34,"children":959},[960,961,962,963,964],{"id":38,"depth":350,"text":39},{"id":83,"depth":350,"text":84},{"id":117,"depth":350,"text":118},{"id":150,"depth":350,"text":151},{"id":183,"depth":350,"text":184},{"id":216,"depth":344,"text":217},{"id":245,"depth":344,"text":246},{"id":301,"depth":344,"text":302},{},{"title":5,"description":360},[372,373,374,375,376,377,378,379,380,381,382,383,384,385,386,387],{"id":972,"title":973,"articleId":6,"body":974,"category":358,"date":359,"description":1295,"extension":361,"lastUpdated":359,"locale":1296,"meta":1297,"navigation":364,"path":1298,"publishDate":366,"readTime":367,"refreshInterval":368,"seo":1299,"slug":1300,"stem":1301,"tags":1302,"__hash__":1312},"blog\u002Fblog\u002Farei-regulations-2026.fr.md","Réglementation RGIE 2026 : Les Changements Clés",{"type":8,"value":975,"toc":1282},[976,980,986,989,993,997,1000,1026,1033,1037,1044,1064,1067,1071,1074,1100,1104,1107,1130,1134,1141,1155,1163,1167,1178,1189,1192,1196,1241,1245,1248,1274,1277],[11,977,979],{"id":978},"aperçu-des-modifications-2026","Aperçu des modifications 2026",[16,981,982,983,985],{},"Les réglementations électriques belges — connues sous le nom de RGIE (",[20,984,26],{},"), ou AREI en néerlandais — sont régulièrement mises à jour pour suivre les avancées technologiques et les exigences de sécurité. L'édition 2026 introduit plusieurs changements importants qui affectent aussi bien les nouvelles installations que les rénovations.",[16,987,988],{},"Que vous soyez propriétaire planifiant une rénovation, électricien travaillant sur des projets, ou promoteur immobilier, comprendre ces changements est essentiel pour assurer la conformité.",[11,990,992],{"id":991},"les-changements-clés-en-bref","Les changements clés en bref",[36,994,996],{"id":995},"_1-protection-renforcée-pour-les-bornes-de-recharge-ve","1. Protection renforcée pour les bornes de recharge VE",[16,998,999],{},"Avec la croissance rapide des véhicules électriques en Belgique, la réglementation 2026 renforce les exigences pour les installations de recharge :",[44,1001,1002,1008,1014,1020],{},[47,1003,1004,1007],{},[50,1005,1006],{},"Circuit dédié obligatoire"," — Chaque point de charge doit avoir son propre circuit avec une protection appropriée",[47,1009,1010,1013],{},[50,1011,1012],{},"Gestion de charge"," — Les installations avec plusieurs points de charge doivent inclure une gestion intelligente de la charge",[47,1015,1016,1019],{},[50,1017,1018],{},"Dimensionnement des câbles"," — Les sections minimales des câbles pour les circuits de recharge ont été augmentées",[47,1021,1022,1025],{},[50,1023,1024],{},"Différentiel Type B"," — Les installations de recharge nécessitent désormais des différentiels de Type B (ou Type A avec détection DC)",[73,1027,1028],{},[16,1029,1030,1032],{},[50,1031,79],{}," : Si vous installez une borne de recharge VE, prévoyez un circuit dédié avec une protection appropriée. La mise à niveau d'un circuit existant n'est plus acceptable.",[36,1034,1036],{"id":1035},"_2-protection-contre-les-surtensions-désormais-obligatoire","2. Protection contre les surtensions désormais obligatoire",[16,1038,1039,1040,1043],{},"Bien que précédemment recommandée, la protection contre les surtensions (SPD — Surge Protection Device) est maintenant ",[50,1041,1042],{},"obligatoire"," pour toutes les nouvelles installations et rénovations majeures :",[44,1045,1046,1052,1058,1061],{},[47,1047,1048,1051],{},[50,1049,1050],{},"SPD Type 2"," minimum au tableau de distribution principal",[47,1053,1054,1057],{},[50,1055,1056],{},"SPD Type 3"," recommandé pour les équipements sensibles",[47,1059,1060],{},"Doit être coordonné avec les dispositifs de protection en amont",[47,1062,1063],{},"Contrôle régulier et remplacement après activation requis",[16,1065,1066],{},"Ce changement reflète la sensibilité croissante des équipements électroniques modernes et le risque grandissant de surtensions provenant du réseau.",[36,1068,1070],{"id":1069},"_3-exigences-mises-à-jour-pour-les-installations-solaires","3. Exigences mises à jour pour les installations solaires",[16,1072,1073],{},"Les réglementations pour les installations photovoltaïques (PV) ont été affinées :",[44,1075,1076,1082,1088,1094],{},[47,1077,1078,1081],{},[50,1079,1080],{},"Interrupteur-sectionneur DC"," doit être accessible et clairement étiqueté",[47,1083,1084,1087],{},[50,1085,1086],{},"Détection d'arc"," (AFDD) est désormais recommandée pour les circuits DC",[47,1089,1090,1093],{},[50,1091,1092],{},"Systèmes de stockage par batteries"," doivent respecter des exigences spécifiques de ventilation et de protection incendie",[47,1095,1096,1099],{},[50,1097,1098],{},"Documentation du comptage bidirectionnel"," doit être incluse dans le dossier d'installation",[36,1101,1103],{"id":1102},"_4-règles-plus-strictes-pour-les-pièces-humides","4. Règles plus strictes pour les pièces humides",[16,1105,1106],{},"La classification des pièces humides (zones) et leurs exigences de protection ont été mises à jour :",[44,1108,1109,1114,1119,1124],{},[47,1110,1111,1113],{},[50,1112,161],{}," (dans la baignoire\u002Fdouche) — Seuls les circuits TBTS (Très Basse Tension de Sécurité) autorisés",[47,1115,1116,1118],{},[50,1117,167],{}," (au-dessus de la baignoire\u002Fdouche) — Minimum IPX4 en zone 1 (IPX5 uniquement en cas de jets d'eau\u002Fnettoyage haute pression)",[47,1120,1121,1123],{},[50,1122,173],{}," (0,6m autour de la baignoire\u002Fdouche) — Protection différentielle 30mA obligatoire, IP X4 minimum",[47,1125,1126,1129],{},[50,1127,1128],{},"Zone en dehors des zones"," — Règles d'installation normales, équipement résistant aux éclaboussures recommandé",[36,1131,1133],{"id":1132},"_5-documentation-numérique-acceptée","5. Documentation numérique acceptée",[16,1135,1136,1137,1140],{},"Pour la première fois, la réglementation accepte explicitement la ",[50,1138,1139],{},"documentation numérique"," :",[44,1142,1143,1146,1149,1152],{},[47,1144,1145],{},"Les schémas unifilaires peuvent être soumis au format PDF numérique",[47,1147,1148],{},"Les plans de situation peuvent être générés avec des outils numériques (comme PlanElec)",[47,1150,1151],{},"Les signatures numériques sont acceptées sur les déclarations de conformité",[47,1153,1154],{},"L'archivage électronique des rapports de contrôle est autorisé",[73,1156,1157],{},[16,1158,1159,1162],{},[50,1160,1161],{},"Bonne nouvelle"," : Ce changement valide officiellement l'utilisation d'outils comme PlanElec pour la création de votre documentation électrique.",[11,1164,1166],{"id":1165},"ce-que-cela-signifie-pour-les-installations-existantes","Ce que cela signifie pour les installations existantes",[16,1168,1169,1170,1173,1174,1177],{},"La réglementation 2026 s'applique principalement aux ",[50,1171,1172],{},"nouvelles installations"," et aux ",[50,1175,1176],{},"rénovations majeures",". Les installations existantes ayant réussi le contrôle sous les réglementations précédentes restent valides jusqu'à :",[44,1179,1180,1183,1186],{},[47,1181,1182],{},"Le prochain contrôle périodique (tous les 25 ans)",[47,1184,1185],{},"Une modification majeure de l'installation",[47,1187,1188],{},"La vente du bien immobilier",[16,1190,1191],{},"Cependant, il est recommandé de mettre à jour proactivement votre installation pour répondre aux nouvelles normes, en particulier concernant la protection contre les surtensions et les exigences des pièces humides.",[11,1193,1195],{"id":1194},"calendrier-et-mise-en-œuvre","Calendrier et mise en œuvre",[248,1197,1198,1207],{},[251,1199,1200],{},[254,1201,1202,1204],{},[257,1203,259],{},[257,1205,1206],{},"Jalon",[264,1208,1209,1217,1225,1233],{},[254,1210,1211,1214],{},[269,1212,1213],{},"Janvier 2026",[269,1215,1216],{},"Nouvelles réglementations publiées",[254,1218,1219,1222],{},[269,1220,1221],{},"Mars 2026",[269,1223,1224],{},"Période de transition commence",[254,1226,1227,1230],{},[269,1228,1229],{},"Juin 2026",[269,1231,1232],{},"Application complète pour les nouvelles installations",[254,1234,1235,1238],{},[269,1236,1237],{},"Décembre 2026",[269,1239,1240],{},"Application complète pour les rénovations majeures",[11,1242,1244],{"id":1243},"comment-planelec-reste-à-jour","Comment PlanElec reste à jour",[16,1246,1247],{},"PlanElec est continuellement mis à jour pour refléter les dernières réglementations RGIE :",[44,1249,1250,1256,1262,1268],{},[47,1251,1252,1255],{},[50,1253,1254],{},"Bibliothèque de symboles"," mise à jour avec les nouveaux symboles de composants",[47,1257,1258,1261],{},[50,1259,1260],{},"Règles de validation"," vérifient la conformité avec les exigences 2026",[47,1263,1264,1267],{},[50,1265,1266],{},"Modèles"," incluent les nouveaux éléments obligatoires (SPD, circuits VE)",[47,1269,1270,1273],{},[50,1271,1272],{},"Format d'exportation"," génère une documentation conforme aux nouvelles normes d'acceptation numérique",[16,1275,1276],{},"Restez conforme sans avoir à étudier le texte réglementaire complet. PlanElec garantit automatiquement que votre documentation répond aux dernières normes.",[16,1278,1279],{},[338,1280,1281],{"href":340},"Mettez à jour votre documentation électrique avec PlanElec →",{"title":343,"searchDepth":344,"depth":344,"links":1283},[1284,1285,1292,1293,1294],{"id":978,"depth":344,"text":979},{"id":991,"depth":344,"text":992,"children":1286},[1287,1288,1289,1290,1291],{"id":995,"depth":350,"text":996},{"id":1035,"depth":350,"text":1036},{"id":1069,"depth":350,"text":1070},{"id":1102,"depth":350,"text":1103},{"id":1132,"depth":350,"text":1133},{"id":1165,"depth":344,"text":1166},{"id":1194,"depth":344,"text":1195},{"id":1243,"depth":344,"text":1244},"Les dernières mises à jour des réglementations électriques belges et ce qu'elles signifient pour votre installation.","fr",{},"\u002Fblog\u002Farei-regulations-2026.fr",{"title":973,"description":1295},"reglementations-rgie-2026","blog\u002Farei-regulations-2026.fr",[372,373,1303,1304,1305,381,379,1306,733,1307,1308,1309,1310,1311],"réglementation 2026","réglementations électriques","contrôle électrique","plan de situation","surtension","borne de recharge","panneaux solaires","salle de bain","Belgique","tbzX8CFyZHBWwLuaYTYlHo6bDFaUnabDLitR6Y5Sjmc",{"id":1314,"title":1315,"articleId":6,"body":1316,"category":358,"date":359,"description":1633,"extension":361,"lastUpdated":359,"locale":1634,"meta":1635,"navigation":364,"path":1636,"publishDate":366,"readTime":367,"refreshInterval":368,"seo":1637,"slug":1638,"stem":1639,"tags":1640,"__hash__":1649},"blog\u002Fblog\u002Farei-regulations-2026.nl.md","AREI-regelgeving 2026: De Belangrijkste Wijzigingen",{"type":8,"value":1317,"toc":1620},[1318,1322,1328,1331,1335,1339,1342,1368,1375,1379,1386,1405,1408,1412,1415,1441,1445,1448,1471,1475,1481,1495,1503,1507,1518,1529,1532,1536,1579,1583,1586,1612,1615],[11,1319,1321],{"id":1320},"overzicht-van-de-wijzigingen-2026","Overzicht van de wijzigingen 2026",[16,1323,1324,1325,1327],{},"De Belgische elektrische voorschriften — bekend als het AREI (",[20,1326,22],{},"), of RGIE in het Frans — worden regelmatig bijgewerkt om gelijke tred te houden met technologische vooruitgang en veiligheidseisen. De editie 2026 introduceert verschillende belangrijke wijzigingen die zowel nieuwe installaties als renovaties beïnvloeden.",[16,1329,1330],{},"Of u nu een huiseigenaar bent die een renovatie plant, een elektricien die aan projecten werkt, of een projectontwikkelaar — het begrijpen van deze wijzigingen is essentieel om aan de voorschriften te voldoen.",[11,1332,1334],{"id":1333},"de-belangrijkste-wijzigingen-in-het-kort","De belangrijkste wijzigingen in het kort",[36,1336,1338],{"id":1337},"_1-verbeterde-bescherming-voor-ev-laders","1. Verbeterde bescherming voor EV-laders",[16,1340,1341],{},"Met de snelle groei van elektrische voertuigen in België verscherpen de voorschriften 2026 de eisen voor laadinstallaties:",[44,1343,1344,1350,1356,1362],{},[47,1345,1346,1349],{},[50,1347,1348],{},"Eigen kring vereist"," — Elk laadpunt moet een eigen kring hebben met passende beveiliging",[47,1351,1352,1355],{},[50,1353,1354],{},"Lastbeheer"," — Installaties met meerdere laadpunten moeten intelligent lastbeheer bevatten",[47,1357,1358,1361],{},[50,1359,1360],{},"Kabeldimensionering"," — Minimale kabeldoorsneden voor laadkringen zijn verhoogd",[47,1363,1364,1367],{},[50,1365,1366],{},"Differentieelschakelaar Type B"," — Laadinstallaties vereisen nu Type B differentieelschakelaars (of Type A met DC-detectie)",[73,1369,1370],{},[16,1371,1372,1374],{},[50,1373,79],{},": Als u een EV-lader installeert, reken dan op een eigen kring met passende beveiliging. Het achteraf bijwerken van een bestaande kring is niet meer aanvaardbaar.",[36,1376,1378],{"id":1377},"_2-overspanningsbeveiliging-nu-verplicht","2. Overspanningsbeveiliging nu verplicht",[16,1380,1381,1382,1385],{},"Terwijl het voorheen slechts aanbevolen was, is overspanningsbeveiliging (SPD — Surge Protection Device) nu ",[50,1383,1384],{},"verplicht"," voor alle nieuwe installaties en grote renovaties:",[44,1387,1388,1394,1399,1402],{},[47,1389,1390,1391,1393],{},"Minimum ",[50,1392,98],{}," bij het hoofdverdeelbord",[47,1395,1396,1398],{},[50,1397,104],{}," aanbevolen voor gevoelige apparatuur",[47,1400,1401],{},"Moet gecoördineerd zijn met de bovenstroomse beveiligingsapparaten",[47,1403,1404],{},"Regelmatige controle en vervanging na activering vereist",[16,1406,1407],{},"Deze wijziging weerspiegelt de toenemende gevoeligheid van moderne elektronische apparatuur en het groeiende risico van spanningspieken uit het net.",[36,1409,1411],{"id":1410},"_3-bijgewerkte-eisen-voor-zonne-installaties","3. Bijgewerkte eisen voor zonne-installaties",[16,1413,1414],{},"De voorschriften voor fotovoltaïsche (PV) installaties zijn verfijnd:",[44,1416,1417,1423,1429,1435],{},[47,1418,1419,1422],{},[50,1420,1421],{},"DC-scheidingsschakelaar"," moet bereikbaar en duidelijk gelabeld zijn",[47,1424,1425,1428],{},[50,1426,1427],{},"Vlamboogdetectie"," (AFDD) wordt nu aanbevolen voor DC-kringen",[47,1430,1431,1434],{},[50,1432,1433],{},"Batterijopslagsystemen"," moeten voldoen aan specifieke ventilatie- en brandveiligheidseisen",[47,1436,1437,1440],{},[50,1438,1439],{},"Documentatie van bidirectionele energiemeting"," moet worden opgenomen in het installatiedossier",[36,1442,1444],{"id":1443},"_4-strengere-regels-voor-natte-ruimtes","4. Strengere regels voor natte ruimtes",[16,1446,1447],{},"De classificatie van natte ruimtes (zones) en hun beveiligingseisen zijn bijgewerkt:",[44,1449,1450,1455,1460,1465],{},[47,1451,1452,1454],{},[50,1453,161],{}," (in het bad\u002Fde douche) — Alleen SELV-kringen (Safety Extra Low Voltage) toegestaan",[47,1456,1457,1459],{},[50,1458,167],{}," (boven het bad\u002Fde douche) — Minimum IP X5 voor alle apparatuur",[47,1461,1462,1464],{},[50,1463,173],{}," (0,6m rond bad\u002Fdouche) — 30mA differentieelbescherming verplicht, minimum IP X4",[47,1466,1467,1470],{},[50,1468,1469],{},"Nieuwe Zone 3"," — Uitgebreid tot 2,4m rond het natte gebied, spatwaterdichte apparatuur vereist",[36,1472,1474],{"id":1473},"_5-digitale-documentatie-aanvaard","5. Digitale documentatie aanvaard",[16,1476,1477,1478,191],{},"Voor het eerst aanvaarden de voorschriften uitdrukkelijk ",[50,1479,1480],{},"digitale documentatie",[44,1482,1483,1486,1489,1492],{},[47,1484,1485],{},"Eendraadschema's mogen in digitaal PDF-formaat worden ingediend",[47,1487,1488],{},"Situatieplannen kunnen worden gegenereerd met digitale tools (zoals PlanElec)",[47,1490,1491],{},"Digitale handtekeningen worden aanvaard op conformiteitsverklaringen",[47,1493,1494],{},"Elektronische archivering van keuringsverslagen is toegestaan",[73,1496,1497],{},[16,1498,1499,1502],{},[50,1500,1501],{},"Goed nieuws",": Deze wijziging valideert officieel het gebruik van tools zoals PlanElec voor het aanmaken van uw elektrische documentatie.",[11,1504,1506],{"id":1505},"wat-dit-betekent-voor-bestaande-installaties","Wat dit betekent voor bestaande installaties",[16,1508,1509,1510,1513,1514,1517],{},"De voorschriften 2026 zijn voornamelijk van toepassing op ",[50,1511,1512],{},"nieuwe installaties"," en ",[50,1515,1516],{},"grote renovaties",". Bestaande installaties die onder eerdere voorschriften zijn goedgekeurd, blijven geldig tot:",[44,1519,1520,1523,1526],{},[47,1521,1522],{},"De volgende periodieke keuring (elke 25 jaar)",[47,1524,1525],{},"Een belangrijke wijziging aan de installatie",[47,1527,1528],{},"De verkoop van het onroerend goed",[16,1530,1531],{},"Het wordt echter aanbevolen om uw installatie proactief bij te werken naar de nieuwe normen, vooral wat betreft overspanningsbeveiliging en eisen voor natte ruimtes.",[11,1533,1535],{"id":1534},"tijdlijn-en-implementatie","Tijdlijn en implementatie",[248,1537,1538,1547],{},[251,1539,1540],{},[254,1541,1542,1544],{},[257,1543,628],{},[257,1545,1546],{},"Mijlpaal",[264,1548,1549,1557,1565,1572],{},[254,1550,1551,1554],{},[269,1552,1553],{},"Januari 2026",[269,1555,1556],{},"Nieuwe voorschriften gepubliceerd",[254,1558,1559,1562],{},[269,1560,1561],{},"Maart 2026",[269,1563,1564],{},"Overgangsperiode begint",[254,1566,1567,1569],{},[269,1568,654],{},[269,1570,1571],{},"Volledige handhaving voor nieuwe installaties",[254,1573,1574,1576],{},[269,1575,295],{},[269,1577,1578],{},"Volledige handhaving voor grote renovaties",[11,1580,1582],{"id":1581},"hoe-planelec-actueel-blijft","Hoe PlanElec actueel blijft",[16,1584,1585],{},"PlanElec wordt voortdurend bijgewerkt om de nieuwste AREI-voorschriften weer te geven:",[44,1587,1588,1594,1600,1606],{},[47,1589,1590,1593],{},[50,1591,1592],{},"Symbolenbibliotheek"," bijgewerkt met nieuwe componentsymbolen",[47,1595,1596,1599],{},[50,1597,1598],{},"Validatieregels"," controleren conformiteit met de eisen van 2026",[47,1601,1602,1605],{},[50,1603,1604],{},"Sjablonen"," bevatten nieuwe verplichte elementen (SPD, EV-kringen)",[47,1607,1608,1611],{},[50,1609,1610],{},"Exportformaat"," genereert documentatie die voldoet aan de nieuwe digitale aanvaardingsnormen",[16,1613,1614],{},"Blijf conform zonder de volledige regelgevingstekst te hoeven bestuderen. PlanElec zorgt er automatisch voor dat uw documentatie aan de nieuwste normen voldoet.",[16,1616,1617],{},[338,1618,1619],{"href":340},"Werk uw elektrische documentatie bij met PlanElec →",{"title":343,"searchDepth":344,"depth":344,"links":1621},[1622,1623,1630,1631,1632],{"id":1320,"depth":344,"text":1321},{"id":1333,"depth":344,"text":1334,"children":1624},[1625,1626,1627,1628,1629],{"id":1337,"depth":350,"text":1338},{"id":1377,"depth":350,"text":1378},{"id":1410,"depth":350,"text":1411},{"id":1443,"depth":350,"text":1444},{"id":1473,"depth":350,"text":1474},{"id":1505,"depth":344,"text":1506},{"id":1534,"depth":344,"text":1535},{"id":1581,"depth":344,"text":1582},"De laatste updates van de Belgische elektrische voorschriften en wat ze betekenen voor uw installatie.","nl",{},"\u002Fblog\u002Farei-regulations-2026.nl",{"title":1315,"description":1633},"arei-reglementen-2026","blog\u002Farei-regulations-2026.nl",[372,373,1641,1642,377,379,1643,1644,1645,1646,1647,1480,1648],"regelgeving 2026","elektrische voorschriften","situatieschema","overspanningsbeveiliging","EV-lader","zonnepanelen","badkamerzones","België","bYpktIPgPoqnO__eCawjwytLD0UEbJIbZdZgLgKoemg",1775151659040]