[{"data":1,"prerenderedAt":2521},["ShallowReactive",2],{"blog-post-en-inspection-failed-what-now":3,"blog-alternates-inspection-failed-what-now":579},{"id":4,"title":5,"articleId":6,"body":7,"category":557,"date":558,"description":559,"extension":560,"lastUpdated":561,"locale":562,"meta":563,"navigation":564,"path":565,"publishDate":558,"readTime":566,"refreshInterval":567,"seo":568,"slug":6,"stem":569,"tags":570,"__hash__":578},"blog\u002Fblog\u002Finspection-failed-what-now.en.md","Electrical Inspection Failed — What Now? Step-by-Step Guide After a Negative Inspection","inspection-failed-what-now",{"type":8,"value":9,"toc":534},"minimark",[10,14,22,25,30,37,42,116,123,127,131,138,142,149,153,160,164,317,321,325,328,341,345,352,356,359,379,386,400,404,411,415,426,430,437,440,454,458,464,490,493,496,501,522],[11,12,5],"h1",{"id":13},"electrical-inspection-failed-what-now-step-by-step-guide-after-a-negative-inspection",[15,16,17,21],"p",{},[18,19,20],"strong",{},"Don't panic."," Around 40% of all electrical inspections (keuringen) in Belgium come back negative. A failed inspection doesn't mean your entire installation is dangerous — it's often formal deficiencies or easily fixable problems.",[15,23,24],{},"In this guide, you'll learn what to do after a negative inspection, what the deficiency codes mean and how to prepare for the re-inspection.",[26,27,29],"h2",{"id":28},"what-happens-after-a-negative-inspection","What Happens After a Negative Inspection?",[15,31,32,33,36],{},"After the inspection, you receive a ",[18,34,35],{},"detailed report"," from the inspection body (e.g. BTV, Vinçotte, AIB). This report lists all identified deficiencies, each with a code:",[38,39,41],"h3",{"id":40},"understanding-deficiency-codes","Understanding Deficiency Codes",[43,44,45,64],"table",{},[46,47,48],"thead",{},[49,50,51,55,58,61],"tr",{},[52,53,54],"th",{},"Code",[52,56,57],{},"Severity",[52,59,60],{},"Meaning",[52,62,63],{},"Deadline",[65,66,67,84,100],"tbody",{},[49,68,69,75,78,81],{},[70,71,72],"td",{},[18,73,74],{},"C1",[70,76,77],{},"Minor",[70,79,80],{},"Minor deficiency, no immediate danger",[70,82,83],{},"Fix at the next opportunity",[49,85,86,91,94,97],{},[70,87,88],{},[18,89,90],{},"C2",[70,92,93],{},"Medium",[70,95,96],{},"Deficiency that must be fixed in the medium term",[70,98,99],{},"Must be resolved by re-inspection",[49,101,102,107,110,113],{},[70,103,104],{},[18,105,106],{},"C3",[70,108,109],{},"Severe",[70,111,112],{},"Serious danger — immediate action required",[70,114,115],{},"Fix immediately",[15,117,118,119,122],{},"With C2 and C3 deficiencies, the inspection is ",[18,120,121],{},"negative"," and a re-inspection is required. With only C1 deficiencies, the inspection may still be positive.",[26,124,126],{"id":125},"deadlines-by-situation","Deadlines by Situation",[38,128,130],{"id":129},"property-sale","Property Sale",[15,132,133,134,137],{},"If you are buying a property and the electrical inspection is negative, you as the buyer have an ",[18,135,136],{},"18-month deadline"," from the purchase date to fix all deficiencies and obtain a positive re-inspection.",[38,139,141],{"id":140},"new-installation","New Installation",[15,143,144,145,148],{},"For a new electrical installation (new build, complete renovation), the installation must be compliant ",[18,146,147],{},"BEFORE commissioning",". The grid operator (Fluvius, ORES) only activates the power supply when a positive inspection certificate is presented.",[38,150,152],{"id":151},"periodic-inspection","Periodic Inspection",[15,154,155,156,159],{},"The periodic inspection (every 25 years for residential properties) gives a deadline stated in the report in case of a negative result — typically ",[18,157,158],{},"1 year"," for the re-inspection.",[26,161,163],{"id":162},"top-10-reasons-for-failure","Top 10 Reasons for Failure",[43,165,166,182],{},[46,167,168],{},[49,169,170,173,176,179],{},[52,171,172],{},"No.",[52,174,175],{},"Deficiency",[52,177,178],{},"AREI Article",[52,180,181],{},"Frequency",[65,183,184,198,211,225,238,251,264,277,290,304],{},[49,185,186,189,192,195],{},[70,187,188],{},"1",[70,190,191],{},"Missing or incorrect RCD (30 mA)",[70,193,194],{},"Art. 4.2.4.3",[70,196,197],{},"Very frequent",[49,199,200,203,206,209],{},[70,201,202],{},"2",[70,204,205],{},"Missing or outdated electrical plans (documentation requirement: Art. 9.1.2 Nr. 1 single-line diagram, Art. 9.1.2 Nr. 2 situation plan)",[70,207,208],{},"Art. 9.1.2 \u002F 3.1.2",[70,210,197],{},[49,212,213,216,219,222],{},[70,214,215],{},"3",[70,217,218],{},"Faulty earthing (earth resistance too high: Art. 4.2.4.3b sets 30 Ohm as the regulatory threshold — if exceeded, additional high-sensitivity residual-current devices are required; general formula: R_A x I_delta_n \u003C= 50 V)",[70,220,221],{},"Art. 4.2.4.3b",[70,223,224],{},"Frequent",[49,226,227,230,233,236],{},[70,228,229],{},"4",[70,231,232],{},"Missing labelling of circuits",[70,234,235],{},"Art. 6.4.6",[70,237,224],{},[49,239,240,243,246,249],{},[70,241,242],{},"5",[70,244,245],{},"Cables without protective conduit (XVB cables may be surface-mounted without conduit. VOB single-core wires must always be routed in conduit)",[70,247,248],{},"Art. 5.2.1.5",[70,250,224],{},[49,252,253,256,259,262],{},[70,254,255],{},"6",[70,257,258],{},"Bathroom zones not respected",[70,260,261],{},"Art. 7.1",[70,263,93],{},[49,265,266,269,272,275],{},[70,267,268],{},"7",[70,270,271],{},"Missing main switch (or \u003C40A)",[70,273,274],{},"Art. 5.3.5.1b",[70,276,93],{},[49,278,279,282,285,288],{},[70,280,281],{},"8",[70,283,284],{},"Breaker too large for cable cross-section",[70,286,287],{},"Art. 4.4.3.2",[70,289,93],{},[49,291,292,295,298,301],{},[70,293,294],{},"9",[70,296,297],{},"Missing SPD for new installation",[70,299,300],{},"Art. 4.5.1",[70,302,303],{},"New builds",[49,305,306,309,312,315],{},[70,307,308],{},"10",[70,310,311],{},"Missing smoke detectors on situation plan (smoke detectors are not an AREI requirement per se, but a building\u002Fhousing regulation — regional: Flanders, Wallonia, Brussels. Their absence may be noted as a remark in the inspection report)",[70,313,314],{},"Regional",[70,316,224],{},[26,318,320],{"id":319},"step-by-step-after-the-negative-inspection","Step by Step: After the Negative Inspection",[38,322,324],{"id":323},"step-1-read-the-report-carefully","Step 1: Read the Report Carefully",[15,326,327],{},"Go through each deficiency individually. Note down:",[329,330,331,335,338],"ul",{},[332,333,334],"li",{},"Which code (C1\u002FC2\u002FC3)?",[332,336,337],{},"Where exactly is the problem (room, circuit)?",[332,339,340],{},"What exactly is the complaint?",[38,342,344],{"id":343},"step-2-set-priorities","Step 2: Set Priorities",[15,346,347,348,351],{},"Start with the ",[18,349,350],{},"C3 deficiencies"," (severe) — these represent immediate danger. Then the C2 deficiencies. C1 deficiencies can be addressed in parallel or later.",[38,353,355],{"id":354},"step-3-professional-or-diy","Step 3: Professional or DIY?",[15,357,358],{},"Many deficiencies can be fixed yourself:",[329,360,361,367,373],{},[332,362,363,366],{},[18,364,365],{},"Apply labelling"," — label the circuit breakers in the distribution board",[332,368,369,372],{},[18,370,371],{},"Update the situation plan"," — create with PlanElec",[332,374,375,378],{},[18,376,377],{},"Install smoke detectors"," — simple ceiling mounting",[15,380,381,382,385],{},"For other deficiencies, you need an ",[18,383,384],{},"electrician",":",[329,387,388,391,394,397],{},[332,389,390],{},"Retrofit or replace RCDs",[332,392,393],{},"Improve earthing",[332,395,396],{},"Route cables through protective conduit",[332,398,399],{},"Install the main switch",[38,401,403],{"id":402},"step-4-update-plans","Step 4: Update Plans",[15,405,406,407,410],{},"One of the most common deficiencies is a missing or outdated single-line diagram and situation plan. These must reflect the ",[18,408,409],{},"current state"," of the installation — not the state from 20 years ago.",[38,412,414],{"id":413},"step-5-schedule-the-re-inspection","Step 5: Schedule the Re-Inspection",[15,416,417,418,421,422,425],{},"It is recommended to schedule the re-inspection with the ",[18,419,420],{},"same inspection body"," that carried out the original inspection — however, the owner may also engage a different accredited inspection body. During the re-inspection, ",[18,423,424],{},"only the contested points"," are re-examined — not the entire installation.",[26,427,429],{"id":428},"cost-of-re-inspection","Cost of Re-Inspection",[15,431,432,433,436],{},"The cost of a re-inspection typically ranges between ",[18,434,435],{},"EUR 80 and EUR 120",", depending on the inspection body and the number of points to be checked. This is generally cheaper than the initial inspection.",[15,438,439],{},"Additionally, there are costs for fixing the deficiencies:",[329,441,442,445,448,451],{},[332,443,444],{},"Retrofitting an RCD: EUR 100-200 (material + labour)",[332,446,447],{},"Improving earthing: EUR 200-500",[332,449,450],{},"Having plans created: EUR 150-400 (or free with PlanElec)",[332,452,453],{},"Installing a main switch: EUR 80-150",[26,455,457],{"id":456},"how-planelec-helps","How PlanElec Helps",[15,459,460,461,385],{},"PlanElec can detect many of the most common reasons for failure ",[18,462,463],{},"BEFORE the inspection",[329,465,466,472,478,484],{},[332,467,468,471],{},[18,469,470],{},"Validation"," automatically checks for missing RCDs, incorrect protection sizing and more",[332,473,474,477],{},[18,475,476],{},"Single-line diagram"," is generated AREI-compliant — one of the most common deficiency reasons is eliminated",[332,479,480,483],{},[18,481,482],{},"Situation plan"," with correct AREI symbols",[332,485,486,489],{},[18,487,488],{},"Labelling"," of all circuits is automatically documented in the diagram",[15,491,492],{},"This way, you can avoid typical mistakes before the inspector arrives.",[494,495],"hr",{},[15,497,498],{},[18,499,500],{},"Related articles:",[329,502,503,510,516],{},[332,504,505],{},[506,507,509],"a",{"href":508},"\u002Fen\u002Fblog\u002Ftop-10-arei-violations","Top 10 AREI Violations",[332,511,512],{},[506,513,515],{"href":514},"\u002Fen\u002Fblog\u002F30ma-rcd-per-socket","30 mA RCD: When Is It Mandatory?",[332,517,518],{},[506,519,521],{"href":520},"\u002Fen\u002Fblog\u002Fcable-cross-section-breaker","Cable Cross-Section and Breaker: The Right Combination",[15,523,524,527,528],{},[18,525,526],{},"Prepare optimally for the electrical inspection — with PlanElec, create AREI-compliant plans and detect deficiencies early."," ",[506,529,533],{"href":530,"rel":531},"https:\u002F\u002Fplanelec.be",[532],"nofollow","Get started →",{"title":535,"searchDepth":536,"depth":536,"links":537},"",2,[538,542,547,548,555,556],{"id":28,"depth":536,"text":29,"children":539},[540],{"id":40,"depth":541,"text":41},3,{"id":125,"depth":536,"text":126,"children":543},[544,545,546],{"id":129,"depth":541,"text":130},{"id":140,"depth":541,"text":141},{"id":151,"depth":541,"text":152},{"id":162,"depth":536,"text":163},{"id":319,"depth":536,"text":320,"children":549},[550,551,552,553,554],{"id":323,"depth":541,"text":324},{"id":343,"depth":541,"text":344},{"id":354,"depth":541,"text":355},{"id":402,"depth":541,"text":403},{"id":413,"depth":541,"text":414},{"id":428,"depth":536,"text":429},{"id":456,"depth":536,"text":457},"guide","2026-06-16","Your electrical inspection (keuring) came back negative? Don't panic — around 40% fail. Here's what the deficiency codes mean, how to fix the problems and what the re-inspection costs.","md","2026-06-05","en",{},true,"\u002Fblog\u002Finspection-failed-what-now.en","6 min",12,{"title":5,"description":559},"blog\u002Finspection-failed-what-now.en",[571,572,573,574,575,576,577],"inspection","electrical-inspection","failed","deficiencies","re-inspection","arei","belgium","rDxMTNvxUoBzkSOvecNfFu8pCzCCVzVyRxkQlV49aK0",[580,1102,1475,2000],{"id":581,"title":582,"articleId":6,"body":583,"category":557,"date":558,"description":1087,"extension":560,"lastUpdated":561,"locale":1088,"meta":1089,"navigation":564,"path":1090,"publishDate":558,"readTime":566,"refreshInterval":567,"seo":1091,"slug":1092,"stem":1093,"tags":1094,"__hash__":1101},"blog\u002Fblog\u002Finspection-failed-what-now.de.md","Elektrokontrolle durchgefallen — was nun? Schritt-für-Schritt-Anleitung nach einer negativen Elektrokontrolle",{"type":8,"value":584,"toc":1067},[585,588,594,597,601,608,612,676,683,687,691,698,702,709,713,720,724,857,861,865,868,879,883,890,894,897,917,923,937,941,948,952,963,967,974,977,991,995,1002,1028,1031,1033,1038,1058],[11,586,582],{"id":587},"elektrokontrolle-durchgefallen-was-nun-schritt-für-schritt-anleitung-nach-einer-negativen-elektrokontrolle",[15,589,590,593],{},[18,591,592],{},"Keine Panik."," Rund 40 % aller Elektrokontrollen (Keuringen) in Belgien fallen negativ aus. Eine durchgefallene Kontrolle bedeutet nicht, dass Ihre gesamte Installation gefährlich ist — oft sind es formelle Mängel oder leicht behebbare Probleme.",[15,595,596],{},"In diesem Guide erfahren Sie, was nach einer negativen Kontrolle zu tun ist, welche Mängelcodes es gibt und wie Sie sich auf die Nachkontrolle vorbereiten.",[26,598,600],{"id":599},"was-passiert-nach-einer-negativen-kontrolle","Was passiert nach einer negativen Kontrolle?",[15,602,603,604,607],{},"Nach der Kontrolle erhalten Sie einen ",[18,605,606],{},"ausführlichen Bericht"," des Kontrollorganismus (z. B. BTV, Vinçotte, AIB). Dieser Bericht listet alle festgestellten Mängel auf, jeweils mit einem Code:",[38,609,611],{"id":610},"mängelcodes-verstehen","Mängelcodes verstehen",[43,613,614,629],{},[46,615,616],{},[49,617,618,620,623,626],{},[52,619,54],{},[52,621,622],{},"Schweregrad",[52,624,625],{},"Bedeutung",[52,627,628],{},"Frist",[65,630,631,646,661],{},[49,632,633,637,640,643],{},[70,634,635],{},[18,636,74],{},[70,638,639],{},"Leicht",[70,641,642],{},"Geringfügiger Mangel, keine unmittelbare Gefahr",[70,644,645],{},"Beheben bei nächster Gelegenheit",[49,647,648,652,655,658],{},[70,649,650],{},[18,651,90],{},[70,653,654],{},"Mittel",[70,656,657],{},"Mangel, der mittelfristig behoben werden muss",[70,659,660],{},"Muss bei Nachkontrolle behoben sein",[49,662,663,667,670,673],{},[70,664,665],{},[18,666,106],{},[70,668,669],{},"Schwer",[70,671,672],{},"Ernste Gefahr — sofortiges Handeln erforderlich",[70,674,675],{},"Sofort beheben",[15,677,678,679,682],{},"Bei C2- und C3-Mängeln ist die Kontrolle ",[18,680,681],{},"negativ"," und eine Nachkontrolle ist erforderlich. Bei ausschließlich C1-Mängeln kann die Kontrolle trotzdem positiv ausfallen.",[26,684,686],{"id":685},"fristen-je-nach-situation","Fristen je nach Situation",[38,688,690],{"id":689},"bei-immobilienverkauf","Bei Immobilienverkauf",[15,692,693,694,697],{},"Wenn Sie eine Immobilie kaufen und die Elektrokontrolle negativ ausfällt, haben Sie als Käufer eine ",[18,695,696],{},"Frist von 18 Monaten"," ab dem Kaufdatum, um alle Mängel zu beheben und eine positive Nachkontrolle zu erhalten.",[38,699,701],{"id":700},"bei-neuinstallation","Bei Neuinstallation",[15,703,704,705,708],{},"Bei einer neuen Elektroinstallation (Neubau, komplette Renovierung) muss die Installation ",[18,706,707],{},"VOR der Inbetriebnahme"," konform sein. Der Netzbetreiber (Fluvius, ORES) schaltet den Strom erst frei, wenn ein positives Kontrollzertifikat vorliegt.",[38,710,712],{"id":711},"bei-periodischer-kontrolle","Bei periodischer Kontrolle",[15,714,715,716,719],{},"Die periodische Kontrolle (alle 25 Jahre für Wohnungen) ergibt bei negativem Ergebnis eine Frist, die im Bericht angegeben wird — typischerweise ",[18,717,718],{},"1 Jahr"," für die Nachkontrolle.",[26,721,723],{"id":722},"die-10-häufigsten-durchfallgründe","Die 10 häufigsten Durchfallgründe",[43,725,726,742],{},[46,727,728],{},[49,729,730,733,736,739],{},[52,731,732],{},"Nr.",[52,734,735],{},"Mangel",[52,737,738],{},"AREI-Artikel",[52,740,741],{},"Häufigkeit",[65,743,744,756,767,779,790,801,812,823,834,846],{},[49,745,746,748,751,753],{},[70,747,188],{},[70,749,750],{},"Fehlender oder falscher FI-Schutzschalter (30 mA)",[70,752,194],{},[70,754,755],{},"Sehr häufig",[49,757,758,760,763,765],{},[70,759,202],{},[70,761,762],{},"Fehlende oder veraltete Elektropläne (Dokumentationspflicht: Art. 9.1.2 Nr. 1 Eindrahtschema, Art. 9.1.2 Nr. 2 Situationsplan)",[70,764,208],{},[70,766,755],{},[49,768,769,771,774,776],{},[70,770,215],{},[70,772,773],{},"Fehlerhafte Erdung (Erdungswiderstand zu hoch: Art. 4.2.4.3b legt 30 Ω als regulatorische Schwelle fest — bei Überschreitung sind zusätzliche Differenzstrom-Schutzeinrichtungen mit hoher Empfindlichkeit vorgeschrieben; allgemeine Formel: R_A × I∆n ≤ 50 V)",[70,775,221],{},[70,777,778],{},"Häufig",[49,780,781,783,786,788],{},[70,782,229],{},[70,784,785],{},"Fehlende Beschriftung der Stromkreise",[70,787,235],{},[70,789,778],{},[49,791,792,794,797,799],{},[70,793,242],{},[70,795,796],{},"Kabel ohne Schutzrohr\u002FKabelkanal (XVB-Kabel dürfen auf Putz ohne Schutzrohr verlegt werden. VOB-Einzeladern müssen immer in Schutzrohren verlegt werden)",[70,798,248],{},[70,800,778],{},[49,802,803,805,808,810],{},[70,804,255],{},[70,806,807],{},"Badezimmer-Zonen missachtet",[70,809,261],{},[70,811,654],{},[49,813,814,816,819,821],{},[70,815,268],{},[70,817,818],{},"Fehlender Hauptschalter (oder \u003C40A)",[70,820,274],{},[70,822,654],{},[49,824,825,827,830,832],{},[70,826,281],{},[70,828,829],{},"Sicherung zu groß für den Kabelquerschnitt",[70,831,287],{},[70,833,654],{},[49,835,836,838,841,843],{},[70,837,294],{},[70,839,840],{},"Fehlender SPD bei Neuinstallation",[70,842,300],{},[70,844,845],{},"Bei Neubauten",[49,847,848,850,853,855],{},[70,849,308],{},[70,851,852],{},"Fehlende Rauchmelder auf dem Situationsplan (Rauchmelder sind keine AREI-Anforderung im engeren Sinne, sondern eine baurechtliche\u002Fwohnrechtliche Vorschrift — regional: Flandern, Wallonien, Brüssel. Das Fehlen kann als Anmerkung im Prüfbericht vermerkt werden)",[70,854,314],{},[70,856,778],{},[26,858,860],{"id":859},"schritt-für-schritt-nach-der-negativen-kontrolle","Schritt-für-Schritt: Nach der negativen Kontrolle",[38,862,864],{"id":863},"schritt-1-bericht-sorgfältig-lesen","Schritt 1: Bericht sorgfältig lesen",[15,866,867],{},"Gehen Sie jeden Mangel einzeln durch. Notieren Sie sich:",[329,869,870,873,876],{},[332,871,872],{},"Welcher Code (C1\u002FC2\u002FC3)?",[332,874,875],{},"Wo genau ist das Problem (Raum, Stromkreis)?",[332,877,878],{},"Was genau wird bemängelt?",[38,880,882],{"id":881},"schritt-2-prioritäten-setzen","Schritt 2: Prioritäten setzen",[15,884,885,886,889],{},"Beginnen Sie mit den ",[18,887,888],{},"C3-Mängeln"," (schwer) — diese stellen eine unmittelbare Gefahr dar. Dann die C2-Mängel. C1-Mängel können parallel oder später behoben werden.",[38,891,893],{"id":892},"schritt-3-fachmann-oder-selbst","Schritt 3: Fachmann oder Selbst?",[15,895,896],{},"Viele Mängel können Sie selbst beheben:",[329,898,899,905,911],{},[332,900,901,904],{},[18,902,903],{},"Beschriftung anbringen"," — Sicherungen im Verteiler beschriften",[332,906,907,910],{},[18,908,909],{},"Situationsplan aktualisieren"," — mit PlanElec erstellen",[332,912,913,916],{},[18,914,915],{},"Rauchmelder installieren"," — einfach an der Decke montieren",[15,918,919,920,385],{},"Für andere Mängel brauchen Sie einen ",[18,921,922],{},"Elektriker",[329,924,925,928,931,934],{},[332,926,927],{},"FI-Schalter nachrüsten oder tauschen",[332,929,930],{},"Erdung verbessern",[332,932,933],{},"Kabel in Schutzrohre verlegen",[332,935,936],{},"Hauptschalter installieren",[38,938,940],{"id":939},"schritt-4-pläne-aktualisieren","Schritt 4: Pläne aktualisieren",[15,942,943,944,947],{},"Einer der häufigsten Mängel ist ein fehlendes oder veraltetes Eindrahtschema und Situationsplan. Diese müssen ",[18,945,946],{},"den aktuellen Zustand"," der Installation widerspiegeln — nicht den Zustand von vor 20 Jahren.",[38,949,951],{"id":950},"schritt-5-nachkontrolle-vereinbaren","Schritt 5: Nachkontrolle vereinbaren",[15,953,954,955,958,959,962],{},"Empfohlen wird die Nachkontrolle beim ",[18,956,957],{},"selben Kontrollorganismus",", der die ursprüngliche Kontrolle durchgeführt hat — der Eigentümer kann aber auch einen anderen akkreditierten Kontrollorganismus beauftragen. Bei der Nachkontrolle werden ",[18,960,961],{},"nur die beanstandeten Punkte"," erneut geprüft — nicht die gesamte Installation.",[26,964,966],{"id":965},"kosten-der-nachkontrolle","Kosten der Nachkontrolle",[15,968,969,970,973],{},"Die Kosten für eine Nachkontrolle liegen typischerweise zwischen ",[18,971,972],{},"€80 und €120",", abhängig vom Kontrollorganismus und der Anzahl der zu prüfenden Punkte. Das ist in der Regel günstiger als die Erstkontrolle.",[15,975,976],{},"Zusätzlich fallen Kosten für die Mängelbehebung an:",[329,978,979,982,985,988],{},[332,980,981],{},"FI-Schalter nachrüsten: €100-200 (Material + Arbeit)",[332,983,984],{},"Erdung verbessern: €200-500",[332,986,987],{},"Pläne erstellen lassen: €150-400 (oder kostenlos mit PlanElec)",[332,989,990],{},"Hauptschalter installieren: €80-150",[26,992,994],{"id":993},"wie-planelec-hilft","Wie PlanElec hilft",[15,996,997,998,1001],{},"PlanElec kann viele der häufigsten Durchfallgründe ",[18,999,1000],{},"VOR der Kontrolle"," erkennen:",[329,1003,1004,1010,1016,1022],{},[332,1005,1006,1009],{},[18,1007,1008],{},"Validierung"," prüft automatisch auf fehlende FI-Schalter, falsche Absicherung und mehr",[332,1011,1012,1015],{},[18,1013,1014],{},"Eindrahtschema"," wird AREI-konform generiert — einer der häufigsten Mängelgründe entfällt",[332,1017,1018,1021],{},[18,1019,1020],{},"Situationsplan"," mit korrekten AREI-Symbolen",[332,1023,1024,1027],{},[18,1025,1026],{},"Beschriftung"," aller Stromkreise wird automatisch im Schema dokumentiert",[15,1029,1030],{},"So können Sie typische Fehler vermeiden, bevor der Kontrolleur kommt.",[494,1032],{},[15,1034,1035],{},[18,1036,1037],{},"Verwandte Artikel:",[329,1039,1040,1046,1052],{},[332,1041,1042],{},[506,1043,1045],{"href":1044},"\u002Fde\u002Fblog\u002F10-haeufigste-arei-verstoesse","Die 10 häufigsten AREI-Verstöße",[332,1047,1048],{},[506,1049,1051],{"href":1050},"\u002Fde\u002Fblog\u002F30ma-fi-schutzschalter","30 mA FI-Schutzschalter: Wann ist er Pflicht?",[332,1053,1054],{},[506,1055,1057],{"href":1056},"\u002Fde\u002Fblog\u002Fkabelquerschnitt-sicherung","Kabelquerschnitt und Sicherung: Die richtige Kombination",[15,1059,1060,527,1063],{},[18,1061,1062],{},"Bereiten Sie sich optimal auf die Elektrokontrolle vor — mit PlanElec erstellen Sie AREI-konforme Pläne und erkennen Mängel frühzeitig.",[506,1064,1066],{"href":530,"rel":1065},[532],"Jetzt starten →",{"title":535,"searchDepth":536,"depth":536,"links":1068},[1069,1072,1077,1078,1085,1086],{"id":599,"depth":536,"text":600,"children":1070},[1071],{"id":610,"depth":541,"text":611},{"id":685,"depth":536,"text":686,"children":1073},[1074,1075,1076],{"id":689,"depth":541,"text":690},{"id":700,"depth":541,"text":701},{"id":711,"depth":541,"text":712},{"id":722,"depth":536,"text":723},{"id":859,"depth":536,"text":860,"children":1079},[1080,1081,1082,1083,1084],{"id":863,"depth":541,"text":864},{"id":881,"depth":541,"text":882},{"id":892,"depth":541,"text":893},{"id":939,"depth":541,"text":940},{"id":950,"depth":541,"text":951},{"id":965,"depth":536,"text":966},{"id":993,"depth":536,"text":994},"Ihre Elektrokontrolle (Keuring) ist negativ ausgefallen? Keine Panik — rund 40 % fallen durch. Hier erfahren Sie, was die Mängelcodes bedeuten, wie Sie die Probleme beheben und was die Nachkontrolle kostet.","de",{},"\u002Fblog\u002Finspection-failed-what-now.de",{"title":582,"description":1087},"stromabnahme-durchgefallen","blog\u002Finspection-failed-what-now.de",[1095,1096,1097,1098,1099,576,1100],"keuring","elektrokontrolle","durchgefallen","mängel","nachkontrolle","belgien","eQYj0zplQWit_toCkyHomonhbq0_axSbESVo1rdvCos",{"id":4,"title":5,"articleId":6,"body":1103,"category":557,"date":558,"description":559,"extension":560,"lastUpdated":561,"locale":562,"meta":1472,"navigation":564,"path":565,"publishDate":558,"readTime":566,"refreshInterval":567,"seo":1473,"slug":6,"stem":569,"tags":1474,"__hash__":578},{"type":8,"value":1104,"toc":1452},[1105,1107,1111,1113,1115,1119,1121,1173,1177,1179,1181,1185,1187,1191,1193,1197,1199,1315,1317,1319,1321,1329,1331,1335,1337,1339,1353,1357,1367,1369,1373,1375,1381,1383,1387,1389,1399,1401,1405,1423,1425,1427,1431,1445],[11,1106,5],{"id":13},[15,1108,1109,21],{},[18,1110,20],{},[15,1112,24],{},[26,1114,29],{"id":28},[15,1116,32,1117,36],{},[18,1118,35],{},[38,1120,41],{"id":40},[43,1122,1123,1135],{},[46,1124,1125],{},[49,1126,1127,1129,1131,1133],{},[52,1128,54],{},[52,1130,57],{},[52,1132,60],{},[52,1134,63],{},[65,1136,1137,1149,1161],{},[49,1138,1139,1143,1145,1147],{},[70,1140,1141],{},[18,1142,74],{},[70,1144,77],{},[70,1146,80],{},[70,1148,83],{},[49,1150,1151,1155,1157,1159],{},[70,1152,1153],{},[18,1154,90],{},[70,1156,93],{},[70,1158,96],{},[70,1160,99],{},[49,1162,1163,1167,1169,1171],{},[70,1164,1165],{},[18,1166,106],{},[70,1168,109],{},[70,1170,112],{},[70,1172,115],{},[15,1174,118,1175,122],{},[18,1176,121],{},[26,1178,126],{"id":125},[38,1180,130],{"id":129},[15,1182,133,1183,137],{},[18,1184,136],{},[38,1186,141],{"id":140},[15,1188,144,1189,148],{},[18,1190,147],{},[38,1192,152],{"id":151},[15,1194,155,1195,159],{},[18,1196,158],{},[26,1198,163],{"id":162},[43,1200,1201,1213],{},[46,1202,1203],{},[49,1204,1205,1207,1209,1211],{},[52,1206,172],{},[52,1208,175],{},[52,1210,178],{},[52,1212,181],{},[65,1214,1215,1225,1235,1245,1255,1265,1275,1285,1295,1305],{},[49,1216,1217,1219,1221,1223],{},[70,1218,188],{},[70,1220,191],{},[70,1222,194],{},[70,1224,197],{},[49,1226,1227,1229,1231,1233],{},[70,1228,202],{},[70,1230,205],{},[70,1232,208],{},[70,1234,197],{},[49,1236,1237,1239,1241,1243],{},[70,1238,215],{},[70,1240,218],{},[70,1242,221],{},[70,1244,224],{},[49,1246,1247,1249,1251,1253],{},[70,1248,229],{},[70,1250,232],{},[70,1252,235],{},[70,1254,224],{},[49,1256,1257,1259,1261,1263],{},[70,1258,242],{},[70,1260,245],{},[70,1262,248],{},[70,1264,224],{},[49,1266,1267,1269,1271,1273],{},[70,1268,255],{},[70,1270,258],{},[70,1272,261],{},[70,1274,93],{},[49,1276,1277,1279,1281,1283],{},[70,1278,268],{},[70,1280,271],{},[70,1282,274],{},[70,1284,93],{},[49,1286,1287,1289,1291,1293],{},[70,1288,281],{},[70,1290,284],{},[70,1292,287],{},[70,1294,93],{},[49,1296,1297,1299,1301,1303],{},[70,1298,294],{},[70,1300,297],{},[70,1302,300],{},[70,1304,303],{},[49,1306,1307,1309,1311,1313],{},[70,1308,308],{},[70,1310,311],{},[70,1312,314],{},[70,1314,224],{},[26,1316,320],{"id":319},[38,1318,324],{"id":323},[15,1320,327],{},[329,1322,1323,1325,1327],{},[332,1324,334],{},[332,1326,337],{},[332,1328,340],{},[38,1330,344],{"id":343},[15,1332,347,1333,351],{},[18,1334,350],{},[38,1336,355],{"id":354},[15,1338,358],{},[329,1340,1341,1345,1349],{},[332,1342,1343,366],{},[18,1344,365],{},[332,1346,1347,372],{},[18,1348,371],{},[332,1350,1351,378],{},[18,1352,377],{},[15,1354,381,1355,385],{},[18,1356,384],{},[329,1358,1359,1361,1363,1365],{},[332,1360,390],{},[332,1362,393],{},[332,1364,396],{},[332,1366,399],{},[38,1368,403],{"id":402},[15,1370,406,1371,410],{},[18,1372,409],{},[38,1374,414],{"id":413},[15,1376,417,1377,421,1379,425],{},[18,1378,420],{},[18,1380,424],{},[26,1382,429],{"id":428},[15,1384,432,1385,436],{},[18,1386,435],{},[15,1388,439],{},[329,1390,1391,1393,1395,1397],{},[332,1392,444],{},[332,1394,447],{},[332,1396,450],{},[332,1398,453],{},[26,1400,457],{"id":456},[15,1402,460,1403,385],{},[18,1404,463],{},[329,1406,1407,1411,1415,1419],{},[332,1408,1409,471],{},[18,1410,470],{},[332,1412,1413,477],{},[18,1414,476],{},[332,1416,1417,483],{},[18,1418,482],{},[332,1420,1421,489],{},[18,1422,488],{},[15,1424,492],{},[494,1426],{},[15,1428,1429],{},[18,1430,500],{},[329,1432,1433,1437,1441],{},[332,1434,1435],{},[506,1436,509],{"href":508},[332,1438,1439],{},[506,1440,515],{"href":514},[332,1442,1443],{},[506,1444,521],{"href":520},[15,1446,1447,527,1449],{},[18,1448,526],{},[506,1450,533],{"href":530,"rel":1451},[532],{"title":535,"searchDepth":536,"depth":536,"links":1453},[1454,1457,1462,1463,1470,1471],{"id":28,"depth":536,"text":29,"children":1455},[1456],{"id":40,"depth":541,"text":41},{"id":125,"depth":536,"text":126,"children":1458},[1459,1460,1461],{"id":129,"depth":541,"text":130},{"id":140,"depth":541,"text":141},{"id":151,"depth":541,"text":152},{"id":162,"depth":536,"text":163},{"id":319,"depth":536,"text":320,"children":1464},[1465,1466,1467,1468,1469],{"id":323,"depth":541,"text":324},{"id":343,"depth":541,"text":344},{"id":354,"depth":541,"text":355},{"id":402,"depth":541,"text":403},{"id":413,"depth":541,"text":414},{"id":428,"depth":536,"text":429},{"id":456,"depth":536,"text":457},{},{"title":5,"description":559},[571,572,573,574,575,576,577],{"id":1476,"title":1477,"articleId":6,"body":1478,"category":557,"date":558,"description":1984,"extension":560,"lastUpdated":561,"locale":1985,"meta":1986,"navigation":564,"path":1987,"publishDate":558,"readTime":566,"refreshInterval":567,"seo":1988,"slug":1989,"stem":1990,"tags":1991,"__hash__":1999},"blog\u002Fblog\u002Finspection-failed-what-now.fr.md","Contrôle électrique refusé — que faire ? Guide étape par étape après un contrôle négatif",{"type":8,"value":1479,"toc":1964},[1480,1483,1489,1492,1496,1503,1507,1571,1578,1582,1586,1593,1597,1604,1608,1615,1619,1753,1757,1761,1764,1775,1779,1786,1790,1793,1813,1820,1834,1838,1845,1849,1860,1864,1871,1874,1888,1892,1899,1925,1928,1930,1935,1955],[11,1481,1477],{"id":1482},"contrôle-électrique-refusé-que-faire-guide-étape-par-étape-après-un-contrôle-négatif",[15,1484,1485,1488],{},[18,1486,1487],{},"Pas de panique."," Environ 40 % de tous les contrôles électriques en Belgique sont négatifs. Un contrôle négatif ne signifie pas que toute votre installation est dangereuse — il s'agit souvent de défauts formels ou de problèmes facilement corrigeables.",[15,1490,1491],{},"Dans ce guide, vous découvrirez ce qu'il faut faire après un contrôle négatif, quels sont les codes d'infraction et comment vous préparer au recontrôle.",[26,1493,1495],{"id":1494},"que-se-passe-t-il-après-un-contrôle-négatif","Que se passe-t-il après un contrôle négatif ?",[15,1497,1498,1499,1502],{},"Après le contrôle, vous recevez un ",[18,1500,1501],{},"rapport détaillé"," de l'organisme de contrôle (par ex. BTV, Vinçotte, AIB). Ce rapport liste toutes les infractions constatées, chacune avec un code :",[38,1504,1506],{"id":1505},"comprendre-les-codes-dinfraction","Comprendre les codes d'infraction",[43,1508,1509,1524],{},[46,1510,1511],{},[49,1512,1513,1515,1518,1521],{},[52,1514,54],{},[52,1516,1517],{},"Gravité",[52,1519,1520],{},"Signification",[52,1522,1523],{},"Délai",[65,1525,1526,1541,1556],{},[49,1527,1528,1532,1535,1538],{},[70,1529,1530],{},[18,1531,74],{},[70,1533,1534],{},"Léger",[70,1536,1537],{},"Défaut mineur, pas de danger immédiat",[70,1539,1540],{},"Corriger à la prochaine occasion",[49,1542,1543,1547,1550,1553],{},[70,1544,1545],{},[18,1546,90],{},[70,1548,1549],{},"Moyen",[70,1551,1552],{},"Défaut à corriger à moyen terme",[70,1554,1555],{},"Doit être corrigé lors du recontrôle",[49,1557,1558,1562,1565,1568],{},[70,1559,1560],{},[18,1561,106],{},[70,1563,1564],{},"Grave",[70,1566,1567],{},"Danger sérieux — action immédiate requise",[70,1569,1570],{},"Corriger immédiatement",[15,1572,1573,1574,1577],{},"En présence d'infractions C2 et C3, le contrôle est ",[18,1575,1576],{},"négatif"," et un recontrôle est nécessaire. Avec uniquement des infractions C1, le contrôle peut tout de même être positif.",[26,1579,1581],{"id":1580},"délais-selon-la-situation","Délais selon la situation",[38,1583,1585],{"id":1584},"lors-dune-vente-immobilière","Lors d'une vente immobilière",[15,1587,1588,1589,1592],{},"Si vous achetez un bien immobilier et que le contrôle électrique est négatif, vous disposez en tant qu'acheteur d'un ",[18,1590,1591],{},"délai de 18 mois"," à compter de la date d'achat pour corriger toutes les infractions et obtenir un recontrôle positif.",[38,1594,1596],{"id":1595},"pour-une-nouvelle-installation","Pour une nouvelle installation",[15,1598,1599,1600,1603],{},"Pour une nouvelle installation électrique (construction neuve, rénovation complète), l'installation doit être conforme ",[18,1601,1602],{},"AVANT la mise en service",". Le gestionnaire de réseau (Fluvius, ORES) n'active le courant que lorsqu'un certificat de contrôle positif est présenté.",[38,1605,1607],{"id":1606},"lors-du-contrôle-périodique","Lors du contrôle périodique",[15,1609,1610,1611,1614],{},"Le contrôle périodique (tous les 25 ans pour les habitations) donne, en cas de résultat négatif, un délai indiqué dans le rapport — typiquement ",[18,1612,1613],{},"1 an"," pour le recontrôle.",[26,1616,1618],{"id":1617},"les-10-causes-de-refus-les-plus-fréquentes","Les 10 causes de refus les plus fréquentes",[43,1620,1621,1637],{},[46,1622,1623],{},[49,1624,1625,1628,1631,1634],{},[52,1626,1627],{},"N°",[52,1629,1630],{},"Défaut",[52,1632,1633],{},"Article RGIE",[52,1635,1636],{},"Fréquence",[65,1638,1639,1651,1662,1674,1685,1696,1707,1718,1729,1741],{},[49,1640,1641,1643,1646,1648],{},[70,1642,188],{},[70,1644,1645],{},"Différentiel 30 mA absent ou inadéquat",[70,1647,194],{},[70,1649,1650],{},"Très fréquent",[49,1652,1653,1655,1658,1660],{},[70,1654,202],{},[70,1656,1657],{},"Plans électriques absents ou obsolètes (obligation de documentation : Art. 9.1.2 Nr. 1 schéma unifilaire, Art. 9.1.2 Nr. 2 plan de situation)",[70,1659,208],{},[70,1661,1650],{},[49,1663,1664,1666,1669,1671],{},[70,1665,215],{},[70,1667,1668],{},"Mise à la terre défectueuse (résistance de terre trop élevée : Art. 4.2.4.3b fixe 30 Ω comme seuil réglementaire — en cas de dépassement, des dispositifs différentiels à haute sensibilité supplémentaires sont requis ; formule générale : R_A × I∆n ≤ 50 V)",[70,1670,221],{},[70,1672,1673],{},"Fréquent",[49,1675,1676,1678,1681,1683],{},[70,1677,229],{},[70,1679,1680],{},"Étiquetage manquant des circuits",[70,1682,235],{},[70,1684,1673],{},[49,1686,1687,1689,1692,1694],{},[70,1688,242],{},[70,1690,1691],{},"Câbles sans tube de protection\u002Fgoulotte (les câbles XVB peuvent être posés en apparent sans tube de protection. Les conducteurs VOB individuels doivent toujours être posés dans des tubes de protection)",[70,1693,248],{},[70,1695,1673],{},[49,1697,1698,1700,1703,1705],{},[70,1699,255],{},[70,1701,1702],{},"Zones salle de bains non respectées",[70,1704,261],{},[70,1706,1549],{},[49,1708,1709,1711,1714,1716],{},[70,1710,268],{},[70,1712,1713],{},"Interrupteur principal absent (ou \u003C40A)",[70,1715,274],{},[70,1717,1549],{},[49,1719,1720,1722,1725,1727],{},[70,1721,281],{},[70,1723,1724],{},"Disjoncteur surdimensionné pour la section de câble",[70,1726,287],{},[70,1728,1549],{},[49,1730,1731,1733,1736,1738],{},[70,1732,294],{},[70,1734,1735],{},"SPD absent pour nouvelle installation",[70,1737,300],{},[70,1739,1740],{},"Construction neuve",[49,1742,1743,1745,1748,1751],{},[70,1744,308],{},[70,1746,1747],{},"Détecteurs de fumée absents sur le plan de situation (les détecteurs de fumée ne sont pas une exigence RGIE à proprement parler, mais une prescription du droit de la construction\u002Fdu logement — régionale : Flandre, Wallonie, Bruxelles. L'absence peut être notée comme remarque dans le rapport de contrôle)",[70,1749,1750],{},"Régional",[70,1752,1673],{},[26,1754,1756],{"id":1755},"étape-par-étape-après-le-contrôle-négatif","Étape par étape : après le contrôle négatif",[38,1758,1760],{"id":1759},"étape-1-lire-attentivement-le-rapport","Étape 1 : Lire attentivement le rapport",[15,1762,1763],{},"Examinez chaque infraction individuellement. Notez :",[329,1765,1766,1769,1772],{},[332,1767,1768],{},"Quel code (C1\u002FC2\u002FC3) ?",[332,1770,1771],{},"Où se situe exactement le problème (pièce, circuit) ?",[332,1773,1774],{},"Que reproche-t-on exactement ?",[38,1776,1778],{"id":1777},"étape-2-établir-les-priorités","Étape 2 : Établir les priorités",[15,1780,1781,1782,1785],{},"Commencez par les ",[18,1783,1784],{},"infractions C3"," (graves) — elles représentent un danger immédiat. Ensuite les infractions C2. Les infractions C1 peuvent être résolues en parallèle ou ultérieurement.",[38,1787,1789],{"id":1788},"étape-3-professionnel-ou-soi-même","Étape 3 : Professionnel ou soi-même ?",[15,1791,1792],{},"Beaucoup de défauts peuvent être corrigés soi-même :",[329,1794,1795,1801,1807],{},[332,1796,1797,1800],{},[18,1798,1799],{},"Apposer l'étiquetage"," — étiqueter les disjoncteurs dans le tableau",[332,1802,1803,1806],{},[18,1804,1805],{},"Mettre à jour le plan de situation"," — créer avec PlanElec",[332,1808,1809,1812],{},[18,1810,1811],{},"Installer des détecteurs de fumée"," — simple montage au plafond",[15,1814,1815,1816,1819],{},"Pour d'autres défauts, un ",[18,1817,1818],{},"électricien"," est nécessaire :",[329,1821,1822,1825,1828,1831],{},[332,1823,1824],{},"Ajouter ou remplacer le différentiel",[332,1826,1827],{},"Améliorer la mise à la terre",[332,1829,1830],{},"Placer les câbles dans des tubes de protection",[332,1832,1833],{},"Installer l'interrupteur principal",[38,1835,1837],{"id":1836},"étape-4-mettre-à-jour-les-plans","Étape 4 : Mettre à jour les plans",[15,1839,1840,1841,1844],{},"L'un des défauts les plus fréquents est un schéma unifilaire et un plan de situation absents ou obsolètes. Ceux-ci doivent refléter ",[18,1842,1843],{},"l'état actuel"," de l'installation — pas l'état d'il y a 20 ans.",[38,1846,1848],{"id":1847},"étape-5-planifier-le-recontrôle","Étape 5 : Planifier le recontrôle",[15,1850,1851,1852,1855,1856,1859],{},"Il est recommandé de prendre rendez-vous auprès du ",[18,1853,1854],{},"même organisme de contrôle"," qui a effectué le contrôle initial — mais le propriétaire peut aussi choisir un autre organisme de contrôle accrédité. Lors du recontrôle, ",[18,1857,1858],{},"seuls les points contestés"," sont réexaminés — pas l'installation complète.",[26,1861,1863],{"id":1862},"coût-du-recontrôle","Coût du recontrôle",[15,1865,1866,1867,1870],{},"Le coût d'un recontrôle se situe typiquement entre ",[18,1868,1869],{},"80 € et 120 €",", selon l'organisme de contrôle et le nombre de points à vérifier. C'est généralement moins cher que le premier contrôle.",[15,1872,1873],{},"S'ajoutent les coûts de correction des défauts :",[329,1875,1876,1879,1882,1885],{},[332,1877,1878],{},"Ajouter un différentiel : 100-200 € (matériel + main-d'oeuvre)",[332,1880,1881],{},"Améliorer la mise à la terre : 200-500 €",[332,1883,1884],{},"Faire établir les plans : 150-400 € (ou gratuitement avec PlanElec)",[332,1886,1887],{},"Installer l'interrupteur principal : 80-150 €",[26,1889,1891],{"id":1890},"comment-planelec-vous-aide","Comment PlanElec vous aide",[15,1893,1894,1895,1898],{},"PlanElec peut détecter bon nombre des causes de refus les plus fréquentes ",[18,1896,1897],{},"AVANT le contrôle"," :",[329,1900,1901,1907,1913,1919],{},[332,1902,1903,1906],{},[18,1904,1905],{},"La validation"," vérifie automatiquement les différentiels manquants, la protection inadéquate et plus encore",[332,1908,1909,1912],{},[18,1910,1911],{},"Le schéma unifilaire"," est généré conformément au RGIE — l'une des causes de refus les plus courantes est éliminée",[332,1914,1915,1918],{},[18,1916,1917],{},"Le plan de situation"," avec les symboles RGIE corrects",[332,1920,1921,1924],{},[18,1922,1923],{},"L'étiquetage"," de tous les circuits est automatiquement documenté dans le schéma",[15,1926,1927],{},"Vous évitez ainsi les erreurs typiques avant la visite du contrôleur.",[494,1929],{},[15,1931,1932],{},[18,1933,1934],{},"Articles connexes :",[329,1936,1937,1943,1949],{},[332,1938,1939],{},[506,1940,1942],{"href":1941},"\u002Ffr\u002Fblog\u002F10-infractions-rgie-frequentes","Les 10 infractions RGIE les plus fréquentes",[332,1944,1945],{},[506,1946,1948],{"href":1947},"\u002Ffr\u002Fblog\u002Fdifferentiel-30ma","Différentiel 30 mA : quand est-il obligatoire ?",[332,1950,1951],{},[506,1952,1954],{"href":1953},"\u002Ffr\u002Fblog\u002Fsection-cable-disjoncteur","Section de câble et disjoncteur : la bonne combinaison",[15,1956,1957,527,1960],{},[18,1958,1959],{},"Préparez-vous de manière optimale au contrôle électrique — avec PlanElec, créez des plans conformes au RGIE et détectez les défauts à l'avance.",[506,1961,1963],{"href":530,"rel":1962},[532],"Commencer maintenant →",{"title":535,"searchDepth":536,"depth":536,"links":1965},[1966,1969,1974,1975,1982,1983],{"id":1494,"depth":536,"text":1495,"children":1967},[1968],{"id":1505,"depth":541,"text":1506},{"id":1580,"depth":536,"text":1581,"children":1970},[1971,1972,1973],{"id":1584,"depth":541,"text":1585},{"id":1595,"depth":541,"text":1596},{"id":1606,"depth":541,"text":1607},{"id":1617,"depth":536,"text":1618},{"id":1755,"depth":536,"text":1756,"children":1976},[1977,1978,1979,1980,1981],{"id":1759,"depth":541,"text":1760},{"id":1777,"depth":541,"text":1778},{"id":1788,"depth":541,"text":1789},{"id":1836,"depth":541,"text":1837},{"id":1847,"depth":541,"text":1848},{"id":1862,"depth":536,"text":1863},{"id":1890,"depth":536,"text":1891},"Votre contrôle électrique est négatif ? Pas de panique — environ 40 % des contrôles échouent. Découvrez ce que signifient les codes d'infraction, comment corriger les problèmes et combien coûte le recontrôle.","fr",{},"\u002Fblog\u002Finspection-failed-what-now.fr",{"title":1477,"description":1984},"controle-electrique-refuse","blog\u002Finspection-failed-what-now.fr",[1992,1993,1994,1995,1996,1997,1998],"controle","controle-electrique","refuse","infractions","recontrole","rgie","belgique","b8VmWNMhK-MDS6WNzMFN-eqYhapbKeCEd8ioAvFGYtk",{"id":2001,"title":2002,"articleId":6,"body":2003,"category":557,"date":558,"description":2507,"extension":560,"lastUpdated":561,"locale":2508,"meta":2509,"navigation":564,"path":2510,"publishDate":558,"readTime":566,"refreshInterval":567,"seo":2511,"slug":2512,"stem":2513,"tags":2514,"__hash__":2520},"blog\u002Fblog\u002Finspection-failed-what-now.nl.md","Elektrokeuring afgekeurd — wat nu? Stap-voor-stap gids na een negatieve keuring",{"type":8,"value":2004,"toc":2487},[2005,2008,2014,2017,2021,2028,2032,2096,2103,2107,2111,2118,2122,2129,2133,2140,2144,2276,2280,2284,2287,2298,2302,2309,2313,2316,2336,2343,2357,2361,2368,2372,2383,2387,2394,2397,2411,2415,2422,2448,2451,2453,2458,2478],[11,2006,2002],{"id":2007},"elektrokeuring-afgekeurd-wat-nu-stap-voor-stap-gids-na-een-negatieve-keuring",[15,2009,2010,2013],{},[18,2011,2012],{},"Geen paniek."," Zo'n 40 % van alle elektrokeuringen in België valt negatief uit. Een afgekeurde keuring betekent niet dat uw volledige installatie gevaarlijk is — vaak gaat het om formele tekortkomingen of makkelijk op te lossen problemen.",[15,2015,2016],{},"In deze gids leest u wat er na een negatieve keuring moet gebeuren, welke inbreukcodes er bestaan en hoe u zich voorbereidt op de herkeuring.",[26,2018,2020],{"id":2019},"wat-gebeurt-er-na-een-negatieve-keuring","Wat gebeurt er na een negatieve keuring?",[15,2022,2023,2024,2027],{},"Na de keuring ontvangt u een ",[18,2025,2026],{},"uitgebreid verslag"," van het keuringsorganisme (bijv. BTV, Vinçotte, AIB). Dit verslag somt alle vastgestelde inbreuken op, elk met een code:",[38,2029,2031],{"id":2030},"inbreukcodes-begrijpen","Inbreukcodes begrijpen",[43,2033,2034,2049],{},[46,2035,2036],{},[49,2037,2038,2040,2043,2046],{},[52,2039,54],{},[52,2041,2042],{},"Ernst",[52,2044,2045],{},"Betekenis",[52,2047,2048],{},"Termijn",[65,2050,2051,2066,2081],{},[49,2052,2053,2057,2060,2063],{},[70,2054,2055],{},[18,2056,74],{},[70,2058,2059],{},"Licht",[70,2061,2062],{},"Kleine tekortkoming, geen onmiddellijk gevaar",[70,2064,2065],{},"Oplossen bij eerstvolgende gelegenheid",[49,2067,2068,2072,2075,2078],{},[70,2069,2070],{},[18,2071,90],{},[70,2073,2074],{},"Gemiddeld",[70,2076,2077],{},"Tekortkoming die op middellange termijn opgelost moet worden",[70,2079,2080],{},"Moet bij herkeuring opgelost zijn",[49,2082,2083,2087,2090,2093],{},[70,2084,2085],{},[18,2086,106],{},[70,2088,2089],{},"Zwaar",[70,2091,2092],{},"Ernstig gevaar — onmiddellijk handelen vereist",[70,2094,2095],{},"Onmiddellijk oplossen",[15,2097,2098,2099,2102],{},"Bij C2- en C3-inbreuken is de keuring ",[18,2100,2101],{},"negatief"," en is een herkeuring vereist. Bij uitsluitend C1-inbreuken kan de keuring alsnog positief zijn.",[26,2104,2106],{"id":2105},"termijnen-per-situatie","Termijnen per situatie",[38,2108,2110],{"id":2109},"bij-verkoop-van-vastgoed","Bij verkoop van vastgoed",[15,2112,2113,2114,2117],{},"Wanneer u een woning koopt en de elektrokeuring negatief uitvalt, hebt u als koper een ",[18,2115,2116],{},"termijn van 18 maanden"," vanaf de aankoopdatum om alle inbreuken te verhelpen en een positieve herkeuring te verkrijgen.",[38,2119,2121],{"id":2120},"bij-nieuwe-installatie","Bij nieuwe installatie",[15,2123,2124,2125,2128],{},"Bij een nieuwe elektroinstallatie (nieuwbouw, volledige renovatie) moet de installatie ",[18,2126,2127],{},"VOOR de ingebruikname"," conform zijn. De netbeheerder (Fluvius, ORES) schakelt de stroom pas in wanneer een positief keuringscertificaat voorligt.",[38,2130,2132],{"id":2131},"bij-periodieke-keuring","Bij periodieke keuring",[15,2134,2135,2136,2139],{},"De periodieke keuring (elke 25 jaar voor woningen) geeft bij een negatief resultaat een termijn die in het verslag vermeld wordt — typisch ",[18,2137,2138],{},"1 jaar"," voor de herkeuring.",[26,2141,2143],{"id":2142},"de-10-meest-voorkomende-redenen-voor-afkeuring","De 10 meest voorkomende redenen voor afkeuring",[43,2145,2146,2161],{},[46,2147,2148],{},[49,2149,2150,2152,2155,2158],{},[52,2151,732],{},[52,2153,2154],{},"Tekortkoming",[52,2156,2157],{},"AREI-artikel",[52,2159,2160],{},"Frequentie",[65,2162,2163,2175,2186,2197,2208,2219,2230,2241,2252,2264],{},[49,2164,2165,2167,2170,2172],{},[70,2166,188],{},[70,2168,2169],{},"Ontbrekend of verkeerd differentieel (30 mA)",[70,2171,194],{},[70,2173,2174],{},"Zeer frequent",[49,2176,2177,2179,2182,2184],{},[70,2178,202],{},[70,2180,2181],{},"Ontbrekende of verouderde elektroplannen (documentatieplicht: Art. 9.1.2 Nr. 1 eendraadschema, Art. 9.1.2 Nr. 2 situatieplan)",[70,2183,208],{},[70,2185,2174],{},[49,2187,2188,2190,2193,2195],{},[70,2189,215],{},[70,2191,2192],{},"Gebrekkige aarding (aardingsweerstand te hoog: Art. 4.2.4.3b legt 30 Ω als regulatoire drempel vast — bij overschrijding zijn bijkomende differentieelschakelaars met hoge gevoeligheid vereist; algemene formule: R_A × I∆n ≤ 50 V)",[70,2194,221],{},[70,2196,224],{},[49,2198,2199,2201,2204,2206],{},[70,2200,229],{},[70,2202,2203],{},"Ontbrekende etikettering van stroomkringen",[70,2205,235],{},[70,2207,224],{},[49,2209,2210,2212,2215,2217],{},[70,2211,242],{},[70,2213,2214],{},"Kabels zonder beschermbuis\u002Fkabelgoot (XVB-kabels mogen opbouw zonder beschermbuis worden gelegd. VOB-aders moeten altijd in beschermbuizen worden gelegd)",[70,2216,248],{},[70,2218,224],{},[49,2220,2221,2223,2226,2228],{},[70,2222,255],{},[70,2224,2225],{},"Badkamerzones niet gerespecteerd",[70,2227,261],{},[70,2229,2074],{},[49,2231,2232,2234,2237,2239],{},[70,2233,268],{},[70,2235,2236],{},"Ontbrekende hoofdschakelaar (of \u003C40A)",[70,2238,274],{},[70,2240,2074],{},[49,2242,2243,2245,2248,2250],{},[70,2244,281],{},[70,2246,2247],{},"Zekering te groot voor de kabeldoorsnede",[70,2249,287],{},[70,2251,2074],{},[49,2253,2254,2256,2259,2261],{},[70,2255,294],{},[70,2257,2258],{},"Ontbrekende SPD bij nieuwe installatie",[70,2260,300],{},[70,2262,2263],{},"Bij nieuwbouw",[49,2265,2266,2268,2271,2274],{},[70,2267,308],{},[70,2269,2270],{},"Ontbrekende rookmelders op het situatieplan (rookmelders zijn geen AREI-vereiste in strikte zin, maar een bouwrechtelijke\u002Fwoonrechtelijke verplichting — regionaal: Vlaanderen, Wallonië, Brussel. De afwezigheid kan als opmerking in het keuringsverslag worden vermeld)",[70,2272,2273],{},"Regionaal",[70,2275,224],{},[26,2277,2279],{"id":2278},"stap-voor-stap-na-de-negatieve-keuring","Stap voor stap: na de negatieve keuring",[38,2281,2283],{"id":2282},"stap-1-verslag-zorgvuldig-lezen","Stap 1: Verslag zorgvuldig lezen",[15,2285,2286],{},"Ga elke inbreuk apart door. Noteer:",[329,2288,2289,2292,2295],{},[332,2290,2291],{},"Welke code (C1\u002FC2\u002FC3)?",[332,2293,2294],{},"Waar is het probleem precies (kamer, stroomkring)?",[332,2296,2297],{},"Wat wordt er precies betwist?",[38,2299,2301],{"id":2300},"stap-2-prioriteiten-stellen","Stap 2: Prioriteiten stellen",[15,2303,2304,2305,2308],{},"Begin met de ",[18,2306,2307],{},"C3-inbreuken"," (zwaar) — deze vormen een onmiddellijk gevaar. Daarna de C2-inbreuken. C1-inbreuken kunnen parallel of later opgelost worden.",[38,2310,2312],{"id":2311},"stap-3-vakman-of-zelf","Stap 3: Vakman of zelf?",[15,2314,2315],{},"Veel tekortkomingen kunt u zelf oplossen:",[329,2317,2318,2324,2330],{},[332,2319,2320,2323],{},[18,2321,2322],{},"Etikettering aanbrengen"," — zekeringen in de verdeelkast labelen",[332,2325,2326,2329],{},[18,2327,2328],{},"Situatieplan bijwerken"," — met PlanElec maken",[332,2331,2332,2335],{},[18,2333,2334],{},"Rookmelders installeren"," — eenvoudig aan het plafond monteren",[15,2337,2338,2339,2342],{},"Voor andere tekortkomingen hebt u een ",[18,2340,2341],{},"elektricien"," nodig:",[329,2344,2345,2348,2351,2354],{},[332,2346,2347],{},"Differentieel bijplaatsen of vervangen",[332,2349,2350],{},"Aarding verbeteren",[332,2352,2353],{},"Kabels in beschermbuizen leggen",[332,2355,2356],{},"Hoofdschakelaar installeren",[38,2358,2360],{"id":2359},"stap-4-plannen-bijwerken","Stap 4: Plannen bijwerken",[15,2362,2363,2364,2367],{},"Een van de meest voorkomende tekortkomingen is een ontbrekend of verouderd eendraadschema en situatieplan. Deze moeten ",[18,2365,2366],{},"de huidige toestand"," van de installatie weerspiegelen — niet de toestand van 20 jaar geleden.",[38,2369,2371],{"id":2370},"stap-5-herkeuring-afspreken","Stap 5: Herkeuring afspreken",[15,2373,2374,2375,2378,2379,2382],{},"Aanbevolen wordt de herkeuring bij ",[18,2376,2377],{},"hetzelfde keuringsorganisme"," dat de oorspronkelijke keuring heeft uitgevoerd — de eigenaar kan echter ook een ander geaccrediteerd controleorganisme inschakelen. Bij de herkeuring worden ",[18,2380,2381],{},"enkel de betwiste punten"," opnieuw gecontroleerd — niet de volledige installatie.",[26,2384,2386],{"id":2385},"kosten-van-de-herkeuring","Kosten van de herkeuring",[15,2388,2389,2390,2393],{},"De kosten voor een herkeuring liggen typisch tussen ",[18,2391,2392],{},"€80 en €120",", afhankelijk van het keuringsorganisme en het aantal te controleren punten. Dit is doorgaans goedkoper dan de eerste keuring.",[15,2395,2396],{},"Daarnaast zijn er kosten voor het verhelpen van de tekortkomingen:",[329,2398,2399,2402,2405,2408],{},[332,2400,2401],{},"Differentieel bijplaatsen: €100-200 (materiaal + arbeid)",[332,2403,2404],{},"Aarding verbeteren: €200-500",[332,2406,2407],{},"Plannen laten maken: €150-400 (of gratis met PlanElec)",[332,2409,2410],{},"Hoofdschakelaar installeren: €80-150",[26,2412,2414],{"id":2413},"hoe-planelec-helpt","Hoe PlanElec helpt",[15,2416,2417,2418,2421],{},"PlanElec kan veel van de meest voorkomende afkeuringsredenen ",[18,2419,2420],{},"VOOR de keuring"," detecteren:",[329,2423,2424,2430,2436,2442],{},[332,2425,2426,2429],{},[18,2427,2428],{},"Validatie"," controleert automatisch op ontbrekende differentielen, verkeerde beveiliging en meer",[332,2431,2432,2435],{},[18,2433,2434],{},"Eendraadschema"," wordt AREI-conform gegenereerd — een van de meest voorkomende tekortkomingen vervalt",[332,2437,2438,2441],{},[18,2439,2440],{},"Situatieplan"," met correcte AREI-symbolen",[332,2443,2444,2447],{},[18,2445,2446],{},"Etikettering"," van alle stroomkringen wordt automatisch in het schema gedocumenteerd",[15,2449,2450],{},"Zo kunt u typische fouten vermijden voordat de keurder langskomt.",[494,2452],{},[15,2454,2455],{},[18,2456,2457],{},"Gerelateerde artikelen:",[329,2459,2460,2466,2472],{},[332,2461,2462],{},[506,2463,2465],{"href":2464},"\u002Fblog\u002F10-meest-voorkomende-arei-overtredingen","De 10 meest voorkomende AREI-overtredingen",[332,2467,2468],{},[506,2469,2471],{"href":2470},"\u002Fblog\u002F30ma-differentieel","30 mA differentieel: Wanneer is het verplicht?",[332,2473,2474],{},[506,2475,2477],{"href":2476},"\u002Fblog\u002Fkabeldoorsnede-zekering","Kabeldoorsnede en zekering: De juiste combinatie",[15,2479,2480,527,2483],{},[18,2481,2482],{},"Bereid u optimaal voor op de elektrokeuring — met PlanElec maakt u AREI-conforme plannen en detecteert u tekortkomingen vroegtijdig.",[506,2484,2486],{"href":530,"rel":2485},[532],"Nu starten →",{"title":535,"searchDepth":536,"depth":536,"links":2488},[2489,2492,2497,2498,2505,2506],{"id":2019,"depth":536,"text":2020,"children":2490},[2491],{"id":2030,"depth":541,"text":2031},{"id":2105,"depth":536,"text":2106,"children":2493},[2494,2495,2496],{"id":2109,"depth":541,"text":2110},{"id":2120,"depth":541,"text":2121},{"id":2131,"depth":541,"text":2132},{"id":2142,"depth":536,"text":2143},{"id":2278,"depth":536,"text":2279,"children":2499},[2500,2501,2502,2503,2504],{"id":2282,"depth":541,"text":2283},{"id":2300,"depth":541,"text":2301},{"id":2311,"depth":541,"text":2312},{"id":2359,"depth":541,"text":2360},{"id":2370,"depth":541,"text":2371},{"id":2385,"depth":536,"text":2386},{"id":2413,"depth":536,"text":2414},"Is uw elektrokeuring negatief? Geen paniek — zo'n 40 % valt door. Hier leest u wat de inbreukcodes betekenen, hoe u de problemen oplost en wat de herkeuring kost.","nl",{},"\u002Fblog\u002Finspection-failed-what-now.nl",{"title":2002,"description":2507},"elektrokeuring-afgekeurd","blog\u002Finspection-failed-what-now.nl",[1095,2515,2516,2517,2518,576,2519],"elektrokeuring","afgekeurd","inbreuken","herkeuring","belgie","AvfkBd5ZL8n277EoU-HGxP7IRkC1s9VPy2e_hLYSbDk",1781158576889]