[{"data":1,"prerenderedAt":4311},["ShallowReactive",2],{"blog-post-en-old-building-arei-part-8":3,"blog-alternates-old-building-arei-part8":947},{"id":4,"title":5,"articleId":6,"body":7,"category":925,"date":926,"description":927,"extension":928,"lastUpdated":926,"locale":929,"meta":930,"navigation":931,"path":932,"publishDate":926,"readTime":933,"refreshInterval":934,"seo":935,"slug":936,"stem":937,"tags":938,"__hash__":946},"blog\u002Fblog\u002Fold-building-arei-part8.en.md","Old Buildings and AREI Part 8: Special Rules for Existing Installations","old-building-arei-part8",{"type":8,"value":9,"toc":885},"minimark",[10,14,23,26,31,38,49,58,60,64,71,76,79,83,90,94,122,130,132,136,139,143,187,191,227,238,242,245,268,272,278,282,303,307,310,312,316,323,327,421,425,428,454,456,460,464,471,475,482,494,498,568,582,584,588,594,598,605,627,631,649,651,655,662,666,680,684,695,699,710,714,776,778,782,836,838,842,869,871],[11,12,5],"h1",{"id":13},"old-buildings-and-arei-part-8-special-rules-for-existing-installations",[15,16,17,18,22],"p",{},"Not every electrical installation in Belgium needs to comply with the latest AREI\u002FRGIE regulations. For older buildings, ",[19,20,21],"strong",{},"Part 8 (Partie 8)"," provides a dedicated set of rules that tolerates certain deviations from the current standard — as long as no immediate danger exists. This article explains when Part 8 applies, what is permitted, and where the limits lie.",[24,25],"hr",{},[27,28,30],"h2",{"id":29},"what-is-part-8","What Is Part 8?",[15,32,33,34,37],{},"Part 8 of the AREI (Algemeen Reglement op de Elektrische Installaties \u002F Règlement Général sur les Installations Électriques) is a ",[19,35,36],{},"special regulation for existing installations"," that were constructed and approved before the current AREI came into force.",[15,39,40,41,44,45,48],{},"The basic principle: as long as an installation functions ",[19,42,43],{},"safely"," and poses ",[19,46,47],{},"no immediate danger",", it does not need to be fully brought up to the latest standards — even if it does not meet all current requirements.",[50,51,52],"blockquote",{},[15,53,54,57],{},[19,55,56],{},"Important:"," Part 8 is not a free pass. It clearly defines which deviations are tolerated and which are not.",[24,59],{},[27,61,63],{"id":62},"when-does-part-8-apply","When Does Part 8 Apply?",[15,65,66,67,70],{},"Part 8 applies to installations that meet ",[19,68,69],{},"one"," of the following conditions:",[72,73,75],"h3",{"id":74},"condition-1-installation-before-01101981","Condition 1: Installation Before 01.10.1981",[15,77,78],{},"Installations constructed before 1 October 1981 (the date the original AREI came into force) fall under Part 8 by default.",[72,80,82],{"id":81},"condition-2-approved-under-the-old-arei","Condition 2: Approved Under the Old AREI",[15,84,85,86,89],{},"Installations that were approved under a previous version of the AREI and have ",[19,87,88],{},"not been substantially modified"," since the last approval.",[72,91,93],{"id":92},"what-counts-as-a-substantial-modification","What Counts as a \"Substantial Modification\"?",[95,96,97,104,110,116],"ul",{},[98,99,100,101],"li",{},"Adding ",[19,102,103],{},"new circuits",[98,105,106,107],{},"Expanding the ",[19,108,109],{},"distribution board",[98,111,112,113],{},"Modifying the ",[19,114,115],{},"metering installation",[98,117,118,119],{},"Extensive ",[19,120,121],{},"rewiring",[50,123,124],{},[15,125,126,129],{},[19,127,128],{},"Note:"," Small changes such as replacing a socket outlet or switch do NOT count as a substantial modification.",[24,131],{},[27,133,135],{"id":134},"what-is-permitted-under-part-8-tolerated-deviations","What Is Permitted Under Part 8? (Tolerated Deviations)",[15,137,138],{},"The following points deviate from the current AREI but are tolerated under Part 8 during inspection:",[72,140,142],{"id":141},"_1-old-cable-types","1. Old Cable Types",[144,145,146,159],"table",{},[147,148,149],"thead",{},[150,151,152,156],"tr",{},[153,154,155],"th",{},"Current AREI",[153,157,158],{},"Part 8 tolerates",[160,161,162,171,179],"tbody",{},[150,163,164,168],{},[165,166,167],"td",{},"XVB \u002F VOBst in Preflex",[165,169,170],{},"VOB cables in old conduits",[150,172,173,176],{},[165,174,175],{},"Cca fire reaction class",[165,177,178],{},"Older cable types without CPR classification",[150,180,181,184],{},[165,182,183],{},"Minimum cross-section 2.5 mm² for sockets",[165,185,186],{},"Minimum 1 mm² with max. 6A fuse or 10A MCB (Art. 8.2.1 Nr. 5)",[72,188,190],{"id":189},"_2-residual-current-devices-rcd","2. Residual Current Devices (RCD)",[144,192,193,201],{},[147,194,195],{},[150,196,197,199],{},[153,198,155],{},[153,200,158],{},[160,202,203,211,219],{},[150,204,205,208],{},[165,206,207],{},"30 mA RCD per socket circuit",[165,209,210],{},"No 30 mA RCD needed (only 300 mA main RCD)",[150,212,213,216],{},[165,214,215],{},"30 mA RCD mandatory for bathroom",[165,217,218],{},"Tolerated without, if no direct risk",[150,220,221,224],{},[165,222,223],{},"Max. 8 circuits per RCD",[165,225,226],{},"More circuits permitted",[50,228,229],{},[15,230,231,233,234,237],{},[19,232,128],{}," Even under Part 8, a ",[19,235,236],{},"300 mA main RCD"," is recommended and often required by the grid operator when a new meter is installed.",[72,239,241],{"id":240},"_3-socket-outlets-without-earth-contact","3. Socket Outlets Without Earth Contact",[15,243,244],{},"Old socket outlets (type C, without earth pin) are tolerated under Part 8, provided that:",[95,246,247,254,265],{},[98,248,249,250,253],{},"No ",[19,251,252],{},"Class I"," appliances (with metal housing) are connected.",[98,255,256,257,260,261,264],{},"The socket is not in the ",[19,258,259],{},"bathroom"," or in a ",[19,262,263],{},"damp location",".",[98,266,267],{},"The circuit is otherwise intact.",[72,269,271],{"id":270},"_4-no-spd-surge-protection","4. No SPD (Surge Protection)",[15,273,274,275,264],{},"The current AREI requires a Type 2 SPD (Surge Protection Device) for new installations. Under Part 8, this is ",[19,276,277],{},"not required",[72,279,281],{"id":280},"_5-old-distribution-technology","5. Old Distribution Technology",[95,283,284,290,296],{},[98,285,286,289],{},[19,287,288],{},"Fuses"," instead of MCBs are permitted.",[98,291,292,295],{},[19,293,294],{},"Screw-type fuses"," (Diazed) are tolerated.",[98,297,298,299,302],{},"Missing ",[19,300,301],{},"labelling"," is noted as a deficiency but does not cause a failure.",[72,304,306],{"id":305},"_6-no-fire-reaction-classification-of-cables","6. No Fire Reaction Classification of Cables",[15,308,309],{},"Cables without CPR classification (installed before 2017) are tolerated, as the CPR regulation only applies from July 2017 for new installations.",[24,311],{},[27,313,315],{"id":314},"what-is-not-permitted-even-under-part-8","What Is NOT Permitted (Even Under Part 8)?",[15,317,318,319,322],{},"Certain conditions are ",[19,320,321],{},"never tolerated",", regardless of the installation's age:",[72,324,326],{"id":325},"absolutely-impermissible","Absolutely Impermissible:",[144,328,329,339],{},[147,330,331],{},[150,332,333,336],{},[153,334,335],{},"Condition",[153,337,338],{},"Why?",[160,340,341,351,361,371,381,391,401,411],{},[150,342,343,348],{},[165,344,345],{},[19,346,347],{},"Bare or damaged cables",[165,349,350],{},"Immediate electrocution risk",[150,352,353,358],{},[165,354,355],{},[19,356,357],{},"Complete absence of earthing",[165,359,360],{},"No protection in case of insulation fault",[150,362,363,368],{},[165,364,365],{},[19,366,367],{},"Water in contact with electrics",[165,369,370],{},"Danger to life",[150,372,373,378],{},[165,374,375],{},[19,376,377],{},"Accessible live parts",[165,379,380],{},"Direct contact risk",[150,382,383,388],{},[165,384,385],{},[19,386,387],{},"Overheated cables or connections",[165,389,390],{},"Fire risk",[150,392,393,398],{},[165,394,395],{},[19,396,397],{},"Loose connections in junction boxes",[165,399,400],{},"Arc\u002Ffire risk",[150,402,403,408],{},[165,404,405],{},[19,406,407],{},"Junction boxes without covers",[165,409,410],{},"Contact protection missing",[150,412,413,418],{},[165,414,415],{},[19,416,417],{},"Bathroom socket in zone 0 or 1",[165,419,420],{},"Danger to life, prohibited even under Part 8",[72,422,424],{"id":423},"safety-related-minimum-requirements","Safety-Related Minimum Requirements:",[15,426,427],{},"Even under Part 8, the following must be ensured:",[95,429,430,436,442,448],{},[98,431,432,435],{},[19,433,434],{},"Adequate cross-section"," for the actual load (no overloaded 0.75 mm² cable).",[98,437,438,441],{},[19,439,440],{},"Functioning fuses"," (no \"bridged\" fuses).",[98,443,444,447],{},[19,445,446],{},"Earthing of the main board"," (connection to earth electrode).",[98,449,450,453],{},[19,451,452],{},"Accessibility"," of the distribution board.",[24,455],{},[27,457,459],{"id":458},"periodic-inspection","Periodic Inspection",[72,461,463],{"id":462},"every-25-years-mandatory","Every 25 Years Mandatory",[15,465,466,467,470],{},"Existing installations under Part 8 must undergo a periodic inspection every ",[19,468,469],{},"25 years"," by an approved control body.",[72,472,474],{"id":473},"on-change-of-ownership","On Change of Ownership",[15,476,477,478,481],{},"When ",[19,479,480],{},"selling a property",", a valid inspection certificate (less than 25 years old) is mandatory. If none exists, an inspection must be carried out before the sale.",[50,483,484],{},[15,485,486,489,490,493],{},[19,487,488],{},"18-month deadline (Art. 8.4.2.2):"," When purchasing a property with a negative inspection report, the buyer has ",[19,491,492],{},"18 months"," from the purchase date to remedy the defects and have a re-inspection carried out.",[72,495,497],{"id":496},"what-is-checked-during-the-periodic-inspection","What Is Checked During the Periodic Inspection?",[144,499,500,510],{},[147,501,502],{},[150,503,504,507],{},[153,505,506],{},"Inspection Point",[153,508,509],{},"Assessment",[160,511,512,520,528,536,544,552,560],{},[150,513,514,517],{},[165,515,516],{},"Visual inspection of cables and connections",[165,518,519],{},"Damage, overheating",[150,521,522,525],{},[165,523,524],{},"Earth resistance measurement",[165,526,527],{},"≤ 30 Ohm (regulatory threshold per Art. 4.2.4.3b; above this, additional protective measures required)",[150,529,530,533],{},[165,531,532],{},"Insulation resistance measurement",[165,534,535],{},"> 0.5 MOhm",[150,537,538,541],{},[165,539,540],{},"RCD test (if present)",[165,542,543],{},"Trip time and current",[150,545,546,549],{},[165,547,548],{},"Short-circuit protection check",[165,550,551],{},"Fuses \u002F MCBs present",[150,553,554,557],{},[165,555,556],{},"Protection against direct contact",[165,558,559],{},"Covers, IP protection",[150,561,562,565],{},[165,563,564],{},"Documentation",[165,566,567],{},"Single-line diagram + situation plan present?",[50,569,570],{},[15,571,572,233,574,577,578,581],{},[19,573,128],{},[19,575,576],{},"single-line diagram"," and a ",[19,579,580],{},"situation plan"," must be available — even if they need to be created retrospectively.",[24,583],{},[27,585,587],{"id":586},"the-contamination-rule-for-partial-renovations","The Contamination Rule for Partial Renovations",[15,589,590,591,264],{},"A particularly important aspect for old buildings: the so-called ",[19,592,593],{},"contamination rule",[72,595,597],{"id":596},"how-does-it-work","How Does It Work?",[15,599,600,601,604],{},"When you ",[19,602,603],{},"substantially modify"," part of your installation (e.g., adding new circuits):",[606,607,608,615,621],"ol",{},[98,609,610,611,614],{},"The ",[19,612,613],{},"new part"," must fully comply with the current AREI.",[98,616,610,617,620],{},[19,618,619],{},"existing part"," continues to be assessed under Part 8.",[98,622,623,626],{},[19,624,625],{},"BUT:"," If the new part \"contaminates\" the existing part (e.g., new cables in the same distribution board), the inspector may decide that the entire board must comply with the current AREI.",[72,628,630],{"id":629},"practical-consequences","Practical Consequences:",[95,632,633,639,646],{},[98,634,635,636,264],{},"Plan renovations so that new and old parts are ",[19,637,638],{},"clearly separated",[98,640,641,642,645],{},"Ideally, use a ",[19,643,644],{},"separate sub-board"," for new circuits.",[98,647,648],{},"Document precisely what is old and what is new.",[24,650],{},[27,652,654],{"id":653},"recommendation-gradual-modernisation","Recommendation: Gradual Modernisation",[15,656,657,658,661],{},"Even though Part 8 tolerates deviations, ",[19,659,660],{},"gradual modernisation"," is recommended:",[72,663,665],{"id":664},"priority-1-safety-critical","Priority 1 (Safety-Critical)",[95,667,668,671,674,677],{},[98,669,670],{},"Retrofit a 300 mA main RCD (if not present)",[98,672,673],{},"Replace damaged cables",[98,675,676],{},"Fix loose connections",[98,678,679],{},"Check and improve earthing if necessary",[72,681,683],{"id":682},"priority-2-recommended","Priority 2 (Recommended)",[95,685,686,689,692],{},[98,687,688],{},"30 mA group RCDs for bathroom and kitchen",[98,690,691],{},"Replace old fuses with MCBs",[98,693,694],{},"Retrofit SPD Type 2",[72,696,698],{"id":697},"priority-3-comfort-future-proofing","Priority 3 (Comfort + Future-Proofing)",[95,700,701,704,707],{},[98,702,703],{},"Modernise the board (more rows, labelling)",[98,705,706],{},"Retrofit socket outlets with earth",[98,708,709],{},"Preparation for EV charger \u002F PV system",[72,711,713],{"id":712},"cost-orientation","Cost Orientation",[144,715,716,726],{},[147,717,718],{},[150,719,720,723],{},[153,721,722],{},"Measure",[153,724,725],{},"Estimated Cost",[160,727,728,736,744,752,760,768],{},[150,729,730,733],{},[165,731,732],{},"Retrofit 300 mA main RCD",[165,734,735],{},"EUR 150–300",[150,737,738,741],{},[165,739,740],{},"30 mA group RCD (each)",[165,742,743],{},"EUR 80–150",[150,745,746,749],{},[165,747,748],{},"SPD Type 2",[165,750,751],{},"EUR 100–250",[150,753,754,757],{},[165,755,756],{},"MCB set (10 pieces)",[165,758,759],{},"EUR 50–100",[150,761,762,765],{},[165,763,764],{},"New 4-row board (complete)",[165,766,767],{},"EUR 500–1,500",[150,769,770,773],{},[165,771,772],{},"Complete rewiring (house)",[165,774,775],{},"EUR 5,000–15,000",[24,777],{},[27,779,781],{"id":780},"summary","Summary",[144,783,784,794],{},[147,785,786],{},[150,787,788,791],{},[153,789,790],{},"Question",[153,792,793],{},"Answer",[160,795,796,804,812,820,828],{},[150,797,798,801],{},[165,799,800],{},"Does my old building need to comply with the current AREI?",[165,802,803],{},"Not fully, Part 8 permits deviations",[150,805,806,809],{},[165,807,808],{},"Do I need a 30 mA RCD?",[165,810,811],{},"Not mandatory under Part 8, but strongly recommended",[150,813,814,817],{},[165,815,816],{},"Are old sockets without earth permitted?",[165,818,819],{},"Under conditions yes (no bathroom, no Class I appliances)",[150,821,822,825],{},[165,823,824],{},"How often must inspections take place?",[165,826,827],{},"Every 25 years + on change of ownership",[150,829,830,833],{},[165,831,832],{},"What about partial renovation?",[165,834,835],{},"New part = current AREI, old part = Part 8 (contamination rule applies)",[24,837],{},[27,839,841],{"id":840},"related-articles","Related Articles",[95,843,844,851,857,863],{},[98,845,846],{},[847,848,850],"a",{"href":849},"\u002Fen\u002Fblog\u002Felectrical-inspection","Electrical Inspection in Belgium: What Is Checked?",[98,852,853],{},[847,854,856],{"href":855},"\u002Fen\u002Fblog\u002Farei-2026-changes","What Changes with the AREI 2026?",[98,858,859],{},[847,860,862],{"href":861},"\u002Fen\u002Fblog\u002Fpreflex-vs-open-wiring","Preflex vs. Open Wiring",[98,864,865],{},[847,866,868],{"href":867},"\u002Fen\u002Fblog\u002Fdistribution-board-planning-guide","Distribution Board Planning",[24,870],{},[15,872,873],{},[874,875,876,877,880,881],"em",{},"Even for old buildings, ",[19,878,879],{},"PlanElec"," creates standards-compliant single-line diagrams and situation plans — the mandatory documents for every inspection. Document your installation digitally now. ",[847,882,884],{"href":883},"\u002F","Start for free →",{"title":886,"searchDepth":887,"depth":887,"links":888},"",2,[889,890,896,904,908,913,917,923,924],{"id":29,"depth":887,"text":30},{"id":62,"depth":887,"text":63,"children":891},[892,894,895],{"id":74,"depth":893,"text":75},3,{"id":81,"depth":893,"text":82},{"id":92,"depth":893,"text":93},{"id":134,"depth":887,"text":135,"children":897},[898,899,900,901,902,903],{"id":141,"depth":893,"text":142},{"id":189,"depth":893,"text":190},{"id":240,"depth":893,"text":241},{"id":270,"depth":893,"text":271},{"id":280,"depth":893,"text":281},{"id":305,"depth":893,"text":306},{"id":314,"depth":887,"text":315,"children":905},[906,907],{"id":325,"depth":893,"text":326},{"id":423,"depth":893,"text":424},{"id":458,"depth":887,"text":459,"children":909},[910,911,912],{"id":462,"depth":893,"text":463},{"id":473,"depth":893,"text":474},{"id":496,"depth":893,"text":497},{"id":586,"depth":887,"text":587,"children":914},[915,916],{"id":596,"depth":893,"text":597},{"id":629,"depth":893,"text":630},{"id":653,"depth":887,"text":654,"children":918},[919,920,921,922],{"id":664,"depth":893,"text":665},{"id":682,"depth":893,"text":683},{"id":697,"depth":893,"text":698},{"id":712,"depth":893,"text":713},{"id":780,"depth":887,"text":781},{"id":840,"depth":887,"text":841},"guide","2026-04-14","What applies to older electrical installations in Belgium. AREI Part 8 explained: permitted deviations, periodic inspection, and tips for gradual modernisation.","md","en",{},true,"\u002Fblog\u002Fold-building-arei-part8.en","8 min",12,{"title":5,"description":927},"old-building-arei-part-8","blog\u002Fold-building-arei-part8.en",[939,940,941,942,943,944,945],"old building","AREI","Part 8","existing installation","renovation","inspection","periodic","o_HLin8dVqH9j4w7j3eDEByKMCInkqKYS4BfqGC2wco",[948,1860,2503,3407],{"id":949,"title":950,"articleId":6,"body":951,"category":925,"date":926,"description":1846,"extension":928,"lastUpdated":926,"locale":1847,"meta":1848,"navigation":931,"path":1849,"publishDate":926,"readTime":933,"refreshInterval":934,"seo":1850,"slug":1851,"stem":1852,"tags":1853,"__hash__":1859},"blog\u002Fblog\u002Fold-building-arei-part8.de.md","Altbau und AREI Part 8: Sonderregeln für bestehende Installationen",{"type":8,"value":952,"toc":1809},[953,956,962,964,968,975,986,994,996,1000,1007,1011,1014,1018,1025,1029,1055,1063,1065,1069,1072,1076,1113,1117,1153,1165,1169,1172,1195,1199,1205,1209,1230,1234,1237,1239,1243,1250,1254,1348,1352,1355,1381,1383,1387,1391,1398,1402,1409,1421,1425,1495,1510,1512,1516,1522,1526,1533,1554,1558,1577,1579,1583,1590,1594,1608,1612,1623,1627,1638,1642,1704,1706,1710,1764,1766,1770,1796,1798],[11,954,950],{"id":955},"altbau-und-arei-part-8-sonderregeln-für-bestehende-installationen",[15,957,958,959,961],{},"Nicht jede Elektroinstallation in Belgien muss den neuesten AREI-Vorschriften entsprechen. Für ältere Gebäude gibt es mit ",[19,960,21],{}," ein eigenes Regelwerk, das bestimmte Abweichungen vom aktuellen Standard toleriert — solange keine unmittelbare Gefahr besteht. Dieser Artikel erklärt, wann Part 8 gilt, was erlaubt ist und wo die Grenzen liegen.",[24,963],{},[27,965,967],{"id":966},"was-ist-part-8","Was ist Part 8?",[15,969,970,971,974],{},"Part 8 des AREI (Allgemeines Reglement über die Elektrischen Installationen \u002F Règlement Général sur les Installations Électriques) ist eine ",[19,972,973],{},"Sonderregelung für bestehende Installationen",", die vor Inkrafttreten des aktuellen AREI errichtet und abgenommen wurden.",[15,976,977,978,981,982,985],{},"Das Grundprinzip: Solange eine Installation ",[19,979,980],{},"sicher"," funktioniert und ",[19,983,984],{},"keine unmittelbare Gefahr"," darstellt, muss sie nicht vollständig auf den neuesten Stand gebracht werden — auch wenn sie nicht allen aktuellen Vorschriften entspricht.",[50,987,988],{},[15,989,990,993],{},[19,991,992],{},"Wichtig:"," Part 8 ist kein Freibrief. Es definiert klar, welche Abweichungen toleriert werden und welche nicht.",[24,995],{},[27,997,999],{"id":998},"wann-gilt-part-8","Wann gilt Part 8?",[15,1001,1002,1003,1006],{},"Part 8 gilt für Installationen, die ",[19,1004,1005],{},"eine"," der folgenden Bedingungen erfüllen:",[72,1008,1010],{"id":1009},"bedingung-1-installation-vor-dem-01101981","Bedingung 1: Installation vor dem 01.10.1981",[15,1012,1013],{},"Installationen, die vor dem 1. Oktober 1981 errichtet wurden (Datum des Inkrafttretens des ursprünglichen AREI), fallen grundsätzlich unter Part 8.",[72,1015,1017],{"id":1016},"bedingung-2-unter-dem-alten-arei-abgenommen","Bedingung 2: Unter dem alten AREI abgenommen",[15,1019,1020,1021,1024],{},"Installationen, die unter einer früheren Version des AREI abgenommen wurden und seit der letzten Abnahme ",[19,1022,1023],{},"nicht wesentlich verändert"," wurden.",[72,1026,1028],{"id":1027},"was-zählt-als-wesentliche-änderung","Was zählt als „wesentliche Änderung\"?",[95,1030,1031,1037,1043,1049],{},[98,1032,1033,1034],{},"Hinzufügen ",[19,1035,1036],{},"neuer Stromkreise",[98,1038,1039,1040],{},"Erweiterung des ",[19,1041,1042],{},"Verteilerkastens",[98,1044,1045,1046],{},"Änderung der ",[19,1047,1048],{},"Zähleranlage",[98,1050,1051,1052],{},"Umfangreiche ",[19,1053,1054],{},"Umverdrahtung",[50,1056,1057],{},[15,1058,1059,1062],{},[19,1060,1061],{},"Achtung:"," Kleine Änderungen wie der Austausch einer Steckdose oder eines Schalters gelten NICHT als wesentliche Änderung.",[24,1064],{},[27,1066,1068],{"id":1067},"was-ist-unter-part-8-erlaubt-tolerierte-abweichungen","Was ist unter Part 8 erlaubt? (Tolerierte Abweichungen)",[15,1070,1071],{},"Die folgenden Punkte weichen vom aktuellen AREI ab, werden aber unter Part 8 bei der Kontrolle toleriert:",[72,1073,1075],{"id":1074},"_1-alte-kabeltypen","1. Alte Kabeltypen",[144,1077,1078,1088],{},[147,1079,1080],{},[150,1081,1082,1085],{},[153,1083,1084],{},"Aktuelles AREI",[153,1086,1087],{},"Part 8 toleriert",[160,1089,1090,1097,1105],{},[150,1091,1092,1094],{},[165,1093,167],{},[165,1095,1096],{},"VOB-Kabel in alten Leerrohren",[150,1098,1099,1102],{},[165,1100,1101],{},"Cca-Brandschutzklasse",[165,1103,1104],{},"Ältere Kabeltypen ohne CPR-Klassifizierung",[150,1106,1107,1110],{},[165,1108,1109],{},"Mindestquerschnitt 2,5 mm² für Steckdosen",[165,1111,1112],{},"Mindestens 1 mm² bei Absicherung mit max. 6 A Sicherung oder 10 A Leitungsschutzschalter",[72,1114,1116],{"id":1115},"_2-fehlerstromschutzschalter-rcd-differenzialschalter","2. Fehlerstromschutzschalter (RCD \u002F Differenzialschalter)",[144,1118,1119,1127],{},[147,1120,1121],{},[150,1122,1123,1125],{},[153,1124,1084],{},[153,1126,1087],{},[160,1128,1129,1137,1145],{},[150,1130,1131,1134],{},[165,1132,1133],{},"30 mA RCD pro Steckdosenkreis",[165,1135,1136],{},"Kein 30 mA RCD nötig (nur 300 mA Haupt-RCD)",[150,1138,1139,1142],{},[165,1140,1141],{},"30 mA RCD für Badezimmer Pflicht",[165,1143,1144],{},"Toleriert ohne, wenn kein direktes Risiko",[150,1146,1147,1150],{},[165,1148,1149],{},"Max. 8 Kreise pro RCD",[165,1151,1152],{},"Mehr Kreise erlaubt",[50,1154,1155],{},[15,1156,1157,1160,1161,1164],{},[19,1158,1159],{},"Hinweis:"," Auch unter Part 8 wird ein ",[19,1162,1163],{},"300 mA Haupt-RCD"," empfohlen und bei Neuinstallation des Zählers oft vom Netzbetreiber vorausgesetzt.",[72,1166,1168],{"id":1167},"_3-steckdosen-ohne-erdungskontakt","3. Steckdosen ohne Erdungskontakt",[15,1170,1171],{},"Alte Steckdosen ohne Erdungsanschluss (die modernen belgischen Steckdosen sind Typ E mit Erdungsstift) werden unter Part 8 toleriert, sofern:",[95,1173,1174,1181,1192],{},[98,1175,1176,1177,1180],{},"Keine Geräte der ",[19,1178,1179],{},"Schutzklasse I"," (mit Metallgehäuse) angeschlossen werden.",[98,1182,1183,1184,1187,1188,1191],{},"Die Steckdose nicht im ",[19,1185,1186],{},"Badezimmer"," oder an ",[19,1189,1190],{},"feuchten Orten"," ist.",[98,1193,1194],{},"Der Stromkreis ansonsten intakt ist.",[72,1196,1198],{"id":1197},"_4-kein-spd-überspannungsschutz","4. Kein SPD (Überspannungsschutz)",[15,1200,1201,1202,264],{},"Das aktuelle AREI schreibt für Neuinstallationen einen SPD (Surge Protection Device) Typ 2 vor. Unter Part 8 ist das ",[19,1203,1204],{},"nicht erforderlich",[72,1206,1208],{"id":1207},"_5-alte-verteilertechnik","5. Alte Verteilertechnik",[95,1210,1211,1217,1223],{},[98,1212,1213,1216],{},[19,1214,1215],{},"Schmelzsicherungen"," statt MCBs sind erlaubt.",[98,1218,1219,1222],{},[19,1220,1221],{},"Drehsicherungen"," (Diazed) werden toleriert.",[98,1224,1225,1226,1229],{},"Fehlende ",[19,1227,1228],{},"Beschriftung"," wird als Mangel vermerkt, führt aber nicht zum Durchfallen.",[72,1231,1233],{"id":1232},"_6-keine-brandschutzklassifizierung-der-kabel","6. Keine Brandschutzklassifizierung der Kabel",[15,1235,1236],{},"Kabel ohne CPR-Klassifizierung (vor 2017 installiert) werden toleriert, da die CPR-Verordnung erst ab Juli 2017 für neue Installationen gilt.",[24,1238],{},[27,1240,1242],{"id":1241},"was-ist-nicht-erlaubt-auch-unter-part-8","Was ist NICHT erlaubt (auch unter Part 8)?",[15,1244,1245,1246,1249],{},"Bestimmte Zustände werden ",[19,1247,1248],{},"niemals toleriert",", unabhängig vom Alter der Installation:",[72,1251,1253],{"id":1252},"absolut-unzulässig","Absolut unzulässig:",[144,1255,1256,1266],{},[147,1257,1258],{},[150,1259,1260,1263],{},[153,1261,1262],{},"Zustand",[153,1264,1265],{},"Warum?",[160,1267,1268,1278,1288,1298,1308,1318,1328,1338],{},[150,1269,1270,1275],{},[165,1271,1272],{},[19,1273,1274],{},"Blanke oder beschädigte Kabel",[165,1276,1277],{},"Unmittelbare Stromschlaggefahr",[150,1279,1280,1285],{},[165,1281,1282],{},[19,1283,1284],{},"Fehlende Erdung komplett",[165,1286,1287],{},"Kein Schutz bei Isolationsfehler",[150,1289,1290,1295],{},[165,1291,1292],{},[19,1293,1294],{},"Wasser in Kontakt mit Elektrik",[165,1296,1297],{},"Lebensgefahr",[150,1299,1300,1305],{},[165,1301,1302],{},[19,1303,1304],{},"Zugängliche spannungsführende Teile",[165,1306,1307],{},"Direktes Berührungsrisiko",[150,1309,1310,1315],{},[165,1311,1312],{},[19,1313,1314],{},"Überhitzte Kabel oder Verbindungen",[165,1316,1317],{},"Brandgefahr",[150,1319,1320,1325],{},[165,1321,1322],{},[19,1323,1324],{},"Lose Verbindungen in Verteilerdosen",[165,1326,1327],{},"Lichtbogen-\u002FBrandgefahr",[150,1329,1330,1335],{},[165,1331,1332],{},[19,1333,1334],{},"Abzweigdosen ohne Deckel",[165,1336,1337],{},"Berührungsschutz fehlt",[150,1339,1340,1345],{},[165,1341,1342],{},[19,1343,1344],{},"Badezimmer-Steckdose in Zone 0 oder 1",[165,1346,1347],{},"Lebensgefahr, auch unter Part 8 verboten",[72,1349,1351],{"id":1350},"sicherheitsrelevante-mindestanforderungen","Sicherheitsrelevante Mindestanforderungen:",[15,1353,1354],{},"Auch unter Part 8 muss gewährleistet sein:",[95,1356,1357,1363,1369,1375],{},[98,1358,1359,1362],{},[19,1360,1361],{},"Ausreichender Querschnitt"," für die tatsächliche Belastung (kein überlastetes 0,75 mm²-Kabel).",[98,1364,1365,1368],{},[19,1366,1367],{},"Funktionierende Sicherungen"," (keine „gebrückten\" Sicherungen).",[98,1370,1371,1374],{},[19,1372,1373],{},"Erdung des Hauptverteilers"," (Verbindung zur Erdungselektrode).",[98,1376,1377,1380],{},[19,1378,1379],{},"Zugänglichkeit"," des Verteilerkastens.",[24,1382],{},[27,1384,1386],{"id":1385},"periodische-kontrolle","Periodische Kontrolle",[72,1388,1390],{"id":1389},"alle-25-jahre-pflicht","Alle 25 Jahre Pflicht",[15,1392,1393,1394,1397],{},"Bestehende Installationen unter Part 8 müssen alle ",[19,1395,1396],{},"25 Jahre"," einer periodischen Kontrolle durch einen zugelassenen Kontrollorganismus unterzogen werden.",[72,1399,1401],{"id":1400},"bei-eigentümerwechsel","Bei Eigentümerwechsel",[15,1403,1404,1405,1408],{},"Bei ",[19,1406,1407],{},"Verkauf einer Immobilie"," ist eine gültige Kontrollbescheinigung (weniger als 25 Jahre alt) Pflicht. Liegt keine vor, muss vor dem Verkauf eine Kontrolle durchgeführt werden.",[50,1410,1411],{},[15,1412,1413,1416,1417,1420],{},[19,1414,1415],{},"18-Monate-Frist (Art. 8.4.2.2):"," Bei Kauf einer Immobilie mit negativem Prüfbericht hat der Käufer ",[19,1418,1419],{},"18 Monate"," ab Kaufdatum, um die Mängel zu beheben und eine Nachkontrolle durchführen zu lassen.",[72,1422,1424],{"id":1423},"was-wird-bei-der-periodischen-kontrolle-geprüft","Was wird bei der periodischen Kontrolle geprüft?",[144,1426,1427,1437],{},[147,1428,1429],{},[150,1430,1431,1434],{},[153,1432,1433],{},"Prüfpunkt",[153,1435,1436],{},"Beurteilung",[160,1438,1439,1447,1455,1463,1471,1479,1487],{},[150,1440,1441,1444],{},[165,1442,1443],{},"Sichtprüfung der Kabel und Verbindungen",[165,1445,1446],{},"Beschädigung, Überhitzung",[150,1448,1449,1452],{},[165,1450,1451],{},"Erdungswiderstand messen",[165,1453,1454],{},"≤ 30 Ω (regulatorische Schwelle gemäß Art. 4.2.4.3b; darüber zusätzliche Schutzmaßnahmen nötig)",[150,1456,1457,1460],{},[165,1458,1459],{},"Isolationswiderstand messen",[165,1461,1462],{},"> 0,5 MΩ",[150,1464,1465,1468],{},[165,1466,1467],{},"RCD-Test (falls vorhanden)",[165,1469,1470],{},"Auslösezeit und -strom",[150,1472,1473,1476],{},[165,1474,1475],{},"Kurzschlussschutz prüfen",[165,1477,1478],{},"Sicherungen \u002F MCBs vorhanden",[150,1480,1481,1484],{},[165,1482,1483],{},"Schutz gegen direktes Berühren",[165,1485,1486],{},"Abdeckungen, IP-Schutz",[150,1488,1489,1492],{},[165,1490,1491],{},"Dokumentation",[165,1493,1494],{},"Eindrahtschema + Situationsplan vorhanden?",[50,1496,1497],{},[15,1498,1499,1501,1502,1505,1506,1509],{},[19,1500,1159],{}," Auch unter Part 8 müssen ein ",[19,1503,1504],{},"Eindrahtschema"," und ein ",[19,1507,1508],{},"Situationsplan"," vorhanden sein — auch wenn diese nachträglich erstellt werden müssen.",[24,1511],{},[27,1513,1515],{"id":1514},"die-kontaminationsregel-bei-teilrenovierung","Die Kontaminationsregel bei Teilrenovierung",[15,1517,1518,1519,264],{},"Ein besonders wichtiger Aspekt bei Altbauten: die sogenannte ",[19,1520,1521],{},"Kontaminationsregel",[72,1523,1525],{"id":1524},"wie-funktioniert-sie","Wie funktioniert sie?",[15,1527,1528,1529,1532],{},"Wenn Sie einen Teil Ihrer Installation ",[19,1530,1531],{},"wesentlich verändern"," (z. B. neue Stromkreise hinzufügen), gilt:",[606,1534,1535,1542,1548],{},[98,1536,1537,1538,1541],{},"Der ",[19,1539,1540],{},"neue Teil"," muss vollständig dem aktuellen AREI entsprechen.",[98,1543,1537,1544,1547],{},[19,1545,1546],{},"bestehende Teil"," wird weiterhin nach Part 8 beurteilt.",[98,1549,1550,1553],{},[19,1551,1552],{},"ABER:"," Wenn der neue Teil den bestehenden Teil „kontaminiert\" (z. B. neue Kabel im selben Verteiler), kann der Kontrolleur entscheiden, dass der gesamte Verteiler dem aktuellen AREI entsprechen muss.",[72,1555,1557],{"id":1556},"praktische-konsequenz","Praktische Konsequenz:",[95,1559,1560,1567,1574],{},[98,1561,1562,1563,1566],{},"Planen Sie Renovierungen so, dass neue und alte Teile ",[19,1564,1565],{},"klar getrennt"," sind.",[98,1568,1569,1570,1573],{},"Idealerweise einen ",[19,1571,1572],{},"separaten Unterverteiler"," für neue Stromkreise.",[98,1575,1576],{},"Dokumentieren Sie genau, was alt und was neu ist.",[24,1578],{},[27,1580,1582],{"id":1581},"empfehlung-schrittweise-modernisierung","Empfehlung: Schrittweise Modernisierung",[15,1584,1585,1586,1589],{},"Auch wenn Part 8 Abweichungen toleriert, empfiehlt sich eine ",[19,1587,1588],{},"schrittweise Modernisierung",":",[72,1591,1593],{"id":1592},"priorität-1-sicherheitskritisch","Priorität 1 (Sicherheitskritisch)",[95,1595,1596,1599,1602,1605],{},[98,1597,1598],{},"300 mA Haupt-RCD nachrüsten (falls nicht vorhanden)",[98,1600,1601],{},"Beschädigte Kabel ersetzen",[98,1603,1604],{},"Lose Verbindungen beheben",[98,1606,1607],{},"Erdung prüfen und ggf. verbessern",[72,1609,1611],{"id":1610},"priorität-2-empfohlen","Priorität 2 (Empfohlen)",[95,1613,1614,1617,1620],{},[98,1615,1616],{},"30 mA Gruppen-RCDs für Badezimmer und Küche",[98,1618,1619],{},"Alte Schmelzsicherungen durch MCBs ersetzen",[98,1621,1622],{},"SPD Typ 2 nachrüsten",[72,1624,1626],{"id":1625},"priorität-3-komfort-zukunftssicherheit","Priorität 3 (Komfort + Zukunftssicherheit)",[95,1628,1629,1632,1635],{},[98,1630,1631],{},"Verteiler modernisieren (mehr Reihen, Beschriftung)",[98,1633,1634],{},"Steckdosen mit Erdung nachrüsten",[98,1636,1637],{},"Vorbereitung für Wallbox \u002F PV-Anlage",[72,1639,1641],{"id":1640},"kostenorientierung","Kostenorientierung",[144,1643,1644,1654],{},[147,1645,1646],{},[150,1647,1648,1651],{},[153,1649,1650],{},"Maßnahme",[153,1652,1653],{},"Geschätzte Kosten",[160,1655,1656,1664,1672,1680,1688,1696],{},[150,1657,1658,1661],{},[165,1659,1660],{},"300 mA Haupt-RCD nachrüsten",[165,1662,1663],{},"150–300 EUR",[150,1665,1666,1669],{},[165,1667,1668],{},"30 mA Gruppen-RCD (pro Stück)",[165,1670,1671],{},"80–150 EUR",[150,1673,1674,1677],{},[165,1675,1676],{},"SPD Typ 2",[165,1678,1679],{},"100–250 EUR",[150,1681,1682,1685],{},[165,1683,1684],{},"MCB-Set (10 Stück)",[165,1686,1687],{},"50–100 EUR",[150,1689,1690,1693],{},[165,1691,1692],{},"Neuer 4-Reihen-Verteiler (komplett)",[165,1694,1695],{},"500–1.500 EUR",[150,1697,1698,1701],{},[165,1699,1700],{},"Vollständige Neuverkabelung (EFH)",[165,1702,1703],{},"5.000–15.000 EUR",[24,1705],{},[27,1707,1709],{"id":1708},"zusammenfassung","Zusammenfassung",[144,1711,1712,1722],{},[147,1713,1714],{},[150,1715,1716,1719],{},[153,1717,1718],{},"Frage",[153,1720,1721],{},"Antwort",[160,1723,1724,1732,1740,1748,1756],{},[150,1725,1726,1729],{},[165,1727,1728],{},"Muss mein Altbau dem aktuellen AREI entsprechen?",[165,1730,1731],{},"Nicht vollständig, Part 8 erlaubt Abweichungen",[150,1733,1734,1737],{},[165,1735,1736],{},"Brauche ich einen 30 mA RCD?",[165,1738,1739],{},"Unter Part 8 nicht Pflicht, aber dringend empfohlen",[150,1741,1742,1745],{},[165,1743,1744],{},"Sind alte Steckdosen ohne Erdung erlaubt?",[165,1746,1747],{},"Unter Bedingungen ja (kein Badezimmer, keine Schutzklasse-I-Geräte)",[150,1749,1750,1753],{},[165,1751,1752],{},"Wie oft muss kontrolliert werden?",[165,1754,1755],{},"Alle 25 Jahre + bei Eigentümerwechsel",[150,1757,1758,1761],{},[165,1759,1760],{},"Was passiert bei Teilrenovierung?",[165,1762,1763],{},"Neuer Teil = aktuelles AREI, alter Teil = Part 8 (Kontaminationsregel beachten)",[24,1765],{},[27,1767,1769],{"id":1768},"verwandte-artikel","Verwandte Artikel",[95,1771,1772,1778,1784,1790],{},[98,1773,1774],{},[847,1775,1777],{"href":1776},"\u002Fde\u002Fblog\u002Felektrische-kontrolle","Elektrische Kontrolle in Belgien: Was wird geprüft?",[98,1779,1780],{},[847,1781,1783],{"href":1782},"\u002Fde\u002Fblog\u002Farei-2026-aenderungen","Was ändert sich mit dem AREI 2026?",[98,1785,1786],{},[847,1787,1789],{"href":1788},"\u002Fde\u002Fblog\u002Fpreflex-vs-freie-verlegung","Preflex vs. freie Verlegung",[98,1791,1792],{},[847,1793,1795],{"href":1794},"\u002Fde\u002Fblog\u002Fschaltschrank-planen-aufbau","Schaltschrank planen",[24,1797],{},[15,1799,1800],{},[874,1801,1802,1803,1805,1806],{},"Auch für Altbauten erstellt ",[19,1804,879],{}," normgerechte Eindrahtschemas und Situationspläne — die Pflichtdokumente für jede Kontrolle. Dokumentieren Sie Ihre Installation jetzt digital. ",[847,1807,1808],{"href":883},"Kostenlos starten →",{"title":886,"searchDepth":887,"depth":887,"links":1810},[1811,1812,1817,1825,1829,1834,1838,1844,1845],{"id":966,"depth":887,"text":967},{"id":998,"depth":887,"text":999,"children":1813},[1814,1815,1816],{"id":1009,"depth":893,"text":1010},{"id":1016,"depth":893,"text":1017},{"id":1027,"depth":893,"text":1028},{"id":1067,"depth":887,"text":1068,"children":1818},[1819,1820,1821,1822,1823,1824],{"id":1074,"depth":893,"text":1075},{"id":1115,"depth":893,"text":1116},{"id":1167,"depth":893,"text":1168},{"id":1197,"depth":893,"text":1198},{"id":1207,"depth":893,"text":1208},{"id":1232,"depth":893,"text":1233},{"id":1241,"depth":887,"text":1242,"children":1826},[1827,1828],{"id":1252,"depth":893,"text":1253},{"id":1350,"depth":893,"text":1351},{"id":1385,"depth":887,"text":1386,"children":1830},[1831,1832,1833],{"id":1389,"depth":893,"text":1390},{"id":1400,"depth":893,"text":1401},{"id":1423,"depth":893,"text":1424},{"id":1514,"depth":887,"text":1515,"children":1835},[1836,1837],{"id":1524,"depth":893,"text":1525},{"id":1556,"depth":893,"text":1557},{"id":1581,"depth":887,"text":1582,"children":1839},[1840,1841,1842,1843],{"id":1592,"depth":893,"text":1593},{"id":1610,"depth":893,"text":1611},{"id":1625,"depth":893,"text":1626},{"id":1640,"depth":893,"text":1641},{"id":1708,"depth":887,"text":1709},{"id":1768,"depth":887,"text":1769},"Was bei älteren Elektroinstallationen in Belgien gilt. AREI Part 8 erklärt: erlaubte Abweichungen, periodische Kontrolle und Tipps zur schrittweisen Modernisierung.","de",{},"\u002Fblog\u002Fold-building-arei-part8.de",{"title":950,"description":1846},"altbau-arei-part-8","blog\u002Fold-building-arei-part8.de",[1854,940,941,1855,1856,1857,1858],"altbau","bestandsinstallation","renovierung","kontrolle","periodisch","_TLbU6gMz55zQGkPR7gfITgAejwEoqotZeHQPVySPXM",{"id":4,"title":5,"articleId":6,"body":1861,"category":925,"date":926,"description":927,"extension":928,"lastUpdated":926,"locale":929,"meta":2500,"navigation":931,"path":932,"publishDate":926,"readTime":933,"refreshInterval":934,"seo":2501,"slug":936,"stem":937,"tags":2502,"__hash__":946},{"type":8,"value":1862,"toc":2463},[1863,1865,1869,1871,1873,1877,1883,1889,1891,1893,1897,1899,1901,1903,1907,1909,1927,1933,1935,1937,1939,1941,1971,1973,2003,2011,2013,2015,2029,2031,2035,2037,2051,2053,2055,2057,2059,2063,2065,2141,2143,2145,2163,2165,2167,2169,2173,2175,2179,2187,2189,2243,2253,2255,2257,2261,2263,2267,2281,2283,2295,2297,2299,2303,2305,2315,2317,2325,2327,2335,2337,2385,2387,2389,2431,2433,2435,2453,2455],[11,1864,5],{"id":13},[15,1866,17,1867,22],{},[19,1868,21],{},[24,1870],{},[27,1872,30],{"id":29},[15,1874,33,1875,37],{},[19,1876,36],{},[15,1878,40,1879,44,1881,48],{},[19,1880,43],{},[19,1882,47],{},[50,1884,1885],{},[15,1886,1887,57],{},[19,1888,56],{},[24,1890],{},[27,1892,63],{"id":62},[15,1894,66,1895,70],{},[19,1896,69],{},[72,1898,75],{"id":74},[15,1900,78],{},[72,1902,82],{"id":81},[15,1904,85,1905,89],{},[19,1906,88],{},[72,1908,93],{"id":92},[95,1910,1911,1915,1919,1923],{},[98,1912,100,1913],{},[19,1914,103],{},[98,1916,106,1917],{},[19,1918,109],{},[98,1920,112,1921],{},[19,1922,115],{},[98,1924,118,1925],{},[19,1926,121],{},[50,1928,1929],{},[15,1930,1931,129],{},[19,1932,128],{},[24,1934],{},[27,1936,135],{"id":134},[15,1938,138],{},[72,1940,142],{"id":141},[144,1942,1943,1951],{},[147,1944,1945],{},[150,1946,1947,1949],{},[153,1948,155],{},[153,1950,158],{},[160,1952,1953,1959,1965],{},[150,1954,1955,1957],{},[165,1956,167],{},[165,1958,170],{},[150,1960,1961,1963],{},[165,1962,175],{},[165,1964,178],{},[150,1966,1967,1969],{},[165,1968,183],{},[165,1970,186],{},[72,1972,190],{"id":189},[144,1974,1975,1983],{},[147,1976,1977],{},[150,1978,1979,1981],{},[153,1980,155],{},[153,1982,158],{},[160,1984,1985,1991,1997],{},[150,1986,1987,1989],{},[165,1988,207],{},[165,1990,210],{},[150,1992,1993,1995],{},[165,1994,215],{},[165,1996,218],{},[150,1998,1999,2001],{},[165,2000,223],{},[165,2002,226],{},[50,2004,2005],{},[15,2006,2007,233,2009,237],{},[19,2008,128],{},[19,2010,236],{},[72,2012,241],{"id":240},[15,2014,244],{},[95,2016,2017,2021,2027],{},[98,2018,249,2019,253],{},[19,2020,252],{},[98,2022,256,2023,260,2025,264],{},[19,2024,259],{},[19,2026,263],{},[98,2028,267],{},[72,2030,271],{"id":270},[15,2032,274,2033,264],{},[19,2034,277],{},[72,2036,281],{"id":280},[95,2038,2039,2043,2047],{},[98,2040,2041,289],{},[19,2042,288],{},[98,2044,2045,295],{},[19,2046,294],{},[98,2048,298,2049,302],{},[19,2050,301],{},[72,2052,306],{"id":305},[15,2054,309],{},[24,2056],{},[27,2058,315],{"id":314},[15,2060,318,2061,322],{},[19,2062,321],{},[72,2064,326],{"id":325},[144,2066,2067,2075],{},[147,2068,2069],{},[150,2070,2071,2073],{},[153,2072,335],{},[153,2074,338],{},[160,2076,2077,2085,2093,2101,2109,2117,2125,2133],{},[150,2078,2079,2083],{},[165,2080,2081],{},[19,2082,347],{},[165,2084,350],{},[150,2086,2087,2091],{},[165,2088,2089],{},[19,2090,357],{},[165,2092,360],{},[150,2094,2095,2099],{},[165,2096,2097],{},[19,2098,367],{},[165,2100,370],{},[150,2102,2103,2107],{},[165,2104,2105],{},[19,2106,377],{},[165,2108,380],{},[150,2110,2111,2115],{},[165,2112,2113],{},[19,2114,387],{},[165,2116,390],{},[150,2118,2119,2123],{},[165,2120,2121],{},[19,2122,397],{},[165,2124,400],{},[150,2126,2127,2131],{},[165,2128,2129],{},[19,2130,407],{},[165,2132,410],{},[150,2134,2135,2139],{},[165,2136,2137],{},[19,2138,417],{},[165,2140,420],{},[72,2142,424],{"id":423},[15,2144,427],{},[95,2146,2147,2151,2155,2159],{},[98,2148,2149,435],{},[19,2150,434],{},[98,2152,2153,441],{},[19,2154,440],{},[98,2156,2157,447],{},[19,2158,446],{},[98,2160,2161,453],{},[19,2162,452],{},[24,2164],{},[27,2166,459],{"id":458},[72,2168,463],{"id":462},[15,2170,466,2171,470],{},[19,2172,469],{},[72,2174,474],{"id":473},[15,2176,477,2177,481],{},[19,2178,480],{},[50,2180,2181],{},[15,2182,2183,489,2185,493],{},[19,2184,488],{},[19,2186,492],{},[72,2188,497],{"id":496},[144,2190,2191,2199],{},[147,2192,2193],{},[150,2194,2195,2197],{},[153,2196,506],{},[153,2198,509],{},[160,2200,2201,2207,2213,2219,2225,2231,2237],{},[150,2202,2203,2205],{},[165,2204,516],{},[165,2206,519],{},[150,2208,2209,2211],{},[165,2210,524],{},[165,2212,527],{},[150,2214,2215,2217],{},[165,2216,532],{},[165,2218,535],{},[150,2220,2221,2223],{},[165,2222,540],{},[165,2224,543],{},[150,2226,2227,2229],{},[165,2228,548],{},[165,2230,551],{},[150,2232,2233,2235],{},[165,2234,556],{},[165,2236,559],{},[150,2238,2239,2241],{},[165,2240,564],{},[165,2242,567],{},[50,2244,2245],{},[15,2246,2247,233,2249,577,2251,581],{},[19,2248,128],{},[19,2250,576],{},[19,2252,580],{},[24,2254],{},[27,2256,587],{"id":586},[15,2258,590,2259,264],{},[19,2260,593],{},[72,2262,597],{"id":596},[15,2264,600,2265,604],{},[19,2266,603],{},[606,2268,2269,2273,2277],{},[98,2270,610,2271,614],{},[19,2272,613],{},[98,2274,610,2275,620],{},[19,2276,619],{},[98,2278,2279,626],{},[19,2280,625],{},[72,2282,630],{"id":629},[95,2284,2285,2289,2293],{},[98,2286,635,2287,264],{},[19,2288,638],{},[98,2290,641,2291,645],{},[19,2292,644],{},[98,2294,648],{},[24,2296],{},[27,2298,654],{"id":653},[15,2300,657,2301,661],{},[19,2302,660],{},[72,2304,665],{"id":664},[95,2306,2307,2309,2311,2313],{},[98,2308,670],{},[98,2310,673],{},[98,2312,676],{},[98,2314,679],{},[72,2316,683],{"id":682},[95,2318,2319,2321,2323],{},[98,2320,688],{},[98,2322,691],{},[98,2324,694],{},[72,2326,698],{"id":697},[95,2328,2329,2331,2333],{},[98,2330,703],{},[98,2332,706],{},[98,2334,709],{},[72,2336,713],{"id":712},[144,2338,2339,2347],{},[147,2340,2341],{},[150,2342,2343,2345],{},[153,2344,722],{},[153,2346,725],{},[160,2348,2349,2355,2361,2367,2373,2379],{},[150,2350,2351,2353],{},[165,2352,732],{},[165,2354,735],{},[150,2356,2357,2359],{},[165,2358,740],{},[165,2360,743],{},[150,2362,2363,2365],{},[165,2364,748],{},[165,2366,751],{},[150,2368,2369,2371],{},[165,2370,756],{},[165,2372,759],{},[150,2374,2375,2377],{},[165,2376,764],{},[165,2378,767],{},[150,2380,2381,2383],{},[165,2382,772],{},[165,2384,775],{},[24,2386],{},[27,2388,781],{"id":780},[144,2390,2391,2399],{},[147,2392,2393],{},[150,2394,2395,2397],{},[153,2396,790],{},[153,2398,793],{},[160,2400,2401,2407,2413,2419,2425],{},[150,2402,2403,2405],{},[165,2404,800],{},[165,2406,803],{},[150,2408,2409,2411],{},[165,2410,808],{},[165,2412,811],{},[150,2414,2415,2417],{},[165,2416,816],{},[165,2418,819],{},[150,2420,2421,2423],{},[165,2422,824],{},[165,2424,827],{},[150,2426,2427,2429],{},[165,2428,832],{},[165,2430,835],{},[24,2432],{},[27,2434,841],{"id":840},[95,2436,2437,2441,2445,2449],{},[98,2438,2439],{},[847,2440,850],{"href":849},[98,2442,2443],{},[847,2444,856],{"href":855},[98,2446,2447],{},[847,2448,862],{"href":861},[98,2450,2451],{},[847,2452,868],{"href":867},[24,2454],{},[15,2456,2457],{},[874,2458,876,2459,880,2461],{},[19,2460,879],{},[847,2462,884],{"href":883},{"title":886,"searchDepth":887,"depth":887,"links":2464},[2465,2466,2471,2479,2483,2488,2492,2498,2499],{"id":29,"depth":887,"text":30},{"id":62,"depth":887,"text":63,"children":2467},[2468,2469,2470],{"id":74,"depth":893,"text":75},{"id":81,"depth":893,"text":82},{"id":92,"depth":893,"text":93},{"id":134,"depth":887,"text":135,"children":2472},[2473,2474,2475,2476,2477,2478],{"id":141,"depth":893,"text":142},{"id":189,"depth":893,"text":190},{"id":240,"depth":893,"text":241},{"id":270,"depth":893,"text":271},{"id":280,"depth":893,"text":281},{"id":305,"depth":893,"text":306},{"id":314,"depth":887,"text":315,"children":2480},[2481,2482],{"id":325,"depth":893,"text":326},{"id":423,"depth":893,"text":424},{"id":458,"depth":887,"text":459,"children":2484},[2485,2486,2487],{"id":462,"depth":893,"text":463},{"id":473,"depth":893,"text":474},{"id":496,"depth":893,"text":497},{"id":586,"depth":887,"text":587,"children":2489},[2490,2491],{"id":596,"depth":893,"text":597},{"id":629,"depth":893,"text":630},{"id":653,"depth":887,"text":654,"children":2493},[2494,2495,2496,2497],{"id":664,"depth":893,"text":665},{"id":682,"depth":893,"text":683},{"id":697,"depth":893,"text":698},{"id":712,"depth":893,"text":713},{"id":780,"depth":887,"text":781},{"id":840,"depth":887,"text":841},{},{"title":5,"description":927},[939,940,941,942,943,944,945],{"id":2504,"title":2505,"articleId":6,"body":2506,"category":925,"date":926,"description":3392,"extension":928,"lastUpdated":926,"locale":3393,"meta":3394,"navigation":931,"path":3395,"publishDate":926,"readTime":933,"refreshInterval":934,"seo":3396,"slug":3397,"stem":3398,"tags":3399,"__hash__":3406},"blog\u002Fblog\u002Fold-building-arei-part8.fr.md","Ancien bâtiment et RGIE Partie 8 : Règles spéciales pour les installations existantes",{"type":8,"value":2507,"toc":3355},[2508,2511,2518,2520,2524,2531,2542,2550,2552,2556,2563,2567,2570,2574,2581,2585,2611,2619,2621,2625,2628,2632,2670,2674,2710,2722,2726,2729,2751,2755,2761,2765,2787,2791,2794,2796,2800,2807,2811,2905,2909,2912,2938,2940,2944,2948,2955,2959,2966,2978,2982,3050,3064,3066,3070,3076,3080,3087,3108,3112,3130,3132,3136,3143,3147,3161,3165,3176,3180,3191,3195,3251,3253,3257,3310,3312,3316,3342,3344],[11,2509,2505],{"id":2510},"ancien-bâtiment-et-rgie-partie-8-règles-spéciales-pour-les-installations-existantes",[15,2512,2513,2514,2517],{},"Toute installation électrique en Belgique ne doit pas forcément répondre aux dernières prescriptions du RGIE. Pour les bâtiments plus anciens, la ",[19,2515,2516],{},"Partie 8"," constitue un ensemble de règles spécifiques qui tolère certaines dérogations par rapport au standard actuel — tant qu'il n'existe pas de danger immédiat. Cet article explique quand la Partie 8 s'applique, ce qui est autorisé et où se trouvent les limites.",[24,2519],{},[27,2521,2523],{"id":2522},"quest-ce-que-la-partie-8","Qu'est-ce que la Partie 8 ?",[15,2525,2526,2527,2530],{},"La Partie 8 du RGIE (Règlement Général sur les Installations Électriques) est une ",[19,2528,2529],{},"réglementation spéciale pour les installations existantes"," qui ont été réalisées et réceptionnées avant l'entrée en vigueur du RGIE actuel.",[15,2532,2533,2534,2537,2538,2541],{},"Le principe de base : tant qu'une installation fonctionne de manière ",[19,2535,2536],{},"sûre"," et ne représente ",[19,2539,2540],{},"aucun danger immédiat",", elle n'a pas à être entièrement mise aux normes actuelles — même si elle ne répond pas à toutes les prescriptions en vigueur.",[50,2543,2544],{},[15,2545,2546,2549],{},[19,2547,2548],{},"Important :"," La Partie 8 n'est pas un blanc-seing. Elle définit clairement quelles dérogations sont tolérées et lesquelles ne le sont pas.",[24,2551],{},[27,2553,2555],{"id":2554},"quand-la-partie-8-sapplique-t-elle","Quand la Partie 8 s'applique-t-elle ?",[15,2557,2558,2559,2562],{},"La Partie 8 s'applique aux installations qui remplissent ",[19,2560,2561],{},"l'une"," des conditions suivantes :",[72,2564,2566],{"id":2565},"condition-1-installation-avant-le-01101981","Condition 1 : Installation avant le 01.10.1981",[15,2568,2569],{},"Les installations réalisées avant le 1er octobre 1981 (date d'entrée en vigueur du RGIE original) tombent en principe sous la Partie 8.",[72,2571,2573],{"id":2572},"condition-2-réceptionnée-sous-lancien-rgie","Condition 2 : Réceptionnée sous l'ancien RGIE",[15,2575,2576,2577,2580],{},"Les installations qui ont été réceptionnées sous une version antérieure du RGIE et qui n'ont ",[19,2578,2579],{},"pas été substantiellement modifiées"," depuis la dernière réception.",[72,2582,2584],{"id":2583},"quest-ce-quune-modification-substantielle","Qu'est-ce qu'une « modification substantielle » ?",[95,2586,2587,2593,2599,2605],{},[98,2588,2589,2590],{},"Ajout de ",[19,2591,2592],{},"nouveaux circuits",[98,2594,2595,2596],{},"Extension du ",[19,2597,2598],{},"tableau de distribution",[98,2600,2601,2602],{},"Modification de l'",[19,2603,2604],{},"installation de comptage",[98,2606,2607,2610],{},[19,2608,2609],{},"Recâblage"," important",[50,2612,2613],{},[15,2614,2615,2618],{},[19,2616,2617],{},"Attention :"," Les petites modifications comme le remplacement d'une prise ou d'un interrupteur ne comptent PAS comme modification substantielle.",[24,2620],{},[27,2622,2624],{"id":2623},"ce-qui-est-autorisé-sous-la-partie-8-dérogations-tolérées","Ce qui est autorisé sous la Partie 8 (Dérogations tolérées)",[15,2626,2627],{},"Les points suivants s'écartent du RGIE actuel, mais sont tolérés sous la Partie 8 lors du contrôle :",[72,2629,2631],{"id":2630},"_1-anciens-types-de-câbles","1. Anciens types de câbles",[144,2633,2634,2644],{},[147,2635,2636],{},[150,2637,2638,2641],{},[153,2639,2640],{},"RGIE actuel",[153,2642,2643],{},"Partie 8 tolère",[160,2645,2646,2654,2662],{},[150,2647,2648,2651],{},[165,2649,2650],{},"XVB \u002F VOBst en Preflex",[165,2652,2653],{},"Câbles VOB dans d'anciennes gaines",[150,2655,2656,2659],{},[165,2657,2658],{},"Classe de réaction au feu Cca",[165,2660,2661],{},"Types de câbles plus anciens sans classification CPR",[150,2663,2664,2667],{},[165,2665,2666],{},"Section minimale 2,5 mm² pour les prises",[165,2668,2669],{},"Minimum 1 mm² avec fusible max. 6 A ou disjoncteur max. 10 A (Art. 8.2.1 Nr. 5)",[72,2671,2673],{"id":2672},"_2-différentiels-rcd","2. Différentiels (RCD)",[144,2675,2676,2684],{},[147,2677,2678],{},[150,2679,2680,2682],{},[153,2681,2640],{},[153,2683,2643],{},[160,2685,2686,2694,2702],{},[150,2687,2688,2691],{},[165,2689,2690],{},"Différentiel 30 mA par circuit prises",[165,2692,2693],{},"Pas de 30 mA nécessaire (seulement 300 mA principal)",[150,2695,2696,2699],{},[165,2697,2698],{},"Différentiel 30 mA obligatoire pour salle de bain",[165,2700,2701],{},"Toléré sans, s'il n'y a pas de risque direct",[150,2703,2704,2707],{},[165,2705,2706],{},"Max. 8 circuits par RCD",[165,2708,2709],{},"Plus de circuits autorisés",[50,2711,2712],{},[15,2713,2714,2717,2718,2721],{},[19,2715,2716],{},"Note :"," Même sous la Partie 8, un ",[19,2719,2720],{},"différentiel principal 300 mA"," est recommandé et souvent exigé par le gestionnaire de réseau lors d'une nouvelle installation de compteur.",[72,2723,2725],{"id":2724},"_3-prises-sans-contact-de-terre","3. Prises sans contact de terre",[15,2727,2728],{},"Les anciennes prises (type C, sans broche de terre) sont tolérées sous la Partie 8, à condition que :",[95,2730,2731,2738,2748],{},[98,2732,2733,2734,2737],{},"Aucun appareil de ",[19,2735,2736],{},"classe de protection I"," (avec boîtier métallique) ne soit branché.",[98,2739,2740,2741,2744,2745,264],{},"La prise ne soit pas dans la ",[19,2742,2743],{},"salle de bain"," ou dans un ",[19,2746,2747],{},"lieu humide",[98,2749,2750],{},"Le circuit soit par ailleurs intact.",[72,2752,2754],{"id":2753},"_4-pas-de-parafoudre-spd","4. Pas de parafoudre (SPD)",[15,2756,2757,2758,264],{},"Le RGIE actuel prescrit un parafoudre (SPD) Type 2 pour les nouvelles installations. Sous la Partie 8, ce n'est ",[19,2759,2760],{},"pas requis",[72,2762,2764],{"id":2763},"_5-ancienne-technique-de-distribution","5. Ancienne technique de distribution",[95,2766,2767,2774,2780],{},[98,2768,2769,2770,2773],{},"Les ",[19,2771,2772],{},"fusibles"," au lieu de disjoncteurs sont autorisés.",[98,2775,2769,2776,2779],{},[19,2777,2778],{},"fusibles à vis"," (Diazed) sont tolérés.",[98,2781,2782,2783,2786],{},"L'absence d'",[19,2784,2785],{},"étiquetage"," est mentionnée comme défaut, mais n'entraîne pas un échec.",[72,2788,2790],{"id":2789},"_6-pas-de-classification-de-réaction-au-feu-des-câbles","6. Pas de classification de réaction au feu des câbles",[15,2792,2793],{},"Les câbles sans classification CPR (installés avant 2017) sont tolérés, car le règlement CPR ne s'applique qu'à partir de juillet 2017 pour les nouvelles installations.",[24,2795],{},[27,2797,2799],{"id":2798},"ce-qui-nest-pas-autorisé-même-sous-la-partie-8","Ce qui n'est PAS autorisé (même sous la Partie 8)",[15,2801,2802,2803,2806],{},"Certaines situations ne sont ",[19,2804,2805],{},"jamais tolérées",", quel que soit l'âge de l'installation :",[72,2808,2810],{"id":2809},"absolument-inadmissible","Absolument inadmissible :",[144,2812,2813,2823],{},[147,2814,2815],{},[150,2816,2817,2820],{},[153,2818,2819],{},"Situation",[153,2821,2822],{},"Pourquoi ?",[160,2824,2825,2835,2845,2855,2865,2875,2885,2895],{},[150,2826,2827,2832],{},[165,2828,2829],{},[19,2830,2831],{},"Câbles dénudés ou endommagés",[165,2833,2834],{},"Danger immédiat d'électrocution",[150,2836,2837,2842],{},[165,2838,2839],{},[19,2840,2841],{},"Absence totale de mise à la terre",[165,2843,2844],{},"Pas de protection en cas de défaut d'isolement",[150,2846,2847,2852],{},[165,2848,2849],{},[19,2850,2851],{},"Eau en contact avec l'électricité",[165,2853,2854],{},"Danger de mort",[150,2856,2857,2862],{},[165,2858,2859],{},[19,2860,2861],{},"Parties sous tension accessibles",[165,2863,2864],{},"Risque de contact direct",[150,2866,2867,2872],{},[165,2868,2869],{},[19,2870,2871],{},"Câbles ou connexions en surchauffe",[165,2873,2874],{},"Risque d'incendie",[150,2876,2877,2882],{},[165,2878,2879],{},[19,2880,2881],{},"Connexions desserrées dans les boîtes de dérivation",[165,2883,2884],{},"Risque d'arc\u002Fincendie",[150,2886,2887,2892],{},[165,2888,2889],{},[19,2890,2891],{},"Boîtes de dérivation sans couvercle",[165,2893,2894],{},"Protection contre les contacts manquante",[150,2896,2897,2902],{},[165,2898,2899],{},[19,2900,2901],{},"Prise de salle de bain en zone 0 ou 1",[165,2903,2904],{},"Danger de mort, interdit même sous Partie 8",[72,2906,2908],{"id":2907},"exigences-minimales-de-sécurité","Exigences minimales de sécurité :",[15,2910,2911],{},"Même sous la Partie 8, il faut garantir :",[95,2913,2914,2920,2926,2932],{},[98,2915,2916,2919],{},[19,2917,2918],{},"Section suffisante"," pour la charge réelle (pas de câble 0,75 mm² surchargé).",[98,2921,2922,2925],{},[19,2923,2924],{},"Fusibles fonctionnels"," (pas de fusibles « pontés »).",[98,2927,2928,2931],{},[19,2929,2930],{},"Mise à la terre du tableau principal"," (connexion à l'électrode de terre).",[98,2933,2934,2937],{},[19,2935,2936],{},"Accessibilité"," du tableau de distribution.",[24,2939],{},[27,2941,2943],{"id":2942},"contrôle-périodique","Contrôle périodique",[72,2945,2947],{"id":2946},"tous-les-25-ans-obligatoire","Tous les 25 ans obligatoire",[15,2949,2950,2951,2954],{},"Les installations existantes sous la Partie 8 doivent subir un contrôle périodique tous les ",[19,2952,2953],{},"25 ans"," par un organisme de contrôle agréé.",[72,2956,2958],{"id":2957},"lors-dun-changement-de-propriétaire","Lors d'un changement de propriétaire",[15,2960,2961,2962,2965],{},"Lors de la ",[19,2963,2964],{},"vente d'un bien immobilier",", une attestation de contrôle valide (de moins de 25 ans) est obligatoire. Si elle n'existe pas, un contrôle doit être effectué avant la vente.",[50,2967,2968],{},[15,2969,2970,2973,2974,2977],{},[19,2971,2972],{},"Délai de 18 mois (Art. 8.4.2.2) :"," Lors de l'achat d'un bien immobilier avec un rapport de contrôle négatif, l'acheteur dispose de ",[19,2975,2976],{},"18 mois"," à compter de la date d'achat pour remédier aux défauts et faire effectuer un recontrôle.",[72,2979,2981],{"id":2980},"que-vérifie-t-on-lors-du-contrôle-périodique","Que vérifie-t-on lors du contrôle périodique ?",[144,2983,2984,2994],{},[147,2985,2986],{},[150,2987,2988,2991],{},[153,2989,2990],{},"Point de contrôle",[153,2992,2993],{},"Évaluation",[160,2995,2996,3004,3012,3019,3027,3035,3043],{},[150,2997,2998,3001],{},[165,2999,3000],{},"Inspection visuelle des câbles et connexions",[165,3002,3003],{},"Dommages, surchauffe",[150,3005,3006,3009],{},[165,3007,3008],{},"Mesure de la résistance de terre",[165,3010,3011],{},"≤ 30 Ω (seuil réglementaire selon Art. 4.2.4.3b ; au-delà, des mesures de protection supplémentaires sont nécessaires)",[150,3013,3014,3017],{},[165,3015,3016],{},"Mesure de la résistance d'isolement",[165,3018,1462],{},[150,3020,3021,3024],{},[165,3022,3023],{},"Test RCD (si présent)",[165,3025,3026],{},"Temps et courant de déclenchement",[150,3028,3029,3032],{},[165,3030,3031],{},"Vérification de la protection contre les courts-circuits",[165,3033,3034],{},"Fusibles \u002F disjoncteurs présents",[150,3036,3037,3040],{},[165,3038,3039],{},"Protection contre les contacts directs",[165,3041,3042],{},"Couvercles, protection IP",[150,3044,3045,3047],{},[165,3046,564],{},[165,3048,3049],{},"Schéma unifilaire + plan de situation présents ?",[50,3051,3052],{},[15,3053,3054,2717,3056,3059,3060,3063],{},[19,3055,2716],{},[19,3057,3058],{},"schéma unifilaire"," et un ",[19,3061,3062],{},"plan de situation"," doivent être disponibles — même s'ils doivent être établis rétroactivement.",[24,3065],{},[27,3067,3069],{"id":3068},"la-règle-de-contamination-lors-dune-rénovation-partielle","La règle de contamination lors d'une rénovation partielle",[15,3071,3072,3073,264],{},"Un aspect particulièrement important pour les anciens bâtiments : la ",[19,3074,3075],{},"règle de contamination",[72,3077,3079],{"id":3078},"comment-fonctionne-t-elle","Comment fonctionne-t-elle ?",[15,3081,3082,3083,3086],{},"Lorsque vous modifiez ",[19,3084,3085],{},"substantiellement"," une partie de votre installation (par ex. ajout de nouveaux circuits) :",[606,3088,3089,3096,3102],{},[98,3090,3091,3092,3095],{},"La ",[19,3093,3094],{},"nouvelle partie"," doit entièrement répondre au RGIE actuel.",[98,3097,3091,3098,3101],{},[19,3099,3100],{},"partie existante"," continue d'être évaluée selon la Partie 8.",[98,3103,3104,3107],{},[19,3105,3106],{},"MAIS :"," Si la nouvelle partie « contamine » la partie existante (par ex. nouveaux câbles dans le même tableau), le contrôleur peut décider que l'ensemble du tableau doit répondre au RGIE actuel.",[72,3109,3111],{"id":3110},"conséquences-pratiques","Conséquences pratiques :",[95,3113,3114,3120,3127],{},[98,3115,3116,3117,264],{},"Planifiez les rénovations de manière à ce que les parties nouvelles et anciennes soient ",[19,3118,3119],{},"clairement séparées",[98,3121,3122,3123,3126],{},"Idéalement, un ",[19,3124,3125],{},"sous-tableau séparé"," pour les nouveaux circuits.",[98,3128,3129],{},"Documentez précisément ce qui est ancien et ce qui est nouveau.",[24,3131],{},[27,3133,3135],{"id":3134},"recommandation-modernisation-progressive","Recommandation : Modernisation progressive",[15,3137,3138,3139,3142],{},"Même si la Partie 8 tolère des dérogations, une ",[19,3140,3141],{},"modernisation progressive"," est recommandée :",[72,3144,3146],{"id":3145},"priorité-1-critique-pour-la-sécurité","Priorité 1 (Critique pour la sécurité)",[95,3148,3149,3152,3155,3158],{},[98,3150,3151],{},"Installer un différentiel principal 300 mA (s'il est absent)",[98,3153,3154],{},"Remplacer les câbles endommagés",[98,3156,3157],{},"Réparer les connexions desserrées",[98,3159,3160],{},"Vérifier et améliorer la mise à la terre si nécessaire",[72,3162,3164],{"id":3163},"priorité-2-recommandé","Priorité 2 (Recommandé)",[95,3166,3167,3170,3173],{},[98,3168,3169],{},"Différentiels de groupe 30 mA pour salle de bain et cuisine",[98,3171,3172],{},"Remplacer les anciens fusibles par des disjoncteurs",[98,3174,3175],{},"Installer un parafoudre Type 2",[72,3177,3179],{"id":3178},"priorité-3-confort-pérennité","Priorité 3 (Confort + pérennité)",[95,3181,3182,3185,3188],{},[98,3183,3184],{},"Moderniser le tableau (plus de rangées, étiquetage)",[98,3186,3187],{},"Installer des prises avec terre",[98,3189,3190],{},"Préparation pour borne de recharge \u002F installation PV",[72,3192,3194],{"id":3193},"orientation-des-coûts","Orientation des coûts",[144,3196,3197,3207],{},[147,3198,3199],{},[150,3200,3201,3204],{},[153,3202,3203],{},"Mesure",[153,3205,3206],{},"Coût estimé",[160,3208,3209,3216,3223,3230,3237,3244],{},[150,3210,3211,3214],{},[165,3212,3213],{},"Installer différentiel principal 300 mA",[165,3215,1663],{},[150,3217,3218,3221],{},[165,3219,3220],{},"Différentiel de groupe 30 mA (par pièce)",[165,3222,1671],{},[150,3224,3225,3228],{},[165,3226,3227],{},"Parafoudre Type 2",[165,3229,1679],{},[150,3231,3232,3235],{},[165,3233,3234],{},"Set de disjoncteurs (10 pièces)",[165,3236,1687],{},[150,3238,3239,3242],{},[165,3240,3241],{},"Nouveau tableau 4 rangées (complet)",[165,3243,1695],{},[150,3245,3246,3249],{},[165,3247,3248],{},"Recâblage complet (maison)",[165,3250,1703],{},[24,3252],{},[27,3254,3256],{"id":3255},"résumé","Résumé",[144,3258,3259,3268],{},[147,3260,3261],{},[150,3262,3263,3265],{},[153,3264,790],{},[153,3266,3267],{},"Réponse",[160,3269,3270,3278,3286,3294,3302],{},[150,3271,3272,3275],{},[165,3273,3274],{},"Mon ancien bâtiment doit-il répondre au RGIE actuel ?",[165,3276,3277],{},"Pas entièrement, la Partie 8 autorise des dérogations",[150,3279,3280,3283],{},[165,3281,3282],{},"Ai-je besoin d'un différentiel 30 mA ?",[165,3284,3285],{},"Pas obligatoire sous Partie 8, mais fortement recommandé",[150,3287,3288,3291],{},[165,3289,3290],{},"Les anciennes prises sans terre sont-elles autorisées ?",[165,3292,3293],{},"Sous conditions oui (pas de salle de bain, pas d'appareils classe I)",[150,3295,3296,3299],{},[165,3297,3298],{},"À quelle fréquence faut-il contrôler ?",[165,3300,3301],{},"Tous les 25 ans + lors d'un changement de propriétaire",[150,3303,3304,3307],{},[165,3305,3306],{},"Que se passe-t-il en cas de rénovation partielle ?",[165,3308,3309],{},"Nouvelle partie = RGIE actuel, ancienne = Partie 8 (règle de contamination)",[24,3311],{},[27,3313,3315],{"id":3314},"articles-connexes","Articles connexes",[95,3317,3318,3324,3330,3336],{},[98,3319,3320],{},[847,3321,3323],{"href":3322},"\u002Ffr\u002Fblog\u002Fcontrole-electrique","Contrôle électrique en Belgique : Que vérifie-t-on ?",[98,3325,3326],{},[847,3327,3329],{"href":3328},"\u002Ffr\u002Fblog\u002Frgie-2026-changements","Que change le RGIE 2026 ?",[98,3331,3332],{},[847,3333,3335],{"href":3334},"\u002Ffr\u002Fblog\u002Fpreflex-vs-pose-libre","Preflex vs. pose libre",[98,3337,3338],{},[847,3339,3341],{"href":3340},"\u002Ffr\u002Fblog\u002Fplanifier-tableau-electrique","Planifier un tableau électrique",[24,3343],{},[15,3345,3346],{},[874,3347,3348,3349,3351,3352],{},"Même pour les anciens bâtiments, ",[19,3350,879],{}," crée des schémas unifilaires et des plans de situation conformes aux normes — les documents obligatoires pour chaque contrôle. Documentez votre installation dès maintenant en numérique. ",[847,3353,3354],{"href":883},"Commencer gratuitement →",{"title":886,"searchDepth":887,"depth":887,"links":3356},[3357,3358,3363,3371,3375,3380,3384,3390,3391],{"id":2522,"depth":887,"text":2523},{"id":2554,"depth":887,"text":2555,"children":3359},[3360,3361,3362],{"id":2565,"depth":893,"text":2566},{"id":2572,"depth":893,"text":2573},{"id":2583,"depth":893,"text":2584},{"id":2623,"depth":887,"text":2624,"children":3364},[3365,3366,3367,3368,3369,3370],{"id":2630,"depth":893,"text":2631},{"id":2672,"depth":893,"text":2673},{"id":2724,"depth":893,"text":2725},{"id":2753,"depth":893,"text":2754},{"id":2763,"depth":893,"text":2764},{"id":2789,"depth":893,"text":2790},{"id":2798,"depth":887,"text":2799,"children":3372},[3373,3374],{"id":2809,"depth":893,"text":2810},{"id":2907,"depth":893,"text":2908},{"id":2942,"depth":887,"text":2943,"children":3376},[3377,3378,3379],{"id":2946,"depth":893,"text":2947},{"id":2957,"depth":893,"text":2958},{"id":2980,"depth":893,"text":2981},{"id":3068,"depth":887,"text":3069,"children":3381},[3382,3383],{"id":3078,"depth":893,"text":3079},{"id":3110,"depth":893,"text":3111},{"id":3134,"depth":887,"text":3135,"children":3385},[3386,3387,3388,3389],{"id":3145,"depth":893,"text":3146},{"id":3163,"depth":893,"text":3164},{"id":3178,"depth":893,"text":3179},{"id":3193,"depth":893,"text":3194},{"id":3255,"depth":887,"text":3256},{"id":3314,"depth":887,"text":3315},"Ce qui s'applique aux anciennes installations électriques en Belgique. RGIE Partie 8 expliqué : dérogations autorisées, contrôle périodique et conseils pour une modernisation progressive.","fr",{},"\u002Fblog\u002Fold-building-arei-part8.fr",{"title":2505,"description":3392},"ancien-rgie-part-8","blog\u002Fold-building-arei-part8.fr",[3400,3401,2516,3402,3403,3404,3405],"ancien bâtiment","RGIE","installation existante","rénovation","contrôle","périodique","uPYhmrHk0H2zrnW2t52B5i74mpNM6ngQYiqTmjU6JJk",{"id":3408,"title":3409,"articleId":6,"body":3410,"category":925,"date":926,"description":4297,"extension":928,"lastUpdated":926,"locale":4298,"meta":4299,"navigation":931,"path":4300,"publishDate":926,"readTime":933,"refreshInterval":934,"seo":4301,"slug":4302,"stem":4303,"tags":4304,"__hash__":4310},"blog\u002Fblog\u002Fold-building-arei-part8.nl.md","Oudere installaties en AREI Part 8: Bijzondere regels voor bestaande installaties",{"type":8,"value":3411,"toc":4260},[3412,3415,3421,3423,3427,3434,3445,3453,3455,3459,3466,3470,3473,3477,3484,3488,3514,3522,3524,3528,3531,3535,3572,3576,3612,3624,3628,3631,3654,3658,3664,3668,3689,3693,3696,3698,3702,3709,3713,3807,3811,3814,3840,3842,3846,3850,3857,3861,3868,3880,3884,3953,3968,3970,3974,3981,3985,3992,4013,4017,4035,4037,4041,4048,4052,4066,4070,4081,4085,4096,4100,4155,4157,4161,4215,4217,4221,4247,4249],[11,3413,3409],{"id":3414},"oudere-installaties-en-arei-part-8-bijzondere-regels-voor-bestaande-installaties",[15,3416,3417,3418,3420],{},"Niet elke elektrische installatie in België moet aan de nieuwste AREI-voorschriften voldoen. Voor oudere gebouwen bestaat er met ",[19,3419,21],{}," een apart regelwerk dat bepaalde afwijkingen van de huidige standaard tolereert — zolang er geen onmiddellijk gevaar bestaat. Dit artikel legt uit wanneer Part 8 geldt, wat toegelaten is en waar de grenzen liggen.",[24,3422],{},[27,3424,3426],{"id":3425},"wat-is-part-8","Wat is Part 8?",[15,3428,3429,3430,3433],{},"Part 8 van het AREI (Algemeen Reglement op de Elektrische Installaties) is een ",[19,3431,3432],{},"bijzondere regeling voor bestaande installaties"," die vóór de inwerkingtreding van het huidige AREI werden aangelegd en gekeurd.",[15,3435,3436,3437,3440,3441,3444],{},"Het basisprincipe: zolang een installatie ",[19,3438,3439],{},"veilig"," functioneert en ",[19,3442,3443],{},"geen onmiddellijk gevaar"," vormt, hoeft ze niet volledig op de nieuwste stand gebracht te worden — ook al voldoet ze niet aan alle huidige voorschriften.",[50,3446,3447],{},[15,3448,3449,3452],{},[19,3450,3451],{},"Belangrijk:"," Part 8 is geen vrijbrief. Het definieert duidelijk welke afwijkingen getolereerd worden en welke niet.",[24,3454],{},[27,3456,3458],{"id":3457},"wanneer-geldt-part-8","Wanneer geldt Part 8?",[15,3460,3461,3462,3465],{},"Part 8 geldt voor installaties die aan ",[19,3463,3464],{},"één"," van de volgende voorwaarden voldoen:",[72,3467,3469],{"id":3468},"voorwaarde-1-installatie-vóór-01101981","Voorwaarde 1: Installatie vóór 01.10.1981",[15,3471,3472],{},"Installaties die vóór 1 oktober 1981 werden aangelegd (datum van inwerkingtreding van het oorspronkelijke AREI) vallen in principe onder Part 8.",[72,3474,3476],{"id":3475},"voorwaarde-2-onder-het-oude-arei-gekeurd","Voorwaarde 2: Onder het oude AREI gekeurd",[15,3478,3479,3480,3483],{},"Installaties die onder een eerdere versie van het AREI werden gekeurd en sindsdien ",[19,3481,3482],{},"niet wezenlijk gewijzigd"," zijn.",[72,3485,3487],{"id":3486},"wat-telt-als-wezenlijke-wijziging","Wat telt als \"wezenlijke wijziging\"?",[95,3489,3490,3496,3502,3508],{},[98,3491,3492,3493],{},"Toevoegen van ",[19,3494,3495],{},"nieuwe kringen",[98,3497,3498,3499],{},"Uitbreiding van de ",[19,3500,3501],{},"verdeelkast",[98,3503,3504,3505],{},"Wijziging van de ",[19,3506,3507],{},"meterinstallatie",[98,3509,3510,3511],{},"Omvangrijke ",[19,3512,3513],{},"herbekabeling",[50,3515,3516],{},[15,3517,3518,3521],{},[19,3519,3520],{},"Let op:"," Kleine wijzigingen zoals het vervangen van een stopcontact of schakelaar gelden NIET als wezenlijke wijziging.",[24,3523],{},[27,3525,3527],{"id":3526},"wat-is-onder-part-8-toegelaten-getolereerde-afwijkingen","Wat is onder Part 8 toegelaten? (Getolereerde afwijkingen)",[15,3529,3530],{},"De volgende punten wijken af van het huidige AREI, maar worden onder Part 8 bij de keuring getolereerd:",[72,3532,3534],{"id":3533},"_1-oude-kabeltypes","1. Oude kabeltypes",[144,3536,3537,3547],{},[147,3538,3539],{},[150,3540,3541,3544],{},[153,3542,3543],{},"Huidig AREI",[153,3545,3546],{},"Part 8 tolereert",[160,3548,3549,3556,3564],{},[150,3550,3551,3553],{},[165,3552,167],{},[165,3554,3555],{},"VOB-kabels in oude leidingen",[150,3557,3558,3561],{},[165,3559,3560],{},"Cca-brandveiligheidsklasse",[165,3562,3563],{},"Oudere kabeltypes zonder CPR-classificatie",[150,3565,3566,3569],{},[165,3567,3568],{},"Minimale doorsnede 2,5 mm² voor stopcontacten",[165,3570,3571],{},"Minimaal 1 mm² bij max. 6 A zekering of 10 A automaat (Art. 8.2.1 Nr. 5)",[72,3573,3575],{"id":3574},"_2-aardlekschakelaars-rcd-differentieelschakelaar","2. Aardlekschakelaars (RCD \u002F Differentieelschakelaar)",[144,3577,3578,3586],{},[147,3579,3580],{},[150,3581,3582,3584],{},[153,3583,3543],{},[153,3585,3546],{},[160,3587,3588,3596,3604],{},[150,3589,3590,3593],{},[165,3591,3592],{},"30 mA RCD per stopcontactkring",[165,3594,3595],{},"Geen 30 mA RCD nodig (alleen 300 mA hoofd-RCD)",[150,3597,3598,3601],{},[165,3599,3600],{},"30 mA RCD voor badkamer verplicht",[165,3602,3603],{},"Getolereerd zonder, als er geen direct risico is",[150,3605,3606,3609],{},[165,3607,3608],{},"Max. 8 kringen per RCD",[165,3610,3611],{},"Meer kringen toegelaten",[50,3613,3614],{},[15,3615,3616,3619,3620,3623],{},[19,3617,3618],{},"Opmerking:"," Ook onder Part 8 wordt een ",[19,3621,3622],{},"300 mA hoofd-RCD"," aanbevolen en bij nieuwe meterinstallatie vaak door de netbeheerder vereist.",[72,3625,3627],{"id":3626},"_3-stopcontacten-zonder-aardingcontact","3. Stopcontacten zonder aardingcontact",[15,3629,3630],{},"Oude stopcontacten (type C, zonder aardpen) worden onder Part 8 getolereerd, op voorwaarde dat:",[95,3632,3633,3640,3651],{},[98,3634,3635,3636,3639],{},"Geen toestellen van ",[19,3637,3638],{},"beschermingsklasse I"," (met metalen behuizing) worden aangesloten.",[98,3641,3642,3643,3646,3647,3650],{},"Het stopcontact niet in de ",[19,3644,3645],{},"badkamer"," of op ",[19,3648,3649],{},"vochtige plaatsen"," zit.",[98,3652,3653],{},"De kring verder intact is.",[72,3655,3657],{"id":3656},"_4-geen-spd-overspanningsbeveiliging","4. Geen SPD (overspanningsbeveiliging)",[15,3659,3660,3661,264],{},"Het huidige AREI schrijft voor nieuwe installaties een SPD (Surge Protection Device) Type 2 voor. Onder Part 8 is dit ",[19,3662,3663],{},"niet vereist",[72,3665,3667],{"id":3666},"_5-oude-verdeeltechniek","5. Oude verdeeltechniek",[95,3669,3670,3676,3682],{},[98,3671,3672,3675],{},[19,3673,3674],{},"Smeltzekeringen"," in plaats van MCBs zijn toegelaten.",[98,3677,3678,3681],{},[19,3679,3680],{},"Schroefzekeringen"," (Diazed) worden getolereerd.",[98,3683,3684,3685,3688],{},"Ontbrekende ",[19,3686,3687],{},"opschriften"," worden als gebrek vermeld, maar leiden niet tot afkeuring.",[72,3690,3692],{"id":3691},"_6-geen-brandveiligheidsclassificatie-van-kabels","6. Geen brandveiligheidsclassificatie van kabels",[15,3694,3695],{},"Kabels zonder CPR-classificatie (vóór 2017 geïnstalleerd) worden getolereerd, aangezien de CPR-verordening pas vanaf juli 2017 voor nieuwe installaties geldt.",[24,3697],{},[27,3699,3701],{"id":3700},"wat-is-niet-toegelaten-ook-onder-part-8","Wat is NIET toegelaten (ook onder Part 8)?",[15,3703,3704,3705,3708],{},"Bepaalde toestanden worden ",[19,3706,3707],{},"nooit getolereerd",", ongeacht de ouderdom van de installatie:",[72,3710,3712],{"id":3711},"absoluut-ongeoorloofd","Absoluut ongeoorloofd:",[144,3714,3715,3725],{},[147,3716,3717],{},[150,3718,3719,3722],{},[153,3720,3721],{},"Toestand",[153,3723,3724],{},"Waarom?",[160,3726,3727,3737,3747,3757,3767,3777,3787,3797],{},[150,3728,3729,3734],{},[165,3730,3731],{},[19,3732,3733],{},"Blote of beschadigde kabels",[165,3735,3736],{},"Onmiddellijk elektrocutiegevaar",[150,3738,3739,3744],{},[165,3740,3741],{},[19,3742,3743],{},"Volledig ontbrekende aarding",[165,3745,3746],{},"Geen bescherming bij isolatiefout",[150,3748,3749,3754],{},[165,3750,3751],{},[19,3752,3753],{},"Water in contact met elektriciteit",[165,3755,3756],{},"Levensgevaar",[150,3758,3759,3764],{},[165,3760,3761],{},[19,3762,3763],{},"Toegankelijke spanningvoerende delen",[165,3765,3766],{},"Direct aanrakingsrisico",[150,3768,3769,3774],{},[165,3770,3771],{},[19,3772,3773],{},"Oververhitte kabels of verbindingen",[165,3775,3776],{},"Brandgevaar",[150,3778,3779,3784],{},[165,3780,3781],{},[19,3782,3783],{},"Losse verbindingen in aftakdozen",[165,3785,3786],{},"Vlamboog-\u002Fbrandgevaar",[150,3788,3789,3794],{},[165,3790,3791],{},[19,3792,3793],{},"Aftakdozen zonder deksel",[165,3795,3796],{},"Aanrakingsbescherming ontbreekt",[150,3798,3799,3804],{},[165,3800,3801],{},[19,3802,3803],{},"Badkamer-stopcontact in zone 0 of 1",[165,3805,3806],{},"Levensgevaar, ook onder Part 8 verboden",[72,3808,3810],{"id":3809},"veiligheidsgerelateerde-minimumvereisten","Veiligheidsgerelateerde minimumvereisten:",[15,3812,3813],{},"Ook onder Part 8 moet gewaarborgd zijn:",[95,3815,3816,3822,3828,3834],{},[98,3817,3818,3821],{},[19,3819,3820],{},"Voldoende doorsnede"," voor de werkelijke belasting (geen overbelast 0,75 mm²-kabel).",[98,3823,3824,3827],{},[19,3825,3826],{},"Werkende zekeringen"," (geen \"overbrugde\" zekeringen).",[98,3829,3830,3833],{},[19,3831,3832],{},"Aarding van de hoofdverdeler"," (verbinding met aardingselektrode).",[98,3835,3836,3839],{},[19,3837,3838],{},"Toegankelijkheid"," van de verdeelkast.",[24,3841],{},[27,3843,3845],{"id":3844},"periodieke-keuring","Periodieke keuring",[72,3847,3849],{"id":3848},"elke-25-jaar-verplicht","Elke 25 jaar verplicht",[15,3851,3852,3853,3856],{},"Bestaande installaties onder Part 8 moeten elke ",[19,3854,3855],{},"25 jaar"," een periodieke keuring ondergaan door een erkend controleorganisme.",[72,3858,3860],{"id":3859},"bij-eigendomsoverdracht","Bij eigendomsoverdracht",[15,3862,3863,3864,3867],{},"Bij ",[19,3865,3866],{},"verkoop van een woning"," is een geldig keuringsattest (minder dan 25 jaar oud) verplicht. Ontbreekt dit, dan moet vóór de verkoop een keuring plaatsvinden.",[50,3869,3870],{},[15,3871,3872,3875,3876,3879],{},[19,3873,3874],{},"18-maandentermijn (Art. 8.4.2.2):"," Bij aankoop van een woning met een negatief keuringsverslag heeft de koper ",[19,3877,3878],{},"18 maanden"," vanaf de aankoopdatum om de gebreken te verhelpen en een herkeuring te laten uitvoeren.",[72,3881,3883],{"id":3882},"wat-wordt-bij-de-periodieke-keuring-gecontroleerd","Wat wordt bij de periodieke keuring gecontroleerd?",[144,3885,3886,3896],{},[147,3887,3888],{},[150,3889,3890,3893],{},[153,3891,3892],{},"Controlepunt",[153,3894,3895],{},"Beoordeling",[160,3897,3898,3906,3914,3921,3929,3937,3945],{},[150,3899,3900,3903],{},[165,3901,3902],{},"Visuele inspectie kabels en verbindingen",[165,3904,3905],{},"Beschadiging, oververhitting",[150,3907,3908,3911],{},[165,3909,3910],{},"Aardingsweerstand meten",[165,3912,3913],{},"≤ 30 Ω (reglementaire drempel conform Art. 4.2.4.3b; daarboven bijkomende beschermingsmaatregelen nodig)",[150,3915,3916,3919],{},[165,3917,3918],{},"Isolatieweerstand meten",[165,3920,1462],{},[150,3922,3923,3926],{},[165,3924,3925],{},"RCD-test (indien aanwezig)",[165,3927,3928],{},"Uitschakeltijd en -stroom",[150,3930,3931,3934],{},[165,3932,3933],{},"Kortsluitbeveiliging controleren",[165,3935,3936],{},"Zekeringen \u002F MCBs aanwezig",[150,3938,3939,3942],{},[165,3940,3941],{},"Bescherming tegen direct aanraken",[165,3943,3944],{},"Afdekkingen, IP-bescherming",[150,3946,3947,3950],{},[165,3948,3949],{},"Documentatie",[165,3951,3952],{},"Éénlijnschema + situatieschema aanwezig?",[50,3954,3955],{},[15,3956,3957,3959,3960,3963,3964,3967],{},[19,3958,3618],{}," Ook onder Part 8 moeten een ",[19,3961,3962],{},"éénlijnschema"," en een ",[19,3965,3966],{},"situatieschema"," aanwezig zijn — ook als deze achteraf moeten worden opgesteld.",[24,3969],{},[27,3971,3973],{"id":3972},"de-besmettingsregel-bij-gedeeltelijke-renovatie","De besmettingsregel bij gedeeltelijke renovatie",[15,3975,3976,3977,3980],{},"Een bijzonder belangrijk aspect bij oudere gebouwen: de zogenaamde ",[19,3978,3979],{},"besmettingsregel"," (contamination rule).",[72,3982,3984],{"id":3983},"hoe-werkt-het","Hoe werkt het?",[15,3986,3987,3988,3991],{},"Wanneer u een deel van uw installatie ",[19,3989,3990],{},"wezenlijk wijzigt"," (bijv. nieuwe kringen toevoegen), geldt:",[606,3993,3994,4001,4007],{},[98,3995,3996,3997,4000],{},"Het ",[19,3998,3999],{},"nieuwe deel"," moet volledig voldoen aan het huidige AREI.",[98,4002,3996,4003,4006],{},[19,4004,4005],{},"bestaande deel"," wordt verder beoordeeld volgens Part 8.",[98,4008,4009,4012],{},[19,4010,4011],{},"MAAR:"," Als het nieuwe deel het bestaande deel \"besmet\" (bijv. nieuwe kabels in dezelfde verdeelkast), kan de controleur beslissen dat de hele verdeelkast aan het huidige AREI moet voldoen.",[72,4014,4016],{"id":4015},"praktische-gevolgen","Praktische gevolgen:",[95,4018,4019,4025,4032],{},[98,4020,4021,4022,3483],{},"Plan renovaties zo dat nieuwe en oude delen ",[19,4023,4024],{},"duidelijk gescheiden",[98,4026,4027,4028,4031],{},"Idealiter een ",[19,4029,4030],{},"aparte onderverdeler"," voor nieuwe kringen.",[98,4033,4034],{},"Documenteer precies wat oud en wat nieuw is.",[24,4036],{},[27,4038,4040],{"id":4039},"aanbeveling-stapsgewijze-modernisering","Aanbeveling: Stapsgewijze modernisering",[15,4042,4043,4044,4047],{},"Hoewel Part 8 afwijkingen tolereert, is een ",[19,4045,4046],{},"stapsgewijze modernisering"," aan te raden:",[72,4049,4051],{"id":4050},"prioriteit-1-veiligheidskritisch","Prioriteit 1 (Veiligheidskritisch)",[95,4053,4054,4057,4060,4063],{},[98,4055,4056],{},"300 mA hoofd-RCD bijplaatsen (indien niet aanwezig)",[98,4058,4059],{},"Beschadigde kabels vervangen",[98,4061,4062],{},"Losse verbindingen herstellen",[98,4064,4065],{},"Aarding controleren en eventueel verbeteren",[72,4067,4069],{"id":4068},"prioriteit-2-aanbevolen","Prioriteit 2 (Aanbevolen)",[95,4071,4072,4075,4078],{},[98,4073,4074],{},"30 mA groeps-RCDs voor badkamer en keuken",[98,4076,4077],{},"Oude smeltzekeringen vervangen door MCBs",[98,4079,4080],{},"SPD Type 2 bijplaatsen",[72,4082,4084],{"id":4083},"prioriteit-3-comfort-toekomstbestendigheid","Prioriteit 3 (Comfort + toekomstbestendigheid)",[95,4086,4087,4090,4093],{},[98,4088,4089],{},"Verdeelkast moderniseren (meer rijen, opschriften)",[98,4091,4092],{},"Stopcontacten met aarding bijplaatsen",[98,4094,4095],{},"Voorbereiding voor laadpaal \u002F zonnepanelen",[72,4097,4099],{"id":4098},"kostenoriëntatie","Kostenoriëntatie",[144,4101,4102,4112],{},[147,4103,4104],{},[150,4105,4106,4109],{},[153,4107,4108],{},"Maatregel",[153,4110,4111],{},"Geschatte kosten",[160,4113,4114,4121,4128,4134,4141,4148],{},[150,4115,4116,4119],{},[165,4117,4118],{},"300 mA hoofd-RCD bijplaatsen",[165,4120,1663],{},[150,4122,4123,4126],{},[165,4124,4125],{},"30 mA groeps-RCD (per stuk)",[165,4127,1671],{},[150,4129,4130,4132],{},[165,4131,748],{},[165,4133,1679],{},[150,4135,4136,4139],{},[165,4137,4138],{},"MCB-set (10 stuks)",[165,4140,1687],{},[150,4142,4143,4146],{},[165,4144,4145],{},"Nieuwe 4-rijige verdeelkast (compleet)",[165,4147,1695],{},[150,4149,4150,4153],{},[165,4151,4152],{},"Volledige herbekabeling (EGW)",[165,4154,1703],{},[24,4156],{},[27,4158,4160],{"id":4159},"samenvatting","Samenvatting",[144,4162,4163,4173],{},[147,4164,4165],{},[150,4166,4167,4170],{},[153,4168,4169],{},"Vraag",[153,4171,4172],{},"Antwoord",[160,4174,4175,4183,4191,4199,4207],{},[150,4176,4177,4180],{},[165,4178,4179],{},"Moet mijn oud gebouw aan het huidige AREI voldoen?",[165,4181,4182],{},"Niet volledig, Part 8 staat afwijkingen toe",[150,4184,4185,4188],{},[165,4186,4187],{},"Heb ik een 30 mA RCD nodig?",[165,4189,4190],{},"Onder Part 8 niet verplicht, maar sterk aanbevolen",[150,4192,4193,4196],{},[165,4194,4195],{},"Zijn oude stopcontacten zonder aarding toegelaten?",[165,4197,4198],{},"Onder voorwaarden ja (geen badkamer, geen klasse-I-toestellen)",[150,4200,4201,4204],{},[165,4202,4203],{},"Hoe vaak moet er gekeurd worden?",[165,4205,4206],{},"Elke 25 jaar + bij eigendomsoverdracht",[150,4208,4209,4212],{},[165,4210,4211],{},"Wat bij gedeeltelijke renovatie?",[165,4213,4214],{},"Nieuw deel = huidig AREI, oud deel = Part 8 (besmettingsregel in acht nemen)",[24,4216],{},[27,4218,4220],{"id":4219},"gerelateerde-artikelen","Gerelateerde artikelen",[95,4222,4223,4229,4235,4241],{},[98,4224,4225],{},[847,4226,4228],{"href":4227},"\u002Fblog\u002Felektrische-keuring","Elektrische keuring in België: Wat wordt gecontroleerd?",[98,4230,4231],{},[847,4232,4234],{"href":4233},"\u002Fblog\u002Farei-2026-wijzigingen","Wat verandert er met het AREI 2026?",[98,4236,4237],{},[847,4238,4240],{"href":4239},"\u002Fblog\u002Fpreflex-vs-vrije-bedrading","Preflex vs. vrije bedrading",[98,4242,4243],{},[847,4244,4246],{"href":4245},"\u002Fblog\u002Fverdeelkast-plannen-opbouw","Verdeelkast plannen",[24,4248],{},[15,4250,4251],{},[874,4252,4253,4254,4256,4257],{},"Ook voor oudere gebouwen maakt ",[19,4255,879],{}," normconforme éénlijnschema's en situatieschema's — de verplichte documenten voor elke keuring. Documenteer uw installatie nu digitaal. ",[847,4258,4259],{"href":883},"Gratis starten →",{"title":886,"searchDepth":887,"depth":887,"links":4261},[4262,4263,4268,4276,4280,4285,4289,4295,4296],{"id":3425,"depth":887,"text":3426},{"id":3457,"depth":887,"text":3458,"children":4264},[4265,4266,4267],{"id":3468,"depth":893,"text":3469},{"id":3475,"depth":893,"text":3476},{"id":3486,"depth":893,"text":3487},{"id":3526,"depth":887,"text":3527,"children":4269},[4270,4271,4272,4273,4274,4275],{"id":3533,"depth":893,"text":3534},{"id":3574,"depth":893,"text":3575},{"id":3626,"depth":893,"text":3627},{"id":3656,"depth":893,"text":3657},{"id":3666,"depth":893,"text":3667},{"id":3691,"depth":893,"text":3692},{"id":3700,"depth":887,"text":3701,"children":4277},[4278,4279],{"id":3711,"depth":893,"text":3712},{"id":3809,"depth":893,"text":3810},{"id":3844,"depth":887,"text":3845,"children":4281},[4282,4283,4284],{"id":3848,"depth":893,"text":3849},{"id":3859,"depth":893,"text":3860},{"id":3882,"depth":893,"text":3883},{"id":3972,"depth":887,"text":3973,"children":4286},[4287,4288],{"id":3983,"depth":893,"text":3984},{"id":4015,"depth":893,"text":4016},{"id":4039,"depth":887,"text":4040,"children":4290},[4291,4292,4293,4294],{"id":4050,"depth":893,"text":4051},{"id":4068,"depth":893,"text":4069},{"id":4083,"depth":893,"text":4084},{"id":4098,"depth":893,"text":4099},{"id":4159,"depth":887,"text":4160},{"id":4219,"depth":887,"text":4220},"Wat geldt voor oudere elektrische installaties in België. AREI Part 8 uitgelegd: toegelaten afwijkingen, periodieke keuring en tips voor stapsgewijze modernisering.","nl",{},"\u002Fblog\u002Fold-building-arei-part8.nl",{"title":3409,"description":4297},"oud-arei-part-8","blog\u002Fold-building-arei-part8.nl",[4305,940,941,4306,4307,4308,4309],"oudere installatie","bestaande installatie","renovatie","keuring","periodiek","NUYsPWj79zscyTrgUJpau0P_zivLrfC6l-07Z6xk5rw",1779375815344]