[{"data":1,"prerenderedAt":3199},["ShallowReactive",2],{"blog-post-en-renovation-electrical-plans":3,"blog-alternates-renovation-electrical-plans":708},{"id":4,"title":5,"articleId":6,"body":7,"category":682,"date":683,"description":684,"extension":685,"lastUpdated":686,"locale":687,"meta":688,"navigation":562,"path":689,"publishDate":683,"readTime":690,"refreshInterval":691,"seo":692,"slug":6,"stem":693,"tags":694,"__hash__":707},"blog\u002Fblog\u002Frenovation-electrical-plans.en.md","Renovation and AREI: When Do You Need New Electrical Plans?","renovation-electrical-plans",{"type":8,"value":9,"toc":656},"minimark",[10,15,24,28,33,36,125,129,132,195,208,212,215,222,226,229,256,260,283,287,290,346,350,353,377,381,385,388,408,412,419,439,447,451,507,511,514,544,548,551,589,592,619,623,650],[11,12,14],"h2",{"id":13},"when-does-a-renovation-trigger-a-mandatory-re-inspection","When does a renovation trigger a mandatory re-inspection?",[16,17,18,19,23],"p",{},"Not every renovation requires new electrical plans and a re-inspection. The AREI clearly distinguishes between works that trigger a ",[20,21,22],"strong",{},"mandatory re-inspection"," (keuring) and those that don't. This guide explains which rule applies to your renovation.",[11,25,27],{"id":26},"the-decision-tree-re-inspection-yes-or-no","The decision tree: Re-inspection yes or no?",[29,30,32],"h3",{"id":31},"re-inspection-required","Re-inspection REQUIRED",[16,34,35],{},"The following works trigger a mandatory re-inspection (Art. 6.4.7.3):",[37,38,39,52],"table",{},[40,41,42],"thead",{},[43,44,45,49],"tr",{},[46,47,48],"th",{},"Work",[46,50,51],{},"Reason",[53,54,55,66,76,85,95,105,115],"tbody",{},[43,56,57,63],{},[58,59,60],"td",{},[20,61,62],{},"Adding new circuits",[58,64,65],{},"Extension of the installation",[43,67,68,73],{},[58,69,70],{},[20,71,72],{},"Replacing the distribution board",[58,74,75],{},"Change to protection devices",[43,77,78,83],{},[58,79,80],{},[20,81,82],{},"Installing a sub-distribution",[58,84,65],{},[43,86,87,92],{},[58,88,89],{},[20,90,91],{},"Running new cables",[58,93,94],{},"Substantial modification",[43,96,97,102],{},[58,98,99],{},[20,100,101],{},"Modifying the earthing system",[58,103,104],{},"Safety-critical",[43,106,107,112],{},[58,108,109],{},[20,110,111],{},"Converting to three-phase",[58,113,114],{},"Fundamental change",[43,116,117,122],{},[58,118,119],{},[20,120,121],{},"Connecting an EV charger \u002F heat pump",[58,123,124],{},"New dedicated circuit",[29,126,128],{"id":127},"re-inspection-not-required","Re-inspection NOT REQUIRED",[16,130,131],{},"These works count as maintenance and don't trigger a re-inspection:",[37,133,134,143],{},[40,135,136],{},[43,137,138,140],{},[46,139,48],{},[46,141,142],{},"Why no re-inspection",[53,144,145,155,165,175,185],{},[43,146,147,152],{},[58,148,149],{},[20,150,151],{},"Like-for-like socket\u002Fswitch replacement",[58,153,154],{},"Same position, same rating",[43,156,157,162],{},[58,158,159],{},[20,160,161],{},"Replacing a lamp with LED",[58,163,164],{},"No intervention in the installation",[43,166,167,172],{},[58,168,169],{},[20,170,171],{},"Painting, wallpapering, flooring",[58,173,174],{},"Cosmetic, no electrical connection",[43,176,177,182],{},[58,178,179],{},[20,180,181],{},"Like-for-like breaker replacement",[58,183,184],{},"Same type and rated current",[43,186,187,192],{},[58,188,189],{},[20,190,191],{},"Changing a socket cover plate",[58,193,194],{},"No intervention in wiring",[196,197,198],"blockquote",{},[16,199,200,203,204,207],{},[20,201,202],{},"Grey area",": Moving a socket to a ",[20,205,206],{},"different position"," already counts as a modification. Any significant modification or extension triggers a re-inspection (Art. 6.4.7.3) — even if the circuit stays the same.",[11,209,211],{"id":210},"the-contamination-rule","The contamination rule",[16,213,214],{},"The contamination rule is the most important concept for renovations:",[196,216,217],{},[16,218,219],{},[20,220,221],{},"If you modify one part of the installation, the inspector can question the entire installation.",[29,223,225],{"id":224},"what-this-means-in-practice","What this means in practice",[16,227,228],{},"Say you renovate your bathroom and install new sockets and lighting:",[230,231,232,244,250],"ol",{},[233,234,235,236,239,240,243],"li",{},"The ",[20,237,238],{},"bathroom"," is assessed against the ",[20,241,242],{},"current AREI"," — all current regulations apply",[233,245,246,247],{},"The inspector can also check the ",[20,248,249],{},"rest of the installation",[233,251,252,253],{},"Existing defects (e.g., missing RCDs in the basement) can ",[20,254,255],{},"also be flagged",[29,257,259],{"id":258},"how-to-limit-contamination","How to limit contamination",[261,262,263,269,276],"ul",{},[233,264,265,268],{},[20,266,267],{},"Document precisely"," which parts were modified and which weren't",[233,270,271,272,275],{},"Mark the ",[20,273,274],{},"new\u002Fmodified circuits"," in the single-line diagram",[233,277,278,279,282],{},"Unmodified parts fall under ",[20,280,281],{},"Part 8"," (relaxed requirements)",[11,284,286],{"id":285},"part-8-vs-full-arei-what-applies-when","Part 8 vs. Full AREI: What applies when?",[16,288,289],{},"The AREI distinguishes between old and new:",[37,291,292,305],{},[40,293,294],{},[43,295,296,299,302],{},[46,297,298],{},"Installation part",[46,300,301],{},"Applicable regulation",[46,303,304],{},"Requirements",[53,306,307,320,333],{},[43,308,309,314,317],{},[58,310,311],{},[20,312,313],{},"Unmodified, pre-1981",[58,315,316],{},"Part 8 Art. 8.2 (existing installation)",[58,318,319],{},"Relaxed — e.g., no RCD per circuit required, old cable types tolerated",[43,321,322,327,330],{},[58,323,324],{},[20,325,326],{},"Unmodified, 1981–2020",[58,328,329],{},"Part 8 Section 8.2.2 (deviations for domestic installations under former A.O.E.A.)",[58,331,332],{},"Must comply with the regulation at the time, with limited relaxations per Art. 8.2.2",[43,334,335,340,343],{},[58,336,337],{},[20,338,339],{},"Modified \u002F New",[58,341,342],{},"Current AREI",[58,344,345],{},"All current requirements (300 mA main RCD + 30 mA high-sensitivity RCD for socket, lighting and bathroom circuits, SPD for the new\u002Fmodified part, cable standards)",[29,347,349],{"id":348},"typical-scenario-1960s-house","Typical scenario: 1960s house",[16,351,352],{},"You're renovating the kitchen and bathroom of a 1965 house:",[261,354,355,361,367],{},[233,356,357,360],{},[20,358,359],{},"Kitchen + bathroom"," (new circuits): Full current AREI — SPD expected as good practice (Art. 4.5.1, general principle; applies only to the new\u002Fmodified part of the installation), 300 mA main RCD for the entire installation (Art. 4.2.4.3) + 30 mA high-sensitivity RCD for socket, lighting and bathroom circuits (Art. 4.2.4.3 point b), current cable types",[233,362,363,366],{},[20,364,365],{},"Bedrooms, living room"," (unmodified): Part 8 — old VOB cables tolerated, no RCD per circuit required",[233,368,369,372,373,376],{},[20,370,371],{},"However",": If the inspector finds that the old installation poses a ",[20,374,375],{},"direct safety risk"," (e.g., exposed wires, missing earthing), they can still require remediation",[11,378,380],{"id":379},"documentation-for-renovations","Documentation for renovations",[29,382,384],{"id":383},"houses-with-existing-plans","Houses with existing plans",[16,386,387],{},"If a current single-line diagram and situation plan exist:",[230,389,390,396,402],{},[233,391,392,395],{},[20,393,394],{},"Update the plans"," — add new circuits, modified positions",[233,397,398,401],{},[20,399,400],{},"Mark clearly"," what is old and what is new",[233,403,404,407],{},[20,405,406],{},"Present updated plans"," to the inspector",[29,409,411],{"id":410},"houses-without-plans-pre-1981","Houses without plans (pre-1981)",[16,413,414,415,418],{},"Many older houses have ",[20,416,417],{},"no existing documentation",". In that case (Art. 9.1.2):",[230,420,421,427,433],{},[233,422,423,426],{},[20,424,425],{},"Survey the entire installation"," — including unmodified parts",[233,428,429,432],{},[20,430,431],{},"Create a complete new single-line diagram"," — for the entire installation",[233,434,435,438],{},[20,436,437],{},"Create a situation plan"," — draw all sockets, switches, lighting points",[196,440,441],{},[16,442,443,446],{},[20,444,445],{},"Warning",": This is one of the most common reasons renovations become significantly more expensive than planned — the documentation requirement for the entire installation.",[11,448,450],{"id":449},"budget-planning-typical-costs","Budget planning: Typical costs",[37,452,453,463],{},[40,454,455],{},[43,456,457,460],{},[46,458,459],{},"Item",[46,461,462],{},"Cost",[53,464,465,473,483,491,499],{},[43,466,467,470],{},[58,468,469],{},"Single-line diagram + situation plan (electrician)",[58,471,472],{},"€300 – €600",[43,474,475,478],{},[58,476,477],{},"Single-line diagram + situation plan (PlanElec)",[58,479,480],{},[20,481,482],{},"Early Access currently free",[43,484,485,488],{},[58,486,487],{},"AREI inspection",[58,489,490],{},"€125 – €170",[43,492,493,496],{},[58,494,495],{},"Re-inspection (if defects found)",[58,497,498],{},"€80 – €120",[43,500,501,504],{},[58,502,503],{},"Defect remediation",[58,505,506],{},"€500 – €5,000+",[29,508,510],{"id":509},"the-planelec-advantage-for-renovations","The PlanElec advantage for renovations",[16,512,513],{},"With PlanElec, you can:",[261,515,516,521,527,533,539],{},[233,517,518],{},[20,519,520],{},"Document the existing installation",[233,522,523,526],{},[20,524,525],{},"Add new circuits"," and have them automatically validated",[233,528,529,532],{},[20,530,531],{},"Clearly separate"," old vs. new",[233,534,535,538],{},[20,536,537],{},"Export the result as PDF"," for the inspector",[233,540,541,543],{},[20,542,482],{},"; payment processing is not active yet",[11,545,547],{"id":546},"checklist-for-renovators","Checklist for renovators",[16,549,550],{},"Before starting renovations:",[261,552,555,565,571,577,583],{"className":553},[554],"contains-task-list",[233,556,559,564],{"className":557},[558],"task-list-item",[560,561],"input",{"disabled":562,"type":563},true,"checkbox"," Check: Do my works trigger a re-inspection?",[233,566,568,570],{"className":567},[558],[560,569],{"disabled":562,"type":563}," Find existing electrical plans (if available)",[233,572,574,576],{"className":573},[558],[560,575],{"disabled":562,"type":563}," Budget for documentation + inspection",[233,578,580,582],{"className":579},[558],[560,581],{"disabled":562,"type":563}," Involve an electrician early (for the installation work)",[233,584,586,588],{"className":585},[558],[560,587],{"disabled":562,"type":563}," Use PlanElec for documentation (create plans yourself)",[16,590,591],{},"After renovation:",[261,593,595,601,607,613],{"className":594},[554],[233,596,598,600],{"className":597},[558],[560,599],{"disabled":562,"type":563}," Updated plans created?",[233,602,604,606],{"className":603},[558],[560,605],{"disabled":562,"type":563}," All new circuits in the single-line diagram?",[233,608,610,612],{"className":609},[558],[560,611],{"disabled":562,"type":563}," Inspection body contacted?",[233,614,616,618],{"className":615},[558],[560,617],{"disabled":562,"type":563}," Inspection passed?",[11,620,622],{"id":621},"related-articles","Related articles",[261,624,625,632,638,644],{},[233,626,627],{},[628,629,631],"a",{"href":630},"\u002Fen\u002Fblog\u002Fold-arei-part-8","Old wiring in Belgium: AREI Part 8 explained",[233,633,634],{},[628,635,637],{"href":636},"\u002Fen\u002Fblog\u002Felectrical-plan-costs","What does an electrical plan cost? Price comparison 2026",[233,639,640],{},[628,641,643],{"href":642},"\u002Fen\u002Fblog\u002Fwhat-inspector-checks","What does the inspector check during the inspection?",[233,645,646],{},[628,647,649],{"href":648},"\u002Fen\u002Fblog\u002Fproperty-sale-electrical-dossier","Electrical dossier for property sales",[16,651,652],{},[628,653,655],{"href":654},"\u002F","Plan your renovation AREI-compliant with PlanElec →",{"title":657,"searchDepth":658,"depth":658,"links":659},"",2,[660,661,666,670,673,677,680,681],{"id":13,"depth":658,"text":14},{"id":26,"depth":658,"text":27,"children":662},[663,665],{"id":31,"depth":664,"text":32},3,{"id":127,"depth":664,"text":128},{"id":210,"depth":658,"text":211,"children":667},[668,669],{"id":224,"depth":664,"text":225},{"id":258,"depth":664,"text":259},{"id":285,"depth":658,"text":286,"children":671},[672],{"id":348,"depth":664,"text":349},{"id":379,"depth":658,"text":380,"children":674},[675,676],{"id":383,"depth":664,"text":384},{"id":410,"depth":664,"text":411},{"id":449,"depth":658,"text":450,"children":678},[679],{"id":509,"depth":664,"text":510},{"id":546,"depth":658,"text":547},{"id":621,"depth":658,"text":622},"guide","2026-07-20","Not every renovation requires new electrical plans. Learn which works trigger a mandatory re-inspection and what the contamination rule means.","md","2026-06-05","en",{},"\u002Fblog\u002Frenovation-electrical-plans.en","8 min",12,{"title":5,"description":684},"blog\u002Frenovation-electrical-plans.en",[695,696,697,698,699,700,701,281,702,703,704,705,706],"AREI","RGIE","renovation","remodelling","electrical plans","re-inspection","contamination rule","existing installation","single-line diagram","situation plan","Belgium","electrical inspection","nCBGxWou4A1hu0rIfPE3lKYrQm_ACfHrrNGlrlCNWII",[709,1380,1866,2533],{"id":710,"title":711,"articleId":6,"body":712,"category":682,"date":683,"description":1361,"extension":685,"lastUpdated":686,"locale":1362,"meta":1363,"navigation":562,"path":1364,"publishDate":683,"readTime":690,"refreshInterval":691,"seo":1365,"slug":1366,"stem":1367,"tags":1368,"__hash__":1379},"blog\u002Fblog\u002Frenovation-electrical-plans.de.md","Renovierung und AREI: Wann brauchen Sie neue Elektropläne?",{"type":8,"value":713,"toc":1338},[714,718,725,729,733,736,819,823,826,889,901,905,908,915,919,922,949,953,973,977,980,1036,1040,1043,1067,1071,1075,1078,1098,1102,1109,1129,1137,1141,1194,1198,1201,1233,1237,1240,1273,1276,1303,1307,1333],[11,715,717],{"id":716},"wann-löst-eine-renovierung-eine-pflicht-neuabnahme-aus","Wann löst eine Renovierung eine Pflicht-Neuabnahme aus?",[16,719,720,721,724],{},"Nicht jede Renovierung erfordert neue Elektropläne und eine erneute Abnahme. Das AREI unterscheidet klar zwischen Arbeiten, die eine ",[20,722,723],{},"Neuabnahme"," (keuring) auslösen, und solchen, die das nicht tun. In diesem Leitfaden erfahren Sie, welche Regel für Ihre Renovierung gilt.",[11,726,728],{"id":727},"der-entscheidungsbaum-neuabnahme-ja-oder-nein","Der Entscheidungsbaum: Neuabnahme ja oder nein?",[29,730,732],{"id":731},"neuabnahme-erforderlich","Neuabnahme ERFORDERLICH",[16,734,735],{},"Folgende Arbeiten lösen eine Pflicht zur erneuten Abnahme aus (Art. 6.4.7.3):",[37,737,738,748],{},[40,739,740],{},[43,741,742,745],{},[46,743,744],{},"Arbeit",[46,746,747],{},"Grund",[53,749,750,760,770,779,789,799,809],{},[43,751,752,757],{},[58,753,754],{},[20,755,756],{},"Neue Stromkreise hinzufügen",[58,758,759],{},"Erweiterung der Installation",[43,761,762,767],{},[58,763,764],{},[20,765,766],{},"Schaltschrank (Verteiler) austauschen",[58,768,769],{},"Veränderung der Schutzeinrichtungen",[43,771,772,777],{},[58,773,774],{},[20,775,776],{},"Neue Unterverteilung installieren",[58,778,759],{},[43,780,781,786],{},[58,782,783],{},[20,784,785],{},"Kabel neu verlegen",[58,787,788],{},"Wesentliche Änderung",[43,790,791,796],{},[58,792,793],{},[20,794,795],{},"Erdungsanlage verändern",[58,797,798],{},"Sicherheitskritisch",[43,800,801,806],{},[58,802,803],{},[20,804,805],{},"Installation auf Dreiphasig umstellen",[58,807,808],{},"Grundlegende Änderung",[43,810,811,816],{},[58,812,813],{},[20,814,815],{},"Wallbox \u002F Wärmepumpe anschließen",[58,817,818],{},"Neuer dedizierter Stromkreis",[29,820,822],{"id":821},"neuabnahme-nicht-erforderlich","Neuabnahme NICHT ERFORDERLICH",[16,824,825],{},"Diese Arbeiten gelten als Wartung und lösen keine Neuabnahme aus:",[37,827,828,837],{},[40,829,830],{},[43,831,832,834],{},[46,833,744],{},[46,835,836],{},"Warum keine Neuabnahme",[53,838,839,849,859,869,879],{},[43,840,841,846],{},[58,842,843],{},[20,844,845],{},"Steckdose\u002FSchalter 1:1 austauschen",[58,847,848],{},"Gleiche Position, gleiche Leistung",[43,850,851,856],{},[58,852,853],{},[20,854,855],{},"Lampe durch LED ersetzen",[58,857,858],{},"Kein Eingriff in die Installation",[43,860,861,866],{},[58,862,863],{},[20,864,865],{},"Tapezieren, streichen, Böden verlegen",[58,867,868],{},"Kosmetisch, kein Elektroanschluss",[43,870,871,876],{},[58,872,873],{},[20,874,875],{},"Sicherungsautomat 1:1 tauschen",[58,877,878],{},"Gleicher Typ und Nennstrom",[43,880,881,886],{},[58,882,883],{},[20,884,885],{},"Steckdosenabdeckung wechseln",[58,887,888],{},"Kein Eingriff in die Verdrahtung",[196,890,891],{},[16,892,893,896,897,900],{},[20,894,895],{},"Grauzone",": Eine Steckdose an eine ",[20,898,899],{},"andere Position versetzen"," zählt bereits als Änderung. Jede wesentliche Änderung oder Erweiterung löst eine Neuabnahme aus (Art. 6.4.7.3) — auch wenn der Stromkreis gleich bleibt.",[11,902,904],{"id":903},"die-kontaminationsregel","Die Kontaminationsregel",[16,906,907],{},"Die Kontaminationsregel ist das wichtigste Konzept bei Renovierungen:",[196,909,910],{},[16,911,912],{},[20,913,914],{},"Wenn Sie einen Teil der Installation verändern, kann der Inspekteur die gesamte Installation beanstanden.",[29,916,918],{"id":917},"was-das-in-der-praxis-bedeutet","Was das in der Praxis bedeutet",[16,920,921],{},"Angenommen, Sie renovieren Ihr Badezimmer und installieren dort neue Steckdosen und Beleuchtung:",[230,923,924,935,942],{},[233,925,926,927,930,931,934],{},"Das ",[20,928,929],{},"Badezimmer"," wird nach dem ",[20,932,933],{},"aktuellen AREI"," bewertet — alle aktuellen Vorschriften gelten",[233,936,937,938,941],{},"Der Inspekteur kann auch die ",[20,939,940],{},"restliche Installation"," prüfen",[233,943,944,945,948],{},"Bestehende Mängel (z.B. fehlende FI-Schalter im Keller) können ",[20,946,947],{},"ebenfalls beanstandet"," werden",[29,950,952],{"id":951},"wie-sie-die-kontamination-begrenzen","Wie Sie die Kontamination begrenzen",[261,954,955,961,967],{},[233,956,957,960],{},[20,958,959],{},"Dokumentieren Sie genau",", welche Teile verändert wurden und welche nicht",[233,962,963,964],{},"Markieren Sie im Eindrahtschema die ",[20,965,966],{},"neuen\u002Fgeänderten Stromkreise",[233,968,969,970,972],{},"Die unveränderten Teile fallen unter ",[20,971,281],{}," (gelockerte Anforderungen)",[11,974,976],{"id":975},"part-8-vs-volles-arei-was-gilt-wann","Part 8 vs. Volles AREI: Was gilt wann?",[16,978,979],{},"Das AREI unterscheidet zwischen Alt und Neu:",[37,981,982,995],{},[40,983,984],{},[43,985,986,989,992],{},[46,987,988],{},"Installationsteil",[46,990,991],{},"Geltende Vorschrift",[46,993,994],{},"Anforderungen",[53,996,997,1010,1023],{},[43,998,999,1004,1007],{},[58,1000,1001],{},[20,1002,1003],{},"Unverändert, vor 1981",[58,1005,1006],{},"Part 8 Art. 8.2 (Altinstallation)",[58,1008,1009],{},"Gelockert — z.B. kein FI pro Kreis nötig, alte Kabeltypen toleriert",[43,1011,1012,1017,1020],{},[58,1013,1014],{},[20,1015,1016],{},"Unverändert, 1981–2020",[58,1018,1019],{},"Part 8 Abschnitt 8.2.2 (Abweichungen für hauswirtschaftliche Anlagen nach früherer A.O.E.A.)",[58,1021,1022],{},"Muss der damaligen Vorschrift entsprechen, mit begrenzten Erleichterungen nach Art. 8.2.2",[43,1024,1025,1030,1033],{},[58,1026,1027],{},[20,1028,1029],{},"Verändert \u002F Neu",[58,1031,1032],{},"Aktuelles AREI",[58,1034,1035],{},"Alle aktuellen Vorschriften (300 mA Haupt-RCD + 30 mA FI hoher Empfindlichkeit für Steckdosen-, Beleuchtungs- und Badezimmer-Stromkreise, SPD für den neuen\u002Fveränderten Teil, Kabelstandards)",[29,1037,1039],{"id":1038},"typisches-szenario-haus-aus-den-1960ern","Typisches Szenario: Haus aus den 1960ern",[16,1041,1042],{},"Sie renovieren die Küche und das Badezimmer eines Hauses aus 1965:",[261,1044,1045,1051,1057],{},[233,1046,1047,1050],{},[20,1048,1049],{},"Küche + Bad"," (neue Stromkreise): Volles aktuelles AREI — SPD nach den Regeln des Fachs erwartet (Art. 4.5.1, allgemeiner Grundsatz; gilt nur für den neuen\u002Fveränderten Teil der Installation), 300 mA Haupt-RCD für die gesamte Installation (Art. 4.2.4.3) + 30 mA FI hoher Empfindlichkeit für Steckdosen-, Beleuchtungs- und Badezimmer-Stromkreise (Art. 4.2.4.3 Buchstabe b), aktuelle Kabeltypen",[233,1052,1053,1056],{},[20,1054,1055],{},"Schlafzimmer, Wohnzimmer"," (unverändert): Part 8 — alte VOB-Leitungen toleriert, kein FI pro Kreis nötig",[233,1058,1059,1062,1063,1066],{},[20,1060,1061],{},"Aber",": Falls der Inspekteur feststellt, dass die alte Installation ein ",[20,1064,1065],{},"direktes Sicherheitsrisiko"," darstellt (z.B. blanke Drähte, fehlende Erdung), kann er trotzdem eine Nachbesserung fordern",[11,1068,1070],{"id":1069},"dokumentation-bei-renovierung","Dokumentation bei Renovierung",[29,1072,1074],{"id":1073},"häuser-mit-vorhandenen-plänen","Häuser mit vorhandenen Plänen",[16,1076,1077],{},"Wenn ein aktuelles Eindrahtschema und Situationsplan existieren:",[230,1079,1080,1086,1092],{},[233,1081,1082,1085],{},[20,1083,1084],{},"Pläne aktualisieren"," — neue Stromkreise, veränderte Positionen eintragen",[233,1087,1088,1091],{},[20,1089,1090],{},"Kenntlich machen",", was alt und was neu ist",[233,1093,1094,1097],{},[20,1095,1096],{},"Aktualisierte Pläne"," dem Kontrolleur vorlegen",[29,1099,1101],{"id":1100},"häuser-ohne-pläne-vor-1981","Häuser ohne Pläne (vor 1981)",[16,1103,1104,1105,1108],{},"Viele ältere Häuser haben ",[20,1106,1107],{},"keine vorhandene Dokumentation",". In diesem Fall (Art. 9.1.2):",[230,1110,1111,1117,1123],{},[233,1112,1113,1116],{},[20,1114,1115],{},"Gesamte Installation aufnehmen"," — auch die unveränderten Teile",[233,1118,1119,1122],{},[20,1120,1121],{},"Eindrahtschema komplett neu erstellen"," — für die gesamte Installation",[233,1124,1125,1128],{},[20,1126,1127],{},"Situationsplan erstellen"," — alle Steckdosen, Schalter, Leuchten einzeichnen",[196,1130,1131],{},[16,1132,1133,1136],{},[20,1134,1135],{},"Achtung",": Dies ist einer der häufigsten Gründe, warum Renovierungen deutlich teurer werden als geplant — die Dokumentationspflicht für die Gesamtinstallation.",[11,1138,1140],{"id":1139},"budgetplanung-typische-kosten","Budgetplanung: Typische Kosten",[37,1142,1143,1153],{},[40,1144,1145],{},[43,1146,1147,1150],{},[46,1148,1149],{},"Posten",[46,1151,1152],{},"Kosten",[53,1154,1155,1162,1172,1179,1186],{},[43,1156,1157,1160],{},[58,1158,1159],{},"Eindrahtschema + Situationsplan (Elektriker)",[58,1161,472],{},[43,1163,1164,1167],{},[58,1165,1166],{},"Eindrahtschema + Situationsplan (PlanElec)",[58,1168,1169],{},[20,1170,1171],{},"Early Access derzeit kostenlos",[43,1173,1174,1177],{},[58,1175,1176],{},"AREI-Abnahme (Keuring)",[58,1178,490],{},[43,1180,1181,1184],{},[58,1182,1183],{},"Nachkontrolle (bei Mängeln)",[58,1185,498],{},[43,1187,1188,1191],{},[58,1189,1190],{},"Mängelbeseitigung",[58,1192,1193],{},"€500 – €5.000+",[29,1195,1197],{"id":1196},"der-planelec-vorteil-bei-renovierungen","Der PlanElec-Vorteil bei Renovierungen",[16,1199,1200],{},"Mit PlanElec können Sie:",[261,1202,1203,1210,1216,1222,1228],{},[233,1204,1205,1206,1209],{},"Die ",[20,1207,1208],{},"bestehende Installation"," aufnehmen und dokumentieren",[233,1211,1212,1215],{},[20,1213,1214],{},"Neue Stromkreise"," hinzufügen und automatisch validieren lassen",[233,1217,1218,1221],{},[20,1219,1220],{},"Alt vs. Neu"," klar trennen",[233,1223,926,1224,1227],{},[20,1225,1226],{},"Ergebnis als PDF"," für den Kontrolleur exportieren",[233,1229,1230,1232],{},[20,1231,1171],{},"; noch keine Zahlungsabwicklung aktiv",[11,1234,1236],{"id":1235},"checkliste-für-renovierer","Checkliste für Renovierer",[16,1238,1239],{},"Vor Beginn der Renovierung:",[261,1241,1243,1249,1255,1261,1267],{"className":1242},[554],[233,1244,1246,1248],{"className":1245},[558],[560,1247],{"disabled":562,"type":563}," Prüfen: Lösen meine Arbeiten eine Neuabnahme aus?",[233,1250,1252,1254],{"className":1251},[558],[560,1253],{"disabled":562,"type":563}," Bestehende Elektropläne suchen (falls vorhanden)",[233,1256,1258,1260],{"className":1257},[558],[560,1259],{"disabled":562,"type":563}," Budget für Dokumentation + Keuring einplanen",[233,1262,1264,1266],{"className":1263},[558],[560,1265],{"disabled":562,"type":563}," Elektriker frühzeitig einbinden (für die Installation)",[233,1268,1270,1272],{"className":1269},[558],[560,1271],{"disabled":562,"type":563}," PlanElec für die Dokumentation nutzen (Pläne selbst erstellen)",[16,1274,1275],{},"Nach der Renovierung:",[261,1277,1279,1285,1291,1297],{"className":1278},[554],[233,1280,1282,1284],{"className":1281},[558],[560,1283],{"disabled":562,"type":563}," Aktualisierte Pläne erstellt?",[233,1286,1288,1290],{"className":1287},[558],[560,1289],{"disabled":562,"type":563}," Alle neuen Stromkreise im Eindrahtschema?",[233,1292,1294,1296],{"className":1293},[558],[560,1295],{"disabled":562,"type":563}," Kontrollorganismus kontaktiert?",[233,1298,1300,1302],{"className":1299},[558],[560,1301],{"disabled":562,"type":563}," Keuring bestanden?",[11,1304,1306],{"id":1305},"verwandte-artikel","Verwandte Artikel",[261,1308,1309,1315,1321,1327],{},[233,1310,1311],{},[628,1312,1314],{"href":1313},"\u002Fde\u002Fblog\u002Faltbau-arei-part-8","Altbau-Elektrik in Belgien: AREI Part 8 erklärt",[233,1316,1317],{},[628,1318,1320],{"href":1319},"\u002Fde\u002Fblog\u002Felektroplan-kosten","Was kostet ein Elektroplan? Preisvergleich 2026",[233,1322,1323],{},[628,1324,1326],{"href":1325},"\u002Fde\u002Fblog\u002Fwas-prueft-kontrolleur-stromabnahme","Was prüft der Kontrolleur bei der Stromabnahme?",[233,1328,1329],{},[628,1330,1332],{"href":1331},"\u002Fde\u002Fblog\u002Felektrodossier-immobilienverkauf","Elektrodossier beim Immobilienverkauf",[16,1334,1335],{},[628,1336,1337],{"href":654},"Planen Sie Ihre Renovierung AREI-konform mit PlanElec →",{"title":657,"searchDepth":658,"depth":658,"links":1339},[1340,1341,1345,1349,1352,1356,1359,1360],{"id":716,"depth":658,"text":717},{"id":727,"depth":658,"text":728,"children":1342},[1343,1344],{"id":731,"depth":664,"text":732},{"id":821,"depth":664,"text":822},{"id":903,"depth":658,"text":904,"children":1346},[1347,1348],{"id":917,"depth":664,"text":918},{"id":951,"depth":664,"text":952},{"id":975,"depth":658,"text":976,"children":1350},[1351],{"id":1038,"depth":664,"text":1039},{"id":1069,"depth":658,"text":1070,"children":1353},[1354,1355],{"id":1073,"depth":664,"text":1074},{"id":1100,"depth":664,"text":1101},{"id":1139,"depth":658,"text":1140,"children":1357},[1358],{"id":1196,"depth":664,"text":1197},{"id":1235,"depth":658,"text":1236},{"id":1305,"depth":658,"text":1306},"Nicht jede Renovierung erfordert neue Elektropläne. Erfahren Sie, welche Arbeiten eine Neuabnahme auslösen und was die Kontaminationsregel bedeutet.","de",{},"\u002Fblog\u002Frenovation-electrical-plans.de",{"title":711,"description":1361},"renovierung-arei-elektroplaene","blog\u002Frenovation-electrical-plans.de",[695,696,1369,1370,1371,723,1372,281,1373,1374,1375,1376,1377,1378],"Renovierung","Umbau","Elektropläne","Kontaminationsregel","Altinstallation","Eindrahtschema","Situationsplan","Belgien","Stromabnahme","Keuring","rQY4OtPRMM_xqLDXR_ycAXOA-F1xxQ5O1EQeejOWz6Y",{"id":4,"title":5,"articleId":6,"body":1381,"category":682,"date":683,"description":684,"extension":685,"lastUpdated":686,"locale":687,"meta":1863,"navigation":562,"path":689,"publishDate":683,"readTime":690,"refreshInterval":691,"seo":1864,"slug":6,"stem":693,"tags":1865,"__hash__":707},{"type":8,"value":1382,"toc":1840},[1383,1385,1389,1391,1393,1395,1463,1465,1467,1519,1527,1529,1531,1537,1539,1541,1557,1559,1573,1575,1577,1621,1623,1625,1641,1643,1645,1647,1661,1663,1667,1681,1687,1689,1733,1735,1737,1759,1761,1763,1791,1793,1816,1818,1836],[11,1384,14],{"id":13},[16,1386,18,1387,23],{},[20,1388,22],{},[11,1390,27],{"id":26},[29,1392,32],{"id":31},[16,1394,35],{},[37,1396,1397,1405],{},[40,1398,1399],{},[43,1400,1401,1403],{},[46,1402,48],{},[46,1404,51],{},[53,1406,1407,1415,1423,1431,1439,1447,1455],{},[43,1408,1409,1413],{},[58,1410,1411],{},[20,1412,62],{},[58,1414,65],{},[43,1416,1417,1421],{},[58,1418,1419],{},[20,1420,72],{},[58,1422,75],{},[43,1424,1425,1429],{},[58,1426,1427],{},[20,1428,82],{},[58,1430,65],{},[43,1432,1433,1437],{},[58,1434,1435],{},[20,1436,91],{},[58,1438,94],{},[43,1440,1441,1445],{},[58,1442,1443],{},[20,1444,101],{},[58,1446,104],{},[43,1448,1449,1453],{},[58,1450,1451],{},[20,1452,111],{},[58,1454,114],{},[43,1456,1457,1461],{},[58,1458,1459],{},[20,1460,121],{},[58,1462,124],{},[29,1464,128],{"id":127},[16,1466,131],{},[37,1468,1469,1477],{},[40,1470,1471],{},[43,1472,1473,1475],{},[46,1474,48],{},[46,1476,142],{},[53,1478,1479,1487,1495,1503,1511],{},[43,1480,1481,1485],{},[58,1482,1483],{},[20,1484,151],{},[58,1486,154],{},[43,1488,1489,1493],{},[58,1490,1491],{},[20,1492,161],{},[58,1494,164],{},[43,1496,1497,1501],{},[58,1498,1499],{},[20,1500,171],{},[58,1502,174],{},[43,1504,1505,1509],{},[58,1506,1507],{},[20,1508,181],{},[58,1510,184],{},[43,1512,1513,1517],{},[58,1514,1515],{},[20,1516,191],{},[58,1518,194],{},[196,1520,1521],{},[16,1522,1523,203,1525,207],{},[20,1524,202],{},[20,1526,206],{},[11,1528,211],{"id":210},[16,1530,214],{},[196,1532,1533],{},[16,1534,1535],{},[20,1536,221],{},[29,1538,225],{"id":224},[16,1540,228],{},[230,1542,1543,1549,1553],{},[233,1544,235,1545,239,1547,243],{},[20,1546,238],{},[20,1548,242],{},[233,1550,246,1551],{},[20,1552,249],{},[233,1554,252,1555],{},[20,1556,255],{},[29,1558,259],{"id":258},[261,1560,1561,1565,1569],{},[233,1562,1563,268],{},[20,1564,267],{},[233,1566,271,1567,275],{},[20,1568,274],{},[233,1570,278,1571,282],{},[20,1572,281],{},[11,1574,286],{"id":285},[16,1576,289],{},[37,1578,1579,1589],{},[40,1580,1581],{},[43,1582,1583,1585,1587],{},[46,1584,298],{},[46,1586,301],{},[46,1588,304],{},[53,1590,1591,1601,1611],{},[43,1592,1593,1597,1599],{},[58,1594,1595],{},[20,1596,313],{},[58,1598,316],{},[58,1600,319],{},[43,1602,1603,1607,1609],{},[58,1604,1605],{},[20,1606,326],{},[58,1608,329],{},[58,1610,332],{},[43,1612,1613,1617,1619],{},[58,1614,1615],{},[20,1616,339],{},[58,1618,342],{},[58,1620,345],{},[29,1622,349],{"id":348},[16,1624,352],{},[261,1626,1627,1631,1635],{},[233,1628,1629,360],{},[20,1630,359],{},[233,1632,1633,366],{},[20,1634,365],{},[233,1636,1637,372,1639,376],{},[20,1638,371],{},[20,1640,375],{},[11,1642,380],{"id":379},[29,1644,384],{"id":383},[16,1646,387],{},[230,1648,1649,1653,1657],{},[233,1650,1651,395],{},[20,1652,394],{},[233,1654,1655,401],{},[20,1656,400],{},[233,1658,1659,407],{},[20,1660,406],{},[29,1662,411],{"id":410},[16,1664,414,1665,418],{},[20,1666,417],{},[230,1668,1669,1673,1677],{},[233,1670,1671,426],{},[20,1672,425],{},[233,1674,1675,432],{},[20,1676,431],{},[233,1678,1679,438],{},[20,1680,437],{},[196,1682,1683],{},[16,1684,1685,446],{},[20,1686,445],{},[11,1688,450],{"id":449},[37,1690,1691,1699],{},[40,1692,1693],{},[43,1694,1695,1697],{},[46,1696,459],{},[46,1698,462],{},[53,1700,1701,1707,1715,1721,1727],{},[43,1702,1703,1705],{},[58,1704,469],{},[58,1706,472],{},[43,1708,1709,1711],{},[58,1710,477],{},[58,1712,1713],{},[20,1714,482],{},[43,1716,1717,1719],{},[58,1718,487],{},[58,1720,490],{},[43,1722,1723,1725],{},[58,1724,495],{},[58,1726,498],{},[43,1728,1729,1731],{},[58,1730,503],{},[58,1732,506],{},[29,1734,510],{"id":509},[16,1736,513],{},[261,1738,1739,1743,1747,1751,1755],{},[233,1740,1741],{},[20,1742,520],{},[233,1744,1745,526],{},[20,1746,525],{},[233,1748,1749,532],{},[20,1750,531],{},[233,1752,1753,538],{},[20,1754,537],{},[233,1756,1757,543],{},[20,1758,482],{},[11,1760,547],{"id":546},[16,1762,550],{},[261,1764,1766,1771,1776,1781,1786],{"className":1765},[554],[233,1767,1769,564],{"className":1768},[558],[560,1770],{"disabled":562,"type":563},[233,1772,1774,570],{"className":1773},[558],[560,1775],{"disabled":562,"type":563},[233,1777,1779,576],{"className":1778},[558],[560,1780],{"disabled":562,"type":563},[233,1782,1784,582],{"className":1783},[558],[560,1785],{"disabled":562,"type":563},[233,1787,1789,588],{"className":1788},[558],[560,1790],{"disabled":562,"type":563},[16,1792,591],{},[261,1794,1796,1801,1806,1811],{"className":1795},[554],[233,1797,1799,600],{"className":1798},[558],[560,1800],{"disabled":562,"type":563},[233,1802,1804,606],{"className":1803},[558],[560,1805],{"disabled":562,"type":563},[233,1807,1809,612],{"className":1808},[558],[560,1810],{"disabled":562,"type":563},[233,1812,1814,618],{"className":1813},[558],[560,1815],{"disabled":562,"type":563},[11,1817,622],{"id":621},[261,1819,1820,1824,1828,1832],{},[233,1821,1822],{},[628,1823,631],{"href":630},[233,1825,1826],{},[628,1827,637],{"href":636},[233,1829,1830],{},[628,1831,643],{"href":642},[233,1833,1834],{},[628,1835,649],{"href":648},[16,1837,1838],{},[628,1839,655],{"href":654},{"title":657,"searchDepth":658,"depth":658,"links":1841},[1842,1843,1847,1851,1854,1858,1861,1862],{"id":13,"depth":658,"text":14},{"id":26,"depth":658,"text":27,"children":1844},[1845,1846],{"id":31,"depth":664,"text":32},{"id":127,"depth":664,"text":128},{"id":210,"depth":658,"text":211,"children":1848},[1849,1850],{"id":224,"depth":664,"text":225},{"id":258,"depth":664,"text":259},{"id":285,"depth":658,"text":286,"children":1852},[1853],{"id":348,"depth":664,"text":349},{"id":379,"depth":658,"text":380,"children":1855},[1856,1857],{"id":383,"depth":664,"text":384},{"id":410,"depth":664,"text":411},{"id":449,"depth":658,"text":450,"children":1859},[1860],{"id":509,"depth":664,"text":510},{"id":546,"depth":658,"text":547},{"id":621,"depth":658,"text":622},{},{"title":5,"description":684},[695,696,697,698,699,700,701,281,702,703,704,705,706],{"id":1867,"title":1868,"articleId":6,"body":1869,"category":682,"date":683,"description":2515,"extension":685,"lastUpdated":686,"locale":2516,"meta":2517,"navigation":562,"path":2518,"publishDate":683,"readTime":690,"refreshInterval":691,"seo":2519,"slug":2520,"stem":2521,"tags":2522,"__hash__":2532},"blog\u002Fblog\u002Frenovation-electrical-plans.fr.md","Rénovation et RGIE : Quand avez-vous besoin de nouveaux plans électriques ?",{"type":8,"value":1870,"toc":2492},[1871,1875,1882,1886,1890,1893,1976,1980,1983,2046,2058,2062,2065,2072,2076,2079,2104,2108,2128,2132,2135,2190,2194,2197,2221,2225,2229,2232,2252,2256,2263,2283,2291,2295,2351,2355,2358,2387,2391,2394,2427,2430,2457,2461,2487],[11,1872,1874],{"id":1873},"quand-une-rénovation-déclenche-t-elle-un-contrôle-obligatoire","Quand une rénovation déclenche-t-elle un contrôle obligatoire ?",[16,1876,1877,1878,1881],{},"Toute rénovation ne nécessite pas de nouveaux plans électriques et un nouveau contrôle. Le RGIE distingue clairement les travaux qui déclenchent un ",[20,1879,1880],{},"nouveau contrôle"," de ceux qui ne le font pas. Ce guide vous explique quelle règle s'applique à votre rénovation.",[11,1883,1885],{"id":1884},"larbre-de-décision-nouveau-contrôle-oui-ou-non","L'arbre de décision : Nouveau contrôle oui ou non ?",[29,1887,1889],{"id":1888},"nouveau-contrôle-requis","Nouveau contrôle REQUIS",[16,1891,1892],{},"Les travaux suivants déclenchent un contrôle obligatoire (Art. 6.4.7.3) :",[37,1894,1895,1905],{},[40,1896,1897],{},[43,1898,1899,1902],{},[46,1900,1901],{},"Travaux",[46,1903,1904],{},"Raison",[53,1906,1907,1917,1927,1936,1946,1956,1966],{},[43,1908,1909,1914],{},[58,1910,1911],{},[20,1912,1913],{},"Ajouter de nouveaux circuits",[58,1915,1916],{},"Extension de l'installation",[43,1918,1919,1924],{},[58,1920,1921],{},[20,1922,1923],{},"Remplacer le tableau de distribution",[58,1925,1926],{},"Modification des dispositifs de protection",[43,1928,1929,1934],{},[58,1930,1931],{},[20,1932,1933],{},"Installer un sous-tableau",[58,1935,1916],{},[43,1937,1938,1943],{},[58,1939,1940],{},[20,1941,1942],{},"Poser de nouveaux câbles",[58,1944,1945],{},"Modification substantielle",[43,1947,1948,1953],{},[58,1949,1950],{},[20,1951,1952],{},"Modifier l'installation de mise à la terre",[58,1954,1955],{},"Critique pour la sécurité",[43,1957,1958,1963],{},[58,1959,1960],{},[20,1961,1962],{},"Passer en triphasé",[58,1964,1965],{},"Modification fondamentale",[43,1967,1968,1973],{},[58,1969,1970],{},[20,1971,1972],{},"Raccorder une borne de recharge \u002F pompe à chaleur",[58,1974,1975],{},"Nouveau circuit dédié",[29,1977,1979],{"id":1978},"nouveau-contrôle-non-requis","Nouveau contrôle NON REQUIS",[16,1981,1982],{},"Ces travaux sont considérés comme de la maintenance :",[37,1984,1985,1994],{},[40,1986,1987],{},[43,1988,1989,1991],{},[46,1990,1901],{},[46,1992,1993],{},"Pourquoi pas de nouveau contrôle",[53,1995,1996,2006,2016,2026,2036],{},[43,1997,1998,2003],{},[58,1999,2000],{},[20,2001,2002],{},"Remplacement 1-pour-1 d'une prise\u002Finterrupteur",[58,2004,2005],{},"Même position, même puissance",[43,2007,2008,2013],{},[58,2009,2010],{},[20,2011,2012],{},"Remplacer une lampe par une LED",[58,2014,2015],{},"Pas d'intervention sur l'installation",[43,2017,2018,2023],{},[58,2019,2020],{},[20,2021,2022],{},"Peindre, tapisser, poser des sols",[58,2024,2025],{},"Cosmétique, pas de raccordement électrique",[43,2027,2028,2033],{},[58,2029,2030],{},[20,2031,2032],{},"Remplacement 1-pour-1 d'un disjoncteur",[58,2034,2035],{},"Même type et courant nominal",[43,2037,2038,2043],{},[58,2039,2040],{},[20,2041,2042],{},"Changer un couvercle de prise",[58,2044,2045],{},"Pas d'intervention sur le câblage",[196,2047,2048],{},[16,2049,2050,2053,2054,2057],{},[20,2051,2052],{},"Zone grise"," : Déplacer une prise vers une ",[20,2055,2056],{},"autre position"," constitue déjà une modification. Toute modification ou extension significative déclenche un nouveau contrôle (Art. 6.4.7.3) — même si le circuit reste le même.",[11,2059,2061],{"id":2060},"la-règle-de-contamination","La règle de contamination",[16,2063,2064],{},"La règle de contamination est le concept le plus important lors des rénovations :",[196,2066,2067],{},[16,2068,2069],{},[20,2070,2071],{},"Si vous modifiez une partie de l'installation, le contrôleur peut remettre en question l'ensemble de l'installation.",[29,2073,2075],{"id":2074},"ce-que-cela-signifie-en-pratique","Ce que cela signifie en pratique",[16,2077,2078],{},"Supposons que vous rénovez votre salle de bain et y installez de nouvelles prises et un nouvel éclairage :",[230,2080,2081,2092,2098],{},[233,2082,2083,2084,2087,2088,2091],{},"La ",[20,2085,2086],{},"salle de bain"," est évaluée selon le ",[20,2089,2090],{},"RGIE actuel"," — toutes les prescriptions actuelles s'appliquent",[233,2093,2094,2095],{},"Le contrôleur peut également vérifier le ",[20,2096,2097],{},"reste de l'installation",[233,2099,2100,2101],{},"Les défauts existants (p. ex. différentiels manquants à la cave) peuvent ",[20,2102,2103],{},"également être signalés",[29,2105,2107],{"id":2106},"comment-limiter-la-contamination","Comment limiter la contamination",[261,2109,2110,2116,2122],{},[233,2111,2112,2115],{},[20,2113,2114],{},"Documentez précisément"," quelles parties ont été modifiées et lesquelles ne l'ont pas été",[233,2117,2118,2119],{},"Marquez dans le schéma unifilaire les ",[20,2120,2121],{},"circuits nouveaux\u002Fmodifiés",[233,2123,2124,2125,2127],{},"Les parties inchangées relèvent du ",[20,2126,281],{}," (exigences assouplies)",[11,2129,2131],{"id":2130},"part-8-vs-rgie-complet-que-sapplique-quand","Part 8 vs. RGIE complet : Que s'applique quand ?",[16,2133,2134],{},"Le RGIE distingue entre ancien et nouveau :",[37,2136,2137,2150],{},[40,2138,2139],{},[43,2140,2141,2144,2147],{},[46,2142,2143],{},"Partie de l'installation",[46,2145,2146],{},"Prescription applicable",[46,2148,2149],{},"Exigences",[53,2151,2152,2165,2178],{},[43,2153,2154,2159,2162],{},[58,2155,2156],{},[20,2157,2158],{},"Inchangée, avant 1981",[58,2160,2161],{},"Part 8 Art. 8.2 (installation existante)",[58,2163,2164],{},"Assouplies — p. ex. pas de différentiel par circuit requis, anciens types de câbles tolérés",[43,2166,2167,2172,2175],{},[58,2168,2169],{},[20,2170,2171],{},"Inchangée, 1981–2020",[58,2173,2174],{},"Part 8 Section 8.2.2 (dérogations pour installations domestiques selon l'ancien R.G.I.E.)",[58,2176,2177],{},"Doit correspondre à la prescription de l'époque, avec des allègements limités selon Art. 8.2.2",[43,2179,2180,2185,2187],{},[58,2181,2182],{},[20,2183,2184],{},"Modifiée \u002F Nouvelle",[58,2186,2090],{},[58,2188,2189],{},"Toutes les prescriptions actuelles (différentiel principal 300 mA + différentiel 30 mA à haute sensibilité pour les circuits prises, éclairage et salle de bain, SPD pour la partie nouvelle\u002Fmodifiée, normes de câbles)",[29,2191,2193],{"id":2192},"scénario-typique-maison-des-années-1960","Scénario typique : Maison des années 1960",[16,2195,2196],{},"Vous rénovez la cuisine et la salle de bain d'une maison de 1965 :",[261,2198,2199,2205,2211],{},[233,2200,2201,2204],{},[20,2202,2203],{},"Cuisine + salle de bain"," (nouveaux circuits) : RGIE actuel complet — SPD attendu selon les règles de l'art (Art. 4.5.1, principe général ; uniquement pour la partie nouvelle\u002Fmodifiée de l'installation), différentiel principal 300 mA pour l'ensemble de l'installation (Art. 4.2.4.3) + différentiel 30 mA à haute sensibilité pour les circuits prises, éclairage et salle de bain (Art. 4.2.4.3 point b), types de câbles actuels",[233,2206,2207,2210],{},[20,2208,2209],{},"Chambres, salon"," (inchangés) : Part 8 — anciens câbles VOB tolérés, pas de différentiel par circuit requis",[233,2212,2213,2216,2217,2220],{},[20,2214,2215],{},"Mais"," : Si le contrôleur constate que l'ancienne installation présente un ",[20,2218,2219],{},"risque de sécurité direct"," (p. ex. fils dénudés, mise à la terre manquante), il peut quand même exiger une mise en conformité",[11,2222,2224],{"id":2223},"documentation-lors-dune-rénovation","Documentation lors d'une rénovation",[29,2226,2228],{"id":2227},"maisons-avec-plans-existants","Maisons avec plans existants",[16,2230,2231],{},"Si un schéma unifilaire et un plan de situation actuels existent :",[230,2233,2234,2240,2246],{},[233,2235,2236,2239],{},[20,2237,2238],{},"Mettre à jour les plans"," — ajouter les nouveaux circuits, positions modifiées",[233,2241,2242,2245],{},[20,2243,2244],{},"Marquer"," ce qui est ancien et ce qui est nouveau",[233,2247,2248,2251],{},[20,2249,2250],{},"Présenter les plans mis à jour"," au contrôleur",[29,2253,2255],{"id":2254},"maisons-sans-plans-avant-1981","Maisons sans plans (avant 1981)",[16,2257,2258,2259,2262],{},"De nombreuses maisons anciennes n'ont ",[20,2260,2261],{},"pas de documentation existante",". Dans ce cas (Art. 9.1.2) :",[230,2264,2265,2271,2277],{},[233,2266,2267,2270],{},[20,2268,2269],{},"Relever l'installation complète"," — y compris les parties inchangées",[233,2272,2273,2276],{},[20,2274,2275],{},"Créer un nouveau schéma unifilaire complet"," — pour toute l'installation",[233,2278,2279,2282],{},[20,2280,2281],{},"Établir un plan de situation"," — dessiner toutes les prises, interrupteurs, points lumineux",[196,2284,2285],{},[16,2286,2287,2290],{},[20,2288,2289],{},"Attention"," : C'est l'une des raisons les plus fréquentes pour lesquelles les rénovations coûtent nettement plus cher que prévu — l'obligation de documentation pour l'ensemble de l'installation.",[11,2292,2294],{"id":2293},"budget-coûts-typiques","Budget : Coûts typiques",[37,2296,2297,2307],{},[40,2298,2299],{},[43,2300,2301,2304],{},[46,2302,2303],{},"Poste",[46,2305,2306],{},"Coût",[53,2308,2309,2317,2327,2335,2343],{},[43,2310,2311,2314],{},[58,2312,2313],{},"Schéma unifilaire + plan de situation (électricien)",[58,2315,2316],{},"300 € – 600 €",[43,2318,2319,2322],{},[58,2320,2321],{},"Schéma unifilaire + plan de situation (PlanElec)",[58,2323,2324],{},[20,2325,2326],{},"Early Access actuellement gratuit",[43,2328,2329,2332],{},[58,2330,2331],{},"Contrôle RGIE",[58,2333,2334],{},"125 € – 170 €",[43,2336,2337,2340],{},[58,2338,2339],{},"Recontrôle (en cas de défauts)",[58,2341,2342],{},"80 € – 120 €",[43,2344,2345,2348],{},[58,2346,2347],{},"Correction des défauts",[58,2349,2350],{},"500 € – 5 000 €+",[29,2352,2354],{"id":2353},"lavantage-planelec-pour-les-rénovations","L'avantage PlanElec pour les rénovations",[16,2356,2357],{},"Avec PlanElec, vous pouvez :",[261,2359,2360,2365,2370,2376,2382],{},[233,2361,2362],{},[20,2363,2364],{},"Documenter l'installation existante",[233,2366,2367,2369],{},[20,2368,1913],{}," et les faire valider automatiquement",[233,2371,2372,2375],{},[20,2373,2374],{},"Séparer clairement"," ancien et nouveau",[233,2377,2378,2381],{},[20,2379,2380],{},"Exporter le résultat en PDF"," pour le contrôleur",[233,2383,2384,2386],{},[20,2385,2326],{}," ; aucun paiement n'est encore activé",[11,2388,2390],{"id":2389},"checklist-pour-les-rénovateurs","Checklist pour les rénovateurs",[16,2392,2393],{},"Avant le début des travaux :",[261,2395,2397,2403,2409,2415,2421],{"className":2396},[554],[233,2398,2400,2402],{"className":2399},[558],[560,2401],{"disabled":562,"type":563}," Vérifier : Mes travaux déclenchent-ils un nouveau contrôle ?",[233,2404,2406,2408],{"className":2405},[558],[560,2407],{"disabled":562,"type":563}," Rechercher les plans électriques existants (si disponibles)",[233,2410,2412,2414],{"className":2411},[558],[560,2413],{"disabled":562,"type":563}," Prévoir un budget pour la documentation + le contrôle",[233,2416,2418,2420],{"className":2417},[558],[560,2419],{"disabled":562,"type":563}," Impliquer un électricien à temps (pour l'installation)",[233,2422,2424,2426],{"className":2423},[558],[560,2425],{"disabled":562,"type":563}," Utiliser PlanElec pour la documentation (créer les plans soi-même)",[16,2428,2429],{},"Après la rénovation :",[261,2431,2433,2439,2445,2451],{"className":2432},[554],[233,2434,2436,2438],{"className":2435},[558],[560,2437],{"disabled":562,"type":563}," Plans mis à jour créés ?",[233,2440,2442,2444],{"className":2441},[558],[560,2443],{"disabled":562,"type":563}," Tous les nouveaux circuits dans le schéma unifilaire ?",[233,2446,2448,2450],{"className":2447},[558],[560,2449],{"disabled":562,"type":563}," Organisme de contrôle contacté ?",[233,2452,2454,2456],{"className":2453},[558],[560,2455],{"disabled":562,"type":563}," Contrôle réussi ?",[11,2458,2460],{"id":2459},"articles-connexes","Articles connexes",[261,2462,2463,2469,2475,2481],{},[233,2464,2465],{},[628,2466,2468],{"href":2467},"\u002Ffr\u002Fblog\u002Fancien-rgie-part-8","L'électricité dans les bâtiments anciens en Belgique : Part 8 du RGIE expliqué",[233,2470,2471],{},[628,2472,2474],{"href":2473},"\u002Ffr\u002Fblog\u002Fcout-plan-electrique","Combien coûte un plan électrique ? Comparatif de prix 2026",[233,2476,2477],{},[628,2478,2480],{"href":2479},"\u002Ffr\u002Fblog\u002Fque-verifie-controleur-inspection","Que vérifie le contrôleur lors de l'inspection ?",[233,2482,2483],{},[628,2484,2486],{"href":2485},"\u002Ffr\u002Fblog\u002Fdossier-electrique-vente-immobiliere","Dossier électrique lors de la vente immobilière",[16,2488,2489],{},[628,2490,2491],{"href":654},"Planifiez votre rénovation conformément au RGIE avec PlanElec →",{"title":657,"searchDepth":658,"depth":658,"links":2493},[2494,2495,2499,2503,2506,2510,2513,2514],{"id":1873,"depth":658,"text":1874},{"id":1884,"depth":658,"text":1885,"children":2496},[2497,2498],{"id":1888,"depth":664,"text":1889},{"id":1978,"depth":664,"text":1979},{"id":2060,"depth":658,"text":2061,"children":2500},[2501,2502],{"id":2074,"depth":664,"text":2075},{"id":2106,"depth":664,"text":2107},{"id":2130,"depth":658,"text":2131,"children":2504},[2505],{"id":2192,"depth":664,"text":2193},{"id":2223,"depth":658,"text":2224,"children":2507},[2508,2509],{"id":2227,"depth":664,"text":2228},{"id":2254,"depth":664,"text":2255},{"id":2293,"depth":658,"text":2294,"children":2511},[2512],{"id":2353,"depth":664,"text":2354},{"id":2389,"depth":658,"text":2390},{"id":2459,"depth":658,"text":2460},"Toute rénovation ne nécessite pas de nouveaux plans électriques. Découvrez quels travaux déclenchent un nouveau contrôle et ce que signifie la règle de contamination.","fr",{},"\u002Fblog\u002Frenovation-electrical-plans.fr",{"title":1868,"description":2515},"renovation-rgie-plans-electriques","blog\u002Frenovation-electrical-plans.fr",[695,696,2523,2524,2525,1880,2526,281,2527,2528,2529,2530,2531],"rénovation","travaux","plans électriques","règle de contamination","installation existante","schéma unifilaire","plan de situation","Belgique","contrôle électrique","pskrogmRqJWTAe8uqagWBkG-SWIRTPB01k5T573VlFo",{"id":2534,"title":2535,"articleId":6,"body":2536,"category":682,"date":683,"description":3182,"extension":685,"lastUpdated":686,"locale":3183,"meta":3184,"navigation":562,"path":3185,"publishDate":683,"readTime":690,"refreshInterval":691,"seo":3186,"slug":3187,"stem":3188,"tags":3189,"__hash__":3198},"blog\u002Fblog\u002Frenovation-electrical-plans.nl.md","Renovatie en AREI: Wanneer hebt u nieuwe elektrische plannen nodig?",{"type":8,"value":2537,"toc":3159},[2538,2542,2549,2553,2557,2560,2643,2647,2650,2713,2725,2729,2732,2739,2743,2746,2772,2776,2796,2800,2803,2859,2863,2866,2890,2894,2898,2901,2921,2925,2932,2952,2960,2964,3015,3019,3022,3054,3058,3061,3094,3097,3124,3128,3154],[11,2539,2541],{"id":2540},"wanneer-vereist-een-renovatie-een-verplichte-herkeuring","Wanneer vereist een renovatie een verplichte herkeuring?",[16,2543,2544,2545,2548],{},"Niet elke renovatie vereist nieuwe elektrische plannen en een herkeuring. Het AREI maakt een duidelijk onderscheid tussen werken die een ",[20,2546,2547],{},"herkeuring"," uitlokken en werken waarvoor dat niet geldt. In deze gids leest u welke regel voor uw renovatie van toepassing is.",[11,2550,2552],{"id":2551},"de-beslissingsboom-herkeuring-ja-of-nee","De beslissingsboom: Herkeuring ja of nee?",[29,2554,2556],{"id":2555},"herkeuring-vereist","Herkeuring VEREIST",[16,2558,2559],{},"Volgende werken vereisen een verplichte herkeuring (Art. 6.4.7.3):",[37,2561,2562,2572],{},[40,2563,2564],{},[43,2565,2566,2569],{},[46,2567,2568],{},"Werk",[46,2570,2571],{},"Reden",[53,2573,2574,2584,2594,2603,2613,2623,2633],{},[43,2575,2576,2581],{},[58,2577,2578],{},[20,2579,2580],{},"Nieuwe stroomkringen toevoegen",[58,2582,2583],{},"Uitbreiding van de installatie",[43,2585,2586,2591],{},[58,2587,2588],{},[20,2589,2590],{},"Verdeelkast vervangen",[58,2592,2593],{},"Wijziging van de beveiligingstoestellen",[43,2595,2596,2601],{},[58,2597,2598],{},[20,2599,2600],{},"Nieuwe onderverdeling installeren",[58,2602,2583],{},[43,2604,2605,2610],{},[58,2606,2607],{},[20,2608,2609],{},"Kabels opnieuw trekken",[58,2611,2612],{},"Wezenlijke wijziging",[43,2614,2615,2620],{},[58,2616,2617],{},[20,2618,2619],{},"Aardingsinstallatie wijzigen",[58,2621,2622],{},"Veiligheidskritisch",[43,2624,2625,2630],{},[58,2626,2627],{},[20,2628,2629],{},"Overschakelen naar driefasig",[58,2631,2632],{},"Fundamentele wijziging",[43,2634,2635,2640],{},[58,2636,2637],{},[20,2638,2639],{},"Laadpaal \u002F warmtepomp aansluiten",[58,2641,2642],{},"Nieuwe eigen stroomkring",[29,2644,2646],{"id":2645},"herkeuring-niet-vereist","Herkeuring NIET VEREIST",[16,2648,2649],{},"Deze werken gelden als onderhoud en lokken geen herkeuring uit:",[37,2651,2652,2661],{},[40,2653,2654],{},[43,2655,2656,2658],{},[46,2657,2568],{},[46,2659,2660],{},"Waarom geen herkeuring",[53,2662,2663,2673,2683,2693,2703],{},[43,2664,2665,2670],{},[58,2666,2667],{},[20,2668,2669],{},"Stopcontact\u002Fschakelaar 1-op-1 vervangen",[58,2671,2672],{},"Zelfde positie, zelfde vermogen",[43,2674,2675,2680],{},[58,2676,2677],{},[20,2678,2679],{},"Lamp door LED vervangen",[58,2681,2682],{},"Geen ingreep in de installatie",[43,2684,2685,2690],{},[58,2686,2687],{},[20,2688,2689],{},"Behangen, schilderen, vloeren leggen",[58,2691,2692],{},"Cosmetisch, geen elektrische aanpassing",[43,2694,2695,2700],{},[58,2696,2697],{},[20,2698,2699],{},"Automaat 1-op-1 vervangen",[58,2701,2702],{},"Zelfde type en nominale stroom",[43,2704,2705,2710],{},[58,2706,2707],{},[20,2708,2709],{},"Afdekplaatje stopcontact wisselen",[58,2711,2712],{},"Geen ingreep in de bedrading",[196,2714,2715],{},[16,2716,2717,2720,2721,2724],{},[20,2718,2719],{},"Grijze zone",": Een stopcontact naar een ",[20,2722,2723],{},"andere positie verplaatsen"," geldt al als wijziging. Elke belangrijke wijziging of uitbreiding lokt een herkeuring uit (Art. 6.4.7.3) — ook als de stroomkring dezelfde blijft.",[11,2726,2728],{"id":2727},"de-contaminatieregel","De contaminatieregel",[16,2730,2731],{},"De contaminatieregel is het belangrijkste concept bij renovaties:",[196,2733,2734],{},[16,2735,2736],{},[20,2737,2738],{},"Als u een deel van de installatie wijzigt, kan de inspecteur de volledige installatie in vraag stellen.",[29,2740,2742],{"id":2741},"wat-dit-in-de-praktijk-betekent","Wat dit in de praktijk betekent",[16,2744,2745],{},"Stel dat u uw badkamer renoveert en daar nieuwe stopcontacten en verlichting installeert:",[230,2747,2748,2759,2766],{},[233,2749,2750,2751,2754,2755,2758],{},"De ",[20,2752,2753],{},"badkamer"," wordt beoordeeld volgens het ",[20,2756,2757],{},"huidige AREI"," — alle actuele voorschriften gelden",[233,2760,2761,2762,2765],{},"De inspecteur kan ook de ",[20,2763,2764],{},"rest van de installatie"," controleren",[233,2767,2768,2769],{},"Bestaande gebreken (bijv. ontbrekende differentieelschakelaars in de kelder) kunnen ",[20,2770,2771],{},"ook worden opgemerkt",[29,2773,2775],{"id":2774},"hoe-u-de-contaminatie-beperkt","Hoe u de contaminatie beperkt",[261,2777,2778,2784,2790],{},[233,2779,2780,2783],{},[20,2781,2782],{},"Documenteer nauwkeurig"," welke delen gewijzigd zijn en welke niet",[233,2785,2786,2787],{},"Markeer in het eendraadschema de ",[20,2788,2789],{},"nieuwe\u002Fgewijzigde stroomkringen",[233,2791,2792,2793,2795],{},"De ongewijzigde delen vallen onder ",[20,2794,281],{}," (soepelere eisen)",[11,2797,2799],{"id":2798},"part-8-vs-volledig-arei-wat-geldt-wanneer","Part 8 vs. Volledig AREI: Wat geldt wanneer?",[16,2801,2802],{},"Het AREI onderscheidt tussen oud en nieuw:",[37,2804,2805,2818],{},[40,2806,2807],{},[43,2808,2809,2812,2815],{},[46,2810,2811],{},"Installatiedeel",[46,2813,2814],{},"Geldend voorschrift",[46,2816,2817],{},"Eisen",[53,2819,2820,2833,2846],{},[43,2821,2822,2827,2830],{},[58,2823,2824],{},[20,2825,2826],{},"Ongewijzigd, vóór 1981",[58,2828,2829],{},"Part 8 Art. 8.2 (bestaande installatie)",[58,2831,2832],{},"Soepeler — bijv. geen differentieel per kring nodig, oude kabeltypes getolereerd",[43,2834,2835,2840,2843],{},[58,2836,2837],{},[20,2838,2839],{},"Ongewijzigd, 1981–2020",[58,2841,2842],{},"Part 8 Art. 8.2.2 (afwijkingen voor huishoudelijke installaties volgens het vroegere A.R.E.I.)",[58,2844,2845],{},"Moet voldoen aan het toenmalige voorschrift, met beperkte versoepelingen conform Art. 8.2.2",[43,2847,2848,2853,2856],{},[58,2849,2850],{},[20,2851,2852],{},"Gewijzigd \u002F Nieuw",[58,2854,2855],{},"Actueel AREI",[58,2857,2858],{},"Alle huidige voorschriften (300 mA hoofd-RCD + 30 mA differentieelschakelaar met hoge gevoeligheid voor stopcontact-, verlichtings- en badkamerkringen, SPD voor het nieuwe\u002Fgewijzigde deel, kabelstandaarden)",[29,2860,2862],{"id":2861},"typisch-scenario-woning-uit-de-jaren-1960","Typisch scenario: Woning uit de jaren 1960",[16,2864,2865],{},"U renoveert de keuken en de badkamer van een woning uit 1965:",[261,2867,2868,2874,2880],{},[233,2869,2870,2873],{},[20,2871,2872],{},"Keuken + badkamer"," (nieuwe kringen): Volledig huidig AREI — SPD verwacht volgens de regels van de kunst (Art. 4.5.1, algemeen principe; geldt alleen voor het nieuwe\u002Fgewijzigde deel van de installatie), 300 mA hoofd-RCD voor de gehele installatie (Art. 4.2.4.3) + 30 mA differentieelschakelaar met hoge gevoeligheid voor stopcontact-, verlichtings- en badkamerkringen (Art. 4.2.4.3 punt b), actuele kabeltypes",[233,2875,2876,2879],{},[20,2877,2878],{},"Slaapkamers, woonkamer"," (ongewijzigd): Part 8 — oude VOB-leidingen getolereerd, geen differentieel per kring nodig",[233,2881,2882,2885,2886,2889],{},[20,2883,2884],{},"Maar",": Als de inspecteur vaststelt dat de oude installatie een ",[20,2887,2888],{},"direct veiligheidsrisico"," vormt (bijv. blote draden, ontbrekende aarding), kan hij toch een aanpassing eisen",[11,2891,2893],{"id":2892},"documentatie-bij-renovatie","Documentatie bij renovatie",[29,2895,2897],{"id":2896},"woningen-met-bestaande-plannen","Woningen met bestaande plannen",[16,2899,2900],{},"Als een actueel eendraadschema en situatieschema bestaan:",[230,2902,2903,2909,2915],{},[233,2904,2905,2908],{},[20,2906,2907],{},"Plannen bijwerken"," — nieuwe kringen, gewijzigde posities invoeren",[233,2910,2911,2914],{},[20,2912,2913],{},"Markeren"," wat oud is en wat nieuw",[233,2916,2917,2920],{},[20,2918,2919],{},"Bijgewerkte plannen"," aan de inspecteur voorleggen",[29,2922,2924],{"id":2923},"woningen-zonder-plannen-vóór-1981","Woningen zonder plannen (vóór 1981)",[16,2926,2927,2928,2931],{},"Veel oudere woningen hebben ",[20,2929,2930],{},"geen bestaande documentatie",". In dat geval (Art. 9.1.2):",[230,2933,2934,2940,2946],{},[233,2935,2936,2939],{},[20,2937,2938],{},"Volledige installatie opmeten"," — ook de ongewijzigde delen",[233,2941,2942,2945],{},[20,2943,2944],{},"Eendraadschema volledig opnieuw opstellen"," — voor de gehele installatie",[233,2947,2948,2951],{},[20,2949,2950],{},"Situatieschema opstellen"," — alle stopcontacten, schakelaars, verlichtingspunten intekenen",[196,2953,2954],{},[16,2955,2956,2959],{},[20,2957,2958],{},"Let op",": Dit is een van de meest voorkomende redenen waarom renovaties aanzienlijk duurder uitvallen dan gepland — de documentatieplicht voor de volledige installatie.",[11,2961,2963],{"id":2962},"budgetplanning-typische-kosten","Budgetplanning: Typische kosten",[37,2965,2966,2975],{},[40,2967,2968],{},[43,2969,2970,2973],{},[46,2971,2972],{},"Post",[46,2974,1152],{},[53,2976,2977,2984,2994,3001,3008],{},[43,2978,2979,2982],{},[58,2980,2981],{},"Eendraadschema + situatieschema (elektricien)",[58,2983,472],{},[43,2985,2986,2989],{},[58,2987,2988],{},"Eendraadschema + situatieschema (PlanElec)",[58,2990,2991],{},[20,2992,2993],{},"Early Access momenteel gratis",[43,2995,2996,2999],{},[58,2997,2998],{},"AREI-keuring",[58,3000,490],{},[43,3002,3003,3006],{},[58,3004,3005],{},"Herkeuring (bij gebreken)",[58,3007,498],{},[43,3009,3010,3013],{},[58,3011,3012],{},"Gebrekenverhelping",[58,3014,1193],{},[29,3016,3018],{"id":3017},"het-planelec-voordeel-bij-renovaties","Het PlanElec-voordeel bij renovaties",[16,3020,3021],{},"Met PlanElec kunt u:",[261,3023,3024,3030,3036,3042,3049],{},[233,3025,2750,3026,3029],{},[20,3027,3028],{},"bestaande installatie"," opmeten en documenteren",[233,3031,3032,3035],{},[20,3033,3034],{},"Nieuwe stroomkringen"," toevoegen en automatisch laten valideren",[233,3037,3038,3041],{},[20,3039,3040],{},"Oud vs. nieuw"," duidelijk scheiden",[233,3043,3044,3045,3048],{},"Het ",[20,3046,3047],{},"resultaat als PDF"," exporteren voor de inspecteur",[233,3050,3051,3053],{},[20,3052,2993],{},"; betalingsverwerking is nog niet actief",[11,3055,3057],{"id":3056},"checklist-voor-renoveerders","Checklist voor renoveerders",[16,3059,3060],{},"Vóór aanvang van de renovatie:",[261,3062,3064,3070,3076,3082,3088],{"className":3063},[554],[233,3065,3067,3069],{"className":3066},[558],[560,3068],{"disabled":562,"type":563}," Controleren: Lokken mijn werken een herkeuring uit?",[233,3071,3073,3075],{"className":3072},[558],[560,3074],{"disabled":562,"type":563}," Bestaande elektrische plannen opzoeken (indien beschikbaar)",[233,3077,3079,3081],{"className":3078},[558],[560,3080],{"disabled":562,"type":563}," Budget voor documentatie + keuring inplannen",[233,3083,3085,3087],{"className":3084},[558],[560,3086],{"disabled":562,"type":563}," Elektricien tijdig inschakelen (voor de installatie)",[233,3089,3091,3093],{"className":3090},[558],[560,3092],{"disabled":562,"type":563}," PlanElec gebruiken voor de documentatie (plannen zelf opstellen)",[16,3095,3096],{},"Na de renovatie:",[261,3098,3100,3106,3112,3118],{"className":3099},[554],[233,3101,3103,3105],{"className":3102},[558],[560,3104],{"disabled":562,"type":563}," Bijgewerkte plannen opgesteld?",[233,3107,3109,3111],{"className":3108},[558],[560,3110],{"disabled":562,"type":563}," Alle nieuwe stroomkringen in het eendraadschema?",[233,3113,3115,3117],{"className":3114},[558],[560,3116],{"disabled":562,"type":563}," Controleorganisme gecontacteerd?",[233,3119,3121,3123],{"className":3120},[558],[560,3122],{"disabled":562,"type":563}," Keuring geslaagd?",[11,3125,3127],{"id":3126},"gerelateerde-artikelen","Gerelateerde artikelen",[261,3129,3130,3136,3142,3148],{},[233,3131,3132],{},[628,3133,3135],{"href":3134},"\u002Fnl\u002Fblog\u002Foud-arei-part-8","Oude elektriciteit in België: AREI Part 8 uitgelegd",[233,3137,3138],{},[628,3139,3141],{"href":3140},"\u002Fnl\u002Fblog\u002Felektroplan-kosten","Wat kost een elektroplan? Prijsvergelijking 2026",[233,3143,3144],{},[628,3145,3147],{"href":3146},"\u002Fnl\u002Fblog\u002Fwat-controleert-inspecteur-keuring","Wat controleert de inspecteur bij de keuring?",[233,3149,3150],{},[628,3151,3153],{"href":3152},"\u002Fnl\u002Fblog\u002Felektrisch-dossier-woningverkoop","Elektrisch dossier bij woningverkoop",[16,3155,3156],{},[628,3157,3158],{"href":654},"Plan uw renovatie AREI-conform met PlanElec →",{"title":657,"searchDepth":658,"depth":658,"links":3160},[3161,3162,3166,3170,3173,3177,3180,3181],{"id":2540,"depth":658,"text":2541},{"id":2551,"depth":658,"text":2552,"children":3163},[3164,3165],{"id":2555,"depth":664,"text":2556},{"id":2645,"depth":664,"text":2646},{"id":2727,"depth":658,"text":2728,"children":3167},[3168,3169],{"id":2741,"depth":664,"text":2742},{"id":2774,"depth":664,"text":2775},{"id":2798,"depth":658,"text":2799,"children":3171},[3172],{"id":2861,"depth":664,"text":2862},{"id":2892,"depth":658,"text":2893,"children":3174},[3175,3176],{"id":2896,"depth":664,"text":2897},{"id":2923,"depth":664,"text":2924},{"id":2962,"depth":658,"text":2963,"children":3178},[3179],{"id":3017,"depth":664,"text":3018},{"id":3056,"depth":658,"text":3057},{"id":3126,"depth":658,"text":3127},"Niet elke renovatie vereist nieuwe elektrische plannen. Ontdek welke werken een herkeuring uitlokken en wat de contaminatieregel inhoudt.","nl",{},"\u002Fblog\u002Frenovation-electrical-plans.nl",{"title":2535,"description":3182},"renovatie-arei-elektrische-plannen","blog\u002Frenovation-electrical-plans.nl",[695,696,3190,3191,3192,2547,3193,281,3028,3194,3195,3196,3197],"renovatie","verbouwing","elektrische plannen","contaminatieregel","eendraadschema","situatieschema","België","elektrische keuring","V-hTzF5yCRbfz-0ZSsiw2y4hwXjXjkXyAUBy0lD8NDY",1785171270929]