[{"data":1,"prerenderedAt":2031},["ShallowReactive",2],{"help-guide-en-automatic-planning":3,"help-alternates-automatic-planning":289,"help-related-en":1271},{"id":4,"title":5,"body":6,"category":271,"description":272,"extension":273,"guideId":26,"locale":274,"meta":275,"navigation":276,"order":260,"path":277,"readTime":278,"seo":279,"slug":26,"stem":280,"tags":281,"updatedAt":287,"__hash__":288},"help\u002Fhelp\u002Fautomatic-planning.en.md","Using and reviewing automatic planning",{"type":7,"value":8,"toc":258},"minimark",[9,13,21,33,38,41,44,63,66,71,74,77,82,86,89,92,95,110,113,118,122,125,145,148,153,157,160,163,168,172,175,178,192,195,203,207,210,248,251],[10,11,12],"p",{},"PlanElec's automatic functions create editable proposals. They reduce repetitive work, but they cannot know which equipment will actually be installed, how a cable will run on site, or which product specifications your electrician will select.",[10,14,15,16,20],{},"Use the same pattern each time: ",[17,18,19],"strong",{},"create proposal → review preview → apply → check technically",".",[10,22,23,27,30],{},[24,25],"a",{"id":26},"automatic-planning",[24,28],{"id":29},"consumers",[24,31],{"id":32},"devices",[34,35,37],"h2",{"id":36},"propose-devices-and-lighting-points","Propose devices and lighting points",[10,39,40],{},"The floor-plan editor includes helpers for automatic sockets, lighting, standard equipment, and spotlight grids. The proposals use the drawn rooms and geometry as their basis.",[10,42,43],{},"For a useful result:",[45,46,47,51,54,57,60],"ol",{},[48,49,50],"li",{},"draw closed, correctly named rooms;",[48,52,53],{},"set the required count or pattern where applicable;",[48,55,56],{},"inspect the proposed positions;",[48,58,59],{},"move, add, or remove points to match the real design;",[48,61,62],{},"review special zones and fixed appliances separately.",[10,64,65],{},"PlanElec does not silently add every missing appliance. You remain responsible for the design brief and final placement.",[67,68,70],"h3",{"id":69},"build-switch-chains-automatically","Build switch chains automatically",[10,72,73],{},"PlanElec can propose a switch chain for unassigned switches and lighting points in the same room. It normally starts with the free switch closest to a door and then connects nearby free points.",[10,75,76],{},"Always verify which switch controls which light. Edit the sequence manually when the real control logic differs.",[10,78,79],{},[24,80],{"id":81},"cables",[34,83,85],{"id":84},"generate-cable-specifications-and-routes","Generate cable specifications and routes",[10,87,88],{},"Once the electrical topology exists, PlanElec can create a cable segment for each parent-to-child connection. A real connection or junction box splits the connection into separate segments. A box that is only nearby is not silently inserted into the electrical path.",[10,90,91],{},"Automatic routing searches for a short route along the drawn walls on each floor. If the start and end are not connected through the same wall component, the router uses a direct fallback.",[10,93,94],{},"After routing:",[96,97,98,101,104,107],"ul",{},[48,99,100],{},"check whether the route matches the intended installation;",[48,102,103],{},"add or move waypoints where required;",[48,105,106],{},"review cable type, cross-section, and installation method;",[48,108,109],{},"enter a manual length when the calculated route does not represent reality closely enough.",[10,111,112],{},"The resulting length feeds the material list, voltage-drop calculation, and validation. It is a net length without an automatic waste or reserve factor.",[10,114,115],{},[24,116],{"id":117},"circuits",[34,119,121],{"id":120},"assign-devices-to-circuits-automatically","Assign devices to circuits automatically",[10,123,124],{},"Automatic circuit assignment creates a proposal from the recorded devices and product rules. It supports decisions such as:",[96,126,127,130,133,136,139,142],{},[48,128,129],{},"grouping standard lighting and socket points by room;",[48,131,132],{},"allowing no more than eight connection points on a standard circuit;",[48,134,135],{},"creating dedicated breakers for appliances including hobs, ovens, washing machines, tumble dryers, dishwashers, boilers, heat pumps, and saunas;",[48,137,138],{},"placing standard groups behind 30 mA RCDs;",[48,140,141],{},"assigning an EV charger a separate 30 mA RCD and three-phase breaker; with documented built-in 6 mA DC detection PlanElec proposes external Type A, otherwise Type B;",[48,143,144],{},"distributing assignments across boards in a multi-board project.",[10,146,147],{},"Review the preview before confirming it. Pay particular attention to mixed circuits, special appliances, existing manual assignments, and whether the defaults suit the actual project.",[10,149,150],{},[24,151],{"id":152},"phases",[34,154,156],{"id":155},"balance-loads-across-phases","Balance loads across phases",[10,158,159],{},"For a three-phase or delta supply, PlanElec can distribute loads across L1, L2, and L3. The phase overview shows the calculated load on each phase and warns about a clear imbalance.",[10,161,162],{},"This remains a model calculation based on the entered loads. Real simultaneity, measurements, and network conditions require assessment outside the software.",[10,164,165],{},[24,166],{"id":167},"cabinet",[34,169,171],{"id":170},"fill-the-distribution-board-automatically","Fill the distribution board automatically",[10,173,174],{},"Auto-fill places existing main switches, RCDs, and MCBs in free DIN-rail slots. Its default sequence is main RCD, group RCDs, and then circuit breakers. By default, it reserves about twenty percent of the rail capacity.",[10,176,177],{},"The distinction from circuit assignment matters:",[96,179,180,186],{},[48,181,182,185],{},[17,183,184],{},"Circuit assignment"," creates and connects the electrical protection structure.",[48,187,188,191],{},[17,189,190],{},"Auto-fill"," arranges those existing modules physically in the board.",[10,193,194],{},"After auto-fill, review the board size, TE widths, spare capacity, protection chains, and connection paths. Explicit paths through connection boxes are preserved when the board is filled again.",[10,196,197,200],{},[24,198],{"id":199},"schema",[24,201],{"id":202},"review",[34,204,206],{"id":205},"final-review-of-an-automatic-proposal","Final review of an automatic proposal",[10,208,209],{},"After every automatic action, check:",[45,211,212,218,224,230,236,242],{},[48,213,214,217],{},[17,215,216],{},"Completeness:"," are all real devices, boxes, and boards modeled?",[48,219,220,223],{},[17,221,222],{},"Topology:"," is each parent-to-child connection correct, with nothing left unconnected?",[48,225,226,229],{},[17,227,228],{},"Protection:"," do the RCD, MCB, pole configuration, and cable suit the application?",[48,231,232,235],{},[17,233,234],{},"Space:"," are routes and positions practical on site?",[48,237,238,241],{},[17,239,240],{},"Phases:"," is the allocation plausible for the entered loads?",[48,243,244,247],{},[17,245,246],{},"Documents:"," do the situation plan and single-line diagram remain readable?",[10,249,250],{},"The AREI\u002FRGIE self-check helps with supported rules that can be evaluated from project data. It is not a declaration of conformity and does not replace an electrician's review or the official inspection.",[10,252,253,254,20],{},"Continue with ",[24,255,257],{"href":256},"\u002Fen\u002Fhelp\u002Fexport-documents","Exporting documents",{"title":259,"searchDepth":260,"depth":260,"links":261},"",2,[262,266,267,268,269,270],{"id":36,"depth":260,"text":37,"children":263},[264],{"id":69,"depth":265,"text":70},3,{"id":84,"depth":260,"text":85},{"id":120,"depth":260,"text":121},{"id":155,"depth":260,"text":156},{"id":170,"depth":260,"text":171},{"id":205,"depth":260,"text":206},"automation","Use PlanElec proposals for devices, switch chains, cable routes, circuits, phases, and the distribution board without skipping technical review.","md","en",{},true,"\u002Fhelp\u002Fautomatic-planning.en","9 min",{"title":5,"description":272},"help\u002Fautomatic-planning.en",[282,32,283,117,284,285,286],"automatic planning","cable routing","phase balancing","distribution board","DIN rail","2026-07-20","zmQJ24UMUmpbPSZVOF9GQftSIkXLgz1R2p0q_4MMqT0",[290,561,739,1009],{"id":291,"title":292,"body":293,"category":271,"description":545,"extension":273,"guideId":26,"locale":546,"meta":547,"navigation":276,"order":260,"path":548,"readTime":549,"seo":550,"slug":551,"stem":552,"tags":553,"updatedAt":287,"__hash__":560},"help\u002Fhelp\u002Fautomatic-planning.de.md","Automatische Planung: Verbraucher, Kabel, Stromkreise und Schaltschrank",{"type":7,"value":294,"toc":535},[295,298,302,305,322,325,329,333,336,368,371,375,378,381,401,404,408,411,414,431,434,438,442,445,469,472,476,480,483,487,490,513,517,520,523],[10,296,297],{},"Die Automatik in PlanElec verkürzt wiederkehrende Planungsschritte. Sie erzeugt Vorschläge aus den vorhandenen Räumen, Geräten und Topologiebeziehungen. Das Ergebnis bleibt editierbar und muss mit der geplanten beziehungsweise vorhandenen Installation abgeglichen werden.",[34,299,301],{"id":300},"vor-dem-start","Vor dem Start",[10,303,304],{},"Automatische Ergebnisse werden besser, wenn die Eingangsdaten vollständig sind:",[96,306,307,310,313,316,319],{},[48,308,309],{},"Gebäude, Etagen und geschlossene Räume sind angelegt.",[48,311,312],{},"Räume sind sinnvoll benannt und kategorisiert.",[48,314,315],{},"Der Verteiler steht im richtigen Raum und ist im Projekt korrekt verknüpft.",[48,317,318],{},"Netzform und Polkonfiguration sind gewählt.",[48,320,321],{},"Bereits feststehende Spezialgeräte sind platziert und korrekt typisiert.",[10,323,324],{},"Speichern Sie das Projekt und arbeiten Sie die angezeigten unverbundenen Komponenten ab, bevor Sie die große Stromkreiszuordnung starten.",[10,326,327],{},[24,328],{"id":26},[34,330,332],{"id":331},"verbraucher-automatisch-planen","Verbraucher automatisch planen",[10,334,335],{},"Im Grundriss stehen je nach Raum und Werkzeug mehrere Helfer zur Verfügung:",[96,337,338,344,350,356,362],{},[48,339,340,343],{},[17,341,342],{},"Steckdosen-Vorschläge"," verteilen Steckdosen passend zur Raumgeometrie.",[48,345,346,349],{},[17,347,348],{},"Beleuchtungs-Vorschläge"," setzen Leuchtpunkte als Ausgangspunkt für die Planung.",[48,351,352,355],{},[17,353,354],{},"Standardausstattung"," ergänzt typische elektrische Geräte eines Raums.",[48,357,358,361],{},[17,359,360],{},"Spot-Raster"," erzeugen gleichmäßig angeordnete Spots für die gewählte Fläche.",[48,363,364,367],{},[17,365,366],{},"Schalterketten"," verbinden freie Schalter und Leuchten eines Raums in einer vorgeschlagenen Reihenfolge.",[10,369,370],{},"Prüfen Sie jeden Vorschlag in der Vorschau oder direkt im Grundriss. Achten Sie auf Türen, Fenster, feste Einbauten, Möblierung, Feuchträume und die tatsächlich geplante Nutzung. Löschen, verschieben oder ergänzen Sie Geräte, bevor Sie mit den Stromkreisen fortfahren.",[34,372,374],{"id":373},"kabel-automatisch-spezifizieren-und-verlegen","Kabel automatisch spezifizieren und verlegen",[10,376,377],{},"PlanElec erzeugt Kabelsegmente aus den tatsächlichen Verbindungen der elektrischen Topologie. Eine Verbindungs- oder Abzweigdose trennt den Pfad nur dann in mehrere Segmente, wenn sie als echter Topologieknoten verknüpft ist; räumliche Nähe allein reicht nicht.",[10,379,380],{},"Für verbundene Geräte kann die Route automatisch entlang der Wände berechnet werden:",[45,382,383,386,389,392,395,398],{},[48,384,385],{},"Prüfen Sie Start und Ziel des Segments.",[48,387,388],{},"Starten Sie die automatische Verlegung.",[48,390,391],{},"Kontrollieren Sie den Verlauf im Grundriss. Bei getrennten Wandbereichen kann eine direkte Fallback-Linie entstehen.",[48,393,394],{},"Ergänzen oder verschieben Sie bei Bedarf manuelle Wegpunkte.",[48,396,397],{},"Prüfen Sie die berechnete Länge. Eine manuell eingetragene Länge hat Vorrang.",[48,399,400],{},"Kontrollieren Sie Kabeltyp, Querschnitt und Installationsangaben im fachlichen Kontext.",[10,402,403],{},"Die berechneten Nettolängen fließen in Kabelliste, Materialübersicht und unterstützte Prüfungen ein. Verschnitt und Baustellenreserve werden nicht automatisch als Bestellmenge aufgeschlagen.",[34,405,407],{"id":406},"stromkreise-automatisch-zuweisen","Stromkreise automatisch zuweisen",[10,409,410],{},"Die automatische Stromkreiszuordnung gruppiert normale Licht- und Steckdosenpunkte und behandelt unterstützte Spezialgeräte separat. Dazu gehören unter anderem dedizierte Stromkreise für bestimmte fest angeschlossene Geräte. Eine Wallbox wird im aktuellen Produktmodell als Sonderfall mit eigener Schutzkette behandelt.",[10,412,413],{},"Gehen Sie so vor:",[45,415,416,419,422,425,428],{},[48,417,418],{},"Öffnen Sie die Auto-Zuweisung aus dem geführten Ablauf oder dem Schaltschrankbereich.",[48,420,421],{},"Prüfen Sie die Vorschau: Verbrauchergruppe, Verteiler, Schutzgeräte, Phase und vorgeschlagene Kabeldaten.",[48,423,424],{},"Übernehmen Sie den Vorschlag erst, wenn die Gruppierung zum Projekt passt.",[48,426,427],{},"Verschieben Sie einzelne Verbraucherzweige bei Bedarf manuell zu einem anderen MCB. PlanElec aktualisiert dabei Stromkreis, Verteiler, Phase und betroffene Kabelbeziehungen gemeinsam.",[48,429,430],{},"Kontrollieren Sie anschließend Findings und unverbundene Komponenten.",[10,432,433],{},"Bei mehreren Verteilern kann die automatische Mehrfach-Verteiler-Zuweisung verwendet werden. Für dreiphasige Anlagen verteilt das Phase-Balancing Lasten auf L1, L2 und L3 und zeigt eine Warnung bei deutlicher Schieflast. Das ist eine Planungshilfe, keine Messung der realen Anlage.",[10,435,436],{},[24,437],{"id":167},[34,439,441],{"id":440},"schaltschrank-automatisch-belegen","Schaltschrank automatisch belegen",[10,443,444],{},"Die Auto-Belegung ordnet vorhandene Hauptschalter, RCDs\u002FFI-Schutzschalter und MCBs\u002FLeitungsschutzschalter auf den DIN-Schienen des gewählten Gehäuses an.",[45,446,447,450,453,460,463,466],{},[48,448,449],{},"Wählen Sie Gehäusegröße, Reihen und Polkonfiguration.",[48,451,452],{},"Legen Sie fest, ob die Hauptreihe oben oder unten liegen soll.",[48,454,455,456,459],{},"Starten Sie ",[17,457,458],{},"Auto-Belegen",". PlanElec ordnet die Schutzgeräte in der vorgesehenen Reihenfolge an und reserviert standardmäßig 20 Prozent Schienenplatz.",[48,461,462],{},"Prüfen Sie freie Plätze, Modulbreiten und Schutzgruppen.",[48,464,465],{},"Kontrollieren Sie die sichtbaren Verbindungen von Hauptschalter zu RCD und von RCD zu MCB.",[48,467,468],{},"Ergänzen Sie fehlende Verbindungen mit dem Verbinderwerkzeug oder verschieben Sie Module manuell.",[10,470,471],{},"Explizit modellierte Verbindungsdosenpfade werden beim erneuten Auto-Belegen bewahrt. Ungültige oder unvollständige Innenmodelle gelten dadurch aber nicht automatisch als fachlich vollständig.",[10,473,474],{},[24,475],{"id":199},[34,477,479],{"id":478},"eindrahtschema-nach-der-automatik-prüfen","Eindrahtschema nach der Automatik prüfen",[10,481,482],{},"Öffnen Sie nach Stromkreiszuordnung, Kabelplanung und Schaltschrankbelegung das Eindrahtschema. Prüfen Sie, ob Schutzgeräte, Abzweigungen, Verbraucher und Kabelbeschriftungen vollständig und plausibel erscheinen. Korrigieren Sie fachliche Beziehungen im gemeinsamen Projektmodell und führen Sie den unterstützten Selbstcheck nach jeder relevanten Änderung erneut aus.",[34,484,486],{"id":485},"empfohlener-wiederholungsablauf","Empfohlener Wiederholungsablauf",[10,488,489],{},"Nach größeren Änderungen lohnt sich diese kurze Schleife:",[45,491,492,495,498,501,504,507,510],{},[48,493,494],{},"Geräte und Raumpositionen prüfen.",[48,496,497],{},"Unverbundene Komponenten bearbeiten.",[48,499,500],{},"Stromkreiszuordnung kontrollieren oder neu vorschlagen lassen.",[48,502,503],{},"Kabelsegmente und Routen aktualisieren.",[48,505,506],{},"Schaltschrank neu belegen und Schutzkette prüfen.",[48,508,509],{},"Eindrahtschema und unterstützten AREI\u002FRGIE-Selbstcheck erneut kontrollieren.",[48,511,512],{},"Erst danach neue PDFs oder Listen erzeugen.",[34,514,516],{"id":515},"grenzen-der-automatik","Grenzen der Automatik",[10,518,519],{},"Automatische Vorschläge kennen nur die im Projekt erfassten Daten. Bedingungen vor Ort, Messwerte, Herstellernachweise und nicht modellierte Anlagenbereiche können sie nicht beurteilen. Ein fehlerfreier Selbstcheck bedeutet nur, dass in den aktuell unterstützten und auswertbaren Regeln kein Fehler gefunden wurde.",[10,521,522],{},"PlanElec ersetzt keine Fachplanung, Ausführung oder Keuring. Die offizielle Beurteilung erfolgt ausschließlich durch einen zugelassenen Kontrollorganismus.",[10,524,525,526,530,531,20],{},"Als Nächstes: ",[24,527,529],{"href":528},"\u002Fde\u002Fhelp\u002Fdokumente-exportieren","Dokumente und Listen exportieren"," oder zurück zur ",[24,532,534],{"href":533},"\u002Fde\u002Fhelp","Wissensbasis",{"title":259,"searchDepth":260,"depth":260,"links":536},[537,538,539,540,541,542,543,544],{"id":300,"depth":260,"text":301},{"id":331,"depth":260,"text":332},{"id":373,"depth":260,"text":374},{"id":406,"depth":260,"text":407},{"id":440,"depth":260,"text":441},{"id":478,"depth":260,"text":479},{"id":485,"depth":260,"text":486},{"id":515,"depth":260,"text":516},"Nutzen Sie die automatischen Vorschläge von PlanElec für Geräte, Kabelwege, Stromkreiszuordnung, Phasen und die Belegung des Schaltschranks.","de",{},"\u002Fhelp\u002Fautomatic-planning.de","9 Min.",{"title":292,"description":545},"automatische-planung","help\u002Fautomatic-planning.de",[554,555,556,557,558,559],"Automatische Planung","Verbraucher","Kabel","Stromkreise","Phasen","Schaltschrank","Fs7IVOFRDB6Jbd2LMWjBUebc-_6gKFSqC1Ed6M406jA",{"id":4,"title":5,"body":562,"category":271,"description":272,"extension":273,"guideId":26,"locale":274,"meta":736,"navigation":276,"order":260,"path":277,"readTime":278,"seo":737,"slug":26,"stem":280,"tags":738,"updatedAt":287,"__hash__":288},{"type":7,"value":563,"toc":726},[564,566,570,578,580,582,584,596,598,600,602,604,608,610,612,614,616,626,628,632,634,636,650,652,656,658,660,662,666,668,670,672,682,684,690,692,694,720,722],[10,565,12],{},[10,567,15,568,20],{},[17,569,19],{},[10,571,572,574,576],{},[24,573],{"id":26},[24,575],{"id":29},[24,577],{"id":32},[34,579,37],{"id":36},[10,581,40],{},[10,583,43],{},[45,585,586,588,590,592,594],{},[48,587,50],{},[48,589,53],{},[48,591,56],{},[48,593,59],{},[48,595,62],{},[10,597,65],{},[67,599,70],{"id":69},[10,601,73],{},[10,603,76],{},[10,605,606],{},[24,607],{"id":81},[34,609,85],{"id":84},[10,611,88],{},[10,613,91],{},[10,615,94],{},[96,617,618,620,622,624],{},[48,619,100],{},[48,621,103],{},[48,623,106],{},[48,625,109],{},[10,627,112],{},[10,629,630],{},[24,631],{"id":117},[34,633,121],{"id":120},[10,635,124],{},[96,637,638,640,642,644,646,648],{},[48,639,129],{},[48,641,132],{},[48,643,135],{},[48,645,138],{},[48,647,141],{},[48,649,144],{},[10,651,147],{},[10,653,654],{},[24,655],{"id":152},[34,657,156],{"id":155},[10,659,159],{},[10,661,162],{},[10,663,664],{},[24,665],{"id":167},[34,667,171],{"id":170},[10,669,174],{},[10,671,177],{},[96,673,674,678],{},[48,675,676,185],{},[17,677,184],{},[48,679,680,191],{},[17,681,190],{},[10,683,194],{},[10,685,686,688],{},[24,687],{"id":199},[24,689],{"id":202},[34,691,206],{"id":205},[10,693,209],{},[45,695,696,700,704,708,712,716],{},[48,697,698,217],{},[17,699,216],{},[48,701,702,223],{},[17,703,222],{},[48,705,706,229],{},[17,707,228],{},[48,709,710,235],{},[17,711,234],{},[48,713,714,241],{},[17,715,240],{},[48,717,718,247],{},[17,719,246],{},[10,721,250],{},[10,723,253,724,20],{},[24,725,257],{"href":256},{"title":259,"searchDepth":260,"depth":260,"links":727},[728,731,732,733,734,735],{"id":36,"depth":260,"text":37,"children":729},[730],{"id":69,"depth":265,"text":70},{"id":84,"depth":260,"text":85},{"id":120,"depth":260,"text":121},{"id":155,"depth":260,"text":156},{"id":170,"depth":260,"text":171},{"id":205,"depth":260,"text":206},{},{"title":5,"description":272},[282,32,283,117,284,285,286],{"id":740,"title":741,"body":742,"category":271,"description":996,"extension":273,"guideId":26,"locale":997,"meta":998,"navigation":276,"order":260,"path":999,"readTime":278,"seo":1000,"slug":1001,"stem":1002,"tags":1003,"updatedAt":287,"__hash__":1008},"help\u002Fhelp\u002Fautomatic-planning.fr.md","Planification automatique : récepteurs, câbles, circuits et tableau",{"type":7,"value":743,"toc":986},[744,747,751,754,771,774,778,782,785,819,822,826,829,832,852,855,859,862,865,882,885,889,893,896,920,923,927,931,934,938,941,964,968,971,974],[10,745,746],{},"Les automatismes de PlanElec accélèrent les étapes répétitives. Ils produisent des propositions à partir des pièces, équipements et relations topologiques déjà enregistrés. Le résultat reste modifiable et doit toujours être comparé à l'installation prévue ou existante.",[34,748,750],{"id":749},"avant-de-commencer","Avant de commencer",[10,752,753],{},"Les propositions automatiques sont plus pertinentes lorsque les données de départ sont complètes :",[96,755,756,759,762,765,768],{},[48,757,758],{},"le bâtiment, les étages et les pièces fermées sont créés ;",[48,760,761],{},"les pièces sont nommées et classées de manière cohérente ;",[48,763,764],{},"le tableau se trouve dans la bonne pièce et est correctement relié dans le projet ;",[48,766,767],{},"le régime de réseau et la configuration des pôles sont définis ;",[48,769,770],{},"les appareils spéciaux déjà connus sont placés et correctement typés.",[10,772,773],{},"Enregistrez le projet et traitez les composants signalés comme non connectés avant de lancer l'affectation générale des circuits.",[10,775,776],{},[24,777],{"id":26},[34,779,781],{"id":780},"planifier-automatiquement-les-récepteurs","Planifier automatiquement les récepteurs",[10,783,784],{},"Selon la pièce et l'outil sélectionné, plusieurs assistants sont disponibles dans le plan :",[96,786,787,794,800,807,813],{},[48,788,789,790,793],{},"les ",[17,791,792],{},"propositions de prises"," répartissent des prises en fonction de la géométrie de la pièce ;",[48,795,789,796,799],{},[17,797,798],{},"propositions d'éclairage"," placent des points lumineux comme base de travail ;",[48,801,802,803,806],{},"l'",[17,804,805],{},"équipement standard"," ajoute des équipements électriques courants pour le type de pièce ;",[48,808,789,809,812],{},[17,810,811],{},"grilles de spots"," créent des spots régulièrement espacés dans la zone choisie ;",[48,814,789,815,818],{},[17,816,817],{},"chaînes d'interrupteurs"," relient les interrupteurs et luminaires libres d'une pièce dans un ordre proposé.",[10,820,821],{},"Contrôlez chaque proposition dans l'aperçu ou directement sur le plan. Tenez compte des portes, fenêtres, éléments fixes, meubles, locaux humides et de l'usage réel. Supprimez, déplacez ou complétez les équipements avant de passer aux circuits.",[34,823,825],{"id":824},"spécifier-et-tracer-automatiquement-les-câbles","Spécifier et tracer automatiquement les câbles",[10,827,828],{},"PlanElec crée les segments de câble à partir des relations réelles de la topologie électrique. Une boîte de connexion ou de dérivation ne divise le chemin en plusieurs segments que si elle est reliée comme un vrai nœud topologique ; la proximité spatiale ne suffit pas.",[10,830,831],{},"Pour un équipement connecté, le trajet peut être calculé automatiquement le long des murs :",[45,833,834,837,840,843,846,849],{},[48,835,836],{},"Vérifiez le départ et l'arrivée du segment.",[48,838,839],{},"Lancez le tracé automatique.",[48,841,842],{},"Examinez le chemin sur le plan. Entre des ensembles de murs séparés, une ligne directe de secours peut apparaître.",[48,844,845],{},"Ajoutez ou déplacez des points de passage manuels si nécessaire.",[48,847,848],{},"Vérifiez la longueur calculée. Une longueur saisie manuellement est prioritaire.",[48,850,851],{},"Contrôlez le type, la section et les conditions de pose du câble dans le contexte professionnel.",[10,853,854],{},"Les longueurs nettes calculées alimentent la liste de câbles, la vue matériel et les contrôles pris en charge. Les chutes et réserves de chantier ne sont pas ajoutées automatiquement comme quantités de commande.",[34,856,858],{"id":857},"affecter-automatiquement-les-circuits","Affecter automatiquement les circuits",[10,860,861],{},"L'affectation automatique regroupe les points d'éclairage et les prises ordinaires et traite séparément les appareils spéciaux pris en charge. Certains appareils fixes reçoivent notamment un circuit dédié. Dans le modèle actuel, une borne de recharge constitue un cas particulier avec sa propre chaîne de protection.",[10,863,864],{},"Procédez comme suit :",[45,866,867,870,873,876,879],{},[48,868,869],{},"Ouvrez l'affectation automatique depuis le parcours guidé ou la section du tableau.",[48,871,872],{},"Vérifiez l'aperçu : groupe de récepteurs, tableau, protections, phase et données de câble proposées.",[48,874,875],{},"N'acceptez la proposition que si le regroupement correspond au projet.",[48,877,878],{},"Si nécessaire, déplacez manuellement une branche de récepteurs vers un autre disjoncteur. PlanElec met alors à jour ensemble le circuit, le tableau, la phase et les relations de câble concernées.",[48,880,881],{},"Contrôlez ensuite les constats et les composants non connectés.",[10,883,884],{},"Pour plusieurs tableaux, l'affectation automatique multi-tableaux peut être utilisée. Dans une installation triphasée, l'équilibrage répartit les charges sur L1, L2 et L3 et affiche un avertissement en cas de déséquilibre marqué. Il s'agit d'une aide à la planification, pas d'une mesure de l'installation réelle.",[10,886,887],{},[24,888],{"id":167},[34,890,892],{"id":891},"remplir-automatiquement-le-tableau","Remplir automatiquement le tableau",[10,894,895],{},"Le placement automatique organise les interrupteurs principaux, différentiels et disjoncteurs existants sur les rails DIN du coffret choisi.",[45,897,898,901,904,911,914,917],{},[48,899,900],{},"Choisissez le coffret, le nombre de rangées et la configuration des pôles.",[48,902,903],{},"Indiquez si la rangée principale doit se trouver en haut ou en bas.",[48,905,906,907,910],{},"Lancez le ",[17,908,909],{},"placement automatique",". PlanElec ordonne les protections et réserve par défaut 20 % de l'espace sur rail.",[48,912,913],{},"Vérifiez les emplacements libres, la largeur des modules et les groupes protégés.",[48,915,916],{},"Contrôlez les connexions visibles entre interrupteur principal, différentiels et disjoncteurs.",[48,918,919],{},"Ajoutez les connexions manquantes avec l'outil de liaison ou déplacez les modules manuellement.",[10,921,922],{},"Les chemins de boîtes de connexion explicitement modélisés sont conservés lors d'un nouveau placement automatique. Un modèle interne invalide ou incomplet n'est toutefois pas considéré comme professionnellement complet.",[10,924,925],{},[24,926],{"id":199},[34,928,930],{"id":929},"contrôler-le-schéma-unifilaire-après-lautomatisation","Contrôler le schéma unifilaire après l'automatisation",[10,932,933],{},"Après l'affectation des circuits, la planification des câbles et le placement du tableau, ouvrez le schéma unifilaire. Vérifiez que les protections, dérivations, récepteurs et indications de câble sont complets et plausibles. Corrigez les relations métier dans le modèle de projet commun et relancez l'auto-contrôle pris en charge après chaque modification pertinente.",[34,935,937],{"id":936},"cycle-de-contrôle-recommandé","Cycle de contrôle recommandé",[10,939,940],{},"Après une modification importante, répétez cette courte séquence :",[45,942,943,946,949,952,955,958,961],{},[48,944,945],{},"Vérifier les équipements et leurs positions dans les pièces.",[48,947,948],{},"Traiter les composants non connectés.",[48,950,951],{},"Contrôler l'affectation des circuits ou demander une nouvelle proposition.",[48,953,954],{},"Actualiser les segments et trajets de câble.",[48,956,957],{},"Replacer le tableau et vérifier la chaîne de protection.",[48,959,960],{},"Recontrôler le schéma unifilaire et l'auto-contrôle RGIE pris en charge.",[48,962,963],{},"Générer ensuite seulement de nouveaux PDF ou de nouvelles listes.",[34,965,967],{"id":966},"limites-de-lautomatisation","Limites de l'automatisation",[10,969,970],{},"Les propositions automatiques ne connaissent que les données saisies dans le projet. Elles ne peuvent pas évaluer les conditions sur place, les mesures, les justificatifs des fabricants ni les parties de l'installation qui ne sont pas modélisées. Un auto-contrôle sans erreur signifie uniquement qu'aucune erreur n'a été trouvée dans les règles actuellement prises en charge et évaluables.",[10,972,973],{},"PlanElec ne remplace ni l'étude, ni l'exécution, ni le contrôle officiel. Seul un organisme de contrôle agréé rend l'évaluation officielle.",[10,975,976,977,981,982,20],{},"Étape suivante : ",[24,978,980],{"href":979},"\u002Ffr\u002Fhelp\u002Fexporter-les-documents","exporter les documents et les listes"," ou revenir à la ",[24,983,985],{"href":984},"\u002Ffr\u002Fhelp","base de connaissances",{"title":259,"searchDepth":260,"depth":260,"links":987},[988,989,990,991,992,993,994,995],{"id":749,"depth":260,"text":750},{"id":780,"depth":260,"text":781},{"id":824,"depth":260,"text":825},{"id":857,"depth":260,"text":858},{"id":891,"depth":260,"text":892},{"id":929,"depth":260,"text":930},{"id":936,"depth":260,"text":937},{"id":966,"depth":260,"text":967},"Utilisez les propositions automatiques de PlanElec pour les équipements, les chemins de câble, les circuits, les phases et l’implantation du tableau.","fr",{},"\u002Fhelp\u002Fautomatic-planning.fr",{"title":741,"description":996},"planification-automatique","help\u002Fautomatic-planning.fr",[1004,1005,1006,117,152,1007],"planification automatique","récepteurs","câbles","tableau électrique","jUbUYzUpBuo2uo9VeHuOwYUXd5eyG5sDzTWLx1pI-gA",{"id":1010,"title":1011,"body":1012,"category":271,"description":1255,"extension":273,"guideId":26,"locale":1256,"meta":1257,"navigation":276,"order":260,"path":1258,"readTime":278,"seo":1259,"slug":1260,"stem":1261,"tags":1262,"updatedAt":287,"__hash__":1270},"help\u002Fhelp\u002Fautomatic-planning.nl.md","Automatische planning gebruiken en controleren",{"type":7,"value":1013,"toc":1245},[1014,1017,1023,1031,1035,1038,1041,1058,1061,1065,1068,1071,1075,1079,1082,1085,1088,1102,1105,1109,1113,1116,1136,1139,1143,1147,1150,1153,1157,1161,1164,1167,1181,1184,1190,1194,1197,1235,1238],[10,1015,1016],{},"De automatische functies van PlanElec zijn bedoeld als bewerkbare voorstellen. Ze nemen repetitief werk over, maar kunnen niet weten welke toestellen werkelijk worden geïnstalleerd, hoe een kabel op de werf loopt of welke productspecificaties uw elektricien kiest.",[10,1018,1019,1020,20],{},"Werk daarom steeds volgens hetzelfde patroon: ",[17,1021,1022],{},"voorstel maken → preview controleren → toepassen → technisch nakijken",[10,1024,1025,1027,1029],{},[24,1026],{"id":26},[24,1028],{"id":29},[24,1030],{"id":32},[34,1032,1034],{"id":1033},"verbruikers-en-lichtpunten-voorstellen","Verbruikers en lichtpunten voorstellen",[10,1036,1037],{},"In het grondplan zijn hulpmiddelen beschikbaar voor automatische stopcontacten, verlichting, standaarduitrusting en spotrasters. De voorstellen gebruiken de getekende ruimtes en geometrie als basis.",[10,1039,1040],{},"Voor een bruikbaar resultaat:",[45,1042,1043,1046,1049,1052,1055],{},[48,1044,1045],{},"teken gesloten en correct benoemde ruimtes;",[48,1047,1048],{},"stel waar nodig het gewenste aantal of patroon in;",[48,1050,1051],{},"bekijk de voorgestelde posities;",[48,1053,1054],{},"verplaats, voeg toe of verwijder punten volgens het echte ontwerp;",[48,1056,1057],{},"controleer bijzondere zones en vaste toestellen afzonderlijk.",[10,1059,1060],{},"PlanElec voegt niet stilzwijgend ontbrekende toestellen toe. U blijft verantwoordelijk voor het programma van eisen en de uiteindelijke plaatsing.",[67,1062,1064],{"id":1063},"schakelketens-automatisch-opbouwen","Schakelketens automatisch opbouwen",[10,1066,1067],{},"Voor vrije schakelaars en lichtpunten binnen één ruimte kan PlanElec een schakelketen voorstellen. Het startpunt is normaal de vrije schakelaar die het dichtst bij een deur ligt; daarna worden nabijgelegen vrije punten gekoppeld.",[10,1069,1070],{},"Controleer altijd welke schakelaar welk licht bedient en pas de volgorde manueel aan wanneer de werkelijke bediening anders is.",[10,1072,1073],{},[24,1074],{"id":81},[34,1076,1078],{"id":1077},"kabelspecificaties-en-routes-genereren","Kabelspecificaties en routes genereren",[10,1080,1081],{},"Zodra de elektrische topologie bestaat, kan PlanElec voor iedere ouder-kindverbinding een kabelsegment aanmaken. Een echte verbindings- of aftakdoos splitst de verbinding in afzonderlijke segmenten. Een doos die alleen in de buurt staat, wordt niet automatisch elektrisch in het pad opgenomen.",[10,1083,1084],{},"De automatische routering zoekt per verdieping een korte route langs de getekende muren. Zijn start en einde niet via dezelfde wandcomponent bereikbaar, dan gebruikt de router een directe fallback.",[10,1086,1087],{},"Na het routeren:",[96,1089,1090,1093,1096,1099],{},[48,1091,1092],{},"controleer of de route overeenkomt met de beoogde uitvoering;",[48,1094,1095],{},"voeg of verplaats routepunten waar nodig;",[48,1097,1098],{},"controleer kabeltype, doorsnede en installatiewijze;",[48,1100,1101],{},"vul een manuele lengte in wanneer de berekende route de werkelijkheid niet voldoende benadert.",[10,1103,1104],{},"De berekende lengte voedt de materiaallijst, spanningsvalberekening en validatie. Ze is een nettolengte zonder automatisch snijverlies of reservepercentage.",[10,1106,1107],{},[24,1108],{"id":117},[34,1110,1112],{"id":1111},"verbruikers-automatisch-aan-stroomkringen-toewijzen","Verbruikers automatisch aan stroomkringen toewijzen",[10,1114,1115],{},"De automatische stroomkringtoewijzing maakt een voorstel op basis van de vastgelegde verbruikers en productregels. Onder meer deze keuzes worden ondersteund:",[96,1117,1118,1121,1124,1127,1130,1133],{},[48,1119,1120],{},"standaard licht- en stopcontactpunten worden per ruimte gegroepeerd;",[48,1122,1123],{},"maximaal acht aansluitpunten worden per standaardkring voorzien;",[48,1125,1126],{},"onder andere kookplaat, oven, wasmachine, droogkast, vaatwasser, boiler, warmtepomp en sauna krijgen een toegewijde automaat;",[48,1128,1129],{},"standaardgroepen worden achter 30 mA-differentieelschakelaars geplaatst;",[48,1131,1132],{},"een wallbox krijgt een afzonderlijke 30 mA-RCD en een driefasige automaat; bij gedocumenteerde ingebouwde 6 mA-DC-detectie stelt PlanElec extern type A voor, anders type B;",[48,1134,1135],{},"bij meerdere verdeelkasten kan de toewijzing over boards worden verdeeld.",[10,1137,1138],{},"Bekijk de preview voor u bevestigt. Controleer vooral gemengde kringen, bijzondere toestellen, bestaande handmatige toewijzingen en de toepasbaarheid van de defaults op het concrete project.",[10,1140,1141],{},[24,1142],{"id":152},[34,1144,1146],{"id":1145},"lasten-over-fasen-verdelen","Lasten over fasen verdelen",[10,1148,1149],{},"Voor een driefasig of delta-net kan PlanElec lasten over L1, L2 en L3 verdelen. De faseweergave toont de berekende last per fase en waarschuwt bij een duidelijke onbalans.",[10,1151,1152],{},"Dit blijft een modelberekening op basis van de ingevoerde vermogens. Werkelijke gelijktijdigheid, metingen en netvoorwaarden moeten buiten de software worden beoordeeld.",[10,1154,1155],{},[24,1156],{"id":167},[34,1158,1160],{"id":1159},"de-verdeelkast-automatisch-vullen","De verdeelkast automatisch vullen",[10,1162,1163],{},"Automatisch vullen plaatst de bestaande hoofdschakelaar, RCD's en MCB's op vrije DIN-railplaatsen. De standaardvolgorde is hoofd-RCD, groeps-RCD's en vervolgens automaten. De functie houdt standaard ongeveer twintig procent railruimte vrij.",[10,1165,1166],{},"Het verschil met stroomkringtoewijzing is belangrijk:",[96,1168,1169,1175],{},[48,1170,1171,1174],{},[17,1172,1173],{},"Stroomkringtoewijzing"," maakt en koppelt de elektrische beveiligingsstructuur.",[48,1176,1177,1180],{},[17,1178,1179],{},"Automatisch vullen"," rangschikt die bestaande modules fysiek in de kast.",[10,1182,1183],{},"Na automatisch vullen controleert u de gekozen kastgrootte, TE-breedtes, reservecapaciteit, beschermingsketens en verbindingspaden. Expliciete paden via verbindingsdozen worden bij opnieuw vullen bewaard.",[10,1185,1186,1188],{},[24,1187],{"id":199},[24,1189],{"id":202},[34,1191,1193],{"id":1192},"eindcontrole-van-een-automatisch-voorstel","Eindcontrole van een automatisch voorstel",[10,1195,1196],{},"Loop na elke automatische actie deze punten na:",[45,1198,1199,1205,1211,1217,1223,1229],{},[48,1200,1201,1204],{},[17,1202,1203],{},"Volledigheid:"," zijn alle werkelijke verbruikers, dozen en verdeelkasten gemodelleerd?",[48,1206,1207,1210],{},[17,1208,1209],{},"Topologie:"," klopt elke ouder-kindverbinding en is niets onverbonden?",[48,1212,1213,1216],{},[17,1214,1215],{},"Beveiliging:"," passen RCD, MCB, poolconfiguratie en kabel bij de toepassing?",[48,1218,1219,1222],{},[17,1220,1221],{},"Ruimte:"," zijn routes en posities uitvoerbaar op de werf?",[48,1224,1225,1228],{},[17,1226,1227],{},"Fasen:"," is de verdeling aannemelijk met de ingevoerde vermogens?",[48,1230,1231,1234],{},[17,1232,1233],{},"Documenten:"," blijven situatieplan en eendraadschema na de wijzigingen leesbaar?",[10,1236,1237],{},"De AREI\u002FRGIE-zelfcontrole helpt bij de ondersteunde, op basis van projectdata beslisbare regels. Ze is geen conformiteitsverklaring en vervangt de beoordeling door een elektricien of een officiële keuring niet.",[10,1239,1240,1241,20],{},"Ga daarna verder met ",[24,1242,1244],{"href":1243},"\u002Fhelp\u002Fdocumenten-exporteren","Documenten exporteren",{"title":259,"searchDepth":260,"depth":260,"links":1246},[1247,1250,1251,1252,1253,1254],{"id":1033,"depth":260,"text":1034,"children":1248},[1249],{"id":1063,"depth":265,"text":1064},{"id":1077,"depth":260,"text":1078},{"id":1111,"depth":260,"text":1112},{"id":1145,"depth":260,"text":1146},{"id":1159,"depth":260,"text":1160},{"id":1192,"depth":260,"text":1193},"Gebruik PlanElec-voorstellen voor verbruikers, schakelketens, kabelroutes, stroomkringen, fasen en de verdeelkast zonder de technische controle over te slaan.","nl",{},"\u002Fhelp\u002Fautomatic-planning.nl",{"title":1011,"description":1255},"automatische-planning","help\u002Fautomatic-planning.nl",[1263,1264,1265,1266,1267,1268,1269],"automatische planning","verbruikers","kabelroute","stroomkring","faseverdeling","verdeelkast","DIN-rail","shxANuVbNJ0SjdyM3N3yTuQEYGZweXYcMChlNGuQZV4",[1272,1533,1711],{"id":1273,"title":1274,"body":1275,"category":1519,"description":1520,"extension":273,"guideId":1521,"locale":274,"meta":1522,"navigation":276,"order":1523,"path":1524,"readTime":1525,"seo":1526,"slug":1521,"stem":1527,"tags":1528,"updatedAt":287,"__hash__":1532},"help\u002Fhelp\u002Fgetting-started.en.md","Getting started: from project to first export",{"type":7,"value":1276,"toc":1510},[1277,1280,1286,1291,1295,1302,1305,1322,1325,1333,1337,1347,1350,1353,1356,1370,1374,1378,1381,1384,1387,1395,1401,1405,1408,1411,1428,1431,1435,1439,1442,1445,1448,1456,1460,1467,1470,1476,1480,1483,1503],[10,1278,1279],{},"PlanElec uses one project model for the floor plan, electrical topology, distribution board, and documents. A fixed order therefore works best: capture the spaces and devices first, review the electrical structure next, and export only after that.",[1281,1282,1283],"blockquote",{},[10,1284,1285],{},"Using PlanElec as an owner or self-builder? Have all decisions and documents reviewed by a qualified electrician before installation and inspection.",[10,1287,1288],{},[24,1289],{"id":1290},"project",[34,1292,1294],{"id":1293},"_1-create-the-project","1. Create the project",[10,1296,1297,1298,1301],{},"Choose ",[17,1299,1300],{},"Create project"," in the project overview. You can start with the guided workflow, a localized project template, or an empty project.",[10,1303,1304],{},"Enter at least a recognizable project name. You can add these project details later:",[96,1306,1307,1310,1313,1316,1319],{},[48,1308,1309],{},"customer and contact details;",[48,1311,1312],{},"installation address;",[48,1314,1315],{},"installer and optional logo;",[48,1317,1318],{},"EAN, installation type, and current type;",[48,1320,1321],{},"recognized inspection body and project notes.",[10,1323,1324],{},"PlanElec reuses these details in title blocks, the self-check report, and the working dossier. Missing details do not prevent you from trying the workflow or downloading drafts, but review them before sharing documents.",[10,1326,1327,1330],{},[24,1328],{"id":1329},"floorplan",[24,1331],{"id":1332},"situation-plan",[34,1334,1336],{"id":1335},"_2-draw-the-floor-plan-and-build-the-situation-plan","2. Draw the floor plan and build the situation plan",[10,1338,1339,1340,1343,1344,20],{},"Create a floor first. Then draw the exterior and interior walls with the polygon, rectangle, or line tool. Closed wall areas are detected as rooms; give each room a clear name, such as ",[17,1341,1342],{},"Kitchen"," or ",[17,1345,1346],{},"Bedroom 1",[10,1348,1349],{},"If you already have a plan image, use it as a reference. Calibrate it with a known measurement before placing things precisely. The image is an underlay: walls, openings, and electrical points remain separate project data.",[10,1351,1352],{},"Next, place doors, windows, stairs, and electrical symbols in their real locations. This floor plan becomes the basis for the situation plan PDF.",[10,1354,1355],{},"Practical check:",[45,1357,1358,1361,1364,1367],{},[48,1359,1360],{},"Are all floors and rooms present and named?",[48,1362,1363],{},"Are sockets, switches, lighting points, and fixed appliances in the right room?",[48,1365,1366],{},"Is the distribution board positioned on the plan?",[48,1368,1369],{},"Are bathroom zones and special appliances recorded correctly where relevant?",[10,1371,1372],{},[24,1373],{"id":32},[34,1375,1377],{"id":1376},"_3-place-and-connect-electrical-devices","3. Place and connect electrical devices",[10,1379,1380],{},"Open the symbol palette and place the electrical points you need. Helpers can propose sockets, lighting, standard equipment, or a spotlight grid. Review and edit those proposals: they do not decide the required quantities or final positions for you.",[10,1382,1383],{},"Connect switches and lights in switch chains. PlanElec can propose a chain for unassigned switches and lights in the same room; you can still edit the sequence manually.",[10,1385,1386],{},"A floor-plan symbol and an electrical node belong together, but they are not the same object. Review the unconnected-components panel. Without valid topology, a device cannot reliably appear in a circuit, cable, or material list.",[10,1388,1389,1390,1394],{},"Read ",[24,1391,1393],{"href":1392},"\u002Fen\u002Fhelp\u002Fautomatic-planning","Using automatic planning"," for details about proposals, cables, and circuits.",[10,1396,1397,1399],{},[24,1398],{"id":26},[24,1400],{"id":167},[34,1402,1404],{"id":1403},"_4-review-the-electrical-topology-and-distribution-board","4. Review the electrical topology and distribution board",[10,1406,1407],{},"Use automatic circuit assignment as a starting proposal. PlanElec groups standard devices, creates dedicated protection for special appliances where required, and can distribute loads across phases. Review the preview before applying the assignment.",[10,1409,1410],{},"Then open the distribution board editor. Auto-fill places existing main switches, RCDs, and circuit breakers on DIN rails while reserving spare capacity. Review:",[96,1412,1413,1416,1419,1422,1425],{},[48,1414,1415],{},"the protection chain and assigned devices;",[48,1417,1418],{},"cable type, cross-section, and route;",[48,1420,1421],{},"RCD groups and circuit counts;",[48,1423,1424],{},"phase allocation for a multiphase installation;",[48,1426,1427],{},"spare module positions and the actual board dimensions.",[10,1429,1430],{},"Every automatic result remains editable. A proposal is not an engineering decision or a material order.",[10,1432,1433],{},[24,1434],{"id":199},[34,1436,1438],{"id":1437},"_5-review-the-single-line-diagram-and-self-check","5. Review the single-line diagram and self-check",[10,1440,1441],{},"The single-line diagram is generated from the same electrical topology. Check circuit names, protection devices, cable data, connections, and symbols. Resolve the errors and warnings PlanElec can identify from the available project data.",[10,1443,1444],{},"The AREI\u002FRGIE self-check covers a documented subset of rules that software can evaluate from that data. A clean run only means that no error was found within those supported rules. Measurements, on-site conditions, and rules that are not modeled remain outside its scope.",[10,1446,1447],{},"PlanElec therefore does not issue a certificate of conformity and does not replace an official inspection by a recognized inspection body.",[10,1449,1450,1453],{},[24,1451],{"id":1452},"export",[24,1454],{"id":1455},"exports",[34,1457,1459],{"id":1458},"_6-export-and-review-the-documents","6. Export and review the documents",[10,1461,1462,1463,1466],{},"In ",[17,1464,1465],{},"Export",", you can generate the single-line diagram and situation plan as PDFs. The self-check report and circuit, cable, and material lists are also available centrally; the detailed lists are still part of the pilot workflow.",[10,1468,1469],{},"You can combine selected documents into a working dossier with a cover, document index, and continuous page numbering. Review every page and the project metadata before sharing it.",[10,1471,1472,1473,1475],{},"See ",[24,1474,257],{"href":256}," for the full list, statuses, and limitations.",[34,1477,1479],{"id":1478},"a-useful-first-milestone","A useful first milestone",[10,1481,1482],{},"Your first project is well structured when:",[96,1484,1485,1488,1491,1494,1497,1500],{},[48,1486,1487],{},"rooms and electrical points are shown on the situation plan;",[48,1489,1490],{},"all relevant points are linked to the electrical topology;",[48,1492,1493],{},"circuits, cables, and board layout have been reviewed;",[48,1495,1496],{},"the single-line diagram is readable;",[48,1498,1499],{},"the self-check has run and you understand the remaining findings;",[48,1501,1502],{},"exported documents have been checked visually and technically.",[10,1504,1505,1506,20],{},"Ready to begin? ",[24,1507,1509],{"href":1508},"\u002Fauth\u002Fregister","Create a free Early Access account",{"title":259,"searchDepth":260,"depth":260,"links":1511},[1512,1513,1514,1515,1516,1517,1518],{"id":1293,"depth":260,"text":1294},{"id":1335,"depth":260,"text":1336},{"id":1376,"depth":260,"text":1377},{"id":1403,"depth":260,"text":1404},{"id":1437,"depth":260,"text":1438},{"id":1458,"depth":260,"text":1459},{"id":1478,"depth":260,"text":1479},"getting_started","Build a PlanElec project step by step: project details, floor plan, rooms, electrical devices, distribution board, diagram, and export.","getting-started",{},1,"\u002Fhelp\u002Fgetting-started.en","8 min",{"title":1274,"description":1520},"help\u002Fgetting-started.en",[1290,1529,1530,32,285,1531,1452],"floor plan","situation plan","single-line diagram","Jk9LTOHwpx5Vuw6l7NILCR79GNMWdAIptfijm_R-acg",{"id":4,"title":5,"body":1534,"category":271,"description":272,"extension":273,"guideId":26,"locale":274,"meta":1708,"navigation":276,"order":260,"path":277,"readTime":278,"seo":1709,"slug":26,"stem":280,"tags":1710,"updatedAt":287,"__hash__":288},{"type":7,"value":1535,"toc":1698},[1536,1538,1542,1550,1552,1554,1556,1568,1570,1572,1574,1576,1580,1582,1584,1586,1588,1598,1600,1604,1606,1608,1622,1624,1628,1630,1632,1634,1638,1640,1642,1644,1654,1656,1662,1664,1666,1692,1694],[10,1537,12],{},[10,1539,15,1540,20],{},[17,1541,19],{},[10,1543,1544,1546,1548],{},[24,1545],{"id":26},[24,1547],{"id":29},[24,1549],{"id":32},[34,1551,37],{"id":36},[10,1553,40],{},[10,1555,43],{},[45,1557,1558,1560,1562,1564,1566],{},[48,1559,50],{},[48,1561,53],{},[48,1563,56],{},[48,1565,59],{},[48,1567,62],{},[10,1569,65],{},[67,1571,70],{"id":69},[10,1573,73],{},[10,1575,76],{},[10,1577,1578],{},[24,1579],{"id":81},[34,1581,85],{"id":84},[10,1583,88],{},[10,1585,91],{},[10,1587,94],{},[96,1589,1590,1592,1594,1596],{},[48,1591,100],{},[48,1593,103],{},[48,1595,106],{},[48,1597,109],{},[10,1599,112],{},[10,1601,1602],{},[24,1603],{"id":117},[34,1605,121],{"id":120},[10,1607,124],{},[96,1609,1610,1612,1614,1616,1618,1620],{},[48,1611,129],{},[48,1613,132],{},[48,1615,135],{},[48,1617,138],{},[48,1619,141],{},[48,1621,144],{},[10,1623,147],{},[10,1625,1626],{},[24,1627],{"id":152},[34,1629,156],{"id":155},[10,1631,159],{},[10,1633,162],{},[10,1635,1636],{},[24,1637],{"id":167},[34,1639,171],{"id":170},[10,1641,174],{},[10,1643,177],{},[96,1645,1646,1650],{},[48,1647,1648,185],{},[17,1649,184],{},[48,1651,1652,191],{},[17,1653,190],{},[10,1655,194],{},[10,1657,1658,1660],{},[24,1659],{"id":199},[24,1661],{"id":202},[34,1663,206],{"id":205},[10,1665,209],{},[45,1667,1668,1672,1676,1680,1684,1688],{},[48,1669,1670,217],{},[17,1671,216],{},[48,1673,1674,223],{},[17,1675,222],{},[48,1677,1678,229],{},[17,1679,228],{},[48,1681,1682,235],{},[17,1683,234],{},[48,1685,1686,241],{},[17,1687,240],{},[48,1689,1690,247],{},[17,1691,246],{},[10,1693,250],{},[10,1695,253,1696,20],{},[24,1697,257],{"href":256},{"title":259,"searchDepth":260,"depth":260,"links":1699},[1700,1703,1704,1705,1706,1707],{"id":36,"depth":260,"text":37,"children":1701},[1702],{"id":69,"depth":265,"text":70},{"id":84,"depth":260,"text":85},{"id":120,"depth":260,"text":121},{"id":155,"depth":260,"text":156},{"id":170,"depth":260,"text":171},{"id":205,"depth":260,"text":206},{},{"title":5,"description":272},[282,32,283,117,284,285,286],{"id":1712,"title":1713,"body":1714,"category":1455,"description":2018,"extension":273,"guideId":2019,"locale":274,"meta":2020,"navigation":276,"order":265,"path":2021,"readTime":1525,"seo":2022,"slug":2023,"stem":2024,"tags":2025,"updatedAt":287,"__hash__":2030},"help\u002Fhelp\u002Fdocument-exports.en.md","Exporting documents and assembling a working dossier",{"type":7,"value":1715,"toc":2007},[1716,1719,1723,1727,1815,1822,1825,1828,1831,1848,1852,1855,1858,1861,1866,1869,1872,1875,1889,1892,1895,1915,1918,1925,1928,1936,1941,1945,1948,1951,1956,1960,1963,1986,1989,1993,1996],[10,1717,1718],{},"The export workspace brings together documents from the same project model. You can download documents separately or combine selected parts into one working dossier.",[10,1720,1721],{},[24,1722],{"id":1455},[34,1724,1726],{"id":1725},"status-at-a-glance","Status at a glance",[1728,1729,1730,1746],"table",{},[1731,1732,1733],"thead",{},[1734,1735,1736,1740,1743],"tr",{},[1737,1738,1739],"th",{},"Document",[1737,1741,1742],{},"Current status",[1737,1744,1745],{},"What to know",[1747,1748,1749,1761,1771,1782,1793,1804],"tbody",{},[1734,1750,1751,1755,1758],{},[1752,1753,1754],"td",{},"Single-line diagram PDF",[1752,1756,1757],{},"Available",[1752,1759,1760],{},"Can span several pages; review scale, symbols, and title block.",[1734,1762,1763,1766,1768],{},[1752,1764,1765],{},"Situation plan PDF",[1752,1767,1757],{},[1752,1769,1770],{},"Based on the drawn floor plan and placed symbols.",[1734,1772,1773,1776,1779],{},[1752,1774,1775],{},"AREI\u002FRGIE self-check report",[1752,1777,1778],{},"Available, advisory",[1752,1780,1781],{},"Not a certificate of conformity or a replacement for the official inspection.",[1734,1783,1784,1787,1790],{},[1752,1785,1786],{},"Circuit, cable, and material lists",[1752,1788,1789],{},"Pilot workflow",[1752,1791,1792],{},"Model-based, manufacturer-neutral lists; not approved for ordering.",[1734,1794,1795,1798,1801],{},[1752,1796,1797],{},"Distribution board PDF",[1752,1799,1800],{},"Feature flag",[1752,1802,1803],{},"Shown only when enabled and board data is present.",[1734,1805,1806,1809,1812],{},[1752,1807,1808],{},"Combined installation dossier",[1752,1810,1811],{},"Pilot\u002Fworking state",[1752,1813,1814],{},"Local assembly; a versioned final server snapshot and formal acceptance remain open.",[10,1816,1817,1819],{},[24,1818],{"id":199},[24,1820],{"id":1821},"single-line",[34,1823,1754],{"id":1824},"single-line-diagram-pdf",[10,1826,1827],{},"The single-line diagram uses the electrical topology, protection devices, circuits, cable data, and consumers. Larger installations are divided across several pages.",[10,1829,1830],{},"Before downloading, check:",[96,1832,1833,1836,1839,1842,1845],{},[48,1834,1835],{},"that every consumer path reaches the correct breaker and RCD;",[48,1837,1838],{},"that cable type, cross-section, and labels are present;",[48,1840,1841],{},"that spare modules do not appear as active circuits;",[48,1843,1844],{},"that the project and installer details in the title block are correct;",[48,1846,1847],{},"that no content is clipped at a page edge.",[10,1849,1850],{},[24,1851],{"id":1332},[34,1853,1765],{"id":1854},"situation-plan-pdf",[10,1856,1857],{},"The situation plan shows the drawn rooms, openings, and electrical symbols in their locations. Review every floor separately and check for overlapping labels, missing devices, and legibility at the selected A4 or A3 format.",[10,1859,1860],{},"The situation plan and single-line diagram share project notes and other title-block details. Correct those details in the project instead of editing an individual PDF.",[10,1862,1863],{},[24,1864],{"id":1865},"self-check",[34,1867,1775],{"id":1868},"areirgie-self-check-report",[10,1870,1871],{},"The report summarizes findings that PlanElec can evaluate from the entered data and supported rules. It also states when a check has not started, is incomplete, or falls outside the current coverage.",[10,1873,1874],{},"A report with no detected error does not mean the installation complies with AREI\u002FRGIE. Measurements, evidence, on-site conditions, and rules that are not modeled remain outside a software check. Only a recognized inspection body performs the official inspection.",[10,1876,1877,1880,1883,1886],{},[24,1878],{"id":1879},"lists",[24,1881],{"id":1882},"circuit-list",[24,1884],{"id":1885},"cable-list",[24,1887],{"id":1888},"material-list",[34,1890,1786],{"id":1891},"circuit-cable-and-material-lists",[10,1893,1894],{},"These lists are available in the central pilot workflow:",[96,1896,1897,1903,1909],{},[48,1898,1899,1902],{},[17,1900,1901],{},"Circuit list:"," overview of modeled circuits and protection devices.",[48,1904,1905,1908],{},[17,1906,1907],{},"Cable list:"," cable segments with specifications and calculated or manual length.",[48,1910,1911,1914],{},[17,1912,1913],{},"Material list:"," manufacturer-neutral quantities for wiring accessories, connections, protection, board, accessories, and net cable lengths.",[10,1916,1917],{},"The material list can be viewed by category or room and exposes its default assumptions. It includes no prices or specific manufacturer products. Net cable lengths have no automatic waste or reserve factor. Use it as a review and quotation starting point, not as a purchase order.",[10,1919,1920,1922],{},[24,1921],{"id":167},[24,1923],{"id":1924},"cabinet-pdf",[34,1926,1797],{"id":1927},"distribution-board-pdf",[10,1929,1930,1931,1935],{},"The PDF view of the distribution board is only available when the ",[1932,1933,1934],"code",{},"cabinet_export"," feature flag is active and the project contains board data. If the option is absent, that is not an export error: the feature has not been enabled for that environment.",[10,1937,1938],{},[24,1939],{"id":1940},"dossier",[34,1942,1944],{"id":1943},"assemble-an-installation-dossier","Assemble an installation dossier",[10,1946,1947],{},"Select the required documents in the dossier builder. PlanElec creates a cover, document index, and continuous page numbering locally, then merges the selected PDFs in a fixed order.",[10,1949,1950],{},"This is currently a working and review state. The versioned server snapshot and formally reviewed real-world outputs required for a final dossier are not yet generally released.",[10,1952,1953],{},[24,1954],{"id":1955},"metadata",[34,1957,1959],{"id":1958},"review-project-metadata","Review project metadata",[10,1961,1962],{},"Open the project details from the export area and check at least:",[45,1964,1965,1968,1971,1974,1977,1980,1983],{},[48,1966,1967],{},"customer and installation address;",[48,1969,1970],{},"installer and contact details;",[48,1972,1973],{},"inspection body;",[48,1975,1976],{},"Belgian EAN;",[48,1978,1979],{},"residential or non-residential installation and AC\u002FDC designation;",[48,1981,1982],{},"plan format, revision, and project notes;",[48,1984,1985],{},"logo, if used.",[10,1987,1988],{},"An invalid EAN is not rendered as a valid number, but Early Access does not automatically block the download.",[34,1990,1992],{"id":1991},"final-check-before-sharing","Final check before sharing",[10,1994,1995],{},"Open the downloaded file outside PlanElec and review every page. Check page order, legibility, metadata, warnings, and missing parts. Keep the project version used to create the document and have the result reviewed by the responsible electrician.",[10,1997,1998,1999,2003,2004,20],{},"Need to review the project model first? Start with ",[24,2000,2002],{"href":2001},"\u002Fen\u002Fhelp\u002Fgetting-started","Getting started"," or learn how to ",[24,2005,2006],{"href":1392},"review automatic planning",{"title":259,"searchDepth":260,"depth":260,"links":2008},[2009,2010,2011,2012,2013,2014,2015,2016,2017],{"id":1725,"depth":260,"text":1726},{"id":1824,"depth":260,"text":1754},{"id":1854,"depth":260,"text":1765},{"id":1868,"depth":260,"text":1775},{"id":1891,"depth":260,"text":1786},{"id":1927,"depth":260,"text":1797},{"id":1943,"depth":260,"text":1944},{"id":1958,"depth":260,"text":1959},{"id":1991,"depth":260,"text":1992},"See which PDFs PlanElec creates, which outputs are available or in pilot, and what to review before sharing or inspection.","document-exports",{},"\u002Fhelp\u002Fdocument-exports.en",{"title":1713,"description":2018},"export-documents","help\u002Fdocument-exports.en",[2026,1531,1530,1865,117,2027,2028,2029],"PDF export","cable list","material list","installation dossier","YxK-MLrDVBV4XNPpn-fQqzu9BnwAQ0_QdPKVHIg01Ew",1785171269374]