[{"data":1,"prerenderedAt":1950},["ShallowReactive",2],{"help-guide-en-getting-started":3,"help-alternates-getting-started":286,"help-related-en":1194},{"id":4,"title":5,"body":6,"category":267,"description":268,"extension":269,"guideId":270,"locale":271,"meta":272,"navigation":273,"order":274,"path":275,"readTime":276,"seo":277,"slug":270,"stem":278,"tags":279,"updatedAt":284,"__hash__":285},"help\u002Fhelp\u002Fgetting-started.en.md","Getting started: from project to first export",{"type":7,"value":8,"toc":256},"minimark",[9,13,19,25,30,38,41,60,63,71,75,86,89,92,95,110,115,119,122,125,128,136,144,148,151,154,171,174,179,183,186,189,192,200,204,211,214,222,226,229,249],[10,11,12],"p",{},"PlanElec uses one project model for the floor plan, electrical topology, distribution board, and documents. A fixed order therefore works best: capture the spaces and devices first, review the electrical structure next, and export only after that.",[14,15,16],"blockquote",{},[10,17,18],{},"Using PlanElec as an owner or self-builder? Have all decisions and documents reviewed by a qualified electrician before installation and inspection.",[10,20,21],{},[22,23],"a",{"id":24},"project",[26,27,29],"h2",{"id":28},"_1-create-the-project","1. Create the project",[10,31,32,33,37],{},"Choose ",[34,35,36],"strong",{},"Create project"," in the project overview. You can start with the guided workflow, a localized project template, or an empty project.",[10,39,40],{},"Enter at least a recognizable project name. You can add these project details later:",[42,43,44,48,51,54,57],"ul",{},[45,46,47],"li",{},"customer and contact details;",[45,49,50],{},"installation address;",[45,52,53],{},"installer and optional logo;",[45,55,56],{},"EAN, installation type, and current type;",[45,58,59],{},"recognized inspection body and project notes.",[10,61,62],{},"PlanElec reuses these details in title blocks, the self-check report, and the working dossier. Missing details do not prevent you from trying the workflow or downloading drafts, but review them before sharing documents.",[10,64,65,68],{},[22,66],{"id":67},"floorplan",[22,69],{"id":70},"situation-plan",[26,72,74],{"id":73},"_2-draw-the-floor-plan-and-build-the-situation-plan","2. Draw the floor plan and build the situation plan",[10,76,77,78,81,82,85],{},"Create a floor first. Then draw the exterior and interior walls with the polygon, rectangle, or line tool. Closed wall areas are detected as rooms; give each room a clear name, such as ",[34,79,80],{},"Kitchen"," or ",[34,83,84],{},"Bedroom 1",".",[10,87,88],{},"If you already have a plan image, use it as a reference. Calibrate it with a known measurement before placing things precisely. The image is an underlay: walls, openings, and electrical points remain separate project data.",[10,90,91],{},"Next, place doors, windows, stairs, and electrical symbols in their real locations. This floor plan becomes the basis for the situation plan PDF.",[10,93,94],{},"Practical check:",[96,97,98,101,104,107],"ol",{},[45,99,100],{},"Are all floors and rooms present and named?",[45,102,103],{},"Are sockets, switches, lighting points, and fixed appliances in the right room?",[45,105,106],{},"Is the distribution board positioned on the plan?",[45,108,109],{},"Are bathroom zones and special appliances recorded correctly where relevant?",[10,111,112],{},[22,113],{"id":114},"devices",[26,116,118],{"id":117},"_3-place-and-connect-electrical-devices","3. Place and connect electrical devices",[10,120,121],{},"Open the symbol palette and place the electrical points you need. Helpers can propose sockets, lighting, standard equipment, or a spotlight grid. Review and edit those proposals: they do not decide the required quantities or final positions for you.",[10,123,124],{},"Connect switches and lights in switch chains. PlanElec can propose a chain for unassigned switches and lights in the same room; you can still edit the sequence manually.",[10,126,127],{},"A floor-plan symbol and an electrical node belong together, but they are not the same object. Review the unconnected-components panel. Without valid topology, a device cannot reliably appear in a circuit, cable, or material list.",[10,129,130,131,135],{},"Read ",[22,132,134],{"href":133},"\u002Fen\u002Fhelp\u002Fautomatic-planning","Using automatic planning"," for details about proposals, cables, and circuits.",[10,137,138,141],{},[22,139],{"id":140},"automatic-planning",[22,142],{"id":143},"cabinet",[26,145,147],{"id":146},"_4-review-the-electrical-topology-and-distribution-board","4. Review the electrical topology and distribution board",[10,149,150],{},"Use automatic circuit assignment as a starting proposal. PlanElec groups standard devices, creates dedicated protection for special appliances where required, and can distribute loads across phases. Review the preview before applying the assignment.",[10,152,153],{},"Then open the distribution board editor. Auto-fill places existing main switches, RCDs, and circuit breakers on DIN rails while reserving spare capacity. Review:",[42,155,156,159,162,165,168],{},[45,157,158],{},"the protection chain and assigned devices;",[45,160,161],{},"cable type, cross-section, and route;",[45,163,164],{},"RCD groups and circuit counts;",[45,166,167],{},"phase allocation for a multiphase installation;",[45,169,170],{},"spare module positions and the actual board dimensions.",[10,172,173],{},"Every automatic result remains editable. A proposal is not an engineering decision or a material order.",[10,175,176],{},[22,177],{"id":178},"schema",[26,180,182],{"id":181},"_5-review-the-single-line-diagram-and-self-check","5. Review the single-line diagram and self-check",[10,184,185],{},"The single-line diagram is generated from the same electrical topology. Check circuit names, protection devices, cable data, connections, and symbols. Resolve the errors and warnings PlanElec can identify from the available project data.",[10,187,188],{},"The AREI\u002FRGIE self-check covers a documented subset of rules that software can evaluate from that data. A clean run only means that no error was found within those supported rules. Measurements, on-site conditions, and rules that are not modeled remain outside its scope.",[10,190,191],{},"PlanElec therefore does not issue a certificate of conformity and does not replace an official inspection by a recognized inspection body.",[10,193,194,197],{},[22,195],{"id":196},"export",[22,198],{"id":199},"exports",[26,201,203],{"id":202},"_6-export-and-review-the-documents","6. Export and review the documents",[10,205,206,207,210],{},"In ",[34,208,209],{},"Export",", you can generate the single-line diagram and situation plan as PDFs. The self-check report and circuit, cable, and material lists are also available centrally; the detailed lists are still part of the pilot workflow.",[10,212,213],{},"You can combine selected documents into a working dossier with a cover, document index, and continuous page numbering. Review every page and the project metadata before sharing it.",[10,215,216,217,221],{},"See ",[22,218,220],{"href":219},"\u002Fen\u002Fhelp\u002Fexport-documents","Exporting documents"," for the full list, statuses, and limitations.",[26,223,225],{"id":224},"a-useful-first-milestone","A useful first milestone",[10,227,228],{},"Your first project is well structured when:",[42,230,231,234,237,240,243,246],{},[45,232,233],{},"rooms and electrical points are shown on the situation plan;",[45,235,236],{},"all relevant points are linked to the electrical topology;",[45,238,239],{},"circuits, cables, and board layout have been reviewed;",[45,241,242],{},"the single-line diagram is readable;",[45,244,245],{},"the self-check has run and you understand the remaining findings;",[45,247,248],{},"exported documents have been checked visually and technically.",[10,250,251,252,85],{},"Ready to begin? ",[22,253,255],{"href":254},"\u002Fauth\u002Fregister","Create a free Early Access account",{"title":257,"searchDepth":258,"depth":258,"links":259},"",2,[260,261,262,263,264,265,266],{"id":28,"depth":258,"text":29},{"id":73,"depth":258,"text":74},{"id":117,"depth":258,"text":118},{"id":146,"depth":258,"text":147},{"id":181,"depth":258,"text":182},{"id":202,"depth":258,"text":203},{"id":224,"depth":258,"text":225},"getting_started","Build a PlanElec project step by step: project details, floor plan, rooms, electrical devices, distribution board, diagram, and export.","md","getting-started","en",{},true,1,"\u002Fhelp\u002Fgetting-started.en","8 min",{"title":5,"description":268},"help\u002Fgetting-started.en",[24,280,281,114,282,283,196],"floor plan","situation plan","distribution board","single-line diagram","2026-07-20","Jk9LTOHwpx5Vuw6l7NILCR79GNMWdAIptfijm_R-acg",[287,527,698,941],{"id":288,"title":289,"body":290,"category":267,"description":513,"extension":269,"guideId":270,"locale":514,"meta":515,"navigation":273,"order":274,"path":516,"readTime":517,"seo":518,"slug":519,"stem":520,"tags":521,"updatedAt":284,"__hash__":526},"help\u002Fhelp\u002Fgetting-started.de.md","Erste Schritte: vom Projekt zum Elektroplan",{"type":7,"value":291,"toc":504},[292,295,299,303,323,326,330,334,341,361,364,368,372,375,378,392,399,403,407,414,431,435,439,442,446,450,453,463,467,490,493],[10,293,294],{},"PlanElec verwendet ein gemeinsames Projektmodell für Grundriss, elektrische Topologie, Schaltschrank, Eindrahtschema und Dokumente. Eine Änderung muss deshalb nicht in mehreren voneinander getrennten Zeichnungen nachgeführt werden. Dieser Guide führt durch die sinnvolle Reihenfolge.",[10,296,297],{},[22,298],{"id":24},[26,300,302],{"id":301},"projekt-anlegen-und-vorbereiten","Projekt anlegen und vorbereiten",[96,304,305,308,314,317,320],{},[45,306,307],{},"Registrieren Sie sich oder melden Sie sich an.",[45,309,310,311,85],{},"Wählen Sie in der Projektübersicht ",[34,312,313],{},"Projekt erstellen",[45,315,316],{},"Starten Sie geführt, mit einer Vorlage oder mit einem leeren Projekt. Der geführte Ablauf ist für das erste Projekt am einfachsten.",[45,318,319],{},"Legen Sie Gebäude und Etagen an.",[45,321,322],{},"Öffnen Sie im Projektbereich die Metadaten und erfassen Sie mindestens Projektname, Installationsadresse und Installateur. Diese Angaben werden später für Titelblöcke und das Dossier verwendet.",[10,324,325],{},"Der Guide im Studio zeigt den nächsten fachlichen Schritt. Sie können ihn pausieren oder später fortsetzen; dadurch werden keine Projektdaten verändert.",[10,327,328],{},[22,329],{"id":70},[26,331,333],{"id":332},"projekt-und-situationsplan","Projekt und Situationsplan",[10,335,336,337,340],{},"Der Bereich ",[34,338,339],{},"Grundriss"," ist die räumliche Grundlage des Situationsplans.",[96,342,343,346,349,352,355,358],{},[45,344,345],{},"Zeichnen Sie Außen- und Innenwände als Polygon oder Rechteck. Alternativ können Sie einen vorhandenen Plan als Referenzbild importieren und kalibrieren.",[45,347,348],{},"Schließen Sie die Wandkonturen. PlanElec erkennt geschlossene Flächen als Räume.",[45,350,351],{},"Benennen und kategorisieren Sie die Räume, zum Beispiel Küche, Technikraum oder Außenbereich.",[45,353,354],{},"Platzieren Sie Steckdosen, Schalter, Leuchten, Festanschlüsse, Verbindungsdosen und den Verteiler aus der Palette. Wandgebundene Symbole rasten an der Wand ein.",[45,356,357],{},"Verknüpfen Sie Schalter und Leuchten. Für freie Schalter und Leuchten eines Raums kann PlanElec eine Kette vorschlagen; prüfen Sie die Reihenfolge vor der Übernahme.",[45,359,360],{},"Kontrollieren Sie die Liste der unverbundenen Komponenten. Ein Symbol im Grundriss ist erst dann Teil des elektrischen Modells, wenn die Zuordnung zur Topologie stimmt.",[10,362,363],{},"Bei mehreren Etagen bearbeiten Sie jede Etage separat. Geräte werden beim Kopieren einer Etage bewusst nicht automatisch vervielfältigt.",[10,365,366],{},[22,367],{"id":140},[26,369,371],{"id":370},"verbraucher-kabel-und-stromkreise","Verbraucher, Kabel und Stromkreise",[10,373,374],{},"Platzierte elektrische Geräte bilden die Verbraucherbasis. PlanElec kann für geeignete Räume Steckdosen, Beleuchtung, Standardausstattung und Spot-Raster vorschlagen. Nehmen Sie nur Vorschläge an, die zur realen Installation passen.",[10,376,377],{},"Anschließend können Sie Verbraucher automatisch Stromkreisen zuweisen lassen. Spezialgeräte wie Herd, Waschmaschine oder Wallbox werden dabei anders behandelt als normale Licht- und Steckdosenpunkte. Prüfen Sie nach dem Vorschlag insbesondere:",[42,379,380,383,386,389],{},[45,381,382],{},"ob jeder Verbraucher dem richtigen Verteiler und Stromkreis zugeordnet ist,",[45,384,385],{},"ob Schutzgeräte, Phase und Kabelangaben zum geplanten Aufbau passen,",[45,387,388],{},"ob Verbindungs- oder Abzweigdosen als echte Topologieknoten erfasst sind,",[45,390,391],{},"ob automatisch berechnete Kabellängen und Wandrouten plausibel sind.",[10,393,394,395,85],{},"Die automatische Planung ist ein bearbeitbarer Vorschlag. Manuelle Kabellängen, Wegpunkte und Zuordnungen bleiben möglich. Eine ausführliche Anleitung finden Sie unter ",[22,396,398],{"href":397},"\u002Fde\u002Fhelp\u002Fautomatische-planung","Automatische Planung",[10,400,401],{},[22,402],{"id":143},[26,404,406],{"id":405},"schaltschrank-planen","Schaltschrank planen",[10,408,409,410,413],{},"Öffnen Sie den Bereich ",[34,411,412],{},"Schaltschrank",", nachdem die wichtigsten Verbraucher und Stromkreise vorhanden sind.",[96,415,416,419,422,425,428],{},[45,417,418],{},"Wählen Sie Verteiler, Gehäuse und Polkonfiguration.",[45,420,421],{},"Starten Sie die automatische Belegung. Vorhandene Hauptschalter, RCDs\u002FFI-Schutzschalter und MCBs\u002FLeitungsschutzschalter werden auf den DIN-Schienen angeordnet; PlanElec hält dabei standardmäßig Platzreserve frei.",[45,423,424],{},"Prüfen Sie die Schutzkette und verbinden Sie Hauptschalter, RCDs und MCBs bei Bedarf manuell.",[45,426,427],{},"Kontrollieren Sie bei mehrphasigen Anlagen die Phasenübersicht und die angezeigten Warnungen.",[45,429,430],{},"Wechseln Sie anschließend zum Eindrahtschema.",[10,432,433],{},[22,434],{"id":178},[26,436,438],{"id":437},"eindrahtschema-prüfen","Eindrahtschema prüfen",[10,440,441],{},"Das Eindrahtschema wird aus der elektrischen Topologie abgeleitet und kann im gleichnamigen Bereich weiter geprüft und bearbeitet werden. Ändern Sie nicht nur die Zeichnung, wenn die elektrische Zuordnung falsch ist: Korrigieren Sie den betroffenen Verbraucher, Stromkreis oder Kabelabschnitt im gemeinsamen Modell.",[10,443,444],{},[22,445],{"id":199},[26,447,449],{"id":448},"prüfen-und-dokumente-exportieren","Prüfen und Dokumente exportieren",[10,451,452],{},"Im Projektbereich und vor dem Export zeigt PlanElec Findings für die aktuell unterstützten, anhand der Projektdaten prüfbaren AREI\u002FRGIE-Regeln. Bearbeiten Sie Fehler und prüfen Sie Hinweise fachlich. Bestätigen Sie das Schema erst, wenn Topologie, Kabel und Schutzgeräte zum realen Projekt passen.",[10,454,455,456,458,459,85],{},"Im Bereich ",[34,457,209],{}," stehen unter anderem Eindrahtschema, Situationsplan und der orientierende Selbstprüfbericht als PDF bereit. Zusätzlich können Sie im Pilotworkflow Stromkreis-, Material- und Kabellisten sowie ein auswählbares Arbeitsdossier erzeugen. Die Einzelheiten und Statusgrenzen stehen im Guide ",[22,460,462],{"href":461},"\u002Fde\u002Fhelp\u002Fdokumente-exportieren","Dokumente exportieren",[26,464,466],{"id":465},"checkliste-vor-dem-ersten-download","Checkliste vor dem ersten Download",[42,468,469,472,475,478,481,484,487],{},[45,470,471],{},"Alle Etagen und Räume sind angelegt und benannt.",[45,473,474],{},"Elektrische Symbole stehen an der richtigen Position.",[45,476,477],{},"Verbraucher sind mit Topologie, Stromkreis und Verteiler verbunden.",[45,479,480],{},"Kabelangaben und berechnete oder manuelle Längen wurden geprüft.",[45,482,483],{},"Schaltschrank und Schutzkette entsprechen dem geplanten Aufbau.",[45,485,486],{},"Projekt-, Kunden-, Installateur- und Installationsdaten sind vollständig.",[45,488,489],{},"Findings des unterstützten Selbstchecks wurden geprüft und bewertet.",[10,491,492],{},"PlanElec ersetzt weder Fachplanung und Ausführung noch die offizielle Kontrolle. Lassen Sie Eingaben und Exporte vor der Ausführung von einer qualifizierten Elektrofachkraft prüfen. Die verbindliche Beurteilung erfolgt durch einen zugelassenen Kontrollorganismus.",[10,494,495,496,500,501,85],{},"Mehr Überblick bietet die ",[22,497,499],{"href":498},"\u002Fde\u002Ffeatures","vollständige Funktionsübersicht",". Wenn noch kein Konto vorhanden ist, können Sie ",[22,502,503],{"href":254},"PlanElec im Early Access registrieren",{"title":257,"searchDepth":258,"depth":258,"links":505},[506,507,508,509,510,511,512],{"id":301,"depth":258,"text":302},{"id":332,"depth":258,"text":333},{"id":370,"depth":258,"text":371},{"id":405,"depth":258,"text":406},{"id":437,"depth":258,"text":438},{"id":448,"depth":258,"text":449},{"id":465,"depth":258,"text":466},"Legen Sie ein Projekt an, erstellen Sie den Situationsplan, platzieren Sie elektrische Geräte und bereiten Sie Schema, Schaltschrank und Exporte vor.","de",{},"\u002Fhelp\u002Fgetting-started.de","8 Min.",{"title":289,"description":513},"erste-schritte","help\u002Fgetting-started.de",[522,523,339,524,412,525],"Projekt","Situationsplan","Verbraucher","Eindrahtschema","BIswkxIoTJGkatjA_IT_okr44HQcDN3VEhq_0dDdeUE",{"id":4,"title":5,"body":528,"category":267,"description":268,"extension":269,"guideId":270,"locale":271,"meta":695,"navigation":273,"order":274,"path":275,"readTime":276,"seo":696,"slug":270,"stem":278,"tags":697,"updatedAt":284,"__hash__":285},{"type":7,"value":529,"toc":686},[530,532,536,540,542,546,548,560,562,568,570,576,578,580,582,592,596,598,600,602,604,608,614,616,618,620,632,634,638,640,642,644,646,652,654,658,660,664,666,668,682],[10,531,12],{},[14,533,534],{},[10,535,18],{},[10,537,538],{},[22,539],{"id":24},[26,541,29],{"id":28},[10,543,32,544,37],{},[34,545,36],{},[10,547,40],{},[42,549,550,552,554,556,558],{},[45,551,47],{},[45,553,50],{},[45,555,53],{},[45,557,56],{},[45,559,59],{},[10,561,62],{},[10,563,564,566],{},[22,565],{"id":67},[22,567],{"id":70},[26,569,74],{"id":73},[10,571,77,572,81,574,85],{},[34,573,80],{},[34,575,84],{},[10,577,88],{},[10,579,91],{},[10,581,94],{},[96,583,584,586,588,590],{},[45,585,100],{},[45,587,103],{},[45,589,106],{},[45,591,109],{},[10,593,594],{},[22,595],{"id":114},[26,597,118],{"id":117},[10,599,121],{},[10,601,124],{},[10,603,127],{},[10,605,130,606,135],{},[22,607,134],{"href":133},[10,609,610,612],{},[22,611],{"id":140},[22,613],{"id":143},[26,615,147],{"id":146},[10,617,150],{},[10,619,153],{},[42,621,622,624,626,628,630],{},[45,623,158],{},[45,625,161],{},[45,627,164],{},[45,629,167],{},[45,631,170],{},[10,633,173],{},[10,635,636],{},[22,637],{"id":178},[26,639,182],{"id":181},[10,641,185],{},[10,643,188],{},[10,645,191],{},[10,647,648,650],{},[22,649],{"id":196},[22,651],{"id":199},[26,653,203],{"id":202},[10,655,206,656,210],{},[34,657,209],{},[10,659,213],{},[10,661,216,662,221],{},[22,663,220],{"href":219},[26,665,225],{"id":224},[10,667,228],{},[42,669,670,672,674,676,678,680],{},[45,671,233],{},[45,673,236],{},[45,675,239],{},[45,677,242],{},[45,679,245],{},[45,681,248],{},[10,683,251,684,85],{},[22,685,255],{"href":254},{"title":257,"searchDepth":258,"depth":258,"links":687},[688,689,690,691,692,693,694],{"id":28,"depth":258,"text":29},{"id":73,"depth":258,"text":74},{"id":117,"depth":258,"text":118},{"id":146,"depth":258,"text":147},{"id":181,"depth":258,"text":182},{"id":202,"depth":258,"text":203},{"id":224,"depth":258,"text":225},{},{"title":5,"description":268},[24,280,281,114,282,283,196],{"id":699,"title":700,"body":701,"category":267,"description":926,"extension":269,"guideId":270,"locale":927,"meta":928,"navigation":273,"order":274,"path":929,"readTime":276,"seo":930,"slug":931,"stem":932,"tags":933,"updatedAt":284,"__hash__":940},"help\u002Fhelp\u002Fgetting-started.fr.md","Premiers pas : du projet au plan électrique",{"type":7,"value":702,"toc":917},[703,706,710,714,734,737,741,745,752,772,775,779,783,786,789,803,811,815,819,826,843,847,851,854,858,862,865,876,880,903,906],[10,704,705],{},"PlanElec utilise un modèle de projet commun pour le plan, la topologie électrique, le tableau, le schéma unifilaire et les documents. Une modification ne doit donc pas être reportée dans plusieurs dessins indépendants. Ce guide présente l'ordre de travail recommandé.",[10,707,708],{},[22,709],{"id":24},[26,711,713],{"id":712},"créer-et-préparer-le-projet","Créer et préparer le projet",[96,715,716,719,725,728,731],{},[45,717,718],{},"Inscrivez-vous ou connectez-vous.",[45,720,721,722,85],{},"Dans la liste des projets, choisissez ",[34,723,724],{},"Créer un projet",[45,726,727],{},"Démarrez avec le parcours guidé, un modèle ou un projet vide. Le parcours guidé est le plus simple pour un premier projet.",[45,729,730],{},"Créez le bâtiment et ses étages.",[45,732,733],{},"Dans la section du projet, ouvrez les métadonnées et saisissez au minimum le nom du projet, l'adresse de l'installation et l'installateur. Ces informations alimenteront ensuite les cartouches et le dossier.",[10,735,736],{},"Le guide du studio indique la prochaine étape métier. Vous pouvez le suspendre et le reprendre plus tard sans modifier les données du projet.",[10,738,739],{},[22,740],{"id":70},[26,742,744],{"id":743},"projet-et-plan-de-situation","Projet et plan de situation",[10,746,747,748,751],{},"La section ",[34,749,750],{},"Plan"," constitue la base spatiale du plan de situation.",[96,753,754,757,760,763,766,769],{},[45,755,756],{},"Dessinez les murs extérieurs et intérieurs sous forme de polygone ou de rectangle. Vous pouvez aussi importer un plan existant comme image de référence et le calibrer.",[45,758,759],{},"Fermez les contours des murs. PlanElec reconnaît les surfaces fermées comme des pièces.",[45,761,762],{},"Nommez et classez les pièces, par exemple cuisine, local technique ou zone extérieure.",[45,764,765],{},"Placez depuis la palette les prises, interrupteurs, luminaires, raccordements fixes, boîtes de connexion et le tableau. Les symboles muraux s'alignent sur le mur.",[45,767,768],{},"Reliez les interrupteurs aux luminaires. Pour les éléments encore libres d'une pièce, PlanElec peut proposer une chaîne ; vérifiez son ordre avant de l'accepter.",[45,770,771],{},"Contrôlez la liste des composants non connectés. Un symbole présent sur le plan ne fait partie du modèle électrique que lorsque son lien avec la topologie est correct.",[10,773,774],{},"Dans un bâtiment à plusieurs niveaux, chaque étage se traite séparément. Les équipements ne sont volontairement pas dupliqués lors de la copie d'un étage.",[10,776,777],{},[22,778],{"id":140},[26,780,782],{"id":781},"récepteurs-câbles-et-circuits","Récepteurs, câbles et circuits",[10,784,785],{},"Les équipements électriques placés constituent la base des récepteurs. Pour les pièces appropriées, PlanElec peut proposer des prises, de l'éclairage, un équipement standard et des grilles de spots. N'acceptez que les suggestions correspondant à l'installation réelle.",[10,787,788],{},"Vous pouvez ensuite demander l'affectation automatique des récepteurs aux circuits. Les appareils spéciaux comme la cuisinière, le lave-linge ou la borne de recharge sont traités différemment des points d'éclairage et des prises ordinaires. Après la proposition, vérifiez notamment :",[42,790,791,794,797,800],{},[45,792,793],{},"que chaque récepteur dépend du bon tableau et du bon circuit ;",[45,795,796],{},"que les protections, la phase et les données de câble correspondent au montage prévu ;",[45,798,799],{},"que les boîtes de connexion ou de dérivation sont saisies comme de vrais nœuds topologiques ;",[45,801,802],{},"que les longueurs calculées et les tracés de câble le long des murs sont plausibles.",[10,804,805,806,810],{},"La planification automatique reste une proposition modifiable. Vous pouvez toujours corriger les longueurs, points de passage et affectations manuellement. Consultez le guide ",[22,807,809],{"href":808},"\u002Ffr\u002Fhelp\u002Fplanification-automatique","Planification automatique"," pour le déroulement détaillé.",[10,812,813],{},[22,814],{"id":143},[26,816,818],{"id":817},"planifier-le-tableau-électrique","Planifier le tableau électrique",[10,820,821,822,825],{},"Ouvrez la section ",[34,823,824],{},"Tableau"," lorsque les principaux récepteurs et circuits sont en place.",[96,827,828,831,834,837,840],{},[45,829,830],{},"Choisissez le tableau, le coffret et la configuration des pôles.",[45,832,833],{},"Lancez le placement automatique. Les interrupteurs principaux, différentiels et disjoncteurs existants sont disposés sur les rails DIN, avec une réserve de place prévue par défaut.",[45,835,836],{},"Vérifiez la chaîne de protection et reliez manuellement l'interrupteur principal, les différentiels et les disjoncteurs si nécessaire.",[45,838,839],{},"Pour une installation polyphasée, contrôlez l'aperçu des phases et les avertissements affichés.",[45,841,842],{},"Passez ensuite au schéma unifilaire.",[10,844,845],{},[22,846],{"id":178},[26,848,850],{"id":849},"contrôler-le-schéma-unifilaire","Contrôler le schéma unifilaire",[10,852,853],{},"Le schéma unifilaire est dérivé de la topologie électrique et peut être contrôlé et ajusté dans la section correspondante. Si une affectation électrique est incorrecte, ne corrigez pas uniquement le dessin : modifiez le récepteur, le circuit ou le segment de câble concerné dans le modèle commun.",[10,855,856],{},[22,857],{"id":199},[26,859,861],{"id":860},"contrôler-et-exporter-les-documents","Contrôler et exporter les documents",[10,863,864],{},"Dans le projet et avant l'export, PlanElec signale les constats relatifs aux règles RGIE actuellement prises en charge et vérifiables à partir des données saisies. Corrigez les erreurs et évaluez professionnellement les avertissements. Ne confirmez le schéma qu'après avoir comparé la topologie, les câbles et les protections à l'installation réelle.",[10,866,867,868,870,871,875],{},"Dans la section ",[34,869,209],{},", le schéma unifilaire, le plan de situation et le rapport indicatif d'auto-contrôle sont notamment disponibles en PDF. Le flux pilote permet aussi de produire des listes de circuits, de matériel et de câbles ainsi qu'un dossier de travail sélectionnable. Le guide ",[22,872,874],{"href":873},"\u002Ffr\u002Fhelp\u002Fexporter-les-documents","Exporter les documents"," explique chaque statut et chaque sortie.",[26,877,879],{"id":878},"liste-de-contrôle-avant-le-premier-téléchargement","Liste de contrôle avant le premier téléchargement",[42,881,882,885,888,891,894,897,900],{},[45,883,884],{},"Tous les étages et toutes les pièces sont créés et nommés.",[45,886,887],{},"Les symboles électriques se trouvent au bon endroit.",[45,889,890],{},"Les récepteurs sont reliés à la topologie, au circuit et au tableau appropriés.",[45,892,893],{},"Les données et longueurs calculées ou manuelles des câbles ont été vérifiées.",[45,895,896],{},"Le tableau et la chaîne de protection correspondent au montage prévu.",[45,898,899],{},"Les données du projet, du client, de l'installateur et de l'installation sont complètes.",[45,901,902],{},"Les constats de l'auto-contrôle pris en charge ont été examinés et évalués.",[10,904,905],{},"PlanElec ne remplace ni l'étude et l'exécution par un professionnel, ni le contrôle officiel. Faites vérifier les données et les exports par un électricien qualifié avant les travaux. Seul un organisme de contrôle agréé rend l'évaluation officielle.",[10,907,908,909,913,914,85],{},"Consultez aussi la ",[22,910,912],{"href":911},"\u002Ffr\u002Ffeatures","vue complète des fonctionnalités",". Si vous n'avez pas encore de compte, vous pouvez ",[22,915,916],{"href":254},"vous inscrire à PlanElec en Early Access",{"title":257,"searchDepth":258,"depth":258,"links":918},[919,920,921,922,923,924,925],{"id":712,"depth":258,"text":713},{"id":743,"depth":258,"text":744},{"id":781,"depth":258,"text":782},{"id":817,"depth":258,"text":818},{"id":849,"depth":258,"text":850},{"id":860,"depth":258,"text":861},{"id":878,"depth":258,"text":879},"Créez un projet, dessinez le plan de situation, placez les équipements électriques et préparez le schéma, le tableau et les exports.","fr",{},"\u002Fhelp\u002Fgetting-started.fr",{"title":700,"description":926},"bien-demarrer","help\u002Fgetting-started.fr",[934,935,936,937,938,939],"projet","plan de situation","plan","récepteurs","tableau électrique","schéma unifilaire","QA22h1gV57BjApXnZlRT0B3L11Ln3H-BHvFhNAfZKUY",{"id":942,"title":943,"body":944,"category":267,"description":1180,"extension":269,"guideId":270,"locale":1181,"meta":1182,"navigation":273,"order":274,"path":1183,"readTime":276,"seo":1184,"slug":1185,"stem":1186,"tags":1187,"updatedAt":284,"__hash__":1193},"help\u002Fhelp\u002Fgetting-started.nl.md","Aan de slag: van project tot eerste export",{"type":7,"value":945,"toc":1171},[946,949,954,958,962,969,972,989,992,998,1002,1012,1015,1018,1021,1035,1039,1043,1046,1049,1052,1059,1065,1069,1072,1075,1092,1095,1099,1103,1106,1109,1112,1118,1122,1127,1130,1138,1142,1145,1165],[10,947,948],{},"PlanElec gebruikt één projectmodel voor het grondplan, de elektrische topologie, de verdeelkast en de documenten. Daardoor werkt u het best in een vaste volgorde: eerst de ruimte en toestellen vastleggen, daarna de elektrische structuur controleren en pas dan exporteren.",[14,950,951],{},[10,952,953],{},"Gebruikt u PlanElec als eigenaar of bouwheer? Laat keuzes en documenten vóór uitvoering en keuring nakijken door een gekwalificeerde elektricien.",[10,955,956],{},[22,957],{"id":24},[26,959,961],{"id":960},"_1-maak-het-project-aan","1. Maak het project aan",[10,963,964,965,968],{},"Kies in het projectoverzicht ",[34,966,967],{},"Project aanmaken",". U kunt starten met de begeleide workflow, een gelokaliseerde projecttemplate of een leeg project.",[10,970,971],{},"Vul minstens een herkenbare projectnaam in. In de projectgegevens kunt u later ook deze gegevens bewaren:",[42,973,974,977,980,983,986],{},[45,975,976],{},"klant en contactgegevens;",[45,978,979],{},"installatieadres;",[45,981,982],{},"installateur en eventueel logo;",[45,984,985],{},"EAN, installatie- en stroomtype;",[45,987,988],{},"erkend controleorganisme en projectnotities.",[10,990,991],{},"Deze gegevens worden hergebruikt in titelblokken, het zelfcontrolerapport en het werkdossier. Ontbrekende gegevens blokkeren uitproberen en conceptdownloads niet, maar controleer ze voordat u documenten deelt.",[10,993,994,996],{},[22,995],{"id":67},[22,997],{"id":70},[26,999,1001],{"id":1000},"_2-teken-het-grondplan-en-bouw-het-situatieplan-op","2. Teken het grondplan en bouw het situatieplan op",[10,1003,1004,1005,1008,1009,85],{},"Maak eerst een verdieping aan. Teken daarna de buiten- en binnenmuren met het veelhoek-, rechthoek- of lijnwerktuig. Gesloten wandvlakken worden als ruimtes herkend; geef elke ruimte een duidelijke naam, zoals ",[34,1006,1007],{},"Keuken"," of ",[34,1010,1011],{},"Slaapkamer 1",[10,1013,1014],{},"Hebt u al een plan als afbeelding, dan kunt u dat als referentie gebruiken. Kalibreer het met een bekende maat voordat u nauwkeurig plaatst. De afbeelding is een onderlegger: muren, openingen en elektrische punten blijven afzonderlijke projectgegevens.",[10,1016,1017],{},"Plaats vervolgens deuren, ramen, trappen en de elektrische symbolen op hun werkelijke locatie. Het resulterende grondplan vormt de basis van het situatieschema dat u later als PDF exporteert.",[10,1019,1020],{},"Praktische controle:",[96,1022,1023,1026,1029,1032],{},[45,1024,1025],{},"Zijn alle verdiepingen en ruimtes aanwezig en benoemd?",[45,1027,1028],{},"Staan stopcontacten, schakelaars, lichtpunten en vaste toestellen in de juiste ruimte?",[45,1030,1031],{},"Is de verdeelkast op het plan geplaatst?",[45,1033,1034],{},"Zijn eventuele badkamerzones en bijzondere toestellen correct vastgelegd?",[10,1036,1037],{},[22,1038],{"id":114},[26,1040,1042],{"id":1041},"_3-plaats-en-verbind-elektrische-punten","3. Plaats en verbind elektrische punten",[10,1044,1045],{},"Open het symbolenpalet en plaats de nodige elektrische punten. Sommige hulpmiddelen kunnen voorstellen maken voor stopcontacten, verlichting, standaardtoestellen of een spotraster. Beoordeel en pas die voorstellen aan: ze vervangen uw keuze van aantallen en posities niet.",[10,1047,1048],{},"Koppel schakelaars en lichtpunten in schakelketens. Voor vrije schakelaars en lichten in een ruimte kan PlanElec een keten voorstellen; de volgorde blijft manueel aanpasbaar.",[10,1050,1051],{},"Een symbool op het grondplan en een elektrisch knooppunt horen bij elkaar, maar zijn niet hetzelfde. Controleer daarom onverbonden componenten. Zonder geldige topologie kan een toestel niet betrouwbaar in een stroomkring, kabel- of materiaallijst terechtkomen.",[10,1053,1054,1055,85],{},"Meer over automatische voorstellen, kabels en stroomkringen leest u in ",[22,1056,1058],{"href":1057},"\u002Fhelp\u002Fautomatische-planning","Automatische planning gebruiken",[10,1060,1061,1063],{},[22,1062],{"id":140},[22,1064],{"id":143},[26,1066,1068],{"id":1067},"_4-controleer-de-elektrische-topologie-en-verdeelkast","4. Controleer de elektrische topologie en verdeelkast",[10,1070,1071],{},"Gebruik de automatische stroomkringtoewijzing als startvoorstel. PlanElec groepeert standaardverbruikers, maakt voor bijzondere toestellen waar nodig een aparte beveiliging aan en kan lasten over fasen verdelen. Bekijk de preview voordat u de toewijzing toepast.",[10,1073,1074],{},"Open daarna de verdeelkasteditor. Automatisch vullen plaatst bestaande hoofdschakelaars, differentieelschakelaars en automaten op de DIN-rails en houdt ruimte vrij. Controleer vervolgens:",[42,1076,1077,1080,1083,1086,1089],{},[45,1078,1079],{},"de beveiligingsketen en de toegewezen verbruikers;",[45,1081,1082],{},"kabeltype, doorsnede en route;",[45,1084,1085],{},"RCD-groepen en aantallen stroomkringen;",[45,1087,1088],{},"faseverdeling bij een meerfasige installatie;",[45,1090,1091],{},"vrije moduleplaatsen en de werkelijke kastafmetingen.",[10,1093,1094],{},"Alle automatische resultaten blijven bewerkbaar. Een voorstel is geen ontwerpbeslissing of materiaalbestelling.",[10,1096,1097],{},[22,1098],{"id":178},[26,1100,1102],{"id":1101},"_5-bekijk-het-eendraadschema-en-de-zelfcontrole","5. Bekijk het eendraadschema en de zelfcontrole",[10,1104,1105],{},"Het eendraadschema wordt uit dezelfde elektrische topologie opgebouwd. Controleer circuitnamen, beveiligingen, kabelgegevens, verbindingen en symbolen. Los fouten en waarschuwingen op die PlanElec met de beschikbare projectgegevens kan herkennen.",[10,1107,1108],{},"De AREI\u002FRGIE-zelfcontrole ondersteunt een gedocumenteerd deel van de softwarematig controleerbare regels. Een foutloze run betekent alleen dat binnen die ondersteunde regels geen fout is gevonden. Metingen, omstandigheden ter plaatse en niet gemodelleerde regels vallen buiten deze controle.",[10,1110,1111],{},"PlanElec levert dus geen conformiteitsattest en vervangt geen officiële keuring door een erkend controleorganisme.",[10,1113,1114,1116],{},[22,1115],{"id":196},[22,1117],{"id":199},[26,1119,1121],{"id":1120},"_6-exporteer-en-beoordeel-de-documenten","6. Exporteer en beoordeel de documenten",[10,1123,206,1124,1126],{},[34,1125,209],{}," kunt u onder andere het eendraadschema en het situatieschema als PDF genereren. Ook het zelfcontrolerapport en lijsten voor stroomkringen, kabels en materiaal zijn centraal beschikbaar; de gedetailleerde lijsten bevinden zich nog in de pilotworkflow.",[10,1128,1129],{},"U kunt geselecteerde documenten ook samenvoegen tot een werkdossier met voorblad, inhoudsoverzicht en doorlopende paginanummering. Bekijk vóór delen iedere pagina en controleer de projectmetadata.",[10,1131,1132,1133,1137],{},"Zie ",[22,1134,1136],{"href":1135},"\u002Fhelp\u002Fdocumenten-exporteren","Documenten exporteren"," voor de volledige lijst, statussen en beperkingen.",[26,1139,1141],{"id":1140},"een-bruikbare-eerste-mijlpaal","Een bruikbare eerste mijlpaal",[10,1143,1144],{},"Uw eerste project is goed opgebouwd wanneer:",[42,1146,1147,1150,1153,1156,1159,1162],{},[45,1148,1149],{},"ruimtes en elektrische punten op het situatieplan staan;",[45,1151,1152],{},"alle relevante punten met de elektrische topologie verbonden zijn;",[45,1154,1155],{},"stroomkringen, kabels en kastindeling zijn beoordeeld;",[45,1157,1158],{},"het eendraadschema leesbaar is;",[45,1160,1161],{},"de zelfcontrole is uitgevoerd en resterende bevindingen begrepen zijn;",[45,1163,1164],{},"geëxporteerde documenten visueel en inhoudelijk zijn nagekeken.",[10,1166,1167,1168,85],{},"Wilt u meteen beginnen? ",[22,1169,1170],{"href":254},"Maak gratis een Early Access-account aan",{"title":257,"searchDepth":258,"depth":258,"links":1172},[1173,1174,1175,1176,1177,1178,1179],{"id":960,"depth":258,"text":961},{"id":1000,"depth":258,"text":1001},{"id":1041,"depth":258,"text":1042},{"id":1067,"depth":258,"text":1068},{"id":1101,"depth":258,"text":1102},{"id":1120,"depth":258,"text":1121},{"id":1140,"depth":258,"text":1141},"Bouw stap voor stap een PlanElec-project op: projectgegevens, grondplan, ruimtes, elektrische punten, verdeelkast, schema en export.","nl",{},"\u002Fhelp\u002Fgetting-started.nl",{"title":943,"description":1180},"aan-de-slag","help\u002Fgetting-started.nl",[24,1188,1189,1190,1191,1192,196],"grondplan","situatieplan","verbruikers","verdeelkast","eendraadschema","XwyAIWndJ3lLL5UYQrExSvDk2venBuT63vYEUT0HFTQ",[1195,1366,1630],{"id":4,"title":5,"body":1196,"category":267,"description":268,"extension":269,"guideId":270,"locale":271,"meta":1363,"navigation":273,"order":274,"path":275,"readTime":276,"seo":1364,"slug":270,"stem":278,"tags":1365,"updatedAt":284,"__hash__":285},{"type":7,"value":1197,"toc":1354},[1198,1200,1204,1208,1210,1214,1216,1228,1230,1236,1238,1244,1246,1248,1250,1260,1264,1266,1268,1270,1272,1276,1282,1284,1286,1288,1300,1302,1306,1308,1310,1312,1314,1320,1322,1326,1328,1332,1334,1336,1350],[10,1199,12],{},[14,1201,1202],{},[10,1203,18],{},[10,1205,1206],{},[22,1207],{"id":24},[26,1209,29],{"id":28},[10,1211,32,1212,37],{},[34,1213,36],{},[10,1215,40],{},[42,1217,1218,1220,1222,1224,1226],{},[45,1219,47],{},[45,1221,50],{},[45,1223,53],{},[45,1225,56],{},[45,1227,59],{},[10,1229,62],{},[10,1231,1232,1234],{},[22,1233],{"id":67},[22,1235],{"id":70},[26,1237,74],{"id":73},[10,1239,77,1240,81,1242,85],{},[34,1241,80],{},[34,1243,84],{},[10,1245,88],{},[10,1247,91],{},[10,1249,94],{},[96,1251,1252,1254,1256,1258],{},[45,1253,100],{},[45,1255,103],{},[45,1257,106],{},[45,1259,109],{},[10,1261,1262],{},[22,1263],{"id":114},[26,1265,118],{"id":117},[10,1267,121],{},[10,1269,124],{},[10,1271,127],{},[10,1273,130,1274,135],{},[22,1275,134],{"href":133},[10,1277,1278,1280],{},[22,1279],{"id":140},[22,1281],{"id":143},[26,1283,147],{"id":146},[10,1285,150],{},[10,1287,153],{},[42,1289,1290,1292,1294,1296,1298],{},[45,1291,158],{},[45,1293,161],{},[45,1295,164],{},[45,1297,167],{},[45,1299,170],{},[10,1301,173],{},[10,1303,1304],{},[22,1305],{"id":178},[26,1307,182],{"id":181},[10,1309,185],{},[10,1311,188],{},[10,1313,191],{},[10,1315,1316,1318],{},[22,1317],{"id":196},[22,1319],{"id":199},[26,1321,203],{"id":202},[10,1323,206,1324,210],{},[34,1325,209],{},[10,1327,213],{},[10,1329,216,1330,221],{},[22,1331,220],{"href":219},[26,1333,225],{"id":224},[10,1335,228],{},[42,1337,1338,1340,1342,1344,1346,1348],{},[45,1339,233],{},[45,1341,236],{},[45,1343,239],{},[45,1345,242],{},[45,1347,245],{},[45,1349,248],{},[10,1351,251,1352,85],{},[22,1353,255],{"href":254},{"title":257,"searchDepth":258,"depth":258,"links":1355},[1356,1357,1358,1359,1360,1361,1362],{"id":28,"depth":258,"text":29},{"id":73,"depth":258,"text":74},{"id":117,"depth":258,"text":118},{"id":146,"depth":258,"text":147},{"id":181,"depth":258,"text":182},{"id":202,"depth":258,"text":203},{"id":224,"depth":258,"text":225},{},{"title":5,"description":268},[24,280,281,114,282,283,196],{"id":1367,"title":1368,"body":1369,"category":1617,"description":1618,"extension":269,"guideId":140,"locale":271,"meta":1619,"navigation":273,"order":258,"path":1620,"readTime":1621,"seo":1622,"slug":140,"stem":1623,"tags":1624,"updatedAt":284,"__hash__":1629},"help\u002Fhelp\u002Fautomatic-planning.en.md","Using and reviewing automatic planning",{"type":7,"value":1370,"toc":1606},[1371,1374,1380,1389,1393,1396,1399,1416,1419,1424,1427,1430,1435,1439,1442,1445,1448,1462,1465,1470,1474,1477,1497,1500,1505,1509,1512,1515,1519,1523,1526,1529,1543,1546,1553,1557,1560,1598,1601],[10,1372,1373],{},"PlanElec's automatic functions create editable proposals. They reduce repetitive work, but they cannot know which equipment will actually be installed, how a cable will run on site, or which product specifications your electrician will select.",[10,1375,1376,1377,85],{},"Use the same pattern each time: ",[34,1378,1379],{},"create proposal → review preview → apply → check technically",[10,1381,1382,1384,1387],{},[22,1383],{"id":140},[22,1385],{"id":1386},"consumers",[22,1388],{"id":114},[26,1390,1392],{"id":1391},"propose-devices-and-lighting-points","Propose devices and lighting points",[10,1394,1395],{},"The floor-plan editor includes helpers for automatic sockets, lighting, standard equipment, and spotlight grids. The proposals use the drawn rooms and geometry as their basis.",[10,1397,1398],{},"For a useful result:",[96,1400,1401,1404,1407,1410,1413],{},[45,1402,1403],{},"draw closed, correctly named rooms;",[45,1405,1406],{},"set the required count or pattern where applicable;",[45,1408,1409],{},"inspect the proposed positions;",[45,1411,1412],{},"move, add, or remove points to match the real design;",[45,1414,1415],{},"review special zones and fixed appliances separately.",[10,1417,1418],{},"PlanElec does not silently add every missing appliance. You remain responsible for the design brief and final placement.",[1420,1421,1423],"h3",{"id":1422},"build-switch-chains-automatically","Build switch chains automatically",[10,1425,1426],{},"PlanElec can propose a switch chain for unassigned switches and lighting points in the same room. It normally starts with the free switch closest to a door and then connects nearby free points.",[10,1428,1429],{},"Always verify which switch controls which light. Edit the sequence manually when the real control logic differs.",[10,1431,1432],{},[22,1433],{"id":1434},"cables",[26,1436,1438],{"id":1437},"generate-cable-specifications-and-routes","Generate cable specifications and routes",[10,1440,1441],{},"Once the electrical topology exists, PlanElec can create a cable segment for each parent-to-child connection. A real connection or junction box splits the connection into separate segments. A box that is only nearby is not silently inserted into the electrical path.",[10,1443,1444],{},"Automatic routing searches for a short route along the drawn walls on each floor. If the start and end are not connected through the same wall component, the router uses a direct fallback.",[10,1446,1447],{},"After routing:",[42,1449,1450,1453,1456,1459],{},[45,1451,1452],{},"check whether the route matches the intended installation;",[45,1454,1455],{},"add or move waypoints where required;",[45,1457,1458],{},"review cable type, cross-section, and installation method;",[45,1460,1461],{},"enter a manual length when the calculated route does not represent reality closely enough.",[10,1463,1464],{},"The resulting length feeds the material list, voltage-drop calculation, and validation. It is a net length without an automatic waste or reserve factor.",[10,1466,1467],{},[22,1468],{"id":1469},"circuits",[26,1471,1473],{"id":1472},"assign-devices-to-circuits-automatically","Assign devices to circuits automatically",[10,1475,1476],{},"Automatic circuit assignment creates a proposal from the recorded devices and product rules. It supports decisions such as:",[42,1478,1479,1482,1485,1488,1491,1494],{},[45,1480,1481],{},"grouping standard lighting and socket points by room;",[45,1483,1484],{},"allowing no more than eight connection points on a standard circuit;",[45,1486,1487],{},"creating dedicated breakers for appliances including hobs, ovens, washing machines, tumble dryers, dishwashers, boilers, heat pumps, and saunas;",[45,1489,1490],{},"placing standard groups behind 30 mA RCDs;",[45,1492,1493],{},"assigning an EV charger a separate 30 mA RCD and three-phase breaker; with documented built-in 6 mA DC detection PlanElec proposes external Type A, otherwise Type B;",[45,1495,1496],{},"distributing assignments across boards in a multi-board project.",[10,1498,1499],{},"Review the preview before confirming it. Pay particular attention to mixed circuits, special appliances, existing manual assignments, and whether the defaults suit the actual project.",[10,1501,1502],{},[22,1503],{"id":1504},"phases",[26,1506,1508],{"id":1507},"balance-loads-across-phases","Balance loads across phases",[10,1510,1511],{},"For a three-phase or delta supply, PlanElec can distribute loads across L1, L2, and L3. The phase overview shows the calculated load on each phase and warns about a clear imbalance.",[10,1513,1514],{},"This remains a model calculation based on the entered loads. Real simultaneity, measurements, and network conditions require assessment outside the software.",[10,1516,1517],{},[22,1518],{"id":143},[26,1520,1522],{"id":1521},"fill-the-distribution-board-automatically","Fill the distribution board automatically",[10,1524,1525],{},"Auto-fill places existing main switches, RCDs, and MCBs in free DIN-rail slots. Its default sequence is main RCD, group RCDs, and then circuit breakers. By default, it reserves about twenty percent of the rail capacity.",[10,1527,1528],{},"The distinction from circuit assignment matters:",[42,1530,1531,1537],{},[45,1532,1533,1536],{},[34,1534,1535],{},"Circuit assignment"," creates and connects the electrical protection structure.",[45,1538,1539,1542],{},[34,1540,1541],{},"Auto-fill"," arranges those existing modules physically in the board.",[10,1544,1545],{},"After auto-fill, review the board size, TE widths, spare capacity, protection chains, and connection paths. Explicit paths through connection boxes are preserved when the board is filled again.",[10,1547,1548,1550],{},[22,1549],{"id":178},[22,1551],{"id":1552},"review",[26,1554,1556],{"id":1555},"final-review-of-an-automatic-proposal","Final review of an automatic proposal",[10,1558,1559],{},"After every automatic action, check:",[96,1561,1562,1568,1574,1580,1586,1592],{},[45,1563,1564,1567],{},[34,1565,1566],{},"Completeness:"," are all real devices, boxes, and boards modeled?",[45,1569,1570,1573],{},[34,1571,1572],{},"Topology:"," is each parent-to-child connection correct, with nothing left unconnected?",[45,1575,1576,1579],{},[34,1577,1578],{},"Protection:"," do the RCD, MCB, pole configuration, and cable suit the application?",[45,1581,1582,1585],{},[34,1583,1584],{},"Space:"," are routes and positions practical on site?",[45,1587,1588,1591],{},[34,1589,1590],{},"Phases:"," is the allocation plausible for the entered loads?",[45,1593,1594,1597],{},[34,1595,1596],{},"Documents:"," do the situation plan and single-line diagram remain readable?",[10,1599,1600],{},"The AREI\u002FRGIE self-check helps with supported rules that can be evaluated from project data. It is not a declaration of conformity and does not replace an electrician's review or the official inspection.",[10,1602,1603,1604,85],{},"Continue with ",[22,1605,220],{"href":219},{"title":257,"searchDepth":258,"depth":258,"links":1607},[1608,1612,1613,1614,1615,1616],{"id":1391,"depth":258,"text":1392,"children":1609},[1610],{"id":1422,"depth":1611,"text":1423},3,{"id":1437,"depth":258,"text":1438},{"id":1472,"depth":258,"text":1473},{"id":1507,"depth":258,"text":1508},{"id":1521,"depth":258,"text":1522},{"id":1555,"depth":258,"text":1556},"automation","Use PlanElec proposals for devices, switch chains, cable routes, circuits, phases, and the distribution board without skipping technical review.",{},"\u002Fhelp\u002Fautomatic-planning.en","9 min",{"title":1368,"description":1618},"help\u002Fautomatic-planning.en",[1625,114,1626,1469,1627,282,1628],"automatic planning","cable routing","phase balancing","DIN rail","zmQJ24UMUmpbPSZVOF9GQftSIkXLgz1R2p0q_4MMqT0",{"id":1631,"title":1632,"body":1633,"category":199,"description":1937,"extension":269,"guideId":1938,"locale":271,"meta":1939,"navigation":273,"order":1611,"path":1940,"readTime":276,"seo":1941,"slug":1942,"stem":1943,"tags":1944,"updatedAt":284,"__hash__":1949},"help\u002Fhelp\u002Fdocument-exports.en.md","Exporting documents and assembling a working dossier",{"type":7,"value":1634,"toc":1926},[1635,1638,1642,1646,1734,1741,1744,1747,1750,1767,1771,1774,1777,1780,1785,1788,1791,1794,1808,1811,1814,1834,1837,1844,1847,1855,1860,1864,1867,1870,1875,1879,1882,1905,1908,1912,1915],[10,1636,1637],{},"The export workspace brings together documents from the same project model. You can download documents separately or combine selected parts into one working dossier.",[10,1639,1640],{},[22,1641],{"id":199},[26,1643,1645],{"id":1644},"status-at-a-glance","Status at a glance",[1647,1648,1649,1665],"table",{},[1650,1651,1652],"thead",{},[1653,1654,1655,1659,1662],"tr",{},[1656,1657,1658],"th",{},"Document",[1656,1660,1661],{},"Current status",[1656,1663,1664],{},"What to know",[1666,1667,1668,1680,1690,1701,1712,1723],"tbody",{},[1653,1669,1670,1674,1677],{},[1671,1672,1673],"td",{},"Single-line diagram PDF",[1671,1675,1676],{},"Available",[1671,1678,1679],{},"Can span several pages; review scale, symbols, and title block.",[1653,1681,1682,1685,1687],{},[1671,1683,1684],{},"Situation plan PDF",[1671,1686,1676],{},[1671,1688,1689],{},"Based on the drawn floor plan and placed symbols.",[1653,1691,1692,1695,1698],{},[1671,1693,1694],{},"AREI\u002FRGIE self-check report",[1671,1696,1697],{},"Available, advisory",[1671,1699,1700],{},"Not a certificate of conformity or a replacement for the official inspection.",[1653,1702,1703,1706,1709],{},[1671,1704,1705],{},"Circuit, cable, and material lists",[1671,1707,1708],{},"Pilot workflow",[1671,1710,1711],{},"Model-based, manufacturer-neutral lists; not approved for ordering.",[1653,1713,1714,1717,1720],{},[1671,1715,1716],{},"Distribution board PDF",[1671,1718,1719],{},"Feature flag",[1671,1721,1722],{},"Shown only when enabled and board data is present.",[1653,1724,1725,1728,1731],{},[1671,1726,1727],{},"Combined installation dossier",[1671,1729,1730],{},"Pilot\u002Fworking state",[1671,1732,1733],{},"Local assembly; a versioned final server snapshot and formal acceptance remain open.",[10,1735,1736,1738],{},[22,1737],{"id":178},[22,1739],{"id":1740},"single-line",[26,1742,1673],{"id":1743},"single-line-diagram-pdf",[10,1745,1746],{},"The single-line diagram uses the electrical topology, protection devices, circuits, cable data, and consumers. Larger installations are divided across several pages.",[10,1748,1749],{},"Before downloading, check:",[42,1751,1752,1755,1758,1761,1764],{},[45,1753,1754],{},"that every consumer path reaches the correct breaker and RCD;",[45,1756,1757],{},"that cable type, cross-section, and labels are present;",[45,1759,1760],{},"that spare modules do not appear as active circuits;",[45,1762,1763],{},"that the project and installer details in the title block are correct;",[45,1765,1766],{},"that no content is clipped at a page edge.",[10,1768,1769],{},[22,1770],{"id":70},[26,1772,1684],{"id":1773},"situation-plan-pdf",[10,1775,1776],{},"The situation plan shows the drawn rooms, openings, and electrical symbols in their locations. Review every floor separately and check for overlapping labels, missing devices, and legibility at the selected A4 or A3 format.",[10,1778,1779],{},"The situation plan and single-line diagram share project notes and other title-block details. Correct those details in the project instead of editing an individual PDF.",[10,1781,1782],{},[22,1783],{"id":1784},"self-check",[26,1786,1694],{"id":1787},"areirgie-self-check-report",[10,1789,1790],{},"The report summarizes findings that PlanElec can evaluate from the entered data and supported rules. It also states when a check has not started, is incomplete, or falls outside the current coverage.",[10,1792,1793],{},"A report with no detected error does not mean the installation complies with AREI\u002FRGIE. Measurements, evidence, on-site conditions, and rules that are not modeled remain outside a software check. Only a recognized inspection body performs the official inspection.",[10,1795,1796,1799,1802,1805],{},[22,1797],{"id":1798},"lists",[22,1800],{"id":1801},"circuit-list",[22,1803],{"id":1804},"cable-list",[22,1806],{"id":1807},"material-list",[26,1809,1705],{"id":1810},"circuit-cable-and-material-lists",[10,1812,1813],{},"These lists are available in the central pilot workflow:",[42,1815,1816,1822,1828],{},[45,1817,1818,1821],{},[34,1819,1820],{},"Circuit list:"," overview of modeled circuits and protection devices.",[45,1823,1824,1827],{},[34,1825,1826],{},"Cable list:"," cable segments with specifications and calculated or manual length.",[45,1829,1830,1833],{},[34,1831,1832],{},"Material list:"," manufacturer-neutral quantities for wiring accessories, connections, protection, board, accessories, and net cable lengths.",[10,1835,1836],{},"The material list can be viewed by category or room and exposes its default assumptions. It includes no prices or specific manufacturer products. Net cable lengths have no automatic waste or reserve factor. Use it as a review and quotation starting point, not as a purchase order.",[10,1838,1839,1841],{},[22,1840],{"id":143},[22,1842],{"id":1843},"cabinet-pdf",[26,1845,1716],{"id":1846},"distribution-board-pdf",[10,1848,1849,1850,1854],{},"The PDF view of the distribution board is only available when the ",[1851,1852,1853],"code",{},"cabinet_export"," feature flag is active and the project contains board data. If the option is absent, that is not an export error: the feature has not been enabled for that environment.",[10,1856,1857],{},[22,1858],{"id":1859},"dossier",[26,1861,1863],{"id":1862},"assemble-an-installation-dossier","Assemble an installation dossier",[10,1865,1866],{},"Select the required documents in the dossier builder. PlanElec creates a cover, document index, and continuous page numbering locally, then merges the selected PDFs in a fixed order.",[10,1868,1869],{},"This is currently a working and review state. The versioned server snapshot and formally reviewed real-world outputs required for a final dossier are not yet generally released.",[10,1871,1872],{},[22,1873],{"id":1874},"metadata",[26,1876,1878],{"id":1877},"review-project-metadata","Review project metadata",[10,1880,1881],{},"Open the project details from the export area and check at least:",[96,1883,1884,1887,1890,1893,1896,1899,1902],{},[45,1885,1886],{},"customer and installation address;",[45,1888,1889],{},"installer and contact details;",[45,1891,1892],{},"inspection body;",[45,1894,1895],{},"Belgian EAN;",[45,1897,1898],{},"residential or non-residential installation and AC\u002FDC designation;",[45,1900,1901],{},"plan format, revision, and project notes;",[45,1903,1904],{},"logo, if used.",[10,1906,1907],{},"An invalid EAN is not rendered as a valid number, but Early Access does not automatically block the download.",[26,1909,1911],{"id":1910},"final-check-before-sharing","Final check before sharing",[10,1913,1914],{},"Open the downloaded file outside PlanElec and review every page. Check page order, legibility, metadata, warnings, and missing parts. Keep the project version used to create the document and have the result reviewed by the responsible electrician.",[10,1916,1917,1918,1922,1923,85],{},"Need to review the project model first? Start with ",[22,1919,1921],{"href":1920},"\u002Fen\u002Fhelp\u002Fgetting-started","Getting started"," or learn how to ",[22,1924,1925],{"href":133},"review automatic planning",{"title":257,"searchDepth":258,"depth":258,"links":1927},[1928,1929,1930,1931,1932,1933,1934,1935,1936],{"id":1644,"depth":258,"text":1645},{"id":1743,"depth":258,"text":1673},{"id":1773,"depth":258,"text":1684},{"id":1787,"depth":258,"text":1694},{"id":1810,"depth":258,"text":1705},{"id":1846,"depth":258,"text":1716},{"id":1862,"depth":258,"text":1863},{"id":1877,"depth":258,"text":1878},{"id":1910,"depth":258,"text":1911},"See which PDFs PlanElec creates, which outputs are available or in pilot, and what to review before sharing or inspection.","document-exports",{},"\u002Fhelp\u002Fdocument-exports.en",{"title":1632,"description":1937},"export-documents","help\u002Fdocument-exports.en",[1945,283,281,1784,1469,1946,1947,1948],"PDF export","cable list","material list","installation dossier","YxK-MLrDVBV4XNPpn-fQqzu9BnwAQ0_QdPKVHIg01Ew",1785171266727]