[{"data":1,"prerenderedAt":4311},["ShallowReactive",2],{"blog-post-fr-ancien-rgie-part-8":3,"blog-alternates-old-building-arei-part8":948},{"id":4,"title":5,"articleId":6,"body":7,"category":927,"date":928,"description":929,"extension":930,"lastUpdated":928,"locale":931,"meta":932,"navigation":933,"path":934,"publishDate":928,"readTime":935,"refreshInterval":936,"seo":937,"slug":938,"stem":939,"tags":940,"__hash__":947},"blog\u002Fblog\u002Fold-building-arei-part8.fr.md","Ancien bâtiment et RGIE Partie 8 : Règles spéciales pour les installations existantes","old-building-arei-part8",{"type":8,"value":9,"toc":887},"minimark",[10,14,23,26,31,38,49,58,60,64,71,76,79,83,90,94,122,130,132,136,139,143,187,191,227,239,243,246,269,273,279,283,305,309,312,314,318,325,329,423,427,430,456,458,462,466,473,477,484,496,500,570,584,586,590,596,600,607,629,633,651,653,657,664,668,682,686,697,701,712,716,778,780,784,838,840,844,871,873],[11,12,5],"h1",{"id":13},"ancien-bâtiment-et-rgie-partie-8-règles-spéciales-pour-les-installations-existantes",[15,16,17,18,22],"p",{},"Toute installation électrique en Belgique ne doit pas forcément répondre aux dernières prescriptions du RGIE. Pour les bâtiments plus anciens, la ",[19,20,21],"strong",{},"Partie 8"," constitue un ensemble de règles spécifiques qui tolère certaines dérogations par rapport au standard actuel — tant qu'il n'existe pas de danger immédiat. Cet article explique quand la Partie 8 s'applique, ce qui est autorisé et où se trouvent les limites.",[24,25],"hr",{},[27,28,30],"h2",{"id":29},"quest-ce-que-la-partie-8","Qu'est-ce que la Partie 8 ?",[15,32,33,34,37],{},"La Partie 8 du RGIE (Règlement Général sur les Installations Électriques) est une ",[19,35,36],{},"réglementation spéciale pour les installations existantes"," qui ont été réalisées et réceptionnées avant l'entrée en vigueur du RGIE actuel.",[15,39,40,41,44,45,48],{},"Le principe de base : tant qu'une installation fonctionne de manière ",[19,42,43],{},"sûre"," et ne représente ",[19,46,47],{},"aucun danger immédiat",", elle n'a pas à être entièrement mise aux normes actuelles — même si elle ne répond pas à toutes les prescriptions en vigueur.",[50,51,52],"blockquote",{},[15,53,54,57],{},[19,55,56],{},"Important :"," La Partie 8 n'est pas un blanc-seing. Elle définit clairement quelles dérogations sont tolérées et lesquelles ne le sont pas.",[24,59],{},[27,61,63],{"id":62},"quand-la-partie-8-sapplique-t-elle","Quand la Partie 8 s'applique-t-elle ?",[15,65,66,67,70],{},"La Partie 8 s'applique aux installations qui remplissent ",[19,68,69],{},"l'une"," des conditions suivantes :",[72,73,75],"h3",{"id":74},"condition-1-installation-avant-le-01101981","Condition 1 : Installation avant le 01.10.1981",[15,77,78],{},"Les installations réalisées avant le 1er octobre 1981 (date d'entrée en vigueur du RGIE original) tombent en principe sous la Partie 8.",[72,80,82],{"id":81},"condition-2-réceptionnée-sous-lancien-rgie","Condition 2 : Réceptionnée sous l'ancien RGIE",[15,84,85,86,89],{},"Les installations qui ont été réceptionnées sous une version antérieure du RGIE et qui n'ont ",[19,87,88],{},"pas été substantiellement modifiées"," depuis la dernière réception.",[72,91,93],{"id":92},"quest-ce-quune-modification-substantielle","Qu'est-ce qu'une « modification substantielle » ?",[95,96,97,104,110,116],"ul",{},[98,99,100,101],"li",{},"Ajout de ",[19,102,103],{},"nouveaux circuits",[98,105,106,107],{},"Extension du ",[19,108,109],{},"tableau de distribution",[98,111,112,113],{},"Modification de l'",[19,114,115],{},"installation de comptage",[98,117,118,121],{},[19,119,120],{},"Recâblage"," important",[50,123,124],{},[15,125,126,129],{},[19,127,128],{},"Attention :"," Les petites modifications comme le remplacement d'une prise ou d'un interrupteur ne comptent PAS comme modification substantielle.",[24,131],{},[27,133,135],{"id":134},"ce-qui-est-autorisé-sous-la-partie-8-dérogations-tolérées","Ce qui est autorisé sous la Partie 8 (Dérogations tolérées)",[15,137,138],{},"Les points suivants s'écartent du RGIE actuel, mais sont tolérés sous la Partie 8 lors du contrôle :",[72,140,142],{"id":141},"_1-anciens-types-de-câbles","1. Anciens types de câbles",[144,145,146,159],"table",{},[147,148,149],"thead",{},[150,151,152,156],"tr",{},[153,154,155],"th",{},"RGIE actuel",[153,157,158],{},"Partie 8 tolère",[160,161,162,171,179],"tbody",{},[150,163,164,168],{},[165,166,167],"td",{},"XVB \u002F VOBst en Preflex",[165,169,170],{},"Câbles VOB dans d'anciennes gaines",[150,172,173,176],{},[165,174,175],{},"Classe de réaction au feu Cca",[165,177,178],{},"Types de câbles plus anciens sans classification CPR",[150,180,181,184],{},[165,182,183],{},"Section minimale 2,5 mm² pour les prises",[165,185,186],{},"Minimum 1 mm² avec fusible max. 6 A ou disjoncteur max. 10 A (Art. 8.2.1 Nr. 5)",[72,188,190],{"id":189},"_2-différentiels-rcd","2. Différentiels (RCD)",[144,192,193,201],{},[147,194,195],{},[150,196,197,199],{},[153,198,155],{},[153,200,158],{},[160,202,203,211,219],{},[150,204,205,208],{},[165,206,207],{},"Différentiel 30 mA par circuit prises",[165,209,210],{},"Pas de 30 mA nécessaire (seulement 300 mA principal)",[150,212,213,216],{},[165,214,215],{},"Différentiel 30 mA obligatoire pour salle de bain",[165,217,218],{},"Toléré sans, s'il n'y a pas de risque direct",[150,220,221,224],{},[165,222,223],{},"Max. 8 circuits par RCD",[165,225,226],{},"Plus de circuits autorisés",[50,228,229],{},[15,230,231,234,235,238],{},[19,232,233],{},"Note :"," Même sous la Partie 8, un ",[19,236,237],{},"différentiel principal 300 mA"," est recommandé et souvent exigé par le gestionnaire de réseau lors d'une nouvelle installation de compteur.",[72,240,242],{"id":241},"_3-prises-sans-contact-de-terre","3. Prises sans contact de terre",[15,244,245],{},"Les anciennes prises (type C, sans broche de terre) sont tolérées sous la Partie 8, à condition que :",[95,247,248,255,266],{},[98,249,250,251,254],{},"Aucun appareil de ",[19,252,253],{},"classe de protection I"," (avec boîtier métallique) ne soit branché.",[98,256,257,258,261,262,265],{},"La prise ne soit pas dans la ",[19,259,260],{},"salle de bain"," ou dans un ",[19,263,264],{},"lieu humide",".",[98,267,268],{},"Le circuit soit par ailleurs intact.",[72,270,272],{"id":271},"_4-pas-de-parafoudre-spd","4. Pas de parafoudre (SPD)",[15,274,275,276,265],{},"Le RGIE actuel prescrit un parafoudre (SPD) Type 2 pour les nouvelles installations. Sous la Partie 8, ce n'est ",[19,277,278],{},"pas requis",[72,280,282],{"id":281},"_5-ancienne-technique-de-distribution","5. Ancienne technique de distribution",[95,284,285,292,298],{},[98,286,287,288,291],{},"Les ",[19,289,290],{},"fusibles"," au lieu de disjoncteurs sont autorisés.",[98,293,287,294,297],{},[19,295,296],{},"fusibles à vis"," (Diazed) sont tolérés.",[98,299,300,301,304],{},"L'absence d'",[19,302,303],{},"étiquetage"," est mentionnée comme défaut, mais n'entraîne pas un échec.",[72,306,308],{"id":307},"_6-pas-de-classification-de-réaction-au-feu-des-câbles","6. Pas de classification de réaction au feu des câbles",[15,310,311],{},"Les câbles sans classification CPR (installés avant 2017) sont tolérés, car le règlement CPR ne s'applique qu'à partir de juillet 2017 pour les nouvelles installations.",[24,313],{},[27,315,317],{"id":316},"ce-qui-nest-pas-autorisé-même-sous-la-partie-8","Ce qui n'est PAS autorisé (même sous la Partie 8)",[15,319,320,321,324],{},"Certaines situations ne sont ",[19,322,323],{},"jamais tolérées",", quel que soit l'âge de l'installation :",[72,326,328],{"id":327},"absolument-inadmissible","Absolument inadmissible :",[144,330,331,341],{},[147,332,333],{},[150,334,335,338],{},[153,336,337],{},"Situation",[153,339,340],{},"Pourquoi ?",[160,342,343,353,363,373,383,393,403,413],{},[150,344,345,350],{},[165,346,347],{},[19,348,349],{},"Câbles dénudés ou endommagés",[165,351,352],{},"Danger immédiat d'électrocution",[150,354,355,360],{},[165,356,357],{},[19,358,359],{},"Absence totale de mise à la terre",[165,361,362],{},"Pas de protection en cas de défaut d'isolement",[150,364,365,370],{},[165,366,367],{},[19,368,369],{},"Eau en contact avec l'électricité",[165,371,372],{},"Danger de mort",[150,374,375,380],{},[165,376,377],{},[19,378,379],{},"Parties sous tension accessibles",[165,381,382],{},"Risque de contact direct",[150,384,385,390],{},[165,386,387],{},[19,388,389],{},"Câbles ou connexions en surchauffe",[165,391,392],{},"Risque d'incendie",[150,394,395,400],{},[165,396,397],{},[19,398,399],{},"Connexions desserrées dans les boîtes de dérivation",[165,401,402],{},"Risque d'arc\u002Fincendie",[150,404,405,410],{},[165,406,407],{},[19,408,409],{},"Boîtes de dérivation sans couvercle",[165,411,412],{},"Protection contre les contacts manquante",[150,414,415,420],{},[165,416,417],{},[19,418,419],{},"Prise de salle de bain en zone 0 ou 1",[165,421,422],{},"Danger de mort, interdit même sous Partie 8",[72,424,426],{"id":425},"exigences-minimales-de-sécurité","Exigences minimales de sécurité :",[15,428,429],{},"Même sous la Partie 8, il faut garantir :",[95,431,432,438,444,450],{},[98,433,434,437],{},[19,435,436],{},"Section suffisante"," pour la charge réelle (pas de câble 0,75 mm² surchargé).",[98,439,440,443],{},[19,441,442],{},"Fusibles fonctionnels"," (pas de fusibles « pontés »).",[98,445,446,449],{},[19,447,448],{},"Mise à la terre du tableau principal"," (connexion à l'électrode de terre).",[98,451,452,455],{},[19,453,454],{},"Accessibilité"," du tableau de distribution.",[24,457],{},[27,459,461],{"id":460},"contrôle-périodique","Contrôle périodique",[72,463,465],{"id":464},"tous-les-25-ans-obligatoire","Tous les 25 ans obligatoire",[15,467,468,469,472],{},"Les installations existantes sous la Partie 8 doivent subir un contrôle périodique tous les ",[19,470,471],{},"25 ans"," par un organisme de contrôle agréé.",[72,474,476],{"id":475},"lors-dun-changement-de-propriétaire","Lors d'un changement de propriétaire",[15,478,479,480,483],{},"Lors de la ",[19,481,482],{},"vente d'un bien immobilier",", une attestation de contrôle valide (de moins de 25 ans) est obligatoire. Si elle n'existe pas, un contrôle doit être effectué avant la vente.",[50,485,486],{},[15,487,488,491,492,495],{},[19,489,490],{},"Délai de 18 mois (Art. 8.4.2.2) :"," Lors de l'achat d'un bien immobilier avec un rapport de contrôle négatif, l'acheteur dispose de ",[19,493,494],{},"18 mois"," à compter de la date d'achat pour remédier aux défauts et faire effectuer un recontrôle.",[72,497,499],{"id":498},"que-vérifie-t-on-lors-du-contrôle-périodique","Que vérifie-t-on lors du contrôle périodique ?",[144,501,502,512],{},[147,503,504],{},[150,505,506,509],{},[153,507,508],{},"Point de contrôle",[153,510,511],{},"Évaluation",[160,513,514,522,530,538,546,554,562],{},[150,515,516,519],{},[165,517,518],{},"Inspection visuelle des câbles et connexions",[165,520,521],{},"Dommages, surchauffe",[150,523,524,527],{},[165,525,526],{},"Mesure de la résistance de terre",[165,528,529],{},"≤ 30 Ω (seuil réglementaire selon Art. 4.2.4.3b ; au-delà, des mesures de protection supplémentaires sont nécessaires)",[150,531,532,535],{},[165,533,534],{},"Mesure de la résistance d'isolement",[165,536,537],{},"> 0,5 MΩ",[150,539,540,543],{},[165,541,542],{},"Test RCD (si présent)",[165,544,545],{},"Temps et courant de déclenchement",[150,547,548,551],{},[165,549,550],{},"Vérification de la protection contre les courts-circuits",[165,552,553],{},"Fusibles \u002F disjoncteurs présents",[150,555,556,559],{},[165,557,558],{},"Protection contre les contacts directs",[165,560,561],{},"Couvercles, protection IP",[150,563,564,567],{},[165,565,566],{},"Documentation",[165,568,569],{},"Schéma unifilaire + plan de situation présents ?",[50,571,572],{},[15,573,574,234,576,579,580,583],{},[19,575,233],{},[19,577,578],{},"schéma unifilaire"," et un ",[19,581,582],{},"plan de situation"," doivent être disponibles — même s'ils doivent être établis rétroactivement.",[24,585],{},[27,587,589],{"id":588},"la-règle-de-contamination-lors-dune-rénovation-partielle","La règle de contamination lors d'une rénovation partielle",[15,591,592,593,265],{},"Un aspect particulièrement important pour les anciens bâtiments : la ",[19,594,595],{},"règle de contamination",[72,597,599],{"id":598},"comment-fonctionne-t-elle","Comment fonctionne-t-elle ?",[15,601,602,603,606],{},"Lorsque vous modifiez ",[19,604,605],{},"substantiellement"," une partie de votre installation (par ex. ajout de nouveaux circuits) :",[608,609,610,617,623],"ol",{},[98,611,612,613,616],{},"La ",[19,614,615],{},"nouvelle partie"," doit entièrement répondre au RGIE actuel.",[98,618,612,619,622],{},[19,620,621],{},"partie existante"," continue d'être évaluée selon la Partie 8.",[98,624,625,628],{},[19,626,627],{},"MAIS :"," Si la nouvelle partie « contamine » la partie existante (par ex. nouveaux câbles dans le même tableau), le contrôleur peut décider que l'ensemble du tableau doit répondre au RGIE actuel.",[72,630,632],{"id":631},"conséquences-pratiques","Conséquences pratiques :",[95,634,635,641,648],{},[98,636,637,638,265],{},"Planifiez les rénovations de manière à ce que les parties nouvelles et anciennes soient ",[19,639,640],{},"clairement séparées",[98,642,643,644,647],{},"Idéalement, un ",[19,645,646],{},"sous-tableau séparé"," pour les nouveaux circuits.",[98,649,650],{},"Documentez précisément ce qui est ancien et ce qui est nouveau.",[24,652],{},[27,654,656],{"id":655},"recommandation-modernisation-progressive","Recommandation : Modernisation progressive",[15,658,659,660,663],{},"Même si la Partie 8 tolère des dérogations, une ",[19,661,662],{},"modernisation progressive"," est recommandée :",[72,665,667],{"id":666},"priorité-1-critique-pour-la-sécurité","Priorité 1 (Critique pour la sécurité)",[95,669,670,673,676,679],{},[98,671,672],{},"Installer un différentiel principal 300 mA (s'il est absent)",[98,674,675],{},"Remplacer les câbles endommagés",[98,677,678],{},"Réparer les connexions desserrées",[98,680,681],{},"Vérifier et améliorer la mise à la terre si nécessaire",[72,683,685],{"id":684},"priorité-2-recommandé","Priorité 2 (Recommandé)",[95,687,688,691,694],{},[98,689,690],{},"Différentiels de groupe 30 mA pour salle de bain et cuisine",[98,692,693],{},"Remplacer les anciens fusibles par des disjoncteurs",[98,695,696],{},"Installer un parafoudre Type 2",[72,698,700],{"id":699},"priorité-3-confort-pérennité","Priorité 3 (Confort + pérennité)",[95,702,703,706,709],{},[98,704,705],{},"Moderniser le tableau (plus de rangées, étiquetage)",[98,707,708],{},"Installer des prises avec terre",[98,710,711],{},"Préparation pour borne de recharge \u002F installation PV",[72,713,715],{"id":714},"orientation-des-coûts","Orientation des coûts",[144,717,718,728],{},[147,719,720],{},[150,721,722,725],{},[153,723,724],{},"Mesure",[153,726,727],{},"Coût estimé",[160,729,730,738,746,754,762,770],{},[150,731,732,735],{},[165,733,734],{},"Installer différentiel principal 300 mA",[165,736,737],{},"150–300 EUR",[150,739,740,743],{},[165,741,742],{},"Différentiel de groupe 30 mA (par pièce)",[165,744,745],{},"80–150 EUR",[150,747,748,751],{},[165,749,750],{},"Parafoudre Type 2",[165,752,753],{},"100–250 EUR",[150,755,756,759],{},[165,757,758],{},"Set de disjoncteurs (10 pièces)",[165,760,761],{},"50–100 EUR",[150,763,764,767],{},[165,765,766],{},"Nouveau tableau 4 rangées (complet)",[165,768,769],{},"500–1.500 EUR",[150,771,772,775],{},[165,773,774],{},"Recâblage complet (maison)",[165,776,777],{},"5.000–15.000 EUR",[24,779],{},[27,781,783],{"id":782},"résumé","Résumé",[144,785,786,796],{},[147,787,788],{},[150,789,790,793],{},[153,791,792],{},"Question",[153,794,795],{},"Réponse",[160,797,798,806,814,822,830],{},[150,799,800,803],{},[165,801,802],{},"Mon ancien bâtiment doit-il répondre au RGIE actuel ?",[165,804,805],{},"Pas entièrement, la Partie 8 autorise des dérogations",[150,807,808,811],{},[165,809,810],{},"Ai-je besoin d'un différentiel 30 mA ?",[165,812,813],{},"Pas obligatoire sous Partie 8, mais fortement recommandé",[150,815,816,819],{},[165,817,818],{},"Les anciennes prises sans terre sont-elles autorisées ?",[165,820,821],{},"Sous conditions oui (pas de salle de bain, pas d'appareils classe I)",[150,823,824,827],{},[165,825,826],{},"À quelle fréquence faut-il contrôler ?",[165,828,829],{},"Tous les 25 ans + lors d'un changement de propriétaire",[150,831,832,835],{},[165,833,834],{},"Que se passe-t-il en cas de rénovation partielle ?",[165,836,837],{},"Nouvelle partie = RGIE actuel, ancienne = Partie 8 (règle de contamination)",[24,839],{},[27,841,843],{"id":842},"articles-connexes","Articles connexes",[95,845,846,853,859,865],{},[98,847,848],{},[849,850,852],"a",{"href":851},"\u002Ffr\u002Fblog\u002Fcontrole-electrique","Contrôle électrique en Belgique : Que vérifie-t-on ?",[98,854,855],{},[849,856,858],{"href":857},"\u002Ffr\u002Fblog\u002Frgie-2026-changements","Que change le RGIE 2026 ?",[98,860,861],{},[849,862,864],{"href":863},"\u002Ffr\u002Fblog\u002Fpreflex-vs-pose-libre","Preflex vs. pose libre",[98,866,867],{},[849,868,870],{"href":869},"\u002Ffr\u002Fblog\u002Fplanifier-tableau-electrique","Planifier un tableau électrique",[24,872],{},[15,874,875],{},[876,877,878,879,882,883],"em",{},"Même pour les anciens bâtiments, ",[19,880,881],{},"PlanElec"," crée des schémas unifilaires et des plans de situation conformes aux normes — les documents obligatoires pour chaque contrôle. Documentez votre installation dès maintenant en numérique. ",[849,884,886],{"href":885},"\u002F","Commencer gratuitement →",{"title":888,"searchDepth":889,"depth":889,"links":890},"",2,[891,892,898,906,910,915,919,925,926],{"id":29,"depth":889,"text":30},{"id":62,"depth":889,"text":63,"children":893},[894,896,897],{"id":74,"depth":895,"text":75},3,{"id":81,"depth":895,"text":82},{"id":92,"depth":895,"text":93},{"id":134,"depth":889,"text":135,"children":899},[900,901,902,903,904,905],{"id":141,"depth":895,"text":142},{"id":189,"depth":895,"text":190},{"id":241,"depth":895,"text":242},{"id":271,"depth":895,"text":272},{"id":281,"depth":895,"text":282},{"id":307,"depth":895,"text":308},{"id":316,"depth":889,"text":317,"children":907},[908,909],{"id":327,"depth":895,"text":328},{"id":425,"depth":895,"text":426},{"id":460,"depth":889,"text":461,"children":911},[912,913,914],{"id":464,"depth":895,"text":465},{"id":475,"depth":895,"text":476},{"id":498,"depth":895,"text":499},{"id":588,"depth":889,"text":589,"children":916},[917,918],{"id":598,"depth":895,"text":599},{"id":631,"depth":895,"text":632},{"id":655,"depth":889,"text":656,"children":920},[921,922,923,924],{"id":666,"depth":895,"text":667},{"id":684,"depth":895,"text":685},{"id":699,"depth":895,"text":700},{"id":714,"depth":895,"text":715},{"id":782,"depth":889,"text":783},{"id":842,"depth":889,"text":843},"guide","2026-04-14","Ce qui s'applique aux anciennes installations électriques en Belgique. RGIE Partie 8 expliqué : dérogations autorisées, contrôle périodique et conseils pour une modernisation progressive.","md","fr",{},true,"\u002Fblog\u002Fold-building-arei-part8.fr","8 min",12,{"title":5,"description":929},"ancien-rgie-part-8","blog\u002Fold-building-arei-part8.fr",[941,942,21,943,944,945,946],"ancien bâtiment","RGIE","installation existante","rénovation","contrôle","périodique","uPYhmrHk0H2zrnW2t52B5i74mpNM6ngQYiqTmjU6JJk",[949,1858,2764,3407],{"id":950,"title":951,"articleId":6,"body":952,"category":927,"date":928,"description":1842,"extension":930,"lastUpdated":928,"locale":1843,"meta":1844,"navigation":933,"path":1845,"publishDate":928,"readTime":935,"refreshInterval":936,"seo":1846,"slug":1847,"stem":1848,"tags":1849,"__hash__":1857},"blog\u002Fblog\u002Fold-building-arei-part8.de.md","Altbau und AREI Part 8: Sonderregeln für bestehende Installationen",{"type":8,"value":953,"toc":1805},[954,957,964,966,970,977,988,996,998,1002,1009,1013,1016,1020,1027,1031,1057,1065,1067,1071,1074,1078,1116,1120,1156,1168,1172,1175,1198,1202,1208,1212,1233,1237,1240,1242,1246,1253,1257,1351,1355,1358,1384,1386,1390,1394,1401,1405,1412,1424,1428,1497,1512,1514,1518,1524,1528,1535,1556,1560,1579,1581,1585,1592,1596,1610,1614,1625,1629,1640,1644,1700,1702,1706,1760,1762,1766,1792,1794],[11,955,951],{"id":956},"altbau-und-arei-part-8-sonderregeln-für-bestehende-installationen",[15,958,959,960,963],{},"Nicht jede Elektroinstallation in Belgien muss den neuesten AREI-Vorschriften entsprechen. Für ältere Gebäude gibt es mit ",[19,961,962],{},"Part 8 (Partie 8)"," ein eigenes Regelwerk, das bestimmte Abweichungen vom aktuellen Standard toleriert — solange keine unmittelbare Gefahr besteht. Dieser Artikel erklärt, wann Part 8 gilt, was erlaubt ist und wo die Grenzen liegen.",[24,965],{},[27,967,969],{"id":968},"was-ist-part-8","Was ist Part 8?",[15,971,972,973,976],{},"Part 8 des AREI (Allgemeines Reglement über die Elektrischen Installationen \u002F Règlement Général sur les Installations Électriques) ist eine ",[19,974,975],{},"Sonderregelung für bestehende Installationen",", die vor Inkrafttreten des aktuellen AREI errichtet und abgenommen wurden.",[15,978,979,980,983,984,987],{},"Das Grundprinzip: Solange eine Installation ",[19,981,982],{},"sicher"," funktioniert und ",[19,985,986],{},"keine unmittelbare Gefahr"," darstellt, muss sie nicht vollständig auf den neuesten Stand gebracht werden — auch wenn sie nicht allen aktuellen Vorschriften entspricht.",[50,989,990],{},[15,991,992,995],{},[19,993,994],{},"Wichtig:"," Part 8 ist kein Freibrief. Es definiert klar, welche Abweichungen toleriert werden und welche nicht.",[24,997],{},[27,999,1001],{"id":1000},"wann-gilt-part-8","Wann gilt Part 8?",[15,1003,1004,1005,1008],{},"Part 8 gilt für Installationen, die ",[19,1006,1007],{},"eine"," der folgenden Bedingungen erfüllen:",[72,1010,1012],{"id":1011},"bedingung-1-installation-vor-dem-01101981","Bedingung 1: Installation vor dem 01.10.1981",[15,1014,1015],{},"Installationen, die vor dem 1. Oktober 1981 errichtet wurden (Datum des Inkrafttretens des ursprünglichen AREI), fallen grundsätzlich unter Part 8.",[72,1017,1019],{"id":1018},"bedingung-2-unter-dem-alten-arei-abgenommen","Bedingung 2: Unter dem alten AREI abgenommen",[15,1021,1022,1023,1026],{},"Installationen, die unter einer früheren Version des AREI abgenommen wurden und seit der letzten Abnahme ",[19,1024,1025],{},"nicht wesentlich verändert"," wurden.",[72,1028,1030],{"id":1029},"was-zählt-als-wesentliche-änderung","Was zählt als „wesentliche Änderung\"?",[95,1032,1033,1039,1045,1051],{},[98,1034,1035,1036],{},"Hinzufügen ",[19,1037,1038],{},"neuer Stromkreise",[98,1040,1041,1042],{},"Erweiterung des ",[19,1043,1044],{},"Verteilerkastens",[98,1046,1047,1048],{},"Änderung der ",[19,1049,1050],{},"Zähleranlage",[98,1052,1053,1054],{},"Umfangreiche ",[19,1055,1056],{},"Umverdrahtung",[50,1058,1059],{},[15,1060,1061,1064],{},[19,1062,1063],{},"Achtung:"," Kleine Änderungen wie der Austausch einer Steckdose oder eines Schalters gelten NICHT als wesentliche Änderung.",[24,1066],{},[27,1068,1070],{"id":1069},"was-ist-unter-part-8-erlaubt-tolerierte-abweichungen","Was ist unter Part 8 erlaubt? (Tolerierte Abweichungen)",[15,1072,1073],{},"Die folgenden Punkte weichen vom aktuellen AREI ab, werden aber unter Part 8 bei der Kontrolle toleriert:",[72,1075,1077],{"id":1076},"_1-alte-kabeltypen","1. Alte Kabeltypen",[144,1079,1080,1090],{},[147,1081,1082],{},[150,1083,1084,1087],{},[153,1085,1086],{},"Aktuelles AREI",[153,1088,1089],{},"Part 8 toleriert",[160,1091,1092,1100,1108],{},[150,1093,1094,1097],{},[165,1095,1096],{},"XVB \u002F VOBst in Preflex",[165,1098,1099],{},"VOB-Kabel in alten Leerrohren",[150,1101,1102,1105],{},[165,1103,1104],{},"Cca-Brandschutzklasse",[165,1106,1107],{},"Ältere Kabeltypen ohne CPR-Klassifizierung",[150,1109,1110,1113],{},[165,1111,1112],{},"Mindestquerschnitt 2,5 mm² für Steckdosen",[165,1114,1115],{},"Mindestens 1 mm² bei Absicherung mit max. 6 A Sicherung oder 10 A Leitungsschutzschalter",[72,1117,1119],{"id":1118},"_2-fehlerstromschutzschalter-rcd-differenzialschalter","2. Fehlerstromschutzschalter (RCD \u002F Differenzialschalter)",[144,1121,1122,1130],{},[147,1123,1124],{},[150,1125,1126,1128],{},[153,1127,1086],{},[153,1129,1089],{},[160,1131,1132,1140,1148],{},[150,1133,1134,1137],{},[165,1135,1136],{},"30 mA RCD pro Steckdosenkreis",[165,1138,1139],{},"Kein 30 mA RCD nötig (nur 300 mA Haupt-RCD)",[150,1141,1142,1145],{},[165,1143,1144],{},"30 mA RCD für Badezimmer Pflicht",[165,1146,1147],{},"Toleriert ohne, wenn kein direktes Risiko",[150,1149,1150,1153],{},[165,1151,1152],{},"Max. 8 Kreise pro RCD",[165,1154,1155],{},"Mehr Kreise erlaubt",[50,1157,1158],{},[15,1159,1160,1163,1164,1167],{},[19,1161,1162],{},"Hinweis:"," Auch unter Part 8 wird ein ",[19,1165,1166],{},"300 mA Haupt-RCD"," empfohlen und bei Neuinstallation des Zählers oft vom Netzbetreiber vorausgesetzt.",[72,1169,1171],{"id":1170},"_3-steckdosen-ohne-erdungskontakt","3. Steckdosen ohne Erdungskontakt",[15,1173,1174],{},"Alte Steckdosen ohne Erdungsanschluss (die modernen belgischen Steckdosen sind Typ E mit Erdungsstift) werden unter Part 8 toleriert, sofern:",[95,1176,1177,1184,1195],{},[98,1178,1179,1180,1183],{},"Keine Geräte der ",[19,1181,1182],{},"Schutzklasse I"," (mit Metallgehäuse) angeschlossen werden.",[98,1185,1186,1187,1190,1191,1194],{},"Die Steckdose nicht im ",[19,1188,1189],{},"Badezimmer"," oder an ",[19,1192,1193],{},"feuchten Orten"," ist.",[98,1196,1197],{},"Der Stromkreis ansonsten intakt ist.",[72,1199,1201],{"id":1200},"_4-kein-spd-überspannungsschutz","4. Kein SPD (Überspannungsschutz)",[15,1203,1204,1205,265],{},"Das aktuelle AREI schreibt für Neuinstallationen einen SPD (Surge Protection Device) Typ 2 vor. Unter Part 8 ist das ",[19,1206,1207],{},"nicht erforderlich",[72,1209,1211],{"id":1210},"_5-alte-verteilertechnik","5. Alte Verteilertechnik",[95,1213,1214,1220,1226],{},[98,1215,1216,1219],{},[19,1217,1218],{},"Schmelzsicherungen"," statt MCBs sind erlaubt.",[98,1221,1222,1225],{},[19,1223,1224],{},"Drehsicherungen"," (Diazed) werden toleriert.",[98,1227,1228,1229,1232],{},"Fehlende ",[19,1230,1231],{},"Beschriftung"," wird als Mangel vermerkt, führt aber nicht zum Durchfallen.",[72,1234,1236],{"id":1235},"_6-keine-brandschutzklassifizierung-der-kabel","6. Keine Brandschutzklassifizierung der Kabel",[15,1238,1239],{},"Kabel ohne CPR-Klassifizierung (vor 2017 installiert) werden toleriert, da die CPR-Verordnung erst ab Juli 2017 für neue Installationen gilt.",[24,1241],{},[27,1243,1245],{"id":1244},"was-ist-nicht-erlaubt-auch-unter-part-8","Was ist NICHT erlaubt (auch unter Part 8)?",[15,1247,1248,1249,1252],{},"Bestimmte Zustände werden ",[19,1250,1251],{},"niemals toleriert",", unabhängig vom Alter der Installation:",[72,1254,1256],{"id":1255},"absolut-unzulässig","Absolut unzulässig:",[144,1258,1259,1269],{},[147,1260,1261],{},[150,1262,1263,1266],{},[153,1264,1265],{},"Zustand",[153,1267,1268],{},"Warum?",[160,1270,1271,1281,1291,1301,1311,1321,1331,1341],{},[150,1272,1273,1278],{},[165,1274,1275],{},[19,1276,1277],{},"Blanke oder beschädigte Kabel",[165,1279,1280],{},"Unmittelbare Stromschlaggefahr",[150,1282,1283,1288],{},[165,1284,1285],{},[19,1286,1287],{},"Fehlende Erdung komplett",[165,1289,1290],{},"Kein Schutz bei Isolationsfehler",[150,1292,1293,1298],{},[165,1294,1295],{},[19,1296,1297],{},"Wasser in Kontakt mit Elektrik",[165,1299,1300],{},"Lebensgefahr",[150,1302,1303,1308],{},[165,1304,1305],{},[19,1306,1307],{},"Zugängliche spannungsführende Teile",[165,1309,1310],{},"Direktes Berührungsrisiko",[150,1312,1313,1318],{},[165,1314,1315],{},[19,1316,1317],{},"Überhitzte Kabel oder Verbindungen",[165,1319,1320],{},"Brandgefahr",[150,1322,1323,1328],{},[165,1324,1325],{},[19,1326,1327],{},"Lose Verbindungen in Verteilerdosen",[165,1329,1330],{},"Lichtbogen-\u002FBrandgefahr",[150,1332,1333,1338],{},[165,1334,1335],{},[19,1336,1337],{},"Abzweigdosen ohne Deckel",[165,1339,1340],{},"Berührungsschutz fehlt",[150,1342,1343,1348],{},[165,1344,1345],{},[19,1346,1347],{},"Badezimmer-Steckdose in Zone 0 oder 1",[165,1349,1350],{},"Lebensgefahr, auch unter Part 8 verboten",[72,1352,1354],{"id":1353},"sicherheitsrelevante-mindestanforderungen","Sicherheitsrelevante Mindestanforderungen:",[15,1356,1357],{},"Auch unter Part 8 muss gewährleistet sein:",[95,1359,1360,1366,1372,1378],{},[98,1361,1362,1365],{},[19,1363,1364],{},"Ausreichender Querschnitt"," für die tatsächliche Belastung (kein überlastetes 0,75 mm²-Kabel).",[98,1367,1368,1371],{},[19,1369,1370],{},"Funktionierende Sicherungen"," (keine „gebrückten\" Sicherungen).",[98,1373,1374,1377],{},[19,1375,1376],{},"Erdung des Hauptverteilers"," (Verbindung zur Erdungselektrode).",[98,1379,1380,1383],{},[19,1381,1382],{},"Zugänglichkeit"," des Verteilerkastens.",[24,1385],{},[27,1387,1389],{"id":1388},"periodische-kontrolle","Periodische Kontrolle",[72,1391,1393],{"id":1392},"alle-25-jahre-pflicht","Alle 25 Jahre Pflicht",[15,1395,1396,1397,1400],{},"Bestehende Installationen unter Part 8 müssen alle ",[19,1398,1399],{},"25 Jahre"," einer periodischen Kontrolle durch einen zugelassenen Kontrollorganismus unterzogen werden.",[72,1402,1404],{"id":1403},"bei-eigentümerwechsel","Bei Eigentümerwechsel",[15,1406,1407,1408,1411],{},"Bei ",[19,1409,1410],{},"Verkauf einer Immobilie"," ist eine gültige Kontrollbescheinigung (weniger als 25 Jahre alt) Pflicht. Liegt keine vor, muss vor dem Verkauf eine Kontrolle durchgeführt werden.",[50,1413,1414],{},[15,1415,1416,1419,1420,1423],{},[19,1417,1418],{},"18-Monate-Frist (Art. 8.4.2.2):"," Bei Kauf einer Immobilie mit negativem Prüfbericht hat der Käufer ",[19,1421,1422],{},"18 Monate"," ab Kaufdatum, um die Mängel zu beheben und eine Nachkontrolle durchführen zu lassen.",[72,1425,1427],{"id":1426},"was-wird-bei-der-periodischen-kontrolle-geprüft","Was wird bei der periodischen Kontrolle geprüft?",[144,1429,1430,1440],{},[147,1431,1432],{},[150,1433,1434,1437],{},[153,1435,1436],{},"Prüfpunkt",[153,1438,1439],{},"Beurteilung",[160,1441,1442,1450,1458,1465,1473,1481,1489],{},[150,1443,1444,1447],{},[165,1445,1446],{},"Sichtprüfung der Kabel und Verbindungen",[165,1448,1449],{},"Beschädigung, Überhitzung",[150,1451,1452,1455],{},[165,1453,1454],{},"Erdungswiderstand messen",[165,1456,1457],{},"≤ 30 Ω (regulatorische Schwelle gemäß Art. 4.2.4.3b; darüber zusätzliche Schutzmaßnahmen nötig)",[150,1459,1460,1463],{},[165,1461,1462],{},"Isolationswiderstand messen",[165,1464,537],{},[150,1466,1467,1470],{},[165,1468,1469],{},"RCD-Test (falls vorhanden)",[165,1471,1472],{},"Auslösezeit und -strom",[150,1474,1475,1478],{},[165,1476,1477],{},"Kurzschlussschutz prüfen",[165,1479,1480],{},"Sicherungen \u002F MCBs vorhanden",[150,1482,1483,1486],{},[165,1484,1485],{},"Schutz gegen direktes Berühren",[165,1487,1488],{},"Abdeckungen, IP-Schutz",[150,1490,1491,1494],{},[165,1492,1493],{},"Dokumentation",[165,1495,1496],{},"Eindrahtschema + Situationsplan vorhanden?",[50,1498,1499],{},[15,1500,1501,1503,1504,1507,1508,1511],{},[19,1502,1162],{}," Auch unter Part 8 müssen ein ",[19,1505,1506],{},"Eindrahtschema"," und ein ",[19,1509,1510],{},"Situationsplan"," vorhanden sein — auch wenn diese nachträglich erstellt werden müssen.",[24,1513],{},[27,1515,1517],{"id":1516},"die-kontaminationsregel-bei-teilrenovierung","Die Kontaminationsregel bei Teilrenovierung",[15,1519,1520,1521,265],{},"Ein besonders wichtiger Aspekt bei Altbauten: die sogenannte ",[19,1522,1523],{},"Kontaminationsregel",[72,1525,1527],{"id":1526},"wie-funktioniert-sie","Wie funktioniert sie?",[15,1529,1530,1531,1534],{},"Wenn Sie einen Teil Ihrer Installation ",[19,1532,1533],{},"wesentlich verändern"," (z. B. neue Stromkreise hinzufügen), gilt:",[608,1536,1537,1544,1550],{},[98,1538,1539,1540,1543],{},"Der ",[19,1541,1542],{},"neue Teil"," muss vollständig dem aktuellen AREI entsprechen.",[98,1545,1539,1546,1549],{},[19,1547,1548],{},"bestehende Teil"," wird weiterhin nach Part 8 beurteilt.",[98,1551,1552,1555],{},[19,1553,1554],{},"ABER:"," Wenn der neue Teil den bestehenden Teil „kontaminiert\" (z. B. neue Kabel im selben Verteiler), kann der Kontrolleur entscheiden, dass der gesamte Verteiler dem aktuellen AREI entsprechen muss.",[72,1557,1559],{"id":1558},"praktische-konsequenz","Praktische Konsequenz:",[95,1561,1562,1569,1576],{},[98,1563,1564,1565,1568],{},"Planen Sie Renovierungen so, dass neue und alte Teile ",[19,1566,1567],{},"klar getrennt"," sind.",[98,1570,1571,1572,1575],{},"Idealerweise einen ",[19,1573,1574],{},"separaten Unterverteiler"," für neue Stromkreise.",[98,1577,1578],{},"Dokumentieren Sie genau, was alt und was neu ist.",[24,1580],{},[27,1582,1584],{"id":1583},"empfehlung-schrittweise-modernisierung","Empfehlung: Schrittweise Modernisierung",[15,1586,1587,1588,1591],{},"Auch wenn Part 8 Abweichungen toleriert, empfiehlt sich eine ",[19,1589,1590],{},"schrittweise Modernisierung",":",[72,1593,1595],{"id":1594},"priorität-1-sicherheitskritisch","Priorität 1 (Sicherheitskritisch)",[95,1597,1598,1601,1604,1607],{},[98,1599,1600],{},"300 mA Haupt-RCD nachrüsten (falls nicht vorhanden)",[98,1602,1603],{},"Beschädigte Kabel ersetzen",[98,1605,1606],{},"Lose Verbindungen beheben",[98,1608,1609],{},"Erdung prüfen und ggf. verbessern",[72,1611,1613],{"id":1612},"priorität-2-empfohlen","Priorität 2 (Empfohlen)",[95,1615,1616,1619,1622],{},[98,1617,1618],{},"30 mA Gruppen-RCDs für Badezimmer und Küche",[98,1620,1621],{},"Alte Schmelzsicherungen durch MCBs ersetzen",[98,1623,1624],{},"SPD Typ 2 nachrüsten",[72,1626,1628],{"id":1627},"priorität-3-komfort-zukunftssicherheit","Priorität 3 (Komfort + Zukunftssicherheit)",[95,1630,1631,1634,1637],{},[98,1632,1633],{},"Verteiler modernisieren (mehr Reihen, Beschriftung)",[98,1635,1636],{},"Steckdosen mit Erdung nachrüsten",[98,1638,1639],{},"Vorbereitung für Wallbox \u002F PV-Anlage",[72,1641,1643],{"id":1642},"kostenorientierung","Kostenorientierung",[144,1645,1646,1656],{},[147,1647,1648],{},[150,1649,1650,1653],{},[153,1651,1652],{},"Maßnahme",[153,1654,1655],{},"Geschätzte Kosten",[160,1657,1658,1665,1672,1679,1686,1693],{},[150,1659,1660,1663],{},[165,1661,1662],{},"300 mA Haupt-RCD nachrüsten",[165,1664,737],{},[150,1666,1667,1670],{},[165,1668,1669],{},"30 mA Gruppen-RCD (pro Stück)",[165,1671,745],{},[150,1673,1674,1677],{},[165,1675,1676],{},"SPD Typ 2",[165,1678,753],{},[150,1680,1681,1684],{},[165,1682,1683],{},"MCB-Set (10 Stück)",[165,1685,761],{},[150,1687,1688,1691],{},[165,1689,1690],{},"Neuer 4-Reihen-Verteiler (komplett)",[165,1692,769],{},[150,1694,1695,1698],{},[165,1696,1697],{},"Vollständige Neuverkabelung (EFH)",[165,1699,777],{},[24,1701],{},[27,1703,1705],{"id":1704},"zusammenfassung","Zusammenfassung",[144,1707,1708,1718],{},[147,1709,1710],{},[150,1711,1712,1715],{},[153,1713,1714],{},"Frage",[153,1716,1717],{},"Antwort",[160,1719,1720,1728,1736,1744,1752],{},[150,1721,1722,1725],{},[165,1723,1724],{},"Muss mein Altbau dem aktuellen AREI entsprechen?",[165,1726,1727],{},"Nicht vollständig, Part 8 erlaubt Abweichungen",[150,1729,1730,1733],{},[165,1731,1732],{},"Brauche ich einen 30 mA RCD?",[165,1734,1735],{},"Unter Part 8 nicht Pflicht, aber dringend empfohlen",[150,1737,1738,1741],{},[165,1739,1740],{},"Sind alte Steckdosen ohne Erdung erlaubt?",[165,1742,1743],{},"Unter Bedingungen ja (kein Badezimmer, keine Schutzklasse-I-Geräte)",[150,1745,1746,1749],{},[165,1747,1748],{},"Wie oft muss kontrolliert werden?",[165,1750,1751],{},"Alle 25 Jahre + bei Eigentümerwechsel",[150,1753,1754,1757],{},[165,1755,1756],{},"Was passiert bei Teilrenovierung?",[165,1758,1759],{},"Neuer Teil = aktuelles AREI, alter Teil = Part 8 (Kontaminationsregel beachten)",[24,1761],{},[27,1763,1765],{"id":1764},"verwandte-artikel","Verwandte Artikel",[95,1767,1768,1774,1780,1786],{},[98,1769,1770],{},[849,1771,1773],{"href":1772},"\u002Fde\u002Fblog\u002Felektrische-kontrolle","Elektrische Kontrolle in Belgien: Was wird geprüft?",[98,1775,1776],{},[849,1777,1779],{"href":1778},"\u002Fde\u002Fblog\u002Farei-2026-aenderungen","Was ändert sich mit dem AREI 2026?",[98,1781,1782],{},[849,1783,1785],{"href":1784},"\u002Fde\u002Fblog\u002Fpreflex-vs-freie-verlegung","Preflex vs. freie Verlegung",[98,1787,1788],{},[849,1789,1791],{"href":1790},"\u002Fde\u002Fblog\u002Fschaltschrank-planen-aufbau","Schaltschrank planen",[24,1793],{},[15,1795,1796],{},[876,1797,1798,1799,1801,1802],{},"Auch für Altbauten erstellt ",[19,1800,881],{}," normgerechte Eindrahtschemas und Situationspläne — die Pflichtdokumente für jede Kontrolle. Dokumentieren Sie Ihre Installation jetzt digital. ",[849,1803,1804],{"href":885},"Kostenlos starten →",{"title":888,"searchDepth":889,"depth":889,"links":1806},[1807,1808,1813,1821,1825,1830,1834,1840,1841],{"id":968,"depth":889,"text":969},{"id":1000,"depth":889,"text":1001,"children":1809},[1810,1811,1812],{"id":1011,"depth":895,"text":1012},{"id":1018,"depth":895,"text":1019},{"id":1029,"depth":895,"text":1030},{"id":1069,"depth":889,"text":1070,"children":1814},[1815,1816,1817,1818,1819,1820],{"id":1076,"depth":895,"text":1077},{"id":1118,"depth":895,"text":1119},{"id":1170,"depth":895,"text":1171},{"id":1200,"depth":895,"text":1201},{"id":1210,"depth":895,"text":1211},{"id":1235,"depth":895,"text":1236},{"id":1244,"depth":889,"text":1245,"children":1822},[1823,1824],{"id":1255,"depth":895,"text":1256},{"id":1353,"depth":895,"text":1354},{"id":1388,"depth":889,"text":1389,"children":1826},[1827,1828,1829],{"id":1392,"depth":895,"text":1393},{"id":1403,"depth":895,"text":1404},{"id":1426,"depth":895,"text":1427},{"id":1516,"depth":889,"text":1517,"children":1831},[1832,1833],{"id":1526,"depth":895,"text":1527},{"id":1558,"depth":895,"text":1559},{"id":1583,"depth":889,"text":1584,"children":1835},[1836,1837,1838,1839],{"id":1594,"depth":895,"text":1595},{"id":1612,"depth":895,"text":1613},{"id":1627,"depth":895,"text":1628},{"id":1642,"depth":895,"text":1643},{"id":1704,"depth":889,"text":1705},{"id":1764,"depth":889,"text":1765},"Was bei älteren Elektroinstallationen in Belgien gilt. AREI Part 8 erklärt: erlaubte Abweichungen, periodische Kontrolle und Tipps zur schrittweisen Modernisierung.","de",{},"\u002Fblog\u002Fold-building-arei-part8.de",{"title":951,"description":1842},"altbau-arei-part-8","blog\u002Fold-building-arei-part8.de",[1850,1851,1852,1853,1854,1855,1856],"altbau","AREI","Part 8","bestandsinstallation","renovierung","kontrolle","periodisch","_TLbU6gMz55zQGkPR7gfITgAejwEoqotZeHQPVySPXM",{"id":1859,"title":1860,"articleId":6,"body":1861,"category":927,"date":928,"description":2750,"extension":930,"lastUpdated":928,"locale":2751,"meta":2752,"navigation":933,"path":2753,"publishDate":928,"readTime":935,"refreshInterval":936,"seo":2754,"slug":2755,"stem":2756,"tags":2757,"__hash__":2763},"blog\u002Fblog\u002Fold-building-arei-part8.en.md","Old Buildings and AREI Part 8: Special Rules for Existing Installations",{"type":8,"value":1862,"toc":2713},[1863,1866,1872,1874,1878,1885,1896,1904,1906,1910,1917,1921,1924,1928,1935,1939,1965,1973,1975,1979,1982,1986,2023,2027,2063,2074,2078,2081,2103,2107,2113,2117,2138,2142,2145,2147,2151,2158,2162,2256,2260,2263,2289,2291,2295,2299,2306,2310,2317,2329,2333,2402,2416,2418,2422,2428,2432,2439,2460,2464,2482,2484,2488,2495,2499,2513,2517,2528,2532,2543,2547,2609,2611,2615,2668,2670,2674,2700,2702],[11,1864,1860],{"id":1865},"old-buildings-and-arei-part-8-special-rules-for-existing-installations",[15,1867,1868,1869,1871],{},"Not every electrical installation in Belgium needs to comply with the latest AREI\u002FRGIE regulations. For older buildings, ",[19,1870,962],{}," provides a dedicated set of rules that tolerates certain deviations from the current standard — as long as no immediate danger exists. This article explains when Part 8 applies, what is permitted, and where the limits lie.",[24,1873],{},[27,1875,1877],{"id":1876},"what-is-part-8","What Is Part 8?",[15,1879,1880,1881,1884],{},"Part 8 of the AREI (Algemeen Reglement op de Elektrische Installaties \u002F Règlement Général sur les Installations Électriques) is a ",[19,1882,1883],{},"special regulation for existing installations"," that were constructed and approved before the current AREI came into force.",[15,1886,1887,1888,1891,1892,1895],{},"The basic principle: as long as an installation functions ",[19,1889,1890],{},"safely"," and poses ",[19,1893,1894],{},"no immediate danger",", it does not need to be fully brought up to the latest standards — even if it does not meet all current requirements.",[50,1897,1898],{},[15,1899,1900,1903],{},[19,1901,1902],{},"Important:"," Part 8 is not a free pass. It clearly defines which deviations are tolerated and which are not.",[24,1905],{},[27,1907,1909],{"id":1908},"when-does-part-8-apply","When Does Part 8 Apply?",[15,1911,1912,1913,1916],{},"Part 8 applies to installations that meet ",[19,1914,1915],{},"one"," of the following conditions:",[72,1918,1920],{"id":1919},"condition-1-installation-before-01101981","Condition 1: Installation Before 01.10.1981",[15,1922,1923],{},"Installations constructed before 1 October 1981 (the date the original AREI came into force) fall under Part 8 by default.",[72,1925,1927],{"id":1926},"condition-2-approved-under-the-old-arei","Condition 2: Approved Under the Old AREI",[15,1929,1930,1931,1934],{},"Installations that were approved under a previous version of the AREI and have ",[19,1932,1933],{},"not been substantially modified"," since the last approval.",[72,1936,1938],{"id":1937},"what-counts-as-a-substantial-modification","What Counts as a \"Substantial Modification\"?",[95,1940,1941,1947,1953,1959],{},[98,1942,1943,1944],{},"Adding ",[19,1945,1946],{},"new circuits",[98,1948,1949,1950],{},"Expanding the ",[19,1951,1952],{},"distribution board",[98,1954,1955,1956],{},"Modifying the ",[19,1957,1958],{},"metering installation",[98,1960,1961,1962],{},"Extensive ",[19,1963,1964],{},"rewiring",[50,1966,1967],{},[15,1968,1969,1972],{},[19,1970,1971],{},"Note:"," Small changes such as replacing a socket outlet or switch do NOT count as a substantial modification.",[24,1974],{},[27,1976,1978],{"id":1977},"what-is-permitted-under-part-8-tolerated-deviations","What Is Permitted Under Part 8? (Tolerated Deviations)",[15,1980,1981],{},"The following points deviate from the current AREI but are tolerated under Part 8 during inspection:",[72,1983,1985],{"id":1984},"_1-old-cable-types","1. Old Cable Types",[144,1987,1988,1998],{},[147,1989,1990],{},[150,1991,1992,1995],{},[153,1993,1994],{},"Current AREI",[153,1996,1997],{},"Part 8 tolerates",[160,1999,2000,2007,2015],{},[150,2001,2002,2004],{},[165,2003,1096],{},[165,2005,2006],{},"VOB cables in old conduits",[150,2008,2009,2012],{},[165,2010,2011],{},"Cca fire reaction class",[165,2013,2014],{},"Older cable types without CPR classification",[150,2016,2017,2020],{},[165,2018,2019],{},"Minimum cross-section 2.5 mm² for sockets",[165,2021,2022],{},"Minimum 1 mm² with max. 6A fuse or 10A MCB (Art. 8.2.1 Nr. 5)",[72,2024,2026],{"id":2025},"_2-residual-current-devices-rcd","2. Residual Current Devices (RCD)",[144,2028,2029,2037],{},[147,2030,2031],{},[150,2032,2033,2035],{},[153,2034,1994],{},[153,2036,1997],{},[160,2038,2039,2047,2055],{},[150,2040,2041,2044],{},[165,2042,2043],{},"30 mA RCD per socket circuit",[165,2045,2046],{},"No 30 mA RCD needed (only 300 mA main RCD)",[150,2048,2049,2052],{},[165,2050,2051],{},"30 mA RCD mandatory for bathroom",[165,2053,2054],{},"Tolerated without, if no direct risk",[150,2056,2057,2060],{},[165,2058,2059],{},"Max. 8 circuits per RCD",[165,2061,2062],{},"More circuits permitted",[50,2064,2065],{},[15,2066,2067,2069,2070,2073],{},[19,2068,1971],{}," Even under Part 8, a ",[19,2071,2072],{},"300 mA main RCD"," is recommended and often required by the grid operator when a new meter is installed.",[72,2075,2077],{"id":2076},"_3-socket-outlets-without-earth-contact","3. Socket Outlets Without Earth Contact",[15,2079,2080],{},"Old socket outlets (type C, without earth pin) are tolerated under Part 8, provided that:",[95,2082,2083,2090,2100],{},[98,2084,2085,2086,2089],{},"No ",[19,2087,2088],{},"Class I"," appliances (with metal housing) are connected.",[98,2091,2092,2093,2096,2097,265],{},"The socket is not in the ",[19,2094,2095],{},"bathroom"," or in a ",[19,2098,2099],{},"damp location",[98,2101,2102],{},"The circuit is otherwise intact.",[72,2104,2106],{"id":2105},"_4-no-spd-surge-protection","4. No SPD (Surge Protection)",[15,2108,2109,2110,265],{},"The current AREI requires a Type 2 SPD (Surge Protection Device) for new installations. Under Part 8, this is ",[19,2111,2112],{},"not required",[72,2114,2116],{"id":2115},"_5-old-distribution-technology","5. Old Distribution Technology",[95,2118,2119,2125,2131],{},[98,2120,2121,2124],{},[19,2122,2123],{},"Fuses"," instead of MCBs are permitted.",[98,2126,2127,2130],{},[19,2128,2129],{},"Screw-type fuses"," (Diazed) are tolerated.",[98,2132,2133,2134,2137],{},"Missing ",[19,2135,2136],{},"labelling"," is noted as a deficiency but does not cause a failure.",[72,2139,2141],{"id":2140},"_6-no-fire-reaction-classification-of-cables","6. No Fire Reaction Classification of Cables",[15,2143,2144],{},"Cables without CPR classification (installed before 2017) are tolerated, as the CPR regulation only applies from July 2017 for new installations.",[24,2146],{},[27,2148,2150],{"id":2149},"what-is-not-permitted-even-under-part-8","What Is NOT Permitted (Even Under Part 8)?",[15,2152,2153,2154,2157],{},"Certain conditions are ",[19,2155,2156],{},"never tolerated",", regardless of the installation's age:",[72,2159,2161],{"id":2160},"absolutely-impermissible","Absolutely Impermissible:",[144,2163,2164,2174],{},[147,2165,2166],{},[150,2167,2168,2171],{},[153,2169,2170],{},"Condition",[153,2172,2173],{},"Why?",[160,2175,2176,2186,2196,2206,2216,2226,2236,2246],{},[150,2177,2178,2183],{},[165,2179,2180],{},[19,2181,2182],{},"Bare or damaged cables",[165,2184,2185],{},"Immediate electrocution risk",[150,2187,2188,2193],{},[165,2189,2190],{},[19,2191,2192],{},"Complete absence of earthing",[165,2194,2195],{},"No protection in case of insulation fault",[150,2197,2198,2203],{},[165,2199,2200],{},[19,2201,2202],{},"Water in contact with electrics",[165,2204,2205],{},"Danger to life",[150,2207,2208,2213],{},[165,2209,2210],{},[19,2211,2212],{},"Accessible live parts",[165,2214,2215],{},"Direct contact risk",[150,2217,2218,2223],{},[165,2219,2220],{},[19,2221,2222],{},"Overheated cables or connections",[165,2224,2225],{},"Fire risk",[150,2227,2228,2233],{},[165,2229,2230],{},[19,2231,2232],{},"Loose connections in junction boxes",[165,2234,2235],{},"Arc\u002Ffire risk",[150,2237,2238,2243],{},[165,2239,2240],{},[19,2241,2242],{},"Junction boxes without covers",[165,2244,2245],{},"Contact protection missing",[150,2247,2248,2253],{},[165,2249,2250],{},[19,2251,2252],{},"Bathroom socket in zone 0 or 1",[165,2254,2255],{},"Danger to life, prohibited even under Part 8",[72,2257,2259],{"id":2258},"safety-related-minimum-requirements","Safety-Related Minimum Requirements:",[15,2261,2262],{},"Even under Part 8, the following must be ensured:",[95,2264,2265,2271,2277,2283],{},[98,2266,2267,2270],{},[19,2268,2269],{},"Adequate cross-section"," for the actual load (no overloaded 0.75 mm² cable).",[98,2272,2273,2276],{},[19,2274,2275],{},"Functioning fuses"," (no \"bridged\" fuses).",[98,2278,2279,2282],{},[19,2280,2281],{},"Earthing of the main board"," (connection to earth electrode).",[98,2284,2285,2288],{},[19,2286,2287],{},"Accessibility"," of the distribution board.",[24,2290],{},[27,2292,2294],{"id":2293},"periodic-inspection","Periodic Inspection",[72,2296,2298],{"id":2297},"every-25-years-mandatory","Every 25 Years Mandatory",[15,2300,2301,2302,2305],{},"Existing installations under Part 8 must undergo a periodic inspection every ",[19,2303,2304],{},"25 years"," by an approved control body.",[72,2307,2309],{"id":2308},"on-change-of-ownership","On Change of Ownership",[15,2311,2312,2313,2316],{},"When ",[19,2314,2315],{},"selling a property",", a valid inspection certificate (less than 25 years old) is mandatory. If none exists, an inspection must be carried out before the sale.",[50,2318,2319],{},[15,2320,2321,2324,2325,2328],{},[19,2322,2323],{},"18-month deadline (Art. 8.4.2.2):"," When purchasing a property with a negative inspection report, the buyer has ",[19,2326,2327],{},"18 months"," from the purchase date to remedy the defects and have a re-inspection carried out.",[72,2330,2332],{"id":2331},"what-is-checked-during-the-periodic-inspection","What Is Checked During the Periodic Inspection?",[144,2334,2335,2345],{},[147,2336,2337],{},[150,2338,2339,2342],{},[153,2340,2341],{},"Inspection Point",[153,2343,2344],{},"Assessment",[160,2346,2347,2355,2363,2371,2379,2387,2395],{},[150,2348,2349,2352],{},[165,2350,2351],{},"Visual inspection of cables and connections",[165,2353,2354],{},"Damage, overheating",[150,2356,2357,2360],{},[165,2358,2359],{},"Earth resistance measurement",[165,2361,2362],{},"≤ 30 Ohm (regulatory threshold per Art. 4.2.4.3b; above this, additional protective measures required)",[150,2364,2365,2368],{},[165,2366,2367],{},"Insulation resistance measurement",[165,2369,2370],{},"> 0.5 MOhm",[150,2372,2373,2376],{},[165,2374,2375],{},"RCD test (if present)",[165,2377,2378],{},"Trip time and current",[150,2380,2381,2384],{},[165,2382,2383],{},"Short-circuit protection check",[165,2385,2386],{},"Fuses \u002F MCBs present",[150,2388,2389,2392],{},[165,2390,2391],{},"Protection against direct contact",[165,2393,2394],{},"Covers, IP protection",[150,2396,2397,2399],{},[165,2398,566],{},[165,2400,2401],{},"Single-line diagram + situation plan present?",[50,2403,2404],{},[15,2405,2406,2069,2408,2411,2412,2415],{},[19,2407,1971],{},[19,2409,2410],{},"single-line diagram"," and a ",[19,2413,2414],{},"situation plan"," must be available — even if they need to be created retrospectively.",[24,2417],{},[27,2419,2421],{"id":2420},"the-contamination-rule-for-partial-renovations","The Contamination Rule for Partial Renovations",[15,2423,2424,2425,265],{},"A particularly important aspect for old buildings: the so-called ",[19,2426,2427],{},"contamination rule",[72,2429,2431],{"id":2430},"how-does-it-work","How Does It Work?",[15,2433,2434,2435,2438],{},"When you ",[19,2436,2437],{},"substantially modify"," part of your installation (e.g., adding new circuits):",[608,2440,2441,2448,2454],{},[98,2442,2443,2444,2447],{},"The ",[19,2445,2446],{},"new part"," must fully comply with the current AREI.",[98,2449,2443,2450,2453],{},[19,2451,2452],{},"existing part"," continues to be assessed under Part 8.",[98,2455,2456,2459],{},[19,2457,2458],{},"BUT:"," If the new part \"contaminates\" the existing part (e.g., new cables in the same distribution board), the inspector may decide that the entire board must comply with the current AREI.",[72,2461,2463],{"id":2462},"practical-consequences","Practical Consequences:",[95,2465,2466,2472,2479],{},[98,2467,2468,2469,265],{},"Plan renovations so that new and old parts are ",[19,2470,2471],{},"clearly separated",[98,2473,2474,2475,2478],{},"Ideally, use a ",[19,2476,2477],{},"separate sub-board"," for new circuits.",[98,2480,2481],{},"Document precisely what is old and what is new.",[24,2483],{},[27,2485,2487],{"id":2486},"recommendation-gradual-modernisation","Recommendation: Gradual Modernisation",[15,2489,2490,2491,2494],{},"Even though Part 8 tolerates deviations, ",[19,2492,2493],{},"gradual modernisation"," is recommended:",[72,2496,2498],{"id":2497},"priority-1-safety-critical","Priority 1 (Safety-Critical)",[95,2500,2501,2504,2507,2510],{},[98,2502,2503],{},"Retrofit a 300 mA main RCD (if not present)",[98,2505,2506],{},"Replace damaged cables",[98,2508,2509],{},"Fix loose connections",[98,2511,2512],{},"Check and improve earthing if necessary",[72,2514,2516],{"id":2515},"priority-2-recommended","Priority 2 (Recommended)",[95,2518,2519,2522,2525],{},[98,2520,2521],{},"30 mA group RCDs for bathroom and kitchen",[98,2523,2524],{},"Replace old fuses with MCBs",[98,2526,2527],{},"Retrofit SPD Type 2",[72,2529,2531],{"id":2530},"priority-3-comfort-future-proofing","Priority 3 (Comfort + Future-Proofing)",[95,2533,2534,2537,2540],{},[98,2535,2536],{},"Modernise the board (more rows, labelling)",[98,2538,2539],{},"Retrofit socket outlets with earth",[98,2541,2542],{},"Preparation for EV charger \u002F PV system",[72,2544,2546],{"id":2545},"cost-orientation","Cost Orientation",[144,2548,2549,2559],{},[147,2550,2551],{},[150,2552,2553,2556],{},[153,2554,2555],{},"Measure",[153,2557,2558],{},"Estimated Cost",[160,2560,2561,2569,2577,2585,2593,2601],{},[150,2562,2563,2566],{},[165,2564,2565],{},"Retrofit 300 mA main RCD",[165,2567,2568],{},"EUR 150–300",[150,2570,2571,2574],{},[165,2572,2573],{},"30 mA group RCD (each)",[165,2575,2576],{},"EUR 80–150",[150,2578,2579,2582],{},[165,2580,2581],{},"SPD Type 2",[165,2583,2584],{},"EUR 100–250",[150,2586,2587,2590],{},[165,2588,2589],{},"MCB set (10 pieces)",[165,2591,2592],{},"EUR 50–100",[150,2594,2595,2598],{},[165,2596,2597],{},"New 4-row board (complete)",[165,2599,2600],{},"EUR 500–1,500",[150,2602,2603,2606],{},[165,2604,2605],{},"Complete rewiring (house)",[165,2607,2608],{},"EUR 5,000–15,000",[24,2610],{},[27,2612,2614],{"id":2613},"summary","Summary",[144,2616,2617,2626],{},[147,2618,2619],{},[150,2620,2621,2623],{},[153,2622,792],{},[153,2624,2625],{},"Answer",[160,2627,2628,2636,2644,2652,2660],{},[150,2629,2630,2633],{},[165,2631,2632],{},"Does my old building need to comply with the current AREI?",[165,2634,2635],{},"Not fully, Part 8 permits deviations",[150,2637,2638,2641],{},[165,2639,2640],{},"Do I need a 30 mA RCD?",[165,2642,2643],{},"Not mandatory under Part 8, but strongly recommended",[150,2645,2646,2649],{},[165,2647,2648],{},"Are old sockets without earth permitted?",[165,2650,2651],{},"Under conditions yes (no bathroom, no Class I appliances)",[150,2653,2654,2657],{},[165,2655,2656],{},"How often must inspections take place?",[165,2658,2659],{},"Every 25 years + on change of ownership",[150,2661,2662,2665],{},[165,2663,2664],{},"What about partial renovation?",[165,2666,2667],{},"New part = current AREI, old part = Part 8 (contamination rule applies)",[24,2669],{},[27,2671,2673],{"id":2672},"related-articles","Related Articles",[95,2675,2676,2682,2688,2694],{},[98,2677,2678],{},[849,2679,2681],{"href":2680},"\u002Fen\u002Fblog\u002Felectrical-inspection","Electrical Inspection in Belgium: What Is Checked?",[98,2683,2684],{},[849,2685,2687],{"href":2686},"\u002Fen\u002Fblog\u002Farei-2026-changes","What Changes with the AREI 2026?",[98,2689,2690],{},[849,2691,2693],{"href":2692},"\u002Fen\u002Fblog\u002Fpreflex-vs-open-wiring","Preflex vs. Open Wiring",[98,2695,2696],{},[849,2697,2699],{"href":2698},"\u002Fen\u002Fblog\u002Fdistribution-board-planning-guide","Distribution Board Planning",[24,2701],{},[15,2703,2704],{},[876,2705,2706,2707,2709,2710],{},"Even for old buildings, ",[19,2708,881],{}," creates standards-compliant single-line diagrams and situation plans — the mandatory documents for every inspection. Document your installation digitally now. ",[849,2711,2712],{"href":885},"Start for free →",{"title":888,"searchDepth":889,"depth":889,"links":2714},[2715,2716,2721,2729,2733,2738,2742,2748,2749],{"id":1876,"depth":889,"text":1877},{"id":1908,"depth":889,"text":1909,"children":2717},[2718,2719,2720],{"id":1919,"depth":895,"text":1920},{"id":1926,"depth":895,"text":1927},{"id":1937,"depth":895,"text":1938},{"id":1977,"depth":889,"text":1978,"children":2722},[2723,2724,2725,2726,2727,2728],{"id":1984,"depth":895,"text":1985},{"id":2025,"depth":895,"text":2026},{"id":2076,"depth":895,"text":2077},{"id":2105,"depth":895,"text":2106},{"id":2115,"depth":895,"text":2116},{"id":2140,"depth":895,"text":2141},{"id":2149,"depth":889,"text":2150,"children":2730},[2731,2732],{"id":2160,"depth":895,"text":2161},{"id":2258,"depth":895,"text":2259},{"id":2293,"depth":889,"text":2294,"children":2734},[2735,2736,2737],{"id":2297,"depth":895,"text":2298},{"id":2308,"depth":895,"text":2309},{"id":2331,"depth":895,"text":2332},{"id":2420,"depth":889,"text":2421,"children":2739},[2740,2741],{"id":2430,"depth":895,"text":2431},{"id":2462,"depth":895,"text":2463},{"id":2486,"depth":889,"text":2487,"children":2743},[2744,2745,2746,2747],{"id":2497,"depth":895,"text":2498},{"id":2515,"depth":895,"text":2516},{"id":2530,"depth":895,"text":2531},{"id":2545,"depth":895,"text":2546},{"id":2613,"depth":889,"text":2614},{"id":2672,"depth":889,"text":2673},"What applies to older electrical installations in Belgium. AREI Part 8 explained: permitted deviations, periodic inspection, and tips for gradual modernisation.","en",{},"\u002Fblog\u002Fold-building-arei-part8.en",{"title":1860,"description":2750},"old-building-arei-part-8","blog\u002Fold-building-arei-part8.en",[2758,1851,1852,2759,2760,2761,2762],"old building","existing installation","renovation","inspection","periodic","o_HLin8dVqH9j4w7j3eDEByKMCInkqKYS4BfqGC2wco",{"id":4,"title":5,"articleId":6,"body":2765,"category":927,"date":928,"description":929,"extension":930,"lastUpdated":928,"locale":931,"meta":3404,"navigation":933,"path":934,"publishDate":928,"readTime":935,"refreshInterval":936,"seo":3405,"slug":938,"stem":939,"tags":3406,"__hash__":947},{"type":8,"value":2766,"toc":3367},[2767,2769,2773,2775,2777,2781,2787,2793,2795,2797,2801,2803,2805,2807,2811,2813,2831,2837,2839,2841,2843,2845,2875,2877,2907,2915,2917,2919,2933,2935,2939,2941,2955,2957,2959,2961,2963,2967,2969,3045,3047,3049,3067,3069,3071,3073,3077,3079,3083,3091,3093,3147,3157,3159,3161,3165,3167,3171,3185,3187,3199,3201,3203,3207,3209,3219,3221,3229,3231,3239,3241,3289,3291,3293,3335,3337,3339,3357,3359],[11,2768,5],{"id":13},[15,2770,17,2771,22],{},[19,2772,21],{},[24,2774],{},[27,2776,30],{"id":29},[15,2778,33,2779,37],{},[19,2780,36],{},[15,2782,40,2783,44,2785,48],{},[19,2784,43],{},[19,2786,47],{},[50,2788,2789],{},[15,2790,2791,57],{},[19,2792,56],{},[24,2794],{},[27,2796,63],{"id":62},[15,2798,66,2799,70],{},[19,2800,69],{},[72,2802,75],{"id":74},[15,2804,78],{},[72,2806,82],{"id":81},[15,2808,85,2809,89],{},[19,2810,88],{},[72,2812,93],{"id":92},[95,2814,2815,2819,2823,2827],{},[98,2816,100,2817],{},[19,2818,103],{},[98,2820,106,2821],{},[19,2822,109],{},[98,2824,112,2825],{},[19,2826,115],{},[98,2828,2829,121],{},[19,2830,120],{},[50,2832,2833],{},[15,2834,2835,129],{},[19,2836,128],{},[24,2838],{},[27,2840,135],{"id":134},[15,2842,138],{},[72,2844,142],{"id":141},[144,2846,2847,2855],{},[147,2848,2849],{},[150,2850,2851,2853],{},[153,2852,155],{},[153,2854,158],{},[160,2856,2857,2863,2869],{},[150,2858,2859,2861],{},[165,2860,167],{},[165,2862,170],{},[150,2864,2865,2867],{},[165,2866,175],{},[165,2868,178],{},[150,2870,2871,2873],{},[165,2872,183],{},[165,2874,186],{},[72,2876,190],{"id":189},[144,2878,2879,2887],{},[147,2880,2881],{},[150,2882,2883,2885],{},[153,2884,155],{},[153,2886,158],{},[160,2888,2889,2895,2901],{},[150,2890,2891,2893],{},[165,2892,207],{},[165,2894,210],{},[150,2896,2897,2899],{},[165,2898,215],{},[165,2900,218],{},[150,2902,2903,2905],{},[165,2904,223],{},[165,2906,226],{},[50,2908,2909],{},[15,2910,2911,234,2913,238],{},[19,2912,233],{},[19,2914,237],{},[72,2916,242],{"id":241},[15,2918,245],{},[95,2920,2921,2925,2931],{},[98,2922,250,2923,254],{},[19,2924,253],{},[98,2926,257,2927,261,2929,265],{},[19,2928,260],{},[19,2930,264],{},[98,2932,268],{},[72,2934,272],{"id":271},[15,2936,275,2937,265],{},[19,2938,278],{},[72,2940,282],{"id":281},[95,2942,2943,2947,2951],{},[98,2944,287,2945,291],{},[19,2946,290],{},[98,2948,287,2949,297],{},[19,2950,296],{},[98,2952,300,2953,304],{},[19,2954,303],{},[72,2956,308],{"id":307},[15,2958,311],{},[24,2960],{},[27,2962,317],{"id":316},[15,2964,320,2965,324],{},[19,2966,323],{},[72,2968,328],{"id":327},[144,2970,2971,2979],{},[147,2972,2973],{},[150,2974,2975,2977],{},[153,2976,337],{},[153,2978,340],{},[160,2980,2981,2989,2997,3005,3013,3021,3029,3037],{},[150,2982,2983,2987],{},[165,2984,2985],{},[19,2986,349],{},[165,2988,352],{},[150,2990,2991,2995],{},[165,2992,2993],{},[19,2994,359],{},[165,2996,362],{},[150,2998,2999,3003],{},[165,3000,3001],{},[19,3002,369],{},[165,3004,372],{},[150,3006,3007,3011],{},[165,3008,3009],{},[19,3010,379],{},[165,3012,382],{},[150,3014,3015,3019],{},[165,3016,3017],{},[19,3018,389],{},[165,3020,392],{},[150,3022,3023,3027],{},[165,3024,3025],{},[19,3026,399],{},[165,3028,402],{},[150,3030,3031,3035],{},[165,3032,3033],{},[19,3034,409],{},[165,3036,412],{},[150,3038,3039,3043],{},[165,3040,3041],{},[19,3042,419],{},[165,3044,422],{},[72,3046,426],{"id":425},[15,3048,429],{},[95,3050,3051,3055,3059,3063],{},[98,3052,3053,437],{},[19,3054,436],{},[98,3056,3057,443],{},[19,3058,442],{},[98,3060,3061,449],{},[19,3062,448],{},[98,3064,3065,455],{},[19,3066,454],{},[24,3068],{},[27,3070,461],{"id":460},[72,3072,465],{"id":464},[15,3074,468,3075,472],{},[19,3076,471],{},[72,3078,476],{"id":475},[15,3080,479,3081,483],{},[19,3082,482],{},[50,3084,3085],{},[15,3086,3087,491,3089,495],{},[19,3088,490],{},[19,3090,494],{},[72,3092,499],{"id":498},[144,3094,3095,3103],{},[147,3096,3097],{},[150,3098,3099,3101],{},[153,3100,508],{},[153,3102,511],{},[160,3104,3105,3111,3117,3123,3129,3135,3141],{},[150,3106,3107,3109],{},[165,3108,518],{},[165,3110,521],{},[150,3112,3113,3115],{},[165,3114,526],{},[165,3116,529],{},[150,3118,3119,3121],{},[165,3120,534],{},[165,3122,537],{},[150,3124,3125,3127],{},[165,3126,542],{},[165,3128,545],{},[150,3130,3131,3133],{},[165,3132,550],{},[165,3134,553],{},[150,3136,3137,3139],{},[165,3138,558],{},[165,3140,561],{},[150,3142,3143,3145],{},[165,3144,566],{},[165,3146,569],{},[50,3148,3149],{},[15,3150,3151,234,3153,579,3155,583],{},[19,3152,233],{},[19,3154,578],{},[19,3156,582],{},[24,3158],{},[27,3160,589],{"id":588},[15,3162,592,3163,265],{},[19,3164,595],{},[72,3166,599],{"id":598},[15,3168,602,3169,606],{},[19,3170,605],{},[608,3172,3173,3177,3181],{},[98,3174,612,3175,616],{},[19,3176,615],{},[98,3178,612,3179,622],{},[19,3180,621],{},[98,3182,3183,628],{},[19,3184,627],{},[72,3186,632],{"id":631},[95,3188,3189,3193,3197],{},[98,3190,637,3191,265],{},[19,3192,640],{},[98,3194,643,3195,647],{},[19,3196,646],{},[98,3198,650],{},[24,3200],{},[27,3202,656],{"id":655},[15,3204,659,3205,663],{},[19,3206,662],{},[72,3208,667],{"id":666},[95,3210,3211,3213,3215,3217],{},[98,3212,672],{},[98,3214,675],{},[98,3216,678],{},[98,3218,681],{},[72,3220,685],{"id":684},[95,3222,3223,3225,3227],{},[98,3224,690],{},[98,3226,693],{},[98,3228,696],{},[72,3230,700],{"id":699},[95,3232,3233,3235,3237],{},[98,3234,705],{},[98,3236,708],{},[98,3238,711],{},[72,3240,715],{"id":714},[144,3242,3243,3251],{},[147,3244,3245],{},[150,3246,3247,3249],{},[153,3248,724],{},[153,3250,727],{},[160,3252,3253,3259,3265,3271,3277,3283],{},[150,3254,3255,3257],{},[165,3256,734],{},[165,3258,737],{},[150,3260,3261,3263],{},[165,3262,742],{},[165,3264,745],{},[150,3266,3267,3269],{},[165,3268,750],{},[165,3270,753],{},[150,3272,3273,3275],{},[165,3274,758],{},[165,3276,761],{},[150,3278,3279,3281],{},[165,3280,766],{},[165,3282,769],{},[150,3284,3285,3287],{},[165,3286,774],{},[165,3288,777],{},[24,3290],{},[27,3292,783],{"id":782},[144,3294,3295,3303],{},[147,3296,3297],{},[150,3298,3299,3301],{},[153,3300,792],{},[153,3302,795],{},[160,3304,3305,3311,3317,3323,3329],{},[150,3306,3307,3309],{},[165,3308,802],{},[165,3310,805],{},[150,3312,3313,3315],{},[165,3314,810],{},[165,3316,813],{},[150,3318,3319,3321],{},[165,3320,818],{},[165,3322,821],{},[150,3324,3325,3327],{},[165,3326,826],{},[165,3328,829],{},[150,3330,3331,3333],{},[165,3332,834],{},[165,3334,837],{},[24,3336],{},[27,3338,843],{"id":842},[95,3340,3341,3345,3349,3353],{},[98,3342,3343],{},[849,3344,852],{"href":851},[98,3346,3347],{},[849,3348,858],{"href":857},[98,3350,3351],{},[849,3352,864],{"href":863},[98,3354,3355],{},[849,3356,870],{"href":869},[24,3358],{},[15,3360,3361],{},[876,3362,878,3363,882,3365],{},[19,3364,881],{},[849,3366,886],{"href":885},{"title":888,"searchDepth":889,"depth":889,"links":3368},[3369,3370,3375,3383,3387,3392,3396,3402,3403],{"id":29,"depth":889,"text":30},{"id":62,"depth":889,"text":63,"children":3371},[3372,3373,3374],{"id":74,"depth":895,"text":75},{"id":81,"depth":895,"text":82},{"id":92,"depth":895,"text":93},{"id":134,"depth":889,"text":135,"children":3376},[3377,3378,3379,3380,3381,3382],{"id":141,"depth":895,"text":142},{"id":189,"depth":895,"text":190},{"id":241,"depth":895,"text":242},{"id":271,"depth":895,"text":272},{"id":281,"depth":895,"text":282},{"id":307,"depth":895,"text":308},{"id":316,"depth":889,"text":317,"children":3384},[3385,3386],{"id":327,"depth":895,"text":328},{"id":425,"depth":895,"text":426},{"id":460,"depth":889,"text":461,"children":3388},[3389,3390,3391],{"id":464,"depth":895,"text":465},{"id":475,"depth":895,"text":476},{"id":498,"depth":895,"text":499},{"id":588,"depth":889,"text":589,"children":3393},[3394,3395],{"id":598,"depth":895,"text":599},{"id":631,"depth":895,"text":632},{"id":655,"depth":889,"text":656,"children":3397},[3398,3399,3400,3401],{"id":666,"depth":895,"text":667},{"id":684,"depth":895,"text":685},{"id":699,"depth":895,"text":700},{"id":714,"depth":895,"text":715},{"id":782,"depth":889,"text":783},{"id":842,"depth":889,"text":843},{},{"title":5,"description":929},[941,942,21,943,944,945,946],{"id":3408,"title":3409,"articleId":6,"body":3410,"category":927,"date":928,"description":4297,"extension":930,"lastUpdated":928,"locale":4298,"meta":4299,"navigation":933,"path":4300,"publishDate":928,"readTime":935,"refreshInterval":936,"seo":4301,"slug":4302,"stem":4303,"tags":4304,"__hash__":4310},"blog\u002Fblog\u002Fold-building-arei-part8.nl.md","Oudere installaties en AREI Part 8: Bijzondere regels voor bestaande installaties",{"type":8,"value":3411,"toc":4260},[3412,3415,3421,3423,3427,3434,3445,3453,3455,3459,3466,3470,3473,3477,3484,3488,3514,3522,3524,3528,3531,3535,3572,3576,3612,3624,3628,3631,3654,3658,3664,3668,3689,3693,3696,3698,3702,3709,3713,3807,3811,3814,3840,3842,3846,3850,3857,3861,3868,3880,3884,3953,3968,3970,3974,3981,3985,3992,4013,4017,4035,4037,4041,4048,4052,4066,4070,4081,4085,4096,4100,4155,4157,4161,4215,4217,4221,4247,4249],[11,3413,3409],{"id":3414},"oudere-installaties-en-arei-part-8-bijzondere-regels-voor-bestaande-installaties",[15,3416,3417,3418,3420],{},"Niet elke elektrische installatie in België moet aan de nieuwste AREI-voorschriften voldoen. Voor oudere gebouwen bestaat er met ",[19,3419,962],{}," een apart regelwerk dat bepaalde afwijkingen van de huidige standaard tolereert — zolang er geen onmiddellijk gevaar bestaat. Dit artikel legt uit wanneer Part 8 geldt, wat toegelaten is en waar de grenzen liggen.",[24,3422],{},[27,3424,3426],{"id":3425},"wat-is-part-8","Wat is Part 8?",[15,3428,3429,3430,3433],{},"Part 8 van het AREI (Algemeen Reglement op de Elektrische Installaties) is een ",[19,3431,3432],{},"bijzondere regeling voor bestaande installaties"," die vóór de inwerkingtreding van het huidige AREI werden aangelegd en gekeurd.",[15,3435,3436,3437,3440,3441,3444],{},"Het basisprincipe: zolang een installatie ",[19,3438,3439],{},"veilig"," functioneert en ",[19,3442,3443],{},"geen onmiddellijk gevaar"," vormt, hoeft ze niet volledig op de nieuwste stand gebracht te worden — ook al voldoet ze niet aan alle huidige voorschriften.",[50,3446,3447],{},[15,3448,3449,3452],{},[19,3450,3451],{},"Belangrijk:"," Part 8 is geen vrijbrief. Het definieert duidelijk welke afwijkingen getolereerd worden en welke niet.",[24,3454],{},[27,3456,3458],{"id":3457},"wanneer-geldt-part-8","Wanneer geldt Part 8?",[15,3460,3461,3462,3465],{},"Part 8 geldt voor installaties die aan ",[19,3463,3464],{},"één"," van de volgende voorwaarden voldoen:",[72,3467,3469],{"id":3468},"voorwaarde-1-installatie-vóór-01101981","Voorwaarde 1: Installatie vóór 01.10.1981",[15,3471,3472],{},"Installaties die vóór 1 oktober 1981 werden aangelegd (datum van inwerkingtreding van het oorspronkelijke AREI) vallen in principe onder Part 8.",[72,3474,3476],{"id":3475},"voorwaarde-2-onder-het-oude-arei-gekeurd","Voorwaarde 2: Onder het oude AREI gekeurd",[15,3478,3479,3480,3483],{},"Installaties die onder een eerdere versie van het AREI werden gekeurd en sindsdien ",[19,3481,3482],{},"niet wezenlijk gewijzigd"," zijn.",[72,3485,3487],{"id":3486},"wat-telt-als-wezenlijke-wijziging","Wat telt als \"wezenlijke wijziging\"?",[95,3489,3490,3496,3502,3508],{},[98,3491,3492,3493],{},"Toevoegen van ",[19,3494,3495],{},"nieuwe kringen",[98,3497,3498,3499],{},"Uitbreiding van de ",[19,3500,3501],{},"verdeelkast",[98,3503,3504,3505],{},"Wijziging van de ",[19,3506,3507],{},"meterinstallatie",[98,3509,3510,3511],{},"Omvangrijke ",[19,3512,3513],{},"herbekabeling",[50,3515,3516],{},[15,3517,3518,3521],{},[19,3519,3520],{},"Let op:"," Kleine wijzigingen zoals het vervangen van een stopcontact of schakelaar gelden NIET als wezenlijke wijziging.",[24,3523],{},[27,3525,3527],{"id":3526},"wat-is-onder-part-8-toegelaten-getolereerde-afwijkingen","Wat is onder Part 8 toegelaten? (Getolereerde afwijkingen)",[15,3529,3530],{},"De volgende punten wijken af van het huidige AREI, maar worden onder Part 8 bij de keuring getolereerd:",[72,3532,3534],{"id":3533},"_1-oude-kabeltypes","1. Oude kabeltypes",[144,3536,3537,3547],{},[147,3538,3539],{},[150,3540,3541,3544],{},[153,3542,3543],{},"Huidig AREI",[153,3545,3546],{},"Part 8 tolereert",[160,3548,3549,3556,3564],{},[150,3550,3551,3553],{},[165,3552,1096],{},[165,3554,3555],{},"VOB-kabels in oude leidingen",[150,3557,3558,3561],{},[165,3559,3560],{},"Cca-brandveiligheidsklasse",[165,3562,3563],{},"Oudere kabeltypes zonder CPR-classificatie",[150,3565,3566,3569],{},[165,3567,3568],{},"Minimale doorsnede 2,5 mm² voor stopcontacten",[165,3570,3571],{},"Minimaal 1 mm² bij max. 6 A zekering of 10 A automaat (Art. 8.2.1 Nr. 5)",[72,3573,3575],{"id":3574},"_2-aardlekschakelaars-rcd-differentieelschakelaar","2. Aardlekschakelaars (RCD \u002F Differentieelschakelaar)",[144,3577,3578,3586],{},[147,3579,3580],{},[150,3581,3582,3584],{},[153,3583,3543],{},[153,3585,3546],{},[160,3587,3588,3596,3604],{},[150,3589,3590,3593],{},[165,3591,3592],{},"30 mA RCD per stopcontactkring",[165,3594,3595],{},"Geen 30 mA RCD nodig (alleen 300 mA hoofd-RCD)",[150,3597,3598,3601],{},[165,3599,3600],{},"30 mA RCD voor badkamer verplicht",[165,3602,3603],{},"Getolereerd zonder, als er geen direct risico is",[150,3605,3606,3609],{},[165,3607,3608],{},"Max. 8 kringen per RCD",[165,3610,3611],{},"Meer kringen toegelaten",[50,3613,3614],{},[15,3615,3616,3619,3620,3623],{},[19,3617,3618],{},"Opmerking:"," Ook onder Part 8 wordt een ",[19,3621,3622],{},"300 mA hoofd-RCD"," aanbevolen en bij nieuwe meterinstallatie vaak door de netbeheerder vereist.",[72,3625,3627],{"id":3626},"_3-stopcontacten-zonder-aardingcontact","3. Stopcontacten zonder aardingcontact",[15,3629,3630],{},"Oude stopcontacten (type C, zonder aardpen) worden onder Part 8 getolereerd, op voorwaarde dat:",[95,3632,3633,3640,3651],{},[98,3634,3635,3636,3639],{},"Geen toestellen van ",[19,3637,3638],{},"beschermingsklasse I"," (met metalen behuizing) worden aangesloten.",[98,3641,3642,3643,3646,3647,3650],{},"Het stopcontact niet in de ",[19,3644,3645],{},"badkamer"," of op ",[19,3648,3649],{},"vochtige plaatsen"," zit.",[98,3652,3653],{},"De kring verder intact is.",[72,3655,3657],{"id":3656},"_4-geen-spd-overspanningsbeveiliging","4. Geen SPD (overspanningsbeveiliging)",[15,3659,3660,3661,265],{},"Het huidige AREI schrijft voor nieuwe installaties een SPD (Surge Protection Device) Type 2 voor. Onder Part 8 is dit ",[19,3662,3663],{},"niet vereist",[72,3665,3667],{"id":3666},"_5-oude-verdeeltechniek","5. Oude verdeeltechniek",[95,3669,3670,3676,3682],{},[98,3671,3672,3675],{},[19,3673,3674],{},"Smeltzekeringen"," in plaats van MCBs zijn toegelaten.",[98,3677,3678,3681],{},[19,3679,3680],{},"Schroefzekeringen"," (Diazed) worden getolereerd.",[98,3683,3684,3685,3688],{},"Ontbrekende ",[19,3686,3687],{},"opschriften"," worden als gebrek vermeld, maar leiden niet tot afkeuring.",[72,3690,3692],{"id":3691},"_6-geen-brandveiligheidsclassificatie-van-kabels","6. Geen brandveiligheidsclassificatie van kabels",[15,3694,3695],{},"Kabels zonder CPR-classificatie (vóór 2017 geïnstalleerd) worden getolereerd, aangezien de CPR-verordening pas vanaf juli 2017 voor nieuwe installaties geldt.",[24,3697],{},[27,3699,3701],{"id":3700},"wat-is-niet-toegelaten-ook-onder-part-8","Wat is NIET toegelaten (ook onder Part 8)?",[15,3703,3704,3705,3708],{},"Bepaalde toestanden worden ",[19,3706,3707],{},"nooit getolereerd",", ongeacht de ouderdom van de installatie:",[72,3710,3712],{"id":3711},"absoluut-ongeoorloofd","Absoluut ongeoorloofd:",[144,3714,3715,3725],{},[147,3716,3717],{},[150,3718,3719,3722],{},[153,3720,3721],{},"Toestand",[153,3723,3724],{},"Waarom?",[160,3726,3727,3737,3747,3757,3767,3777,3787,3797],{},[150,3728,3729,3734],{},[165,3730,3731],{},[19,3732,3733],{},"Blote of beschadigde kabels",[165,3735,3736],{},"Onmiddellijk elektrocutiegevaar",[150,3738,3739,3744],{},[165,3740,3741],{},[19,3742,3743],{},"Volledig ontbrekende aarding",[165,3745,3746],{},"Geen bescherming bij isolatiefout",[150,3748,3749,3754],{},[165,3750,3751],{},[19,3752,3753],{},"Water in contact met elektriciteit",[165,3755,3756],{},"Levensgevaar",[150,3758,3759,3764],{},[165,3760,3761],{},[19,3762,3763],{},"Toegankelijke spanningvoerende delen",[165,3765,3766],{},"Direct aanrakingsrisico",[150,3768,3769,3774],{},[165,3770,3771],{},[19,3772,3773],{},"Oververhitte kabels of verbindingen",[165,3775,3776],{},"Brandgevaar",[150,3778,3779,3784],{},[165,3780,3781],{},[19,3782,3783],{},"Losse verbindingen in aftakdozen",[165,3785,3786],{},"Vlamboog-\u002Fbrandgevaar",[150,3788,3789,3794],{},[165,3790,3791],{},[19,3792,3793],{},"Aftakdozen zonder deksel",[165,3795,3796],{},"Aanrakingsbescherming ontbreekt",[150,3798,3799,3804],{},[165,3800,3801],{},[19,3802,3803],{},"Badkamer-stopcontact in zone 0 of 1",[165,3805,3806],{},"Levensgevaar, ook onder Part 8 verboden",[72,3808,3810],{"id":3809},"veiligheidsgerelateerde-minimumvereisten","Veiligheidsgerelateerde minimumvereisten:",[15,3812,3813],{},"Ook onder Part 8 moet gewaarborgd zijn:",[95,3815,3816,3822,3828,3834],{},[98,3817,3818,3821],{},[19,3819,3820],{},"Voldoende doorsnede"," voor de werkelijke belasting (geen overbelast 0,75 mm²-kabel).",[98,3823,3824,3827],{},[19,3825,3826],{},"Werkende zekeringen"," (geen \"overbrugde\" zekeringen).",[98,3829,3830,3833],{},[19,3831,3832],{},"Aarding van de hoofdverdeler"," (verbinding met aardingselektrode).",[98,3835,3836,3839],{},[19,3837,3838],{},"Toegankelijkheid"," van de verdeelkast.",[24,3841],{},[27,3843,3845],{"id":3844},"periodieke-keuring","Periodieke keuring",[72,3847,3849],{"id":3848},"elke-25-jaar-verplicht","Elke 25 jaar verplicht",[15,3851,3852,3853,3856],{},"Bestaande installaties onder Part 8 moeten elke ",[19,3854,3855],{},"25 jaar"," een periodieke keuring ondergaan door een erkend controleorganisme.",[72,3858,3860],{"id":3859},"bij-eigendomsoverdracht","Bij eigendomsoverdracht",[15,3862,3863,3864,3867],{},"Bij ",[19,3865,3866],{},"verkoop van een woning"," is een geldig keuringsattest (minder dan 25 jaar oud) verplicht. Ontbreekt dit, dan moet vóór de verkoop een keuring plaatsvinden.",[50,3869,3870],{},[15,3871,3872,3875,3876,3879],{},[19,3873,3874],{},"18-maandentermijn (Art. 8.4.2.2):"," Bij aankoop van een woning met een negatief keuringsverslag heeft de koper ",[19,3877,3878],{},"18 maanden"," vanaf de aankoopdatum om de gebreken te verhelpen en een herkeuring te laten uitvoeren.",[72,3881,3883],{"id":3882},"wat-wordt-bij-de-periodieke-keuring-gecontroleerd","Wat wordt bij de periodieke keuring gecontroleerd?",[144,3885,3886,3896],{},[147,3887,3888],{},[150,3889,3890,3893],{},[153,3891,3892],{},"Controlepunt",[153,3894,3895],{},"Beoordeling",[160,3897,3898,3906,3914,3921,3929,3937,3945],{},[150,3899,3900,3903],{},[165,3901,3902],{},"Visuele inspectie kabels en verbindingen",[165,3904,3905],{},"Beschadiging, oververhitting",[150,3907,3908,3911],{},[165,3909,3910],{},"Aardingsweerstand meten",[165,3912,3913],{},"≤ 30 Ω (reglementaire drempel conform Art. 4.2.4.3b; daarboven bijkomende beschermingsmaatregelen nodig)",[150,3915,3916,3919],{},[165,3917,3918],{},"Isolatieweerstand meten",[165,3920,537],{},[150,3922,3923,3926],{},[165,3924,3925],{},"RCD-test (indien aanwezig)",[165,3927,3928],{},"Uitschakeltijd en -stroom",[150,3930,3931,3934],{},[165,3932,3933],{},"Kortsluitbeveiliging controleren",[165,3935,3936],{},"Zekeringen \u002F MCBs aanwezig",[150,3938,3939,3942],{},[165,3940,3941],{},"Bescherming tegen direct aanraken",[165,3943,3944],{},"Afdekkingen, IP-bescherming",[150,3946,3947,3950],{},[165,3948,3949],{},"Documentatie",[165,3951,3952],{},"Éénlijnschema + situatieschema aanwezig?",[50,3954,3955],{},[15,3956,3957,3959,3960,3963,3964,3967],{},[19,3958,3618],{}," Ook onder Part 8 moeten een ",[19,3961,3962],{},"éénlijnschema"," en een ",[19,3965,3966],{},"situatieschema"," aanwezig zijn — ook als deze achteraf moeten worden opgesteld.",[24,3969],{},[27,3971,3973],{"id":3972},"de-besmettingsregel-bij-gedeeltelijke-renovatie","De besmettingsregel bij gedeeltelijke renovatie",[15,3975,3976,3977,3980],{},"Een bijzonder belangrijk aspect bij oudere gebouwen: de zogenaamde ",[19,3978,3979],{},"besmettingsregel"," (contamination rule).",[72,3982,3984],{"id":3983},"hoe-werkt-het","Hoe werkt het?",[15,3986,3987,3988,3991],{},"Wanneer u een deel van uw installatie ",[19,3989,3990],{},"wezenlijk wijzigt"," (bijv. nieuwe kringen toevoegen), geldt:",[608,3993,3994,4001,4007],{},[98,3995,3996,3997,4000],{},"Het ",[19,3998,3999],{},"nieuwe deel"," moet volledig voldoen aan het huidige AREI.",[98,4002,3996,4003,4006],{},[19,4004,4005],{},"bestaande deel"," wordt verder beoordeeld volgens Part 8.",[98,4008,4009,4012],{},[19,4010,4011],{},"MAAR:"," Als het nieuwe deel het bestaande deel \"besmet\" (bijv. nieuwe kabels in dezelfde verdeelkast), kan de controleur beslissen dat de hele verdeelkast aan het huidige AREI moet voldoen.",[72,4014,4016],{"id":4015},"praktische-gevolgen","Praktische gevolgen:",[95,4018,4019,4025,4032],{},[98,4020,4021,4022,3483],{},"Plan renovaties zo dat nieuwe en oude delen ",[19,4023,4024],{},"duidelijk gescheiden",[98,4026,4027,4028,4031],{},"Idealiter een ",[19,4029,4030],{},"aparte onderverdeler"," voor nieuwe kringen.",[98,4033,4034],{},"Documenteer precies wat oud en wat nieuw is.",[24,4036],{},[27,4038,4040],{"id":4039},"aanbeveling-stapsgewijze-modernisering","Aanbeveling: Stapsgewijze modernisering",[15,4042,4043,4044,4047],{},"Hoewel Part 8 afwijkingen tolereert, is een ",[19,4045,4046],{},"stapsgewijze modernisering"," aan te raden:",[72,4049,4051],{"id":4050},"prioriteit-1-veiligheidskritisch","Prioriteit 1 (Veiligheidskritisch)",[95,4053,4054,4057,4060,4063],{},[98,4055,4056],{},"300 mA hoofd-RCD bijplaatsen (indien niet aanwezig)",[98,4058,4059],{},"Beschadigde kabels vervangen",[98,4061,4062],{},"Losse verbindingen herstellen",[98,4064,4065],{},"Aarding controleren en eventueel verbeteren",[72,4067,4069],{"id":4068},"prioriteit-2-aanbevolen","Prioriteit 2 (Aanbevolen)",[95,4071,4072,4075,4078],{},[98,4073,4074],{},"30 mA groeps-RCDs voor badkamer en keuken",[98,4076,4077],{},"Oude smeltzekeringen vervangen door MCBs",[98,4079,4080],{},"SPD Type 2 bijplaatsen",[72,4082,4084],{"id":4083},"prioriteit-3-comfort-toekomstbestendigheid","Prioriteit 3 (Comfort + toekomstbestendigheid)",[95,4086,4087,4090,4093],{},[98,4088,4089],{},"Verdeelkast moderniseren (meer rijen, opschriften)",[98,4091,4092],{},"Stopcontacten met aarding bijplaatsen",[98,4094,4095],{},"Voorbereiding voor laadpaal \u002F zonnepanelen",[72,4097,4099],{"id":4098},"kostenoriëntatie","Kostenoriëntatie",[144,4101,4102,4112],{},[147,4103,4104],{},[150,4105,4106,4109],{},[153,4107,4108],{},"Maatregel",[153,4110,4111],{},"Geschatte kosten",[160,4113,4114,4121,4128,4134,4141,4148],{},[150,4115,4116,4119],{},[165,4117,4118],{},"300 mA hoofd-RCD bijplaatsen",[165,4120,737],{},[150,4122,4123,4126],{},[165,4124,4125],{},"30 mA groeps-RCD (per stuk)",[165,4127,745],{},[150,4129,4130,4132],{},[165,4131,2581],{},[165,4133,753],{},[150,4135,4136,4139],{},[165,4137,4138],{},"MCB-set (10 stuks)",[165,4140,761],{},[150,4142,4143,4146],{},[165,4144,4145],{},"Nieuwe 4-rijige verdeelkast (compleet)",[165,4147,769],{},[150,4149,4150,4153],{},[165,4151,4152],{},"Volledige herbekabeling (EGW)",[165,4154,777],{},[24,4156],{},[27,4158,4160],{"id":4159},"samenvatting","Samenvatting",[144,4162,4163,4173],{},[147,4164,4165],{},[150,4166,4167,4170],{},[153,4168,4169],{},"Vraag",[153,4171,4172],{},"Antwoord",[160,4174,4175,4183,4191,4199,4207],{},[150,4176,4177,4180],{},[165,4178,4179],{},"Moet mijn oud gebouw aan het huidige AREI voldoen?",[165,4181,4182],{},"Niet volledig, Part 8 staat afwijkingen toe",[150,4184,4185,4188],{},[165,4186,4187],{},"Heb ik een 30 mA RCD nodig?",[165,4189,4190],{},"Onder Part 8 niet verplicht, maar sterk aanbevolen",[150,4192,4193,4196],{},[165,4194,4195],{},"Zijn oude stopcontacten zonder aarding toegelaten?",[165,4197,4198],{},"Onder voorwaarden ja (geen badkamer, geen klasse-I-toestellen)",[150,4200,4201,4204],{},[165,4202,4203],{},"Hoe vaak moet er gekeurd worden?",[165,4205,4206],{},"Elke 25 jaar + bij eigendomsoverdracht",[150,4208,4209,4212],{},[165,4210,4211],{},"Wat bij gedeeltelijke renovatie?",[165,4213,4214],{},"Nieuw deel = huidig AREI, oud deel = Part 8 (besmettingsregel in acht nemen)",[24,4216],{},[27,4218,4220],{"id":4219},"gerelateerde-artikelen","Gerelateerde artikelen",[95,4222,4223,4229,4235,4241],{},[98,4224,4225],{},[849,4226,4228],{"href":4227},"\u002Fblog\u002Felektrische-keuring","Elektrische keuring in België: Wat wordt gecontroleerd?",[98,4230,4231],{},[849,4232,4234],{"href":4233},"\u002Fblog\u002Farei-2026-wijzigingen","Wat verandert er met het AREI 2026?",[98,4236,4237],{},[849,4238,4240],{"href":4239},"\u002Fblog\u002Fpreflex-vs-vrije-bedrading","Preflex vs. vrije bedrading",[98,4242,4243],{},[849,4244,4246],{"href":4245},"\u002Fblog\u002Fverdeelkast-plannen-opbouw","Verdeelkast plannen",[24,4248],{},[15,4250,4251],{},[876,4252,4253,4254,4256,4257],{},"Ook voor oudere gebouwen maakt ",[19,4255,881],{}," normconforme éénlijnschema's en situatieschema's — de verplichte documenten voor elke keuring. Documenteer uw installatie nu digitaal. ",[849,4258,4259],{"href":885},"Gratis starten →",{"title":888,"searchDepth":889,"depth":889,"links":4261},[4262,4263,4268,4276,4280,4285,4289,4295,4296],{"id":3425,"depth":889,"text":3426},{"id":3457,"depth":889,"text":3458,"children":4264},[4265,4266,4267],{"id":3468,"depth":895,"text":3469},{"id":3475,"depth":895,"text":3476},{"id":3486,"depth":895,"text":3487},{"id":3526,"depth":889,"text":3527,"children":4269},[4270,4271,4272,4273,4274,4275],{"id":3533,"depth":895,"text":3534},{"id":3574,"depth":895,"text":3575},{"id":3626,"depth":895,"text":3627},{"id":3656,"depth":895,"text":3657},{"id":3666,"depth":895,"text":3667},{"id":3691,"depth":895,"text":3692},{"id":3700,"depth":889,"text":3701,"children":4277},[4278,4279],{"id":3711,"depth":895,"text":3712},{"id":3809,"depth":895,"text":3810},{"id":3844,"depth":889,"text":3845,"children":4281},[4282,4283,4284],{"id":3848,"depth":895,"text":3849},{"id":3859,"depth":895,"text":3860},{"id":3882,"depth":895,"text":3883},{"id":3972,"depth":889,"text":3973,"children":4286},[4287,4288],{"id":3983,"depth":895,"text":3984},{"id":4015,"depth":895,"text":4016},{"id":4039,"depth":889,"text":4040,"children":4290},[4291,4292,4293,4294],{"id":4050,"depth":895,"text":4051},{"id":4068,"depth":895,"text":4069},{"id":4083,"depth":895,"text":4084},{"id":4098,"depth":895,"text":4099},{"id":4159,"depth":889,"text":4160},{"id":4219,"depth":889,"text":4220},"Wat geldt voor oudere elektrische installaties in België. AREI Part 8 uitgelegd: toegelaten afwijkingen, periodieke keuring en tips voor stapsgewijze modernisering.","nl",{},"\u002Fblog\u002Fold-building-arei-part8.nl",{"title":3409,"description":4297},"oud-arei-part-8","blog\u002Fold-building-arei-part8.nl",[4305,1851,1852,4306,4307,4308,4309],"oudere installatie","bestaande installatie","renovatie","keuring","periodiek","NUYsPWj79zscyTrgUJpau0P_zivLrfC6l-07Z6xk5rw",1779375813738]