[{"data":1,"prerenderedAt":1337},["ShallowReactive",2],{"blog-post-fr-controle-electrique":3,"blog-alternates-electrical-inspection":311},{"id":4,"title":5,"articleId":6,"body":7,"category":281,"date":282,"description":283,"extension":284,"lastUpdated":282,"locale":285,"meta":286,"navigation":287,"path":288,"publishDate":289,"readTime":290,"refreshInterval":291,"seo":292,"slug":293,"stem":294,"tags":295,"__hash__":310},"blog\u002Fblog\u002Felectrical-inspection.fr.md","Contrôle Électrique en Belgique : Le Guide Complet 2026","electrical-inspection",{"type":8,"value":9,"toc":267},"minimark",[10,15,24,27,31,34,68,77,81,84,89,92,118,122,125,148,152,155,175,179,182,209,212,216,223,255,260],[11,12,14],"h2",{"id":13},"quest-ce-quun-contrôle-électrique","Qu'est-ce qu'un Contrôle Électrique ?",[16,17,18,19,23],"p",{},"En Belgique, toute installation électrique doit être contrôlée par un organisme agréé avant de pouvoir être raccordée au réseau. Ce contrôle vérifie que votre installation est conforme au ",[20,21,22],"strong",{},"RGIE"," (Règlement Général sur les Installations Électriques), également connu sous le nom d'AREI en néerlandais.",[16,25,26],{},"Que vous construisiez une nouvelle maison, rénoviez un bien existant ou vendiez votre propriété, un contrôle électrique est obligatoire. Un échec peut retarder votre projet de plusieurs semaines et vous coûter des centaines d'euros en frais supplémentaires.",[11,28,30],{"id":29},"quand-avez-vous-besoin-dun-contrôle","Quand avez-vous besoin d'un contrôle ?",[16,32,33],{},"Un contrôle électrique est requis dans les situations suivantes :",[35,36,37,44,50,56,62],"ul",{},[38,39,40,43],"li",{},[20,41,42],{},"Nouvelles installations"," : Avant le premier raccordement au réseau électrique",[38,45,46,49],{},[20,47,48],{},"Rénovations importantes"," : Lorsque vous modifiez ou étendez l'installation existante",[38,51,52,55],{},[20,53,54],{},"Vente immobilière"," : Tous les 25 ans ou lors de la vente d'un bien",[38,57,58,61],{},[20,59,60],{},"Après un rapport d'infraction"," : Recontrôle après correction des problèmes identifiés",[38,63,64,67],{},[20,65,66],{},"Changement d'affectation"," : Lors du passage d'un usage résidentiel à commercial",[69,70,71],"blockquote",{},[16,72,73,76],{},[20,74,75],{},"Bon à savoir"," : Même si vous n'ajoutez que quelques nouveaux circuits, un recontrôle complet peut être déclenché. Vérifiez toujours auprès de votre électricien ou organisme de contrôle au préalable.",[11,78,80],{"id":79},"comment-se-préparer-au-contrôle","Comment se préparer au contrôle",[16,82,83],{},"Une bonne préparation est la clé pour réussir votre contrôle électrique du premier coup. Voici ce dont vous avez besoin :",[85,86,88],"h3",{"id":87},"_1-documentation-requise","1. Documentation requise",[16,90,91],{},"L'inspecteur demandera les documents suivants :",[35,93,94,100,106,112],{},[38,95,96,99],{},[20,97,98],{},"Schéma unifilaire"," — Un aperçu schématique de tous les circuits, dispositifs de protection et raccordements",[38,101,102,105],{},[20,103,104],{},"Plan de situation"," — Indique l'emplacement physique de tous les composants électriques",[38,107,108,111],{},[20,109,110],{},"Déclaration de conformité"," de l'installateur",[38,113,114,117],{},[20,115,116],{},"Fiches techniques"," des composants principaux (disjoncteurs, différentiels, etc.)",[85,119,121],{"id":120},"_2-exigences-de-linstallation","2. Exigences de l'installation",[16,123,124],{},"Assurez-vous que votre installation répond à ces exigences de base :",[35,126,127,130,133,136,139,142,145],{},[38,128,129],{},"Tous les circuits sont correctement protégés par des disjoncteurs",[38,131,132],{},"Un différentiel de 300mA protège l'ensemble de l'installation",[38,134,135],{},"Protection différentielle supplémentaire de 30mA pour les pièces humides (salle de bain, cuisine)",[38,137,138],{},"Mise à la terre correcte avec une résistance maximale de 30 Ohms (RGIE Art. 4.2.4.3b : en cas de dépassement de 30 Ω, des dispositifs différentiels à haute sensibilité supplémentaires sont requis ; formule générale : R_A × I∆n ≤ 50 V)",[38,140,141],{},"Tous les câbles sont correctement fixés et protégés",[38,143,144],{},"Les boîtes de dérivation sont accessibles et correctement fermées",[38,146,147],{},"Au moins deux circuits d'éclairage séparés pour les appartements de plus de deux pièces (Art. 5.3.5.2b)",[85,149,151],{"id":150},"_3-erreurs-courantes-à-éviter","3. Erreurs courantes à éviter",[16,153,154],{},"Selon les statistiques de contrôle, voici les raisons d'échec les plus fréquentes :",[35,156,157,160,163,166,169,172],{},[38,158,159],{},"Schéma unifilaire manquant ou incorrect",[38,161,162],{},"Protection différentielle insuffisante",[38,164,165],{},"Résistance de terre trop élevée",[38,167,168],{},"Câbles mal fixés ou non protégés",[38,170,171],{},"Couvercles manquants sur les boîtes de dérivation",[38,173,174],{},"Moins de deux circuits d'éclairage séparés pour les appartements de plus de deux pièces",[11,176,178],{"id":177},"que-se-passe-t-il-pendant-le-contrôle","Que se passe-t-il pendant le contrôle ?",[16,180,181],{},"Le contrôle dure généralement entre 1 et 3 heures, selon la taille de l'installation. L'inspecteur va :",[183,184,185,191,197,203],"ol",{},[38,186,187,190],{},[20,188,189],{},"Vérifier la documentation"," — S'assurer que le schéma unifilaire et le plan de situation correspondent à l'installation réelle",[38,192,193,196],{},[20,194,195],{},"Inspection visuelle"," — Contrôler tous les composants, câbles et connexions visibles",[38,198,199,202],{},[20,200,201],{},"Effectuer des mesures"," — Tester la résistance de terre, la résistance d'isolement et l'impédance de boucle",[38,204,205,208],{},[20,206,207],{},"Tests fonctionnels"," — Tester tous les différentiels et disjoncteurs",[16,210,211],{},"Après le contrôle, vous recevrez un rapport détaillé listant les éventuelles infractions. En cas de réussite, vous obtiendrez un certificat vert valable 25 ans.",[11,213,215],{"id":214},"comment-planelec-vous-aide","Comment PlanElec vous aide",[16,217,218,219,222],{},"La création de la documentation requise est souvent la partie la plus chronophage de la préparation d'un contrôle électrique. ",[20,220,221],{},"PlanElec"," simplifie considérablement ce processus :",[35,224,225,231,237,243,249],{},[38,226,227,230],{},[20,228,229],{},"Générer des schémas unifilaires"," en quelques minutes au lieu de plusieurs heures",[38,232,233,236],{},[20,234,235],{},"Conforme au RGIE"," — Tous les symboles et mises en page respectent la réglementation belge",[38,238,239,242],{},[20,240,241],{},"Plans de situation automatiques"," basés sur votre agencement de pièces",[38,244,245,248],{},[20,246,247],{},"Export en PDF"," pour une soumission facile à l'inspecteur",[38,250,251,254],{},[20,252,253],{},"Support multilingue"," — Documentation en néerlandais, français, allemand ou anglais",[69,256,257],{},[16,258,259],{},"Arrêtez de vous inquiéter pour la documentation. Concentrez-vous sur votre installation et laissez PlanElec gérer la paperasse.",[16,261,262],{},[263,264,266],"a",{"href":265},"\u002F","Commencez gratuitement votre documentation électrique →",{"title":268,"searchDepth":269,"depth":269,"links":270},"",2,[271,272,273,279,280],{"id":13,"depth":269,"text":14},{"id":29,"depth":269,"text":30},{"id":79,"depth":269,"text":80,"children":274},[275,277,278],{"id":87,"depth":276,"text":88},3,{"id":120,"depth":276,"text":121},{"id":150,"depth":276,"text":151},{"id":177,"depth":269,"text":178},{"id":214,"depth":269,"text":215},"guide","2026-01-08","Tout ce que vous devez savoir sur le contrôle électrique — de la préparation à l'inspection finale.","md","fr",{},true,"\u002Fblog\u002Felectrical-inspection.fr",null,"8 min",12,{"title":5,"description":283},"controle-electrique","blog\u002Felectrical-inspection.fr",[296,22,297,298,299,300,301,302,303,304,305,306,307,308,309],"AREI","contrôle électrique","keuring","schéma unifilaire","eendraadschema","plan de situation","Situationsplan","conformité","différentiel","mise à la terre","électricien","Belgique","Eindrahtschema","single-line diagram","rygd29utEDxdTtZgBcKVPuaEknXFlgMISNuelVwziP0",[312,597,880,1061],{"id":313,"title":314,"articleId":6,"body":315,"category":281,"date":282,"description":581,"extension":284,"lastUpdated":282,"locale":582,"meta":583,"navigation":287,"path":584,"publishDate":289,"readTime":290,"refreshInterval":291,"seo":585,"slug":586,"stem":587,"tags":588,"__hash__":596},"blog\u002Fblog\u002Felectrical-inspection.de.md","Stromabnahme in Belgien: Der komplette Leitfaden 2026",{"type":8,"value":316,"toc":570},[317,321,337,340,344,347,379,387,391,394,398,401,425,429,432,455,459,462,482,486,489,515,518,522,528,560,565],[11,318,320],{"id":319},"was-ist-eine-stromabnahme","Was ist eine Stromabnahme?",[16,322,323,324,328,329,332,333,336],{},"In Belgien muss jede elektrische Anlage von einer zugelassenen Stelle geprüft werden, bevor sie ans Netz angeschlossen werden kann. Diese Prüfung — die sogenannte ",[325,326,327],"em",{},"Keuring"," (niederländisch) oder ",[325,330,331],{},"Contrôle"," (französisch) — überprüft, ob Ihre Installation den ",[20,334,335],{},"AREI\u002FRGIE-Vorschriften"," entspricht (Algemeen Reglement op de Elektrische Installaties \u002F Règlement Général sur les Installations Électriques).",[16,338,339],{},"Ob Sie ein neues Haus bauen, eine bestehende Immobilie renovieren oder Ihr Haus verkaufen — eine elektrische Abnahme ist Pflicht. Ein Nichtbestehen kann Ihr Projekt um Wochen verzögern und Sie Hunderte Euro an zusätzlichen Gebühren kosten.",[11,341,343],{"id":342},"wann-brauchen-sie-eine-abnahme","Wann brauchen Sie eine Abnahme?",[16,345,346],{},"Eine elektrische Abnahme ist in folgenden Situationen erforderlich:",[35,348,349,355,361,367,373],{},[38,350,351,354],{},[20,352,353],{},"Neuinstallationen",": Vor dem Erstanschluss ans Stromnetz",[38,356,357,360],{},[20,358,359],{},"Größere Renovierungen",": Wenn Sie die bestehende Installation verändern oder erweitern",[38,362,363,366],{},[20,364,365],{},"Immobilienverkauf",": Alle 25 Jahre oder beim Verkauf einer Immobilie",[38,368,369,372],{},[20,370,371],{},"Nach einem Mängelbericht",": Wiederholungsprüfung nach Behebung festgestellter Mängel",[38,374,375,378],{},[20,376,377],{},"Nutzungsänderung",": Bei Umwidmung eines Gebäudes von Wohn- zu Geschäftsnutzung",[69,380,381],{},[16,382,383,386],{},[20,384,385],{},"Gut zu wissen",": Selbst wenn Sie nur einige neue Stromkreise hinzufügen, kann eine vollständige Neuprüfung ausgelöst werden. Klären Sie dies vorher immer mit Ihrem Elektriker oder der Prüfstelle ab.",[11,388,390],{"id":389},"wie-sie-sich-auf-die-abnahme-vorbereiten","Wie Sie sich auf die Abnahme vorbereiten",[16,392,393],{},"Eine gründliche Vorbereitung ist der Schlüssel, um die elektrische Abnahme beim ersten Versuch zu bestehen. Folgendes benötigen Sie:",[85,395,397],{"id":396},"_1-erforderliche-dokumentation","1. Erforderliche Dokumentation",[16,399,400],{},"Der Prüfer wird folgende Unterlagen verlangen:",[35,402,403,408,413,419],{},[38,404,405,407],{},[20,406,308],{}," (Eendraadschema \u002F Schéma unifilaire) — Eine schematische Übersicht aller Stromkreise, Schutzvorrichtungen und Anschlüsse",[38,409,410,412],{},[20,411,302],{}," (Plan de situation) — Zeigt die physische Lage aller elektrischen Komponenten",[38,414,415,418],{},[20,416,417],{},"Konformitätserklärung"," des Installateurs",[38,420,421,424],{},[20,422,423],{},"Technische Datenblätter"," der Hauptkomponenten (Leitungsschutzschalter, FI-Schutzschalter etc.)",[85,426,428],{"id":427},"_2-anforderungen-an-die-installation","2. Anforderungen an die Installation",[16,430,431],{},"Stellen Sie sicher, dass Ihre Installation diese grundlegenden Anforderungen erfüllt:",[35,433,434,437,440,443,446,449,452],{},[38,435,436],{},"Alle Stromkreise sind ordnungsgemäß durch Leitungsschutzschalter geschützt",[38,438,439],{},"Ein 300mA FI-Schutzschalter schützt die gesamte Installation",[38,441,442],{},"Zusätzlicher 30mA FI-Schutz für Feuchträume (Bad, Waschküche) und alle Steckdosenstromkreise ≤ 32 A",[38,444,445],{},"Ordnungsgemäße Erdung mit einem Widerstand von höchstens 30 Ohm (AREI Art. 4.2.4.3b: bei Überschreitung von 30 Ω sind zusätzliche Differenzstrom-Schutzeinrichtungen mit hoher Empfindlichkeit vorgeschrieben; allgemeine Formel: R_A × I∆n ≤ 50 V)",[38,447,448],{},"Alle Kabel sind ordnungsgemäß befestigt und geschützt",[38,450,451],{},"Abzweigdosen sind zugänglich und ordnungsgemäß verschlossen",[38,453,454],{},"Mindestens zwei getrennte Beleuchtungsstromkreise bei Wohnungen mit mehr als zwei Räumen (Art. 5.3.5.2b)",[85,456,458],{"id":457},"_3-häufige-fehler-die-sie-vermeiden-sollten","3. Häufige Fehler, die Sie vermeiden sollten",[16,460,461],{},"Basierend auf Prüfstatistiken sind dies die häufigsten Gründe für ein Nichtbestehen:",[35,463,464,467,470,473,476,479],{},[38,465,466],{},"Fehlendes oder falsches Eindrahtschema",[38,468,469],{},"Unzureichender FI-Schutz",[38,471,472],{},"Erdungswiderstand zu hoch",[38,474,475],{},"Kabel nicht ordnungsgemäß befestigt oder geschützt",[38,477,478],{},"Fehlende Abdeckungen an Abzweigdosen",[38,480,481],{},"Weniger als zwei getrennte Beleuchtungsstromkreise bei Wohnungen mit mehr als zwei Räumen",[11,483,485],{"id":484},"was-passiert-während-der-abnahme","Was passiert während der Abnahme?",[16,487,488],{},"Die Prüfung dauert in der Regel zwischen 1 und 3 Stunden, abhängig von der Größe der Installation. Der Prüfer wird:",[183,490,491,497,503,509],{},[38,492,493,496],{},[20,494,495],{},"Dokumentation prüfen"," — Überprüfen, ob Eindrahtschema und Situationsplan mit der tatsächlichen Installation übereinstimmen",[38,498,499,502],{},[20,500,501],{},"Sichtprüfung"," — Alle sichtbaren Komponenten, Kabel und Anschlüsse kontrollieren",[38,504,505,508],{},[20,506,507],{},"Messungen durchführen"," — Erdungswiderstand, Isolationswiderstand und Schleifenimpedanz testen",[38,510,511,514],{},[20,512,513],{},"Funktionsprüfungen"," — Alle FI-Schutzschalter und Leitungsschutzschalter testen",[16,516,517],{},"Nach der Prüfung erhalten Sie einen detaillierten Bericht mit eventuellen Mängeln. Bei Bestehen erhalten Sie ein grünes Zertifikat, das 25 Jahre gültig ist.",[11,519,521],{"id":520},"wie-planelec-hilft","Wie PlanElec hilft",[16,523,524,525,527],{},"Die Erstellung der erforderlichen Dokumentation ist oft der zeitaufwändigste Teil der Vorbereitung auf eine Stromabnahme. ",[20,526,221],{}," vereinfacht diesen Prozess erheblich:",[35,529,530,536,542,548,554],{},[38,531,532,535],{},[20,533,534],{},"Eindrahtschemas erstellen"," in Minuten statt Stunden",[38,537,538,541],{},[20,539,540],{},"AREI\u002FRGIE-konform"," — Alle Symbole und Layouts entsprechen den belgischen Vorschriften",[38,543,544,547],{},[20,545,546],{},"Automatische Situationspläne"," basierend auf Ihrem Raumlayout",[38,549,550,553],{},[20,551,552],{},"Export als PDF"," zur einfachen Vorlage beim Prüfer",[38,555,556,559],{},[20,557,558],{},"Mehrsprachig"," — Dokumentation auf Niederländisch, Französisch, Deutsch oder Englisch",[69,561,562],{},[16,563,564],{},"Machen Sie sich keine Sorgen mehr um die Dokumentation. Konzentrieren Sie sich auf Ihre Installation und lassen Sie PlanElec den Papierkram erledigen.",[16,566,567],{},[263,568,569],{"href":265},"Starten Sie jetzt kostenlos mit Ihrer elektrischen Dokumentation →",{"title":268,"searchDepth":269,"depth":269,"links":571},[572,573,574,579,580],{"id":319,"depth":269,"text":320},{"id":342,"depth":269,"text":343},{"id":389,"depth":269,"text":390,"children":575},[576,577,578],{"id":396,"depth":276,"text":397},{"id":427,"depth":276,"text":428},{"id":457,"depth":276,"text":458},{"id":484,"depth":269,"text":485},{"id":520,"depth":269,"text":521},"Alles was Sie über die elektrische Abnahme wissen müssen — von der Vorbereitung bis zur Prüfung.","de",{},"\u002Fblog\u002Felectrical-inspection.de",{"title":314,"description":581},"elektrische-abnahme","blog\u002Felectrical-inspection.de",[296,22,589,327,590,308,591,302,417,592,593,594,595,299,301],"Stromabnahme","elektrische Abnahme","Eendraadschema","FI-Schutzschalter","Erdung","Elektriker","Belgien","iwaTwK7RzEh8_3Ogzt9byycf0UtlAvPvju0vOLkWIII",{"id":598,"title":599,"articleId":6,"body":600,"category":281,"date":282,"description":866,"extension":284,"lastUpdated":282,"locale":867,"meta":868,"navigation":287,"path":869,"publishDate":289,"readTime":290,"refreshInterval":291,"seo":870,"slug":6,"stem":871,"tags":872,"__hash__":879},"blog\u002Fblog\u002Felectrical-inspection.en.md","Electrical Inspection in Belgium: The Complete Guide 2026",{"type":8,"value":601,"toc":855},[602,606,620,623,627,630,662,670,674,677,681,684,710,714,717,740,744,747,767,771,774,800,803,807,813,845,850],[11,603,605],{"id":604},"what-is-an-electrical-inspection","What is an Electrical Inspection?",[16,607,608,609,611,612,615,616,619],{},"In Belgium, every electrical installation must be inspected by an accredited body before it can be connected to the grid. This inspection — known as the ",[325,610,298],{}," (Dutch) or ",[325,613,614],{},"contrôle"," (French) — verifies that your installation complies with the ",[20,617,618],{},"AREI\u002FRGIE regulations"," (Algemeen Reglement op de Elektrische Installaties \u002F Règlement Général sur les Installations Électriques).",[16,621,622],{},"Whether you're building a new home, renovating an existing property, or selling your house, an electrical inspection is mandatory. Failing the inspection can delay your project by weeks and cost you hundreds of euros in additional fees.",[11,624,626],{"id":625},"when-do-you-need-an-inspection","When Do You Need an Inspection?",[16,628,629],{},"An electrical inspection is required in the following situations:",[35,631,632,638,644,650,656],{},[38,633,634,637],{},[20,635,636],{},"New installations",": Before the initial connection to the grid",[38,639,640,643],{},[20,641,642],{},"Major renovations",": When you modify or extend the existing installation",[38,645,646,649],{},[20,647,648],{},"Property sales",": Every 25 years or when selling a property",[38,651,652,655],{},[20,653,654],{},"After a violation report",": Re-inspection after fixing identified issues",[38,657,658,661],{},[20,659,660],{},"Change of use",": When a building changes from residential to commercial use",[69,663,664],{},[16,665,666,669],{},[20,667,668],{},"Good to know",": Even if you're only adding a few new circuits, you may trigger a full re-inspection. Always check with your electrician or inspection body beforehand.",[11,671,673],{"id":672},"how-to-prepare-for-the-inspection","How to Prepare for the Inspection",[16,675,676],{},"Proper preparation is the key to passing your electrical inspection on the first attempt. Here's what you need:",[85,678,680],{"id":679},"_1-required-documentation","1. Required Documentation",[16,682,683],{},"The inspector will ask for the following documents:",[35,685,686,692,698,704],{},[38,687,688,691],{},[20,689,690],{},"Single-line diagram"," (Eindrahtschema \u002F Schéma unifilaire) — A schematic overview of all circuits, protection devices, and connections",[38,693,694,697],{},[20,695,696],{},"Floor plan"," (Situationsplan \u002F Plan de situation) — Shows the physical location of all electrical components",[38,699,700,703],{},[20,701,702],{},"Compliance declaration"," from the installer",[38,705,706,709],{},[20,707,708],{},"Technical specifications"," of the main components (circuit breakers, differential switches, etc.)",[85,711,713],{"id":712},"_2-installation-requirements","2. Installation Requirements",[16,715,716],{},"Make sure your installation meets these basic requirements:",[35,718,719,722,725,728,731,734,737],{},[38,720,721],{},"All circuits are properly protected by circuit breakers",[38,723,724],{},"A 300mA differential switch protects the entire installation",[38,726,727],{},"Additional 30mA differential protection for wet rooms (bathroom, kitchen)",[38,729,730],{},"Proper earth connection with a resistance of at most 30 Ohms (AREI Art. 4.2.4.3b: if 30 Ohm is exceeded, additional high-sensitivity residual-current devices are required; general formula: R_A x I_delta_n \u003C= 50 V)",[38,732,733],{},"All cables are properly secured and protected",[38,735,736],{},"Junction boxes are accessible and properly closed",[38,738,739],{},"At least two separate lighting circuits for dwellings with more than two rooms (Art. 5.3.5.2b)",[85,741,743],{"id":742},"_3-common-mistakes-to-avoid","3. Common Mistakes to Avoid",[16,745,746],{},"Based on inspection statistics, these are the most frequent reasons for failure:",[35,748,749,752,755,758,761,764],{},[38,750,751],{},"Missing or incorrect single-line diagram",[38,753,754],{},"Insufficient differential protection",[38,756,757],{},"Earth resistance too high",[38,759,760],{},"Cables not properly fixed or protected",[38,762,763],{},"Missing covers on junction boxes",[38,765,766],{},"Fewer than two separate lighting circuits for dwellings with more than two rooms",[11,768,770],{"id":769},"what-happens-during-the-inspection","What Happens During the Inspection?",[16,772,773],{},"The inspection typically takes between 1 and 3 hours, depending on the size of the installation. The inspector will:",[183,775,776,782,788,794],{},[38,777,778,781],{},[20,779,780],{},"Check documentation"," — Verify that the single-line diagram and floor plan match the actual installation",[38,783,784,787],{},[20,785,786],{},"Visual inspection"," — Check all visible components, cables, and connections",[38,789,790,793],{},[20,791,792],{},"Measurements"," — Test earth resistance, insulation resistance, and loop impedance",[38,795,796,799],{},[20,797,798],{},"Functional tests"," — Test all differential switches and circuit breakers",[16,801,802],{},"After the inspection, you'll receive a detailed report listing any violations. If the installation passes, you'll get a green certificate valid for 25 years.",[11,804,806],{"id":805},"how-planelec-helps","How PlanElec Helps",[16,808,809,810,812],{},"Creating the required documentation is often the most time-consuming part of preparing for an electrical inspection. ",[20,811,221],{}," simplifies this process dramatically:",[35,814,815,821,827,833,839],{},[38,816,817,820],{},[20,818,819],{},"Generate single-line diagrams"," in minutes instead of hours",[38,822,823,826],{},[20,824,825],{},"AREI\u002FRGIE compliant"," — All symbols and layouts follow Belgian regulations",[38,828,829,832],{},[20,830,831],{},"Automatic floor plans"," based on your room layout",[38,834,835,838],{},[20,836,837],{},"Export to PDF"," for easy submission to the inspector",[38,840,841,844],{},[20,842,843],{},"Multi-language support"," — Documentation in Dutch, French, German, or English",[69,846,847],{},[16,848,849],{},"Stop worrying about documentation. Focus on your installation and let PlanElec handle the paperwork.",[16,851,852],{},[263,853,854],{"href":265},"Start creating your electrical documentation for free →",{"title":268,"searchDepth":269,"depth":269,"links":856},[857,858,859,864,865],{"id":604,"depth":269,"text":605},{"id":625,"depth":269,"text":626},{"id":672,"depth":269,"text":673,"children":860},[861,862,863],{"id":679,"depth":276,"text":680},{"id":712,"depth":276,"text":713},{"id":742,"depth":276,"text":743},{"id":769,"depth":269,"text":770},{"id":805,"depth":269,"text":806},"Everything you need to know about the electrical inspection — from preparation to the final check.","en",{},"\u002Fblog\u002Felectrical-inspection.en",{"title":599,"description":866},"blog\u002Felectrical-inspection.en",[296,22,873,298,297,309,300,308,299,874,302,301,875,876,877,878],"electrical inspection","situation plan","compliance","RCD","earthing","Belgium","V-NaRt_5_U7jnk272coGxXr60nQgwQZV-QF1VbBWH88",{"id":4,"title":5,"articleId":6,"body":881,"category":281,"date":282,"description":283,"extension":284,"lastUpdated":282,"locale":285,"meta":1058,"navigation":287,"path":288,"publishDate":289,"readTime":290,"refreshInterval":291,"seo":1059,"slug":293,"stem":294,"tags":1060,"__hash__":310},{"type":8,"value":882,"toc":1047},[883,885,889,891,893,895,917,923,925,927,929,931,949,951,953,969,971,973,987,989,991,1009,1011,1013,1017,1039,1043],[11,884,14],{"id":13},[16,886,18,887,23],{},[20,888,22],{},[16,890,26],{},[11,892,30],{"id":29},[16,894,33],{},[35,896,897,901,905,909,913],{},[38,898,899,43],{},[20,900,42],{},[38,902,903,49],{},[20,904,48],{},[38,906,907,55],{},[20,908,54],{},[38,910,911,61],{},[20,912,60],{},[38,914,915,67],{},[20,916,66],{},[69,918,919],{},[16,920,921,76],{},[20,922,75],{},[11,924,80],{"id":79},[16,926,83],{},[85,928,88],{"id":87},[16,930,91],{},[35,932,933,937,941,945],{},[38,934,935,99],{},[20,936,98],{},[38,938,939,105],{},[20,940,104],{},[38,942,943,111],{},[20,944,110],{},[38,946,947,117],{},[20,948,116],{},[85,950,121],{"id":120},[16,952,124],{},[35,954,955,957,959,961,963,965,967],{},[38,956,129],{},[38,958,132],{},[38,960,135],{},[38,962,138],{},[38,964,141],{},[38,966,144],{},[38,968,147],{},[85,970,151],{"id":150},[16,972,154],{},[35,974,975,977,979,981,983,985],{},[38,976,159],{},[38,978,162],{},[38,980,165],{},[38,982,168],{},[38,984,171],{},[38,986,174],{},[11,988,178],{"id":177},[16,990,181],{},[183,992,993,997,1001,1005],{},[38,994,995,190],{},[20,996,189],{},[38,998,999,196],{},[20,1000,195],{},[38,1002,1003,202],{},[20,1004,201],{},[38,1006,1007,208],{},[20,1008,207],{},[16,1010,211],{},[11,1012,215],{"id":214},[16,1014,218,1015,222],{},[20,1016,221],{},[35,1018,1019,1023,1027,1031,1035],{},[38,1020,1021,230],{},[20,1022,229],{},[38,1024,1025,236],{},[20,1026,235],{},[38,1028,1029,242],{},[20,1030,241],{},[38,1032,1033,248],{},[20,1034,247],{},[38,1036,1037,254],{},[20,1038,253],{},[69,1040,1041],{},[16,1042,259],{},[16,1044,1045],{},[263,1046,266],{"href":265},{"title":268,"searchDepth":269,"depth":269,"links":1048},[1049,1050,1051,1056,1057],{"id":13,"depth":269,"text":14},{"id":29,"depth":269,"text":30},{"id":79,"depth":269,"text":80,"children":1052},[1053,1054,1055],{"id":87,"depth":276,"text":88},{"id":120,"depth":276,"text":121},{"id":150,"depth":276,"text":151},{"id":177,"depth":269,"text":178},{"id":214,"depth":269,"text":215},{},{"title":5,"description":283},[296,22,297,298,299,300,301,302,303,304,305,306,307,308,309],{"id":1062,"title":1063,"articleId":6,"body":1064,"category":281,"date":282,"description":1321,"extension":284,"lastUpdated":282,"locale":1322,"meta":1323,"navigation":287,"path":1324,"publishDate":289,"readTime":290,"refreshInterval":291,"seo":1325,"slug":1326,"stem":1327,"tags":1328,"__hash__":1336},"blog\u002Fblog\u002Felectrical-inspection.nl.md","Elektrische Keuring in België: De Volledige Gids 2026",{"type":8,"value":1065,"toc":1310},[1066,1070,1076,1079,1083,1086,1118,1126,1130,1133,1137,1140,1165,1169,1172,1195,1199,1202,1222,1226,1229,1255,1258,1262,1268,1300,1305],[11,1067,1069],{"id":1068},"wat-is-een-elektrische-keuring","Wat is een Elektrische Keuring?",[16,1071,1072,1073,1075],{},"In België moet elke elektrische installatie worden gekeurd door een erkend organisme voordat ze op het net kan worden aangesloten. Deze keuring controleert of uw installatie voldoet aan het ",[20,1074,296],{}," (Algemeen Reglement op de Elektrische Installaties), ook wel RGIE genoemd in het Frans.",[16,1077,1078],{},"Of u nu een nieuw huis bouwt, een bestaand pand renoveert of uw woning verkoopt — een elektrische keuring is verplicht. Niet slagen voor de keuring kan uw project met weken vertragen en u honderden euro's aan extra kosten opleveren.",[11,1080,1082],{"id":1081},"wanneer-heeft-u-een-keuring-nodig","Wanneer heeft u een keuring nodig?",[16,1084,1085],{},"Een elektrische keuring is vereist in de volgende situaties:",[35,1087,1088,1094,1100,1106,1112],{},[38,1089,1090,1093],{},[20,1091,1092],{},"Nieuwe installaties",": Voor de eerste aansluiting op het elektriciteitsnet",[38,1095,1096,1099],{},[20,1097,1098],{},"Belangrijke renovaties",": Wanneer u de bestaande installatie wijzigt of uitbreidt",[38,1101,1102,1105],{},[20,1103,1104],{},"Verkoop van onroerend goed",": Elke 25 jaar of bij verkoop van een woning",[38,1107,1108,1111],{},[20,1109,1110],{},"Na een inbreukverslag",": Herkeuring na het verhelpen van vastgestelde gebreken",[38,1113,1114,1117],{},[20,1115,1116],{},"Bestemmingswijziging",": Bij omschakeling van residentieel naar commercieel gebruik",[69,1119,1120],{},[16,1121,1122,1125],{},[20,1123,1124],{},"Goed om te weten",": Zelfs als u slechts enkele nieuwe kringen toevoegt, kan een volledige herkeuring nodig zijn. Informeer vooraf altijd bij uw elektricien of keuringsorganisme.",[11,1127,1129],{"id":1128},"hoe-u-zich-voorbereidt-op-de-keuring","Hoe u zich voorbereidt op de keuring",[16,1131,1132],{},"Een goede voorbereiding is de sleutel om uw elektrische keuring in één keer te doorstaan. Dit heeft u nodig:",[85,1134,1136],{"id":1135},"_1-vereiste-documentatie","1. Vereiste documentatie",[16,1138,1139],{},"De keurder zal de volgende documenten opvragen:",[35,1141,1142,1147,1153,1159],{},[38,1143,1144,1146],{},[20,1145,591],{}," — Een schematisch overzicht van alle kringen, beveiligingsapparaten en aansluitingen",[38,1148,1149,1152],{},[20,1150,1151],{},"Situatieplan"," — Toont de fysieke locatie van alle elektrische componenten",[38,1154,1155,1158],{},[20,1156,1157],{},"Conformiteitsverklaring"," van de installateur",[38,1160,1161,1164],{},[20,1162,1163],{},"Technische fiches"," van de belangrijkste componenten (automaten, differentieelschakelaars, etc.)",[85,1166,1168],{"id":1167},"_2-eisen-aan-de-installatie","2. Eisen aan de installatie",[16,1170,1171],{},"Zorg ervoor dat uw installatie aan deze basiseisen voldoet:",[35,1173,1174,1177,1180,1183,1186,1189,1192],{},[38,1175,1176],{},"Alle kringen zijn correct beveiligd door automatische zekeringen",[38,1178,1179],{},"Een 300mA differentieelschakelaar beschermt de volledige installatie",[38,1181,1182],{},"Extra 30mA differentieelbescherming voor natte ruimtes (badkamer, keuken)",[38,1184,1185],{},"Correcte aarding met een weerstand van hoogstens 30 Ohm (AREI Art. 4.2.4.3b: bij overschrijding van 30 Ω zijn bijkomende differentieelschakelaars met hoge gevoeligheid vereist; algemene formule: R_A × I∆n ≤ 50 V)",[38,1187,1188],{},"Alle kabels zijn correct bevestigd en beschermd",[38,1190,1191],{},"Aftakdozen zijn bereikbaar en correct afgesloten",[38,1193,1194],{},"Minstens twee afzonderlijke verlichtingskringen bij woningen met meer dan twee kamers (Art. 5.3.5.2b)",[85,1196,1198],{"id":1197},"_3-veelgemaakte-fouten-om-te-vermijden","3. Veelgemaakte fouten om te vermijden",[16,1200,1201],{},"Op basis van keuringsstatistieken zijn dit de meest voorkomende redenen voor afkeuring:",[35,1203,1204,1207,1210,1213,1216,1219],{},[38,1205,1206],{},"Ontbrekend of onjuist eendraadschema",[38,1208,1209],{},"Onvoldoende differentieelbescherming",[38,1211,1212],{},"Aardingsweerstand te hoog",[38,1214,1215],{},"Kabels niet correct bevestigd of beschermd",[38,1217,1218],{},"Ontbrekende deksels op aftakdozen",[38,1220,1221],{},"Minder dan twee afzonderlijke verlichtingskringen bij woningen met meer dan twee kamers",[11,1223,1225],{"id":1224},"wat-gebeurt-er-tijdens-de-keuring","Wat gebeurt er tijdens de keuring?",[16,1227,1228],{},"De keuring duurt doorgaans tussen 1 en 3 uur, afhankelijk van de omvang van de installatie. De keurder zal:",[183,1230,1231,1237,1243,1249],{},[38,1232,1233,1236],{},[20,1234,1235],{},"Documentatie controleren"," — Verifiëren of het eendraadschema en situatieplan overeenkomen met de werkelijke installatie",[38,1238,1239,1242],{},[20,1240,1241],{},"Visuele inspectie"," — Alle zichtbare componenten, kabels en verbindingen controleren",[38,1244,1245,1248],{},[20,1246,1247],{},"Metingen uitvoeren"," — Aardingsweerstand, isolatieweerstand en lusimpedantie testen",[38,1250,1251,1254],{},[20,1252,1253],{},"Functionele testen"," — Alle differentieelschakelaars en automaten testen",[16,1256,1257],{},"Na de keuring ontvangt u een gedetailleerd verslag met eventuele inbreuken. Bij goedkeuring ontvangt u een groen certificaat dat 25 jaar geldig is.",[11,1259,1261],{"id":1260},"hoe-planelec-helpt","Hoe PlanElec helpt",[16,1263,1264,1265,1267],{},"Het opstellen van de vereiste documentatie is vaak het meest tijdrovende onderdeel van de voorbereiding op een elektrische keuring. ",[20,1266,221],{}," vereenvoudigt dit proces aanzienlijk:",[35,1269,1270,1276,1282,1288,1294],{},[38,1271,1272,1275],{},[20,1273,1274],{},"Eendraadschema's genereren"," in minuten in plaats van uren",[38,1277,1278,1281],{},[20,1279,1280],{},"AREI-conform"," — Alle symbolen en layouts voldoen aan de Belgische regelgeving",[38,1283,1284,1287],{},[20,1285,1286],{},"Automatische situatieplannen"," op basis van uw kamerindeling",[38,1289,1290,1293],{},[20,1291,1292],{},"Exporteren naar PDF"," voor eenvoudige indiening bij de keurder",[38,1295,1296,1299],{},[20,1297,1298],{},"Meertalige ondersteuning"," — Documentatie in het Nederlands, Frans, Duits of Engels",[69,1301,1302],{},[16,1303,1304],{},"Stop met piekeren over documentatie. Concentreer u op uw installatie en laat PlanElec het papierwerk afhandelen.",[16,1306,1307],{},[263,1308,1309],{"href":265},"Begin nu gratis met uw elektrische documentatie →",{"title":268,"searchDepth":269,"depth":269,"links":1311},[1312,1313,1314,1319,1320],{"id":1068,"depth":269,"text":1069},{"id":1081,"depth":269,"text":1082},{"id":1128,"depth":269,"text":1129,"children":1315},[1316,1317,1318],{"id":1135,"depth":276,"text":1136},{"id":1167,"depth":276,"text":1168},{"id":1197,"depth":276,"text":1198},{"id":1224,"depth":269,"text":1225},{"id":1260,"depth":269,"text":1261},"Alles wat u moet weten over de elektrische keuring — van voorbereiding tot het uiteindelijke onderzoek.","nl",{},"\u002Fblog\u002Felectrical-inspection.nl",{"title":1063,"description":1321},"elektrische-keuring","blog\u002Felectrical-inspection.nl",[296,22,298,1329,300,1330,1331,1332,1333,1334,1335,308,299,301,302],"elektrische keuring","situatieschema","conformiteitsverklaring","differentieel","aarding","elektricien","België","kwCi4Yw4r9xdM0Ao_EC7E9URbIedfTFkPiI2QUstAnM",1775151659229]