[{"data":1,"prerenderedAt":1648},["ShallowReactive",2],{"blog-post-fr-reglementations-rgie-2026":3,"blog-alternates-arei-regulations-2026":384},{"id":4,"title":5,"articleId":6,"body":7,"category":354,"date":355,"description":356,"extension":357,"lastUpdated":355,"locale":358,"meta":359,"navigation":360,"path":361,"publishDate":362,"readTime":363,"refreshInterval":364,"seo":365,"slug":366,"stem":367,"tags":368,"__hash__":383},"blog\u002Fblog\u002Farei-regulations-2026.fr.md","Réglementation RGIE 2026 : Les Changements Clés","arei-regulations-2026",{"type":8,"value":9,"toc":338},"minimark",[10,15,24,27,31,36,39,68,77,81,88,108,111,115,118,144,148,151,177,181,188,202,210,214,225,236,239,243,295,299,302,328,331],[11,12,14],"h2",{"id":13},"aperçu-des-modifications-2026","Aperçu des modifications 2026",[16,17,18,19,23],"p",{},"Les réglementations électriques belges — connues sous le nom de RGIE (",[20,21,22],"em",{},"Règlement Général sur les Installations Électriques","), ou AREI en néerlandais — sont régulièrement mises à jour pour suivre les avancées technologiques et les exigences de sécurité. L'édition 2026 introduit plusieurs changements importants qui affectent aussi bien les nouvelles installations que les rénovations.",[16,25,26],{},"Que vous soyez propriétaire planifiant une rénovation, électricien travaillant sur des projets, ou promoteur immobilier, comprendre ces changements est essentiel pour assurer la conformité.",[11,28,30],{"id":29},"les-changements-clés-en-bref","Les changements clés en bref",[32,33,35],"h3",{"id":34},"_1-protection-renforcée-pour-les-bornes-de-recharge-ve","1. Protection renforcée pour les bornes de recharge VE",[16,37,38],{},"Avec la croissance rapide des véhicules électriques en Belgique, la réglementation 2026 renforce les exigences pour les installations de recharge :",[40,41,42,50,56,62],"ul",{},[43,44,45,49],"li",{},[46,47,48],"strong",{},"Circuit dédié obligatoire"," — Chaque point de charge doit avoir son propre circuit avec une protection appropriée",[43,51,52,55],{},[46,53,54],{},"Gestion de charge"," — Les installations avec plusieurs points de charge doivent inclure une gestion intelligente de la charge",[43,57,58,61],{},[46,59,60],{},"Dimensionnement des câbles"," — Les sections minimales des câbles pour les circuits de recharge ont été augmentées",[43,63,64,67],{},[46,65,66],{},"Différentiel Type B"," — Les installations de recharge nécessitent désormais des différentiels de Type B (ou Type A avec détection DC)",[69,70,71],"blockquote",{},[16,72,73,76],{},[46,74,75],{},"Impact"," : Si vous installez une borne de recharge VE, prévoyez un circuit dédié avec une protection appropriée. La mise à niveau d'un circuit existant n'est plus acceptable.",[32,78,80],{"id":79},"_2-protection-contre-les-surtensions-désormais-obligatoire","2. Protection contre les surtensions désormais obligatoire",[16,82,83,84,87],{},"Bien que précédemment recommandée, la protection contre les surtensions (SPD — Surge Protection Device) est maintenant ",[46,85,86],{},"obligatoire"," pour toutes les nouvelles installations et rénovations majeures :",[40,89,90,96,102,105],{},[43,91,92,95],{},[46,93,94],{},"SPD Type 2"," minimum au tableau de distribution principal",[43,97,98,101],{},[46,99,100],{},"SPD Type 3"," recommandé pour les équipements sensibles",[43,103,104],{},"Doit être coordonné avec les dispositifs de protection en amont",[43,106,107],{},"Contrôle régulier et remplacement après activation requis",[16,109,110],{},"Ce changement reflète la sensibilité croissante des équipements électroniques modernes et le risque grandissant de surtensions provenant du réseau.",[32,112,114],{"id":113},"_3-exigences-mises-à-jour-pour-les-installations-solaires","3. Exigences mises à jour pour les installations solaires",[16,116,117],{},"Les réglementations pour les installations photovoltaïques (PV) ont été affinées :",[40,119,120,126,132,138],{},[43,121,122,125],{},[46,123,124],{},"Interrupteur-sectionneur DC"," doit être accessible et clairement étiqueté",[43,127,128,131],{},[46,129,130],{},"Détection d'arc"," (AFDD) est désormais recommandée pour les circuits DC",[43,133,134,137],{},[46,135,136],{},"Systèmes de stockage par batteries"," doivent respecter des exigences spécifiques de ventilation et de protection incendie",[43,139,140,143],{},[46,141,142],{},"Documentation du comptage bidirectionnel"," doit être incluse dans le dossier d'installation",[32,145,147],{"id":146},"_4-règles-plus-strictes-pour-les-pièces-humides","4. Règles plus strictes pour les pièces humides",[16,149,150],{},"La classification des pièces humides (zones) et leurs exigences de protection ont été mises à jour :",[40,152,153,159,165,171],{},[43,154,155,158],{},[46,156,157],{},"Zone 0"," (dans la baignoire\u002Fdouche) — Seuls les circuits TBTS (Très Basse Tension de Sécurité) autorisés",[43,160,161,164],{},[46,162,163],{},"Zone 1"," (au-dessus de la baignoire\u002Fdouche) — Minimum IPX4 en zone 1 (IPX5 uniquement en cas de jets d'eau\u002Fnettoyage haute pression)",[43,166,167,170],{},[46,168,169],{},"Zone 2"," (0,6m autour de la baignoire\u002Fdouche) — Protection différentielle 30mA obligatoire, IP X4 minimum",[43,172,173,176],{},[46,174,175],{},"Zone en dehors des zones"," — Règles d'installation normales, équipement résistant aux éclaboussures recommandé",[32,178,180],{"id":179},"_5-documentation-numérique-acceptée","5. Documentation numérique acceptée",[16,182,183,184,187],{},"Pour la première fois, la réglementation accepte explicitement la ",[46,185,186],{},"documentation numérique"," :",[40,189,190,193,196,199],{},[43,191,192],{},"Les schémas unifilaires peuvent être soumis au format PDF numérique",[43,194,195],{},"Les plans de situation peuvent être générés avec des outils numériques (comme PlanElec)",[43,197,198],{},"Les signatures numériques sont acceptées sur les déclarations de conformité",[43,200,201],{},"L'archivage électronique des rapports de contrôle est autorisé",[69,203,204],{},[16,205,206,209],{},[46,207,208],{},"Bonne nouvelle"," : Ce changement valide officiellement l'utilisation d'outils comme PlanElec pour la création de votre documentation électrique.",[11,211,213],{"id":212},"ce-que-cela-signifie-pour-les-installations-existantes","Ce que cela signifie pour les installations existantes",[16,215,216,217,220,221,224],{},"La réglementation 2026 s'applique principalement aux ",[46,218,219],{},"nouvelles installations"," et aux ",[46,222,223],{},"rénovations majeures",". Les installations existantes ayant réussi le contrôle sous les réglementations précédentes restent valides jusqu'à :",[40,226,227,230,233],{},[43,228,229],{},"Le prochain contrôle périodique (tous les 25 ans)",[43,231,232],{},"Une modification majeure de l'installation",[43,234,235],{},"La vente du bien immobilier",[16,237,238],{},"Cependant, il est recommandé de mettre à jour proactivement votre installation pour répondre aux nouvelles normes, en particulier concernant la protection contre les surtensions et les exigences des pièces humides.",[11,240,242],{"id":241},"calendrier-et-mise-en-œuvre","Calendrier et mise en œuvre",[244,245,246,259],"table",{},[247,248,249],"thead",{},[250,251,252,256],"tr",{},[253,254,255],"th",{},"Date",[253,257,258],{},"Jalon",[260,261,262,271,279,287],"tbody",{},[250,263,264,268],{},[265,266,267],"td",{},"Janvier 2026",[265,269,270],{},"Nouvelles réglementations publiées",[250,272,273,276],{},[265,274,275],{},"Mars 2026",[265,277,278],{},"Période de transition commence",[250,280,281,284],{},[265,282,283],{},"Juin 2026",[265,285,286],{},"Application complète pour les nouvelles installations",[250,288,289,292],{},[265,290,291],{},"Décembre 2026",[265,293,294],{},"Application complète pour les rénovations majeures",[11,296,298],{"id":297},"comment-planelec-reste-à-jour","Comment PlanElec reste à jour",[16,300,301],{},"PlanElec est continuellement mis à jour pour refléter les dernières réglementations RGIE :",[40,303,304,310,316,322],{},[43,305,306,309],{},[46,307,308],{},"Bibliothèque de symboles"," mise à jour avec les nouveaux symboles de composants",[43,311,312,315],{},[46,313,314],{},"Règles de validation"," vérifient la conformité avec les exigences 2026",[43,317,318,321],{},[46,319,320],{},"Modèles"," incluent les nouveaux éléments obligatoires (SPD, circuits VE)",[43,323,324,327],{},[46,325,326],{},"Format d'exportation"," génère une documentation conforme aux nouvelles normes d'acceptation numérique",[16,329,330],{},"Restez conforme sans avoir à étudier le texte réglementaire complet. PlanElec garantit automatiquement que votre documentation répond aux dernières normes.",[16,332,333],{},[334,335,337],"a",{"href":336},"\u002F","Mettez à jour votre documentation électrique avec PlanElec →",{"title":339,"searchDepth":340,"depth":340,"links":341},"",2,[342,343,351,352,353],{"id":13,"depth":340,"text":14},{"id":29,"depth":340,"text":30,"children":344},[345,347,348,349,350],{"id":34,"depth":346,"text":35},3,{"id":79,"depth":346,"text":80},{"id":113,"depth":346,"text":114},{"id":146,"depth":346,"text":147},{"id":179,"depth":346,"text":180},{"id":212,"depth":340,"text":213},{"id":241,"depth":340,"text":242},{"id":297,"depth":340,"text":298},"news","2026-01-02","Les dernières mises à jour des réglementations électriques belges et ce qu'elles signifient pour votre installation.","md","fr",{},true,"\u002Fblog\u002Farei-regulations-2026.fr",null,"6 min",6,{"title":5,"description":356},"reglementations-rgie-2026","blog\u002Farei-regulations-2026.fr",[369,370,371,372,373,374,375,376,377,378,379,380,381,382],"AREI","RGIE","réglementation 2026","réglementations électriques","contrôle électrique","schéma unifilaire","eendraadschema","plan de situation","Situationsplan","surtension","borne de recharge","panneaux solaires","salle de bain","Belgique","tbzX8CFyZHBWwLuaYTYlHo6bDFaUnabDLitR6Y5Sjmc",[385,736,1082,1311],{"id":386,"title":387,"articleId":6,"body":388,"category":354,"date":355,"description":716,"extension":357,"lastUpdated":355,"locale":717,"meta":718,"navigation":360,"path":719,"publishDate":362,"readTime":363,"refreshInterval":364,"seo":720,"slug":721,"stem":722,"tags":723,"__hash__":735},"blog\u002Fblog\u002Farei-regulations-2026.de.md","AREI-Vorschriften 2026: Die wichtigsten Änderungen",{"type":8,"value":389,"toc":703},[390,394,404,407,411,415,418,444,452,456,463,484,487,491,494,520,524,527,550,554,561,575,583,587,598,609,612,616,662,666,669,695,698],[11,391,393],{"id":392},"überblick-über-die-änderungen-2026","Überblick über die Änderungen 2026",[16,395,396,397,400,401,403],{},"Die belgischen Elektrovorschriften — auf Niederländisch als AREI (",[20,398,399],{},"Algemeen Reglement op de Elektrische Installaties",") und auf Französisch als RGIE (",[20,402,22],{},") bekannt — werden regelmäßig aktualisiert, um mit dem technischen Fortschritt und den Sicherheitsanforderungen Schritt zu halten. Die Ausgabe 2026 führt mehrere wichtige Änderungen ein, die sowohl Neuinstallationen als auch Renovierungen betreffen.",[16,405,406],{},"Ob Sie als Hausbesitzer eine Renovierung planen, als Elektriker an Projekten arbeiten oder als Bauträger tätig sind — das Verständnis dieser Änderungen ist für die Einhaltung der Vorschriften unerlässlich.",[11,408,410],{"id":409},"die-wichtigsten-änderungen-im-überblick","Die wichtigsten Änderungen im Überblick",[32,412,414],{"id":413},"_1-verstärkter-schutz-für-e-auto-ladestationen","1. Verstärkter Schutz für E-Auto-Ladestationen",[16,416,417],{},"Mit der raschen Zunahme von Elektrofahrzeugen in Belgien verschärfen die Vorschriften 2026 die Anforderungen an Ladeinstallationen:",[40,419,420,426,432,438],{},[43,421,422,425],{},[46,423,424],{},"Eigener Stromkreis erforderlich"," — Jeder Ladepunkt muss einen eigenen Stromkreis mit entsprechendem Schutz haben",[43,427,428,431],{},[46,429,430],{},"Lastmanagement"," — Installationen mit mehreren Ladepunkten müssen ein intelligentes Lastmanagement enthalten",[43,433,434,437],{},[46,435,436],{},"Kabeldimensionierung"," — Mindestquerschnitte für Ladestromkreise wurden erhöht",[43,439,440,443],{},[46,441,442],{},"FI-Schutz Typ B oder Typ A-EV"," — Ladeinstallationen erfordern FI-Schutzschalter vom Typ B oder Typ A-EV (mit integrierter DC-Fehlerstromsensorik ≥ 6 mA)",[69,445,446],{},[16,447,448,451],{},[46,449,450],{},"Auswirkung",": Wenn Sie eine E-Auto-Ladestation installieren, planen Sie einen eigenen Stromkreis mit entsprechendem Schutz ein. Die Nachrüstung eines bestehenden Stromkreises ist nicht mehr zulässig.",[32,453,455],{"id":454},"_2-überspannungsschutz-jetzt-pflicht","2. Überspannungsschutz jetzt Pflicht",[16,457,458,459,462],{},"Ein Überspannungsschutz (SPD — Surge Protection Device) ist bereits seit dem AREI 2020 für alle Neuinstallationen und größeren Renovierungen ",[46,460,461],{},"Pflicht",". Die Vorschriften 2026 bekräftigen dies und konkretisieren die Anforderungen:",[40,464,465,472,478,481],{},[43,466,467,468,471],{},"Mindestens ",[46,469,470],{},"Typ 2 SPD"," am Hauptverteiler",[43,473,474,477],{},[46,475,476],{},"Typ 3 SPD"," empfohlen für empfindliche Geräte",[43,479,480],{},"Muss mit den vorgelagerten Schutzeinrichtungen koordiniert sein",[43,482,483],{},"Regelmäßige Prüfung und Austausch nach Auslösung erforderlich",[16,485,486],{},"Diese Änderung spiegelt die zunehmende Empfindlichkeit moderner elektronischer Geräte und das wachsende Risiko von Spannungsspitzen aus dem Netz wider.",[32,488,490],{"id":489},"_3-aktualisierte-anforderungen-für-solaranlagen","3. Aktualisierte Anforderungen für Solaranlagen",[16,492,493],{},"Die Vorschriften für Photovoltaik-Anlagen (PV) wurden präzisiert:",[40,495,496,502,508,514],{},[43,497,498,501],{},[46,499,500],{},"DC-Trennschalter"," muss zugänglich und deutlich gekennzeichnet sein",[43,503,504,507],{},[46,505,506],{},"Lichtbogenerkennung"," (AFDD) wird jetzt für DC-Stromkreise empfohlen",[43,509,510,513],{},[46,511,512],{},"Batteriespeichersysteme"," müssen spezifische Belüftungs- und Brandschutzanforderungen erfüllen",[43,515,516,519],{},[46,517,518],{},"Dokumentation der bidirektionalen Energiemessung"," muss in der Installationsakte enthalten sein",[32,521,523],{"id":522},"_4-strengere-regeln-für-feuchträume","4. Strengere Regeln für Feuchträume",[16,525,526],{},"Die Klassifizierung von Feuchträumen (Zonen) und deren Schutzanforderungen wurden aktualisiert:",[40,528,529,534,539,544],{},[43,530,531,533],{},[46,532,157],{}," (innerhalb der Badewanne\u002FDusche) — Nur SELV-Stromkreise (Sicherheitskleinspannung) erlaubt",[43,535,536,538],{},[46,537,163],{}," (über der Badewanne\u002FDusche) — Mindestens IPX4 in Zone 1 (IPX5 nur bei Strahlwasser\u002FHochdruckreinigung)",[43,540,541,543],{},[46,542,169],{}," (0,6m um Badewanne\u002FDusche) — 30mA FI-Schutz Pflicht, mindestens IPX4",[43,545,546,549],{},[46,547,548],{},"Bereich außerhalb der Zonen"," — Normale Installationsregeln, spritzwassergeschützte Geräte empfohlen",[32,551,553],{"id":552},"_5-digitale-dokumentation-akzeptiert","5. Digitale Dokumentation akzeptiert",[16,555,556,557,560],{},"Erstmals erkennen die Vorschriften ausdrücklich ",[46,558,559],{},"digitale Dokumentation"," an:",[40,562,563,566,569,572],{},[43,564,565],{},"Eindrahtschemas dürfen im digitalen PDF-Format eingereicht werden",[43,567,568],{},"Situationspläne können mit digitalen Werkzeugen (wie PlanElec) erstellt werden",[43,570,571],{},"Digitale Unterschriften werden auf Konformitätserklärungen akzeptiert",[43,573,574],{},"Elektronische Archivierung von Prüfberichten ist zulässig",[69,576,577],{},[16,578,579,582],{},[46,580,581],{},"Gute Nachricht",": Diese Änderung bestätigt offiziell die Verwendung von Tools wie PlanElec zur Erstellung Ihrer elektrischen Dokumentation.",[11,584,586],{"id":585},"was-das-für-bestehende-installationen-bedeutet","Was das für bestehende Installationen bedeutet",[16,588,589,590,593,594,597],{},"Die Vorschriften 2026 betreffen in erster Linie ",[46,591,592],{},"Neuinstallationen"," und ",[46,595,596],{},"größere Renovierungen",". Bestehende Installationen, die unter früheren Vorschriften geprüft wurden, bleiben gültig bis:",[40,599,600,603,606],{},[43,601,602],{},"Zur nächsten periodischen Prüfung (alle 25 Jahre)",[43,604,605],{},"Bei einer wesentlichen Änderung der Installation",[43,607,608],{},"Beim Verkauf der Immobilie",[16,610,611],{},"Es wird jedoch empfohlen, Ihre Installation proaktiv auf die neuen Standards zu aktualisieren, insbesondere hinsichtlich Überspannungsschutz und Feuchtraum-Anforderungen.",[11,613,615],{"id":614},"zeitplan-und-umsetzung","Zeitplan und Umsetzung",[244,617,618,628],{},[247,619,620],{},[250,621,622,625],{},[253,623,624],{},"Datum",[253,626,627],{},"Meilenstein",[260,629,630,638,646,654],{},[250,631,632,635],{},[265,633,634],{},"Januar 2026",[265,636,637],{},"Neue Vorschriften veröffentlicht",[250,639,640,643],{},[265,641,642],{},"März 2026",[265,644,645],{},"Übergangsfrist beginnt",[250,647,648,651],{},[265,649,650],{},"Juni 2026",[265,652,653],{},"Vollständige Durchsetzung für Neuinstallationen",[250,655,656,659],{},[265,657,658],{},"Dezember 2026",[265,660,661],{},"Vollständige Durchsetzung für größere Renovierungen",[11,663,665],{"id":664},"wie-planelec-aktuell-bleibt","Wie PlanElec aktuell bleibt",[16,667,668],{},"PlanElec wird kontinuierlich aktualisiert, um die neuesten AREI\u002FRGIE-Vorschriften widerzuspiegeln:",[40,670,671,677,683,689],{},[43,672,673,676],{},[46,674,675],{},"Symbolbibliothek"," aktualisiert mit neuen Komponentensymbolen",[43,678,679,682],{},[46,680,681],{},"Validierungsregeln"," prüfen die Konformität mit den Anforderungen 2026",[43,684,685,688],{},[46,686,687],{},"Vorlagen"," enthalten neue Pflichtelemente (SPD, E-Auto-Stromkreise)",[43,690,691,694],{},[46,692,693],{},"Exportformat"," generiert Dokumentation, die den neuen digitalen Akzeptanzstandards entspricht",[16,696,697],{},"Bleiben Sie konform, ohne den vollständigen Vorschriftentext studieren zu müssen. PlanElec stellt automatisch sicher, dass Ihre Dokumentation den neuesten Standards entspricht.",[16,699,700],{},[334,701,702],{"href":336},"Aktualisieren Sie Ihre elektrische Dokumentation mit PlanElec →",{"title":339,"searchDepth":340,"depth":340,"links":704},[705,706,713,714,715],{"id":392,"depth":340,"text":393},{"id":409,"depth":340,"text":410,"children":707},[708,709,710,711,712],{"id":413,"depth":346,"text":414},{"id":454,"depth":346,"text":455},{"id":489,"depth":346,"text":490},{"id":522,"depth":346,"text":523},{"id":552,"depth":346,"text":553},{"id":585,"depth":340,"text":586},{"id":614,"depth":340,"text":615},{"id":664,"depth":340,"text":665},"Die neuesten Updates der belgischen Elektrovorschriften und was sie für Ihre Installation bedeuten.","de",{},"\u002Fblog\u002Farei-regulations-2026.de",{"title":387,"description":716},"arei-vorschriften-2026","blog\u002Farei-regulations-2026.de",[369,370,724,725,726,727,728,729,377,730,731,732,733,734],"Vorschriften 2026","Elektrovorschriften","Stromabnahme","Keuring","Eindrahtschema","Eendraadschema","Überspannungsschutz","Wallbox","Solaranlage","Badezimmerzonen","Belgien","ehbQe1W8O9_XFaSsNDZFf6Aabp5qcIa4JEDLbTj1oZA",{"id":737,"title":738,"articleId":6,"body":739,"category":354,"date":355,"description":1063,"extension":357,"lastUpdated":355,"locale":1064,"meta":1065,"navigation":360,"path":1066,"publishDate":362,"readTime":363,"refreshInterval":364,"seo":1067,"slug":6,"stem":1068,"tags":1069,"__hash__":1081},"blog\u002Fblog\u002Farei-regulations-2026.en.md","AREI\u002FRGIE Regulations 2026: The Key Changes",{"type":8,"value":740,"toc":1050},[741,745,754,757,761,765,768,794,801,805,812,832,835,839,842,868,872,875,898,902,909,923,931,935,946,957,960,964,1009,1013,1016,1042,1045],[11,742,744],{"id":743},"overview-of-the-2026-updates","Overview of the 2026 Updates",[16,746,747,748,750,751,753],{},"The Belgian electrical regulations — known as AREI (",[20,749,399],{},") in Dutch and RGIE (",[20,752,22],{},") in French — receive regular updates to keep pace with technological advances and safety requirements. The 2026 edition introduces several important changes that affect both new installations and renovations.",[16,755,756],{},"Whether you're a homeowner planning a renovation, an electrician working on projects, or a property developer, understanding these changes is essential for ensuring compliance.",[11,758,760],{"id":759},"key-changes-at-a-glance","Key Changes at a Glance",[32,762,764],{"id":763},"_1-enhanced-protection-for-ev-charging","1. Enhanced Protection for EV Charging",[16,766,767],{},"With the rapid growth of electric vehicle adoption in Belgium, the 2026 regulations strengthen the requirements for EV charging installations:",[40,769,770,776,782,788],{},[43,771,772,775],{},[46,773,774],{},"Dedicated circuit required"," — Each charging point must have its own dedicated circuit with appropriate protection",[43,777,778,781],{},[46,779,780],{},"Load management"," — Installations with multiple charging points must include intelligent load management",[43,783,784,787],{},[46,785,786],{},"Cable sizing"," — Minimum cable cross-sections have been increased for charging circuits",[43,789,790,793],{},[46,791,792],{},"RCD Type B or Type A-EV"," — Charging installations require Type B or Type A-EV residual current devices (with integrated DC fault current sensing ≥ 6 mA)",[69,795,796],{},[16,797,798,800],{},[46,799,75],{},": If you're installing an EV charger, budget for a dedicated circuit with appropriate protection. Retrofitting an existing circuit is no longer acceptable.",[32,802,804],{"id":803},"_2-surge-protection-now-mandatory","2. Surge Protection Now Mandatory",[16,806,807,808,811],{},"Surge protection (SPD — Surge Protection Device) has been ",[46,809,810],{},"mandatory"," since the AREI 2020 for all new installations and major renovations. The 2026 regulations reaffirm this and specify the requirements further:",[40,813,814,820,826,829],{},[43,815,816,819],{},[46,817,818],{},"Type 2 SPD"," minimum at the main distribution board",[43,821,822,825],{},[46,823,824],{},"Type 3 SPD"," recommended for sensitive equipment",[43,827,828],{},"Must be coordinated with the upstream protection devices",[43,830,831],{},"Regular testing and replacement after activation required",[16,833,834],{},"This change reflects the increasing sensitivity of modern electronic equipment and the growing risk of voltage surges from the grid.",[32,836,838],{"id":837},"_3-updated-requirements-for-solar-installations","3. Updated Requirements for Solar Installations",[16,840,841],{},"The regulations for photovoltaic (PV) installations have been refined:",[40,843,844,850,856,862],{},[43,845,846,849],{},[46,847,848],{},"DC disconnect switch"," must be accessible and clearly labeled",[43,851,852,855],{},[46,853,854],{},"Arc fault detection"," (AFDD) is now recommended for DC circuits",[43,857,858,861],{},[46,859,860],{},"Battery storage systems"," must comply with specific ventilation and fire protection requirements",[43,863,864,867],{},[46,865,866],{},"Bidirectional energy metering"," documentation must be included in the installation file",[32,869,871],{"id":870},"_4-stricter-rules-for-wet-areas","4. Stricter Rules for Wet Areas",[16,873,874],{},"The classification of wet areas (zones) and their protection requirements have been updated:",[40,876,877,882,887,892],{},[43,878,879,881],{},[46,880,157],{}," (inside bath\u002Fshower) — Only SELV (Safety Extra Low Voltage) circuits allowed",[43,883,884,886],{},[46,885,163],{}," (above bath\u002Fshower) — Minimum IPX4 (IPX5 only when jet water\u002Fhigh-pressure cleaning is present)",[43,888,889,891],{},[46,890,169],{}," (0.6m around bath\u002Fshower) — 30mA RCD protection mandatory, minimum IPX4",[43,893,894,897],{},[46,895,896],{},"Area outside the zones"," — Normal installation rules, splash-proof equipment recommended",[32,899,901],{"id":900},"_5-digital-documentation-accepted","5. Digital Documentation Accepted",[16,903,904,905,908],{},"For the first time, the regulations explicitly accept ",[46,906,907],{},"digital documentation",":",[40,910,911,914,917,920],{},[43,912,913],{},"Single-line diagrams may be submitted in digital PDF format",[43,915,916],{},"Floor plans can be generated from digital tools (like PlanElec)",[43,918,919],{},"Digital signatures are accepted on compliance declarations",[43,921,922],{},"Electronic archiving of inspection reports is permitted",[69,924,925],{},[16,926,927,930],{},[46,928,929],{},"Good news",": This change officially validates the use of tools like PlanElec for creating your electrical documentation.",[11,932,934],{"id":933},"what-this-means-for-existing-installations","What This Means for Existing Installations",[16,936,937,938,941,942,945],{},"The 2026 regulations primarily affect ",[46,939,940],{},"new installations"," and ",[46,943,944],{},"major renovations",". Existing installations that passed inspection under previous regulations remain valid until:",[40,947,948,951,954],{},[43,949,950],{},"The next periodic inspection (every 25 years)",[43,952,953],{},"A major modification to the installation",[43,955,956],{},"The sale of the property",[16,958,959],{},"However, it's recommended to proactively update your installation to meet the new standards, especially regarding surge protection and wet area requirements.",[11,961,963],{"id":962},"timeline-and-implementation","Timeline and Implementation",[244,965,966,975],{},[247,967,968],{},[250,969,970,972],{},[253,971,255],{},[253,973,974],{},"Milestone",[260,976,977,985,993,1001],{},[250,978,979,982],{},[265,980,981],{},"January 2026",[265,983,984],{},"New regulations published",[250,986,987,990],{},[265,988,989],{},"March 2026",[265,991,992],{},"Transition period begins",[250,994,995,998],{},[265,996,997],{},"June 2026",[265,999,1000],{},"Full enforcement for new installations",[250,1002,1003,1006],{},[265,1004,1005],{},"December 2026",[265,1007,1008],{},"Full enforcement for major renovations",[11,1010,1012],{"id":1011},"how-planelec-stays-current","How PlanElec Stays Current",[16,1014,1015],{},"PlanElec is continuously updated to reflect the latest AREI\u002FRGIE regulations:",[40,1017,1018,1024,1030,1036],{},[43,1019,1020,1023],{},[46,1021,1022],{},"Symbol library"," updated with new component symbols",[43,1025,1026,1029],{},[46,1027,1028],{},"Validation rules"," check compliance with 2026 requirements",[43,1031,1032,1035],{},[46,1033,1034],{},"Templates"," include new mandatory elements (SPD, EV circuits)",[43,1037,1038,1041],{},[46,1039,1040],{},"Export format"," generates documentation that meets the new digital acceptance standards",[16,1043,1044],{},"Stay compliant without having to study the full regulation text. PlanElec ensures your documentation meets the latest standards automatically.",[16,1046,1047],{},[334,1048,1049],{"href":336},"Update your electrical documentation with PlanElec →",{"title":339,"searchDepth":340,"depth":340,"links":1051},[1052,1053,1060,1061,1062],{"id":743,"depth":340,"text":744},{"id":759,"depth":340,"text":760,"children":1054},[1055,1056,1057,1058,1059],{"id":763,"depth":346,"text":764},{"id":803,"depth":346,"text":804},{"id":837,"depth":346,"text":838},{"id":870,"depth":346,"text":871},{"id":900,"depth":346,"text":901},{"id":933,"depth":340,"text":934},{"id":962,"depth":340,"text":963},{"id":1011,"depth":340,"text":1012},"The latest updates to the Belgian electrical regulations and what they mean for your installation.","en",{},"\u002Fblog\u002Farei-regulations-2026.en",{"title":738,"description":1063},"blog\u002Farei-regulations-2026.en",[369,370,1070,1071,1072,1073,1074,375,728,374,1075,1076,1077,1078,1079,1080],"regulations 2026","electrical regulations","inspection","keuring","single-line diagram","situation plan","surge protection","EV charging","solar panels","bathroom zones","Belgium","1N5r4QSyqGaTxVnrPScx_lqRefOJnnEkd9ppDyvj5i0",{"id":4,"title":5,"articleId":6,"body":1083,"category":354,"date":355,"description":356,"extension":357,"lastUpdated":355,"locale":358,"meta":1308,"navigation":360,"path":361,"publishDate":362,"readTime":363,"refreshInterval":364,"seo":1309,"slug":366,"stem":367,"tags":1310,"__hash__":383},{"type":8,"value":1084,"toc":1295},[1085,1087,1091,1093,1095,1097,1099,1117,1123,1125,1129,1143,1145,1147,1149,1167,1169,1171,1189,1191,1195,1205,1211,1213,1219,1227,1229,1231,1267,1269,1271,1289,1291],[11,1086,14],{"id":13},[16,1088,18,1089,23],{},[20,1090,22],{},[16,1092,26],{},[11,1094,30],{"id":29},[32,1096,35],{"id":34},[16,1098,38],{},[40,1100,1101,1105,1109,1113],{},[43,1102,1103,49],{},[46,1104,48],{},[43,1106,1107,55],{},[46,1108,54],{},[43,1110,1111,61],{},[46,1112,60],{},[43,1114,1115,67],{},[46,1116,66],{},[69,1118,1119],{},[16,1120,1121,76],{},[46,1122,75],{},[32,1124,80],{"id":79},[16,1126,83,1127,87],{},[46,1128,86],{},[40,1130,1131,1135,1139,1141],{},[43,1132,1133,95],{},[46,1134,94],{},[43,1136,1137,101],{},[46,1138,100],{},[43,1140,104],{},[43,1142,107],{},[16,1144,110],{},[32,1146,114],{"id":113},[16,1148,117],{},[40,1150,1151,1155,1159,1163],{},[43,1152,1153,125],{},[46,1154,124],{},[43,1156,1157,131],{},[46,1158,130],{},[43,1160,1161,137],{},[46,1162,136],{},[43,1164,1165,143],{},[46,1166,142],{},[32,1168,147],{"id":146},[16,1170,150],{},[40,1172,1173,1177,1181,1185],{},[43,1174,1175,158],{},[46,1176,157],{},[43,1178,1179,164],{},[46,1180,163],{},[43,1182,1183,170],{},[46,1184,169],{},[43,1186,1187,176],{},[46,1188,175],{},[32,1190,180],{"id":179},[16,1192,183,1193,187],{},[46,1194,186],{},[40,1196,1197,1199,1201,1203],{},[43,1198,192],{},[43,1200,195],{},[43,1202,198],{},[43,1204,201],{},[69,1206,1207],{},[16,1208,1209,209],{},[46,1210,208],{},[11,1212,213],{"id":212},[16,1214,216,1215,220,1217,224],{},[46,1216,219],{},[46,1218,223],{},[40,1220,1221,1223,1225],{},[43,1222,229],{},[43,1224,232],{},[43,1226,235],{},[16,1228,238],{},[11,1230,242],{"id":241},[244,1232,1233,1241],{},[247,1234,1235],{},[250,1236,1237,1239],{},[253,1238,255],{},[253,1240,258],{},[260,1242,1243,1249,1255,1261],{},[250,1244,1245,1247],{},[265,1246,267],{},[265,1248,270],{},[250,1250,1251,1253],{},[265,1252,275],{},[265,1254,278],{},[250,1256,1257,1259],{},[265,1258,283],{},[265,1260,286],{},[250,1262,1263,1265],{},[265,1264,291],{},[265,1266,294],{},[11,1268,298],{"id":297},[16,1270,301],{},[40,1272,1273,1277,1281,1285],{},[43,1274,1275,309],{},[46,1276,308],{},[43,1278,1279,315],{},[46,1280,314],{},[43,1282,1283,321],{},[46,1284,320],{},[43,1286,1287,327],{},[46,1288,326],{},[16,1290,330],{},[16,1292,1293],{},[334,1294,337],{"href":336},{"title":339,"searchDepth":340,"depth":340,"links":1296},[1297,1298,1305,1306,1307],{"id":13,"depth":340,"text":14},{"id":29,"depth":340,"text":30,"children":1299},[1300,1301,1302,1303,1304],{"id":34,"depth":346,"text":35},{"id":79,"depth":346,"text":80},{"id":113,"depth":346,"text":114},{"id":146,"depth":346,"text":147},{"id":179,"depth":346,"text":180},{"id":212,"depth":340,"text":213},{"id":241,"depth":340,"text":242},{"id":297,"depth":340,"text":298},{},{"title":5,"description":356},[369,370,371,372,373,374,375,376,377,378,379,380,381,382],{"id":1312,"title":1313,"articleId":6,"body":1314,"category":354,"date":355,"description":1631,"extension":357,"lastUpdated":355,"locale":1632,"meta":1633,"navigation":360,"path":1634,"publishDate":362,"readTime":363,"refreshInterval":364,"seo":1635,"slug":1636,"stem":1637,"tags":1638,"__hash__":1647},"blog\u002Fblog\u002Farei-regulations-2026.nl.md","AREI-regelgeving 2026: De Belangrijkste Wijzigingen",{"type":8,"value":1315,"toc":1618},[1316,1320,1326,1329,1333,1337,1340,1366,1373,1377,1384,1403,1406,1410,1413,1439,1443,1446,1469,1473,1479,1493,1501,1505,1516,1527,1530,1534,1577,1581,1584,1610,1613],[11,1317,1319],{"id":1318},"overzicht-van-de-wijzigingen-2026","Overzicht van de wijzigingen 2026",[16,1321,1322,1323,1325],{},"De Belgische elektrische voorschriften — bekend als het AREI (",[20,1324,399],{},"), of RGIE in het Frans — worden regelmatig bijgewerkt om gelijke tred te houden met technologische vooruitgang en veiligheidseisen. De editie 2026 introduceert verschillende belangrijke wijzigingen die zowel nieuwe installaties als renovaties beïnvloeden.",[16,1327,1328],{},"Of u nu een huiseigenaar bent die een renovatie plant, een elektricien die aan projecten werkt, of een projectontwikkelaar — het begrijpen van deze wijzigingen is essentieel om aan de voorschriften te voldoen.",[11,1330,1332],{"id":1331},"de-belangrijkste-wijzigingen-in-het-kort","De belangrijkste wijzigingen in het kort",[32,1334,1336],{"id":1335},"_1-verbeterde-bescherming-voor-ev-laders","1. Verbeterde bescherming voor EV-laders",[16,1338,1339],{},"Met de snelle groei van elektrische voertuigen in België verscherpen de voorschriften 2026 de eisen voor laadinstallaties:",[40,1341,1342,1348,1354,1360],{},[43,1343,1344,1347],{},[46,1345,1346],{},"Eigen kring vereist"," — Elk laadpunt moet een eigen kring hebben met passende beveiliging",[43,1349,1350,1353],{},[46,1351,1352],{},"Lastbeheer"," — Installaties met meerdere laadpunten moeten intelligent lastbeheer bevatten",[43,1355,1356,1359],{},[46,1357,1358],{},"Kabeldimensionering"," — Minimale kabeldoorsneden voor laadkringen zijn verhoogd",[43,1361,1362,1365],{},[46,1363,1364],{},"Differentieelschakelaar Type B"," — Laadinstallaties vereisen nu Type B differentieelschakelaars (of Type A met DC-detectie)",[69,1367,1368],{},[16,1369,1370,1372],{},[46,1371,75],{},": Als u een EV-lader installeert, reken dan op een eigen kring met passende beveiliging. Het achteraf bijwerken van een bestaande kring is niet meer aanvaardbaar.",[32,1374,1376],{"id":1375},"_2-overspanningsbeveiliging-nu-verplicht","2. Overspanningsbeveiliging nu verplicht",[16,1378,1379,1380,1383],{},"Terwijl het voorheen slechts aanbevolen was, is overspanningsbeveiliging (SPD — Surge Protection Device) nu ",[46,1381,1382],{},"verplicht"," voor alle nieuwe installaties en grote renovaties:",[40,1385,1386,1392,1397,1400],{},[43,1387,1388,1389,1391],{},"Minimum ",[46,1390,818],{}," bij het hoofdverdeelbord",[43,1393,1394,1396],{},[46,1395,824],{}," aanbevolen voor gevoelige apparatuur",[43,1398,1399],{},"Moet gecoördineerd zijn met de bovenstroomse beveiligingsapparaten",[43,1401,1402],{},"Regelmatige controle en vervanging na activering vereist",[16,1404,1405],{},"Deze wijziging weerspiegelt de toenemende gevoeligheid van moderne elektronische apparatuur en het groeiende risico van spanningspieken uit het net.",[32,1407,1409],{"id":1408},"_3-bijgewerkte-eisen-voor-zonne-installaties","3. Bijgewerkte eisen voor zonne-installaties",[16,1411,1412],{},"De voorschriften voor fotovoltaïsche (PV) installaties zijn verfijnd:",[40,1414,1415,1421,1427,1433],{},[43,1416,1417,1420],{},[46,1418,1419],{},"DC-scheidingsschakelaar"," moet bereikbaar en duidelijk gelabeld zijn",[43,1422,1423,1426],{},[46,1424,1425],{},"Vlamboogdetectie"," (AFDD) wordt nu aanbevolen voor DC-kringen",[43,1428,1429,1432],{},[46,1430,1431],{},"Batterijopslagsystemen"," moeten voldoen aan specifieke ventilatie- en brandveiligheidseisen",[43,1434,1435,1438],{},[46,1436,1437],{},"Documentatie van bidirectionele energiemeting"," moet worden opgenomen in het installatiedossier",[32,1440,1442],{"id":1441},"_4-strengere-regels-voor-natte-ruimtes","4. Strengere regels voor natte ruimtes",[16,1444,1445],{},"De classificatie van natte ruimtes (zones) en hun beveiligingseisen zijn bijgewerkt:",[40,1447,1448,1453,1458,1463],{},[43,1449,1450,1452],{},[46,1451,157],{}," (in het bad\u002Fde douche) — Alleen SELV-kringen (Safety Extra Low Voltage) toegestaan",[43,1454,1455,1457],{},[46,1456,163],{}," (boven het bad\u002Fde douche) — Minimum IP X5 voor alle apparatuur",[43,1459,1460,1462],{},[46,1461,169],{}," (0,6m rond bad\u002Fdouche) — 30mA differentieelbescherming verplicht, minimum IP X4",[43,1464,1465,1468],{},[46,1466,1467],{},"Nieuwe Zone 3"," — Uitgebreid tot 2,4m rond het natte gebied, spatwaterdichte apparatuur vereist",[32,1470,1472],{"id":1471},"_5-digitale-documentatie-aanvaard","5. Digitale documentatie aanvaard",[16,1474,1475,1476,908],{},"Voor het eerst aanvaarden de voorschriften uitdrukkelijk ",[46,1477,1478],{},"digitale documentatie",[40,1480,1481,1484,1487,1490],{},[43,1482,1483],{},"Eendraadschema's mogen in digitaal PDF-formaat worden ingediend",[43,1485,1486],{},"Situatieplannen kunnen worden gegenereerd met digitale tools (zoals PlanElec)",[43,1488,1489],{},"Digitale handtekeningen worden aanvaard op conformiteitsverklaringen",[43,1491,1492],{},"Elektronische archivering van keuringsverslagen is toegestaan",[69,1494,1495],{},[16,1496,1497,1500],{},[46,1498,1499],{},"Goed nieuws",": Deze wijziging valideert officieel het gebruik van tools zoals PlanElec voor het aanmaken van uw elektrische documentatie.",[11,1502,1504],{"id":1503},"wat-dit-betekent-voor-bestaande-installaties","Wat dit betekent voor bestaande installaties",[16,1506,1507,1508,1511,1512,1515],{},"De voorschriften 2026 zijn voornamelijk van toepassing op ",[46,1509,1510],{},"nieuwe installaties"," en ",[46,1513,1514],{},"grote renovaties",". Bestaande installaties die onder eerdere voorschriften zijn goedgekeurd, blijven geldig tot:",[40,1517,1518,1521,1524],{},[43,1519,1520],{},"De volgende periodieke keuring (elke 25 jaar)",[43,1522,1523],{},"Een belangrijke wijziging aan de installatie",[43,1525,1526],{},"De verkoop van het onroerend goed",[16,1528,1529],{},"Het wordt echter aanbevolen om uw installatie proactief bij te werken naar de nieuwe normen, vooral wat betreft overspanningsbeveiliging en eisen voor natte ruimtes.",[11,1531,1533],{"id":1532},"tijdlijn-en-implementatie","Tijdlijn en implementatie",[244,1535,1536,1545],{},[247,1537,1538],{},[250,1539,1540,1542],{},[253,1541,624],{},[253,1543,1544],{},"Mijlpaal",[260,1546,1547,1555,1563,1570],{},[250,1548,1549,1552],{},[265,1550,1551],{},"Januari 2026",[265,1553,1554],{},"Nieuwe voorschriften gepubliceerd",[250,1556,1557,1560],{},[265,1558,1559],{},"Maart 2026",[265,1561,1562],{},"Overgangsperiode begint",[250,1564,1565,1567],{},[265,1566,650],{},[265,1568,1569],{},"Volledige handhaving voor nieuwe installaties",[250,1571,1572,1574],{},[265,1573,1005],{},[265,1575,1576],{},"Volledige handhaving voor grote renovaties",[11,1578,1580],{"id":1579},"hoe-planelec-actueel-blijft","Hoe PlanElec actueel blijft",[16,1582,1583],{},"PlanElec wordt voortdurend bijgewerkt om de nieuwste AREI-voorschriften weer te geven:",[40,1585,1586,1592,1598,1604],{},[43,1587,1588,1591],{},[46,1589,1590],{},"Symbolenbibliotheek"," bijgewerkt met nieuwe componentsymbolen",[43,1593,1594,1597],{},[46,1595,1596],{},"Validatieregels"," controleren conformiteit met de eisen van 2026",[43,1599,1600,1603],{},[46,1601,1602],{},"Sjablonen"," bevatten nieuwe verplichte elementen (SPD, EV-kringen)",[43,1605,1606,1609],{},[46,1607,1608],{},"Exportformaat"," genereert documentatie die voldoet aan de nieuwe digitale aanvaardingsnormen",[16,1611,1612],{},"Blijf conform zonder de volledige regelgevingstekst te hoeven bestuderen. PlanElec zorgt er automatisch voor dat uw documentatie aan de nieuwste normen voldoet.",[16,1614,1615],{},[334,1616,1617],{"href":336},"Werk uw elektrische documentatie bij met PlanElec →",{"title":339,"searchDepth":340,"depth":340,"links":1619},[1620,1621,1628,1629,1630],{"id":1318,"depth":340,"text":1319},{"id":1331,"depth":340,"text":1332,"children":1622},[1623,1624,1625,1626,1627],{"id":1335,"depth":346,"text":1336},{"id":1375,"depth":346,"text":1376},{"id":1408,"depth":346,"text":1409},{"id":1441,"depth":346,"text":1442},{"id":1471,"depth":346,"text":1472},{"id":1503,"depth":340,"text":1504},{"id":1532,"depth":340,"text":1533},{"id":1579,"depth":340,"text":1580},"De laatste updates van de Belgische elektrische voorschriften en wat ze betekenen voor uw installatie.","nl",{},"\u002Fblog\u002Farei-regulations-2026.nl",{"title":1313,"description":1631},"arei-reglementen-2026","blog\u002Farei-regulations-2026.nl",[369,370,1639,1640,1073,375,1641,1642,1643,1644,1645,1478,1646],"regelgeving 2026","elektrische voorschriften","situatieschema","overspanningsbeveiliging","EV-lader","zonnepanelen","badkamerzones","België","bYpktIPgPoqnO__eCawjwytLD0UEbJIbZdZgLgKoemg",1775151659392]