[{"data":1,"prerenderedAt":3199},["ShallowReactive",2],{"blog-post-fr-renovation-rgie-plans-electriques":3,"blog-alternates-renovation-electrical-plans":705},{"id":4,"title":5,"articleId":6,"body":7,"category":679,"date":680,"description":681,"extension":682,"lastUpdated":683,"locale":684,"meta":685,"navigation":559,"path":686,"publishDate":680,"readTime":687,"refreshInterval":688,"seo":689,"slug":690,"stem":691,"tags":692,"__hash__":704},"blog\u002Fblog\u002Frenovation-electrical-plans.fr.md","Rénovation et RGIE : Quand avez-vous besoin de nouveaux plans électriques ?","renovation-electrical-plans",{"type":8,"value":9,"toc":653},"minimark",[10,15,24,28,33,36,125,129,132,195,208,212,215,222,226,229,256,260,282,286,289,344,348,351,375,379,383,386,406,410,417,437,445,449,505,509,512,541,545,548,586,589,616,620,647],[11,12,14],"h2",{"id":13},"quand-une-rénovation-déclenche-t-elle-un-contrôle-obligatoire","Quand une rénovation déclenche-t-elle un contrôle obligatoire ?",[16,17,18,19,23],"p",{},"Toute rénovation ne nécessite pas de nouveaux plans électriques et un nouveau contrôle. Le RGIE distingue clairement les travaux qui déclenchent un ",[20,21,22],"strong",{},"nouveau contrôle"," de ceux qui ne le font pas. Ce guide vous explique quelle règle s'applique à votre rénovation.",[11,25,27],{"id":26},"larbre-de-décision-nouveau-contrôle-oui-ou-non","L'arbre de décision : Nouveau contrôle oui ou non ?",[29,30,32],"h3",{"id":31},"nouveau-contrôle-requis","Nouveau contrôle REQUIS",[16,34,35],{},"Les travaux suivants déclenchent un contrôle obligatoire (Art. 6.4.7.3) :",[37,38,39,52],"table",{},[40,41,42],"thead",{},[43,44,45,49],"tr",{},[46,47,48],"th",{},"Travaux",[46,50,51],{},"Raison",[53,54,55,66,76,85,95,105,115],"tbody",{},[43,56,57,63],{},[58,59,60],"td",{},[20,61,62],{},"Ajouter de nouveaux circuits",[58,64,65],{},"Extension de l'installation",[43,67,68,73],{},[58,69,70],{},[20,71,72],{},"Remplacer le tableau de distribution",[58,74,75],{},"Modification des dispositifs de protection",[43,77,78,83],{},[58,79,80],{},[20,81,82],{},"Installer un sous-tableau",[58,84,65],{},[43,86,87,92],{},[58,88,89],{},[20,90,91],{},"Poser de nouveaux câbles",[58,93,94],{},"Modification substantielle",[43,96,97,102],{},[58,98,99],{},[20,100,101],{},"Modifier l'installation de mise à la terre",[58,103,104],{},"Critique pour la sécurité",[43,106,107,112],{},[58,108,109],{},[20,110,111],{},"Passer en triphasé",[58,113,114],{},"Modification fondamentale",[43,116,117,122],{},[58,118,119],{},[20,120,121],{},"Raccorder une borne de recharge \u002F pompe à chaleur",[58,123,124],{},"Nouveau circuit dédié",[29,126,128],{"id":127},"nouveau-contrôle-non-requis","Nouveau contrôle NON REQUIS",[16,130,131],{},"Ces travaux sont considérés comme de la maintenance :",[37,133,134,143],{},[40,135,136],{},[43,137,138,140],{},[46,139,48],{},[46,141,142],{},"Pourquoi pas de nouveau contrôle",[53,144,145,155,165,175,185],{},[43,146,147,152],{},[58,148,149],{},[20,150,151],{},"Remplacement 1-pour-1 d'une prise\u002Finterrupteur",[58,153,154],{},"Même position, même puissance",[43,156,157,162],{},[58,158,159],{},[20,160,161],{},"Remplacer une lampe par une LED",[58,163,164],{},"Pas d'intervention sur l'installation",[43,166,167,172],{},[58,168,169],{},[20,170,171],{},"Peindre, tapisser, poser des sols",[58,173,174],{},"Cosmétique, pas de raccordement électrique",[43,176,177,182],{},[58,178,179],{},[20,180,181],{},"Remplacement 1-pour-1 d'un disjoncteur",[58,183,184],{},"Même type et courant nominal",[43,186,187,192],{},[58,188,189],{},[20,190,191],{},"Changer un couvercle de prise",[58,193,194],{},"Pas d'intervention sur le câblage",[196,197,198],"blockquote",{},[16,199,200,203,204,207],{},[20,201,202],{},"Zone grise"," : Déplacer une prise vers une ",[20,205,206],{},"autre position"," constitue déjà une modification. Toute modification ou extension significative déclenche un nouveau contrôle (Art. 6.4.7.3) — même si le circuit reste le même.",[11,209,211],{"id":210},"la-règle-de-contamination","La règle de contamination",[16,213,214],{},"La règle de contamination est le concept le plus important lors des rénovations :",[196,216,217],{},[16,218,219],{},[20,220,221],{},"Si vous modifiez une partie de l'installation, le contrôleur peut remettre en question l'ensemble de l'installation.",[29,223,225],{"id":224},"ce-que-cela-signifie-en-pratique","Ce que cela signifie en pratique",[16,227,228],{},"Supposons que vous rénovez votre salle de bain et y installez de nouvelles prises et un nouvel éclairage :",[230,231,232,244,250],"ol",{},[233,234,235,236,239,240,243],"li",{},"La ",[20,237,238],{},"salle de bain"," est évaluée selon le ",[20,241,242],{},"RGIE actuel"," — toutes les prescriptions actuelles s'appliquent",[233,245,246,247],{},"Le contrôleur peut également vérifier le ",[20,248,249],{},"reste de l'installation",[233,251,252,253],{},"Les défauts existants (p. ex. différentiels manquants à la cave) peuvent ",[20,254,255],{},"également être signalés",[29,257,259],{"id":258},"comment-limiter-la-contamination","Comment limiter la contamination",[261,262,263,269,275],"ul",{},[233,264,265,268],{},[20,266,267],{},"Documentez précisément"," quelles parties ont été modifiées et lesquelles ne l'ont pas été",[233,270,271,272],{},"Marquez dans le schéma unifilaire les ",[20,273,274],{},"circuits nouveaux\u002Fmodifiés",[233,276,277,278,281],{},"Les parties inchangées relèvent du ",[20,279,280],{},"Part 8"," (exigences assouplies)",[11,283,285],{"id":284},"part-8-vs-rgie-complet-que-sapplique-quand","Part 8 vs. RGIE complet : Que s'applique quand ?",[16,287,288],{},"Le RGIE distingue entre ancien et nouveau :",[37,290,291,304],{},[40,292,293],{},[43,294,295,298,301],{},[46,296,297],{},"Partie de l'installation",[46,299,300],{},"Prescription applicable",[46,302,303],{},"Exigences",[53,305,306,319,332],{},[43,307,308,313,316],{},[58,309,310],{},[20,311,312],{},"Inchangée, avant 1981",[58,314,315],{},"Part 8 Art. 8.2 (installation existante)",[58,317,318],{},"Assouplies — p. ex. pas de différentiel par circuit requis, anciens types de câbles tolérés",[43,320,321,326,329],{},[58,322,323],{},[20,324,325],{},"Inchangée, 1981–2020",[58,327,328],{},"Part 8 Section 8.2.2 (dérogations pour installations domestiques selon l'ancien R.G.I.E.)",[58,330,331],{},"Doit correspondre à la prescription de l'époque, avec des allègements limités selon Art. 8.2.2",[43,333,334,339,341],{},[58,335,336],{},[20,337,338],{},"Modifiée \u002F Nouvelle",[58,340,242],{},[58,342,343],{},"Toutes les prescriptions actuelles (différentiel principal 300 mA + différentiel 30 mA à haute sensibilité pour les circuits prises, éclairage et salle de bain, SPD pour la partie nouvelle\u002Fmodifiée, normes de câbles)",[29,345,347],{"id":346},"scénario-typique-maison-des-années-1960","Scénario typique : Maison des années 1960",[16,349,350],{},"Vous rénovez la cuisine et la salle de bain d'une maison de 1965 :",[261,352,353,359,365],{},[233,354,355,358],{},[20,356,357],{},"Cuisine + salle de bain"," (nouveaux circuits) : RGIE actuel complet — SPD attendu selon les règles de l'art (Art. 4.5.1, principe général ; uniquement pour la partie nouvelle\u002Fmodifiée de l'installation), différentiel principal 300 mA pour l'ensemble de l'installation (Art. 4.2.4.3) + différentiel 30 mA à haute sensibilité pour les circuits prises, éclairage et salle de bain (Art. 4.2.4.3 point b), types de câbles actuels",[233,360,361,364],{},[20,362,363],{},"Chambres, salon"," (inchangés) : Part 8 — anciens câbles VOB tolérés, pas de différentiel par circuit requis",[233,366,367,370,371,374],{},[20,368,369],{},"Mais"," : Si le contrôleur constate que l'ancienne installation présente un ",[20,372,373],{},"risque de sécurité direct"," (p. ex. fils dénudés, mise à la terre manquante), il peut quand même exiger une mise en conformité",[11,376,378],{"id":377},"documentation-lors-dune-rénovation","Documentation lors d'une rénovation",[29,380,382],{"id":381},"maisons-avec-plans-existants","Maisons avec plans existants",[16,384,385],{},"Si un schéma unifilaire et un plan de situation actuels existent :",[230,387,388,394,400],{},[233,389,390,393],{},[20,391,392],{},"Mettre à jour les plans"," — ajouter les nouveaux circuits, positions modifiées",[233,395,396,399],{},[20,397,398],{},"Marquer"," ce qui est ancien et ce qui est nouveau",[233,401,402,405],{},[20,403,404],{},"Présenter les plans mis à jour"," au contrôleur",[29,407,409],{"id":408},"maisons-sans-plans-avant-1981","Maisons sans plans (avant 1981)",[16,411,412,413,416],{},"De nombreuses maisons anciennes n'ont ",[20,414,415],{},"pas de documentation existante",". Dans ce cas (Art. 9.1.2) :",[230,418,419,425,431],{},[233,420,421,424],{},[20,422,423],{},"Relever l'installation complète"," — y compris les parties inchangées",[233,426,427,430],{},[20,428,429],{},"Créer un nouveau schéma unifilaire complet"," — pour toute l'installation",[233,432,433,436],{},[20,434,435],{},"Établir un plan de situation"," — dessiner toutes les prises, interrupteurs, points lumineux",[196,438,439],{},[16,440,441,444],{},[20,442,443],{},"Attention"," : C'est l'une des raisons les plus fréquentes pour lesquelles les rénovations coûtent nettement plus cher que prévu — l'obligation de documentation pour l'ensemble de l'installation.",[11,446,448],{"id":447},"budget-coûts-typiques","Budget : Coûts typiques",[37,450,451,461],{},[40,452,453],{},[43,454,455,458],{},[46,456,457],{},"Poste",[46,459,460],{},"Coût",[53,462,463,471,481,489,497],{},[43,464,465,468],{},[58,466,467],{},"Schéma unifilaire + plan de situation (électricien)",[58,469,470],{},"300 € – 600 €",[43,472,473,476],{},[58,474,475],{},"Schéma unifilaire + plan de situation (PlanElec)",[58,477,478],{},[20,479,480],{},"Early Access actuellement gratuit",[43,482,483,486],{},[58,484,485],{},"Contrôle RGIE",[58,487,488],{},"125 € – 170 €",[43,490,491,494],{},[58,492,493],{},"Recontrôle (en cas de défauts)",[58,495,496],{},"80 € – 120 €",[43,498,499,502],{},[58,500,501],{},"Correction des défauts",[58,503,504],{},"500 € – 5 000 €+",[29,506,508],{"id":507},"lavantage-planelec-pour-les-rénovations","L'avantage PlanElec pour les rénovations",[16,510,511],{},"Avec PlanElec, vous pouvez :",[261,513,514,519,524,530,536],{},[233,515,516],{},[20,517,518],{},"Documenter l'installation existante",[233,520,521,523],{},[20,522,62],{}," et les faire valider automatiquement",[233,525,526,529],{},[20,527,528],{},"Séparer clairement"," ancien et nouveau",[233,531,532,535],{},[20,533,534],{},"Exporter le résultat en PDF"," pour le contrôleur",[233,537,538,540],{},[20,539,480],{}," ; aucun paiement n'est encore activé",[11,542,544],{"id":543},"checklist-pour-les-rénovateurs","Checklist pour les rénovateurs",[16,546,547],{},"Avant le début des travaux :",[261,549,552,562,568,574,580],{"className":550},[551],"contains-task-list",[233,553,556,561],{"className":554},[555],"task-list-item",[557,558],"input",{"disabled":559,"type":560},true,"checkbox"," Vérifier : Mes travaux déclenchent-ils un nouveau contrôle ?",[233,563,565,567],{"className":564},[555],[557,566],{"disabled":559,"type":560}," Rechercher les plans électriques existants (si disponibles)",[233,569,571,573],{"className":570},[555],[557,572],{"disabled":559,"type":560}," Prévoir un budget pour la documentation + le contrôle",[233,575,577,579],{"className":576},[555],[557,578],{"disabled":559,"type":560}," Impliquer un électricien à temps (pour l'installation)",[233,581,583,585],{"className":582},[555],[557,584],{"disabled":559,"type":560}," Utiliser PlanElec pour la documentation (créer les plans soi-même)",[16,587,588],{},"Après la rénovation :",[261,590,592,598,604,610],{"className":591},[551],[233,593,595,597],{"className":594},[555],[557,596],{"disabled":559,"type":560}," Plans mis à jour créés ?",[233,599,601,603],{"className":600},[555],[557,602],{"disabled":559,"type":560}," Tous les nouveaux circuits dans le schéma unifilaire ?",[233,605,607,609],{"className":606},[555],[557,608],{"disabled":559,"type":560}," Organisme de contrôle contacté ?",[233,611,613,615],{"className":612},[555],[557,614],{"disabled":559,"type":560}," Contrôle réussi ?",[11,617,619],{"id":618},"articles-connexes","Articles connexes",[261,621,622,629,635,641],{},[233,623,624],{},[625,626,628],"a",{"href":627},"\u002Ffr\u002Fblog\u002Fancien-rgie-part-8","L'électricité dans les bâtiments anciens en Belgique : Part 8 du RGIE expliqué",[233,630,631],{},[625,632,634],{"href":633},"\u002Ffr\u002Fblog\u002Fcout-plan-electrique","Combien coûte un plan électrique ? Comparatif de prix 2026",[233,636,637],{},[625,638,640],{"href":639},"\u002Ffr\u002Fblog\u002Fque-verifie-controleur-inspection","Que vérifie le contrôleur lors de l'inspection ?",[233,642,643],{},[625,644,646],{"href":645},"\u002Ffr\u002Fblog\u002Fdossier-electrique-vente-immobiliere","Dossier électrique lors de la vente immobilière",[16,648,649],{},[625,650,652],{"href":651},"\u002F","Planifiez votre rénovation conformément au RGIE avec PlanElec →",{"title":654,"searchDepth":655,"depth":655,"links":656},"",2,[657,658,663,667,670,674,677,678],{"id":13,"depth":655,"text":14},{"id":26,"depth":655,"text":27,"children":659},[660,662],{"id":31,"depth":661,"text":32},3,{"id":127,"depth":661,"text":128},{"id":210,"depth":655,"text":211,"children":664},[665,666],{"id":224,"depth":661,"text":225},{"id":258,"depth":661,"text":259},{"id":284,"depth":655,"text":285,"children":668},[669],{"id":346,"depth":661,"text":347},{"id":377,"depth":655,"text":378,"children":671},[672,673],{"id":381,"depth":661,"text":382},{"id":408,"depth":661,"text":409},{"id":447,"depth":655,"text":448,"children":675},[676],{"id":507,"depth":661,"text":508},{"id":543,"depth":655,"text":544},{"id":618,"depth":655,"text":619},"guide","2026-07-20","Toute rénovation ne nécessite pas de nouveaux plans électriques. Découvrez quels travaux déclenchent un nouveau contrôle et ce que signifie la règle de contamination.","md","2026-06-05","fr",{},"\u002Fblog\u002Frenovation-electrical-plans.fr","8 min",12,{"title":5,"description":681},"renovation-rgie-plans-electriques","blog\u002Frenovation-electrical-plans.fr",[693,694,695,696,697,22,698,280,699,700,701,702,703],"AREI","RGIE","rénovation","travaux","plans électriques","règle de contamination","installation existante","schéma unifilaire","plan de situation","Belgique","contrôle électrique","pskrogmRqJWTAe8uqagWBkG-SWIRTPB01k5T573VlFo",[706,1380,2047,2533],{"id":707,"title":708,"articleId":6,"body":709,"category":679,"date":680,"description":1361,"extension":682,"lastUpdated":683,"locale":1362,"meta":1363,"navigation":559,"path":1364,"publishDate":680,"readTime":687,"refreshInterval":688,"seo":1365,"slug":1366,"stem":1367,"tags":1368,"__hash__":1379},"blog\u002Fblog\u002Frenovation-electrical-plans.de.md","Renovierung und AREI: Wann brauchen Sie neue Elektropläne?",{"type":8,"value":710,"toc":1338},[711,715,722,726,730,733,816,820,823,886,898,902,905,912,916,919,946,950,970,974,977,1033,1037,1040,1064,1068,1072,1075,1095,1099,1106,1126,1134,1138,1194,1198,1201,1233,1237,1240,1273,1276,1303,1307,1333],[11,712,714],{"id":713},"wann-löst-eine-renovierung-eine-pflicht-neuabnahme-aus","Wann löst eine Renovierung eine Pflicht-Neuabnahme aus?",[16,716,717,718,721],{},"Nicht jede Renovierung erfordert neue Elektropläne und eine erneute Abnahme. Das AREI unterscheidet klar zwischen Arbeiten, die eine ",[20,719,720],{},"Neuabnahme"," (keuring) auslösen, und solchen, die das nicht tun. In diesem Leitfaden erfahren Sie, welche Regel für Ihre Renovierung gilt.",[11,723,725],{"id":724},"der-entscheidungsbaum-neuabnahme-ja-oder-nein","Der Entscheidungsbaum: Neuabnahme ja oder nein?",[29,727,729],{"id":728},"neuabnahme-erforderlich","Neuabnahme ERFORDERLICH",[16,731,732],{},"Folgende Arbeiten lösen eine Pflicht zur erneuten Abnahme aus (Art. 6.4.7.3):",[37,734,735,745],{},[40,736,737],{},[43,738,739,742],{},[46,740,741],{},"Arbeit",[46,743,744],{},"Grund",[53,746,747,757,767,776,786,796,806],{},[43,748,749,754],{},[58,750,751],{},[20,752,753],{},"Neue Stromkreise hinzufügen",[58,755,756],{},"Erweiterung der Installation",[43,758,759,764],{},[58,760,761],{},[20,762,763],{},"Schaltschrank (Verteiler) austauschen",[58,765,766],{},"Veränderung der Schutzeinrichtungen",[43,768,769,774],{},[58,770,771],{},[20,772,773],{},"Neue Unterverteilung installieren",[58,775,756],{},[43,777,778,783],{},[58,779,780],{},[20,781,782],{},"Kabel neu verlegen",[58,784,785],{},"Wesentliche Änderung",[43,787,788,793],{},[58,789,790],{},[20,791,792],{},"Erdungsanlage verändern",[58,794,795],{},"Sicherheitskritisch",[43,797,798,803],{},[58,799,800],{},[20,801,802],{},"Installation auf Dreiphasig umstellen",[58,804,805],{},"Grundlegende Änderung",[43,807,808,813],{},[58,809,810],{},[20,811,812],{},"Wallbox \u002F Wärmepumpe anschließen",[58,814,815],{},"Neuer dedizierter Stromkreis",[29,817,819],{"id":818},"neuabnahme-nicht-erforderlich","Neuabnahme NICHT ERFORDERLICH",[16,821,822],{},"Diese Arbeiten gelten als Wartung und lösen keine Neuabnahme aus:",[37,824,825,834],{},[40,826,827],{},[43,828,829,831],{},[46,830,741],{},[46,832,833],{},"Warum keine Neuabnahme",[53,835,836,846,856,866,876],{},[43,837,838,843],{},[58,839,840],{},[20,841,842],{},"Steckdose\u002FSchalter 1:1 austauschen",[58,844,845],{},"Gleiche Position, gleiche Leistung",[43,847,848,853],{},[58,849,850],{},[20,851,852],{},"Lampe durch LED ersetzen",[58,854,855],{},"Kein Eingriff in die Installation",[43,857,858,863],{},[58,859,860],{},[20,861,862],{},"Tapezieren, streichen, Böden verlegen",[58,864,865],{},"Kosmetisch, kein Elektroanschluss",[43,867,868,873],{},[58,869,870],{},[20,871,872],{},"Sicherungsautomat 1:1 tauschen",[58,874,875],{},"Gleicher Typ und Nennstrom",[43,877,878,883],{},[58,879,880],{},[20,881,882],{},"Steckdosenabdeckung wechseln",[58,884,885],{},"Kein Eingriff in die Verdrahtung",[196,887,888],{},[16,889,890,893,894,897],{},[20,891,892],{},"Grauzone",": Eine Steckdose an eine ",[20,895,896],{},"andere Position versetzen"," zählt bereits als Änderung. Jede wesentliche Änderung oder Erweiterung löst eine Neuabnahme aus (Art. 6.4.7.3) — auch wenn der Stromkreis gleich bleibt.",[11,899,901],{"id":900},"die-kontaminationsregel","Die Kontaminationsregel",[16,903,904],{},"Die Kontaminationsregel ist das wichtigste Konzept bei Renovierungen:",[196,906,907],{},[16,908,909],{},[20,910,911],{},"Wenn Sie einen Teil der Installation verändern, kann der Inspekteur die gesamte Installation beanstanden.",[29,913,915],{"id":914},"was-das-in-der-praxis-bedeutet","Was das in der Praxis bedeutet",[16,917,918],{},"Angenommen, Sie renovieren Ihr Badezimmer und installieren dort neue Steckdosen und Beleuchtung:",[230,920,921,932,939],{},[233,922,923,924,927,928,931],{},"Das ",[20,925,926],{},"Badezimmer"," wird nach dem ",[20,929,930],{},"aktuellen AREI"," bewertet — alle aktuellen Vorschriften gelten",[233,933,934,935,938],{},"Der Inspekteur kann auch die ",[20,936,937],{},"restliche Installation"," prüfen",[233,940,941,942,945],{},"Bestehende Mängel (z.B. fehlende FI-Schalter im Keller) können ",[20,943,944],{},"ebenfalls beanstandet"," werden",[29,947,949],{"id":948},"wie-sie-die-kontamination-begrenzen","Wie Sie die Kontamination begrenzen",[261,951,952,958,964],{},[233,953,954,957],{},[20,955,956],{},"Dokumentieren Sie genau",", welche Teile verändert wurden und welche nicht",[233,959,960,961],{},"Markieren Sie im Eindrahtschema die ",[20,962,963],{},"neuen\u002Fgeänderten Stromkreise",[233,965,966,967,969],{},"Die unveränderten Teile fallen unter ",[20,968,280],{}," (gelockerte Anforderungen)",[11,971,973],{"id":972},"part-8-vs-volles-arei-was-gilt-wann","Part 8 vs. Volles AREI: Was gilt wann?",[16,975,976],{},"Das AREI unterscheidet zwischen Alt und Neu:",[37,978,979,992],{},[40,980,981],{},[43,982,983,986,989],{},[46,984,985],{},"Installationsteil",[46,987,988],{},"Geltende Vorschrift",[46,990,991],{},"Anforderungen",[53,993,994,1007,1020],{},[43,995,996,1001,1004],{},[58,997,998],{},[20,999,1000],{},"Unverändert, vor 1981",[58,1002,1003],{},"Part 8 Art. 8.2 (Altinstallation)",[58,1005,1006],{},"Gelockert — z.B. kein FI pro Kreis nötig, alte Kabeltypen toleriert",[43,1008,1009,1014,1017],{},[58,1010,1011],{},[20,1012,1013],{},"Unverändert, 1981–2020",[58,1015,1016],{},"Part 8 Abschnitt 8.2.2 (Abweichungen für hauswirtschaftliche Anlagen nach früherer A.O.E.A.)",[58,1018,1019],{},"Muss der damaligen Vorschrift entsprechen, mit begrenzten Erleichterungen nach Art. 8.2.2",[43,1021,1022,1027,1030],{},[58,1023,1024],{},[20,1025,1026],{},"Verändert \u002F Neu",[58,1028,1029],{},"Aktuelles AREI",[58,1031,1032],{},"Alle aktuellen Vorschriften (300 mA Haupt-RCD + 30 mA FI hoher Empfindlichkeit für Steckdosen-, Beleuchtungs- und Badezimmer-Stromkreise, SPD für den neuen\u002Fveränderten Teil, Kabelstandards)",[29,1034,1036],{"id":1035},"typisches-szenario-haus-aus-den-1960ern","Typisches Szenario: Haus aus den 1960ern",[16,1038,1039],{},"Sie renovieren die Küche und das Badezimmer eines Hauses aus 1965:",[261,1041,1042,1048,1054],{},[233,1043,1044,1047],{},[20,1045,1046],{},"Küche + Bad"," (neue Stromkreise): Volles aktuelles AREI — SPD nach den Regeln des Fachs erwartet (Art. 4.5.1, allgemeiner Grundsatz; gilt nur für den neuen\u002Fveränderten Teil der Installation), 300 mA Haupt-RCD für die gesamte Installation (Art. 4.2.4.3) + 30 mA FI hoher Empfindlichkeit für Steckdosen-, Beleuchtungs- und Badezimmer-Stromkreise (Art. 4.2.4.3 Buchstabe b), aktuelle Kabeltypen",[233,1049,1050,1053],{},[20,1051,1052],{},"Schlafzimmer, Wohnzimmer"," (unverändert): Part 8 — alte VOB-Leitungen toleriert, kein FI pro Kreis nötig",[233,1055,1056,1059,1060,1063],{},[20,1057,1058],{},"Aber",": Falls der Inspekteur feststellt, dass die alte Installation ein ",[20,1061,1062],{},"direktes Sicherheitsrisiko"," darstellt (z.B. blanke Drähte, fehlende Erdung), kann er trotzdem eine Nachbesserung fordern",[11,1065,1067],{"id":1066},"dokumentation-bei-renovierung","Dokumentation bei Renovierung",[29,1069,1071],{"id":1070},"häuser-mit-vorhandenen-plänen","Häuser mit vorhandenen Plänen",[16,1073,1074],{},"Wenn ein aktuelles Eindrahtschema und Situationsplan existieren:",[230,1076,1077,1083,1089],{},[233,1078,1079,1082],{},[20,1080,1081],{},"Pläne aktualisieren"," — neue Stromkreise, veränderte Positionen eintragen",[233,1084,1085,1088],{},[20,1086,1087],{},"Kenntlich machen",", was alt und was neu ist",[233,1090,1091,1094],{},[20,1092,1093],{},"Aktualisierte Pläne"," dem Kontrolleur vorlegen",[29,1096,1098],{"id":1097},"häuser-ohne-pläne-vor-1981","Häuser ohne Pläne (vor 1981)",[16,1100,1101,1102,1105],{},"Viele ältere Häuser haben ",[20,1103,1104],{},"keine vorhandene Dokumentation",". In diesem Fall (Art. 9.1.2):",[230,1107,1108,1114,1120],{},[233,1109,1110,1113],{},[20,1111,1112],{},"Gesamte Installation aufnehmen"," — auch die unveränderten Teile",[233,1115,1116,1119],{},[20,1117,1118],{},"Eindrahtschema komplett neu erstellen"," — für die gesamte Installation",[233,1121,1122,1125],{},[20,1123,1124],{},"Situationsplan erstellen"," — alle Steckdosen, Schalter, Leuchten einzeichnen",[196,1127,1128],{},[16,1129,1130,1133],{},[20,1131,1132],{},"Achtung",": Dies ist einer der häufigsten Gründe, warum Renovierungen deutlich teurer werden als geplant — die Dokumentationspflicht für die Gesamtinstallation.",[11,1135,1137],{"id":1136},"budgetplanung-typische-kosten","Budgetplanung: Typische Kosten",[37,1139,1140,1150],{},[40,1141,1142],{},[43,1143,1144,1147],{},[46,1145,1146],{},"Posten",[46,1148,1149],{},"Kosten",[53,1151,1152,1160,1170,1178,1186],{},[43,1153,1154,1157],{},[58,1155,1156],{},"Eindrahtschema + Situationsplan (Elektriker)",[58,1158,1159],{},"€300 – €600",[43,1161,1162,1165],{},[58,1163,1164],{},"Eindrahtschema + Situationsplan (PlanElec)",[58,1166,1167],{},[20,1168,1169],{},"Early Access derzeit kostenlos",[43,1171,1172,1175],{},[58,1173,1174],{},"AREI-Abnahme (Keuring)",[58,1176,1177],{},"€125 – €170",[43,1179,1180,1183],{},[58,1181,1182],{},"Nachkontrolle (bei Mängeln)",[58,1184,1185],{},"€80 – €120",[43,1187,1188,1191],{},[58,1189,1190],{},"Mängelbeseitigung",[58,1192,1193],{},"€500 – €5.000+",[29,1195,1197],{"id":1196},"der-planelec-vorteil-bei-renovierungen","Der PlanElec-Vorteil bei Renovierungen",[16,1199,1200],{},"Mit PlanElec können Sie:",[261,1202,1203,1210,1216,1222,1228],{},[233,1204,1205,1206,1209],{},"Die ",[20,1207,1208],{},"bestehende Installation"," aufnehmen und dokumentieren",[233,1211,1212,1215],{},[20,1213,1214],{},"Neue Stromkreise"," hinzufügen und automatisch validieren lassen",[233,1217,1218,1221],{},[20,1219,1220],{},"Alt vs. Neu"," klar trennen",[233,1223,923,1224,1227],{},[20,1225,1226],{},"Ergebnis als PDF"," für den Kontrolleur exportieren",[233,1229,1230,1232],{},[20,1231,1169],{},"; noch keine Zahlungsabwicklung aktiv",[11,1234,1236],{"id":1235},"checkliste-für-renovierer","Checkliste für Renovierer",[16,1238,1239],{},"Vor Beginn der Renovierung:",[261,1241,1243,1249,1255,1261,1267],{"className":1242},[551],[233,1244,1246,1248],{"className":1245},[555],[557,1247],{"disabled":559,"type":560}," Prüfen: Lösen meine Arbeiten eine Neuabnahme aus?",[233,1250,1252,1254],{"className":1251},[555],[557,1253],{"disabled":559,"type":560}," Bestehende Elektropläne suchen (falls vorhanden)",[233,1256,1258,1260],{"className":1257},[555],[557,1259],{"disabled":559,"type":560}," Budget für Dokumentation + Keuring einplanen",[233,1262,1264,1266],{"className":1263},[555],[557,1265],{"disabled":559,"type":560}," Elektriker frühzeitig einbinden (für die Installation)",[233,1268,1270,1272],{"className":1269},[555],[557,1271],{"disabled":559,"type":560}," PlanElec für die Dokumentation nutzen (Pläne selbst erstellen)",[16,1274,1275],{},"Nach der Renovierung:",[261,1277,1279,1285,1291,1297],{"className":1278},[551],[233,1280,1282,1284],{"className":1281},[555],[557,1283],{"disabled":559,"type":560}," Aktualisierte Pläne erstellt?",[233,1286,1288,1290],{"className":1287},[555],[557,1289],{"disabled":559,"type":560}," Alle neuen Stromkreise im Eindrahtschema?",[233,1292,1294,1296],{"className":1293},[555],[557,1295],{"disabled":559,"type":560}," Kontrollorganismus kontaktiert?",[233,1298,1300,1302],{"className":1299},[555],[557,1301],{"disabled":559,"type":560}," Keuring bestanden?",[11,1304,1306],{"id":1305},"verwandte-artikel","Verwandte Artikel",[261,1308,1309,1315,1321,1327],{},[233,1310,1311],{},[625,1312,1314],{"href":1313},"\u002Fde\u002Fblog\u002Faltbau-arei-part-8","Altbau-Elektrik in Belgien: AREI Part 8 erklärt",[233,1316,1317],{},[625,1318,1320],{"href":1319},"\u002Fde\u002Fblog\u002Felektroplan-kosten","Was kostet ein Elektroplan? Preisvergleich 2026",[233,1322,1323],{},[625,1324,1326],{"href":1325},"\u002Fde\u002Fblog\u002Fwas-prueft-kontrolleur-stromabnahme","Was prüft der Kontrolleur bei der Stromabnahme?",[233,1328,1329],{},[625,1330,1332],{"href":1331},"\u002Fde\u002Fblog\u002Felektrodossier-immobilienverkauf","Elektrodossier beim Immobilienverkauf",[16,1334,1335],{},[625,1336,1337],{"href":651},"Planen Sie Ihre Renovierung AREI-konform mit PlanElec →",{"title":654,"searchDepth":655,"depth":655,"links":1339},[1340,1341,1345,1349,1352,1356,1359,1360],{"id":713,"depth":655,"text":714},{"id":724,"depth":655,"text":725,"children":1342},[1343,1344],{"id":728,"depth":661,"text":729},{"id":818,"depth":661,"text":819},{"id":900,"depth":655,"text":901,"children":1346},[1347,1348],{"id":914,"depth":661,"text":915},{"id":948,"depth":661,"text":949},{"id":972,"depth":655,"text":973,"children":1350},[1351],{"id":1035,"depth":661,"text":1036},{"id":1066,"depth":655,"text":1067,"children":1353},[1354,1355],{"id":1070,"depth":661,"text":1071},{"id":1097,"depth":661,"text":1098},{"id":1136,"depth":655,"text":1137,"children":1357},[1358],{"id":1196,"depth":661,"text":1197},{"id":1235,"depth":655,"text":1236},{"id":1305,"depth":655,"text":1306},"Nicht jede Renovierung erfordert neue Elektropläne. Erfahren Sie, welche Arbeiten eine Neuabnahme auslösen und was die Kontaminationsregel bedeutet.","de",{},"\u002Fblog\u002Frenovation-electrical-plans.de",{"title":708,"description":1361},"renovierung-arei-elektroplaene","blog\u002Frenovation-electrical-plans.de",[693,694,1369,1370,1371,720,1372,280,1373,1374,1375,1376,1377,1378],"Renovierung","Umbau","Elektropläne","Kontaminationsregel","Altinstallation","Eindrahtschema","Situationsplan","Belgien","Stromabnahme","Keuring","rQY4OtPRMM_xqLDXR_ycAXOA-F1xxQ5O1EQeejOWz6Y",{"id":1381,"title":1382,"articleId":6,"body":1383,"category":679,"date":680,"description":2029,"extension":682,"lastUpdated":683,"locale":2030,"meta":2031,"navigation":559,"path":2032,"publishDate":680,"readTime":687,"refreshInterval":688,"seo":2033,"slug":6,"stem":2034,"tags":2035,"__hash__":2046},"blog\u002Fblog\u002Frenovation-electrical-plans.en.md","Renovation and AREI: When Do You Need New Electrical Plans?",{"type":8,"value":1384,"toc":2006},[1385,1389,1396,1400,1404,1407,1490,1494,1497,1560,1572,1576,1579,1586,1590,1593,1618,1622,1643,1647,1650,1706,1710,1713,1737,1741,1745,1748,1768,1772,1779,1799,1807,1811,1864,1868,1871,1901,1905,1908,1941,1944,1971,1975,2001],[11,1386,1388],{"id":1387},"when-does-a-renovation-trigger-a-mandatory-re-inspection","When does a renovation trigger a mandatory re-inspection?",[16,1390,1391,1392,1395],{},"Not every renovation requires new electrical plans and a re-inspection. The AREI clearly distinguishes between works that trigger a ",[20,1393,1394],{},"mandatory re-inspection"," (keuring) and those that don't. This guide explains which rule applies to your renovation.",[11,1397,1399],{"id":1398},"the-decision-tree-re-inspection-yes-or-no","The decision tree: Re-inspection yes or no?",[29,1401,1403],{"id":1402},"re-inspection-required","Re-inspection REQUIRED",[16,1405,1406],{},"The following works trigger a mandatory re-inspection (Art. 6.4.7.3):",[37,1408,1409,1419],{},[40,1410,1411],{},[43,1412,1413,1416],{},[46,1414,1415],{},"Work",[46,1417,1418],{},"Reason",[53,1420,1421,1431,1441,1450,1460,1470,1480],{},[43,1422,1423,1428],{},[58,1424,1425],{},[20,1426,1427],{},"Adding new circuits",[58,1429,1430],{},"Extension of the installation",[43,1432,1433,1438],{},[58,1434,1435],{},[20,1436,1437],{},"Replacing the distribution board",[58,1439,1440],{},"Change to protection devices",[43,1442,1443,1448],{},[58,1444,1445],{},[20,1446,1447],{},"Installing a sub-distribution",[58,1449,1430],{},[43,1451,1452,1457],{},[58,1453,1454],{},[20,1455,1456],{},"Running new cables",[58,1458,1459],{},"Substantial modification",[43,1461,1462,1467],{},[58,1463,1464],{},[20,1465,1466],{},"Modifying the earthing system",[58,1468,1469],{},"Safety-critical",[43,1471,1472,1477],{},[58,1473,1474],{},[20,1475,1476],{},"Converting to three-phase",[58,1478,1479],{},"Fundamental change",[43,1481,1482,1487],{},[58,1483,1484],{},[20,1485,1486],{},"Connecting an EV charger \u002F heat pump",[58,1488,1489],{},"New dedicated circuit",[29,1491,1493],{"id":1492},"re-inspection-not-required","Re-inspection NOT REQUIRED",[16,1495,1496],{},"These works count as maintenance and don't trigger a re-inspection:",[37,1498,1499,1508],{},[40,1500,1501],{},[43,1502,1503,1505],{},[46,1504,1415],{},[46,1506,1507],{},"Why no re-inspection",[53,1509,1510,1520,1530,1540,1550],{},[43,1511,1512,1517],{},[58,1513,1514],{},[20,1515,1516],{},"Like-for-like socket\u002Fswitch replacement",[58,1518,1519],{},"Same position, same rating",[43,1521,1522,1527],{},[58,1523,1524],{},[20,1525,1526],{},"Replacing a lamp with LED",[58,1528,1529],{},"No intervention in the installation",[43,1531,1532,1537],{},[58,1533,1534],{},[20,1535,1536],{},"Painting, wallpapering, flooring",[58,1538,1539],{},"Cosmetic, no electrical connection",[43,1541,1542,1547],{},[58,1543,1544],{},[20,1545,1546],{},"Like-for-like breaker replacement",[58,1548,1549],{},"Same type and rated current",[43,1551,1552,1557],{},[58,1553,1554],{},[20,1555,1556],{},"Changing a socket cover plate",[58,1558,1559],{},"No intervention in wiring",[196,1561,1562],{},[16,1563,1564,1567,1568,1571],{},[20,1565,1566],{},"Grey area",": Moving a socket to a ",[20,1569,1570],{},"different position"," already counts as a modification. Any significant modification or extension triggers a re-inspection (Art. 6.4.7.3) — even if the circuit stays the same.",[11,1573,1575],{"id":1574},"the-contamination-rule","The contamination rule",[16,1577,1578],{},"The contamination rule is the most important concept for renovations:",[196,1580,1581],{},[16,1582,1583],{},[20,1584,1585],{},"If you modify one part of the installation, the inspector can question the entire installation.",[29,1587,1589],{"id":1588},"what-this-means-in-practice","What this means in practice",[16,1591,1592],{},"Say you renovate your bathroom and install new sockets and lighting:",[230,1594,1595,1606,1612],{},[233,1596,1597,1598,1601,1602,1605],{},"The ",[20,1599,1600],{},"bathroom"," is assessed against the ",[20,1603,1604],{},"current AREI"," — all current regulations apply",[233,1607,1608,1609],{},"The inspector can also check the ",[20,1610,1611],{},"rest of the installation",[233,1613,1614,1615],{},"Existing defects (e.g., missing RCDs in the basement) can ",[20,1616,1617],{},"also be flagged",[29,1619,1621],{"id":1620},"how-to-limit-contamination","How to limit contamination",[261,1623,1624,1630,1637],{},[233,1625,1626,1629],{},[20,1627,1628],{},"Document precisely"," which parts were modified and which weren't",[233,1631,1632,1633,1636],{},"Mark the ",[20,1634,1635],{},"new\u002Fmodified circuits"," in the single-line diagram",[233,1638,1639,1640,1642],{},"Unmodified parts fall under ",[20,1641,280],{}," (relaxed requirements)",[11,1644,1646],{"id":1645},"part-8-vs-full-arei-what-applies-when","Part 8 vs. Full AREI: What applies when?",[16,1648,1649],{},"The AREI distinguishes between old and new:",[37,1651,1652,1665],{},[40,1653,1654],{},[43,1655,1656,1659,1662],{},[46,1657,1658],{},"Installation part",[46,1660,1661],{},"Applicable regulation",[46,1663,1664],{},"Requirements",[53,1666,1667,1680,1693],{},[43,1668,1669,1674,1677],{},[58,1670,1671],{},[20,1672,1673],{},"Unmodified, pre-1981",[58,1675,1676],{},"Part 8 Art. 8.2 (existing installation)",[58,1678,1679],{},"Relaxed — e.g., no RCD per circuit required, old cable types tolerated",[43,1681,1682,1687,1690],{},[58,1683,1684],{},[20,1685,1686],{},"Unmodified, 1981–2020",[58,1688,1689],{},"Part 8 Section 8.2.2 (deviations for domestic installations under former A.O.E.A.)",[58,1691,1692],{},"Must comply with the regulation at the time, with limited relaxations per Art. 8.2.2",[43,1694,1695,1700,1703],{},[58,1696,1697],{},[20,1698,1699],{},"Modified \u002F New",[58,1701,1702],{},"Current AREI",[58,1704,1705],{},"All current requirements (300 mA main RCD + 30 mA high-sensitivity RCD for socket, lighting and bathroom circuits, SPD for the new\u002Fmodified part, cable standards)",[29,1707,1709],{"id":1708},"typical-scenario-1960s-house","Typical scenario: 1960s house",[16,1711,1712],{},"You're renovating the kitchen and bathroom of a 1965 house:",[261,1714,1715,1721,1727],{},[233,1716,1717,1720],{},[20,1718,1719],{},"Kitchen + bathroom"," (new circuits): Full current AREI — SPD expected as good practice (Art. 4.5.1, general principle; applies only to the new\u002Fmodified part of the installation), 300 mA main RCD for the entire installation (Art. 4.2.4.3) + 30 mA high-sensitivity RCD for socket, lighting and bathroom circuits (Art. 4.2.4.3 point b), current cable types",[233,1722,1723,1726],{},[20,1724,1725],{},"Bedrooms, living room"," (unmodified): Part 8 — old VOB cables tolerated, no RCD per circuit required",[233,1728,1729,1732,1733,1736],{},[20,1730,1731],{},"However",": If the inspector finds that the old installation poses a ",[20,1734,1735],{},"direct safety risk"," (e.g., exposed wires, missing earthing), they can still require remediation",[11,1738,1740],{"id":1739},"documentation-for-renovations","Documentation for renovations",[29,1742,1744],{"id":1743},"houses-with-existing-plans","Houses with existing plans",[16,1746,1747],{},"If a current single-line diagram and situation plan exist:",[230,1749,1750,1756,1762],{},[233,1751,1752,1755],{},[20,1753,1754],{},"Update the plans"," — add new circuits, modified positions",[233,1757,1758,1761],{},[20,1759,1760],{},"Mark clearly"," what is old and what is new",[233,1763,1764,1767],{},[20,1765,1766],{},"Present updated plans"," to the inspector",[29,1769,1771],{"id":1770},"houses-without-plans-pre-1981","Houses without plans (pre-1981)",[16,1773,1774,1775,1778],{},"Many older houses have ",[20,1776,1777],{},"no existing documentation",". In that case (Art. 9.1.2):",[230,1780,1781,1787,1793],{},[233,1782,1783,1786],{},[20,1784,1785],{},"Survey the entire installation"," — including unmodified parts",[233,1788,1789,1792],{},[20,1790,1791],{},"Create a complete new single-line diagram"," — for the entire installation",[233,1794,1795,1798],{},[20,1796,1797],{},"Create a situation plan"," — draw all sockets, switches, lighting points",[196,1800,1801],{},[16,1802,1803,1806],{},[20,1804,1805],{},"Warning",": This is one of the most common reasons renovations become significantly more expensive than planned — the documentation requirement for the entire installation.",[11,1808,1810],{"id":1809},"budget-planning-typical-costs","Budget planning: Typical costs",[37,1812,1813,1823],{},[40,1814,1815],{},[43,1816,1817,1820],{},[46,1818,1819],{},"Item",[46,1821,1822],{},"Cost",[53,1824,1825,1832,1842,1849,1856],{},[43,1826,1827,1830],{},[58,1828,1829],{},"Single-line diagram + situation plan (electrician)",[58,1831,1159],{},[43,1833,1834,1837],{},[58,1835,1836],{},"Single-line diagram + situation plan (PlanElec)",[58,1838,1839],{},[20,1840,1841],{},"Early Access currently free",[43,1843,1844,1847],{},[58,1845,1846],{},"AREI inspection",[58,1848,1177],{},[43,1850,1851,1854],{},[58,1852,1853],{},"Re-inspection (if defects found)",[58,1855,1185],{},[43,1857,1858,1861],{},[58,1859,1860],{},"Defect remediation",[58,1862,1863],{},"€500 – €5,000+",[29,1865,1867],{"id":1866},"the-planelec-advantage-for-renovations","The PlanElec advantage for renovations",[16,1869,1870],{},"With PlanElec, you can:",[261,1872,1873,1878,1884,1890,1896],{},[233,1874,1875],{},[20,1876,1877],{},"Document the existing installation",[233,1879,1880,1883],{},[20,1881,1882],{},"Add new circuits"," and have them automatically validated",[233,1885,1886,1889],{},[20,1887,1888],{},"Clearly separate"," old vs. new",[233,1891,1892,1895],{},[20,1893,1894],{},"Export the result as PDF"," for the inspector",[233,1897,1898,1900],{},[20,1899,1841],{},"; payment processing is not active yet",[11,1902,1904],{"id":1903},"checklist-for-renovators","Checklist for renovators",[16,1906,1907],{},"Before starting renovations:",[261,1909,1911,1917,1923,1929,1935],{"className":1910},[551],[233,1912,1914,1916],{"className":1913},[555],[557,1915],{"disabled":559,"type":560}," Check: Do my works trigger a re-inspection?",[233,1918,1920,1922],{"className":1919},[555],[557,1921],{"disabled":559,"type":560}," Find existing electrical plans (if available)",[233,1924,1926,1928],{"className":1925},[555],[557,1927],{"disabled":559,"type":560}," Budget for documentation + inspection",[233,1930,1932,1934],{"className":1931},[555],[557,1933],{"disabled":559,"type":560}," Involve an electrician early (for the installation work)",[233,1936,1938,1940],{"className":1937},[555],[557,1939],{"disabled":559,"type":560}," Use PlanElec for documentation (create plans yourself)",[16,1942,1943],{},"After renovation:",[261,1945,1947,1953,1959,1965],{"className":1946},[551],[233,1948,1950,1952],{"className":1949},[555],[557,1951],{"disabled":559,"type":560}," Updated plans created?",[233,1954,1956,1958],{"className":1955},[555],[557,1957],{"disabled":559,"type":560}," All new circuits in the single-line diagram?",[233,1960,1962,1964],{"className":1961},[555],[557,1963],{"disabled":559,"type":560}," Inspection body contacted?",[233,1966,1968,1970],{"className":1967},[555],[557,1969],{"disabled":559,"type":560}," Inspection passed?",[11,1972,1974],{"id":1973},"related-articles","Related articles",[261,1976,1977,1983,1989,1995],{},[233,1978,1979],{},[625,1980,1982],{"href":1981},"\u002Fen\u002Fblog\u002Fold-arei-part-8","Old wiring in Belgium: AREI Part 8 explained",[233,1984,1985],{},[625,1986,1988],{"href":1987},"\u002Fen\u002Fblog\u002Felectrical-plan-costs","What does an electrical plan cost? Price comparison 2026",[233,1990,1991],{},[625,1992,1994],{"href":1993},"\u002Fen\u002Fblog\u002Fwhat-inspector-checks","What does the inspector check during the inspection?",[233,1996,1997],{},[625,1998,2000],{"href":1999},"\u002Fen\u002Fblog\u002Fproperty-sale-electrical-dossier","Electrical dossier for property sales",[16,2002,2003],{},[625,2004,2005],{"href":651},"Plan your renovation AREI-compliant with PlanElec →",{"title":654,"searchDepth":655,"depth":655,"links":2007},[2008,2009,2013,2017,2020,2024,2027,2028],{"id":1387,"depth":655,"text":1388},{"id":1398,"depth":655,"text":1399,"children":2010},[2011,2012],{"id":1402,"depth":661,"text":1403},{"id":1492,"depth":661,"text":1493},{"id":1574,"depth":655,"text":1575,"children":2014},[2015,2016],{"id":1588,"depth":661,"text":1589},{"id":1620,"depth":661,"text":1621},{"id":1645,"depth":655,"text":1646,"children":2018},[2019],{"id":1708,"depth":661,"text":1709},{"id":1739,"depth":655,"text":1740,"children":2021},[2022,2023],{"id":1743,"depth":661,"text":1744},{"id":1770,"depth":661,"text":1771},{"id":1809,"depth":655,"text":1810,"children":2025},[2026],{"id":1866,"depth":661,"text":1867},{"id":1903,"depth":655,"text":1904},{"id":1973,"depth":655,"text":1974},"Not every renovation requires new electrical plans. Learn which works trigger a mandatory re-inspection and what the contamination rule means.","en",{},"\u002Fblog\u002Frenovation-electrical-plans.en",{"title":1382,"description":2029},"blog\u002Frenovation-electrical-plans.en",[693,694,2036,2037,2038,2039,2040,280,2041,2042,2043,2044,2045],"renovation","remodelling","electrical plans","re-inspection","contamination rule","existing installation","single-line diagram","situation plan","Belgium","electrical inspection","nCBGxWou4A1hu0rIfPE3lKYrQm_ACfHrrNGlrlCNWII",{"id":4,"title":5,"articleId":6,"body":2048,"category":679,"date":680,"description":681,"extension":682,"lastUpdated":683,"locale":684,"meta":2530,"navigation":559,"path":686,"publishDate":680,"readTime":687,"refreshInterval":688,"seo":2531,"slug":690,"stem":691,"tags":2532,"__hash__":704},{"type":8,"value":2049,"toc":2507},[2050,2052,2056,2058,2060,2062,2130,2132,2134,2186,2194,2196,2198,2204,2206,2208,2224,2226,2240,2242,2244,2288,2290,2292,2308,2310,2312,2314,2328,2330,2334,2348,2354,2356,2400,2402,2404,2426,2428,2430,2458,2460,2483,2485,2503],[11,2051,14],{"id":13},[16,2053,18,2054,23],{},[20,2055,22],{},[11,2057,27],{"id":26},[29,2059,32],{"id":31},[16,2061,35],{},[37,2063,2064,2072],{},[40,2065,2066],{},[43,2067,2068,2070],{},[46,2069,48],{},[46,2071,51],{},[53,2073,2074,2082,2090,2098,2106,2114,2122],{},[43,2075,2076,2080],{},[58,2077,2078],{},[20,2079,62],{},[58,2081,65],{},[43,2083,2084,2088],{},[58,2085,2086],{},[20,2087,72],{},[58,2089,75],{},[43,2091,2092,2096],{},[58,2093,2094],{},[20,2095,82],{},[58,2097,65],{},[43,2099,2100,2104],{},[58,2101,2102],{},[20,2103,91],{},[58,2105,94],{},[43,2107,2108,2112],{},[58,2109,2110],{},[20,2111,101],{},[58,2113,104],{},[43,2115,2116,2120],{},[58,2117,2118],{},[20,2119,111],{},[58,2121,114],{},[43,2123,2124,2128],{},[58,2125,2126],{},[20,2127,121],{},[58,2129,124],{},[29,2131,128],{"id":127},[16,2133,131],{},[37,2135,2136,2144],{},[40,2137,2138],{},[43,2139,2140,2142],{},[46,2141,48],{},[46,2143,142],{},[53,2145,2146,2154,2162,2170,2178],{},[43,2147,2148,2152],{},[58,2149,2150],{},[20,2151,151],{},[58,2153,154],{},[43,2155,2156,2160],{},[58,2157,2158],{},[20,2159,161],{},[58,2161,164],{},[43,2163,2164,2168],{},[58,2165,2166],{},[20,2167,171],{},[58,2169,174],{},[43,2171,2172,2176],{},[58,2173,2174],{},[20,2175,181],{},[58,2177,184],{},[43,2179,2180,2184],{},[58,2181,2182],{},[20,2183,191],{},[58,2185,194],{},[196,2187,2188],{},[16,2189,2190,203,2192,207],{},[20,2191,202],{},[20,2193,206],{},[11,2195,211],{"id":210},[16,2197,214],{},[196,2199,2200],{},[16,2201,2202],{},[20,2203,221],{},[29,2205,225],{"id":224},[16,2207,228],{},[230,2209,2210,2216,2220],{},[233,2211,235,2212,239,2214,243],{},[20,2213,238],{},[20,2215,242],{},[233,2217,246,2218],{},[20,2219,249],{},[233,2221,252,2222],{},[20,2223,255],{},[29,2225,259],{"id":258},[261,2227,2228,2232,2236],{},[233,2229,2230,268],{},[20,2231,267],{},[233,2233,271,2234],{},[20,2235,274],{},[233,2237,277,2238,281],{},[20,2239,280],{},[11,2241,285],{"id":284},[16,2243,288],{},[37,2245,2246,2256],{},[40,2247,2248],{},[43,2249,2250,2252,2254],{},[46,2251,297],{},[46,2253,300],{},[46,2255,303],{},[53,2257,2258,2268,2278],{},[43,2259,2260,2264,2266],{},[58,2261,2262],{},[20,2263,312],{},[58,2265,315],{},[58,2267,318],{},[43,2269,2270,2274,2276],{},[58,2271,2272],{},[20,2273,325],{},[58,2275,328],{},[58,2277,331],{},[43,2279,2280,2284,2286],{},[58,2281,2282],{},[20,2283,338],{},[58,2285,242],{},[58,2287,343],{},[29,2289,347],{"id":346},[16,2291,350],{},[261,2293,2294,2298,2302],{},[233,2295,2296,358],{},[20,2297,357],{},[233,2299,2300,364],{},[20,2301,363],{},[233,2303,2304,370,2306,374],{},[20,2305,369],{},[20,2307,373],{},[11,2309,378],{"id":377},[29,2311,382],{"id":381},[16,2313,385],{},[230,2315,2316,2320,2324],{},[233,2317,2318,393],{},[20,2319,392],{},[233,2321,2322,399],{},[20,2323,398],{},[233,2325,2326,405],{},[20,2327,404],{},[29,2329,409],{"id":408},[16,2331,412,2332,416],{},[20,2333,415],{},[230,2335,2336,2340,2344],{},[233,2337,2338,424],{},[20,2339,423],{},[233,2341,2342,430],{},[20,2343,429],{},[233,2345,2346,436],{},[20,2347,435],{},[196,2349,2350],{},[16,2351,2352,444],{},[20,2353,443],{},[11,2355,448],{"id":447},[37,2357,2358,2366],{},[40,2359,2360],{},[43,2361,2362,2364],{},[46,2363,457],{},[46,2365,460],{},[53,2367,2368,2374,2382,2388,2394],{},[43,2369,2370,2372],{},[58,2371,467],{},[58,2373,470],{},[43,2375,2376,2378],{},[58,2377,475],{},[58,2379,2380],{},[20,2381,480],{},[43,2383,2384,2386],{},[58,2385,485],{},[58,2387,488],{},[43,2389,2390,2392],{},[58,2391,493],{},[58,2393,496],{},[43,2395,2396,2398],{},[58,2397,501],{},[58,2399,504],{},[29,2401,508],{"id":507},[16,2403,511],{},[261,2405,2406,2410,2414,2418,2422],{},[233,2407,2408],{},[20,2409,518],{},[233,2411,2412,523],{},[20,2413,62],{},[233,2415,2416,529],{},[20,2417,528],{},[233,2419,2420,535],{},[20,2421,534],{},[233,2423,2424,540],{},[20,2425,480],{},[11,2427,544],{"id":543},[16,2429,547],{},[261,2431,2433,2438,2443,2448,2453],{"className":2432},[551],[233,2434,2436,561],{"className":2435},[555],[557,2437],{"disabled":559,"type":560},[233,2439,2441,567],{"className":2440},[555],[557,2442],{"disabled":559,"type":560},[233,2444,2446,573],{"className":2445},[555],[557,2447],{"disabled":559,"type":560},[233,2449,2451,579],{"className":2450},[555],[557,2452],{"disabled":559,"type":560},[233,2454,2456,585],{"className":2455},[555],[557,2457],{"disabled":559,"type":560},[16,2459,588],{},[261,2461,2463,2468,2473,2478],{"className":2462},[551],[233,2464,2466,597],{"className":2465},[555],[557,2467],{"disabled":559,"type":560},[233,2469,2471,603],{"className":2470},[555],[557,2472],{"disabled":559,"type":560},[233,2474,2476,609],{"className":2475},[555],[557,2477],{"disabled":559,"type":560},[233,2479,2481,615],{"className":2480},[555],[557,2482],{"disabled":559,"type":560},[11,2484,619],{"id":618},[261,2486,2487,2491,2495,2499],{},[233,2488,2489],{},[625,2490,628],{"href":627},[233,2492,2493],{},[625,2494,634],{"href":633},[233,2496,2497],{},[625,2498,640],{"href":639},[233,2500,2501],{},[625,2502,646],{"href":645},[16,2504,2505],{},[625,2506,652],{"href":651},{"title":654,"searchDepth":655,"depth":655,"links":2508},[2509,2510,2514,2518,2521,2525,2528,2529],{"id":13,"depth":655,"text":14},{"id":26,"depth":655,"text":27,"children":2511},[2512,2513],{"id":31,"depth":661,"text":32},{"id":127,"depth":661,"text":128},{"id":210,"depth":655,"text":211,"children":2515},[2516,2517],{"id":224,"depth":661,"text":225},{"id":258,"depth":661,"text":259},{"id":284,"depth":655,"text":285,"children":2519},[2520],{"id":346,"depth":661,"text":347},{"id":377,"depth":655,"text":378,"children":2522},[2523,2524],{"id":381,"depth":661,"text":382},{"id":408,"depth":661,"text":409},{"id":447,"depth":655,"text":448,"children":2526},[2527],{"id":507,"depth":661,"text":508},{"id":543,"depth":655,"text":544},{"id":618,"depth":655,"text":619},{},{"title":5,"description":681},[693,694,695,696,697,22,698,280,699,700,701,702,703],{"id":2534,"title":2535,"articleId":6,"body":2536,"category":679,"date":680,"description":3182,"extension":682,"lastUpdated":683,"locale":3183,"meta":3184,"navigation":559,"path":3185,"publishDate":680,"readTime":687,"refreshInterval":688,"seo":3186,"slug":3187,"stem":3188,"tags":3189,"__hash__":3198},"blog\u002Fblog\u002Frenovation-electrical-plans.nl.md","Renovatie en AREI: Wanneer hebt u nieuwe elektrische plannen nodig?",{"type":8,"value":2537,"toc":3159},[2538,2542,2549,2553,2557,2560,2643,2647,2650,2713,2725,2729,2732,2739,2743,2746,2772,2776,2796,2800,2803,2859,2863,2866,2890,2894,2898,2901,2921,2925,2932,2952,2960,2964,3015,3019,3022,3054,3058,3061,3094,3097,3124,3128,3154],[11,2539,2541],{"id":2540},"wanneer-vereist-een-renovatie-een-verplichte-herkeuring","Wanneer vereist een renovatie een verplichte herkeuring?",[16,2543,2544,2545,2548],{},"Niet elke renovatie vereist nieuwe elektrische plannen en een herkeuring. Het AREI maakt een duidelijk onderscheid tussen werken die een ",[20,2546,2547],{},"herkeuring"," uitlokken en werken waarvoor dat niet geldt. In deze gids leest u welke regel voor uw renovatie van toepassing is.",[11,2550,2552],{"id":2551},"de-beslissingsboom-herkeuring-ja-of-nee","De beslissingsboom: Herkeuring ja of nee?",[29,2554,2556],{"id":2555},"herkeuring-vereist","Herkeuring VEREIST",[16,2558,2559],{},"Volgende werken vereisen een verplichte herkeuring (Art. 6.4.7.3):",[37,2561,2562,2572],{},[40,2563,2564],{},[43,2565,2566,2569],{},[46,2567,2568],{},"Werk",[46,2570,2571],{},"Reden",[53,2573,2574,2584,2594,2603,2613,2623,2633],{},[43,2575,2576,2581],{},[58,2577,2578],{},[20,2579,2580],{},"Nieuwe stroomkringen toevoegen",[58,2582,2583],{},"Uitbreiding van de installatie",[43,2585,2586,2591],{},[58,2587,2588],{},[20,2589,2590],{},"Verdeelkast vervangen",[58,2592,2593],{},"Wijziging van de beveiligingstoestellen",[43,2595,2596,2601],{},[58,2597,2598],{},[20,2599,2600],{},"Nieuwe onderverdeling installeren",[58,2602,2583],{},[43,2604,2605,2610],{},[58,2606,2607],{},[20,2608,2609],{},"Kabels opnieuw trekken",[58,2611,2612],{},"Wezenlijke wijziging",[43,2614,2615,2620],{},[58,2616,2617],{},[20,2618,2619],{},"Aardingsinstallatie wijzigen",[58,2621,2622],{},"Veiligheidskritisch",[43,2624,2625,2630],{},[58,2626,2627],{},[20,2628,2629],{},"Overschakelen naar driefasig",[58,2631,2632],{},"Fundamentele wijziging",[43,2634,2635,2640],{},[58,2636,2637],{},[20,2638,2639],{},"Laadpaal \u002F warmtepomp aansluiten",[58,2641,2642],{},"Nieuwe eigen stroomkring",[29,2644,2646],{"id":2645},"herkeuring-niet-vereist","Herkeuring NIET VEREIST",[16,2648,2649],{},"Deze werken gelden als onderhoud en lokken geen herkeuring uit:",[37,2651,2652,2661],{},[40,2653,2654],{},[43,2655,2656,2658],{},[46,2657,2568],{},[46,2659,2660],{},"Waarom geen herkeuring",[53,2662,2663,2673,2683,2693,2703],{},[43,2664,2665,2670],{},[58,2666,2667],{},[20,2668,2669],{},"Stopcontact\u002Fschakelaar 1-op-1 vervangen",[58,2671,2672],{},"Zelfde positie, zelfde vermogen",[43,2674,2675,2680],{},[58,2676,2677],{},[20,2678,2679],{},"Lamp door LED vervangen",[58,2681,2682],{},"Geen ingreep in de installatie",[43,2684,2685,2690],{},[58,2686,2687],{},[20,2688,2689],{},"Behangen, schilderen, vloeren leggen",[58,2691,2692],{},"Cosmetisch, geen elektrische aanpassing",[43,2694,2695,2700],{},[58,2696,2697],{},[20,2698,2699],{},"Automaat 1-op-1 vervangen",[58,2701,2702],{},"Zelfde type en nominale stroom",[43,2704,2705,2710],{},[58,2706,2707],{},[20,2708,2709],{},"Afdekplaatje stopcontact wisselen",[58,2711,2712],{},"Geen ingreep in de bedrading",[196,2714,2715],{},[16,2716,2717,2720,2721,2724],{},[20,2718,2719],{},"Grijze zone",": Een stopcontact naar een ",[20,2722,2723],{},"andere positie verplaatsen"," geldt al als wijziging. Elke belangrijke wijziging of uitbreiding lokt een herkeuring uit (Art. 6.4.7.3) — ook als de stroomkring dezelfde blijft.",[11,2726,2728],{"id":2727},"de-contaminatieregel","De contaminatieregel",[16,2730,2731],{},"De contaminatieregel is het belangrijkste concept bij renovaties:",[196,2733,2734],{},[16,2735,2736],{},[20,2737,2738],{},"Als u een deel van de installatie wijzigt, kan de inspecteur de volledige installatie in vraag stellen.",[29,2740,2742],{"id":2741},"wat-dit-in-de-praktijk-betekent","Wat dit in de praktijk betekent",[16,2744,2745],{},"Stel dat u uw badkamer renoveert en daar nieuwe stopcontacten en verlichting installeert:",[230,2747,2748,2759,2766],{},[233,2749,2750,2751,2754,2755,2758],{},"De ",[20,2752,2753],{},"badkamer"," wordt beoordeeld volgens het ",[20,2756,2757],{},"huidige AREI"," — alle actuele voorschriften gelden",[233,2760,2761,2762,2765],{},"De inspecteur kan ook de ",[20,2763,2764],{},"rest van de installatie"," controleren",[233,2767,2768,2769],{},"Bestaande gebreken (bijv. ontbrekende differentieelschakelaars in de kelder) kunnen ",[20,2770,2771],{},"ook worden opgemerkt",[29,2773,2775],{"id":2774},"hoe-u-de-contaminatie-beperkt","Hoe u de contaminatie beperkt",[261,2777,2778,2784,2790],{},[233,2779,2780,2783],{},[20,2781,2782],{},"Documenteer nauwkeurig"," welke delen gewijzigd zijn en welke niet",[233,2785,2786,2787],{},"Markeer in het eendraadschema de ",[20,2788,2789],{},"nieuwe\u002Fgewijzigde stroomkringen",[233,2791,2792,2793,2795],{},"De ongewijzigde delen vallen onder ",[20,2794,280],{}," (soepelere eisen)",[11,2797,2799],{"id":2798},"part-8-vs-volledig-arei-wat-geldt-wanneer","Part 8 vs. Volledig AREI: Wat geldt wanneer?",[16,2801,2802],{},"Het AREI onderscheidt tussen oud en nieuw:",[37,2804,2805,2818],{},[40,2806,2807],{},[43,2808,2809,2812,2815],{},[46,2810,2811],{},"Installatiedeel",[46,2813,2814],{},"Geldend voorschrift",[46,2816,2817],{},"Eisen",[53,2819,2820,2833,2846],{},[43,2821,2822,2827,2830],{},[58,2823,2824],{},[20,2825,2826],{},"Ongewijzigd, vóór 1981",[58,2828,2829],{},"Part 8 Art. 8.2 (bestaande installatie)",[58,2831,2832],{},"Soepeler — bijv. geen differentieel per kring nodig, oude kabeltypes getolereerd",[43,2834,2835,2840,2843],{},[58,2836,2837],{},[20,2838,2839],{},"Ongewijzigd, 1981–2020",[58,2841,2842],{},"Part 8 Art. 8.2.2 (afwijkingen voor huishoudelijke installaties volgens het vroegere A.R.E.I.)",[58,2844,2845],{},"Moet voldoen aan het toenmalige voorschrift, met beperkte versoepelingen conform Art. 8.2.2",[43,2847,2848,2853,2856],{},[58,2849,2850],{},[20,2851,2852],{},"Gewijzigd \u002F Nieuw",[58,2854,2855],{},"Actueel AREI",[58,2857,2858],{},"Alle huidige voorschriften (300 mA hoofd-RCD + 30 mA differentieelschakelaar met hoge gevoeligheid voor stopcontact-, verlichtings- en badkamerkringen, SPD voor het nieuwe\u002Fgewijzigde deel, kabelstandaarden)",[29,2860,2862],{"id":2861},"typisch-scenario-woning-uit-de-jaren-1960","Typisch scenario: Woning uit de jaren 1960",[16,2864,2865],{},"U renoveert de keuken en de badkamer van een woning uit 1965:",[261,2867,2868,2874,2880],{},[233,2869,2870,2873],{},[20,2871,2872],{},"Keuken + badkamer"," (nieuwe kringen): Volledig huidig AREI — SPD verwacht volgens de regels van de kunst (Art. 4.5.1, algemeen principe; geldt alleen voor het nieuwe\u002Fgewijzigde deel van de installatie), 300 mA hoofd-RCD voor de gehele installatie (Art. 4.2.4.3) + 30 mA differentieelschakelaar met hoge gevoeligheid voor stopcontact-, verlichtings- en badkamerkringen (Art. 4.2.4.3 punt b), actuele kabeltypes",[233,2875,2876,2879],{},[20,2877,2878],{},"Slaapkamers, woonkamer"," (ongewijzigd): Part 8 — oude VOB-leidingen getolereerd, geen differentieel per kring nodig",[233,2881,2882,2885,2886,2889],{},[20,2883,2884],{},"Maar",": Als de inspecteur vaststelt dat de oude installatie een ",[20,2887,2888],{},"direct veiligheidsrisico"," vormt (bijv. blote draden, ontbrekende aarding), kan hij toch een aanpassing eisen",[11,2891,2893],{"id":2892},"documentatie-bij-renovatie","Documentatie bij renovatie",[29,2895,2897],{"id":2896},"woningen-met-bestaande-plannen","Woningen met bestaande plannen",[16,2899,2900],{},"Als een actueel eendraadschema en situatieschema bestaan:",[230,2902,2903,2909,2915],{},[233,2904,2905,2908],{},[20,2906,2907],{},"Plannen bijwerken"," — nieuwe kringen, gewijzigde posities invoeren",[233,2910,2911,2914],{},[20,2912,2913],{},"Markeren"," wat oud is en wat nieuw",[233,2916,2917,2920],{},[20,2918,2919],{},"Bijgewerkte plannen"," aan de inspecteur voorleggen",[29,2922,2924],{"id":2923},"woningen-zonder-plannen-vóór-1981","Woningen zonder plannen (vóór 1981)",[16,2926,2927,2928,2931],{},"Veel oudere woningen hebben ",[20,2929,2930],{},"geen bestaande documentatie",". In dat geval (Art. 9.1.2):",[230,2933,2934,2940,2946],{},[233,2935,2936,2939],{},[20,2937,2938],{},"Volledige installatie opmeten"," — ook de ongewijzigde delen",[233,2941,2942,2945],{},[20,2943,2944],{},"Eendraadschema volledig opnieuw opstellen"," — voor de gehele installatie",[233,2947,2948,2951],{},[20,2949,2950],{},"Situatieschema opstellen"," — alle stopcontacten, schakelaars, verlichtingspunten intekenen",[196,2953,2954],{},[16,2955,2956,2959],{},[20,2957,2958],{},"Let op",": Dit is een van de meest voorkomende redenen waarom renovaties aanzienlijk duurder uitvallen dan gepland — de documentatieplicht voor de volledige installatie.",[11,2961,2963],{"id":2962},"budgetplanning-typische-kosten","Budgetplanning: Typische kosten",[37,2965,2966,2975],{},[40,2967,2968],{},[43,2969,2970,2973],{},[46,2971,2972],{},"Post",[46,2974,1149],{},[53,2976,2977,2984,2994,3001,3008],{},[43,2978,2979,2982],{},[58,2980,2981],{},"Eendraadschema + situatieschema (elektricien)",[58,2983,1159],{},[43,2985,2986,2989],{},[58,2987,2988],{},"Eendraadschema + situatieschema (PlanElec)",[58,2990,2991],{},[20,2992,2993],{},"Early Access momenteel gratis",[43,2995,2996,2999],{},[58,2997,2998],{},"AREI-keuring",[58,3000,1177],{},[43,3002,3003,3006],{},[58,3004,3005],{},"Herkeuring (bij gebreken)",[58,3007,1185],{},[43,3009,3010,3013],{},[58,3011,3012],{},"Gebrekenverhelping",[58,3014,1193],{},[29,3016,3018],{"id":3017},"het-planelec-voordeel-bij-renovaties","Het PlanElec-voordeel bij renovaties",[16,3020,3021],{},"Met PlanElec kunt u:",[261,3023,3024,3030,3036,3042,3049],{},[233,3025,2750,3026,3029],{},[20,3027,3028],{},"bestaande installatie"," opmeten en documenteren",[233,3031,3032,3035],{},[20,3033,3034],{},"Nieuwe stroomkringen"," toevoegen en automatisch laten valideren",[233,3037,3038,3041],{},[20,3039,3040],{},"Oud vs. nieuw"," duidelijk scheiden",[233,3043,3044,3045,3048],{},"Het ",[20,3046,3047],{},"resultaat als PDF"," exporteren voor de inspecteur",[233,3050,3051,3053],{},[20,3052,2993],{},"; betalingsverwerking is nog niet actief",[11,3055,3057],{"id":3056},"checklist-voor-renoveerders","Checklist voor renoveerders",[16,3059,3060],{},"Vóór aanvang van de renovatie:",[261,3062,3064,3070,3076,3082,3088],{"className":3063},[551],[233,3065,3067,3069],{"className":3066},[555],[557,3068],{"disabled":559,"type":560}," Controleren: Lokken mijn werken een herkeuring uit?",[233,3071,3073,3075],{"className":3072},[555],[557,3074],{"disabled":559,"type":560}," Bestaande elektrische plannen opzoeken (indien beschikbaar)",[233,3077,3079,3081],{"className":3078},[555],[557,3080],{"disabled":559,"type":560}," Budget voor documentatie + keuring inplannen",[233,3083,3085,3087],{"className":3084},[555],[557,3086],{"disabled":559,"type":560}," Elektricien tijdig inschakelen (voor de installatie)",[233,3089,3091,3093],{"className":3090},[555],[557,3092],{"disabled":559,"type":560}," PlanElec gebruiken voor de documentatie (plannen zelf opstellen)",[16,3095,3096],{},"Na de renovatie:",[261,3098,3100,3106,3112,3118],{"className":3099},[551],[233,3101,3103,3105],{"className":3102},[555],[557,3104],{"disabled":559,"type":560}," Bijgewerkte plannen opgesteld?",[233,3107,3109,3111],{"className":3108},[555],[557,3110],{"disabled":559,"type":560}," Alle nieuwe stroomkringen in het eendraadschema?",[233,3113,3115,3117],{"className":3114},[555],[557,3116],{"disabled":559,"type":560}," Controleorganisme gecontacteerd?",[233,3119,3121,3123],{"className":3120},[555],[557,3122],{"disabled":559,"type":560}," Keuring geslaagd?",[11,3125,3127],{"id":3126},"gerelateerde-artikelen","Gerelateerde artikelen",[261,3129,3130,3136,3142,3148],{},[233,3131,3132],{},[625,3133,3135],{"href":3134},"\u002Fnl\u002Fblog\u002Foud-arei-part-8","Oude elektriciteit in België: AREI Part 8 uitgelegd",[233,3137,3138],{},[625,3139,3141],{"href":3140},"\u002Fnl\u002Fblog\u002Felektroplan-kosten","Wat kost een elektroplan? Prijsvergelijking 2026",[233,3143,3144],{},[625,3145,3147],{"href":3146},"\u002Fnl\u002Fblog\u002Fwat-controleert-inspecteur-keuring","Wat controleert de inspecteur bij de keuring?",[233,3149,3150],{},[625,3151,3153],{"href":3152},"\u002Fnl\u002Fblog\u002Felektrisch-dossier-woningverkoop","Elektrisch dossier bij woningverkoop",[16,3155,3156],{},[625,3157,3158],{"href":651},"Plan uw renovatie AREI-conform met PlanElec →",{"title":654,"searchDepth":655,"depth":655,"links":3160},[3161,3162,3166,3170,3173,3177,3180,3181],{"id":2540,"depth":655,"text":2541},{"id":2551,"depth":655,"text":2552,"children":3163},[3164,3165],{"id":2555,"depth":661,"text":2556},{"id":2645,"depth":661,"text":2646},{"id":2727,"depth":655,"text":2728,"children":3167},[3168,3169],{"id":2741,"depth":661,"text":2742},{"id":2774,"depth":661,"text":2775},{"id":2798,"depth":655,"text":2799,"children":3171},[3172],{"id":2861,"depth":661,"text":2862},{"id":2892,"depth":655,"text":2893,"children":3174},[3175,3176],{"id":2896,"depth":661,"text":2897},{"id":2923,"depth":661,"text":2924},{"id":2962,"depth":655,"text":2963,"children":3178},[3179],{"id":3017,"depth":661,"text":3018},{"id":3056,"depth":655,"text":3057},{"id":3126,"depth":655,"text":3127},"Niet elke renovatie vereist nieuwe elektrische plannen. Ontdek welke werken een herkeuring uitlokken en wat de contaminatieregel inhoudt.","nl",{},"\u002Fblog\u002Frenovation-electrical-plans.nl",{"title":2535,"description":3182},"renovatie-arei-elektrische-plannen","blog\u002Frenovation-electrical-plans.nl",[693,694,3190,3191,3192,2547,3193,280,3028,3194,3195,3196,3197],"renovatie","verbouwing","elektrische plannen","contaminatieregel","eendraadschema","situatieschema","België","elektrische keuring","V-hTzF5yCRbfz-0ZSsiw2y4hwXjXjkXyAUBy0lD8NDY",1785171271003]