Guide

How Much Does an Electrical Plan Cost? Cost Factors 2026

What drives the price of a Belgian electrical plan, how to compare quotations with an editable calculation model and what PlanElec Sketch and Pro cost since the paid plans started.

Published on 19 February 2026 Updated on 8 November 2026 13 min

Short answer: the price follows the scope of work

Belgium has no official flat rate for a single-line diagram and situation plan. The price comes from the specific job: is there a reliable survey, or does the installation have to be traced on site? Are only the two plans drawn, or do calculations, corrective work, a technical review and the official inspection belong to the job? A price range found online without a named sample, date, region and VAT status does not answer those questions.

Who needs Sketch, and who needs Pro?

Your taskYour route
Homeowner, DIY enthusiast or sole trader: draw the single-line diagram and situation plan for inspection, sale or a small jobPlanElec Sketch: free in the browser; no distribution board editor or self-check report
Electrical contractor, planner, integrator or solar installer: distribution board, self-check, dossier, PV, KNX or a teamPlanElec Pro: site pass per property or a subscription for ongoing projects and teamwork
Start with the drawing and later plan the whole installationSketch → Take it to Pro; transfer runs only from Sketch to Pro

Electrical planning and project documents at a table.

So compare the same result for the same scope, not a software price against an electrician’s invoice. With PlanElec you draw the single-line diagram and situation plan in Sketch free of charge; The subscription costs EUR 15 per property as site pass or EUR 29 per month as a subscription. Your own time, measurements, materials, work on the installation, technical support and the inspection by an approved body are costed separately.

Which documents are officially required?

The Belgian FPS Economy states that a domestic inspection requires at least the single-line diagram, the situation plan and, when available, the connection’s EAN code. The single-line diagram records cables, installation method, RCDs, overcurrent protection, switches, boxes, socket outlets, lighting points, fixed appliances and sources (AREI/RGIE Book 1 V06, Subsection 3.1.2.2 a). The situation plan shows where those items are (Subsection 3.1.2.3 a). Together with the inspection reports, they form the installation file (Section 9.1.2). The primary sources are the official federal domestic-inspection guidance and AREI/RGIE Book 1 version 06; this English article summarises the official national-language material.

Which documents you need depends on the occasion:

OccasionDocumentsReference
New installationsingle-line diagram, situation plan, conformity inspection before use3.1.2.1 a, Chapter 6.4
Substantial alteration or extensionupdated plans; inspection of the modified and added parts3.1.2.1 a, 6.4.7.3
Non-substantial alterationdated, signed short description; situation plan shows the current state3.1.2.1 a
Sale of a dwelling with an old installationinspection visit; existing file made availableSection 8.4.2
Supply capacity increase for an old installationinspection visit before the increaseSection 8.4.1

If the single-line diagram and situation plan are missing at the inspection visit on sale, the approved body draws up a brief description and a rough sketch. These do not replace the plans, and the absence is recorded as an infringement in the report (Subsection 8.4.2.2 d). If you are selling, plan the drawings in good time.

Define the scope before the price

A quotation becomes comparable once every item is described. This list stops a cheap drawing quote from growing later with necessary work.

ComponentWhat is explicitly agreed
SurveyAre rooms, loads, boxes, cable routes and boards surveyed on site, or do you supply verified data?
Circuit tracingAre the assignments known, or must they be established by switching, measuring and opening suitable points?
Single-line diagramAre all protective devices, conductor data, installation methods, sources and fixed appliances included?
Situation planIs there a usable floor plan, and are the references to the circuits unambiguous?
CalculationsAre sizing, short-circuit, selectivity or voltage-drop calculations part of the job?
Technical reviewDoes a qualified electrician check the as-built state and technical plausibility, or is it drawing only?
Corrective workIs work on the board, cables or equipment included?
Inspection appointmentIs the approved body’s fee included or separate?
RevisionsHow many technically justified correction rounds are included?
VAT and travelDoes the amount include VAT, travel and any extra appointments?

An editable calculation model instead of invented market prices

Enter only values that come from your quotation or your own time estimate:

Total scenario = survey + drawing + technical review + corrective work + inspection + travel + own time

Value your own work with a personal comparison rate:

valued own time = documented hours × personal comparison rate per hour

That rate is not a Belgian market tariff. It shows that a weekend of work is not economically free. Conversely, an external flat fee is not expensive if survey, measurement, technical responsibility and revisions are included.

Scenario A: complete data is available

The board is clearly labelled, circuit assignments are checked, a scaled floor plan exists and the protective-device data is legible. The work then consists mainly of taking over data, checking plausibility and drawing. For the drawing alone, PlanElec Sketch is enough; if you need the board, the self-check report and the dossier in the same model, you work in PlanElec Pro. An electrician checks the data in a targeted way.

Scenario B: old installation without reliable records

If cross-sections, installation methods or assignments are unknown, drawing is the last step. First a competent person surveys the installation safely; opening enclosures, measuring and intervening belong in professional hands. Here the survey often costs more than producing the plans, and that is exactly the item that must appear clearly in the quotation.

Scenario C: renovation with open design decisions

For new circuits, PV, a home battery, an EV charger, a heat pump or board changes, the technical design is settled first; the diagram documents that decision. Ask for a quotation that separates design, manufacturer data, grid operator conditions, execution and inspection. You will then see later which item changed. Which renovation triggers new plans is explained in Renovation and AREI.

Scenario D: sale with a deadline

Time pressure alone does not justify an express surcharge. Ask for a written quotation with delivery date, prerequisites and correction process. Agree who books the inspection visit and which existing reports belong in the file. A hastily drawn plan that does not show the as-built state does not solve the documentation problem. More in Electrical dossier for property sales.

What does PlanElec cost?

The paid plans have applied since 2 November 2026. PlanElec has two interfaces and one plan: Pro applies in Sketch and in Pro.

PlanPriceScope
PlanElec SketchEUR 0, even without an accountdraw the single-line diagram and situation plan in the browser, PDF in A4 or A3; without an account with a logo watermark, with a free account without. No distribution board, no self-check report
Try ProEUR 0 for 1 monthfull Pro editor for one person; exports without masked areas; immediate start with a valid VAT number, otherwise request approval
Site passEUR 15 per property, one-offall documents without masked areas for exactly one confirmed property address
subscriptionEUR 29 per month or EUR 290 per yearall projects and documents without masked areas, three editing seats, each further seat EUR 12 per month or EUR 120 per year; read-only access free

In 2026 PlanElec uses the Belgian small business exemption scheme: no VAT is charged and the amounts are final prices. A site pass covers twelve months. From 20 sites per year, the yearly subscription at EUR 290 costs less than site passes at EUR 15, without additional seats. The subscription price stays for as long as the subscription runs without a break. Costs only arise once you book explicitly. The current details are on the pricing page.

Which route fits your situation?

Starting pointSuitable routePrice
You own the property and want to prepare the plans of your installation or draw a draft for your electricianPlanElec Sketch in the browserEUR 0
You work on your own, draw the single-line diagram and situation plan, or continue Trikker filesPlanElec Sketch, without a watermark with a free accountEUR 0
Your business needs a distribution board, self-check report or installation dossier for one propertyPlanElec Pro as site passEUR 15 per property
Your business plans several properties on an ongoing basis or works as a teamPlanElec subscriptionEUR 29 per month

A drawing started in Sketch moves to Pro with Take it to Pro as soon as you need the distribution board or the self-check report. A Pro project does not go back to Sketch.

The ‘Print’ area in PlanElec Sketch: on the left ‘Download PDF’ with the free PDF and watermark line, on the right ‘For your business’ with site pass at € 15 per object and The subscription at € 29 a month, below ‘Take it to Pro’.
The PDF stays free; you only pay for a PDF without the ‘Generated with planelec.be’ line or for moving to Pro. Prices as shown in the interface on 6 November 2026.
Open full-size image

What PlanElec contributes today

PlanElec Sketch draws the single-line diagram and situation plan in the browser and exports them as PDF or SVG. You open Trikker files (.trik) there and continue working on them. The Sketch material list counts the devices in the drawing and exports as CSV.

PlanElec Pro brings floor plan, electrical topology and board planning together in one project. The single-line diagram and situation plan are exported as PDFs, as is a compiled installation dossier with cover sheet and document index. The AREI/RGIE self-check report evaluates, on an indicative basis, the supported rules that can be decided from your data and shows data gaps. The manufacturer-neutral material list with cable quantities is a pilot feature without prices and is not an order release; what both lists count is explained in Bill of materials for an electrical installation.

The roles are therefore clear: PlanElec produces the plans from your project model and keeps the documents consistent. The on-site survey, technical design and installation stay with the electrician, and the approved body writes the inspection report. Whether that pays off for you depends on how complete your project data already is. Everything PlanElec can do is covered in What you can do with PlanElec; how it compares with Excel and paper is explained in PlanElec compared with Excel and paper.

How to obtain comparable quotations

  1. Describe the building, supply, number of boards and known circuits.
  2. Mention special sources and loads such as PV, battery, EV charger or heat pump.
  3. Share existing plans and inspection reports without guessing unknown data.
  4. Ask for separate items for survey, drawing, technical review, execution and inspection.
  5. Ask about VAT, travel, delivery format and correction rounds.
  6. Compare not only the total but also responsibility and coverage.
  7. After changes, document the as-built state and keep the documents in the installation file.

Agree handover and revision as a separate service

A good quotation states not only “plan as PDF” but the handed-over working state. Agree which existing documents were checked, which data you supplied and which unknowns remain open. Record how many correction rounds are included, who reports changes after the site work and which file version then counts as the as-built state.

A short checklist helps at handover: do the circuit references match between board, single-line diagram and situation plan? Have new and removed devices been updated? Are assumptions marked as assumptions? Are datasheets and measurement records with the responsible party? Only this handover makes drawing, technical review and later maintenance comparable. A low quotation without agreed revisions quickly becomes more expensive at the next change.

Related guide: Share plans with fitters and the workshop through Pro read access.

Frequently asked questions

Which data should I gather before asking for a quotation?

Start with everything visible without intervention: address and supply type, number and location of boards, legible ratings of RCDs and circuit breakers, circuit names, floor plan, earlier diagrams and inspection reports. Record fixed loads and sources separately. Mark unknown values explicitly as unknown. An invented cross-section makes a drawing look complete and technically worthless. Photos help with preparation; they do not replace safely establishing concealed cable data.

Which services must not disappear into a “plan price”?

Changes to the installation, fault finding, measurement reports, sizing according to manufacturer conditions and resolving an inspection finding are separate services. Grid operator procedures for generation or storage do not run automatically either. If these steps are needed, they appear as separate items with result, responsible party and deadline. That protects both sides: you see what is delivered, and the contractor takes no responsibility for parts that were not ordered.

How do I handle changes after the first export?

Keep a traceable baseline version, enter confirmed changes in the project and situation plan and have technical changes checked. Record not just “kitchen changed” but which circuit, protective device, cable and points the change affects. The next correction round then stays a limited update rather than a new survey.

May I draw the diagram myself?

The AREI states who draws up the single-line diagram: the person responsible for carrying out the work (Subsection 3.1.2.1 a). What matters is that the documents show the actual state correctly and are available during the inspection. Drawing yourself is not installing yourself: surveying live parts and installation work stay with professionals. For preparing the plans, PlanElec Sketch is enough, free in the browser; the professional confirms the actual state. A side-by-side comparison of both routes is in the cost comparison: DIY or electrician.

Does a PlanElec PDF mean the installation is compliant?

No. The PDF documents your project data, and the self-check report in Pro tests the supported rules on an indicative basis. Whether the inspected installation meets the regulations is established by the approved body in the prescribed procedure.

What is the main cost driver?

Not floor area, but uncertainty about the as-built state and the agreed scope. Known, verified data reduces survey effort; unknown cables, several boards or technical changes increase it.

Conclusion

A sound price for an electrical plan is a project-specific quotation. Separate survey, drawing, technical review, work and inspection, value your own time too and compare equivalent services. In PlanElec Sketch you draw the plans free of charge; The subscription costs EUR 15 per property or EUR 29 per month. Technical design, installation and inspection remain separate items.

Draw a single-line diagram free in PlanElec Sketch →

Which next step fits your task?

Try Pro for 1 month: for one person, without payment details or an automatic switch to a subscription. With a valid VAT number you start immediately; without one you request approval. The trial includes exports without masked areas; a confirmed account is required.

Start drawing right away

Open PlanElec Sketch in your browser and draw your single-line diagram and situation plan. Drawing is free and needs no installation.

Fictitious sample dossier, available without sign-up.