What Can You Do with PlanElec? From Floor Plan to Installation Dossier
Floor plan, AI assistant, automatic circuit and board planning, single-line diagram, situation plan, self-check and PDF dossier: the feature overview with status and limits.
With PlanElec, you plan a Belgian electrical installation in a single project: from floor plan through devices, cables, circuits and distribution board to single-line diagram, situation plan, AREI/RGIE self-check and PDF dossier. You model the spatial and electrical structure once and derive plans, lists and check findings from it. The PlanElec assistant carries out instructions in your own words, and recognition turns PDFs, scans and board photos into editable proposals. That project model is PlanElec Pro, for electrical contractors, planners, integrators and solar installers. For a single-line diagram and a situation plan on their own, there is PlanElec Sketch, free in the browser.

PlanElec Sketch or PlanElec Pro: what do you need?
PlanElec has two environments for two tasks. PlanElec Sketch is the drawing tool for the single-line diagram and the situation plan: free in the browser, even without an account, on a computer just as on a tablet or phone at the customer's home. PlanElec Pro is the shared project model for firms that need the distribution board, the self-check report, PV, building automation and teamwork. The rest of this overview describes Pro.
| Task | PlanElec Sketch | PlanElec Pro |
|---|---|---|
| Draw single-line diagram and situation plan, PDF | yes, free | yes |
Keep working on Trikker files (.trik) | yes, even without an account | yes, one by one or as a whole archive |
| Floor plan | draw it or place a plan as an image or PDF underlay | draw, import or recognise it with AI |
| Find gaps before the PDF | “Check documents” | “On the way to your documents” in the export |
| Plan the distribution board | no | yes |
| AREI/RGIE self-check report and dossier | no | yes |
| PV, KNX and home automation | no, points to Pro | yes |
| Team with roles, read mode for viewers | no | yes |
The handover goes in one direction only. In Sketch, Take it to Pro opens the Pro import page: the single-line diagram, boards including sub-boards, circuits, cables, project details and the situation plan with its floors, rooms and linked devices come along. Images of underlays only travel with the project file; whatever is not carried over is listed on the import page before the project is created. A Pro project never goes back to Sketch. One plan covers both: if you have Pro, you use it in Sketch and in Pro.


The PlanElec Pro workflow at a glance
| Step | What you do in PlanElec | Result |
|---|---|---|
| Project | Create the building, floors and metadata | Shared basis for plans and title blocks |
| Floor plan | Draw walls and rooms, calibrate a reference image or recognise a plan | Spatial model |
| Devices | Place sockets, switches, lights, fixed connections and boards | Situation plan and consumer base |
| Topology | Connect circuits, protection devices, cables and branches | Electrical model |
| Distribution board | Arrange modules on DIN rails and check protection chains | Editable board layout |
| Diagram and check | Review the single-line diagram and run the AREI/RGIE self-check | Findings and a documentable diagram |
| Export | Produce individual PDFs or a selectable installation dossier | Project documents for review and coordination |
At every step you can call on the PlanElec assistant: it works across the whole project model and has every change checked by the self-check.
One project model instead of separate drawings
In traditional workflows the same information lives in several files: the floor plan, the diagram, the board sketch and a spreadsheet. PlanElec stores rooms, devices, electrical connections, circuits, cables and protection devices in one linked model. Move a device and its position changes on the situation plan. Change its electrical connection and the topology and single-line diagram follow. You still review every result, but you no longer maintain unrelated drawings.
Build the floor plan and situation plan
In the floor-plan editor, you draw exterior and interior walls as a polygon, rectangle or individual wall segments. Closed areas become rooms that you name and classify. Doors, windows, stairs, dimensions, bathroom zones and multiple floors are part of it. An existing plan can be imported as an image, PDF or DXF underlay, rotated and calibrated against a known distance.
Recognise floor plan is faster: from a PDF, scan or photo (including a Trikker PDF export), PlanElec proposes walls, rooms with their area, doors, windows and supported device symbols. PlanElec reads the scale from dimension lines or the PDF scale, or you measure two points yourself. You correct the draft and import it into an empty floor; without a confirmed scale, the import stays locked. The article Recognise floor plans and boards with AI has the details.
If you are coming from Trikker, import .trik project files with Import Trikker projects, one by one or as a whole archive. Each file becomes its own project with single-line diagram, project details and the situation plan as floor plan; anything not carried over is listed in the report. An imported project is a starting point, not a checked document. The steps are in Import Trikker projects.
Then you place electrical symbols on walls or freely in the room: sockets and switches, lights and spotlights, fixed connections and special equipment such as a heat pump or EV charger, junction and branch boxes, and boards. The situation plan uses exactly those positions. A 3D view is available to all users; on small screens or without WebGL, you keep working in the 2D views.
Plan with the PlanElec assistant
You describe a task in your own words, in Dutch, French, German or English, and the assistant carries it out. It works with more than 100 planning commands across the whole project model: floor plan, rooms, devices, circuits, switch chains, cables, distribution board, automation/KNX, PV strings and lighting control.
- Checked: after every change, PlanElec checks the project with the AREI/RGIE self-check.
- Reversible: every change is a single undo step and appears in the project history with the person who requested it.
- Confirmed: clear, reversible instructions run directly; risky actions wait for your confirmation. It never deletes projects.
The assistant answers technical questions with verified sources from the PlanElec help and the full AREI/RGIE text. The language model runs in the EU region; the AI provider does not store your requests or train on them. Read more in AI assistant for electrical planning.
Prepare repetitive planning automatically
PlanElec takes routine work off your hands. Every automatic step delivers a proposal that you review on its own:
- proposals for sockets, lighting, standard equipment and spotlight grids;
- automatic chaining of unassigned switches and lights in a room;
- cable segments from the topology and routes along the walls;
- automatic grouping and assignment of consumers to circuits;
- separate handling of supported special appliances; an EV charger gets its own protection chain;
- load distribution across several boards and phase balancing across L1, L2 and L3;
- automatic placement of protection devices on DIN rails with 20 percent spare space.
Automatic assignment places standard circuits behind 30 mA residual current devices and connects no more than eight final circuits to each of them. That follows the limit in AREI/RGIE Book 1, subsection 4.2.4.3.b, for residual current devices with high or very high sensitivity. Every proposal can be moved and reassigned; you add or override cable routes and lengths by hand. The guide Automatic planning shows the workflow in detail.
Plan the board and single-line diagram together
In the distribution board editor, you arrange the main switch, residual current devices (RCDs), circuit breakers and supported accessories on a real module grid. Protection devices are placed automatically, and you move or connect them by hand afterwards. With several phases, PlanElec shows the modelled loads and warns about a clear imbalance. Enclosure proposals take recorded module widths, spare space and accessories into account; with open data, they remain an estimate, not a thermal approval.
For existing installations, you upload photos of the board: PlanElec detects visible DIN modules with row, start position, width and type. You review the proposal and import it into an empty board. Hidden wiring is not visible in a photo; you define the electrical connections in the planning.
PlanElec derives the single-line diagram from the electrical topology. Consumer branches, protection devices, branches and cable data stay linked to the project model. When you change an assignment, the diagram is rebuilt from the current state. Missing or incorrect links stay visible instead of disappearing into a drawing.
Document PV, KNX and home automation
For photovoltaics, you assign strings to the inverter's MPPTs and document modules, DC protection, cable sections and frame PE. The same data feeds the single-line diagram, situation plan and material list. Missing string assignments or manufacturer data stay visible. PlanElec calculates the PV yield with PVGIS for the confirmed project location. Self-consumption, home battery and charging one or two electric cars are a pilot: the calculation runs on request with a standard household profile instead of your meter data and states no savings and no payback.
KNX documentation is available in a pilot scope: KNX power supply, switching and blind actuators, channel assignment and push buttons appear in the single-line diagram, and a missing supply, missing protection or overload blocks the final export. For ETS, PlanElec proposes physical addresses, group addresses and datapoint types and exports the group addresses as files in the ETS format (CSV and XML), together with a list of the physical addresses. You still create devices, parameters and the links to communication objects in ETS; PlanElec does not generate an ETS project file. With an active automation profile, you also export channel and terminal plans, room functions, topology and quantities individually or as a home-automation handover dossier. More in Home automation and KNX in the electrical installation and, worked through for an apartment, in KNX planning: apartment and ETS preparation.
Which documents can you export?
| Output | Status today |
|---|---|
| Single-line diagram as a multi-page PDF | Available |
| Situation plan PDF | Available |
| Advisory AREI/RGIE self-check report | Available |
| Distribution board PDF | Available as soon as board data exists |
| Selectable installation dossier | Available with cover, index, page numbering and versioned archiving |
| Circuit, cable and detailed material lists | Pilot: manufacturer-neutral, no prices, default assumptions visible |
| Home-automation documents | With an active automation profile; watermarked draft, final once readiness is met |
All professional documents carry your approved installer details and, optionally, your logo. You archive the dossier in versions on the server: every page carries the same dossier UUID, a 40 mm QR sticker leads to the archived version, and a SHA-256 check proves the file's origin and integrity. This archiving confirms the file, not the AREI/RGIE compliance of the installation.
The material list breaks modelled assemblies down into quantities and shows them by category or room. Cable quantities are net lengths without an automatic waste factor. Known, partial and missing data are marked "Known", "Partial" and "Missing". Use the list as a basis for review and quotation; it is not an approval to order. Exporting documents describes the status of each document and the download steps.
What your documents still need is shown at the top of the export in the step list On the way to your documents: project details, circuits, situation plan, board, diagram review and self-check, each open or done, with a jump to the right place. In the header, the badge “Documents: x of y” sums up the same status. The list is a completeness aid; the approved inspection body carries out the inspection.
What does PlanElec check against the AREI/RGIE?
The software-based self-check verifies a documented subset of the rules that can be decided from the recorded project data. It shows findings for supported areas and explicitly flags known coverage gaps and incomplete checks. A clean run means that, within the supported rules, PlanElec finds no error in your data. The report is your self-check, not a certificate of conformity; the official assessment is made by a recognized inspection body.
How large is that coverage exactly?
An installer asked us directly: does PlanElec cover all of Book 1, including every exception, or the most common cases? The answer: the most common cases, clearly delimited.
The integrated rule text is complete: Book 1, Parts 1 to 9, in the version that applies on the date in question. Since 1 November 2026 that is version 07 (Royal Decree of 13 August 2026); compared with version 06, it only removes the sealing of the residual current device at the origin of the installation. PlanElec carries the official French and Dutch texts of version 07. PlanElec does not check the sealing itself. The automatic check logic focuses on protective measures, earthing, cable sizing and completeness of the file in a domestic AC installation. Of the fourteen chapters on special installations in Part 7, it touches three in part: rooms containing a bath or shower (7.1), supply of electric road vehicles (7.22) and domestic photovoltaic installations (7.112). Not included are the DC side with the L+, L-, M, PEM and PEL conductors and the transitional exceptions in articles 59 and 69 of the amending Royal Decree of 6 October 2025.
The full list of what the self-check does and does not verify is in the knowledge base.
Who is PlanElec for?
- Sole traders, micro-businesses and homeowners who need a single-line diagram and a situation plan draw them free of charge in PlanElec Sketch. Homeowners agree the plan and the work with a qualified electrician before the inspection.
- Electrical contractors get one continuous path in PlanElec Pro from survey through board and self-check report to dossier, with colleagues in the same project.
- Planners, integrators and solar installers model spatial and electrical relationships together, document PV and building automation and adjust alternatives traceably.
What does PlanElec cost?
The paid plans have been running since 2 November 2026. PlanElec Sketch stays free; Pro can be tried, used per property or taken as a subscription. The binding terms are on the pricing page:
| Plan | Price | Scope |
|---|---|---|
| Sketch | EUR 0, even without an account | Draw the single-line diagram and situation plan and produce the PDF; with a free account, uploads, PDF without the logo watermark and drawings in the cloud; without Pro, cloud storage is limited, the current limit is on the pricing page |
| Try Pro | EUR 0 for 1 month | Full Pro scope for one person, exports without masked areas; immediate start with a valid VAT number, otherwise request approval |
| Site pass | EUR 15 per property, one-off | All documents without masking for one confirmed property address |
| subscription | EUR 29 per month or EUR 290 per year | All projects and documents without masking, three editor seats, read access free of charge |
One plan covers both environments: Pro applies in Sketch and in Pro. The subscription price stays the same for as long as the subscription runs without interruption. A site pass covers twelve months. From 20 sites per year, the yearly subscription at EUR 290 costs less than site passes at EUR 15, without additional seats. All AI features use your account's monthly AI allowance.
A practical approval workflow
Treat every automatic step as a proposal with a named reviewer. Fix the building geometry and rooms first, then place only equipment that is really planned. Check switch chains and junction boxes before assigning circuits, because topology errors propagate into cable segments and the single-line diagram. Replace default values with real conductor and protection data.
At the board, check phases, upstream protection, RCD groups, spare modules and the electrical paths between devices. The grid arranges the modules; measured fault conditions, prospective short-circuit current, installation method and manufacturer limits are yours to assess as the professional.
Before export, run the self-check and read both findings and coverage notices. Green means the supported checks find no problem in your data. Then reconcile the situation plan and single-line diagram with the installed work and add measurements and manufacturer documents. The official inspection is carried out by a recognized inspection body.
Team handover and a clean revision
In Pro, you work as an organisation in the same project: members join by invitation, and each person has the project role of administrator, editor or viewer. A viewer, for example in the workshop or on site, sees the studio in read mode without tools: situation plan, single-line diagram, board and documents to read. Decide per project who approves the floor plan, topology, board and comparison with the as-built state. Hand over open fields as open instead of filling them with plausible-sounding assumptions. The next person can then see whether a cable length was measured, calculated from the floor plan or overridden manually. The same discipline applies to appliance power, phase assignment and protection components.
An example: a dishwasher circuit is added in a kitchen. The change starts with the appliance on the floor plan, followed by the electrical connection, circuit, protection device, cable data and board position. The situation plan and single-line diagram are regenerated from the same state; you check that the new identifier matches in both documents. Instead of quietly replacing the old dossier, you archive a new version and note which circuits were added and what needs confirming on site.
In multi-board projects, you model the relationships between source and sub-distribution boards explicitly. Check which board actually supplies a circuit and whether the documents show the same hierarchy. Name unsupported parts of the installation in the handover so that nobody mistakes them for automatically checked.
This overview was checked on 6 November 2026 against the feature overview, the pricing page, the split between Sketch and Pro and the reachable editor and export workflow. If in doubt, the status shown in the product applies. Continue in the help center; start a project with Try Pro, or a single drawing free of charge in PlanElec Sketch.
Related guide: Share plans with fitters and the workshop through Pro read access.
From the guide to your own electrical plan
Create a project and document circuits, cables and protective devices. Check the result against the actual installation.
Fictitious sample dossier, available without sign-up.