Getting Started with PlanElec: From Floor Plan to First Export

PlanElec step by step: create the project and floors, draw or recognise the floor plan, connect devices, fill the distribution board and export PDFs.

Published on 14 July 2026 Updated on 8 November 2026 15 min

Your first PlanElec project runs through eight steps: create the project, draw or recognise the floor plan, place devices, connect consumers, check cable routes, fill the distribution board, review the single-line diagram and self-check, and export the documents. Everything happens in one shared project model. The key principle to start with: a symbol on the floor plan fixes where a device sits. Only its electrical assignment makes it part of the single-line diagram. This guide is for contractors and planners working in Pro from floor plan to dossier; Sketch covers drawing alone.

Electrical planning with digital devices.

Diagram: the eight steps in three columns. Spatial, where does the device sit: project, location and floors, floor plan and rooms, place devices. Electrical, what feeds it: connect consumers and circuits, check cable routes, fill the distribution board. Document, what do you hand over: single-line diagram and self-check, export. Below, the shared project model and the planning approach “Draw the single-line diagram first”, which starts directly in the diagram.
All three views read the same project model. If you draw the single-line diagram first, you start in the middle column and add the floor plan later if needed.
Open full-size image

1. Create the project, location and floors

After signing in, open the project overview and choose Create project. The New project dialog has three steps:

  1. Name and project type: the project name, an optional description and the project type: new build, document existing installation, extension or renovation.
  2. Planning approach: Plan from the floor plan is preselected and recommended. You capture rooms and devices on the floor plan, and the single-line diagram is generated from them. Draw the single-line diagram first is meant for users coming from classic drawing tools: the main board and the installation head are ready as an assumption, you place symbols directly in the diagram and add the floor plan later if needed. On the floor-plan approach you also choose how to start: Build with guidance, Start from a template (small apartment, family house or existing installation survey), Start with the situation plan or Without guidance.
  3. Location: you confirm the site on the map, or choose Create without location and add it later. Features that need the location, such as the PV yield, stay blocked until then.

For your first project, choose Plan from the floor plan with Build with guidance: the guidance derives the next step from the actual project state, and you can pause it at any time without losing project data. You can switch the planning approach later in the project settings; diagram, floor plan and board stay unchanged. Without a drawn floor plan, the situation plan is left out of the dossier, while the single-line diagram and self-check report remain available. The guide Getting started walks through the first clicks.

If all you need is a single-line diagram and a situation plan, for example as documents for the inspection of a home, draw both free of charge in PlanElec Sketch in your browser, even without an account. The distribution board and the self-check report are only in Pro. If you need them later, bring the drawing along with Take it to Pro: single-line diagram, situation plan, boards, circuits and project details come along. There is no way back from Pro to Sketch.

Then create the building and its floors. Open the project metadata and enter the project name, installation address and installer. PlanElec reuses these details in title blocks, the self-check report and the dossier.

PlanElec Pro, New project dialog, step 2 of 3 ‘Planning approach’: cards ‘Plan from the floor plan’ (recommended) and ‘Draw the single-line diagram first’, below four ways to start, from guided to no guidance.
The planning approach only sets the entry point, not the project type; you can change it later in the project settings.
Open full-size image

2. Build the floor plan and rooms

In the Floor plan area, draw exterior and interior walls as a polygon or rectangle. If you already have a plan, import it as a reference image and calibrate it against a known distance.

Recognition is faster: put a PDF, scan or photo (PDF, PNG, JPEG or WebP) in Project files and start Recognise floor plan from the preview. PlanElec proposes walls, rooms with their area, doors, windows and supported device symbols. You confirm the scale, correct the draft and import it into an empty floor. The article Recognise a floor plan from a PDF or photo walks through the details.

As soon as walls enclose an area, PlanElec detects a room. Name and categorise every room, for example Kitchen, Utility room or Bedroom 1. Clean rooms pay off later: in equipment proposals, when grouping consumers, in the material view by room and during the technical review. Work one floor at a time and check the geometry before you place many devices; major changes are easier while the plan is still empty.

3. Place the electrical devices

Open the device palette and place sockets, switches, lights, fixed connections, junction boxes and the distribution board in their planned positions. Wall-mounted devices snap to the wall; lights sit freely in the room.

For suitable rooms, PlanElec proposes sockets, lighting, a standard fit-out or a spotlight grid. You decide what stays, based on doors, windows, built-in units, use and wet zones. The proposals are an editable starting point; the design decisions are yours.

Room actions for a living and kitchen area with automatic switch chain, lighting, sockets and standard fit-out.
The room actions give you an editable proposal; you decide the quantities and final positions.
Open full-size image

You can also tell the PlanElec assistant in your own words what you need, for example "Place three sockets in the kitchen". Open it with the bot button in the header or with ⌘J / Ctrl+J. Every change the assistant makes is a single undo step, and PlanElec then checks the project with the AREI/RGIE self-check. Read more in AI assistant for electrical planning.

4. Connect switches, consumers and topology

Link switches to the lights they actually control. For unassigned switches and lights in a room, PlanElec proposes a switch chain. The list of unconnected components then shows what is still missing.

Next, assign consumers to the right board and circuit. Automatic assignment groups ordinary lighting and socket points and handles supported special appliances such as a cooker, washing machine or EV charger separately. With several boards, multi-board assignment spreads the loads; in three-phase installations, phase balancing distributes them across L1, L2 and L3 and warns about a clear imbalance. Check protection devices, phase and cable data in the preview, and only then apply it.

Situation plan of a living and kitchen area in PlanElec Pro: sockets, lights and fixed connections carry their circuit reference such as C1, E1 or F1.
Assigned devices show their circuit reference directly on the situation plan. You use it to trace a device to its circuit in the single-line diagram.
Open full-size image

Connect junction and branch boxes as real topology nodes whenever a cable needs to be split into separate segments. Proximity is not enough: PlanElec does not insert a box into an electrical path automatically.

5. Check the cable routes

For connected devices, PlanElec calculates a cable route along the walls. Check start, end and path, and add manual waypoints where needed. A manually entered length takes precedence over the calculated one.

Cable type, cross-section, installation method and length must match the real installation. The calculated net lengths feed the cable list and material overview; you add offcuts and site reserve yourself. The guide Automatic planning explains device, cable, circuit and board automation together.

6. Fill the distribution board

Open the Distribution board area, choose the enclosure, rows and pole configuration, and start Auto-Assign. PlanElec arranges the main switch, residual current devices (RCDs) and circuit breakers in the intended order on the DIN rails and keeps 20 percent of rail space free by default.

Then check module widths, protection groups and the connections from main switch to RCD and on to the circuit breakers. Add missing connections with the connector tool and move modules by hand where needed. In multi-phase installations, also check the phase overview. Facing an existing board? PlanElec detects the visible DIN modules in cabinet photos and, once you have reviewed them, imports them into an empty board.

7. Review the single-line diagram and self-check

PlanElec derives the single-line diagram from the electrical topology. Check that consumer branches, protection devices, cable data and branches appear in full. If an assignment is wrong, correct the relationship in the shared project model, not just in the drawing, and review the diagram again.

The AREI/RGIE self-check reports findings in the rule areas PlanElec can evaluate from your project data. It is advisory: a clean run means the supported rules find no error in your data. Which rules those are is listed in What the self-check verifies. The inspection of the installed work is carried out by the recognized inspection body.

8. Export the documents

Evaluate the Pro workflow on a small job: assign devices, lay out the board, read the self-check and select the documents you need. Assess the scope on your own project before choosing site pass or a subscription.

In the Export area, you produce the single-line diagram, the situation plan and the advisory self-check report as PDFs. As soon as board data exists, the distribution board PDF is available too. The selectable installation dossier bundles the documents with a cover page, index and continuous page numbering. Circuit, material and cable lists are available as a pilot: manufacturer-neutral, without prices and with visible default assumptions.

At the top of the export, the step list On the way to your documents shows what is still open: complete the project details, create circuits in the single-line diagram, place devices on the situation plan, fill the distribution board, review and confirm the single-line diagram, read the self-check. Each step is marked open or done, Open jumps to the right place, and the preview stays available at any time. In the header, the badge “Documents: x of y” shows the same status and opens the export. The list is a completeness aid: the self-check shows you open points; the approved inspection body carries out the inspection.

Before passing anything on, check metadata, legibility, page order and open findings. Exporting documents describes the status of each document.

PlanElec Pro, export: the ‘On the way to your documents’ list with ‘2 of 6 done’; circuits and the board are done, project data, situation plan, confirming the single-line diagram and ‘Read the self-check’ are still open.
Each step fills the documents and leads to the open item with one click; the preview is always available. Acceptance is done by the accredited inspection body.
Open full-size image

Making your first run dependable

Keep your first project small and real: one floor with a board, two socket circuits, lighting and one fixed appliance. That makes it clear early on which information is spatial, electrical or documentary. A socket symbol on the floor plan answers where it is. Its circuit, protective device and cable answer how it is supplied. The export brings both views together; measurements you have not entered do not appear in it either.

Take inventory before you place anything

Record the connection type and voltage, existing boards, rooms, floors and every visible electrical point. Sealed parts stay closed, and you do not infer the earthing system from the conductor count alone. For an existing installation, photos of the labels and a careful survey by a qualified person help more than assumptions. Mark unknown data as open rather than entering a plausible-looking cable type or protection rating.

Review devices and circuits separately

Place the board and the real devices first. Link switches to the lights they really control, then assign consumers to circuits. With every automatic proposal, check whether the proposed group is technically sound. PlanElec provides guided editing and proposals; approving the electrical design is your call as the professional. Cable length, installation method, grouping, ambient conditions, voltage drop, short-circuit current and manufacturer conditions are part of your review wherever the project does not capture them.

Keep three views aligned

Use the same circuit identifiers in the board, the single-line diagram and the situation plan. After moving a device, splitting a circuit or changing a protection device, check all three views. A good interim test: can a second person start from a situation-plan symbol, follow its identifier to the right circuit and get back to the board? If so, the project is ready to be documented.

Use the export as a review stage

Generate previews first. Check page breaks, clipped labels, legend, installation address, responsible person, plan revision and date. Then reopen the PDFs and compare them with the current project. Single-line diagram, situation plan, board PDF and dossier run in the normal workflow. The material list is a pilot with visible coverage limits; it supports planning and is not an approval to order.

The AREI/RGIE self-check is advisory. A result without errors means the supported rules that can be decided from your data report no error. Measurements, manufacturer data, site conditions and unmodelled provisions are checked on site. Have the design, installed work and documents reviewed by a qualified electrician before commissioning; the official inspection is then carried out by the recognized inspection body.

When something does not add up

SymptomWhat to check
Device missing from the diagramits electrical assignment, not just its position
Circuit missing from the planunplaced or incorrectly referenced devices
Protection rating looks implausibleresolve conductor data and design first, then change it
Export shows stale dataproject metadata, current revision and last saved state
Self-check is incompletefill in open data; incomplete never means passed

Saving, alternatives and collaboration

Give the project and floors stable, clear names. Before trying a major automatic proposal or restructuring, check the saved state and create a comparison export where useful. A design alternative is not yet an installed system: mark clearly which option is planned, rejected or carried out on site.

When several people work on the project, agree who owns the floor plan, electrical assignment, board and final review. Nobody quietly renames shared circuit identifiers. A short change note with date, affected area and responsible person prevents a new spatial revision from being exported with an old electrical one.

Related guide: Share plans with fitters and the workshop through Pro read access.

Example: plan one room end to end

Use a kitchen as an exercise. Draw and name the room, then place general sockets, lighting and the fixed appliances actually planned. Link switches to their lights and keep high-load appliances separate where your design calls for it. Do not derive cable or breaker values from an appliance name: enter confirmed data and leave unknown lengths open.

Then check the situation-plan references, every consumer's path in the single-line diagram and the board layout. Consider whether additional sources or outdoor areas affect the scope. Export both plans and trace three devices in both directions. Once that chain works, move on to the next room.

Data protection and project data

Do not use real customer data in practice projects. A real dossier needs the name, installation address and responsible parties; share them only within the authorised project circle. Before sending, check that a preview contains no internal notes, old alternatives or incomplete data. The recipient needs the approved document version, not your entire working state.

When your first project is finished

A project is finished when the spatial points match the building, electrical assignments are traceable, board and drawings use the same identifiers, open data stays visible and a qualified person has reviewed the relevant decisions. The PDF is the result of that work, not its proof. The inspection that follows assesses the installed work.

Finally, archive the approved PDFs and note the matching project revision. If a device is moved or a circuit added later, start from that state. That keeps the difference between the earlier inspection, the new design and the later as-built state visible.

Checklist before the first download

  • Building, floors and rooms are fully created and named.
  • All electrical devices are in the right position.
  • Consumers are linked to topology, circuit and board.
  • Cable routes and lengths are checked.
  • Protection chain and board layout are plausible.
  • Single-line diagram and situation plan are visually reviewed.
  • Project metadata is complete for the intended document revision.
  • Self-check findings and coverage gaps are understood and assessed.

Further reading and official source

PlanElec takes you from floor plan to dossier. The installation work is the qualified electrician's responsibility; the official assessment is made by a recognized inspection body. You will find more guides in the help center and the full scope in the feature overview. With Try Pro for 1 month, one person can evaluate the full Pro editor and exports without masked areas; choose site pass or a subscription for continued use if needed. The terms are on the pricing page.

Which next step fits your task?

Try Pro for 1 month: for one person, without payment details or an automatic switch to a subscription. With a valid VAT number you start immediately; without one you request approval. The trial includes exports without masked areas; a confirmed account is required.

From the guide to your own electrical plan

Create a project and document circuits, cables and protective devices. Check the result against the actual installation.

Fictitious sample dossier, available without sign-up.