Blog

Tips, guides and news about electrical documentation and AREI regulations

Guide

LED Strip Calculation: Which Power Supply, How Many Feed Points, Which Cable Size?

Calculate power, current, power-supply size, feed points and feed cable for 12, 24 and 48 V LED strips. Formulas, tables, the RGBW case, AREI/RGIE rules for SELV and bathrooms, and a free calculator.

5 October 2026 9 min
Guide

AI assistant for electrical planning: what does the PlanElec assistant do in your project?

The PlanElec assistant carries out plain-language instructions across the whole project – from floor plan and circuits to the distribution board. Every change runs through the AREI/RGIE self-check and is a single undo step.

3 October 2026 9 min
Tutorial

How do you turn a PDF, scan or Trikker export into a floor plan – and a distribution board photo into modules?

PlanElec recognises walls, rooms, doors, windows and device symbols in a PDF, scan or Trikker export, and populates an empty distribution board from photos. You review the proposal and import it in one click.

3 October 2026 9 min
News

Trikker 2.0 for Mac: what the beta brings – and what PlanElec already does

Trikker 2.0 has been available as a beta for macOS since 30 September 2026. What is new, how to bring Trikker PDFs across with floor plan recognition and plan in the browser – on Mac, PC and tablet.

2 October 2026 8 min
News

What changes on 1 November 2026 for the sealing of residual current devices?

From 1 November 2026 the mandatory sealing of the RCD at the origin of a Belgian domestic installation disappears. What the Royal Decree of 13 August 2026 removes exactly, what stays unchanged, and what it means for inspection reports.

27 September 2026 9 min
Guide

Home Automation and KNX in the Electrical Installation: What Belongs on the Plan and the Single-Line Diagram?

A bus instead of strapping conductors: what a KNX installation shows on the single-line diagram and situation plan, what belongs in ETS and how PlanElec keeps the two apart – with the AREI/RGIE reference beside each statement.

25 September 2026 13 min
FAQ

Breaking capacity of an MCB: 3, 6 or 10 kA?

What 3 kA, 6 kA and 10 kA mean, the minimum values the AREI sets for domestic installations, what determines the short-circuit current at the point of installation, and how the figure reaches the single-line diagram.

21 September 2026 9 min
Tutorial

How do I use activity and the assistant in the studio?

Follow project changes and assistant tasks in the studio, check who requested each action, and give the PlanElec assistant instructions in your own words.

15 September 2026 4 min
Product update

From floor plan to installation and distribution board

The new installation tree connects existing devices, protection paths, distribution boards and documents in one planning workflow.

13 September 2026 4 min
Tutorial

Plan an installation and form distribution boards

Assign existing floor-plan devices, check protection paths and develop an electrical plan into distribution boards, cabinet layouts and a single-line diagram.

13 September 2026 9 min
Product update

PlanElec adds a new perspective: furniture, 3D views and lighting scenes

Furniture in your floor plan, side-by-side 2D and 3D views and an illustrative lighting preview: this update makes your project easy to see and discuss.

12 September 2026 4 min
Tutorial

Plan KNX: push buttons, channels and quantities

Assign two lights and two push buttons, document the power supply and bus line, and export an initial material list with an illustrated example.

12 September 2026 9 min
Guide

Bill of materials for an electrical installation: which items belong on it?

Seven item groups, how they derive from the single-line diagram and the situation plan, the items that are routinely forgotten — earthing material, boxes, cable allowance, spare ways — and where the AREI fixes a quantity and where it does not.

31 August 2026 13 min
Guide

Cable Routes and Lengths: How Do You Determine a Cable Length on an Electrical Plan?

Measure the route, not the straight line: installation zones under AREI 5.2.9.10, installation method, segments at junction boxes, allowances from trade practice, and when the AREI/RGIE requires the length on the diagram.

31 August 2026 12 min
Guide

Installation methods under the AREI: which entry belongs on the single-line diagram?

The installation method belongs on the single-line diagram. All seventeen methods from AREI 5.2.2.1, their rules in section 5.2.9, their effect on current-carrying capacity and typical inspection findings, with the article next to every statement.

31 August 2026 12 min
Guide

Electrical planning across several floors: does every storey need its own board?

When a sub-distribution board per floor earns its place, how to size and protect the riser, what the AREI/RGIE actually says about selectivity, and how storeys appear on the situation plan and the single-line diagram — with the article reference beside every statement.

31 August 2026 14 min
Guide

Two-Way, Intermediate or Double Switch: Which One Belongs on the Single-Line Diagram?

The number of control points decides the wiring arrangement. Symbols from Table 2.23, conductors per variant, referencing on the situation plan and the boundary with home automation — with the AREI/RGIE article beside each statement.

31 August 2026 11 min
Guide

AREI Electrical Symbols: Overview for Single-Line Diagram and Situation Plan

Which symbols AREI/RGIE Table 2.23 provides for Belgian domestic installations, when you introduce your own sign through the legend, and which data belongs next to every symbol on diagram and plan.

29 August 2026 9 min
Tutorial

Heat Pump on a Single-Line Diagram: Showing the Circuit and Equipment Correctly

Document the outdoor unit, indoor unit, backup heater, protection, cable and manufacturer data of a heat pump correctly under AREI Book 1 V06.

29 August 2026 10 min
Tutorial

Single-Line Diagram for a New Build: The AREI Checklist up to Inspection

What a new-build single-line diagram must contain: title block, supply, protective devices, cables, loads, sources and the match with the situation plan under AREI Book 1 V06.

29 August 2026 11 min
Guide

Single-Line Diagram vs. Situation Plan: Difference and Coordination

A single-line diagram shows the electrical structure; a situation plan shows where equipment sits. Shared circuit references turn the two Belgian AREI/RGIE records into one checkable dossier.

29 August 2026 9 min
Tutorial

Combining Solar PV and an EV Charger on a Single-Line Diagram

Draw the PV inverter, EV charger, dedicated circuits, protection, energy metering and possible reverse power flow correctly on one shared single-line diagram.

29 August 2026 11 min
Tutorial

Drawing Solar PV on a Situation Plan: Modules, Inverter and Cable Routes

Locate PV modules, inverter, fixed isolators, distribution boards and cable routes on the situation plan, using the same references as the single-line diagram.

29 August 2026 10 min
Guide

Synergrid C10/26 list: is my inverter on the list – and what if it is not?

What the Synergrid C10/26 list is, why grid operators require it, how to read reference, firmware, Smax and restrictions correctly – and how to check a device right in your browser.

26 August 2026 7 min
Comparison

Trikker alternative PlanElec: features and prices compared

PlanElec vs Trikker for Belgium: AI assistant, floor plan recognition from Trikker PDFs, single-line diagrams, situation plans, PV, KNX and PDF dossiers compared.

22 August 2026 10 min
Tutorial

Import and calibrate a floor plan

Use an image, PDF or DXF drawing as a scale-accurate reference, align the layer and draw the editable floor plan over it.

21 August 2026 9 min
Tutorial

Place and connect electrical symbols

Place devices at the right location, create shared cover frames and connect electrical symbols to the appropriate topology.

21 August 2026 8 min
Tutorial

Edit switch chains, circuits and cable routes

Keep lighting control, circuit assignment and the physical cable path separate, and use the appropriate tool for each step.

21 August 2026 9 min
Tutorial

What does PlanElec's AREI self-check verify?

The complete list of rules PlanElec checks automatically — and an equally explicit list of what the self-check does not assess.

17 August 2026 7 min
Guide

Voltage Drop Calculation: How Long Can Your Cable Be?

Calculate the voltage drop of your cable and see at which length a larger cross-section is needed. Formula, length table and free calculator for Belgium.

2 August 2026 8 min
Guide

Single-phase or three-phase? Belgian networks and building connections

1×230 V, 3×230 V or 3N~400/230 V: understand the Belgian street network, neutral conductor and connection phase count, and plan protection, EV charger and heat pump accordingly.

27 July 2026 12 min
Guide

Renovation and AREI: When Do You Need New Electrical Plans?

Which renovation triggers new plans and a conformity inspection: substantial and non-substantial alterations, modified and unchanged parts, old installations under Part 8 and the file obligation.

20 July 2026 12 min
Guide

What Can You Do with PlanElec? From Floor Plan to Installation Dossier

Floor plan, AI assistant, automatic circuit and board planning, single-line diagram, situation plan, self-check and PDF dossier: the feature overview with status and limits.

20 July 2026 9 min
Tutorial

Using and reviewing automatic planning

Use PlanElec proposals for devices, switch chains, cable routes, circuits, phases, and the distribution board without skipping technical review.

20 July 2026 9 min
Tutorial

Exporting documents and assembling a working dossier

See which PDFs PlanElec creates, which outputs are available or in pilot, and what to review before sharing or inspection.

20 July 2026 8 min
Tutorial

Getting started: from project to first export

Build a PlanElec project step by step: project details, floor plan, rooms, electrical devices, distribution board, diagram, and export.

20 July 2026 8 min
Guide

Getting Started with PlanElec: From Floor Plan to First Export

PlanElec step by step: create the project and floors, draw or recognise the floor plan, connect devices, fill the distribution board and export PDFs.

14 July 2026 12 min
FAQ

Dedicated Circuit Required: Which Appliances Need Their Own Breaker?

Washing machine, cooker, tumble dryer and anything rated 2600 W or more: the AREI requires a dedicated circuit. The complete list with references.

13 July 2026 4 min
FAQ

Is Surge Protection (SPD) Mandatory Under AREI?

AREI requires protection against overvoltages (section 4.5.1) but prescribes no specific SPD type. What that means for your distribution board, existing installations and PV.

6 July 2026 4 min
Guide

Electrical Dossier for a Property Sale in 2026: Rules and Records

Which electrical inspection is mandatory when you sell in Belgium, what goes into the installation file and when the 18-month deadline applies – per AREI/RGIE Book 1 V06, with references.

29 June 2026 10 min
Guide

10 Important AREI Inspection Points: Identify, Avoid and Correct Them

Ten points where Belgian domestic installations often stumble at inspection – with limit values, AREI references and the right correction for each one.

20 June 2026 9 min
Guide

Electrical Inspection Failed – What Now? Step by Step to the Re-Inspection

Your electrical inspection came back negative? Read the report, identify the applicable AREI deadline, plan safe corrections and prepare the re-inspection.

16 June 2026 8 min
FAQ

Smart Home and AREI: What You Need to Know About Home Automation

Does a smart home installation have to meet the AREI/RGIE? The fixed electrical installation does. What is allowed, what goes on the single-line diagram and what the inspection checks.

9 June 2026 4 min
Guide

Home Battery and AREI: Correctly Integrating Battery Storage into Your Electrical Installation

How do you install a home battery under the AREI? This guide covers circuit, isolation point, single-line diagram, backup operation and grid operator registration.

2 June 2026 11 min
FAQ

Smoke Detectors Mandatory in Belgium: Flanders, Wallonia, Brussels

Yes, smoke detectors are mandatory in all three regions – under regional housing law, not AREI. Number, placement and start dates for Flanders, Wallonia and Brussels.

28 May 2026 4 min
Guide

EV Charger Installation According to AREI: The Complete Guide for Belgium

AREI/RGIE requirements for your EV charger in Belgium: dedicated circuit per connection point, RCD and DC fault-current protection, cable design, documentation and grid questions.

25 May 2026 9 min
Comparison

Cost Comparison: Drawing Your Single-Line Diagram Yourself vs. Hiring an Electrician

Single-line diagram yourself with PlanElec or by an electrician? Three scenarios for an existing installation, an unknown old installation and a new build, a quotation check and a clear decision rule for Belgium.

19 May 2026 6 min
Comparison

PlanElec vs. Excel & Paper: Why Digital Single-Line Diagrams Are Better

Single-line diagram with PlanElec, Excel or on paper: what the AREI/RGIE requires, where drawings and spreadsheets hit their limits and what PlanElec checks automatically.

5 May 2026 6 min
Guide

PV single-line diagrams in Belgium: documentation for electrical contractors

Document a Belgian PV extension properly: align strings, inverter, connection point and unresolved data across the single-line diagram, situation plan and dossier.

21 April 2026 6 min
Guide

Old Buildings and AREI Part 8: Special Rules for Existing Installations

What applies to older electrical installations in Belgium: part 8 of the AREI/RGIE with the key derogations, the duties without exception, control visits and step-by-step modernisation.

14 April 2026 10 min
Guide

Distribution Board Planning: Layout and Sizing According to AREI/RGIE

Plan a distribution board under the AREI/RGIE: main switch, 300 mA and 30 mA RCDs, at most 8 circuits per 30 mA RCD, row allocation, spare capacity and a complete example for a single-family home.

7 April 2026 13 min
Guide

Draw a Situation Plan: Step-by-Step Guide According to AREI/RGIE

How to draw a checkable situation plan under AREI/RGIE: floor plan, Table 2.23 symbols, circuit references matching the single-line diagram, legend, title block and a final site check.

30 March 2026 12 min
FAQ

Preflex vs. Open Wiring: Which Cable Method for Your Project?

Preflex conduit or XVB installed directly? Comparison for new builds and renovations in Belgium, with the AREI/RGIE rules on conduits, fire classes and installation zones.

27 March 2026 4 min
FAQ

RCD Type A or Type B? The AREI Rule in 2026

In Belgian homes every RCD is at least Type A. When you need Type B or Type A with RDC-DD – EV charger, heat pump, PV – and why A-SI does not mean selective.

25 March 2026 8 min
FAQ

Is a Main Switch Mandatory? What AREI Requires

Yes: every main distribution board needs a main switch-disconnector that breaks all line conductors at once – at least 40 A in homes (AREI 5.3.5.1(b)). All requirements at a glance.

23 March 2026 4 min
FAQ

TT or TN-S Earthing? The Difference Under AREI (2026)

TT or TN-S decides the fault-current path and the disconnection condition. Formulas, local earth electrode below 100 Ω and the 30 Ω rule for Belgian homes under AREI Book 1 V06.

20 March 2026 8 min
FAQ

Cable Cross-Section per Circuit Breaker: Which Cable for Which Protection?

Which cable cross-section for a 16, 20 or 32 A breaker in Belgium? AREI/RGIE Table 4.11, minimum sizes for socket circuits and what else you need to check.

18 March 2026 7 min
FAQ

XVB cable or VOB wire: differences and choice in Belgium

XVB or VOB? Where AREI/RGIE lets you install sheathed cable and single-core wire, which fire class applies and how to compare costs properly.

16 March 2026 5 min
FAQ

What Does the Inspector Check During an Electrical Inspection?

Documents, visual checks, tests, measurements: point by point, what the inspector checks and measures during an electrical inspection in Belgium – with limit values and AREI references.

13 March 2026 5 min
FAQ

How Many Sockets per Circuit? The AREI Rule

At most 8 sockets per final circuit, and a multiple socket counts as one: how to count, choose cable and breaker, and plan lighting and dedicated circuits under the AREI.

11 March 2026 4 min
FAQ

Which Cables Can I Use in the Bathroom? (AREI Zones)

XVB or VOB in conduit, with no metal elements: which wiring is allowed in bathroom zones 0, 1 and 2, how to install it and which RCD the bathroom needs.

9 March 2026 6 min
FAQ

What Is a Situation Plan?

A situation plan shows where the electrical components in your building are located. What AREI/RGIE requires on it, how it links to the single-line diagram and what the inspection checks.

6 March 2026 4 min
FAQ

A 30 mA RCD for Every Socket? The AREI Rule (2026)

No: AREI requires neither a 30 mA RCD per socket nor one per circuit. One 30 mA RCD protects up to eight final circuits – here is how to count, for new and existing installations.

4 March 2026 7 min
Guide

How Much Does an Electrical Plan Cost? Cost Factors 2026

What drives the price of a Belgian electrical plan, how to compare quotations with an editable calculation model and what PlanElec costs during early access and after the paid plans start.

19 February 2026 11 min
Guide

Electrical Inspection in Belgium: Booking, Re-inspection and AREI Requirements

Booking an electrical inspection with an approved body: how long it stays valid, when a re-inspection is needed, what drives the cost and what the inspector checks – with AREI references.

8 January 2026 13 min
Tutorial

Creating a Single-Line Diagram: Step by Step under AREI/RGIE

How to create and draw a reviewable Belgian single-line diagram: required information, Table 2.23 symbols, an example, solar PV, circuit references and PDF export with PlanElec.

5 January 2026 15 min
News

AREI/RGIE Regulations 2026: The Key Changes

What changed in the Belgian AREI/RGIE on 1 April 2026, what follows on 1 November 2026, and how to assess the consequences for design, documentation and inspection.

2 January 2026 11 min
More articles coming soon

Subscribe to Newsletter

Get the latest articles and updates directly in your inbox.