
Power to the garden shed or garage: how do I plan and draw the buried cable and sub-board under the AREI/RGIE?
Buried cable at least 0.60 m deep or mechanically protected, sub-board labelled and shown on the situation plan, degree of protection according to water: how to plan the supply of a garden shed, garage or carport under the Belgian AREI/RGIE and draw it in PlanElec Sketch.






